Preliminary Guide to the Washington State University Facilities Development Contracts 14372-16330, 2007
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Development
- Title
- Preliminary Guide to the Washington State University Facilities Development Contracts 14372-16330
- Dates
- 2007 (inclusive)20072007
- Quantity
- 9.25 Linear feet of shelf space, (9 Boxes + 1 Map Tube)
- Collection Number
- UA2007-06 (collection)
- Summary
- Financial contracts related to small-scale construction projects on the WSU campuses and owned property circa 2007.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
'The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
Contains financial contracts related to several small-scale projects on the WSU campuses and owned property. Notable projects include the Creamery Annex Addition and several modernization efforts in buildings on the WSU campus from circa 2007.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Development Contracts 14372-16330, 2007 (UA2007-06)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Boxes 1-4 contain contracts 14372-15921. Boxes 5-9 contain contracts 15957-16330.
Detailed Description of the Collection
-
Box 1
-
Description: Design Will No. 8Dates: FY 2008Container: Contract 14372, Log 251596
-
Description: Daggy Parking Garage RehabilitationDates: FY 2007Container: Contract 14983, Log 283158
-
Description: McCoy Hall - Multi-Purpose Rms 148 & 149Dates: FY 2007Container: Contract 15023, Log 285256
-
Description: Emergency Response to Hazardous SpillsDates: FY 2008Container: Contract 15066, Log 292092
-
Description: Safety Building - Replace Central Fire Reporting System - RebidDates: FY 2007Container: Contract 15143, Log 144523
-
Description: Clark Hall - Fire Sprinkler SystemDates: FY 2007Container: Contract 15211, Log 295868
-
Description: Final Arts Garage RepairsDates: FY 2007Container: Contract 15229, Log 296809
-
Description: College Ave Steam Plant Temp Op & MaintDates: FY 2007Container: Contract 15230, Log N/A
-
Description: Remediation at Knott DairyDates: FY 2007Container: Contract 15232, Log 292190
-
Description: Remediate Contamination at Spillman FarmDates: FY 2007Container: Contract 15233, Log 292618
-
Description: Perform Substantial & Disproportionate Analysis at Long Beach WashingtonDates: FY 2007Container: Contract 15244, Log 259984
-
Description: Remediate Contamination - Plant Pathology Shed #3Dates: FY 2007Container: Contract 15301, Log 299552
-
Description: Bailey Field - Install Field Turf- TestingDates: FY 2007Container: Contract 15323, Log 280791
-
Description: Albrook Lab - Fire Sprinkler SystemDates: FY 2007Container: Contract 15426, Log 293992
-
Description: Cleveland Hall - Fire Sprinkler SystemDates: FY 2008Container: Contract 15427, Log 294000
-
Description: Murrow Hall - Fire Sprinkler SystemDates: FY 2007Container: Contract 15428, Log 294007
-
Description: Goldsworthy Hall West Stairwell - Design RepairDates: FY 2007Container: Contract 15433, Log 286570A
-
Description: McCoy Hall - Multi-Purpose Classroom in 148 & 149Dates: FY 2007Container: Contract 15434, Log 285256
-
Description: Stock Pavilion - Remodel Interior of BuildingDates: FY 2007Container: Contract 15435, Log 299936
-
Description: ETRL Cleanroom/Lab Room 2Dates: FY 2007Container: Contract 15438, Log 295573
-
Description: Eastlick Half BSL -3Dates: FY 2007Container: Contract 15439, Log 303339
-
Description: Commons Hall - Install Central HVAC in BuildingDates: FY 2007Container: Contract 15456, Log 303073
-
Description: Stock Pavilion - Remodel Interior of BuildingDates: FY 2007Container: Contract 15501, Log 299936
-
Description: Fine Arts - Sprinkler SystemDates: FY 2007Container: Contract 15511, Log 294004
-
Description: Bryan Hall - Sprinkler SystemDates: FY 2008Container: Contract 15512, Log 293995
-
Description: Salvage 165B & Construct Storage BldgDates: FY 2007Container: Contract 15513, Log 296586
-
Description: WSU Wenatchee - Tree Fruit ResearchDates: FY 2007Container: Contract 15587, Log 309228
-
Description: 165 B Storage BuildingDates: FY 2007Container: Contract 15588, Log 296586
-
Description: WSU Prosser Rehabilitate Well #3Dates: FY 2007Container: Contract 15589, Log 295870
-
Description: Utility Tunnel RehabDates: FY 2008Container: Contract 15603, Log 266683
-
Description: Construct Exterior Sports Act - Construction InspectDates: FY 2007Container: Contract 15623, Log 280807
-
-
Box 2
-
Description: Elevator Modernization - Clark Hall, Info Tech Bldg & FulmerDates: FY 2007Container: Contract 15624, Log 305209
-
Description: Chilled water Lines to Regents HallDates: FY 2007Container: Contract 15625, Log 299692
-
Description: New Filing Cabinet Sys in Lighty & French AdDates: FY 2007Container: Contract 15711, Log NO Log
-
Description: Construct Cleanroom in ETRL Rm 2 - Electrical Design SvcsDates: FY 2008Container: Contract 15717, Log 295573
-
Description: SRC - Back Yard Project - LightingDates: FY 2007Container: Contract 15735, Log 280807
-
Description: WSU Prosser - 3rd Party Oversight of AsbestosDates: FY 2007Container: Contract 15759, Log 314724
-
Description: Study HVAC Interaction at Engineering ComplexDates: FY 2007Container: Contract 15760, Log 313554
-
Description: Wilson Hall - Exterior Renovation of Exterior Terra Cotta CorniceDates: FY 2007Container: Contract 15770, Log 310357
-
Description: Construct Exterior Sports Courts@ SRC - Geotech SvcsDates: FY 2007Container: Contract 15775, Log 280807
-
Description: Facilities Operations Code Review ServicesDates: FY 2008Container: Contract 15872, Log No Log
-
Description: SEL Equipment Installation and Data IntegrationDates: FY 2007Container: Contract 15891, Log 295869
-
Description: Asbestos Good Faith Survey for Daggy HallDates: FY 2007Container: Contract 15894, Log 294003
-
Description: Perform Traffic Study on WSU Pullman CampusDates: FY 2007Container: Contract 15911, Log 318990
-
Description: Replace Steam Boilers - Research ParkDates: FY 2008Container: Contract 15913, Log 313816
-
Description: Bustad Hall - Modify Rms. 212 & 214 into Multimedia ClassroomDates: FY 2008Container: Contract 15941, Log 318305
-
Description: Smith Gym - Repair Swimming Fool Floor to Stop LeakDates: FY 2007Container: Contract 15978, Log 312129
-
Description: Creamery Annex - Construction Refrigerated StorageDates: FY 2008Container: Contract 15953, Log 317357
-
Description: WSU Prosser Re-Roof Hamilton Hall BuildingDates: FY 2007Container: Contract 16082, Log 319879
-
Description: Bohler Gym - Construct Rowing TankDates: FY 2008Container: Contract 16089, Log 310066
-
Description: WSU Pullman - 40 Scale Map UpgradeDates: FY 2007Container: Contract 16101, Log 218155
-
Description: Asbestos 3rd Party Oversight and Air MonitoringDates: FY 2008Container: Contract 16124, Log 314724
-
Description: Food Quality Building - Structural Review for Door OpeningDates: FY 2008Container: Contract 16126, Log 322709
-
Description: Fine Arts, New Library & Smith Gym Parking Garage - Perform Chloride Ion Concentration StudyDates: FY 2008Container: Contract 16153, Log 319120
-
Description: Fine Arts, New Library & Smith Gym Parking Garage - Perform Chloride Ion Concentration StudyDates: FY 2008Container: Contract 16153, Log 319123
-
Description: Fine Arts, New Library & Smith Gym Parking Garage - Perform Chloride Ion Concentration StudyDates: FY 2008Container: Contract 16153, Log 321479
-
Description: Creamery Annex Addition - Construction Materials TestingDates: FY 2008Container: Contract 16195, Log 317357
-
Description: Todd Hall - Remodel Rooms 270 and 277Dates: FY 2008Container: Contract 16237, Log 317044
-
Description: Hamilton Hall - Asbestos Third Party Contractor OversightDates: FY 2008Container: Contract 16240, Log 319879
-
Description: Commons Hall - Remediate Lead Contaminated Soil Around Exterior of BuildingDates: FY 2008Container: Contract 16247, Log 323350
-
Description: Bustad Hall - Modify Rooms 211 & 214 into Multimedia Classroom CompletionDates: FY 2008Container: Contract 16250, Log 316151
-
Description: Physical Education Building - Good Faith Lead And Asbestos ReportDates: FY 2008Container: Contract 16304, Log 294008
-
Description: Beasley Coliseum - Good Faith Report for the Retrofit Fire System ProjectDates: FY 2008Container: Contract 16312, Log 293994
-
Description: Repair, Resurface ad Reconstruct Parking Lots - 2005Dates: FY 2008Container: Contract 16322, Log 323141
-
Description: Murrow West - Develop Master Plan for Studio ADates: FY 2008Container: Contract 16421, Log 325225
-
Description: Consolidated Storage BuildingDates: FY 2008Container: Contract 16410, Log 318390
-
Description: Bailey Field - Construction Material TestingDates: FY 2008Container: Contract 16495, Log 318921
-
-
Box 3
-
Description: Resurface and Rehabilitate Parking Structure - Daggy HallDates: FY 2008Container: Contract 15153, Log 293158
-
Description: Commons Hall - HVAC RemodelDates: FY 2008Container: Contract 15677, Log 303073
-
Description: Goldsworthy Hall - West Stairwell RenovationDates: FY 2008Container: Contract 15768, Log 286570C
-
Description: Cleveland Hall - Life Safety EnhancementDates: FY 2008Container: Contract 15777, Log 294000
-
-
Box 4
-
Description: Lighty Student Services Building - Remodel Room 270Dates: FY 2008Container: Contract 15883, Log 307918
-
Description: Regents Hall Dining Center - Install Chilled Water LinesDates: FY 2008Container: Contract 15912, Log 299692
-
Description: Engineering, Teaching & Research Laboratory Building - Construct Cleanroom in Room 2Dates: FY 2008Container: Contract 15920, Log 295573
-
Description: Bryan Hall - Fire Safety ImprovementsDates: FY 2008Container: Contract 15921, Log 293995
-
-
Box 5
-
Description: WSU Mt. Vernon Research and Ext. Center - Upgrade Campus Electrical SystemsDates: FY 2008Container: Contract 15957, Log 311821
-
Description: Fulmer Annex and Clark Hall - ElevatorDates: FY 2008Container: Contract 15992, Log 293900
-
Description: Fulmer Annex and Clark Hall - ElevatorDates: FY 2008Container: Contract 15992, Log 305209
-
Description: French Administration Bldg - Remodel Suite 240Dates: FY 2008Container: Contract 16011, Log 317340
-
Description: Prosser - Upgrade Steam LinesDates: FY 2008Container: Contract 16019, Log 308895
-
-
Box 6
-
Description: Tri-Cities East Bldg - Remodel RestroomsDates: FY 2008Container: Contract 16068, Log 299395
-
Description: Tri-Cities East Bldg - Remodel Rm 113Dates: FY 2008Container: Contract 16069, Log 296954
-
Description: WSU Steam Tunnel Renovation - Grimes WayDates: FY 2008Container: Contract 16081, Log 266683
-
Description: Van Doren Hall - Install New Exterior Doors & WindowsDates: FY 2008Container: Contract 16100, Log 323160
-
Description: Upgrade Exterior Light FixturesDates: FY 2008Container: Contract 16102, Log 306656
-
-
Box 7
-
Description: Information Tech Bldg - Elevator ModernizationDates: FY 2008Container: Contract 16110, Log 254612
-
Description: Knott Dairy - Upgrade Electrical ServiceDates: FY 2008Container: Contract 16112, Log 321960
-
Description: Murrow East - Remodel Various Rooms in Suites 102, 106 &107Dates: FY 2008Container: Contract 16117, Log 307679
-
Description: Bustad Hall - Modify Rooms 212 & 214 into a Multimedia ClassroomDates: FY 2008Container: Contract 16129, Log 316151
-
Description: President's Residence Patio ExtensionDates: FY 2008Container: Contract 16169, Log 315129
-
-
Box 8
-
Description: Creamery Annex AdditionDates: FY 2008Container: Contract 16176, Log 317357
-
Description: Phys. Ed Bldg/Smith Gym - Plumb Swimming Pool Wastewater Systems to Sanitary SewerDates: FY 2008Container: Contract 16177, Log 319646
-
Description: Todd Hall - Modify Walls, Floors & Doors in 101Dates: FY 2008Container: Contract 16194, Log 315513
-
Description: Repair, Resurface & Reconstruct Parking Lots - 2005Dates: FY 2008Container: Contract 16227, Log 323141
-
Description: Eastlick Hall - Remodel Labs 274, 274A, 270 & 270ADates: FY 2008Container: Contract 16228, Log 317474
-
Description: McCoy Hall - Improve Cooling HVAC in Rms 148, 149, 150 & 184Dates: FY 2008Container: Contract 16230, Log 311884
-
-
Box 9
-
Description: McAllister hall - Remodel Interior of 1st & 2nd FloorsDates: FY 2008Container: Contract 16236, Log 319110
-
Description: WSU Prosser - Re-Roof Hamilton Hall BuildingDates: FY 2008Container: Contract 16249, Log 319879
-
Description: Knott Dairy - Provide Site Work & Utilities for Digester EquipmentDates: FY 2008Container: Contract 16266, Log 319863
-
Description: Trillium Apartments - New Vinyl Siding and Window ReplacementDates: FY 2008Container: Contract 16330, Log 313076
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Development -- Records and correspondence