Preliminary Guide to the Washington State University Facilities Planning Building Files, 1965-1985

Overview of the Collection

Creator
Washington State University. Facilities Planning
Title
Preliminary Guide to the Washington State University Facilities Planning Building Files
Dates
1965-1985 (inclusive)
Quantity
29 Linear feet of shelf space, (29 Boxes)
Collection Number
UA1990-23 (collection)
Summary
Aministrative and financial reports, general correspondence, contracts, and various other construction files related to remodeling and construction of several buildings on the WSU campuses and property from 1965-1985.
Repository
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu
Access Restrictions

This collection is open and available for research use.

Languages
English

Historical NoteReturn to Top

The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.

Content DescriptionReturn to Top

Primarily consists of correspondence, administrative and financial reports, and various construction related documents such as contracts and specification reports related to several building projects on WSU campuses and propoerty. Files range from 1965-1985.

Use of the CollectionReturn to Top

Restrictions on Use

Copyright restrictions apply.

Preferred Citation

[Item description]

Preliminary Guide to the Washington State University Facilities Planning Building Files, 1965-1985 (UA1990-23)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Administrative InformationReturn to Top

Arrangement

This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.

All boxes are clearly labeled with the buildings they contain. Boxes 1-10 contain files related to buildings 11-199G. Boxes 11-20 contains files related to buildings 158-807. Boxes 21-29 contains files related to buildings 810-3000.

Location of Collection

(MASC STAFF USE) 4-05-04-3

Acquisition Information

This material was transferred to WSU Libraries' MASC by Lana (last name unrecorded) of Facilities Planning on August 01, 1990 and retained as UA1990-23.

Detailed Description of the CollectionReturn to Top

BUILDING #11 BOHLER GYMNASIUMReturn to Top

Container(s) Description
Box
1
Remodel of Bohler Gym shower and toilet rooms - Budget

BUILDING #14 WHITE HALLReturn to Top

Container(s) Description
Box
1
Building Program for White Hall (July 1970) 2 each

BUILDING #15/17 MEMORIAL HOSPITAL/STUDENT HEALTHReturn to Top

Container(s) Description
Box
1
Hospital Budget
1
Memorial Hospital - Environmental Impact Statement
1
Program Statement - Student Health Service Clinic - July 1965
1
Environmental Assessment of the Proposed Remodeling and Expansion of Memorial Hosp.
1
Student Health/Memorial Hosp. - Gilbert Moen Contractor General Correspondence
1
Student Health Service - DeNeff, Deeble, Barton Contract, C.O.'s payments-1977.
1
Memorial Hosp/Student Health - Gilbert Moen, Co. Contractor contract, payments COs
1
Student Health/Memorial Hosp. - Landscape Correspondence
1
Student Health - Richal Smith General correspondence
1
Student Health Services - Affirm. action reports, Gilbert Moen, Co.
1
Memorial Hosp/Student Health - Bid Summaries - Genera1/Mech/Elect
1
Student Health/Memorial Hosp. - Masters of C.O. Form, Partial Pymt's, etc.
1
Memorial Hosp./Student Health - Gilbert H. Moen Co., Contract, C.O.'s, payments
1
Student Health Services - Diary Inspection reports
1
Memorial Hosp./Student Health - Gilbert H. Moen Co., Payments, C.O.
1
Memorial Hosp./Student Health - Gilbert H. Moen Co., contract, C.O.'s, payments
1
Student Health Center - Keying schedule
1
A.B.C. Laboratories - Student Health Center - Memorial Hospital
1
Budget - Student Health Services
1
Student Health Services 4/1/81, DeNeff, Deeble, Barton General Correspondence
1
Student Health Services DeNeff, Deeble, Barton General Correspondence, 1/80-3/81
1
Student Health Services DeNeff, Deeble, Barton Correspondence, 1977-1979
1
Student Health Services General Correspondence 3/81
1
Hospital - General Correspondence 1972, 1973
1
Student Health Service - General Correspondence 1977-1979
2
Student Health Service - General Correspondence 1979-1981

BUILDING #16 CHEMICAL ENGINEERING BUILDINGReturn to Top

Container(s) Description
Box
2
Former Chemical Engineering Bldg. - Affirmative Action Reports
2
Chemical Engineering Bldg. Renovation - Budget
2
Former Chemical Engineering Bldg. Renovation - Commercial Builders, Contracts, COs
2
Former Chemical Engineering Bldg. - Commercial Builders, General Correspondence
2
Former Chemical Engineering Bldg. - Commercial Builders, General Correspondence
2
Former Chemical Engineering Bldg. - Commercial Builders, General Correspondence
2
Chemical Engineering Remodel - Diary Reports
2
Chemical Engineering Bldg. Renovation - Project Financial Recap.
2
Former Chemical Engineering Bldg. - General Correspondence, 2/63-6/81
2
Former Chemical Engineering Bldg. - General Correspondence, 7/81
2
Former Chemical Engineering Bldg. - Ressa and Company Contract, Change Orders, Payments
2
Former Chemical Engineering Bldg. - Ressa and Company, General Correspondence 8/80-7/81
2
Former Chemical Engineering Bldg. - Ressa/Zeck Architect, General Correspondence, 8/81
2
Former Chemical Engineering Bldg. - Smith and Swenson, General Correspondence

BUILDING #23 MECHANICAL ENGINEERING LABORATORYReturn to Top

Container(s) Description
Box
2
Mechanical Engineering Building Renovation Program 2/81

BUILDING #40 WILSON HALLReturn to Top

Container(s) Description
Box
2
Program for Remodeling of Wilson Hall - January 22, 1971

BUILDING #45 WAGNER HALLReturn to Top

Container(s) Description
Box
2
Remodeling and Addition - September 1977 (original typing)
2
Budget - Wegner Hall Addition and Remodeling
2
Minutes of Meetings - Wegner Hall, Design Phase
2
Wegner Hall Remodel and Addition - Contract, Payments, Change Orders, Halvorson/Berg
2
Wegner Hall - Grant Application
2
Wegner Hall Remodeling and Addition - TRA Contract, Payments, COs
2
Wegner Hall Remodeling and Addition - Minutes Meeting
2
Wegner Hall Remodeling - Environmental Impact Statement
2
Wegner Hall Remodeling and Addition - General Correspondence 1/83
2
Wegner Hall Remodeling and Addition - Diary Reports 8/81
2
Wegner Hall Remodeling and Addition - Halvorson/Berg Correspondence 4/82
2
Wegner Hall Remodeling and Addition - TRA Correspondence 1/82
2
Wegner Hall Addition and Remodeling - Munir Daud and Assoc. Contract, COs Payment 1977
2
Wegner Hall Landscaping - Minatani Landscaping - Correspondence
2
Wegner Hall Artwork - Contract, Payments
2
Wegner Hall Remodeling and Addition, McCoy Hall Remodeling and Animal Shelter and Isolation Bldgs - Environmental Quality Study June 1977 (2 each)
2
Wegner Hall Renovation/Addition - Mechanical HVAC System Life Cycle Cost Analysis
2
Wegner Hall Renovation/Addition - Envelope Life Cycle Cost Analysis
3
Wegner Hall Landscaping, EIS
3
Wegner Hall Remodeling and Addition - Landscape Correspondence
3
Wegner Hall Remodeling and Addition - Artwork Selection
3
Wegner Hall - Landscaping, ABC Laboratories - Testing
3
Wegner Hall Remodeling and Addition - Wyatt Engineering (Concrete Tests)
3
Wegner Hall - Landscaping - Burke/Lee Associates
3
Wegner Remodeling and Addition - Richal Smith - General Correspondence
3
Wegner Hall Remodeling - Keying Schedule
3
Wegner Hall Remodeling and Addition - Affirmative Action Reports
3
Wegner Landscaping - Rejected Bids
3
Wegner Hall Remodeling and Addition - Rejected Bids - General
3
Wegner Hall Remodeling and Addition - Rejected Bids - Mechanical
3
Wegner Hall Remodeling and Addition - Rejected Bids - Electrical
3
Wegner Hall Remodeling and Addition - Casework - Rejected Bids
3
Wegner Hall Remodeling and Addition - September 1977
3
Wegner Hall Remodeling and Addition - Halverson/Berg Corresp. 8/80 - 3/88
3
Wegner Hall Remodeling and Addition - Halverson/Berg Corresp. 1/80 - 7/80
3
Wegner Hall Log
3
Wegner Hall Remodel - Grant Funds from Ken Abbey's Files - 11/77 - 4/84
3
Wegner Hall Addition and Remodeling - General Corresp. Jan. 77 - Dec. 77
3
Wegner Hall Addition and Remodeling - General Corresp. 1/78 - 2/28/79
3
Wegner Hall Remodeling and Addition - General Corresp. 7/79 - 12/79
3
Wegner Hall, Et.al, Environmental Quality Study (Originals)
3
Wegner Hall Remodeling and Addition - General Correspondence 1/80 - 4/80
3
Wegner Hall Remodeling and Addition - Richardson Assoc. Corresp. 5/80-8/80
4
Wegner Hall Remodeling and Addition - General Corresp. 5/1/80 - 7/31/80
4
Wegner Hall Remodeling and Addition - TRA Corresp. 10/1/81 - 12/31/81
4
Wegner Hall Remodeling - DHEW Correspondence
4
Wegner Hall - Misc. Corresp. From Ken Abbey's Files 10/26/74 - 10/15/79
4
Wegner Hall Remodeling and Addition - Diary Reports
4
Wegner Hall Remodeling and Addition - Gen. Corresp. 3/79 - 6/30/79
4
Wegner Hall Remodeling and Addition - Halvorson/Berg Contract C.O.'s, Payments #1
4
Wegner Hall Remodeling and Addition - Halvorson/Berg Contract C.O.'s, Payments #2
4
Wegner Hall Remodeling and Addition - Halvorson/Berg Contract C.O.'s, Payments #3
4
Wegner Hall Addition and Remodeling - Richardson Assoc. Contract, C.O.'s, Payments 1977
4
Wegner Hall Remodeling and Addition - Gen. Corresp. 4/1/81 - 6/30/81
4
Wegner Hall Remodeling and Addition - Gen. Corresp. 8/1/80 - 10/31/80
4
Wegner Hall Remodeling and Addition - Gen. Corresp. 11/1/80 - 3/31/81
5
Wegner Hall Remodeling and Addition - Gen. Corresp. 7/1/81 - 11/30/81
5
Wegner Hall Remodeling and Addition - Gen. Corresp. 12/1/81 - 4/30/82
5
Wegner Hall Remodeling and Addition - Gen. Corresp. 5/1/82 - 12/31/82
5
Wegner Hall Remodeling and Addition - Richardson Assoc, Gen. Corresp. 7/79 - 10/31/79
5
Wegner Hall - Richardson Assoc., Gen. Corresp. 1/79 - 6/30/79
5
Wegner Hall Addition and Remodeling - Richardson Assoc. Corresp. 6/77 - 12/78
5
Wegner Hall Remodeling and Addition - Richardson Assoc. Corresp. 3/1/80 - 4/30/1980
5
Wegner Hall Remodeling and Addition - Richardson Assoc. Corresp. 11/79 - 2/29/1980
5
Wegner Hall Remodeling and Addition - TRA 3/81 - 9/30/81
5
Wegner Hall Remodeling and Addition - Richardson Assoc. Corresp. 10/1/80 - 2/28/1981

BUILDING #63 COMPTON UNION BUILDINGReturn to Top

Container(s) Description
Box
5
Budget - Remodel Room 107 CUB for Delicatessen
5
Remodeling of Room 107 CUB for a Delicatessen - C and S Builders Contract. Est and C.O.'s
5
Remodeling of Room 107 CUB for a Delicatessen - C and S Builders Inc., Corresp.
5
CUB Deli - Diary - Inspection Report
5
Compton Union Building - Douglas Durkoop cont., Payments, etc.
5
Douglas C. Durkoop - Remodel Room 107, Wilson Compton Union Contracts, Est. C.O.'s
5
Remodeling for Physically Handicapped - Douglas C. Durkoop, Architect corresp. 8/74
5
Douglas C. Durkoop - Remodel Room 107, Wilson Compton Union - Gen. Corresp.
5
Remodel Room 107 Wilson Compton Union - Gen Corresp.
5
Rejected Bids - CUB, Room 107 Remodel for Delicatessen 10/76

BUILDING #64 STUDENT BOOKSTOREReturn to Top

Container(s) Description
Box
5
Addition to the Student Bookstore (2 Each)
5
Building Program - Addition Student Book Corporation (3 each)
5
Bookstore Addition - Budget
5
Student Bookstore Fixtures - Custom Craft Fixtures, Inc., Contract, C.O.'s, Payments
5
Student Bookstore Fixtures - Custom Craft Fixtures, Inc. - Corresp. 1979
6
Bookstore Addition - General Correspondence - 7/79
6
Addition to Student Bookstore - Lavernier-Shea Construction Co., Affirmative Action Reports
6
Student Bookstore - Lavernier-Shea Construction Co., Payments, C.O.'s and Contract
6
Student Bookstore - Lavernier-Shea Construction Co., Payments, C.O.'s and Payments
6
Student Bookstore - Lavernier-Shea Construction Co., Gen. Corresp.
6
Student Bookstore Addition - Munir Daud contract
6
Addition to the Student Bookstore - Pittsburgh Testing
6
Addition to the Student Bookstore - Rejected Bids - Electrical
6
Addition to the Student Bookstore - Bookstore Fixtures and Equipment, Rejected Bids
6
Addition to the Student Bookstore - Rejected Bids - General Construction
6
Addition to the Student Bookstore - Rejected Bids - Mechanical
6
Bookstore Addition - Richal Smith - General Correspondence
6
Bookstore Addition - Trogdon, Smith, Grossman, Contract, C.O.'s, Payments
6
Bookstore Addition - Trogdon, Smith, Grossman, Corresp. 1978 - 6/30/79
6
Bookstore Addition - Trogdon, Smith, Grossman, Gen. Corresp. 7/79
6
Student Bookstore Addition - Diary - Inspection Reports
6
Student Bookstore Addition - Environmental Assessment - Munir Daud and Assoc.
6
Environmental Assessment of the Proposed Addition to the Student Bookstore, August 1978 (2 each)
6
Explorations and Geotechnical Engineering Studies - WSU Bookstore Addition, January 19, 1979
6
Bookstore Addition - General Correspondence

BUILDING #65A REGENTS DINING HALLReturn to Top

Container(s) Description
Box
6
Regents, Stearns Dining Hall - Tan, Brookie, Kundig, AIA contract, Change Orders, Payments
6
Regents Dining Hall Remodel - Lavernier-Shea Construction, contracts, C.O.'s, Estimates
6
Regents Hill - Stearns Dining Hall - Budget
6
Regents Dining Hall Remodeling - Project Financial Recap
6
Regents Dining Hall Remodeling - Diary Inspection Reports
6
Regents Hill Dining Hall - General Correspondence
6
Regents Dining Hall Remodeling - Lavernier-Shea Construction, Inc. Corresp. 7/79
6
Regents Dining Hall - Tan, Brookie, Kundig Correspondence 1/80
6
Regents Dining Hall Remodeling - Affirmative Action Reports
6
Regents Dining Remodel - Pittsburgh Testing
6
Regents Dining Hall - Richal Smith, General Correspondence
6
Rejected Bids - Regents Dining Hall - Mechanical
6
Rejected Bids - Regents Dining Hall - Electrical
6
Regents Dining Hall Remodeling - Rejected Bids - General Construction
6
Regents-Stearns Dining Hall - Tan, Brookie, Kundig, AIA Gen. corresp. 7/78 - 12/31/79

BUILDING #67 JEWETT OBSERVATORYReturn to Top

Container(s) Description
Box
6
Jewett Observatory Photos

BUILDING #74 NUCLEAR RADIATION CENTERReturn to Top

Container(s) Description
Box
7
Dense Concrete

BUILDING #76 JOHNSON HALLReturn to Top

Container(s) Description
Box
7
Architecture, I.D.L.A.- Adkinson, Leigh, Sims, Cuppage Corresp.
7
Architecture, I.D., Landscape Architecture, Adkinson, Leigh, Sims, Cuppage - Contract
7
Architecture, Landscape Architecture and Interior Design Facility 1970 - 1979
7
Architecture, Landscape Architecture and Interior Design Facility 1980
7
Architecture Interior Design, L.A. Facility - Budget
7
Architecture Interior Design, L.A. Facility - Building Program
7
Architecture, Interior Design, Landscape Architecture Facility - Gen. Corresp. 10/79 - 4/80
7
Architecture, Interior Design, Landscape Architecture Facility - Gen. Corresp. 5/80
7
Architecture, Interior Design, Landscape Architecture Facility - Gen. corresp. - Project Financial Recap
7
Building Program - Architecture, Interior Design and Landscape Architecture - July 21, 1980 (2 each)
7
A Study of Alternate Sites - Architecture, Interior Design, Landscape Architecture Facility - March 28, 1980
7
Architecture, I.D., L.A. Building - Program Study

BUILDING #78A ELECTRICAL MECHANICAL ENGINEERINGReturn to Top

Container(s) Description
Box
7
Mechanical Engineering - Budget
7
Mechanical Engineering - Renovation - Project Financial Recap
7
Mechanical Engineering Facility Renovation - Gen. Corresp.
7
Mechanical Engineering Facility Renovation - T.S.G. Architects, Contracts, Payments, C.O.'s
7
Mechanical Engineering Facility Renovation - T.S.G. Corresp.
7
Electrica1/Mechanical Engineering Building - Site Selection Study

BUILDING #82 HEALD HALLReturn to Top

Container(s) Description
Box
7
Biosciences Building - Phase II - ABC Laboratories Inc., Concrete Testing 1975, 76
7
Biosciences Building - Phase II - Artwork - Corresp. 1976, 1977
7
Biological Sciences - Phase II - Budget
7
Biosciences Building - Phase II - Diary Inspection Reports 1975
7
Environmental Impact - Biosciences Addition
7
Heald Hall - Phase II - Gen. Corresp. 1968 - 1972
7
Biosciences - Phase II - Gen. Corresp. 8/76 - 4/78
7
Biosciences - Phase II - Gen. Corresp. 5/78 - 81
7
Biosciences Building - Phase II, Hense1/Phelps Construction Co. - Affirmative Action Reports 5/75 - 6/77
9
Biosciences - Kolb and Stansfield - Review of Agreement
9
Biosciences Building - Phase II - Photographs
9
Biosciences Building - Phase II - Physical Plant Inspection Report 1975-1978
9
Biosciences Building - Phase II - Pile Driving Reports 1975
9
Biosciences Building - Phase II - Program November 27, 1973 (3 each)
9
Program for Biological Sciences Building - Heald Phase II - May 28, 1970
9
Rejected Bids - Biosciences, Phase II - Electrical 3/75
9
Rejected Bids - Biosciences, Phase II - Plant Growth Chambers 1975
9
Rejected Bids - Biosciences, Phase II - Environmental Rooms 1975
9
Rejected Bids - Biosciences, Phase II - Casework 3/75
9
Rejected Bids - Biosciences, Phase II - Mechanical 3/75
9
Rejected Bids - Biosciences, Phase II - General Construction 1975
9
Biosciences Building, Phase II Clint Brown, Sculptor Contract, C.O.'s, Payments 76-77
9
Biosciences Building, Phase II Shannon and Wilson - Foundation Evaluation and Recommendations 1974-75

BUILDING #82A EASTLICK HALLReturn to Top

Container(s) Description
Box
8
Biosciences Building - Phase II - Hensel, Phelps Construction Co., Contract, Payment, C.O.'s 11/76, Folder #2
8
Biosciences Building - Phase II - Hensel, Phelps Construction Co., Contract, Payment, C.O.'s 11/76, Folder #1
8
Biosciences Building - Phase II - Hensel, Phelps Construction Co., Gen. Corresp. 3/75 - 9/77
8
Biosciences Building - Phase II - Hensel, Phelps Construction Co., Gen. Corresp. 10/77 - 12/80
8
Biosciences Building - Phase II - Hensel, Phelps - Info and Policy 1976
8
Biosciences Building (Eastlick) - 1st and 2nd Increment Pick-Up 1978
8
Biosciences Building (Eastlick) - Infectious Disease Suite 1977-78
8
Biosciences Building - Phase II - Keying Schedule 1975
8
Heald Hall, Phase II, Decker, Kolb and Stansfield - Contract, C.O.'s Est. 5/70 - 9/70
8
Heald Hall, Phase II, Kolb and Stansfield Contract File , 12/73 - 10/77
8
Biosciences Building, Phase II, Decker, Kolb and Stansfield Corresp. 1/75 - 5/75
8
Decker, Kolb and Stansfield - Corresp. 2/70 - 6/73
8
Biosciences Building, Phase II, Kolb and Stansfield Corresp. 9/73 - 12/74
8
Biosciences Building, Phase II, Kolb and Stansfield Corresp. 6/75 - 12/75
8
Biosciences Building, Phase II, Kolb and Stansfield Corresp. 1/76 - 7/31/1976
8
Biosciences Building, Phase II, Kolb and Stansfield Corresp. 8/76 - 12/78
8
Biosciences Building, Phase II, Kolb and Stansfield Job Meeting Notes 1975-78
9
Biosciences Phase II - General Correspondence 1973-74
9
Biosciences Phase II - General Correspondence 1/75 - 5/75
9
Biosciences Phase II General Correspondence 6/75 - 7/31/76

BUILDING #92 FRENCH ADReturn to Top

Container(s) Description
Box
9
Specs for 1st Floor North Side Remodel 1981 #8
9
French Ad Building - Budget
9
French Ad Building - General Correspondence 3/80 - 12/31/82
9
French Ad Building - General Correspondence 1/1/83
9
French Ad Building - Don Murray and Assoc. Contract, C.O.'s, Payments
9
French Ad Building - Don Murray and Assoc. Corresp.

BUILDING #93C STEPHENSON DINING HALLReturn to Top

Container(s) Description
Box
9
Remodeling in Stephenson Center - Rejected Bids
9
Stephenson Center Handicapped Access - Budget
9
Stephenson Center Remodeling - Diary Reports
9
Stephenson Center Handicapped Access - Gen. Corresp.
9
Remodeling in Stephenson Center - Best-Way Construction Corresp.
9
Remodeling in Stephenson Center - Best-Way Construction - Contract, C.O.'s, Payments
9
Stephenson Center - Handicapped Access - Doug Durkoop - Corresp.
9
Remodeling for Physical Handicapped - Douglas C. Durkoop, Architect, Contract, Payments, C.O.'s
9
Stephenson Center Handicapped Access - Doug Durkoop - Contract, Payments, C.O.'s

BUILDING #96 PHYSICAL EDUCATION BUILDINGReturn to Top

Container(s) Description
Box
9
Budget - Handball/Racquetball
9
Handball/Racquetball Facility - 1/S Affirmative Action Reports
9
Handball/Racquetball Facility - Diary Construction Reports
9
Handball/Racquetball Facility - Phase EIS
9
Handball/Racquetball - Atkinson, Leigh, Sims, Cuppage - Contract, C.O.'s, Payments
9
Handball/Racquetball Facility - Atkinson, Leigh, Sims, Cuppage - Corresp. 4/1/80
9
Handball/Racquetball Atkinson, Leigh, Sims, Cuppage - Gen. Corresp. 6/78 - 3/31/80
9
Handball/Racquetball - Project Financial Recap
9
Handball/Racquetball - Gen. Corresp. 4/78 - 12/31/79
9
Handball/Racquetball Facility - Gen. Corresp. 1/80 - 12/31-80
10
Handball/Racquetball Facility - Structural Calculations 10/26/79
10
Handball/Racquetball Facility - General Correspondence 1/1/81
10
Handball/Racquetball Facility - Lavernier-Shea Construction Co., Contract, Payments, C.O.'s
10
Handball/Racquetball Facility - Lavernier-Shea Corresp. 1/80
10
Handball/Racquetball - Meeting Minutes
10
Handball/Racquetball Facility - Pittsburgh Testing
10
Handball/Racquetball - Rejected Bids
10
Handball/Racquetball - Site Study
10
Handball/Racquetball - Richal Smith - General Correspondence

BUILDING #114 PLANT SCIENCES GREENHOUSEReturn to Top

Container(s) Description
Box
10
Controlled Environment Laboratories, Phase II Gen. Corresp. 1977

BUILDING #169 VETERINARY ANIMAL HOLDING BARNReturn to Top

Container(s) Description
Box
10
Budget - Vet Animal Holding Facilities
10
Animal Holding and Quarantine - Bernard and Holloway - Gen. Corresp.
10
Vet Medicine Animal Care Facility - Gen. Corresp
10
Animal Holding and Quarantine Facility - Bernard and Holloway, Contract, C.O., Est. etc.
10
Animal Holding Facilities - Contract, C.O.'s, Payments - S.G. Morin and Son, Inc.
10
Program for Animal Holding and Quarantine Facilities Feb. 13, 1978 (2 each)
10
Consolidated Supply Co. - Water Heater and Lavatory Catalog
10
Animal Holding Facilities - Dept. of Health, Education , Welfare
10
Animal Holding and Quarantine - General Correspondence 9/1/79
10
Vet Animal Holding - Diary Inspection Reports
10
Vet Animal Holding Facilities - Design Development - June 1978
10
Vet Animal Holding Facility - Corresp. - S.G. Morin and Son Inc.
10
Vet Animal Holding Facility - Richal Smith Corresp.
10
Vet Animal Holding - Affirmative Action Reports
10
Vet Animal Holding Facility - Rejected Bids, 1978
10
Animal Holding and Quarantine - Gen. Corresp. 8/19/77 - 8/31/79

BUILDING # 199A VETERINARY QUARANTINE FACILITY AReturn to Top

Container(s) Description
Box
10
Veterinary Field and Quarantine Facility - Phase II - Budget
10
Veterinary Field and Quarantine Facility - Phase I - Barnard and Holloway Corresp.
10
Veterinary Field and Quarantine Facility - Phase I - Contract, Est. Payments
10
Veterinary Field and Quarantine Facilities - Ken Abbey's Files
10
Rejected Bids - Vet Field and Quarantine Facilities - Phases I and II

BUILDING #199G VETERINARY ISOLATION BARNReturn to Top

Container(s) Description
Box
10
Isolation Building - Animal Holding and Quarantine Facility - Budget
10
Veterinary Isolation Building - Project Financial Recap
10
Isolation Building - Animal Holding and Quarantine Facility - Gen. Corresp.
10
Isolation Building - S.G. Morin, Inc. - Corresp.
10
Vet Med Isolation Completion - Bernard and Holloway - Contract, Payments, C.O. 's
10
Large Animal Isolation Facility Completion - Vern W. Johnson and Sons Inc., Contract, C.O.'s, Payments
10
Vet Science Isolation Building - S.G. Morin, Contract, Payments, C.O.'s
10
Isolation Building - Barnard and Holloway, Payments, Contract, C.O.'s
10
Isolation Building - Animal Holding and Quarantine Facility - Barnard and Holloway Corresp.
10
Isolation Building - Diary Inspection Reports
10
Vet Med Isolation Building - Richard Wyatt Engineering Co.
10
Isolation Building - Smith and Swenson, Gen. Corresp.
10
Isolation Building - S.G. Morin, Affirmative Action Reports
10
Rejected Bids - Vet Animal Holding and Quarantine Facility - Isolation Building
10
Vet Med Isolation Completion - Gen. Corresp.
10
Isolation Building - Diary Reports
10
Vet Med Isolation Completion - Barnard and Holloway, Corresp.
10
Large Animal Isolation Facility Completion - Vern Johnson and Sons Inc. - Corresp.
10
Vet Isolation Facility - Affirmative Action Reports
10
Completion of Large Animal Isolation Facility - Rejected Bids

BUILDING #358A/358B/358C RECEIVING AND DELIVERY/GENERAL STORAGE BUILDING AND CHEMICAL STORES BUILDINGReturn to Top

Container(s) Description
Box
11
General Services Complex, Phase II - Budget
11
General Services Complex, ABC Laboratories - Concrete Testing
11
General Services Complex, Phase II, Northwestern Construction Inc. - Affirmative Action Reports
11
General Services Complex, Phase II - Arch. Schematic Brochure
11
General Services Complex, Phase II - Diary Inspection Report
11
General Services Complex, Phase II - Gen. Corresp. 1970 thru 12-31-76
11
General Services Complex, Phase II - Gen. Corresp. 1/1/77
11
General Services, Phase II - Northwestern Construction, Contract, C.O.'s, Payments, 1976
11
General Services, Phase II - Northwestern Construction, Corresp. 1976
11
General Services Complex, Phase II - Victor Louis Wulff - Contract, C.O.'s, Est.
11
General Services Complex, Phase II - Victor Louis Wulff - Corresp. 6/75 - 6/76
11
General Services Complex, Phase II - Victor Louis Wulff - Corresp. 7/76
11
Rejected Bids - General Services Complex, Phase II
11
General Services, Phase III - General Corresp.
11
General Services, Phase III - Northwestern Construction of Washington Inc. - Corresp.
11
An Analysis of Central Receiving for the Future - March 1, 1966
11
An Analysis of Receiving and Delivery for the Future, Revised - Dec. 8, 1967
11
General Services, Phase III, Receiving and Delivery Program - Aug. 1975
11
General Services Complex, Phase III, Receiving and Delivery - Rejected
11
Bids, General Construction
11
General Services, Phase III, Richal Smith - Gen. Corresp.
11
Soils Engineering Studies - Nov. 1975
11
General Services, Phase III, Victor L. Wulff - Contract, Payments, C.O. 's
11
General Services, Phase III, Victor L. Wulff - Corresp.
11
General Services, Phase III - Budget
11
General Services, Phase III - Affirmative Action Reports
11
General Services, Phase III - Receiving and Delivery - Diary Inspection Reports
11
General Services, Phase III - DeNeff, Deeble, Barton, Assoc., Contracts, C.O.'s, Est.
11
General Services, Phase III - Receiving and Delivery, DeNeff, Deeble, Barton- Corresp. 7/79
11
General Services, Phase III - Receiving and Delivery, Project Financial Recap.

BUILDING #372 BAILEY FIELDReturn to Top

Container(s) Description
Box
11
Baseball Field - Pittsburgh Testing

BUILDING #380 HOUSING AND FOOD SERVICE STORAGE BUILDINGReturn to Top

Container(s) Description
Box
11
HSF and Food Service Storage Building - General

BUILDING #402K PROPOSED DAIRY PLANT SILO BARNReturn to Top

Container(s) Description
Box
11
Dairy Plant Silo
11
Silo Barn

BUILDING #404D BEEF CATTLE CENTER FEED STORAGEReturn to Top

Container(s) Description
Box
12
Expo.

BUILDING #405 SWINE CENTERReturn to Top

Container(s) Description
Box
12
Livestock Teaching and Research Facilities, Phase II - (Swine Center) - Budget
12
Building Program Statement for Livestock Teaching and Research Facility, Phase II - Swine Center, Aug. 1975 (2 each)
12
Draft Environmental Impact Statement for Swine Center (2 each)
12
Swine Center Environmental Impact Statement 1976
12
Soils Evaluation and Foundation Studies April 1976
12
Swine General Correspondence - 1/79
12
Swine Center - Diary Inspection Reports 1976, 77
12
Swine - Standards and Guidelines for the breeding, care and management of lab animals
12
Final Environmental Impact Statement for a Swine Center - July 28, 1976 (2 each)
12
Swine Center - Olson-Richert-Bignold, Corresp. 8/77
12
Swine Center - Vern W. Johnson and Sons, Corresp. 1976, 77
12
Swine Center - Vern W. Johnson and sons, Contract, Payments, C.O.'s
12
Western Consultants, Inc. General Correspondence and Contracts
12
Swine Center - Keying Schedule
12
Swine Center - Vern Johnson, Affirmative Action Report
12
Swine Center - ABC Laboratories, Concrete Testing
12
Swine Center - Rejected Bids, General 1976
12
Swine Center - Rejected Bids, Mechanical 9/9/76
12
Swine Center - Rejected Bids, Electrical 9/76
12
Swine Center - Olson-Richert-Bignold, Corresp. 1/77 - 8/8/77
12
Livestock Teaching and Research Facilities, Phase II, (Swine Center), Olson, Richert, Bignold, Corresp. 6/75 - 12/31/76
12
Swine Center - General Corresp. 6/78 - 12/78
12
Swine Center - General Corresp. 1/77 - 5/31/78
12
Swine Center Livestock Teaching and Research Facilities, Phase II, Corresp. 1974, 75, 76

BUILDING #410 NORTH/SOUTH SKI BOWLReturn to Top

Container(s) Description
Box
14
North/South Ski Facility - Atkinson, Leigh, Sims, Cuppage, Contract, C.O.'s, Est.
14
North/South Ski Facility - Improvement - Atkinson, Leigh, Sims, Cuppage, Corresp. 6/75
14
North/South Ski - Budget
14
North/South Building Committee Report (2 each)
14
North/South Ski Lodge, Phase I, Dairy Inspection Reports 1976
14
North/South Ski Lodge - General Correspondence
14
North/South Ski Lodge - Affirmative Action Reports, Griffith Construction Co. Inc.
14
North/South Ski Lodge - Phase I, Griffith Construction Co. Inc., Contract, C.O.'s, Est., Etc.
14
North/South Ski Lodge - Phase I, Griffith Construction Co. Inc., Gen. Corresp.
14
North/South Ski Lodge - Rejected Bids

BUILDING #677 NEZ PERCE VILLAGEReturn to Top

Container(s) Description
Box
13
Student Housing Site Study - Nov. 20, 1974
13
1975 TurnKey Housing Project - Environmental Impact Statement
13
1975 TurnKey Housing - Minutes of Public Meetings
13
1975 TurnKey - Diary Inspection Report
13
1975 TurnKey - Conifer/Strouss, Affirmative Action Reports
13
1975 TurnKey - Diary Inspection Report
13
1975 TurnKey - Olson-Richert-Bignold Corresp. 3/75
13
1975 TurnKey - Olson-Richert-Bignold Corresp. 1974
13
1975 TurnKey - Olson-Richert-Bignold Corresp. 3/75

BUILDING # 678 COLUMBIA VILLAGEReturn to Top

Container(s) Description
Box
13
1975 TurnKey - General Correspondence 3/75
13
1975 TurnKey - Conifer/Strouss, General Correspondence 1975
13
1975 TurnKey - Walsh Construction Co. General Correspondence 1975
13
1975 TurnKey - Walsh Construction Co. Contract, Payment, C.O.'s
13
1975 TurnKey - Conifer/Strouss, Contract Payments, C.O.'s
13
1975 TurnKey - Walsh Construction Co., Affirmative Action Reports
13
1976 TurnKey - Student Housing Site Study
13
Final Environmental Impact Statement Feb. 1975
13
Rejected Bids - 1975 TurnKey Housing Project
13
1975 TurnKey - Gen. Corresp.1974 - 3/31/75
13
1975 TurnKey - Olson, Richert, Bignold, Contract, Payments, C.O.'s
13
Budget 1976 TurnKey
13
Life Cycle cost Analysis (LCC) - TurnKey Housing 1976
13
TurnKey - Prequalification Package, Sept. 3, 1970
13
1976 TurnKey - Diary Inspection Report
13
1976 TurnKey Housing Project - Walsh Construction Co., Affirmative Action Reports

BUILDING #679 CHINOOK VILLAGEReturn to Top

Container(s) Description
Box
13
1976 TurnKey - General Correspondence 3/76
13
1976 TurnKey - General Correspondence 9/75 - 2/76
13
1976 TurnKey Housing Project - Walsh Construction Co., Contract, Payments, C.O.'s
13
1976 TurnKey Housing Project - Walsh Construction Co., Gen. Corresp.
13
1976 TurnKey - Olson-Richert-Bignold, Contract, Payments, C.O.'s
13
1976 TurnKey - Olson-Richert-Bignold, Corresp. 1975,76
13
1976 TurnKey Housing Project - Environmental Impact Statement
13
1976 TurnKey - Prequalifications
13
Final Environment Impact Statement - Dec. 1975
13
Draft Environment Impact Statement - Oct. 14, 1975

BUILDING #801 PHYSICAL SCIENCES BUILDINGReturn to Top

Container(s) Description
Box
14
WSU Attorney Information
14
Physical Sciences Building - Bouillon, Christofferson and Schairer, Corresp., Report of Site Visits
14
Physical Sciences Building - Budget
14
Physical Sciences Building - Christiansen Bros., Inc., Affirmative Action Reports
14
Physical Sciences Building - Christiansen Bros., Inc., Contract, C.O.'s, Payments 1971 - 1974
14
Physical Sciences Building - Christiansen Bros., Inc., Corresp. 1971
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 5/6/71 - 6/30/71
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 7/1/71 - 12/31/71
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 1/3/72 - 6/30/72
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 7/5/72 - 12/29/72
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 1/2/73 - 6/29/73
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 7/2/73 - 12/18/73
14
Physical Sciences Building - Christiansen Bros., Inc., Daily Job Reports 1/4/74 - 1/24/74
14
Report - Contract 4499 - Physical Sciences Building - by Christiansen Bros. , Inc.
15
Physical Sciences Building - Detweiler Bros. Inc. - Affirmative Action Reports
15
Detweiler Claim - Physical Sciences Building, Contract 4500
15
Physical Science Building - Detweiler Bros., Inc., Contract, C.O.'s, Payments 1971 - 1974
15
Physical Science Building - Detweiler Bros., Inc., Corresp. 6/74
15
Physical Science Building - Detweiler Bros., Inc., Corresp. 4/71 - 6/74
15
Detweilerfs Progress Photographs
15
Back-up for Detweiler C. Proposal M-V Physical Sciences
15
Physical Sciences Building - Charles Lerch and Assoc. Elevator Data
15
Elevator Data (Final Elevator Summary) 5/15/70 - Charles Lerch and Assoc
15
Questionnaire, Fact Finding Tour - April 15-18, 1968
15
Foundation Investigation, Physical Sciences Building, June 4, 1969
15
Physical Sciences Building - Gen. Corresp. - Attorney's Thomas C. Cochran and Robert H. Lamp
15
Physical Sciences Building - General Correspondence 1967,68 - 5/14/69
15
Physical Sciences Building - General Correspondence 8/69 -6/30/70
15
Physical Sciences Building - General Correspondence 7/1/70 - 12/31/70
15
Physical Sciences Building - General Correspondence 1/71 - 12/71
15
Physical Sciences Building - General Correspondence 1/1/72 - 7/31/73
15
Physical Sciences Building - General Correspondence 8/1/73 - 2/28/74
15
Physical Sciences Building - General Correspondence 3/1/74 - 8/74
15
Physical Sciences Building - General Correspondence 8/74 - 12/31/74
15
Physical Sciences Building - General Correspondence 1/75 - 12/76
15
Physical Sciences Building - General Correspondence 1/77
15
Claims and Correspondence - Christiansen Bros.
16
Physical Sciences Building - Kehne-Crabtree Electric Co. Inc., Affirmative Action Reports
16
Physical Sciences Building - Kehne-Crabtree Electric Co. Inc., Contract, C.O.'s, Payments 1971 - 1974
16
Physical Sciences Building - Kehne-Crabtree Electric Co. Inc., Corresp. 1971
16
Physical Sciences Building - Keying Schedule
16
Physical Sciences Building - Legal Matters
16
Physical Sciences Building - NBBJ Back-up Material for Estimate No. 4
16
Physical Sciences Building - NBBJ Contract, C.O.'s, Payments 1968 - 1975
16
Physical Sciences Building, Daily Log 1/1/72 - 7/31/72
16
Physical Sciences Building, Daily Log 8/1/72 - 12/31/72
16
Physical Sciences Building, Daily Log 1/1/73 - 6/30/73
16
Physical Sciences Building, Daily Log 7/1/73 - 12/31/73
16
Physical Sciences Building, Daily Log 5/71 - 12/71
16
Physical Sciences Building, Daily Log 1/1/74 - 2/15/74
16
Physical Sciences Building - NBBJ, Corresp. 5/73 - 12/31/73
16
Physical Sciences Building - NBBJ, Corresp. 1969 - 1970
16
Physical Sciences Building - NBBJ, Corresp. 1967,68 - 7/69
16
Physical Sciences Building - NBBJ, Corresp. 7/1/70 - 12/3/70
16
Physical Sciences Building - NBBJ, Corresp. 8/69 - 6/30/70
16
Physical Sciences Building - NBBJ, Corresp. 7/72 - 4/30/73
16
Physical Sciences Building - NBBJ, Corresp. 10/71 - 6/72
17
Physical Sciences Building - NBBJ Corresp. 1/71 - 9/71
17
Physical Sciences Building - NBBJ Corresp. 6/1/74 - 12/31/74
17
Physical Sciences Building - NBBJ Corresp. 1/1/74 - 5/31/74
17
Physical Sciences Building - NBBJ Corresp. 1/75
17
Physical Sciences Building - NBBJ Reconstruction Conference
17
Physical Sciences Building - Nelson Landscape Service, Inc., Contract, Est., C.O.'s
17
Physical Sciences Building - Nelson Landscape Service, Inc., Corresp. 1971
17
Physical Sciences Building - NII Laboratory Furniture, Contract, Est., C.O. 's
17
Physical sciences Building - NII Laboratory Furniture - Permalab, Corresp. 1971
17
Physical Sciences Building - Permalab Factory Stored Inventory
17
Physical Sciences Building - Pittsburgh Testing Labs. Concrete Testing 4/71 - 12/71
17
Physical Sciences Building - Pittsburgh Testing Labs. Concrete Testing 1/1/72- 8/1/72
17
Physical Sciences Building - Pittsburgh Testing Labs. Concrete Testing 8/1/72 - 12/31/72
17
Physical Sciences Building - Pittsburgh Testing Labs. Concrete Testing 1/1/1973
17
Physical Sciences Building - Pittsburgh Testing Labs. Miscellaneous Testing
17
Program Statement - Physical Sciences Building - Nov. 1965
17
Physical Sciences Building - II Program
17
Physical Sciences Building - Proposal
17
Rejected Bids - Physical Sciences Building, Electrical
17
Rejected Bids - Physical Sciences Building, General
17
Rejected Bids - Physical Sciences Building, Lab Equipment
17
Rejected Bids - Physical Sciences Building, Landscape
17
Rejected Bids - Physical Sciences Building, Mechanical
17
Physical Sciences Building - Shannon and Wilson, Inc., Soil Investigation
17
Report of Site Visits - 5/71 - 6/25/74

BUILDING #806 BEASLEY COLISEUMReturn to Top

Container(s) Description
Box
17
Coliseum - Light Bridge Failure, John Graham and Co. - Corresp. 1976,77
17
Coliseum - Light Bridge and Rigging Failures
17
Coliseum - Light Bridge - Skilling, Helle, Christiansen and Robertson - Contracts, C.O.'s, Est.
17
Coliseum - Rigging Improvements
17
Coliseum - Light Bridge Failure, Gen. Corresp. 1976
17
Coliseum - (Hartford Failure Information)
17
Budget - Light Bridge Failure
17
Report - Heary, Stage Rigging - 2/28/79

BUILDING #807 BUSTAD HALLReturn to Top

Container(s) Description
Box
18
Veterinary Medicine Building - Budget
18
Vet Science Building - Maloney, Herrington, Freesz and Lund, Corresp. 1/79
18
Vet Science Building - Vern W Johnson and Sons, Inc,, Contract, C.O.'s, Payments 8/8/77
18
Vet Science Building - Vern W Johnson and Sons, Inc., Contract, C.O.'s, Payments
18
Vet Medicine Building - Maloney, Herrington, Freesz and Lund, Corresp. 7/1/75 - 12/31/75
18
Shared Curriculum, Veterinary Medicine, Ken Abbey's Files, 1976
18
Vet Medicine Building - Building Program
18
Vet Science Building - Daily Inspection Reports, 1/1/76
18
Vet Medicine Building - DHEW Corresp. 1974,75 - 1979
18
Vet Science Building - Construction Reports (Crea)
18
Vet Science Building - Environmental Impact Statement
18
Vet Science Building - Vern W. Johnson and Sons, Contract, C,O.'s, Proposals
18
Vet Science Building - Skilling, Helle, Christiansen, Robertson - Corresp.
18
Vet Medicine Building - Keying Schedule
18
Vet Science Building - Vern W. Johnson and Sons, Inc. Corresp. 4/1/78
18
Vet Science Building - Gen, Corresp. 1/77 - 3/77
18
Vet Science Building - Affirmative Action Reports
18
Vet Medicine, Univ. of Idaho Proposal - Caldwell
18
Vet Science Building - Robert W. Ellison, Sculptor, Contract, C.O.'s, Payments
18
Vet Science Building - Biohazard Suite Remodel - Vern W. Johnson, Contract, C.O.'s, Payments
18
Vet Science Building and Biohazard suite Remodeling - Mills, John Rigdon, AIA, Contract, Payments
19
Vet Sciences Building - Cage and Rack Washer
19
Vet Sciences Cage Washroom - Maloney, Herrington (MJR) Corresp.
19
Vet Medicine Building and Cage Washroom - Maloney, Herrington, Freesz and Lund - Contract, C.O.'s, Payments
19
Vet Sciences Cage Washroom Rev. - C and S Builders, Inc. - Corresp.
19
Vet Sciences Cage Washroom Rev. - C and S Builders, Inc. - Contract, Payments, C.O.'s
19
Vet Science Building Biohazard Suite Remodeling - Budget
19
Vet Science Building Biohazard Suite - Gen. Corresp. 4/1/82
19
Vet Science Building Biohazard Suite Remodeling - Diary Reports
19
Vet Science Building Biohazard Suite - 5/80 - 3/31/82
19
Vet Science Building Biohazard Suite Remodel - Vern W. Johnson and Sons, Corresp.
19
Vet Science Building Biohazard Suite Operations Manual
19
Vet Science Building Biohazard Suite MJR Corresp.
19
Vet Science Building Biohazard Suite Remodel - Rejected Bids
19
Vet Science Building Biohazard Suite Remodeling - Vern W. Johnson and Sons, Inc. - Affirmative Action Reports
19
Vet Science Building Biohazard Suite Mills, John, rigdon Corresp. 7/80 - 8/31/1982
19
Vet Medicine Building - Maloney, Herrington, Freesz and Lund - Gen. Corresp. 1/75 - 6/75
19
Vet Medicine Building - Gen. Corresp. 1/76 - 12/31/76
19
Vet Medicine Building - Gen. Corresp. 1975
19
Vet Science Building - Maloney, Herrington, Freesz and Lund - Corresp. 9/77 - 12/78
19
Vet Science Building - Maloney, Herrington, Freesz and Lund - Corresp. 8/76 - 8/77
19
Vet Science Building - General Correspondence 1/80
19
Vet Science Building - Design Calculations - Mechanical (2 each)
19
Vet Science Building - Lent's Inc. - Affirmative Action Plan
19
Vet Science Building - Building Program - May 1974
19
Vet Science Building - soil Engineering - Jan. 30, 1975 Shannon and Wilson Inc.
19
Vet Medicine Building - General Correspondence 1974
19
Vet Science Building - Proposed State Diagnostic and Research Lab.
20
Vet Sciences Building - Pittsburgh Testing Lab - Concrete Testing 1976
20
Vet Sciences Building - Robert W. Ellison - Corresp.
20
Vet Sciences Building - Rejected Bids - Cage Wash Revision
20
Vet Sciences Building - Rejected Bids - Mechanical 1975
20
Vet Sciences Building - Rejected Bids - Electrical 1975
20
Vet Sciences Building - Rejected Bids - General 1975
20
Vet Sciences Building - Close-out Projects
20
Vet Sciences Building - Furniture List 8/9/76
20
Vet Sciences Monitor Drawer Deliberations
20
Vet Sciences Building - Furnishings
20
Vet Sciences Building - Maloney, Herrington, et.al.- Job Meeting Notes, 74-75, 76, 77, 78
20
Vet Sciences Building - Maloney, Herrington, Freesz, and Lund, Corresp 1/1/76 - 7/76
20
Vet Sciences Building - Vern W, Johnson and sons, Inc. Corresp. 11/75 - 2/1/1978
20
Vet Sciences Building - General Correspondence 4/1/78 - 8/31/78
20
Vet Sciences Building - General Correspondence 1/79 - 12/79
20
Vet Medicine Building - Maloney, Herrington, Freesz, and Lund, Corresp 2/70-74
20
Vet Sciences Building - General Corresp. 9/1/78 - 12/31/78

BUILDING #809 AVERY HALLReturn to Top

Container(s) Description
Box
22
Completion of a Portion of Avery, 4th Floor - Lavernier-Shea
22
Construction, Affirmative Action Reports
22
English Building - Fred Bassetti and Co., Corresp. 1970 - 6/30/72
22
Avery Hall 4th Floor - Completion - Corresp. 3/77
22
Avery Hall 4th Floor - (Portion), Corresp. to 4/77
22
Avery Hall 4th Floor - Fred Bassetti and Co., Contract, C.O.'s, Payments
22
Avery Hall 4th Floor - Completion - Fred Bassetti and Co., Contract, C.O.'s, Payments 1977
22
Budget - Completion of Avery Hall
22
Completion of a portion of 4th Floor, Avery Hall - Budget
22
Avery Hall - Portion, Diary Inspection Reports 1976
22
Avery Hall Completion - Diary Inspection Reports 1977
22
English Building - General Correspondence 3/16/70 - 12/71
22
Avery Hall 4th Floor - Completion - Gen. Corresp. 3/77
22
Completion of a Portion of Avery Hall 4th Floor - Gen. Corresp.
22
English Building - Kohler Electric, Inc., Affirmative Action Reports
22
English Building - Kohler Electric, Inc., Contract, C.O.'s, Payments
22
Completion of 4th Floor Avery - Lavernier-Shea construction, Contract, Payments, C.O.'s 7/77
22
Completion of a portion of the 4th Floor, Avery Hall - Lavernier-Shea Construction, Contract, Est. C.O.'s
22
Completion of 4th Floor Avery - Lavernier-Shea Construction Inc., Corresp. 7/77
22
Completion of a Portion of 4th Floor Avery - Lavernier-Shea Construction Inc. - Gen. Corresp.
22
Avery Hall - Rejected Bids - Completion of 4th Floor 6/30/77
22
Avery Hall - Rejected Bids - 4th Floor 1975
22
English Building - Rejected Bids - Electrical
22
English Building - Rejected Bids - General
22
English Building - Rejected Bids - Mechanical

BUILDING #810 OWEN SCIENCE AND ENGINEERING LIBRARYReturn to Top

Container(s) Description
Box
21
Science Area Library - Vern W. Johnson and Sons - General Correspondence
21
Science Area Library - Vern W. Johnson and Sons - Contract, Payment, C.O. 's
21
Science Area Library - HRL Contract #4987 Contract, Payments, C.O.'s 1973
21
Science Area Library - Harris, Reed and Litzenberger - Corresp. 8/1/76
21
Science Area Library - HRL Correspondence 1974 - 6/74
21
Science Area Library - HRL Correspondence
21
Science Area Library - Schematics, HRL General Correspondence
21
Science Area Library - Site Study, HRL General Correspondence
21
Science Area Library - Site Study, HRL General Correspondence
21
Science Area Library - Site Study, HRL General Correspondence
21
Science Area Library - Kenneth S. Allen - Gen. Corresp. Library Consultant
21
Science Area Library - Library Consultant Selection
21
Science Area Library - HRL Gen. Corresp. 6/75 - 7/31/76
21
Science Area Library - HRL Gen. Corresp. 7/74 - 5/75
21
Science Area Library - Gen. Corresp. 8/1/76 - 12/77
21
Science Area Library - Gen. Corresp. 7/30/73 - 6/74
21
Science Area Library - HRL Schematics and Site Study, Contract, Payments, C.O. 's
21
Science Area Library - Environmental Impact
21
Science Area Library - Vern W. Johnson and Sons, Affirmative Action Forms
21
Science Area Library - Kenneth S. Allen - Contract, Payments
21
Science Area Library - Foundation Investigation and Piling Reports 1974 - 1975
21
Science Area Library - Shelving and Movable Equipment, Corresp. 1974
21
Science Area Library - ABC Testing, Concrete Testing
21
Science Area Library - Furniture Purchases 1976
21
Science Area Library - Rejected Bids - 1975 General Contractor
21
Science Area Library - Rejected Bids - 1975 Mechanical
21
Science Area Library - Rejected Bids - 1975 Electrical
21
Science Area Library - General Correspondence 6/75 - 7/31/76
22
Science Area Library - Budget Science Area Library - Program
22
Science Area Library - Hardware Schedule Science Area Library - Plan Review Notes
22
Science Area Library - Inspection Reports - Physical Plant Science Area Library - General Correspondence 1/78
22
Science Area Library - HRL Diary Inspection Report 3/75 Science Area Library - General Correspondence 6/74 - 5/75
22
Science Area Library - Draft Environmental Impact Statement 1/23/74

BUILDING #811 LABORATORY ANIMAL RESOURCES CENTERReturn to Top

Container(s) Description
Box
22
Lab Animal Resource Facility, Phase I - Diary Inspection Report
22
Addition to Lab Animal - Diary Inspection Reports
22
Completion of Carnivore Wing, Lab Animal Facility - Diary Inspection Report
22
Central Lab Animal Completion - Diary Inspection Reports
22
Central Lab Animal Completion - Project Financial Recap
22
Central Lab Animal Resources - Gen. Corresp. Aug. 1967, 1970 - Dec. 1971
22
Lab Animal Resource Facility, Phase I - Gen. Corresp. 1/1/72
22
Lab Animal Facility Addition - Gen. Corresp. 1973
22
Completion of Lab Central Animal Lab Facility - Gen. Corresp. 3/75
22
Completion of Carnivore Wing, Central Lab Animal Facility - Gen. Corresp, 12/75
23
Addition to Central Lab Animal Resource - General Corresp.
23
Central Lab Animal Resources Building - Gen. Corresp.
23
Addition to Central Lab Animal Facility - Stevens Construction Co., Corresp. 1973
23
Lab Animal Resource Facility, Phase I - Vern W. Johnson and Sons Inc. - Contract, Payments, C.O.'s
23
Completion of Lab, Lab Animal Facility - Vern W. Johnson and Sons - Contract, Payments, C.O.'s
23
Lab Animal Resource Facility, Phase I - Vern W. Johnson and Sons Inc. - Corresp. 1971
23
Completion of Lab, Lab Animal Facility - Vern W. Johnson and Sons - Corresp.
23
Completion of Carnivore Wing, Central Lab Animal Facility - Lavernier-Shea Construction, Contract, Payments, C.O.'s
23
Lab Animal Resources Facility - Pittsburgh Testing Labs, Concrete Testing
23
Lab Animal Addition - Concrete Testing - Pittsburgh Testing Labs
23
Central Lab Animal Resources Building Exp. - (Testing Laboratory)
23
Lab Animal Resource Facility, Phase I - Redding Construction Co., Contract, Payments, C.O.'s
23
Lab Animal Resource Facility, Phase I - Redding Construction Co.- Corresp. 1971
23
Rejected Bids - Lab Animal Facilities - Precast Concrete Members
23
Rejected Bids - Lab Animal Resource Facility, Phase I
23
Rejected Bids - Completion of Lab, Central Animal Lab Facility
23
Rejected Bids - Site Grading and Utility Installation for future Lab Animal Resource Facility
23
Rejected Bids - Central Lab Animal Resources Building
23
Rejected Bids - Central Lab Animal Resources Expansion
23
Rejected Bids - Completion of Carnivore Wing, Central Lab Animal Facility 1976
23
Central Lab Animal Resources Expansion - Earl Russell, Contract, C.O.'s, Payments
23
Central Lab Animal Resources Expansion - Earl Russell - Corresp.
23
Central Lab Animal Addition - Stevens Construction - Affirmative Action Report
23
Central Lab Animal Resources Building - Budget
23
Lab Animal Facilities Addition - Budget
23
Completion of Lab, Central Lab Animal Facility - Budget
23
Completion of Carnivore Wing, Central Lab Animal Facility - Budget
23
Central Lab Animal Resources Completion - Budget
23
Central Lab Animal Resources - Budget File
23
Central Animal Resources Building - Affirmative Action Reports
23
Lab Animal Resource Facility, Phase I - Redding Construction Co.-Affirmative Action Reports
23
Building Program - Lab Animal Resource Facility, Aug. 24, 1970
23
Central Lab Animal Resources Building - Barnard and Holloway, Arch., Contract, Payments, C.O.'s
23
Addition to Central Lab Animal Facilities - Stevens Construction Co., Contract, Payments, C.O.'s
23
Lab Animal Facilities Addition - Barnard and Holloway, Contract, Payments, C.O. 's
23
Completion of Lab, Central Lab Animal Facility - Barnard and Holloway, Contract, Payments, C.O.'s 3/75
23
Completion of Carnivore Lab, Central Lab Animal Facility - Barnard and Holloway, Contract, Payments, C.O.'s 1975, 76
23
Completion of Central Lab Animal Resources Building - Barnard and Holloway, Contract, Payments, C.O.'s
23
Central Lab Animal Resources Building Expansion - Barnard and Holloway, Contract, Payments, C.O.'s
23
Lab Animal Resource Facility, Phase I - Barnard and Holloway - Inspection Reports, Construction, Conference Meetings 1971
23
Central Lab Animal Resources Building - Barnard and Holloway, Arch., Corresp. 6/1/70 - 12/71
23
Central Lab Animal Resources Building - Barnard and Holloway, Arch., Corresp. 1/172
23
Lab Animal Facilities Addition - Barnard and Holloway, Arch., Corresp. 1973
23
Completion of Lab, Central Lab Animal Facility - Barnard and Holloway, Corresp. 3/75
23
Completion of Carnivore Wing, Central Lab Animal Facility - Barnard and Holloway - Corresp. 1975,76
23
Central Lab Animal Resources Building - Barnard and Holloway - Gen. Corresp.
23
Central Lab Animal Resources Building Expansion - Barnard and Holloway - Corresp.
23
Lab Animal Resources Facility, Phase I, Central Premix Concrete Co., Contract, Payments, C.O.'s
23
Lab Animal Resources Facility, Phase I, Central Premix Concrete Co.- Corresp. 1971
23
Completion of Central Lab Animal Resources Building, Contract, Payments, C.O. 's
23
Central Lab Animal Resources Completion - C and S Builders, Inc. Corresp.

BUILDING #812 COMPUTER SCIENCE BUILDINGReturn to Top

Container(s) Description
Box
23
Computer Science Energy Study
23
Computer Science Trane Air Conditioning Economics
23
Clarence D. Martin Stadium and Academic Center, Phase II - Trogdon-Smith-Grossman, Corresp. 1974 - 1976
23
Clarence D. Martin Stadium and Academic Center (Computing Center) Trogdon-Smith-Grossman, Corresp. 1/77 - 12/77
23
Computing Center (Clarence D. Martin Stadium and Academic Center), II, Trogdon-Smith Grossman, Corresp 1/78 - 10/78
23
Computing Center (Martin Stadium) - Trogdon, Smith, Grossman, Corresp. 11/78 - 10/31/80
23
Computing Center (Martin Stadium) - Trogdon, Smith, Grossman, Corresp. 11/1/1980
24
Computer Science - Math Building - Office Space Problems - Fall 1979
24
Clarence D. Martin Stadium and Academic Center (Computer Science) Pittsburgh Testing
24
Computing Center - Richal Smith - General Correspondence
24
Computer Science Building - Rejected Bids - Electrical 7/7/77
24
Computer Science Building - Rejected Bids - General
24
Computer Science Building - Rejected Bids - Mechanical 7/7/77
24
Stadium and Academic Center - Phase II - Budget
24
Computer Sciences - Math Building, Phase I, Martin Stadium/Academic Center, Phase II - Coord. Meetings
24
Martin Stadium/Academic Center, Phase II, Computing Center -
24
Environmental Impact Statement - Corresp. 1976
24
Clarence D. Martin Stadium and Academic Center, Phase II - Gen. Corresp. 10/74 - 9/76
24
Clarence D. Martin Stadium and Academic Center, Phase II - Gen. Corresp. 9/77 - 10/76
24
Martin Stadium Expansion - General Correspondence 3/79
24
Clarence D. Martin Stadium and Academic Center (Computer Science) - Gen. Corresp. 10/77 - 10/78
24
Clarence D. Martin Stadium and Academic Center (Computer Science) - Gen. Corresp. 11/1/78 - 12/79
24
Computer Sciences - Math Building - General Corresp. 1/80 - 12/31/80
24
Computer Sciences - Math Building - General Corresp. 1/81
24
Clarence D. Martin Stadium and Academic Center, Phase II - Trogdon-Smith-Grossman, Contract, C.O.'s, Payments
25
Computer Sciences - Math Building - Artwork, Correspondence
25
Computer Sciences Building - Trance Air-Conditioning Economics (2 each)
25
Computer Sciences - Math Building - Diary Inspection Reports 1977 - 1978
25
Computer Sciences - Math Building - Diary Inspection Reports 1979
25
Computer Sciences - Math Building - EIS Open Hearing Comments - 9/23/76
25
Computer Sciences - Math Building - Energy Study and Life Cycle Cost Analysis
25
Computer Sciences - Math Building - Foundation Soils Evaluation (2 each)
25
Computer Sciences Building - Furnishings
25
Computer Sciences - Math Building - James Lee Hansen, Sculptor, Contract, C.O.'s Payments
25
Computer Sciences - Math Building - Phase I (Artist) James Lee Hansen, Gen. Corresp.
25
Computer Sciences - Math Building - Vern W. Johnson and Sons, Affirmative Action Forms
25
Computer Sciences - Math Building - Phase I - Vern W. Johnson and Sons Inc., Contracts, C.O.'s, Payments 6/77 - 2/79
25
Computer Sciences - Math Building - Phase I - Vern W. Johnson and Sons Inc., Contracts, C.O.'s, Payments 3/79 - 1/80
25
Computer Sciences - Math Building - Phase I - Vern W. Johnson and Sons - Corresp. 1977
25
Computer Sciences - Key Schedule
25
Computer Sciences - Math Building - Bid Summary, Landscape Development
25
Computer Sciences - Math Building - Landscaping
25
Computer Sciences - Landscape Development, Nelson Landscape Service Inc., Contract, C.O.'s, Payments

BUILDING #812A MARTIN STADIUM - SOUTH STANDReturn to Top

Container(s) Description
Box
25
Rogers Field - South Stands, Foundation Investigation - Nov. 10, 1971

BUILDING #812C MARTIN STADIUM - NORTH STANDReturn to Top

Container(s) Description
Box
25
Martin Stadium, North Stands Replacement - Financial Statement
25
Martin Stadium, North Stands Replacement - Gus J. Bouten Construction Co., Affirmative Action Reports
25
Martln Stadium/Academic Center - North Stands - Gus J. Bouten Construction Contracts, Payments, etc.
25
Martin Stadium/Academic Center - North Stands - Gus J. Bouten Construction Co. - Gen. Corresp. 1974
25
North Stands Replacement - Martin Stadium - Environmental Impact Statement
25
North Stands Replacement - Clarence D. Martin Stadium and Academic Center - Gen. Corresp. 1974,75,76
25
Martin Stadium/Academic Center - North Stands Replacement - NBBJ, Contracts, Est., etc.
25
North Stands Replacement - Clarence D. Martin Stadium and Academic Center - NBBJ, Gen. Corresp., 1974
25
North Stands Replacement - Clarence D. Martin Stadium and Academic Center - NBBJ, Gen. Corresp., 1975
25
North Stands Replacement - Clarence D. Martin Stadium and Academic Center - NBBJ, Gen. Corresp., 1/76
25
Stadium North Stands - Pittsburgh Testing Laboratory, Concrete Testing, Inspection of Structure Steel 74-75
25
Stadium - Rejected Bids - General Construction
25
Academic Stadium Facility, Phase I - Rejected Bids - Piling Work
25
Stadium Seating - Rejected Bids
25
Clarence D. Martin Stadium North Stand Replacement - Rejected Bids
25
Martin Stadium - North Stands - Foundation Investigation - NBBJ - June 1974

BUILDING #812S MARTIN STADIUMReturn to Top

Container(s) Description
Box
26
Stadium - Budget
26
Stadium/Academic - Concrete Testing, Pittsburgh Testing Lab
26
Stadium Phase I - Cost Information
26
Martin Stadium - From Ken Abbey's Files
26
Stadium/Academic - C and S Builders, Inc. Affirmative Action Reports 1972
26
Stadium Seating - C and S Builders, Inc., Contract, C.O.'s, Payments 1972
26
Stadium/Academic - C and S Builders, Inc. Correspondence 1972
26
Stadium/Academic - Diary Inspection Reports 1972
26
Martin Stadium and Academic Center CTR - Diary Inspection Reports
26
Stadium - General Correspondence - 1/1/72 - 6/72
26
Stadium - General Correspondence - 1970, 1971 - 12/71
26
Stadium - General Correspondence - 7/72
26
Stadium Expansion Feasibility Study - General Correspondence 1974
26
Stadium/Academic - Halverson-Berg, Affirmative Action Reports 1/1/72
26
Stadium/Academic - Halverson-Berg, Contract, C.O.'s, Est. 1/1/72
26
Stadium/Academic - Halverson-Berg, Correspondence 1/1/72
26
Stadium/Academic - Hardware Schedule
26
Stadium Expansion Feasibility Study - NBBJ, Contract, Payments
26
Stadium - NBBJ, Contract, C.O.'s, Payments
26
Stadium/Academic - NBBJ, Report of Site Visit and Const. Conf. Meetings 1/1/1972
26
Martin Stadium Expansion - EIS
26
Stadium Expansion Feasibility Study - NBBJ, Correspondence 1974
26
Stadium - NBBJ, Correspondence 1970 - 12/71
26
Stadium - NBBJ, Correspondence 1/1/72 - 6/72
26
Stadium - NBBJ, General Correspondence 7/72
26
Stadium/Academic - Piling Construction, Upper Columbia Construction Co., Corresp.
26
Stadium - Pile Load - Settlement Test, Upper Columbia Construction Co.
26
Stadium - Pittsburgh Testing Lab, Structural Steel Fab. Inspection
26
Stadium - Phase I - Review
26
Stadium - Phase I - Seating
26
Stadium/Academic - Steering Committee, General Information
26
Stadium/Academic - Upper Columbia R. Construction Co., Contract, Payments, C.O.'s
26
Track and Field Relocation - Bovay Engineers - General Correspondence
26
Martin Stadium Expansion - Budget
26
Track and Baseball Field - Diary Inspection Reports
26
Track and Field - From Ken Abbey's Files
26
Track and Field Relocation - Munir Daud, Correspondence
26
Track and Field Facility Relocation - Vern W. Johnson and Sons,
26
General Correspondence
26
Track and Field Relocation - Budget
26
Martin Stadium Expansion and Track and Field Relocation - Building Program, Sept. 1978
26
Specifications for Sprinkler System - Athletic Track Installation 1979
26
Track and Field Relocation - EIS
26
Martin Stadium Track and Field Relocation - Building Program,
26
Martin Stadium Expansion, Track and Field - Bovay Engineers Inc. Gen. Corresp.
27
Martin Stadium Expansion - Diary Inspection Reports
27
Martin Stadium Expansion - Cougar Club Foundation, Corresp.
27
Martin Stadium Expansion - NBBJ, AIA, Contract, C.O.'s, Payments
27
Martin Stadium Expansion - Bovay Engineers, Contract, C.O.'s, Payments
27
Martin Stadium Expansion - Munir Daud, Contract, Payments
27
Martin Stadium Improvements - Pittsburgh Testing
27
Martin Stadium Expansion - NBBJ Correspondence
27
Martin Stadium V.W. Johnson, General Correspondence
27
Martin stadium Expansion - General Correspondence 3/78 - 2/79
27
Martin Stadium Expansion - Earl Nelson Corp. - General Correspondence
27
Track and Field Relocation - General Correspondence 10/10/78 - 12/31/79
27
Track and Field Relocation - General Correspondence 1/1/80
27
Track and Field Relocation - Munir Daud, Contract, Payments
27
Track and Field Relocation - NBBJ, General Correspondence
27
Track and Field Relocation - NBBJ, Contract, C.O.'s, Payments
27
Track and Field Relocation - Originals of Comments on Draft EIS
27
Martin stadium Expansion and Track and Field Stadium - Project Concept and Organization - 10/16/78
27
Track and Field Facility Relocation - Comparison of Six Potential Sites 10/11/1978
27
Track and Field Facility Relocation - Environmental Assessment 9/78
27
Track and Field Facility Relocation - Final EIS
27
Track and Field Facility Relocation - Draft EIS

BUILDING #813 CHILLED WATER PLANTReturn to Top

Container(s) Description
Box
28
Final Environmental Impact Statement

BUILDING #814 EXPERIMENTAL ANIMAL LABORATORYReturn to Top

Container(s) Description
Box
27
Experimental Animal Laboratory - Budget
27
Experimental Animal Laboratory - ABC Labs, Concrete Testing 1976
27
Experimental Animal Laboratory - Artwork, Correspondence
27
Experimental Animal Laboratory - Correspondence 1974, 75, 76 - 12/31/76
27
Experimental Animal Laboratory - Foundation Engineering 12/3/75
27
Experimental Animal Laboratory - General Correspondence 1/1/77
27
Experimental Animal Laboratory - Diary Inspection Reports
27
Experimental Animal Laboratory - EIS
28
Experimental Animal Lab - Draft EIS 1975
28
Experimental Animal Lab - Draft EIS 1976
28
Experimental Animal Lab - Kirk, Wallace McKinley, Contract, C.O.'s, Est.
28
Experimental Animal Lab - Kirk, Wallace McKinley, Corresp. 6/75 - 7/31/1976
28
Experimental Animal Lab - Kirk, Wallace McKinley, Corresp. 8/76 - 12/77
28
Experimental Animal Lab - Kirk, Wallace McKinley, Corresp. 1/78
28
Experimental Animal Lab - Max J. Kuney Co., Affirmative Action Reports
28
Experimental Animal Lab - Max J. Kuney Co., Contract, C.O.'s, Payments 1976
28
Experimental Animal Lab - Max J. Kuney Co., Correspondence 1976
28
Experimental Animal Lab - Program 6/2/75
28
Experimental Animal Lab - Scientific Systems Corp., Instrument Manual for Animal Test Chamber 1978
28
Experimental Animal Lab - Rejected Bids - 5/25/76
28
Experimental Animal Lab - Rejected Bids - Electrical 5/76
28
Experimental Animal Lab - Rejected Bids - Mechanical 5/76
28
Experimental Animal Lab - Larry Tate, Sculptor Contract, C.O.'s, Payments 76-77
28
Additional Environmental Rooms for Experimental Animal Lab - Gen. Corresp. 7/77
28
Additional Environmental Rooms for Experimental Animal Lab - Rejected Bids 6/30/77
28
Additional Environmental Rooms for Experimental Animal Lab - M.J. Kuney Contract, Payments, Etc.
28
Additional Environmental Rooms for Experimental Animal Lab - M. J. Kuney Corresp. 7/77

BUILDING #9031 CREW SHELLHOUSE WAWAWAIReturn to Top

Container(s) Description
Box
28
Shellhouse - General Correspondence
28
Shellhouse - Budget
28
Crew Shellhouse - EIS
28
Crew Shellhouse - Diary Reports
28
A Crew Shellhouse - Wind River Construction, Corresp.
28
Launch Boathouse and Docks - General Correspondence 9/3/84
28
A Crew Shellhouse - Wind River Construction, Contract, Payments, C.O.'s
28
Shellhouse - Campbell Engineers, Inc., Correspondence
28
Shellhouse - Campbell Engineers, Inc., Contract, Payments, etc.
28
A Crew Shellhouse - Concrete Testing
28
A Crew Shellhouse - Affirmative Action Reports
28
A Crew Shellhouse - Rejected Bids
28
Launch Boathouse - Rejected Bids

LOCATION #3000 TFRC WENATCHEEReturn to Top

Container(s) Description
Box
28
USDA Addition to Tree Fruit Research Center - Budget
28
Structural Calculations by Joseph F. Jackson, PE For USDA/NWS Facility 8/12/1976
28
Mechanical Calculations - USDA/NWS Facility 8/12/76
28
USDA/NWS Facility - Wenatchee - Keying Schedule
28
USDA/NWS Facility - Wenatchee - Pittsburgh Testing Labs, Concrete Testing 1976, 1977
28
USDA/NWS Facility - Wenatchee - General Correspondence 1/77
28
Lease Facility - Wenatchee - Dept. of Housing and Urban Development - Application
28
USDA/NWS Facility - Wenatchee - Fraley and Leighton Corresp. 1/1/77
28
GSA Lease Facility - Wenatchee - Fraley and eight on Contract
29
TFRC - 70-219A, Fraley, Leighton, Architects
29
TFRC - 70-217, Correspondence
29
USDA/NWS Facility - Wenatchee, Del Guzzi Inv. Inc., Corresp. 10/76
29
USDA/NWS Facility - Wenatchee, Del Guzzi Inv. Inc., Contract, Payments, C.O.'s 10/76
29
USDA/NWS Facility - Wenatchee, Del Guzzi Inv. Inc., Affirmative Action Reports
29
USDA/NWS - Wenatchee, Rejected Bids, Electrical 9/30/76
29
USDA/NWS - Wenatchee, Rejected Bids, Mechanical 9/30/76
29
USDA/NWS - Wenatchee, Rejected Bids, General 10/76
29
USDA Addition to Tree Fruit Research Center - Fraley and Leighton, Corresp. 11/70 - 6/76
29
USDA National Weather SVC Facility - Fraley and Leighton, Corresp 7/1/76 - 12/31/1976
29
USDA National Weather SVC Facility - General Correspondence 7/1/76 - 12/31/1976
29
GSA Lease Facility - Wenatchee, General Correspondence 4/67 - 6/30/76
29
LOCATION #4000 - MT. VERNON
29
Lab and Storage Building - Budget
29
Laboratory Building - Bustad, Inc. Contract, C.O.'s, Payments
29
Laboratory Building - Bustad, Inc., Correspondence
29
Lab and Storage Building - General Correspondence
29
Lab and Storage Building - Henry Klein and Assoc., Architects, Contract and C.O. 's
29
Lab and Storage Building - Henry Klein and Assoc., Architects, Corresp.
29
Miscellaneous Storage Buildings - Rejected Bids
29
Lab Building - Rejected Bids
29
Machinery Storage Building - Rejected Bids

LOCATION #9200 CAMP ROGER LARSONReturn to Top

Container(s) Description
Box
29
Material Lists and Cost Estimate - Camp Manatowish

WSU MISC. FACILITIES PLANNING FILESReturn to Top

Container(s) Description
Box
29
Student Housing Enrollment Projections through 1980 - Final EIS
29
1977 Turnkey Student Housing Site Analysis
29
1977 Turnkey Student Housing Project - EIS
29
1977 Turnkey - Olson-Richert-Bignold Contract, Payments, C.O.'s
29
1977 Turnkey - General Correspondence
29
1977 Turnkey - Olson-Richert-Bignold Correspondence
29
1975 Turnkey - Budget
29
Long Range Landscape Plan - 1963
29
Long Range Landscape Plan - L. Keith Hellstrom, Landscape Architect, Corresp.
29
Long Range Landscape Plan - L. Keith Hellstrom, Landscape Architect, Contract, C.O.'s
29
Terreview Mobile Home Park - Draft Environmental Impact Statement - 4/4/1977
29
Stadium Way Widening - Budget
29
Stadium Way Overpass - General Correspondence 1962-66
29
Stadium Way Widening - General Correspondence, Topics Program
29
Stadium Way Widening - Topics - Ken Brooks, Architect, Corresp. 1971
29
Misc. Off-Campus Projects - EIS 8/21/74 - 10/1/79
29
Shopping Center - EIS Draft 3/78
29
Pullman Parks and Recreation EIS
29
Proposed Purchase of Fort Wright, Spokane 1982
29
Negative Declarations - Non Department Projects
29
Water Supply Plan Update - Final Declaration of Non-Significance
29
Comprehensive Water Supply Plan - Draft EIS 1973
29
Water System Improvements, Prosser, Washington, Environmental Impact Assessment
29
Residence Hall Study for conversion to Academic and Student Support Space 1984
29
Stevens Hall History
29
Waller Hall Fact Sheet 9/20/84
29
Residence Hall Conversion, a proposal to the Ad Hoc Committee 9/20/84
29
Environmental Impact Statements and Correspondence - 1973 - 1982
29
1971 - 1973 Major Capital Improvement Program, 1971-73 Minor
29
Capital Budget 1973 - 1975
29
Capital Budget Worksheets 1975 - 1977
29
Family Student Housing Replacement - Olson, Richert, Bignold - Contract, Payments 4/26/82
29
Family Student Housing Replacement - Olson, Richert, Bignold - Gen. Corresp.

Names and SubjectsReturn to Top