View XML QR Code

Preliminary Guide to the Washington State University Capital Planning and Development Contracts 17740-19396, 2012

Overview of the Collection

Creator
Washington State University. Capital Planning and Development
Title
Preliminary Guide to the Washington State University Capital Planning and Development Contracts 17740-19396
Dates
2012 (inclusive)
Quantity
4 Linear feet of shelf space, (4 Boxes)
Collection Number
UA2012-11 (collection)
Summary
Financial contracts related to small-scale construction projects on the WSU campuses and owned property circa 2012.
Repository
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu
Access Restrictions

This collection is open and available for research use.

Languages
English
Return to Top

Historical Note

A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning (later Capital Planning and Development). While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.

Return to Top

Content Description

Contains financial contracts related to several small-scale projects on the WSU campuses and owned property. Notable projects include renovations to the WSU Childrens Center and additions to Todd Hall circa 2012.

Return to Top

Use of the Collection

Restrictions on Use

Copyright restrictions apply.

Preferred Citation

[Item description]

Preliminary Guide to the Washington State University Capital Planning and Development Contracts 17740-19396, 2012 (UA2012-11)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Return to Top

Administrative Information

Arrangement

This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.

Boxes 1-2 contain contracts 17740-19720. Boxes 3-4 contain contracts 18743-18884. Files are separated by contract number.

Location of Collection

(MASC STAFF USE) 4-05-21-5

Acquisition Information

This material was transferred to WSU Libraries' MASC by Rick Ward of Facilities on November 02, 2012 and retained as UA2012-11.

Return to Top

Detailed Description of the Collection

  • BOX 1 FY '13

    • Description: Johnson Tower - Good Faith Survey Walkway Roof
      Dates: 2013
      Container: Contract 18728, Project 4616-2009
    • Description: Todd Add - Structural Design for Kitchen Remodel
      Dates: 2013
      Container: Contract 18719, Project 1591-2006
    • Description: Todd Add - NV Design for Kitchen Remodel
      Dates: 2013
      Container: Contract 18716, Project 1591-2006
    • Description: Regent's Scott-Comen 3rd Party Oversight
      Dates: 2013
      Container: Contract 18762, Project 4484-2009
    • Description: Todd Add - Design for Kitchen Remodel Room 270
      Dates: 2013
      Container: Contract 18668, Project 1591-2006
    • Description: Fulmer Annex - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18560, Project 4759-2009
    • Description: Exterior Renovation LARC Good Faith Survey
      Dates: 2013
      Container: Contract 19242, Project 5295-2010
    • Description: Fulmer Hall Classroom 201 Good Faith Survey
      Dates: 2013
      Container: Contract 19264, Project 4139-2009
    • Description: Bryan Hall Classroom GFS - Upgrade
      Dates: 2013
      Container: Contract 19247, Project 5091-2010
    • Description: Todd Add - Design for Hosp. Ctr. Kitchen Remodel
      Dates: 2013
      Container: Contract 18549, Project 1591-2006
    • Description: Smith Gym - Design Phase 11 for Rms. 21,19 and 19A-B
      Dates: 2013
      Container: Contract 18531, Project 3866-2006
    • Description: Bustad Hall - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18529, Project 1346-2006
    • Description: Housing Apts. Asbestos & Lead Survey
      Dates: 2013
      Container: Contract 18523, Project 4171-2009
    • Description: Johnson Tower- Design to Replace Lower Roof
      Dates: 2013
      Container: Contract 18516, Project 5025-2010
    • Description: Commons - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18512, Project 4375-2009
    • Description: Webster - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18487, Project 1351-2006
    • Description: Nevada Street Overpass - Structural Evaluation
      Dates: 2013
      Container: Contract 18465, Project 4905-2010
    • Description: Sloan Hall - Acoustical Upgrades
      Dates: 2013
      Container: Contract 18457, Project 3864-2008
    • Description: Prosser GC Engineering/Inspection for Irrigation Sys PH II
      Dates: 2013
      Container: Contract 18332, Project 4775-2010
    • Description: French Ad - Exterior Renovation & Re-Roof
      Dates: 2013
      Container: Contract 18263, Project 2254-2006
    • Description: CUB NV Upgrades Field Verification & As-Builts
      Dates: 2013
      Container: Contract 19087, Project 5262-2010
    • Description: Webster Physical Science Bldg. Bridge Structure Repair
      Dates: 2013
      Container: Contract 19230, Project 5371-2010
    • Description: Bryan Hall - Design Services for Re-Roof
      Dates: 2013
      Container: Contract 18189, Project 2799-2007
    • Description: GC - Assessment of Parking Structures
      Dates: 2013
      Container: Contract 18090, Project 4578-2009
    • Description: WSU Children's Ctr. - Design Services for Addition
      Dates: 2013
      Container: Contract 17740, Project 3735-2008
  • BOX 2 FY '13

    • Description: Beasley Coliseum - Overpass Repair & Seal
      Dates: 2013
      Container: Contract 19076, Project 5294-2010
    • Description: Tri-Cities West Building Roof Replacement
      Dates: 2013
      Container: Contract 19158, Project 3271-2007
    • Description: Dodgen Good Faith Survey
      Dates: 2013
      Container: Contract 19132, Project 5071-2010
    • Description: Knott Dairy Center- Soil Remediation & Environmental
      Dates: 2013
      Container: Contract 19066, Project 4709-2009
    • Description: Bustad Hall Good Faith Survey
      Dates: 2013
      Container: Contract 19056, Project 5172-2010
    • Description: Wegner Hall - Good Faith Survey
      Dates: 2013
      Container: Contract 18991, Project 5122-2010
    • Description: Murrow West Third Party Oversight
      Dates: 2013
      Container: Contract 19121, Project 4725-2009
    • Description: McEachran East Roofing Inspection
      Dates: 2013
      Container: Contract 18975, Project 5078-2010
    • Description: McEachran East Provide Moisture Scan
      Dates: 2013
      Container: Contract 18953, Project 5078-2010
    • Description: GC & Duncan Dunn Halls Good Faith Survey
      Dates: 2013
      Container: Contract 18949, Project 5239-2010
    • Description: WSU Roadways/Parking Lots - 2010 Const. Material Testing
      Dates: 2013
      Container: Contract 18934, Project 3737-2008
    • Description: Prosser Hamilton Hall - Good Faith for Electrical
      Dates: 2013
      Container: Contract 18897, Project 5207-2010
    • Description: Wegner - Electrical Design for Basement
      Dates: 2013
      Container: Contract 18896, Project 5122-2010
    • Description: CUB Design Brick Enclosure for Dumpster
      Dates: 2013
      Container: Contract 18911, Project 4351-2009
    • Description: Albrook Hydraulic Lab Lead & Asbestos Survey
      Dates: 2013
      Container: Contract 18797, Project 5105-2010
    • Description: Abelson Hall Structural Design for Fall Protection
      Dates: 2013
      Container: Contract 18781, Project 3518-2008
    • Description: Puyallup Isolation Bldg - Good Faith to Install Backup Power
      Dates: 2013
      Container: Contract 18780, Project 5086-2010
    • Description: GC - Compact Test for Water Main East of Beasley
      Dates: 2013
      Container: Contract 18759, Project 5123-2010
    • Description: Fine Arts - Good Faith Survey for Gallery Floor
      Dates: 2013
      Container: Contract 18745, Project 4148-2009
    • Description: Bailey Brayton - GeoTech Engineer for Scoreboard
      Dates: 2013
      Container: Contract 18720, Project 5215-2010
    • Description: GC - Feasability Study
      Dates: 2013
      Container: Contract 18718, Project 3977-2008
    • Description: Smith Gym - Renovate Rooms 19, 19A&B, 21.
      Dates: 2013
      Container: Contract 18686, Project 3866-2008
    • Description: Neuro Science - Good Faith Survey for Demolition
      Dates: 2013
      Container: Contract 18817, Project 4947-2010
    • Description: Markley Grounds Store - GFS for Roof Replacement
      Dates: 2013
      Container: Contract 18816, Project 5108-2010
    • Description: McEachran East - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18623, Project 5078-2010
    • Description: Orton Hall - Design for Roof Replacement
      Dates: 2013
      Container: Contract 18610, Project 5077-2010
    • Description: Fulmer Syn. Replace Fume Hoods on 6th Floor
      Dates: 2013
      Container: Contract 19396, Project 5027-2010
    • Description: Mccroskey Hall Replace Roof - Strata
      Dates: 2013
      Container: Contract 19384, Project 5809-2011
    • Description: Mccroskey Hall Replace Roof - OAC
      Dates: 2013
      Container: Contract 19368, Project 5809-2011
    • Description: IBC Greenhouse Topographic & Geotechnical Survey
      Dates: 2013
      Container: Contract 19327, Project 5345-2010
    • Description: Athletics Trailer Wrap Design
      Dates: 2013
      Container: Contract 19318, Project 5880-2011
    • Description: Wegner Additional Sampling
      Dates: 2013
      Container: Contract 19298, Project 5720-2011
    • Description: Smith Center Parking Garage Structural Repairs
      Dates: 2013
      Container: Contract 19281, Project 5369-2010
    • Description: Beasley Coliseum Constructability Review
      Dates: 2013
      Container: Contract 19272, Project 5294-2010
    • Description: Fine Arts Parking Garage Structural Repair
      Dates: 2013
      Container: Contract 19271, Project 5541-2010
    • Description: Daggy Parking Garage Structural Repairs
      Dates: 2013
      Container: Contract 19270, Project 5540-2010
  • BOX 3 FY '13

    • Description: BSEL - Chem Storage Cabinets Room 157 (Contract)
      Dates: 2013
      Container: Contract 18744, Project 5042-2010
    • Description: BSEL - Chem Storage Cabinets Room 157 (Specs)
      Dates: 2013
      Container: Contract 18744, Project 5042-2010
    • Description: Webster Physical Science - Replace Roof (Contract)
      Dates: 2013
      Container: Contract 18846, Project 1351-2006
    • Description: Webster Physical Science - Replace Roof (Specs)
      Dates: 2013
      Container: Contract 18846, Project 1351-2006
    • Description: Fulmer Annex Replace Roof (Contract)
      Dates: 2013
      Container: Contract 18837, Project 4759-2009
    • Description: Fulmer Annex Replace Roof (Specs)
      Dates: 2013
      Container: Contract 18837, Project 4759-2009
    • Description: Poe - Repair/Resurface Roadwys/Parking Us 2010 (Contract)
      Dates: 2013
      Container: Contract 18877, Project 3737-2008
    • Description: Poe - Repair/Resurface Roadwys/Parking Us 2010 (Specs)
      Dates: 2013
      Container: Contract 18877, Project 3737-2008
    • Description: Johnson Tower Replace Roof/Fall Protection (Contract)
      Dates: 2013
      Container: Contract 18814, Project 5025-2010
    • Description: Johnson Tower Replace Roof/Fall Protection (Specs)
      Dates: 2013
      Container: Contract 18814, Project 5025-2010
    • Description: Sloan Hall - Classrooms AN Systems Upgarde (Contract)
      Dates: 2013
      Container: Contract 18743, Project 3864-2008
    • Description: Sloan Hall - Classrooms AN Systems Upgarde (Specs)
      Dates: 2013
      Container: Contract 18743, Project 3864-2008
  • BOX 4 FY '13

    • Description: Clark Reconfigure Rms 306 & 376 for Equip (Contract)
      Dates: 2013
      Container: Contract 18884, Project 4942-2010
    • Description: Clark Reconfigure Rms 306 & 376 for Equip (Specs)
      Dates: 2013
      Container: Contract 18884, Project 4942-2010
    • Description: PEB Modifications to Room 146 (Contract)
      Dates: 2013
      Container: Contract 18929, Project 4998-2010
    • Description: PEB Modifications to Room 146 (Specs)
      Dates: 2013
      Container: Contract 18929, Project 4998-2010
    • Description: WSU Spokane SIRTI Vivarium Renovation (Contract)
      Dates: 2013
      Container: Contract 19069
    • Description: WSU Spokane SIRTI Vivarium Renovation (Specs)
      Dates: 2013
      Container: Contract 19069
    • Description: Tri-Cities BSEL Remodel Labs 170 &173 (Contract)
      Dates: 2013
      Container: Contract 18829, Project 4636-2009
    • Description: Tri-Cities BSEL Remodel Labs 170 &173 (Specs)
      Dates: 2013
      Container: Contract 18829, Project 4636-2009

Names and SubjectsReturn to Top

Corporate Names

  • Washington State University. Capital Planning and Development -- Records and correspondence
Loading...
Loading...