Preliminary Guide to the Washington State University Capital Planning and Development Contracts 18091-19670, 2012-2013
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Capital Planning and Development
- Title
- Preliminary Guide to the Washington State University Capital Planning and Development Contracts 18091-19670
- Dates
- 2012-2013 (inclusive)20122013
- Quantity
- 12 Linear feet of shelf space, (12)
- Collection Number
- UA2013-09 (collection)
- Summary
- Contract documents, architecture drawings, and specification documents related to various construction projects on the WSU Pullman and Tri-Cities Campuses, as well as other WSU-owned facilities from 2012-2013.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning (later Capital Planning and Development). While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Content Description
Contains contracts, building plans, and specification reprots related to the various small-scale projects related to WSU. Projects related to both the WSU Pullman Campus and the Tri-Cities Campus from 2012-2013.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Capital Planning and Development Contracts 18091-19670, 2012-2013 (UA2013-09)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Boxes 1-6 contain files 19601-19097. Boxes 7-12 contain files 18857-19005. Files are ordered chronologically.
Detailed Description of the Collection
-
BOX 1 Fiscal Year 2014
-
Description: Fine Arts Parking Structure RepairContainer: Contract 19601, Log 5369-2010
-
Description: Fulmer Hall Remediate Contaminated Soil (Contract)Container: Contract 19509, Log 5834-2011
-
Description: Fulmer Hall Remediate Contaminated Soil (Bid Specs)Container: Contract 19509, Log 5834-2011
-
Description: Tri-Cities CIC Offices in Area 125A, 125M, 202 (Contract)Container: Contract 19571, Log 5904-2011
-
Description: Tri-Cities CIC Offices in Area 125A, 125M, 202 (Bid Specs)Container: Contract 19571, Log 5904-2011
-
Description: RTP Renovate Oust Collection & Exhaust Systems (Specs)Container: Log 4882-2010
-
Description: Tri-Cities West Bldg Construct Ofcs Areas 2631269A (Specs)Container: Log 5903-2011
-
Description: Steptoe Apt Roofs A, B, C (Bid Specs)Container: Log 5491-2010
-
-
BOX 2 Fiscal Year 2014
-
Description: Fulmer Hall Soil 3rd Party OversightContainer: Contract 19511, Log 5834-2011
-
Description: IBC Greenhouse Addition DesignContainer: Contract 19259, Log 4139-2009
-
Description: Puyallup IAREC Dairy Office & Facops OfficeContainer: Contract 19231, Log 5824-2011
-
Description: WSU Prosser Replace Irrigation Sys Phase II (Contract)Container: Contract 18742, Log 4775-2010
-
Description: WSU Prosser Replace Irrigation Sys Phase II (Specs & Bids)Container: Contract 18742, Log 4775-2010
-
Description: Orton Hall Replace Roof & Fall Protection (Contract)Container: Contract 18895, Log 5077-2010
-
Description: Orton Hall Replace Roof & Fall Protection (Specs & Bids)Container: Contract 18895, Log 5077-2010
-
Description: Fine Arts, Daggy & Smith CUE Parking Phase I (Contract)Container: Contract 19445, Log 5369-2010
-
Description: Fine Arts, Daggy & Smith CUE Parking Phase I (Specs & Bids)Container: Contract 19445, Log 5369-2010
-
-
BOX 3 Fiscal Year 2014
-
Description: Daggy Hall Replace Roof and Gutters (Contract)Container: Contract 18746, Log 1755-2006
-
Description: Daggy Hall Replace Roof and Gutters (Specs & Bids)Container: Contract 18746, Log 1755-2006
-
Description: LARC Phase II Remodel Micro Sterilizer (Contract)Container: Contract 19006, Log 5020-2010
-
Description: LARC Phase II Remodel Micro Sterilizer (Specs & Bids)Container: Contract 19006, Log 5020-2010
-
Description: McEachran East Roof/Fall Protection (Contract)Container: Contract 18865, Log 5078-2010
-
Description: McEachran East Roof/Fall Protection (Specs & Bids)Container: Contract 18865, Log 5078-2010
-
Description: Pullman Water System Hi to Low X-Over Valve (Contract)Container: Contract 18091, Log 3533-2008
-
Description: Pullman Water System Hi to Low X-Over Valve (Specs & Bids)Container: Contract 18091, Log 3533-2008
-
-
BOX 4 Fiscal Year 2014
-
Description: Fulmer Syn Replace Fume Hoods (Contract)Container: Contract 19473, Log 5027-2010
-
Description: Fulmer Syn Replace Fume Hoods (Specs & Bids)Container: Contract 19473, Log 5027-2010
-
Description: Bustad Hall Replace Acid Waste Piping Sys (Contract)Container: Contract 19615, Log 5828-2011
-
Description: Bustad Hall Replace Acid Waste Piping Sys(Specs & Bids)Container: Contract 19615, Log 5828-2011
-
Description: Wegner Hall Remodel Rms G70/G70A (Contract)Container: Contract 19362, Log 5720-2011
-
Description: Wegner Hall Remodel Rms G70/G70A (Bid Specs)Container: Contract 19362, Log 5720-2011
-
-
BOX 5 Fiscal Year 2014
-
Description: Wegner Hall Rms 201,205 & 270 (Contract)Container: Contract 18528, Log 4553-2009
-
Description: Wegner Hall Rms 201,205 & 270 (Bid Specs & Drawings)Container: Contract 18528, Log 4553-2009
-
Description: Utility Tunnel Repair Pipe Supports (Contracts)Container: Contract 19381, Log 2154-2006
-
Description: Utility Tunnel Repair Pipe Supports (Specs & Drawings)Container: Contract 19381, Log 2154-2006
-
Description: West Building Re-Roof (Contract)Container: Contract 19297, Log 3271-2007
-
Description: West Building Re-Roof (Bid Specs & Drawings)Container: Contract 19297, Log 3271-2007
-
-
BOX 6 Fiscal Year 2014
-
Description: CUB Remodel Room 10 C-Store (Contract)Container: Contract 19528, Log 5845-2011
-
Description: CUB Remodel Room 10 C-Store (Bid Specs & Drawings)Container: Contract 19528, Log 5845-2011
-
Description: LARC Exterior Renovation (Contract)Container: Contract 19464, Log 5295-2010
-
Description: LARC Exterior Renovation (Bid Specs & Drawings)Container: Contract 19464, Log 5295-2010
-
Description: Spokane HSB Access Emergency Egress (Contract)Container: Contract 19539, Log 3415-2007
-
Description: Spokane HSB Access Emergency Egress (Specs/ Draw)Container: Contract 19539, Log 3415-2007
-
Description: Prosser Hamilton Hall Electric Upgrade (Contract)Container: Contract 19097, Log 5207-2010
-
Description: Prosser Hamilton Hall Electric Upgrade (Specs & Draw)Container: Contract 19097, Log 5207-2010
-
-
BOX 7 Fiscal Year 2014
-
Description: Todd Hall Remodel Rm 270 (Contract Docs)Container: Contract 18857, Log 1591-2006
-
Description: Todd Hall Remodel Rm 270 (Bid Specs)Container: Contract 18857, Log 1591-2006
-
Description: Eastlick Hall Roof Replacement (Contract Docs)Container: Contract 18810, Log 1352-2006
-
Description: Eastlick Hall Roof Replacement (Contract Docs)Container: Contract 18810, Log 1352-2006
-
Description: Bohler Gym Repair Exterior Masonry (Contract Docs)Container: Contract 18763, Log 2554-2007
-
Description: Bohler Gym Repair Exterior Masonry (Bid Specs & Drawings)Container: Contract 18763, Log 2554-2007
-
Description: Fulmer Remodel Rooms 426427 (Contract Docs)Container: Contract 18819, Log 4810-2010
-
Description: Fulmer Remodel Rooms 426-427 (Bid Specs & Drawings)Container: Contract 18819, Log 4810-2010
-
-
BOX 8 Fiscal Year 2014
-
Description: Campus Crosswalk Enhancements (Contract Docs)Container: Contract 19337, Log 5479-2010
-
Description: Campus Crosswalk Enhancements (Bid Specs & Drawings)Container: Contract 19337, Log 5479-2010
-
Description: GC Oil Spills Soil Remediation (Contract Docs)Container: Contract 19512, Log 5827-2011
-
Description: GC Oil Spills Soil Remediation (Bid Specs & Drawings)Container: Contract 19512, Log 5827-2011
-
Description: Rec Center Restroom Facility (Contract Docs)Container: Contract 19004, Log 4480-2009
-
Description: Rec Center Restroom Facility (Bid Specs & Drawings)Container: Contract 19004, Log 4480-2009
-
-
BOX 9 Fiscal Year 2014
-
Description: TPO Upgrade Classroom AV SystemsContainer: Contract 18811, Log 3864-2008
-
Description: General Campus Generator PermittingContainer: Contract 18681, Log 5208-2010
-
Description: General Campus Design Brand Master PlanContainer: Contract 18572, Log 5081-2010
-
Description: Prosser Civil & Structural Consulting ServicesContainer: Contract 18980, Log 5172-2010
-
Description: East Building Boiler ReplacementContainer: Contract 19628
-
Description: TPO Wegner Rooms G70/G70AContainer: Contract 19543, Log 5720-2011
-
Description: TPO Neurological Sciences BuildingContainer: Contract 19518, Log 4947-2010
-
Description: Tri-Cities West Offices 263/ 269AContainer: Contract 19491, Log 5903-2011
-
Description: Palouse Conservation Farm Load Cap. 2nd FloorContainer: Contract 19486, Log 5944-2011
-
Description: TPO Fulmer Room 201Container: Contract 19472, Log 4139-2009
-
Description: TPO Bryan Hall GFS UpgradeContainer: Contract 19454, Log 5091-2010
-
Description: Phys Ed Room 136 Lead & Asbestos TestingContainer: Contract 19419, Log 4319-2009
-
Description: Biotech Life Sciences Generator Exhaust FilterContainer: Contract 19404, Log 5695-2011
-
Description: RTP Renovate Dust Collection Exhaust SystemsContainer: Contract 19316, Log 4882-2010
-
Description: Utility Tunnels Repair Pipe SupportsContainer: Contract 19315, Log 2154-2006
-
Description: Hulbert Hall HVAC Control Valve ReplacementContainer: Contract 19269, Log 2880-2007
-
Description: PEB Modifications to Room 146Container: Contract 19245, Log 4998-2010
-
Description: !BC Greenhouse AdditionContainer: Contract 19485, Log 5345-2010
-
Description: GC Update 40 Scale MapContainer: Contract 18820, Log 5360-2010
-
Description: Rogers Hall Good Faith SurveyContainer: Contract 19240, Log 5488-2010
-
Description: Wegner Hall Electrical EngineeringContainer: Contract 19167, Log 5720-2011
-
Description: Tri-Cities East/West Buildings Design Roof ReplacementContainer: Contract 18904, Log 3271-2007
-
Description: Dairy Road Storage Addition ReviewContainer: Contract 19063, Log 3833-2008
-
Description: Utility Tunnel Repair Pipe SupportsContainer: Contract 19084, Log 2154-2006
-
Description: Wenatchee USDA Facility Install Fire Sprinkler SystemsContainer: Contract 19656, Log 5897-2011
-
Description: Wenatchee USDA Facility Install Fire Sprinkler SystemsContainer: Contract 19636, Log 5897-2011
-
Description: Daggy Hall Design for Re-roof and Gutter ReplacementContainer: Contract 18233, Log 1755-2006
-
Description: Eastlick Hall Construction Documents & DesignContainer: Contract 18599, Log 1352-2006
-
Description: Tri-Cities CIC Offices in 125A,125M and 202Container: Contract 19492, Log 5901-2011
-
Description: Compton Union Building Seal LeakContainer: Contract 19453, Log 5594-2011
-
Description: Bryan Hall Remodel Suite 316Container: Contract 19670, Log 5999-2011
-
-
BOX 10 Fiscal Year 2013
-
Description: Bustad Hall Roof Replacement (Contract Docs)Container: Contract 18872, Log 1346-2006
-
Description: Bustad Hall Roof Replacement (Bid Specs & Drawings)Container: Contract 18872, Log 1346-2006
-
Description: Bryan Hall Renovate Clock Tower (Contract Docs)Container: Contract 18735, Log 2672-2007
-
Description: Bryan Hall Renovate Clock Tower (Bid Specs & Drawings)Container: Contract 18735, Log 2672-2007
-
Description: Orton Hall Modernize Elevators (Contract Docs)Container: Contract 18705, Log 4944-2010
-
Description: Orton Hall Modernize Elevators (Bid Specs & Drawings)Container: Contract 18705, Log 4944-2010
-
Description: Smith Gym Renovate Exterior Masonry (Contract Docs)Container: Contract 18590, Log 2591-2007
-
Description: Smith Gym Renovate Exterior Masonry (Bid Specs & Draws)Container: Contract 18590, Log 2591-2007
-
Description: WSU Wenatchee Replace Roof (Contract Docs)Container: Contract 18481, Log 4758-2009
-
-
BOX 11 Fiscal Year 2013
-
Description: Bustad Hall Roof Replacement (Contract Docs)Container: Contract 18872, Log 1346-2006
-
Description: Bustad Hall Roof Replacement (Bid Specs & Drawings)Container: Contract 18872, Log 1346-2006
-
Description: Bryan Hall Renovate Clock Tower (Contract Docs)Container: Contract 18735, Log 2672-2007
-
Description: Bryan Hall Renovate Clock Tower (Bid Specs & Drawings)Container: Contract 18735, Log 2672-2007
-
Description: Orton Hall Modernize Elevators (Contract Docs)Container: Contract 18705, Log 4944-2010
-
Description: Orton Hall Modernize Elevators (Bid Specs & Drawings)Container: Contract 18705, Log 4944-2010
-
Description: Smith Gym Renovate Exterior Masonry (Contract Docs)Container: Contract 18590, Log 2591-2007
-
Description: Smith Gym Renovate Exterior Masonry (Bid Specs & Draws)Container: Contract 18590, Log 2591-2007
-
Description: WSU Wenatchee Replace Roof (Contract Docs)Container: Contract 18481, Log 4758-2009
-
-
BOX 12 Fiscal Year 2013
-
Description: WSU Prosser GC - Construct Greenhouse (Contract Docs)Container: Contract 18405, Log 4740-2009
-
Description: WSU Prosser GC - Construct Greenhouse (Specs & Dwgs)Container: Contract 18405, Log 4740-2009
-
Description: Bryan Hall Replace Roof (Contract Docs)Container: Contract 18621, Log 2799-2007
-
Description: Bryan Hall Replace Roof (Bid Specs & Drawings)Container: Contract 18621, Log 2799-2007
-
Description: Scott-Comen Refurbish Residence Halls (Contract Docs)Container: Contract 18605, Log 4481-2009
-
Description: Scott-Comen Refurbish Residence Halls (Bid Specs)Container: Contract 18605, Log 4481-2009
-
Description: WSU Wenatchee Replace Roof (Bid Specs & drawings)Container: Contract 18481, Log 4758-2009
-