Preliminary Guide to the Washington State University Facilities Planning Records, 1982-1993

Overview of the Collection

Creator
Washington State University. Facilities Planning
Title
Preliminary Guide to the Washington State University Facilities Planning Records
Dates
1982-1993 (inclusive)
Quantity
6 Linear feet of shelf space, (6 Boxes)
Collection Number
UA1997-20 (collection)
Summary
Administrative documents and forms from the WSU Facilities Planning department between 1985-1993.
Repository
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu
Access Restrictions

This collection is open and available for research use.

Languages
English

Historical NoteReturn to Top

The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.

Content DescriptionReturn to Top

Box 1 contains general correspondence, bid results, estimate costs, and miscellaneous administrative information. Box 2 contains development and remodel plans for the Bohler gym, WSU Vancouver, WSU Wenatchee, Buckley Dairy site, Daggy Hall, McCroskey Hall, Hulbert Hall, Knott Dairy Center, and the Cattle Reproduction Barn. Box 3 contains roofing information and forms, cost reports, environmental forms, cost estimate forms, and the Visitor Center Site Study done in 1988. Box 4 contains safety issues and concerns files, policy and consult agreements, and the WSU Tri-Cities Site selection forms. Box 5 contains repair documents for various dorms, the Bear Research Facility upgrade from 1990, and Handicapped Accessibility Improvements for various buildings. Box 6 contains, Bohler Gym floor replacement of 1985, Bohler Gym weight room remodel, Chemistry Building Repairs, and the Bryan Hall clock face replacement of 1982.

Use of the CollectionReturn to Top

Restrictions on Use

Copyright restrictions apply.

Preferred Citation

[Item description]

Preliminary Guide to the Washington State University Facilities Planning Records, 1982-1993 (UA1997-20)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Administrative InformationReturn to Top

Arrangement

This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.

Items are in their original order. Some files contain date labels.

Location of Collection

(MASC STAFF USE) 2-35-10-7

Acquisition Information

This material was transferred to WSU Libraries' MASC by Bob Sabo of Facilities Development on December 09, 1997 and retained as UA1997-20.

Detailed Description of the CollectionReturn to Top

Container(s) Description
Box
1 Chemical Storage - Puyallup L65329
1 Modification to the General Conditions, Instruction to Bidders, Form of Proposals & Advertisements
1 CIC Building - WSU Tri-Cities
1 Steffen Center - Construct Greenhouse/ Headhouse L43874
1 Bohler Gym Addition
1 WSU Tri-Cities Remodel East Building (1992-1993)
2 General Campus Information & Memo's
2 Bryan Hall - Clock
2 Log 4350 Heifer Barn, Animal Sciences
2 Bleachers (Hillside) Between Tennis Courts 2/1985
2 Log Routing Process
2 Training & Development Plan for Classified Staff Employees
2 Bohler Gym & P.E. Building Remodel: Preliminary Plan Modifications
2 Crew Shellhouse & Golf Storage: DWGS & Specs. Review Comments
2 University Construction Standards 1983
2 Use of Sears' Cabinets in Fulmer Annex 23 1984
2 Dept. of L & I - Interlock Requirement on Lid of Centrifuges 1984
2 Nevada St. Overpass Deterioration Contract # 7966 - Various New Veterinary Sciences Pole Framed BLDGS. - Sites D & F
2 Inadequate MCI Account for Building Name Signs Physical Plant Subscription to "NRCA"
2 Roofing Materials Reference & Guide P.O.F 70984
2 Alumni Center - Bldg. Program Questions 1984 via Joe Spodnemode
2 Contract No. 7981 Various Vet. Science Pole Framed Bldgs. Sites B & C 1984
2 AG Phase II (Hulbert) Reroofing 1984
2 Fuller O'Brien Paint No. 262-xx 100% Acrylic Not An Equal to Cowman-Campbell Brell-o-Flex 1984
2 Computer Science & Math Bldg./Inserts 1984
2 Bryan Hall Clock
2 Crew Shellhouse Construction Reports
2 Golf Storage Building
2 Reroof Kalkus Lab - Puyallup
2 Buckley Dairy Site - Reconstruct Silage Storage
2 Cost Estimates Auto Shop Log 46733 - Puyallup
2 Labor Cost for Projects Under Log 43795
2 Poultry Feed Mixing Room - Puyallup (Reprioritization)
2 Pesticide Storage Bldg. Puyallup Log 65329 1992
2 Allmendinger Center
2 ADA Transition Plan Outline 1/15/1993
2 ICNE Requests for Carpeting 1990
2 WSU Vancouver Pole Barn (Loafing Shed)
2 WSU Vancouver Master Plan Etc.
2 WSU Vancouver
2 WSU Prosser
2 WSU Wenatchee
2 WSU Mt. Vernon
2 Camp Roger Larson
2 Cougar Depot - Handicapped Access. Impv.
2 Observatory Court
2 Chilled Water Plant - Replace 1000 ton Chiller
2 Martin Stadium Projects (Various)
2 Martin Stadium East Stands Log 46727
2 Martin Stadium Upgrade Restroom
2 Computer Science Bldg. - Various Projects
2 Avery Hall - Remodel of Humanities Research Center
2 Hulbert Hall - Toilet Partition Doors
2 Clark Hall - Cold Temps NE Hall 1st Floor 1984
2 Bustad 145 Classroom Improvement
2 Multi Purpose Animal Holding Facilities: Buried Roof Protection
2 Phase I Merger Remodeling - Women's Locker Room
2 Multi Purpose Animal Holding Facilities
2 Coliseum - Refinish Portable Basketball Floor Log 42175
2 Graduate Dorms
2 Daggy Hall Reroofing
2 Daggy Hall Snow Melting System
2 Physical Science Bldg. Plaza
2 Weatherization of Various Units at Chinook, Columbia, and Nez Perce Villages 1984
2 Various Pictures Roofing Projects of Spokane Roofing Co. Site Problems (Chief Joseph and McCroskey Hall)
2 Rejection of Bid (Roy Freeman Roofing Co.) - Not Qualified
2 Nez Perce Handicap Remodel Inspection Report 2/23/1983
2 Chief Jo - Asbestos Abatement - Telecon. W/ Ken Abby
2 Razing Various Housing Units 1984
2 Razing Various Housing Units 1983
2 Smoot Hill: Site for New Barn 1984
2 Knott Dairy Center - Metal Covering Over Conc. Bunker Silos
2 Knott Dairy Farm Log 43150 Heifer Barn
2 Swine Center - Septic Tank & Absorption System 1992
2 Central Stores Warehouse Floor Load Analysis
2 Bldg. 66L Move Bldg. From Power Plant to Markley Services Complex 1984
2 Bldg. 358C Chemical Storage Building Improvements
2 Moisture in general Storage Building 1988
2 358E Anthropology Storage Building
2 Housing & Food Service General Storage Building
2 Vet Science Pole Framed Buildings Sites B & C
2 Butch's Cage & Area
2 Stephen Center New Green Houses 180C
2 Repairs to Potter House
2 Mooberry Track
2 Hilltop Stables
2 Modification of Greenhouse 109
2 Greenhouse 113B
2 Observatory Court Housing # 670
2 Carver Poultry Center Bldg. F/East Half
2 Bldg. 141B Beef Cattle Barn Log 3123 (Now The Alumni Center) (1982, 1983)
2 Clark Hall Projects
2 Cattle Reproduction Barn (Feed Annex # 145)
2 Bldg. 358A Receiving Bldg. (1990) Porosity Test
2 Cattle Feed Lot
2 Hulbert Hall Safety Hazard
2 Racquetball Court Panels
2 Addition of Handicap Ramp at P.E. Bldg.
2 Meats Lab - Cover Animal Holding Pens
2 Fine Arts Bldg Various Needs & Projects
3 Campus Roofing Survey 1993
3 Tri-Cities Modular Office Building
3 Veterans Memorial Plaza 1993
3 Information
3 Post Harvest Storage Bldg. Airport Rd. 1992
3 Contracts - Budgets
3 Project Planning Considerations
3 Red Folder
3 ADA - Essential Function For Human Resource Center
3 Visitor Center Site Study By Burke/Lee 1988
3 Facility Condition Survey 1990
3 USDA Research Lab
3 Buckley Farm - Dairy Forage Facility Phase II
3 ADA Survey & Transition
3 Shingle Roofing
3 Consulting Agreement
4 Ellis-Finney, Arch. & Planners - Proposal for Architectural Services
4 Public Works Contracts - General Conditions - 1991 Update
4 Carpet Specification Standards
4 Food Service Building Addition Redding Claim General Conditions Revisions Recommended
4 Ect. Masonry
4 Smith Gym Electrical Renewal Phase II - Proposed Changes to Standard Specifications
4 Plan Review Coordination Meeting
4 WSU Safety Division Plan Review/Project Approval
4 Nov. 1990 WSU Parking Control & Security - Design Work Session
4 Stair Change 7th Floor Mech. Level to A Ship's Ladder New Chemistry Bldg.
4 Safety Issues & Concerns
4 Review of WSU New Construction Standards Update 1987 From Russ Schaff
4 Norcus Modular Unit
4 1992 Sweets Catalog Dept. Reg.
4 Concrete Pre-mix Concrete Co. - Concrete & Related Products
4 Personal Services Contracts 1987
4 California Glass Association 1990
4 Resurfacing of Racquetball Courts - Physical Education Bldg.
4 Resurfacing of Racquetball Courts - Physical Education Bldg.
4 1992 Purchase Order Requisitions for Non-Public Works Contracts
4 Code Applications & Interpretations
4 Facilities for Summer 1992 Sports Camps
4 Position No. 40891 1/14/1991
4 Floor Tile, V.C.T. 1988 A2Rock Tile & Kemtile Not Accepted
4 Central Filing System 1986
4 Facility Condition Survey for Ad Annex, Chemical Engineering, Commons, Van Doren
4 Sale of Our Blue Print Machine to Fine Arts 10/29/1990
4 Recycling Bins 1990
4 Construction Management Report on Miner Capital Construction Projects 1985
4 Arbitration Rules 1989
4 Disposal of Seaman Nuclear R-75 Roof Moisture Meter 1987
4 East Fairways Asbestos Shingles
4 Policy: Surplus/Scrap Construction & Demolition Materials
4 1986 Eng. Division WSU Physical Plant Employees Chart
4 Physical Plant Department
4 Indirect Costs for Application to Physical Plant Cost Estimates 11/6/1985
4 Dining Hall Improvements, Contract No. 8138
4 Temporary Employment Classification & Compensation Plan
4 Books & Other References: Latest Copies
4 Request For Funding 1/30/1986
4 Contract Award Summary Contract No. 166-86
4 Final Approval - All Animal Holding Facilities 5/15/1986
4 ASTM Book of Standards
4 Spectext - Extra Binders
4 Materials Testing - McCluskey Services Addition
4 Personal Items Missing BBT. 1985
4 Request for Installation Manual - Pensil 851 Silicone Foam Penetration Sealant 1985
4 4/29/1985 Correction of Letter Sabo to Trim Pated April 29, 1985
4 Gary Lauerman Recommendation Letter Via Bob Sabo 1985
4 Chemistry Building Mechanical Room Water Proofing 1/13/1986
4 Job Log Tracking & Project Management 1985
4 Project Planning Considerations
4 1985 - 1987 Capital Program - Additional Staffing Requirements
4 Functional Employee Chart - Physical Plant 5/22/1985
4 Maint. & Const. & Division Chart 9/22/1985
4 Whitman Co. Building Permits on WSU Property
4 Time Slip Position Requests
4 Substandard Animal Facilities 5/20/1985
4 Phys. Plant New Personnel Introduction
4 Time Reports
4 Document Review - Major Construction Projects
4 Construction Management Report on Minor Capital Construction Projects
4 State Public Works Contract, Coen. Conditions Committee
4 Dairy Forage Facility, Phase II Approval of Schematics
4 ADA Survey & Transition Plan
4 Recorders, Maintenance Materials & Recycling, Phase I - Schematic Submittal for WSU Review
4 Holland Lib. Parking Garage - Kelmar Traffic Topping vs. Epoxy Coated Reinforcing Steel
4 Addition to McCluskey Services Building - Phys. Plant Requirements
4 Carpenter Hall Landis & GYR O&M Manuals 3/24/1992
4 Todd Hall & Neill Hall Safety Complaints 12/4/1991
4 WSU Vancouver Building Demolition 1991
4 Historic Preservation: Van Doren, Ad. Annex, Chem Eng. & Commons
4 Tri-Cities University Center Addition 1991
4 Options for Moving Facilities Planning From French Ad 1991
4 Alternating Tread Stairs
4 Article: Exterior Building System Failure
4 Facility Condition Survey - Contract # 10153
4 1991 - 1993 Major Capital Improvement Projects
4 Carver Farm - Bldg. No. 120D Renovate for Entomology Insectary L48060
4 Controllers Office Remodel L45060
4 MCI Projects - Waiting on Programs 1989
4 Consultant Furnished Specifications
4 Bldg. 807 Building Maintenance for Vivarium 1988
4 Pavers In Sand Bed
4 Software for Ordering Furnishings 1988
4 Panel Installation in RM. 61, Environ. Health Services L41497
4 Construction Codes
4 Kamiak Butte Construction 1987
4 Design Standards for WSU Bldgs. 1986
4 Liability Prevention & Protection
4 Form Letter - Closing Out
4 Food/Human Nutrition Facility: Wood vs. Steel Casework
4 Alumni Center - Waterproofing Substitution 1987
4 Architect Selection Process - Ray Crowder Letter to Earl Muir
4 Design Standards for WSU Field Buildings
4 Final Approval - All Animal Holding Facilities
4 Legal Advertisement 1986
4 WSU Building Cost/Gross Sq. Ft. 1986
4 Carpenter Hall Renewal 1986
4 Color of Roofing Shingles on Pitched Roofs 1987
4 Allemdinger Conference Center, WWCEC Preconst. Conference
4 Chemistry Building Construction Documents
4 Stimson Hall - Roof Shingles
4 Razing of Vacated Sheep Buildings: 143B, 143C
4 Phys. Plt. Comments on Proposed Animal Bldg. 1985
4 1985 - 1987 Project Programs 12/13/1985
4 WSU Tri-Cities Site Selection for Future Branch Campus 1988
4 CAD System Proposal 1988
4 Cougar Depot - Handicapped Access. Improv. 1988
4 Roof Vapor Barriers 1988
4 Inclusion of "Cultural Spaces" in University Buildings 1988
4 Room Numbers on Construction Projects
4 Comprehensive Physical Planning Process 1988
4 Streit-Perham Remodel 1985
4 Document Review - Major Construction Projects 1985
4 WSU Comprehensive Plan EIS 1985
4 Chemistry Building: Roof Plan 1985
4 Facilities Management Chart 4/15/1992
4 Carpet Policy 6/19/1990
4 Creation of Assist. Facilities Designer Position 7/5/1990
4 Holland Library Addition - Plaza Deck Waterproofing Membrane 7/3/1990
4 Develop & Improve Institutional Animal resources - 1988
4 Complaint Procedure 7/11/1986
4 Update on Stadium Way/Nevada St. Intersection Study 4/8/1987
4 WSU Sale Agreement 6/20/1989
4 Correspondence File
4 Golf Course Parking Lot Extension Determination of Nonsignificance & Environmental Checklist 7/29/1993
4 Phiferglass Sunscreen
4 Energy Demand Limiting 12/20/1985
4 BPA Energy Smart Design Workshops
4 WSU Comprehensive Physical Planning Process
4 Commercial Complex Development Plan for WSU
4 USDA - ARS Greenhouses 1987
4 Jerry Johnson Radiation Exposure 6/1985
4 Charlie Hanks Accident 12/1/1986
4 Cleaning Acoustical Ceilings 8/8/1985
4 Authorized Signatures 1985
4 Contracts Rev. 4/9/1985
4 Weight Room Office Construction 12/9/1990
4 Mooberry Track 5/10/1988 Stands Footboard Failure
4 Action Courts Inc. Request to be on our Bidder's List for Recreational Surfacing Protest
4 Preseason Practices: Football & Volleyball 1985
4 Special Purpose Grounds Area Valves 11/1/1987 Athletic Facilities
4 Martin Stadium - Replacement of Synthetic Turf 3/20/1990
4 A/E Fee Increases 3/13/1985
4 Revised Consultant Fees & Contract Terms 7/22/1993
4 Consultant Roster Policy Revisions 7/1/1987
4 Architectural Agreement 7/10/1991
4 Bohler Gym Addition Prll MB Budget Ect. 10/24/1991
4 Consultant Agreement
4 Predesign Manual 9/1991
4 Facility Condition Survey - Draft of Consultant Agreement 3/15/1990
4 Sample Forms
4 1986 Review of Animal Facilities
4 Updated Capital Improvement Approval Procedures 11/7/1990
4 Wegner Farm - Disposition 7/13/1987
4 1993 Elliot Elec. Eng - Continuing Eng. Services
4 South Fairway Intramural Field Budget Verification 1992 (Consulting Contract)
4 WSU Veterans War Memorial Plaza Budget Verification (Consulting Contract) 1991
4 WSU Depot 1988
4 Section Heads Meeting 17 Oct. 1985
4 Master Spec. Options 11/14/1985
4 Camp Larson Sewer System Prelim. Recommendations 1993
4 Tripping Hazard, Gate II, Martin Stadium
4 Program for D.I. Water Generation Facility
4 MCI/MCR Budget Estimates & Project Costs
4 Vet. Teach. Hospital - Exit Devices & Entry Grates
4 Liquidating Balances on Completed Consulting Agreements 1993
4 Beef Cattle Center Manure Separator Bldg. - Response of Review
4 WSU Tri-Cities Center - East Building Remodel
4 Various Campus Buildings - Exterior Wall Repairs 1992
4 Stimson Hall - Termite Remediation 1992
4 Carpenter Hall Remodel - Replacement Tile 1992
4 Bohler Gym Addition - Heald Hall Renewal 1992
4 Building Permits 1993
4 Purchase Order Requisitions in Lieu of Public Works Contracts 2/2/1992
4 Sending Correspondence 2/26/1992
4 Eng. & Arch. Group Goals 8/2/1992
4 Report to the President ICSEW Activities 7/1/1991 - 6/30/1992
4 Prosser Greenhouse - Refurbish, Motor Replacement F. O. # F032060
4 Pacificad - Scope of Services - 2/3/1992
4 Facilities File 7/16/1992
4 Clerical Help for Engineering 2/5/1992
4 Area Specific Budget Office Analyst 2/8/1993
4 Bob Sabo Appointment to CIC Bldg. Committee 2/26/1993
4 Meeting With Purchasing Concerning Carpet Ect. 8/3/1992
4 Budget Estimates & Confirmations on Public Works Construction Contracts 5/18/1993
4 Material Handling Charge 2/22/1993
4 Specification of Software & Hardcopies 8/21/1992
4 Print Machine for Arch. & Eng. 8/21/1992
4 Reference Letter & Letter of No Openings 1992
4 State Personnel System 4/2/1992
4 Samples: Memorandum & Contract Addendum Oramendment
4 Relocate Facilities Planning to Commons
4 Annual Vacation Schedule Request 1990
4 Carpet Specification
4 Research Park - Extreme Painting 8/26/1992
4 Bulletin Board Issue
4 Facilities Project Officer
5 Vertical Column Reinforcement - Heald Hall 1993
5 Heald Hall Exterior Walls/ Upgrade Mech. Rooms/ & Rm 101
5 Eastlick Hall Leaking Ceiling 1990 (&1985)
5 Eastlick Hall - Installation of Dry Stand Pipe System
5 Safety Bldg. - Handicapped Accessibility Improvements
5 Safety Bldg.
5 Requisition Vertical File in Vault & CAD Working Area Stations 9/22/1993
5 1991 - 1993 Major Capital Improvement Projects
5 Judy Mousseau - Interior Design Projects - 1989
5 Masonry Repair - French Ad L6122
5 Cooper Publications Remodel - 1986
5 Bear Research Facilities Upgrade 1990
5 Food Service Bldg. Addition - 1986
5 Rogers Orton Dining Hall - Sprinklers/Transfer/Reroofing/Proposed Child Care Facilities
5 Tiered T.V. Seating 1985
5 Rotunda Dining Hall - Interior Design Concept 1985
5 Cleveland Hall Various Projects 1983 - 1992
5 Addition to McCluskey 1986 - 1991
5 1985 Holland Lib - Halon System
5 Streit - Perham Remodeling 1985
5 Rotunda Hall Work - Various - 1984 - 1986
5 Gannon Goldsworthy - Computer Lab Remodel 1993
5 Goldsworthy Hall Renovation 1985
5 Exterior Painting Various Building 1982
5 Goldsworthy Hall Moisture Reading Survey
5 Sloan Hall - Heat on South Side 1987
5 EE/ME Building Punch List 1987
5 Sloan Hall - Movable Walls 1986
5 Sloan Hall - Rm 45 Log 4131 1986
5 Johnson Hall - Rain Damage July 28-29, 1984
5 Johnson Hall - Reroofing 1984
5 Neill Hall Remodel 1986
5 Bldg. 68 Remodel 1983
5 Modular Office Bldg. For Grounds 1991
5 Stephenson E. & S. Fire Sprinklers 1992
5 Stephenson Trash Bin Relocation 1989
5 Stephenson Complex - Masonry Repairs - 1984
5 Stearns Hall Painting
5 Masonry Sealer Application: Sample Panel 10/10/1986
5 Summer Projects 1993
5 CUB - Seafirst Cash Machine 1991
5 CUB - Remodel G 77B - Travel Studio 1989
5 CUB - Information Desk 1986
5 CUB - Bowling Alley Resurfacing 1986
5 CUB - End Zone Remodel 1984
5 CUB - Satellite Dish 5/21/1984
5 CUB - Roof Deck Repairs 1985
5 CUB - Handicapped Remodeling
5 CUB - Antenna System 1984
5 CUB - Credit Union - Live Load Determination
5 CUB - Cash Machine 1982
5 Hops Research Facility - Prosser
5 Holland Lib. - Upgrade Fire Exits 1985
5 Holland Lib. Roofing 1993
5 Holland Lib. - Metal Book Stacks - Old Lib 1993
5 Holland Lib. Plaza Waterproofing 1992
5 Holland Lib. - 3 7/8" Face Mullion Profile for Triple Door Assembly
5 Holland Lib. - Fire Protection 1987
5 Holland Lib. - New Exit Stairs From Ground Floor Log 6131 1986
5 Holland Lib. - Fire Doors Log 6128 1985
5 Holland Lib. - Improvements 1984
5 Holland Lib. - New Entrance Doors 1982
5 Spillman Hall - Upgrade Rms. 122 & 123; Reroofing 1988 & 1989
5 Research Park - Questions
5 Thermal Fluids Lab 1992
5 Wood Eng. Lab Renovation 1987
5 Dana Hall Reroofing 1990
5 Smith Ag Addition 1981
5 Wegner Hall Windows 1982
5 Wegner Hall Rm 130 1982
5 McCoy Hall - Roof Drain Installation 1992
5 Trailer for Office Space - Next to McCoy Hall 1992
5 Vet Facilities Constructed 1984 - 1986 - Bring up to Accreditation Standards
5 Vet Hospital - McCoy - Engineering Assistance 1988
5 McCoy Hall - Student Study Center 1986 Rm 112
5 McCoy Hall - Remodel Rm 111 1984
5 McCoy Hall - Remodel Phase II
5 Anthropology Lab Bldg. - Bldg. Condition Assessment 1992
5 Women's Studies - WRRC - Wilson Hall 1993
5 Relocation of Records & Gift Processing to Ad Annex 1988
5 Fire Escapes - Van Doren & Ad Annex 1987 & 1984
5 Van Doren - Floor Load Analysis
5 Van Doren Hall - Historic Preservation - A Resolution 1989
5 Van Doren Hall - Painting NROTC Offices - Rm 617, 7A 1989
5 Van Doren Hall - Attic 1984
5 Troy Hall - Rm 308 Alterations 1987
5 Troy Hall - Handicapped Access to Basement 1984
5 Troy Hall - Window Replacement - Creamery 1984
5 Stimson Hall Renovation 1989
5 Stevens Hall Exterior Restoration 1992
5 Murrow Hall Remodel 1993
5 Murrow Communication Center - Arcade Construction - Adding A Room 1984
5 Murrow East - Remove Wall Between Rm. 122 & 123 1986
5 Science Hall - Phase II - Interior Entrance Ramp Flooring 1988
5 Science Hall - Building Salvage 1988
5 Science Hall - Phase I Greenhouse Design 1983
5 Science Hall - Phase II - Lab Counter Tops - 1987
5 Science Hall - Phase I - 7th Floor Flooring 1985
5 Science Hall Remodeling 1983
5 Nez Perce Village, Unit F, Apt. 17 Punch List 1983
5 Science Hall 3 Pictures
5 Presidents Residence - Reroof & Repair Ext. Wood 1982
5 Wilmer Davis - Restroom Remodel 1986
5 Boiler Plant - Stack Testport Platforms L54547 1992
5 Handicapped Accessibility Improvements, Phase I - Kimbrough Hall 1988
5 Computer Sci. Bldg. - Replacement Weather Stripping 1984
5 Kimbrough Hall - Bldg. Maintenance 1985
5 Morrill Hall Window Replacement 1988
5 Morrill Hall - Floor Covering Rm 208 Complex 1983
5 Morril Hall - Landscaping 1982
5 Morrill Hall Warrantee 1984
5 Bldg. 22 - Mech. Eng. Research Bldg. - Razing 1988
5 Bldg. 23 - Mech. Eng. Lab (Shops) Improvements 1983
5 Carpenter Hall Renewal 1986
5 McCroskey Hall Remodel 30, 61, 62-62B 1983
5 Handicapped Accessibility Improvements, Mem. Hosp. / Student Health 1984
5 White Hall - Update Space Utilization 1991
5 White Hall Workstation 1989
5 White Hall Roofing 1988
5 Smith Hall - Floor Structural Analysis Rm 214A 1986
5 Varsity Wt. Rm. Office Addition 1990
5 Bohler Gym - Press Boxes 1991
6 Bohler Gym Floor Replacement 1985
6 Remodeling Weight Room Bohler M-2 1987
6 Bohler Gym - Fire Code Analysis 1987
6 Masonry Repairs 1982
6 Hollingberry Fieldhouse L61581 1991 - 1992
6 Hollingberry Fieldhouse 4th Floor Improvements 1986
6 Duncan Dunn - Snack Center/ Mail Rm Reception
6 College Hall Renovation Bid Summery 1982
6 College Hall Remodeling: New Conc. Floors 3/14/1983
6 Chemistry Synthesis Bldg. Various Problems 9/20/1990
6 Chemistry Bldg. Soil Settlement 1991
6 Chemistry Bldg. VIF Floor Joints & Drains 3/21/1990
6 Chemistry Bldg. Synthesis Bldg. - Resilient Flooring in Controlled Temp. Rooms 1/19/1990
6 Chemistry Bldg. - Vertical Blinds on Windows Log 44097 11/8/1989
6 Fulmer Hall - Air Intake Wall Surface
6 Fulmer Hall - NMR Installation - Prelim. Est. 5/15/1989
6 Chemistry Bldg. - Aluminum Windows 8/5/1988
6 Chemistry Bldg. - Rubber Base 5/17/1988
6 Chemistry Bldg. - VIF Bldg. Observations During Backfill 3/4/1988
6 Chemistry Bldg. - Roofing 4/20/1987
6 Chemistry Bldg. - Mech. Penthouse Roof 6/27/1984
6 Fulmer Hall Phase I & II Completion 6/11/1984
6 Fulmer Hall Remodeling - Construction Report 1982-1983
6 Bryan Hall Replace Clock Faces with Back Lighting Log 2316 9/13/1982
6 Thompson Hall - Window Replacement - Prelim. Cost Estimate 6/15/1987
6 Bryan Hall - Clock Tower Flashing, Restoration & Painting 6/6/1990

Names and SubjectsReturn to Top

Corporate Names

  • Washington State University. Facilities Planning -- Records and correspondence