Preliminary Guide to the Washington State University Capital Planning and Development Neurological Science Center Files, 1967-2011
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Capital Planning and Development
- Title
- Preliminary Guide to the Washington State University Capital Planning and Development Neurological Science Center Files
- Dates
- 1967-2011 (inclusive)19672011
- Quantity
- 0.75 Linear feet of shelf space, (0.5 Box + 1 Map Tube)
- Collection Number
- UA2013-05 (collection)
- Summary
- Building plans, demolition reports, and administrative files related to the Neurological Science Center on the WSU Pullman Campus from 1967-2011.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning (later Capital Planning and Development). While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Content Description
Material consists of building plans, memoranda, and architectural notes on the development and demolition of the Neurological Science Center on the WSU Pullman Campus. Files cover 1967-2011.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Capital Planning and Development Neurological Science Center Files, 1967-2011 (UA2013-05)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Files are clearly labeled and arranged by subject matter and project number. Tubes contain plans for the Neurological Science Center.
Detailed Description of the Collection
-
Drawings
-
Description: Demolish buildingDates: 4/12/10Container: Number 4947-2010, Id 47-G-004
-
Description: Endo-parasite vector laboratoryDates: 11/10/67Container: Number 3397, Id 47-G-003
-
Description: Endo-parasite vector laboratoryDates: No dateContainer: Number 3349, Id 47-G-002
-
Description: Neuroscience center-water system premise isolation, phase 2Dates: 2/11/00Container: Number L-278222, Id 47-M-007
-
Description: Neurologic science center-connect to building water outlets to deionized water storage tanksDates: 6/16/92Container: Number L-68597, Id 47-M-006
-
Description: Install double distiller- room 17Dates: 12/6/90Container: Number L-43922, Id 47-M-005
-
Description: Neuro-science center- cross connection correctionDates: 6/26/89Container: Number L-45432, Id 47-M-004
-
Description: Endo-parasite vector lab- mechanical improvements to cell biology labDates: 8/3/83Container: Number 3642 6141, Id 47-M-003
-
Description: Endo-parasite lab- biological hood exhaustDates: 9/26/80Container: Number 5518, Id 47-M-002
-
Description: Endo-parasite vector lab- fume duct installationDates: 8/3/67Container: Number 3326, Id 47-M-001
-
Description: Neurological science center- install new wireless fire alarm systemDates: 2/19/08Container: Number 3434-2007, Id 47-E-001
-
-
Files
-
Description: New exhaust fan hemo parasite labContainer: Number L-3642
-
Description: Upgrade hemo parasite labs- rooms 8,17,18, & 19Container: Number L-43922
-
Description: Install double distiller, room 17Container: Number L-43922
-
Description: Cross-connection correctionContainer: Number L-45432
-
Description: Connect building outlets to deionized water systemContainer: Number L-68597
-
Description: Upgrade hemo labContainer: Number L-43922
-
Description: Remove existing autoclave and install in room 19Container: Number L-289067
-
Description: Install fire alarm systemContainer: Number L-124728
-
Description: Retrofit fire alarm system- phase 2Container: Number L-124728
-
Description: Install fire alarm systemContainer: Number 3434-2007
-
Description: Demolish buildingContainer: Number 4947-2010
-
Description: Demolish buildingContainer: Number 4947-2010
-
Description: Demolish buildingContainer: Number 4947-2010
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Capital Planning and Development -- Records and correspondence
