- BUILDING #11 BOHLER GYMNASIUM
- BUILDING #14 WHITE HALL
- BUILDING #15/17 MEMORIAL HOSPITAL/STUDENT HEALTH
- BUILDING #16 CHEMICAL ENGINEERING BUILDING
- BUILDING #23 MECHANICAL ENGINEERING LABORATORY
- BUILDING #40 WILSON HALL
- BUILDING #45 WAGNER HALL
- BUILDING #63 COMPTON UNION BUILDING
- BUILDING #64 STUDENT BOOKSTORE
- BUILDING #65A REGENTS DINING HALL
- BUILDING #67 JEWETT OBSERVATORY
- BUILDING #74 NUCLEAR RADIATION CENTER
- BUILDING #76 JOHNSON HALL
- BUILDING #78A ELECTRICAL MECHANICAL ENGINEERING
- BUILDING #82 HEALD HALL
- BUILDING #82A EASTLICK HALL
- BUILDING #92 FRENCH AD
- BUILDING #93C STEPHENSON DINING HALL
- BUILDING #96 PHYSICAL EDUCATION BUILDING
- BUILDING #114 PLANT SCIENCES GREENHOUSE
- BUILDING #169 VETERINARY ANIMAL HOLDING BARN
- BUILDING # 199A VETERINARY QUARANTINE FACILITY A
- BUILDING #199G VETERINARY ISOLATION BARN
- BUILDING #358A/358B/358C RECEIVING AND DELIVERY/GENERAL STORAGE BUILDING AND CHEMICAL STORES BUILDING
- BUILDING #372 BAILEY FIELD
- BUILDING #380 HOUSING AND FOOD SERVICE STORAGE BUILDING
- BUILDING #402K PROPOSED DAIRY PLANT SILO BARN
- BUILDING #404D BEEF CATTLE CENTER FEED STORAGE
- BUILDING #405 SWINE CENTER
- BUILDING #410 NORTH/SOUTH SKI BOWL
- BUILDING #677 NEZ PERCE VILLAGE
- BUILDING # 678 COLUMBIA VILLAGE
- BUILDING #679 CHINOOK VILLAGE
- BUILDING #801 PHYSICAL SCIENCES BUILDING
- BUILDING #806 BEASLEY COLISEUM
- BUILDING #807 BUSTAD HALL
- BUILDING #809 AVERY HALL
- BUILDING #810 OWEN SCIENCE AND ENGINEERING LIBRARY
- BUILDING #811 LABORATORY ANIMAL RESOURCES CENTER
- BUILDING #812 COMPUTER SCIENCE BUILDING
- BUILDING #812A MARTIN STADIUM - SOUTH STAND
- BUILDING #812C MARTIN STADIUM - NORTH STAND
- BUILDING #812S MARTIN STADIUM
- BUILDING #813 CHILLED WATER PLANT
- BUILDING #814 EXPERIMENTAL ANIMAL LABORATORY
- BUILDING #9031 CREW SHELLHOUSE WAWAWAI
- LOCATION #3000 TFRC WENATCHEE
- LOCATION #9200 CAMP ROGER LARSON
- WSU MISC. FACILITIES PLANNING FILES
- Names and Subjects
Preliminary Guide to the Washington State University Facilities Planning Building Files, 1965-1985
Overview of the Collection
- Creator
- Washington State University. Facilities Planning
- Title
- Preliminary Guide to the Washington State University Facilities Planning Building Files
- Dates
- 1965-1985 (inclusive)19651985
- Quantity
- 29 Linear feet of shelf space, (29 Boxes)
- Collection Number
- UA1990-23 (collection)
- Summary
- Aministrative and financial reports, general correspondence, contracts, and various other construction files related to remodeling and construction of several buildings on the WSU campuses and property from 1965-1985.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content DescriptionReturn to Top
Primarily consists of correspondence, administrative and financial reports, and various construction related documents such as contracts and specification reports related to several building projects on WSU campuses and propoerty. Files range from 1965-1985.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Planning Building Files, 1965-1985 (UA1990-23)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
All boxes are clearly labeled with the buildings they contain. Boxes 1-10 contain files related to buildings 11-199G. Boxes 11-20 contains files related to buildings 158-807. Boxes 21-29 contains files related to buildings 810-3000.
Detailed Description of the CollectionReturn to Top
BUILDING #11 BOHLER GYMNASIUMReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Remodel of Bohler Gym shower and toilet
rooms - Budget |
BUILDING #14 WHITE HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Building Program for White Hall (July
1970) 2 each |
BUILDING #15/17 MEMORIAL HOSPITAL/STUDENT HEALTHReturn to Top
Container(s) | Description |
---|---|
Box | |
1 | Hospital Budget |
1 | Memorial Hospital - Environmental Impact
Statement |
1 | Program Statement - Student Health Service
Clinic - July 1965 |
1 | Environmental Assessment of the Proposed
Remodeling and Expansion of Memorial Hosp. |
1 | Student Health/Memorial Hosp. - Gilbert
Moen Contractor General Correspondence |
1 | Student Health Service - DeNeff, Deeble,
Barton Contract, C.O.'s payments-1977. |
1 | Memorial Hosp/Student Health - Gilbert
Moen, Co. Contractor contract, payments COs |
1 | Student Health/Memorial Hosp. - Landscape
Correspondence |
1 | Student Health - Richal Smith General
correspondence |
1 | Student Health Services - Affirm. action
reports, Gilbert Moen, Co. |
1 | Memorial Hosp/Student Health - Bid
Summaries - Genera1/Mech/Elect |
1 | Student Health/Memorial Hosp. - Masters of
C.O. Form, Partial Pymt's, etc. |
1 | Memorial Hosp./Student Health - Gilbert H.
Moen Co., Contract, C.O.'s, payments |
1 | Student Health Services - Diary Inspection
reports |
1 | Memorial Hosp./Student Health - Gilbert H.
Moen Co., Payments, C.O. |
1 | Memorial Hosp./Student Health - Gilbert H.
Moen Co., contract, C.O.'s, payments |
1 | Student Health Center - Keying
schedule |
1 | A.B.C. Laboratories - Student Health
Center - Memorial Hospital |
1 | Budget - Student Health
Services |
1 | Student Health Services 4/1/81, DeNeff,
Deeble, Barton General Correspondence |
1 | Student Health Services DeNeff, Deeble,
Barton General Correspondence, 1/80-3/81 |
1 | Student Health Services DeNeff, Deeble,
Barton Correspondence, 1977-1979 |
1 | Student Health Services General
Correspondence 3/81 |
1 | Hospital - General Correspondence 1972,
1973 |
1 | Student Health Service - General
Correspondence 1977-1979 |
2 | Student Health Service - General
Correspondence 1979-1981 |
BUILDING #16 CHEMICAL ENGINEERING BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Former Chemical Engineering Bldg. -
Affirmative Action Reports |
2 | Chemical Engineering Bldg. Renovation -
Budget |
2 | Former Chemical Engineering Bldg.
Renovation - Commercial Builders, Contracts, COs |
2 | Former Chemical Engineering Bldg. -
Commercial Builders, General Correspondence |
2 | Former Chemical Engineering Bldg. -
Commercial Builders, General Correspondence |
2 | Former Chemical Engineering Bldg. -
Commercial Builders, General Correspondence |
2 | Chemical Engineering Remodel - Diary
Reports |
2 | Chemical Engineering Bldg. Renovation -
Project Financial Recap. |
2 | Former Chemical Engineering Bldg. -
General Correspondence, 2/63-6/81 |
2 | Former Chemical Engineering Bldg. -
General Correspondence, 7/81 |
2 | Former Chemical Engineering Bldg. - Ressa
and Company Contract, Change Orders, Payments |
2 | Former Chemical Engineering Bldg. - Ressa
and Company, General Correspondence 8/80-7/81 |
2 | Former Chemical Engineering Bldg. -
Ressa/Zeck Architect, General Correspondence, 8/81 |
2 | Former Chemical Engineering Bldg. - Smith
and Swenson, General Correspondence |
BUILDING #23 MECHANICAL ENGINEERING LABORATORYReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Mechanical Engineering Building Renovation
Program 2/81 |
BUILDING #40 WILSON HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Program for Remodeling of Wilson Hall -
January 22, 1971 |
BUILDING #45 WAGNER HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
2 | Remodeling and Addition - September 1977
(original typing) |
2 | Budget - Wegner Hall Addition and
Remodeling |
2 | Minutes of Meetings - Wegner Hall, Design
Phase |
2 | Wegner Hall Remodel and Addition -
Contract, Payments, Change Orders, Halvorson/Berg |
2 | Wegner Hall - Grant
Application |
2 | Wegner Hall Remodeling and Addition - TRA
Contract, Payments, COs |
2 | Wegner Hall Remodeling and Addition -
Minutes Meeting |
2 | Wegner Hall Remodeling - Environmental
Impact Statement |
2 | Wegner Hall Remodeling and Addition -
General Correspondence 1/83 |
2 | Wegner Hall Remodeling and Addition -
Diary Reports 8/81 |
2 | Wegner Hall Remodeling and Addition -
Halvorson/Berg Correspondence 4/82 |
2 | Wegner Hall Remodeling and Addition - TRA
Correspondence 1/82 |
2 | Wegner Hall Addition and Remodeling -
Munir Daud and Assoc. Contract, COs Payment 1977 |
2 | Wegner Hall Landscaping - Minatani
Landscaping - Correspondence |
2 | Wegner Hall Artwork - Contract,
Payments |
2 | Wegner Hall Remodeling and Addition, McCoy
Hall Remodeling and Animal Shelter and Isolation Bldgs - Environmental
Quality Study June 1977 (2 each) |
2 | Wegner Hall Renovation/Addition -
Mechanical HVAC System Life Cycle Cost Analysis |
2 | Wegner Hall Renovation/Addition - Envelope
Life Cycle Cost Analysis |
3 | Wegner Hall Landscaping, EIS |
3 | Wegner Hall Remodeling and Addition -
Landscape Correspondence |
3 | Wegner Hall Remodeling and Addition -
Artwork Selection |
3 | Wegner Hall - Landscaping, ABC
Laboratories - Testing |
3 | Wegner Hall Remodeling and Addition -
Wyatt Engineering (Concrete Tests) |
3 | Wegner Hall - Landscaping - Burke/Lee
Associates |
3 | Wegner Remodeling and Addition - Richal
Smith - General Correspondence |
3 | Wegner Hall Remodeling - Keying
Schedule |
3 | Wegner Hall Remodeling and Addition -
Affirmative Action Reports |
3 | Wegner Landscaping - Rejected
Bids |
3 | Wegner Hall Remodeling and Addition -
Rejected Bids - General |
3 | Wegner Hall Remodeling and Addition -
Rejected Bids - Mechanical |
3 | Wegner Hall Remodeling and Addition -
Rejected Bids - Electrical |
3 | Wegner Hall Remodeling and Addition -
Casework - Rejected Bids |
3 | Wegner Hall Remodeling and Addition -
September 1977 |
3 | Wegner Hall Remodeling and Addition -
Halverson/Berg Corresp. 8/80 - 3/88 |
3 | Wegner Hall Remodeling and Addition -
Halverson/Berg Corresp. 1/80 - 7/80 |
3 | Wegner Hall Log |
3 | Wegner Hall Remodel - Grant Funds from Ken
Abbey's Files - 11/77 - 4/84 |
3 | Wegner Hall Addition and Remodeling -
General Corresp. Jan. 77 - Dec. 77 |
3 | Wegner Hall Addition and Remodeling -
General Corresp. 1/78 - 2/28/79 |
3 | Wegner Hall Remodeling and Addition -
General Corresp. 7/79 - 12/79 |
3 | Wegner Hall, Et.al, Environmental Quality
Study (Originals) |
3 | Wegner Hall Remodeling and Addition -
General Correspondence 1/80 - 4/80 |
3 | Wegner Hall Remodeling and Addition -
Richardson Assoc. Corresp. 5/80-8/80 |
4 | Wegner Hall Remodeling and Addition -
General Corresp. 5/1/80 - 7/31/80 |
4 | Wegner Hall Remodeling and Addition - TRA
Corresp. 10/1/81 - 12/31/81 |
4 | Wegner Hall Remodeling - DHEW
Correspondence |
4 | Wegner Hall - Misc. Corresp. From Ken
Abbey's Files 10/26/74 - 10/15/79 |
4 | Wegner Hall Remodeling and Addition -
Diary Reports |
4 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 3/79 - 6/30/79 |
4 | Wegner Hall Remodeling and Addition -
Halvorson/Berg Contract C.O.'s, Payments #1 |
4 | Wegner Hall Remodeling and Addition -
Halvorson/Berg Contract C.O.'s, Payments #2 |
4 | Wegner Hall Remodeling and Addition -
Halvorson/Berg Contract C.O.'s, Payments #3 |
4 | Wegner Hall Addition and Remodeling -
Richardson Assoc. Contract, C.O.'s, Payments 1977 |
4 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 4/1/81 - 6/30/81 |
4 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 8/1/80 - 10/31/80 |
4 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 11/1/80 - 3/31/81 |
5 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 7/1/81 - 11/30/81 |
5 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 12/1/81 - 4/30/82 |
5 | Wegner Hall Remodeling and Addition - Gen.
Corresp. 5/1/82 - 12/31/82 |
5 | Wegner Hall Remodeling and Addition -
Richardson Assoc, Gen. Corresp. 7/79 - 10/31/79 |
5 | Wegner Hall - Richardson Assoc., Gen.
Corresp. 1/79 - 6/30/79 |
5 | Wegner Hall Addition and Remodeling -
Richardson Assoc. Corresp. 6/77 - 12/78 |
5 | Wegner Hall Remodeling and Addition -
Richardson Assoc. Corresp. 3/1/80 - 4/30/1980 |
5 | Wegner Hall Remodeling and Addition -
Richardson Assoc. Corresp. 11/79 - 2/29/1980 |
5 | Wegner Hall Remodeling and Addition - TRA
3/81 - 9/30/81 |
5 | Wegner Hall Remodeling and Addition -
Richardson Assoc. Corresp. 10/1/80 - 2/28/1981 |
BUILDING #63 COMPTON UNION BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
5 | Budget - Remodel Room 107 CUB for
Delicatessen |
5 | Remodeling of Room 107 CUB for a
Delicatessen - C and S Builders Contract. Est and C.O.'s |
5 | Remodeling of Room 107 CUB for a
Delicatessen - C and S Builders Inc., Corresp. |
5 | CUB Deli - Diary - Inspection
Report |
5 | Compton Union Building - Douglas Durkoop
cont., Payments, etc. |
5 | Douglas C. Durkoop - Remodel Room 107,
Wilson Compton Union Contracts, Est. C.O.'s |
5 | Remodeling for Physically Handicapped -
Douglas C. Durkoop, Architect corresp. 8/74 |
5 | Douglas C. Durkoop - Remodel Room 107,
Wilson Compton Union - Gen. Corresp. |
5 | Remodel Room 107 Wilson Compton Union -
Gen Corresp. |
5 | Rejected Bids - CUB, Room 107 Remodel for
Delicatessen 10/76 |
BUILDING #64 STUDENT BOOKSTOREReturn to Top
Container(s) | Description |
---|---|
Box | |
5 | Addition to the Student Bookstore (2
Each) |
5 | Building Program - Addition Student Book
Corporation (3 each) |
5 | Bookstore Addition - Budget |
5 | Student Bookstore Fixtures - Custom Craft
Fixtures, Inc., Contract, C.O.'s, Payments |
5 | Student Bookstore Fixtures - Custom Craft
Fixtures, Inc. - Corresp. 1979 |
6 | Bookstore Addition - General
Correspondence - 7/79 |
6 | Addition to Student Bookstore -
Lavernier-Shea Construction Co., Affirmative Action Reports |
6 | Student Bookstore - Lavernier-Shea
Construction Co., Payments, C.O.'s and Contract |
6 | Student Bookstore - Lavernier-Shea
Construction Co., Payments, C.O.'s and Payments |
6 | Student Bookstore - Lavernier-Shea
Construction Co., Gen. Corresp. |
6 | Student Bookstore Addition - Munir Daud
contract |
6 | Addition to the Student Bookstore -
Pittsburgh Testing |
6 | Addition to the Student Bookstore -
Rejected Bids - Electrical |
6 | Addition to the Student Bookstore -
Bookstore Fixtures and Equipment, Rejected Bids |
6 | Addition to the Student Bookstore -
Rejected Bids - General Construction |
6 | Addition to the Student Bookstore -
Rejected Bids - Mechanical |
6 | Bookstore Addition - Richal Smith -
General Correspondence |
6 | Bookstore Addition - Trogdon, Smith,
Grossman, Contract, C.O.'s, Payments |
6 | Bookstore Addition - Trogdon, Smith,
Grossman, Corresp. 1978 - 6/30/79 |
6 | Bookstore Addition - Trogdon, Smith,
Grossman, Gen. Corresp. 7/79 |
6 | Student Bookstore Addition - Diary -
Inspection Reports |
6 | Student Bookstore Addition - Environmental
Assessment - Munir Daud and Assoc. |
6 | Environmental Assessment of the Proposed
Addition to the Student Bookstore, August 1978 (2 each) |
6 | Explorations and Geotechnical Engineering
Studies - WSU Bookstore Addition, January 19, 1979 |
6 | Bookstore Addition - General
Correspondence |
BUILDING #65A REGENTS DINING HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
6 | Regents, Stearns Dining Hall - Tan,
Brookie, Kundig, AIA contract, Change Orders, Payments |
6 | Regents Dining Hall Remodel -
Lavernier-Shea Construction, contracts, C.O.'s, Estimates |
6 | Regents Hill - Stearns Dining Hall -
Budget |
6 | Regents Dining Hall Remodeling - Project
Financial Recap |
6 | Regents Dining Hall Remodeling - Diary
Inspection Reports |
6 | Regents Hill Dining Hall - General
Correspondence |
6 | Regents Dining Hall Remodeling -
Lavernier-Shea Construction, Inc. Corresp. 7/79 |
6 | Regents Dining Hall - Tan, Brookie, Kundig
Correspondence 1/80 |
6 | Regents Dining Hall Remodeling -
Affirmative Action Reports |
6 | Regents Dining Remodel - Pittsburgh
Testing |
6 | Regents Dining Hall - Richal Smith,
General Correspondence |
6 | Rejected Bids - Regents Dining Hall -
Mechanical |
6 | Rejected Bids - Regents Dining Hall -
Electrical |
6 | Regents Dining Hall Remodeling - Rejected
Bids - General Construction |
6 | Regents-Stearns Dining Hall - Tan,
Brookie, Kundig, AIA Gen. corresp. 7/78 - 12/31/79 |
BUILDING #67 JEWETT OBSERVATORYReturn to Top
Container(s) | Description |
---|---|
Box | |
6 | Jewett Observatory Photos |
BUILDING #74 NUCLEAR RADIATION CENTERReturn to Top
Container(s) | Description |
---|---|
Box | |
7 | Dense Concrete |
BUILDING #76 JOHNSON HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
7 | Architecture, I.D.L.A.- Adkinson, Leigh,
Sims, Cuppage Corresp. |
7 | Architecture, I.D., Landscape
Architecture, Adkinson, Leigh, Sims, Cuppage - Contract |
7 | Architecture, Landscape Architecture and
Interior Design Facility 1970 - 1979 |
7 | Architecture, Landscape Architecture and
Interior Design Facility 1980 |
7 | Architecture Interior Design, L.A.
Facility - Budget |
7 | Architecture Interior Design, L.A.
Facility - Building Program |
7 | Architecture, Interior Design, Landscape
Architecture Facility - Gen. Corresp. 10/79 - 4/80 |
7 | Architecture, Interior Design, Landscape
Architecture Facility - Gen. Corresp. 5/80 |
7 | Architecture, Interior Design, Landscape
Architecture Facility - Gen. corresp. - Project Financial
Recap |
7 | Building Program - Architecture, Interior
Design and Landscape Architecture - July 21, 1980 (2 each) |
7 | A Study of Alternate Sites - Architecture,
Interior Design, Landscape Architecture Facility - March 28,
1980 |
7 | Architecture, I.D., L.A. Building -
Program Study |
BUILDING #78A ELECTRICAL MECHANICAL ENGINEERINGReturn to Top
Container(s) | Description |
---|---|
Box | |
7 | Mechanical Engineering -
Budget |
7 | Mechanical Engineering - Renovation -
Project Financial Recap |
7 | Mechanical Engineering Facility Renovation
- Gen. Corresp. |
7 | Mechanical Engineering Facility Renovation
- T.S.G. Architects, Contracts, Payments, C.O.'s |
7 | Mechanical Engineering Facility Renovation
- T.S.G. Corresp. |
7 | Electrica1/Mechanical Engineering Building
- Site Selection Study |
BUILDING #82 HEALD HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
7 | Biosciences Building - Phase II - ABC
Laboratories Inc., Concrete Testing 1975, 76 |
7 | Biosciences Building - Phase II - Artwork
- Corresp. 1976, 1977 |
7 | Biological Sciences - Phase II -
Budget |
7 | Biosciences Building - Phase II - Diary
Inspection Reports 1975 |
7 | Environmental Impact - Biosciences
Addition |
7 | Heald Hall - Phase II - Gen. Corresp. 1968
- 1972 |
7 | Biosciences - Phase II - Gen. Corresp.
8/76 - 4/78 |
7 | Biosciences - Phase II - Gen. Corresp.
5/78 - 81 |
7 | Biosciences Building - Phase II,
Hense1/Phelps Construction Co. - Affirmative Action Reports 5/75 -
6/77 |
9 | Biosciences - Kolb and Stansfield - Review
of Agreement |
9 | Biosciences Building - Phase II -
Photographs |
9 | Biosciences Building - Phase II - Physical
Plant Inspection Report 1975-1978 |
9 | Biosciences Building - Phase II - Pile
Driving Reports 1975 |
9 | Biosciences Building - Phase II - Program
November 27, 1973 (3 each) |
9 | Program for Biological Sciences Building -
Heald Phase II - May 28, 1970 |
9 | Rejected Bids - Biosciences, Phase II -
Electrical 3/75 |
9 | Rejected Bids - Biosciences, Phase II -
Plant Growth Chambers 1975 |
9 | Rejected Bids - Biosciences, Phase II -
Environmental Rooms 1975 |
9 | Rejected Bids - Biosciences, Phase II -
Casework 3/75 |
9 | Rejected Bids - Biosciences, Phase II -
Mechanical 3/75 |
9 | Rejected Bids - Biosciences, Phase II -
General Construction 1975 |
9 | Biosciences Building, Phase II Clint
Brown, Sculptor Contract, C.O.'s, Payments 76-77 |
9 | Biosciences Building, Phase II Shannon and
Wilson - Foundation Evaluation and Recommendations 1974-75 |
BUILDING #82A EASTLICK HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
8 | Biosciences Building - Phase II - Hensel,
Phelps Construction Co., Contract, Payment, C.O.'s 11/76, Folder
#2 |
8 | Biosciences Building - Phase II - Hensel,
Phelps Construction Co., Contract, Payment, C.O.'s 11/76, Folder
#1 |
8 | Biosciences Building - Phase II - Hensel,
Phelps Construction Co., Gen. Corresp. 3/75 - 9/77 |
8 | Biosciences Building - Phase II - Hensel,
Phelps Construction Co., Gen. Corresp. 10/77 - 12/80 |
8 | Biosciences Building - Phase II - Hensel,
Phelps - Info and Policy 1976 |
8 | Biosciences Building (Eastlick) - 1st and
2nd Increment Pick-Up 1978 |
8 | Biosciences Building (Eastlick) -
Infectious Disease Suite 1977-78 |
8 | Biosciences Building - Phase II - Keying
Schedule 1975 |
8 | Heald Hall, Phase II, Decker, Kolb and
Stansfield - Contract, C.O.'s Est. 5/70 - 9/70 |
8 | Heald Hall, Phase II, Kolb and Stansfield
Contract File , 12/73 - 10/77 |
8 | Biosciences Building, Phase II, Decker,
Kolb and Stansfield Corresp. 1/75 - 5/75 |
8 | Decker, Kolb and Stansfield - Corresp.
2/70 - 6/73 |
8 | Biosciences Building, Phase II, Kolb and
Stansfield Corresp. 9/73 - 12/74 |
8 | Biosciences Building, Phase II, Kolb and
Stansfield Corresp. 6/75 - 12/75 |
8 | Biosciences Building, Phase II, Kolb and
Stansfield Corresp. 1/76 - 7/31/1976 |
8 | Biosciences Building, Phase II, Kolb and
Stansfield Corresp. 8/76 - 12/78 |
8 | Biosciences Building, Phase II, Kolb and
Stansfield Job Meeting Notes 1975-78 |
9 | Biosciences Phase II - General
Correspondence 1973-74 |
9 | Biosciences Phase II - General
Correspondence 1/75 - 5/75 |
9 | Biosciences Phase II General
Correspondence 6/75 - 7/31/76 |
BUILDING #92 FRENCH ADReturn to Top
Container(s) | Description |
---|---|
Box | |
9 | Specs for 1st Floor North Side Remodel
1981 #8 |
9 | French Ad Building - Budget |
9 | French Ad Building - General
Correspondence 3/80 - 12/31/82 |
9 | French Ad Building - General
Correspondence 1/1/83 |
9 | French Ad Building - Don Murray and Assoc.
Contract, C.O.'s, Payments |
9 | French Ad Building - Don Murray and Assoc.
Corresp. |
BUILDING #93C STEPHENSON DINING HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
9 | Remodeling in Stephenson Center - Rejected
Bids |
9 | Stephenson Center Handicapped Access -
Budget |
9 | Stephenson Center Remodeling - Diary
Reports |
9 | Stephenson Center Handicapped Access -
Gen. Corresp. |
9 | Remodeling in Stephenson Center - Best-Way
Construction Corresp. |
9 | Remodeling in Stephenson Center - Best-Way
Construction - Contract, C.O.'s, Payments |
9 | Stephenson Center - Handicapped Access -
Doug Durkoop - Corresp. |
9 | Remodeling for Physical Handicapped -
Douglas C. Durkoop, Architect, Contract, Payments, C.O.'s |
9 | Stephenson Center Handicapped Access -
Doug Durkoop - Contract, Payments, C.O.'s |
BUILDING #96 PHYSICAL EDUCATION BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
9 | Budget - Handball/Racquetball |
9 | Handball/Racquetball Facility - 1/S
Affirmative Action Reports |
9 | Handball/Racquetball Facility - Diary
Construction Reports |
9 | Handball/Racquetball Facility - Phase
EIS |
9 | Handball/Racquetball - Atkinson, Leigh,
Sims, Cuppage - Contract, C.O.'s, Payments |
9 | Handball/Racquetball Facility - Atkinson,
Leigh, Sims, Cuppage - Corresp. 4/1/80 |
9 | Handball/Racquetball Atkinson, Leigh,
Sims, Cuppage - Gen. Corresp. 6/78 - 3/31/80 |
9 | Handball/Racquetball - Project Financial
Recap |
9 | Handball/Racquetball - Gen. Corresp. 4/78
- 12/31/79 |
9 | Handball/Racquetball Facility - Gen.
Corresp. 1/80 - 12/31-80 |
10 | Handball/Racquetball Facility - Structural
Calculations 10/26/79 |
10 | Handball/Racquetball Facility - General
Correspondence 1/1/81 |
10 | Handball/Racquetball Facility -
Lavernier-Shea Construction Co., Contract, Payments, C.O.'s |
10 | Handball/Racquetball Facility -
Lavernier-Shea Corresp. 1/80 |
10 | Handball/Racquetball - Meeting
Minutes |
10 | Handball/Racquetball Facility - Pittsburgh
Testing |
10 | Handball/Racquetball - Rejected
Bids |
10 | Handball/Racquetball - Site
Study |
10 | Handball/Racquetball - Richal Smith -
General Correspondence |
BUILDING #114 PLANT SCIENCES GREENHOUSEReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Controlled Environment Laboratories, Phase
II Gen. Corresp. 1977 |
BUILDING #169 VETERINARY ANIMAL HOLDING BARNReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Budget - Vet Animal Holding
Facilities |
10 | Animal Holding and Quarantine - Bernard
and Holloway - Gen. Corresp. |
10 | Vet Medicine Animal Care Facility - Gen.
Corresp |
10 | Animal Holding and Quarantine Facility -
Bernard and Holloway, Contract, C.O., Est. etc. |
10 | Animal Holding Facilities - Contract,
C.O.'s, Payments - S.G. Morin and Son, Inc. |
10 | Program for Animal Holding and Quarantine
Facilities Feb. 13, 1978 (2 each) |
10 | Consolidated Supply Co. - Water Heater and
Lavatory Catalog |
10 | Animal Holding Facilities - Dept. of
Health, Education , Welfare |
10 | Animal Holding and Quarantine - General
Correspondence 9/1/79 |
10 | Vet Animal Holding - Diary Inspection
Reports |
10 | Vet Animal Holding Facilities - Design
Development - June 1978 |
10 | Vet Animal Holding Facility - Corresp. -
S.G. Morin and Son Inc. |
10 | Vet Animal Holding Facility - Richal Smith
Corresp. |
10 | Vet Animal Holding - Affirmative Action
Reports |
10 | Vet Animal Holding Facility - Rejected
Bids, 1978 |
10 | Animal Holding and Quarantine - Gen.
Corresp. 8/19/77 - 8/31/79 |
BUILDING # 199A VETERINARY QUARANTINE FACILITY AReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Veterinary Field and Quarantine Facility -
Phase II - Budget |
10 | Veterinary Field and Quarantine Facility -
Phase I - Barnard and Holloway Corresp. |
10 | Veterinary Field and Quarantine Facility -
Phase I - Contract, Est. Payments |
10 | Veterinary Field and Quarantine Facilities
- Ken Abbey's Files |
10 | Rejected Bids - Vet Field and Quarantine
Facilities - Phases I and II |
BUILDING #199G VETERINARY ISOLATION BARNReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Isolation Building - Animal Holding and
Quarantine Facility - Budget |
10 | Veterinary Isolation Building - Project
Financial Recap |
10 | Isolation Building - Animal Holding and
Quarantine Facility - Gen. Corresp. |
10 | Isolation Building - S.G. Morin, Inc. -
Corresp. |
10 | Vet Med Isolation Completion - Bernard and
Holloway - Contract, Payments, C.O. 's |
10 | Large Animal Isolation Facility Completion
- Vern W. Johnson and Sons Inc., Contract, C.O.'s, Payments |
10 | Vet Science Isolation Building - S.G.
Morin, Contract, Payments, C.O.'s |
10 | Isolation Building - Barnard and Holloway,
Payments, Contract, C.O.'s |
10 | Isolation Building - Animal Holding and
Quarantine Facility - Barnard and Holloway Corresp. |
10 | Isolation Building - Diary Inspection
Reports |
10 | Vet Med Isolation Building - Richard Wyatt
Engineering Co. |
10 | Isolation Building - Smith and Swenson,
Gen. Corresp. |
10 | Isolation Building - S.G. Morin,
Affirmative Action Reports |
10 | Rejected Bids - Vet Animal Holding and
Quarantine Facility - Isolation Building |
10 | Vet Med Isolation Completion - Gen.
Corresp. |
10 | Isolation Building - Diary
Reports |
10 | Vet Med Isolation Completion - Barnard and
Holloway, Corresp. |
10 | Large Animal Isolation Facility Completion
- Vern Johnson and Sons Inc. - Corresp. |
10 | Vet Isolation Facility - Affirmative
Action Reports |
10 | Completion of Large Animal Isolation
Facility - Rejected Bids |
BUILDING #358A/358B/358C RECEIVING AND DELIVERY/GENERAL STORAGE BUILDING AND CHEMICAL STORES BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | General Services Complex, Phase II -
Budget |
11 | General Services Complex, ABC Laboratories
- Concrete Testing |
11 | General Services Complex, Phase II,
Northwestern Construction Inc. - Affirmative Action Reports |
11 | General Services Complex, Phase II - Arch.
Schematic Brochure |
11 | General Services Complex, Phase II - Diary
Inspection Report |
11 | General Services Complex, Phase II - Gen.
Corresp. 1970 thru 12-31-76 |
11 | General Services Complex, Phase II - Gen.
Corresp. 1/1/77 |
11 | General Services, Phase II - Northwestern
Construction, Contract, C.O.'s, Payments, 1976 |
11 | General Services, Phase II - Northwestern
Construction, Corresp. 1976 |
11 | General Services Complex, Phase II -
Victor Louis Wulff - Contract, C.O.'s, Est. |
11 | General Services Complex, Phase II -
Victor Louis Wulff - Corresp. 6/75 - 6/76 |
11 | General Services Complex, Phase II -
Victor Louis Wulff - Corresp. 7/76 |
11 | Rejected Bids - General Services Complex,
Phase II |
11 | General Services, Phase III - General
Corresp. |
11 | General Services, Phase III - Northwestern
Construction of Washington Inc. - Corresp. |
11 | An Analysis of Central Receiving for the
Future - March 1, 1966 |
11 | An Analysis of Receiving and Delivery for
the Future, Revised - Dec. 8, 1967 |
11 | General Services, Phase III, Receiving and
Delivery Program - Aug. 1975 |
11 | General Services Complex, Phase III,
Receiving and Delivery - Rejected |
11 | Bids, General Construction |
11 | General Services, Phase III, Richal Smith
- Gen. Corresp. |
11 | Soils Engineering Studies - Nov.
1975 |
11 | General Services, Phase III, Victor L.
Wulff - Contract, Payments, C.O. 's |
11 | General Services, Phase III, Victor L.
Wulff - Corresp. |
11 | General Services, Phase III -
Budget |
11 | General Services, Phase III - Affirmative
Action Reports |
11 | General Services, Phase III - Receiving
and Delivery - Diary Inspection Reports |
11 | General Services, Phase III - DeNeff,
Deeble, Barton, Assoc., Contracts, C.O.'s, Est. |
11 | General Services, Phase III - Receiving
and Delivery, DeNeff, Deeble, Barton- Corresp. 7/79 |
11 | General Services, Phase III - Receiving
and Delivery, Project Financial Recap. |
BUILDING #372 BAILEY FIELDReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Baseball Field - Pittsburgh
Testing |
BUILDING #380 HOUSING AND FOOD SERVICE STORAGE BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | HSF and Food Service Storage Building -
General |
BUILDING #402K PROPOSED DAIRY PLANT SILO BARNReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Dairy Plant Silo |
11 | Silo Barn |
BUILDING #404D BEEF CATTLE CENTER FEED STORAGEReturn to Top
Container(s) | Description |
---|---|
Box | |
12 | Expo. |
BUILDING #405 SWINE CENTERReturn to Top
Container(s) | Description |
---|---|
Box | |
12 | Livestock Teaching and Research
Facilities, Phase II - (Swine Center) - Budget |
12 | Building Program Statement for Livestock
Teaching and Research Facility, Phase II - Swine Center, Aug. 1975 (2
each) |
12 | Draft Environmental Impact Statement for
Swine Center (2 each) |
12 | Swine Center Environmental Impact
Statement 1976 |
12 | Soils Evaluation and Foundation Studies
April 1976 |
12 | Swine General Correspondence -
1/79 |
12 | Swine Center - Diary Inspection Reports
1976, 77 |
12 | Swine - Standards and Guidelines for the
breeding, care and management of lab animals |
12 | Final Environmental Impact Statement for a
Swine Center - July 28, 1976 (2 each) |
12 | Swine Center - Olson-Richert-Bignold,
Corresp. 8/77 |
12 | Swine Center - Vern W. Johnson and Sons,
Corresp. 1976, 77 |
12 | Swine Center - Vern W. Johnson and sons,
Contract, Payments, C.O.'s |
12 | Western Consultants, Inc. General
Correspondence and Contracts |
12 | Swine Center - Keying Schedule |
12 | Swine Center - Vern Johnson, Affirmative
Action Report |
12 | Swine Center - ABC Laboratories, Concrete
Testing |
12 | Swine Center - Rejected Bids, General
1976 |
12 | Swine Center - Rejected Bids, Mechanical
9/9/76 |
12 | Swine Center - Rejected Bids, Electrical
9/76 |
12 | Swine Center - Olson-Richert-Bignold,
Corresp. 1/77 - 8/8/77 |
12 | Livestock Teaching and Research
Facilities, Phase II, (Swine Center), Olson, Richert, Bignold, Corresp.
6/75 - 12/31/76 |
12 | Swine Center - General Corresp. 6/78 -
12/78 |
12 | Swine Center - General Corresp. 1/77 -
5/31/78 |
12 | Swine Center Livestock Teaching and
Research Facilities, Phase II, Corresp. 1974, 75, 76 |
BUILDING #410 NORTH/SOUTH SKI BOWLReturn to Top
Container(s) | Description |
---|---|
Box | |
14 | North/South Ski Facility - Atkinson,
Leigh, Sims, Cuppage, Contract, C.O.'s, Est. |
14 | North/South Ski Facility - Improvement -
Atkinson, Leigh, Sims, Cuppage, Corresp. 6/75 |
14 | North/South Ski - Budget |
14 | North/South Building Committee Report (2
each) |
14 | North/South Ski Lodge, Phase I, Dairy
Inspection Reports 1976 |
14 | North/South Ski Lodge - General
Correspondence |
14 | North/South Ski Lodge - Affirmative Action
Reports, Griffith Construction Co. Inc. |
14 | North/South Ski Lodge - Phase I, Griffith
Construction Co. Inc., Contract, C.O.'s, Est., Etc. |
14 | North/South Ski Lodge - Phase I, Griffith
Construction Co. Inc., Gen. Corresp. |
14 | North/South Ski Lodge - Rejected
Bids |
BUILDING #677 NEZ PERCE VILLAGEReturn to Top
Container(s) | Description |
---|---|
Box | |
13 | Student Housing Site Study - Nov. 20,
1974 |
13 | 1975 TurnKey Housing Project -
Environmental Impact Statement |
13 | 1975 TurnKey Housing - Minutes of Public
Meetings |
13 | 1975 TurnKey - Diary Inspection
Report |
13 | 1975 TurnKey - Conifer/Strouss,
Affirmative Action Reports |
13 | 1975 TurnKey - Diary Inspection
Report |
13 | 1975 TurnKey - Olson-Richert-Bignold
Corresp. 3/75 |
13 | 1975 TurnKey - Olson-Richert-Bignold
Corresp. 1974 |
13 | 1975 TurnKey - Olson-Richert-Bignold
Corresp. 3/75 |
BUILDING # 678 COLUMBIA VILLAGEReturn to Top
Container(s) | Description |
---|---|
Box | |
13 | 1975 TurnKey - General Correspondence
3/75 |
13 | 1975 TurnKey - Conifer/Strouss, General
Correspondence 1975 |
13 | 1975 TurnKey - Walsh Construction Co.
General Correspondence 1975 |
13 | 1975 TurnKey - Walsh Construction Co.
Contract, Payment, C.O.'s |
13 | 1975 TurnKey - Conifer/Strouss, Contract
Payments, C.O.'s |
13 | 1975 TurnKey - Walsh Construction Co.,
Affirmative Action Reports |
13 | 1976 TurnKey - Student Housing Site
Study |
13 | Final Environmental Impact Statement Feb.
1975 |
13 | Rejected Bids - 1975 TurnKey Housing
Project |
13 | 1975 TurnKey - Gen. Corresp.1974 -
3/31/75 |
13 | 1975 TurnKey - Olson, Richert, Bignold,
Contract, Payments, C.O.'s |
13 | Budget 1976 TurnKey |
13 | Life Cycle cost Analysis (LCC) - TurnKey
Housing 1976 |
13 | TurnKey - Prequalification Package, Sept.
3, 1970 |
13 | 1976 TurnKey - Diary Inspection
Report |
13 | 1976 TurnKey Housing Project - Walsh
Construction Co., Affirmative Action Reports |
BUILDING #679 CHINOOK VILLAGEReturn to Top
Container(s) | Description |
---|---|
Box | |
13 | 1976 TurnKey - General Correspondence
3/76 |
13 | 1976 TurnKey - General Correspondence 9/75
- 2/76 |
13 | 1976 TurnKey Housing Project - Walsh
Construction Co., Contract, Payments, C.O.'s |
13 | 1976 TurnKey Housing Project - Walsh
Construction Co., Gen. Corresp. |
13 | 1976 TurnKey - Olson-Richert-Bignold,
Contract, Payments, C.O.'s |
13 | 1976 TurnKey - Olson-Richert-Bignold,
Corresp. 1975,76 |
13 | 1976 TurnKey Housing Project -
Environmental Impact Statement |
13 | 1976 TurnKey -
Prequalifications |
13 | Final Environment Impact Statement - Dec.
1975 |
13 | Draft Environment Impact Statement - Oct.
14, 1975 |
BUILDING #801 PHYSICAL SCIENCES BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
14 | WSU Attorney Information |
14 | Physical Sciences Building - Bouillon,
Christofferson and Schairer, Corresp., Report of Site Visits |
14 | Physical Sciences Building -
Budget |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Affirmative Action Reports |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Contract, C.O.'s, Payments 1971 - 1974 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Corresp. 1971 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 5/6/71 - 6/30/71 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 7/1/71 - 12/31/71 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 1/3/72 - 6/30/72 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 7/5/72 - 12/29/72 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 1/2/73 - 6/29/73 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 7/2/73 - 12/18/73 |
14 | Physical Sciences Building - Christiansen
Bros., Inc., Daily Job Reports 1/4/74 - 1/24/74 |
14 | Report - Contract 4499 - Physical Sciences
Building - by Christiansen Bros. , Inc. |
15 | Physical Sciences Building - Detweiler
Bros. Inc. - Affirmative Action Reports |
15 | Detweiler Claim - Physical Sciences
Building, Contract 4500 |
15 | Physical Science Building - Detweiler
Bros., Inc., Contract, C.O.'s, Payments 1971 - 1974 |
15 | Physical Science Building - Detweiler
Bros., Inc., Corresp. 6/74 |
15 | Physical Science Building - Detweiler
Bros., Inc., Corresp. 4/71 - 6/74 |
15 | Detweilerfs Progress
Photographs |
15 | Back-up for Detweiler C. Proposal M-V
Physical Sciences |
15 | Physical Sciences Building - Charles Lerch
and Assoc. Elevator Data |
15 | Elevator Data (Final Elevator Summary)
5/15/70 - Charles Lerch and Assoc |
15 | Questionnaire, Fact Finding Tour - April
15-18, 1968 |
15 | Foundation Investigation, Physical
Sciences Building, June 4, 1969 |
15 | Physical Sciences Building - Gen. Corresp.
- Attorney's Thomas C. Cochran and Robert H. Lamp |
15 | Physical Sciences Building - General
Correspondence 1967,68 - 5/14/69 |
15 | Physical Sciences Building - General
Correspondence 8/69 -6/30/70 |
15 | Physical Sciences Building - General
Correspondence 7/1/70 - 12/31/70 |
15 | Physical Sciences Building - General
Correspondence 1/71 - 12/71 |
15 | Physical Sciences Building - General
Correspondence 1/1/72 - 7/31/73 |
15 | Physical Sciences Building - General
Correspondence 8/1/73 - 2/28/74 |
15 | Physical Sciences Building - General
Correspondence 3/1/74 - 8/74 |
15 | Physical Sciences Building - General
Correspondence 8/74 - 12/31/74 |
15 | Physical Sciences Building - General
Correspondence 1/75 - 12/76 |
15 | Physical Sciences Building - General
Correspondence 1/77 |
15 | Claims and Correspondence - Christiansen
Bros. |
16 | Physical Sciences Building -
Kehne-Crabtree Electric Co. Inc., Affirmative Action Reports |
16 | Physical Sciences Building -
Kehne-Crabtree Electric Co. Inc., Contract, C.O.'s, Payments 1971 -
1974 |
16 | Physical Sciences Building -
Kehne-Crabtree Electric Co. Inc., Corresp. 1971 |
16 | Physical Sciences Building - Keying
Schedule |
16 | Physical Sciences Building - Legal
Matters |
16 | Physical Sciences Building - NBBJ Back-up
Material for Estimate No. 4 |
16 | Physical Sciences Building - NBBJ
Contract, C.O.'s, Payments 1968 - 1975 |
16 | Physical Sciences Building, Daily Log
1/1/72 - 7/31/72 |
16 | Physical Sciences Building, Daily Log
8/1/72 - 12/31/72 |
16 | Physical Sciences Building, Daily Log
1/1/73 - 6/30/73 |
16 | Physical Sciences Building, Daily Log
7/1/73 - 12/31/73 |
16 | Physical Sciences Building, Daily Log 5/71
- 12/71 |
16 | Physical Sciences Building, Daily Log
1/1/74 - 2/15/74 |
16 | Physical Sciences Building - NBBJ,
Corresp. 5/73 - 12/31/73 |
16 | Physical Sciences Building - NBBJ,
Corresp. 1969 - 1970 |
16 | Physical Sciences Building - NBBJ,
Corresp. 1967,68 - 7/69 |
16 | Physical Sciences Building - NBBJ,
Corresp. 7/1/70 - 12/3/70 |
16 | Physical Sciences Building - NBBJ,
Corresp. 8/69 - 6/30/70 |
16 | Physical Sciences Building - NBBJ,
Corresp. 7/72 - 4/30/73 |
16 | Physical Sciences Building - NBBJ,
Corresp. 10/71 - 6/72 |
17 | Physical Sciences Building - NBBJ Corresp.
1/71 - 9/71 |
17 | Physical Sciences Building - NBBJ Corresp.
6/1/74 - 12/31/74 |
17 | Physical Sciences Building - NBBJ Corresp.
1/1/74 - 5/31/74 |
17 | Physical Sciences Building - NBBJ Corresp.
1/75 |
17 | Physical Sciences Building - NBBJ
Reconstruction Conference |
17 | Physical Sciences Building - Nelson
Landscape Service, Inc., Contract, Est., C.O.'s |
17 | Physical Sciences Building - Nelson
Landscape Service, Inc., Corresp. 1971 |
17 | Physical Sciences Building - NII
Laboratory Furniture, Contract, Est., C.O. 's |
17 | Physical sciences Building - NII
Laboratory Furniture - Permalab, Corresp. 1971 |
17 | Physical Sciences Building - Permalab
Factory Stored Inventory |
17 | Physical Sciences Building - Pittsburgh
Testing Labs. Concrete Testing 4/71 - 12/71 |
17 | Physical Sciences Building - Pittsburgh
Testing Labs. Concrete Testing 1/1/72- 8/1/72 |
17 | Physical Sciences Building - Pittsburgh
Testing Labs. Concrete Testing 8/1/72 - 12/31/72 |
17 | Physical Sciences Building - Pittsburgh
Testing Labs. Concrete Testing 1/1/1973 |
17 | Physical Sciences Building - Pittsburgh
Testing Labs. Miscellaneous Testing |
17 | Program Statement - Physical Sciences
Building - Nov. 1965 |
17 | Physical Sciences Building - II
Program |
17 | Physical Sciences Building -
Proposal |
17 | Rejected Bids - Physical Sciences
Building, Electrical |
17 | Rejected Bids - Physical Sciences
Building, General |
17 | Rejected Bids - Physical Sciences
Building, Lab Equipment |
17 | Rejected Bids - Physical Sciences
Building, Landscape |
17 | Rejected Bids - Physical Sciences
Building, Mechanical |
17 | Physical Sciences Building - Shannon and
Wilson, Inc., Soil Investigation |
17 | Report of Site Visits - 5/71 -
6/25/74 |
BUILDING #806 BEASLEY COLISEUMReturn to Top
Container(s) | Description |
---|---|
Box | |
17 | Coliseum - Light Bridge Failure, John
Graham and Co. - Corresp. 1976,77 |
17 | Coliseum - Light Bridge and Rigging
Failures |
17 | Coliseum - Light Bridge - Skilling, Helle,
Christiansen and Robertson - Contracts, C.O.'s, Est. |
17 | Coliseum - Rigging
Improvements |
17 | Coliseum - Light Bridge Failure, Gen.
Corresp. 1976 |
17 | Coliseum - (Hartford Failure
Information) |
17 | Budget - Light Bridge Failure |
17 | Report - Heary, Stage Rigging -
2/28/79 |
BUILDING #807 BUSTAD HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
18 | Veterinary Medicine Building -
Budget |
18 | Vet Science Building - Maloney,
Herrington, Freesz and Lund, Corresp. 1/79 |
18 | Vet Science Building - Vern W Johnson and
Sons, Inc,, Contract, C.O.'s, Payments 8/8/77 |
18 | Vet Science Building - Vern W Johnson and
Sons, Inc., Contract, C.O.'s, Payments |
18 | Vet Medicine Building - Maloney,
Herrington, Freesz and Lund, Corresp. 7/1/75 - 12/31/75 |
18 | Shared Curriculum, Veterinary Medicine,
Ken Abbey's Files, 1976 |
18 | Vet Medicine Building - Building
Program |
18 | Vet Science Building - Daily Inspection
Reports, 1/1/76 |
18 | Vet Medicine Building - DHEW Corresp.
1974,75 - 1979 |
18 | Vet Science Building - Construction
Reports (Crea) |
18 | Vet Science Building - Environmental
Impact Statement |
18 | Vet Science Building - Vern W. Johnson and
Sons, Contract, C,O.'s, Proposals |
18 | Vet Science Building - Skilling, Helle,
Christiansen, Robertson - Corresp. |
18 | Vet Medicine Building - Keying
Schedule |
18 | Vet Science Building - Vern W. Johnson and
Sons, Inc. Corresp. 4/1/78 |
18 | Vet Science Building - Gen, Corresp. 1/77
- 3/77 |
18 | Vet Science Building - Affirmative Action
Reports |
18 | Vet Medicine, Univ. of Idaho Proposal -
Caldwell |
18 | Vet Science Building - Robert W. Ellison,
Sculptor, Contract, C.O.'s, Payments |
18 | Vet Science Building - Biohazard Suite
Remodel - Vern W. Johnson, Contract, C.O.'s, Payments |
18 | Vet Science Building and Biohazard suite
Remodeling - Mills, John Rigdon, AIA, Contract, Payments |
19 | Vet Sciences Building - Cage and Rack
Washer |
19 | Vet Sciences Cage Washroom - Maloney,
Herrington (MJR) Corresp. |
19 | Vet Medicine Building and Cage Washroom -
Maloney, Herrington, Freesz and Lund - Contract, C.O.'s,
Payments |
19 | Vet Sciences Cage Washroom Rev. - C and S
Builders, Inc. - Corresp. |
19 | Vet Sciences Cage Washroom Rev. - C and S
Builders, Inc. - Contract, Payments, C.O.'s |
19 | Vet Science Building Biohazard Suite
Remodeling - Budget |
19 | Vet Science Building Biohazard Suite -
Gen. Corresp. 4/1/82 |
19 | Vet Science Building Biohazard Suite
Remodeling - Diary Reports |
19 | Vet Science Building Biohazard Suite -
5/80 - 3/31/82 |
19 | Vet Science Building Biohazard Suite
Remodel - Vern W. Johnson and Sons, Corresp. |
19 | Vet Science Building Biohazard Suite
Operations Manual |
19 | Vet Science Building Biohazard Suite MJR
Corresp. |
19 | Vet Science Building Biohazard Suite
Remodel - Rejected Bids |
19 | Vet Science Building Biohazard Suite
Remodeling - Vern W. Johnson and Sons, Inc. - Affirmative Action
Reports |
19 | Vet Science Building Biohazard Suite
Mills, John, rigdon Corresp. 7/80 - 8/31/1982 |
19 | Vet Medicine Building - Maloney,
Herrington, Freesz and Lund - Gen. Corresp. 1/75 - 6/75 |
19 | Vet Medicine Building - Gen. Corresp. 1/76
- 12/31/76 |
19 | Vet Medicine Building - Gen. Corresp.
1975 |
19 | Vet Science Building - Maloney,
Herrington, Freesz and Lund - Corresp. 9/77 - 12/78 |
19 | Vet Science Building - Maloney,
Herrington, Freesz and Lund - Corresp. 8/76 - 8/77 |
19 | Vet Science Building - General
Correspondence 1/80 |
19 | Vet Science Building - Design Calculations
- Mechanical (2 each) |
19 | Vet Science Building - Lent's Inc. -
Affirmative Action Plan |
19 | Vet Science Building - Building Program -
May 1974 |
19 | Vet Science Building - soil Engineering -
Jan. 30, 1975 Shannon and Wilson Inc. |
19 | Vet Medicine Building - General
Correspondence 1974 |
19 | Vet Science Building - Proposed State
Diagnostic and Research Lab. |
20 | Vet Sciences Building - Pittsburgh Testing
Lab - Concrete Testing 1976 |
20 | Vet Sciences Building - Robert W. Ellison
- Corresp. |
20 | Vet Sciences Building - Rejected Bids -
Cage Wash Revision |
20 | Vet Sciences Building - Rejected Bids -
Mechanical 1975 |
20 | Vet Sciences Building - Rejected Bids -
Electrical 1975 |
20 | Vet Sciences Building - Rejected Bids -
General 1975 |
20 | Vet Sciences Building - Close-out
Projects |
20 | Vet Sciences Building - Furniture List
8/9/76 |
20 | Vet Sciences Monitor Drawer
Deliberations |
20 | Vet Sciences Building -
Furnishings |
20 | Vet Sciences Building - Maloney,
Herrington, et.al.- Job Meeting Notes, 74-75, 76, 77, 78 |
20 | Vet Sciences Building - Maloney,
Herrington, Freesz, and Lund, Corresp 1/1/76 - 7/76 |
20 | Vet Sciences Building - Vern W, Johnson
and sons, Inc. Corresp. 11/75 - 2/1/1978 |
20 | Vet Sciences Building - General
Correspondence 4/1/78 - 8/31/78 |
20 | Vet Sciences Building - General
Correspondence 1/79 - 12/79 |
20 | Vet Medicine Building - Maloney,
Herrington, Freesz, and Lund, Corresp 2/70-74 |
20 | Vet Sciences Building - General Corresp.
9/1/78 - 12/31/78 |
BUILDING #809 AVERY HALLReturn to Top
Container(s) | Description |
---|---|
Box | |
22 | Completion of a Portion of Avery, 4th
Floor - Lavernier-Shea |
22 | Construction, Affirmative Action
Reports |
22 | English Building - Fred Bassetti and Co.,
Corresp. 1970 - 6/30/72 |
22 | Avery Hall 4th Floor - Completion -
Corresp. 3/77 |
22 | Avery Hall 4th Floor - (Portion), Corresp.
to 4/77 |
22 | Avery Hall 4th Floor - Fred Bassetti and
Co., Contract, C.O.'s, Payments |
22 | Avery Hall 4th Floor - Completion - Fred
Bassetti and Co., Contract, C.O.'s, Payments 1977 |
22 | Budget - Completion of Avery
Hall |
22 | Completion of a portion of 4th Floor,
Avery Hall - Budget |
22 | Avery Hall - Portion, Diary Inspection
Reports 1976 |
22 | Avery Hall Completion - Diary Inspection
Reports 1977 |
22 | English Building - General Correspondence
3/16/70 - 12/71 |
22 | Avery Hall 4th Floor - Completion - Gen.
Corresp. 3/77 |
22 | Completion of a Portion of Avery Hall 4th
Floor - Gen. Corresp. |
22 | English Building - Kohler Electric, Inc.,
Affirmative Action Reports |
22 | English Building - Kohler Electric, Inc.,
Contract, C.O.'s, Payments |
22 | Completion of 4th Floor Avery -
Lavernier-Shea construction, Contract, Payments, C.O.'s 7/77 |
22 | Completion of a portion of the 4th Floor,
Avery Hall - Lavernier-Shea Construction, Contract, Est.
C.O.'s |
22 | Completion of 4th Floor Avery -
Lavernier-Shea Construction Inc., Corresp. 7/77 |
22 | Completion of a Portion of 4th Floor Avery
- Lavernier-Shea Construction Inc. - Gen. Corresp. |
22 | Avery Hall - Rejected Bids - Completion of
4th Floor 6/30/77 |
22 | Avery Hall - Rejected Bids - 4th Floor
1975 |
22 | English Building - Rejected Bids -
Electrical |
22 | English Building - Rejected Bids -
General |
22 | English Building - Rejected Bids -
Mechanical |
BUILDING #810 OWEN SCIENCE AND ENGINEERING LIBRARYReturn to Top
Container(s) | Description |
---|---|
Box | |
21 | Science Area Library - Vern W. Johnson and
Sons - General Correspondence |
21 | Science Area Library - Vern W. Johnson and
Sons - Contract, Payment, C.O. 's |
21 | Science Area Library - HRL Contract #4987
Contract, Payments, C.O.'s 1973 |
21 | Science Area Library - Harris, Reed and
Litzenberger - Corresp. 8/1/76 |
21 | Science Area Library - HRL Correspondence
1974 - 6/74 |
21 | Science Area Library - HRL
Correspondence |
21 | Science Area Library - Schematics, HRL
General Correspondence |
21 | Science Area Library - Site Study, HRL
General Correspondence |
21 | Science Area Library - Site Study, HRL
General Correspondence |
21 | Science Area Library - Site Study, HRL
General Correspondence |
21 | Science Area Library - Kenneth S. Allen -
Gen. Corresp. Library Consultant |
21 | Science Area Library - Library Consultant
Selection |
21 | Science Area Library - HRL Gen. Corresp.
6/75 - 7/31/76 |
21 | Science Area Library - HRL Gen. Corresp.
7/74 - 5/75 |
21 | Science Area Library - Gen. Corresp.
8/1/76 - 12/77 |
21 | Science Area Library - Gen. Corresp.
7/30/73 - 6/74 |
21 | Science Area Library - HRL Schematics and
Site Study, Contract, Payments, C.O. 's |
21 | Science Area Library - Environmental
Impact |
21 | Science Area Library - Vern W. Johnson and
Sons, Affirmative Action Forms |
21 | Science Area Library - Kenneth S. Allen -
Contract, Payments |
21 | Science Area Library - Foundation
Investigation and Piling Reports 1974 - 1975 |
21 | Science Area Library - Shelving and
Movable Equipment, Corresp. 1974 |
21 | Science Area Library - ABC Testing,
Concrete Testing |
21 | Science Area Library - Furniture Purchases
1976 |
21 | Science Area Library - Rejected Bids -
1975 General Contractor |
21 | Science Area Library - Rejected Bids -
1975 Mechanical |
21 | Science Area Library - Rejected Bids -
1975 Electrical |
21 | Science Area Library - General
Correspondence 6/75 - 7/31/76 |
22 | Science Area Library - Budget Science Area
Library - Program |
22 | Science Area Library - Hardware Schedule
Science Area Library - Plan Review Notes |
22 | Science Area Library - Inspection Reports
- Physical Plant Science Area Library - General Correspondence
1/78 |
22 | Science Area Library - HRL Diary
Inspection Report 3/75 Science Area Library - General Correspondence
6/74 - 5/75 |
22 | Science Area Library - Draft Environmental
Impact Statement 1/23/74 |
BUILDING #811 LABORATORY ANIMAL RESOURCES CENTERReturn to Top
Container(s) | Description |
---|---|
Box | |
22 | Lab Animal Resource Facility, Phase I -
Diary Inspection Report |
22 | Addition to Lab Animal - Diary Inspection
Reports |
22 | Completion of Carnivore Wing, Lab Animal
Facility - Diary Inspection Report |
22 | Central Lab Animal Completion - Diary
Inspection Reports |
22 | Central Lab Animal Completion - Project
Financial Recap |
22 | Central Lab Animal Resources - Gen.
Corresp. Aug. 1967, 1970 - Dec. 1971 |
22 | Lab Animal Resource Facility, Phase I -
Gen. Corresp. 1/1/72 |
22 | Lab Animal Facility Addition - Gen.
Corresp. 1973 |
22 | Completion of Lab Central Animal Lab
Facility - Gen. Corresp. 3/75 |
22 | Completion of Carnivore Wing, Central Lab
Animal Facility - Gen. Corresp, 12/75 |
23 | Addition to Central Lab Animal Resource -
General Corresp. |
23 | Central Lab Animal Resources Building -
Gen. Corresp. |
23 | Addition to Central Lab Animal Facility -
Stevens Construction Co., Corresp. 1973 |
23 | Lab Animal Resource Facility, Phase I -
Vern W. Johnson and Sons Inc. - Contract, Payments, C.O.'s |
23 | Completion of Lab, Lab Animal Facility -
Vern W. Johnson and Sons - Contract, Payments, C.O.'s |
23 | Lab Animal Resource Facility, Phase I -
Vern W. Johnson and Sons Inc. - Corresp. 1971 |
23 | Completion of Lab, Lab Animal Facility -
Vern W. Johnson and Sons - Corresp. |
23 | Completion of Carnivore Wing, Central Lab
Animal Facility - Lavernier-Shea Construction, Contract, Payments,
C.O.'s |
23 | Lab Animal Resources Facility - Pittsburgh
Testing Labs, Concrete Testing |
23 | Lab Animal Addition - Concrete Testing -
Pittsburgh Testing Labs |
23 | Central Lab Animal Resources Building Exp.
- (Testing Laboratory) |
23 | Lab Animal Resource Facility, Phase I -
Redding Construction Co., Contract, Payments, C.O.'s |
23 | Lab Animal Resource Facility, Phase I -
Redding Construction Co.- Corresp. 1971 |
23 | Rejected Bids - Lab Animal Facilities -
Precast Concrete Members |
23 | Rejected Bids - Lab Animal Resource
Facility, Phase I |
23 | Rejected Bids - Completion of Lab, Central
Animal Lab Facility |
23 | Rejected Bids - Site Grading and Utility
Installation for future Lab Animal Resource Facility |
23 | Rejected Bids - Central Lab Animal
Resources Building |
23 | Rejected Bids - Central Lab Animal
Resources Expansion |
23 | Rejected Bids - Completion of Carnivore
Wing, Central Lab Animal Facility 1976 |
23 | Central Lab Animal Resources Expansion -
Earl Russell, Contract, C.O.'s, Payments |
23 | Central Lab Animal Resources Expansion -
Earl Russell - Corresp. |
23 | Central Lab Animal Addition - Stevens
Construction - Affirmative Action Report |
23 | Central Lab Animal Resources Building -
Budget |
23 | Lab Animal Facilities Addition -
Budget |
23 | Completion of Lab, Central Lab Animal
Facility - Budget |
23 | Completion of Carnivore Wing, Central Lab
Animal Facility - Budget |
23 | Central Lab Animal Resources Completion -
Budget |
23 | Central Lab Animal Resources - Budget
File |
23 | Central Animal Resources Building -
Affirmative Action Reports |
23 | Lab Animal Resource Facility, Phase I -
Redding Construction Co.-Affirmative Action Reports |
23 | Building Program - Lab Animal Resource
Facility, Aug. 24, 1970 |
23 | Central Lab Animal Resources Building -
Barnard and Holloway, Arch., Contract, Payments, C.O.'s |
23 | Addition to Central Lab Animal Facilities
- Stevens Construction Co., Contract, Payments, C.O.'s |
23 | Lab Animal Facilities Addition - Barnard
and Holloway, Contract, Payments, C.O. 's |
23 | Completion of Lab, Central Lab Animal
Facility - Barnard and Holloway, Contract, Payments, C.O.'s
3/75 |
23 | Completion of Carnivore Lab, Central Lab
Animal Facility - Barnard and Holloway, Contract, Payments, C.O.'s 1975,
76 |
23 | Completion of Central Lab Animal Resources
Building - Barnard and Holloway, Contract, Payments, C.O.'s |
23 | Central Lab Animal Resources Building
Expansion - Barnard and Holloway, Contract, Payments, C.O.'s |
23 | Lab Animal Resource Facility, Phase I -
Barnard and Holloway - Inspection Reports, Construction, Conference
Meetings 1971 |
23 | Central Lab Animal Resources Building -
Barnard and Holloway, Arch., Corresp. 6/1/70 - 12/71 |
23 | Central Lab Animal Resources Building -
Barnard and Holloway, Arch., Corresp. 1/172 |
23 | Lab Animal Facilities Addition - Barnard
and Holloway, Arch., Corresp. 1973 |
23 | Completion of Lab, Central Lab Animal
Facility - Barnard and Holloway, Corresp. 3/75 |
23 | Completion of Carnivore Wing, Central Lab
Animal Facility - Barnard and Holloway - Corresp. 1975,76 |
23 | Central Lab Animal Resources Building -
Barnard and Holloway - Gen. Corresp. |
23 | Central Lab Animal Resources Building
Expansion - Barnard and Holloway - Corresp. |
23 | Lab Animal Resources Facility, Phase I,
Central Premix Concrete Co., Contract, Payments, C.O.'s |
23 | Lab Animal Resources Facility, Phase I,
Central Premix Concrete Co.- Corresp. 1971 |
23 | Completion of Central Lab Animal Resources
Building, Contract, Payments, C.O. 's |
23 | Central Lab Animal Resources Completion -
C and S Builders, Inc. Corresp. |
BUILDING #812 COMPUTER SCIENCE BUILDINGReturn to Top
Container(s) | Description |
---|---|
Box | |
23 | Computer Science Energy Study |
23 | Computer Science Trane Air Conditioning
Economics |
23 | Clarence D. Martin Stadium and Academic
Center, Phase II - Trogdon-Smith-Grossman, Corresp. 1974 -
1976 |
23 | Clarence D. Martin Stadium and Academic
Center (Computing Center) Trogdon-Smith-Grossman, Corresp. 1/77 -
12/77 |
23 | Computing Center (Clarence D. Martin
Stadium and Academic Center), II, Trogdon-Smith Grossman, Corresp 1/78 -
10/78 |
23 | Computing Center (Martin Stadium) -
Trogdon, Smith, Grossman, Corresp. 11/78 - 10/31/80 |
23 | Computing Center (Martin Stadium) -
Trogdon, Smith, Grossman, Corresp. 11/1/1980 |
24 | Computer Science - Math Building - Office
Space Problems - Fall 1979 |
24 | Clarence D. Martin Stadium and Academic
Center (Computer Science) Pittsburgh Testing |
24 | Computing Center - Richal Smith - General
Correspondence |
24 | Computer Science Building - Rejected Bids
- Electrical 7/7/77 |
24 | Computer Science Building - Rejected Bids
- General |
24 | Computer Science Building - Rejected Bids
- Mechanical 7/7/77 |
24 | Stadium and Academic Center - Phase II -
Budget |
24 | Computer Sciences - Math Building, Phase
I, Martin Stadium/Academic Center, Phase II - Coord.
Meetings |
24 | Martin Stadium/Academic Center, Phase II,
Computing Center - |
24 | Environmental Impact Statement - Corresp.
1976 |
24 | Clarence D. Martin Stadium and Academic
Center, Phase II - Gen. Corresp. 10/74 - 9/76 |
24 | Clarence D. Martin Stadium and Academic
Center, Phase II - Gen. Corresp. 9/77 - 10/76 |
24 | Martin Stadium Expansion - General
Correspondence 3/79 |
24 | Clarence D. Martin Stadium and Academic
Center (Computer Science) - Gen. Corresp. 10/77 - 10/78 |
24 | Clarence D. Martin Stadium and Academic
Center (Computer Science) - Gen. Corresp. 11/1/78 - 12/79 |
24 | Computer Sciences - Math Building -
General Corresp. 1/80 - 12/31/80 |
24 | Computer Sciences - Math Building -
General Corresp. 1/81 |
24 | Clarence D. Martin Stadium and Academic
Center, Phase II - Trogdon-Smith-Grossman, Contract, C.O.'s,
Payments |
25 | Computer Sciences - Math Building -
Artwork, Correspondence |
25 | Computer Sciences Building - Trance
Air-Conditioning Economics (2 each) |
25 | Computer Sciences - Math Building - Diary
Inspection Reports 1977 - 1978 |
25 | Computer Sciences - Math Building - Diary
Inspection Reports 1979 |
25 | Computer Sciences - Math Building - EIS
Open Hearing Comments - 9/23/76 |
25 | Computer Sciences - Math Building - Energy
Study and Life Cycle Cost Analysis |
25 | Computer Sciences - Math Building -
Foundation Soils Evaluation (2 each) |
25 | Computer Sciences Building -
Furnishings |
25 | Computer Sciences - Math Building - James
Lee Hansen, Sculptor, Contract, C.O.'s Payments |
25 | Computer Sciences - Math Building - Phase
I (Artist) James Lee Hansen, Gen. Corresp. |
25 | Computer Sciences - Math Building - Vern
W. Johnson and Sons, Affirmative Action Forms |
25 | Computer Sciences - Math Building - Phase
I - Vern W. Johnson and Sons Inc., Contracts, C.O.'s, Payments 6/77 -
2/79 |
25 | Computer Sciences - Math Building - Phase
I - Vern W. Johnson and Sons Inc., Contracts, C.O.'s, Payments 3/79 -
1/80 |
25 | Computer Sciences - Math Building - Phase
I - Vern W. Johnson and Sons - Corresp. 1977 |
25 | Computer Sciences - Key
Schedule |
25 | Computer Sciences - Math Building - Bid
Summary, Landscape Development |
25 | Computer Sciences - Math Building -
Landscaping |
25 | Computer Sciences - Landscape Development,
Nelson Landscape Service Inc., Contract, C.O.'s, Payments |
BUILDING #812A MARTIN STADIUM - SOUTH STANDReturn to Top
Container(s) | Description |
---|---|
Box | |
25 | Rogers Field - South Stands, Foundation
Investigation - Nov. 10, 1971 |
BUILDING #812C MARTIN STADIUM - NORTH STANDReturn to Top
Container(s) | Description |
---|---|
Box | |
25 | Martin Stadium, North Stands Replacement -
Financial Statement |
25 | Martin Stadium, North Stands Replacement -
Gus J. Bouten Construction Co., Affirmative Action Reports |
25 | Martln Stadium/Academic Center - North
Stands - Gus J. Bouten Construction Contracts, Payments,
etc. |
25 | Martin Stadium/Academic Center - North
Stands - Gus J. Bouten Construction Co. - Gen. Corresp. 1974 |
25 | North Stands Replacement - Martin Stadium
- Environmental Impact Statement |
25 | North Stands Replacement - Clarence D.
Martin Stadium and Academic Center - Gen. Corresp.
1974,75,76 |
25 | Martin Stadium/Academic Center - North
Stands Replacement - NBBJ, Contracts, Est., etc. |
25 | North Stands Replacement - Clarence D.
Martin Stadium and Academic Center - NBBJ, Gen. Corresp.,
1974 |
25 | North Stands Replacement - Clarence D.
Martin Stadium and Academic Center - NBBJ, Gen. Corresp.,
1975 |
25 | North Stands Replacement - Clarence D.
Martin Stadium and Academic Center - NBBJ, Gen. Corresp.,
1/76 |
25 | Stadium North Stands - Pittsburgh Testing
Laboratory, Concrete Testing, Inspection of Structure Steel
74-75 |
25 | Stadium - Rejected Bids - General
Construction |
25 | Academic Stadium Facility, Phase I -
Rejected Bids - Piling Work |
25 | Stadium Seating - Rejected
Bids |
25 | Clarence D. Martin Stadium North Stand
Replacement - Rejected Bids |
25 | Martin Stadium - North Stands - Foundation
Investigation - NBBJ - June 1974 |
BUILDING #812S MARTIN STADIUMReturn to Top
Container(s) | Description |
---|---|
Box | |
26 | Stadium - Budget |
26 | Stadium/Academic - Concrete Testing,
Pittsburgh Testing Lab |
26 | Stadium Phase I - Cost
Information |
26 | Martin Stadium - From Ken Abbey's
Files |
26 | Stadium/Academic - C and S Builders, Inc.
Affirmative Action Reports 1972 |
26 | Stadium Seating - C and S Builders, Inc.,
Contract, C.O.'s, Payments 1972 |
26 | Stadium/Academic - C and S Builders, Inc.
Correspondence 1972 |
26 | Stadium/Academic - Diary Inspection
Reports 1972 |
26 | Martin Stadium and Academic Center CTR -
Diary Inspection Reports |
26 | Stadium - General Correspondence - 1/1/72
- 6/72 |
26 | Stadium - General Correspondence - 1970,
1971 - 12/71 |
26 | Stadium - General Correspondence -
7/72 |
26 | Stadium Expansion Feasibility Study -
General Correspondence 1974 |
26 | Stadium/Academic - Halverson-Berg,
Affirmative Action Reports 1/1/72 |
26 | Stadium/Academic - Halverson-Berg,
Contract, C.O.'s, Est. 1/1/72 |
26 | Stadium/Academic - Halverson-Berg,
Correspondence 1/1/72 |
26 | Stadium/Academic - Hardware
Schedule |
26 | Stadium Expansion Feasibility Study -
NBBJ, Contract, Payments |
26 | Stadium - NBBJ, Contract, C.O.'s,
Payments |
26 | Stadium/Academic - NBBJ, Report of Site
Visit and Const. Conf. Meetings 1/1/1972 |
26 | Martin Stadium Expansion - EIS |
26 | Stadium Expansion Feasibility Study -
NBBJ, Correspondence 1974 |
26 | Stadium - NBBJ, Correspondence 1970 -
12/71 |
26 | Stadium - NBBJ, Correspondence 1/1/72 -
6/72 |
26 | Stadium - NBBJ, General Correspondence
7/72 |
26 | Stadium/Academic - Piling Construction,
Upper Columbia Construction Co., Corresp. |
26 | Stadium - Pile Load - Settlement Test,
Upper Columbia Construction Co. |
26 | Stadium - Pittsburgh Testing Lab,
Structural Steel Fab. Inspection |
26 | Stadium - Phase I - Review |
26 | Stadium - Phase I - Seating |
26 | Stadium/Academic - Steering Committee,
General Information |
26 | Stadium/Academic - Upper Columbia R.
Construction Co., Contract, Payments, C.O.'s |
26 | Track and Field Relocation - Bovay
Engineers - General Correspondence |
26 | Martin Stadium Expansion -
Budget |
26 | Track and Baseball Field - Diary
Inspection Reports |
26 | Track and Field - From Ken Abbey's
Files |
26 | Track and Field Relocation - Munir Daud,
Correspondence |
26 | Track and Field Facility Relocation - Vern
W. Johnson and Sons, |
26 | General Correspondence |
26 | Track and Field Relocation -
Budget |
26 | Martin Stadium Expansion and Track and
Field Relocation - Building Program, Sept. 1978 |
26 | Specifications for Sprinkler System -
Athletic Track Installation 1979 |
26 | Track and Field Relocation -
EIS |
26 | Martin Stadium Track and Field Relocation
- Building Program, |
26 | Martin Stadium Expansion, Track and Field
- Bovay Engineers Inc. Gen. Corresp. |
27 | Martin Stadium Expansion - Diary
Inspection Reports |
27 | Martin Stadium Expansion - Cougar Club
Foundation, Corresp. |
27 | Martin Stadium Expansion - NBBJ, AIA,
Contract, C.O.'s, Payments |
27 | Martin Stadium Expansion - Bovay
Engineers, Contract, C.O.'s, Payments |
27 | Martin Stadium Expansion - Munir Daud,
Contract, Payments |
27 | Martin Stadium Improvements - Pittsburgh
Testing |
27 | Martin Stadium Expansion - NBBJ
Correspondence |
27 | Martin Stadium V.W. Johnson, General
Correspondence |
27 | Martin stadium Expansion - General
Correspondence 3/78 - 2/79 |
27 | Martin Stadium Expansion - Earl Nelson
Corp. - General Correspondence |
27 | Track and Field Relocation - General
Correspondence 10/10/78 - 12/31/79 |
27 | Track and Field Relocation - General
Correspondence 1/1/80 |
27 | Track and Field Relocation - Munir Daud,
Contract, Payments |
27 | Track and Field Relocation - NBBJ, General
Correspondence |
27 | Track and Field Relocation - NBBJ,
Contract, C.O.'s, Payments |
27 | Track and Field Relocation - Originals of
Comments on Draft EIS |
27 | Martin stadium Expansion and Track and
Field Stadium - Project Concept and Organization - 10/16/78 |
27 | Track and Field Facility Relocation -
Comparison of Six Potential Sites 10/11/1978 |
27 | Track and Field Facility Relocation -
Environmental Assessment 9/78 |
27 | Track and Field Facility Relocation -
Final EIS |
27 | Track and Field Facility Relocation -
Draft EIS |
BUILDING #813 CHILLED WATER PLANTReturn to Top
Container(s) | Description |
---|---|
Box | |
28 | Final Environmental Impact
Statement |
BUILDING #814 EXPERIMENTAL ANIMAL LABORATORYReturn to Top
Container(s) | Description |
---|---|
Box | |
27 | Experimental Animal Laboratory -
Budget |
27 | Experimental Animal Laboratory - ABC Labs,
Concrete Testing 1976 |
27 | Experimental Animal Laboratory - Artwork,
Correspondence |
27 | Experimental Animal Laboratory -
Correspondence 1974, 75, 76 - 12/31/76 |
27 | Experimental Animal Laboratory -
Foundation Engineering 12/3/75 |
27 | Experimental Animal Laboratory - General
Correspondence 1/1/77 |
27 | Experimental Animal Laboratory - Diary
Inspection Reports |
27 | Experimental Animal Laboratory -
EIS |
28 | Experimental Animal Lab - Draft EIS
1975 |
28 | Experimental Animal Lab - Draft EIS
1976 |
28 | Experimental Animal Lab - Kirk, Wallace
McKinley, Contract, C.O.'s, Est. |
28 | Experimental Animal Lab - Kirk, Wallace
McKinley, Corresp. 6/75 - 7/31/1976 |
28 | Experimental Animal Lab - Kirk, Wallace
McKinley, Corresp. 8/76 - 12/77 |
28 | Experimental Animal Lab - Kirk, Wallace
McKinley, Corresp. 1/78 |
28 | Experimental Animal Lab - Max J. Kuney
Co., Affirmative Action Reports |
28 | Experimental Animal Lab - Max J. Kuney
Co., Contract, C.O.'s, Payments 1976 |
28 | Experimental Animal Lab - Max J. Kuney
Co., Correspondence 1976 |
28 | Experimental Animal Lab - Program
6/2/75 |
28 | Experimental Animal Lab - Scientific
Systems Corp., Instrument Manual for Animal Test Chamber
1978 |
28 | Experimental Animal Lab - Rejected Bids -
5/25/76 |
28 | Experimental Animal Lab - Rejected Bids -
Electrical 5/76 |
28 | Experimental Animal Lab - Rejected Bids -
Mechanical 5/76 |
28 | Experimental Animal Lab - Larry Tate,
Sculptor Contract, C.O.'s, Payments 76-77 |
28 | Additional Environmental Rooms for
Experimental Animal Lab - Gen. Corresp. 7/77 |
28 | Additional Environmental Rooms for
Experimental Animal Lab - Rejected Bids 6/30/77 |
28 | Additional Environmental Rooms for
Experimental Animal Lab - M.J. Kuney Contract, Payments,
Etc. |
28 | Additional Environmental Rooms for
Experimental Animal Lab - M. J. Kuney Corresp. 7/77 |
BUILDING #9031 CREW SHELLHOUSE WAWAWAIReturn to Top
Container(s) | Description |
---|---|
Box | |
28 | Shellhouse - General
Correspondence |
28 | Shellhouse - Budget |
28 | Crew Shellhouse - EIS |
28 | Crew Shellhouse - Diary
Reports |
28 | A Crew Shellhouse - Wind River
Construction, Corresp. |
28 | Launch Boathouse and Docks - General
Correspondence 9/3/84 |
28 | A Crew Shellhouse - Wind River
Construction, Contract, Payments, C.O.'s |
28 | Shellhouse - Campbell Engineers, Inc.,
Correspondence |
28 | Shellhouse - Campbell Engineers, Inc.,
Contract, Payments, etc. |
28 | A Crew Shellhouse - Concrete
Testing |
28 | A Crew Shellhouse - Affirmative Action
Reports |
28 | A Crew Shellhouse - Rejected
Bids |
28 | Launch Boathouse - Rejected
Bids |
LOCATION #3000 TFRC WENATCHEEReturn to Top
Container(s) | Description |
---|---|
Box | |
28 | USDA Addition to Tree Fruit Research
Center - Budget |
28 | Structural Calculations by Joseph F.
Jackson, PE For USDA/NWS Facility 8/12/1976 |
28 | Mechanical Calculations - USDA/NWS
Facility 8/12/76 |
28 | USDA/NWS Facility - Wenatchee - Keying
Schedule |
28 | USDA/NWS Facility - Wenatchee - Pittsburgh
Testing Labs, Concrete Testing 1976, 1977 |
28 | USDA/NWS Facility - Wenatchee - General
Correspondence 1/77 |
28 | Lease Facility - Wenatchee - Dept. of
Housing and Urban Development - Application |
28 | USDA/NWS Facility - Wenatchee - Fraley and
Leighton Corresp. 1/1/77 |
28 | GSA Lease Facility - Wenatchee - Fraley
and eight on Contract |
29 | TFRC - 70-219A, Fraley, Leighton,
Architects |
29 | TFRC - 70-217, Correspondence |
29 | USDA/NWS Facility - Wenatchee, Del Guzzi
Inv. Inc., Corresp. 10/76 |
29 | USDA/NWS Facility - Wenatchee, Del Guzzi
Inv. Inc., Contract, Payments, C.O.'s 10/76 |
29 | USDA/NWS Facility - Wenatchee, Del Guzzi
Inv. Inc., Affirmative Action Reports |
29 | USDA/NWS - Wenatchee, Rejected Bids,
Electrical 9/30/76 |
29 | USDA/NWS - Wenatchee, Rejected Bids,
Mechanical 9/30/76 |
29 | USDA/NWS - Wenatchee, Rejected Bids,
General 10/76 |
29 | USDA Addition to Tree Fruit Research
Center - Fraley and Leighton, Corresp. 11/70 - 6/76 |
29 | USDA National Weather SVC Facility -
Fraley and Leighton, Corresp 7/1/76 - 12/31/1976 |
29 | USDA National Weather SVC Facility -
General Correspondence 7/1/76 - 12/31/1976 |
29 | GSA Lease Facility - Wenatchee, General
Correspondence 4/67 - 6/30/76 |
29 | LOCATION #4000 - MT. VERNON |
29 | Lab and Storage Building -
Budget |
29 | Laboratory Building - Bustad, Inc.
Contract, C.O.'s, Payments |
29 | Laboratory Building - Bustad, Inc.,
Correspondence |
29 | Lab and Storage Building - General
Correspondence |
29 | Lab and Storage Building - Henry Klein and
Assoc., Architects, Contract and C.O. 's |
29 | Lab and Storage Building - Henry Klein and
Assoc., Architects, Corresp. |
29 | Miscellaneous Storage Buildings - Rejected
Bids |
29 | Lab Building - Rejected Bids |
29 | Machinery Storage Building - Rejected
Bids |
LOCATION #9200 CAMP ROGER LARSONReturn to Top
Container(s) | Description |
---|---|
Box | |
29 | Material Lists and Cost Estimate - Camp
Manatowish |
WSU MISC. FACILITIES PLANNING FILESReturn to Top
Container(s) | Description |
---|---|
Box | |
29 | Student Housing Enrollment Projections
through 1980 - Final EIS |
29 | 1977 Turnkey Student Housing Site
Analysis |
29 | 1977 Turnkey Student Housing Project -
EIS |
29 | 1977 Turnkey - Olson-Richert-Bignold
Contract, Payments, C.O.'s |
29 | 1977 Turnkey - General
Correspondence |
29 | 1977 Turnkey - Olson-Richert-Bignold
Correspondence |
29 | 1975 Turnkey - Budget |
29 | Long Range Landscape Plan -
1963 |
29 | Long Range Landscape Plan - L. Keith
Hellstrom, Landscape Architect, Corresp. |
29 | Long Range Landscape Plan - L. Keith
Hellstrom, Landscape Architect, Contract, C.O.'s |
29 | Terreview Mobile Home Park - Draft
Environmental Impact Statement - 4/4/1977 |
29 | Stadium Way Widening - Budget |
29 | Stadium Way Overpass - General
Correspondence 1962-66 |
29 | Stadium Way Widening - General
Correspondence, Topics Program |
29 | Stadium Way Widening - Topics - Ken
Brooks, Architect, Corresp. 1971 |
29 | Misc. Off-Campus Projects - EIS 8/21/74 -
10/1/79 |
29 | Shopping Center - EIS Draft
3/78 |
29 | Pullman Parks and Recreation
EIS |
29 | Proposed Purchase of Fort Wright, Spokane
1982 |
29 | Negative Declarations - Non Department
Projects |
29 | Water Supply Plan Update - Final
Declaration of Non-Significance |
29 | Comprehensive Water Supply Plan - Draft
EIS 1973 |
29 | Water System Improvements, Prosser,
Washington, Environmental Impact Assessment |
29 | Residence Hall Study for conversion to
Academic and Student Support Space 1984 |
29 | Stevens Hall History |
29 | Waller Hall Fact Sheet 9/20/84 |
29 | Residence Hall Conversion, a proposal to
the Ad Hoc Committee 9/20/84 |
29 | Environmental Impact Statements and
Correspondence - 1973 - 1982 |
29 | 1971 - 1973 Major Capital Improvement
Program, 1971-73 Minor |
29 | Capital Budget 1973 - 1975 |
29 | Capital Budget Worksheets 1975 -
1977 |
29 | Family Student Housing Replacement -
Olson, Richert, Bignold - Contract, Payments 4/26/82 |
29 | Family Student Housing Replacement -
Olson, Richert, Bignold - Gen. Corresp. |