Preliminary Guide to the Washington State University Facilities Development Records, 2003-2006
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Development
- Title
- Preliminary Guide to the Washington State University Facilities Development Records
- Dates
- 2003-2006 (inclusive)20032006
- Quantity
- 5 Linear feet of shelf space, (5 Boxes)
- Collection Number
- UA2007-05 (collection)
- Summary
- Correspondence, project proposals, and reports related to the modernization of the WSU Powerplant from 2003-2006.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
'The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
Primarily contains files, building plans, and correspondence related to the modernization of the WSU Power plant. Also contains contracts and specification reports. Files range from 2003- 2006.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Development Records, 2003-2006 (UA2007-05)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Boxes 1 and 3 contain files that are clearly labeled by subject matter. The rest of the boxes have no particular order.
Detailed Description of the Collection
-
Box #1
-
Description: EvaluationContainer: Box 1
-
Description: Power plant permitsContainer: Box 1
-
Combustion control piping diagram
-
Description: Control tubing diagramContainer: Box 1
-
-
Description: Back up data, change ordersContainer: Box 1
-
Description: Steam flow transmitterContainer: Box 1
-
Description: Steam silencerContainer: Box 1
-
Description: Steam PRV. schematicContainer: Box 1
-
Description: CorrespondenceContainer: Box 1
-
Description: Eastern electricContainer: Box 1
-
Description: Pre-design studyContainer: Box 1
-
Description: Boiler no.8 schematic designContainer: Box 1
-
Description: Steam study wood harbingerContainer: Box 1
-
Description: Control retrofitContainer: Box 1
-
Description: Assessment studyContainer: Box 1
-
Description: Safety issuesContainer: Box 1
-
Description: Stack replacementContainer: Box 1
-
Power plant project- Sept. 1999
-
Description: Power plant improvementsContainer: Box 1
-
-
Description: Boilers 4 & 5 emissions projectsContainer: Box 1
-
-
Box #2
-
Description: Trigen Energy Corp. dual fired nominal 7OMW cogeneration energy facility RFP, Aug. 17, 2001Container: Box 2
-
Description: Pipe and PRV SurveyContainer: Box 2
-
Description: Contract- P.O. Shea- PlatformContainer: Box 2
-
Description: Power Plant- water treatmentContainer: Box 2
-
Description: Water treatmentContainer: Box 2
-
Description: Boiler Plant- Start UpContainer: Box 2
-
Description: Condensate MetersContainer: Box 2
-
Description: WSU central heating plant boilers #3,4,5, Nov. 10-12, 1992Container: Box 2
-
WSU Power Plant No. 8 Boiler, Nov. 15, 2000
-
Description: Boiler #5Container: Box 2
-
-
Description: WSU Boilers #4 & #5, Particulate Matter, SO2, NO's, and CO emissionsContainer: Box 2
-
Description: Summary of resultsContainer: Box 2
-
Description: AM test air quality, LLC reportContainer: Box 2
-
Description: Nationwide BoilerContainer: Box 2
-
Description: Ecology- Power PlantContainer: Box 2
-
Description: Pacific Northwest Customer Information Session, April, 2001Container: Box 2
-
Description: Plant Web by Fisher-RosemountContainer: Box 2
-
Description: RSVIEW 32Container: Box 2
-
Description: Control Logix- Selection GuideContainer: Box 2
-
Description: Advanced Control and Information Systems for Combustion Processes and Power ManagementContainer: Box 2
-
Description: Power Flex70 AC DriveContainer: Box 2
-
Description: Control News, Rockwell AutomationContainer: Box 2
-
Description: Rockwell Automation- Info. and Automation SystemsContainer: Box 2
-
Description: RMB ultralow emissions, rapid mix burner, Todd CombustionContainer: Box 2
-
Description: Power Plant Boiler Controls Upgrade, Aug. 1994Container: Box 2
-
Description: John Wood group PLC annual report 2001Container: Box 2
-
Description: Forney combustion products, combustion systemsContainer: Box 2
-
Description: Turbocare- Turbomachinery Corp. BinderContainer: Box 2
-
Description: Advanced technology construction info. Prospectus etc.Container: Box 2
-
Description: WSU- Steam distribution system survey and study, 1985Container: Box 2
-
Description: Todd combustion, May 8, 2000, Todd Low NOx BurnersContainer: Box 2
-
Description: Pre Design Study for Power Plant Modernization, Vol. 2, AppendContainer: Box 2
-
Description: Temporary boiler installationContainer: Box 2
-
Description: Boiler rental- installation- 3H Mech.Container: Box 2
-
Description: Colvico Electrical Contractor O & M Manual, WSU Boiler Control Upgrade- WSUContainer: Box 2
-
Description: Wash. Water Power Company 1995 Electrical Integrated Resources Plant Executive SummaryContainer: Box 2
-
Description: New generation surveys- David BrenstainContainer: Box 2
-
Description: Boiler Installation Project- WSU, Shea const.Container: Box 2
-
Description: Siemens- Boiler controls seminarContainer: Box 2
-
-
Box #3 Temporary Boiler Information
-
Description: Wind tunnel simulation proposed WSU Co-generation power plantContainer: Box 3
-
Description: AERMDD modeling analysis of air quality impact for WSU-Co- generation power plantContainer: Box 3
-
Description: Preliminary PSD netting calculationsContainer: Box 3
-
Description: Cogeneration projects: lessons learnedContainer: Box 3
-
Description: AVISTA utilities response to WSU's request proposalContainer: Box 3
-
Description: Confidentiality agreement, Trigen Energy Corp.Container: Box 3
-
Description: Quixx Corporation ProspectusContainer: Box 3
-
Description: Boiler No.7. 1967 Power Plant Addition. One sheet drawingContainer: Box 3
-
Description: HPAC Eng. MagazineContainer: Box 3
-
Description: Power Plant Misc. InformationContainer: Box 3
-
Description: Summary of draft final report covering development of an optimal cogeneration plant for WSU and Integres Arch.Container: Box 3
-
Description: Site diagramsContainer: Box 3
-
Description: WSU power plant modernizationContainer: Box 3
-
Description: Meeting minutes, Feb. 21, 2000Container: Box 3
-
Description: Project committee meeting, Feb. 10, 2000Container: Box 3
-
Description: Proposal - Atlas boiler and equipment co.Container: Box 3
-
Description: Project cost scenarios- Integres arch.Container: Box 3
-
Description: Misc. InformationContainer: Box 3
-
Description: Booklets- Process LogixContainer: Box 3
-
Description: EPI Folder ( Engnergy Products of Idaho)Container: Box 3
-
Description: Misc. Information, Dresser-RandContainer: Box 3
-
Description: Power and thermal energy cycle optimizationContainer: Box 3
-
Description: Turbine repairs (ongoing)Container: Box 3
-
Description: Co-generation, WAC and RCW'sContainer: Box 3
-
Description: Public Service Company of Colorado- steam ratesContainer: Box 3
-
Description: Power Play by Brenda SandburgContainer: Box 3
-
Description: Cogeneration feasibility phase 1 report- January 1991Container: Box 3
-
Description: WSU cogeneration- a preliminary assessmentContainer: Box 3
-
Description: Noise analysis report from BRC acoustics- 7/19/01Container: Box 3
-
Description: Noise limit analysis report from BRC acoustics- 8/18/01Container: Box 3
-
Description: Trigen-WSU cogeneration plant general arrangement planContainer: Box 3
-
Description: Lydig- Industrial expertise pamphletContainer: Box 3
-
Description: WSU electrical service- Avista vs. PlantContainer: Box 3
-
Description: Utility engineering prospectusContainer: Box 3
-
Description: Power engineers prospectusContainer: Box 3
-
Description: Misc. InformationContainer: Box 3
-
Description: Steam production circular graphsContainer: Box 3
-
Description: Misc. InformationContainer: Box 3
-
Description: Flue-gas recirculation systems pamphletContainer: Box 3
-
Description: Misc. InformationContainer: Box 3
-
Description: Soft PLC. Corp. BookletContainer: Box 3
-
Description: Control design article- finding happiness with a PC-based control system- Feb,1998Container: Box 3
-
Description: Soft PLC. Corp. P.C. Based, open Arch. PLC systemsContainer: Box 3
-
Description: Cutler-Hammer Pamphlet, Platt EatonContainer: Box 3
-
Description: Meeting Notes, 10/5/99Container: Box 3
-
Description: Topo sheets, I-14Container: Box 3
-
Description: WSU Power Plant modernization strategic planning task force agenda, 10/7/99Container: Box 3
-
Description: Fact sheetContainer: Box 3
-
Description: Cogeneration RCW database documentContainer: Box 3
-
Description: Solar asset management servicesContainer: Box 3
-
Description: Cooper energy and fertilizer co. proposal, Feb. 22, 2001Container: Box 3
-
Description: Duke solutions proposal, March 2, 2001Container: Box 3
-
Description: RedevelopmentContainer: Box 3
-
Description: Trigen Energy CorporationContainer: Box 3
-
Description: ModernizationContainer: Box 3
-
-
Box #4
-
Description: Power Plant ModernizationContainer: Box 4
-
Description: Power Plant PrioritiesContainer: Box 4
-
Description: Combustion ControlContainer: Box 4
-
Description: Powder BurnerContainer: Box 4
-
Description: Boilers #1 & #2 startupContainer: Box 4
-
Description: Proposal - water tube boiler, in Babcock and Wilcox blue binderContainer: Box 4
-
Description: WSU Bid. No. 8336-A85704947. Industrial watertube boiler proposal by Cole Industries, INC.Container: Box 4
-
Description: Project/system proposal WSU boiler upgrade, 2-copiesContainer: Box 4
-
-
Box #5
-
Description: Design analysis for alterations and additions to the steam distribution system, WSU 1973Container: Box 5
-
Description: Status report on the coal-fired boilers and connected auxiliary equipment, Jan. 1974Container: Box 5
-
Description: Boiler no.6Container: Box 5
-
Description: Boiler no.7Container: Box 5
-
Description: Boiler no.8Container: Box 5
-
Description: Gas line filters / regulatorsContainer: Box 5
-
Description: AvistaContainer: Box 5
-
Description: WSU energy officerContainer: Box 5
-
Description: Turbine dataContainer: Box 5
-
Description: Regents / Royer- correspondence fac. committeeContainer: Box 5
-
Description: Boiler shop drawingsContainer: Box 5
-
Description: Gas valve- main shut offContainer: Box 5
-
Description: Boiler shop drawingsContainer: Box 5
-
Description: Power engineers, prospectus and informationContainer: Box 5
-
Description: Yokagawa transmittersContainer: Box 5
-
Description: ConsultantsContainer: Box 5
-
Description: Steam pipingContainer: Box 5
-
Description: Campus water use- issuesContainer: Box 5
-
Description: Steam dist. project- KPFF- Wood HarbingerContainer: Box 5
-
Description: NALCO- Water treatmentContainer: Box 5
-
Description: Future steam load estimateContainer: Box 5
-
Description: Infrastructure planningContainer: Box 5
-
Description: Steam plant flow dataContainer: Box 5
-
Description: CHP- RFP- Power Plant #27Container: Box 5
-
Description: Correspondence with administration (power plant)Container: Box 5
-
Description: Coal RFP draftContainer: Box 5
-
Description: Boilers 4 & 5Container: Box 5
-
Description: Boiler emissionsContainer: Box 5
-
Description: WSU air operating addendum- radionuclide emissions for incineratorContainer: Box 5
-
Description: WSU air operating permit renewal applicationContainer: Box 5
-
Description: Application for air quality operating permitContainer: Box 5
-
Description: Title V permit renewalContainer: Box 5
-
Description: Emissions test, boilers 3,4,5Container: Box 5
-
Description: A boiler plant addition, 8-16-55 drawingsContainer: Box 5
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Development -- Records and correspondence