Central Business District Transportation Study, 1961-1967
Table of Contents
Overview of the Collection
- Creator
- Seattle (Wash.). Engineering Dept.
- Title
- Central Business District Transportation Study
- Dates
- 1961-1967 (inclusive)19611967
- Quantity
- 2 cubic feet
- Collection Number
- 2609-03
- Repository
-
Seattle Municipal Archives
Seattle Municipal Archives
Office of the City Clerk
City of Seattle
PO Box 94728
98124-4728
Seattle, WA
Telephone: 2062337807
Fax: 2063869025
archives@seattle.gov - Access Restrictions
-
Records are open to the public.
- Languages
- English
Historical Note
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Content Description
Reports, surveys and studies concerning traffic and transportation in downtown Seattle. Subjects include district traffic circulation, reversible roadway, freeways, and the comprehensive traffic plan for the Central Business District.
Use of the Collection
Preferred Citation
[Item and date], Central Business District Transportation Study, Record Series 2609-03 Box [number], Folder [number]. Seattle Municipal Archives.
Administrative Information
Return to TopDetailed Description of the Collection
-
Description: Circulation and Parking Study, Qualification and Selection of Consulting Engineering Firms and Contract ConsultationDates: 1966Container: Box 1, Folder 1
-
Description: Circulation Study Work ProgramDates: 1967Container: Box 1, Folder 2
-
Description: Circulation Study Notes, Contracts, Correspondence for the First Phase of VISTA StudyDates: 1966-1967Container: Box 1, Folder 3
-
Description: Central Business District Transportation Study Volume I, Studies After B11Dates: 1962-1963Container: Box 1, Folder 4
-
Description: Central Business District Transportation Study Volume II, Studies After B11Dates: 1962-1963Container: Box 1, Folder 5
-
Description: Central Business District Transportation Study Volume III, Studies After B11Dates: 1962-1963Container: Box 1, Folder 6
-
Description: Central Business District Transportation Study Volume IDates: 1962Container: Box 1, Folder 7
-
Description: Central Business District Transportation Study Volume IIDates: 1962Container: Box 1, Folder 8
-
Description: Central Business District Transportation Study Volume IIIDates: 1962Container: Box 1, Folder 9
-
Description: Seattle Freeway, Spokane Street Interchange, Study of Freeway Surface Condition in Relation with South Seattle Urban Renewal AreaDates: 1965Container: Box 2, Folder 1
-
Description: Seattle Freeway, S. Connecticut Street, Eighth Avenue S. Relocation of through Traffic Prior to May 7th, 1963; Relocation and Engineering Shops Complex StudyDates: 1963Container: Box 2, Folder 2
-
Description: Seattle Freeway, Revised First Hill Mall PlanDates: 1961Container: Box 2, Folder 3
-
Description: Seattle Freeway, Employee Parking: James to ColumbiaDates: 1961Container: Box 2, Folder 4
-
Description: Seattle Freeway, Cover Study James to Olive StreetDates: 1961Container: Box 2, Folder 5
-
Description: Seattle Freeway, Cover Study, Job 15537.1Dates: 1961Container: Box 2, Folder 6
-
Description: Seattle Freeway Reversible Roadway Part II, Pattern of Peak Hour Ramp to Ramp Vehicular MovementDates: 1967Container: Box 2, Folder 7
-
Description: Central Business District Transportation Study, Preliminary Right of Way Estimates, Thomson ExpresswayDates: 1966Container: Box 2, Folder 8
-
Description: Preliminary Transportation Planning Report, International Business District Transportation StudyDates: 1967Container: Box 2, Folder 9
-
Description: Central Business District Transportation Plan, Preliminary ReportDates: 1962Container: Box 2, Folder 10
-
Description: Central Business District Transportation Study, Meeting Minutes and CorrespondenceDates: 1962-1966Container: Box 2, Folder 11
-
Description: Effect of the Lonie Project on Central Business District PlanDates: 1964Container: Box 2, Folder 12
-
Description: Central Business District Transportation Study, Cost Study , Surface Roads OnlyDates: 1962Container: Box 2, Folder 13
-
Description: Central Business District Transportation Study, Cost Estimates and Design ProgramDates: 1964Container: Box 2, Folder 14
-
Description: Central Business District Transportation Study, Construction Estimate and Cost Estimate PlansDates: 1963Container: Box 2, Folder 15
Names and SubjectsReturn to Top
Subject Terms
- Automobile parking--Washington (State)--Seattle
- Central business districts--Washington (State)--Seattle
- Express highways--Washington (State)--Seattle
- Spokane Street (Seattle, Wash.)
- Traffic engineering--Washington (State)--Seattle
Corporate Names
- Seattle (Wash.). Engineering Dept.
Geographical Names
- Seattle (Wash.)
