Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1995-2015
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Services
- Title
- Preliminary Guide to the Washington State University Facilities Services Building Files and Records
- Dates
- 1995-2015 (inclusive)19952015
- Quantity
- 57 Linear feet of shelf space, (57 Boxes)
- Collection Number
- UA 2019-04 (collection)
- Summary
- Records relating to the planning, construction, and renovation of WSU facilities.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
The collection consists of records pertaining to the planning, contruction, and/or renovation of WSU facilities. Correspondence with architects, planners, and contractors is often included.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1995-2015 (UA2019-04)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
As much as possible, materials remained in the order in which they were received, though they were rehoused. Most records from individual buildings are together, but the buildings themselves appear to be in no particular order. The process of rehousing these began in 2019, with boxes 1 to 26 of the 100 received compressed into new boxes 1-21. However, beginning with original box 27, the materials appeared to have been sent over in a chaotic order, often unlabeled, which bore little relation to the contents list. As a result, 13 boxes were returned to Facilities, and may eventually come back to MASC, at which point they'll be treated as a new accession. The remaining 61 boxes of the materials were reboxed in Jan. 2026, forming the current boxes 22 to 57. Much of this portion of the materials were rearranged during rehousing, and significant quantities of material were discarded.
Location of Collection
(MASC STAFF USE) 2-04-15-2Acquisition Information
This material was transferred to WSU Libraries' MASC by Blair Myron of Facilities Services on August 27, 2019 and retained as UA2019-04.
Detailed Description of the Collection
-
Chief Joe Building D Renovation & Demo. Project# 8577-2016. Project Completed 2012
-
Description: Contractor: Certified Payroll Reports/LNI/Sub-Contractor. Firm: Premier ElectricContainer: Box 1
-
Description: Procurement Process : Draft SpecContainer: Box 1
-
Description: Procurement Process : Rejected BidsContainer: Box 1
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps/CCPs. Firm: Blew's Construction. Contract# 19274Container: Box 1
-
Description: Contractor: General Correspondence. Firm: Blew's Construction. Contract# 19274Container: Box 1
-
Description: Consultant : General Correspondence. Firm: Mahlum. Contract# 19153Container: Box 1
-
Description: Consultant : Contract Docs/Add Svcs/Invoices. Firm: Mahlum. Contract# 19153Container: Box 1
-
Description: Contractor: Project Meeting Minutes Project MeetingContainer: Box 1
-
Description: Compliance : Builders Risk PolicyContainer: Box 1
-
Description: Financial : Finance & Audit CommitteeContainer: Box 1
-
Description: Consultant : Consultant Contract. Firm: RCK Consultants. Contract# 19277Container: Box 1
-
Description: Consultant : Consultant Contract. Firm: Allwest Testing. Contract# 19332Container: Box 1
-
Description: Consultant : Consultant Contract. Firm: Taylor Engineering. Contract# 19099Container: Box 1
-
Description: Compliance : Builders Risk PolicyContainer: Box 1
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps/CCPs. Firm: Motley & Motley. Contract# 19022Container: Box 1
-
Description: Procurement Process : Rejected BidsContainer: Box 1
-
Description: Consultant : Contract Docs/Add Svcs/Invoices. Firm: Strata. Contract# 19028Container: Box 1
-
Description: Compliance : Asbesros & Lead Survey. Firm: E3RAContainer: Box 1
-
Description: Procurement Process : Draft SpecContainer: Box 1
-
-
Recreational Playfield Improvements
-
Description: Project Planning: Research and Education Complex Master Plan. Contract# 2003Container: Box 1
-
Description: Procurement Process: Rejected BidsContainer: Box 1
-
Description: Compliance : Builders Risk PolicyContainer: Box 1
-
Description: Compliance : Storm water permitContainer: Box 1
-
Description: Compliance : E.I.SContainer: Box 1
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: KPFF. Contract# 18765Container: Box 2
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Hogan. Contract# 17364Container: Box 2
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: STRATA. Contract# 18779Container: Box 2
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Structural Forte. Contract# 18693Container: Box 2
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Taylor Engineering. Contract# 17885Container: Box 2
-
Description: Contractor: General Correspondence. Firm: Motley-Motley. Contract# 18764Container: Box 2
-
Description: Contractor: Contract Docs/Change Orders/CCPS. Firm: Motley-Motley. Contract# 18764Container: Box 2
-
Description: Financial: Finance & Audit CommitteeContainer: Box 2
-
-
Hotel & Conference Center
-
Description: Project Planning: Regents. Date: 2002Container: Box 2
-
Description: Project Planning: Public Records requests. Date: 2002Container: Box 2
-
Description: Project Planning: Consulting Reports. Date: 2002Container: Box 2
-
Description: Project Planning: Consulting Survey. Date: 2002Container: Box 2
-
Description: Project Planning: Contract Docs/Feasability Study/Invoices. Firm: FCW. Contract# 14496Container: Box 2
-
Description: Project Planning: Contract Docs/Invoices. Firm: Hatch Mueller, PC. Contract# 15054Container: Box 2
-
Description: Project Planning: Contract Docs/Invoices. Firm: Taylor Engineering. Contract# 19047Container: Box 2
-
Description: Project Planning: Soils Report - 12/22/1969. Firm: Dames & Moore SoilsContainer: Box 2
-
Description: General Cooresponance: General Correspondence. Firm: Gerry SchlaterContainer: Box 2
-
Description: Project Planning: Evaluation Report - Need for a Conf Center (1985). Firm: Chamber of CommerceContainer: Box 2
-
Description: Project Planning: RFQ/Draft RFQContainer: Box 3
-
Description: Project Planning: Meeting Minuttes/ General Correspondence/Mailing ListsContainer: Box 3
-
Description: Project Planning: Pullman City Council Zone ChangeContainer: Box 3
-
Description: Project Planning: PM Files. Date: 2001-2003Container: Box 3
-
Description: Project Planning: PM Files. Date: 2010Container: Box 3
-
Description: Project Planning: RFQ'sContainer: Box 3
-
Description: Project Planning: Miscellaneous Proposals including: Developer Submission, Proposal Form, Cover Letter. Firm: X 6 TeamsContainer: Box 3
-
-
Various Projects - Budget Reports from Pullman, Vancouver, Tri-Cities, etc.. Project Completed 1993-2007.
-
Description: Budget: BudgetContainer: Box 4
-
Description: Financial: Departmental RequisitionsContainer: Box 4
-
Description: Legal: JLARC - Audit Review Committee Reports (Misc)Container: Box 4
-
Description: Legal: Tapani UndergroundContainer: Box 4
-
Description: Financial: Misc Historical Project Status/Budget ReportsContainer: Box 4
-
Description: Financial: PO's and/or KO's Misc ProjectsContainer: Box 4
-
Description: Financial: Project Finance RecapsContainer: Box 4
-
Description: Financial: Project Status ReportsContainer: Box 4
-
Description: Financial: Project Summary VariousContainer: Box 4
-
Description: Financial: Vancouver Project Budget - Various Reports & RecapsContainer: Box 4
-
-
Jensen Byrd Building/Pine Street. Project Completed 2012
-
Description: Project Planning: RFP / RFQ. Firm: DexterContainer: Box 4
-
Description: Public Record Requests: #12-127, June, 2012Container: Box 5
-
Description: Public Record Requests: #12-127, June, 2012Container: Box 5
-
Description: Public Record Requests: #12-120, June 2012Container: Box 5
-
Description: Public Record Requests: #8-325, November, 2008Container: Box 5
-
Description: Consultant: Contract Docs/Ground Lease. Firm: NexcoreContainer: Box 5
-
Description: Consultant: Ground Lease RFP'sContainer: Box 5
-
Description: Consultant: Contract Docs/Ground Lease. Firm: Taylor EngineeringContainer: Box 5
-
Description: Project Planning: Ground Lease RFP'sContainer: Box 5
-
-
Waller Hall Renovation. Project Completed 2012
-
Description: Board of Regents: Finance and Audit CommitteeContainer: Box 5
-
Description: Financial: FinancialContainer: Box 5
-
Description: Consultant: Contract Docs. Firm: PBS Engineering. Contract# 19133Container: Box 5
-
Description: Consultant: Contract Docs. Firm: Taylor Engineering. Contract# 19114Container: Box 5
-
Description: Consultant: Contract Docs. Firm: STRATA, Inc.. Contract# 19334 ConsultantContainer: Box 5
-
Description: Consultant: Contract Docs. Firm: Mahlum. Contract# 19174Container: Box 5
-
Description: Consultant: Contract Docs. Firm: PBS EngineeringContainer: Box 5
-
Description: Procurement Process: Good Faith SurveyContainer: Box 5
-
-
Martin Stadium Improvements. Project Completed 2012
-
Description: Financial: Contractor Budget, A/E, other ConsultantsContainer: Box 5
-
Description: Financial: Re-Caps and Budget StatementsContainer: Box 6
-
Description: Financial: DO's IRI's, Dept Req's, PO's and MiscContainer: Box 6
-
Description: Consultant: Third Party Oversight. Firm: STRATA, Inc.Container: Box 6
-
Description: Consultant: Geotechnical Evalutation Report. Firm: STRATA, Inc.Container: Box 6
-
Description: Contractor: GCCM/Contract Docs/Pay Apps/Folders 1-4.. Firm: Hoffman Construction. Contract# 20437Container: Box 6
-
Description: Contractor: GCCM/Contract Docs/Pay Apps/Folders 5-8. Firm: Hoffman Construction. Contract# 20437Container: Box 7
-
Description: Contractor: GCCM/Contract Docs/General Correspondence Folders 2-4. Firm: Hoffman Construction. Contract# 20437Container: Box 7
-
Description: Consultant: Construction Documents Spec Vol 1, Div 0-14. Firm: ALSCContainer: Box 7
-
Description: Consultant: Construction Documents Spec Vol 2, Div 22-23. Firm: ALSCContainer: Box 7
-
Description: Consultant: RFSP - Student Rec Climbing Walls. Firm: EldoradoContainer: Box 7
-
Description: Consultant: RFSP - Student Rec Climbing Walls. Firm: Nicros, Inc.Container: Box 7
-
Description: Construction: Contract docs/Change Orders. Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9. Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 9 Continued... Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Consultant: Drawings/ Master Plan. Firm: ALSCContainer: Box 8
-
Description: Martin Stadium Reno Phase 3/RFQ/Design Build TeamContainer: Box 8
-
Description: Martin Stadium Reno Phase 3/RFQ/Design Build TeamContainer: Box 8
-
Description: Martin Stadium Reno Phase 3/RFQ/AddendumContainer: Box 8
-
Description: Construction: Contract docs/General Correspondence Folder 2. Firm: Hoffman. Contract# 19744Container: Box 8
-
Description: Construction: Contract docs/Pay App 8. Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract Docs/ Consultant A/E Services/Invoices/Add Svcs 1. Firm: ALSC. Contract# 19477Container: Box 9
-
Description: Consultant: Contract Docs/ Consultant A/E Services/Invoices/Add Svcs 2. Firm: ALSC. Contract# 19477Container: Box 9
-
Description: Consultant: Contract Docs/ Consultant A/E Services/Invoices/Add Svcs 3. Firm: ALSC. Contract# 19477Container: Box 9
-
Description: Consultant: Contract docs/Pay App 7. Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 9
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 10
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 10
-
Description: Construction: Contract docs/Pay App 7 Continued... Firm: Hoffman. Contract# 19744Container: Box 10
-
Description: Procurement: RFQ-Project Controls & Monitoring Svcs for South SideContainer: Box 10
-
Description: Procurement: RFP - Martin Stadium Reno Phase 3/Addendum 1Container: Box 10
-
Description: Financial: Finance & Audit Committee/Martin Stadium Phase 3Container: Box 10
-
Description: Board of Regents: Regents/Martin Stadium Phase 4Container: Box 10
-
Description: Contractor: Contract Docs. Firm: Hoffman Construction. Contract# 17609Container: Box 10
-
Description: Consultant: Contract Docs. Firm: HOK Sports. Contract# 17065Container: Box 10
-
Description: Consultant: Contract Docs. Firm: Davis Landon. Contract# 17064Container: Box 10
-
Description: Budget: CPARB ApprovalContainer: Box 10
-
Description: Contractor: Contract Docs/General Correspondence. Firm: Graham ConstructionContainer: Box 10
-
Description: Contractor: General Folder/ 100% DD's. Firm: Graham/ALSC/EllerbeContainer: Box 10
-
Description: Contractor: Phase 3 / HVAC Loads. Firm: McKinstryContainer: Box 10
-
Description: Procurement Process: RFP - Martin Stadium Reno Phase 3Container: Box 11
-
Description: Contractor: Pre-construction. Firm: Graham Construction. Contract# 17769Container: Box 11
-
Description: Contractor: PM/CM Files/ 100% Construction Documents. Firm: Graham/ALSC/EllerbeContainer: Box 11
-
Description: Project Planning: General Correspondence #1Container: Box 11
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Madsen Mitchell Evenson. Contract# 16570Container: Box 11
-
Description: Contractor: Contract Docs/General Correspondence (#1). Firm: Graham Construction & Mgmnt. Contract# 16724Container: Box 11
-
Description: Contractor: Contract Docs/Preconstruction Professional Scs. Firm: Graham Construction & Mgmnt. Contract# 16723Container: Box 11
-
Description: Contractor: Contract Docs/CO's 17-24 and Pay Apps 17-23 (#2). Firm: Graham Construction & Mgmnt. Contract# 16902Container: Box 11
-
Description: Contractor: Contract Docs/CCP's126-167. Firm: Graham Construction & Mgmnt. Contract# 16902Container: Box 11
-
Description: Contractor: Contract Docs/CCP's1-126. Firm: Graham Construction & Mgmnt. Contract# 16902Container: Box 12
-
Description: Procurement Process: Rejected GC/CM BidsContainer: Box 12
-
Description: Contractor: Contract Docs/ RFI and Construction ScheduleContainer: Box 12
-
Description: Procurement Process: RFP's/Miscellaneous ConsultantsContainer: Box 12
-
Description: Compliance: Builder's RiskContainer: Box 12
-
Description: Board of Regents: Business Affairs and Info Tech/ zregents Final Budget ReviewContainer: Box 12
-
Description: Compliance: EIS/MiscellaneousContainer: Box 12
-
Description: Compliance: Public Records Request/Public Information RequestsContainer: Box 12
-
Description: Consultant: Contract Docs/Consultant Contract (#1). Firm: Conventions Sports & Leisure. Contract# 16072Container: Box 12
-
Description: Consultant: Contract Docs/ Good Faith Survey. Firm: E3RA. Contract# 16750Container: Box 12
-
Description: Consultant: Contract Docs/Consultant Contract. Firm: Fabrication Specialties. Contract# 17163Container: Box 12
-
Description: Consultant: Contract Docs/Consultant Contract/Third Party Neutral. Firm: Steve Goldblatt. Contract# 17085Container: Box 12
-
Description: Consultant: Contract Docs/Invoices. Firm: STRATA, Inc.. Contract# 16309Container: Box 12
-
Description: Consultant: Final Project Binder. Firm: STRATA, Inc.. Contract# 16309Container: Box 12
-
Description: Consultant: Contract Docs/Invoices. Firm: Taylor Engineering. Contract# 16180Container: Box 12
-
Description: Project Planning: Martin Stadium Master Plan/Meeting Minutes/PM FilesContainer: Box 12
-
Description: Consultant: Contract Docs/General Correspondence. Firm: Madsen Mitchell, E&CContainer: Box 12
-
Description: Consultant: Contract Docs/Invoices. Firm: Madsen Mitchell, E&C. Contract# 16071Container: Box 12
-
Description: Consultant: Contract Docs/Invoices. Firm: ALSC. Contract# 15071Container: Box 12
-
Description: Compliance: Stormwater Pollution Prevention Plan (2006). Firm: Graham ConstructionContainer: Box 12
-
Description: Contractor: General Correspondence. Firm: SchlaterContainer: Box 12
-
Description: Consultant: Contract Docs/Invoices/Add Svcs #1. Firm: Madsen Mitchell & Evanson. Contract# 16570Container: Box 13
-
Description: Consultant: Contract Docs/Invoices/Add Svcs #2. Firm: Madsen Mitchell & Evanson. Contract# 16570Container: Box 13
-
Description: Consultant: Contract Docs/Invoices/Add Svcs #3. Firm: Madsen Mitchell & Evanson. Contract# 16570Container: Box 13
-
Description: Consultant: Contract Docs/Invoices/Add Svcs #4. Firm: Madsen Mitchell & Evanson. Contract# 16570Container: Box 13
-
Description: Contractor: Construction. Firm: Contract docs/Pay App 8 Continued... Firm: Hoffman. Contract# 19744Container: Box 13
-
Description: Procurement Process: Construction. Firm: Contract Docs/ Consultant A/E Services/Invoices/Add Svcs 1. Firm: ALSC. Contract# 19477Container: Box 13
-
Description: Construction: Contract Docs/Invoices (#4). Firm: ALSC. Contract# 19477Container: Box 14
-
Description: Construction: Contract Docs/Pay Apps (#1). Firm: Hoffman. Contract# 19358Container: Box 14
-
Description: Procurment: Draft Specifications/PM File/Larry Harris (#1)Container: Box 14
-
Description: Procurment: Draft Specifications/PM File/Larry Harris (#2)Container: Box 14
-
Description: Project Planning : RFQ/RFP/GCCMContainer: Box 15
-
Description: Financial: Finance and Audit CommitteeContainer: Box 15
-
Description: Board of Regents : Board of regents ItemsContainer: Box 15
-
Description: Legals: Issues and ClaimsContainer: Box 15
-
Description: Budget: Certified Payroll ReportsContainer: Box 15
-
Description: Project Planning : Schematic design. Firm: ALSCContainer: Box 15
-
Description: Legals: Gift in Place/ Scorebaord Hazard/ PMContainer: Box 15
-
Description: Contractor: Contract Docs/General Correspondence (#3). Firm: Hoffman Construction. Contract# 19744Container: Box 15
-
Description: Contractor: Contract Docs/General Correspondence /Final Completion(#4). Firm: Hoffman Construction. Contract# 19744Container: Box 15
-
Description: Contractor: Contract Docs/General Correspondence (#1). Firm: Hoffman Construction. Contract# 19744Container: Box 15
-
Description: Contractor: Contract Docs/Pay Apps (#2). Firm: Hoffman Construction. Contract# 19358Container: Box 15
-
Description: Contractor: Contract Docs/CCP's192-207. Firm: Hoffman Construction. Contract# 19744Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: ALSC. Contract# 19477Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: STRATA, Inc.. Contract# 21893Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: Allwest. Contract# 19805Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: Creighton Engineering. Contract# 19742Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: SimplexGrinnell. Contract# 19902Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: Steve Goldblatt. Contract# 19847Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: STRATA, Inc.. Contract# 19458Container: Box 15
-
Description: Consultant: Contract Docs/Invoices. Firm: Taylor Engineering. Contract# 19400Container: Box 15
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps (#1). Firm: Hoffman. Contract# 19744Container: Box 15
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps (#2). Firm: Hoffman. Contract# 19744Container: Box 16
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps (#3). Firm: Hoffman. Contract# 19744Container: Box 16
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps (#4). Firm: Hoffman. Contract# 19744Container: Box 16
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps (#9). Firm: Hoffman. Contract# 19744Container: Box 16
-
Description: Consultant: Contract Docs/Invoices/Add Svcs (#9). Firm: ALSC. Contract# 19892Container: Box 16
-
Description: Consultant: Contract Docs/Invoices/Add Svcs (#10). Firm: ALSC. Contract# 19893Container: Box 16
-
Description: Procurement Process: RFQ (#1)Container: Box 16
-
Description: Procurement Process: RFQ (#2)Container: Box 16
-
Description: Procurement Process: GCCM Selection (#1)Container: Box 16
-
Description: Procurement Process: GCCM Selection (#2)Container: Box 16
-
-
Global Scholars Hall. Project Completed 2015
-
Description: Contractor: PM Documents. Firm: BNB. Contract# 21176Container: Box 16
-
Description: Contractor: PM Documents. Firm: BNB. Contract# 21176Container: Box 17
-
Description: Contractor: PM Documents/schedules/submittals/meeting minutes. Firm: BNB. Contract# 21176Container: Box 17
-
Description: Contractor: PM Documents/schedules/submittals/meeting minutes. Firm: BNB. Contract# 21176Container: Box 18
-
Description: Procument Process: RFQ. Firm: All firmsContainer: Box 18
-
Description: Procument Process: RFQ. Firm: All firmsContainer: Box 19
-
Description: Compliance: SWP - Drainage Report. Firm: BNBContainer: Box 19
-
Description: Contractor: PM Notes. Firm: WSU. Contract# 21176Container: Box 19
-
Description: Project Closeout: 100% Construction Drawings. Firm: WSU. Contract# 21176Container: Box 19
-
Description: Project Closeout: Final Report on Water Infiltration During Construction. Firm: GrahamContainer: Box 19
-
Description: Project Closeout: Contract Close-Out Audit. Firm: MRW Advisory, LLCContainer: Box 19
-
Description: Contractor: Change Orders. Firm: GrahamContainer: Box 19
-
Description: Project Closeout: 100% Design Development DrawingsContainer: Box 19
-
-
Northside Residence Hall 1 - Global Scholars (cont.). Project Completed 2012
-
Description: Project Closeout: 100% Construction Documents + Drawings. Firm: BNB.Container: Box 20
-
-
Beasley Coliseum /Martin Stadium. Project Completed 2012
-
Description: Contractor: PM Documents -Scoreboard Hoist Pkg.. Firm: Daktronics. Contract# 19532Container: Box 20
-
Description: Procurement Process: Rejected Bids - Scoreboard Hoist Pkg.. Firm: VariousContainer: Box 20
-
Description: Contractor: Change Order - Beasley Coliseum Replacement. Firm: Daktronics. Contract# 18531Container: Box 20
-
Description: Contractor: Contract -Scoreboard Hoist Pkg.. Firm: Daktronics. Contract# 19532Container: Box 20
-
Description: Contractor: Regents Items. Firm: Daktronics. Contract# 19532Container: Box 20
-
Description: Contractor: General Coorespondence. Firm: Daktronics. Contract# 19532Container: Box 20
-
Description: Contractor: Contract. Firm: Anthony James Partners. Contract# 19380Container: Box 20
-
Description: Contractor: General Coorespondence. Firm: Daktronics. Contract# 19532Container: Box 20
-
Description: Contractor: Pay Apps. Firm: Daktronics. Contract# 19531Container: Box 20
-
Description: Contractor: Rejected Bids -Beasley Coliseum Scoreboare ReplaceContainer: Box 20
-
Description: Contractor: Bid Bond. Firm: TS SportsContainer: Box 20
-
Description: Contractor: Bid Bond return. Firm: YESCOContainer: Box 20
-
Description: Contractor: Bid Bond return. Firm: CBS OutdoorContainer: Box 20
-
Description: Procurement Process: Specs. Firm: WSUContainer: Box 20
-
Description: Contractor: Invoices-Beasley Coliseum Structural Roof Reinforcement. Firm: Strata. Contract# 19626Container: Box 20
-
Description: Procurement Process: Rejected Bids - Structural RoofContainer: Box 20
-
Description: Contractor: Pay Apps. Firm: Lydig. Contract# 19564Container: Box 20
-
Description: Contractor: General Coorespondence. Firm: Lydig. Contract# 19564Container: Box 20
-
Description: Contractor: Change Order. Firm: Lydig. Contract# 19564Container: Box 20
-
Description: Contractor: drawings. Firm: Lydig. Contract# 19564Container: Box 20
-
Description: Contractor: Replacement Draft SpecsContainer: Box 20
-
Description: Procurement Process: Regents Reports - Martin Stadium Remove BleachersContainer: Box 20
-
Description: Procurement Process: Builders RiskContainer: Box 20
-
Description: Contractor: General Coorespondence. Firm: Motley-Motley. Contract# 19607Container: Box 20
-
Description: Contractor: Change Order. Firm: Motley-Motley. Contract# 19607Container: Box 20
-
Description: Procurement Process: Rejected BidsContainer: Box 20
-
Description: Contractor: HLA Display Garden DrawingsContainer: Box 20
-
-
Tri-Cities. Project Completed 2012
-
Description: Contractor: General Coorespondence -Outdoor Stage. Firm: ALSC. Contract# 19671Container: Box 21
-
Description: Contractor: Contract. Firm: Winkler. Contract# 19312Container: Box 21
-
Description: Contractor: General Coorespondence - Veterans Memorial. Firm: Columbia Engineers. Contract# 19490Container: Box 21
-
Description: Contractor: Tri-Cities Master PlanContainer: Box 21
-
-
Regents Dining Center Remodel. Completed 2003
-
Description: Consultants: Asbestos Abatement Closeout Report. Firm: Lydig. Contract# 18131Container: Box 21
-
Description: Consultants: Air Monitoring Report. Firm: MCS EnvironmentalContainer: Box 21
-
Description: Consultants: Daily Project Logbook. Firm: Tektoniks CorporationContainer: Box 21
-
Description: Consultants: Commissioning Report. Firm: Tektoniks CorporationContainer: Box 21
-
Description: Consultants: Deficiency Report. Firm: TestcommContainer: Box 21
-
Description: Consultants: Asbestos Abatement Final Report. Firm: SCM ConsultantsContainer: Box 21
-
-
Veterinary Medical Research Building (REC 4 )
-
Description: Consultants: Programm Verification ReportContainer: Box 21
-
Description: Consultants: Schematic Design Technical Submittal. Firm: SRG Partnership, Inc.Container: Box 21
-
Description: Consultants: Schematic Design CM/PM Notes. Firm: Virgil HansenContainer: Box 21
-
Description: Consultants: Project Binder/Bid Releae 1/Const Mat Test & Inspection. Firm: StrataContainer: Box 21
-
Description: Contractor: Monthly Report/Project Status/QC Summary/Budget/RFI/Disputes/ Lydig CorporationContainer: Box 22
-
Description: Contractor: October - December 2010Container: Box 22
-
Description: Contractor: January - December 2011Container: Box 22
-
Description: Contractor: January - December 2012Container: Box 22
-
Description: Contractor: Structural Calculations Volume 1 Magnusson Klemencic Associates 2010Container: Box 22
-
Description: Contractor: Structural Calculations Volume 2 Magnusson Klemencic Associates 2010Container: Box 22
-
Description: Contractor: Structural Calculations Volume 3 Magnusson Klemencic Associates 2010Container: Box 22
-
Description: Procurement: Bid Package Addendum 10 - 12Container: Box 22
-
Description: Procurement: Bid DrawingsContainer: Box 22
-
Description: Contractor: CM/PM Progress Meeting MinutesContainer: Box 23
-
Description: Contractor: 50 % Coordination Bid Release DocumentContainer: Box 23
-
Description: Contractor: 100% Design Development Spec Volume 1Container: Box 23
-
Description: Contractor: 100% Design Development Spec Volume 2Container: Box 23
-
-
WaWaWai Boat Dock Replacement
-
Description: Contractor: Contract Docs. Firm: Knight Construction & Supply Contract# 16270Container: Box 23
-
Description: Consultant: Contract Docs/Invoices. Firm: Womer & Associates Contract# 15875Container: Box 23
-
Description: CM/PM : Misc CorrespondencePM. Firm: Army Corp of EngContainer: Box 23
-
Description: Consultant : Consultant RFQ /2004. Firm: Womer & AssociatesContainer: Box 23
-
Description: CM/PM: Project Manual/Bid Set/SEPA CheckistContainer: Box 23
-
Description: CM/PM: Misc Docs/Joint Aquatic Resources Permit Application. Firm: JARPAContainer: Box 24
-
-
Hazardous Waste Facilities . Completed 1998
-
Description: CM/PM : Project Manager Files/Emails/Meeting Minutes 1993-1998Container: Box 24
-
Description: Consultant : Contract Docs/Add Svcs/Misc Notes. Firm: Bovay Northwest Contract# 10798Container: Box 24
-
Description: Planning : Project Manual/ Volume 1/ Divisions 0-16Container: Box 24
-
Description: Regents : Meeting MinutesContainer: Box 24
-
Description: Contract/Deliverables : Reports/Surveys/TestingContainer: Box 24
-
Description: College of Agriculture/ Markley ServicesContainer: Box 24
-
Description: Value Engineering StudyContainer: Box 24
-
Description: Cost EstimatingContainer: Box 25
-
Description: Pre-Design reportsContainer: Box 25
-
-
Regents Dining Center. Project Completed 2005
-
Description: Contractor: CM/PM Electrical SubmittalsContainer: Box 25
-
Description: Contractor: CM/PM RFI'sContainer: Box 25
-
Description: Contractor: CM/PM Project Manual/Bid SetContainer: Box 25
-
Description: Contractor: Final Balancing ReportContainer: Box 25
-
Description: Contractor: Punch Lists/One Year Warranty Issues/Commissioning ReportsContainer: Box 25
-
Description: Contractor/CM/PM: Project Manual - Volume 1-3 Design Development. Firm: URS CorporationContainer: Box 26
-
Description: Contractor/CM/PM: Project Manual - Volume 1-3 Bid Set. Firm: URS CorporationContainer: Box 26
-
Description: Contractor/CM/PM: Schematic Submittal/ Basis of Design. Firm: URS CorporationContainer: Box 26
-
Description: Contractor/CM/PM: 65% Construction Documents - Volume 1-3. Firm: URS CorporationContainer: Box 26
-
Description: CM/PM: Miscellaneous Correspondence/Construction ScheduleContainer: Box 26
-
Description: CM/PM: Preliminary Schedule/Monthly UpdatesContainer: Box 26
-
Description: CM/PM: Hardware Schedules/SubmittalsContainer: Box 26
-
Description: Mechanical Submittal ReviewsContainer: Box 26
-
Description: CM/PM: Submittal ReviewsContainer: Box 27
-
Description: CM/PM: Submittal DrawingsContainer: Box 27
-
Description: CM/PM: IRI's/Work Orders/Misc Review CommentsContainer: Box 27
-
Description: CM/PM: Asbestos Abatement Report Post ProjectContainer: Box 27
-
-
Palouse Golf Course Club House. Project Completed 2004
-
Description: Regents: Meeting MinutesContainer: Box 27
-
Description: Regents: Business Affairs & Info Tech Committee.Container: Box 27
-
Description: Contractor: Change Orders/Pay Apps. Firm: Graham Construction Contract# 17256Container: Box 27
-
Description: Contractor: Contract Docs. Firm: Graham Construction Contract# 17256Container: Box 27
-
Description: Contractor: CCP's. Firm: Graham Construction Contract# 17256Container: Box 27
-
Description: Consultant: Finanicial Analysis ReportContainer: Box 27
-
Description: Legal: Issues & ClaimsContainer: Box 27
-
Description: Consultant: Contract Docs/Invoices. Firm: Affiliated Engineers Inc. Contract# 17347Container: Box 27
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Studio SC Contract# 17026Container: Box 27
-
Description: Consultant: Contract Docs. Firm: Taylor Engineering Contract# 16052Container: Box 27
-
Description: Contractor: Project ManualContainer: Box 28
-
Description: Consultant: Daily Reports StrataContainer: Box 28
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: Design West Contract# 16725Container: Box 28
-
Description: Contractor: Miscellaneoius Correspondence. Firm: CM/PMContainer: Box 28
-
Description: Consultant: Commercial Lease between WSU & Cougar Restaurant Enterprises Contract# 16985Container: Box 28
-
Description: Contractor: RFI's. Firm: Graham ConstructionContainer: Box 28
-
Description: Contractor: EmailsContainer: Box 28
-
Description: Contractor: ASI's. Firm: Design WestContainer: Box 28
-
Description: Contractor: Pre-Design Docs (2-1-04)Container: Box 28
-
Description: Contractor: Meeting Minutes. Firm: Graham ConstructionContainer: Box 28
-
Description: Contractor: Certified Payroll Reports. Firm: Graham ConstructionContainer: Box 28
-
Description: Contractor: Project Construction Submittals/Misc Docs. Firm: Graham Construction Contract# 17256Container: Box 28
-
Description: Sections 20 through 26Container: Box 28
-
-
Stadium Way Lighting
-
Description: CM/PM: Project Submittals/ PM Copies of Contract Docs/Pay RequestsContainer: Box 29
-
-
Compton Union Building (CUB). Project Completed 2006
-
Description: Procurement: RFP Bid Package #1. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: RFP Bid Package #2. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: RFP Bid Package #3a. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: Design Package/Structural & Elevator. Firm: Pfeiffer PartnersContainer: Box 29
-
Description: Procurement: Bid Package #1 - Demolition & Abatement Addendum No. A. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: Bid Package #2 - Structural & Elevator Addendum No. A. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: Bid Package #3 - All Other Work Addendum A. Firm: Hoffman Construction CompanyContainer: Box 29
-
Description: Procurement: Bid Package #3 - All Other Work Addendum B. Firm: Hoffman Construction CompanyContainer: Box 30
-
Description: Procurement: Bid Package #3 - All Other Work Addendum C. Firm: Hoffman Construction CompanyContainer: Box 30
-
Description: CM/PM: Bid Docs/Daily Reports. Firm: Hoffman Construction CompanyContainer: Box 30
-
Description: CM/PM: 100% Design Development Project Specification - Vol 1. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 100% Design Development Project Specification - Vol 2. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 100% Design Development Project Specification - Vol 3. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 50% Design Development - Project Narratives. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 85% Construction Documents - Vol 1. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 85% Construction Documents - Vol 2. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 85% Construction Documents - Vol 3. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 100% Construction Documents - Vol 1. Firm: Pfeiffer PartnersContainer: Box 30
-
Description: CM/PM: 100% Construction Documents - Vol 2. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: 100% Construction Documents - Vol 3. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: WA Bldg Renovation Project/Submittals/TransmittalsContainer: Box 31
-
Description: CM/PM: 50% Project Manual WSU WA Bldg. Firm: ALSCContainer: Box 31
-
Description: CM/PM: 50% Construction Documents Supplemental Spec Sections. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: 50% Plus Construction Documents. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: BP-1 Demolition and Abtement - Project Specification. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: 50% CD's. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: CM/PM: BP-1 Demolition and Abtement - Project Specification. Firm: PfeifferContainer: Box 31
-
Description: CM/PM: Project Manual.Container: Box 31
-
Description: Procurement: 100 % Building Construction Design Bid Packages Volume 1. Firm: Pfeiffer PartnersContainer: Box 31
-
Description: Procurement: 100 % Building Construction Design Bid Packages Volume 2. Firm: Pfeiffer PartnersContainer: Box 32
-
Description: Procurement: Bid Package A1 Washington BuildingContainer: Box 32
-
Description: Procurement: Bid Package A2 CUB ReloationContainer: Box 32
-
Description: CM/PM: CUB Daily Reports. Firm: Hoffman ConstructionContainer: Box 32
-
Description: CM/PM: CUB Construction Budget Submittals. Firm: Hoffman ConstructionContainer: Box 32
-
-
Rotunda Dining Center Renovation. Project Completed 2007
-
Description: CM/PM: Start Up Plan with Performance Test And Data Sheets. Firm: TestComm Contract# 15247Container: Box 32
-
Description: Contractor: Transmittal Record. Firm: Lydig CorporationContainer: Box 32
-
Description: CM/PM: Mechanical Submittals. Firm: CoffmanContainer: Box 32
-
Description: CM/PM: Electrical Submittals & Reviews. Firm: Lydig CorporationContainer: Box 32
-
Description: CM/PM: Commissioning Plan. Firm: TestCommContainer: Box 32
-
Description: CM/PM: Plumbing Submittals. Firm: 3M MechanicalContainer: Box 32
-
Description: CM/PM: Telecom Data Submittals. Firm: PowerComContainer: Box 32
-
Description: CM/PM: Digital Control Submittals. Firm: Johnson ControlsContainer: Box 32
-
Description: CM/PM: Fire Protection System Submittal Package. Firm: Fire Control Sprinkler SystemsContainer: Box 32
-
Description: CM/PM: Paint Submittals. Firm: Columbia PaintsContainer: Box 32
-
Description: CM/PM: Casework Shop Drawings. Firm: Lydig CorporationContainer: Box 32
-
-
Libaray Road Phase 1. Project Completed 2006
-
Description: Contractor: PM/CM Project Docs Related to Construction ContractContainer: Box 32
-
Description: 12-8 Punch ListContainer: Box 32
-
Description: 11-4 Weekly Project Meeting MinutesContainer: Box 32
-
Description: 11-3 Pre-Bid/Pre-Con Meetring minutesContainer: Box 32
-
Description: 10-2-16 Division 16 ElectricalContainer: Box 32
-
Description: 10-2-15 Division 15 MechanicalContainer: Box 32
-
Description: 10-2-4 Division 4 - MasonryContainer: Box 32
-
Description: 10-2-3 Division 3 - ConcreteContainer: Box 32
-
Description: 10-2-2 Division 2 - Site WorkContainer: Box 32
-
Description: 9-2 Payment RequestsContainer: Box 32
-
Description: 8-6 Look Ahead SchedulesContainer: Box 32
-
Description: 8-3-1 Review CommentsContainer: Box 32
-
Description: 8-2 Construction ScheduleContainer: Box 32
-
Description: 8-1 Miscellaneous CorrespondenceContainer: Box 32
-
Description: 7-2-1 Field DirectivesContainer: Box 32
-
Description: 6-1 RFI LogContainer: Box 32
-
Description: 5-1 Bid PackageContainer: Box 32
-
Description: Miscellaneous Correspondence (between A/E, PM & Contractor)Container: Box 32
-
-
Vancouver Underground Classroom Building Project Completed 2009
-
Description: Budget: Project Financial RecapsContainer: Box 33
-
Description: Budget: Budget StatementsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO's (VIT- VFO)Container: Box 33
-
-
Vancouver Campus Infrastructure Project Completed 2006
-
Description: Budget: Budget StatementsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
-
Spokane Applied Sciences Lab Project Completed 2006
-
Description: Budget: Budget StatementsContainer: Box 33
-
-
Spokane Classroom Bldg Phase 1 Project Completed 2006
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
Description: Budget: Project Financial RecapsContainer: Box 33
-
Description: Budget: Project Cost Detail for Spokane Data CenterContainer: Box 33
-
-
Spokane Vet Teaching Clinic Project Completed 2008
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
-
Tri-Cities Bio-Products Project Completed 2007
-
Description: Budget: Project Financial RecapsContainer: Box 33
-
Description: Budget: Budget StatementsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
Description: Financial: Departmental PO's (Equipment)Container: Box 33
-
-
Golf Course. Project Completed 2010
-
Description: Budget: Budget StatementsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
-
Golf Course Clubhouse. Project Completed 2009
-
Description: Budget: Project Financial RecapsContainer: Box 33
-
Description: Budget: Budget StatementsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
-
Library Remote Storage Facility. Project Completed 2004
-
Description: Budget: Project Financial RecapsContainer: Box 33
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 33
-
-
Library Master Plan. Project Completed 2004
-
Description: Budget: Budget StatementsContainer: Box 34
-
-
Vet Med Barn Relocation. Project Completed 2006
-
Description: Budget: Project Financial RecapsContainer: Box 34
-
Description: Budget: Budget StatementsContainer: Box 34
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 34
-
-
Student Housing Development. Project Completed 2010
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 34
-
-
CUB Renovation. Project Completed 2007
-
Description: Budget: Project Financial RecapsContainer: Box 34
-
Description: Budget: Budget StatementsContainer: Box 34
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 34
-
-
Campus Infrastructure. Project Completed 1998
-
Description: Budget: Project Financial RecapsContainer: Box 34
-
Description: Budget: Budget StatementsContainer: Box 34
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 34
-
-
Vancouver Infrastructure. Project Completed 2003
-
Description: Budget: Project Financial RecapsContainer: Box 34
-
Description: Budget: Budget StatementsContainer: Box 34
-
-
Tennis Court Facility. Project Completed 2005
-
Description: Contractor: CM/PM Daily Project Site ReportsContainer: Box 34
-
Description: Consultant: Pre-Con Electrical Submittals. Firm: QC ElectricContainer: Box 34
-
Description: Consultant: Contract Docs. Firm: KPFF. Contract# 15599Container: Box 34
-
Description: Consultant: Good Faith Hazardous Materials Survey. Firm: E3RA. Contract# 16097Container: Box 34
-
Description: Consultant: Storm Drainage Report. Firm: Taylor EngineeringContainer: Box 34
-
Description: Contractor: Contract Docs/Change Orders. Firm: Lydig. Contract# 16609Container: Box 34
-
Description: Consultant: Contract Docs/Add Svcs. Firm: STRATA, Inc.. Contract# 16683Container: Box 34
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Motley-Motley. Contract# 16958Container: Box 34
-
-
Energy Plant. Project Completed 2009
-
Description: Budget: Budget StatementsContainer: Box 35
-
Description: Budget: Project Finacial RecapsContainer: Box 35
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 35
-
Description: Contractor: Contract Change Orders. Firm: Hoffman Construction. Contract# 14972Container: Box 35
-
Description: Contractor: Contract Change Orders. Firm: Lydig. Contract# 14625Container: Box 35
-
Description: Consultant: Contract Docs. Firm: Miscellaneous. Contract# MultipleContainer: Box 35
-
Description: Financial: Departmental Orders, IRI's and PO's. Contract# MultipleContainer: Box 35
-
-
College of Nursing Spokane Facility
-
Description: Budget: Budget StatementsContainer: Box 36
-
Description: Budget: RecapsContainer: Box 36
-
-
Olympia Avenue Student Housing
-
Description: Budget: Budget StatementsContainer: Box 36
-
Description: Budget: RecapsContainer: Box 36
-
-
Science Hall Remodeling Phase 1. Project Completed 1985
-
Description: Project Financial Recap FolderContainer: Box 36
-
-
Project Name Campus Infrastructure Improvements. Project Completed 1999-2004
-
Description: Budget: RecapsContainer: Box 36
-
Description: Budget: Budget StatementsContainer: Box 36
-
-
Vancouver Engineering Life Sciences
-
Description: Budget: RecapsContainer: Box 36
-
Description: Budget: Budget StatementsContainer: Box 36
-
-
Dana Hall & Precinct Study
-
Description: Budget: RecapsContainer: Box 36
-
Description: Budget: Budget StatementsContainer: Box 36
-
-
Major Capital Infrastructures
-
Description: Budget: RecapsContainer: Box 36
-
Description: Budget: Budget StatementsContainer: Box 36
-
-
Vancouver Miscellaneous
-
Description: Consultant: Loop RoadContainer: Box 36
-
Description: Consultant: North Parking LotContainer: Box 36
-
Description: Consultant: 78th Street AREU Redevelopment Study. Firm: JD White. Contract# 15584Container: Box 36
-
-
Vancouver Tree Replacement/Wetland & Habitat Mitigation
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Pacific Landscape Industries. Contract# 15089Container: Box 36
-
-
Spokane Health Sciences Building. Project Completed 2001
-
Description: Budget: Budget StatementsContainer: Box 36
-
Description: Budget: BudgetsContainer: Box 36
-
Description: Budget: Project RecapsContainer: Box 36
-
-
Stadium Way Improvements. Project Completed Multiple
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Motley-Motley. Contract# 14579Container: Box 36
-
Description: Budget: Budget StatementsContainer: Box 36
-
Description: Budget: Project RecapsContainer: Box 36
-
-
Rotunda Dining Renovation
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Lydig. Contract# 16922Container: Box 37
-
Description: Consultant: Contract/Add Svcs. Firm: URS Corporation. Contract# 15848Container: Box 37
-
Description: Budget: Budget StatementsContainer: Box 37
-
Description: Budget: Project RecapsContainer: Box 37
-
-
Spokane Academic Center Phase I & II. Project Completed 1999
-
Description: Consultant: Programming Study Institutional Research & WSUSContainer: Box 37
-
Description: Consultant: Contract Docs/Add Svcs. Firm: NAC. Contract# 14503, 13453Container: Box 37
-
Description: Contractor: Change Orders. Firm: Shea Graham. Contract# 15583, 16950Container: Box 37
-
Description: Budget: Budget StatementsContainer: Box 37
-
Description: Budget: Project RecapsContainer: Box 37
-
-
Shock Physics Building. Project Completed 2000 -2003
-
Description: Funding: Project Planning/Funding Request/Cost EstimateContainer: Box 37
-
Description: Consultant: Value Engineering Study. Firm: Miller-Hull PartnershipContainer: Box 37
-
Description: Consultant: Construcability ReportContainer: Box 37
-
Description: Consultant: 95% Design Review Firm: PM/CMContainer: Box 37
-
Description: Budget: Project RecapsContainer: Box 37
-
Description: Budget: Firm: OFM - Project Budget DetailContainer: Box 37
-
Description: Contractor: Contract Docs/Change Orders. Firm: Lydig. Contract# 14269Container: Box 37
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Miller-Hull Partnership. Contract# 12905Container: Box 37
-
Description: Consultant: Contract Docs. Firm: Strata. Contract# 14293Container: Box 37
-
-
South Fairway Parking Lot
-
Description: Contractor: Contract Docs/Change Orders. Firm: Motley-Motley. Contract# 15666Container: Box 37
-
Description: Consultant: Contract Docs/Add Svcs. Firm: KPFF. Contract# 15413, 15534Container: Box 37
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Strata. Contract# 15686Container: Box 37
-
Description: Budget: Budget StatementsContainer: Box 37
-
Description: Budget: Project RecapsContainer: Box 37
-
-
Spokane Riverpoint Campus South Campus Facility
-
Description: Budget: Budget StatementsContainer: Box 37
-
Description: Contractor: Change Orders. Firm: Bouten. Contract# 15839Container: Box 37
-
Description: Budget: Project RecapsContainer: Box 37
-
-
Cleveland Hall Education Addition
-
Description: Budget: Project RecapsContainer: Box 38
-
Description: Budget: Budget StatementsContainer: Box 38
-
Description: Contractor: Contract Docs/Change Orders. Firm: Graham. Contract# 15525Container: Box 38
-
-
Chemical Waste Collection Sites
-
Description: Budget: Budget StatementsContainer: Box 71
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Bovay Northwest, Inc.. Contract# 10798Container: Box 38
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Bouten Construction. Contract# 12150Container: Box 38
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Mike Coman Construction. Contract# 12789Container: Box 38
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 38
-
-
WSUV Physical Plant Maintence. Project Completed 1996-1998
-
Description: Budget: Budget StatementsContainer: Box 38
-
Description: Contractor: Contract Docs/Change Orders/. Firm: Neilsen Dillingham Builders. Contract# 13228Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: ZGF. Contract# 12794Container: Box 38
-
Description: Contractor: Contract Docs/Change OrdersContainer: Box 38
-
-
Johnson Hall Addition. Project Completed 2003-2005
-
Description: Budget: Project RecapsContainer: Box 38
-
Description: Budget: Budget StatementsContainer: Box 38
-
Description: Budget: Firm: OFM/Budget Status/Supporting DocumentsContainer: Box 38
-
Description: Contractor: Contract Docs/Change Orders. Firm: CK Doty & Associates of WA. Contract# 16145Container: Box 38
-
Description: Contractor: Contract Docs/Change Orders. Firm: Skanska. Contract# 15014Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs/Invoices. Firm: ZGF. Contract# 14316Container: Box 38
-
-
Library Road Phase I
-
Description: Budget: Budget StatementsContainer: Box 38
-
Description: Budget: Project RecapsContainer: Box 38
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps. Firm: Shea Graham Construction. Contract# 14580Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: KPFF. Contract# 14594Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: The Berger Partnership. Contract# 13861Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Hodge & Associates. Contract# 14250Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: W.P.A. Contract# 13867Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Lydig Construction. Contract# 14418Container: Box 38
-
Description: Consultant: Contract Docs/Add Svcs. Firm: NBBJ. Contract# 14249Container: Box 38
-
-
Library Road Phase II
-
Description: Budget: Budget StatementsContainer: Box 38
-
Description: Budget: Project RecapsContainer: Box 38
-
Description: Contractor: Contract Docs/Change Orders. Firm: Lydig Construction. Contract# 15629Container: Box 38
-
-
Vancouver Student Services. Project Completed 1999-2009
-
Description: Budget: Project RecapsContainer: Box 39
-
Description: Budget: Budget StatementsContainer: Box 39
-
-
Vancouver Multi-Media Electronic Classroom. Project Completed Multiple. 1996-2008
-
Description: Budget: Project RecapsContainer: Box 39
-
Description: Budget: Budget StatementsContainer: Box 39
-
Description: Contractor: Contract/Change Orders. Firm: Baugh Construction Oregon. Contract# 14172, 13029Container: Box 39
-
Description: Consultant: Contract Letters/Add Svcs. Firm: ZGF Partnership. Contract# 12944Container: Box 39
-
-
Vancouver Engineering Life Sciences Building
-
Description: Financial: Budget Statements. Firm: Vicki ChalmersContainer: Box 39
-
Description: Budget: Project RecapsContainer: Box 39
-
-
Prosser Weather Station
-
Description: Financial: Budget Statements. Firm: Vicki ChalmersContainer: Box 39
-
Description: Budget: Project RecapsContainer: Box 39
-
-
Prosser Multipurpose Building
-
Description: Financial: Budget Statements. Firm: Vicki ChalmersContainer: Box 39
-
Description: Budget: Project RecapsContainer: Box 39
-
-
B-Street Houses. Project Completed Multiple 1996-2007
-
Description: Contractor: Contract Docs/Change Orders. Firm: Duracon, Inc. Contract# 16669Container: Box 39
-
Description: Consultant: Contract Design Svcs. Firm: D.K. Mullin Architects. Contract# 16545Container: Box 39
-
Description: Consultant: Contract doc/Add Svcs. Firm: Munir Daud + Associates. Contract# 16752Container: Box 39
-
Description: Compliance: Legal AdsContainer: Box 39
-
-
Vet Med - Biomedical Science Facility
-
Description: Budget: Project Request/Project Status ReportContainer: Box 39
-
Description: Consultant: Pre-Design Contract/. Firm: SRG Partnership. Contract# 15349Container: Box 39
-
Description: Compliance: Legal Ads and Tear Sheets/Dept RecsContainer: Box 39
-
Description: Financial: Project financial Recaps/Budget StatementsContainer: Box 39
-
-
Cell Tower Renovation
-
Description: Budget: Cash Deposit Reports/Deptartmental ReqsContainer: Box 39
-
Description: Consultant: Contract Docs. Firm: Strata Firm: Geotechnical Eng. Contract# 17015Container: Box 39
-
Description: Consultant: Contract Docs. Firm: Northwest Tower. Contract# 16942Container: Box 39
-
Description: Consultant: Contract Docs. Firm: VoiceStream. Contract# 16158Container: Box 39
-
Description: Consultant: Contract Docs. Firm: Adams & Clark. Contract# 16887Container: Box 39
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 39
-
-
CUB Renovation
-
Description: Consultant: Contract Docs. Firm: Kaplin McLughlin Diaz. Contract# 12189Container: Box 39
-
Description: Contractor: Change Orders. Firm: Hoffman. Contract# 16590Container: Box 39
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 39
-
-
Commons 1st & 2nd Floor Renovation
-
Description: Budget: Budget StatementsContainer: Box 39
-
Description: Plans: Office Layout/Power LayoutContainer: Box 39
-
Description: Planning: Various DocumentsContainer: Box 39
-
-
Creamery Annex
-
Description: Contractor: Contract Docs/Change Orders. Firm: Lydig Construction. Contract# 13249Container: Box 39
-
Description: Consultant: Contract Docs/Advice. Firm: Northwest Architectural Co.. Contract# 13109Container: Box 39
-
Description: Consultant: Contract Docs. Firm: Five-G Consulting. Contract# 16833Container: Box 39
-
Description: Consultant: Contract Docs. Firm: Strata Firm: Geotechnical Eng. Contract# 13259Container: Box 39
-
Description: Compliance: Legal Ads/Tear Sheets/InvoicesContainer: Box 39
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 39
-
-
Parking Structures
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki ChalmersContainer: Box 39
-
Description: Contractor: Spring Street Parking Lot - Contract Docs. Firm: Hereford Contracting & Excavating. Contract# 15218Container: Box 39
-
Description: Contractor: Kimbrough Parking Lot - Contract Docs. Firm: Hereford Contracting & Excavating. Contract# 15217Container: Box 39
-
Description: Contractor: Campus Parking Lot - Contract Docs/Change Orders. Firm: Hereford Contracting & Excavating. Contract# 15216Container: Box 39
-
Description: Contractor: Spillman Parking Lot - Contract Docs/Change Orders. Firm: Hereford Contracting & Excavating. Contract# 15215Container: Box 39
-
-
Old Incinerator Hazmat Abatement
-
Description: Project: Budget: Budget Status Report/MemosContainer: Box 39
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps. Firm: IRS Environmnetal. Contract# 16635Container: Box 39
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps. Firm: Motley-Motley. Contract# 16860Container: Box 39
-
Description: Consultant: Technical Report & Cost Study. Firm: Columbia Energy & E.SContainer: Box 39
-
Description: Recaps: Closeout DocsContainer: Box 39
-
Description: Budget: Statements: Budget Recaps. Firm: Vicki Chalmers/Judi DavisContainer: Box 39
-
-
Campus Infrastructure 2003-2007
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
Description: Financial: Ourchase Order/Dept Req/Vendor Invoices/Correspondence. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
-
Colorado Street Improvements
-
Description: Contractor: Contract Docs/Change Orders. Firm: Lydig. Contract# 16058Container: Box 40
-
Description: Consultant: Contract Docs/Add Svcs. Firm: Strata Firm: Geotechnical Eng. Contract# 15602Container: Box 40
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
-
College Hill
-
Description: Budget: Budget Statements. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
-
Glenn Terrell Friendship/Wilson Road Mall Extension
-
Description: Regents: Meeting MinutesContainer: Box 40
-
Description: Contractor: Contract Docs/Change. Firm: Irders RRACo, Inc.. Contract# 15712Container: Box 40
-
Description: Consultant: Contract Docs. Firm: KPFF. Contract# 17306Container: Box 40
-
Description: Budget: Financial Recaps/Budget Reports. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
-
Murrow Hall Renovation. Project Completed Multiple 2000-2007
-
Description: Budget: Budget: Recaps Judi. Firm: Davis FilesContainer: Box 40
-
Description: Budget: Departmental Requisitions/Purchase Orders Judi. Firm: Davis FilesContainer: Box 40
-
Description: Contractor: Change Orders. Contract# 1-17. Firm: Baugh. Firm: Skanska. Contract# 14705Container: Box 40
-
Description: Contractor: Contract Docs/Add Svcs/Pre-Construction Meeting Minutes. Firm: Baugh. Firm: Skanska. Contract# 14563Container: Box 40
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: Northwest Architectural Co. Contract# 13938Container: Box 40
-
Description: Budget: Project Budget/ Purchase Orders:Container: Box 40
-
Description: SSI/Custodial/Furniture/Broadcast/IT: Equipment/Other MiscContainer: Box 40
-
-
Murrow Hall East
-
Description: Budget: Project Budget/Pre-Design Budget/Memos/ExpenditureContainer: Box 40
-
Description: Budget: Budget: Recaps. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
Description: Budget: Budget Statements. Firm: Vicki Chalmers/Judi DavisContainer: Box 40
-
-
Hazardous Waste Facilities
-
Description: Budget: Project Budget PlanningContainer: Box 40
-
Description: Planning: Business Affairs and Planning Committee Meeting MinsContainer: Box 40
-
Description: Consultant: Purchase Orders (multiple) Dept RequisitionsContainer: Box 40
-
Description: Budget: Purchase Orders/Budget Recap/Advertisement TransmittalsContainer: Box 40
-
Description: Contractor: Contract/Change Orders. Firm: Concord Construction. Contract# 14943Container: Box 40
-
Description: Contractor: Contract/Change Orders. Firm: Hughes-Sillers Construction. Contract# 14502Container: Box 40
-
Description: Contractor: Contract/Change Orders. Firm: USK Corporation. Contract# 14932Container: Box 40
-
Description: Contractor: Contract/Change Orders. Firm: Walker Construction. Contract# 14468Container: Box 40
-
Description: Contractor: Contract/Change Orders. Firm: Whitebird, Inc.. Contract# 14306Container: Box 40
-
Description: Consultant: Contract - Design Services. Firm: URS Corporation. Contract# 12192Container: Box 40
-
Description: Consultant: Contract - A/E Design Services. Firm: URS Corporation. Contract# 13680Container: Box 40
-
Description: Consultant: Good Faith HazMat Survey. Firm: SCM Consultants. Contract# 15026Container: Box 40
-
-
Horticulture Greenhouse Relocation
-
Description: Contractor: Contract/Change Orders/Pay Apps Firm: Brown Contracting Co. Contract# 17041Container: Box 40
-
Description: Budget: Budget Statements/Project Cost Estimates/Pre-DesignContainer: Box 40
-
Description: Board: of Regents: Meeting Minutes Project Request/OFMContainer: Box 40
-
-
Indoor Practice Facility Projects Completed Multiple 2000-2007
-
Description: Budget: Budget StatementsContainer: Box 41
-
Description: Budget: Project Financial RecapsContainer: Box 41
-
Description: Consultant: Contract/InvoiceS. Firm: Mondo USA. Contract# 14582Container: Box 41
-
Description: Contractor: Contract/Change Orders/Pay Apps. Firm: Shea Graham Construction. Contract# 14313Container: Box 41
-
Description: Consultant: Contract/Invoices. Firm: ALSC. Contract# 14366Container: Box 41
-
Description: Consultant: Purchase Orders (multiple) Dept Requisitions. Firm: Southwest Recreational Ind.Container: Box 41
-
Description: Hollingberry Field HouseContainer: Box 41
-
Description: Consultants: Consultants/Purchase Orders. Firm: Motley/Poe/McKinstryContainer: Box 41
-
-
Outdoor Tennis Court Facility
-
Description: Contractor:. Firm: ACCeptance of Sub-Completion. Firm: LydigContainer: Box 41
-
Description: Consultant: Contract/Add Services Ltrs. Firm: KPFF Consulting Engineers. Contract# 15599Container: Box 41
-
Description: Consultant: Contract/Add Services Ltrs. Firm: Motley-Motley. Contract# 16958Container: Box 41
-
Description: Consultant: Contract/Add Services Ltrs. Firm: Strata. Contract# 16683Container: Box 41
-
Description: Consultant: Contract/Add Services Ltrs. Firm: E3RA. Contract# 16097Container: Box 41
-
Description: Consultant: Contract/Add Services Ltrs. Firm: Taylor Eng. Contract# 16749Container: Box 41
-
Description: Budget: Purchase Orders/Budget Recap/Advertisement TransmittalsContainer: Box 41
-
-
Hospital Renovation/Washington Building
-
Description: Budget: Project Budget PlanningContainer: Box 41
-
Description: Planning: Busineess Affairs and Planning Committee Meeting MinsContainer: Box 41
-
Description: Consultants: Contract/Add Svcs. Firm: ALSC. Contract# 15245Container: Box 41
-
Description: Consultants: Contract/Add Svcs. Firm: E3RA, Inc.. Contract# 15927Container: Box 41
-
Description: Budget: Purchase Orders/Budget Recap/Advertisement TransmittalsContainer: Box 41
-
-
WSU Vancouver Campus Infrastructure. Project Completed 2003
-
Description: Regents: Business Affairs & Info Tech Meeting MinutesContainer: Box 41
-
Description: Budget: Finance & Audit Committee Meeting MinutesContainer: Box 41
-
Description: Contractor: Builders Risk InsuranceContainer: Box 41
-
Description: Consultants: Contract/Add Svcs/Invoices Firm: GRI. Contract# 15590Container: Box 41
-
Description: Consultants: Contract/Add Svcs/Invoices Firm: LSW Architects. Contract# 15429Container: Box 41
-
-
Vancouver Irrigation Well Drilling & Testing
-
Description: Regents: Business Affairs & Info Tech Meeting MinutesContainer: Box 41
-
Description: Budget: Finance & Audit Committee Meeting MinutesContainer: Box 41
-
Description: Compliance: Misc Documents/Newspaper Tear SheetsContainer: Box 41
-
Description: Compliance: Water Rights Transfer DocumentsContainer: Box 41
-
Description: Contractor: Contract/Change Orders/Pay Apps Firm: Holt Drilling & Testing. Contract# 16612Container: Box 41
-
Description: Regents: Business Affairs & Info Tech Meeting MinutesContainer: Box 41
-
Description: Consultants: Contract/Add Svcs/Invoices Firm: GRI. Contract# 15642Container: Box 41
-
Description: Consultants: Contract/Add Svcs/Invoices Firm: Minister-Glaeser Surveying. Contract# 15491Container: Box 41
-
Description: Consultants: Contract/Invoices. Firm: PAE. Contract# 15129Container: Box 41
-
Description: Consultants: Contract/Add Svcs/Invoices Firm: Professional Services Industries. Contract# 16046Container: Box 41
-
Description: Consultants: Code Review Firm: Reid Middleton. Contract# 15523Container: Box 41
-
Description: Consultant: Clark College Building/MOU DiscussionContainer: Box 41
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: LSW ArchitectsContainer: Box 41
-
Description: Procurement: RFQ WSUContainer: Box 41
-
Description: Procurement: Selection Memo/Responsibility Rewview Firm: 2KG ContracorsContainer: Box 41
-
Description: Contractor: Contract/Back up Docs Firm: 2KG Contracors. Contract# 15970Container: Box 41
-
Description: Contractor: Change Orders/CCPS Firm: 2KG Contracors. Contract# 15970Container: Box 41
-
-
Vancouver Physical Plant Maintenance Shops. Project Completed 1999
-
Description: Consultant: Physical Plant Capacity Study. Firm: PAE Consulting EngineersContainer: Box 42
-
Description: Consultant: Final Stormwater Plan Technical Information Report. Firm: ZGFContainer: Box 42
-
Description: Consultant: Campus Infrastructure Firm: Keith BloomContainer: Box 42
-
Description: Cosultants: Contract/Add Svcs/Invoices. Firm: ZGFP. Contract# 12795Container: Box 42
-
Description: Cosultants: Contract/Add Svcs/Invoices #1. Firm: ZGFP. Contract# 12794Container: Box 42
-
Description: Cosultants: Contract/Add Svcs/Invoices #2. Firm: ZGFP. Contract# 12794Container: Box 42
-
Description: Cosultants: Contract/Add Svcs/Invoices #3. Firm: ZGFP. Contract# 12794Container: Box 42
-
Description: Contractor: Contract/Change Orders/Pay Apps. Firm: Neilsen Dillingham Builders. Contract# 13228Container: Box 42
-
Description: Contractor: General Correspondence. Firm: Neilsen Dillingham Builders. Contract# 13228Container: Box 42
-
Description: CM/PM: General Correspondence PMContainer: Box 42
-
Description: Consultant: Contract Firm: O'Brien Keitzberg. Contract# 12789Container: Box 42
-
Description: Consultant: Contract/Invoices Firm: Carlson Testing. Contract# 13347Container: Box 42
-
Description: Regents: Finance & Audit/Misc Memo/Meeting minutesContainer: Box 42
-
Description: Budget: Firm: OFM/BudgetContainer: Box 42
-
Description: Legal: Attorney General Office/ Approval Letters. Firm: Baugh ConstructionContainer: Box 42
-
Description: Planning: Project Planning Committee- Meeting MinutesContainer: Box 42
-
Description: Consultant: Contract Docs/Invoices. Firm: Baugh Construction. Contract# 13338Container: Box 42
-
Description: Planning: Rejected Bids 9 BiddersContainer: Box 42
-
-
WSUV Phase II Development Campus Infrastructure. Project Completed 1997
-
Description: Consultant: Construction Document Set. Firm: ZGFContainer: Box 43
-
Description: Consultant: Value Engineering Study Firm: Consulting Value SpecialistsContainer: Box 43
-
Description: Consultant: Stormwater Technical Report. Firm: ZGFContainer: Box 43
-
Description: Consultant: Project Manager Consultant Files/Misc Documents Firm: PM/CMContainer: Box 43
-
Description: Compliance: Plamondon Property Purchase/ Zoning/Environmental Assessment Firm: PM/CMContainer: Box 43
-
Description: Compliance: Environmental Assessmenbt Report Firm: Hahn & AssociatesContainer: Box 43
-
Description: Compliance: Stormwater Baseline Permit Firm: Clark CountyContainer: Box 43
-
Description: Consultant: Program Validation Report Firm: HHPRContainer: Box 43
-
-
WSU Spokane Speciality Veterninary Clinic. Project Completed 2009
-
Description: Regents: Finance & Audit Committee Meeting Minutes Greg RoyerContainer: Box 43
-
Description: Regents: Regents: Meeting MinutesContainer: Box 43
-
Description: Consultant: Contract/Invoices Firm: Allwest. Contract# 18027Container: Box 43
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: NAC Architecture. Contract# 17129Container: Box 43
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: SRG Partnership. Contract# 18302Container: Box 43
-
Description: Contractor: Contract/Change Orders/Pay Apps. Firm: Bouten Construction. Contract# 17981Container: Box 43
-
Description: Contractor: Certified Payroll Requests/NoticesContainer: Box 43
-
Description: Contractor: Project Manuals/Set 4 & 5. Firm: Bouten ConstructionContainer: Box 43
-
-
Spokane South Campus Facility. Project Completed 2006
-
Description: Contractor: CCPs. Contract# 1-81. Firm: Bouten Construction Co. Contract# 15839Container: Box 43
-
-
WSU Vancouver Education & Human Development. Project Completed Multiple
-
Description: Regents: Regents: Project Meeting Minutes/Funding NotesContainer: Box 44
-
Description: Regents: Finance and Audit Committee Meeting MinutesContainer: Box 44
-
Description: Consultant: Contract/Invoices Firm: Geotech Resources Inc.. Contract# 18165Container: Box 44
-
Description: Consultant: Contract/Invoices Firm: Minister-Glaesar Surveying. Contract# 17833Container: Box 44
-
Description: Consultant: Contract/Invoices Firm: Professional Service Indust.. Contract# 18159Container: Box 44
-
Description: Planning: Dedsign Review Records Firm: PMContainer: Box 44
-
Description: Legal: Issues and ClaimsContainer: Box 44
-
Description: Contractor: General Correspondence/Advertisements/Memos, etcContainer: Box 44
-
Description: Contractor: Construction Meeting Minutes Firm: PM Dan BodellContainer: Box 44
-
Description: Consultant: General Correspondence/Advertisements/Memos, etc Firm: BBL. Contract# 17848Container: Box 44
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: BBL. Contract# 17848Container: Box 44
-
Description: Contractor: Contract/Change Orders/Pay Apps/Bidder Pre-Qualify Firm: Rehfeldt Conbstruction. Contract# 18118Container: Box 44
-
Description: Contractor: Project ManualContainer: Box 44
-
-
WSU Vancouver Mount St. Helen's Corridor Improvement
-
Description: Consultant: Contract/Invoices. Firm: Mayes Testing Engineers. Contract# 15038Container: Box 44
-
Description: Consultant: Contract/Invoices/Monthly Financial ReportS. Firm: ZGF. Contract# 14906Container: Box 44
-
Description: Contractor: Contract Docs/Change Orders/Pay Apps. Firm: Skanska USA. Contract# 15043Container: Box 44
-
Description: Contractor: Construction Documents. Firm: ZGFContainer: Box 44
-
-
Prototype Suites (Pullman)
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: Mithun. Contract# 15399Container: Box 44
-
Description: Regents: Meeting Minutes/Memos CM/PMContainer: Box 44
-
-
Riverpoint Higher Education Campus. Project Completed 1998
-
Description: Planning: Pre-Design Study. Firm: Northwest Architectural CompanyContainer: Box 44
-
Description: Planning: General Correspondence Firm: PMContainer: Box 44
-
Description: Planning: Master Plan Update Bruce. Firm: ThompsonContainer: Box 44
-
Description: Planning: Environmental Impact Study Firm: Terry Novak/Bruce. Firm: ThompsonContainer: Box 44
-
Description: Consultant: Contract Firm: Brubaker & Associates 8832102Container: Box 44
-
Description: Regents: Finance & Audit Committee Meeting MinutesContainer: Box 44
-
Description: Report: Milwaukee Trench Investigation & Containment Area Design Report Firm: Landau Associates, Inc.Container: Box 44
-
Description: Report: Riverpoint Campus Management DocumentsContainer: Box 44
-
Description: Consultant: Riverpoint Parking Lot Expansion Construction Documents Firm: David Evans & AssociatesContainer: Box 44
-
-
Prosser Multipurpose Building. Project Completed 2004
-
Description: Regents: Business Affairs CommitteeContainer: Box 45
-
Description: Regents: Finance & Audit committeeContainer: Box 45
-
Description: Regents: High Tech Tax DeferralContainer: Box 45
-
Description: Consultant: Contract. Firm: Davis Langdon. Contract# 15981Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: JUB. Contract# 15409Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: Northern, Inc.. Contract# 15997Container: Box 45
-
Description: Consultant: Contract/Invoices. Firm: Shannon & Wilson. Contract# 15363Container: Box 45
-
Description: Drawings: Floor Plans. Firm: SCM ConsultantsContainer: Box 45
-
Description: PM/CM: Progress Meeting Minutes. Firm: SCM ConsultantsContainer: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: SCM Consultants. Contract# 15356Container: Box 45
-
Description: Contractor: Contract/Change Orders/Pay App. Firm: Sevigney. Contract# 16111Container: Box 45
-
Description: CD: Mylar Set Firm: AutoCADContainer: Box 45
-
Description: Compliance: Building Permit Application/Energy Calculations/Environmental. Firm: SCM ConsultantsContainer: Box 45
-
Description: Planning: Checklist/Storm Drain CalculationsContainer: Box 45
-
Description: Planning: Construction Documents Cost Plan. Firm: Davis LangdonContainer: Box 45
-
Description: Consultant: Program & Scope of Work. Firm: SCM ConsultantsContainer: Box 45
-
Description: Consultant: Firm: Geotechnical Engineering Study. Firm: Shannon & WilsonContainer: Box 45
-
Description: Project: Manual - Vol. 1Container: Box 45
-
Description: Project: Manual - Vol 2Container: Box 45
-
-
Pullman Student Apartment Housing Development. Project Completed 2009
-
Description: Regents: Finance & Audit committeeContainer: Box 45
-
Description: Regents: Meeting MinutesContainer: Box 45
-
-
Walter Clor Wine and Culinary Center. Project Completed N/A
-
Description: Planning: Study/Budget/Scope/Planning DocumentsContainer: Box 45
-
-
Spokane Vivarium Study. Project Completed 2008
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: MWConsulting. Contract# 18546Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Estime'. Contract# 17624Container: Box 45
-
-
Spokane SIRTI Property. Project Completed 2003
-
Description: Consultant: Contract/Invoices Firm: David Evans & Associates. Contract# 16805Container: Box 45
-
Description: Consultant: Contract/Add Svcs/ Invoices Firm: GeoEngineers. Contract# 16122Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: Integrus Architecture. Contract# 16121Container: Box 45
-
Description: Consultant: Contract/Invoices Firm: TD&H. Contract# 16120Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices - Riverside Surplus Property. Firm: Taylor Engineering. Contract# 15892Container: Box 45
-
-
Floor Friction Testing & Various Flooring. Project Completed 2003
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: Strata. Contract# 17366Container: Box 45
-
-
Engineering & Arch Precinct Master Plan. Project Completed 2003
-
Description: Regents: Business Affairs & Info Tech CommitteeContainer: Box 45
-
Description: Regents: Meeting MinutesContainer: Box 45
-
Description: Planning: Precinct Relocation Study - Campus Master Firm: PMContainer: Box 45
-
Description: Planning: Planning Committee Meeting MinutesContainer: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: Flack & Kurtz. Contract# 17161Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: KPFF. Contract# 17276Container: Box 45
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: CO Architects. Contract# 16886Container: Box 45
-
-
Hill Halls Study. Project Completed 1996
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: Design West. Contract# 12216Container: Box 45
-
-
WSUV - Firm: USGS Cascades Volcano Observatory. Project Completed 1996
-
Description: Planning: WSU Grant Firm: Dave Smith/Jerry SchlatterContainer: Box 45
-
Description: Consultant: US Geological Survey for possible Research Facility Firm: USGS CooperativeContainer: Box 45
-
Description: Consultant: Memo of Understanding Firm: USGS CooperativeContainer: Box 45
-
Description: Consultant: Contract/Invoices. Firm: ZGF. Contract# 17763Container: Box 45
-
Description: Consultant: US Geological Survey/ Program Requirements Firm: USGS/GSA/DOI/CVOContainer: Box 45
-
-
WSU Vancouver Student Services Center. Project Completed 2007
-
Description: Budget: Budget Authorization/Client ApprovalContainer: Box 46
-
Description: Regents: Regents: ItemsContainer: Box 46
-
Description: Consultants: Contract/Invoices. Firm: Mayes Testing Engineers, Inc.. Contract# 16461Container: Box 46
-
Description: Consultants: Contract/Invoices Firm: Professional Roof Consultants. Contract# 16560Container: Box 46
-
Description: Consultants: Contract/Third Party Neutral. Firm: William C. Neland. Contract# 16631Container: Box 46
-
Description: Consultants: Contract/Add Svcs/Invoices. Firm: System Commissioning. Contract# 14850Container: Box 46
-
Description: Consultants: Contract/Add Svcs/Invoices. Firm: JD White & Company, Inc.. Contract# 14762Container: Box 46
-
Description: Project: Planning. Contract# 10 Year Major Capital Improvement Program Firm: H.A. Dengerink, Campus DeanContainer: Box 46
-
Description: Consultant: Contract/Add Svcs/Invoices. Contract# 1. Firm: ZGF. Contract# 14404Container: Box 46
-
Description: Consultant: Contract/Add Svcs/Invoices 2. Firm: ZGF. Contract# 14404Container: Box 46
-
Description: Consultant: Contract/Add Svcs/Invoices 3. Firm: ZGF. Contract# 14404Container: Box 46
-
Description: Consultant: Contract/Add Svcs/Invoices 4. Firm: ZGF. Contract# 14404Container: Box 46
-
Description: Consultant: Contract/Add Svcs/Invoices 5. Firm: ZGF. Contract# 14404Container: Box 46
-
Description: Construction: Documents Volume 2Container: Box 46
-
Description: Construction: Documents Volume 3Container: Box 46
-
Description: Consultant: Energy Life Cycle Cost Analysis. Firm: PAEContainer: Box 46
-
-
WSU Vancouver Student Services Center. Project Completed 2007
-
Description: Contractor: Pre-Construction Contract. Firm: Hoffman Construction. Contract# 14576Container: Box 47
-
Description: Closeout: Pre-Construction Closeout Report. Firm: Hoffman ConstructionContainer: Box 47
-
Description: Contractor: Contract Documents. Firm: Hoffman Construction. Contract# 16378Container: Box 47
-
Description: Contractor: (Folders 1-7) Change Orders 1-28/CCPs 1-111/Pay Apps 1-21. Firm: Hoffman Construction. Contract# 16378Container: Box 47
-
-
WSU Vancouver, Phase III Campus Development. Project Completed 1996
-
Description: Consultant: Deliverables/Pre-Design Study/Value Engineering. Firm: ZGFContainer: Box 48
-
Description: Consultant: Final Stormwater Plan Tech Information Report. Firm: ZGF/Kato & WarrenContainer: Box 48
-
Description: PM/CM: Email Correspondence Firm: Linda WallContainer: Box 48
-
Description: Budget: Budget Evaluation Study Firm: David SmithContainer: Box 48
-
Description: Budget: Budget Evaluation Study Firm: Earl MuirContainer: Box 48
-
Description: Budget: 1997-1999 Capital Budget Request Firm: David SmithContainer: Box 48
-
Description: Consultant: Ten Year Major Cpaital Improvement Program 1999-2009 Firm: H.A. Dengerink, CEO & Dean 3/20/1998Container: Box 48
-
Description: Consultant: Contract Documents WSUV Loop Road Extension Firm: HHPR, Inc. 3/1/2005Container: Box 48
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: Patrick Kelly Engineers. Contract# 15830Container: Box 48
-
Description: Consultant: Contrac/Add Svcs/Invoices Firm: Minister Glaeser Surveying. Contract# 15893 &. Contract# 15491Container: Box 48
-
Description: Consultant: General Correspondence Firm: David SmithContainer: Box 48
-
-
WSU Vancouver Loop Road Extension. Project Completed 2006
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: PBS Engineering. Contract# 16021Container: Box 48
-
Description: Consultant: Asbestos Report Firm: PBS EngineeringContainer: Box 48
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: PSI Engineering. Contract# 16149Container: Box 48
-
Description: Consultant: Survey/Calculations Firm: KGAContainer: Box 48
-
Description: Consultant: Shop Drawings/Design/Design Caluclations Firm: KGAContainer: Box 48
-
Description: Consultant: Contract/Add Svcs/Invoices Firm: HHPR, Inc.. Contract# 15813Container: Box 48
-
Description: Contractor: Contract/Change Orders/Pay Apps Firm: Andersen Pacific Contr.. Contract# 16095Container: Box 48
-
-
WSU Vancouver, Phase II Campus Development. Project Completed 1996
-
Description: Contractor: Construction Documents. Firm: ZGFContainer: Box 48
-
Description: CM/PM: General Correspondence #1 Firm: Earl MuirContainer: Box 48
-
Description: CM/PM: General Correspondence #2 Firm: Earl MuirContainer: Box 48
-
Description: Consultant: Work Scope Descriptions & Conceptual Estimates. Firm: ZGFContainer: Box 48
-
Description: Budget: Budget Notes/Miscellaneous Firm: MiscellaneousContainer: Box 48
-
Description: CM/PM: General Correspondence/Hazel Dell Sewer Disxtrict Firm: Linda WallContainer: Box 48
-
Description: CM/PM: General Correspondence/Heery Internatrional Firm: Linda WallContainer: Box 48
-
Description: PM/CM: Email Correspondence Firm: Earl MuirContainer: Box 48
-
Description: PM/CM: General Correspondence #1 Firm: PM/CMContainer: Box 48
-
Description: PM/CM: Miscellaneous Email Correspondence Firm: Earl Muir/Linda WallContainer: Box 48
-
Description: Budget: Best Value Study/MiscellaneousContainer: Box 48
-
-
WSUV 78th Street Research Station. Project Completed 2005
-
Description: Consultant: Contract/Invoices Firm: Minister-Glaeser. Contract# 15694Container: Box 49
-
Description: PM/CM: Project Team/Meeting Minutes. Firm: JD White CompanyContainer: Box 49
-
Description: PM/CM: PM Notes Firm: Dave SmithContainer: Box 49
-
Description: Consultant: Land Survey; two copies Firm: Minister-GlaeserContainer: Box 49
-
Description: PM/CM: Draft Site Assessment; Wetland Assessement; Habitat Evaluation Firm: Dave SmithContainer: Box 49
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: JD White Company, Inc.Container: Box 49
-
Description: PM/CM: Final Report Volume 1Container: Box 49
-
Description: PM/CM: Final Report Volume 2Container: Box 49
-
Description: PM/CM: Master Plan Project /PM NotesContainer: Box 49
-
-
Hazardous Waste Projects/Chemical Storage Building. Project Completed 1995
-
Description: Consulting: Contract/Invoices. Firm: Bovay Northwest, Inc.. Contract# 10798Container: Box 49
-
Description: Consulting: Contract/Add Svcs/Invoices. Firm: URS Corporation. Contract# 12192Container: Box 49
-
-
WSUV Wetland & Habitat. Project: Completed 2009
-
Description: General: Corresp. Miscellaneous Firm: Bartels Northwestern. Contract# 15722Container: Box 49
-
Description: Contractor: Contract/Change Orders/Pay Apps Firm: Bartels Northwestern. Contract# 15722Container: Box 49
-
Description: Consutlant: Contract/Add Svcs/Invoices. Firm: JD White Company. Contract# 13617Container: Box 49
-
Description: Consutlant/Deliverables: Project Manual. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: As-Built Report. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: Loop Road Preliminary and Final Habitat Evaluation. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: Fifth Year Monitoring Report Firm: BergerABAMContainer: Box 49
-
Description: Consutlant/Deliverables: Fourth Year Monitoring Report. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: First Year Monitoring Report. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: East Entrance wetland Delinieation. Firm: JD White CompanyContainer: Box 49
-
Description: Consutlant/Deliverables: Mitigation As-Builts Report. Firm: JD White CompanyContainer: Box 49
-
-
Vancouver Undergraduate Classroom Building. Project: Completed 2008
-
Description: Board: of Regents: Regents: - Meeting MinutesContainer: Box 50
-
Description: Consultant: Contract/Invoices Firm: Brailsford & Dunlavey. Contract# 17831Container: Box 50
-
Description: Planning: Van Survey Analysis Presentation Firm: Brailsford & DunlaveyContainer: Box 50
-
-
Horticulture Greenhouse Relocation. Project Completed 2007
-
Description: Legal: Issues and ClaimsContainer: Box 50
-
Description: Board: of Regents: Business Affairs and Info Tech Comm.Container: Box 50
-
Description: Budget: Cost Breakdown Firm: Terry BaxterContainer: Box 50
-
Description: Consutlant: Contract/Add Svcs/Invoices Firm: MCS Environmental. Contract# 16939Container: Box 50
-
Description: Consutlant: Asbestos Survey Firm: MCS EnvironmentalContainer: Box 50
-
Description: Consutlant: Closure Report/ Asbestos Abatrement Firm: MCS EnvironmentalContainer: Box 50
-
Description: Consutlant: Firm: Geotechnical Engineering Evaluation. Firm: StrataContainer: Box 50
-
Description: Consutlant: Contract/Add Svcs/Invoices. Firm: Strata. Contract# 16790Container: Box 50
-
Description: Consutlant: Contract/Invoices. Firm: Taylor Engineering. Contract# 16866Container: Box 50
-
Description: PM/CM: Meeting Minutes Firm: Terry BaxterContainer: Box 50
-
Description: PM/CM: Submittals Firm: Musgrove EngineeringContainer: Box 50
-
Description: PM/CM: Site Reports Firm: Terry BaxterContainer: Box 50
-
Description: PM/CM: Field Reports Firm: Design WestContainer: Box 50
-
Description: Consutlant: Contract/Add Svcs/Invoices Firm: Design West. Contract# 16719Container: Box 50
-
Description: Consutlant: Project Manual Firm: Design West. Contract# 16719Container: Box 50
-
Description: Consutlant: Electrical Submittals Firm: Design West. Contract# 16719Container: Box 50
-
Description: PM/CM: RFI's Firm: Terry BaxterContainer: Box 50
-
Description: Contractor: AsBuilts Information/CD Firm: Brown ContractingContainer: Box 50
-
Description: Contractor: Contract/Change Orders/CCPs/Pay Apps Firm: Brown Contracting. Contract# 17041Container: Box 50
-
Description: PM/CM: Design De velopment Review Firm: Terry BaxterContainer: Box 50
-
Description: General: Corresp. Conditions of Energy Services Agreement Firm: State of WA:ESPCContainer: Box 50
-
Description: Procurement: Bid Drawings/Layout Plumbing & Electrical Firm: Design WestContainer: Box 50
-
Description: Planning: Greenhouse Schematic/Construction Booklet Firm: NexusContainer: Box 50
-
-
Apparel Merchandising Interior Design (AMID) & Landscape Architecture (LA)
-
Description: Budget: Design Budget Memo Firm: OFMContainer: Box 50
-
Description: Regents: Memos on AMID & LAContainer: Box 50
-
Description: Finance: Audit Meeting Minutes/MiscellaneousContainer: Box 50
-
Description: Consultant: Agreement/Invocies Firm: Stoel Rives. Contract# 12589Container: Box 50
-
Description: Consultant: Agreement/Invocies Firm: KJM & Associates. Contract# 13232Container: Box 50
-
Description: Procurement: Project Planning Committee Meeting MinutesContainer: Box 50
-
Description: Consultant: Reports on Subsurface Expolrations Firm: GeoEngineersContainer: Box 50
-
Description: Consultant: Schematic Design Technical Brochure. Firm: Northwest Architectural Co.Container: Box 50
-
Description: Consultant: Agreement/Add Svcs/Invoices. Firm: Northwest Architectural Co.. Contract# 12862Container: Box 50
-
Description: Project: Planning Project Planning Committee Meeting Minutes - #1Container: Box 50
-
Description: Project: Planning Project Planning Committee Meeting Minutes - #2Container: Box 50
-
Description: Project: Planning Project Planning Committee Meeting Minutes - #3Container: Box 50
-
Description: Project: Planning Project Planning Committee Meeting Minutes - #4Container: Box 50
-
-
Indoor: Practice Facility. Project: Completed 2005
-
Description: Document: Type Document/File Contents Firm Name (if applicable) Contract NumberContainer: Box 50
-
Description: Regents: Meeting MinutesContainer: Box 50
-
Description: Consultants: Contract/Invoices. Firm: ALSC 20740Container: Box 50
-
Description: Regents: Business Affairs Committee/Meeting MinutesContainer: Box 50
-
Description: Procurement: GC/CM SelectionContainer: Box 50
-
Description: Consultants: Contract/Invoices. Firm: Strata. Contract# 14339Container: Box 50
-
Description: Contractor: Contract/Invoices. Firm: Shea Graham Construction. Contract# 14313Container: Box 50
-
Description: Contractor: Change Orders/CCP's/Pay Apps. Firm: Shea Graham Construction. Contract# 14313Container: Box 50
-
Description: Contractor: Owners Manual- Magic Carpet Equipment Firm: Mitchell Machine WorksContainer: Box 50
-
Description: Consultant: Contract/Invoices FOR Rubber Track & Floor. Firm: Mondo. Contract# 14582Container: Box 50
-
Description: Consultant: Schematic Design Report. Firm: ALSC 9914Container: Box 50
-
Description: Consultant: Project Manual. Firm: ALSC 9914Container: Box 50
-
Description: Consultant: Project Manual - Electrical Section 16Container: Box 50
-
Description: Consultant: Firm: Geotechnical Report Firm: GCI Consultants, Inc. E-1998-02Container: Box 50
-
Description: Consultant: Storm Drainage Report. Firm: Taylor EngineeringContainer: Box 50
-
Description: Consultant: Contract/Invoices. Firm: ALSC. Contract# 14366Container: Box 50
-
-
Arboretum & Wildlife Research Park
-
Description: Project: Planning Botanical Garden Master Plan (1983) Ralph MizeContainer: Box 51
-
Description: Project: Planning Planning Committee Discussion Notes on First Right of Entry Agreement Firm: PM/CMContainer: Box 51
-
Description: Project: Planning Planning Committee Meeting MinutesContainer: Box 51
-
Description: Consultant: Agreement/Invoices. Firm: KPFF. Contract# 16086Container: Box 51
-
Description: Drawings: Plans and Area Outlines for Arboretum & Research ParkContainer: Box 51
-
Description: Regents: Finance & Audit Committee NotesContainer: Box 51
-
Description: Regents: Finance & Audit Committee Meeting MinutesContainer: Box 51
-
Description: Compliance: Permitting Requirements Between. Firm: Motley and Firm: Dept of Ecology (EIS)Container: Box 51
-
Description: Compliance: Stormwater Permits Firm: Dept of EcologyContainer: Box 51
-
Description: Consulting: Agreement/Invoices Firm: Portico, Inc. Contract# 17976Container: Box 51
-
-
Smith CUE Snowfence Installation. Project: Completed 2010
-
Description: Document: Type Document/File Contents Firm Name (if applicable) Contract NumberContainer: Box 51
-
Description: Consultants: Final Project Binder Smith Snow Guard Torque Testing. Firm: StrataContainer: Box 51
-
Description: Contractor: Builders RiskContainer: Box 51
-
Description: Consultants: Contract/Invocies. Firm: Strata. Contract# 18432Container: Box 51
-
Description: Contractor: Project Manual Firm: CPDContainer: Box 51
-
Description: Contractor: Smith Center Roof Project Material SubmittalsContainer: Box 51
-
Description: Compliance: Smith Center Roof Snowfence Installation Drawings Firm: CPDContainer: Box 51
-
Description: Procurement: Bid Summary/Rejected Bids Firm: CPDContainer: Box 51
-
Description: Consultants: Submittals VariousContainer: Box 51
-
Description: Contractor:. Firm: Lydig ReportsContainer: Box 51
-
Description: Contractor: Daily Inspection ReportsContainer: Box 51
-
Description: Contractor: Contract/Change Orders/Invoices. Firm: Graham Construction & Management. Contract# 18812Container: Box 51
-
Description: Contractor: General Correspondence/Completion Docs. Firm: Graham Construction & Management. Contract# 18812Container: Box 51
-
Description: Procurement: Selection Memo/Advertiesement for Project ScopeContainer: Box 51
-
-
Washington Building Phase 2/CUB Relocation. Project: Completed 2006
-
Description: Contractor: PM/CM - Doors/Frames/Harware Submittals. Firm: Duracon, Inc.Container: Box 52
-
Description: Procurement: Bid Package A1- Submittals - WA Building. Firm: Hoffman/QC ElectricContainer: Box 52
-
Description: Procurement: Bid Package A2- Submittals - CUB. Firm: Hoffman/QC ElectricContainer: Box 52
-
Description: Contractor: RFI's for CUB & WA Building Ph 2. Firm: Hoffman/ALSCContainer: Box 52
-
Description: Contractor: PM/CM - Hazmat/Tests/Reports/Meeting Mins/Asbestos Report PMContainer: Box 52
-
Description: Contractor: PM/CM Closure Report - Asbestos Abatement Firm: MCS EnvironmentalContainer: Box 52
-
Description: Contractor: PM/CM Closure Report - Asbestos Abatement Addendum 1 Firm: MCS EnvironmentalContainer: Box 52
-
Description: Contractor: PM/CM Closure Report - Lead Paint Survey Firm: MCS EnvironmentalContainer: Box 52
-
Description: Contractor: PM/CM Closure Report - Commissioning Plan & Report Firm: McKinstryContainer: Box 52
-
-
Student Health & Wellness/ WA Building Phase III. Project: Completed 2005
-
Description: Drawings: Various Drawings: CUB Relocation; WA Bldg, WSECU Brnch Tenant ImprovementsContainer: Box 52
-
Description: Contractor: Construction Documents/Dwgs. Firm: ALSCContainer: Box 53
-
Description: Contractor: Pre-Design/ Budget Status/Notes Firm: J. SchlatterContainer: Box 53
-
Description: Contractor: Bid Set Drawings/Design Docs. Firm: ALSCContainer: Box 53
-
Description: Contractor: Dwgs for Fire Sprinkler Design & Install Firm: Tyco/SimplexGrinnellContainer: Box 53
-
Description: Contractor: Fire Protection Material Submittals Firm: Tyco/SimplexGrinnellContainer: Box 53
-
Description: Contractor: HVAC O&M Manuals Firm: Johnson ControlsContainer: Box 53
-
Description: Contractor: Electrical Submittals Firm: QC ElectricContainer: Box 53
-
Description: Contractor: Paint Specification Submittals Firm: Sherwin WilliamsContainer: Box 53
-
Description: Contractor: Mechanical Submittals Firm: 3H MechanicalContainer: Box 53
-
Description: Contractor: Steel Stud Technical Information Firm: Steel Stud ManufacturersContainer: Box 53
-
Description: Contractor: Casework Submittals. Firm: HalmeContainer: Box 53
-
Description: Contractor: Mechanical Submittals. Firm: HalmeContainer: Box 53
-
Description: Contractor: RFP Hazmat Sampling. Firm: ALSCContainer: Box 53
-
Description: Contractor: Contract/Add Svcs/Invoices. Firm: E3RA. Contract# 15927Container: Box 53
-
Description: Regents: RegentsContainer: Box 53
-
Description: Contractor: Hazmat Sampling & Testing. Firm: E3RAContainer: Box 53
-
Description: Planning: Pre-Design StudyContainer: Box 53
-
Description: Contractor: General Correspondence/Contract/CO's/CCP's/ Pay Apps/Final Comp Do. Firm: Halme. Contract# 16181Container: Box 53
-
Description: Consultant: Contract/Add Svcs/Invoices. Firm: ALSC. Contract# 15245Container: Box 53
-
Description: Contractor: Final Report. Firm: ALSC/Hoffman EngContainer: Box 53
-
Description: Contractor: Certified Payroll Reports. Firm: HalmeContainer: Box 53
-
Description: Contractor: PM/CM/ Responsibility Review. Firm: HalmeContainer: Box 53
-
Description: Contractor: Project Manual. Firm: ALSCContainer: Box 54
-
Description: Financial: IRI's/PO's/Quotes/Budget Statements/Invoices/Meeting Minutes Firm: PMContainer: Box 53
-
Description: Drawings: As Builts - on Compact DiskContainer: Box 53
-
Description: Contractor: WA Bldg Phase III - Project Manual - 2008. Firm: ALSCContainer: Box 54
-
-
Compton Union Building Project: Completed 2008
-
Description: Contractor/PM/CM: Commissioning Report - 2008 Firm: McKinstryContainer: Box 54
-
Description: Contractor/PM/CM: CAT6 - Cable Certification Report Firm: WireScope 350Container: Box 54
-
-
Stadium Way Improvements. Project: Completed 2002
-
Description: Document: Type Document/File Contents Firm Name (if applicable) Contract NumberContainer: Box 54
-
Description: Contractor: Construction Photographs of Student Rec 1999 Firm: PM/CMContainer: Box 95
-
Description: Contractor: Product Substitution Submittals Misc. VendorsContainer: Box 54
-
Description: Contractor: Landscaping/Irrigation O&M Submittals. Firm: Motley, Firm: KPFF, Living WatersContainer: Box 54
-
-
Indoor Practice Facility
-
Description: Consultant/Contract: Athletics Facility Study. Firm: ALSC. Contract# 14366Container: Box 54
-
Description: Contractor/PM/CM: PicturesContainer: Box 54
-
Description: Contractor/PM/CM: SchedulesContainer: Box 54
-
Description: Contractor/PM/CM:. Firm: Mondo Adhesive Claim NotesContainer: Box 54
-
Description: Contractor/PM/CM: Indoor Practice Facility - EstimatesContainer: Box 54
-
Description: Contractor/PM/CM: Indoor Practice Facility - MACC EstimatesContainer: Box 54
-
-
Nuclear Reactor Center
-
Description: Consultant: Contract/Analysis/Report Firm: Oceaneering. Contract# 13324Container: Box 54
-
Description: Contractor/PM/CM: Drawings/Plans/Miscellaneous Notes/LettersContainer: Box 54
-
Description: Contractor/PM/CM: Analytical Report Firm: QuanterraContainer: Box 54
-
-
East: Campus Infrastructure
-
Description: Contractor/PM/CM: Residential Property Assets/NotesContainer: Box 54
-
Description: Contractor/PM/CM: Holland Library Heave ReportContainer: Box 54
-
Description: Contractor/PM/CM: Palouse Columns Sculpture Firm: MAKIContainer: Box 54
-
-
New Energy Plant Redevelopment Project. Project: Completed 2003
-
Description: Construction: Monthly Schedule Update/Revisions. Firm: Hoffman. Contract# 14972Container: Box 55
-
Description: Procurement: Pricing Proposals. Firm: HoffmanContainer: Box 55
-
Description: Construction: Schedule/Submittals for Project Delays to Completion. Firm: Hoffman. Contract# 14972Container: Box 55
-
-
Housing & Dining Services Master Plan. Project: Completed 2004
-
Description: Document: Type Document/File ContentsContainer: Box 55
-
Description: Regents: Master Plan Meeting MinutesContainer: Box 55
-
Description: Regents: Finance & Audit Committee Meeting MinutresContainer: Box 55
-
Description: Consultants: Contract Firm: American Campus Communities. Contract# 15397Container: Box 55
-
Description: Consultants: Additional Services/Invoices Firm: American Campus Communities. Contract# 15397Container: Box 55
-
-
Comprehensive Physical Planning
-
Description: WSU: Comprehensive Physical Planning Process Documents Adopted 1994Container: Box 55
-
-
WSU: Hospital Building
-
Description: Consultant: Facility Condition/Assessment Survey/Final Report. Firm: ALSCContainer: Box 55
-
Description: Consultant: Various Plans for Renovation/Meeting Minutes/NotesContainer: Box 55
-
Description: Contractor/PM/CM: Hazardous Waste Shipment Records - Copies Firm: Specialty EnvironmentalContainer: Box 55
-
Description: Contractor/PM/CM: Pre-Construction Sight ReviewsContainer: Box 55
-
Description: Contractor/PM/CM: MACC EstimatesContainer: Box 55
-
Description: Contractor/PM/CM: Transition Info/NotesContainer: Box 55
-
Description: Contractor/PM/CM: Project Budget Sheets/RCW Notes Firm: Keith BloomContainer: Box 55
-
Description: Contractor/PM/CM: Field Authorization Sheets Firm: K. Poitra/Halme BuildersContainer: Box 55
-
Description: Contractor/PM/CM: Pre-Construction Meeting Minutes/Notes Firm: K. PoitraContainer: Box 55
-
Description: Contractor/PM/CM: RFI's #1-25 Firm: V.HansonContainer: Box 55
-
Description: Contractor/PM/CM: Daily Reports - Construction Phase Firm: K. PoitraContainer: Box 55
-
Description: Contractor/PM/CM: Good Faith Inspection/Notes Firm: K. PoitraContainer: Box 55
-
Description: Contractor/PM/CM: Budget Estimate/Notes Firm: V.HansonContainer: Box 55
-
Description: Project: Closeout Misc Notes/Transmittals/Correspondence Firm: V. HansonContainer: Box 55
-
Description: Project: Closeout Post Project Assessment/ Final Report. Firm: ALSC/Coffman EngineersContainer: Box 55
-
-
Student Rec Center. Project: Completed 2004
-
Description: Document: Type Document/File Contents Firm Name (if applicable) Contract NumberContainer: Box 56
-
Description: Contractor: Project Manual Vol. 1-2. Firm: Yost Grube Hall 98-2-062Container: Box 56
-
Description: Contractor: Value Engineering Workshop 1998 Firm: O'Brien KreitzbergContainer: Box 56
-
Description: Contractor: Energy ife Cycle Cost Analysis Firm: Glumac InternationalContainer: Box 56
-
Description: Contractor: PM/CM Cost Analysis/Electrical Design Review Meeting MinutesContainer: Box 56
-
Description: Contractor: Maximum Allowable Construction Cost Proposal (MACC) Firm: GilbaneContainer: Box 56
-
Description: Contractor: Change Proposal Copies - CCP 20 - 29 Firm: GilbaneContainer: Box 56
-
Description: Contractor: CM/PM Files/Meeting Minutes/Code Review/Swimming Pool/ Firm: Keth BloomContainer: Box 56
-
Description: Code: Review Response/Construction Report/Miscellaneous Code Review DocsContainer: Box 56
-
-
Vet Med Barn Relocation. Project Completed 2006
-
Description: Budget: Project Financial RecapsContainer: Box 56
-
Description: Budget: Budget StatementsContainer: Box 56
-
Description: Financial: Departmental Orders, IRI's and PO'sContainer: Box 56
-
-
Agricultural: Tech Bldg - Prosser. Project: Completed 2008
-
Description: Document: Type Document/File ContentsContainer: Box 57
-
Description: Project: Planning Draft Master Plan - May 2007 - Headquarters UnitContainer: Box 57
-
Description: Project: Planning Project Manual Part 1 - October 2006Container: Box 57
-
Description: Project: Planning Project Manual Part 2 - October 2006Container: Box 57
-
Description: Contractor: SubContract Agreement Firm: TetraTech/SCMContainer: Box 57
-
Description: Consultants: IAREC Multi-Purpose Building - Schematic Design Report Firm: TetraTech/SCMContainer: Box 57
-
Description: Contractor: Contract/Invoices Firm: TetraTech/SCM. Contract# 16404Container: Box 57
-
Description: Contractor: General Correspondence File/Contractor Supporting Docs Firm: Sevigny Construction. Contract# 16882Container: Box 57
-
Description: Contractor: Change Orders/Pay Apps Firm: Sevigny Construction. Contract# 16882Container: Box 57
-
Description: Project: Planning Master Plan June 2007 Firm: CPDContainer: Box 57
-
Description: Regents: Regents: & Business Affairs Meeting MinutesContainer: Box 57
-
Description: Consulting: Contract/Invoices Firm: BAER Testing & Consulting. Contract# 16973Container: Box 57
-
Description: Consulting: Contract/Invoices. Firm: J-U-B Consulting. Contract# 15409Container: Box 57
-
Description: Consulting: Contract/Invoices Firm: Testcomm. Contract# 16989Container: Box 57
-
Description: Contractor: General Correspondence Firm: Sevigny Construction. Contract# 16882/16973/18299Container: Box 57
-
-
Library: Road Phase III. Project: Completed 2010
-
Description: Document: Type Document/File Contents Firm Name (if applicable) Contract NumberContainer: Box 57
-
Description: Financial: Recaps/Budget StatementsContainer: Box 57
-
Description: Contract: Tree Evaluation Report/Asbestos ReportContainer: Box 57
-
Description: Contract: Testing & Evaluation Reports. Firm: StrataContainer: Box 57
-
Description: Construction: Post Project Record Asbestos Abatement. Firm: Hoffman/IRS Environmental. Contract# 10976Container: Box 57
-
-
Tennis Courts Project Completed 2006-2008
-
Description: Project ManualContainer: Box 57
-
Description: PM/CM: Miscellaneous/Submittals/Meeting MinutesContainer: Box 57
-
Description: PM/CM: Misc Non-Conformance ReportrsContainer: Box 57
-
-
Washington: Stormwater
-
Description: Washington: Stormwater Technical Resource Center - Business Plan 2011Container: Box 57
-
Description: WSU: Stormwater Work Group/ManagementContainer: Box 57
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Services -- Records and correspondence