Preliminary Guide to the Washington State University Facilities Planning Building Files, 1979-1986

Overview of the Collection

Creator
Washington State University. Facilities Planning
Title
Preliminary Guide to the Washington State University Facilities Planning Building Files
Dates
1979-1986 (inclusive)
Quantity
3 Linear feet of shelf space, (3 Boxes)
Collection Number
UA1994-16 (collection)
Summary
Documents from the WSU Facilities and Planning Department from 1979-1986. Includes Handicapped Accessibility Improvement files, and Multipurpose Animal Holding Facility files.
Repository
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu
Access Restrictions

This collection is open and available for research use.

Languages
English

Historical NoteReturn to Top

The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.

Content DescriptionReturn to Top

Documents from the WSU Facilities and Planning Department from 1979-1986. Items include reports on Handicapped Accessibility, planning material for the Olympic Weight Room, and files related to the Multipurpose Animal Holding Facility.

Use of the CollectionReturn to Top

Restrictions on Use

Copyright restrictions apply.

Preferred Citation

[Item description]

Preliminary Guide to the Washington State University Facilities Planning Building Files, 1979-1986 (UA1994-16)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Administrative InformationReturn to Top

Arrangement

This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.

Box 1 includes files on Handicapped Accessibility Improvements. Box 2 contains Handicapped Physical Barrier Improvement files, and Olympic Weight room files. Box 3 includes Multipurpose Animal Holding Facility files.

Location of Collection

(MASC STAFF USE) 2-35-22-6

Acquisition Information

This material was transferred to WSU Libraries' MASC by Lana Miller of Facilities Department on August 05, 1994 and retained as UA1994-16.

Detailed Description of the CollectionReturn to Top

Building No. 0000 - Handicapped Accessibility ImprovementsReturn to Top

Container(s) Description
Box
1
1979 Budget Request
1
Smith & Swenson, General Correspondence 10/1980 - 10/1981
1
Environmental Impact Statement (E.I.S.) 1/1981
1
Affirmative Action Reports, 3/1983
1
Diary Reports, 8/1981 - 4/1982
1
Building Program, 3/1980
1
Minutes of Meetings, 1/1983
1
ABC Laboratories Concrete Testing 9/1982
1
General Correspondence, (8 files), 9/1977 - 11/1989
1
CMB/PENCE Associates Correspondence, (5 files), 10/1979 - 3/1984
1
CMB/PENCE Associates Contract, Payments, Change Orders (2 files), 3/1980 - 5/1983
1
Vern W. Johnson & Sons General Correspondence, 3/1983
1
Vern W. Johnson & Sons Contract Payments, Change Orders, 3/1983
1
Lydig Construction General Correspondence - Part C Building Retrofit, 8/1985
1
Lydig Construction Contract, Payments, Change Orders, 6/1983
1
Otis Elevator, General Correspondence, 11/1982
1
Otis Elevator, Contract, Payments, Change Orders, 12/1982
1
Otis Elevator, Affirmative Action Reports, 10/1981
1
General Correspondence, Nez Perce Village, Unit F, Apartment 17, 5/1983
1
Earl J. Russell Construction, Nez Perce Village Unit F, Apartment 17, General Correspondence, 6/1983
1
Earl J. Russell Construction, Nez Perce Village Unit F, Apartment 17, Contract, Payments, Change Orders, 11/1983
1
Rejected Bids, Nez Perce Village, Unit F, Apartment 17, 11/1982
1
Rejected Bids, Part A Elevator Controls, 3/1981
1
Rejected Bids, Part C - Building Retrofit, 11/1981
1
Rejected Bids - Part B-1, 11/1981

Building No. 0807 - Multipurpose Animal Holding FacilityReturn to Top

Container(s) Description
Box
2
Budget
2
Smith & Swenson General Correspondence, 5/1981 - 2/1982
2
Environmental Impact Statement (E.I.S.)
2
Keying Schedule
2
Affirmative Action Reports
2
Diary Reports
2
Diary Reports - Landscaping
2
Testing Labs
2
Concrete Testing - Landscaping MAHF
2
General Correspondence, (4 files), 1/1979 -8/1985
2
Naramore, Bain, Brady, Johnson (NBBJ) Architects General Correspondence, (5 files). 10/1979 - 6/1985
2
NBBJ Architects Contract, Payments, Change Orders
2
Lydig Construction General Correspondence, 7/1982 - 10/1986
2
Lydig Construction Contract, Payments, Change Orders
2
Rejected Bids
2
Rejected Bids - Mechanical
2
Rejected Bids - General
2
Rejected Bids - Electrical
2
Building Program, 12/1980
2
Shannon & Wilson, Inc. Geotechnical Consultants, Explorations and Geotechnical Studies for the MAHF, WSU, 4/1981
2
NBBJ Architects, WSU MAHF, An Addition to and Partial Remodeling of the Veterinary Science Bldg. 9/1981

Building No. 0000 - Handicapped Accessibility Improvements CONTINUEDReturn to Top

Container(s) Description
Box
3
Building Program, 3/1980
3
The Pence Associates, Inc., Architect and Atwood-Hinzman, Structural Engineers Agreement, 2/1981
3
The Pence Associates, Inc., Architect and Rice & Luhn, Mechanical Engineers Agreement, 8/1980
3
The Pence Associates, Inc., Architect and Wanless-Cook Associates, Electrical Engineers, 2/1981
3
NACUBO, Management of Accessibility for Handicapped Students in Higher Education, 7/1981
3
Survey of Physical Barriers Which Affect the Handicapped at WSU, 12/1977
3
Atwood/Hinzman, Consulting Engineers, Structural Calculations for WSU Handicapped Accessibility Improvements, 4/1981

Building No. 817 - IBC Plant Growth FacilityReturn to Top

Container(s) Description
Box
3
Environmental Impact Statement (E.I.S.)
3
General Correspondence, 12/1983 - 8/1985

(No) Building No. - Biological Chemistry BuildingReturn to Top

Container(s) Description
Box
3
General Correspondence, 1/1979 - 5/1981

Building No. 0009 - Olympic Weight Room (Hollingberry Field House)Return to Top

Container(s) Description
Box
3
Budget
3
Mahan & Smith, Inc. Correspondence
3
Environmental Impact Statement (E.I.S.), 3/1985
3
Affirmative Action Reports
3
Diary Reports
3
Concrete Testing
3
General Correspondence, 5/1984 - 1/1987
3
Adkinson Leigh Sims Cuppage (ALSC) Architects, General Correspondence, 11/1984 - 11/1988
3
ALSC Architects, Contracts, Payments, Addendums
3
S.G. Morin & Son, Inc. Contractors, General Correspondence, 9/1985 - 3/1987
3
S.G. Morin & Son, Inc. Contractors, Contract, Payments, Change Orders
3
Landscaping
3
Rejected Bids, 9/1985
3
Pending Change Proposals
3
Olympic Weight Room Facility, WSU, Design Development, 3/1985
3
Shannon and Wilson, Inc., Geotechnical Consultants, Geotechnical Studies for Olympic Weight Room At WSU, 4/1985

Names and SubjectsReturn to Top

Corporate Names

  • Washington State University. Facilities Planning -- Records and correspondence