Archives West Finding Aid
Table of Contents
- Overview of the Collection
-
Historical Note
- Content Description
- Use of the Collection
- Administrative Information
-
Detailed Description of the Collection
- Bohler Gym Addition
- Holland Library Phase II
- # 807 Animal Disease Biotechnology Facility
- Vet Teaching Hospital
- Student Services Submittals
- Todd Hall Renewal
- 13.2 Electrical Duct Bank Addition
- Plant Growth & Wheat Research Lab
- Field House
- Water Fluoridation Fac.
- Physical Science Bldg.
- Animal Science Lab Bldg. # 100
- Fulmer Hall Annex
- Chemical Waste Collection Sites
- Eng. Teaching Research Lab
- Vancouver
- Kimbrough Hall
- Names and Subjects
Preliminary Guide to the Washington State University Physical Plant Records, 1992-1997
Overview of the Collection
- Creator
- Washington State University. Physical Plant
- Title
- Preliminary Guide to the Washington State University Physical Plant Records
- Dates
- 1992-1997 (inclusive)19921997
- Quantity
- 4 Linear feet of shelf space, (4 Boxes)
- Collection Number
- UA1998-21 (collection)
- Summary
- Administrative files, correspondence, memoranda, other executive construction reports related to various projects on the WSU campuses from around 1992-1997.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content DescriptionReturn to Top
Contains primarily correspondence, memoranda, building plans, and other contractor and architectural documents. Documents relate to various projects on the WSU campus from 1992-1997 such as the Todd Hall Renewal, the renewal of Bohler Gym, and more.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Physical Plant Records, 1992-1997 (UA1998-21)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Files are mostly divided into subject files. Some are unlabeled while others are clearly labeled. Some boxes contain binders related to contractor reports and submittables. Tubes contain
Detailed Description of the CollectionReturn to Top
Bohler Gym AdditionReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Preliminary Punch List |
1 | Transmittal Sheet Re: Asbuilts |
1 | Fax on Lamp for MIA Luminaire |
1 | Fax on Beam Detector
Installation |
1 | Meeting Minutes - Fire Alarm
Pre-Installation |
1 | Construction Meeting Minutes |
1 | Miscellaneous |
1 | Resubmittals |
Holland Library Phase IIReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Holland Library Fixtures &
Lamps |
1 | Weekly Reports |
1 | Pay Requests |
1 | Memo |
1 | Contract Change Proposal Log |
1 | Submittal/Shop Drawing Log |
1 | RFC/RFI Log |
1 | Construction Meeting Minutes |
1 | Steam Meter NW Mech. Rm. |
1 | Changes Made to Schedule in Update
#14 |
1 | Addendum No. 4 |
1 | Addendum No. 5 |
1 | SZ. 11 |
1 | Drawing Addendum No. 3 |
1 | Addendum No. 1 |
1 | Addendum No. 2 |
1 | Finished Hardware Revisions |
1 | CIN No. 48 CPM Schedule |
1 | Beam Smoke Detector Testing |
1 | Design Review Record |
1 | Miscellaneous |
# 807 Animal Disease Biotechnology FacilityReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Submittals Electrical |
1 | Consolidated Information Center:
Tri-Cities |
1 | Electrical Submittals |
1 | Lighting Controls |
1 | RGB Video |
1 | Remote Control System |
1 | Sound System |
1 | Telecommunication |
1 | Snow Melt Cable |
1 | Fire Alarm & Clock |
1 | Various Electrical Submittals |
1 | Pay Requests |
Vet Teaching HospitalReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Isotrol Systems Submittal |
2 | Elec. Submittals |
2 | Lighting Foot Candle Map |
2 | Push Button Submittal & Various Elec.
Submittals |
2 | Electrical Submittals: Conduit
Etc. |
2 | Addendum No. 1 |
2 | Switch Gear, Panels, MCC's
Submittals |
2 | Lighting Fixtures |
2 | OCT. Boxes |
2 | Address Heat Detector Combination/Fire
Alarm |
2 | Substitution Request for General Cable
#2131321 |
2 | Change Proposals (C.P.) |
2 | Invoice 021-02830, Transfer Switch
Repair |
2 | Pay Request |
2 | Construction MTG. Minutes |
2 | Request For Information
(R.F.I.) |
2 | Contract Change Proposals
(C.C.P.) |
2 | Miscellaneous |
2 | Contract Change Order (C.C.O. |
2 | Weekly Reports |
Student Services SubmittalsReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | L&I Correction |
2 | WSU Requests Verification of Circuits to
Roll Up Fire Doors |
2 | Memorandum Oct. 16, 1996 |
2 | Miscellaneous |
2 | Construction Meeting Minutes |
2 | Weekly Reports |
Todd Hall RenewalReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Construction Meeting Minutes |
2 | Weekly Reports |
2 | Pay Request |
2 | Request for Information
(R.F.I.) |
2 | Contract Change Proposal
(C.C.P.) |
2 | Miscellaneous |
13.2 Electrical Duct Bank AdditionReturn to Top
Container(s) | Description |
---|---|
Box | |
3 | Drawings |
3 | Schedules |
Plant Growth & Wheat Research LabReturn to Top
Container(s) | Description |
---|---|
Box | |
3 | Electrical Submittal |
3 | Miscellaneous |
Field HouseReturn to Top
Container(s) | Description |
---|---|
Box | |
3 | Fire Alarm Submittals |
Water Fluoridation Fac.Return to Top
Container(s) | Description |
---|---|
Box | |
3 | Submittals |
Physical Science Bldg.Return to Top
Container(s) | Description |
---|---|
Box | |
3 | Install Perchloric Acid Fume Hood (August
1995) |
Animal Science Lab Bldg. # 100Return to Top
Container(s) | Description |
---|---|
Box | |
4 | Elec. Permit |
4 | Design Review Record |
4 | Lab Submittals |
4 | Snow Melt Update |
4 | Electrical Submittals |
Fulmer Hall AnnexReturn to Top
Container(s) | Description |
---|---|
Box | |
4 | Miscellaneous |
Chemical Waste Collection SitesReturn to Top
Container(s) | Description |
---|---|
Box | |
4 | Submittals |
Eng. Teaching Research LabReturn to Top
Container(s) | Description |
---|---|
Box | |
4 | Electrical Submittals |
VancouverReturn to Top
Container(s) | Description |
---|---|
Box | |
4 | Transmittal Notice & Electrical
Submittal |
Kimbrough HallReturn to Top
Container(s) | Description |
---|---|
Box | |
4 | Miscellaneous |
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Physical Plant -- Records and correspondence