Preliminary Guide to the Washington State University Capital Planning and Development Razed and Inactive Buildings Records, 1985-2010
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Capital Planning and Development
- Title
- Preliminary Guide to the Washington State University Capital Planning and Development Razed and Inactive Buildings Records
- Dates
- 1985-2010 (inclusive)19852010
- Quantity
- 2 Linear feet of shelf space, (2 Boxes + 1 Map Tube)
- Collection Number
- UA2013-06 (collection)
- Summary
- Building plans, architectual drawings, and administrative files related to construction projects related to Martin Stadium and the Intercollegiate Nursing Center (ICNE) at WSU from 1985-2010.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning (later Capital Planning and Development). While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Content Description
Primarily consists of drawings, administrative files, and contracts related to construction on the Martin Stadium Tunnel and the Intercollegiate Nursing Center (also known as ICNE) from 1985-2010.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Capital Planning and Development Razed and Inactive Buildings Records, 1985-2010 (UA2013-06)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Material is sorted into clearly labeled subject matter folders. Accession list exists within both boxes. Box 1 contains material on both Martin Stadium and ICNE. Box 2 contains material mostly related to the construction and remodel of the Intercollegiate Nursing Center. Tube holds plans for both the ICNE and Martin Stadium Tunnel.
Detailed Description of the Collection
-
Files: Nevada State Bridge
-
Description: #750, 5263-2010, Nevada State Bridge- paint and repair overpass, 2010
-
-
Files: Martin Stadium Tunnel
-
Description: Martin Stadium access tunnel, 1992-93Container: Number 812D
-
Description: Repair to tunnel, 1992-93Container: Log L66282, Number 812D
-
Description: Access tunnel- tunnel shoring contract 11738, 1994Container: Log L66282, Number 812D
-
Description: Reconstruct Martin Stadium tunnel (this was never done)Container: Number 812D
-
-
Drawings: Martin Stadium Tunnel
-
Description: Martin Stadium access tunnel shoring; job no. 92003, 4/22/1994Container: Log L66282, Number 812D-G-001
-
Description: Reconstruct Martin Stadium tunnel; job never done, 1996Container: Log 7803, Number 812D-G-002
-
Description: Martin Stadium access tunnel shoring (this was the fix for the tunnel); job no. 92003, 4/11/1994Container: Number 812D-G-00
-
-
Intercollegiate Nursing Center Files, #9003 (1985-1999)
-
Description: HVAC remodel powers systemContainer: Number 9003
-
Description: Computer lab, suite 161Container: Log -7719, Number 9003
-
Description: Remodel suite 161 A-FContainer: Log -7719, Number 9003
-
Description: Replace stairwell carpetContainer: Log -2471, Number 9003
-
Description: Remodel rooms 220 A,B,C,DContainer: Log -3198, Number 9003
-
Description: Estimate for showers in restroomsContainer: Log -3258, Number 9003
-
Description: Modification to reception counter in main lobbyContainer: Log -5674, Number 9003
-
Description: Sidewalk repairContainer: Log -8050, Number 9003
-
Description: Room 201 and 214 revisionsContainer: Log L5647, Number 9003
-
Description: Remodel rooms 220A-CContainer: Log -3198, Number 9003
-
Description: Remodel of rooms to locker rooms and estimate for installation of two handicap showersContainer: Log -5751, Number 9003
-
Description: Library lightingContainer: Log L 46977, Number 9003
-
Description: Remodel room 161GContainer: Log L 48049, Number 9003
-
Description: Remodel audiovisual officeContainer: Log L 48049, Number 9003
-
Description: Remodel room 161GContainer: Log L 48049, Number 9003
-
Description: Carpet specifications for room 166Container: Log L 48923, Number 9003
-
Description: Hallway lightingContainer: Log L 48924, Number 9003
-
Description: Classroom seating room 148Container: Log L 56322, Number 9003
-
Description: Provide emergency lightingContainer: Log L 86396, Number 9003
-
Description: Replace practice lab cubicle curtains and bedspreadsContainer: Log L 112189, Number 9003
-
Description: Combine portion of room 255 into room 261CContainer: Log L 139128, Number 9003
-
Description: New Whets classroom and control room, conference room seatsContainer: Log L 116526, Number 9003
-
-
ICNE Boiler, #9003
-
Description: Seating room 156Container: Log L 123672, Number 9003
-
Description: Provide computer work station in libraryContainer: Log L 130063, Number 9003
-
Description: A/C in room 168/170Container: Log L 139130, Number 9003
-
Description: Repaint all interior areasContainer: Log L 138259, Number 9003
-
Description: Replace carpet, room 159Container: Log L 139215, Number 9003
-
Description: Carpet for Suite 247Container: Log L 160559, Number 9003
-
Description: Replace carpet in student lounge, room 141Container: Log L 162152, Number 9003
-
Description: Carpet for room 206 and 207Container: Log L 171359, Number 9003
-
Description: Replace worn carpet in priority areasContainer: Log L 173973, Number 9003
-
Description: Door opening between rooms 220D and 220EContainer: Log L 182883, Number 9003
-
Description: Revise ventilationContainer: Log L 139130, Number 9003
-
Description: Provide doorway between rooms 247A & BContainer: Log L 194491, Number 9003
-
Description: Room 165 video productionContainer: Log L 202054, Number 9003
-
Description: Replace boilersContainer: Log L 258513, Number 9003
-
Description: Boiler replacementContainer: Log L 43932, Number 9003
-
-
ICNE Drawings (Original Topographic Copy)
-
Description: Remove wall between rooms 247A and 247BContainer: Log L 194491, Number 9003-G-14
-
Description: Provide door opening between rooms 220D and 220EContainer: Log L 182883, Number 9003-G-13
-
Description: Painting and carpeting of the interior public areasContainer: Log L 138259, Number 9003-G-12
-
Description: Renovation of ICNE rooms 255B and 261CContainer: Log L 139128, Number 9003-G-11
-
Description: Install new door operatorsContainer: Log L 139127, Number 9003-G-10
-
Description: W.H.E.T.S. alterations I.C.N.E.Container: Log L 116526, Number 9003-G-9
-
Description: Install new sidewalk to Fort George WrightContainer: Log L 48050, Number 9003-G-8
-
Description: Remodel room 161GContainer: Log L 48049, Number 9003-G-7
-
Description: Remodel rooms 121D and 121F into room 119Container: Log L 45751, Number 9003-G-6
-
Description: Modification to reception counter in main lobbyContainer: Log L 45674, Number 9003-G-5
-
Description: Modifications to rooms 168 and 170Container: Log L 45342, Number 9003-G-4
-
Description: Remodel of rooms 220 A,B,C,DContainer: Log L 43198, Number 9003-G-3
-
Description: Remodel of room suite 161 A-FContainer: Log L 7719, Number 9003-G-2
-
Description: Revisions to workroom 201 and lounge 214Container: Log L 5647; drawing. no. 6476, Number 9003-G-1
-
Description: Computer control remodelContainer: Log L 10625, Number 9003-M-9
-
Description: Install dial up temperature controlsContainer: Log 6929, Number 9003-M-8
-
Description: Auto, temperature controls AHV-1 and cond. unitContainer: Log 6802, Number 9003-M-7
-
Description: Installation of new boilerContainer: Log L 43932, Number 9003-M-6
-
Description: Irrigation improvementsContainer: Log 6180, Number 9003-M-5
-
Description: Remodel of room suite 161 A-F (in 9003-G-2)Container: Log 6704, Number 9003-M-4
-
Description: HVAC improvementsContainer: Log 6475, Number 9003-M-3
-
Description: Relocate fire hydrantsContainer: Log 6470, Number 9003-M-2
-
Description: Ventilation alterations to workroom 201Container: Log 5649, Number 9003-M-1
-
Description: Provide emergency lightingContainer: Log L 86396, Number 9003-E-5
-
Description: Replacement of 175 watt mercury vapor lightingContainer: Log L 48924, Number 9003-E-4
-
Description: Additional light fixturesContainer: Log L 46977, Number 9003-E-3
-
Description: Emergency lighting systemsContainer: Log 7042, Number 9003-E-2
-
Description: Remodel of room suite 161 A-F (in 9003-G-2)Container: Log 3322, Number 9003-E-1
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Capital Planning and Development -- Records and correspondence
