Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000
Overview of the Collection
- Creator
- Washington State University. Facilities Development
- Title
- Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218
- Dates
- circa 1993-2000 (inclusive)19932000
- Quantity
- 2 Linear feet of shelf space, (2 Boxes)
- Collection Number
- UA2001-14 (collection)
- Summary
- Contracts, building plans, and financial documents related to small-project construction related to WSU from 1993-2000.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content DescriptionReturn to Top
All folders contain correspondence, financial documents, and contracts related to various small projects for WSU. Projects include (but are not limited to) a protection plan for the Pullman Campus water system, an air conditioning system for the WSU Childcare Center, and the moving of the victory bell to the alumni center. All files range from around 1993-2000.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Development Contracts 11339-14218, circa 1993-2000 (UA2001-14)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Box 1 contains contracts 11339-12941. Box 2 contains contracts 12948-14218. All files are contains in black two-pocket files and are ordered chronologically.
Detailed Description of the CollectionReturn to Top
Container(s) | Description | |
---|---|---|
contract | log | |
11339 | 48269 | Continuing electrical
engineering services Contractor: E3 Elliott Electrical Engineering
|
12363 | 127403 | Beasley coliseum Locker Room Renovation for
Men's Contractor: RRACO., Inc
|
12485 | 119209 | Prep. of Wellhead
Protection Program Plan Contractor: Thomas, Dean & Hoskins, Inc.
|
12546 | 148547 | Fulmer Annex Rooms 142, 144,
147, 147A, and
148A Contractor: Klemo Construction
|
12645 | 146277 | WSU Child Care Facility Add Air
Conditiong Contractor: Palouse Empire, Inc
|
12655 | 119104 | Deionized Water Production Facility
and Sheet Metal Contractor: Mike Coman Construction
|
12662 | 111883 | Stadium way Reconstruction
Johnson Rd to Grimes Contractor: E3 Elliott Electrical Engineering
|
12691 | 155969 | Deionized Water
Production Facility and Sheet Metal Contractor: Mike Coman Construction
|
12694 | 134509 | WSU Campus Sewer Plan Phase 2 Contractor: Motley-Motley, Inc
|
12733 | 119104 | Provide Special inspection for
deionized water Contractor: Strata
|
12737 | 162901 | Structural Evaluation of Wooden Bleachers
@ Martin Contractor: Coffman Engineers, Inc
|
12904 | 175022 | Amend Air
Operating Permit Add Radionuclides Contractor: Wieland Lindgren
|
12920 | 157179 | Daggy Hall Restoration of Theatre Stage Floor
Room Contractor: Talisman Construction Services
|
12941 | 103926 | Parking Lot #1
Lighting Improvements Contractor: Twin City Electricians, Inc
|
12948 | 175884 | Alumni Centre Placement Victory
Bell Contractor: NW Architectural Company
|
12955 | 141351 | Provide Material Testing & Special Inspection Contractor: Strata
|
12956 | 140536 | Provide Material Testing & Special
Inspection Contractor: Strata
|
13002 | 173097 | Roadway and Parking Lot Crack Sealing and Seal Contractor: Asphalt Products, Inc
|
13022 | 179485 | Compost Facility
Storm Water Storage Pond Contractor: MunirDaud & Assoc.
|
13085 | Testing, Evaluating, and Recommendation
for Corrective Contractor: Oceaneering Remote Intervention
|
|
log | ||
13087 | 184483 | Remove Buried Fuel Tank@
Fieldhouse Contractor: Olympus Environmental
|
13146 | 182348 | Smith Gym Replacement of Pedestrian Contractor: NW Architectural Company
|
13168 | 47985 | Machine Room Fire System Replacement-
Information Contractor: M&M Harrison Electric Co.
|
13185 | 190617 | Environmental
Survey & Special Inspections Contractor: EMCON
|
13212 | 190499 | Install Fiber Optic Cable Between
Various Buildings Contractor: E3 Elliott Electrical Engineering
|
13230 | 92309 | Markley Services Complex: New Gravel Storage Contractor: PBI Construction, Inc
|
13243 | 172903 | Dana Hall- Remodel Rooms 103-124 Contractor: Tee Construction, Inc
|
13569 | 202708 | Martin Stadium- Replace Artificial Turf System Contractor: Motley-Motley, Inc.
|
14218 | 139855 | Dana Hall - Isolate Building Non-
potable Water Contractor: 3-H Mechanical, Inc
|