Archives West Finding Aid
Table of Contents
Preliminary Guide to the Washington State University Physical Plant Building Records, 1990-1991
Overview of the Collection
- Creator
- Washington State University. Physical Plant
- Title
- Preliminary Guide to the Washington State University Physical Plant Building Records
- Dates
- 1990-1991 (inclusive)19901991
- Quantity
- 5 Linear feet of shelf space, (5 Boxes)
- Collection Number
- UA1992-24 (collection)
- Summary
- Contractor reports, correspondence, and memoranda related to various small-scale projects on the WSU Pullman Campus from 1990-1991.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content DescriptionReturn to Top
Primarily contains instruction manuals, building plans, and engineering drawings related to small-scale projects on campus. Notable projects include the remodel of the Chemistry Building beginning in 1990; and the rewiring of Duncan Dunn Hall in 1990. All files range from 1990-1991.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Physical Plant Building Records, 1990-1991 (UA1992-24)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Items in boxes 1 and two contain some subject folders but are mostly unorganized. Boxes 3-5 are collections of binders and subject folders that are ordered by subject matter and project type.
Detailed Description of the CollectionReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Chemistry Building, 1988 |
2 | Chemistry Building, 1988 |
2 | Mount Vernon Storage Building, 1990 |
2 | Fine Arts Center, Exhaust Fan, 1991 |
2 | Duncan-Dunn Rewire, 1990 |
3 | Safety Bldg. Air Conditioning, 1990 |
3 | PCB Transformer, Housing and Bookstore, 1990 |
3 | Lab Animal Research Center (LARC) Cooler, 1990 |
3 | Computer Science Plaza, 1990 |
3 | Transfer Pump Station - Meter, 1990 |
3 | Bohler Gym Lighting Upgrade, 1990 |
3 | East Coliseum Parking Lot, 1990 |
4 | General Storage Building, Wilson Road Parking, Phase II, 1990 |
4 | Steptoe/Nez Perce Exterior Painting, 1990 |
4 | Bohler Gym Medical Facility, 1990 |
4 | Turfgrass Research Building, 1991 |
4 | Columbia Parking Lot, 1990 |
4 | Chemistry Building, NMR Center, 1990 |
5 | Cleveland Hall, Remodel Second Floor East, 1990 |
5 | ICNE, New Gas Boiler, 1991 |
5 | Life Safety - CUB, Phase II, 1990 |
5 | Mooberry Track Resurface, 1990 |
5 | Re-Roof WSU Tri-Cities Center, 1990 |
5 | Wegner Hall Remodel, 1990 |
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Physical Plant -- Records and correspondence