Preliminary Guide to the Washington State University Facilities Development Contracts 13168-15414, 1999-2005
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Development
- Title
- Preliminary Guide to the Washington State University Facilities Development Contracts 13168-15414
- Dates
- 1999-2005 (inclusive)19992005
- Quantity
- 8 Linear feet of shelf space, (8 Boxes)
- Collection Number
- UA2005-14 (collection)
- Summary
- Contractual and architectual documents related to construction projects across WSU campuses from 1999-2005.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The WSU Physical Plant was originally known as Buildings and Grounds dating back to at least 1908 when a superintendent was appointed to the department. The department underwent a name change to Buildings and Grounds in the 1960's and a reorganizing in the 80's. The department is responsible for small scale construction and remodeling work around the WSU campus, as well as day to day maintenance.
Content Description
Primarily consists of contractual documents related to several small-scale remodel and construction projects on the WSU campuses from 1999-2005.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Development Contracts 13168-15414, 1999-2005 (UA2005-14)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Boxes 1-3 contains contracts 13235-15207. Boxes 4-8 contains contracts 14439-14498. Boxes are clearly labeled and filed by contract number.
Detailed Description of the Collection
-
Box 1 - Consulting Projects
-
Description: Health Sciences Soil Evaluation WSU RiverpointDates: FY '04Container: Contract C#13235, Log L #189733
-
Description: Clark Hall Retrofit Fire Sprinkler & Fire Alarm Sys.Dates: FY '05Container: Contract C#13530, Log L #144517
-
Description: Design of Monitoring and Control Facilities for Pullman Campus Water SystemDates: FY '05Container: Contract C#13554, Log L #119207
-
Description: Lower College Avenue to Spring Street Bridge Storm Sewer ReplacementDates: FY '05Container: Contract C#l3685, Log L #206297
-
Description: WSU Vane. Student Svc. Bldg. Various Remodels in FacilityDates: FY '05Container: Contract C#l3686, Log L #206716
-
Description: Emergency Response to Hazardous SpillsDates: FY '05Container: Contract C#l3738, Log L #200384
-
Description: Pullman Campus Domestic Water System Plan UpdateDates: FY '05Container: Contract C#l3874, Log L #205068
-
Description: Linden Avenue Parking LotDates: FY '05Container: Contract C#l3935, Log L #181612
-
Description: Electrical Distribution PostsDates: FY '05Container: Contract C#l3937, Log L #144515
-
Description: Upgrade Water Systems at IAREC-ProsserDates: FY '05Container: Contract C#l3954, Log L #144534
-
Description: Safety Bldg. Central Fire Reporting SystemDates: FY '05Container: Contract C#l3976, Log L #144523
-
Description: Safety Bldg. Fire Service Area SignalingDates: FY '03Container: Contract C#13977, Log L #220457
-
Description: Energy Plant Boiler #5 Particulate Emissions Reduc.Dates: FY '05Container: Contract C#l4025, Log L #219099
-
Description: Cleveland Hall - Remodel Suite 57Dates: FY '05Container: Contract C#l4131, Log L #244008
-
Description: Remodel Rooms 323 and 324C - Classroom Building WSU VancouverDates: FY '05Container: Contract C#l4188, Log L #252727
-
Description: Site Assessment and Characterization of Old Pesticide Storage Building, WSU WenatcheeDates: FY '05Container: Contract C#l4276, Log L #169440
-
Description: Power Plant Coal Chute Structural Rev. and AnalysisDates: FY '05Container: Contract C#l4325, Log Non Log
-
Description: Testing Services for Lower College Ave. to Spring St Bridge Storm Sewer Replacement ProjectDates: FY '05Container: Contract C#l4334, Log L #206897
-
Description: Ground Watering MonitoringDates: FY '05Container: Contract C#l4373, Log L #256518
-
-
Box 2 - Consulting Projects
-
Description: WSU Tri-Cities CIC Bldg, Install Barrier Screens for Bird MigrationDates: FY '05Container: Contract C#14382, Log L #256584
-
Description: Entomology Greenhouse Addition to Bldg. IIIDates: FY '05Container: Contract C#14428, Log L #219206
-
Description: Preparation of Pullman Campus Topographical MapsDates: FY '05Container: Contract C#14455, Log L #218155
-
Description: Construct Medium Voltage Electrical Feeder from East substation to Student Recreation CenterDates: FY '05Container: Contract C#14516, Log L #260806
-
Description: Replacement Buildings for New Power PlantDates: FY '05Container: Contract C#14517, Log L #268335
-
Description: Consulting Services for Exhaust System at Engineering Teaching/Research Lab BuildingDates: FY '05Container: Contract C#14626, Log L #266359
-
Description: North Fairway Sanitary Sewer Replacement/UpgradeDates: FY '05Container: Contract C#14644, Log L #269859
-
Description: The Deer Shelter (Wild Ungulate Facility)Dates: FY '05Container: Contract C#l4686, Log L #259115
-
Description: WSU Mt. Vernon - On-site Wastewater Treatment And DisposalDates: FY '05Container: Contract C#14693, Log L #214087
-
Description: WSU Prosser - Upgrade Water SystemsDates: FY '05Container: Contract C#14757, Log L #144534
-
Description: WSU Wenatchee - Upgrade Water SystemsDates: FY '05Container: Contract C#14769, Log L #266696
-
Description: WSU Tri-Cities - Remodel of Rooms 142 & 144Dates: FY '05Container: Contract C#14803, Log L #256586
-
Description: Upgrade Water System at IAREC -Prosser-Phase IIDates: FY '05Container: Contract C#l4687, Log L #269574
-
Description: Bailey Field - Install Field TurfDates: FY '06Container: Contract C#l4878, Log L #280791
-
Description: Air Quality Testing, Hulbert Hall & Surr. Bldgs.Dates: FY '05Container: Contract C#14888, Log L #283167
-
Description: Regulatory Review of Asbestos Man. Prog.Dates: FY '05Container: Contract C#14902, Log L #283528
-
Description: Investigate Ground Water ContaminationDates: FY '05Container: Contract C#14962, Log L #265322
-
Description: Goldsworthy Hall West StairwellDates: FY '06Container: Contract C#14984, Log L #286570
-
Description: Wegner-Remove Projection Booth & Add SeatingDates: FY '06Container: Contract C#14991, Log L #281881
-
Description: Bustad Hall-Modify Walls, Doors, and FinishDates: FY '06Container: Contract C#14999, Log L #280772
-
Description: Bustad Hall-Convert Rooms 40H & 40KDates: FY '06Container: Contract C#15000, Log L #278156
-
Description: Bailey Field - Install Field TurfDates: FY '06Container: Contract C#15001, Log L #280791
-
Description: Martin Stadium Sport BoothsDates: FY '06Container: Contract C#15031, Log L #287721
-
Description: Abatement SpecificationsDates: FY '06Container: Contract C#l5032, Log L #283527
-
Description: Construct New Coal Ash Storage BuildingDates: FY '05Container: Contract C#15040, Log L #286284
-
Description: Replace Turf on Lower Soccer Field-GeotechnicalDates: FY '06Container: Contract C#15142, Log L #294010
-
Description: Heald Hall Exterior Column RenovationDates: FY '06Container: Contract C#15163, Log L #289294
-
Description: Martin Stadium Sport Booths-Pressbox Heat PanelsDates: FY '06Container: Contract C#15165, Log L #287721
-
Description: Student Recreation Center Back Yard ProjectDates: FY '06Container: Contract C#l5179, Log L #280807
-
Description: Student Recreation Center Back Yard Project-Grading PlanDates: FY '06Container: Contract C#15187, Log L #280807
-
Description: Pullman Campus-Upgrade 40 Scale Utility MapsDates: FY '06Container: Contract C#15347, Log L #218155
-
Description: Salvage 165B and Construct Storage BuildingDates: FY '06Container: Contract C#15414, Log L #296586
-
-
Box 3 - Public Works Projects
-
Description: Reconstruct and Repair Campus Avenue - Spokane Street to Thatuna StreetDates: FY '06Container: Contract C#15133, Log L #283181
-
Description: Parking Services Parking Lots - Crackseal, Repair & ResurfaceDates: FY '06Container: Contract C#15164, Log L #283117
-
Description: Housing Services Parking Lots and Driveways Crackseal, Repair and ResurfaceDates: FY '06Container: Contract C#l5172, Log L #283117
-
Description: Compost Storage- Construct New Coal Ash Storage BuildingDates: FY '06Container: Contract C#l5195, Log L #286284
-
Description: WSU Pullman-Central Fire Alarm Reporting SystemDates: FY '06Container: Contract C#l5197, Log L #144523
-
Description: Creamery Annex-Create Additional Mezzanine SpaceDates: FY '06Container: Contract C#15207, Log L #288293
-
-
Box 4 - Public Works Projects
-
Description: Parking and Transportation Services BuildingDates: FY '06Container: Contract C#l4998, Log L #251319
-
Description: Construct New Stone Arch-Oak Street Ent.Dates: FY '06Container: Contract C#l5024, Log L #275352
-
Description: Repair, Resurface, and Reconstruct Parking Lots And RoadwaysDates: FY '06Container: Contract C#15065, Log L #283180
-
Description: Bryan Hall and Van Doren Hall Exterior Restoration and PaintingDates: FY '06Container: Contract C#15113, Log L #284388
-
Description: Heald Hall - Exterior Column RestorationDates: FY '06Container: Contract C#l5115, Log L #289294
-
-
Box 5 - Public Works Projects
-
Description: Kalkus Office Lab Building - Install Flammable and Hazardous Storage CabinetsDates: FY '06Container: Contract C#l4763, Log L #090761
-
Description: WSU Puyallup-Kalkus Hall ElevatorDates: FY '06Container: Contract C#l4832, Log L #268354
-
Description: Fulmer Syn. Bldg. - Install Purge System in NBMRDates: FY '06Container: Contract C#14842, Log L #263986
-
Description: Campus Well No. 8Dates: FY '06Container: Contract C#l4875, Log L #257596
-
Description: N. Fairway Road- San. Sewer Replace Phase IIDates: FY '06Container: Contract C#l4884, Log L #269859
-
Description: WSU Tri-Cities-Remodel Rooms 142 and 144Dates: FY '06Container: Contract C#14908, Log L #256586
-
-
Box 6 - Public Works Projects
-
Description: WSU Prosser- Water System ImprovementsDates: FY '06Container: Contract C#14938, Log L #269574
-
Description: Johnson Hall- Upgrade Electrical ServiceDates: FY '06Container: Contract C#l4952, Log L #281509
-
Description: WSU Vancouver- Parking AdditionDates: FY '06Container: Contract C#l4958, Log L #260488
-
Description: WSU Wenatchee- Water System ImprovementsDates: FY '06Container: Contract C#l4595, Log L #266696
-
-
Box 7 - Public Works Projects (these are spec books and drawings from previously archived files)
-
Description: Water System Monitoring and Control FacilitiesDates: FY '05Container: Contract C#l4120, Log L #119207
-
Description: Demolish Linden Cottage and Construct Parking LotDates: FY '04Container: Contract C#14123, Log L #181612
-
Description: Chilled Water Plant- Cooling Tower Mods.Dates: FY '03Container: Contract C#l3715, Log L #199355
-
Description: Completion ofWSU Veterans Memorial Phase IIDates: FY '03Container: Contract C#l3744, Log L #207425
-
Description: Todd Hall-Construct Computer Teaching Lab/ClassrmDates: FY '03Container: Contract C#13787, Log L #200225
-
Description: WSU Tri-Cities - Installation of Metal Storage Bldg.Dates: FY '03Container: Contract C#l3824, Log L #191364
-
Description: Electrical/Mechanical Engineering Building Elevator Modernization REBIDDates: FY '03Container: Contract C#13825, Log L #206302
-
Description: Chemical Storage Bldg. Mods. to Office AreaDates: FY '03Container: Contract C#13869, Log L #177540
-
Description: Observatory Hill Transfer Pump Station UpgradeDates: FY '03Container: Contract C#l3870, Log L #206300
-
Description: WSU Mt. Vernon-Re-roof Admin BuildingDates: FY '03Container: Contract C#l3871, Log L #218832
-
Description: Vancouver Campus Surface Drainage ImprovementsDates: FY '03Container: Contract C#13893, Log L #139223
-
Description: Monroe Street House Demolition and Site RestorationDates: FY '03Container: Contract C#l3928, Log L #219115
-
Description: Spillman Hall DemolitionDates: FY '03Container: Contract C#l3934, Log L #218897
-
Description: WSU Pullman-Grimes Way Lift Station GeneratorDates: FY '04Container: Contract C#l4004, Log L #217653
-
-
Box 8
-
Description: WSU Pullman- Central Fire Alarm Reporting System (This Project was REBID as the original bid was declined due to OVERBID)Dates: FY '05Container: Contract No C#, Log L #144523
-
Description: Student Recreation Center - Construct Electrical Feeder (This project was cancelled)Dates: FY '06Container: Contract No C#, Log L #260806
-
Description: Campus Well No. 8 (This project was REBID, a new file was created for the replacement project)Dates: FY '06Container: Contract No C#, Log L #251596
-
Description: Commons Building- HVAC Remodel (This project was cancelled)Dates: FY '05Container: Contract No C#, Log L #212976
-
Description: Roger Field- Construct New Gated Fence Around Practice Field (Specs, drawings and final accounting documents)Dates: FY '02Container: Contract C#13276, Log L #183100
-
-
Box 8 - Miscellaneous Documents
-
Description: Final accounting documentsContainer: Contract C#13168, Log L #47985
-
Description: Final accounting documentsContainer: Contract C#13530, Log L #144518
-
Description: Final accounting documentsContainer: Contract C#14439, Log L #246907
-
Description: Final accounting documentsContainer: Contract C#13784, Log L #187641
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Development -- Records and correspondence