Preliminary Guide to the Washington State University Physical Plant Engineer Lab Records Building # 23, 1930-1983
Overview of the Collection
- Creator
- Washington State University. Physical Plant
- Title
- Preliminary Guide to the Washington State University Physical Plant Engineer Lab Records Building # 23
- Dates
- 1930-1983 (inclusive)19301983
- Quantity
- 0.5 Linear feet of shelf space, (1 Box + 1 Map Tube)
- Collection Number
- UA1997-11 (collection)
- Summary
- Engineering Lab records from Building 23 from the Physical Plant. Records range from 1930-1983. Records include air conditioning instillation, tunnel modifications, and heating systems.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content DescriptionReturn to Top
This collection consists of Mechanical Engineering Lab (23, demolished 1986) records from 1930-1983. Records include air conditioning instillation, tunnel modifications, and heating systems.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Physical Plant Engineer Lab Records Building # 23, 1930-1983 (UA1997-11)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Items are filed into subject files related to the Mechanical Engineering Lab. Tube contains plans for the Mechanical Engineering Lab.
Detailed Description of the CollectionReturn to Top
Engineering Lab records, Bldg # 23. Received at library June 13, 2007.Return to Top
Description |
---|
1. R-Sheet |
2. Shops Additions 7/24/46. Job No. 336. 3
Drawings |
3. A Shop Building for State College of
Washington. 5/15/30. Job 184. 7 Drawings |
4. Files: |
Heating, Ventilation, and Air
Conditioning |
Gas Service |
Room 102 A/C Revision |
Room 103 Air Conditioning |
Room 102 Air Conditioning |
Room 59 L1073 |
Modifications to the wind tunnel
(6/813). L2805 |
MECHANICAL ENGINEERING LABORATORY (MACHINE SHOP) - 23 - GeneralReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
number | file | ||
1124 | 23-G-01 | New Bookcase |
01-26-50 |
1770 | 23-G-02 | Ceiling Plan |
12-26-57 |
2908 | 23-G-03 | Renovations in Rooms 106 and
108 |
04-30-65 |
3110 | 23-G-04 | Gauging Lab Stage #1 |
04-13-64 |
3111 | 23-G-05 | Remodel Gauging and Specification
Labs |
07-12-66 |
3502 | 23-G-06 | Renovations in Rooms 10lB and the
Engineering Shops |
04-08-68 |
3825 | 23-G-07 | Improvements to Room 102 |
01-09-79 |
4813 | 23-G-08 | Remodel Rooms 102A, 102B, 103A and
103B |
03-19-76 |
4815 | 23-G-09 | Install Bench A/C Units in Room
106 |
03-23-76 |
4835 | 23-G-10 | Remodel Room 103 |
04-30-76 |
4904 | 23-G-11 | Relocate Wind Tunnels to Room
101 |
11-01-76 |
5007 | 23-G-12 | Deck on Roof and Alterations to Room
108 |
07-13-77 |
5895 | 23-G-13 | Modific tions to Room 101 (Log
#2805) |
05-13-82 |
5979 | 23-G-14 | Modifications to Room 101 - Contract (Log
#2805) |
09-23-82 |
6204 | 23-G-15 | Roof Plan (log #3316) |
11-17-83 |
4669 | 1-G-49 | See Exterior Painting - 1975 For
Thompson |
4-21-75 |
MECHANICAL ENGINEERING LABORATORY (MACHINE SHOP) - 23 - MechanicalReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
number | file | ||
Missing | 23-M-01 | Laboratory Addition |
01-01-41 |
1769 | 23-M-02 | Machine Shop - Heating and Ventilation
Remodel |
12-26-57 |
1784 | 23-M-03 | Welding Lab - Heating and Ventilation
Remodel |
02-14-58 |
3815 | 23-M-04 | Air Conditioning in Room 102 |
12-15-69 |
4837 | 23-M-05 | Ventilation and Special Exhaust in Room
103 |
05-04-76 |
4859 | 23-M-06 | New Ductwork from Existing Air
Conditioning Unit in Room 102 |
06-24-67 |
4907 | 23-M-07 | Air Conditioning in Room 103 |
11-03-76 |
5591 | 23-M-08 | Backflow Protection (Log
#1960) |
02-25-81 |
5979 | 23-M-09 | Modifications to Room 101 - Contract (Log
#2805) |
09-23-82 |
6196 | 23-M-10 | Exhaust Ducts and Electrical to Welding in
Room 111 (Log #3316) |
11-11-83 |
L41249 | 23-M-11 | Connect Computer Air System to Dana Screw
Computer |
03-03-89 |
MECHANICAL ENGINEERING LABORATORY (MACHINE SHOP) - 23 - ElectricalReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
number | file | ||
1306 Missing | 23-E-01 | Proposed Shop Buildings |
01-01-41 |
2292 | 23-E-02 | New Lighting of Main
Passageway |
01-06-62 |
3319 | 23-E-03 | Lighting in Room 109 |
07-27-67 |
4339 | 23-E-04 | New Lighting in Room 101 |
10-19-72 |
5510 | 23-E-05 | Existing Lighting and Power |
09-05-80 |
5979 | 23-E-06 | Modifications to Room 101 - Contract (Log
#2805) |
09-23-82 |