Preliminary Guide to the Washington State University Physical Plant Records, 1992-1997
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Physical Plant
- Title
- Preliminary Guide to the Washington State University Physical Plant Records
- Dates
- 1992-1997 (inclusive)19921997
- Quantity
- 4 Linear feet of shelf space, (4 Boxes)
- Collection Number
- UA1998-21 (collection)
- Summary
- Administrative files, correspondence, memoranda, other executive construction reports related to various projects on the WSU campuses from around 1992-1997.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content Description
Contains primarily correspondence, memoranda, building plans, and other contractor and architectural documents. Documents relate to various projects on the WSU campus from 1992-1997 such as the Todd Hall Renewal, the renewal of Bohler Gym, and more.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Physical Plant Records, 1992-1997 (UA1998-21)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Files are mostly divided into subject files. Some are unlabeled while others are clearly labeled. Some boxes contain binders related to contractor reports and submittables. Tubes contain
Detailed Description of the Collection
-
Bohler Gym Addition
-
Description: Preliminary Punch ListContainer: Box 1
-
Description: Transmittal Sheet Re: AsbuiltsContainer: Box 1
-
Description: Fax on Lamp for MIA LuminaireContainer: Box 1
-
Description: Fax on Beam Detector InstallationContainer: Box 1
-
Description: Meeting Minutes - Fire Alarm Pre-InstallationContainer: Box 1
-
Description: Construction Meeting MinutesContainer: Box 1
-
Description: MiscellaneousContainer: Box 1
-
Description: ResubmittalsContainer: Box 1
-
-
Holland Library Phase II
-
Description: Holland Library Fixtures & LampsContainer: Box 1
-
Description: Weekly ReportsContainer: Box 1
-
Description: Pay RequestsContainer: Box 1
-
Description: MemoContainer: Box 1
-
Description: Contract Change Proposal LogContainer: Box 1
-
Description: Submittal/Shop Drawing LogContainer: Box 1
-
Description: RFC/RFI LogContainer: Box 1
-
Description: Construction Meeting MinutesContainer: Box 1
-
Description: Steam Meter NW Mech. Rm.Container: Box 1
-
Description: Changes Made to Schedule in Update #14Container: Box 1
-
Description: Addendum No. 4Container: Box 1
-
Description: Addendum No. 5Container: Box 1
-
Description: SZ. 11Container: Box 1
-
Description: Drawing Addendum No. 3Container: Box 1
-
Description: Addendum No. 1Container: Box 1
-
Description: Addendum No. 2Container: Box 1
-
Description: Finished Hardware RevisionsContainer: Box 1
-
Description: CIN No. 48 CPM ScheduleContainer: Box 1
-
Description: Beam Smoke Detector TestingContainer: Box 1
-
Description: Design Review RecordContainer: Box 1
-
Description: MiscellaneousContainer: Box 1
-
-
# 807 Animal Disease Biotechnology Facility
-
Description: Submittals ElectricalContainer: Box 1
-
Description: Consolidated Information Center: Tri-CitiesContainer: Box 1
-
Description: Electrical SubmittalsContainer: Box 1
-
Description: Lighting ControlsContainer: Box 1
-
Description: RGB VideoContainer: Box 1
-
Description: Remote Control SystemContainer: Box 1
-
Description: Sound SystemContainer: Box 1
-
Description: TelecommunicationContainer: Box 1
-
Description: Snow Melt CableContainer: Box 1
-
Description: Fire Alarm & ClockContainer: Box 1
-
Description: Various Electrical SubmittalsContainer: Box 1
-
Description: Pay RequestsContainer: Box 1
-
-
Vet Teaching Hospital
-
Description: Isotrol Systems SubmittalContainer: Box 2
-
Description: Elec. SubmittalsContainer: Box 2
-
Description: Lighting Foot Candle MapContainer: Box 2
-
Description: Push Button Submittal & Various Elec. SubmittalsContainer: Box 2
-
Description: Electrical Submittals: Conduit Etc.Container: Box 2
-
Description: Addendum No. 1Container: Box 2
-
Description: Switch Gear, Panels, MCC's SubmittalsContainer: Box 2
-
Description: Lighting FixturesContainer: Box 2
-
Description: OCT. BoxesContainer: Box 2
-
Description: Address Heat Detector Combination/Fire AlarmContainer: Box 2
-
Description: Substitution Request for General Cable #2131321Container: Box 2
-
Description: Change Proposals (C.P.)Container: Box 2
-
Description: Invoice 021-02830, Transfer Switch RepairContainer: Box 2
-
Description: Pay RequestContainer: Box 2
-
Description: Construction MTG. MinutesContainer: Box 2
-
Description: Request For Information (R.F.I.)Container: Box 2
-
Description: Contract Change Proposals (C.C.P.)Container: Box 2
-
Description: MiscellaneousContainer: Box 2
-
Description: Contract Change Order (C.C.O.Container: Box 2
-
Description: Weekly ReportsContainer: Box 2
-
-
Student Services Submittals
-
Description: L&I CorrectionContainer: Box 2
-
Description: WSU Requests Verification of Circuits to Roll Up Fire DoorsContainer: Box 2
-
Description: Memorandum Oct. 16, 1996Container: Box 2
-
Description: MiscellaneousContainer: Box 2
-
Description: Construction Meeting MinutesContainer: Box 2
-
Description: Weekly ReportsContainer: Box 2
-
-
Todd Hall Renewal
-
Description: Construction Meeting MinutesContainer: Box 2
-
Description: Weekly ReportsContainer: Box 2
-
Description: Pay RequestContainer: Box 2
-
Description: Request for Information (R.F.I.)Container: Box 2
-
Description: Contract Change Proposal (C.C.P.)Container: Box 2
-
Description: MiscellaneousContainer: Box 2
-
-
13.2 Electrical Duct Bank Addition
-
Description: DrawingsContainer: Box 3
-
Description: SchedulesContainer: Box 3
-
-
Plant Growth & Wheat Research Lab
-
Description: Electrical SubmittalContainer: Box 3
-
Description: MiscellaneousContainer: Box 3
-
-
Field House
-
Description: Fire Alarm SubmittalsContainer: Box 3
-
-
Water Fluoridation Fac.
-
Description: SubmittalsContainer: Box 3
-
-
Physical Science Bldg.
-
Description: Install Perchloric Acid Fume Hood (August 1995)Container: Box 3
-
-
Animal Science Lab Bldg. # 100
-
Description: Elec. PermitContainer: Box 4
-
Description: Design Review RecordContainer: Box 4
-
Description: Lab SubmittalsContainer: Box 4
-
Description: Snow Melt UpdateContainer: Box 4
-
Description: Electrical SubmittalsContainer: Box 4
-
-
Fulmer Hall Annex
-
Description: MiscellaneousContainer: Box 4
-
-
Chemical Waste Collection Sites
-
Description: SubmittalsContainer: Box 4
-
-
Eng. Teaching Research Lab
-
Description: Electrical SubmittalsContainer: Box 4
-
-
Vancouver
-
Description: Transmittal Notice & Electrical SubmittalContainer: Box 4
-
-
Kimbrough Hall
-
Description: MiscellaneousContainer: Box 4
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Physical Plant -- Records and correspondence
