Preliminary Guide to the Washington State University Physical Plant Records, 1990-2005
Table of Contents
- Overview of the Collection
-
Historical Note
- Content Description
- Use of the Collection
- Administrative Information
-
Detailed Description of the Collection
- Reconfigure desks in 41 and 41A using existing parts
- Reconfigure ACT/REC. offices
- Oil filter replacement original supply fan 1969
- Ventilation and cooling for 2nd and 3rd floors south 1970
- Rm 34 air conditioning 1970
- Brine tank replacements 1971
- Bowling machine ventilation 1975
- Alterations and additions to rooms. 227, 233, and 332. 1976
- Vent Xerox machines 1977
- Misc. 1979
- Satellite dish 1984
- CUB antenna support 1984
- Resurfacing of bowling lanes 1986
- Bowling alley lane resurfacing 1986
- Enlarge board Room 232. L-796
- Backflow protection on irrigation system. L-2064
- Remodel second floor meeting rooms 206-216 and 232. L-2164
- New bronze windows for 3rd floor 11/82. L-3071
- 3rd floor remodel for ASWSU. L-4293
- Ceiling and info desk. L-5289, L-5290
- New lighting and ceiling in lounge and lobby area. L-5290
- Construct divide wall room 14A. L-5301
- Upgrade fire alarm system and install fire doors. L-6241
- Remodel board Room 224 and 232. L-8166
- Exit door from junior ballroom to senior ballroom. L-10088
- Replace floor tile 5/87. L-10639
- Safety improvements. L-10733
- Safety improvements. L-10733 (fire sprinkler)
- Installation of new water softener. L-11082
- 3rd floor lounge 4/88. L-41170
- Phase 2 life safety improvements. L-41560
- Carpet. L-42905
- CUB Basement meeting Rooms 10/88. L-42906
- Remodel CUB barber shop Room 68. L-42956
- Room 68 Hairstyles 3/89. L-42956
- Grid iron room lighting. L-42896
- Install a 5' roll up counter window in Room 234 corridor wall. L-42920
- Repairs to walk-in cooler. L-44631
- Modifications to Lande's flower shop. L-47031
- Room 131 faculty lounge 8/90. L-48619
- Furnishings in Room 143A 6/90. L-48873
- Window AC in Room 308A,B,C; 314 and 316. L-49283
- Furnishings in Room 143 and D. L-52446
- Sam's confectionary. L-55653
- Remodel Sam's confectionary. L-55653
- Renovate Butch's Den. L-59708
- Dance club in Butch's Den. L-59708
- Renovate Butch's Den. L-59108
- Repair kitchen flooring Room 120. L-59935
- Remodel to expand games area into 510. L-63361
- Serving line alterations. L-68905
- CUB cafeteria serving line alterations. L-68905
- Install backflow assemblies- Room SB2. L-69030
- Replace s. stairwell entrance and auditorium entrance. L-75120
- Furniture in Clevenger Lounge. L-86087
- Improve bowling lane access. L-88558
- Air conditioning 3rd floor and BLDG.. L-89156 and. L-89825
- Room 107 convenience store. L-91232
- Lande's cougar flower shop revisions. L-94545
- Regency Room remodel 204-206. L-97317
- Install gas line stadium way to CUB. L-106136 prelim, est.
- AC Convenience store. L-100242
- Install additional mailboxes in ground floor mailroom. L-106599
- Install wire mesh partition Room 425. L-107616
- Install new guard rail at stairs near south entrance. L-108260
- Connect B27 exhaust duct to main exhaust. L-111092
- Remodel food service areas. L-115818 - L-115824
- Remodel rooms B17 and B19A for GLBA. L-119387
- Lair west entrance door installation. L-120282
- Carpet for rooms B19B, BA,C,D and 219. L-120441
- (3) Installation of carpet in Cascade Rooms. L-121211
- (2) Cell site for cellular phone. L-122622
- Remodel Rooms 48 and 50 for ideal images. L-124761
- Remodel of credit union Room 101 summer 1996
- Consultant evaluation of CUB 1996. L-124763
- CUB improvements - consultant evaluation of facility. L-124763
- (3) Office furniture selection and install, room 143C. L-130813
- Taco Bell at CUB. L-131522
- Alterations for Taco Bell - ground floor. L-131522
- Replacement of carpet in 3rd floor offices. L-132567
- (2) Solar film on south side of building. L-132699
- Air balance the ventilation system. L-139875
- Replace condensate pumps room B-2. L-167140
- (2) GLBA Center office removaiton room B19A. L-134123
- (2) Air conditioning SF-1 basement. L-134512
- Install curtains for game room. L-135842
- Office furniture for room B19 BA. L-135844
- Remodel room 232. L-138978
- (3) renovate 3rd floor - SL & CSL offices. L-137832
- 3rd floor remodel & basement chiller. L-137832
- Install loading dock lift. L-137833
- Replace water heaters. L-137835
- Improvements, suite B22-B30 for office ventilation and elec. L-138412
- (2) CUB room 232. L-138978
- Replace water heaters. L-139525
- Refurnish 16 hotel rooms. L-140737
- Upgrade administrative office furniture. L-144557
- Reupholster chaire for 3rd floor lounge. L-142316
- Replace/add public telephone. L-143989
- Refurbish conference rooms 220, 222, 224. L-144763
- Modify guardrail north side. L-144880
- Replace chw sys. L-148437
- ADA public telephone. L-150008
- Evaluate restrooms for ADA compliance. L-153022
- Evaluate roof for repairs. L-153026
- Install condensate pump and meter. L-153271
- Remodel room B25 to student computing lab. L-157670
- Replace Lair chairs and table tops. L-158687
- Replace a portion of ballroom blackout drapes. L-158690
- Paint partitions in Cascade Rooms. L-162079
- Install door from game area (43) to Taco Bell (51). L-163475
- New furnishings for hotel rooms. L-172083
- (2) Replace carpet in 2nd floor. L-172084
- (2) New gas line. L-172086
- HRS corridor lighting. L-172254
- Room 668B card center. L-174517
- Reupholster furniture in Clevenger lounge. L-1782212
- Select and install furniture for renovated offices, B19. L-1820095
- Cyber Café in Lair. L-183107
- CUB chiller. L-185400
- Select and install furniture for renovated offices, 3rd floor. L-180830
- Renovate rooms 208-216. L-192520
- Renovate room 232 and new furnishing. L-192936
- Air conditioning SF-10 basement. L-194857
- Install booster fans on SF-1 system. L-194857
- Install additional power for booster fan. L-198941
- Install new furniture in Room 302. L-200274
- Install sliding security wall to separate Cyber Café and Lair. L-204042
- Office remodel room 302. L-213544
- (2) Reconfigure work space for room 142. L-217195
- New furniture layout rooms 143 and 143F. L-217195
- Track ATM machine - Washington Mutual improvement. L-222057
- Replace light fixtures in Cascade Room. L-244068
- (2) Refurbish Clevenger Lounge room 100L. L-254902
- Renovate west cafeteria entrance. L-222236
- Power door operators, mens and womens restrooms. L-255827
- Improve guardrail and level 2 landing. L-263983
- Remodel room 51. L-272575
- (2) Remodel room 51 for Multicultural Student Services Ctr. L-272575
- Refurbish suite 308. L-274542.
- (3) Remodel room 177 to vending service / food service equipment. L-285686
- Remodel locker room G41 into offices. L-306513
- Renovate rooms 202, 204, 208. L-313431
- Mss misc. items, room 51. L-324258
- Butch's Den remodel. 7/17/2003
- CUB Housing info.
- Names and Subjects
Overview of the Collection
- Creator
- Washington State University. Physical Plant
- Title
- Preliminary Guide to the Washington State University Physical Plant Records
- Dates
- 1990-2005 (inclusive)19902005
- Quantity
- 4 Linear feet of shelf space, (4 Boxes)
- Collection Number
- UA2008-14 (collection)
- Summary
- Administrative reports, architectual drawings, and consultation documents related to several small-scale projects related to WSU and the greater Pullman community from 1990-2005
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content Description
Mostly buidling plans, administrative reports, cost analysis reports, and consultation files related to several small-scale renovation and construction projects. Projects include Compton Union Building (CUB) remodel and others such as Bowling Alley renovations in the greater Pullman community. Files range from 1990-2005.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Physical Plant Records, 1990-2005 (UA2008-14)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
All boxes contain files that are clearly labeled by project number and subject. Box 3 and 4 contain files mostly related to remodelling projects within the Compton Union Building (CUB).
Detailed Description of the Collection
-
Description: Reconfigure desks in 41 and 41A using existing partsContainer: Box 1
-
Description: Reconfigure ACT/REC. officesContainer: Box 1
-
Description: Oil filter replacement original supply fan 1969Container: Box 1
-
Description: Ventilation and cooling for 2nd and 3rd floors south 1970Container: Box 1
-
Description: Rm 34 air conditioning 1970Container: Box 1
-
Description: Brine tank replacements 1971Container: Box 1
-
Description: Bowling machine ventilation 1975Container: Box 1
-
Description: Alterations and additions to rooms. 227, 233, and 332. 1976Container: Box 1
-
Description: Vent Xerox machines 1977Container: Box 1
-
Description: Misc. 1979Container: Box 1
-
Description: Satellite dish 1984Container: Box 1
-
Description: CUB antenna support 1984Container: Box 1
-
Description: Resurfacing of bowling lanes 1986Container: Box 1
-
Description: Bowling alley lane resurfacing 1986Container: Box 1
-
Description: Enlarge board Room 232. L-796Container: Box 1
-
Description: Backflow protection on irrigation system. L-2064Container: Box 1
-
Description: Remodel second floor meeting rooms 206-216 and 232. L-2164Container: Box 1
-
Description: New bronze windows for 3rd floor 11/82. L-3071Container: Box 1
-
Description: 3rd floor remodel for ASWSU. L-4293Container: Box 1
-
Description: Ceiling and info desk. L-5289, L-5290Container: Box 1
-
Description: New lighting and ceiling in lounge and lobby area. L-5290Container: Box 1
-
Description: Construct divide wall room 14A. L-5301Container: Box 1
-
Description: Upgrade fire alarm system and install fire doors. L-6241Container: Box 1
-
Description: Remodel board Room 224 and 232. L-8166Container: Box 1
-
Description: Exit door from junior ballroom to senior ballroom. L-10088Container: Box 1
-
Description: Replace floor tile 5/87. L-10639Container: Box 1
-
Description: Safety improvements. L-10733Container: Box 1
-
Description: Safety improvements. L-10733 (fire sprinkler)Container: Box 1
-
Description: Installation of new water softener. L-11082Container: Box 1
-
Description: 3rd floor lounge 4/88. L-41170Container: Box 1
-
Description: Phase 2 life safety improvements. L-41560Container: Box 1
-
Description: Carpet. L-42905Container: Box 1
-
Description: CUB Basement meeting Rooms 10/88. L-42906Container: Box 1
-
Description: Remodel CUB barber shop Room 68. L-42956Container: Box 1
-
Description: Room 68 Hairstyles 3/89. L-42956Container: Box 1
-
Description: Grid iron room lighting. L-42896Container: Box 1
-
Description: Install a 5' roll up counter window in Room 234 corridor wall. L-42920Container: Box 1
-
Description: Repairs to walk-in cooler. L-44631Container: Box 1
-
Description: Modifications to Lande's flower shop. L-47031Container: Box 1
-
Description: Room 131 faculty lounge 8/90. L-48619Container: Box 1
-
Description: Furnishings in Room 143A 6/90. L-48873Container: Box 1
-
Description: Window AC in Room 308A,B,C; 314 and 316. L-49283Container: Box 1
-
Description: Furnishings in Room 143 and D. L-52446Container: Box 1
-
Description: Sam's confectionary. L-55653Container: Box 1
-
Description: Remodel Sam's confectionary. L-55653Container: Box 1
-
Description: Renovate Butch's Den. L-59708Container: Box 1
-
Description: Dance club in Butch's Den. L-59708Container: Box 1
-
Description: Renovate Butch's Den. L-59108Container: Box 1
-
Description: Repair kitchen flooring Room 120. L-59935Container: Box 2
-
Description: Remodel to expand games area into 510. L-63361Container: Box 2
-
Description: Serving line alterations. L-68905Container: Box 2
-
Description: CUB cafeteria serving line alterations. L-68905Container: Box 2
-
Description: Install backflow assemblies- Room SB2. L-69030Container: Box 2
-
Description: Replace s. stairwell entrance and auditorium entrance. L-75120Container: Box 2
-
Description: Furniture in Clevenger Lounge. L-86087Container: Box 2
-
Description: Improve bowling lane access. L-88558Container: Box 2
-
Description: Air conditioning 3rd floor and BLDG.. L-89156 and. L-89825Container: Box 2
-
Description: Room 107 convenience store. L-91232Container: Box 2
-
Description: Lande's cougar flower shop revisions. L-94545Container: Box 2
-
Description: Regency Room remodel 204-206. L-97317Container: Box 2
-
Description: Install gas line stadium way to CUB. L-106136 prelim, est.Container: Box 2
-
Description: AC Convenience store. L-100242Container: Box 2
-
Description: Install additional mailboxes in ground floor mailroom. L-106599Container: Box 2
-
Description: Install wire mesh partition Room 425. L-107616Container: Box 2
-
Description: Install new guard rail at stairs near south entrance. L-108260Container: Box 2
-
Description: Connect B27 exhaust duct to main exhaust. L-111092Container: Box 2
-
Description: Remodel food service areas. L-115818 - L-115824Container: Box 2
-
Description: Remodel rooms B17 and B19A for GLBA. L-119387Container: Box 2
-
Description: Lair west entrance door installation. L-120282Container: Box 2
-
Description: Carpet for rooms B19B, BA,C,D and 219. L-120441Container: Box 2
-
Description: (3) Installation of carpet in Cascade Rooms. L-121211Container: Box 2
-
Description: (2) Cell site for cellular phone. L-122622Container: Box 2
-
Description: Remodel Rooms 48 and 50 for ideal images. L-124761Container: Box 2
-
Description: Remodel of credit union Room 101 summer 1996Container: Box 2
-
Description: Consultant evaluation of CUB 1996. L-124763Container: Box 2
-
Description: CUB improvements - consultant evaluation of facility. L-124763Container: Box 2
-
Description: (3) Office furniture selection and install, room 143C. L-130813Container: Box 2
-
Description: Taco Bell at CUB. L-131522Container: Box 2
-
Description: Alterations for Taco Bell - ground floor. L-131522Container: Box 2
-
Description: Replacement of carpet in 3rd floor offices. L-132567Container: Box 2
-
Description: (2) Solar film on south side of building. L-132699Container: Box 2
-
Description: Air balance the ventilation system. L-139875Container: Box 2
-
Description: Replace condensate pumps room B-2. L-167140Container: Box 2
-
Description: (2) GLBA Center office removaiton room B19A. L-134123Container: Box 3
-
Description: (2) Air conditioning SF-1 basement. L-134512Container: Box 3
-
Description: Install curtains for game room. L-135842Container: Box 3
-
Description: Office furniture for room B19 BA. L-135844Container: Box 3
-
Description: Remodel room 232. L-138978Container: Box 3
-
Description: (3) renovate 3rd floor - SL & CSL offices. L-137832Container: Box 3
-
Description: 3rd floor remodel & basement chiller. L-137832Container: Box 3
-
Description: Install loading dock lift. L-137833Container: Box 3
-
Description: Replace water heaters. L-137835Container: Box 3
-
Description: Improvements, suite B22-B30 for office ventilation and elec. L-138412Container: Box 3
-
Description: (2) CUB room 232. L-138978Container: Box 3
-
Description: Replace water heaters. L-139525Container: Box 3
-
Description: Refurnish 16 hotel rooms. L-140737Container: Box 3
-
Description: Upgrade administrative office furniture. L-144557Container: Box 3
-
Description: Reupholster chaire for 3rd floor lounge. L-142316Container: Box 3
-
Description: Replace/add public telephone. L-143989Container: Box 3
-
Description: Refurbish conference rooms 220, 222, 224. L-144763Container: Box 3
-
Description: Modify guardrail north side. L-144880Container: Box 3
-
Description: Replace chw sys. L-148437Container: Box 3
-
Description: ADA public telephone. L-150008Container: Box 3
-
Description: Evaluate restrooms for ADA compliance. L-153022Container: Box 3
-
Description: Evaluate roof for repairs. L-153026Container: Box 3
-
Description: Install condensate pump and meter. L-153271Container: Box 3
-
Description: Remodel room B25 to student computing lab. L-157670Container: Box 3
-
Description: Replace Lair chairs and table tops. L-158687Container: Box 3
-
Description: Replace a portion of ballroom blackout drapes. L-158690Container: Box 3
-
Description: Paint partitions in Cascade Rooms. L-162079Container: Box 3
-
Description: Install door from game area (43) to Taco Bell (51). L-163475Container: Box 3
-
Description: New furnishings for hotel rooms. L-172083Container: Box 3
-
Description: (2) Replace carpet in 2nd floor. L-172084Container: Box 3
-
Description: (2) New gas line. L-172086Container: Box 3
-
Description: HRS corridor lighting. L-172254Container: Box 3
-
Description: Room 668B card center. L-174517Container: Box 3
-
Description: Reupholster furniture in Clevenger lounge. L-1782212Container: Box 3
-
Description: Select and install furniture for renovated offices, B19. L-1820095Container: Box 3
-
Description: Cyber Café in Lair. L-183107Container: Box 3
-
Description: CUB chiller. L-185400Container: Box 3
-
Description: Select and install furniture for renovated offices, 3rd floor. L-180830Container: Box 3
-
Description: Renovate rooms 208-216. L-192520Container: Box 3
-
Description: Renovate room 232 and new furnishing. L-192936Container: Box 3
-
Description: Air conditioning SF-10 basement. L-194857Container: Box 3
-
Description: Install booster fans on SF-1 system. L-194857Container: Box 3
-
Description: Install additional power for booster fan. L-198941Container: Box 3
-
Description: Install new furniture in Room 302. L-200274Container: Box 4
-
Description: Install sliding security wall to separate Cyber Café and Lair. L-204042Container: Box 4
-
Description: Office remodel room 302. L-213544Container: Box 4
-
Description: (2) Reconfigure work space for room 142. L-217195Container: Box 4
-
Description: New furniture layout rooms 143 and 143F. L-217195Container: Box 4
-
Description: Track ATM machine - Washington Mutual improvement. L-222057Container: Box 4
-
Description: Replace light fixtures in Cascade Room. L-244068Container: Box 4
-
Description: (2) Refurbish Clevenger Lounge room 100L. L-254902Container: Box 4
-
Description: Renovate west cafeteria entrance. L-222236Container: Box 4
-
Description: Power door operators, mens and womens restrooms. L-255827Container: Box 4
-
Description: Improve guardrail and level 2 landing. L-263983Container: Box 4
-
Description: Remodel room 51. L-272575Container: Box 4
-
Description: (2) Remodel room 51 for Multicultural Student Services Ctr. L-272575Container: Box 4
-
Description: Refurbish suite 308. L-274542.Container: Box 4
-
Description: (3) Remodel room 177 to vending service / food service equipment. L-285686Container: Box 4
-
Description: Remodel locker room G41 into offices. L-306513Container: Box 4
-
Description: Renovate rooms 202, 204, 208. L-313431Container: Box 4
-
Description: Mss misc. items, room 51. L-324258Container: Box 4
-
Description: Butch's Den remodel. 7/17/2003Container: Box 4
-
Description: CUB Housing info.Container: Box 4
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Physical Plant -- Records and correspondence
