Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1990-2010
Table of Contents
Overview of the Collection
- Creator
- Washington State University. Facilities Services
- Title
- Preliminary Guide to the Washington State University Facilities Services Building Files and Records
- Dates
- 1990-2010 (inclusive)19902010
- Quantity
- 89 Linear feet of shelf space, (89 Boxes)
- Collection Number
- UA2016-05 (collection)
- Summary
- Records relating to the planning, construction, and renovation of WSU facilities.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical Note
The office of Facilities and Planning did not exist as a full-time staffed administrative department at WSU until 1947. Prior to this a University Architect served as the construction officer of WSU dating to 1911. Facilities and Planning was later renamed as Facilities and Development in 1993, and then as Capital Planning in 2001. The office of Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question.
Content Description
The collection consists of records pertaining to the planning, contruction, and/or renovation of WSU facilities. Correspondence with architects, planners, and contractors is often included.
Use of the Collection
Restrictions on Use
Copyright restrictions apply.
Preferred Citation
[Item description]
Preliminary Guide to the Washington State University Facilities Services Building Files and Records, 1990-2010 (UA2016-05)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative Information
Arrangement
This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff.
Materials remain in the order in which they were received, though they were rehoused. All records from individual buildings are together, but the buildings themselves appear to be in no particular order.
Detailed Description of the Collection
-
Compton Union Building Renovation Bldg. No. 0063
-
Description: Builder’s RiskDates: 4/20/06Container: Box 1
-
Description: BAIT CommitteeDates: 3/01-8/08Container: Box 1
-
Description: RegentsDates: 5/1/01-5/9/06Container: Box 1
-
Description: BudgetDates: 8/1/01Container: Box 1
-
Description: GrantsDates: 1/1/05Container: Box 1
-
Description: Public Records Requests 09-293Dates: 11/09Container: Box 1
-
Description: Public Records Requests 09-192Dates: 7/09Container: Box 1
-
Description: Public Records Requests 08-35Dates: 2/08Container: Box 1
-
Description: AMEC Earth & Environmental CO#14187Dates: 6/1/01Container: Box 1
-
Description: Brailsford & Dunlavey CO#14034 Social & Economic Sciences Research Center Data Report 01-13Dates: 2/1/01Container: Box 1
-
Description: Brightworks Northwest #1 CO#16147Dates: 5/31/05Container: Box 1
-
Description: Davis Langdon #1 CO#16144Dates: 5/1/05Container: Box 1
-
Description: Kaplan, McLaughlin, Diaz #1 CO#12189Dates: 11/13/95-3/11/97Container: Box 1
-
Description: McKinstry/Essention CO#16575Dates: 9/27/06Container: Box 1
-
Description: MCS Environmental #1 CO#16190Dates: 6/10/05Container: Box 1
-
Description: Steve Goldblatt Third Party Neutral #1 CO#16634Dates: 5/1/06Container: Box 1
-
Description: Tim McCarty CO#14111Dates: 5/1/01Container: Box 1
-
Description: Reid Middleton #1 CO#12968Dates: UndatedContainer: Box 1
-
Description: Siemens Building Technologies #1 CO#16616Dates: 5/1/06Container: Box 1
-
Description: Strata Geotechnical CO#16273Dates: 3/23/05Container: Box 1
-
Description: Studio SC CO#17236Dates: 6/1/07Container: Box 1
-
Description: Taylor Engineering #1 CO#16170Dates: 6/6/05Container: Box 1
-
Description: WSU Police Department Contract #1Dates: 5/1/06Container: Box 1
-
Description: Integrus Architecture CO#14280Dates: 6/1/01Container: Box 1
-
Description: Integrus Architecture Predesign Study CO#14395#1Dates: 10/17/01Container: Box 1
-
Description: Strata Geotechnical Engineering Evaluation ReportDates: 11/28/05Container: Box 1
-
Description: MCS Environmental, Inc. Lead Based Paint SurveyDates: 7/13/05Container: Box 1
-
Description: Hoffman Construction Co. Asbestos-Free Certification CO#16590Dates: 8/14/09Container: Box 1
-
Description: The Kresge Foundation Green Building InitiativeDates: 6/1/05Container: Box 1
-
Description: Owen F. Turnbull "Socialization & Architecture"Dates: UndatedContainer: Box 1
-
Description: Yost Grube Hall Architecture Services & Activities Facilities Fee RequestDates: Numbers 99-01Container: Box 1
-
Description: Compton Union - A Center for Education & CommunityDates: 11/99Container: Box 1
-
Description: Hoffman Construction Company RFQDates: 5/25/05Container: Box 1
-
Description: Integrus Architecture RFQDates: 4/19/05Container: Box 1
-
Description: MCS Environmental, Inc. Environmental Logic Mercury Containing Components SurveyDates: 10/14/05Container: Box 1
-
Description: MCS Proposal to Conduct Regulated/Hazardous Materials Good Faith SurveyDates: 5/1/05Container: Box 1
-
Description: McKinstry Essention SOQDates: 1/27/06Container: Box 1
-
Description: MCS Environmental, Inc. Good Faith Asbestos SurveyDates: 7/13/05Container: Box 1
-
Description: Kaplan/McLaughlin/Diaz Building Improvement & Expansion StudyDates: 7/12/96Container: Box 1
-
Description: Integrus Architecture SOQDates: 4/26/01Container: Box 1
-
Description: Architecture Submittals “Firms Not Used #1”Dates: UndatedContainer: Box 1
-
Description: RFP for Consultant SelectionDates: 11/00Container: Box 2
-
Description: A/E Design Services SelectionDates: 5/01Container: Box 2
-
Description: Miscellaneous 411 Prior to RenovationDates: 12/1/95-7/31/97Container: Box 2
-
Description: Post Office CorrespondenceDates: 1/1/06Container: Box 2
-
Description: Email General Correspondence #2Dates: 5/18/05Container: Box 2
-
Description: General Correspondence #3Dates: 1/1/05Container: Box 2
-
Description: Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Outline SpecificationsDates: 9/1/05Container: Box 2
-
Description: Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Project NarrativesDates: 9/1/05Container: Box 2
-
Description: Hoffman Construction Company GC/CM - InterviewDates: 6/15/05Container: Box 2
-
Description: Tenant ImprovementsDates: 10/1/08Container: Box 2
-
Description: Integrus Email Correspondence #1Dates: 1/11/05-6/9/05Container: Box 2
-
Description: Pfeiffer Partners, Inc. General Correspondence #1Dates: 2/7/05Container: Box 2
-
Description: Hoffman Construction Co. #20 Contract CO#16590Dates: 5/1/09Container: Box 2
-
Description: Integrus Architecture #2 Contract CO#15398Dates: 1/1/05Container: Box 2
-
Description: Integrus Architecture #15 Contract CO#16324Dates: 3/1/09Container: Box 2
-
Description: SignageDates: 9/1/08Container: Box 2
-
Description: Hoffman Construction Co. #1Dates: 11/11/05Container: Box 2
-
Description: Hoffman Construction Co. #19 Contract CO#16590Dates: 11/1/08Container: Box 2
-
Description: Hoffman Construction Co. Contract Change ProposalsDates: Numbers 325-768Container: Box 3
-
Description: Contract Change ProposalsDates: Numbers 035-324Container: Box 4
-
Description: Contract Change ProposalsDates: Numbers 001-034Container: Box 5
-
Description: Integrus General Correspondence #1Dates: 2/25/02-8/4/09Container: Box 5
-
Description: Certified Payroll ReportsDates: 9/1/07Container: Box 5
-
Description: Rejected BidsDates: 5/7/07Container: Box 5
-
Description: Strata Final Project BinderDates: 9/8/08Container: Box 5
-
Description: Email General Correspondence #1Dates: 12/01/01-5/17/05Container: Box 5
-
Description: General Correspondence #2Dates: 11/1/00-12/31/04Container: Box 5
-
Description: Integrus Architecture #1 CO#15398Dates: 2/4/04-12/31/04Container: Box 5
-
Description: Integrus Architecture #14 CO#16324Dates: 3/1/08-6/30/08Container: Box 5
-
Description: Integrus Architecture #13 CO#16324Dates: 7/1/08-2/28/09Container: Box 5
-
Description: Integrus Architecture #12 CO#16324Dates: 11/1/07-2/29/08Container: Box 5
-
Description: Integrus Architecture #11 CO#16324Dates: 10/1/07-10/16/07Container: Box 5
-
Description: Integrus Architecture #10 CO#16324Dates: 8/1/07-9/30/07Container: Box 6
-
Description: Integrus Architecture #9 CO#16324Dates: 6/1/07-7/31/07Container: Box 6
-
Description: Integrus Architecture #8 CO#16324Dates: 2/1/07-5/31/07Container: Box 6
-
Description: Integrus Architecture #7 CO#16324Dates: 9/1/06-1/31/07Container: Box 6
-
Description: Integrus Architecture #6 CO#16324Dates: 6/9/06-8/31/06Container: Box 6
-
Description: Integrus Architecture #5 CO#16324Dates: 4/1/06-5/10/06Container: Box 6
-
Description: Integrus Architecture #4 CO#16324Dates: 2/9/06-3/31/06Container: Box 6
-
Description: Integrus Architecture #3 CO#16324Dates: 1/1/06-2/8/06Container: Box 6
-
Description: Integrus Architecture #2 CO#16324Dates: 10/1/05-12/31/05Container: Box 6
-
Description: Integrus #1 CO#16324Dates: 10/5/05Container: Box 7
-
Description: Hoffman Construction Co. #3 CO#16590Dates: 1/1/07-2/28/07Container: Box 7
-
Description: Hoffman Construction Co. #2 CO#16590Dates: 11/1/06-12/31/06Container: Box 7
-
Description: Hoffman Construction Co. #1 CO#16590Dates: 5/9/06-10/31/06Container: Box 7
-
Description: Hoffman Construction Co. GC/CM Procedures #3Dates: 5/18/05Container: Box 7
-
Description: Hoffman Construction Co. GC/CM Procedures #2Dates: 6/21/05Container: Box 7
-
Description: Hoffman Construction Co. GC/CM Procedures #1Dates: 5/3/05Container: Box 7
-
Description: Hoffman Construction Co. #18 CO#16590Dates: 8/1/08-10/31/08Container: Box 7
-
Description: Request for Proposals for Hazmat ConsultantsDates: 4/18/05Container: Box 7
-
Description: Hoffman Construction Co. #17 CO#16590Dates: 6/1/08Container: Box 7
-
Description: Hoffman Construction Co. #16 CO#16590Dates: 4/1/08-5/31/08Container: Box 7
-
Description: Hoffman Construction Co. #15 CO#16590Dates: 3/1/08Container: Box 8
-
Description: Hoffman Construction Co. #14 CO#16590Dates: 2/1/08Container: Box 8
-
Description: Hoffman Construction Co. #13 CO#16590Dates: 1/1/08-1/31/08Container: Box 8
-
Description: Hoffman Construction Co. #12 CO#16590Dates: 12/1/07-12/31/07Container: Box 8
-
Description: Hoffman Construction Co. #11 CO#16590Dates: 11/1/07-11/30/07Container: Box 8
-
Description: Hoffman Construction Co. #10 CO#16590Dates: 10/1/07-10/31/07Container: Box 8
-
Description: Hoffman Construction Co. #9 CO#16590Dates: 91/1/07-9/30/07Container: Box 8
-
Description: Hoffman Construction Co. #8 CO#16590Dates: 8/1/07-8/31/07Container: Box 8
-
Description: Hoffman Construction #7 CO#16590Dates: 7/1/07-7/31/07Container: Box 8
-
Description: Hoffman Construction #6 CO#16590Dates: 6/1/07-9/25/07Container: Box 8
-
Description: Hoffman Construction #5 CO#16590Dates: 4/1/07-5/31/07Container: Box 8
-
Description: Hoffman Construction #4 CO#16590Dates: 3/1/07-3/31/07Container: Box 8
-
Description: Kaplan/McLaughlin/Diaz Building Improvements, and Expansion StudyDates: 7/12/96Container: Box 9
-
Description: Integrus Architecture/HHPA SubmittalDates: UndatedContainer: Box 9
-
Description: Integrus Architecture SOQ AE and Related ServicesDates: 4/7/05Container: Box 9
-
Description: Hoffman Construction Co. GC/CM RFQDates: 5/25/05Container: Box 9
-
Description: RFQ for Commissioning ServicesDates: 1/31/06Container: Box 9
-
Description: Hoffman Construction Preconstruction #1 CO#16440Dates: 1/13/06Container: Box 9
-
Description: Brailsford & Dunlavey Preliminary Market Analysis *Updates*Dates: Summer 2001Container: Box 9
-
Description: Wilson Road ImprovementsDates: 2007-2008Container: Box 9
-
Description: Electronic Documents 1-4Dates: 2006Container: Box 9
-
Description: RFQ for GC/CM ServicesDates: 5/3/05Container: Box 9
-
Description: AMEC Earth & Environmental, Inc. Limited Facility SurveyDates: 10/31/01Container: Box 9
-
Description: MCS Environmental, Inc. ProposalDates: 5/11/05Container: Box 9
-
Description: Avista Rebates & LEED IncentiveDates: 6/11/08Container: Box 9
-
Description: McKinstry Energy Services Proposal Phase 2.4 CHW Loop Connection Final ESPDates: 2/1/06Container: Box 9
-
Description: SESRC (Social & Economic Sciences Research Center) Data Report 01-13 Cub Renovation SurveyContainer: Box 9
-
Description: Hoffman Construction Company RFQ Bid Package #A2Dates: 1/30/06Container: Box 9
-
Description: Integrus Architecture Wayfinding & Environmental Graphics ProgramDates: 8/10/06Container: Box 9
-
Description: MCS Environmental Inc. Closure Report for Asbestos Abatement Project Supervision (WA Bldg.)Dates: 3/10/06Container: Box 9
-
Description: Integrus Structural InvestigationDates: 9/6/01Container: Box 9
-
Description: Brailsford & Dunlavey Proposal to Render Professional Consulting ServicesDates: 5/11/00Container: Box 9
-
-
Education Addition (Cleveland Hall) Bldg. No. 086A
-
Description: BudgetDates: 10/1/99Container: Box 9
-
Description: Builder’s Risk InsuranceDates: 4/7/04Container: Box 9
-
Description: EISDates: 1/1/03Container: Box 9
-
Description: RegentsDates: 7/22/97Container: Box 9
-
Description: FACDates: 1/13/00-9/15/05Container: Box 9
-
Description: Project Planning Committee #1Dates: 1/8/98Container: Box 9
-
Description: AMEC Earth & Environmental, Inc. #1Dates: 3/17/03Container: Box 9
-
Description: Geo Engineers, Inc. CO#13431Dates: 11/1/99Container: Box 9
-
Description: KJM CO#14730Dates: 3/1/02Container: Box 9
-
Description: KJM CSI Division Report (Draft) 100% CD EstimationDates: 4/28/03Container: Box 9
-
Description: KJM By Element ReportDates: 4/28/03Container: Box 9
-
Description: KJM Constructability ReviewDates: 9/12/02Container: Box 9
-
Description: Reid Middleton #1 CO#12968Dates: 10/1/99Container: Box 9
-
Description: Stephen F. McAuley Construction Management #1 CO#13339Dates: 8/9/99Container: Box 10
-
Description: Stoel Rives LLP #1 CO#12589Dates: 3/30/98Container: Box 10
-
Description: Strata Geotechnical Engineering #1 CO#15527Dates: 3/24/04Container: Box 10
-
Description: Email General CorrespondenceDates: 1/17/01-6/23/05Container: Box 10
-
Description: General Correspondence #2Dates: 9/5/02-6/17/08Container: Box 10
-
Description: Project Management MinutesDates: 8/1/99Container: Box 10
-
Description: Project Schedule CorrespondenceDates: 10/1/99Container: Box 10
-
Description: Energy Life Cycle Cost Analysis CorrespondenceDates: 7/1/00Container: Box 10
-
Description: Schematic Design ReportDates: UndatedContainer: Box 10
-
Description: Roen & Associates #2 Value Engineering SurveyDates: 6/1/00Container: Box 10
-
Description: Roen & Associates #1 Value Engineering StudyDates: 6/27/00Container: Box 10
-
Description: A/E Consulting Services SelectionDates: 5/97Container: Box 10
-
Description: Thomas Hacker & Associates #4 General CorrespondenceDates: 5/1/01Container: Box 10
-
Description: Thomas Hacker & Associates Structural & Energy CalculationsDates: 4/2/03Container: Box 10
-
Description: Thomas Hacker & Associates #5 Contract CO#12801Dates: 3/1/05Container: Box 10
-
Description: MW Consulting Engineers Energy Life Cycle Cost Analysis Volume IDates: 7/00Container: Box 10
-
Description: MW Consulting Engineers Energy Life Cycle Cost Analysis Volume IIDates: 7/00Container: Box 10
-
Description: Shea Graham Construction, Inc. #1 General CorrespondenceDates: 3/1/04-3/20/06Container: Box 10
-
Description: Shea Graham Construction, Inc. #1 Contract CO#15525Dates: 3/1/04-9/30/05Container: Box 10
-
Description: Thomas Hacker & Associates Architects PC Predesign DocumentsDates: 6/22/98Container: Box 10
-
Description: Schematic DesignDates: UndatedContainer: Box 10
-
Description: Strata Final Project Summary Test ReportDates: 8/4/04Container: Box 10
-
Description: KJM 100% Construction Document EstimateDates: 5/9/03Container: Box 10
-
Description: Thomas Hacker Architects, Inc. Project Manual Volume I Division 0-14Dates: 1/23/04Container: Box 11
-
Description: Thomas Hacker Architects, Inc. Project Manual Volume I Division 15 & 16Dates: 1/23/04Container: Box 11
-
Description: Maiani Construction Services, Inc. Test & Balance RPF Final RevisionDates: 8/25/06Container: Box 11
-
Description: Design Team EstimateDates: 4/1/03Container: Box 11
-
Description: Contract Change ProposalsDates: Numbers 062-121Container: Box 11
-
Description: Certified Payroll RecordsDates: 2/1/05Container: Box 11
-
Description: Contract Change ProposalsDates: Numbers 001R-061Container: Box 11
-
Description: Rejected BidsDates: 3/16/04Container: Box 11
-
Description: Shea Graham - Project Closeout #1Dates: 3/9/06Container: Box 11
-
Description: Thomas Hacker & Associates Architecture PC Education Addition StudyDates: 6/22/98Container: Box 11
-
Description: Architectural cost Consultants, LLC 100% Design Development EstimateDates: 6/9/00Container: Box 11
-
Description: Thomas Hacker & Associates Architecture Outline Specification Design DevelopmentDates: 6/12/00Container: Box 11
-
Description: Roen & Associates #1 Value Engineering StudyDates: 2/1/00-6/00Container: Box 11
-
Description: General Correspondence #1Dates: 7/97-6/30/01Container: Box 11
-
Description: Thomas Hacker & Associates #3 General CorrespondenceDates: 12/1/00-4/30/01Container: Box 12
-
Description: Thomas Hacker & Associates #2 General CorrespondenceDates: 11/1/99-11/30/00Container: Box 12
-
Description: Thomas Hacker & Associates #1 General CorrespondenceDates: 10/97-10/31/99Container: Box 12
-
Description: Thomas Hacker & Associates #4 Contract CO#12801Dates: 10/1/04-2/28/05Container: Box 12
-
Description: Thomas Hacker & Associates #3 Contract CO#12801Dates: 5/1/03-9/30/04Container: Box 12
-
Description: Thomas Hacker & Associates #2 Contract CO#12801Dates: 6/1/00-4/30/03Container: Box 12
-
Description: Thomas Hacker & Associates #1 Contract CO#12801Dates: 11/18/97-3/31/00Container: Box 12
-
Description: Steve Pea Good Faith Building Inspection Report (rm. #130A, roof top, and steam tunnel)Dates: 11/5/02Container: Box 12
-
-
Golf Course Expansion (and Master Plan) Bldg. No. 365E
-
Description: Builder’s Risk InsuranceDates: 5/23/06Container: Box 12
-
Description: EIS #1Dates: 5/6/05Container: Box 12
-
Description: RegentsDates: 11/23/02-8/28/08Container: Box 12
-
Description: BAIT CommitteeDates: 11/1/02-8/28/08Container: Box 12
-
Description: Attorney GeneralDates: 10/2009Container: Box 12
-
Description: Issues and ClaimsDates: 6/1/08Container: Box 12
-
Description: Public Records Requests 10-32 (1 of 7 folders)Dates: 1/2010Container: Box 12
-
Description: Public Records Requests 10-32 (6 of 7 folders)Dates: 1/2010Container: Box 13
-
Description: Public Records Requests 8-35Dates: 2/2008Container: Box 13
-
Description: Public Records Requests 8-33Dates: 3/2008Container: Box 13
-
Description: Public Information Requests 7-154Dates: 9/28/07Container: Box 13
-
Description: Public Information Requests SEPA 0562 #3Dates: 3/29/05Container: Box 13
-
Description: Public Information Requests SEPA 0562 #2Dates: 3/29/05Container: Box 13
-
Description: Public Information Requests SEPA 0562 #1 (3 folders)Dates: 3/29/05Container: Box 13
-
Description: Public Information Requests 5-33Dates: 2/14/05Container: Box 13
-
Description: FTP Site Archive (on CD)Dates: 6/28/06Container: Box 13
-
Description: “Creating a Championship Golf Course at WSU” BrochureDates: UndatedContainer: Box 13
-
Description: Master Plan Water ResourcesDates: 4/1/04Container: Box 14
-
Description: SignageDates: 4/1/08Container: Box 14
-
Description: Bakers Tree Servic3e #1 CO#16085Dates: 3/22/05Container: Box 14
-
Description: Dahlin Group, Inc. #1 CO#16036Dates: 2/18/05Container: Box 14
-
Description: Davis Langdon #1 CO16098Dates: 2/28/05-7/2/07Container: Box 14
-
Description: Design West Architects #1 CO#16513Dates: 2/1/06-4/16/05Container: Box 14
-
Description: Design West Architects Project Manual Division 0-16Dates: 3/26/07Container: Box 14
-
Description: Master Plan Economics Research Association Market & Financial Analysis CO#15633Dates: 5/1/04Container: Box 14
-
Description: E3RA #1 CO#16148Dates: 4/1/05Container: Box 14
-
Description: E3RA Good Faith Hazardous Materials SurveyDates: 7/7/05Container: Box 14
-
Description: Trent School of Golf CO#15074Dates: 5/1/06Container: Box 14
-
Description: Lane Powell Attorneys Land Use IssuesDates: 6/28/05Container: Box 14
-
Description: HGHB #1 CO#16000Dates: 2/8/05Container: Box 14
-
Description: Jim Kolva Associates #1 CO#16207Dates: 6/29/05Container: Box 14
-
Description: KPFF Consulting Engineers #1 CO#16084Dates: 3/30/05Container: Box 14
-
Description: OB Sports #1 CO#16001Dates: 2/1/05Container: Box 14
-
Description: Sparling #1 CO#16220Dates: 7/11/05Container: Box 14
-
Description: Strata Geotechnical #1 CO#15958Dates: 1/24/05Container: Box 14
-
Description: Taylor Engineering #1 CO#15959Dates: 1/25/05Container: Box 14
-
Description: RFQ for Golf Course DesignerDates: 7/1/03Container: Box 14
-
Description: “An Environmental Approach to Golf Course Development”Dates: UndatedContainer: Box 14
-
Description: Email General Correspondence #1Dates: 3/1/04Container: Box 14
-
Description: General Correspondence #1Dates: 6/1/03Container: Box 14
-
Description: John Harbottle Email CorrespondenceDates: 4/1/04Container: Box 14
-
Description: Kemper Sports General Correspondence #1Dates: 12/15/05Container: Box 14
-
Description: John Harbottle Design #1 General CorrespondenceDates: 1/1/04Container: Box 14
-
Description: John Harbottle Design #1 Contract CO#15415Dates: 2/2/04Container: Box 14
-
Description: John Harbottle Design #1 Contract CO#15919Dates: 1/19/05Container: Box 14
-
Description: Oliphant Golf Construction #1 General CorrespondenceDates: 5/1/06Container: Box 14
-
Description: Oliphant Golf Contract #1 CO#16598Dates: 5/1/06Container: Box 14
-
Description: Pre-bid Meeting Minutes #1Dates: 3/2/06Container: Box 14
-
Description: Courseco, Inc. General CorrespondenceDates: 6/1/06Container: Box 14
-
Description: Environmental Permits #1Dates: 1/31/06Container: Box 14
-
Description: Gathering Pavilion Tent Failure CorrespondenceDates: 2/1/09Container: Box 14
-
Description: Tent Failure CorrespondenceDates: 11/1/08Container: Box 14
-
Description: Wetland MitigationDates: 1/1/06Container: Box 15
-
Description: Water ReuseDates: 1996-2008Container: Box 15
-
Description: Golf Course StudiesDates: 1995Container: Box 15
-
Description: Project Manual John Harbottle DesignDates: 1/24/06Container: Box 15
-
Description: Preliminary Expansion StudyDates: 5/96Container: Box 15
-
Description: Wetland Delineation ReportDates: 1/7/05Container: Box 15
-
Description: Golf Course Market Analysis Report City of PullmanDates: 10/15/91Container: Box 15
-
Description: ERA Market Analysis ReportDates: 6/15/04Container: Box 15
-
Description: Comfort Station CorrespondenceDates: 10/1/07Container: Box 15
-
Description: Vet Med RelocationDates: 6/10/04Container: Box 15
-
Description: Master Plan Meeting MinutesDates: 4/1/04Container: Box 15
-
Description: Golf CourseDates: 6/12/91-10/02Container: Box 15
-
Description: Golf Couse Expansion ThemeDates: 1/1/96-10/31/97Container: Box 15
-
Description: FirmsDates: 1997Container: Box 15
-
Description: Public SurveyDates: 7/18/97Container: Box 15
-
Description: Meetings and CorrespondenceDates: 9/7/95-3/13/98Container: Box 15
-
Description: FinancingDates: 8/7/95-3/13/98Container: Box 15
-
Description: Certified Payroll ReportsDates: 6/1/06Container: Box 15
-
Description: Contract Change Proposals OliphantDates: Numbers 001-021Container: Box 15
-
Description: Oliphant Responsibility FileDates: 4/06Container: Box 15
-
Description: Rejected BidsDates: 3/06-5/06Container: Box 15
-
-
Golf Course Entry Road and Parking Bldg. No. 365
-
Description: Builder’s Risk InsuranceDates: 4/26/06Container: Box 15
-
Description: RegentsDates: 5/2/05-5/9/06Container: Box 15
-
Description: BAITDates: 10/22/04-3/20/08Container: Box 15
-
Description: Public Records Request Numbers 8-33Dates: 3/08Container: Box 15
-
Description: Public Records Request Numbers 8-33Dates: 2/08Container: Box 15
-
Description: Strata Geotechnical Engineering & Materials Testing CO#16751Dates: 7/1/06Container: Box 15
-
Description: Taylor Engineering, Inc. #1 CO#16052Dates: 2/25/05Container: Box 15
-
Description: Roundtop Hill/Jerry Newbrey TrailDates: 6/1/06Container: Box 15
-
Description: Stormwater PermitsDates: 8/1/06Container: Box 15
-
Description: General Correspondence #1Dates: 3/23/06Container: Box 15
-
Description: John Harbottle Project Manual Design Golf Course Architecture Volume I Divisions 0-16Dates: 3/1/06Container: Box 15
-
Description: John Harbottle Design #1 General Correspondence CO#16599Dates: 5/1/06Container: Box 16
-
Description: Motley-Motley, Inc. #1 General CorrespondenceDates: 4/19/06-9/28/10Container: Box 16
-
Description: Motely-Motley, Inc. Contract CO#16599Dates: 5/9/06Container: Box 16
-
Description: Contract Change Proposals Motley-MotleyDates: Numbers 001-038Container: Box 16
-
Description: Rejected BidsDates: 4/13/06Container: Box 16
-
-
Golf Course Management Bldg. No. 365
-
Description: General CorrespondenceDates: 10/27/05Container: Box 16
-
Description: CourseCo, Inc. #1 General CorrespondenceDates: 6/1/06Container: Box 16
-
Description: CourseCo, Inc. #1 Contract CO#16450Dates: 6/1/06Container: Box 16
-
-
Golf Course Pavilion Bldg. No. 365M
-
Description: Bunker Steel Building, Inc.Dates: 4/2/09-11/5/09Container: Box 16
-
Description: Coffman Engineering CO#18203Dates: 6/1/09Container: Box 16
-
Description: General CorrespondenceDates: 6/1/09Container: Box 16
-
Description: FurnaceDates: 11/2010Container: Box 16
-
Description: Acoustic PanelsDates: 10/2010Container: Box 16
-
Description: East Concrete PatioDates: 8/2010Container: Box 16
-
Description: Concrete PolishingDates: 7/2010Container: Box 16
-
Description: Design DrawingsDates: 3/2009Container: Box 16
-
-
Grimes Way Steam Plant (Energy Plant Redevelopment) Bldg. No. 0840
-
Description: BudgetDates: 7/1/02Container: Box 16
-
Description: Builder’s Risk InsuranceDates: 7/3/03Container: Box 16
-
Description: EISDates: 10/2/01Container: Box 16
-
Description: RegentsDates: 9/6/02-6/29/01Container: Box 16
-
Description: BAIT CommitteeDates: 12/6/00-10/27/05Container: Box 16
-
Description: Attorney GeneralDates: 2/1/01Container: Box 16
-
Description: Department of Ecology General CorrespondenceDates: 9/9/03Container: Box 16
-
Description: Department of Ecology Notice of ConstructionDates: 6/12/03Container: Box 16
-
Description: Avista Utilities CorrespondenceDates: 4/1/02Container: Box 16
-
Description: AMEC Earth & Environmental, Inc. #1 Asbestos Abatement CO#15053Dates: 5/1/03Container: Box 16
-
Description: Bison Engineering, Inc. #1 CO#16070Dates: 3/14/05Container: Box 16
-
Description: E3RA, Inc. #1 CO#15739Dates: 8/13/04Container: Box 16
-
Description: Geoengineering, Inc. #1 CO#14495Dates: 3/29/02Container: Box 16
-
Description: Bison Engineering NOx, CO, & VOC Emissions Compliance TestDates: 5/10/05Container: Box 16
-
Description: MRW & Associates, Inc. CO#14023Dates: 3/1/01Container: Box 16
-
Description: New Generation Services CO#14024Dates: 3/1/01Container: Box 16
-
Description: Preston/Gates/Ellis, LLPDates: 3/1/01Container: Box 17
-
Description: Progressive Engineering Group, Inc. CO#17401Dates: 11/1/07Container: Box 17
-
Description: Rooney Engineering, Inc. #1 CO14813Dates: 11/5/02Container: Box 17
-
Description: Strata Geotechnical Engineering & Materials Testing CO#14278Dates: 7/1/01Container: Box 17
-
Description: Strata Geotechnical Engineering Evaluation Final ReportDates: 1/24/03Container: Box 17
-
Description: SCM Consultants, Inc. #1 CO#14814Dates: 1/31/03Container: Box 17
-
Description: Siemens Energy & AutomationContainer: Box 17
-
Description: Sonnichsen Engineering, Inc. CO#13953Container: Box 17
-
Description: Susan D. Musselman Inc. #1 CO#14409Container: Box 17
-
Description: Taylor Engineering, INc. C.E. Design ServicesContainer: Box 17
-
Description: Thomas, Dean, & Hoskins Domestic Water System Modeling CO#14592Container: Box 17
-
Description: URS Corporation #1 CO#16262Container: Box 17
-
Description: Valutek CO#13948Container: Box 17
-
Description: Williams Gas Pipeline West Letter AgreementContainer: Box 17
-
Description: Wood/Harbinger, Inc. CO#14279Container: Box 17
-
Description: Wood/Harbinger, Inc. Steam System Upgrades #2 CO#14560Container: Box 17
-
Description: RFP for Joint AgreementContainer: Box 17
-
Description: RFP for Engineering Consultant ServicesContainer: Box 17
-
Description: Email General Correspondence #1Dates: 10/02Container: Box 17
-
Description: Trigen Energy Corporation General Correspondence #1Dates: 3/1/04Container: Box 17
-
Description: General Correspondence #3Dates: 1/1/01Container: Box 17
-
Description: Harris Group Inc. General Correspondence #1Dates: 1/1/03Container: Box 17
-
Description: Harris Group Inc. Contract #6 CO14852Dates: 1/9/03Container: Box 17
-
Description: Hoffman Construction Company #1 General CorrespondenceDates: 7/20/04Container: Box 17
-
Description: Hoffman Construction Company #1 Preconstruction Professional Services CO#14889Dates: 12/27/02Container: Box 17
-
Description: General Correspondence #2Dates: 1/1/01-12/31/03Container: Box 18
-
Description: RFQ New Energy PlantDates: 11/02Container: Box 18
-
Description: Contract Change ProposalsDates: Numbers 002-009Container: Box 18
-
Description: RFQ GC/CM Selection #2Dates: 10/02Container: Box 18
-
Description: RFQ GC/CM Selection #1Dates: 12/02Container: Box 18
-
Description: Certified Payroll ReportsDates: 8/1/03Container: Box 18
-
Description: Rejected Bids GC/CM RFPDates: 12/02Container: Box 18
-
Description: Hoffman Construction Company InterviewDates: 12/5/02Container: Box 18
-
Description: Hoffman Construction Company SOQ for GC/CMDates: 11/21/02Container: Box 18
-
Description: Lydig SOQDates: 11/21/02Container: Box 18
-
Description: Wood/Harbinger Steam CO#14560Dates: 4/1/02-5/1/03Container: Box 18
-
Description: Harris Group, Inc. #5 CO#14852Dates: 1/17/04-7/19/04Container: Box 18
-
Description: Harris Group, Inc. #4 CO#14852Dates: 10/1/03-1/16/04Container: Box 18
-
Description: Harris Group, Inc. #3 Contract CO#14852Dates: 7/23/03Container: Box 18
-
Description: Harris Group, Inc. #2 Contract CO#14852Dates: 4/1/03-7/22/03Container: Box 19
-
Description: Harris Group, Inc. #1 Contract CO#14852Dates: 1/13/03-3/30/03Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #7Dates: 8/1/04-8/1/04Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #6Dates: 2/11/04-8/1/04Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #5Dates: 10/1/03-2/10/04Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #4Dates: 9/1/03-9/30/03Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #3Dates: 8/1/03-8/31/03Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #2Dates: 7/1/03-7/31/03Container: Box 19
-
Description: Hoffman Construction Co. of WA. GC/CM #1Dates: 5/1/03-6/30/03Container: Box 19
-
Description: Builder’s Risk InsuranceDates: 7/12/02Container: Box 19
-
Description: RegentsDates: 7/1/02Container: Box 19
-
Description: BAIT CommitteeDates: 7/1/02-9/5/02Container: Box 19
-
Description: Hodge and Associates CO#14451Dates: 2/1/02Container: Box 19
-
Description: Strata Geotechnical Engineering & Materials Testing CO#14448Dates: 2/1/02Container: Box 19
-
Description: Taylor Engineering, Inc. CO#14513Dates: 1/28/02Container: Box 19
-
Description: General Correspondence #1Dates: 2/1/02Container: Box 19
-
Description: Lydig Construction, Inc.Dates: 7/1/02-7/9/03Container: Box 20
-
Description: Lydig Construction, Inc. #1 CO#14625Dates: 7/1/02-4/30/03Container: Box 20
-
Description: Contract Change Proposals Lydig Construction, Inc.Dates: Numbers 001-015Container: Box 20
-
Description: Responsibility File Lydig Construction, Inc.Dates: 6/7/02Container: Box 20
-
Description: Planholders List/ CorrespondenceDates: 7/2002Container: Box 20
-
Description: Rejected BidsDates: 6/7/02Container: Box 20
-
Description: CloseoutDates: 1/1/03Container: Box 20
-
-
Heald Hall Renewal Bldg. No. 82
-
Description: BudgetDates: 10/92-8/93Container: Box 20
-
Description: RegentsDates: 12/8/92Container: Box 20
-
Description: Coffman Engineers, Inc. CO#14615Dates: 6/1/02Container: Box 20
-
Description: Project Planning CommitteeDates: 92-93Container: Box 20
-
Description: Project Request ReportDates: 10/1/01Container: Box 20
-
Description: Miller/Hull Partnership Preliminary Expanded Options StudyDates: 8/95Container: Box 20
-
Description: Miller/Hull Partnership Options Phase DocumentDates: 6/15/92Container: Box 20
-
Description: AMEC (Administration Annex) Cost-Estimate Regulated Material Removal/DisposalDates: 2/8/02Container: Box 20
-
Description: AMEC Limited Facility Survey (2 copies)Dates: 2/8/02Container: Box 20
-
Description: Expanded Options Study #2Dates: 6/1/95-3/18/69Container: Box 20
-
Description: Column Analysis and Rebar StudyDates: 1993Container: Box 20
-
Description: Email General Correspondence #1Dates: 5/15/97Container: Box 20
-
Description: General Correspondence #2Dates: 41/1/92-4/15/03Container: Box 20
-
Description: Miller/Hull Partnership General Correspondence #1Dates: 12/91Container: Box 20
-
Description: Miller/Hull Partnership Consultant SelectionDates: 1991Container: Box 20
-
Description: Miller/Hull Partnership Predesign StudyDates: 9/92Container: Box 20
-
Description: Expanded Options Study #1Dates: 2/10/93-5/31/95Container: Box 20
-
Description: General Correspondence #1Dates: 1991Container: Box 20
-
Description: BAIT CommitteeDates: 3/29/01-5/10/01Container: Box 20
-
Description: RegentsDates: 5/01Container: Box 20
-
Description: Project Planning CommitteeDates: 4/17/02Container: Box 20
-
Description: General Correspondence #1Dates: 4/1/01-6/18/02Container: Box 20
-
Description: AMEC Earth & Environmental, Inc. #1 CO#14393Dates: 11/19/01Container: Box 20
-
Description: Coffman Engineers Structural Review CO#14615Dates: 5/1/02Container: Box 21
-
Description: Meeting MinutesDates: 11/1/02Container: Box 21
-
Description: A/E Design Services SelectionDates: 4/2001Container: Box 21
-
Description: LMN Architects General Correspondence #1Dates: 7/1/01Container: Box 21
-
Description: Project Request ReportDates: 10/1/01Container: Box 21
-
Description: Budget Committee Presentation: Major Capital Projects RequestDates: 2/5/08Container: Box 21
-
Description: LMN Architects Predesign Report (electronic copy included)Dates: UndatedContainer: Box 21
-
Description: LMN Architects Biotechnology Life Sciences Facility Predesign ReportDates: 8/6/01Container: Box 21
-
Description: AMEC (AD Annex) Limited Facility SurveyDates: 2/8/02Container: Box 21
-
Description: AMEC Hazardous Materials Limited Facility Survey (Originals)Dates: 2/8/02Container: Box 21
-
Description: A/E Design Services SelectionDates: 4/01Container: Box 21
-
-
(Holland) Library Renovation Bldg. No. 0062
-
Description: BudgetDates: 6/1/02-2/9/04Container: Box 21
-
Description: RegentsDates: 4/18/01Container: Box 21
-
Description: BAIT CommitteeDates: 3/29/01-5/10/01Container: Box 21
-
Description: Project Planning CommitteeDates: 7/9/99Container: Box 21
-
Description: Email General correspondence #1Dates: 7/1/00-2/5/04Container: Box 21
-
Description: General Correspondence #1Dates: 6/1/01Container: Box 21
-
Description: NW Architectural Company General Correspondence #1Dates: 7/19/02Container: Box 21
-
Description: NW Architectural Company Contract #1 CO#12862Dates: 5/1/01-5/31/01Container: Box 21
-
Description: Phoenix Environmental, Inc. Asbestos & Paint InspectionsDates: 6/26/01Container: Box 21
-
Description: Baugh Construction Oregon, Inc. Response to RFQ for GC/CM (x2)Dates: 4/19/01Container: Box 21
-
Description: Lydig Construction, Inc. RFQ and Interview (x2)Dates: 4/19/01Container: Box 21
-
Description: Garco Construction, Inc.Dates: 4/19/01Container: Box 21
-
Description: A/E Design Services SelectionDates: January 2001Container: Box 21
-
-
(Holland) Library Swing Space
-
Description: NW Architecture Company General Corporation #1Dates: 11/25/03-2/3/04Container: Box 21
-
Description: NW Architecture Contract #1 CO#15337Dates: 10/1/03-2/17/04Container: Box 21
-
-
(Holland) Library System Master Plan
-
Description: RegentsDates: 9/2003Container: Box 21
-
Description: Finance & Audit CommitteeDates: 9/03-10/03Container: Box 21
-
Description: LMN Architecture General Correspondence #1Dates: 1/1/03-11/17/05Container: Box 21
-
Description: BudgetDates: 11/1/03-11/25/03Container: Box 21
-
Description: General Correspondence #1Dates: 10/1/03-3/15/05Container: Box 21
-
Description: RFQ for Architectural Planning ServicesDates: 7/1/03Container: Box 21
-
Description: GC/CM ProceduresDates: UndatedContainer: Box 21
-
Description: LMN Architectural + Resource Planning Group SOQDates: 8/22/03Container: Box 22
-
Description: LMN Interview PresentationDates: 9/19/03Container: Box 22
-
Description: LMN Project File StudyDates: 6/21/04Container: Box 22
-
Description: NAC Predesign StudyDates: 6/02Container: Box 22
-
Description: OPSIS Architecture/NAC Program AnalysisDates: 6/19/01Container: Box 22
-
Description: NAC Submittal (Application)Dates: 6/02Container: Box 22
-
Description: Installation of Fire Sprinklers & Alarm System (Old Files)Dates: 8/29/90-3/29/95Container: Box 22
-
-
Library Road Phase III Bldg. No. 0062
-
Description: Builder’s Risk InsuranceDates: 3/6/08-1/22/10Container: Box 22
-
Description: EISDates: 11/1/07-4/7/08Container: Box 22
-
Description: StormwaterDates: 1/1/08-4/7/08Container: Box 22
-
Description: RegentsDates: 10/19/07-7/2/08Container: Box 22
-
Description: Finance and Audit CommitteeDates: 9/6/07-10/9/09Container: Box 22
-
Description: Issues and ClaimsDates: 10/1/08-9/17/09Container: Box 22
-
Description: BOLA Architecture + Planning CO#17653Dates: 5/1/08-9/6/08Container: Box 22
-
Description: E3RA, Inc. CO#17408Dates: 12/1/07-5/20/09Container: Box 22
-
Description: Steven Goldblatt Third Party Neutral CO#17627Dates: 5/1/08Container: Box 22
-
Description: Strata Geotechnical Engineering & Materials Testing CO#17162Dates: 7/1/07-9/14/09Container: Box 22
-
Description: Strata Geotechnical Engineering EvaluationDates: 12/6/07Container: Box 22
-
Description: Taylor Engineering CO#17547Dates: 4/10/08-2/23/09Container: Box 22
-
Description: Tree Associates CO#17849Dates: 9/1/08-12/14/08Container: Box 22
-
Description: Whiteshield, Inc. CO#17160Dates: 6/1/07-4/3/08Container: Box 22
-
Description: Field ReportsDates: 7/1/07-9/27/08Container: Box 22
-
Description: Murrow Hall BridgesDates: 2/1/08-5/5/08Container: Box 22
-
Description: AD Annex (w/ photocopies dated back to the 1970s)Dates: 12/1/07-12/8/08Container: Box 22
-
Description: AD Annex AbatementDates: 2/1/02-7/15/08Container: Box 22
-
Description: Schematic Design BrochureDates: 10/1/07Container: Box 22
-
Description: Design Review CommentsDates: 12/1/07-4/22/08Container: Box 22
-
Description: General CorrespondenceDates: 12/1/06-4/6/11Container: Box 22
-
Description: GC/CM Selection #2Dates: 7/19/07Container: Box 22
-
Description: GC/CM Selection #1Dates: 7/2/07Container: Box 22
-
Description: KPFF Drainage Control Plan AnalysisDates: 4/2/08Container: Box 22
-
Description: KPFF Preliminary Design ReportDates: 10/12/07Container: Box 22
-
Description: Meeting MinutesDates: 5/1/07-1/14/09Container: Box 23
-
Description: KPFF Consulting Engineering General Correspondence #1Dates: 5/1/07-10/4/10Container: Box 23
-
Description: KPFF Consulting Engineering Contract #2 CO#17159Dates: 4/15/08-8/20/10Container: Box 23
-
Description: SchedulesDates: 6/1/07Container: Box 23
-
Description: RFQ GC/CMDates: 7/19/07Container: Box 23
-
Description: Hoffman Construction Co. General Correspondence #1Dates: 8/1/07-9/29/10Container: Box 23
-
Description: Estimates GC/CMDates: 3/28/07-6/12/08Container: Box 23
-
Description: Non-Compliance ReportsDates: 7/1/08Container: Box 23
-
Description: TreesDates: 3/1/02Container: Box 23
-
Description: Strata Geotechnical Engineering Evaluation Revised Report Phases 3 & 4 (OBSOLETE)Dates: 9/25/07Container: Box 23
-
Description: Graham Construction & Management, Inc. SOQDates: 7/24/07Container: Box 23
-
Description: Hoffman Construction Co. RFQ for GC/CMDates: 7/24/07Container: Box 23
-
Description: Lydig Construction SOQ for GC/CM ServicesDates: 7/24/07Container: Box 23
-
Description: Hoffman Construction Co. GC/CM Contract #1 CO#17497Dates: 3/1/08-2/28/10Container: Box 23
-
Description: Hoffman Construction Co. Contract #7 CO#17645Dates: 12/1/09-3/25/10Container: Box 23
-
Description: Certified Payroll ReportsDates: 12/1/09-12/17/09Container: Box 23
-
Description: Rejected BidsDates: Bid Date 8/13/07Container: Box 23
-
Description: Close Out ItemsDates: 11/1/08-11/21/08Container: Box 23
-
Description: Hoffman Construction Co. Contract #1 CO#17246 (Preconstruction)Dates: 8/1/07-6/28/08Container: Box 23
-
Description: Hoffman Construction Co. Contract #6 CO#17645Dates: 9/1/09-11/30/09Container: Box 24
-
Description: Hoffman Construction Co. Contract #5 CO#17645Dates: 7/1/09-9/1/09Container: Box 24
-
Description: Hoffman Construction Co. Contract #4 CO#17645Dates: 5/1/09-7/31/09Container: Box 24
-
Description: Hoffman Construction Co. Contract #3 CO#17645Dates: 1/1/09-4/30/09Container: Box 24
-
Description: Hoffman Construction Co. Contract #2 CO#17645Dates: 10/1/08-12/31/08Container: Box 24
-
Description: Hoffman Construction Co. Contract #1 CO#17645Dates: 6/1/08-9/30/08Container: Box 24
-
Description: KPFF Consulting Engineers Contract #1 CO#17159Dates: 7/1/07-3/15/08Container: Box 24
-
Description: KPFF Consulting Engineers Bid Package #2 Utilities Project ManualDates: 2/14/08Container: Box 24
-
Description: KPFF Consulting Engineers Bid Package #1 Utilities Project ManualDates: 5/14/08Container: Box 24
-
-
Johnson Hall Addition PBS I Interior Sign Package (Pre-Public Records Request) - Do not mix with post-request files
-
Bldg. No. 0076 Johnson Hall Addition, PBS II
-
Description: Budget #1Dates: 4/10/98-7/17/03Container: Box 24
-
Description: RegentsDates: 5/1/01-6/15/05Container: Box 24
-
Description: BAIT CommitteeDates: 3/29/01-5/10/01Container: Box 24
-
Description: Zimmer Gunsul Frasca Partnership #1 General CorrespondenceDates: 12/21/01-5/16/02Container: Box 24
-
Description: Zimmer Gunsul Frasca Partnership Contract CO#14432Dates: 1/1/02-9/30/02Container: Box 24
-
-
Johnson Hall Addition, PBS I
-
Description: Builder’s Risk Insurance, Interior Sign PackageDates: 5/31/05-6/15Container: Box 25
-
Description: Builder’s Risk InsuranceDates: 7/23/03-4/26/04Container: Box 25
-
Description: EISDates: 3/17/03Container: Box 25
-
Description: RegentsDates: 5/19/99-6/14/02Container: Box 25
-
Description: BAIT CommitteeDates: 6/15/05-10/15/05Container: Box 25
-
Description: Public Records RequestDates: 3/05Container: Box 25
-
Description: Attorney GeneralDates: 1/1/02-6/23/03Container: Box 25
-
Description: Project Planning CommitteeDates: 4/5/00-10/05/01Container: Box 25
-
Description: Issues & ClaimsDates: 4/1/05Container: Box 25
-
Description: Roen Associates Construction Cost Estimate - Design Review DevelopmentDates: 9/10/02Container: Box 25
-
Description: Construction Meeting Minutes #1Dates: 10/1/99Container: Box 25
-
Description: Zimmer Gunsul Frasca Partnership Predesign StudyDates: 5/02Container: Box 25
-
Description: WSU Utility Services Good Faith Building InspectionDates: 3/4/03-3/11/03Container: Box 25
-
Description: Roen Associates Construction Cost Estimate - Schematic DesignDates: 4/30/02-9/19/02Container: Box 25
-
Description: #0076 Johnson Hall Scoping Study McClellan & Copenhagen, Inc.Dates: 12/24/97-4/18/98Container: Box 25
-
Description: Johnson Hall Strategic Master PlanDates: 5/12/99-3/15/00Container: Box 25
-
Description: #0076 McClellan & Copenhagen, Inc. CO#12835Dates: 1/27/98-7/22/02Container: Box 25
-
Description: McClellan & Copenhagen, Inc. Statement of QualificationsDates: 10/22/97Container: Box 25
-
Description: Lane Powell AttorneysDates: 10/01/04-10/1/05Container: Box 25
-
Description: Glumac International Commissionary Services CO#15061Dates: 3/1/03Container: Box 25
-
Description: Pederson Associates, Inc. CO#14045Dates: 4/1/01Container: Box 25
-
Description: SCM Consultants Asbestos Lead Survey CO#14124Dates: 6/1/01Container: Box 25
-
Description: Reid Middleton #1 CO#12968Dates: 4/1/02Container: Box 25
-
Description: Siemens #1 CO#14520Dates: 1/1/02-8/21/03Container: Box 25
-
Description: Strata #1 CO#14422Dates: 12/1/01-2/28/05Container: Box 25
-
Description: White Shield, Inc. Site Survey Contract CO#14423Dates: 12/1/01-6/17/02Container: Box 25
-
Description: Winston & Cashatt - Patrick Sullivan Third Party Neutral CO#15212Dates: 5/1/03-1/14/04Container: Box 25
-
Description: Email General CorrespondenceDates: 5/1/99-8/5/02Container: Box 25
-
Description: General Correspondence #2Dates: 6/1/04-1/18/05Container: Box 25
-
Description: Zimmer Gunsul Frasca Partnership Email CorrespondenceDates: 7/1/01-5/2/05Container: Box 25
-
Description: Zimmer Gunsul Frasca Partnership Contract CO#14316Dates: 11/11/05-6/29/07Container: Box 25
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence #2Dates: 7/1/02-7/2/04Container: Box 25
-
Description: CK Doty & Associates Responsibility FileDates: 4/11/05Container: Box 25
-
Description: Baugh/Skanska GC/CM Preconstruction Services #2 Contract CO#14353Dates: 9/1/03-10/10/03Container: Box 25
-
Description: Baugh Construction Oregon, Inc. GC/CM Preconstruction Services #1 CO#14353Dates: 10/21/01-11/4/02Container: Box 25
-
Description: Baugh/Skanska Design Development Estimate - Phase IDates: 9/9/02Container: Box 25
-
Description: Certified Payroll ReportsDates: 2/1/05-5/10/05Container: Box 25
-
Description: Contract Change Proposal Skanska USA, Inc. CO#15014 (Electrical Final Offer)Dates: Numbers 23, 14, 15, 77, 48, 107, 93, 106, 103, 101, 122Container: Box 25
-
Description: Contract Change ProposalsDates: Numbers 160-186Container: Box 25
-
Description: Contract Change Proposal Skanska, Inc. CO#15014Dates: Numbers 001-159Container: Box 26
-
Description: Plant Sciences Programs Document for Dr. Gretchen Bataille, ProvostDates: 8/22/97Container: Box 27
-
Description: Zimmer Gunsul Frasca #1 General CorrespondenceDates: 7/1/99-6/30/02Container: Box 27
-
Description: Rejected Bids GC/CMDates: 7/26/01Container: Box 27
-
Description: Zimmer Gunsul Frasca #8 Contract CO#14316Dates: 4/19/05-11/10/05Container: Box 27
-
Description: Zimmer Gunsul Frasca #7 Contract CO#14316Dates: 8/20/04-4/6/05Container: Box 27
-
Description: Zimmer Gunsul Frasca #6 Contract CO#14316Dates: 1/1/04-8/19/04Container: Box 27
-
Description: Zimmer Gunsul Frasca #4 Contract CO#14316Dates: 1/1/03-4/30/03Container: Box 27
-
Description: Zimmer Gunsul Frasca #3 Contract CO#14316Dates: 9/1/02-12/31/02Container: Box 27
-
Description: Zimmer Gunsul Frasca #2 Contract CO#14316Dates: 6/1/02-8/31/02Container: Box 27
-
Description: Zimmer Gunsul Frasca #1 Contract CO#14316Dates: 9/1/01-5/31/02Container: Box 27
-
Description: General Correspondence #1 Contract CO#14316Dates: 1/15/98-5/31/04Container: Box 28
-
Description: Skanska USA Building Inc. #1 General CorrespondenceDates: 1/1/01-2/24/05Container: Box 28
-
Description: Baugh Construction Oregon, Inc. #1 Contract CO#14353Dates: 2/1/02-9/1/03Container: Box 28
-
Description: Zimmer Gunsul Frasca #5 Contract CO#14316Dates: 5/1/03-12/31/03Container: Box 28
-
Description: Zimmer Gunsul Frasca #2 Predesign CO#13396 ContractDates: 3/1/01-1/14/02Container: Box 28
-
Description: Zimmer Gunsul Frasca #1 (Pay estimates, Change orders, Extra design services)Dates: 12/1/99-2/28/01Container: Box 28
-
Description: Skanska USA Building Inc. #2 Contract CO#15014Dates: 10/21/03-3/24/04Container: Box 28
-
Description: McClellan & Copenhagen, Inc. College of Agriculture & Home Economics Johnson Hall Condition/Needs Assessment a Study of Capital Program Requirements for Plant Sciences 90% Pre-draft copyDates: 4/6/98Container: Box 28
-
Description: Baugh RFQ for GC/CM ServicesDates: 5/25/01Container: Box 28
-
Description: Lydig Construction, Inc. RFQDates: 5/25/01Container: Box 28
-
Description: McClellan & Copenhagen, Inc. Strategic Vision PlanDates: 10/6/99Container: Box 28
-
Description: BudgetDates: 7/1/05Container: Box 29
-
Description: Builder’s Risk InsuranceDates: 8/3/05Container: Box 29
-
Description: EISDates: 1/6/06Container: Box 29
-
Description: Public Records Request 5-89Dates: Numbers 5-89Container: Box 29
-
Description: Strata Post Records RequestDates: 2/27/05-3/31/05Container: Box 29
-
Description: Issues and Claims #2Dates: 9/22/04-8/22/05Container: Box 29
-
Description: Issues and Claims #1Dates: 8/22/03-10/7/04Container: Box 29
-
Description: Project Planning CommitteeDates: 8/1/02Container: Box 29
-
Description: McLellan & Copenhagen General CorrespondenceDates: 6/1/02Container: Box 29
-
Description: Daily Construction ReportsDates: 11/1/03-12/17/04Container: Box 29
-
Description: Email General CorrespondenceDates: 5/1/01-10/01/05Container: Box 29
-
Description: General CorrespondenceDates: 10/10/01-12/11/06Container: Box 29
-
Description: Zimmer Gunsul Frasca Email General CorrespondenceDates: 8/1/01-6/3/03Container: Box 29
-
Description: Zimmer Gunsul Frasca General CorrespondenceDates: 3/10/02Container: Box 29
-
Description: Zimmer Gunsul Frasca Contract CO#14316Dates: 10/31/05-5/31/07Container: Box 29
-
Description: Schematic Design System and Material Narrative DescriptionDates: 3/27/02Container: Box 29
-
Description: CK Doty & Associates Interior Sign Package Contract Change ProposalDates: 001Container: Box 29
-
Description: CK Doty & Associates #1 General CorrespondenceDates: 4/1/05-8/2/05Container: Box 29
-
Description: CK Doty Associates #1 Contract CO#16145 #1Dates: 6/8/05-10/17/05Container: Box 29
-
Description: Skanska USA Building, Inc. Contract CO#15014Dates: 4/30/05-10/31/05Container: Box 29
-
Description: Skanska #2 General CorrespondenceDates: 1/1/05Container: Box 29
-
Description: Skanska Monthly ReportsDates: May - JuneContainer: Box 29
-
Description: Skanska Monthly Reports March-AprilDates: March - AprilContainer: Box 29
-
Description: Skanska General Correspondence #1Dates: 9/20/02-9/24/02Container: Box 29
-
Description: Skanska #3 Contract CO#15014Dates: 3/25/04-3/27/05Container: Box 29
-
Description: Skanska USA Building Inc. #1 ContractDates: 5/1/03-10/20/03Container: Box 30
-
Description: Skanska Construction Meeting MinutesDates: 1/04-6/27/05Container: Box 30
-
Description: Skanska Contract Change ProposalsDates: Numbers 057.2 - 219Container: Box 30
-
Description: Rejected Bids - Interior Sign PackageDates: 4/12/05Container: Box 30
-
Description: Baugh/Skanska M.A.C.C ProposalDates: 12/10/02Container: Box 30
-
Description: Report Geotechnical Engineering EvaluationDates: 4/9/02Container: Box 30
-
Description: Strata Statement of QualificationsDates: 1/3/02Container: Box 30
-
Description: A/E Consulting Services SelectionDates: 5/99Container: Box 30
-
Description: Original Draft Floor PlanDates: UndatedContainer: Box 30
-
Description: GC/CM Management ProceduresDates: 3/01Container: Box 30
-
Description: Change Proposal InformationDates: 6/17/04-2/24/05Container: Box 30
-
Description: Change Proposal InformationDates: 7/22/04-11/10/04Container: Box 30
-
Description: Change Proposal InformationDates: 9/14/04-12/29/04Container: Box 30
-
Description: Change Proposal InformationDates: 9/9/04-11/18/04Container: Box 30
-
Description: Change Proposal InformationDates: 3/1/04-4/19/04Container: Box 31
-
Description: Change Proposal InformationDates: 1/19/05-4/20/04Container: Box 31
-
Description: Change Proposal InformationDates: 5/14/04-7/19/05Container: Box 31
-
Description: Glumac Commissioning Report Sections A-KDates: June 2005Container: Box 31
-
Description: Zimmer Gunsul Frasca Partnership Project Specs Bid Package 1Dates: 4/13/03Container: Box 31
-
Description: Zimmer Gunsul Frasca Partnership Project Conform Construction Set Volumes 1 & 2Dates: 7/17/03Container: Box 31
-
Description: Glumac Commissioning Report Section L (O&M Manual, Control Shop Drawings)Dates: June 2005Container: Box 31
-
Description: Skanska General Correspondence #1Dates: 2/1/02-12/31/04Container: Box 31
-
Description: Wesselman/Pellecchia Associates Environmental Graphic Design Bid Set SpecificationsDates: 3/21/05Container: Box 31
-
Description: Zimmer Gunsul Frasca Partnership Predesign Study 2nd DraftDates: 4/28/00Container: Box 31
-
Description: RFP GC/CMDates: 7/5/01Container: Box 31
-
-
-
Kimbrough Hall Addition/Remodel Bldg. No. 0025
-
Description: RegentsDates: 1/8/92-12/14/00Container: Box 31
-
Description: BudgetDates: 9/1/92-8/4/99Container: Box 31
-
Description: Attorney GeneralDates: 7/15/97-10/4/99Container: Box 31
-
Description: Public Information RequestsDates: 3/1/99-10/5/99Container: Box 31
-
Description: EIS #1Dates: 8/30/96Container: Box 31
-
Description: Disputes Review Board Third Party Agreement Thomas D. Cochran #1 CO#13066Dates: 9/17/98-11/30/99Container: Box 31
-
Description: Disputes Review Board Third Party Agreement James A. Fish #1 CO#13066Dates: 9/23/98-10/1/98Container: Box 31
-
Description: Rick Fisher, Inc. #1 CO#14844Dates: 9/23/98-1/19/00Container: Box 31
-
Description: Disputes Review Board General CorrespondenceDates: 12/1/02-2/12/03Container: Box 31
-
Description: Robert Fossatti Associates, Inc. P.S. #1 CO#6060Dates: 2/99Container: Box 31
-
Description: Hainline & Associates #1 CO#12257Dates: 2/5/96-8/12/98Container: Box 32
-
Description: Reid Middleton CO#12968Dates: 5/14/98-7/26/99Container: Box 32
-
Description: Rider Hunt Ackroyd CO#12599Dates: 6/23/98-6/23/99Container: Box 32
-
Description: Redicheck Firm CO#11621Dates: 5/5/97-7/16/97Container: Box 32
-
Description: SCM Consultants, Inc. CO#12436Dates: 5/14/97-6/24/97Container: Box 32
-
Description: Strata Geotechnical Engineering & Materials Testing #1 CO#12940 (Per Estimates, CO’s)Dates: 9/25/96-8/10/98Container: Box 32
-
Description: Strata #2 Concrete Testing ReportsDates: 5/1/98-10/25/99Container: Box 32
-
Description: Wyatt Engineering Contract #1 CO#12165Dates: 2/1/99-11/16/99Container: Box 32
-
Description: Project Planning CommitteeDates: 11/9/91-12/21/98Container: Box 32
-
Description: Construction Field Reports #1Dates: 12/2/95-3/18/96Container: Box 32
-
Description: Thompson Vaivoda & Associates Supplemental InstructionsDates: 6/21/98-8/20/99Container: Box 32
-
Description: Thompson Vaivoda & Associates #7 General CorrespondenceDates: 7/24/98-11/5/99Container: Box 32
-
Description: General Correspondence #3Dates: 1/1/99-5/17/00Container: Box 32
-
Description: Thomas Vaivoda & Associates #4 Contract (PE’s, CO’s)Dates: 7/1/99-6/31/00Container: Box 32
-
Description: Shea Construction, Inc. General Correspondence #2Dates: 4/1/99Container: Box 32
-
Description: Shea Construction, Inc. #2 Contract CO#12931 (PE’s, CO’s, Est.)Dates: 10/1/99-9/30/00Container: Box 32
-
Description: Mechanical Submittals. Division 15. (1 of 2)Dates: 1998Container: Box 32
-
Description: Mechanical Submittals. Division 15. (2 of 2)Dates: 1998Container: Box 33
-
Description: Mechanical Submittals. Division 2-14Dates: 1998Container: Box 33
-
Description: Architects Request for information (x3)Dates: UndatedContainer: Box 33
-
Description: Architectural Supplemental InstructionsDates: UndatedContainer: Box 33
-
Description: Electrical Submittals Division 16 (x2)Dates: UndatedContainer: Box 33
-
Description: Additional PaintingDates: 12/1/98-1/26/00Container: Box 33
-
Description: Thomas Vaivoda RFQDates: 5/20/98-5/3/99Container: Box 33
-
Description: Fire AlarmsDates: 11/1/99-3/8/00Container: Box 33
-
Description: Shea Construction, Inc. #1 Email CorrespondenceDates: 6/1/99-8/3/99Container: Box 33
-
Description: Shea Construction, Inc. Contract Change Proposal LogDates: UndatedContainer: Box 34
-
Description: Shea Construction, Inc. Contract Change ProposalDates: Numbers 001-086Container: Box 34
-
Description: Rick Fisher, Inc. CO#12583Dates: 4/7/97-2/12/03Container: Box 34
-
Description: SCM Consultants, Inc. Hazardous Materials ReportDates: 12/2/96Container: Box 34
-
Description: Strata Geotechnical Engineering & Materials Testing Final Project CO#12940Dates: 12/29/99Container: Box 34
-
Description: Roen Associates Value Engineering Study Addition & ModernizationDates: 3/21/96Container: Box 34
-
Description: Glumac International Energy Life Cycle Cost AnalysisDates: 4/1/97-5/16/97Container: Box 34
-
Description: Rick Fisher Hi-Fi Audio & Music Production Systems Final ReportDates: 8/97Container: Box 34
-
Description: Tektoniks Corporation #1 General CorrespondenceDates: 6/7/97Container: Box 34
-
Description: Tektoniks #1 Contract Pay Estimates & CO’sDates: 6/16/97Container: Box 34
-
Description: Tektoniks Contract Change ProposalDates: Numbers 001-002Container: Box 34
-
Description: Rejected BidsDates: Bid Opening Date 4/23/98Container: Box 34
-
Description: Rejected Bid Hazardous MaterialsDates: 6/5/97Container: Box 34
-
Description: Rejected BidsDates: Bid Opening Date 10/2/97Container: Box 34
-
Description: Project Completion PlanningDates: 6/1/98-10/3/00Container: Box 35
-
Description: Punch List ItemsDates: 11/1/99-12/27/99Container: Box 35
-
Description: Strata Geotechnical Engineering & Materials Testing Concrete Testing ReportDates: 6/1/98-1/31/99Container: Box 35
-
Description: General Correspondence #2Dates: 1/1/92-6/30/96Container: Box 35
-
Description: General Correspondence #1Dates: 11/20/91-12/31/91Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #6Dates: 1/1/98-12/31/08Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #5Dates: 2/1/97-12/31/97Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #4Dates: 10/1/96-1/31/97Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #3Dates: 6/1/96-9/30/96Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #2Dates: 1/1/96-5/31/96Container: Box 35
-
Description: Thompson Vaivoda & Associates General Correspondence #1Dates: 1/17/92-12/31/95Container: Box 36
-
Description: Thompson Vaivoda & Associates #3 Contract CO#12151Dates: 9/1/98-2/17/99Container: Box 36
-
Description: Thompson Vaivoda & Associates #2 Contract CO#12151Dates: 1/2/97-7/15/98Container: Box 36
-
Description: Thompson Vaivoda & Associates #1 Contract CO#12151Dates: 11/16/95-12/31/96Container: Box 36
-
Description: Thompson Vaivoda & Associates #1 Contract CO#10971Dates: 3/92-10/8/92Container: Box 36
-
Description: Shea Construction, Inc. #1 General CorrespondenceDates: 5/1/98-3/31/99Container: Box 36
-
Description: Shea Construction, Inc. #1 Contract CO#12931Dates: 5/1/98-9/30/99Container: Box 36
-
Description: Thomas Vaivoda & Associates, Architecture AIA Addendum OneDates: 4/8/98Container: Box 36
-
Description: Hongwest & Associates, Inc. Geotechnical ReportDates: 6/20/96-7/16/96Container: Box 36
-
Description: Rider Hunt Ackroyd 100% Construction Document EstimateDates: 6/27/97Container: Box 36
-
Description: SCM Consultants, Inc. Hazardous Materials Safety (Project 4162.010)Dates: UndatedContainer: Box 36
-
-
McCroskey Hall Renovation Bldg. No. 0019
-
Description: BudgetDates: August 1997Container: Box 36
-
Description: Builder’s Risk InsuranceDates: 12/31/00-4/4/01Container: Box 36
-
Description: RegentsDates: 9/3/99-1/15/01Container: Box 36
-
Description: FAC CommitteeDates: 9/9/99-9/21/00Container: Box 36
-
Description: BAIT CommitteeDates: 5/99-7/00Container: Box 36
-
Description: Attorney GeneralDates: 3/00Container: Box 36
-
Description: Project Planning CommitteeDates: 11/18/99Container: Box 36
-
Description: Design West Renovation StudyDates: 9/1995Container: Box 36
-
Description: Agra Earth & Environmental, Inc. Limited Facility SurveyDates: 5/30/00Container: Box 36
-
Description: Agra Earth & Environmental, Inc. CO#13743Dates: 6/1/00-11/4/02Container: Box 36
-
Description: Kovalenko Hale Architects Cost Verification Study #1 CO#13296Dates: 7/1/99-12/17/99Container: Box 36
-
Description: McAuley and Associates CO#13339Dates: 8/16/99-10/23/00Container: Box 36
-
Description: McAuley and Associates CO#13792Dates: 8/1/0-10/23/00Container: Box 36
-
Description: Nixon Consulting, Inc.CO#13706Dates: 6/1/00-9/25/00Container: Box 36
-
Description: Reid Middleton #1 CO#12968Dates: 3/6/00-10/4/01Container: Box 36
-
Description: ROEN Associates CO#13742Dates: 7/1/00-8/10/00Container: Box 36
-
Description: Strata Geotechnical Engineering & Materials Testing CO#13972Dates: 11/1/00-6/28/01Container: Box 36
-
Description: Email General Correspondence #1Dates: 3/2/00Container: Box 36
-
Description: General Correspondence #1Dates: 2/1/95-10/21/03Container: Box 36
-
Description: Garco Construction, Inc. General Correspondence #1Dates: 12/20/00-12/29/03Container: Box 37
-
Description: Garco Construction, Inc. Contract #1Dates: 12/19/00-3/13/02Container: Box 37
-
Description: Kovalenko Architecture General Correspondence #1Dates: 5/1/97-10/30/01Container: Box 37
-
Description: Garco Construction, Inc. Contract Change ProposalDates: Numbers 001-041Container: Box 37
-
Description: Garco Construction, Inc. Responsibility FileDates: 11/28/00-12/18/00Container: Box 37
-
Description: Rejected BidsDates: Bid Opening 11/28/00Container: Box 37
-
Description: Kovalenko Hale Architects Contract #1 CO#13387Dates: 1/31/00-3/31/01Container: Box 37
-
Description: Kovalenko Project SpecsDates: 10/9/00Container: Box 37
-
Description: Kovalenko Program DocsDates: 12/2000Container: Box 37
-
Description: Roen Associates 75% Construction Document EstimateDates: 7/10/00-4/9/01Container: Box 37
-
Description: Schematic Design BrochureDates: 7/2000Container: Box 37
-
Description: Garco Construction Operating & Maintenance Manual (Telecommunications Vol. 4)Dates: 2001Container: Box 37
-
Description: Kovalenko Hale Architects Program DocumentsDates: 12/2000Container: Box 37
-
Description: McCroskey Hall & Stevens Hall Renovation (Finalist Letters)Dates: 8/16/95-8/22/95Container: Box 37
-
Description: McCroskey Hall & Stevens Hall Renovation General Correspondence & Letters of InterestDates: 5/6/95-7/12/95Container: Box 37
-
-
Meyer’s Point Challenge Course Facility ID #1850
-
Description: Builder’s Risk InsuranceDates: 1/2/09-5/12/09Container: Box 37
-
Description: Quit Claim DeedDates: September 1996Container: Box 37
-
Description: Edward R. Meyer Revocable Living TrustDates: October 1990Container: Box 37
-
Description: Property AssessmentDates: March 2004Container: Box 37
-
Description: AHBL Pre-design DocumentDates: October 2007Container: Box 37
-
Description: General Correspondence #1Dates: 5/29/07-2/8/09Container: Box 37
-
Description: AHBL General CorrespondenceDates: 4/1/07Container: Box 37
-
Description: AHBL Predesign Contract CO#17067Dates: 4/1/07-1/9/08Container: Box 37
-
-
Meyer’s Point House/Office/Barn Facility ID #1854, 1852, 1853
-
Description: Henderson Inlet BAIT CommitteeDates: 11/17/05-1/09Container: Box 37
-
Description: RegentsDates: February 2009Container: Box 37
-
Description: E3RA, Inc. CO#18031Dates: 2/1/09-4/30/09Container: Box 37
-
Description: General CorrespondenceDates: 3/04-2/29/12Container: Box 37
-
Description: Phase 1 Evaluation Mark Travers General Correspondence #1Dates: 8/8/05-3/18/10Container: Box 37
-
Description: NW Environmental Solutions, Inc. General Correspondence #1Dates: 12/1/08-12/31/09Container: Box 37
-
Description: NW Environmental Solutions, Inc. Contract #1 CO#17975Dates: 1/1/09-10/9/29Container: Box 37
-
Description: Inventory & AnalysisDates: UndatedContainer: Box 37
-
Description: NW Environmental Contract Change ProposalsContainer: Box 37
-
Description: Responsibility FileDates: December 2008Container: Box 37
-
Description: Rejected BidsDates: Bid Date 12/2/08Container: Box 37
-
-
Meyer’s Point Septic System Facility ID #1850
-
Description: SpecificationsDates: 11/22/11Container: Box 38
-
Description: General CorrespondenceDates: 9/1/10-12/11Container: Box 38
-
Description: Jim Hunter & Associates General CorrespondenceDates: 9/1/10Container: Box 38
-
Description: Jim Hunter & Associates Contract CO#19042Dates: 9/1/10-2/4/11Container: Box 38
-
Description: Rejected BidsDates: Bid Date 12/16/11Container: Box 38
-
-
Meyer’s Point Water System Facility ID #1850
-
Description: Email General CorrespondenceDates: 6/18/08-11/12/08Container: Box 38
-
Description: General CorrespondenceDates: 6/1/10Container: Box 38
-
Description: NW Water Systems, Inc. General CorrespondenceDates: 4/1/10-7/21/11Container: Box 38
-
Description: NW Water Systems, Inc. Contract CO#18807Dates: 5/1/10-9/29/11Container: Box 38
-
Description: NW Water Systems, Inc. Group B WorkbookDates: 9/12/11Container: Box 38
-
Description: NW Water Systems, Inc. SpecificationsDates: 9/12/11Container: Box 38
-
Description: Mark Travers Architect Contract CO#15859Dates: 8/28/05-7/1/12Container: Box 38
-
Description: Mark Travers Architect DrawingsDates: UndatedContainer: Box 38
-
Description: Mark Travers Architect Specifications Phase IIDates: 4/9/08Container: Box 38
-
Description: Mark Travers Architect Specifications DemolitionDates: 11/11/08Container: Box 38
-
Description: E3RA Asbestos Abatement 3rd Party Clearance Inspection/Demolition/Debris Waste ReportDates: 4/24/08Container: Box 38
-
Description: NVL Labs & Hazmat Services Asbestos SurveyDates: 9/22/05Container: Box 38
-
Description: Puget Sound Clean Air Agency Regulation IIIDates: UndatedContainer: Box 38
-
-
Murrow Hall Renovation & Addition Bldg. No. 0033E
-
Description: Builder’s Risk InsuranceDates: 9/1/02-12/2/03Container: Box 38
-
Description: E.I.S. #1Dates: 10/17/01-11/13/01Container: Box 38
-
Description: Attorney General CorrespondenceDates: 12/1/00-8/14/02Container: Box 38
-
Description: BAIT CommitteeDates: 3/29/01Container: Box 38
-
Description: Budget #1Dates: 11/1/99-5/30/02Container: Box 38
-
Description: RegentsDates: 7/22/97-8/12/02Container: Box 38
-
Description: Issues and ClaimsDates: July 2002Container: Box 38
-
Description: Warranty FolderDates: 3/18/04Container: Box 38
-
Description: Project Planning Committee Meeting Minutes #5Dates: 3/13/98-1/9/01Container: Box 38
-
Description: Coffman Engineers Structural Design Review CO#14519Dates: 3/1/02-5/15/03Container: Box 38
-
Description: Design West Architects CO#14012Dates: 2/1/01-6/1/01Container: Box 38
-
Description: Design West Architects Value Engineering StudyDates: May 2001Container: Box 38
-
Description: Reid Middleton CO#12968Dates: 12/1/00-9/3/02Container: Box 38
-
Description: Sony Systems Integration - TV Production SystemDates: 7/1/02-8/21/02Container: Box 38
-
Description: Stole Rives AttorneysDates: 3/30/98-5/27/98Container: Box 38
-
Description: WPA, Inc. CO#14704Dates: 8/1/02-12/3/03Container: Box 38
-
Description: Strata CO#14754Dates: 10/1/02-2/20/04Container: Box 38
-
Description: Email General CorrespondenceDates: 2/1/008/2/01Container: Box 38
-
Description: Northwest Architecture Company Email CorrespondenceDates: 3/1/01-8/7/01Container: Box 38
-
Description: Meeting Minutes #1Dates: 10/1/00-10/22/01Container: Box 38
-
Description: Review Comments #1Dates: 5/29/01-9/5/01Container: Box 38
-
Description: Murrow NarrativeDates: UndatedContainer: Box 38
-
Description: Murrow Addition EstimateDates: 7/24/01Container: Box 38
-
Description: GC/CM Selection CorrespondenceDates: 2/1/02-5/9/05Container: Box 38
-
Description: A/E Consulting Services SelectionDates: June 1997Container: Box 38
-
Description: General Correspondence #1Dates: 7/97-7/7/04Container: Box 38
-
Description: Northwest Architecture Company General Correspondence #3Dates: 8/1/04-9/17/04Container: Box 38
-
Description: Northwest Architecture Company Contract #2 CO#13938Dates: 7/19/02Container: Box 38
-
Description: Northwest Architecture Company Contract #1 CO#12863 (Extra Services)Dates: 2/23/98-3/25/03Container: Box 38
-
Description: Baugh Skanska Company General Correspondence #2Dates: 2/1/04-8/31/07Container: Box 38
-
Description: Baugh Skanska Company Contract #4 CO#14705 (Pay App 15-19)Dates: 11/1/03-9/1/04Container: Box 39
-
Description: Baugh Skanska Company Preconstruction Contract #1 CO#14563Dates: 5/1/02-10/2/02Container: Box 39
-
Description: RFQ for GC/GM SelectionDates: February 2002Container: Box 39
-
Description: Baugh Skanska, Inc. Contract Change ProposalsDates: Numbers 112-134Container: Box 39
-
Description: Johns Electric, Inc. Satellite Dish Relocate Electrical Operations & Maintenance ManualDates: 1/31/03Container: Box 39
-
Description: Baugh Skanska, Inc. Contract Change ProposalsDates: Numbers 001-111Container: Box 39
-
Description: Northwest Architecture Company/Opsis Architecture Schematic Design BrochureDates: UndatedContainer: Box 39
-
Description: Northwest Architecture Company Predesign StudyDates: June 1998Container: Box 39
-
Description: Northwest Architecture Company Project Manual 50% Construction DocumentsDates: 2/11/02Container: Box 39
-
Description: Planning Committee Meeting Minutes #4Dates: May-June 1998Container: Box 39
-
Description: Planning Committee Meeting Minutes #3Dates: May-June 1998Container: Box 39
-
Description: Planning Committee Meeting Minutes #2Dates: 2/27/98-2/27/98Container: Box 39
-
Description: Planning Committee Meeting Minutes #1Dates: February 1998Container: Box 40
-
Description: General Correspondence #2Dates: 6/1/01-5/28/04Container: Box 40
-
Description: General Correspondence #1Northwest Architecture Company Contract CO#13938Dates: 9/10/98-5/31/01Container: Box 40
-
Description: Baugh Skanska, Inc. General Correspondence #1Dates: 9/25/00-7/18/02Container: Box 40
-
Description: Baugh Skanska, Inc. Contract #3 CO#14705 (Pay App 10-14)Dates: 5/1/02-7/31/04Container: Box 40
-
Description: Baugh Skanska, Inc. Contract #2 CO#14705 (Pay App 5-9)Dates: 6/1/03-10/31/03Container: Box 40
-
Description: Baugh Skanska, Inc. Contract #1 CO#14705 (Change Orders 1-10)Dates: 1/1/03-5/31/03Container: Box 40
-
Description: Baugh Skanska, Inc. Contract #1 CO#14705 (Pay App 1-4)Dates: 6/1/03-8/4/03Container: Box 40
-
Description: Baugh Skanska, Inc. M.A.C.C. Estimate Draft (Rev. 1)Dates: 9/1/02-1/31/02Container: Box 40
-
Description: Northwest Architecture Company Project Manual 75% Construction Document SubmittalDates: 6/19/02Container: Box 40
-
Description: Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14Dates: 3/18/02Container: Box 40
-
Description: Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16Dates: 5/1/02Container: Box 40
-
Description: Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14Dates: 5/1/02Container: Box 41
-
Description: Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16Dates: 7/16/02Container: Box 41
-
-
Murrow Hall East Renovation Bldg. No. 0033E
-
Description: RegentsDates: September 2003Container: Box 41
-
Description: Finance and Audit CommitteeDates: September - October 2003Container: Box 41
-
Description: BJSS Duarte Bryant General Correspondence #1Dates: November 2003Container: Box 41
-
Description: BJSS Duarte Bryant, Inc. Architectural Predesign ServicesDates: 8/22/03Container: Box 41
-
Description: BJSS Duarte Bryant, Inc. Contract #1 CO# 15281Dates: 11/4/03-2/9/05Container: Box 41
-
Description: BJSS Duarte Bryant, Inc. Predesign StudyDates: June 2004Container: Box 41
-
Description: Baugh Skanska RFQ for GC/CMDates: 3/22/02Container: Box 41
-
-
Museum of Art Building Bldg. No. 0829
-
Description: RegentsDates: 5/19/99-10/15/99Container: Box 41
-
Description: BAIT CommitteeDates: 9/3/99Container: Box 41
-
Description: Finance and Audit CommitteeDates: 4/9/99-5/7/99Container: Box 41
-
Description: Site AnalysisDates: August 1999Container: Box 41
-
Description: Project Planning Committee #1Dates: 10/1/99Container: Box 41
-
Description: General Correspondence #1Dates: 2/1/99-9/17/99Container: Box 41
-
Description: ALSC Architects/OPIS Architecture General Correspondence #1Dates: 8/5/99-2/2/00Container: Box 41
-
Description: ALSC Architects/OPIS Architecture Contract #1 CO#13470Dates: 11/22/99Container: Box 41
-
Description: DCI Engineers Civil and Structural Engineering BrochureDates: UndatedContainer: Box 41
-
Description: ALSC Architects/OPIS Architecture Design Services ProposalDates: 7/16/99Container: Box 41
-
Description: ALSC Architects/OPIS Architecture Predesign StudyDates: May 2000Container: Box 41
-
Description: ALSC Architects/OPIS Architecture ProcessDates: July 1999Container: Box 41
-
Description: H.M. Brandston & Partners, Inc. (Lighting) Design SubmittalDates: UndatedContainer: Box 41
-
Description: James D. Graham & Associates, Inc. (Power, Lighting, and Telecommunication Systems) Design SubmittalDates: UndatedContainer: Box 41
-
Description: Sparling Electrical Engineering, Lighting Design & Technical ConsultingDates: 6/30/99Container: Box 41
-
Description: RFQ for Architectural Predesign Study ServicesDates: UndatedContainer: Box 41
-
Description: AE Design Services SelectionDates: 6/99Container: Box 41
-
-
North Fairway Drive Bldg. No.
-
Description: City of Pullman Memorandum of UnderstandingDates: 3/1/03-56/14/03Container: Box 41
-
Description: City of Pullman Engineering Services AgreementDates: September 2003Container: Box 41
-
Description: Strata Geotechnical Engineering & Materials Testing (Lime Stabilization Laboratory Results)Dates: January 2004Container: Box 41
-
Description: Taylor Engineering, Inc. Pavement Section Design ReportDates: March - April 2004Container: Box 41
-
Description: Taylor Engineering, Inc. Alternative Analysis Technical MemorandumDates: 3/2/04Container: Box 41
-
Description: GrantsDates: 3/19/04Container: Box 41
-
Description: Collision ReportsDates: October - November 2003Container: Box 41
-
Description: Email General CorrespondenceDates: 8/1/02Container: Box 41
-
Description: General CorrespondenceDates: 3/6/97-6/11/02Container: Box 41
-
Description: Sanitary Sewer Replacement SpecificationsDates: 3/1/04Container: Box 41
-
Description: Strata Geotechnical Engineering Evaluation Proposed Outdoor Recreation CenterDates: 3/8/13Container: Box 41
-
-
Old Incinerator Decommission, Demolition, & Related Works Bldg. No. 0077
-
Description: BudgetDates: March 2004Container: Box 42
-
Description: Builder’s Risk InsuranceDates: 11/16/06-3/8/07Container: Box 42
-
Description: RegentsDates: 6/7/06-12/1/06Container: Box 42
-
Description: BAITDates: 3/3/05-1/25/07Container: Box 42
-
Description: E3RA, Inc. #1 CO#16401Dates: 12/7/05-8/31/06Container: Box 42
-
Description: USKH, Inc. #1 CO#15928Dates: 1/24/05-7/14/05Container: Box 42
-
Description: Department of Health Correspondence #1Dates: 1/1/04-11/28/05Container: Box 42
-
Description: General Correspondence #1Dates: 1/1/03-7/14/05Container: Box 42
-
Description: IRS Environmental Hazardous Materials Abatement Contract #1 CO#16635Dates: 6/1/06-10/31/06Container: Box 42
-
Description: IRS Environmental General CorrespondenceDates: 5/1/06-12/12/06Container: Box 42
-
Description: Columbia Energy & Environmental Services General Correspondence #1Dates: 2/1/03-4/20/06Container: Box 42
-
Description: Columbia Energy & Environmental Services Contract #1 CO#15575Dates: 4/1/04-6/25/05Container: Box 42
-
Description: Motley-Motley, Inc. General Correspondence #1Dates: 10/1/06-10/25/07Container: Box 42
-
Description: Motley-Motley, Inc. Contract #1 CO#16860Dates: 10/1/06-5/31/07Container: Box 42
-
Description: Construction Meeting MinutesDates: 9/1/03-3/29/04Container: Box 42
-
Description: Certified Payroll ReportsDates: 8/1/06Container: Box 42
-
Description: SCM Consultants, Inc. and Dade Moeller & Associates, Inc. Termination of License & Decommission of Old IncineratorDates: 1/14/04Container: Box 42
-
Description: Columbia Energy & Environmental Services, Inc. Characterization & Decommission ReportDates: 11/10/05Container: Box 42
-
Description: Columbia Energy & Environmental Services, Inc. Characterization & Decommissioning PlanDates: 9/30/04Container: Box 42
-
Description: Columbia Energy & Environmental Services, Inc. Decontamination & Decommissioning PlanDates: 8/6/04Container: Box 42
-
Description: Columbia Energy & Environmental Services, Inc. Characterization PlanDates: 7/7/04Container: Box 42
-
Description: Columbia Energy & Environmental Services, Inc. Technical & Cost Proposal for Additional Process DemolitionDates: 4/1/04Container: Box 42
-
Description: USKA Project Manual “Preliminary”Dates: March 2005Container: Box 42
-
Description: SCM Consultants, Inc. State of QualificationsDates: 11/19/03Container: Box 42
-
Description: Environmental ChecklistDates: 5/18/05Container: Box 42
-
Description: Rejected Bids Old IncineratorDates: Bid Date 10/17/06Container: Box 42
-
Description: Rejected Bids Hazardous Materials AbatementDates: Bid Date 5/4/06Container: Box 42
-
-
Olympia Avenue Student Housing
-
Description: Builder’s Risk InsuranceDates: 4/29/08-11/9/09Container: Box 42
-
Description: Phase II Builder’s Risk InsuranceDates: 8/13/08-11/9/09Container: Box 42
-
Description: E.I.S.Dates: 6/1/08Container: Box 42
-
Description: RegentsDates: 9/19/03-7/6/11Container: Box 42
-
Description: FAA ApprovalDates: 5/15/08Container: Box 42
-
Description: FACDates: 9/19/03-9/3/09Container: Box 42
-
Description: StormwaterDates: 4/1/08-7/29/10Container: Box 42
-
Description: A-One Geothermal, Inc. CO#17570Dates: 4/1/08-4/8/10Container: Box 42
-
Description: Hainline & Associates CO#18089Dates: 3/1/9-6/26/09Container: Box 42
-
Description: Hales & Aldrich, Inc. CO#18729Dates: 3/1/10-6/21/10Container: Box 42
-
Description: NW Consulting Engineers CO#19136Dates: 11/1/10-5/31/11Container: Box 42
-
Description: Steve Goldblatt Third Party Neutral CO#17735Dates: 8/1/08-12/28/09Container: Box 42
-
Description: Strata Final Project BinderDates: 10/15/09Container: Box 42
-
Description: Strata CO#17365Dates: 11/1/07Container: Box 42
-
Description: Taylor Engineering, Inc. CO#17421Dates: 12/1/07-3/28/08Container: Box 42
-
Description: TESTCOMM, LLC CO#17770Dates: 7/1/08-7/12/10Container: Box 43
-
Description: TESTCOMM, LLC Commissioning PlanDates: 10/17/08Container: Box 43
-
Description: TESTCOMM, LLC Start-up PlanDates: 6/5/09Container: Box 43
-
Description: ALLWEST Testing & Engineering SOQDates: UndatedContainer: Box 43
-
Description: Meeting MinutesDates: 4/1/08Container: Box 43
-
Description: Miscellaneous Test Reports & LogsDates: 8/1/08-3/31/10Container: Box 43
-
Description: Email General CorrespondenceDates: 4/1/08-9/1/09Container: Box 43
-
Description: General Correspondence #1Dates: 11/1/07-7/6/11Container: Box 43
-
Description: Mithun General Correspondence #1 CO#17590Dates: 12/1/07-12/23/14Container: Box 43
-
Description: Mithun Contract #6 General Correspondence CO#17590Dates: 2/1/11-511/11Container: Box 43
-
Description: Mithun Contract #1 CO#17313Dates: 1/1/08Container: Box 43
-
Description: Mithun Project Manual Volume 1 & 2Dates: UndatedContainer: Box 43
-
Description: GC/CM Selection #1Dates: UndatedContainer: Box 43
-
Description: GC/CM Selection #2Dates: UndatedContainer: Box 43
-
Description: SubmittalsDates: 6/1/08-11/30/09Container: Box 43
-
Description: SchedulesDates: 4/1/08-7/31/08Container: Box 43
-
Description: RFQsDates: 7/1/08Container: Box 43
-
Description: Graham Construction & Management, Inc. Contract #1 CO#17768Dates: 7/1/08-1/31/10Container: Box 43
-
Description: Graham Construction & Management, Inc. Contract (Supplemental Boiler Installation) CO#19137Dates: 11/1/10-8/31/11Container: Box 43
-
Description: Graham Construction & Management, Inc. Contract #1 (Preconstruction Services) CO#17505Dates: 1/1/08Container: Box 43
-
Description: Graham Construction & Management, Inc. Contract #1 GC/CM CO#17637Dates: 5/1/03-2/1/10Container: Box 43
-
Description: Graham Construction & Management, Inc. Contract #1 SOQDates: 12/6/07Container: Box 43
-
Description: Graham Construction & Management, Inc. General Correspondence #2Dates: 1/1/10-9/9/11Container: Box 44
-
Description: Contract Change Proposal Student Housing (Boiler)Dates: Number 001Container: Box 44
-
Description: Contract Change Proposal Student HousingDates: Numbers 001-091Container: Box 44
-
Description: Contract Change Proposal Student Housing Phase IIDates: Number 095Container: Box 44
-
Description: Certified Payroll ReportsDates: 7/1/09Container: Box 44
-
Description: Rejected BidsDates: 12/21/07Container: Box 44
-
Description: InterviewsDates: UndatedContainer: Box 44
-
Description: Public Notices & AdvertisementsDates: UndatedContainer: Box 44
-
Description: RFQsDates: UndatedContainer: Box 44
-
Description: Mandatory Pre-SOQ MeetingDates: UndatedContainer: Box 44
-
Description: Rationale for Utilizing the GC/CM ProcessDates: UndatedContainer: Box 44
-
Description: Preliminary Determination to Utilize the GC/CM ProcessDates: UndatedContainer: Box 44
-
Description: Final Determination to Utilize the GC/CM ProcessDates: UndatedContainer: Box 44
-
Description: Public HearingDates: UndatedContainer: Box 44
-
Description: SOQ EvaluationDates: UndatedContainer: Box 44
-
Description: GC/CM RFQDates: UndatedContainer: Box 44
-
Description: RFP ProposalsDates: UndatedContainer: Box 44
-
Description: Preconstruction Services ProposalsDates: UndatedContainer: Box 44
-
Description: Awards RFP/RFQ/SOQ CommunicationDates: UndatedContainer: Box 44
-
Description: GC/CM Selection CommitteeDates: UndatedContainer: Box 44
-
Description: GC/CM RFP/Divisions 0, 1 & ProposalsDates: UndatedContainer: Box 44
-
Description: Graham/Mithun Interview PresentationDates: 1/8/07Container: Box 44
-
Description: Graham Construction & Management, Inc. General Correspondence #1Dates: 3/1/08-12/31/09Container: Box 44
-
Description: Mithun Contract #4 CO#17590Dates: 10/9/09-10/22/10Container: Box 44
-
Description: Mithun Contract #3 CO#17590Dates: 7/1/09-9/15/09Container: Box 44
-
Description: Mithun Contract #2 CO#17590Dates: 12/1/08-6/5/09Container: Box 44
-
Description: Mithun Contract #1 CO#17590Dates: 5/1/08-12/1/08Container: Box 45
-
-
Power Plant Modernization Addition
-
Description: BudgetDates: 5/1/00Container: Box 45
-
Description: FACDates: 10/1/99-7/5/00Container: Box 45
-
Description: RegentsDates: July 2000Container: Box 45
-
Description: Builder’s Risk InsuranceDates: 8/9/00Container: Box 45
-
Description: Project Planning CommitteeDates: 10/1/99Container: Box 45
-
Description: Asbestos Abatement SurveyDates: 2/29/00Container: Box 45
-
Description: Avista Utilities #1 (Power Plant Modernization Predesign)Dates: 3/1/00-6/13/01Container: Box 45
-
Description: Power Plant Boiler Installation ReportDates: August 2000Container: Box 45
-
Description: Email General CorrespondenceDates: 12/1/99-8/22/00Container: Box 45
-
Description: General CorrespondenceDates: 7/1/00-9/27/01Container: Box 45
-
Description: Integrus Architecture Construction Progress Meetings #1Dates: 8/1/00-1/4/01Container: Box 45
-
Description: Integrus Architecture Addition General Correspondence #1Dates: 7/1/00-12/15/00Container: Box 45
-
Description: Integrus Architecture Predesign Project Committee Meetings #1Dates: 12/1/99-4/14/00Container: Box 45
-
Description: Integrus Architecture Predesign Study CO#13527 (electronic copy included)Dates: 6/15/00Container: Box 45
-
Description: Integrus Architecture Predesign Email CorrespondenceDates: 1/1/00-6/16/00Container: Box 45
-
Description: Integrus Architecture Predesign General CorrespondenceDates: 12/1/99-8/15/00Container: Box 45
-
Description: Integrus Architecture Contract #1 CO#13527Dates: 2/10/99-10/31/01Container: Box 45
-
Description: Shea Construction, Inc. General Correspondence #1Dates: 7/1/00-9/28/01Container: Box 45
-
Description: Shea Construction, Inc. Contract CO#13781Dates: 7/1/00-5/24/01Container: Box 45
-
Description: Daily Construction ReportsDates: 8/1/00-5/29/01Container: Box 45
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #10Dates: 3/1/01-3/31/01Container: Box 45
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #11Dates: 4/1/01-4/28/01Container: Box 45
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #12Dates: 4/29/01-7/28/01Container: Box 45
-
Description: Shea Construction, Inc. Cost ReportsDates: 8/1/00-4/25/01Container: Box 45
-
Description: Boiler Installation Contract Change ProposalsDates: Number 002Container: Box 45
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #9Dates: 1/1/01-2/28/01Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #7Dates: 11/25/00-12/31/00Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #6Dates: 10/29/00-11/24/00Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #4Dates: 10/1/00-10/28/00Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #3Dates: 8/26/00-9/30/00Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #2Dates: 7/24/00-8/25/00Container: Box 46
-
Description: Shea Construction, Inc. (Pay Applications & Billing Summary) #1Dates: 7/6/00-7/21/00Container: Box 46
-
Description: Contractor EvaluationDates: 7/5/00Container: Box 46
-
Description: General Correspondence #1Dates: 9/1/99-12/31/00Container: Box 46
-
-
Professional Skills Training Center (CVM)
-
Description: General CorrespondenceDates: 1/1/07Container: Box 46
-
-
Regents Dining Renovation
-
Description: RegentsDates: 9/19/03-10/11/04Container: Box 46
-
Description: BAIT CommitteeDates: 6/13/03-9/15/05Container: Box 46
-
Description: Builder’s Risk InsuranceDates: 9/22/04-8/31/05Container: Box 46
-
Description: Virgil Hanson’s Email Backup DiskDates: 9/28/06Container: Box 46
-
Description: Kevin Poitra Email Backup DiskDates: 9/29/06Container: Box 46
-
Description: OAC Technical ProposalDates: 9/30/04Container: Box 46
-
Description: Olympic Associates Company #1 CO#15841Dates: 11/17/04-11/9/05Container: Box 46
-
Description: AMEC Earth & Environmental, Inc. #1 CO#15480Dates: 4/27/04Container: Box 46
-
Description: Thomas Consulting #1 CO#14858Dates: 12/1/02-1/14/03Container: Box 46
-
Description: Strata Geotechnical Engineering #1 CO#15821Dates: 10/1/04-7/21/05Container: Box 46
-
Description: Email General Correspondence #1Dates: 5/16/03Container: Box 46
-
Description: General CorrespondenceDates: 11/1/03-11/30/04Container: Box 46
-
Description: Final Commissioning Report (OAC, TESTCOMM, & George Bundy Associates)Dates: September 2005Container: Box 46
-
Description: URS General Correspondence #2Dates: 10/1/03-11/9/13Container: Box 46
-
Description: URS Corporation Contract #3 CO#15247Dates: 10/5/05-5/2/06Container: Box 47
-
Description: Lydig Construction General Correspondence #1Dates: 9/1/04-10/16/08Container: Box 47
-
Description: Lydig Construction Contract #1 CO#15898Dates: 9/1/04-11/30/05Container: Box 47
-
Description: Lydig Construction Contract Change ProposalsDates: Numbers 001-112Container: Box 47
-
Description: Rejected BidsDates: 9/17/04-10/13/04Container: Box 47
-
Description: Lydig Construction Responsibility File CopiesDates: 9/21/04Container: Box 47
-
Description: Lydig Construction Responsibility FileDates: 9/21/04Container: Box 47
-
Description: URS Corporation Contract #2 CO#15247Dates: 12/1/04-10/4/05Container: Box 47
-
Description: URS Corporation Contract #1 CO#15247Dates: 10/16/03-11/30/04Container: Box 47
-
-
Rotunda Dining Center Renovation Building No. 80
-
Description: RegentsDates: 9/10/14-1/30/07Container: Box 48
-
Description: BAITDates: 9/10/03-3/20/08Container: Box 48
-
Description: Builder’s Risk InsuranceDates: 1/15/07-2/04/08Container: Box 48
-
Description: Public Records Request #8-35Dates: February 2008Container: Box 48
-
Description: Public Information Request #7-60Dates: 4/13/07Container: Box 48
-
Description: Coffman Engineers, Inc. CO#16951Dates: 1/1/07-12/17/07Container: Box 48
-
Description: Creighton Engineering, Inc. CO#16946Dates: 1/1/07-2/6/08Container: Box 48
-
Description: Degenkolb Engineers CO#16293Dates: 9/1/05-11/30/07Container: Box 48
-
Description: Degenkolb Engineers Seismic Evaluation & Upgrade ConceptsDates: 10/5/05Container: Box 48
-
Description: Elevator Consulting Services, Inc. #1 CO#16952Dates: 1/1/07-6/20/08Container: Box 48
-
Description: JLR Design Group, Inc. CO#16972Dates: 2/1/07-12/31/07Container: Box 48
-
Description: McKinstry Essention CO#16962Dates: 1/1/07-2/29/08Container: Box 48
-
Description: Strata CO#16943Dates: 12/1/06-6/28/07Container: Box 48
-
Description: Taylor Engineering, Inc. CO#16343Dates: 7/1/07-2/29/08Container: Box 48
-
Description: TESTCOMM, LLC CO#16940Dates: 12/1/06-4/11/08Container: Box 48
-
Description: TESTCOMM, LLC Technical ProposalDates: 3/20/06Container: Box 48
-
Description: Thomas Consulting CO#14858Dates: 12/1/01Container: Box 48
-
Description: Issues and ClaimsDates: 9/1/08-10/2/08Container: Box 48
-
Description: General Correspondence #1Dates: 9/2/05-6/4/09Container: Box 48
-
Description: Lydig Construction, Inc. General Correspondence #1Dates: 1/1/07-10/16/08Container: Box 48
-
Description: Lydig Construction, Inc. Contract #2 CO#16922Dates: 10/1/07-6/18/08Container: Box 48
-
Description: URS Corporation General Correspondence #1Dates: 12/14/04-8/28/12Container: Box 48
-
Description: URS Corporation Contract #3Dates: 1/1/07-3/9/07Container: Box 48
-
Description: Lydig Construction, Inc. Responsibility FileDates: 12/13/06Container: Box 48
-
Description: IRS Environmental of WA Site Safety & Health Plan Including Asbestos Removal ProceduresDates: 2/12/07Container: Box 48
-
Description: Lydig Construction, Inc. Contract Change Proposal-36 Mechanical RedesignDates: UndatedContainer: Box 48
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: Numbers 001-103Container: Box 48
-
Description: Certified Payroll ReportsDates: 3/1/07Container: Box 49
-
Description: Rejected Bids (Original Bid Date 4/1/06)Dates: Rebid Date 12/12/06Container: Box 49
-
Description: URS Corporation Contract #2 CO#15848Dates: 10/11/05-12/31/06Container: Box 49
-
Description: URS Corporation Contract #1 CO#15848Dates: 1/5/05-10/4/05Container: Box 49
-
Description: Lydig Construction, Inc. #1 CO#16922Dates: 12/1/06-9/31/07Container: Box 49
-
-
Institute for Shock Physics Building No. 801A
-
Description: BudgetDates: 8/97-10/21/02Container: Box 49
-
Description: Builder’s Risk InsuranceDates: 8/31/01-11/12/03Container: Box 49
-
Description: EIS #1Dates: 9/13/01-10/15/01Container: Box 49
-
Description: RegentsDates: 9/26/97-9/4/01Container: Box 49
-
Description: BAIT CommitteeDates: 1/13/00-3/29/01Container: Box 49
-
Description: Attorney General Correspondence #1Dates: 9/4/01Container: Box 49
-
Description: Architectural Cost Consultants #1 CO#13985Dates: 1/18/01-4/7/01Container: Box 49
-
Description: CTA Architects Engineers CO#13831Dates: 2/9/00-10/19/01Container: Box 49
-
Description: Hainline & Associates, Inc. CO#12257Dates: 12/1/00-3/29/02Container: Box 49
-
Description: The Redicheck Firm #1 CO#14029Dates: 2/12/01-4/12/01Container: Box 49
-
Description: Reid Middleton CO#12968Dates: 10/1/99-12/18/01Container: Box 49
-
Description: SCM Consultants Asbestos/Lead Survey CO#13662Dates: 4/1/00-10/7/01Container: Box 49
-
Description: Strata Geotechnical Engineers #1 CO#14293Dates: 3/13/99-11/15/02Container: Box 49
-
Description: A/E Consulting Services SelectionDates: October 1997Container: Box 49
-
Description: Project Planning CommitteeDates: 9/9/97-4/8/98Container: Box 49
-
Description: Value Engineering ReportDates: 8/2/00Container: Box 49
-
Description: Email General CorrespondenceDates: 8/11/97-3/6/12Container: Box 49
-
Description: General Correspondence #2Dates: 6/1/01-8/17/04Container: Box 49
-
Description: Shock Physics ControlsDates: February-March 2001Container: Box 50
-
Description: Shock Physics Controls CorrespondenceDates: February-March 2001Container: Box 50
-
Description: Shock Physics Latest Control SpecificationsDates: February-March 2001Container: Box 50
-
Description: Shock Physics ReviewsDates: February-March 2001Container: Box 50
-
Description: Bid DocumentsDates: October 2002Container: Box 50
-
Description: SCM Consultants, Inc. Good Faith Lead and Asbestos SurveyDates: May 2001Container: Box 50
-
Description: Strata Geotechnical Engineers Test ResultsDates: 8/1/02-9/26/02Container: Box 50
-
Description: Lydig Construction Inc. #1 Email General CorrespondenceDates: 9/6/01-1/10/03Container: Box 50
-
Description: Lydig Construction, Inc. #2 General CorrespondenceDates: 7/1/02-8/28/06Container: Box 50
-
Description: Miller/Hull Partnership #4 General CorrespondenceDates: 9/1/0-3/21/07Container: Box 50
-
Description: Miller/Hull Partnership Code Review CommentsDates: 1/8/02Container: Box 50
-
Description: Miller/Hull Partnership Contract #3 CO#12905Dates: 2/1/03-2/22/05Container: Box 50
-
Description: Miller/Hull Partnership Request for Information #1Dates: 11/1/01-10/4/02Container: Box 50
-
Description: Miller/Hull Partnership Supplemental InformationDates: 12/1/01Container: Box 50
-
Description: Lydig Construction, Inc. SchedulesDates: 10/1/01-3/7/02Container: Box 50
-
Description: Lydig Construction, Inc. Contract #2 CO#14269Dates: 9/1/02-6/60/03Container: Box 50
-
Description: Miller/Hull Partnership SubmittalsDates: 3/1/01-3/1/02Container: Box 50
-
Description: Field Authorizations #1Dates: 10/1/01-2/11/03Container: Box 50
-
Description: Miller/Hull Schematic Design BrochureDates: 2/4/00Container: Box 50
-
Description: Gun Lab Exhaust ModificationsDates: 4/1/03-6/30/03Container: Box 50
-
Description: Warranties #1Dates: 1/20/03-1/8/04Container: Box 50
-
Description: Responsibility FileDates: August 2002Container: Box 50
-
Description: Preconstruction Schedule DevelopmentDates: 9/99/99Container: Box 50
-
Description: Close out ItemsDates: 11/1/02-7/31/03Container: Box 50
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: Numbers 187-212Container: Box 50
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: Numbers 036-186Container: Box 51
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: Numbers 001-035Container: Box 52
-
Description: Miller/Hull Partnership General Correspondence #3Dates: 4/13/01-8/31/02Container: Box 52
-
Description: Rejected Bids #1Dates: Bid Opening 7/9/01Container: Box 52
-
Description: Miller/Hull Partnership General Correspondence #2Dates: 4/1/00-4/30/01Container: Box 52
-
Description: Miller/Hull Partnership General Correspondence #1Dates: 4/27/98-8/24/99Container: Box 52
-
Description: General Correspondence #1Dates: May 1997Container: Box 52
-
Description: Miller/Hull Partnership Project Manual 100% Construction Document Bid Set (Volume 1 & 2)Dates: 6/14/01Container: Box 52
-
Description: MW Consulting Engineers Energy Life Cycle Analysis (Volume 1 &2)Dates: 9/2000Container: Box 52
-
Description: Miller/Hull Partnership Contract #2 CO#12905Dates: 1/1/01-1/31/03Container: Box 53
-
Description: Lydig Construction, Inc. Sherwin Williams Paint SpecificationsDates: 9/10/02Container: Box 53
-
Description: Lydig Construction, Inc. Contract #1 CO#14269Dates: 8/6/01-8/31/02Container: Box 53
-
Description: Lydig Construction, Inc. General Correspondence #1Dates: 8/6/00-6/30/02Container: Box 53
-
Description: Miller/Hull Partnership Contract #1 CO#12905Dates: 5/13/98-12/31/00Container: Box 53
-
Description: Strata Final Project BinderDates: 12/6/02Container: Box 53
-
Description: Miller/Hull Partnership Predesign DocumentDates: 5/28/98Container: Box 53
-
Description: Code ReviewDates: 1/28/02Container: Box 53
-
Description: Budget/Budget EstimatesDates: 8/23/00Container: Box 53
-
Description: Miller/Hull Partnership 100% Schematic Design A1.1Dates: 2/7/00Container: Box 53
-
Description: Miller/Hull Partnership 100% Veneer Support Elevation S8.1Dates: 6/14/01Container: Box 53
-
Description: Sign Shop DrawingsDates: 11/18/02Container: Box 53
-
Description: 75% Schematic Design (Models/Color Renderings/Elevations)Dates: 2/10/99Container: Box 53
-
-
South Fairway Intramural Field No. 1 Facility ID # 0833
-
Description: Regents “Valley Road Multi-use Recreational Fields Phase II”Dates: February 1998Container: Box 54
-
Description: Determination of Nonsignificance (Non-Facilities Planning Project) #2Dates: 1/1/90-2/7/93Container: Box 54
-
Description: Burke/Lee “Comprehensive Physical Planning Process” Correspondence #1Dates: 7/25/91-2/3/93Container: Box 54
-
Description: Email General Correspondence (Field No. 2)Dates: 3/31/97-4/21/99Container: Box 54
-
Description: General CorrespondenceDates: 6/91-5/7/98Container: Box 54
-
Description: Motley & Motley, Inc. General CorrespondenceDates: 7/23/93Container: Box 54
-
Description: Determination of Nonsignificance (Non-Facilities Planning Project) #1Dates: 4/90-12/31/92Container: Box 54
-
-
South Fairway Intramural Field No. 2
-
Description: Budget “Valley Road Multi-use Recreational Fields”Dates: 3/1/99Container: Box 54
-
Description: RegentsDates: 7/20/93Container: Box 54
-
Description: EIS #2Dates: UndatedContainer: Box 54
-
Description: Program Statement Expansion & ImprovementsDates: 8/7/97-10/23/97Container: Box 54
-
Description: Project Planning Committee #1Dates: 3/1/97-8/12/98Container: Box 54
-
Description: Richard Carothers Associates, Ltd. #1 CO#10891 & 11466Dates: 6/91-12/15/93Container: Box 54
-
Description: Stoel Rives LLP #1 CO#12589Dates: 5/27/98Container: Box 54
-
Description: Strata Geotechnical, Inc. CO#13069Dates: 9/14/98-12/31/98Container: Box 54
-
Description: Strata Geotechnical Concrete Test Reports #1Dates: 9/25/98-1/5/99Container: Box 54
-
Description: RCA Huitt-Zollars #1 Email CorrespondenceDates: 10/21/98-1/4/00Container: Box 54
-
Description: General Correspondence #2Dates: 7/1/98-2/7/00Container: Box 54
-
Description: Construction Meeting MinutesDates: 9/1/98-3/17/99Container: Box 54
-
Description: RCA/Huitt-Zollars General Correspondence #1Dates: 4/15/97-8/2/01Container: Box 54
-
Description: RCA \/Huitt-Zollars Contract CO#12596Dates: 4/15/97-9/17/01Container: Box 54
-
Description: Certified Payroll ReportsDates: 10/31/98Container: Box 54
-
Description: Goodfellow Bros., Inc. General Correspondence #1Dates: 7/28/98-11/25/00Container: Box 54
-
Description: Goodfellow Bros., Inc. Statement of ComplianceDates: 9/15/98-4/28/99Container: Box 54
-
Description: Goodfellow Bros., Inc. Contract #1 CO#13023Dates: 7/23/98-1/29/00Container: Box 54
-
Description: General Correspondence #1Dates: 3/7/97-6/30/98Container: Box 54
-
Description: Goodfellow Bros., Inc. Contract Change ProposalsDates: CCPs 001-005Container: Box 54
-
Description: Rejected BidsDates: 7/23/98Container: Box 54
-
Description: Rejected BidsDates: 6/22/98Container: Box 54
-
Description: RCA/Huitt-Zollars, Inc. Schematic Design BrochureDates: 3/6/98Container: Box 54
-
Description: Strata Final Project BinderDates: 12/21/98Container: Box 54
-
-
South Fairway Parking & Road Improvements Facility ID # 0762
-
Description: Attorney GeneralDates: 7/1/04Container: Box 54
-
Description: RegentsDates: 6/16/04Container: Box 54
-
Description: EISDates: 6/1/04-7/14/04Container: Box 54
-
Description: Builder’s Risk InsuranceDates: 6/17/04-10/11/04Container: Box 54
-
Description: Strata Geotechnical Engineering #1 CO#15686Dates: 7/6/04-11/23/04Container: Box 54
-
Description: Strata Geotechnical Engineering Testing & Inspection ReportsDates: 8/1/04-11/9/04Container: Box 54
-
Description: Meeting NotesDates: 3/1/04Container: Box 55
-
Description: Daily Construction ReportsDates: 7/1/04-11/29/04Container: Box 55
-
Description: Email General CorrespondenceDates: 4/1/04Container: Box 55
-
Description: General Correspondence #1Dates: 6/1/04-8/23/05Container: Box 55
-
Description: “Campus Infrastructure 3-05” KPFF General CorrespondenceDates: 6/1/04-7/20/04Container: Box 55
-
Description: KPFF Email General CorrespondenceDates: 3/1/04-2/12/05Container: Box 55
-
Description: KPFF Consulting Engineers #1 Contract CO#15534Dates: 4/9/04Container: Box 55
-
Description: KPFF Consulting Engineers #1 Contract CO#15513Dates: 3/26/04-10/31/04Container: Box 55
-
Description: Request for InformationDates: 8/1/04Container: Box 55
-
Description: Motley & Motley General CorrespondenceDates: 6/1/04-11/9/05Container: Box 55
-
Description: Motley & Motley Contract #1 CO#15666Dates: 6/1/04-4/30/05Container: Box 55
-
Description: Motley & Motley Contract Change ProposalsDates: CCPs 001-005Container: Box 55
-
Description: Motley & Motley Responsibility FileDates: 6/1/04-4/30/05Container: Box 55
-
Description: Rejected BidsDates: 6/1/04Container: Box 55
-
-
Spring Street, Campus Street, Spillman & Kimbrough Parking Lot Project
-
Description: Budget #1Dates: June 2003Container: Box 55
-
Description: Builder’s Risk InsuranceDates: 10/2/03-8/5/04Container: Box 55
-
Description: EIS #1Dates: 3/6/03-9/25/03Container: Box 55
-
Description: MD & A CO#15083Dates: 6/3/03Container: Box 55
-
Description: Strata Geotechnical Engineering & Materials Testing #1 CO#15220Dates: 8/8/03-5/13/04Container: Box 55
-
Description: Strata Geotechnical Engineering & Materials Testing #1 CO#15221Dates: 8/8/03-5/13/04Container: Box 55
-
Description: Strata Geotechnical Engineering & Materials Testing #1 CO#15222Dates: 7/29/04Container: Box 55
-
Description: Strata Geotechnical Engineering & Materials Testing General Correspondence #1Dates: 8/8/03Container: Box 55
-
Description: Email General Correspondence #1Dates: 2/3/03-7/25/03Container: Box 55
-
Description: Taylor Engineering Contract #1 CO#15965Dates: 1/31/03-3/4/05Container: Box 55
-
Description: Taylor Engineering General Correspondence #1Dates: 1/31/03-3/4/03Container: Box 55
-
Description: Hereford Contracting & Excavating Responsibility FileDates: August 2003Container: Box 55
-
Description: General Correspondence #1Dates: 1/2/03-4/8/05Container: Box 55
-
Description: Hereford Contracting & Excavating General Correspondence #1Dates: 8/14/03-5/24/04Container: Box 55
-
Description: Taylor Engineering Construction Plans Site Demolition & Removal PlanDates: 7/29/03Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. #1 CO#15218Dates: 9/8/03-1/31/05Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. #1 CO#15215Dates: 9/8/03-8/30/04Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. #1 CO#15216Dates: 9/8/03-8/30/04Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. #1 CO#15217Dates: 9/8/03-4/30/04Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. Contract Change Proposals CO#15216Dates: CCP 001Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. Contract Change Proposals CO#15215Dates: CCP 002Container: Box 55
-
Description: Hereford Contracting & Excavating, Inc. Contract Change Proposals CO#15218Dates: CCPs 003-005Container: Box 55
-
Description: Certified Payroll #1Dates: 11/3/03Container: Box 55
-
Description: Rejected Bids #1Dates: Bid Opening 8/14/03Container: Box 55
-
Description: KPFF Consulting Engineers Drainage ReportDates: 4/6/04Container: Box 55
-
Description: KPFF Consulting Engineers Project Manual Bid SetDates: 5/24/04Container: Box 55
-
Description: Taylor Engineering, Inc. Project Manual Division 0-16Dates: July 2003Container: Box 55
-
Description: Taylor Engineering, Inc. SpecificationsDates: July 2003Container: Box 55
-
Description: KPFF Consulting Engineers Construction DocumentsDates: 5/24/04Container: Box 55
-
-
Teaching & Learning Center (aka) Smith Center for Undergraduate Education Facility ID # 0095
-
Description: Budget #1Dates: 8/5/96-7/10/02Container: Box 56
-
Description: BAIT Committee #1Dates: 1/22/99-6/28/01Container: Box 56
-
Description: EISDates: 5/1/99Container: Box 56
-
Description: Regents #1Dates: 6/18/97-11/3/03Container: Box 56
-
Description: FAC CommitteeDates: 1/22/99-6/28/01Container: Box 56
-
Description: Project Planning Committee #1Dates: 9/95-1/23/98Container: Box 56
-
Description: RFQ for PM/CM Consulting ServicesDates: January 1998Container: Box 56
-
Description: Issues & Claims #1Dates: 6/13/02Container: Box 56
-
Description: GC/CM Preliminary DeterminationDates: 7/8/98-9/25/98Container: Box 56
-
Description: GC/CM Mandatory MeetingDates: 6/26/98-7/6/98Container: Box 56
-
Description: GC/CM Final ProposalDates: 9/1/98Container: Box 56
-
Description: KPFF Consulting Engineers CO#12818Dates: 10/1/00-3/1/01Container: Box 56
-
Description: Coffman Engineering CO#13308Dates: 7/1/99-7/28/99Container: Box 56
-
Description: Disputes Review Board Third Party Agreement CO#13448Dates: 11/16/99-1/18/02Container: Box 56
-
Description: EFT Architects, Inc. #1 CO#13183Dates: 1/20/99Container: Box 56
-
Description: Hodge & Associates, Inc. CO#14222Dates: 7/1/99-8/6/99Container: Box 56
-
Description: Hodge & Associates, Inc. CO#12813Dates: 11/13/97-8/99Container: Box 56
-
Description: KJM & Associates CO#13232Dates: 5/1/99-10/31/01Container: Box 56
-
Description: Stephen F. McCauley Construction Management CO#13339Dates: 8/1/99-4/9/01Container: Box 56
-
Description: McAuley & Associates CO#13590Dates: 4/1/00-5/22/01Container: Box 56
-
Description: O’Brien Kreitzberg #1 CO#12879Dates: 3/12/98-3/31/99Container: Box 56
-
Description: Preston/Gates/EllisDates: September 2000Container: Box 56
-
Description: Redicheck CO#13336Dates: 8/1/99-9/21/99Container: Box 56
-
Description: Reid Middleton, Inc. #1 CO#12968Dates: 6/23/98-5/30/03Container: Box 56
-
Description: Roen Associates #1 CO#13140Dates: 12/10/98-3/10/99Container: Box 56
-
Description: Stoel Rives,LLP Attorneys #1 CO#12589Dates: 5/23/97-5/28/98Container: Box 56
-
Description: Strata Geotechnical Engineering & Materials Testing CO#13288Dates: 7/1/99-12/28/01Container: Box 56
-
Description: Tomasi-Dobois & Associates CO#13328Dates: 7/1/99-8/6/99Container: Box 56
-
Description: WPA, Inc. CO#13867Dates: 1/1/01-7/15/02Container: Box 56
-
Description: Email General Correspondence #1Dates: 9/97-2/7/01Container: Box 56
-
Description: General Correspondence #2Dates: 7/1/01-2/24/09Container: Box 56
-
Description: A/E Consulting Services SelectionDates: May 97Container: Box 56
-
Description: Yost Grube Hall Architecture Contract #8 CO#12837Dates: 1/1/02-5/31/02Container: Box 56
-
Description: Yost Grube Hall Architecture Contract #1 General CorrespondenceDates: 8/97-4/30/04Container: Box 56
-
Description: Yost Grube Hall Architecture Contract #1 Email CorrespondenceDates: 10/20/98-6/1/99Container: Box 56
-
Description: GC/CM Final DeterminationDates: 3/11/98Container: Box 56
-
Description: GC/CM Interested FirmsDates: UndatedContainer: Box 56
-
Description: Predesign StudyDates: July 1996Container: Box 56
-
Description: GC/CM InterviewsDates: 8/3/98Container: Box 56
-
Description: GC/CM Procedures & SelectionDates: March 1998Container: Box 56
-
Description: Lydig Construction, Inc. #2 General CorrespondenceDates: 9/1/01-8/28/06Container: Box 56
-
Description: Lydig Construction, Inc. Contract #1 CO#13303 (GC/CM Early Releases Bid Package)Dates: 8/1/99-10/31/03Container: Box 56
-
Description: Backup Electronic Files (x3)Dates: 7/00-7/11/02Container: Box 56
-
Description: Lydig Construction, Inc. Contract #1 CO#13103 (GC/CM Preconstruction Services)Dates: 10/1/98-2/2100Container: Box 56
-
Description: Lydig Construction, Inc. Contract #4 CO#13465 (GC/CM Preconstruction Services)Dates: 8/1/01-10/22/03Container: Box 57
-
Description: Lydig Construction, Inc. Contract Change ProposalsDates: CCPs 013-073Container: Box 57
-
Description: Lydig Construction, Inc. Contract Change Proposals CO# 13303Dates: CCPs 001-006Container: Box 57
-
Description: Lydig Construction, Inc. Contract Change Proposals CO# 13465Dates: CCPs 001-012Container: Box 57
-
Description: GC/CM Rejected Bids #1Dates: Bid Date 9/15/98Container: Box 57
-
Description: GC/CM Rejected Bids Bid Package #5Dates: August 1999Container: Box 57
-
Description: Yost Grube Hall Architecture Schematic DesignDates: January 1999Container: Box 58
-
Description: Yost Grube Hall Architecture Design ProgramDates: 9/8/98Container: Box 58
-
Description: Yost Grube Hall Architecture Preliminary Design ProgramDates: 12/11/97Container: Box 58
-
Description: Lydig Construction, Inc. Bidding DocumentsDates: 10/29/99Container: Box 58
-
Description: Lydig Construction, Inc. GC/CM Qualification PackageDates: August 1999Container: Box 58
-
Description: Lydig Construction, Inc. General Correspondence #1Dates: 7/15/98Container: Box 58
-
Description: Lydig Construction, Inc. Contract #3 CO#13465 (GC/CM)Dates: 9/25/98-8/31/01Container: Box 58
-
Description: Lydig Construction, Inc. Contract #2 CO#13465Dates: 7/1/00-1/31/01Container: Box 58
-
Description: Lydig Construction, Inc. Contract #1 CO#13465Dates: 1/1/00-1/31/01Container: Box 58
-
Description: Lydig Construction, Inc. GC/CM Agreement CO#13465Dates: UndatedContainer: Box 58
-
Description: Yost Grube Hall Architecture Contract #7 CO#12837Dates: 11/1/01-12/31/01Container: Box 58
-
Description: Yost Grube Hall Architecture Contract #6 CO#12837Dates: 2/1/01-10/15/01Container: Box 58
-
Description: Yost Grube Hall Architecture Contract #5 CO#12837Dates: 7/1/00-1/31/01Container: Box 58
-
Description: Yost Grube Hall Architecture General Correspondence #1Dates: 9/95-6/30/01Container: Box 59
-
Description: Yost Grube Hall Architecture Contract #4 CO#12837Dates: 11/1/99-6/30/00Container: Box 59
-
Description: Yost Grube Hall Architecture Contract #3 CO#12837Dates: 8/1/99-10/31/99Container: Box 59
-
Description: Yost Grube Hall Architecture Contract #2 CO#12837Dates: 5/1/99-7/31/99Container: Box 59
-
Description: Yost Grube Hall Architecture Contract #1 CO#12837Dates: 1/12/98-4/30/99Container: Box 59
-
-
Indoor Tennis Courts Facility ID # 0827
-
Description: Hollingbery Field House Global Sports Tennis Design Group, LLC. CO#16619Dates: 5/1/06-10/1/06Container: Box 59
-
Description: Indoor Tennis Facility Global Sports Tennis Design Group, LLC. #1 CO#15600Dates: 5/28/04-8/1/04Container: Box 59
-
Description: ICA Sports & Building Systems CO#15601Dates: 5/1/04-7/30/04Container: Box 59
-
Description: ICA Sports & Building Systems Sports Usage & Budgeting ReportDates: 7/30/04Container: Box 59
-
Description: General Correspondence #1Dates: 5/1/04-6/21/06Container: Box 59
-
Description: Certified Payroll ReportsDates: March 2008Container: Box 59
-
-
Outdoor Tennis Courts
-
Description: EISDates: 3/1/05Container: Box 59
-
Description: Construction Stormwater General PermitDates: 7/1/05-5/30/06Container: Box 59
-
Description: Federal Aviation Administration General CorrespondenceDates: 1/3/06Container: Box 59
-
Description: Meeting MinutesDates: 11/1/05Container: Box 59
-
Description: E3RA, Inc. #1 CO#16097Dates: 4/1/05-5/31/05Container: Box 59
-
Description: Motley-Motley, Inc. CO#16958Dates: 1/1/07-2/20/08Container: Box 59
-
Description: Strata Geotechnical Engineering & Materials Testing CO#16683Dates: 6/1/06-6/29/07Container: Box 59
-
Description: Taylor Engineering, Inc. CO#16749Dates: 8/1/06-11/8/06Container: Box 59
-
Description: Additive Alternative Bid Package Volume 2 Technical Specifications Divisions 2-16Dates: 3/1/06Container: Box 59
-
Description: Email General CorrespondenceDates: 12/1/04Container: Box 59
-
Description: General Correspondence #1Dates: 5/1/04-4/16/09Container: Box 59
-
Description: Tennis Court CracksDates: 6/1/07Container: Box 59
-
Description: Lydig Construction, Inc. General CorrespondenceDates: 8/1/06-4/14/08Container: Box 59
-
Description: KPFF Consulting Engineers General CorrespondenceDates: 5/1/04-6/15/06Container: Box 59
-
Description: KPFF Consulting Engineers Contract #2 CO#15599Dates: 6/1/06-12/15/06Container: Box 59
-
Description: Lydig Construction, Inc. Contract Change ProposalDates: CCP 001-022Container: Box 59
-
Description: KPFF Construction Engineers Contract #1 CO#15549Dates: 5/1/04-5/31/06Container: Box 60
-
Description: KPFF Construction Engineers Project Manual Bid Divisions 0-16Dates: 12/7/05Container: Box 60
-
-
Town Center
-
Description: BudgetDates: 11/1/01-5/23/03Container: Box 60
-
Description: Avista UtilitiesDates: 11/1/02-1/17/03Container: Box 60
-
Description: General CorrespondenceDates: 6/1/01-5/8/03Container: Box 60
-
Description: Town Center, LLC.Dates: 10/1/03-5/8/03Container: Box 60
-
Description: Ground Lease AgreementDates: UndatedContainer: Box 60
-
Description: Foundation RelocationDates: 2/1/01-9/5/02Container: Box 60
-
Description: Email General CorrespondenceDates: 11/1/01-12/27/02Container: Box 60
-
Description: Design West Architectural General CorrespondenceDates: 9/1/01-3/5/03Container: Box 60
-
Description: Brown Construction General CorrespondenceDates: 8/1/01-8/26/02Container: Box 60
-
Description: Brown Construction Contract #1 CO#14472Dates: 5/1/02-6/12/02Container: Box 60
-
Description: Fypon Molded Millwork BrochureDates: UndatedContainer: Box 60
-
-
Troy Hall Renovation Facility ID # 0036
-
Description: RFQ for Architectural Predesign ServicesDates: August 2003Container: Box 60
-
Description: BudgetDates: 11/1/03-11/1/04Container: Box 60
-
Description: SERA Architecture, Inc. General Correspondence #1Dates: 5/1/04-6/23/04Container: Box 60
-
Description: SERA Architecture, Inc. Contract #1 CO#15618Dates: 5/1/04-12/28/04Container: Box 60
-
Description: SERA Architecture, Inc. RFQDates: 2/6/03Container: Box 60
-
Description: General Correspondence #1Dates: 1/1/04-12/27/04Container: Box 60
-
Description: Predesign ReportDates: 10/12/04Container: Box 60
-
-
Veterinary Medicine Barn Relocation (F/K/A) Biomedical Science Facility Facility ID # 0165E
-
Description: Regents (Rec 4 Vet Med Research Bldg.)Dates: 9/19/03-9/22/03Container: Box 60
-
Description: RegentsDates: 10/5/05-5/23/05Container: Box 60
-
Description: Strata CO#16323Dates: 9/22/05-12/30/05Container: Box 60
-
Description: BAIT CommitteeDates: 5/5/05-9/14/06Container: Box 60
-
Description: EIS #1Dates: 5/13/05Container: Box 60
-
Description: Builder’s Risk InsuranceDates: 9/29/05-6/2/06Container: Box 60
-
Description: Meeting MinutesDates: January 2005Container: Box 60
-
Description: Field AuthorizationsDates: 11/28/05Container: Box 60
-
Description: PermitsDates: 9/16/05Container: Box 60
-
Description: General Correspondence #1Dates: 2/25/05-11/8/06Container: Box 60
-
Description: KPFF Consulting Engineers General Correspondence #1Dates: 7/15/05-11/9/05Container: Box 60
-
Description: KPFF Consulting Engineers Contract #1 CO#16305Dates: 5/18/05-7/15/06Container: Box 60
-
Description: KPFF Consulting Engineers Bid Documents Project Manual Volume 1 & 2Dates: 7/19/05Container: Box 60
-
Description: KPFF Consulting Engineers Meeting Minutes #1Dates: 5/18/05Container: Box 60
-
Description: Graham Construction General Correspondence #1Dates: 8/1/05-10/26/06Container: Box 60
-
Description: Graham Construction Contract #1 CO#16305Dates: 10/5/05-6/5/06Container: Box 60
-
Description: Graham Construction Contract Change ProposalsDates: CCPs 020-052Container: Box 60
-
Description: Graham Construction Contract Change ProposalsDates: CCPs 001-019Container: Box 61
-
Description: Rejected BidsDates: Bid Opening 8/9/05Container: Box 61
-
Description: Responsibility FileDates: August 2005Container: Box 61
-
-
Veterinary Teaching Hospital Security System Facility ID # 0818
-
Description: Builder’s Risk InsuranceDates: 12/15/00Container: Box 61
-
Description: RegentsDates: 11/1/00Container: Box 61
-
Description: McAuley & Associates CO#13643Container: Box 61
-
Description: Email General CorrespondenceDates: 4/1/00-1/3/01Container: Box 61
-
Description: General CorrespondenceDates: 7/1/00Container: Box 61
-
Description: Electronic Technologies Corporation General CorrespondenceDates: 11/1/00-3/19/01Container: Box 61
-
Description: Electronic Technologies Corporation Contract CO#13865Dates: 11/1/99-5/16/01Container: Box 61
-
Description: Electronic Technologies Corporation Contract Change ProposalsDates: CCPs 001-003Container: Box 61
-
-
Brelsford Visitors Center Signage Facility ID # 0843
-
Description: BudgetDates: 8/1/04Container: Box 61
-
Description: BAIT CommitteeDates: October 2006Container: Box 61
-
Description: Builder’s Risk InsuranceDates: 6/5/05-12/8/06Container: Box 61
-
Description: WPA #1 CO#15401Dates: 1/26/04-10/5/06Container: Box 61
-
Description: WPA #1 CO#13867Dates: 3/1/01Container: Box 61
-
Description: General CorrespondenceContainer: Box 61
-
Description: Tube Art Displays, Inc. General CorrespondenceDates: 7/1/04-5/21/09Container: Box 61
-
Description: Tube Art Displays, Inc. Contract #1Dates: 6/8/05-6/25/10Container: Box 61
-
Description: Tube Art Displays, Inc. Responsibilities FileDates: 2/1/05-11/30/06Container: Box 61
-
Description: Meeting MinutesDates: 3/1/04Container: Box 61
-
Description: Rejected BidsDates: 2/22/05Container: Box 61
-
-
WAWAWAI Landing Boat Dock
-
Description: RegentsDates: 2/10/06Container: Box 61
-
Description: BAIT CommitteeDates: 2/26/06Container: Box 61
-
Description: EISDates: 6/15/05Container: Box 61
-
Description: Womer & Associates, Inc. CO#15875Dates: 11/30/04-2/13/06Container: Box 61
-
Description: Army Corps of Engineers General CorrespondenceDates: 9/20/04-1/9/06Container: Box 61
-
Description: Army Corps of Engineers LeaseDates: 6/3/05-10/10/08Container: Box 61
-
Description: General Correspondence #1Dates: 12/1/04Container: Box 61
-
Description: Knight Construction General Correspondence #1Dates: 7/8/05-8/24/10Container: Box 61
-
Description: Knight Construction Contract CO#16270Dates: 2/10/06-9/25/06Container: Box 61
-
Description: Knight Construction Contract Change ProposalDates: CCPs 001-004Container: Box 61
-
Description: Knight Construction Responsibility FileDates: 7/7/05Container: Box 61
-
-
WAWAWAI Canyon Survey
-
Description: General Correspondence #1Dates: 2/3/06Container: Box 61
-
Description: Munir Daud & Associates General Correspondence #1Dates: 1/31/06Container: Box 61
-
Description: Munir Daud & Associates Contract #1 CO#16476Dates: 2/2/06-12/18/06Container: Box 61
-
-
Wegner Hall Addition Facility ID # 0045
-
Description: NIH Grant ApplicationDates: March 2003Container: Box 61
-
-
WHETS
-
Description: General CorrespondenceDates: 8/31/87-4/22/93Container: Box 61
-
Description: KWSU Radio-TV StationDates: 4/22/93Container: Box 61
-
-
Wilmer Davis Dining Renovation Facility ID # 0030
-
Description: Builder’s Risk InsuranceDates: 6/2/03Container: Box 61
-
Description: RegentsDates: 5/9/02-12/4/02Container: Box 61
-
Description: Attorney General #1Dates: August 2002Container: Box 61
-
Description: SCM Consultants #1 CO#14814Dates: 10/23/02-2/12/04Container: Box 61
-
Description: WPA #1 Contract CO#14704Dates: 3/20/03-8/6/03Container: Box 61
-
Description: RFQ for A/E Design ServicesDates: June 2002Container: Box 61
-
Description: Email General Correspondence #1Dates: 3/18/03Container: Box 61
-
Description: General Correspondence #1Dates: 6/5/02-3/4/05Container: Box 61
-
Description: SCM RFQ Environmental Consulting ServicesDates: 10/23/02Container: Box 61
-
Description: SCM Abatement Specifications & Contract Documents 75% SubmittalsDates: 2/16/03Container: Box 61
-
Description: SCM Limited Good Faith Asbestos ReportDates: 1/20/03Container: Box 61
-
Description: Electronic Files (x3 CDs) GraphicsDates: 6/2/04Container: Box 61
-
Description: Electronic Files (x3 CDs) WPA Building ID Blade LayoutDates: UndatedContainer: Box 61
-
Description: Email BackupDates: UndatedContainer: Box 61
-
Description: URS Corporation Basement Floor Demo Plan - ElectricalDates: 9/4/03Container: Box 62
-
Description: Submittal for Architectural Design ServicesDates: 6/21/02Container: Box 62
-
Description: URS Corporation Design Development Submittal Volume VDates: 12/16/02Container: Box 62
-
Description: URS Corporation Remodel Bid SetDates: 4/14/03Container: Box 62
-
Description: URS Corporation Contract #2 CO#14723Dates: 7/1/03-2/10/05Container: Box 62
-
Description: Lydig Construction, Inc. General Correspondence #1Dates: 5/13/03Container: Box 62
-
Description: Lydig Construction, Inc. Contract #1 CO#15508Dates: 5/6/03Container: Box 62
-
Description: Lydig Construction, Inc. Contract Change ProposalDates: CCPs 001-086Container: Box 62
-
Description: Lydig Construction, Inc. Responsibility FileDates: 5/9/03Container: Box 62
-
Description: Rejected BidsDates: Bid OpeningContainer: Box 62
-
Description: URS Corporation Contract #1 CO#14723Dates: 8/23/02-6/30/03Container: Box 62
-
Description: URS Corporation D4esign Development SubmittalDates: 12/16/02Container: Box 62
-
-
Spokane Archives/CALS
-
Description: David Evans & Associates #1 CO#13059Dates: 7/15/98-3/10/03Container: Box 63
-
Description: Email General Correspondence #1Dates: 5/5/98-6/11/98Container: Box 63
-
Description: General Correspondence #1Dates: 2/12/97-9/27/00Container: Box 63
-
Description: Integrus Architecture General Correspondence #1Dates: 6/3/98-12/15/98Container: Box 63
-
Description: Integrus Architecture Contract #1 CO#13092Container: Box 63
-
Description: Integrus Architecture Design DevelopmentDates: October 1998Container: Box 63
-
-
Spokane Riverpoint Higher Education Park
-
Description: Northwest Architecture Company Predesign Feasibility StudyDates: September 2000Container: Box 63
-
Description: Northwest Architecture Company Feasibility StudyDates: 10/30/01-1/7/02Container: Box 63
-
Description: Grant Application #1Dates: June 2000Container: Box 63
-
Description: General Correspondence #1Dates: 6/12/00Container: Box 63
-
-
Spokane Health Sciences Building Building No. 9010
-
Description: BudgetDates: 1/5/00-9/17/02Container: Box 63
-
Description: BAIT CommitteeDates: 12/28/98-11/15/01Container: Box 63
-
Description: RegentsDates: 8/3/98-3/25/02Container: Box 63
-
Description: Attorney General Correspondence #1Dates: 9/27/99-11/19/99Container: Box 63
-
Description: EISDates: 6/2/99-3/18/03Container: Box 63
-
Description: National Center for Research Resource Grant ApplicationDates: 2/20/99Container: Box 63
-
Description: Interagency Memorandum of AgreementDates: 12/15/98Container: Box 63
-
Description: Coffman Engineers CO#13255Dates: 5/20/99Container: Box 63
-
Description: David Evans & Associates #1CO#13059Dates: 7/15/98-6/12/03Container: Box 63
-
Description: David Evans & Associates Traffic & Parking StudyDates: 2/23/99-10/18/01Container: Box 63
-
Description: David Evans & Associates Revised Final ReportDates: 12/3/99Container: Box 63
-
Description: David Evans & Associates Final ReportDates: 2/23/99Container: Box 63
-
Description: Disputes Review Board Third Party Agreement Co#13435Dates: 10/18/99Container: Box 63
-
Description: Integrus Architecture #1Dates: 2/2/01-7/1/01Container: Box 63
-
Description: GeoEngineers - Gifford #1 CO#13432Dates: 11/1/99Container: Box 63
-
Description: O’Brien Kreitzberg #1 CO#12879Dates: 7/30/98-2/2/99Container: Box 63
-
Description: KJM & Associates #1 CO#13181Dates: 12/1/98-11/2/01Container: Box 63
-
Description: Landau Associates Soils AssessmentDates: 6/21/99Container: Box 64
-
Description: MW Consulting Engineers Energy Life Cycle Cost AnalysisDates: 2/16/99Container: Box 64
-
Description: Shea Construction, Inc. RFQDates: 9/10/98Container: Box 64
-
Description: MW Consultants Energy Life Cycle Analysis Volumes I & IIDates: March 1999Container: Box 64
-
Description: O’Brien Kreitzberg Value Engineering WorkshopDates: January 1999Container: Box 64
-
Description: KJM Constructability Review 100% Review DocumentsDates: 1/24/00Container: Box 64
-
Description: HWA Geosciences Geotechnical ReportDates: 6/24/99Container: Box 64
-
Description: Trent Ave/Spokane Falls Blvd. Utility UpgradeDates: 1/1/03-7/18/03Container: Box 64
-
Description: O’Brien Kreitzberg Email General Correspondence #1Dates: 1/8/99-2/1/99Container: Box 64
-
Description: Email General Correspondence #1Dates: 5/5/98-9/9/99Container: Box 64
-
Description: General Correspondence #3Dates: 1/1/01-5/14/03Container: Box 64
-
Description: Integrus Architecture Email General CorrespondenceDates: 1/14/99-8/20/99Container: Box 64
-
Description: Integrus Architecture General Correspondence #4Dates: 10/1/99-5/1/06Container: Box 64
-
Description: Integrus Architecture Contract #3 CO#13112\Dates: 6/1/01-1/31/03Container: Box 64
-
Description: Integrus Architecture Meeting Minutes #1Dates: 5/5/98-6/4/99Container: Box 64
-
Description: KJM Associates Email Correspondence #4Dates: 7/1/99Container: Box 64
-
Description: KJM Associates Meeting Minutes #4Dates: 7/6/99Container: Box 64
-
Description: Value Engineering StudyDates: January 1999Container: Box 64
-
Description: GC/CM Procedures & SelectionDates: August 1998Container: Box 64
-
Description: Shea Construction General Correspondence #2Dates: 1/1/01-1/30/04Container: Box 64
-
Description: Shea Construction Preconstruction Contract #1 CO#13111Dates: 12/10/98-5/22/00Container: Box 64
-
Description: Shea Construction Monthly Reports #1Dates: 4/99-9/99Container: Box 64
-
Description: Shea Construction Bid Package #2A Mass EvacuationDates: 6/1/02-1/23/04Container: Box 64
-
Description: Shea Construction Contract #3 CO#13466Dates: 9/17/99-5/9/01Container: Box 64
-
-
Spokane Higher Education Park
-
Description: Shea Construction Meeting Minutes #1Dates: 12/3/98-6/5/01Container: Box 65
-
Description: Shea Construction Contract Change Proposals CO#13377Dates: Numbers 001-047Container: Box 65
-
Description: Certified Payroll ReportsDates: May 2001Container: Box 65
-
Description: GC/CM Rejected Bids #1Dates: 8/31/99-2/21/00Container: Box 65
-
-
Spokane Health Science Building/Higher Education Park Building No. 9010
-
Description: Shea Construction M.A.C.C ProposalDates: December 1999Container: Box 65
-
Description: Shea Construction Subcontracting PlanDates: August 1999Container: Box 65
-
Description: Shea Construction Contingency PlanDates: July 1999Container: Box 65
-
Description: Shea Construction 50% Design Development Document ReviewDates: May 1999Container: Box 65
-
Description: Shea Construction Pre-construction PlanDates: November 1998Container: Box 65
-
Description: Shea Construction General Contractor QualificationsDates: Sept 1998Container: Box 65
-
Description: Integrus Architecture Schematic Design Project #9575Dates: 9/15/97Container: Box 65
-
Description: Integrus Architecture (Revised) Predesign Study Project#9575.06Dates: 7/12/96Container: Box 65
-
Description: General Correspondence #2Dates: 3/1/99-12/31/00Container: Box 65
-
Description: General Correspondence #1Dates: 4/15/98-2/28/99Container: Box 65
-
Description: Integrus Architecture CO#13112 Contract #2Dates: 3/1/00-5/31/01Container: Box 66
-
Description: Integrus Architecture CO#13112 Contract #1Dates: 1/11/97-12/1/00Container: Box 66
-
Description: Shea Construction CO#13466 Contract #2 GC/CMDates: 11/29/99-9/30/00Container: Box 66
-
Description: Shea Construction CO#13466 Contract #1Dates: 10/01/00-5/31/02Container: Box 66
-
Description: Integrus Architecture General Correspondence #3Dates: 4/1/99-9/30/99Container: Box 66
-
Description: Integrus Architecture General Correspondence #2Dates: 2/99-3/31/99Container: Box 66
-
Description: Integrus Architecture General Correspondence #1Dates: 3/98-2/28/99Container: Box 66
-
Description: Shea Construction, Inc. General CorrespondenceDates: 12/23/98-2/31/00Container: Box 66
-
Description: Shea Construction SRG Partnership Pre-design ReportDates: 4/21/98Container: Box 66
-
-
Tri-Cities Bioproducts Science & Engineering (BSEL) Building No. 9513
-
Description: Builder’s Risk InsuranceDates: 3/17/06-4/7/08Container: Box 67
-
Description: BudgetDates: 8/4/03Container: Box 67
-
Description: BAIT CommitteeDates: 5/8/03-03/20/04Container: Box 67
-
Description: RegentsDates: 5/9/03-11/23/04Container: Box 67
-
Description: EISDates: December 2005Container: Box 67
-
Description: Public Records RequestDates: February 2008Container: Box 67
-
Description: ALSC Architects CO#17511Dates: 3/1/08-4/30/08Container: Box 67
-
Description: Confederated Tribes of the Umatilla Indian Reservation CO#16528Dates: 5/15/06-12/8/06Container: Box 67
-
Description: The Estime Group, Inc. #1 CO#16225Dates: 7/22/05Container: Box 67
-
Description: Intermountain Materials Testing #1 CO#16530Dates: 3/27/06-4/30/07Container: Box 67
-
Description: JUB Engineers, Inc. #1 CO#16225Dates: 4/14/04Container: Box 67
-
Description: Pacific Northwest National Laboratory (PNNL)Dates: 6/1/03-4/4/06Container: Box 67
-
Description: Shannon & Wilson, Inc. #1 CO#15605Dates: 5/13/04-7/8/04Container: Box 67
-
Description: Project Planning CommitteeDates: August 2003Container: Box 67
-
Description: City of Richland #1Dates: January 2006Container: Box 67
-
Description: Meeting Minutes #1Dates: 9/16/03-10/5/05Container: Box 67
-
Description: SRG Partnership Lab Predesign ReportDates: 3/5/04Container: Box 67
-
Description: Email General CorrespondenceDates: 3/8/04Container: Box 67
-
Description: General CorrespondenceDates: April 2006Container: Box 67
-
Description: Lab Predesign ReportDates: September 2002Container: Box 67
-
Description: GC/CM Procedures #1Dates: 2/19/04-3/30/04Container: Box 67
-
Description: GC.CM Procedures #2Dates: 6/18/03-2/19/04Container: Box 67
-
Description: Bouten Construction General Correspondence #1Dates: 6/1/04-12/18/14Container: Box 67
-
Description: Bouten Construction GC/CM Preconstruction Contract #1 CO#15832Dates: 11/18/04-4/30/06Container: Box 67
-
Description: Bouten Construction Use of ContingencyDates: 2/1/07-9/8/07Container: Box 67
-
Description: SRG Partnership General Correspondence #1Dates: 6/6/04-6/3/09Container: Box 67
-
Description: SRG Partnership Contract #1 CO#15241Dates: 9/19/03-6/11/04Container: Box 67
-
Description: SRG Partnership Contract #5 CO#15593Dates: 9/1/07-1/18/09Container: Box 67
-
Description: SRG Partnership Construction Documents Volumes I & II Divisions 1-17Dates: 12/10/06Container: Box 68
-
Description: Structural CalculationsDates: November 2005Container: Box 68
-
Description: Bouten Construction GC/CM Preconstruction Monthly Reports 2-21Dates: 3/05-1/08Container: Box 68
-
Description: SRG Partnership Schematic Design ReportDates: 6/9/04Container: Box 68
-
Description: Design West Architecture Project Review Materials PlanDates: 5/8/11Container: Box 68
-
Description: Design West Architecture Project Review Energy Solutions ElevationsDates: 5/8/11Container: Box 68
-
Description: Bouten Construction Contract #3 Co#16588Dates: 9/26/07Container: Box 68
-
Description: Northern, Inc. Statement of QualificationsDates: 4/15/04Container: Box 68
-
Description: SRG Partnership Statement of QualificationsDates: 8/6/03Container: Box 68
-
Description: PNNL Project SubmittalDates: January 2003Container: Box 68
-
Description: Bouten Contract Change ProposalDates: Numbers 016-110Container: Box 68
-
Description: Bouten Contract Change ProposalDates: Numbers 001-015Container: Box 69
-
Description: SRG Partnership 25% CD ReportDates: 8/8/05Container: Box 69
-
Description: Bouten 50% CD EstimateDates: 10/25/05Container: Box 69
-
Description: GC/CM Preconstruction ScheduleDates: 8/4/05Container: Box 69
-
Description: RFQ for A/E Services #1Dates: May 2003Container: Box 69
-
Description: RFQ for A/E Services #2Dates: May 2003Container: Box 69
-
Description: RFQ for A/E Services #1Dates: February 2004Container: Box 69
-
Description: RFQ for A/E Services #2Dates: February 2004Container: Box 69
-
Description: Preconstruction Subcontracting PlansDates: 10/18/05-12/8/05Container: Box 69
-
Description: Rejected BidsDates: 2/20/04-5/19/04Container: Box 69
-
Description: Bouten RFQ for GC/CMDates: 3/30/04Container: Box 69
-
Description: BJSS Duarte Bryant RFQDates: 6/5/03Container: Box 69
-
Description: SRG Partnership #4 Contract CO#15593Dates: 12/1/06-8/31/07Container: Box 69
-
Description: SRG Partnership #3 Contract CO#15593Dates: 1/20/06-11/30/06Container: Box 69
-
Description: SRG Partnership #2 Contract CO#15593Dates: 5/1/05-1/10/06Container: Box 69
-
Description: SRG Partnership #1 Contract CO#15593Dates: 6/23/04-4/30/05Container: Box 69
-
Description: Bouten Construction #2 Contract CO#16588Dates: 12/1/06-9/1/07Container: Box 70
-
Description: Bouten Construction #1 Contract CO#16588Dates: 5/12/06-11/30/06Container: Box 70
-
-
Tri-Cities Education Center Building No. 9500
-
Description: BudgetDates: 6/1/98Container: Box 70
-
Description: RegentsDates: 7/22/97-10/17/97Container: Box 70
-
Description: Stoel Rives LLP Attorneys #1 CO#12589Dates: 5/23/97Container: Box 70
-
Description: Value EngineeringDates: 10/1/98Container: Box 70
-
Description: Project Planning Committee #1Dates: 9/97Container: Box 70
-
Description: Email General Correspondence #1Dates: 9/24/97-3/10/00Container: Box 70
-
Description: General Correspondence #2Dates: 2/1/98Container: Box 70
-
Description: SRG Partnership Email General Correspondence #1Dates: 12/3/97Container: Box 70
-
Description: SRG Partnership General Correspondence #2Dates: 4/1/98-6/15/98Container: Box 70
-
Description: SRG Partnership Contract #1 CO#12809Dates: 11/18/97-11/15/98Container: Box 70
-
Description: General Correspondence #1Dates: 7/97-1/31/98Container: Box 70
-
Description: SRG General Correspondence #1Dates: 9/4/97-3/31/98Container: Box 70
-
-
Vancouver Clark Center Bldg. No. 6509
-
Description: Project Planning CommitteeDates: 10/18/99Container: Box 70
-
Description: BudgetDates: 3/1/99-7/20/04Container: Box 70
-
Description: Email General CorrespondenceDates: 2/29/00Container: Box 70
-
Description: General CorrespondenceDates: 12/1/02-5/8/07Container: Box 70
-
Description: LSW General CorrespondenceDates: 1/1/03-1/15/03Container: Box 70
-
Description: Zimmer Gunsul Frasca General CorrespondenceDates: 6/26/00Container: Box 70
-
Description: Tripplett Willman General CorrespondenceDates: 8/23/04-3/28/06Container: Box 70
-
Description: General Correspondence #1Dates: 5/27/98-10/30/00Container: Box 70
-
Description: LSW Design Development Outline Specifications Pre-Conference ApplicationDates: June 2003Container: Box 70
-
Description: LSW Design Development Outline Specifications Site Plan ApplicationDates: March 2003Container: Box 70
-
Description: LSW Design Development Outline Specifications Project ManualDates: June 2003Container: Box 71
-
Description: Meng Analysis Value Analysis StudyDates: March 2004Container: Box 71
-
-
Vancouver Clark County Development Agreement
-
Description: JD White Company CO#13617Dates: 2/4/98-4/21/05Container: Box 71
-
Description: Email General Correspondence #1Dates: 3/9/00Container: Box 71
-
Description: General CorrespondenceDates: 10/10/99-5/3/12Container: Box 71
-
-
Vancouver Classroom Building Plant Growth Chambers Bldg. No. 6502
-
Description: PAE Consulting Engineers CO#13215Dates: 4/9/99-6/30/99Container: Box 71
-
Description: General CorrespondenceDates: 4/1/99-4/21/99Container: Box 71
-
-
Vancouver Engineering Life Sciences Building Bldg. No. 6507
-
Description: JD White Company Environmental Impact StatementDates: June 2003Container: Box 71
-
Description: Design Report & Budget AllocationDates: May 1999Container: Box 71
-
Description: BudgetDates: 11/10/97-7/7/04Container: Box 71
-
Description: RegentsDates: 4/30/98-8/31/01Container: Box 71
-
Description: Finance and Audit Capital CommitteeDates: 11/18/99Container: Box 71
-
Description: Attorney General CorrespondenceDates: UndatedContainer: Box 71
-
Description: Architectural Cost Consultants CO#13028Dates: 3/30/98-2/1/99Container: Box 71
-
Description: Arnold Gray Third Party Neutral CO#13257Dates: 6/1/99-10/1/99Container: Box 71
-
Description: Colbert Infrared Services CO#14027Dates: 2/8/01-3/30/01Container: Box 71
-
Description: KJM & Associates Email General CorrespondenceDates: UndatedContainer: Box 71
-
Description: KJM & Associates ContractDates: 4/1/99-5/31/99Container: Box 71
-
Description: O’Brien Kreitzberg Email General CorrespondenceDates: 1/1/99-7/28/00Container: Box 71
-
Description: O’Brien Kreitzberg Contract CO#12879Dates: 3/98-11/98Container: Box 71
-
Description: O’Brien Kreitzberg Contract CO#13300Dates: 6/1/99-2/28/00Container: Box 71
-
Description: O’Brien Kreitzberg Daily Inspection ReportsDates: 4/14/00-7/27/00Container: Box 71
-
Description: PAE Consulting Engineers CO#13434Dates: 1/1/99-1/24/00Container: Box 71
-
Description: Professional Services Industries #3 Test ReportsDates: 11/1/99-1/24/00Container: Box 71
-
Description: Professional Services Industries CO#13287Dates: 7/1/99-12/18/00Container: Box 71
-
Description: The Redicheck Firm CO#13202Dates: 4/1/99-4/20/99Container: Box 72
-
Description: Reid Middleton CO#12968Dates: 6/23/98-11/23/98Container: Box 72
-
Description: Stoel Rives LLP, Attorneys CO#12589Dates: 3/30/98-5/27/98Container: Box 72
-
Description: System Commissioning Consultants CO#13433Dates: 8/1/99-8/20/01Container: Box 72
-
Description: Roger K Watts CO#13549Dates: 12/1/99-11/19/01Container: Box 72
-
Description: Life Cycle Cost AnalysisDates: 3/31/99Container: Box 72
-
Description: Clark County Permits/FeesDates: 6/4/99Container: Box 72
-
Description: Project Planning CommitteeDates: 7/97-2/98Container: Box 72
-
Description: Email General Correspondence #3Dates: 4/1/00-3/22/02Container: Box 72
-
Description: Geotechnical & Environmental Consultants CO#13811Dates: 8/1/00-9/24/00Container: Box 72
-
Description: Geotechnical Resources - Site ReportsDates: 7/1/99-5/31/00Container: Box 72
-
Description: General Correspondence Firstenburg Fountain #1Dates: 4/1/99-1/30/07Container: Box 72
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence Firstenburg FountainDates: 4/1/99-4/25/00Container: Box 72
-
Description: Zimmer Gunsul Frasca Partnership Contract #1 CO#13618 Firstenburg FountainDates: 4/1/00-3/20/01Container: Box 72
-
Description: General Correspondence #5Dates: 1/1/07-2/15/15Container: Box 72
-
Description: Zimmer Gunsul Frasca Partnership ClarificationsDates: 2/1/00-3/31/00Container: Box 72
-
Description: Zimmer Gunsul Frasca Partnership Site Observation ReportsDates: 10/1/99-9/20/00Container: Box 72
-
Description: Predesign StudyDates: May 1996Container: Box 72
-
Description: Zimmer Gunsul Frasca Schematic DesignDates: June 1998Container: Box 72
-
Description: MEI - Charlton, Inc. - Epoxy Terrazzo Floor DelaminationDates: 4/2/02Container: Box 72
-
Description: Zimmer Gunsul Frasca Estimate of Probable Construction CostDates: 6/11/98Container: Box 72
-
Description: Change RequestsDates: 12/1/99-9/30/00Container: Box 72
-
Description: Zimmer Gunsul Frasca SubmittalsDates: 5/1/99-2/28/01Container: Box 72
-
Description: Requests for InformationDates: 6/1/99-11/30/00Container: Box 72
-
Description: Architects Supplemental InstructionsDates: 7/1/99-10/31/99Container: Box 72
-
Description: GC/CM Selection May 1998Dates: May 1998Container: Box 72
-
Description: Zimmer Gunsul Frasca Construction Meeting Meetings #1Dates: 1/98-10/26/98Container: Box 72
-
Description: Zimmer Gunsul Frasca Email Correspondence #1Dates: 1/16/98-2/7/01Container: Box 73
-
Description: Zimmer Gunsul Frasca General Correspondence #6Dates: 6/1/00-4/30/01Container: Box 73
-
Description: Zimmer Gunsul Frasca Contract #8 CO#12867Dates: 11/1/01-3/18/05Container: Box 73
-
Description: Miscellaneous Permits/FeesDates: 2/4/99-8/10/99Container: Box 73
-
Description: Plaza ImprovementsDates: 6/1/00-11/27/00Container: Box 73
-
Description: Baugh Construction, Oregon Field Orders #1Dates: 10/1/99-2/17/00Container: Box 73
-
Description: Baugh Construction, Oregon GC/CM Monthly Reports #1Dates: 4/1/99-7/13/99Container: Box 73
-
Description: Baugh Construction, Oregon Pre Installation Meeting #1Dates: 1/1/99-4/12/00Container: Box 73
-
Description: Baugh Construction, Oregon Meeting Minutes #4Dates: 7/1/00-12/31/00Container: Box 73
-
Description: Baugh Construction, Oregon Design Meeting MinutesDates: 1/99-7/99Container: Box 73
-
Description: Baugh Construction, Oregon Job DiaryDates: 7/19/99-7/14/00Container: Box 73
-
Description: Baugh Construction, Oregon Email CorrespondenceDates: 11/1/98-7/26/07Container: Box 73
-
Description: Baugh Construction, Oregon Contract #2 GC/CM AgreementDates: 7/1/99-5/1/01Container: Box 73
-
Description: PAE Consulting - Energy Study & Life Cycle Cost AnalysisDates: 3/30/99Container: Box 73
-
Description: Baugh Construction Oregon Contract #2 CO#13029Dates: 6/1/99-11/10/99Container: Box 73
-
Description: Baugh Construction Oregon Firstenburg Fountain General CorrespondenceDates: 7/1/00-4/19/04Container: Box 74
-
Description: Certified PayrollDates: 11/1/00-11/28/00Container: Box 74
-
Description: Contract Change ProposalsDates: Numbers 001-124Container: Box 74
-
Description: Baugh Construction Oregon Close Out Items #1Dates: 9/21/00-5/14/01Container: Box 74
-
Description: Schematic DesignDates: 9/8/98-9/9/98Container: Box 74
-
Description: Baugh Construction Oregon Monthly ReportsDates: 10/00-3/01Container: Box 75
-
Description: Baugh Construction, Oregon Monthly ReportsDates: 7/00-9/00Container: Box 75
-
Description: Baugh Construction, Oregon Monthly ReportsDates: 4/00-6/00Container: Box 75
-
Description: Baugh Construction, Oregon Monthly ReportsDates: 1/00-3/00Container: Box 75
-
Description: Baugh Construction, Oregon Monthly ReportsDates: 10/99-12/99Container: Box 75
-
Description: Baugh Construction, Oregon Monthly ReportsDates: 7/99-9/99Container: Box 75
-
Description: Baugh Construction, Oregon Preconstruction PlanDates: 8/13/98Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 2/00Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 1/00Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 12/99Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 11/99Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 10/99Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 9/99Container: Box 75
-
Description: Baugh Construction, Oregon CPM Progress ScheduleDates: 8/99Container: Box 75
-
Description: Baugh Construction Oregon CPM Progress ScheduleDates: July 1999Container: Box 76
-
Description: GC/CM Rejected BidsDates: 6/25/99Container: Box 76
-
Description: Bid Package #1 Earthwork/Underground UtilitiesDates: UndatedContainer: Box 76
-
Description: Bid Package #2 Surveying/StakingDates: UndatedContainer: Box 76
-
Description: Bid Package #3Dates: UndatedContainer: Box 76
-
Description: Bid Package #4Dates: UndatedContainer: Box 76
-
Description: Bid Package #5Dates: UndatedContainer: Box 76
-
Description: Bid Package #6Dates: UndatedContainer: Box 76
-
Description: Bid Package #7Dates: UndatedContainer: Box 76
-
Description: Bid Package #8Dates: UndatedContainer: Box 76
-
Description: Bid Package #9/10Dates: UndatedContainer: Box 76
-
Description: Bid Package 11A Steel Fabrication-Safety Tie Off & MetalDates: UndatedContainer: Box 76
-
Description: Bid Package 12 Rough Carpentry Wood StructureDates: UndatedContainer: Box 76
-
Description: Bid Package #13, 31, 32, 33, 35 - Carpentry, Lab Equipment/DarkroomDates: UndatedContainer: Box 76
-
Description: Bid Package #14 Waterproofing/Joint SealantDates: UndatedContainer: Box 76
-
Description: Bid Package #15 Rigid InsulationDates: UndatedContainer: Box 76
-
Description: Bid Package #16 Metal panels/Sheet Metal/Metal RFQDates: UndatedContainer: Box 76
-
Description: Bid Package #17 Membrane RoofingDates: UndatedContainer: Box 76
-
Description: Bid Package #18 Doors, Frames & HardwareDates: UndatedContainer: Box 76
-
Description: Bid Package #19 Overhead Section - DoorsDates: UndatedContainer: Box 76
-
Description: Bid Package #20 Aluminum Window - Stone Front/GlazingDates: UndatedContainer: Box 76
-
Description: Bid Package #21 Aluminum Framed Sky LightsDates: UndatedContainer: Box 76
-
Description: Bid Package #22 Metal Studs/Drywall Ceiling/Batt InsulationDates: UndatedContainer: Box 76
-
Description: Bid Package #23 TerrazzoDates: UndatedContainer: Box 76
-
Description: Bid Package #24 Ceramic TileDates: UndatedContainer: Box 76
-
Description: Bid Package #25 Floor Finishes - Carpet/ResilientDates: UndatedContainer: Box 76
-
Description: Bid Package #26 Special Flooring - Traffic CoatingsDates: UndatedContainer: Box 76
-
Description: Bid Package #27 PaintingDates: UndatedContainer: Box 76
-
Description: Bid Package #28 Special/Furnish/InstallDates: UndatedContainer: Box 76
-
Description: Bid Package #29 SignageDates: UndatedContainer: Box 76
-
Description: Bid Package #30 Dock EquipmentDates: UndatedContainer: Box 76
-
Description: Bid Package #34 Window TreatmentDates: UndatedContainer: Box 76
-
Description: Bid Package #36 Greenhouse (Design/Build)Dates: UndatedContainer: Box 76
-
Description: Bid Package #38 Mechanical Controls/Underground/Plumbing (HVAC)Dates: UndatedContainer: Box 76
-
Description: Bid Package #39 Fire ProtectionDates: UndatedContainer: Box 76
-
Description: Bid Package #40 ElectricalDates: UndatedContainer: Box 76
-
Description: Bid Package #41 TelecomDates: UndatedContainer: Box 76
-
Description: ETI - Equipment Field Evaluation Final Report MachineDates: 2/27/98Container: Box 76
-
Description: Revised Space Requirement - Final DraftDates: UndatedContainer: Box 76
-
Description: Baugh - Consolidated Financial StatementsDates: 11/18/96Container: Box 76
-
Description: WSU/ZGF - Response to Value Analysis Study “Best”Dates: 9/15/98Container: Box 76
-
Description: ZGF - Foundation InvestigationDates: 6/28/99Container: Box 76
-
Description: Baugh/ZGF Case StudyDates: 1/31/99Container: Box 76
-
Description: Ventilation Engineering - Atmospheric Air Flow/Exhaust Stem/Air Intake AnalysisDates: 5/18/99Container: Box 76
-
Description: M.A.C.C. Proposal Documents - Revision 1 5/18/99Dates: UndatedContainer: Box 76
-
Description: Equipment Rapid Type SystemDates: 6/21/00Container: Box 76
-
Description: Manufacture Engineer CorrespondenceDates: UndatedContainer: Box 76
-
Description: Roger Watts - Contract/Invoice Equipment CoordinationDates: 6/1/00Container: Box 76
-
Description: Equipment CoordinationDates: 5/19/00Container: Box 76
-
Description: Equipment CoordinationDates: 3/23/00Container: Box 76
-
Description: Equipment CoordinationDates: 3/9/00Container: Box 76
-
Description: Equipment CoordinationDates: 5/4/00Container: Box 76
-
Description: Jay Wiley (Science)Dates: UndatedContainer: Box 76
-
Description: Equipment for ELSBDates: UndatedContainer: Box 76
-
Description: Next Equipment Coordination MeetingDates: UndatedContainer: Box 76
-
Description: Equipment Purchase ProcessDates: April 2000Container: Box 76
-
Description: O’Brien Kreitzberg Daily InspectionDates: 1/5/00-3/31/00Container: Box 77
-
Description: O’Brien Kreitzberg Daily Inspection #1Dates: 7/18/99-12/16/99Container: Box 77
-
Description: Professional Services Industries Test Reports #2Dates: 8/1/99-9/30/99Container: Box 77
-
Description: Professional Services Industries Test Reports #1Dates: 10/1/99-10/31/99Container: Box 77
-
Description: Email General Correspondence #2Dates: 4/1/99-3/31/00Container: Box 77
-
Description: General Correspondence #4Dates: 1/1/00-12/31/00Container: Box 77
-
Description: Email General Correspondence #1Dates: 12/12/97-3/31/99Container: Box 77
-
Description: General Correspondence #3Dates: 5/1/99-12/31/99Container: Box 77
-
Description: General Correspondence #2Dates: 12/1/98-4/30/99Container: Box 77
-
Description: General Correspondence #1Dates: 2/1/98-11/30/98Container: Box 77
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence #5Dates: 1/1/00-5/31/00Container: Box 77
-
Description: Zimmer Gunsul Frasca PartnershipDates: 7/1/99-12/31/99Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence # 4Dates: 3/1/99-6/30/99Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence #3Dates: 11/1/98-2/28/99Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence #2Dates: 7/1/97-10/31/98Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership General Correspondence #1Dates: 6/1/00-10/31/01Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership Contract #6 CO #12867Dates: 1/1/00-5/31/00Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership Contract #5 CO #12867Dates: 10/1/99-1/30/00Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership Contract #4 CO #12867Dates: 5/1/99-9/30/99Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership Contract #3 CO #12867Dates: 4/1/99-4/30/99Container: Box 78
-
Description: Zimmer Gunsul Frasca Partnership Contract #2 CO#12867Dates: 8/1/98-12/31/99Container: Box 79
-
Description: Zimmer Gunsul Frasca Partnership Contract #1 CO#12867Dates: 5/18/98-7/31/98Container: Box 79
-
Description: Zimmer Gunsul Frasca Partnership Construction Documents Volume 3 Divisions 15 & 16Dates: 5/3/99Container: Box 79
-
Description: Zimmer Gunsul Frasca Partnership Construction Documents Volume 2 Divisions 2 & 14Dates: 5/3/99Container: Box 79
-
Description: Zimmer Gunsul Frasca Partnership Construction Documents Volume 1 Divisions 0 & 1Dates: 5/3/99Container: Box 79
-
Description: Baugh Construction Oregon Construction Meeting Minutes #3Dates: 4/1/00-6/30/00Container: Box 79
-
Description: Baugh Construction Oregon Construction Meeting Minutes #2Dates: 12/1/99-3/30/00Container: Box 79
-
Description: Baugh Construction Oregon Construction Meeting Minutes #1Dates: 7/1/99-11/30/99Container: Box 79
-
Description: Baugh Construction Oregon General Correspondence #6Dates: 10/1/00-4/5/02Container: Box 79
-
Description: Baugh Construction Oregon General Correspondence #5Dates: 1/1/00-9/30/00Container: Box 79
-
Description: Baugh Construction Oregon Contract #1 CO#13029Dates: 7/1/98-5/19/95Container: Box 79
-
Description: Baugh Construction Oregon General Correspondence #4Dates: 7/1/99-12/31/99Container: Box 80
-
Description: Baugh Construction Oregon General Correspondence #3Dates: 5/1/99-6/30/99Container: Box 80
-
Description: Baugh Construction Oregon General Correspondence #2Dates: 1/1/99-4/30/99Container: Box 80
-
Description: Baugh Construction Oregon General Correspondence #1Dates: 7/1/97-12/31/98Container: Box 80
-
Description: Baugh Construction Oregon Contract #1 CO#13256Dates: 1/22/99-6/30/99Container: Box 80
-
-
Multimedia Classroom Building Bldg. No. 6508
-
Description: Builder’s Risk InsuranceDates: 6/1/01Container: Box 80
-
Description: Predesign StudyDates: May 1996Container: Box 80
-
Description: BudgetDates: 11/10/97Container: Box 80
-
Description: RegentsDates: 5/8/98Container: Box 80
-
Description: BAIT CommitteeDates: 5/8/98Container: Box 80
-
Description: Project Planning CommitteeDates: 7/30/97-2/27/98Container: Box 80
-
Description: Attorney GeneralDates: 1/1/03-9/3/03Container: Box 80
-
Description: Architectural Cost Consultants CO#13028 #1Dates: 8/10/98-1/10/01Container: Box 80
-
Description: Hopper Dennis Jellison PLLC CO#14499 Site Improvement RepairsDates: 3/1/02-11/1/03Container: Box 80
-
Description: James R. McGranahan 3rd Party Neutral CO#14112Dates: 4/1/01-8/1/02Container: Box 80
-
Description: Minister & Glaeser Surveying, INC. CO#14581Dates: 5/1/02-8/11/02Container: Box 80
-
Description: O’brien Kreitzberg CO#12879Dates: March 1998Container: Box 80
-
Description: Stoel Rives, LLP (Attorneys) #1 CO#12589Dates: 5/23/97Container: Box 80
-
Description: Zimmer Gunsul Frasca Construction Meeting MinutesDates: February 1998Container: Box 80
-
Description: Systems Commissioning Consultants, Inc. CO#14500Dates: 3/1/02-12/1/02Container: Box 80
-
Description: Email General Correspondence #1Dates: 1/5/98Container: Box 80
-
Description: General Correspondence #2Dates: 8/1/01Container: Box 80
-
Description: Zimmer Gunsul Frasca General Correspondence #1Dates: August 1997Container: Box 80
-
Description: Contract #6 CO#12944Dates: 7/1/02Container: Box 80
-
Description: Baugh Construction Oregon General Correspondence #1Dates: 7/1/98-5/23/03Container: Box 81
-
Description: Baugh Construction Oregon Contract #2Dates: 5/1/02-6/30/03Container: Box 81
-
Description: Baugh Construction Oregon Contract #1Dates: 8/17/98-5/30/01Container: Box 81
-
Description: Baugh Construction Oregon Monthly ReportsDates: July-Sept 2002Container: Box 81
-
Description: Baugh Construction Oregon Monthly ReportsDates: April - June 2002Container: Box 81
-
Description: Baugh Construction Oregon Monthly ReportsDates: January - March 2002Container: Box 81
-
Description: Baugh Construction Oregon Monthly ReportsDates: October - December 2001Container: Box 81
-
Description: Baugh Construction Oregon Monthly ReportsDates: July - September 2001Container: Box 81
-
Description: Palouse Empire, Inc. Claims #2Dates: 1/9/03-8/11/03Container: Box 81
-
Description: Palouse Empire, Inc. Claims #1Dates: 9/17/01-12/2/02Container: Box 81
-
Description: Rejected GC/CM BidsDates: Bid Opening 6/25/98Container: Box 81
-
Description: Baugh Construction Oregon, Inc. Contract Change ProposalDates: Numbers 001-062Container: Box 81
-
Description: General Correspondence #1Dates: 7/97-7/31/01Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Contract #5 CO#12944Dates: 1/1/02-6/30/02Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Contract #4 CO#12944Dates: 8/31/01-12/31/01Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Contract #3 CO#12944Dates: 3/1/01-7/31/01Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Contract #2 CO#12944Dates: 6/1/99-2/28/01Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Contract #1 CO#12944Dates: 5/18/98-5/31/99Container: Box 82
-
Description: Baugh Construction Oregon #1 Contract GC/CM CO#14172Dates: 4/1/01-4/30/02Container: Box 82
-
Description: JD White Co., Inc. (aka Berger ABAM) Wetland & Habitat Permit Application TWC ProjectDates: Numbers 00-192Container: Box 82
-
Description: Habitat Buffer Mitigation As-built ReportDates: January 2005Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Foundation InvestigationDates: September 1998Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Schematic DesignDates: June 1998Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Estimate of Probable Construction CostDates: July 1999Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Building Improvements (Prepared by Kato & Warren, Inc.)Dates: March 2001Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Project Manual Bid Documents Volume 3 Divisions 15 & 16Container: Box 82
-
Description: Zimmer Gunsul Frasca Partnership Project Manual Bid Documents Volume 2 Divisions 2 to 14Container: Box 83
-
Description: Zimmer Gunsul Frasca Partnership Project Manual Bid Documents Volume 1 Divisions 0 and 1Container: Box 83
-
Description: Baugh Construction Oregon M.A.C.C Proposal Documents Rev. 1Dates: 3/26/01Container: Box 83
-
Description: Baugh Construction Oregon InterviewDates: 6/9/98Container: Box 83
-
Description: PAE Consulting Engineers, Inc. Engineering Life Cycle Cost AnalysisDates: 12/5/01Container: Box 83
-
-
Early Childhood Education Facility Bldg. No. 6508
-
Description: Specifications (CD)Container: Box 83
-
Description: Consulting Value Specialists. Value Engineering StudyDates: 1996-05-23Container: Box 83
-
Description: Zimmer Gunsul Frasca Partnership. Schematic DesignDates: 1995-12Container: Box 83
-
Description: Zimmer Gunsul Frasca Partnership. Construction DocumentsDates: 1997-05-01Container: Box 83
-
-
WSU Vancouver (General)
-
Description: Zimmer Gunsul Frasca Partnership. Summary Master PlanContainer: Box 83
-
Description: Zimmer Gunsul Frasca Partnership. Bid and Construction Document Set.Dates: 1994-05-12Container: Box 83
-
Description: Ctr. For NW Anthro. Final Supplemental Environmental Impact Statement.Dates: 1993-02-24Container: Box 83
-
Description: Hahn & Associates. Phase I Environmental Site Assessment.Dates: 1997-05-12Container: Box 83
-
-
Facility Services Capital Projects Contract Administration Comprehensive Physical Planning
-
Description: Budget, Contract # Various - Ledgers, Vouchers, Authorizations for fundingDates: Mar-93Container: Box 83
-
Description: Environmental Impact Statement, Contract # VariousDates: Apr-88Container: Box 83
-
Description: Regents Reports, Contract # Various - Memorandums, MinutesDates: Jun-94Container: Box 83
-
Description: Campus/Downtown Pedestrian Corridor, Contract # Various, Levernier-Shea - CCP, Pay AppsDates: Dec-97Container: Box 83
-
Description: Process Update, Contract # Various - General Correspondence #5Dates: Apr-99Container: Box 83
-
Description: Process Update, Contract # Various - General Correspondence #4Dates: Dec-91Container: Box 83
-
Description: Comprehensive Campus Plan, Contract # Various - Project Reviews Amendment #2Dates: Jan-85Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: Nov-94Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: May-94Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - General CorrespondenceDates: Jun-92Container: Box 84
-
Description: Architect Selection, Contract # Various, Burke/Lee Associates - Advertisement, Evaluation, InterviewsDates: Jan-91Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: Apr-91Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: Dec-89Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: Jan-89Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - PaymentsDates: Mar-87Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendments #11 - 16Dates: Jul-85Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendments #17 and 18Dates: Jun-86Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendment #10Dates: Apr-87Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendment #3-8Dates: Jun-82Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendment #2Dates: Apr-86Container: Box 84
-
Description: Contract # 7350, Burke/Lee Associates - Amendment #2Dates: May-83Container: Box 84
-
Description: Butch's Cage AreaDates: Feb-84Container: Box 85
-
Description: Campus/Downtown Corridor, Pittsburgh Testing Lab - Concrete Test ResultsDates: Dec-86Container: Box 85
-
Description: Campus/Downtown Corridor, Levernier Construction, Inc. - Affirmative Action ReportsDates: Oct-86Container: Box 85
-
Description: Campus/Downtown Corridor, Levernier Construction, Inc. - General CorrespondenceDates: Jun-87Container: Box 85
-
Description: Campus/Downtown Corridor, Levernier Construction, Inc. - Contract Change ProposalsContainer: Box 85
-
Description: Campus/Downtown Corridor, Levernier Construction, Inc. - Rejected BidsDates: Aug-86Container: Box 85
-
Description: Campus/Downtown Corridor, Levernier Construction, Inc. - Rejected Bids - 2nd BidContainer: Box 85
-
Description: Planning Process - Letters & Responses to Burke's PresentationDates: May-85Container: Box 85
-
Description: Schematic Layouts and Cost Estimates - Amendment #10Dates: Jun-86Container: Box 85
-
Description: Site Selection Studies -- B/L - Various Amendment NumbersDates: Nov-88Container: Box 85
-
Description: Planning Process Update - General Correspondence #4Dates: Feb-94Container: Box 85
-
Description: Planning Process Update - General Correspondence #3Dates: Nov-91Container: Box 85
-
Description: Campus Plan - General Correspondence #2Dates: Dec-90Container: Box 85
-
Description: Planning Process Update - Volumes I & II #2Dates: Dec-90Container: Box 85
-
Description: Campus Planning - Various Projects #2Dates: Dec-90Container: Box 85
-
Description: Campus Planning - General CorrespondenceDates: Dec-88Container: Box 85
-
Description: Campus Plan - General CorrespondenceDates: Jun-86Container: Box 85
-
Description: Development Plan for (Spokane/Tri-Cities/Vancouver)Dates: May-88Container: Box 85
-
Description: Process Documents, Burke/Lee AssociatesDates: Jun-94Container: Box 85
-
Description: Process Documents (Volume I & II), Burke/Lee AssociatesDates: Nov-87Container: Box 85
-
Description: Process Documents (Volume III - East Contiguous Resource LandsDates: Jun-86Container: Box 85
-
Description: Process Documents - Draft Environmental Impact StatementDates: Sep-85Container: Box 85
-
Description: Agra Earth & Environmental - Contract Documents CO #11569Dates: Apr-96Container: Box 85
-
Description: Process Documents, Marsh Insurance Brokerage - Various Documents CO #13842Dates: 3-NovContainer: Box 86
-
Description: Landscape Architecture Design Services, The Berger Partnership, P.S. - Various Projects #2Dates: Jan-02Container: Box 86
-
Description: Landscape Architecture Design Services, The Berger Partnership, P.S. - Various Projects #1Dates: 1-DecContainer: Box 86
-
Description: Various Projects, Hainline & Associates - CO# 12257Dates: Jul-00Container: Box 86
-
Description: PM/CA Support Services, KJM & Associates - Various Projects #3 CO# 13232Dates: Jun-01Container: Box 86
-
Description: CPD Guideline Manual, KJM & Associates - Facilities Procedures Guidelines CO#13705 #1Dates: May-00Container: Box 86
-
Description: KJM & Associates - Various Projects #2 CO#13232Dates: Sep-00Container: Box 86
-
Description: Mahan & DeSalvo - Construction CodesDates: Oct-93Container: Box 86
-
Description: Various Projects, KJM & Associates - CO#13232 #1Dates: Oct-99Container: Box 86
-
Description: Various Projects, Mahan & DeSalvo - Plan Review ServicesDates: Feb-93Container: Box 86
-
Description: Various Projects, McAuley & Associates - Code Review CO#13232 #1Dates: Mar-91Container: Box 86
-
Description: Construction Document Review, McAuley Construction Mgmt. - CO# 13339Dates: Oct-00Container: Box 86
-
Description: Mechanical Plumbing Inspection, McAuley & Associates - CO#13590 #1Dates: Jan-00Container: Box 86
-
Description: GIS Data Creation, Marshall and Associates, Inc. - CO# 15982 #1Dates: Feb-05Container: Box 86
-
Description: O'Brien Kreitzberg - CO #12879 #3Dates: Jan-99Container: Box 86
-
Description: O'Brien Kreitzberg - CO #12879 #2Dates: Feb-99Container: Box 86
-
Description: O'Brien Kreitzberg - CO #12879 #1Dates: Feb-99Container: Box 86
-
Description: Various Projects, The Redicheck Firm - CO# 11621Dates: Apr-98Container: Box 86
-
Description: Various Projects, Reid Middleton, Inc. - CO# 12968Dates: Apr-00Container: Box 86
-
Description: Robert Fossatti Associates, Inc. - General CorrespondenceDates: Aug-98Container: Box 86
-
Description: Various Projects, David M. Scott - CO# 13472 #1Dates: Dec-99Container: Box 86
-
Description: Smith & Swenson - DEAD FILEDates: Jul-84Container: Box 86
-
Description: Strategic Partnership Support, Pederson Associates, Inc. - CO# 14045Dates: Jul-02Container: Box 86
-
Description: General Conditions Updates, Stoel Rives, LLP (Alan Merkle) - CO# 12589Dates: May-98Container: Box 86
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #3Dates: Nov-02Container: Box 86
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #2Dates: Dec-01Container: Box 86
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #1Dates: Jun-01Container: Box 86
-
Description: Various Projects, The Redicheck Firm - CO# 11621Dates: Apr-98Container: Box 87
-
Description: Various Projects, Reid Middleton, Inc. - CO# 12968Dates: Apr-00Container: Box 87
-
Description: Robert Fossatti Associates, Inc. - General CorrespondenceDates: Aug-98Container: Box 87
-
Description: Various Projects, David M. Scott - CO# 13472 #1Dates: Dec-99Container: Box 87
-
Description: Smith & Swenson - DEAD FILEDates: Jul-84Container: Box 87
-
Description: Strategic Partnership Support, Pederson Associates, Inc. - CO# 14045Dates: Jul-02Container: Box 87
-
Description: General Conditions Updates, Stoel Rives, LLP (Alan Merkle) - CO# 12589Dates: May-98Container: Box 87
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #3Dates: Nov-02Container: Box 87
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #2Dates: Dec-01Container: Box 87
-
Description: Various Projects - Graphic Design, WPA, Inc. - CO# 13867 #1Dates: Jun-01Container: Box 87
-
-
Hazardous Waste Facilities: College of Ag/Markley Bldg. No. 66Q&R
-
Description: Builder’s Risk InsuranceDates: 3/18/02Container: Box 87
-
Description: EISDates: 4/10/03Container: Box 87
-
Description: RegentsDates: 2/15/02Container: Box 87
-
Description: Daily Inspection ReportsDates: 7/1/02Container: Box 87
-
Description: Weekly Observation ReportsDates: 7/1/02Container: Box 87
-
Description: Email General Correspondence #1Dates: 2/1/02Container: Box 87
-
Description: Strata Geotechnical Engineering & Materials Testing CO#14476Dates: 2/1/02Container: Box 87
-
Description: Meeting MinutesDates: 3/1/02Container: Box 87
-
Description: General Correspondence #1Dates: 5/17/01Container: Box 87
-
Description: URS General Correspondence #1Dates: 1/1/02Container: Box 87
-
Description: Walker Construction, Inc. General CorrespondenceDates: 2/1/02Container: Box 87
-
Description: Walker Construction, Inc. Contract CO#14468Dates: 1/1/02Container: Box 87
-
Description: Contract Change Proposals Walker Construction, Inc.Dates: Numbers 001-014Container: Box 87
-
Description: Contractor ResponsibilityDates: 1/1/02Container: Box 87
-
Description: Rejected BidsDates: 1/29/02Container: Box 87
-
-
Hazardous Waste Facilities (Containment Pad): Mt. Vernon Bldg. No. 4025
-
Description: Builder’s Risk InsuranceDates: 3/24/03Container: Box 87
-
Description: EISDates: 2/1/03Container: Box 87
-
Description: Attorney General CorrespondenceDates: 3/1/03Container: Box 87
-
Description: Daily Inspection ReportsDates: 4/1/03Container: Box 87
-
Description: Krazan & Associates Testing & Inspecting CO#15016Dates: 4/1/03Container: Box 87
-
Description: Email General CorrespondenceDates: 2/20/03-5/5/03Container: Box 87
-
Description: General CorrespondenceDates: 12/1/02Container: Box 87
-
Description: URS General CorrespondenceDates: 5/1/02Container: Box 87
-
Description: USK Corporation L&I Premium Liability Release Status #1Dates: 9/8/03Container: Box 87
-
Description: USK Corporation General CorrespondenceDates: 2/1/03Container: Box 87
-
Description: USK Corporation Contract CO#14932Dates: 2/1/03Container: Box 87
-
Description: Mt. Vernon Research & Extension Unit Responsibility FileDates: 2/10/03-2/12/03Container: Box 87
-
Description: Rejected BidsDates: 2/6/03Container: Box 87
-
-
Hazardous Waste Facilities (Containment Pad): Othello/Roza Bldg. No. 2315/2115
-
Description: EISDates: 12/2/02Container: Box 88
-
Description: General CorrespondenceDates: 10/1/02Container: Box 88
-
Description: URS General CorrespondenceDates: 12/1/02Container: Box 88
-
-
Hazardous Waste Facilities: Puyallup Research & Extension Bldg. No. 1000
-
Description: EIS #1Container: Box 88
-
Description: Builder’s Risk Insurance (Roza, Othello, & Lind Chemical Sites)Dates: 3/24/03Container: Box 88
-
Description: Attorney General CorrespondenceDates: 3/1/03Container: Box 88
-
Description: General CorrespondenceDates: 1/28/03-10/13/03Container: Box 88
-
Description: Meeting MinutesDates: 2/1/03Container: Box 88
-
Description: URS General CorrespondenceDates: 2/1/03Container: Box 88
-
Description: Concord Construction, Inc. #1 General CorrespondenceDates: 2/25/03-4/5/04Container: Box 88
-
Description: Concord Construction, Inc. Contract CO#14943Dates: 2/25/03-6/30/03Container: Box 88
-
Description: Concord Construction, Inc. #1 L&I Premium Liability Release StatusDates: 9/8/03-11/12/03Container: Box 88
-
Description: Responsibility FileDates: 2/17/03-2/24/03Container: Box 88
-
Description: Contract Change Proposals Concord Construction, Inc.Dates: Numbers 001-002Container: Box 88
-
Description: Rejected BidsDates: 2/13/03Container: Box 88
-
-
Hazardous Waste Facilities (Modular Unit 3): Tri-Cities/Prosser Bldg. No. 9550
-
Description: Builder’s Risk InsuranceDates: 5/13/02Container: Box 88
-
Description: Irrigated Agriculture Research & Extension Center Master PlanDates: 6/07Container: Box 88
-
Description: URS Specifications Volume IDates: 6/00Container: Box 88
-
Description: General CorrespondenceDates: 1/1/02Container: Box 88
-
Description: URS Requests for InformationDates: 4/02Container: Box 88
-
Description: URS General CorrespondenceDates: 4/1/02Container: Box 88
-
Description: Hughes-Sillers Construction General CorrespondenceDates: 3/1/02Container: Box 88
-
Description: Hughes-Sillers Construction Contract CO#14502Dates: 4/1/02Container: Box 88
-
Description: Prosser Daily Inspection ReportsDates: 5/1/02Container: Box 88
-
Description: Hughes-Sillers Construction L&I Premium Liability Release StatusDates: 9/08/03Container: Box 88
-
Description: Contract Change Proposal Hughes-Sillers ConstructionDates: Numbers 001-012Container: Box 88
-
Description: Hughes-Sillers Construction Responsibility FileDates: 2/20/02-3/13/02Container: Box 88
-
Description: Rejected BidsDates: 2/28/02Container: Box 88
-
-
Hazardous Waste Facilities Wenatchee Tree Fruit Research Center Bldg. No. 3043
-
Description: Builder’s Risk InsuranceDates: 10/15/01Container: Box 88
-
Description: EISDates: 7/1/01Container: Box 88
-
Description: JARPA FormDates: 3/9/14Container: Box 88
-
Description: Master PlanDates: 3/08Container: Box 88
-
Description: Hammond Collier Wade Livingstone (Blanket 348045)Dates: 1/1/02Container: Box 88
-
Description: Public Utility District #1 Chelan Country Line Extension Agreement #14941Dates: 3/18/03Container: Box 88
-
Description: JPG Valuation Inc. AppraisalDates: 1/19/05Container: Box 88
-
Description: Meeting MinutesDates: 8/1/01Container: Box 88
-
Description: Water Line ExtensionDates: 10/8/01Container: Box 88
-
Description: Email General Correspondence #1Dates: 7/1/01Container: Box 88
-
Description: General Correspondence #1Dates: 8/1/01Container: Box 88
-
Description: Whitebird, Inc. General CorrespondenceDates: 9/28/01-6/17/02Container: Box 88
-
Description: URS Greiner #1 Email CorrespondenceDates: 9/1/07-5/23/02Container: Box 88
-
Description: URS Greiner #1 General CorrespondenceDates: 9/12/01-8/26/02Container: Box 88
-
Description: Contract Change Proposal Whitebird, Inc.Dates: Numbers 001-004Container: Box 88
-
Description: Whitebird Responsibility FileDates: 8/21/01-/830/01Container: Box 88
-
Description: Rejected BidsDates: 8/21/01Container: Box 88
-
-
Hazardous Waste Facilities Wenatchee Tree Fruit Research Center Bldg. No. 3043
-
Description: URS Greiner Woodwood Cycle Specifications Vol IIDates: 6/00Container: Box 89
-
Description: Vinod Ghoting Miscellaneous NotebookDates: 6/11/04Container: Box 89
-
-
Academic Athletic Complex.
-
Description: Redevelopment Study. Seiler, ScottDates: 1980Container: Box 89
-
Description: Naramore Bain Brady & Johansen. Design Proposal.Dates: UndatedContainer: Box 89
-
-
Compton Union Building.
-
Description: Building Program for the Washington State College Union.Dates: 1948-07-07Container: Box 89
-
Description: Misc. documents.Dates: 1945-1946, 2000Container: Box 89
-
Description: Renewal/Renovation Focus Group. VHS tape.Dates: 1997-07-08Container: Box 89
-
-
Culver House.
-
Description: Smith & Rounds Specification for the General Construction of a Residence to be built at the 1800 Block on B Street for H.E. Culver (Job 1035A).Dates: 1928Container: Box 89
-
-
Plant Growth – Wheat Research Center.
-
Description: Tan-Heyamoto Architects. Project Specification for the Plant Growth – Wheat Research Center. Vol. I: Gen. Construction and Detail Manual.Dates: 1996-06Container: Box 89
-
-
Terrell Mall.
-
Description: Granite Replacement. Photographs.Dates: 1994Container: Box 89
-
Names and SubjectsReturn to Top
Corporate Names
- Washington State University. Facilities Services -- Records and correspondence