Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000

Overview of the Collection

Creator
Washington State University. Facilities Development
Title
Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218
Dates
circa 1993-2000 (inclusive)
Quantity
2 Linear feet of shelf space, (2 Boxes)
Collection Number
UA2001-14 (collection)
Summary
Contracts, building plans, and financial documents related to small-project construction related to WSU from 1993-2000.
Repository
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu
Access Restrictions

This collection is open and available for research use.

Languages
English

Historical NoteReturn to Top

The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.

Content DescriptionReturn to Top

All folders contain correspondence, financial documents, and contracts related to various small projects for WSU. Projects include (but are not limited to) a protection plan for the Pullman Campus water system, an air conditioning system for the WSU Childcare Center, and the moving of the victory bell to the alumni center. All files range from around 1993-2000.

Use of the CollectionReturn to Top

Restrictions on Use

Copyright restrictions apply.

Preferred Citation

[Item description]

Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000 (UA2001-14)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Administrative InformationReturn to Top

Arrangement

This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.

Box 1 contains contracts 11339-12941. Box 2 contains contracts 12948-14218. All files are contains in black two-pocket files and are ordered chronologically.

Location of Collection

(MASC STAFF USE) 4-02-22-3

Acquisition Information

This material was transferred to WSU Libraries' MASC by Rick Ward of Facilities on November 08, 2001 and retained as UA2001-14.

Detailed Description of the CollectionReturn to Top

Container(s) Description
contract log
11339 48269 Continuing electrical engineering services
Contractor: E3 Elliott Electrical Engineering
12363 127403 Beasley coliseum Locker Room Renovation for Men's
Contractor: RRACO., Inc
12485 119209 Prep. of Wellhead Protection Program Plan
Contractor: Thomas, Dean & Hoskins, Inc.
12546 148547 Fulmer Annex Rooms 142, 144, 147, 147A, and 148A
Contractor: Klemo Construction
12645 146277 WSU Child Care Facility Add Air Conditiong
Contractor: Palouse Empire, Inc
12655 119104 Deionized Water Production Facility and Sheet Metal
Contractor: Mike Coman Construction
12662 111883 Stadium way Reconstruction Johnson Rd to Grimes
Contractor: E3 Elliott Electrical Engineering
12691 155969 Deionized Water Production Facility and Sheet Metal
Contractor: Mike Coman Construction
12694 134509 WSU Campus Sewer Plan Phase 2
Contractor: Motley-Motley, Inc
12733 119104 Provide Special inspection for deionized water
Contractor: Strata
12737 162901 Structural Evaluation of Wooden Bleachers @ Martin
Contractor: Coffman Engineers, Inc
12904 175022 Amend Air Operating Permit Add Radionuclides
Contractor: Wieland Lindgren
12920 157179 Daggy Hall Restoration of Theatre Stage Floor Room
Contractor: Talisman Construction Services
12941 103926 Parking Lot #1 Lighting Improvements
Contractor: Twin City Electricians, Inc
12948 175884 Alumni Centre Placement Victory Bell
Contractor: NW Architectural Company
12955 141351 Provide Material Testing & Special Inspection
Contractor: Strata
12956 140536 Provide Material Testing & Special Inspection
Contractor: Strata
13002 173097 Roadway and Parking Lot Crack Sealing and Seal
Contractor: Asphalt Products, Inc
13022 179485 Compost Facility Storm Water Storage Pond
Contractor: MunirDaud & Assoc.
13085 Testing, Evaluating, and Recommendation for Corrective
Contractor: Oceaneering Remote Intervention
log
13087 184483 Remove Buried Fuel Tank@ Fieldhouse
Contractor: Olympus Environmental
13146 182348 Smith Gym Replacement of Pedestrian
Contractor: NW Architectural Company
13168 47985 Machine Room Fire System Replacement- Information
Contractor: M&M Harrison Electric Co.
13185 190617 Environmental Survey & Special Inspections
Contractor: EMCON
13212 190499 Install Fiber Optic Cable Between Various Buildings
Contractor: E3 Elliott Electrical Engineering
13230 92309 Markley Services Complex: New Gravel Storage
Contractor: PBI Construction, Inc
13243 172903 Dana Hall- Remodel Rooms 103-124
Contractor: Tee Construction, Inc
13569 202708 Martin Stadium- Replace Artificial Turf System
Contractor: Motley-Motley, Inc.
14218 139855 Dana Hall - Isolate Building Non- potable Water
Contractor: 3-H Mechanical, Inc