Archives West Finding Aid
Table of Contents
Oswald Berg, Jr. Architectural Drawings, 1952-1979
Overview of the Collection
- Creator
- O. Berg Jr. and Associates
- Title
- Oswald Berg, Jr. Architectural Drawings
- Dates
- 1952-1979 (inclusive)19521979
- Quantity
- 47 items, (47 sets of drawings)
- Collection Number
- 2320
- Summary
- The Oswald Berg, Jr. Architectural Drawings consist of architectural drawings and blueprints of various Montana towns and other locations. Montana towns represented are Alder, Belgrade, Bozeman, Colstrip, Ennis, Fort Harrison, Gallatin Gateway, Glendive, Livingston, Phillipburg, Shelby, Sunburst, and Three Forks. Other locations are Cody, Mammoth, and Thermopolis, Wyoming, and Boardman, Oregon.
- Repository
-
Montana State University Library, Merrill G. Burlingame Special Collections
Montana State University-Bozeman Library
Merrill G Burlingame Special Collections
P.O. Box 173320
Bozeman, MT
59717-3320
Telephone: 4069944242
Fax: 4069942851
- Access Restrictions
-
This collection is open for research.
- Languages
- Sponsor
- Funding for encoding this finding aid was provided by a grant from the National Endowment for the Humanities
Historical NoteReturn to Top
Oswald Berg, Jr. was a Bozeman, Montana architect and son of a Meagher County rancher. Berg attended Washington State College and served as an architect in the U.S. Navy during World War II. He began professional practice in Bozeman in 1949, doing business until 1983 under the corporate names of O. Berg Jr. and Associates, BGS Architects, and Berg-Grabow and Partners. Berg also served as president of the Bozeman Chamber of Commerce in 1969. He designed many buildings in Montana and neighboring states, including residences, schools, and businesses.
Content DescriptionReturn to Top
The Oswald Berg architectural drawings include plans for buildings designed by Oswald Berg or his architectural firms. Most of the buildings are located towns across Montana including Alder, Belgrade, Bozeman, Colstrip, Ennis, Fort Harrison, Gallatin Gateway, Glendive, Livingston, Philipsburg, Shelby, Sunburst, and Three Forks. Other locations are Cody, Mammoth, and Thermopolis, Wyoming, and Boardman, Oregon. Plans include multiple drawings for each building that are grouped in sets. Several sets include item-level inventories, which include titles for each drawing. Item numbers are derived from the number printed on the drawing by the architectural firm, although many are unnumbered.
Administrative InformationReturn to Top
Arrangement
Drawings are grouped in sets by building and arranged alphabetically by city. Set numbers that reflect the order in which the materials were processed.
Detailed Description of the CollectionReturn to Top
Snowcrest Resident, Closs Ranch; Alder, MT; Serial #: 7713, 1977 August 28Return to Top
Container(s): Set 30
Firm: Berg-Grabow-Schofield Medium: 16"x18" topographic with pencil; plastic sheets w/ pencil 18"x24" Inventory: 1-11
Belgrade JR High School; Belgrade, MT; Serial #: 4168Return to Top
Container(s): Set 9
Firm: O. Berg Jr. & Associates
Container(s) | Description | |
---|---|---|
set | item | |
9 | 1 | Plot plan |
9 | 2 | Foundation plan |
9 | 3 | Foundation plan and roof framing |
9 | 4-6 | Floor plan |
9 | 7 | Door schedule |
9 | 8 | Finish schedule |
9 | 9-10 | Exterior elevations |
9 | 11 | Interior elevations |
9 | 12 | Interior elevations and section |
9 | 13 | Cross sections |
9 | 14 | Details |
9 | 15 | Wall details |
9 | 16 | Plot plan, elevations, details |
9 | 17 | Floor and foundation plans, details, and cross section |
9 | 18 | Wall section, details, and elevations |
9 | S1 | Roof framing |
9 | S2 | Structural details |
9 | M1 | Floor plan details |
9 | M2 | Foundation plan and details |
9 | M3 | Plan and details |
9 | M4 | Foundation plan and details |
9 | M5 | Basement plan and details |
9 | M6 | Boiler room plan and details |
9 | M7 | Schedules |
9 | M8 | Plans and details |
9 | E1 | Classroom wing power and specialties |
9 | E2 | Classroom wing lighting plan |
9 | E3 | Schedule, music and shop floor plan, elementary classroom plan |
9 | E4 | Gymnasium basement remedial electrical plan, PA system |
Belgrade High School; Belgrade, MT; Serial #: 2361, 1962 September 9 and 17, 1962 November 6 and 10, 1963 May 21 and 24Return to Top
Container(s): Set 28
Firm: O. Berg, Jr. & Associates Medium: Pencil on 22"x34" sheets Inventory includes untitled pages: M1, 2, 3, 3A, 4, 5, 6, 7 - ? venting hoods 1-15, A1-2, E1-5, S1-3 - ? FE1-2, M8-9, F1-6 - fallout shelter
Belgrade Public School; Belgrade, MT; Serial #: 1253, 1954 April 3, December 21Return to Top
Container(s): Set 38
Firm: Oswald Berg, Jr. Medium: pencil on paper Size: 32"x42", 21"x30"
Graff Residence; Belgrade, MT; Serial #: None, undatedReturn to Top
Container(s): Set 47
Medium: pencil on plastic Size: 16"x24"
McAulan Residence (Residence for Ms. Helen McAulan); Bozeman, MT; Serial #: 2065, 1966 FebruaryReturn to Top
Container(s): Set 1
Firm: O. Berg, Jr. & Associates - Architects - Bozeman, MT Medium: Pencil on trace paper (4), Ink on trace (1) Scale: varies, 1"=20'-0"; "=1'-0" Size: 9x15 (1); 22"x34" (4)
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
1 | 1 | Site plan, site details, and specification |
|
1 | 2 | Basement, foundation, main floor, and roof framing plans |
|
1 | 2A | Alterations on main floor |
|
1 | 3 | Sections and elevations |
|
1 | 6 | Electrical and mechanical layout - fixture schedules |
Lair Ice Cream Parlor; Bozeman, MT; Serial #: 7614, 1976 AugustReturn to Top
Container(s): Set 5
Firm: Berg-Grabow-Schofield
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
5 | Cover sheet |
||
item | |||
5 | 1 | Roof plan |
|
5 | 2 | Footing and foundation plan |
|
5 | 3 | Floor plan and room finish schedule |
|
5 | 4 | Roof framing plan and structural detail |
|
5 | 5 | Building sections, elevations, and miscellaneous detail |
|
5 | 6 | Wall sections and details |
|
5 | M1 | H.V.A.C. plan |
|
5 | M2 | Plumbing plan |
|
5 | M3 | Site risers and pipe sleeve plan |
|
5 | M4 | H.V.A.C. and plumbing specifications |
|
5 | E1 | Schedule |
|
5 | E2 | Lighting plan |
|
5 | E3 | Equipment schedule |
|
5 | R1 | Revisions: Electrical equipment rough plan |
|
5 | R2 | Rough plan |
Taylor Tennis Court, Westridge Dr.; Bozeman, MT; Serial #: none, undatedReturn to Top
Container(s): Set 6
Firm: Berg-Grabow & Partners, Bozeman, MT
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
6 | 1 | Elevations and sections |
|
6 | 2 | Rough drawing |
|
6 | 3 | Section |
|
6 | 4 | Section and elevations |
|
6 | 5 | Location |
City Shops; Bozeman, MT; Serial #: 7406, 1974 MayReturn to Top
Container(s): Set 10
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
10 | Preliminary site plan |
||
10 | Site plan |
||
item | |||
10 | P4 | Wall sections |
|
10 | Floor plan - shop building |
||
item | |||
10 | AD1 | Mezzanine beam connection |
|
10 | AD2 | Revised (3) wall section |
|
10 | 1 | Site plan and details |
|
10 | 2 | Foundation plan and floor slab plan |
|
10 | 3 | Foundation details and stair details |
|
10 | 4 | Floor plan and schedule |
|
10 | 5 | Building elevations and window details |
|
10 | 6 | Building sections and wall details |
|
10 | 7-8 | Wall sections and details |
|
10 | 9 | Roof framing plan |
|
10 | M1 | Plot plan and fuel station details |
|
10 | M2 | Sewer system |
|
10 | M3 | Floor Plan, plumbing, and air systems |
|
10 | M4 | Underfloor plan, heat, and ventilation |
|
10 | M5 | Floor Plan, mechanical, heating, and ventilation |
|
10 | M6 | Exhaust system, schedules and details |
|
10 | M7 | Details: hot and cold water, sewer, hydraulic hoist, lube system |
|
10 | E1 | Lighting floor plan, fixture schedule |
|
10 | E2 | Power floor Plan, riser diagram |
|
10 | E3 | Electrical site plan, control equipment, panels |
O. Berg Office; Bozeman, MT; Serial #: 3154, 1954 September 14Return to Top
Container(s): Set 11
Firm: Oswald Berg, Jr., Bozeman
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
11 | 1 | Specifications, plot plan, foundation plan |
|
11 | 1A | Plan and elevation |
|
11 | 2 | Floor plan details |
|
11 | 3 | Elevation (East and North), door schedule |
|
11 | 4 | Elevation (South and West), glulam schedule |
|
11 | 5 | Cabinet detail |
|
11 | 6 | Plumbing, heating, electric |
|
11 | 1 | Office addition |
|
11 | 2 | Office details |
Museum of the Rockies; Bozeman, MT; Serial #s: 6922, 7423, 7209, 1971 SeptemberReturn to Top
Container(s): Set 13
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
13 | Cover sheet |
||
item | |||
13 | 1 | Site plan |
|
13 | 2 | Door, hardware, room finish schedule, door details |
|
13 | 3 | Footing and foundation plan details |
|
13 | 3R | Revised footing and foundation plan details |
|
13 | 3.1 | 1st Floor and roof framing plans |
|
13 | 3.2 | 1st Floor and basement |
|
13 | 4 | Elevations |
|
13 | 5 | Building sections |
|
13 | 5.1 | Cross sections details |
|
13 | 6 | Scupper, window, and stair details |
|
13 | ME1 | Mechanical and electrical |
|
13 | ME2 | Mechanical plans and details |
|
13 | ME3 | Electrical plans |
|
13 | Corridor addition |
||
item | |||
13 | 1 | Footing, foundation, basement, and main floor plans |
|
13 | 2 | Floor and roof framing plan, roof plan, and miscellaneous details |
|
13 | 3 | Exterior elevations and miscellaneous details |
|
13 | 4 | Wall sections and miscellaneous sections |
|
13 | S1 | Buildings 1 and 2 - site plan, Serial #: 7209 |
|
13 | S2 | Building 2, Serial #: 7209 |
Lewis Hall, MSU, remodeling; Bozeman, MT; Serial #: 7403, 1974 AprilReturn to Top
Container(s): Set 23
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
23 | 1 | Floor plan |
|
23 | 2 | Room elevations, millwork, and detail |
Nelson Residence; Bozeman, MT, Lot #9; Serial #: 7508, 1975 SeptemberReturn to Top
Container(s): Set 24
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
24 | 1 | Plot plan |
|
24 | 2 | Basement floor plan, footing and foundation plan, and miscellaneous detail |
|
24 | 3 | Sections - building, stair and wall |
|
24 | 4 | Exterior elevation |
MSU Locker Room Remodel; Bozeman, MT; Serial #: 7306, 1973 AugustReturn to Top
Container(s): Set 25
Firm: Berg-Grabow & Partners
Intermountain Forest and Range Experiment Station; Bozeman, MT; Serial #: 261, undatedReturn to Top
Container(s): Set 27
Bogart Park Pavilion; Bozeman, MT; Serial #: 7611, 1976 July 15, 1976 AugustReturn to Top
Container(s): Set 33
Firm: Berg-Grabow & Partners Medium: printed on plastic, pencil on paper Size: 17"x22", 22"x34" Inventory: S1-2 - paper
Bozeman Daily Chronicle; Bozeman, MT; Serial #: 7404, undatedReturn to Top
Container(s): Set 35
Firm: Berg-Grabow & Partners Medium: pencil on paper Size: 22"x34"
1st National Bank; Bozeman, MT; Serial #: 7302, 1973 JuneReturn to Top
Container(s): Set 36
Firm: Berg-Grabow & Partners Medium: pencil on paper Size: 22"x34"
Bridger Bowl Chalet; Bozeman, MT; Serial #: 667, 1967 June 25, 1967 August 3Return to Top
Container(s): Set 39
Firm: O. Berg, Jr. & Associates Medium: blueprint Size: 22"x34"
Senior High - Junior High Complex, Phase II; Bozeman, MT; Serial #s: 70-02, 7402, 1975 April, 1975 April 28, 1975 June 7Return to Top
Container(s): Set 41
Firm: Berg-Grabow & Partners Documents: 73 sheets Medium: pencil on paper, plastic insert of bldg. on title page Size: 22"x34"
Bozeman Senior High/Jr. High Complex, Addition Phase I, Shop building, Career Ctr.; Bozeman, MT; Serial #s: 7115 HS, 7115 S, 1973 August 10, 1973 September 11, 1973 October, 1974 JanuaryReturn to Top
Container(s): Set 42
Firm: Berg-Grabow & Partners Medium: pencil on paper Size: 22"x34"
Dokken-Nelson Funeral Home; Bozeman, MT; Serial #: none, 1974 MarchReturn to Top
Container(s): Set 44
Firm: Berg-Grabow & Partners Medium: pencil on paper Size: 14"x26" mounted on 22"x34"
Bridger Pines Condominiums # 1 and Lower Lift Terminal House; Bozeman, MT; Serial # 7201, 1972 NovemberReturn to Top
Container(s): Set 20
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
20 | 1 | Site plan |
|
20 | 2 | Floor plans |
|
20 | 3 | Elevations and sections |
|
20 | 4 | Details |
|
20 | 1 | Lower lift terminal house |
Shop Complex; Colstrip, MT; Serial #: 7309, 1974 JuneReturn to Top
Container(s): Set 14
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
14 | pump house revision |
||
item | |||
14 | 1 | Water storage standpipe |
|
14 | A4 | Warehouse plan |
|
14 | A5 | Crew change house floor plan |
|
14 | A6 | Office floor plan and schedules |
|
14 | A7 | Room elevations |
|
14 | E1 | Welding, pump house, crew change, office, and grease building |
|
14 | S1 | Floor slab plans |
|
14 | S2 | Floor slab plans |
|
14 | M1 | Site plan |
|
14 | M2 | Plot plan |
|
14 | M3 | Office |
|
14 | M4 | Office complex |
|
14 | M5 | Crew change - plumbing |
|
14 | M6 | Crew change - mechanical |
|
14 | M7 | Warehouse - mechanical and plumbing |
|
14 | M9 | Welding shop - plumbing and details |
|
14 | M10 | Welding shop mechanical and details |
|
14 | M11-M11A | Repair and service shop - plumbing and details |
|
14 | M12-M12A | Repair and service shop - mechanical and details |
Shop Complex, Coal Strip Mines; Colstrip, MT; Serial #: 7309, 1972 October 10, 1973 February, June, August, October 26, December 6, 1974 June, NovemberReturn to Top
Container(s): Set 34
Firm: Berg-Grabow & Partners Medium: pencil on paper, plastic print Size: 22"x36", 22"x34", 24"x36", 24"x18"
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
34 | Title page with plastic print of buffalo silhouette |
||
34 | Water storage stand pine and pump house revision |
||
34 | Lagoon profile |
1974 November | |
34 | Electric unit heater schedule |
||
item | |||
34 | 2A | Blueprint |
|
34 | Unit train coal handling facility - plot plan |
1972 October 10 | |
34 | Blueprint - site plan |
1973 December 6 |
Elementary School Addition; Ennis, MT; Serial #: 7532, 1976 June, 1952 May 3Return to Top
Container(s): Set 4
Firm: Berg-Grabow-Schofield, Walter Arnold, Architects, Butte, MT
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
4 | 1 | Plot plan |
|
4 | 2 | Ground floor plan |
|
4 | 3 | 1st Floor plan - schedules |
|
4 | 4 | Roof framing plan - room elevation |
|
4 | 5 | Elevations |
|
4 | 6 | Sections |
|
4 | 7 | Details |
|
4 | M1 | Mechanical-boiler room - detail |
|
4 | M2 | Mechanical - schedules |
|
4 | M3 | Mechanical details |
|
4 | P1 | Plot plan - plumbing - details |
|
4 | P2 | Plumbing - ground floor plan |
|
4 | P3 | Plumbing - 1st floor plan |
|
4 | P4 | Plumbing - piping diagram |
|
4 | E1-E3 | Electrical |
|
4 | 1 | Foundation and basement plan |
1952 May 3 |
4 | 2 | 1st Floor plan |
1952 May 3 |
4 | 3 | Root plan |
1952 May 3 |
4 | 4 | Elevation |
1952 May 3 |
4 | 5 | Sections and elevations |
1952 May 3 |
4 | 6-8 | Detail |
1952 May 3 |
Fort Harrison National Guard Armory; Ft. Harrison, MT; Serial #: 6912, 1970 MayReturn to Top
Container(s): Set 8
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
8 | 1 | Photograph of plot plan |
|
8 | 2 | Footing and foundation plan |
|
8 | 3-3A | 1st Floor plan |
|
8 | 4-4A | 2nd Floor plan |
|
8 | 5 | Roof framing plan |
|
8 | 6-6A | Elevations |
|
8 | 7 | Sections |
|
8 | 8-8A | Wall sections and details |
|
8 | 9 | Entry stair details and wall sections |
|
8 | 10-10A | Elevations and details |
|
8 | M1 | Utility plot plan |
|
8 | M2 | Roof plan mechanical |
|
8 | M3 | Plumbing and heating, footing and foundation plan |
|
8 | M4 | 1st Floor plan - heating and ventilation |
|
8 | M5 | 1st Floor plumbing plan |
|
8 | M6 | 2nd Floor mechanical and enlarged plumbing plan |
|
8 | M7 | Schedules and details - mechanical |
|
8 | E1 | 1st Floor - electrical power and lighting |
|
8 | E2 | Plot plan and 2nd floor plan |
Norem residence (Mr. & Mrs. Don Norem); Gallatin Gateway, MT; Serial #: 7717, undatedReturn to Top
Container(s): Set 32
Firm: Berg-Grabow-Schofield Medium: printed plastic sheets Size: 24"x36"
1st National Bank of Glendive; Glendive, MT; Serial #s: 1759, 7610,7817, 2241, 1962 March 15, 1965 April 8, 1966 January 11, 1979 June 12Return to Top
Container(s): Set 2
Firm: Oswald Berg, Jr. - Bozeman, MT Scale: varies, 1"=10', "-1'-0", "=1'-0", 1"=1', "=1', "-1'-0", "=1'-0" Size: 26x36 (29), 24x35 (5), 18x24 (20), 36 x24 (1), 21x33 14/16 (1)
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
2 | 1 | Plot plan |
|
2 | 2 | Basement plan |
|
2 | 3 | 1st Floor plan |
|
2 | 3A | 1st Floor plan |
|
2 | 4 | Schedules |
|
2 | 5 | Elevation |
|
2 | 6 | Cross sections |
|
2 | 7 | Typical wall sections |
|
2 | 8 | Ceiling plans |
|
2 | 9 | Details |
|
2 | S1 | Basement foundation plan |
|
2 | S3 | Root framing plan |
|
2 | S4 | Sections |
|
2 | S5 | Sections |
|
2 | S6 | Sections |
|
2 | R1 | Basement cabinet details (1-11-66) |
|
2 | R2 | Revisions 1# (4-8-65) |
|
2 | R3 | Revisions 1# (4-8-65, different from R-Z) |
|
2 | S7 | Sections and details |
|
2 | S8 | Concrete beam details |
|
2 | M1 | Plot plan schedules |
|
2 | M2 | 1st Floor heat and ventilation |
|
2 | M3 | Basement heat and ventilation |
|
2 | M4 | Basement plan (plumbers) |
|
2 | M5 | 1st Reflected ceiling plan |
|
2 | M6 | Basement reflected ceiling plan |
|
2 | M7-8 | Details |
|
2 | M9-10 | Revisions |
|
2 | E1 | Plot plan, electrical |
|
2 | E2 | Basement floor plan, electrical |
|
2 | E3 | 1st Floor plan, electrical |
|
2 | Cover sheet - additions to the 1st National Bank of Glendive, #7817 |
||
item | |||
2 | 1-10 | Additions to officers area and drive in |
|
2 | M1-M5 | Additions to officers area and drive in |
|
2 | E1-E4 | Additions to officers area and drive in |
|
2 | 1 | Drive up window, #2241 |
|
2 | 1 | Plot plan and details, #7610 |
|
2 | 2 | Basement and foundation plan - details |
|
2 | 3 | 1st Floor plan and details |
|
2 | 4 | Sections and details |
|
2 | 5 | Canopy framing plan and details |
State Publishing Building - Restoration and Remodel; Helena, MT; Serial #: 7709, 1978 JulyReturn to Top
Container(s): Set 19
Firm: BGS Architects
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
19 | 1 | Site plan |
|
19 | 2 | South Facade (elevations) |
|
19 | 3 | North Evaluation |
|
19 | 4 | North and Wet Facades (restoration) |
|
19 | 5 | Restoration details - West and South facades |
|
19 | 6 | D.H. Window details architrave, capital and balcony details |
|
19 | 7 | Elevations and stair details |
|
19 | 9 | Existing ground floor plan and renovated ground floor plan |
|
19 | 10 | Existing 1st floor plan and renovated 1st floor plan (Phase 1,2,3) |
|
19 | 11 | 2nd floor |
|
19 | 12 | 3rd floor |
|
19 | 13 | 2nd and 3rd floor - finish schedule |
|
19 | S1-S2 | Framing plan |
|
19 | S3 | Structural renovation |
|
19 | S4-S5 | Details |
|
19 | M1-M6 | Phase II - building remodel |
|
19 | M7-M11 | Phase III - building remodel |
|
19 | Schedules |
||
item | |||
19 | E1 | Ground floor demolition |
|
19 | E2 | 1st and ground floor - electrical |
|
19 | E3 | 2nd floor - electrical |
|
19 | E4 | 3rd floor - electrical |
|
19 | E5-E14 | Building remodel |
|
19 | Sections and details |
||
item | |||
19 | A | Water supply - ground and 1st floor |
|
19 | B | Water supply - 2nd floor |
|
19 | C | Water supply - 3rd floor |
|
19 | D | Composite of M3 and M8 |
|
19 | E | Schedules - composite of M4 and M9 |
|
19 | F | Heating and ventilation |
|
19 | G | Schedules and details |
|
19 | Photo 1 | Building |
|
19 | Photo 2 | West facade |
|
19 | Photo 3 | South facade - center and east entrance |
|
19 | Photo 4 | Earliest picture |
Sturdi - Built Homes, Inc.; Livingston, MT; Serial #: 7515, 1975 August 8Return to Top
Container(s): Set 29
Firm: BGS (Berg-Grabow-Schofield) Medium: pencil on 18"x24" sheets Inventory: 1-5 - waste & vent pipe diagram
Winama School - addition and renovation; Livingston, MT; Serial #s: 952A, 7621, 1953 January 17, 1976 SeptemberReturn to Top
Container(s): Set 37
Firm: Oswald Berg, Jr. Berg-Grabow & Partners Medium: pencil on paper; printed on paper Size: 21"x30" 22"x34"
Livingston Memorial Hospital Additions; Livingston, MT; Serial #: 7001, 1972 April, 1972 JulyReturn to Top
Container(s): Set 43
Firm: Berg-Grabow & Partners Medium: pencil on paper, colored marker on paper Size: 22"x34", 24"x36"
Philipsburg Gym; Philipsburg, MT; Serial #: 555, 1956 March 6Return to Top
Container(s): Set 12
Firm: Oswald Berg, Jr., Bozeman
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
12 | 1 | Plot plan |
|
12 | 2 | Foundation plan |
|
12 | 3 | 1st Floor plan |
|
12 | 4-5 | Elevations |
|
12 | 6 | Room and door schedule |
|
12 | 7 | Sections |
|
12 | 8 | Kitchen sections |
|
12 | 9 | Section, trim schedule |
|
12 | 10 | Sections |
|
12 | 11 | Stair sections |
|
12 | 12-13 | Wall sections |
|
12 | 14 | Door details and lockers |
|
12 | 15-16 | Cabinet details |
|
12 | M1 | Basement plumbing |
|
12 | M2 | 1st Floor plumbing |
|
12 | M3 | Basement heating |
|
12 | M4 | Basement plumbing |
|
12 | E1 | Basement electrical |
|
12 | E2 | 1st Floor electrical |
Toole Co. Courthouse & renovation; Shelby, MT; Serial #: 7815, 276, 1934 July 14, 1979 MayReturn to Top
Container(s): Set 18
Firm: BGS Architects & McIver & Cohogen (Billings & Great Falls)
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
18 | Cover page |
||
item | |||
18 | 1 | Ground floor plan |
|
18 | 2 | 1st Floor plan |
|
18 | 3 | 2nd floor plan |
|
18 | 4A | Room finish schedule |
|
18 | 4B | Room finish schedule - 2nd floor plan |
|
18 | 4C | Schedules |
|
18 | 5 | Elevations |
|
18 | 6 | Court room details |
|
18 | 7 | Court room details and miscellaneous |
|
18 | 8-9 | Entry 1 |
|
18 | 10 | 3rd Floor library |
|
18 | 11 | Library details |
|
18 | 12 | Stairs details |
|
18 | 14 | 1st Floor plan |
|
18 | M1 | 2nd and 3rd Floor mechanical demo plan |
|
18 | M2 | Ground floor mechanical plan |
|
18 | M3 | 2nd and 3rd Floor mechanical plan |
|
18 | M4 | Sections |
|
18 | M5 | Schedules |
|
18 | E1 | Ground floor electrical plan |
|
18 | E2 | 1st Floor electrical plan |
|
18 | E3 | 2nd Floor lighting plan |
|
18 | E4 | 2nd Floor power and sprinkler system plan |
|
18 | E5 | 2nd Floor electrical demo plan |
|
18 | E6 | Enlarged boiler room, 3rd Floor electrical plan |
|
18 | E7 | Diagrams and schedule |
|
18 | 1 | Approach plan |
|
18 | 2 | Ground and 1st floor plan |
|
18 | 3 | Roof and 2nd floor plan |
|
18 | 4 | Elevations |
|
18 | 5-6 | Details |
|
18 | 7 | Footing and ground floor plan, 1st floor framing |
|
18 | 8 | 2nd Floor and Roof framing plan |
Toole County Library; Sunburst, MT; Serial#: 7627, 1977 January 13Return to Top
Container(s): Set 31
Firm: Berg-Grabow-Schofield Medium: plastic sheet, printed Size: varies, 25"x36"; 18"x24"; 24"x30"; 24"x36" Inventory: 1-5; M1; E1 - arch. drawing of bldg., site & elev. plan, topo map
Three Forks High School Addition; Three Forks, MT; Serial #s: none, 6809, 1916 June 15, 1969 MarchReturn to Top
Container(s): Set 40
Firm: James Calloway Teague Berg-Grabow & Partners Medium: blueprint printed on clear plastic Size: 15"x20" 8"x10", 14"x11", 14"x17"
Gymnasium Addition - storage room; Three Forks, MT; Serials #: 7501, 1975 MarchReturn to Top
Container(s): Set 22
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
22 | Preliminary take-off |
||
22 | North elevation and floor plan (2) |
||
item | |||
22 | 1 | Floor plan, elevation, section and framing plans |
|
22 | 2 | Details, section and electrical plan |
Three Forks High School; Three Forks, MT; Serial #: 6809Return to Top
Container(s): Set 26
1st State Bank; Cody, WY; Serial #: 563, 1964 January 22Return to Top
Container(s): Set 15
Firm: Berg & Tresler Associate Ar.
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
15 | S1 | Structural |
|
15 | 1 | Plot plan |
|
15 | 2 | Basement floor plan |
|
15 | 3 | 1st Floor plan |
|
15 | 4 | Schedules |
|
15 | 5 | Elevations |
|
15 | 6 | Section |
|
15 | 7 | Interior elevations |
|
15 | 8-10 | Details |
|
15 | 11 | Coupon booths and teller units |
|
15 | M1-M2 | Basement plan |
|
15 | M3 | 1st Floor plan |
|
15 | M4 | Details |
|
15 | E1 | Basement and plot plan - electrical |
|
15 | E2 | 1st Floor plan - electrical |
|
15 | E3 | Schedules and details - electrical |
1st Wyoming Bank - Renovations and Additions; Cody, WY; Serial #: 7813Return to Top
Container(s): Set 16
Firm: BGS Architects, 1119 N. 7th
Container(s) | Description | |
---|---|---|
set | ||
16 | Cover sheet |
|
item | ||
16 | 1 | Site plan |
16 | 2 | Site details |
16 | 3 | Floor plan and schedules |
16 | 4 | Walk up teller details |
16 | 5 | Wall sections and teller center |
16 | 6 | Loan counter details, night depository, and cash vault details |
16 | 7 | Elevations and details |
16 | 8 | Cabinets and details |
16 | 9 | Drive-up canopy |
16 | 10 | Drive-up canopy details, sidewalk trellis |
16 | 11 | Snow removal shed |
16 | M1 | 1st Floor demo |
16 | M2 | 1st Floor mechanical |
16 | M3 | Basement floor plan |
16 | M4-M6 | Specifications |
16 | E1 | Basement and site plan |
16 | E2 | 1st Floor demo |
16 | E3 | 1st Floor plan |
16 | E4 | Legend and specs, map showing building location for 1st State Bank |
Mammoth Elementary School; Mammoth, WY; Serial #: 7722, 1977 December 30Return to Top
Container(s): Set 3
Firm: Berg
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
3 | A1 | 1st Floor plan, 2nd floor plan, roof framing plan, footing foundation plan, & plot plan |
|
3 | A2 | North, East, and West elevations |
|
3 | 3 | 1st and 2nd Floor plan - electrical and mechanical, site plan |
|
3 | 1 | Cover sheet - map of YNP |
|
3 | 2886C | Entrances |
|
3 | 440 | Cross sections |
|
3 | 1 | Plot plan |
|
3 | 3 | Basement and foundation plan |
|
3 | 4 | Floor plan |
|
3 | 5 | Room finish schedule |
|
3 | 6 | Exterior elevation and cabinet details |
|
3 | 7 | Sections and interior elevations |
|
3 | 8 | Interior elevation and cabinet details |
|
3 | 9 | Multipurpose room details |
|
3 | 10 | Classroom details |
|
3 | 11 | Roof framing plan and structural details |
|
3 | 12 | Electrical floor plan, legend schedules, transformer details |
|
3 | 13 | Special services floor plan, panels riser diagram |
|
3 | 14-17 | Mechanical |
1st State Bank of Thermopolis; Thermopolis, Hot Springs Co., WY; Serial #: 7818, 1979 April 6Return to Top
Container(s): Set 7
Firm: BGS Architects, Bozeman, MT
Container(s) | Description | Dates | |
---|---|---|---|
set | |||
7 | Cover page |
||
item | |||
7 | S1 | Post sections |
|
7 | A1 | Basement floor plan |
|
7 | A2 | 1st Floor plan |
|
7 | A3 | Section |
|
7 | A4 | Roof framing plan |
|
7 | A5 | Elevation (North and South) |
|
7 | A6 | Elevation (West and East) |
|
7 | A7 | Elevation and section |
|
7 | A8 | Section |
|
7 | A9 | Details |
|
7 | A10 | Sections and elevations |
|
7 | A11 | Details |
|
7 | A12 | Schedules |
|
7 | A13 | Revision |
1979 July |
7 | A14 | Drive - up window |
|
7 | A15 | Night depository |
|
7 | A16 | Cabinet details |
|
7 | Site plan |
||
item | |||
7 | M1 | Basement floor plan |
|
7 | M2 | 1st Floor plan |
|
7 | M3 | Mechanical legend, schedules & section |
|
7 | P1 | Site plan |
|
7 | P2 | Basement floor plan (BFP) |
|
7 | E1 | BFP - power & telephone |
|
7 | E2 | BFP - lighting |
|
7 | E3 | Site plan and 1st floor - power |
|
7 | E4 | 1st Floor plan - lighting |
|
7 | E5 | Schedules |
Kyd residence (Mr. and Mrs. Charles R. Kyd); Boardman, OR; Serial #: 7615, 1978 JanuaryReturn to Top
Container(s): Set 21
Firm: Berg-Grabow-Schofield
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
21 | 1 | Footing and foundation plan |
|
21 | 2 | 1st Floor plan |
|
21 | 3 | Roof framing plan |
|
21 | 4 | Cross sections and elevations |
|
21 | 5 | Sections and details |
|
21 | 6 | Wall sections and details |
|
21 | 7 | Details and schedules |
|
21 | 8 | Plot plan and details |
|
21 | P1 | Foundation plumbing plan |
|
21 | E1 | Electrical plan |
|
21 | Footing and foundation plan |
Office Building Addition (Assoc. P&C Engineers, Inc.); Serial #: 7312, 1973 November 10Return to Top
Container(s): Set 17
Firm: Berg-Grabow & Partners
Container(s) | Description | Dates | |
---|---|---|---|
set | item | ||
17 | A1 | Plot plan and details |
|
17 | A1.1 | Details and revisions |
|
17 | A2 | Structural plan and details, footing foundation plan, and details |
|
17 | A3 | Ground floor plan |
|
17 | A4 | 1st Floor plan |
|
17 | A5 | Door hardware schedule and details |
|
17 | A5.1 | Room finish schedule |
|
17 | A6 | Building elevations |
|
17 | A7 | Building and stair sections |
|
17 | A8 | Entry sections and details |
|
17 | A9 | Wall sections |
|
17 | A10 | Interior room elevations |
|
17 | A11 | Reflected ceiling plans |
City Center Motel, remodel; Serial #: 7507, undatedReturn to Top
Container(s): Set 45
Medium: pencil on paper Size: 22"x34"
1st National Bank, alternations & additions, 1970 JulyReturn to Top
Container(s): Set 46
Medium: printed on clear plastic Size: 11"x17"
Names and SubjectsReturn to Top
Subject Terms
- Buildings-Montana
Corporate Names
- BGS Architects
- Berg and Grabow, Associated Architects
Geographical Names
- Montana-Buildings, structures, etc