Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000
Table of Contents
- Overview of the Collection
-
Historical Note
- Content Description
- Use of the Collection
- Administrative Information
-
Detailed Description of the Collection
- Continuing electrical engineering services
- Beasley coliseum Locker Room Renovation for Men's
- Prep. of Wellhead Protection Program Plan
- Fulmer Annex Rooms 142, 144, 147, 147A, and 148A
- WSU Child Care Facility Add Air Conditiong
- Deionized Water Production Facility and Sheet Metal
- Stadium way Reconstruction Johnson Rd to Grimes
- Deionized Water Production Facility and Sheet Metal
- WSU Campus Sewer Plan Phase 2
- Provide Special inspection for deionized water
- Structural Evaluation of Wooden Bleachers @ Martin
- Amend Air Operating Permit Add Radionuclides
- Daggy Hall Restoration of Theatre Stage Floor Room
- Parking Lot #1 Lighting Improvements
- Alumni Centre Placement Victory Bell
- Provide Material Testing & Special Inspection
- Provide Material Testing & Special Inspection
- Roadway and Parking Lot Crack Sealing and Seal
- Compost Facility Storm Water Storage Pond
- Testing, Evaluating, and Recommendation for Corrective
- Remove Buried Fuel Tank@ Fieldhouse
- Smith Gym Replacement of Pedestrian
- Machine Room Fire System Replacement- Information
- Environmental Survey & Special Inspections
- Install Fiber Optic Cable Between Various Buildings
- Markley Services Complex: New Gravel Storage
- Dana Hall- Remodel Rooms 103-124
- Martin Stadium- Replace Artificial Turf System
- Dana Hall - Isolate Building Non- potable Water
- Names and Subjects
Overview of the Collection
- Creator
- Washington State University. Facilities Development
- Title
- Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218
- Dates
- circa 1993-2000 (inclusive)19932000
- Quantity
- 2 Linear feet of shelf space, (2 Boxes)
- Collection Number
- UA2001-14 (collection)
- Summary
- Contracts, building plans, and financial documents related to small-project construction related to WSU from 1993-2000.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content Description
All folders contain correspondence, financial documents, and contracts related to various small projects for WSU. Projects include (but are not limited to) a protection plan for the Pullman Campus water system, an air conditioning system for the WSU Childcare Center, and the moving of the victory bell to the alumni center. All files range from around 1993-2000.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000 (UA2001-14)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Box 1 contains contracts 11339-12941. Box 2 contains contracts 12948-14218. All files are contains in black two-pocket files and are ordered chronologically.
Detailed Description of the Collection
-
Description: Continuing electrical engineering services
Contractor: E3 Elliott Electrical Engineering
Container: Contract 11339, Log 48269 -
Description: Beasley coliseum Locker Room Renovation for Men's
Contractor: RRACO., Inc
Container: Contract 12363, Log 127403 -
Description: Prep. of Wellhead Protection Program Plan
Contractor: Thomas, Dean & Hoskins, Inc.
Container: Contract 12485, Log 119209 -
Description: Fulmer Annex Rooms 142, 144, 147, 147A, and 148A
Contractor: Klemo Construction
Container: Contract 12546, Log 148547 -
Description: WSU Child Care Facility Add Air Conditiong
Contractor: Palouse Empire, Inc
Container: Contract 12645, Log 146277 -
Description: Deionized Water Production Facility and Sheet Metal
Contractor: Mike Coman Construction
Container: Contract 12655, Log 119104 -
Description: Stadium way Reconstruction Johnson Rd to Grimes
Contractor: E3 Elliott Electrical Engineering
Container: Contract 12662, Log 111883 -
Description: Deionized Water Production Facility and Sheet Metal
Contractor: Mike Coman Construction
Container: Contract 12691, Log 155969 -
Description: WSU Campus Sewer Plan Phase 2
Contractor: Motley-Motley, Inc
Container: Contract 12694, Log 134509 -
Description: Provide Special inspection for deionized water
Contractor: Strata
Container: Contract 12733, Log 119104 -
Description: Structural Evaluation of Wooden Bleachers @ Martin
Contractor: Coffman Engineers, Inc
Container: Contract 12737, Log 162901 -
Description: Amend Air Operating Permit Add Radionuclides
Contractor: Wieland Lindgren
Container: Contract 12904, Log 175022 -
Description: Daggy Hall Restoration of Theatre Stage Floor Room
Contractor: Talisman Construction Services
Container: Contract 12920, Log 157179 -
Description: Parking Lot #1 Lighting Improvements
Contractor: Twin City Electricians, Inc
Container: Contract 12941, Log 103926 -
Description: Alumni Centre Placement Victory Bell
Contractor: NW Architectural Company
Container: Contract 12948, Log 175884 -
Description: Provide Material Testing & Special Inspection
Contractor: Strata
Container: Contract 12955, Log 141351 -
Description: Provide Material Testing & Special Inspection
Contractor: Strata
Container: Contract 12956, Log 140536 -
Description: Roadway and Parking Lot Crack Sealing and Seal
Contractor: Asphalt Products, Inc
Container: Contract 13002, Log 173097 -
Description: Compost Facility Storm Water Storage Pond
Contractor: MunirDaud & Assoc.
Container: Contract 13022, Log 179485 -
Description: Testing, Evaluating, and Recommendation for Corrective
Contractor: Oceaneering Remote Intervention
Container: Contract 13085 -
Description: Remove Buried Fuel Tank@ Fieldhouse
Contractor: Olympus Environmental
Container: Contract 13087, Log 184483 -
Description: Smith Gym Replacement of Pedestrian
Contractor: NW Architectural Company
Container: Contract 13146, Log 182348 -
Description: Machine Room Fire System Replacement- Information
Contractor: M&M Harrison Electric Co.
Container: Contract 13168, Log 47985 -
Description: Environmental Survey & Special Inspections
Contractor: EMCON
Container: Contract 13185, Log 190617 -
Description: Install Fiber Optic Cable Between Various Buildings
Contractor: E3 Elliott Electrical Engineering
Container: Contract 13212, Log 190499 -
Description: Markley Services Complex: New Gravel Storage
Contractor: PBI Construction, Inc
Container: Contract 13230, Log 92309 -
Description: Dana Hall- Remodel Rooms 103-124
Contractor: Tee Construction, Inc
Container: Contract 13243, Log 172903 -
Description: Martin Stadium- Replace Artificial Turf System
Contractor: Motley-Motley, Inc.
Container: Contract 13569, Log 202708 -
Description: Dana Hall - Isolate Building Non- potable Water
Contractor: 3-H Mechanical, Inc
Container: Contract 14218, Log 139855
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Development -- Records and correspondence