Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1991-2012
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Services
- Title
- Preliminary Guide to the Washington State University Facilities Services Building Files and Records
- Dates
- 1991-2012 (inclusive)19912012
- Quantity
- 35.5 Linear feet of shelf space, (36 Boxes)
- Collection Number
- UA2015-12 (collection)
- Summary
- Construction reports, specification reports, and various administrative and financial files related to several large-scale projects on the WSU Campuses from 1991-2000. Projects include the 1992 Thompson Hall Renewal, the renovation of Honors Hall, as well
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
All boxes contain correspondence, specification reports, contracts, and various administrative and financial reports related to several larger construction and remodel projects on the WSU campuses from 1991-2012. Notable projects include the Thompson Hall Renewal from 1992-2000, the remodel of Honors Hall, as well as the remodel of the Engineering Teaching / Research Lab.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1991-2012 (UA2015-12)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
All boxes are clearly organized by subject matter. Most boxes contain files relating to only one project. Projects are often split into two or three different boxes.
Detailed Description of the Collection
-
Thompson Hall Bldg. No. 0001
-
Description: BudgetDates: undatedContainer: Box 1
-
Description: RegentsDates: undatedContainer: Box 1
-
Description: Public Information RequestDates: 3/1/99Container: Box 1
-
Description: Issues & ClaimsDates: undatedContainer: Box 1
-
Description: Dispute Review Board - Martin W. Becker CO#13077Dates: 9/21/98Container: Box 1
-
Description: Dispute Review Board - John A. Beyer CO#13077Dates: 9/21/98Container: Box 1
-
Description: Dispute Review Board - Roger L. Brown CO#13077Dates: 9/21/98Container: Box 1
-
Description: Hainline & Associates CO#12257Dates: 5/9/96Container: Box 1
-
Description: Redicheck Firm Agreement Contract 11621Dates: undatedContainer: Box 1
-
Description: Reid Middleton CO#12968Dates: 7/22/98Container: Box 1
-
Description: Robert Fossatti AssociatesDates: 1/14/94Container: Box 1
-
Description: SCM Consultants, Inc. CO#11868Dates: undatedContainer: Box 1
-
Description: Stoel Rives LLP Attorneys CO#12589Dates: 5/23/97Container: Box 1
-
Description: Walker Inspectorate CO#12965Dates: 6/10/98Container: Box 1
-
Description: Value Engineering StudyDates: 10/94Container: Box 1
-
Description: Geotechnical ReportDates: 10/27/95Container: Box 1
-
Description: Program EstimateDates: 5/29/92Container: Box 1
-
Description: ProgramDates: undatedContainer: Box 1
-
Description: Project Recap (with overhead sheets)Dates: 10/94Container: Box 1
-
Description: Building Committee MeetingsDates: 10/20/94Container: Box 1
-
Description: Project Completion PlanningDates: 6/1/00Container: Box 1
-
Description: Email General CorrespondenceDates: 4/95Container: Box 1
-
Description: General Correspondence #3Dates: 10/1/98Container: Box 1
-
Description: Cardwell Thomas & Associates General CorrespondenceDates: 1/1/98Container: Box 1
-
Description: Cardwell Thomas & Associates Contract CO#10972Dates: 9/1/99Container: Box 1
-
Description: Iconco, Inc. General Correspondence #1Dates: 6/29/97 - 6/29/98Container: Box 2
-
Description: Iconco Inc. Contract CO#12721Dates: 7/15/97 - 3/2/98Container: Box 2
-
Description: V.K. Powell Company, Inc. General CorrespondenceDates: 6/9/98 - 4/10/00Container: Box 2
-
Description: V.K. Powell Company, Inc. Contract CO#12981Dates: 5/1/99 - 2/29/00Container: Box 2
-
Description: Cardwell Thomas & Associates Construction Meeting MinutesDates: 10/24/97 - 5/12/97Container: Box 2
-
Description: 1991 Consultant Selection for Rehabilitation of Thompson Hall Floor ProfileDates: 3/98Container: Box 2
-
Description: Construction EstimatesDates: 1995 & 1998Container: Box 2
-
Description: SCM Consultants, Inc. Addendum No. 1 Hazardous Materials SurveyDates: 8/98Container: Box 2
-
Description: SCM Consultants, Inc. Asbestos Bulk SamplingDates: 11/14/97Container: Box 2
-
Description: SCM Consultants, Inc. Bid Package No. 1 Specifications for Appendix ADates: 6/6/97Container: Box 2
-
Description: SCM Consultants, Inc. Bid Package No. 2 Specifications for Appendix ADates: 3/98Container: Box 2
-
Description: SCM Consultants, Inc. Asbestos Bid Package No. 2 Specifications for Appendix ADates: 12/1/97Container: Box 2
-
Description: Ackroyd Construction Documents EstimateDates: 7/3/95Container: Box 2
-
Description: SCM Asbestos Abatement ProjectDates: 4/16/98Container: Box 2
-
Description: 3-H Mechanical IssuesDates: 10/98Container: Box 3
-
Description: 3rd Floor Y.K.P. to Arch.Dates: 2/99Container: Box 3
-
Description: Dispute Review Board #3Dates: 99Container: Box 3
-
Description: Dispute Review Board #2Dates: 98Container: Box 3
-
Description: Dispute Review Board #1Dates: 97Container: Box 3
-
Description: Lead Paint Information & Issues #1Dates: 9/98 - 12/99Container: Box 3
-
Description: Lead Paint Information & Issues #1Dates: 9/98 - 12/99Container: Box 3
-
Description: Schedule (Weekly/Monthly) #1Dates: 98-99Container: Box 3
-
Description: Schedule (Weekly/Monthly) #2Dates: 98-99Container: Box 3
-
Description: ScheduleDates: 98-99Container: Box 3
-
Description: SignageDates: 98-99Container: Box 3
-
Description: UpgradesDates: 1999Container: Box 3
-
Description: V.K. Powell Company, Inc. Contract CO#12981 #1Dates: 6/19/98 - 5/31/99Container: Box 3
-
Description: General Correspondence #2Dates: 6/1/94 - 9/30/95Container: Box 3
-
Description: General Correspondence #1Dates: 6/1/94 - 9/30/95Container: Box 3
-
Description: Cardwell Thomas & Associates General Correspondence #5Dates: 1/9/98 - 12/31/97Container: Box 3
-
Description: Cardwell Thomas & Associates General Correspondence #4Dates: 3/1/95 - 12/31/95Container: Box 3
-
Description: Cardwell Thomas & Associates General Correspondence #3Dates: 9/1/94 - 2/28/95Container: Box 4
-
Description: Cardwell Thomas & Associates General Correspondence #2Dates: 1/1/94 - 8/31/94Container: Box 4
-
Description: Cardwell Thomas & Associates General Correspondence #1Dates: 1/21/91 - 12/31/93Container: Box 4
-
Description: Cardwell Thomas & Associates Contract CO#10972 #3Dates: 5/1/98 - 8/31/99Container: Box 4
-
Description: Cardwell Thomas & Associates Contract CO#10972 #2 Contract, Pay Estimates, and COsDates: 8/1/97 - 4/30/98Container: Box 4
-
Description: Cardwell Thomas & Associates Contract CO#10972 #1 Agreements & PaymentsDates: 2/28/92 - 7/31/97Container: Box 4
-
Description: Iconco, Inc. Certified Payroll ReportsDates: 10/1/97 - 12/2/97Container: Box 4
-
Description: Iconco, Inc. Certified Payroll Reports (cont.)Dates: 10/1/97 - 12/2/97Container: Box 5
-
Description: Contract Change Proposals Numbers 001 - 98Dates: variousContainer: Box 5
-
Description: Rejected Bid Package #2 Bid OpeningDates: 6/9/98Container: Box 5
-
Description: Rejected Bid Package Demolition #1Dates: 7/17/97Container: Box 5
-
Description: BudgetDates: 7/13/93 - 2/11/03Container: Box 5
-
Description: RegentsDates: 6/3/96 - 3/6/98Container: Box 5
-
Description: BAIT CommitteeDates: 5/01Container: Box 5
-
Description: FAC CommitteeDates: 11/00Container: Box 5
-
Description: Washington State Office of Financial Management - B.E.S.T StudyDates: 9/94Container: Box 5
-
Description: Sasaki Associates, Inc. /Stewart Associates Design Team Review & Responses to B.E.S.T StudyDates: 11/94Container: Box 5
-
Description: Disputes Review Board Three-Part Agreement CO#13131 #1Dates: 12/1/98Container: Box 5
-
Description: Disputes Review Board PresentationDates: 8/15/00Container: Box 5
-
Description: Disputes Review Board Gym Floor ReplacementDates: 8/15/00Container: Box 5
-
Description: Dispute Resolution Management AGC Spokane OfficeDates: 8/15/00Container: Box 5
-
Description: Stoel Rives LLP Attorneys CO#12589Dates: 3/30/98Container: Box 5
-
Description: Lane Powell, Spears, Lubersky AttorneysDates: 01/10/03 - 12/16/02Container: Box 5
-
Description: Project Planning Committee #1Dates: 11/95Container: Box 5
-
Description: Hainline & Associates CO#12257 #1Dates: 5/3/96Container: Box 5
-
Description: PPL Coffman Engineers CO#12569 #1Dates: 3/27/97 - 7/7/97Container: Box 5
-
Description: The Redicheck Firm CO#11621 #1Dates: 3/17/94Container: Box 5
-
Description: Reid Middleton CO#12968Dates: 6/23/98Container: Box 5
-
Description: Robert Fossatti Associates CO#6060Dates: 2/12/96 - 6/25/98Container: Box 5
-
-
Bohler Gymnasium Renovation Bldg. No. 0011
-
Description: SCM Consultants, Inc. CO#12571Dates: 1/1/97 - 6/23/02Container: Box 6
-
Description: Strata Geotechnical Engineering CO#12550Dates: 6/29/98Container: Box 6
-
Description: WJE Associates, Inc.Dates: 2/15/01Container: Box 6
-
Description: Value Engineering StudyDates: 9/1/94 - 9/11/96Container: Box 6
-
Description: SCM Consultants, Inc. Test Reports #1Dates: 11/15/97Container: Box 6
-
Description: Strata Geotechnical Engineering Concrete Test Reports #1Dates: 2/18/97Container: Box 6
-
Description: Broken Water Main #1Dates: 11/1/99Container: Box 6
-
Description: Flotex Carpet General Correspondence #1Dates: 12/6/01Container: Box 6
-
Description: Gym FloorDates: 8/1/00Container: Box 6
-
Description: Test Reports (Miscellaneous) #1Dates: 5/1/99Container: Box 6
-
Description: Email General Correspondence #1Dates: 6/20/96Container: Box 6
-
Description: General Correspondence #2Dates: 8/1/99Container: Box 6
-
Description: Sasaki Associates Submittals #1Dates: 3/2/98Container: Box 6
-
Description: Sasaki Associates Construction Meeting Minutes #1Dates: 3/2/98Container: Box 6
-
Description: Sasaki Associates Request For InformationDates: 2/23/98Container: Box 6
-
Description: Sasaki Associates General Correspondence #6Dates: 12/96 - 1/1/00Container: Box 6
-
Description: Sasaki Associates Contract CO#12044 #3Dates: 8/1/99Container: Box 6
-
Description: Sasaki Associates Contract CO#11608 #1Dates: 11/17/93 - 1/26/95Container: Box 6
-
Description: Sasaki Associates Bulletin Folder #1Dates: 6/1/99Container: Box 6
-
Description: TLH Abatement, Inc. General Correspondence #1Dates: 11/5/97 - 9/15/99Container: Box 6
-
Description: WarrantiesDates: 3/1/01Container: Box 6
-
Description: Garco Construction, Inc. General Correspondence #2Dates: 9/1/00Container: Box 6
-
Description: Sasaki Associates, Inc./Steward Associates Predesign StudyDates: 6/94Container: Box 6
-
Description: Sasaki Associates General Correspondence #3Dates: 9/1/96 - 12/31/97Container: Box 7
-
Description: Sasaki Associates General Correspondence #2Dates: 6/1/94 - 8/31/96Container: Box 7
-
Description: Sasaki Associates Contract CO#12044 #1Dates: 6/96 - 05/98Container: Box 7
-
Description: Sasaki Associates Contract CO#12044 #2Dates: 7/1/98 - 7/31/99Container: Box 7
-
Description: Garco Construction, Inc. General Correspondence #1Dates: 9/11/98 - 8/31/00Container: Box 7
-
Description: Garco Construction, Inc. Contract CO#13055 #1Dates: 8/20/98 - 12/31/99Container: Box 7
-
Description: Sasaki Associates/Stewart Associates Predesign StudyDates: 10/32Container: Box 7
-
Description: EFT Architects, Inc. Schematic Design Phase Value EngineeringDates: 6/27/96Container: Box 7
-
Description: PPL Coffman Engineers - Masonry StudyDates: 1997Container: Box 7
-
Description: TLH Abatement, Inc. Statements of Compliance #1Dates: 2/20/98Container: Box 7
-
Description: Garco Construction, Inc. CO#13055 #2Dates: 1/1/00Container: Box 7
-
Description: TLH Abatement, Inc. Contract Change ProposalsDates: Numbers 001 - 012Container: Box 7
-
Description: Rejected BidsDates: 8/20/98Container: Box 7
-
Description: Rejected BidsDates: 12/4/97Container: Box 8
-
Description: Closeout Items #1Dates: 5/1/00Container: Box 8
-
Description: Issues and Claims #1Dates: 6/1/00Container: Box 8
-
Description: General Correspondence #1Dates: 2/26/91 - 8/31/98Container: Box 8
-
Description: Sasaki and Associates - General Correspondence #1Dates: 2/92 - 6/94Container: Box 8
-
Description: Sasaki and Associates - General Correspondence #5Dates: 5/1/98 - 12/31/99Container: Box 8
-
Description: Sasaki and Associates - General Correspondence #4Dates: 1/1/98 - 4/30/98Container: Box 8
-
-
Honors Hall (aka White/Scholars Hall) Bldg. No. 0014
-
Description: BudgetDates: 2/20/01Container: Box 8
-
Description: Builder’s Risk InsuranceDates: 6/1/00Container: Box 8
-
Description: RegentsDates: 1999Container: Box 8
-
Description: Finance, Audit, Capital CommitteeDates: 6/28/01Container: Box 8
-
Description: BAIT CommitteeDates: 6/28/01Container: Box 8
-
Description: Public Information RequestsDates: 10/1/00Container: Box 8
-
Description: GC/CM Public HearingDates: 1/13/99Container: Box 8
-
Description: Attorney GeneralDates: 4/1/99Container: Box 8
-
Description: Code IssuesDates: 6/30/00Container: Box 8
-
Description: Completion PlanningDates: 9/1/99Container: Box 8
-
Description: AMEC Earth & Environmental CO#13182Dates: 1/10/99Container: Box 8
-
Description: Disputes Review Board Agreement CO#13579Dates: 3/1/00Container: Box 8
-
Description: Hainline & Associates CO#12257 (Amendment #10)Dates: 7/1/00Container: Box 8
-
Description: Hodge $ Associates, Inc. CO#14222Dates: 2/1/99Container: Box 8
-
Description: Nixon Consulting International, Inc. CO#13507Dates: 1/1/00Container: Box 9
-
Description: O’Brien Kreitzberg CO#12879Dates: 5/14/98Container: Box 9
-
Description: Reid Middleton CO#12968Dates: 3/1/99Container: Box 9
-
Description: Stephen F. McAuley Construction Management CO#13339Dates: 9/1/99Container: Box 9
-
Description: Strata Geotechnical Engineering & Materials Testing CO#13126Dates: 11/11/98Container: Box 9
-
Description: Strata Geotechnical Engineering & Materials Testing CO#13290Dates: 6/1/99Container: Box 9
-
Description: Strata Geotechnical Engineering & Materials Testing CO#13707Dates: 5/1/00Container: Box 9
-
Description: WPA, Inc. CO#13867Dates: 5/1/01Container: Box 9
-
Description: Email Correspondence #1Dates: 10/97Container: Box 9
-
Description: General Correspondence #1Dates: 7/96Container: Box 9
-
Description: RFQ GC/CM Procedures and SelectionDates: 11/98Container: Box 9
-
Description: RFQ Consulting Services SelectionDates: 5/98Container: Box 9
-
Description: Rehabilitation Structural StudyDates: 12/28/98Container: Box 9
-
Description: Mailani Construction Services, Inc. Test & Balance ReportDates: 9/27/01Container: Box 9
-
Description: AGRA Earth & Environmental Hazardous Materials SurveyDates: 2/9/99Container: Box 9
-
Description: Baugh Construction Oregon, Inc. Pre-Construction PlanDates: 2/18/99Container: Box 9
-
Description: Baugh Construction Oregon, Inc. Statement of QualificationsDates: 1/28/99Container: Box 9
-
Description: Baugh Construction Oregon, Inc. General Correspondence #2Dates: 9/8/00 - 12/5/01Container: Box 9
-
Description: Baugh Construction Oregon, Inc. Contract CO#13204 #1Dates: 4/1/99 - 6/6/00Container: Box 9
-
Description: Baugh Construction Oregon, Inc. Contract CO#13651 #1Dates: 5/1/00 - 11/30/01Container: Box 9
-
Description: Kovalenko Hale Architects Program DocumentsDates: 1/4/99Container: Box 9
-
Description: Kovalenko Hale Architects White Hall Historical StudyDates: 1998Container: Box 9
-
Description: Kovalenko Hale Architects General Correspondence #1Dates: 7/9/98 - 10/19/01Container: Box 9
-
Description: Kovalenko Hale Architects Contract CO#13082 #3Dates: 2/01/01 - 7/10/01Container: Box 9
-
Description: Kovalenko Hale Architects Schematic Design BrochureDates: 4/99Container: Box 10
-
Description: RFQ GC/CM ServicesDates: 1998Container: Box 10
-
Description: Kovalenko Hale Architects Contract CO#13082 #2Dates: 1/1/00 - 1/31/01Container: Box 10
-
Description: Kovalenko Hale Architects Contract CO#13082 #1Dates: 9/23/98 - 12/21/99Container: Box 10
-
Description: Certified Payroll ReportsDates: 9/11/00 - 5/9/01Container: Box 10
-
Description: Contract Change ProposalsDates: Numbers 001 - 086Container: Box 10
-
Description: Rejected BidsDates: Bid Date 6/1/00Container: Box 10
-
Description: AMEC Regulated Material Project Closeout DocumentationDates: 6/25/01Container: Box 10
-
-
Engineering Teaching/Research Lab Bldg. No. 0058
-
Description: BudgetContainer: Box 11
-
Description: Regents FileContainer: Box 11
-
Description: Predesign Building ProgramContainer: Box 11
-
Description: Attorney GeneralContainer: Box 11
-
Description: Issues and ClaimsContainer: Box 11
-
Description: Engine Test Stand ClaimDates: 5/1/02Container: Box 11
-
Description: L.A.I.P CorrespondenceContainer: Box 11
-
Description: EIS #2Dates: 12/94Container: Box 11
-
Description: Public Information RequestsDates: 5/1/00Container: Box 11
-
Description: Callison ArchitectureContainer: Box 11
-
Description: Value Engineering StudyContainer: Box 11
-
Description: Callison Architecture Schmatic Design SubmittalDates: 1/94Container: Box 11
-
Description: Meng Analysis Group - Value Engineering StudyDates: 5/26/94Container: Box 11
-
Description: Agra Earth & EnvironmentalDates: 4/11/94 - 6/6/95Container: Box 11
-
Description: Burke/Lee CorrespondenceDates: 3/19/95Container: Box 11
-
Description: Dispute Review Board- General Correspondence #1Dates: 10/7/96Container: Box 11
-
Description: Dispute Review Board- Dennis Fullerton CO#12444Dates: 8/23/96Container: Box 11
-
Description: Dispute Review Board- Gerald Schlatter CO#12444Dates: 10/24/96Container: Box 11
-
Description: Dispute Review Board- Stephen Goldblatt CO#12444Dates: 10/24/96Container: Box 11
-
Description: Hainline and Associates Contract CO#12257Dates: 5/19/96Container: Box 11
-
Description: Redicheck CO#11621Dates: 10/29/95Container: Box 11
-
Description: Robert Fossatti Associates CO#12444Dates: 10/8/92Container: Box 11
-
Description: Professional Services Industries, Inc. General Correspondence #1Dates: 1/24/97Container: Box 11
-
Description: Professional Services Industries, Inc. Contract #1 CO#12431Dates: 1/24/97Container: Box 11
-
Description: Professional Services Industries, Inc. Concrete Testing Reports #1Dates: 5/14/96Container: Box 11
-
Description: Professional Services Industries, Inc. Various Inspection Reports #1Dates: 5/14/96Container: Box 11
-
Description: Daily Construction Reports #2Dates: 5/1/97Container: Box 11
-
Description: Geotechnical Engineering Design StudyDates: 05/17/97Container: Box 11
-
Description: HCI Howard Consultants, Inc. Concrete Test ReportsDates: 5/16/96Container: Box 11
-
Description: Building Committee MeetingsContainer: Box 12
-
Description: Email Correspondence #2Dates: 5/1/98Container: Box 12
-
Description: General Correspondence #8Dates: 5/1/98Container: Box 12
-
Description: Callison Architecture Construction Meeting MinutesDates: 5/16/96Container: Box 12
-
Description: Callison Architecture Request for Interpretation #3Dates: 5/1/97Container: Box 12
-
Description: Callison Architecture Email Correspondence #1Container: Box 12
-
Description: Callison Architecture General Correspondence #13Dates: 12/1/97Container: Box 12
-
Description: Callison Architecture Contract CO#10970Dates: 8/1/98Container: Box 12
-
Description: Swank Enterprises Email CorrespondenceDates: 4/13/98Container: Box 12
-
Description: Swank Enterprises General Correspondence #5Dates: 5/1/98Container: Box 12
-
Description: Swank Enterprises Contract CO#12249Dates: 8/23/96Container: Box 12
-
Description: Swank Enterprises Non Compliance ReportsContainer: Box 12
-
Description: Swank Enterprises Non Numbered Change ProposalsContainer: Box 12
-
Description: Swank Contract Change Proposals 115A-185Container: Box 12
-
Description: Swank Enterprises Contract Change ProposalsDates: Numbers 001-114Container: Box 13
-
Description: Motley - Motley, Inc. General Correspondence #1Dates: 5/95Container: Box 13
-
Description: Motley - Motley, Inc. Contract CO#11989Container: Box 13
-
Description: Engineering Teaching Shop Demolition General Correspondence #1Dates: 3/95Container: Box 13
-
Description: Callison Architecture General CorrespondenceDates: 3/95Container: Box 13
-
Description: Mechanical Engineering Shop Demolition Rejected BidsContainer: Box 13
-
Description: Engineering Teaching/Research Lab Rejected BidsDates: 3/21/96Container: Box 13
-
Description: Engineering Teaching/Research Lab Rejected BidsDates: 3/21/96Container: Box 13
-
Description: Engineering Teaching/Research Lab Rejected BidsDates: 9/14/95Container: Box 13
-
Description: Cobra Corporation Roofing Materials SubmittalsDates: 10/22/96Container: Box 14
-
Description: E.I.S. #1Dates: 11/91 - 11/94Container: Box 14
-
Description: Daily Construction Reports #1Dates: 4/30/96 - 4/30/97Container: Box 14
-
Description: Email General Correspondence #1Dates: 3/9/94 - 4/30/98Container: Box 14
-
Description: General Correspondence #7Dates: 6/1/97 - 4/30/98Container: Box 14
-
Description: General Correspondence #6Dates: 9/1/96- - 5/31/97Container: Box 14
-
Description: General Correspondence #5Dates: 11/1/95 - 8/31/96Container: Box 14
-
Description: General Correspondence #4Dates: 3/95 - 10/31/95Container: Box 14
-
Description: General Correspondence #3Dates: 7/1/94 - 3/14/94Container: Box 14
-
Description: General Correspondence #14Container: Box 14
-
Description: General Correspondence #13Container: Box 14
-
Description: Callison Architecture General Correspondence #12Dates: 5/97 - 11/30/97Container: Box 15
-
Description: Callison Architecture General Correspondence #11Dates: 8/1/96 - 5/97Container: Box 15
-
Description: Callison Architecture General Correspondence #10Dates: 3/1/96 - 5/97Container: Box 15
-
Description: Callison Architecture General Correspondence #9Dates: 1/1/96 - 2/29/96Container: Box 15
-
Description: Callison Architecture General Correspondence #8Container: Box 15
-
Description: Callison Architecture General Correspondence #7Dates: 8/1/95 - 8/31/95Container: Box 15
-
Description: Callison Architecture General Correspondence #6Dates: 7/1/95 - 7/31/95Container: Box 15
-
Description: Callison Architecture General Correspondence #5Dates: 3/95 - 6/30/95Container: Box 15
-
Description: General Correspondence #4Dates: 1/95 - 3/95Container: Box 15
-
Description: General Correspondence #3Dates: 10/1/94 - 12/95Container: Box 15
-
Description: General Correspondence #2Dates: 2/2/94 - 9/30/94Container: Box 16
-
Description: General Correspondence #1Dates: 10/91 - 3/31/94Container: Box 16
-
Description: Callison Architecture Requests for Interpretation #2Dates: 10/1/96 - 4/30/99Container: Box 16
-
Description: Callison Architecture Contract CO# 10970 #3Dates: 5/1/96Container: Box 16
-
Description: Callison Architecture Contract CO# 10970 #2Dates: 4/1/96 - 4/30/96Container: Box 16
-
Description: Callison Architecture Contract CO# 10970 #1Dates: 4/29/96 - 3/31/96Container: Box 16
-
Description: Callison Architecture Denied Extra Services #3Dates: 5/94 - 12/98Container: Box 16
-
Description: Callison Architecture Denied Extra Services #2Dates: 5/94 - 12/98Container: Box 16
-
Description: Callison Architecture Denied Extra Services #1Dates: 5/94 - 12/98Container: Box 16
-
Description: Swank Enterprises General Correspondence #4Dates: 6/97 - 4/30/98Container: Box 17
-
Description: Swank Enterprises General Correspondence #3Dates: 12/96 - 5/97Container: Box 17
-
Description: Swank Enterprises General Correspondence #2Dates: 7/1/96 - 11/30/96Container: Box 17
-
Description: Swank Enterprises Contract CO#12249 #1Dates: 3/27/96 - 4/30/97Container: Box 17
-
-
Children’s Center (98 - 00) Bldg. No. 0088
-
Description: BudgetDates: 12/15/00Container: Box 17
-
Description: Builder’s Risk InsuranceDates: 05/99 - 5/02Container: Box 17
-
Description: RegentsDates: 2/1/01Container: Box 17
-
Description: Public Information RequestsDates: 3/99 - 11/00Container: Box 17
-
Description: Finance Audit CommitteeDates: 12/98Container: Box 17
-
Description: Space Descriptions & Electronic FilesDates: 7/1/99Container: Box 17
-
Description: Project Schedule CorrespondenceDates: 12/28/00 - 5/17/01Container: Box 17
-
Description: ASBESTOS (Mgmt, Abatement, Directives, Analysis)Dates: 3/99Container: Box 17
-
Description: Hainline & Associates CO#14085Dates: 5/1/01Container: Box 17
-
Description: McAuley & Associates CO#13339Dates: 8/1/99Container: Box 17
-
Description: SCM Consultants, Inc. CO#13546Dates: 2/1/01Container: Box 17
-
Description: Strata Geotechnical Engineering & Material Testing CO#13992Dates: 3/1/00Container: Box 17
-
Description: Thomas Consulting CO#13576Dates: 10/26/00 - 11/20/00Container: Box 17
-
Description: Western States Construction Responsibility FileDates: 3/9/00 - 5/29/01Container: Box 17
-
Description: Email General CorrespondenceDates: 1/1/00Container: Box 17
-
Description: General CorrespondenceContainer: Box 17
-
Description: Architects BCRA/Tsang Email CorrespondenceDates: 7/1/00Container: Box 18
-
Description: Architects BCRA/Tsang General CorrespondenceDates: 10/1/99Container: Box 18
-
Description: Tsang Partnership Contract CO#13147 #1Dates: 12/16/98Container: Box 18
-
Description: BCRA/Tsang Meeting MinutesDates: 8/1/99Container: Box 18
-
Description: Western States Construction, LLC General Correspondence #1Dates: 1/19/00 - 6/20/02Container: Box 18
-
Description: Request for InformationContainer: Box 18
-
Description: Construction Meeting MinutesDates: 1/1/01Container: Box 18
-
Description: Design Review CommentsDates: 1/24/99Container: Box 18
-
Description: PBI Construction, LLC Responsibility FileDates: 10/26/98 - 11/13/00Container: Box 18
-
Description: General Correspondence #1Dates: 12/01/98 - 12/31/99Container: Box 18
-
Description: Tsang Partnership General Correspondence #1Dates: 1/6/99 - 9/30/99Container: Box 18
-
Description: Western States Construction, LLC Contract Change ProposalsDates: Numbers 001 - 008Container: Box 18
-
Description: Rejected BidsDates: Bid Opening - 10/26/00Container: Box 18
-
-
Knott Dairy Center Expansion Bldg. No. 0402
-
Description: RegentsContainer: Box 19
-
Description: BAIT CommitteeDates: 09/14/06Container: Box 19
-
Description: Email CorrespondenceDates: 9/13/04 – 6/10/10Container: Box 19
-
Description: General CorrespondenceDates: 3/1/05 – 10/1/08Container: Box 19
-
Description: Five-G Consulting Request for QualificationsDates: 6/21/06Container: Box 19
-
Description: Five -G Consulting General CorrespondenceDates: 10/1/06 – 7/20/07Container: Box 19
-
Description: Five -G Consulting Contract CO#16833Dates: 10/16/06 – 3/22/07Container: Box 19
-
Description: Meeting MinutesDates: 4/06 – 12/06Container: Box 19
-
Description: Site PlansContainer: Box 19
-
-
Biotechnology/Life Sciences Facility Bldg. No. 0836
-
Description: BudgetDates: 6/1/02Container: Box 19
-
Description: Builders Risk InsuranceDates: 8/1/07Container: Box 19
-
Description: Builder’s Risk InsuranceDates: 5/23/06Container: Box 19
-
Description: EISDates: 3/1/04Container: Box 19
-
Description: RegentsDates: 5/6/94-6/6/06Container: Box 19
-
Description: BAIT CommitteeDates: 3/29/01-9/4/09Container: Box 19
-
Description: Public Information Requests Numbers 9-322Dates: 12/09Container: Box 19
-
Description: Public Information Requests Numbers 8-35Dates: 2/08Container: Box 19
-
Description: Public Information Requests Numbers 7-195Dates: 12/07Container: Box 19
-
Description: Public Information Requests Numbers 7-191Dates: 12/07Container: Box 19
-
Description: Construction Stormwater General PermitDates: 4/1/06Container: Box 19
-
Description: Issues and ClaimsDates: 10/1/09Container: Box 19
-
Description: Project Planning CommitteeDates: 7/1/02Container: Box 19
-
Description: Affiliated Engineers NW #1 CO#15887Dates: 10/1/04Container: Box 19
-
Description: Allwest Testing CO#16639 Construction TestingDates: 5/1/06Container: Box 19
-
Description: Allwest Special Inspection ReportsDates: 2007Container: Box 19
-
Description: Allwest Piledriving Test ReportsDates: 6/6/06-7/31/06Container: Box 19
-
Description: Avista Corporation CO#17518Dates: 4/19/08Container: Box 19
-
Description: Davis Langdon Adamson #1 CO#15584Dates: 10/1/04Container: Box 19
-
Description: Degenkolb Engineers #1 CO#15885Dates: 9/1/04Container: Box 19
-
Description: E3RA, Inc. CO#16080Dates: 3/15/05Container: Box 19
-
Description: The Estime Group, Inc. CO#15632Dates: 5/28/04Container: Box 19
-
Description: McKinstry/Essention Company #1 CO#16449Dates: 5/18/06Container: Box 19
-
Description: McKinstry/Essention Company Commissioning Report Book Two, Folder ThreeDates: 7/09Container: Box 20
-
Description: McKinstry/Essention Company Commissioning Report Book Two, Folder TwoDates: 7/09Container: Box 20
-
Description: McKinstry/Essention Company Commissioning Report Book Two, Folder OneDates: 7/09Container: Box 20
-
Description: McKinstry/Essention Company Commissioning Report Book One, Folder ThreeDates: 7/09Container: Box 20
-
Description: McKinstry/Essention Company Commissioning Report Book One, Folder TwoDates: 7/09Container: Box 20
-
Description: McKinstry/Essention Company Commissioning Report Book One, Folder OneDates: 7/09Container: Box 20
-
Description: PAE Consulting Engineers #1 CO# 15886Dates: 9/1/04Container: Box 20
-
Description: Rid Middleton, Inc. #1 CO#12968Dates: 12/1/03Container: Box 20
-
Description: Siemens Building Automation BAS Design Services #1 CO#15585Dates: 4/1/04Container: Box 20
-
Description: Strata Geotechnical Engineering & Materials Testing #1 CO#15198Dates: 8/1/03Container: Box 20
-
Description: Strata Geotechnical Engineering & Materials Testing Final ReportDates: 10/23/03Container: Box 20
-
Description: Strata Geotechnical Engineering & Materials Testing Final Project Binder 1 of 2Dates: 3/9/09Container: Box 20
-
Description: Strata Geotechnical Engineering & Materials Testing Final Project Binder 2 of 2Dates: 3/9/09Container: Box 20
-
Description: White Shield, Inc. #1 CO#15406Dates: 1/30/04Container: Box 20
-
Description: RFQ Construction Testing ServicesContainer: Box 20
-
Description: Roofing and WarrantyDates: 11/1/07Container: Box 20
-
Description: Schematic DesignContainer: Box 20
-
Description: LMN Architects Schematic Design ReportDates: 3/5/04Container: Box 20
-
Description: Email CorrespondenceDates: 8/1/02Container: Box 20
-
Description: General CorrespondenceDates: 5/1/02Container: Box 21
-
Description: LMN Architects Email CorrespondenceDates: 3/1/04Container: Box 21
-
Description: LMN Architects General CorrespondenceDates: 10/1/02Container: Box 21
-
Description: LMN Architects Contract #6 CO# 15299Dates: 8/1/08Container: Box 21
-
Description: LMN Architects Contract Predesign Study CO#14851Dates: 12/1/02Container: Box 21
-
Description: LMN Architects Contract #1 CO# 14331Dates: 7/19/02Container: Box 21
-
Description: Lydig Construction #1 General CorrespondenceDates: 3/1/04Container: Box 21
-
Description: Lydig Construction #1 CO#16609Dates: 6/06Container: Box 21
-
Description: Lydig Construction #1 GC/CM CO#17174Dates: 5/1/09Container: Box 21
-
Description: Lydig Construction #2 Preconstruction Services CO#15568Dates: 9/1/05Container: Box 21
-
Description: Lydig Construction Master PlanContainer: Box 21
-
Description: LMN Architects Research & Education Complex Masterplan SubmittalDates: 7/9/03Container: Box 21
-
Description: Design Phase Meeting MinutesDates: 11/1/03-9/30/04Container: Box 21
-
Description: Field Authorizations No. 2-275 through 2-305Dates: 6/1/09-9/3/09Container: Box 21
-
Description: Field Authorizations No. 2-228 through 2-274Dates: 4/1/09-5/31/09Container: Box 22
-
Description: Field Authorizations No. 2-187 through 2-227Dates: 2/1/09-3/31/09Container: Box 22
-
Description: Field Authorizations No. 2-136 through 2-186Dates: 10/1/08-1/30/09Container: Box 22
-
Description: Field Authorizations No. 2-77 through 2-135Dates: 6/1/08-9/30/08Container: Box 22
-
Description: Field Authorizations No. 2-48 through 2-76Dates: 3/14/08-5/30/08Container: Box 22
-
Description: Lydig Construction Response to SOQ GC/CM ServicesDates: 1/15/04Container: Box 22
-
Description: Code AlternativeDates: 5/6/05Container: Box 22
-
Description: ELCCA Work PlanDates: 9/1/04Container: Box 22
-
Description: Design DevelopmentDates: UndatedContainer: Box 22
-
Description: Rejected BidsDates: 8/6/04Container: Box 22
-
Description: NIH GrantDates: /1/04 7/1/09-1/31/10Container: Box 22
-
Description: Warranty LogDates: 1/1/08-4/30/09Container: Box 22
-
Description: Firestopping GrantsDates: 2/1/04Container: Box 22
-
Description: 14G Test RequestsDates: 11/07-5/09Container: Box 22
-
Description: CTR for Reproductive Biology WSU/University of IdahoContainer: Box 22
-
Description: CTR for Reproductive Biology Annual Report & General InformationDates: 8/06Container: Box 22
-
Description: GC/CM Procedures #1 & #2Dates: 11/03Container: Box 23
-
Description: Field Authorizations No. 1B-1 through 2-47Dates: 6/1/07-3/13/08Container: Box 23
-
Description: Lydig Construction QA/QC ReportsDates: 7/07-7/09Container: Box 23
-
Description: Construction Phone Meeting Mintues (CD)Dates: 4/1/07-5/31/09Container: Box 23
-
Description: Lydig Training SessionsDates: 3/1/09-5/31/09Container: Box 23
-
Description: Field Observation Report (CD)Dates: 10/1/07-4/30/09Container: Box 23
-
Description: Certified Payroll ReportsDates: 6/1/10Container: Box 23
-
Description: Lydig Construction Contract Change ProposalsDates: Numbers 001-017Container: Box 23
-
Description: LMN Architecture Preprogramming Report (Draft)Dates: 12/03Container: Box 23
-
Description: Master Plan Report, Research, and Education Biotechnology Complex (Draft)Container: Box 24
-
Description: LMN Architecture Preliminary Predesign ReportDates: UndatedContainer: Box 24
-
Description: Project Request ReportDates: 5/31/02Container: Box 24
-
Description: Vivarium Equipment Selection BinderDates: 7/13/04Container: Box 24
-
Description: Lydig Construction - Safety PlanDates: 2/5/04Container: Box 24
-
Description: Lydig Construction - Subcontracting Plan (Draft)Container: Box 24
-
Description: Center for Integrated Biotechnology Administration CommunityDates: 9/13/05Container: Box 24
-
Description: WSU - Life Sciences FacilitiesDates: 11/23/99Container: Box 24
-
Description: Design Review RecordDates: 10/13/04Container: Box 24
-
Description: CPP, Colorado Biotech Wind Tunnel AnalysisDates: 4/04Container: Box 24
-
Description: CPP, Colorado Air Quality AssessmentDates: 6/04Container: Box 24
-
Description: RFP for GC/CM ServicesDates: 10/31/03Container: Box 24
-
Description: Revised RFP for GC/CM ServicesDates: 10/30/06Container: Box 24
-
Description: LMN Architects Contract #5 CO# 15299Dates: 6/1/07-7/31/08Container: Box 24
-
Description: LMN Architects Contract #4 CO# 15299Dates: 1/10/05-5/3/07Container: Box 24
-
Description: LMN Architects Contract #3 CO# 15299Dates: 10/10/04-12/10/05Container: Box 24
-
Description: CCP Wind Engineering Consultants Air Quality AssessmentDates: 8/02Container: Box 24
-
Description: LMN Architects #2 Contract CO#15299Dates: 2/10/04-10/8/04Container: Box 24
-
Description: LMN Architects #1 Contract CO#15299Dates: 6/1/03-2/9/04Container: Box 24
-
Description: Lydig Construction #1 Contract GC/CM Preconstruction Services CO#15568Dates: 5/20/04-8/25/05Container: Box 24
-
Description: Lydig Construction GC/CM Services CONTRACT CANCELLED CO#17063Dates: 4/1/07Container: Box 24
-
Description: Lydig Construction #2 Contract GC/CM CO#17174Dates: 8/1/08-4/30/09Container: Box 24
-
Description: Lydig Construction #1 Contract GC/CM CO#17174Dates: 7/7/07-7/31/08Container: Box 24
-
-
Mt. Vernon ARTB (Agricultural Research and Technology Building) Bldg. No. 4015
-
Description: Builder’s Risk InsuranceDates: 9/22/05Container: Box 25
-
Description: Builder’s Risk Insurance Kitchen Exhaust Hood ModificationsDates: 1/09 - 5/09Container: Box 25
-
Description: RegentsDates: 9/19/05 - 6/30/09Container: Box 25
-
Description: BAIT CommitteeDates: 9/18/03 - 1/30/09Container: Box 25
-
Description: Attorney GeneralDates: 6/29/05Container: Box 25
-
Description: Permits & EasementsDates: 9/15/05Container: Box 25
-
Description: Alpine Fire & Safety Systems, Inc. CO#17828Dates: 8/1/08 - 12/15/08Container: Box 25
-
Description: Davis Langdon CO#15961 #1Dates: 1/20/05 - 2/25/05Container: Box 25
-
Description: E3RA, Inc. CO#15479 #1Dates: 3/22/04 - 11/30/06Container: Box 25
-
Description: Lundin Construction Services CO#16119Dates: 5/4/05Container: Box 25
-
Description: Lundin Statement of Qualifications for Construction ManagementDates: 3/18/05Container: Box 25
-
Description: Materials Testing & Consulting, Inc. CO#16165Dates: 5/16/05 - 4/30/07Container: Box 25
-
Description: McKinstry Essention, Inc. CO#16641Dates: 3/1/06 - 11/28/06Container: Box 25
-
Description: McKinstry Statement of Qualifications for Commissioning ServicesDates: 3/13/06Container: Box 25
-
Description: Virgil’s Electronic Project Files (14 disks)Dates: 1/1/03 - 7/1/09Container: Box 25
-
Description: RFP for Commissioning ServicesDates: 3/06Container: Box 25
-
Description: RFP for Construction Material Sampling, Testing, and InspectionDates: 4/05Container: Box 25
-
Description: RFQ for A/E Pre-Design ServicesDates: 8/03Container: Box 25
-
Description: RFQ for C/M ServicesDates: 3/05Container: Box 25
-
Description: General E-mailDates: 7/9/05Container: Box 25
-
Description: General Correspondence #1Dates: 12/8/03 - 8/14/09Container: Box 25
-
Description: Skagit County CorrespondenceDates: 5/1/04 - 11/8/08Container: Box 25
-
Description: Meeting MinutesDates: 10/1/04 - 6/1/06Container: Box 25
-
Description: ARC Architects General CorrespondenceDates: 1/1/04Container: Box 25
-
Description: ARC Architects Contract CO#15536 #2Dates: 10/13/05 - 8/7/08Container: Box 25
-
Description: TKG Consulting Engineers Statement of Qualifications (Sub-consultant for ARC)Dates: 6/3/04Container: Box 25
-
Description: ARC Architects Contract CO#15246Dates: 10/3/03 - 5/7/04Container: Box 25
-
Description: Kitchen Exhaust Hood Modifications Alpine Fire & Safety Systems, Inc. General CorrespondenceDates: 1/1/09 - 12/6/12Container: Box 25
-
Description: Kitchen Exhaust Hood Modifications Alpine Fire & Safety Systems, Inc. Contract CO#17992Dates: 1/1/09 - 3/3/09Container: Box 25
-
Description: Impero Contracting General CorrespondenceDates: 5/16/05 - 12/12/06Container: Box 25
-
Description: Impero Contracting Contract CO#16200Dates: 7/7/05 - 5/23/07Container: Box 25
-
Description: Warranties & IssuesDates: 10/5/05 - 6/27/07Container: Box 26
-
Description: ARC Architects Pre-Design ReportDates: 3/1/04Container: Box 26
-
Description: ARC Architects Schematic Design Phase ReportDates: 5/7/04Container: Box 26
-
Description: SpecificationsDates: 6/00Container: Box 26
-
Description: Specifications for Onsite Domestic Wastewater Treatment & DisposalDates: 8/04Container: Box 26
-
Description: E3RA, Inc. Regulated Material Project Closeout DocumentationDates: 2/8/07Container: Box 26
-
Description: E3RA, Inc. Septic System Contamination AssessmentDates: 12/29/05Container: Box 26
-
Description: E3RA, Inc. Underground Storage Tank Removal & DisposalDates: 10/9/05Container: Box 26
-
Description: E3RA, Inc. Hazardous Material Sampling & TestingDates: 6/10/04Container: Box 26
-
Description: Certified Payroll ReportsDates: 6/1/05Container: Box 26
-
Description: ARC Architects Contract CO# 15536 #1Dates: 4/13/04 - 9/30/05Container: Box 26
-
Description: Impero Contracting Contract Change ProposalsDates: Numbers 001 - 084Container: Box 26
-
Description: Impero Contracting Responsibility FileDates: 5/05Container: Box 26
-
Description: Alpine Fire & Safety Responsibility FileDates: 1/1/09Container: Box 26
-
Description: Rejected BidsDates: Bid Date 8/10/05Container: Box 26
-
-
Campus Infrastructure & Road Improvements Phase I
-
Phase I (1998)
-
Description: Budget #1Dates: 9/29/98-7/1/05Container: Box 27
-
Description: RegentsDates: 6/18/9 -4/27/98Container: Box 27
-
Description: KPFF Schematic Design Brochure Phase IDates: 1/16/98Container: Box 27
-
Description: Coffman Engineers Steam Tunnel EvaluationDates: 7/27/01Container: Box 27
-
Description: SCM Consultants #1 Asbestos Plans & Specifications; Hazardous Materials CO#15026Dates: 5/3/03Container: Box 27
-
Description: Pederson Associates CO#14045Dates: 3/1/01Container: Box 27
-
Description: Stoel Rives LLP Attorneys #1 CO#12589Dates: 3/30/98Container: Box 27
-
Description: Walker Inspectorate CO#13250Dates: 5/1/99Container: Box 27
-
Description: Walker Inspectorate CorrespondenceDates: 3/98Container: Box 27
-
Description: Walker Inspectorate Test ReportsDates: 5/29/98Container: Box 27
-
Description: Daily Construction Reports #1Dates: 6/29/98Container: Box 27
-
Description: Email Correspondence #1Dates: 2/23/98Container: Box 27
-
Description: General CorrespondenceDates: 6/1/01Container: Box 27
-
Description: Construction Meeting Minutes #1Dates: 5/26/98Container: Box 27
-
Description: Campus Infrastructure - Utilities Survey and Responses from WSU’s Peer InstitutesDates: 7/06Container: Box 27
-
Description: General Correspondence #1Dates: 6/99-2/99Container: Box 27
-
Description: KPFF Consulting Email CorrespondenceDates: 7/1/01Container: Box 27
-
Description: KPFF Consulting General CorrespondenceDates: 4/1/01Container: Box 27
-
Description: Goodfellow Bros, Inc. #1 General CorrespondenceDates: 4/27/98Container: Box 27
-
Description: Goodfellow Bros, Inc. #1 Contract CO#12914Dates: 4/98Container: Box 27
-
Description: Goodfellow Bros, Inc. Contract Change ProposalsDates: 001-003Container: Box 27
-
Description: Statements of Compliance #1Dates: 5/98Container: Box 27
-
Description: Rejected BidsDates: 4/20/98Container: Box 27
-
Description: Close Out FileDates: 1/1/99Container: Box 27
-
-
Phase II (1999)
-
Description: E.I.S.Dates: 4/1/99Container: Box 27
-
Description: RegentsDates: 1/22/99-5/19/99Container: Box 27
-
Description: FAC #1Dates: 1/22/99-5/19/99Container: Box 27
-
Description: Attorney General CorrespondenceDates: 5/1/99Container: Box 27
-
Description: Project Planning CommitteeDates: 12/5/97Container: Box 27
-
Description: KPFF Program Analysis (Draft)Dates: 8/21/98Container: Box 27
-
Description: KPFF Project Manual Volume I Divisions 0-16 100% SubmittalDates: 8/24/98Container: Box 27
-
Description: KPFF Schematic Design Brochure Phase IIDates: 3/11/98Container: Box 27
-
Description: General Correspondence #2Dates: 1999Container: Box 27
-
Description: KPFF Consulting Engineers General Correspondence #3Dates: 9/1/98Container: Box 27
-
Description: KPFF Consulting Engineers Contract CO#12818Dates: 12/1/98Container: Box 28
-
Description: KPFF Consulting Engineers Field ReportsDates: 6/1/99Container: Box 28
-
Description: KPFF Consulting Engineers Request for InformationDates: 6/1/99Container: Box 28
-
Description: MRM Construction, Inc. #1 General CorrespondenceDates: 6/1/99Container: Box 28
-
Description: MRM Construction #1 Contract CO#13229Dates: 4/1/99Container: Box 28
-
Description: MRM Contract Change ProposalsDates: Numbers 001-015Container: Box 28
-
Description: Rejected bids #1Dates: Bid Opening 4/13/99Container: Box 28
-
Description: KPFF Consulting Engineers #2 General CorrespondenceDates: 6/1/98Container: Box 28
-
Description: KPFF Consulting Engineers #1 General CorrespondenceDates: 9/8/97Container: Box 28
-
Description: KPFF Consulting Engineers #2 Contract CO#12818Dates: 11/1/98-5/31/99Container: Box 28
-
Description: KPFF Consulting Engineers #1 Contract CO#12818Dates: 11/26/97-10/31/98Container: Box 28
-
-
Phase III (2000)
-
Description: RegentsDates: 3/31/00Container: Box 28
-
Description: BAITDates: 2/11/00Container: Box 28
-
Description: RegentsDates: 3/29/01-6/29/01Container: Box 28
-
Description: BAIT CommitteeDates: 6/28/01Container: Box 28
-
Description: General CorrespondenceDates: 7/1/02Container: Box 28
-
Description: Regulatory SignsDates: 5/30/03-6/3/03Container: Box 28
-
-
Colorado Street Improvements
-
Description: Builder’s Risk InsuranceDates: 3/28/05Container: Box 28
-
Description: RegentsDates: 4/8/05Container: Box 28
-
Description: Attorney General CorrespondenceDates: 4/4/05Container: Box 28
-
Description: Strata CO#15602Dates: 5/1/04Container: Box 28
-
Description: WPA, Inc. CO#14704Dates: 1/1/02Container: Box 28
-
Description: WPA, Inc. CO#15382Dates: 1/13/04Container: Box 28
-
Description: Email General Correspondence #1Dates: 7/1/04Container: Box 29
-
Description: General Correspondence #1Dates: 4/1/04Container: Box 29
-
Description: KPFF General Correspondence #1Dates: 9/1/04Container: Box 29
-
Description: Lydig Construction, Inc. General correspondence #1Dates: 2/01/05Container: Box 29
-
Description: Lydig Construction, Inc. Contract CO#16058Dates: 4/8/05Container: Box 29
-
Description: Meeting Minutes #1Dates: 1/26/05Container: Box 29
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: Number 001Container: Box 29
-
Description: Responsibility File Lydig Construction, Inc.Dates: 2/15/05Container: Box 29
-
Description: Rejected Bid FormsDates: 4/20/05Container: Box 29
-
-
Colorado Street to Lake Street Sanitary Sewer System
-
Description: Builder’s RiskDates: 4/27/09Container: Box 29
-
Description: RegentsDates: 9/1/09Container: Box 29
-
Description: FACContainer: Box 29
-
Description: Munir Daud & Associates CO#16638Dates: 4/1/06Container: Box 29
-
Description: Slipstream Design CO#17666Dates: 6/1/08Container: Box 29
-
Description: Meeting MinutesDates: 3/1/09Container: Box 29
-
Description: Field ReportsDates: 2/1/07Container: Box 29
-
Description: General CorrespondenceDates: 7/1/06Container: Box 29
-
Description: Specifications for Colorado to Lake Street Sanitary & Storm Sewer Rehabilitation ProjectDates: 5/08Container: Box 29
-
Description: Motley-Motley, Inc. General CorrespondenceDates: 10/08-9/10Container: Box 29
-
Description: Motley-Motley, Inc. Contract CO#17781Dates: 10/1/08Container: Box 29
-
Description: Motley-Motely, Inc. Contract Change ProposalDates: Numbers 001-003Container: Box 29
-
Description: Rejected BidsContainer: Box 29
-
Description: Self-Propelled Cutting Apparatus PatentDates: 12/1/07Container: Box 29
-
Description: Pipe Ripper Disclosure AgreementDates: 10/1/07Container: Box 29
-
-
Grimes Way Realignment
-
Description: PredesignDates: 6/30/12Container: Box 29
-
-
Fountain Design (Mary Miss)
-
Description: Fountain Technology & Design, Inc. CO#14891Dates: 12/3/02Container: Box 29
-
Description: Fountain Design Shea/Graham CO#15013Dates: 4/1/03Container: Box 29
-
Description: General CorrespondenceDates: 1/24/03Container: Box 29
-
Description: Fountain Design Mary MissDates: 7/1/02Container: Box 29
-
-
East Campus Infrastructure
-
Description: Builder’s Risk InsuranceDates: 8/9/00Container: Box 29
-
Description: Regents #1Dates: 5/5/00-7/28/00Container: Box 29
-
Description: Attorney GeneralDates: 7/1/00Container: Box 29
-
Description: Business Affairs CommitteeDates: 7/5/00Container: Box 29
-
Description: GeoEngineers - Gifford #1 CO#13850Dates: 10/1/00Container: Box 29
-
Description: Walker Inspectorate CO#13777Dates: 7/1/00Container: Box 29
-
Description: MD+A CO#14101Dates: 5/1/00Container: Box 29
-
Description: Coffman Engineers Steam Tunnel EvaluationDates: 7/27/01Container: Box 29
-
Description: Field Authorizations #1Dates: 8/1/00Container: Box 29
-
Description: Email General Correspondence #1Dates: 5/4/00Container: Box 29
-
Description: General Correspondence #1Dates: 5/11/00Container: Box 29
-
Description: Adairco Construction, Inc. #1 General CorrespondenceDates: 6/1/00Container: Box 29
-
Description: Adairco Construction, Inc. #1 ContractDates: 7/1/00Container: Box 29
-
Description: ALSC Architecture #1 Contract CO#13512Dates: 6/1/99Container: Box 29
-
Description: Certified Payroll Reports #1Dates: 8/1/00Container: Box 29
-
Description: Adarco Construction, Inc. Contract Change ProposalsDates: Numbers 001-024Container: Box 29
-
Description: Rejected BidsDates: Bid Date 6/8/00Container: Box 29
-
Description: L&I Plan ReviewDates: 2003-2006Container: Box 29
-
-
Library Road Phase I
-
Description: Builder’s Risk InsuranceDates: 6/2/02Container: Box 29
-
Description: RegentsContainer: Box 29
-
Description: BAITContainer: Box 29
-
Description: Berger Partnership, PS.Dates: 9/1/00Container: Box 29
-
Description: Hodge & Associates CO#14250Dates: 7/1/01Container: Box 30
-
Description: Lydig Construction #1 CO#14418Dates: 10/17/01Container: Box 30
-
Description: SCM Consultants, Inc. CO#14509Dates: 4/1/02Container: Box 30
-
Description: Strata Geotechnical Engineering & Materials Testing CO#14591Dates: 6/1/00Container: Box 30
-
Description: NBBJ - Campus-wide Lighting Design Survey #1Dates: 9/14/01Container: Box 30
-
Description: WPA, Inc. #2 CO#13867Dates: 5/1/01Container: Box 30
-
Description: General Correspondence #1Dates: 10/1/00Container: Box 30
-
Description: Meeting MinutesDates: 4/1/01Container: Box 30
-
Description: KPFF General Correspondence #1Dates: 4/1/02Container: Box 30
-
Description: KPFF Bid & Construction Administrative Services #2 Contract CO#14594Dates: 4/1/03Container: Box 30
-
Description: Shea Construction General Correspondence #2Dates: 5/1/03Container: Box 30
-
Description: Shea Construction Contract CO#14580Dates: 5/1/02Container: Box 30
-
Description: Shea/Graham Contract Change ProposalDates: Numbers 001-009Container: Box 30
-
Description: Shea/Graham Responsibility FileDates: 5/17/02Container: Box 30
-
Description: Rejected BidsDates: 5/8/02Container: Box 30
-
Description: KPFF Bid & Construction Administrative Services Contract CO#14594Dates: 6/1/02-3/31/03Container: Box 30
-
Description: Shea Graham Construction General Correspondence #1Dates: 5/1/02Container: Box 30
-
Description: The Berger Partnership Bid Set Project ManualDates: 4/30/03-4/10/02Container: Box 30
-
-
-
Library Road Phase II
-
Description: Builder’s Risk InsuranceDates: 5/27/04Container: Box 31
-
Description: Pre-Bid MeetingDates: 4/6/04Container: Box 31
-
Description: Avista M.O.UDates: 11/17/03-9/12/08Container: Box 31
-
Description: Strata Geotechnical Engineering #1 CO#15567Dates: 5/11/04Container: Box 31
-
Description: WPA-General Correspondence #1Dates: 11/12/04Container: Box 31
-
Description: SCM Consultants, Inc. - Asbestos / Lead Good Faith ReportDates: 4/3/02Container: Box 31
-
Description: Hazardous Materials SurveysContainer: Box 31
-
Description: Meeting MinutesDates: 4/1/04Container: Box 31
-
Description: A/E Consulting Services SelectionDates: 5/97Container: Box 31
-
Description: General Correspondence #1Dates: 12/1/03Container: Box 31
-
Description: KPFF General Correspondence #1Dates: 8/1/03Container: Box 31
-
Description: KPFF Contract CO#15551Dates: 4/1/04Container: Box 31
-
Description: KPFF #2 Contract CO#15227Dates: 10/1/04Container: Box 31
-
Description: Lydig General CorrespondenceDates: 6/1/04Container: Box 31
-
Description: Lydig #1 Contract CO#15629Dates: 4/1/04Container: Box 31
-
Description: Motley-Motley, Inc. General Correspondence CO#16235Dates: 7/28/05Container: Box 31
-
Description: Motley-Motley, Inc. Contract Arboretum Walking Path #16235Dates: 7/28/05Container: Box 31
-
Description: Lydig CCPDates: Numbers 001-012Container: Box 31
-
Description: Lydig Responsibility FileDates: 5/1/04Container: Box 31
-
Description: Rejected BidsDates: 4/27/04Container: Box 31
-
Description: KPFF Contract #1 #15227Dates: 9/10/03-9/30/04Container: Box 31
-
Description: KPFF Schematic Design Brochure Phase IIDates: 1/4/98Container: Box 31
-
Description: Wood/Harbinger, Inc. Communication Cable Issues, Stadium Way TunnelDates: 4/13/00Container: Box 31
-
-
Campus Infrastructure & Road Improvements - Lighting Improvements Projects
-
Description: BudgetDates: 6/1/04Container: Box 31
-
Description: Builder’s Risk InsuranceDates: 2/23/04Container: Box 31
-
Description: RegentsDates: 12/1/07Container: Box 31
-
Description: BAIT CommitteeDates: 3/1/07Container: Box 31
-
Description: E3RA, Inc. CO#17016Dates: 9/6/07Container: Box 31
-
Description: MCS Environment, Inc. Limited Good Faith Survey for Accumulated Dust on Horizontal SurfacesDates: 2/16/07Container: Box 31
-
Description: Strata, Inc.Dates: 3/1/07Container: Box 31
-
Description: General Correspondence #1Dates: 9/1/06Container: Box 31
-
Description: KPFF General Correspondence #1Dates: 8/1/06Container: Box 31
-
Description: KPFF #1 Contract CO#16765Dates: 2/1/07Container: Box 31
-
Description: QC Electrical, Inc. General CorrespondenceDates: 2/1/07Container: Box 31
-
Description: QC Electrical, Inc. #1 Contract CO#16765Dates: 7/1/06Container: Box 31
-
Description: QC Contract Change ProposalsDates: Numbers 001-010Container: Box 31
-
Description: QC Responsibility FileDates: 2/1/07Container: Box 31
-
Description: Rejected BidsDates: 2/15/07Container: Box 31
-
Description: Survey of Existing Fixtures by Kathryn TaylorDates: 2003Container: Box 31
-
Description: NBBJ Lighting Design Study “Preliminary Lighting Concepts”Container: Box 31
-
Description: Construction Documents KPPF Consulting Engineers Project Manual Division 0-16Container: Box 32
-
-
North Fairway Drive Reconstruction
-
Description: Strata Geotechnical Engineers CO#14260Dates: 7/1/01Container: Box 32
-
Description: Taylor Engineering CO#14074Dates: 5/1/01Container: Box 32
-
Description: WPA, Inc. CO#13867Dates: 11/1/01Container: Box 32
-
Description: Motley-Motley #1 Sanitary Sewer General CorrespondenceDates: 10/01Container: Box 32
-
Description: Utility Improvements General CorrespondenceDates: 6/1/01Container: Box 32
-
-
Pedestrian Bridges Evaluation/Repairs
-
Description: Businesss Affairs CommitteeDates: 11/16/00Container: Box 32
-
Description: Coffman Engineers General CorrespondenceDates: 7/1/00Container: Box 32
-
Description: Coffman Engineers Contract CO#13778Dates: 7/1/00Container: Box 32
-
Description: General CorrespondenceDates: 5/1/00Container: Box 32
-
Description: Pedistrian Bridge Evaluation/RepairsContainer: Box 32
-
Description: Paints, Sealants & TreatmentsContainer: Box 32
-
-
Pedestrian Crosswalk Study
-
Description: DKS Associates #1 CO#16015Dates: 3/30/05Container: Box 32
-
Description: DKS Associates General Correspondence #1Container: Box 32
-
Description: General Correspondence #1Container: Box 32
-
-
Stadium Way Corridor Improvements
-
Description: Builder’s RiskDates: 6/3/02Container: Box 32
-
Description: RegentsDates: 10/5/01-5/13/02Container: Box 32
-
Description: BAITDates: 10/4/01Container: Box 32
-
Description: The Berger Partnership #1 CO#13861Dates: 11/00Container: Box 32
-
Description: Strata Final Project Binder CO#14589Dates: 5/1/02Container: Box 32
-
Description: Strata Geotechnical Testing ReportsDates: 9/18/02Container: Box 32
-
Description: Email General CorrespondenceDates: 6/1/02Container: Box 32
-
Description: General Correspondence #2Dates: 2/1/03Container: Box 32
-
Description: KPFF Requests for InformationDates: 6/1/02Container: Box 32
-
Description: KPFF Email Nevada Street to Grimes WayDates: 10/6/01Container: Box 32
-
Description: KPFF General Correspondence #2Dates: 3/1/03Container: Box 32
-
Description: Meeting MinutesDates: 7/1/01Container: Box 32
-
Description: American Water Works Associates (AWWA Standard) Disinfecting Water MainsDates: 6/1/05Container: Box 32
-
Description: KPFF Bid Set Project Manual Volume I Division 0-6Dates: 4/10/02Container: Box 32
-
Description: KPFF Construction Set Volume I Division 0-16Dates: 5/31/02Container: Box 32
-
Description: KPFF Nevada to Grimes Way Project Manual Volume I Division 0-16Dates: 3/13/02Container: Box 32
-
Description: KPFF #2 Contract CO#14349Dates: 9/1/02Container: Box 32
-
Description: Motely-Motley #1 Contract CO#14579Dates: 5/1/02Container: Box 32
-
Description: Motley-Motley General CorrespondenceDates: 5/1/02Container: Box 33
-
Description: #3 Daily Inspection ReportsDates: 10/1/02-1/6/03Container: Box 33
-
Description: #2 Daily Inspection ReportsDates: 8/13/02-9/30/02Container: Box 33
-
Description: #1 Daily Inspection ReportsDates: 5/1/02Container: Box 33
-
Description: Motely-Motley Contract Change ProposalsDates: Numbers 001-013Container: Box 33
-
Description: Motley-Motley Responsibility FileDates: 5/02Container: Box 33
-
Description: Rejected BidsDates: 5/2/02Container: Box 33
-
Description: Strata Report Geotechnical Engineering InvestigationDates: 2/7/02Container: Box 33
-
Description: General Correspondence #1Dates: 2/16/01-1/31/03Container: Box 33
-
Description: KPFF General Correspondence #1Dates: 10/17/01-2/31/03Container: Box 33
-
Description: KPFF #2 Contract CO#14349Dates: 5/1/02-8/31/02Container: Box 33
-
Description: KPFF #1 Contract CO#14349Dates: 11/01/01-4/30/02Container: Box 33
-
-
College Hill Preservation Plan
-
Description: RegentsDates: 7/12/00Container: Box 33
-
Description: BAIT CommitteeDates: 8/16/00Container: Box 33
-
Description: E.D. Hovee & Company #1 CO#13797Dates: 8/15/00Container: Box 33
-
Description: Dollars for ScholarsContainer: Box 33
-
Description: Rental HousingDates: 1/1/01Container: Box 33
-
Description: Home Ownership Assistance ProgramDates: 9/1/00Container: Box 33
-
Description: Inspection ProgramDates: 10/1/00Container: Box 33
-
Description: Edges StudyContainer: Box 34
-
Description: College Hill Discussion GroupContainer: Box 34
-
Description: Hovee StudyContainer: Box 34
-
Description: Greystone Church CorrespondenceDates: 1/1/00Container: Box 34
-
Description: Hatchmueller General CorrespondenceDates: 6/12/02Container: Box 34
-
Description: Hatchmueller Contract CO#14668Dates: 8/6/02Container: Box 34
-
Description: College Hill Master PlanContainer: Box 34
-
Description: College Hill Homeowner AssistanceContainer: Box 34
-
Description: Greystone Loan DocumentsContainer: Box 34
-
Description: Greystone MiscellaneousContainer: Box 34
-
Description: College Hill Preservation Project Priority ProposalDates: 7/13/00Container: Box 34
-
Description: Real EstateContainer: Box 34
-
Description: ZoningContainer: Box 34
-
Description: Parking Study Nelson/Nygard Consulting AssociatesDates: 7/06Container: Box 34
-
Description: Shakers/ValhallaDates: 8/1/00Container: Box 34
-
Description: Neighborhood Study Studio Cascade, Inc.Dates: 3/9/07Container: Box 34
-
Description: Email CorrespondenceDates: 2/4/01Container: Box 34
-
Description: General Correspondence #1Dates: 7/13/00Container: Box 34
-
Description: Press ReleasesContainer: Box 34
-
Description: Hazmat Predemolition Facility Survey ReportDates: 7/23/07Container: Box 34
-
Description: Colorado Street RFP SubmittalDates: 7/13/07Container: Box 34
-
"B" Street Enhancements
-
Description: Builder’s Risk InsuranceDates: 6/22/06Container: Box 34
-
Description: BAIT CommitteeDates: 12/1/07Container: Box 34
-
Description: RegentsDates: 9/14/06Container: Box 34
-
Description: Munir Daud & Associates - Land Surveying ServicesDates: 8/1/06Container: Box 34
-
Description: General Correspondence #1Dates: 4/7/06Container: Box 34
-
Description: DK Mullin Architects #1 General CorrespondenceDates: 4/4/06Container: Box 34
-
Description: DK Mullin Architects #1 Contract CO#16545Dates: 3/31/06Container: Box 34
-
Description: Duracon, Inc. #1 General CorrespondenceDates: 6/30/06-1/3/08Container: Box 34
-
Description: Duracong, Inc. Contract CO#16669Dates: 3/20/03-11/9/07Container: Box 34
-
Description: Duracon, Inc. Contract Change ProposalsDates: Numbers 001-021Container: Box 34
-
Description: Duracon, Inc. Responsibility FileContainer: Box 34
-
Description: Rejected BidsContainer: Box 34
-
College Hill House Files
-
Description: Kimbrough HouseContainer: Box 34
-
Description: TKE House 500 ColoradoContainer: Box 34
-
Description: 920 Linden StreetContainer: Box 34
-
Description: Eastlick House 600 Garfield StreetContainer: Box 34
-
Description: French House 725 NE Campus StreetContainer: Box 34
-
Description: Women’s Co-op 735 NE Campus StreetContainer: Box 34
-
Description: Trillium Apartments 845 NE “D” StreetContainer: Box 34
-
Description: 740 NE Oak Street (Behind President’s Residence)Container: Box 34
-
Description: Custodial Office 1090 NE Orchard StreetContainer: Box 34
-
Description: 915 “D” StreetContainer: Box 34
-
Description: Potter House 815 “B” StreetContainer: Box 34
-
Description: 1060 “B” StreetContainer: Box 34
-
-
-
Colocation Facility YVCC
-
Description: General Correspondence #1Dates: 5/20/97Container: Box 35
-
-
Conference Center WSU/City of Pullman
-
Description: AD Hoc CommitteeDates: 1/6/05Container: Box 35
-
-
Colorado Street RFP
-
Description: Corporate Pointe Developers RFPContainer: Box 35
-
Description: S.E. Corner of Colorado St RFP for Ground Lease - Retail & HousingContainer: Box 35
-
Description: E3RA, Inc. CO#17145Dates: 6/1/07Container: Box 35
-
Description: General CorrespondenceDates: 6/1/07Container: Box 35
-
Description: Corporate Pointe Developers General CorrespondenceDates: 7/1/07Container: Box 35
-
-
Colorado Street Ground Lease for Retail & Housing Development
-
Description: FACDates: 9/6/07Container: Box 35
-
Description: RegentsDates: 9/7/07Container: Box 35
-
-
Colorado Street Recreational Field Facilities Improvements
-
Description: General Correspondence #1Dates: 10/1/07Container: Box 35
-
Description: ALSC Architecture #1 Contract CO#17322Dates: 10/1/07Container: Box 35
-
Description: ALSC Architecture General Correspondence #1Dates: 10/1/07Container: Box 35
-
-
Consolidated Storage Building
-
Description: FACDates: 9/6/07Container: Box 35
-
-
Friel House Enhancements
-
Description: Builder’s Risk InsuranceDates: 5/16/05Container: Box 35
-
Description: RegentsDates: 5/24/05Container: Box 35
-
Description: Attorney GeneralContainer: Box 35
-
Description: General CorrespondenceDates: 4/1/05Container: Box 35
-
Description: Design West Architecture - General Correspondence #1Dates: 12/13/04Container: Box 35
-
Description: Duracon, Inc. General CorrespondenceDates: 5/1/05Container: Box 35
-
Description: Duracon, Inc. Contract CO#16146Dates: 5/1/05Container: Box 35
-
Description: Duracon Contract Change ProposalsDates: Numbers 001-008Container: Box 35
-
Description: Duracon Responsibility FileDates: 4/21/05Container: Box 35
-
Description: Rejected BidsDates: 4/21/05Container: Box 35
-
-
-
Administration Annex Replacement (Formerly Known As: Intl. Studies/Sciences) Bldg. No. 0038
-
Description: Finance and Audit CommitteeDates: 9/18/03Container: Box 36
-
Description: AMEC Earth & Environmental - Cost Estimate Removal/DisposalDates: 2/02Container: Box 36
-
Description: RFQ for Predesign ServicesDates: 8/03Container: Box 36
-
Description: Architects SelectionDates: 2003 - 2008Container: Box 36
-
Description: General Correspondence #1Dates: 9/1/03Container: Box 36
-
Description: LMN Architects A/E RFQ SubmittalDates: 9/12/03Container: Box 36
-
Description: LMN Architects General Correspondence #1Dates: 3/1/04Container: Box 36
-
Description: LMN Architects Contract #1 CO#15482Dates: 3/29/04Container: Box 36
-
Description: LMN Architects Preliminary Predesign ReportDates: UndatedContainer: Box 36
-
-
Agronomy Research Facility Bldg. No. 0186
-
Description: Builder’s Risk InsuranceDates: 5/20/04Container: Box 36
-
Description: EISDates: 11/1/03Container: Box 36
-
Description: Regents ReportsContainer: Box 36
-
Description: Strata Geotech Engineering & Materials CO#15620Dates: 5/1/04Container: Box 36
-
Description: Taylor Engineering, Inc. CO#15395Dates: 1/14/04Container: Box 36
-
Description: General Correspondence #1Dates: 1/1/04Container: Box 36
-
Description: Architects SelectionDates: 2004 - 2005Container: Box 36
-
Description: Kirby-Hunt Construction General Correspondence #1Dates: 3/1/04Container: Box 36
-
Description: Kirby-Hunt Contract #1 CO15610Dates: 5/1/04Container: Box 36
-
Description: Kirby-Hunt Contract Change ProposalDates: Numbers 001 - 010Container: Box 36
-
Description: Responsibility File Kirby-Hunt ConstructionDates: 5/1/04Container: Box 36
-
Description: Rejected BidsDates: 4/29/04Container: Box 36
-
-
Beasley Performing Arts Coliseum Bldg. No. 0806
-
Description: The Sports Management Group - Revenue & Expense ProjectionsDates: 10/17/96Container: Box 36
-
Description: Email General CorrespondenceDates: 4/15/03Container: Box 36
-
Description: Operational Analysis & RecommendationsContainer: Box 36
-
-
Beasley Coliseum Parking Structure Bldg. No. 0806
-
Description: General Correspondence #1Dates: 6/1/03Container: Box 36
-
Description: General Correspondence #2Dates: Pre-2000Container: Box 36
-
Description: KPFF Consulting Engineers General CorrespondenceDates: 6/1/03Container: Box 36
-
Description: KPFF Consulting Engineers Contract #1 CO#15139Dates: 7/1/03Container: Box 36
-
-
Parking and Transportation Services Building Formerly known as: (Burger King Property) Bldg. No. 0831
-
Description: RegentsDates: 08/31/01 - 11/26/01Container: Box 36
-
Description: General CorrespondenceDates: 8/1/00Container: Box 36
-
Description: Former Burger King Lots 9, 10, 11, Block 4, and Rose Park (Building Assessment, Assignment of Lease, Clark Pacific Real Estate Proposal)Dates: 6/00Container: Box 36
-
-
Commons Hall First Floor Remodel Bldg. No. 0005
-
Description: Builder’s Risk InsuranceDates: 5/27/02Container: Box 36
-
Description: RegentsDates: 6/5/02Container: Box 36
-
Description: Attorney GeneralDates: 5/29/02Container: Box 36
-
Description: Planholders List/CorrespondenceDates: 4/10/02Container: Box 36
-
Description: AMEC Earth & Environmental #1 CO#14379Dates: 11/21/01Container: Box 36
-
Description: General Correspondence #1Dates: 8/29/01Container: Box 36
-
Description: Camco Construction, Inc. Email CorrespondenceDates: 9/18/00Container: Box 36
-
Description: Camco Construction, Inc. General Correspondence #1Dates: 4/02 - 7/03Container: Box 36
-
Description: Camco Construction, Inc. Contract #1 CO#14564Dates: 4/29/02 - 2/28/03Container: Box 36
-
Description: SubmittalsDates: 4/1/02Container: Box 36
-
Description: Contract Change ProposalsDates: Numbers 001 - 003Container: Box 36
-
Description: Responsibility File Camco Construction, Inc.Dates: 4/02Container: Box 36
-
Description: Rejected BidsDates: 4/02Container: Box 36
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Services -- Records and correspondence
