L.M. Winsor photograph collection, 1915-1963
Table of Contents
Overview of the Collection
- Title
- L.M. Winsor photograph collection
- Dates
- 1915-1963 (inclusive)19151963
1915-1941 (bulk)19151941 - Quantity
- 5 boxes, (2.5 linear feet)
- Collection Number
- UUS_p0343
- Summary
- Black and white photographs and negatives that document Winsor's career as an irrigation specialist and flood control researcher. Collectively, the photographs show the step-by-step construction of many dams and flood control barriers, and chronicle the changing machinery and technologies used to build dams from 1915 to the early 1940s.
- Repository
-
Utah State University, Merrill-Cazier Library, Special Collections and Archives Division
Special Collections & Archives
Merrill-Cazier Library
Utah State University
Logan, UT
84322-3000
Telephone: 4357978248
Fax: 4357972880
scweb@usu.edu - Access Restrictions
-
Open to public research.
- Languages
- Collection materials are in English.
- Sponsor
- Library Services and Technology Act (LSTA) grant, 2007-2008
Biographical Note
Luther M. Winsor, born in Hebron, Utah on January 21, 1884, spent his whole life working with water, irrigation, and flood control. With his experience and expertise he was appointed to governmental positions on both the state and national level as well as serving as a specialist to private companies. The bulk of his work with irrigation and flood control kept him in Utah, but he also studied and developed water programs in Chile, Iran, Canada, and much of the western United States.
His early life in Hebron, Washington County, consisted of learning first-hand about irrigation, masonry, and railroad surveying. In 1904 he registered at Utah Agricultural College (now Utah State University) in Logan. From the outset of his education he focused on irrigation. He not only attended college, but he also gained valuable field experience by working under the State Engineer in Logan measuring water levels in canals and studying water use in crop production with an appointment from the United States Division of Irrigation Investigations. In 1911 he became the first person in Utah to receive a degree in Irrigation Engineering. In 1926 Winsor earned a Master's degree from the University of California, Berkeley.
Winsor held numerous positions, most of which were concerned with irrigation and flood control. Shortly after he received his degree, Winsor became the first County Agent in the West and served posts in the Uintah Basin and in Colorado. In 1913 he served as the Irrigation Specialist, a position he held for more than 20 years, for the state of Utah. It was in this capacity that he assisted in analyzing floods and developed the barrier system of flood control, in which debris is channeled away from flood waters.
Besides assisting in many flood control projects in Utah, in 1918 Winsor was called upon by the American Smelting and Refining Company to investigate irrigation and, as a result, increase food production for the company's copper mine camp in northern Chile. He would also assist the company on future projects in Garfield, Utah and Black Lake, Quebec. Winsor felt his most significant work, however, was in Iran (under appointment from the President of the United States) serving as Director General at the Ministry of Agriculture. Winsor spent almost five years in the 1940s in the Middle East.
Winsor published extensively about the many projects he assisted on or developed. On January 18, 1968 he passed away. His groundbreaking work set standards for flood control and irrigation not only in Utah, but throughout the West.
Content Description
The L.M. Winsor Photograph Collection consists of 958 photographs and negatives that document Winsor's carreer as an irrigation specialist and flood control researcher. Collectively, the photographs show the step-by-step construction of many dams and flood control barriers, and chronicle the changing machinery and technologies used to build dams from 1915 to the early 1940s. Included in the images are many different irrigation and flood control projects, the surveying of the Bear River Migratory Bird Refuge, and photos of the Lake Mead area. Many of the photos are of Winsor's farm or projects in Enterprise, Utah. Also contains his report, "Utah's flood problem," and photos showing damage from various Utah floods and flood control projects, in particular the Willard, Utah flood of Aug. 13, 1923.
Box 1 documents the building of a dam at Enterprise, Utah from 1915 through 1918. Boxes 2 and 3 contain photographs and negatives in chronological order by year, from 1916 to 1941. Included in the images are many different irrigation and flood control projects, along with the surveying of the Bear River Migratory Bird Refuge. Box 4 is comprised mostly of unidentified prints. The photos in box 5 are part of a report submitted by Winsor to the Utah State Land Board. Although this report on Utah's flood problems was originally located in the manuscript collection (MSS 98), it was included because of the link with the photos in Box 5. Most photographs were given detailed captions by Winsor. An additional set of negatives and prints were included in 2024 (Box 4, folder 27).
L.M. Winsor's original captions were used where available to describe the images. His original numbering was also maintained in addition to our own numbering system. Within the first 3 boxes, there is an occasional empty envelope with a typed caption. These original envelopes were kept in the collection because they may correspond with photos in the L.M. Winsor manuscript collection (MSS 98). This collection also contains a box marked "Picture Index," but does not refer to photographs in this collection. All of the negatives appear to be made of nitrate cellulose. Box 3 also contains 57 negatives which are recent copies of existing photos and negatives from the L.M. Winsor manuscript collection.
Use of the Collection
Restrictions on Use
It is the responsibility of the user to obtain permission to publish from the owner of the copyright (the institution, the creator of the record, the author or his/her transferees, heirs, legates, or literary executors). The user agrees to indemnify and hold harmless the Utah State University Libraries, its officers, employees, and agents from and against all claims made by any person asserting that he or she is an owner of copyright.
Permission to publish material from the L.M. Winsor photograph collection must be obtained from the Photograph Curator and/or the Special Collections Department Head.
Preferred Citation
L.M. Winsor photograph collection, 1915-1963. (P0343). Utah State University. Special Collections and Archives Department.
Administrative Information
Arrangement
Arranged in numeric sequence according to Box and item
Acquisition Information
Donated in 1968 by Mrs. L.M. Winsor
Processing Note
Guide completed by Matthew Stiffler, May 2003, with additional material added in 2024 by Heather Housley.
Separated Materials
Photographs and report in box 5 were removed from L.M. Winsor papersMSS 98.
Related Materials
L.M. Winsor manuscript collection (COLL MSS 98)
Detailed Description of the Collection
-
I. Enterprise Dam construction, 1915-1919
-
Description: 1:01: Beaver DrainageDates: 1915 AugustContainer: Box 1
-
Description: 1:02: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:03: Enterprise, UTDates: 1915 DecemberContainer: Box 1
-
Description: 1:04: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:05: Enterprise, UTDates: 1911 DecemberContainer: Box 1
-
Description: 1:06: Enterprise, UTDates: 11916 November-DecemberContainer: Box 1
-
Description: 1:07: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:08: Enterprise, UTDates: 1916 November-DecemberContainer: Box 1
-
Description: 1:09: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:10: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:11: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:12: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:13: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:14: Enterprise, UTDates: 1917 JulyContainer: Box 1
-
Description: 1:15: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:16: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:17: Enterprise, UTDates: 1917 JulyContainer: Box 1
-
Description: 1:18: Enterprise, UTDates: 1916 November-DecemberContainer: Box 1
-
Description: 1:19: Enterprise, UTDates: 1917 November and DecemberContainer: Box 1
-
Description: 1:20: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
Description: 1:21: Enterprise, UTDates: 1915 MayContainer: Box 1
-
Description: 1:22: Enterprise, UTDates: 1915 MayContainer: Box 1
-
Description: 1:23: Enterprise, UTDates: 1916 NovemberContainer: Box 1
-
Description: 1:24: Enterprise, UTDates: 1916 NovemberContainer: Box 1
-
Description: 1:25: Enterprise, UTDates: 1916 NovemberContainer: Box 1
-
Description: 1:26: Enterprise, UTDates: 1916 NovemberContainer: Box 1
-
Description: 1:27: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:28: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:29: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:30: Enterprise, UT, Cave CanyonDates: 1917 DecemberContainer: Box 1
-
Description: 1:31: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:32: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:33: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:34: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:35: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:36: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:37: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:38: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:39: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:40: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:41: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:42: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:43: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:44: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:45: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:46: Enterprise, UTDates: 1916 AprilContainer: Box 1
-
Description: 1:47: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:48: Enterprise, UTDates: 1916 MarchContainer: Box 1
-
Description: 1:49: Enterprise, UTDates: 1915 MarchContainer: Box 1
-
Description: 1:50: Enterprise, UTDates: 1915 MarchContainer: Box 1
-
Description: 1:51: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:52: Enterprise, UTDates: 1919 DecemberContainer: Box 1
-
Description: 1:53: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:54: Enterprise, UTDates: 1918 SeptemberContainer: Box 1
-
Description: 1:55: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:56: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:57: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:58: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:59: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:60: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:61: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:62: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:63: Enterprise, UTDates: 1917 DecemberContainer: Box 1
-
Description: 1:64: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
Description: 1:65: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:66: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:67: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:68: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:69: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:70: Enterprise, UTDates: 1918 MarchContainer: Box 1
-
Description: 1:71: Enterprise, UTDates: 1917Container: Box 1
-
Description: 1:72: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:73: Enterprise, UTDates: 1917 SeptemberContainer: Box 1
-
Description: 1:74: Enterprise, UTDates: 1917 SeptemberContainer: Box 1
-
Description: 1:75: Enterprise, UTDates: 1917 SeptemberContainer: Box 1
-
Description: 1:76: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:77: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:78: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:79: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:80: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
Description: 1:81: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
Description: 1:82: Enterprise, UTDates: 1916 DecemberContainer: Box 1
-
Description: 1:83: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
Description: 1:84: Enterprise, UTDates: 1916 November and DecemberContainer: Box 1
-
-
II. Images by date, 1916-1941
-
1916-1920
-
Description: 2:01: Enterprise, UT. Spillway from reservoir No. 1 with Bishop Geo. A. Holt and Director L.M. Terry of the Canal Board looking the situation overDates: 1916Container: Box 2
-
Description: 2:02: Enterprise, UT. Location: Undercurrent Dam Site. View showing detail of constructionDates: 1916 DecemberContainer: Box 2
-
Description: 2:03: Orderville, UT. Diversion dam of logs and rock at head waters of Orderville Canyon. This dam has stood through many floodsDates: 1916Container: Box 2
-
Description: 2:04: Enterprise, UT. Outlet work consists of double set of flashboardsDates: 1916Container: Box 2
-
Description: 2:05: Enterprise, UT. Group of water users and members of canal board along with Dr. Samuel Fortier examining condition of down-stream face of old damDates: 1916 SeptemberContainer: Box 2
-
Description: 2:06: Enterprise, UT. Group of Enterprise water users examining old dam. Looking west along top of crestDates: 1916 SeptemberContainer: Box 2
-
Description: 2:07: Enterprise, UT. Bishop Geo. A. Holt and detail of down-stream face near middle of old damDates: 1916 SeptemberContainer: Box 2
-
Description: 2:08: Enterprise, UT. Detail of masonry near west wall, down-stream face of old damDates: 1916 SeptemberContainer: Box 2
-
Description: 2:09: Enterprise, UT. Upper Reservoir. Dr. Samuel Fortier examining conditions of masonry in lower face of old damDates: 1916 SeptemberContainer: Box 2
-
Description: 2:10: Enterprise, UT. Three views showing ladder and gate installation at intake to tunnel during process of constructionDates: 1917 DecemberContainer: Box 2
-
Description: 2:11: Enterprise, UT. Jim Barnum on guard at Enterprise Dam No.1Dates: 1918 MayContainer: Box 2
-
Description: 2:12: Cedar City, UT. Lyle well rig and Weagle perforated well using casing used in sinking Jones Experimental wellDates: 1919Container: Box 2
-
Description: 2:13: Mt. Pleasant, UT. Flood control structure, looking down stream at spillway after heavy torrential floodDates: 1919Container: Box 2
-
Description: 2:14: Chile, South America. Location: Headworks of water system in Ranc Auga Valley, Southern Chile. Looking down stream at intake to parallel canal system with caretakers's residence in foregroundDates: 1919 MayContainer: Box 2
-
Description: 2:15: Chile, South America. Location: Control gates at headworks of main delivery system. Two views: No.1 looking down stream, and No. 2 looking up streamDates: 1919 MayContainer: Box 2
-
Description: 2:16: Fillmore, UT. Clyde and Croft testing Mearioneaux well with air compressure outfitDates: 1920Container: Box 2
-
Description: 2:17: Ogden Valley, Ogden, UT. Testing city well with an air-lift pumping plant. Russel Croft in foreground. Air-lift pump equipment shown on left, and 100 cu. feet air tank in foregroundDates: 1920Container: Box 2
-
Description: 2:18: Fillmore, UT. Two views of air testing equipment for cleaning out and testing the water supply in deep wells, with George D. Clyde as operatorDates: 1920Container: Box 2
-
Description: 2:19: Fillmore, UT. Another view of air testing equipment in operation. Millard CountyDates: 1920Container: Box 2
-
Description: 2:20: North Salt Lake, UT. Location: Stock Yard Well. Making a test on water supply and cleaning well with an air testing outfit. Joseph Manderfield, manager of the yards, is the central figureDates: 1920Container: Box 2
-
-
1921-1923
-
Description: 2:21: Logan, UT. Two views of first Logan residence in winter soon after birth of oldest son, LutherDates: 1921 DecemberContainer: Box 2
-
Description: 2:22: Vernon, UT. First test on Fredrickson well, same being made with wood screw pumpDates: 1921 JulyContainer: Box 2
-
Description: 2:23: Ogden Valley, UT. Testing the flowing wells at head of Ogden Water systemDates: June or July 1921Container: Box 2
-
Description: 2:24: Beaver, UT. Location: North Creek. Blue Lake on North Creek. Making survey for proposed strorage reservoir. Dam site is in narrow gorge beyond the lake directly over the instrumentDates: 1922 SeptemberContainer: Box 2
-
Description: 2:25: Spring City?, UT. Following first torrential flood after construction of new diversion dam shown in distanceDates: 1922Container: Box 2
-
Description: 2:26: Lund, UT. Location: Hugo Hunt Well. Two views testing the flow from Hugo Hunt well with a v-notch weir. Winsor and Fife making the measurementDates: 1922 JulyContainer: Box 2
-
Description: 2:27: Enterprise, UT. Two views of laying the foundation for spillway at intake to canal systemDates: 1922 DecemberContainer: Box 2
-
Description: 2:28: Enterprise, UT. Narrows Dam Site. Looking upstream at tunnel outlet sectionDates: 1922 NovemberContainer: Box 2
-
Description: 2:29: Enterprise, UT. Examining the rock fill below the old dam. LM Winsor, LM Terry, Tom Robinson, George A. Holt, and Roy AdamsDates: 1922 SeptemberContainer: Box 2
-
Description: 2:30: Enterprise, UT. Location: Upper Reservoir. Looking upstream face of old damDates: 1922 SeptemberContainer: Box 2
-
Description: 2:31: Enterprise, UT. Under-current dam. General view of dam and spillway. In foreground is high lane diversion damDates: 1922 November 22Container: Box 2
-
Description: 2:32: Enterprise, UT. Under current dam. Looking down-stream through Juniper post curb spillwayDates: 1922 November 22Container: Box 2
-
Description: 2:33: Manti, UT. General view of barrier and barrier basinDates: 1922Container: Box 2
-
Description: 2:34: Manderfield, UT. Intake to diversion canal where stream was diverted from five miles of dry sand into a canal leading to farm lands across good formation, thus saving seepage lossDates: 1922Container: Box 2
-
Description: 2:35: Nephi, UT. Location: Upper Barrier, Spillway structure soon after completionDates: 1922 DecemberContainer: Box 2
-
Description: 2:36: Nephi, UT. Location: Upper Salt Creek. Locating barrier control siteDates: 1922 SeptemberContainer: Box 2
-
Description: 2:37: Spring City, UT. Looking down stream through timber crib division dam following summer floodDates: 1922 JulyContainer: Box 2
-
Description: 2:38: Spring City, UT. Diversion dam at head of new high line canal following terrific summer flood which struck concrete head wall before it was a week oldDates: 1922 SeptemberContainer: Box 2
-
Description: 2:39: Spring City, UT. View at intake to diversional canal following torrential floodDates: 1922Container: Box 2
-
Description: 2:40: Enterprise, UT. Undercurrent Dam. Looking downstream across old sand dam which has been replaced by the structure shown in the distanceDates: 1922 November 22Container: Box 2
-
Description: 2:41: Davis Creek, UT. Looking north along west margin of highway showing abruptness with which the mud flow stopped in the foreground, and how it pushed its way on west across the strip between the telephone polesDates: 1923 September 2Container: Box 2
-
Description: 2:42: Enterprise, UT. Location: Undercurrent Dam Site. Completing the excavation prior to starting the damDates: 1923 NovemberContainer: Box 2
-
Description: 2:43: Enterprise, UT. Location: Undercurrent Dam Site. Beginning excavation. Looking up streamDates: 1923 NovemberContainer: Box 2
-
Description: 2:44: Enterprise, UT. Location: Undercurrent Dam Site. Series of views showing phases of excavation for permanent dam siteDates: 1923 NovemberContainer: Box 2
-
Description: 2:45: Enterprise, UT. Location: Undercurrent Dam Site. Two views showing sand dam at intake to canal system which was replaced by a permanent structure about 300 feet down streamDates: November 1923Container: Box 2
-
Description: 2:46: Enterprise, UT. Location: Undercurrent Dam Site. Two views showing foundation of structure in process of erectionDates: 1923 NovemberContainer: Box 2
-
Description: 2:47: Enterprise, UT. Location: Undercurrent Dam Site. Four views. Puddling the eroded fill into place above the spillway structure as it was builtDates: 1923 NovemberContainer: Box 2
-
Description: 2:48: Enterprise, UT. Location: Undercurrent Dam Site. Looking down stream across old canal intake toward excavation where permanent diversion dam is being builtDates: 1923 NovemberContainer: Box 2
-
Description: 2:49: Enterprise, UT. Location: Undercurrent Dam Site. Looking down stream at excavation for permanent diversion damDates: 1923 NovemberContainer: Box 2
-
Description: 2:50: Farmington, UT. Location: Farmington Road Crossing. Road Crossing at Farmington after the flood of August 13, 1923Dates: 1923 September 3Container: Box 2
-
Description: 2:51: Farmington, UT. Location: Mouth of Canyon. Showing huge boulders and mass of smaller boulders carried down stream by flood of August 13Dates: 1923 September 3Container: Box 2
-
Description: 2:52: Farmington, UT. Flood and gravel barriers across Cottonwood Creek at Farmington, constructed in 1924, following the flood of August 13, 1923, and the period of high water in the Spring of 1923, during which time the stream was out of bounds after four days of high water. A deep narrow channel had been constructed to carry the stream but had been filled with sand, gravel, and boulders in four days timeDates: 1923 AugustContainer: Box 2
-
Description: 2:53: Farmington, UT. Following flood of Aug. 13, 1923. This boulder, estimated to weigh more than 300 tons, was carried more than a quarter of a mile by the floodDates: 1923 September 5Container: Box 2
-
Description: 2:54: Ford Creek, UT. Location: Mouth of Ford Canyon. View showing sizes of boulders carried out by mud flowDates: 1923 October 12Container: Box 2
-
Description: 2:55: Ford Creek, Davis County, UT. Hess home on Ford Creek, destroyed by flood Aug. 13, 1923Dates: 1923 September 3Container: Box 2
-
Description: 2:56: Haights Creek, UT. Completed diversion structure in operation during spring high water. Water for irrigation is being diverted on both sides of spillwayDates: 1923 AprilContainer: Box 2
-
Description: 2:57: Manti, UT. Spillway in operation during spring run-offDates: 1923 MayContainer: Box 2
-
Description: 2:58: Nephi, UT. Location: Lower Spillway. Two viewsDates: 1923Container: Box 2
-
Description: 2:59: Nephi, UT. Lower barrier spillway in operation during highwater run-off, first season after constructionDates: 1923Container: Box 2
-
Description: 2:60: Steed Creek, UT. Looking toward mouth of canyon following the big floodDates: 1923 September 2Container: Box 2
-
Description: 2:61: Strawberry Valley, UT. Location: Strawberry River. Three views. One evening's catch. Trolling from a boat on Strawberry LakeDates: 1923Container: Box 2
-
Description: 2:62: Wales, UT,. Location: Vales Reservoir. View of Reservoir while same was being surveyed for possible increase in capacityContainer: Box 2
-
Description: 2:63: Willard, UT. Barn containing 75 tons of hay carried a quarter of a mile, and landed on Main Street, by flood of Aug. 13, 1923Dates: 1923 August 23Container: Box 2
-
Description: 2:64: Willard, UT. View of southwest corner of barrier site as it was left by flood of Aug. 13Dates: 1923 August 23Container: Box 2
-
Description: 2:65: Willard, UT. Site of present gravel control worksDates: 1923 August 23Container: Box 2
-
Description: 2:66: Willard, UT. panorama of Main Street and path of flood through north portion of Willard. Site later used for construction of flood control barrierDates: 1923 August 23Container: Box 2
-
Description: 2:67: Willard, UT. Looking down Main Street from North end of Willard, following flood of August 13, 1923Dates: 1923 September 23Container: Box 2
-
-
1924-1925
-
Description: 2:68: Castle Gate, UT. Two views of Castle RockDates: 1924Container: Box 2
-
Description: 2:69: Enterprise, UT. A few turkeys on the old homesteadDates: 1924 JulyContainer: Box 2
-
Description: 2:70: Enterprise, UT. Location: Dam at Narrows. View showing detail of outlet gatesDates: 1924 NovemberContainer: Box 2
-
Description: 2:71: Enterprise, UT. Location: Dam at Narrows. View showing detail of outlet gatesDates: 1924 NovemberContainer: Box 2
-
Description: 2:72: Farmington, UT. Foundation of spillway structure after it was raised for the run-off of 1925. Looking up streamDates: 1924 NovemberContainer: Box 2
-
Description: 2:73: Enterprise, UT. Location: Narrows Dam site. Calking cast iron pipes on each end of outlet gates. View also shows forms for outlet tunnels. Roy Adams, foreman, on left, and Hiram Lamb in the middle, with Joseph Jones doing the calkingDates: 1924 NovemberContainer: Box 2
-
Description: 2:74: Enterprise, UT. Location: Narrows Dam site. General view of dam site with camp in foregroundDates: 1924 NovemberContainer: Box 2
-
Description: 2:75: Enterprise, UT. Location: Narrows Dam site. Looking west along up-stream face of ledge. Derrick shows opening through the ledge where the dam is in process of constructionDates: 1924 NovemberContainer: Box 2
-
Description: 2:76: Enterprise, UT. Location : Narrows Dam site. Quarry from which rock were obtained for dam in distance over top of derrick poleDates: 1924 NovemberContainer: Box 2
-
Description: 2:77: Enterprise, UT. Location: Narrows Dam site. Tunnel outlet formDates: 1924 NovemberContainer: Box 2
-
Description: 2:78: Enterprise, UT. Location: Narrows Dam site. View showing excavation and fill matter at east end of damDates: 1924 NovemberContainer: Box 2
-
Description: 2:79: Enterprise, UT. Location: Narrows Dam site. Set-up for pouring foundationDates: November 1924; 1924 NovemberContainer: Box 2
-
Description: 2:80: Enterprise, UT. Foundation brought nearly to water level. View shows excavation along ledge to right, and beginning of concrete workDates: November 1924Container: Box 2
-
Description: 2:81: Enterprise, UT. Location: Narrows Dam site. Dragging rock into the dam site from a quarryDates: 1924 NovemberContainer: Box 2
-
Description: 2:82: Enterprise, UT. Location: Narrows Dam site. Looking down stream through gap while foundation was being laid for structureDates: 1924 NovemberContainer: Box 2
-
Description: 2:83: Enterprise, UT. Beginning construction of reservoir, Dam No. 2 at narrows. 1 mile below No.1 which lies under "x." If this dam were raised 128 feet it would inundate No. 1Dates: November 1924; 1924 NovemberContainer: Box 2
-
Description: 2:84: Enterprise, UT. Beginning construction of dam at narrowsDates: 1924 NovemberContainer: Box 2
-
Description: 2:85: Farmington, UT. Location: Farmington Road Crossing. Workers endeavoring to keep stream within confinement of channel. Two days later the channel completely filled and stream broke away just beyond bridge to leftDates: 1924 April 15Container: Box 2
-
Description: 2:86: Farmington, UT. Location: Power Plant, on Cottonwood Creek, Davis County. After the flood of Aug. 13, 1923. Note temporary pipe line carrying water out for irrigation purposesDates: 1923 SeptemberContainer: Box 2
-
Description: 2:87: Fillmore, UT. Looking up stream at spillway, during second season of operationDates: 1924 AprilContainer: Box 2
-
Description: 2:88: Fillmore, UT. Looking up stream across North End of Fillmore flood barrier, first season of operationDates: 1924 JulyContainer: Box 2
-
Description: 2:89: Kanosh, UT. Flood barrier spillway. Two views showing detail of constructionDates: 1924Container: Box 2
-
Description: 2:90: Parowan, UT. Two views near mouth of Parowan canyon showing immense deposit of gravel which had been cleared out of stream during period of high water flow in previous years. This method of control was used in an effort to clear the stream of debris so that it might be used for irrigationDates: 1924 AprilContainer: Box 2
-
Description: 2:91: Willard, UT Water running down street from overflow in main channelDates: 1924 Mah 14Container: Box 2
-
Description: 2:92: Willard, UT. View of twin culverts just as they were about to be completely filled with gravelDates: 1924 May 6Container: Box 2
-
Description: 2:93: Willard, UT. Looking down stream from mouth of canyon just before stream was placed under controlDates: 1924 May 8Container: Box 2
-
Description: 2:94: Willard, UT. Looking down stream across remnants of original diversion dam. Committee on left is discussing the problem of supporting the proposition to control the streamDates: 1924 May 8Container: Box 2
-
Description: 2:95: Willard, UT. Location: Willard Barrier. Photograph of west embankment just before water turned in for the first timeDates: 1924 May 9Container: Box 2
-
Description: 2:96: Willard, UT. Evening. Looking north along highway on west side of barrier a short time after same was put into operation for the first time. Sand bags were used to direct the water off of the road and carry it through the channel above the temporary road crossing. Note the heavy leak through the section of the embankment near the telephone poleDates: 1924 May 9Container: Box 2
-
Description: 2:97: Willard, UT. Looking northeast across corner of west dike during early stages of development showing how high water had buried the mass of boulders during a period of less than 12 days of operationDates: 1924 MayContainer: Box 2
-
Description: 2:98: Willard, UT. Road crossing in front of temporary spillway three days after flood was placed under control by spreading it above the barrier where it dropped its load of gravel. The water was then collected over the temporary spillway and passed across the road as shownDates: 1924 May 12Container: Box 2
-
Description: 2:99: Willard, UT Temporary spillway at northwest corner of barrier basin 5 days after flood stream had been diverted under the boulder covered areaDates: 1924 May 14Container: Box 2
-
Description: 2:100: Oregon. Location: On the Columbia Highway. Making campDates: 1925 DecemberContainer: Box 2
-
Description: 2:101: Enterprise, UT. The old Dodge truck loaded with a portion of Utah's best cropDates: 1925 MayContainer: Box 2
-
Description: 2:102: Enterprise, UT. A few turkeys on the L.M. Winsor farmDates: 1925 JuneContainer: Box 2
-
Description: 2:103: Enterprise, UT. TurkeysDates: 1925 JuneContainer: Box 2
-
Description: 2:104: Enterprise, UT. TurkeysDates: 1925 JuneContainer: Box 2
-
Description: 2:105: Enterprise, UT. Location: Undercurrent Dam. Breakwater below Undercurrent Dam just finishedDates: 1925 MarchContainer: Box 2
-
Description: 2:106: Enterprise, UT. Location: Dam No. 2. Excavation along face of ledge at east end of structure before concrete was laidDates: 1925 JuneContainer: Box 2
-
Description: 2:107: Enterprise, UT. Location: Dam No. 2. Series of views showing detail in structure formation where dam was being builtDates: 1925 AprilContainer: Box 2
-
Description: 2:108: Enterprise, UT. Location: Dam No. 2. panorama of upstream faceDates: 1925 JuneContainer: Box 2
-
Description: 2:109: Enterprise, UT. Dam No. 2. panorama of down stream faceDates: 1925Container: Box 2
-
Description: 2:110: Enterprise, UT. Location: Dam No.2. Showing detail of upstream face and character of ledge materials which was covered on west wing of structureDates: 1925 JuneContainer: Box 2
-
Description: 2:111: Enterprise, UT. Location: No 2. Dam. View showing detail of construction of down-stream faceDates: 1925 July 20Container: Box 2
-
Description: 2:112: Enterprise, UT. Dam No. 2. Down-stream face, showing off set at beginning of arch above foundation. Base of foundation is 30 ft thick. Base of arch is 12 ft thickDates: 1925 JuneContainer: Box 2
-
Description: 2:113: Enterprise, UT. Location: Dam No. 2. Looking west along side of ledge against which dam was being builtDates: 1925 JuneContainer: Box 2
-
Description: 2:114: Farmington, UT. Flood control barrier in full action near close of seasonDates: 1925 MayContainer: Box 2
-
Description: 2:115: Santa Quin, UT. Cleaning out the weir box above distribution system after same had been filled by repeated floodingDates: 1925 AprilContainer: Box 2
-
Description: 2:116: Toole County, UT. Looking west across the Great American Desert. Granite Mountain in distanceDates: 1925Container: Box 2
-
Description: 2:117: Willard, UT. Willard Barrier. panoramaDates: 1925 MayContainer: Box 2
-
Description: 2:118: Willard, UT. View of barrier and spillway after first raise of spillway. Note pipe in middle which denotes the first crest levelDates: 1925Container: Box 2
-
Description: 2:119: Willard, UT. Two views of large gravel fan immediately east of town. This comes from a dry canyonDates: 1925 FebruaryContainer: Box 2
-
Description: 2:120: Willard, UT. Southwest corner of temporary barrier basin after gravel had been scraped onto south embankmentDates: 1925 MayContainer: Box 2
-
Description: 2:121: Willard, UT. Location: Willard Gravel Control. Southwest corner at close of first season after extensionDates: 1925 JuneContainer: Box 2
-
Description: 2:122: Willard, UT. Willard Spillway. Wall in foreground is rubble masonryDates: 1925Container: Box 2
-
Description: 2:123: Willard, UT. Looking at west wing corner interior of barrier basin as the barrier was being raisedDates: 1925 MarchContainer: Box 2
-
Description: 2:124: Willard, UT. Last end of high water season showing uniformed distribution of stream over interior of barrier basin, and manner in which stream was collected and passes over spillwayDates: 1925 JuneContainer: Box 2
-
Description: 2:125: Willard, UT. Fresnel four-ups raising marginal embankments around southwest corner of barrier basinDates: 1925 JulyContainer: Box 2
-
Description: 2:126: Willard, UT. panorama of southwest corner showing height of barrier after same had been raised following the second season's depositDates: 1925 July 30Container: Box 2
-
Description: 2:127: Willard, UT. panorama of barrier looking south, after summer floodDates: 1925 November 30Container: Box 2
-
Description: 2:128: Willard, UT. Southwest corner after summer floodDates: 1925 November 30Container: Box 2
-
Description: 2:129: Willard, UT. Willard Barrier. Interior of barrier during period of spring sun-off showing extreme characteristicsDates: 1925 MayContainer: Box 2
-
Description: 2:130: Willard, UT. panorama of southwest corner showing interior of basin following second season of operation after barrier had been extended to the southDates: 1925 June 24Container: Box 2
-
Description: 2:131: UnidentifiedDates: UndatedContainer: Box 2
-
Description: 2:132: Willard. SW corner of Gravel controlDates: UndatedContainer: Box 2
-
Description: 2:133: Farmington, UT, November 1925. Spillway and barrier basin after summer floods and before 1926 highwaterDates: 1925 June 24Container: Box 2
-
Description: 2:134: Willard, UT. General view from mouth of Willard canyon looking down toward the lake across Willard fanDates: 1925 MarchContainer: Box 2
-
Description: 2:135: Willard, UT. Looking down canyon following flood of August 13, 1923 showing characteristics of mud flow and particularly showing deposit of heavy debris on left margin of mud flow. It is characteristic that the heavy material crowds to the outside and forms a wind row of boulders along the margin of the flowDates: 1925 MarchContainer: Box 2
-
-
1926-1928
-
Description: 2:136: Enterprise, UT. New dam near completion of first additionDates: 1926 November 22Container: Box 2
-
Description: 2:137: Enterprise, UT. Location: Dam No.2. Profile view of dam in process of construction, looking eastDates: 1926 NovemberContainer: Box 2
-
Description: 2:138: Enterprise, UT. New dam near completion to first levelDates: 1926 NovemberContainer: Box 2
-
Description: 2:139: Enterprise, UT. New dam near completion to first levelDates: 1926 NovemberContainer: Box 2
-
Description: 2:140: Enterprise, UT. Location: Dam No. 2. Series of views showing construction of damDates: 1926 NovemberContainer: Box 2
-
Description: 2:141: Enterprise, UT. Location: Dam No. 2. Showing detail of hoisting device. The load of rock shown on the skip is raised by a team of horsesDates: 1926 NovemberContainer: Box 2
-
Description: 2:142: Enterprise, UT. Upstream face showing intake to outlet tunnel and showing the last nitch about ready to be filledDates: 1926 NovemberContainer: Box 2
-
Description: 2:143: Enterprise, UT. Two views showing concrete mixer in construction of Dam No.2Dates: 1926 NovemberContainer: Box 2
-
Description: 2:144: Woodruff, UT. Spillway in early stages of constructionDates: 1926Container: Box 2
-
Description: 2:145: Woodruff, UT. Getting ready for the evening meal at the close of a hard day's work. Several of these men were bitter enemies when they began work in September. Two months of work and camp life together, made fast friends of themDates: 1926 OctoberContainer: Box 2
-
Description: 2:146: Woodruff, UT. Looking upstream at spillway foundation, Woodruff Reservoir. Preparing the foundation for a spillway to be raised in stages, year by year, as the consolidation program is into operationDates: 1926 October 16Container: Box 2
-
Description: 2:147: Woodruff, UT. Looking upstream across south end of new reservoir dam. Construction camp in distance. At close of seasonDates: 1926 October 16Container: Box 2
-
Description: 2:148: Bear Bay, UT. panorama of Salt Marsh near toe of Molly's StockingDates: 1927Container: Box 2
-
Description: 2:149: Bear Bay, UT. Salt Marsh below State shooting grounds near toe of Molly's StockingDates: 1927Container: Box 2
-
Description: 2:150: Bear Bay, UT. panorama of Little MountainDates: 1927Container: Box 2
-
Description: 2:151: Bear Bay, UT. Location: Provo Club. panorama taken from water tower or Provo Club, looking from south and southwest to north and northwestDates: 1927 FebruaryContainer: Box 2
-
Description: 2:152: Bear Bay, UT. Location: Duckville Club. Views looking east toward Duckville Club from a point near the intake to No. 2 overflowDates: 1927 SeptemberContainer: Box 2
-
Description: 2:153: Bear Bay, UT. Location: North Bay. The Mud Queen operating under ideal conditions with only one inch of water on top of the mud. This boat was used for the reconnaissance survey of the Bear River Bay projectDates: 1927 SeptemberContainer: Box 2
-
Description: 2:154: Bear Bay, UT. Location: North Bay. Train of the Mud QueenDates: 1927 SeptemberContainer: Box 2
-
Description: 2:155: Bear Bay, UT. Location: Willard Spur. Negotiating deep water with Mud Queen. Note the great amount of agitation and extreme effort in evidence. Facts are the equipment moved very slowly in deep water, but attained a speed of 20 mph when skidding along the mud with water only one inch deepDates: UndatedContainer: Box 2
-
Description: 2:156: Bear Bay, UT. Location: Willard Spur. Slow progress with Mud Queen in deep waterDates: 1927 SeptemberContainer: Box 2
-
Description: 2:157: Bear Bay, UT. Location: Willard Spur. Wake of the Mud QueenDates: 1927 SeptemberContainer: Box 2
-
Description: 2:158: Bear Bay, UT. Location: North Bay. Making survey of D-line extending along the Old Bear RiverDates: 1927 NovemberContainer: Box 2
-
Description: 2:159: Bear Bay, UT. Location: Old River Channel. Showing condition of Provo Club Dam across old river bedDates: 1927 NovemberContainer: Box 2
-
Description: 2:160: Bear Bay, UT. Location: North Bay. Building dike under difficulties in North Bay. Note condition of lake surface where instruments stand on rightDates: 1927 NovemberContainer: Box 2
-
Description: 2:161: Bear Bay, UT. Location: North Bay. 50-B matting her way across North Bay near the end of the first lapDates: 1927 NovemberContainer: Box 2
-
Description: 2:162: Bear Bay, UT. Location: Bear River Club Marsh. View across marsh from east, looking westDates: 1927 July 12Container: Box 2
-
Description: 2:163: Bear Bay, UT. Location: Bear River Club Marsh. View across marsh toward river looking southeastDates: 1927 July 12Container: Box 2
-
Description: 2:164: No info. providedContainer: Box 2
-
Description: 2:165: New State Gun Club, UT. Location: Experimental Dike. View looking northeast from a position on 3 to 1 slope next to gravel covered slopeDates: 1927 September 24Container: Box 2
-
Description: 2:166: New State Gun Club, UT. Location: Experimental Dike. View of experimental dikes looking south, with 10 to 1 slope in foreground, 6 to 1 slope next, and 3 to 1 slope next. Picture taken on day when water was turned in. Water just barely up to toe of slope. Man in foreground is standing on brink in borrow pitDates: 1927 September 8Container: Box 2
-
Description: 2:167: New State Gun Club, UT. Location: Experimental Dike. View from natural embankment looking along toe of experimental dike, with 10 to 1 slope in foregroundDates: 1927 September 8Container: Box 2
-
Description: 2:168: New State Gun Club, UT. Location: Experimental Dike. View from natural embankment looking along toe of experimental dike, with 10 to 1 slope in foreground. View shows top of dike as well as toe slopeDates: 1927 September 8Container: Box 2
-
Description: 2:169: New State Gun Club, UT. Location: Experimental Dike. Close-up of 10 to 1 slope shortly after water was turned in. Heavy wind blowingDates: 1927 September 8Container: Box 2
-
Description: 2:170: New State Gun Club, UT. Location: Experimental Dike. Looking east from west end of experimental section. Gravel covered 3 to 1 slope in foregroundDates: 1927 September 15Container: Box 2
-
Description: 2:171: New State Gun Club, UT. Location: Experimental Dike. Looking east from west end of experimental section. Gravel covered 3 to 1 slope in foregroundDates: 1927 September 15Container: Box 2
-
Description: 2:172: New State Gun Club, UT. Location: Experimental Dike. Looking west from midway along experimental section. 3 to 1 uncovered slope in foreground. 3 to 1 slope covered with 4 inches of gravel next, and normal dike in distanceDates: 1927 September 15Container: Box 2
-
Description: 2:173: New State Gun Club, UT. Location: Experimental Dike. Looking east at southwestern end of experimental section with 3 to 1 slope in middle of picture. This slope had been covered by 4 inches of gravel. Note the effect in checking erosion as compared with the normal embankment in immediate foregroundDates: 1927 September 24Container: Box 2
-
Description: 2:174: New State Gun Club, UT. Location: Experimental Dike. A more direct view of the western extremity of the experimental dike at the junction between the gravel covered 3 to 1 slope and the normal embankment, 16 days after water had been turned inDates: 1927 September 24Container: Box 2
-
Description: 2:175: New State Gun Club, UT. Location: Experimental Dike. Close-up view of 3 to 1 slope showing effect of 16 days of wave actionDates: 1927 September 24Container: Box 2
-
Description: 2:176: New State Gun Club, UT. Location: Experimental Dike. Close-up view of 3 to 1 slope with 6 to 1 on extreme rightDates: 1927 September 24Container: Box 2
-
Description: 2:177: New State Gun Club, UT. Location: Experimental Dike. General view of experimental dike, looking northeast with 3 to 1 slope on left, 6 to 1 slope in middle, 10 to 1 slope in distance, and normal dike in extreme distanceDates: 1927 September 24Container: Box 2
-
Description: 2:178: New State Gun Club, UT. Location: Experimental Dike. Looking east along experimental dike from a point near 3 to 1 slope, showing 6 to 1 slope in foreground, 10 to 1 slope in distance, and normal dike in extreme distanceDates: 1927 September 8Container: Box 2
-
Description: 2:179: New State Gun Club, UT. Looking east along 10 to 1 slope with 1 1/4 slope in distance, showing difference in experimental section and in normal sections of dikeDates: 1927 September 8Container: Box 2
-
Description: 2:180: New State Gun Club, UT. Looking east along 6 to 1 slope and across 10 to 1 slopeDates: 1927 September 8Container: Box 2
-
Description: 2:181: Woodruff, UT. panorama of reservoir and dam just before work of raising began. The community has adopted the practice, as recommended at the time of reorganizing or consolidation of irrigation company, by which they turn out each fall and spend from six to seven weeks work on this dam for the purpose of raising it to greater heightDates: 1927 September 13Container: Box 2
-
Description: 2:182: Willard, UT. Looking down Willard canyon in base of talus slope. Also showing the wreck of power pipe line following the flood of August 13, 1923Dates: 1925 MarchContainer: Box 2
-
Description: 2:183: Locality: Bear River Bay. Side view of thirty-two foot boatDates: 1928 DecemberContainer: Box 2
-
Description: 2:184: Locality: Bear River Bay. At the mouth of Bear River in mid-winterDates: 1928 DecemberContainer: Box 2
-
Description: 2:185: Location: Bear River Mig. Bird Refuge. Mouth of Bear River in mid-winter. Thirty-two foot boat in actionDates: 1928 DecemberContainer: Box 2
-
Description: 2:186: Locality: Bear River Bay. Looking down Bear River from pier opposite Bear River ClubDates: 1928 DecemberContainer: Box 2
-
Description: 2:187: Locality: Bear River Bay. Looking down Bear River from pier opposite Bear River ClubDates: 1928 DecemberContainer: Box 2
-
Description: 2:188: Locality: Bear River Bay. Looking up Bear River from pier opposite ClubDates: 1928 DecemberContainer: Box 2
-
Description: 2:189: Bear Bay, UT. Location: North Bay near State Shooting Grounds. Operating plane table under difficultiesDates: 1928 NovemberContainer: Box 2
-
Description: 2:190: Bear Bay, UT. Location: Bear River Bay. Making topog in mud just south of Molly's Stocking along Y-4 base lineDates: 1928 November 9Container: Box 2
-
Description: 2:191: Locality: Highway between project and engineer's headquarters at Logan. Looking down Sardine Canyon in mid-winterDates: 1928 DecemberContainer: Box 2
-
Description: 2:192: Locality: Bear River Mig. Bird Refuge. Sounding Bear River prior to location of site for river controlDates: 1928 DecemberContainer: Box 2
-
Description: 2:193: Locality: Logan, UT,. Showing the Franklin ready for trial over the soft mud of Bear River BayDates: 1928 SeptemberContainer: Box 2
-
Description: 2:194: A light Dodge Truck followed the Franklin to the point indicated, where it "stuck." It was pulled back to solid ground by the FranklinDates: 1928 OctoberContainer: Box 2
-
Description: 2:195: A light Dodge Truck followed the Franklin to the point indicated, where it "stuck." It was pulled back to solid ground by the FranklinDates: 1928 OctoberContainer: Box 2
-
Description: 2:196: Tracks left by the Franklin in the soft groundDates: 1928 OctoberContainer: Box 2
-
Description: 2:197: Standard Evaporation Tank on raft in Hull Lake-State Shooting GroundsDates: 1928 November 9Container: Box 2
-
Description: 2:198: Looking up overflow from Hull Lake. East side of Molly's StockingDates: 1928 November 9Container: Box 2
-
Description: 2:199: Out across overflow from Hull LakeDates: 1928 November 9Container: Box 2
-
Description: 2:200: Packing up to leave. Hull Lake area. Near Molly's StockingDates: 1928 November 9Container: Box 2
-
Description: 2:201: Panorama of Hull Lake from Molly's Stocking looking toward Little Mountain around south to StockingDates: 1928 November 9Container: Box 2
-
Description: 2:202: Muskrat Nests--Salt Creek Gun Club Marsh lands near Little Mountain. Note the great number of rat housesDates: 1928 November 9Container: Box 2
-
Description: 2:203: Panorama of Weldon Lake and dike; looking south down Molly's Stocking and around to westDates: 1928 November 9Container: Box 2
-
Description: 2:204: Locality: Bear River Mig. Bird Refuge. One of the proposed sites for river control structure. Provo Club in distanceDates: 1928 DecemberContainer: Box 2
-
Description: 2:205: Bear Bay, UT. Location: River Control Head Works. View at point of island where later River Control Works was built. Looking up stream from position approximately where road crossesDates: 1928 DecemberContainer: Box 2
-
Description: 2:206: Locality: Bear River Bay. Stern view of thirty-two foot boat loaded for trip down Bear RiverDates: 1928 DecemberContainer: Box 2
-
Description: 2:207: Bear Bay, UT. Location: D-Line Survey. Showing condition of soil surface in old river bed before dike was builtDates: 1928 August 16Container: Box 2
-
Description: 2:208: Bear Bay, UT. Location: Teele Neck. Old marsh bed west of Salt Lake Club above Bond's PondDates: 1928 AugustContainer: Box 2
-
Description: 2:209: Bear Bay, UT. Location: Provo Club Dike. Showing condition of Provo Club Dike before construction of project beganDates: 1928Container: Box 2
-
Description: 2:210: Location: Bear River Bay. Looking west over break in Bear River Club canal. North of Peshes Place at the mouth of Sulphur CreekDates: 1928 November 9Container: Box 2
-
Description: 2:211: Bear Bay, UT. Location: North Bay, in vicnity of State Shooting Grounds. Mapping and laying out the Bear River Refuge involved the task of carrying alignment and levels over much soft, slippery, muck ground. Taking topog below Molly's Stocking in mud flatsDates: 1928Container: Box 2
-
Description: 2:212: Bear Bay, UT. Location: Bond's Pond. Showing condition of soil surface on bottom of pondDates: 1928 AugustContainer: Box 2
-
Description: 2:213: Bear Bay, UT. Location: Bond's Pond. Lower end of Bond's Pond. Examining soil conditionDates: 1928 AugustContainer: Box 2
-
Description: 2:214: Bear Bay, UT. Location: Bond's Pond. Examining condition on bottom of pondDates: 1928 AugustContainer: Box 2
-
Description: 2:215: Bear Bay, UT. Location: Bond's Pond. Making soil soundings on outer dike lineDates: 1928 AugustContainer: Box 2
-
Description: 2:216: Bear Bay, UT. Location: Bond's Pond. Soil boring testsDates: 1928 AugustContainer: Box 2
-
Description: 2:217: Bear Bay, UT. Location: Bond's Pond. Soil sounding tests and records prior to locating outer dike. Dr. Sherwin Maeser with the notebookDates: 1928 AugustContainer: Box 2
-
Description: 2:218: Bear Bay, UT. panorama showing State Shooting Grounds and adjacent territory taken from Little Mountain. Note the profusion of small islands with wide stretches of flat lands betweenDates: 1928 November 9Container: Box 2
-
Description: 2:219: Bear Bay, UT. Two views. Close up of Sulphur Knolls area, showing nature of the surface which may be readily converted into a refuge of the most ideal characterDates: 1928 OctoberContainer: Box 2
-
Description: 2:220: Bear Bay, UT. In vicinity of Sulphur Knolls. Topog. field partyDates: 1928 OctoberContainer: Box 2
-
Description: 2:221: Bear Bay, UT. Location: South Bay. Series of pictures showing effects of duck sicknessDates: 1928Container: Box 2
-
Description: 2:222: Enterprise, UT. Dam Narrows at crossing of irrigation systemDates: 1928 SeptemberContainer: Box 2
-
Description: 2:223: Enterprise, UT. Two views showing large boulders. Looking down streamDates: 1928 SeptemberContainer: Box 2
-
Description: 2:224: New State Gun Club, UT. Location: Experimental Dike. View looking northeast at junction of 3 to 1 gravel covered slope at normal dike, normal embankment being on the left with gravel covered slope in middle of picture, and other sections of experimental embankment in distanceDates: 1928 April 19Container: Box 2
-
Description: 2:225: New State Gun Club, UT. Location: Experimental Dike. Two views looking east along top of experimental dike from west extremity of experimental section. Remnants of 10 to 1 slope is clearly visible in section just past middle of pictureDates: 1928 April 19Container: Box 2
-
Description: 2:226: New State Gun Club, UT. Location: Experimental Dike. View looking southwest at experimental section of dike. Remnants of 10 to 1 slope in evidence in middle of picture at point where very little abruptness is shown at high water lineDates: 1928 April 19Container: Box 2
-
Description: 2:227: New State Gun Club, UT. Location: Experimental Dike. panorama showing right length of experimental section. 10 to 1 slope on extreme right, 6 to 1 slope next, followed by 3 to 1 without gravel, and 3 to 1 with gravel, then normal embankmentDates: 1928 April 19Container: Box 2
-
Description: 2:228: New State Gun Club, UT. Location: Experimental Dike. Close-up of 3 to 1 slope, looking west, showing effect of small amount of gravel in checking erosionDates: 1928 April 19Container: Box 2
-
Description: 2:229: New State Gun Club, UT. Location: Experimental Dike. View of beach line under normal embankment after six months of wave and ice action. Note the uniformity of slope and the characteristic beach effectDates: 1928 April 19Container: Box 2
-
-
1929-1930
-
Description: 3:01: Bear Bay, UT. Looking south along outer barrier pit from north end of D line northwest extremity of Bear Bay. Photo by Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:02: Bear Bay, UT. Location: South Bay. In the midst of construction of one of the spillboxes. Photo by Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:03: Bear Bay, UT. Location: South Bay. Driving sheet piling for spillbox construction with an air hammer. Photo Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:04: Bear Bay, UT. Location: South Bay. Spillbox nearing completion. Photo Mr BowenDates: 1929-1930Container: Box 3
-
Description: 3:05: Bear Bay, UT. Location: South Bay. A typical scene during a course of installing spill boxes. Photo by Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:06: Bear Bay, UT. Location: River Control. Looking up stream at bridge in process of construction. Photo Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:07: Bear Bay, UT. Location: River Control. Looking west along top of coffer dam after it had collapsed. Photo Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:08: Bear Bay, UT. Location: River Control. View showing results when coffer dam collapsed. Photo shows down-stream action. Photo by Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:09: Bear Bay, UT. Location: River Control Structure. Upstream section showing coffer day after it had collapsed. Photo Mr BowenDates: 1929-1930Container: Box 3
-
Description: 3:10: Bear Bay, UT. Looking west toward Provo Club across River Control works after the collapse of coffer dam. Photo by BowenDates: 1929-1930Container: Box 3
-
Description: 3:11: Bear Bay, UT. Location: South Bay. Checking the sufficiency of the embankment during process of construction. Photo by Mr. BowenDates: 1929-1930Container: Box 3
-
Description: 3:12: Bear Bay, UT. Location: South Bay. Matting across south bay with 50-B. Photo by BowenDates: 1929-1930Container: Box 3
-
Description: 3:13: Location Bear River Bay. Whistler's Overflow in mid-winterDates: 1929 March 29Container: Box 3
-
Description: 3:13a: Location Bear River Bay. Black slough near lower extremity of Reeder's OverflowDates: 1929 March 29Container: Box 3
-
Description: 3:14.: Location Bear River Bay. Last Chance Clubhouse, mid-winterDates: 1929 March 29Container: Box 3
-
Description: 3:15: Looking up river at S.L. Club from no bank. River over bank all wayDates: 1929 March 9Container: Box 3
-
Description: 3:16: Salt Lake Club from east end of B.R. dikeDates: 1929 March 8Container: Box 3
-
Description: 3:17: Looking south at S.L. Club. Water over banks both sides. River just beginning to breakDates: 1929 March 9Container: Box 3
-
Description: 3:18: Location: Bear River Bay. Looking northeast from bank of Brown's OverflowDates: 1929 February 23Container: Box 3
-
Description: 3:19: Location: Bear River Bay. Brown's Overflow, showing height of rover above water level in Bear River Club. Looking upstreamDates: 1929 February 23Container: Box 3
-
Description: 3:20: Looking up at Brown's Overflow into Bear River Club. Water out of banks coming around headworksDates: 1929 March 9Container: Box 3
-
Description: 3:21: Looking down Brown's Overflow into Bear River Club. Water over banks both sides. Ice bulged one foot higher in middle than on sides. Drop over flash boards 16 inDates: 1929 March 9Container: Box 3
-
Description: 3:22: Bear Bay, UT, Location: Brown's Overflow. Showing condition of flash board structureDates: UndatedContainer: Box 3
-
Description: 3:23: Bear Bay, UT, Location: Brown's Overflow. Showing condition of flash board structureDates: UndatedContainer: Box 3
-
Description: 3:24: Bear Bay, UT, Location: Brown's Overflow. Showing condition of flash board structureDates: UndatedContainer: Box 3
-
Description: 3:25: Location Bear River Bay. Ford Truck on ice on Bear River in front of Bear River Club guide houseDates: 1929 February 23Container: Box 3
-
Description: 3:26: Location: Bear River Club. In front of the Bear River Clubhouse showing level of the ice on the river in mid-winterDates: 1929 FebruaryContainer: Box 3
-
Description: 3:27: Bear River Club, showing water around club house from river. Wharf under waterDates: 1929 March 8Container: Box 3
-
Description: 3:28: Up stream along intake to Bear River Club. Between guide houses and club. Ferry boat and river in distanceDates: 1929 March 8Container: Box 3
-
Description: 3:29: Bear River, across from B.R. Club. Water over banks at FerryDates: 1929 March 8Container: Box 3
-
Description: 3:30: Looking down north bank of Bear River across from B.R. Barn. Water over banks for 1,000 feetDates: 1929 March 8Container: Box 3
-
Description: 3:31: Downstream from intake to B.R. Club above Provo FerryDates: 1929 March 8Container: Box 3
-
Description: 3:32: Two views. Looking across B. River at Guide houses, showing water over river banksDates: 1929 March 8Container: Box 3
-
Description: 3:33: Provo Ferry. River over banks both sides. Govt. cabin in backgroundDates: 1929 March 9Container: Box 3
-
Description: 3:34: Looking down river front of boat house, Provo ClubDates: 1929 March 8Container: Box 3
-
Description: 3:35: Looking up river from water tank of Provo Club. River control worksDates: 1929 March 9Container: Box 3
-
Description: 3:36: Looking west from water tank, Provo ClubDates: 1929 March 8Container: Box 3
-
Description: 3:37: Looking between houses, Provo ClubDates: 1929 March 8Container: Box 3
-
Description: 3:38: Location: Bear River Bay. Provo Club dike in mid-winterDates: 1929 FebruaryContainer: Box 3
-
Description: 3:39: Location: Bear River Bay. Provo Club Dike near intersection with Bear River Club Dike, mid-winterDates: 1929 FebruaryContainer: Box 3
-
Description: 3:40: Location: At Provo Ferry, Bear River Bay. Provo Ferry in mid-winterDates: 1929 FebruaryContainer: Box 3
-
Description: 3:41: Location: Bear River Bay. Looking west from Provo ClubDates: 1929 FebruaryContainer: Box 3
-
Description: 3:42: Location: Bear River Bay. Lower Bear River in mid-winter from Provo ClubDates: 1929 FebruaryContainer: Box 3
-
Description: 3:43: Location: Bear River Duck Club. Bear River Club in mid-winter. Taken from opposite bank across ice in riverDates: 1929 FebruaryContainer: Box 3
-
Description: 3:44: Location: Duckville Gun Club. B.R. Bay. Laying out right-of-way for road in front of Duckville Gun ClubDates: 1929 February 23Container: Box 3
-
Description: 3:45: Location: Duckville Gun Club. B.R. Bay. Intake to overflow No. 1 at Duckville Club, showing height of water in river on Feb. 23Dates: 1929 FebruaryContainer: Box 3
-
Description: 3:46: Location: Duckville Gun Club. B.R. Bay. Looking down overflow No. 1 from surface of ice in Bear River at DuckvilleDates: 1929 FebruaryContainer: Box 3
-
Description: 3:47: Location: Bear River Bay. Bear River, below Duckville ClubDates: 1929 March 29Container: Box 3
-
Description: 3:48: Location: Bear River Mig. Bird Refuge. Looking down B.R. in front of Duckville ClubDates: 1929 FebruaryContainer: Box 3
-
Description: 3:49: Location: Bear River Mig. Bird Refuge. Looking across Bear River from bank opposite Duckville Club, toward club houseDates: 1929 FebruaryContainer: Box 3
-
Description: 3:50: Bear Bay, UT. Location: Bear River Bird Refuge. panorama of Bear River Marsh in mid-winter. Looking toward State Shooting grounds on left, and up the river toward Bear River Club on rightDates: 1929 February 23Container: Box 3
-
Description: 3:51: Location: Bear River Bay. Ford Truck after removing same from mud at the edge of North BayDates: 1929 February 23Container: Box 3
-
Description: 3:52: Location: Bear River Mig. Bird Refuge. Lifting truck on to boardsDates: 1929 February 23Container: Box 3
-
Description: 3:53: Location: Bear River Bay. A side view of truckDates: 1929 February 23Container: Box 3
-
Description: 3:54: Location: Bear River Bird Ref. Side view of truckDates: 1929 February 23Container: Box 3
-
Description: 3:55: Location: Bear River Bird Ref. panorama of river control works site, looking down the river toward the island and toward the Provo ClubDates: 1929 February 23Container: Box 3
-
Description: 3:56: Location: Bear River Mig. Bird Ref. Ready to place galvanized sheet iron on sides and bottom of 32-foot boat in order to protect it against damage from iceDates: 1929 November 27Container: Box 3
-
Description: 3:57: Location: Bear River Mig. Bird Ref. Looking west from dragline at Station L-40. Note center line stakes and slope stakes at right. Also note depth of water along marshDates: 1929 November 27Container: Box 3
-
Description: 3:58: Location: Bear River Mig. Bird Ref. General view of No. 2 1/2 channel during construction of river control works. Note bypass in foreground. Note canvas covering over structure. Also note steam boiler used for heating water to raise temp. of concrete while setting. Channel No. 3 1/2 on extreme right spanned by footbridgeDates: 1929 November 27Container: Box 3
-
Description: 3:59: Location: Bear River Mig. Bird Ref. Bucyrus crawling upon double mats in North Bay at Sta. 452 to keep on top of mud. Looking from EastDates: 1929 December 10Container: Box 3
-
Description: 3:60: Location: Bear River Bird Refuge. Looking across muck ditch toward machine from west at Sta. 452 "D" lineDates: 1929 December 10Container: Box 3
-
Description: 3:61: Location: Bear River Bird Refuge. Looking at intersection of "L" and "D" line dikes at Sta. 445 from top of "D" line dike at Sta. 450. D line dike about 60% finished in first operationDates: 1929 December 10Container: Box 3
-
Description: 3:62: Location: Bear River Bird Refuge. East training wall in process of drivingDates: 1929 December 10Container: Box 3
-
Description: 3:63: Location: Bear River Bird Refuge. Puddling east wing, Channel No. 3Dates: 1929 December 10Container: Box 3
-
Description: 3:64: Location: Bear River Bay. Dragline in operation on mats in old river channelDates: 1929 November 17Container: Box 3
-
Description: 3:65: Location Bear River Bay. Intersection of canal and laterals about one and one-fourth miles from intake. Looking south along lateralDates: 1929 November 16Container: Box 3
-
Description: 3:66: Location Bear River Bay. Large barge swinging into place at River Control Works with loadDates: 1929 November 16Container: Box 3
-
Description: 3:67: Location Bear River Bay. Large barge approaching River Control Works with loadDates: 1929 November 16Container: Box 3
-
Description: 3:68: Location Bear River Bay. Spoil bank along canal line, looking upstream from south side of Feeder CanalDates: 1929 November 16Container: Box 3
-
Description: 3:69: Location Bear River Bay. Two views. View of spoil bank on south side of feeder canal between units 1 and 2. Dragline in distance near last turn in riverDates: 1929 November 16Container: Box 3
-
Description: 3:70: Location Bear River Bay. View along fill across old river channel at beginning of "L" line dike. Dragline on east end of fill. Dike only half finished, but water completely closed off in old river bedDates: 1929 November 16Container: Box 3
-
Description: 3:71: Location Bear River Bay. A section of the completed dike on south side of old river channelDates: 1929 November 17Container: Box 3
-
Description: 3:72: Location Bear River Bay. Dragline in operation placing muck from old river channel into form of dike across said channelDates: 1929 November 17Container: Box 3
-
Description: 3:73: Location: Wellsville, UT. Snow plow clearing highway between Logan and Bear River Bay RefugeDates: 1929 FebruaryContainer: Box 3
-
Description: 3:74: Location: Between Brigham City and Wellsville. Highway near summit of Sardine Canyon, leading out of Cache ValleyDates: 1929 FebruaryContainer: Box 3
-
Description: 3:75: Location: Wellsville, UT. 3 views. Streets of Wellsville just after snow plow had passed alongDates: 1929 FebruaryContainer: Box 3
-
Description: 3:76: Location: Bear River Bay. Preparations for measuring Bear River with cable way near State FerryDates: 1929 March 29Container: Box 3
-
Description: 3:77: Location: Bear River Bay. State Ferry in mid-winterDates: 1929 March 29Container: Box 3
-
Description: 3:78: Location: Bear River Bay. Water measuring cable-way across Bear River, near State FerryDates: 1929 March 29Container: Box 3
-
Description: 3:79: Bear Bay, UT. Location: Bear River at All State Ferry. Leslie Bowen measuring flow of river in winter when ice cover was not altogether safeDates: 1928-1929Container: Box 3
-
Description: 3:80: Double row of sheeting on east end of Bear River dikeDates: 1929 March 8Container: Box 3
-
Description: 3:81: Location: Bear River Bay. Edge of Bear River showing height of water on 29th of March, 1929Dates: 1929 March 29Container: Box 3
-
Description: 3:82: Location: Bear River Bay. Cable-way across lower Bear RiverDates: 1929 March 29Container: Box 3
-
Description: 3:83: panorama of River Control site. Looking toward point of island down riverDates: 1929 March 9Container: Box 3
-
Description: 3:84: Location: Govt. Cabin, Bear River Bay. Govt. Cabin on bank near Bear River, surrounded by water and iceDates: 1929 FebruaryContainer: Box 3
-
Description: 3:85: Location: Between Corinne and Brigham City. State Highway bridge across Bear RiverDates: 1929 February 23Container: Box 3
-
Description: 3:86: Location: Near Corinne. Highway between project and CorinneDates: 1929 February 23Container: Box 3
-
Description: 3:87: Prints from negatives by S.H. Newell & Co. Construction of [unintelligible] used on first contract Bear Bay refugeDates: 1929 SeptemberContainer: Box 3
-
Description: 3:88: Bear Bay, UT. Location: Bear River Club. Looking northeast toward mouth of Bear River CanyonDates: 1929Container: Box 3
-
Description: 3:89: Bear Bay, UT. Location: Bear River Club. Looking southeast from driveway through east end of margin. Note number of ducks in pictureDates: 1929Container: Box 3
-
Description: 3:90: Bear Bay, UT. Location: Bear River Club. Looking southwest from driveway through east end of margin. Note number of ducksDates: 1929Container: Box 3
-
Description: 3:91: Bear Bay, UT. Location: Bear River Club. Looking south from driveway through east end of margin. Note number of ducks in pictureDates: 1929Container: Box 3
-
Description: 3:92: Bear Bay, UT. Location: Bear River Club. Looking north from driveway through east end of marginDates: 1929Container: Box 3
-
Description: 3:93: Bear Bay, UT. Location: Bear River Club. Looking west along drivewayDates: 1929Container: Box 3
-
Description: 3:94: Woodruff, UT. A full reservoir and water to spare at the beginning of fourth year under consolidation. Plans call for a raise of 25 feet before dam is completedDates: 1929Container: Box 3
-
Description: 3:95: Bear Bay, UT. Location: Old River Channel. Showing ideal conditions for nesting with duck's nest in foregroundDates: 1930 MayContainer: Box 3
-
Description: 3:96: Bear Bay, Marsh, UT. Outlet from spill box Unit "5"Dates: 1930 JuneContainer: Box 3
-
Description: 3:97: Bear Bay, UT. 50-B Drag Line at work on Unit 2Dates: 1930 JuneContainer: Box 3
-
Description: 3:98: Bear Bay, UT. 50-B Drag Line at work on Unit 2Dates: 1930 JuneContainer: Box 3
-
Description: 3:99: Bear Bay, UT. Location: Bear River Bird Refuge. Borrow pit and dike looking south from boom of dragline near north end of "D" lineDates: 1930 April 14Container: Box 3
-
Description: 3:100: Bear Bay, UT. Location: Bear River Bird Refuge. May flies on dike spillway. Entire Salt Marsh from Promontory to Willard covered with this insectDates: 1930 April 18Container: Box 3
-
Description: 3:101: Bear Bay, UT. Location: Bear River Bird Refuge. Spillway through dike in North Bay. Sea Gulls in foregroundDates: 1930 April 18Container: Box 3
-
Description: 3:102: Bear Bay, UT. Location: Bear River Bird Refuge. Pouring concrete, canal control works leading into Unit No. 1Dates: 1930 April 18Container: Box 3
-
Description: 3:103: Bear Bay, UT. Location: Bear River Bird Refuge. Pouring concrete, canal control works leading into Unit No. 1Dates: 1930 April 18Container: Box 3
-
Description: 3:104: Bear Bay, UT. Location: River Control Works. Showing bypass and south branch of river during high water periodDates: 1930Container: Box 3
-
Description: 3:105: Bear Bay, UT. Location: River Control Structure. View looking southwest from construction campDates: 1930Container: Box 3
-
Description: 3:106: Bear Bay, UT. Location: North Bay. View along top of dike looking northwest as 2 1/4 yards of mud was being dumped from 50-BDates: 1930Container: Box 3
-
Description: 3:107: Bear Bay, UT. Location: North Bay. 50-B on double mats working her way back on west side of North Bay embankmentDates: 1930Container: Box 3
-
Description: 3:108: Bear Bay, UT. Location: North Bay. 50-B working her way back across North Bay with double mats in deepest part of bayDates: 1930Container: Box 3
-
Description: 3:109: Bear Bay, UT. Section corner boundry post in Willard Spur four to five months after latter had been first setDates: 1930 MayContainer: Box 3
-
Description: 3:110: Bear Bay, UT. Leslie Bowen at work re-setting section corner and boundry post which had been shoved over by ice sectionDates: 1930 MayContainer: Box 3
-
Description: 3:111: Bear Bay, UT. Engineers and structure carpenters having luncheon with sea gulls waiting in the back ground for their portionDates: 1930 MayContainer: Box 3
-
Description: 3:112: Bear Bay, UT. Location: River Control Structure. Looking east across overflow No. 1 1/2 after river control structure was fully completed and in operationDates: 1930Container: Box 3
-
Description: 3:113: Bear Bay, UT. Location: North Bay. 50-B working her way back across North Bay with double mats in deepest part of bayDates: 1930Container: Box 3
-
Description: 3:114: Bear Bay, UT. Location: Bear River Bird Refuge. River control works. In distance concrete work under way on canal intake to Unit No. 1Dates: 1930 April 18Container: Box 3
-
Description: 3:115: Bear Bay, UT. Location: South Bay. Construction work on typical outside dike spillway near completionDates: 1930 May 20Container: Box 3
-
Description: 3:116: Bear Bay, UT. Mr. Dillon takes a boat ride down the river. Mushback, Wilson, and Hull are the last figures in the leading boatDates: 1930 JulyContainer: Box 3
-
Description: 3:117: Bear Bay, UT. Location: South Bay. Matting across South Bay was not an easy task with a machine weighing 70 tons right over mud in which a man would sink half way to his kneesDates: 1930 AugustContainer: Box 3
-
Description: 3:118: Bear Bay, UT. Blasting outlet from box in North BayDates: 1930 NovemberContainer: Box 3
-
Description: 3:119: Bear Bay, UT. Location: South Bay. Two views showing inlet and outlet of 20-foot spill box in winter time when entire lake was frozen except through spill boxDates: 1930 DecemberContainer: Box 3
-
Description: 3:120: Bear Bay, UT. Location: South Bay Unit. Water in distance is blown by 50-mile wind out of borrow pit along outer dike where it flows across neck of land, and runs back into borrow pitDates: 1930 AugustContainer: Box 3
-
Description: 3:121: Bear Bay, UT. Location: Unit No. 2. View showing how wind blew water out of borrow pit across half a mile of land and back into borrow pitDates: 1930 AugustContainer: Box 3
-
Description: 3:122: Bear Bay, UT. Location: Unit No. 2. View showing how wind blew water out of borrow pit across half a mile of land and back into borrow pitDates: 1930 AugustContainer: Box 3
-
Description: 3:123: Bear Bay, UT. 50-B moving off the job. Stuck while moving outDates: 1930 JuneContainer: Box 3
-
Description: 3:124: Parrish Creek, UT. View just below mouth of canyon showing character of deposit made by flood of July 11, 1930. Also showing the havoc wrought. The path made by the flood was occupied by a highly improved home and orchard improvements. A beautiful modern home occupied this spot in the right extremity of the picture. Remnants of the house are shown in the photoDates: 1930Container: Box 3
-
Description: 3:125: Parrish Creek, UT. Looking down path of flood made on July 11, 1930Dates: 1930 JulyContainer: Box 3
-
Description: 3:126: Parrish Creek, Davis County, UT. Showing residence and remnants of barn in wake of floodDates: 1930 August 27Container: Box 3
-
-
1931-1941
-
Description: 3:127: Bear Bay, UT. Location: North Bay. View of North Bay beach line after terrific wind storm which lasted for 32 hours carrying water over top of embankment in places. Photo from negative by V.T. WilsonDates: 1931 March 28Container: Box 3
-
Description: 3:128: Bear Bay, UT. Location: North Bay. Following the big wind storm showing beach line along outer dike. Note experimental sod with salt grass in foregroundDates: 1931 MayContainer: Box 3
-
Description: 3:129: Bear Bay, UT. Location: North Bay. Following a 72-mile wind. View is along inner part of outer dike south from 24-foot spill boxDates: 1931 MayContainer: Box 3
-
Description: 3:130: Bear Bay, UT. Location: North Bay. View along outer embankment showing beach line following the heavy wind of April 28Dates: 1931 MayContainer: Box 3
-
Description: 3:131: Bear Bay, UT. Location: North Bay. Close-up showing height to which waves dashed over outer embankment during high windDates: 1931 MayContainer: Box 3
-
Description: 3:132: Bear Bay, UT. Location: Head waters. Six views showing activity of gas well geyser after casing had been blown out of well by gas pressureDates: 1931 August 23Container: Box 3
-
Description: 3:133: Bear Bay, UT. Location: River Control structures. Looking north along lower toe of spillway leading into North Bay, and forms and steel were being laidDates: 1931 DecemberContainer: Box 3
-
Description: 3:134: Bear Bay, UT. Location: River Control structures. Looking south during constructionDates: 1931 DecemberContainer: Box 3
-
Description: 3:135: Bear Bay, UT. Location: River Control structures. Steel and forms for spillway into North BayDates: 1931 DecemberContainer: Box 3
-
Description: 3:136: Bear Bay, UT. Typical scene showing construction of spill box by McGuire, a different method used than that employed by the first contractor, Mr. F.H. NewellDates: 1931 DecemberContainer: Box 3
-
Description: 3:137: Bear Bay, UT. Location: Willard Spur. One of the McGuire spill boxes in middle of winterDates: 1931 DecemberContainer: Box 3
-
Description: 3:138: Bear Bay, UT. Location: Control gate at intake to Whistler's Bend. Process of constructionDates: 1931 DecemberContainer: Box 3
-
Description: 3:139: Bear Bay, UT. Location: Overflow No. 2. Two views of process of constructionDates: 1931 DecemberContainer: Box 3
-
Description: 3:140: Bear Bay, UT. Location: Reeder's Overflow. Showing control gatesecDates: 1931 DecemberContainer: Box 3
-
Description: 3:141: Pomerene, Arizona. Looking down stream across remnants of diversion dam after the flood of Sept. 1931, which caused its failureDates: 1931 DecemberContainer: Box 3
-
Description: 3:142: Bear Bay, UT. Location: Willard Spur. View of outer borrow pit outside of Unit 4Dates: 1932 April 12Container: Box 3
-
Description: 3:143: Bear Bay, UT. Location: Whistler's Bend. Section of control gates at point of distribution into units 4 and 5Dates: 1932 April 12Container: Box 3
-
Description: 3:144: Bear Bay, UT. Location: Old River Channel. Leading to division between units 1 and 2 North Bay. Surfacing roadwayDates: 1932 April 12Container: Box 3
-
Description: 3:145: Bear Bay, UT. Location: Whistler's Bend. Showing control gates in intake to units 4 and 5Dates: 1932 April 12Container: Box 3
-
Description: 3:146: Bear Bay, UT. Location: Big Box in South Bay. Showing progress of erosion above spillway box during period of high waterDates: 1932 April 12Container: Box 3
-
Description: 3:147: Bear Bay, UT. Location: Willard Spur. Looking toward Mt. Ben Lomond showing typical gravel fans at mouths of three canyonsDates: 1932 April 12Container: Box 3
-
Description: 3:148: Bear Bay, UT. Location: Willard Spur. View along outer embankment Unit 5Dates: 1932 April 12Container: Box 3
-
Description: 3:149: Ford Creek, Davis County, UT. Ford Creek. Excavation above highway bridge showing character of materials encountered in obtaining dirt for raising grade. Excavation was through mud and boulder deposits made by floods of 1930 and 1931Dates: 1932Container: Box 3
-
Description: 3:150: New State Gun Club. North of Jordan River, UT. General view of New State Gun Club five years after construction. Note character of beach line and effect of salt grass in protecting against erosion. Most of erosion took place during the first years of operation before salt grass had a chance to get a startDates: 1932 JulyContainer: Box 3
-
Description: 3:151: New State Gun Club. North of Jordan River, UT. View along dike of New State Gun Club originally built 3 to 1 slope. Note vertical banks at extreme high water lineDates: 1932 JulyContainer: Box 3
-
Description: 3:152: New State Gun Club. North of Jordan River, UT. View showing condition of dike of New State five years after construction. This particular area was never subjected to excessive wave actionDates: 1932 JulyContainer: Box 3
-
Description: 3:153: New State Gun Club. North of Jordan River, UT. View looking west of experimental area five years after dike was built. Area in foreground was constructed on 10 to 1 slope. Area on extreme right was 3 to 1 slope. Neither area was provided with surfacing matter other than the natural embankment. Note of absence of high bank at water line on 10 to 1 slope. Salt grass has covered the area and has provided a perfect protection against erosionDates: 1932 JulyContainer: Box 3
-
Description: 3:154: New State Gun Club. North of Jordan River, UT. View looking along slope originally built 10 to 1. Section where rod lies is junction with slope built 3 to 1. After five years of wave action beach line stands approximately 15 to 1Dates: 1932 JulyContainer: Box 3
-
Description: 3:155: New State Gun Club. North of Jordan River, UT. Characteristic appearance of beach line on New State Gun Club dike five years after construction. Tooles are beginning to take a hold on the flooded portions of the beachDates: 1932 JulyContainer: Box 3
-
Description: 3:156: New State Gun Club. North of Jordan River, UT. View of New State experimental dike after five years of operationDates: 1932 JulyContainer: Box 3
-
Description: 3:157: Parrish Creek, UT. Results of flood of July 11, 1932 through peach orchardDates: 1932 JulyContainer: Box 3
-
Description: 3:158: Parrish Creek, Davis County, UT. Looking west from mouth of canyon following a destructive summer floodDates: 1932 August 26Container: Box 3
-
Description: 3:159: Parrish Creek, UT. Working on a flood control barrier at Parrish Creek in Davis CountyDates: 1932 OctoberContainer: Box 3
-
Description: 3:160: Enterprise, UT. View looking upstream out of mouth of tunnelDates: 1933 JulyContainer: Box 3
-
Description: 3:161: Enterprise, UT. Cave Canyon Diversion DamDates: 1933 July 25Container: Box 3
-
Description: 3:162: Enterprise, UT. Looking toward Cave Canyon diversion dam from top of tunnel entranceDates: 1933 July 25Container: Box 3
-
Description: 3:163: Enterprise, UT. Cave Canyon Diversion Dam. Looking toward tunnel lead into reservoir No. 1Dates: 1933 July 25Container: Box 3
-
Description: 3:164: Enterprise, UT. Storage reservoir No. 1. Dam is on extreme rightDates: 1933 July 25Container: Box 3
-
Description: 3:165: Enterprise, UT. Storage reservoir No. 1 from tunnel site. Hog Back Mountain in distance just beyond storage damDates: 1933 July 25Container: Box 3
-
Description: 3:166: Enterprise, UT. Reservoir No. 2Dates: 1933 July 25Container: Box 3
-
Description: 3:167: Enterprise, UT. Looking down from top of Dam No.2 at outlet in operationDates: 1933 July 25Container: Box 3
-
Description: 3:168: Enterprise, UT. Diversion Dam leading into Eagle Rocks CanalDates: 1933 July 25Container: Box 3
-
Description: 3:169: Enterprise, UT. Looking upstream at diversion dam under-current Dam nine years after construction was completed. Flat Top Mountain in distanceDates: 1933 July 25Container: Box 3
-
Description: 3:170: Santa Clara, UT. Diversion dam at intake to Ivin's canal. View shows remnants of concrete structure which once occupied this position, but was washed out by flood. Dam shown is of brush and straw covered with sand. Much water is lost through seepage. This structure replaced later by rock and concrete dam about 600 feet further down streamDates: 1933 MarchContainer: Box 3
-
Description: 3:171: Zion Canyon, UT,. Mt. Carmel Highway looking toward Zion CanyonDates: 1933 FebruaryContainer: Box 3
-
Description: 3:172: Zion Camp, UT. Series of log check damsDates: 1933 JulyContainer: Box 3
-
Description: 3:173: Zion Camp, UT. Blue Springs Area . Eroded area partially recoveredDates: 1933 July 12Container: Box 3
-
Description: 3:174: Enterprise, UT. My first aeroplane ride and first photograph from the air. View of the A.P. Winsor farm, and incidentally of the shadow of the plane. Residence in distance. Alfalfa ground right under shadow of plane, also in foreground; potato field on leftDates: 1934 March 6Container: Box 3
-
Description: 3:175: Enterprise, UT. View of Enterprise from aeroplaneDates: 1934 MarchContainer: Box 3
-
Description: 3:176: Enterprise, UT. View of L.M. Winsor farm from aeroplaneDates: 1934 MarchContainer: Box 3
-
Description: 3:177: Enterprise, UT. View from aeroplane showing west end of Enterprise town. Canal in foreground passes through siphon at point where same disappearsDates: 1934 MarchContainer: Box 3
-
Description: 3:178: Enterprise, UT. panorama of Enterprise farm from a point near the A. P. Winsor residenceDates: 1934 July 29Container: Box 3
-
Description: 3:179: Enterprise, UT, View showing difference between selected and unselected seed in A.P. Winsor's potato field. Crop in distance was treated the same as that in foreground, except that it as planted from certified seed. A.P. Winsor standing on margin between two plantingsDates: 1934 JulyContainer: Box 3
-
Description: 3:180: Enterprise, UT. Garden in front of A.P. Winsor ranch house with garage and dwelling in backgroundDates: 1934 October 25Container: Box 3
-
Description: 3:181: Enterprise, UT. View through A. P. Winsor's potato fieldDates: 1934 October 25Container: Box 3
-
Description: 3:182: Unidentified [view of dam]Dates: UndatedContainer: Box 3
-
Description: 3:183: Winsor Castle, Logan, UT. panorama showing site of structure after excavation had been completed by steam shovelDates: 1928Container: Box 3
-
Description: 3:184: Winsor Castle, Logan, UT. John and Dan Magdiel with their patented movable concrete form. Also showing method of tamping cinders and cement into formDates: UndatedContainer: Box 3
-
Description: 3:185: Winsor Castle, Logan, UT. View of basement and beginning of first story from southeastDates: UndatedContainer: Box 3
-
Description: 3:186: Winsor Castle. Kenneth under his father's hat sitting on rock chairDates: 1933 AprilContainer: Box 3
-
Description: 3:187: Great Salt Lake, UT. Pat, Kenneth, and Janice looking at bathers at Sunshine beachDates: 1933Container: Box 3
-
Description: 3:188: Weber River, UT. Devils Slide in winter. Luther on the lookout for an imph[?]Dates: 1938 January 29Container: Box 3
-
Description: 3:189: Pomerene, ArizonaDates: 1938 April 13Container: Box 3
-
Description: 3:190: Pomerene, Arizona. General view of Pomerene diversion dam in process of being repaired. The Northwest dragline has excavated a basin on the down stream side of the apron and is at work moving large boulders down into the floor of this new basin. These are to be placed in position and embedded in concrete, and boulders are being hauled in by team and wagon, as shown. A derrick on wheels is being used to load the boulders from a supply located along the old railroad embankment about one half mile awayDates: 1938 April 21Container: Box 3
-
Description: 3:191: Kessler Canyon, UT. General view of No. 6 spillway while embankment is being completedDates: 1938 NovemberContainer: Box 3
-
Description: 3:192: Bear Bay, UT. Old bridge at upper end of Whistler overflow, showing condition of timbers after 10 years of installationDates: 1939 May 29Container: Box 3
-
Description: 3:193: Bear Bay, UT. Close-up of one section of structure shown above, giving details of deterioration of timbersDates: 1939 May 29Container: Box 3
-
Description: 3:194: Bear Bay, UT. Outlet end of structure (20 foot spill box in lowest part of North Bay Unit 1) showing condition of timber after 10 years of use and showing the condition of the dike at the outletDates: 1939 May 29Container: Box 3
-
Description: 3:195: Bear Bay, UT. 20 foot spill box in lowest part of North Bay Unit 1, showing condition of overflow sectionDates: 1939 May 29Container: Box 3
-
Description: 3:196: Bear River, UT. View showing broods of Canadian geese. These are very plainly visible under magnifying glass. At least 100 broods seen on Units 3 and 4Dates: 1939 May 11Container: Box 3
-
Description: 3:197: Bear River, UT. View showing broods of Canadian geese. These are very plainly visible under magnifying glass. At least 100 broods seen on Units 3 and 4Dates: 1939 May 11Container: Box 3
-
Description: 3:198: Bear River Refuge. Completing the pouring of abutments and piers in Spillbox No. 3, Unit 2, looking eastDates: 1940 NovemberContainer: Box 3
-
Description: 3:199: Bear River Bay Concentration of swan and other water fowl on the ice in Unit 2Dates: 1940 NovemberContainer: Box 3
-
Description: 3:200: Same as 3:199Dates: 1940 NovemberContainer: Box 3
-
Description: 3:201: Same as 3:202Dates: 1940 NovemberContainer: Box 3
-
Description: 3:202: Bear River Refuge, Utah, Preparing outlet Spillbox No. 2 for riprap below downstream apron and cut off, or curtain wall. Note consistency of silty clay being removed from excavationDates: 1940 NovemberContainer: Box 3
-
Description: 3:203: Bear River Refuge, Utah. Concrete Spillbox No. 2 on South side of Unit 2 looking east along section to be occupied by bridgeDates: 1940 NovemberContainer: Box 3
-
Description: 3:204: Bear River Refuge, Utah. General view of concrete Spillbox No. 2 on south side of Unit 2 looking southeastDates: 1940 NovemberContainer: Box 3
-
Description: 3:205: Bear River Refuge, Utah. Concrete Spillbox No. 1. Located in North Bay Unit 1 looking northwest along flashboard sectionDates: 1940 NovemberContainer: Box 3
-
Description: 3:206: Same as 3:205, except looking northeast along outlet endDates: 1940 NovemberContainer: Box 3
-
Description: 3:207: Boulder RefugeDates: 1930 November; Dec. 4, 1940Container: Box 3
-
Description: 3:208: Boulder Refuge. Lake Mead from Wild Life Service boat looking northeast toward junction of Version River and Muddy ValleyDates: 1940 December 4Container: Box 3
-
Description: 3:209: Boulder Refuge. Same as 3:208 except looking down Diversion Valley from junction of Noapa ValleyDates: 1940 December 4Container: Box 3
-
Description: 3:210: Boulder Refuge. Edge of present silt. Delta about 5 miles below high water mark reached by Lake Mead in Version River area looking westDates: 1940 December 4Container: Box 3
-
Description: 3:211: Boulder Refuge. Silt deposit in Version River about 5 miles below high water mark reached by Lake Mead looking upstreamDates: 1940 December 4Container: Box 3
-
Description: 3:212: Boulder Refuge. Same as 3:211 except looking downstream across edge of present deltaDates: 1940 December 4Container: Box 3
-
Description: 3:213: Boulder Refuge. Diversion Dike, upper end of Lower Noapa Unit looking west from extreme east end. Water in borrow pit is from ground water seepageDates: 1940 December 4Container: Box 3
-
Description: 3:214: Boulder Refuge. View along top of dike at elevation 1205 looking toward Kaolin. Note how flat the slopes appearDates: 1940 December 4Container: Box 3
-
Description: 3:215: Boulder Refuge. View along downstream. Slope of dike at elevation 1205Dates: 1940 December 4Container: Box 3
-
Description: 3:216: Boulder Refuge. Looking southwest across newly cleared land below elevation of 1205Dates: 1940 December 4Container: Box 3
-
Description: 3:217: Bear River Refuge. Control Gates in Old Rover between Units 1 and 2. Looking northwest from bridge over structure leading into Unit 2Dates: 1941 February 25Container: Box 3
-
Description: 3:218: Bear River Refuge. Control gate leading into North central area of Unit 1. V.T. Wilson at the wheelDates: 1941 February 25Container: Box 3
-
-
-
III. Assorted and unidentified images
-
Description: 27 unidentified printsDates: UndatedContainer: Box 4, Folder 1
-
Description: 19 unidentified printsDates: UndatedContainer: Box 4, Folder 2
-
Description: 28 unidentified printsDates: UndatedContainer: Box 4, Folder 3
-
Description: 21 unidentified printsDates: UndatedContainer: Box 4, Folder 4
-
Description: Minersville-Milford job. Cedar City and othersDates: UndatedContainer: Box 4, Folder 5
-
Description: New Harmony- flood loggs culvert on new harmony roadDates: UndatedContainer: Box 4, Folder 6
-
Description: Salina- Rubble culvertDates: UndatedContainer: Box 4, Folder 7
-
Description: Coal Creek, Skull Rock Pass-Dates: 1954 AugustContainer: Box 4, Folder 8
-
Description: Miscellaneous flood conditions, including Kanarraville and WillardDates: UndatedContainer: Box 4, Folder 9
-
Description: Big Cottonwood. Late MarchDates: 1959 AprilContainer: Box 4, Folder 10
-
Description: KanabDates: UndatedContainer: Box 4, Folder 11
-
Description: L.M. Winsor at castleDates: 1951Container: Box 4, Folder 12
-
Description: Spring City, Utah. FloodDates: 1922Container: Box 4, Folder 13
-
Description: Salina Canyon, Utah. Various yearsDates: UndatedContainer: Box 4, Folder 14
-
Description: Enterprise, Utah. Lower Reservoir from the roadDates: 1932 April 28Container: Box 4, Folder 15
-
Description: Little Cottonwood Creek. Salt Lake County, UtahDates: 1959Container: Box 4, Folder 16
-
Description: Willow CreekDates: 1958 June 22Container: Box 4, Folder 17
-
Description: panoramaic print. Possibly KanoshDates: UndatedContainer: Box 4, Folder 18
-
Description: 19 unidentified printsDates: UndatedContainer: Box 4, Folder 19
-
Description: Utahn bridge and jetty-Dates: 1948Container: Box 4, Folder 20
-
Description: 12 unidentified printsDates: UndatedContainer: Box 4, Folder 21
-
Description: 33 unidentified prints. Possibly Under current dam at Enterprise, UtahDates: UndatedContainer: Box 4, Folder 22
-
Description: 30 inch pipe, 3 and 1/2 miles long. Black Lake, CanadaDates: 1955 AugustContainer: Box 4, Folder 23
-
Description: Unidentified photo albumDates: UndatedContainer: Box 4, Folder 24
-
Description: 12 unidentified printsDates: UndatedContainer: Box 4, Folder 25
-
Description: 25 unidentified prints. Mostly 5 x 7Dates: UndatedContainer: Box 4, Folder 26
-
Description: Five Mile Wash in Franklin county Idaho
13 photographs in envelope dated June 1954, 2 negatives in envelope dated April 1955
Dates: 1954-1955Container: Box 4, Folder 27
-
-
IV. Utah's Flood Problem report and photographs
-
North Salt Lake, Undated
Container: Box 5, Folder 1
-
Description: 5:01: Erosion North Salt LakeDates: 1932
-
Description: 5:02: Erosion west of Salt Lake on north of Oquirrh MountainsDates: Undated
-
-
Willard Flood, Undated
Container: Box 5, Folder 2
-
Description: 5:03: Scenes along Main Street, Willard, following the flood ofDates: 1923 August 13
-
Description: 5:04: Scenes along Main Street, Willard, following the flood ofDates: 1923 August 13
-
Description: 5:05: Looking down Main Street Willard, from the north end of the townDates: 1923 August 18
-
Description: 5:06: This barn, containing livestock, automobile trucks, and 75 tons of hay was carried 1/4 mile and deposited on Main StreetDates: Undated
-
Description: 5:07: Site of the Willard Flood BarrierDates: 1923 September 3
-
Description: 5:08: The same site as 5:07, May 10, 1924, two days after construction beganDates: Undated
-
Description: 5:09: In 1925 the Willard Barrier Basin was extended 500 feet further south along the State highway. This picture shows the interior of the southwest corner, as it was prepared to receive the 1925 deposit of gravel carried by high water in MayDates: Undated
-
Description: 5:10: This panorama shows the same view as 5:09 in July 1925, following a summer freshet, after gravel deposited in May had been scraped to the outer bankDates: Undated
-
Description: 5:11: Willard Barrier at the close of the second high water season following controlDates: 1926 June
-
Description: 5:12: A close up of the spillway, same date as 5:11Dates: 1926 June
-
Description: 5:13: Interior of the New Barrier Basin-Dates: June 1925; 1925 June
-
Description: 5:14: Raising the outer bank still higher-July 1926, just previous to summer flood, see panorama (5:10)Dates: Undated
-
Description: 5:15: Closing an opening through one of the control deflectors at upper end of Willard Barrier BasinDates: Undated
-
Description: 5:16: Southwest corner of Willard Barrier, July 30, 1925 during the second season of operationDates: Undated
-
Description: 5:17: Timber coarse straw and boulders, were used to define the limits of the Willard Barrier BasinDates: Undated
-
Description: 5:18: Another view of the Barrier during the first few days of construction. The natural slope of the ground surface was away from rather than toward the channel excavated by steam shovel through the flood debris. When the flood was allowed to spread at random over the depository there followed a constant battle to prevent it from over-topping the lateral embankment, beyond which it would have flooded homes and orchard landsDates: Undated
-
Description: 5:19: A Beaver dam built by man to divert the stream (Willard Creek) into the Barrier Basin
-
Description: 5:20: Temporary spillway just above highway crossingDates: Undated
-
Description: 5:21: Drifting gravel becomes a menace following torrential floods. In an effort to cope with the problem, the State highway department in cooperation with the Willard Flood Relief Committee excavated a deep, narrow channel from the mouth of the canyon to the low lands, across the highway and both railroads a distance of over a mile. It had been assumed that by confining the stream in this manner its high velocity would carry the burden of sand and gravel along. On the contrary, however, the new channel was filled to bank level with gravel within 5 days after high water began to flow. Highway and railroads were blocked and valuable farm lands were buried beneath a heavy bed of gravel. Photograph shows emergency crossing highway, and teams at work endeavoring to keep the channel open on the day flood control work began May 8, 1924Dates: Undated
-
Description: 5:22: The same as 5:21, five days later. When the stream was cleared of its burden, above the hastily improvised barrier, it was free to pick up a new load. Note the successive erosions caused by daily fluctuation in runoff from melting snows. The channel was deepened 18 inches the first night after control. 12 inches the second night during the peak of heavy runoff and so on until a permanent bed was reached 12 feet below highway levelDates: Undated
-
Description: 5:23: Railroad crossing at Willard Creek--2 days after stream was placed under controlDates: Undated
-
Description: 5:24: Crib and rock protection in Willard Canyon beneath a 75 foot bank of gravelDates: Undated
-
-
Farmington
Container: Box 5, Folder 3
-
Description: 5:25: Farmington Flood Barrier in its early stages of developmentDates: Undated
-
Description: 5:26: Farmington Flood Barrier successfully controlling a heavy torrential flood ofDates: Undated; July 3, 1925
-
Description: 5:27: Farmington Spillway following a torrential floodDates: Undated
-
Description: 5:28: Debris deposited above the Farmington Barrier by the flood of July 3, 1926. Control was so complete that the citizens did not know a flood was on. Without control there would have been a repetition ofDates: 1923 August 13
-
Description: 5:29: Farmington Spillway of rubble-concrete during the first season of operationDates: 1925 April
-
Description: 5:30: The same as 5:29 inDates: 1927
-
Description: 5:31: Farmington Flood Barrier at the close of a season of excessive high water which carried hundreds of thousands of cubic yards of sand and gravel into the control basinDates: Undated
-
Description: 5:32: Looking up stream from spillway into Farmington Barrier BasinDates: Undated
-
-
Ford Creek/Parrish Creek
Container: Box 5, Folder 4
-
Description: 5:33: Ford Creek, Davis County, after the third torrential flood in recent years. The high banks of sand and gravel were deposited when Lake Bonneville occupied the higher levels. These banks are characteristic of each of the Davis County flood channels. It has been proved conclusively that the recent floods have cut through these Bonneville deposits for the first time since the lake receded over 25,000 years agoDates: Undated
-
Description: 5:34: Result of mud flow from torrential flood, Ford CreekDates: 1923 August 13
-
Description: 5:35: The disaster of 1923 repeated on Ford Creek in a series of three floods in 1930Dates: Undated
-
Description: 5:36: (No info. provided)Dates: Undated
-
Description: 5:37: Ford Creek in 1924 following 1923 floods. Looking down stream across highway on which great quantities of gravel were deposited during summer runoff. It is characteristic that heavy gravel flows follow excessive torrential floodsDates: Undated
-
Description: 5:38: Looking across State highway at Ford Creek following 1930 flood. Note depth of flow and size of boulders compared with automobile in foreground at leftDates: Undated
-
Description: 5:39: Parrish Creek showing Centerville School in the midst of an area devastated by the floods of 1930Dates: Undated
-
Description: 5:40: Remnants of a home on Parrish Creek near the Centerville SchoolDates: 1930 September
-
Description: 5:41: Highway below Centerville School, Parrish Creek 1930 floodsDates: Undated
-
Description: 5:42: Another home near Centerville SchoolDates: 1930
-
-
Davis County/Steed Creek/ Fiddler's Creek
Container: Box 5, Folder 5
-
Description: 5:43-44: Two pictures showing consistency of mud flows in Davis County. This accounts for the ability of such floods to carry boulders weighing more than 200 tons each far out on to flood planes below the confinement of canyon wallsDates: Undated
-
Description: 5:45: Digging the State Highway out after a typical Davis County floodDates: Undated
-
Description: 5:46: A minor flood from Steed Creek blocked the highway as indicated
-
Description: 5:47: Highway at Steed Creek crossing during torrential flood, looking up stream. Autos are in outer edge of flood and are partly buriedDates: Undated
-
Description: 5:48: A woven wire fence parallel to direction of flow held a torrential flood within bounds, just above highway crossing at Fiddler's Creek, near Cedar CityDates: Undated
-
-
Salt creek/Chalk Creek
Container: Box 5, Folder 6
-
Description: 5:49: Bingham was also severely hit by flood and fireDates: Undated
-
Description: 5:50: Weber Canyon, Aug. 1930. Looking down stream where torrential flood carried a dam completely across the river, forcing the stream to flow down the highwayDates: Undated
-
Description: 5:51: Looking up stream across Salt Creek upper Barrier after it had been in operation two years. Note the immense deposit of gravel above the water line, also the extent of the still water pool which did not fill during the first twenty four hours as was predicted by skeptical water userDates: Undated
-
Description: 5:52: Spillway through above barrier
-
Description: 5:53: Lower Barrier on Salt Creek above Nephi at the beginning of the third season of operationDates: Undated
-
Description: 5:54: Salt Creek out of bounds at plaster Mill above Nephi, on the evening of Aug. 13, 1923 the same time that Farmington and Willard were devastated
-
Description: 5:55: Chalk Creek before control in 1921--Note that stream bed is filled above level of adjacent farmsDates: Undated
-
Description: 5:56: Chalk Creek Barrier and Spillway which for ten years has successfully controlled floods and caused the high water streams to completely unload their burden of gravel which was formerly a menace to successful irrigation
-
-
Kanosh Creek/Parowan/Shoal Creek
Container: Box 5, Folder 7
-
Description: 5:57: Kanosh Creek Barrier and Spillway soon after completion--Note the depth at lower toe. Also the cutoff structure in foreground at right; same to prevent erosion. crest and floor of Juniper timber, wings of cottonwood and bouldersDates: Undated
-
Description: 5:58: Sand and gravel were a serious menace to Parowan City and to the irrigation system before the Barrier was built in 1925Dates: Undated
-
Description: 5:59: Gravel deposited above the Parowan Flood Barrier supplies the building needs of the communityDates: Undated
-
Description: 5:60: Parowan Barrier after a terrific flood. Fine debris carried down to crest of Spillway but no coarse material even approached the structureDates: Undated
-
Description: 5:61: Excavation for Shoal Creek Diversion Dam, above EnterpriseDates: Undated
-
Description: 5:62: The same site as 5:61 after completedDates: Undated
-
Description: 5:63: Looking up stream through spillway of Shoal Creek Diversion DamDates: Undated
-
Description: 5:64: The same looking down stream. This structure made of Juniper timbers cribbed and spiked together and loaded down with dirt and rocks puddled into placeDates: Undated
-
Description: 5:65: (No info. provided)Dates: Undated
-
Description: 5:66: Equalizing Reservoir No. 1- on Shoal CreekDates: Undated
-
Description: 5:67: Equalizing Reservoir No. 2- on Shoal Creek. These Reservoirs built by water users with but little skilled helpDates: Undated
-
-
Various Diversion Dams in Utah
Container: Box 5, Folder 8
-
Description: 5:68: Constructing Flood Control Diversion Dam at SummitDates: Undated
-
Description: 5:69: The same after completion and after a terrific summer flood carrying boulders weighing tons eachDates: Undated
-
Description: 5:70: Diversion Dam above Orderville. This structure crude as it is, has been a material factor in preventing excessive erosion of the upper Virgin immediately above OrdervilleDates: Undated
-
Description: 5:71: Diversion Dam above Escalante in Potato ValleyDates: Undated
-
Description: 5:72: Diversion Dam on Canal Creek, after a terrific flood in July 1922. (Spring City)Dates: Undated
-
Description: 5:73: Diversion Dam on Haghts Creek, buried by a devastating flood July 3, 1926--When uncovered the structure was found to be intact except for one wing. (In Davis County above Bountiful)Dates: Undated
-
-
Various Flood Barriers and Spillways in Utah
Container: Box 5, Folder 9
-
Description: 5:74: Ford Creek, Davis County, after the third torrential flood in recent years. The high banks of sand and gravel were deposited when Lake Bonneville occupied the higher levels. These banks are characteristic of each of the Davis County flood channels. It has been proved conclusively that the recent floods have cut through these Bonneville deposits for the first time since the lake receded over 25,000 years agoDates: Undated
-
Description: 5:75: Mt. Pleasant Flood Barrier Spillway--Nearing completion Nov. 11, 1928--Looking downstream. (In Sanpete)Dates: 1928 November 11
-
Description: 5:76: The same as 5:75, in September 1929 following a terrific mud and boulder flow, looking up stream. (Geo. Albert Smith in front)Dates: Undated
-
Description: 5:77: Manti Barrier, at the close of the high water seasonDates: Undated
-
Description: 5:78: Manti Barrier Spillway in operation. A close upDates: Undated
-
Description: 5:79: Constructing the main barrier and spillway in Payson Creek, rocks dragged into place by teams are grouted with concrete to hold them in positionDates: Undated
-
Description: 5:80: A secondary spillway on Payson Creek made of timber. Photograph shows main floor being placedDates: Undated
-
-
Santa Clara Creek
Container: Box 5, Folder 10
-
Description: 5:81: Erosion on Santa Clara Creek is a problem of great concern to the farmers of St. George and Santa Clara. Note the depth of the fertile orchard lands. The last flood widened the channel a hundred feet at the point shown. (Wallie Mathis Farm)Dates: Undated
-
Description: 5:82: An attempt at control on Santa Clara Creek. The water users are willing and anxious to do what they can to save their farms. Since this report was written they have been organized for flood control and are at work under an assistant to the author who is carrying out an organized plan of control along the entire streamDates: Undated
-
-
Woodruff
Container: Box 5, Folder 11
-
Description: 5:83: Woodruff equalizing reservoir, showing first construction camp, 1926, and beginning of the new dam. This structure is being raised at the rate of six to eight feet each fall. The spillway is a part of the dam and is made of rubble-concreteDates: Undated
-
Description: 5:84: Woodruff Spillway at the height of 24 feet which was the first level reachedDates: Undated
-
Description: 5:85: Woodruff Reservoir, Spring of 1930, during the time of heaviest spring floodsDates: Undated
-
Description: 5:86: Woodruff Spillway-Dates: 1930
-
-
Kessler Canyon
Container: Box 5, Folder 12
-
Description: 5:87: Kessler Canyon Barrier Spillway--Looking down stream toward Garfield Smelter. This structure stands 80 feet above original streambed. (After forms had been removed)Dates: Undated
-
Description: 5:88: The same as 5:87, after a torrential flood which reached a depth of 7 feet over the 70 foot crest. Note the Tower drag line and the caterpillar dragline in position. When completed the embankment on left was raised ten feet above the wing walls and 25 feet above the spillway crest. (The crest was then raised to 114 feet, its present level in 1965)Dates: Undated
-
Description: 5:89: Looking up stream from Garfield Smelter at series of control structures in Kessler Canyon. The tall derrick in the distance is stationed at the site of the main barrierDates: Undated
-
Description: 5:90: Looking down stream across site of main Barrier Spillway Kessler Canyon, during constructionDates: Undated
-
Description: 5:91: Lifting Boulders out of the ground for use in building main spillway. Kessler Canyon. These were loaded by drag line crane on to heavy wagons then hauled to site of spillway by tractorDates: Undated
-
Description: 5:92: Boulders being placed by heavy derrick, in foundation of main spillway, Kessler CanyonDates: Undated
-
Description: 5:93: Building an equalizing check above intake to tunnel through Garfield Smelter. Note main tunnel opening in distance, which is same cross-sectional area as opening in foreground. (Incidentally, this and other checks saved the smelter. There were 4 additional floods in 1927-no further damage)Dates: Undated
-
Description: 5:94: Constructing a check dam in Kessler Canyon below main structureDates: Undated
-
Description: 5:95: Looking down stream from main spillway. Kessler Canyon. The screen in middle of picture was built to remove floating debris which might clog the tunnel, intake of which is shown in the distance. Railroad yards and Garfield Smelter in background beyond which is great Salt LakeDates: Undated
-
Description: 5:96: Detail of Rubble-Concrete Construction. Arch is 15 feet high. (Note old tunnel under smelter. Only 4 x 6 feet. Now tunnel is 22 x 22 feet)Dates: Undated
-
Description: 5:97: Guniting a Rubble-Concrete Wing wall-Kessler CanyonDates: Undated
-
Description: 5:98: Gasoline driven shovel building the flood barrier, Kessler Canyon. This dike was later raised 15 feet by tower draglineDates: Undated
-
Description: 5:99: Spillway through main barrier, Kessler Canyon. This structure is a new departure in spillway construction. It stands 80 feet high and rests upon an alluvial foundation. Huge boulders, some of which weigh two or three tons, were placed in position then grouted together. The flood stream drops over a circular crest into a stilling pool ten feet deep. A secondary crest below the stilling pool passes the stream quietly into the channel belowDates: Undated
-
-
Miscellaneous Photos
Container: Box 5, Folder 13
-
Description: 5:100: Erosion of foot hills near Bountiful, showing goat herd which grazes over the Bountiful Watershed. (Over and back every day)Dates: Undated
-
Description: 5:101: Near the crest of the Davis County watershed, where floods originate. (Saddle horses would sink to their fetlocks in loose soil before a flood)Dates: Undated
-
Description: 5:102: UnidentifiedDates: Undated
-
Description: 5:103: Farmington BarrierDates: Undated
-
Description: 5:104: UnidentifiedDates: Undated
-
Description: 5:105: UnidentifiedDates: Undated
-
Description: 5:106: Unidentified
-
-
Miscellaneous items
Container: Box 5, Folder 14
-
Description: Clipping from Salt Lake Tribune
Article is about L.M. Winsor. Handwritten list of construction costs at Garfield 1927.
Dates: 1930 July
-
-
Description: "Utah's Flood Problem"-Book. Report created by Winsor and submitted to Utah State Land Board
Book is source of photos in Box 5. Second copy of book with photo pages intact added to collection in 2024
Dates: 1933Container: Box 5, Folder 15-16
-
Names and SubjectsReturn to Top
Subject Terms
- Dams--Utah--Enterprise--Photographs.
- Flood control--Utah--Photographs.
- Flood control--West (U.S.)--Photographs.
- Flood damage--Utah--Willard--Photographs.
- Flood dams and reservoirs--Utah--Photographs.
- Floods--Utah--Photographs.
- Floods--Utah--Willard--Photographs.
- Irrigation engineering--Utah--Photographs.
- Irrigation--Utah--Photographs.
Geographical Names
- Bear River Migratory Bird Refuge (Utah)--Photographs.
- Enterprise (Utah)--Photographs.
- Mead, Lake (Ariz. and Nev.)--Photographs.