Preliminary Guide to the Washington State University Facilities Operations Contracts 16662-18972, 2010-2011
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Operations
- Title
- Preliminary Guide to the Washington State University Facilities Operations Contracts 16662-18972
- Dates
- 2010-2011 (inclusive)20102011
- Quantity
- 14.5 Linear feet of shelf space, (13 Boxes + 4 Map Tubes)
- Collection Number
- UA2011-12 (collection)
- Summary
- Contracts, financial reports, and other architectural documents related to construction and remodel on WSU-owned property from 2010-2011.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
Contains contracts, financial documents, and building plans related to small-scale projects on WSU property including but not limited to the Pullman and Tri-Cities campuses from 2010-2011.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Operations Contracts 16662-18972, 2010-2011 (UA2011-12)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Box 1-5 contains files 16662.0113-18358. Boxes 6-13 contain 18145-18530. Files are ordered chronologically. Tubes contain plans for the Todd Hall adiition, the refurbishment of Stephenson and McEachern Hall, the WSU Children's Center, Dairy Road, Sloan Hall, and Scott-Coman Hall.
Location of Collection
(MASC STAFF USE) 4-03-08-07; 3-33-04-7Acquisition Information
This material was transferred to WSU Libraries' MASC by Rick Ward of Facilities on August 01, 2011 and retained as UA2011-12. Boxes 1-2 were not received at that time, and space was left for their eventual arrival. Maya and Rick disagreed on what was happening with those boxes; the end version is that MASC never received them.
Detailed Description of the Collection
-
BOX 1 FY'12
-
Description: WSU Tri-Cities - Spill ContainmentTrenches in Rm 151/151ADates: 2012Container: Contract 16662-0113, Log 4718-2009
-
Description: Tri-Cities BSEL - Services for Mobile Pilot PlantDates: 2012Container: Contract 16662-0112, Log 4434-2009
-
Description: WSU Tri-Cities BSEL - Utilities for Equipment in High Bay Room 157Dates: 2012Container: Contract 16662-0111, Log 4717-2009
-
Description: Terrell Library - Restore Exterior Roof MasonryDates: 2012Container: Contract 16662-0110, Log 4132-2009
-
Description: WSU Spokane Riverpoint Campus - Build 2 New CrosswalksDates: 2012Container: Contract 16662-0109, Log 4687-2009
-
Description: WSU Tri-Cities BSEL - Install Sink and Utilities in High Bay 157Dates: 2012Container: Contract 16662-0108, Log 4442-2009
-
Description: WSU Tri-Cities BSEL - Correct Terperature in Room 168BDates: 2012Container: Contract 16662-0107, Log 4296-2009
-
Description: WSU Tri-Cities East and West Buildings - Repair Roof LeaksDates: 2012Container: Contract 16662-0103, Log 3587-2008
-
Description: WSU Tri-Cities - Relocate Service Yard Phase 2Dates: 2012Container: Contract 16662-0100, Log 3397-2007
-
Description: WSU Puyallup - Demolish Pinckney Duplexes in Tacoma, Wa.Dates: 2012Container: Contract 16662-0097, Log 4024-2008
-
-
BOX 2 FY '12
-
Description: Gannon-Goldsworthy Pedestrian Overpass - Phase 2 Replace Stairs and LandingsDates: 2012Container: Contract 16662-0095, Log 3063-2007
-
Description: McCoy Hall- Remodel Rms 127A, 128, 128A, 128B, 128BADates: 2012Container: Contract 16662-0094, Log 3663-2008
-
Description: Fulmer Synthesis - Upgrade Deionized Water SystemDates: 2012Container: Contract 16662-0056, Log 2718-2007
-
Description: Fulmer Synthesis - Upgrade Deionized Water SystemDates: 2012Container: Contract 16662-0045, Log 2718-2007
-
Description: Old Fulmer HallNIF - Upgrade Deionized Water SystemDates: 2012Container: Contract 16662-0044, Log 2717-2007
-
Description: Fulmer Annex - Upgrade Deionized Water SystemDates: 2012Container: Contract 16662-0043, Log 2715-2007
-
Description: Agronomy Seed House - Replace Roof and Upgrade ElectricalDates: 2012Container: Contract 16662-0011, Log 1740-2006
-
-
BOX 3 FY '12
-
Description: Murrow East - Replace Roof and DeckDates: 2012Container: Contract 18371, Log 3010-2007
-
Description: Fine Arts Parking Garage Precast Concrete Sunshade RepairsDates: 2012Container: Contract 18377, Log 3767-200
-
Description: Regents Barnard/McGregor - Refurbish BathroomsDates: 2012Container: Contract 18871, Log 5375-2010
-
Description: WSU Tri-Cities BSEL Building Install Fume Hoods in Rm 171Dates: 2012Container: Contract N/A, Log 4635-2009
-
Description: WSU Spokane Classroom Building AN ImprovementsDates: 2012Container: Contract N/A, Log 5012-2010
-
Description: Cleveland Hall Recable Building with CAT6 CableDates: 2012Container: Contract N/A, Log 2213-2006
-
Description: Dairy Road Construction New Consolidated Storage FacilityDates: 2012Container: Contract N/A, Log 1312-2006
-
Description: French Administration Building Remodel Suite 130 and 134Dates: 2012Container: Contract N/A, Log 314946
-
Description: Stevenson North Elevator ModernizationDates: 2012Container: Contract N/A, Log 5733-2011
-
Description: Albrook Hall Retrofit Fire Alarm SystemDates: 2012Container: Contract N/A, Log 293992
-
-
BOX 4 FY '12
-
Description: General Campus Install Irrigation Control System Phase 1Dates: 2012Container: Contract 17946, Log 2980-2007
-
Description: Terrell Library Create New Classroom in Room 20Dates: 2012Container: Contract 18987, Log 3649-2008
-
Description: Stephenson! McEachern Refurbish InteriorsDates: 2012Container: Contract 18000, Log 4163-2009
-
Description: Spokane Riverpoint Emergency Warning SystemDates: 2012Container: Contract 18015, Log 3343-2007
-
-
BOX 5 FY '12
-
Description: LJ Smith Remodel Rm 113, Create Biomass LabDates: 2012Container: Contract 18282, Log 3851-2008
-
Description: Cooper Publications New HVAC in Room 70Dates: 2012Container: Contract 18290, Log 3376-2007
-
Description: WSU Tri-Cities BSEL Install HydrogenDates: 2012Container: Contract 18320, Log 4168-2009
-
Description: Veterinary Isolation Building Renovate HVACDates: 2012Container: Contract 18358, Log 1281-2006
-
-
BOX 6 FY '12
-
Description: Todd Addition Remodel Rooms 267,268 & 277Dates: 2012Container: Contract 18145, Log 3827-2008
-
Description: General Campus DI System UpgradeDates: 2012Container: Contract 18174, Log 4392-2009
-
Description: Plant Growth Center Replace BoilersDates: 2012Container: Contract 18179, Log 2975-2007
-
Description: Spillman Farm Electrical Service UpgradesDates: 2012Container: Contract 18245, Log 2056-2006
-
Description: Stephenson North Precast Concrete Sunshade RepairsDates: 2012Container: Contract 18774, Log 3959-2008
-
-
BOX 7 FY '12
-
Description: General Campus Construct Equipment Storage Bldg 0835ADates: 2012Container: Contract 18073, Log 3221-2007
-
Description: Streit Hall Renovate ElevatorDates: 2012Container: Contract 18093, Log 3614-2008
-
Description: ADBF Modify Room 4079Dates: 2012Container: Contract 18115, Log 1799-2006
-
Description: Daggy Hall Refurbish Rms 260, 251 & 251ADates: 2012Container: Contract 18127, Log 3830-2008
-
Description: Information Technology Electrical Upgrades in Rm 1010Dates: 2012Container: Contract 18192, Log 3600-2008
-
-
BOX 8 FY '12
-
Description: Carpenter Hall Renovate ExteriorDates: 2012Container: Contract 18026, Log 3799-2008
-
Description: WSU Tri-C ities Install Emergency Warning SystemDates: 2012Container: Contract 18051, Log 3342-2007
-
Description: Fulmer Synthesis Repair Exterior BrickDates: 2012Container: Contract 18059, Log 2337-2007
-
Description: WSU Children's Center Construct AdditionDates: 2012Container: Contract 18067, Log 3735-2008
-
-
BOX 9 FY '12
-
Description: Engineering Laboratory Building Replace RooftopDates: 2012Container: Contract 17792, Log 3903-2008
-
Description: College Avenue Steam Tunnel Upgrade Street Light System Phase IIDates: 2012Container: Contract 17857, Log 2092-2006
-
Description: Owen Science Library Renovate ConcourseDates: 2012Container: Contract 17933, Log 3544-2008
-
Description: Wegner Hall Improvements to Vivarium Suite G35Dates: 2012Container: Contract 17941, Log 1309-2006
-
Description: WSU Vancouver Emergency Phone, Blue LotDates: 2012Container: Contract 17991, Log 3424-2007
-
-
BOX 10 FY '12
-
Description: Johnson Hall Remodel Rooms 132B, 144, 146Dates: 2012Container: Contract 17716, Log 3671-2008
-
Description: Bohler Gymnasium Construct Rowing Tank in Pool Rm B42Dates: 2012Container: Contract 17691, Log 1562-2006
-
Description: EH&S Expand Parking LotDates: 2012Container: Contract 17772, Log 3113-2007
-
Description: Markley Service Complex Construct Truck Storage ShedDates: 2012Container: Contract 17778, Log 3508-2007
-
Description: French Administration Building Install CAT6 CableDates: 2012Container: Contract 17786, Log 3505-2007
-
-
BOX 11 FY '12
-
Description: Webster Asbestos/Lead Survey Roof ReplacementDates: 2012Container: Contract 18536, Log 1351-2006
-
Description: Johnson Tower Asbestos Survey for Lower RoofDates: 2012Container: Contract 18537, Log 5025-2010
-
Description: Commons Asbestos Survey for Roof ReplacementDates: 2012Container: Contract 18538, Log 4375-2009
-
Description: Eastlick Hall Good Faith SurveyDates: 2012Container: Contract 18558, Log 1352-2006
-
Description: Fulmer Annex Asbestos Survey for Roof ReplacementDates: 2012Container: Contract 18573, Log 4759-2009
-
Description: Cattle Feeding Lab Commodity Storage Building Lead And Asbestos Survey for Project to Demolish BuildingDates: 2012Container: Contract 18600, Log 3121-2007
-
Description: Orton Hall Good Faith SurveyDates: 2012Container: Contract 18611, Log 5077-2010
-
Description: McEachern East Asbestos StudyDates: 2012Container: Contract 18622, Log 5078-2010
-
Description: Physical Education Building Asbestos Survey for Replace RoofDates: 2012Container: Contract 18628, Log 4611-2009
-
Description: Bryan Hall Asbestos Survey for Clock TowerDates: 2012Container: Contract 18642, Log 2672-2007
-
Description: Todd Hall Addition Good Faith Survey for Kitchen RemodelDates: 2012Container: Contract 18715, Log 1591-2006
-
Description: Consolidated Storage Building Provide Design Services And WH LayoutDates: 2012Container: Contract 18734, Log 3833-2008
-
Description: General Campus Crossover Valve Analyze SystemDates: 2012Container: Contract 18710, Log 3533-2008
-
Description: Tri-Cities West and East Buildings Good Faith Survey For RoofDates: 2012Container: Contract 18972, Log 3271-2007
-
Description: LARC Remodel Suite 111 for Microwave SterilizerDates: 2012Container: Contract 17003, Log 1306-2006
-
Description: Owen Sciences Library Modernize ElevatorsDates: 2012Container: Contract 17533, Log 2071-2006
-
Description: Wilson Hall Renovate Exterior FinishesDates: 2012Container: Contract 17583, Log 3563-2008
-
-
BOX 12 FY '12
-
Description: WSU Long Beach Groundwater MonitoringDates: 2012Container: Contract 17071, Log 2634-2007
-
Description: Terrell Library Upgrade Security SystemDates: 2012Container: Contract 17367, Log 1449-2006
-
Description: Asbestos/Lead Surveys Design/Oversight ServicesDates: 2012Container: Contract 17476, Log 3784-2008
-
Description: Beasley Coliseum Upgrade Building Automation SystemsDates: 2012Container: Contract 17565, Log 2034-2006
-
Description: WSU Puyallup Research and Extension Center Pre-Design For Low Impact Development (LID) RetrofitDates: 2012Container: Contract 17616, Log 1864-2006
-
Description: Electrical Design for WSU Pullman Campus Observatory Hill X-Over ValveDates: 2012Container: Contract 17674, Log 3533-2008
-
Description: Electrical Design for WSU Pullman Campus Well 7 2008Dates: 2012Container: Contract 17673, Log 2670-2007
-
Description: Wegner Hall Electrical Design for Improvements to Vivarium SuiteDates: 2012Container: Contract 17700, Log 1309-2006
-
Description: Puyallup Research/Extension Center Design for LID RetrofitDates: 2012Container: Contract 17881, Log 1864-2006
-
Description: Asbestos/Lead Surveys Design and Oversight ServicesDates: 2012Container: Contract 17952, Log 4342-2009
-
Description: Puyallup Research and Extension Center Modular Building Sitework DesignDates: 2012Container: Contract 17954, Log 3385-2007
-
Description: Bryan Hall Design for Renovate Clock Tower and EquipmentDates: 2012Container: Contract 17959, Log 2672-2007
-
Description: Todd Hall Addition AudioNisual Bid Docs for RemodelDates: 2012Container: Contract 18050, Log 3755-2008
-
Description: Todd Hall Addition Fire System Bid Docs for RemodelDates: 2012Container: Contract 18052, Log 3755-2008
-
Description: Todd Hall Additional Bid Docs for AudioNisual SystemsDates: 2012Container: Contract 18064, Log 3827-2008
-
Description: Stephenson/McEachern Third Party OversightDates: 2012Container: Contract 18094, Log 4163-2009
-
Description: LJ Smith Design Services Create Biomass Lab 113Dates: 2012Container: Contract 18114, Log 3851-2008
-
Description: Prosser Testing/Engineering Replace IrrigationDates: 2012Container: Contract 18144, Log 3276-2007
-
Description: Tri-Cltles CIC Design Services for Roof ReplacementDates: 2012Container: Contract 18164, Log 4672-2009
-
Description: Murrow East Design for Reroof/Roof DeckDates: 2012Container: Contract 18182, Log 3010-2007
-
Description: General Campus Hazardous Material Testing for Demolish Barns 142A/142EDates: 2012Container: Contract 18225, Log 1570-2006
-
Description: General Campus Repair Sinkhole Northeast Fulmer HallDates: 2012Container: Contract 18393, Log 4913-2010
-
Description: Wegner Hall Hazardous Materials TestingDates: 2012Container: Contract 18426, Log 4553-2009
-
Description: Fine Arts Precast Concrete Panel RepairDates: 2012Container: Contract 18427, Log 3767-2008
-
Description: General Campus Residence at 960 MonroeDates: 2012Container: Contract 18436, Log 4818-2010
-
Description: WSU Wenatchee Entomology Replace RoofDates: 2012Container: Contract 18429, Log 4758-2009
-
Description: WSU Wenatchee Entomology Replace RoofDates: 2012Container: Contract 18452, Log 4758-2009
-
Description: Well 7 Hydrologic AnalysisDates: 2012Container: Contract 18474, Log 2670-2007
-
Description: Todd Addition Design for Hospitality Teaching Center Kitchen In Room 270Dates: 2012Container: Contract 18497, Log 1591-2006
-
Description: Bustad Hall Asbestos Survey for Roof ReplacementDates: 2012Container: Contract 18530, Log 1346-2006
-
-
BOX 13 FY '12
-
Description: NRC Improvements 2004Dates: 2012Container: Contract N/A, Log 288169
-
Description: French Administration Building Reconfigure Room 220Dates: 2012Container: Contract N/A, Log 2192-2006
-
Names and SubjectsReturn to Top
Corporate Names