Irrigation Systems Management/Research (Pakistan Project) records, 1983-2003
Table of Contents
- Overview of the Collection
-
Historical Note
- Other Descriptive Information
- Other Descriptive Information
- Other Descriptive Information
- Other Descriptive Information
- Other Descriptive Information
- Other Descriptive Information
- Other Descriptive Information
- Content Description
- Administrative Information
-
Detailed Description of the Collection
- Names and Subjects
Overview of the Collection
- Title
- Irrigation Systems Management/Research (Pakistan Project) records
- Dates
- 1983-2003 (inclusive)19832003
- Quantity
- 17 cubic feet
- Collection Number
- UG 045
- Summary
- Financial records, reports, papers concerning the procurement of equipment personnel files, correspondence and other office files, and photographs and slides of the Pakistan field office in the University of Idaho home office relating to a water resource management project in Lahore.
- Repository
-
University of Idaho Library, Special Collections and Archives
Special Collections and Archives
University of Idaho Library
875 Perimeter Drive
MS 2350
Moscow, ID
83844-2350
Telephone: 2088850845
libspec@uidaho.edu - Access Restrictions
-
Collection is open for research.
- Languages
- English
- Sponsor
- Funding for encoding this finding aid was provided through a grant awarded by the National Endowment for the Humanities.
Historical Note
The Irrigation Systems Management/Research (ISM/R) project was based on the premise that resource management can be improved through interdisciplinary, interagency sponsored research that is directed to participants. These participants included both government officials and farmers who needed new techniques and information in order to maintain good water resource management. The objective of the ISM research project was "to improve the capability of scientists and institutions to manage and conduct irrigation research which will lead to better use of irrigation water in Pakistan."
This project was a cooperative venture between the University of Idaho, Washington State University and Development Alternatives, Inc., in collaboration with the Government of Pakistan, the U.S. Agency for International Development and the World Bank to design and later implement a comprehensive water management research program for the Punjab and Sind regions of Pakistan. The program began in the fall of 1985 and continued through March 1991.
The ISM research program was made up of two interrelated and complementary parts: a) a set of water management research projects which addressed national objectives and research needs of Pakistan and b) institution-building activities which focused on technical training and the development of a well-organized, well-managed, and integrated water management research program for Pakistan. The eight projects and the agencies responsible for their management were: Farm Water Management (PARC and WAPDA), Beyond Watercourse Improvement (WAPDA), Farmer Involvement in Water Management (PCRWR), Integrated Watercourse Management (WAPDA), Public and Private Tubewell Performance, (WAPDA), Irrigation Systems Outside the Indus Basin (WAPDA), Surface Drainage and Water Table Control (DRIP), and Groundwater Models (WAPDA). Each project's designated lead institution was responsible for overall project management. Principal investigators from participating agencies worked closely with University of Idaho advisors on project design and implementation.
In addition to short term and long term Americans advisors working in Pakistan, the project provided for Pakistani engineers and other professionals involved in water resource management to attend short courses or training sessions at American Universities.
Content Description
The Records of the ISM/R project span the years 1983 to 1992, with the bulk of the papers covering the years 1985 to 1990.
The papers include the records of the field office in Lahore, Pakistan and the home office at the University of Idaho. Both include financial records, reports, papers concerning the procurement of equipment, personnel files, correspondence and other office files, and photographs, photographic negatives and slides relating to the project.
Other Descriptive Information
1 To upgrade the Irrigation Research Institutes in Punjab and Sind by improving their capability to conduct active and relevant research projects with modern equipment and trained personnel. October 20, 1985.
2 To provide equipment specifications in order to expedite procurement and insure that micro computers and software are compatible with needs. April 7, 1986.
3 To prepare equipment specifications to expedite procurement and insure that documentation equipment is compatible with needs. To assist the Pakistan Council for Research in Water Resources with the development of a training plan and procedure for library acquisition. To assist PCRWR with the final selection of staff for the Documentation/Information Center. To conduct training in documentation and information dissemination techniques for staff of the center. January 27, 1986.
4 In consultation and working with the professionals of SCARP Monitoring to prepare plans for initiation of the ground water modeling program; evaluate existing data bases and recommend format for collecting and collating data for later use in models; Define the role of the Analog Modeling Cell in the Project. To evaluate the suitability of the Advisor for assignment as the Hydrologist on the Long-term resident contractor team in Pakistan. April 1986
5 To provide needed assistance and advice to personnel implementing the Farm Water Management sub-project. To evaluate the suitability of the Advisor for assignment as the Irrigation Agronomist on the Long term resident contractor team in Pakistan. April 1986.
6 To initiate the Beyond Watercourse Management subproject expeditiously and along lines that permit best use of the available data base. June 1986.
7 To initiate the Surface Drainage and Water Table Control subproject expeditiously and according to the original design. [Larry King]. August 1986.
8 To assist with design of the format for the Competitive Grants activity. [Maurice V. Wiese]. August 1986.
9 To provide on-the-job training to the PCRWR staff who will manage and operate the Documentation/Information Center. September 1986.
10 To initiate the Nitrogen Recovery component of the Farm Water Management subproject with the latest techniques and knowledge. To develop reliable and appropriate techniques to collect data for the Water and Salt Balance study. September 1986.
11 To initiate the Irrigation System outside the Indus Basin subproject expeditiously. October 1986.
12 To construct and maintain earthen watercourses using tractor powered machines. To test machines available in Pakistan for this purpose. To design a role for mechanization in the ISM Research program. October 1986.
13 To conduct an assessment of the computer training needs of researchers and support staff from institutions collaborating with ISMR and design a training program which seeks to enhance the use of computers in their research and management activities. December 10, 1986.
14 To design training courses in groundwater simulation and well hydraulics and performance analysis. To finalize research plans for the public and Private Tubewell subproject. February 1987.
15 To finalize sailaba studies and work plant to be conducted under the Irrigation Systems Outside the Indus Basin subproject. April 1987.
16 To design a three-year research plan for the Biotic and Chemical Reclamation of Soils and the Salt Balance studies that are part of the Farm Water management sub-project. March 1987.
17 To review the progress of ISMR in the areas relating to salinity, drainage and water table control, to determine the adequacy of content and degree of duplication with other national programs and, finally, to recommend a course of action for the remaining three project years. April 1987.
18 To determine feasibility of increasing karez discharge. To understand the influence of delay action dams on the adjacent ground water conditions. May 1987.
19 The Short Term Advisor is to assist in the conduction of workshop for the potential collaborators under the Competitive Grants Programme. The participants of the workshop would be trained in writing proposals, and reports/papers. They will also be trained in designing, carrying out and collection and presentation of information obtained from the studies. May 1987.
20 The Short Term Advisor (An Agri-Economist) is to help, organize and train the collaborators for carrying out field research. He may also be required to train the collaborators in the collection and presentation of data obtained from the research under this component of the ISM-R project. May 1987.
21 To select appropriate equipment and provide specifications to expedite procurement. June 1987.
22 To evaluate the Surface Drainage and Water Table Control sub-project and plan its implementation strategy for the next two years. October 1987.
23 To design and test an appropriate method of combining small tubewells with canal supplies in order to optimize production per unit area on a watercourse area. September 1987.
24 To understand dBase III+, its application and where its use is applicable. To design a data base for the mass of data previously collected by the Watercourse Monitoring and Evaluation Directorate. December 1987.
25 To analyse existing data to provide outputs useful to researchers and planners. February 1988.
26 To evaluate the groundwater inventory test sites surrounding pilot karezes and make adjustments where and if needed and prepare a work plan for use of the data in Karez flow augmentation. February 1988.
27 To implement studies and research on the sailaba method of irrigation under the Irrigation Systems Outside the Indus Basin sub-project. March 1988.
28 The objective of the short-term advisor visit will be to develop ground-water flow and transport modelling skills of SCARP Monitoring researchers through in- country training and cooperative research. March 1988.
29 To compile, from local institutions, relevant research results on the subject of optimizing crop production from limited irrigation water supplies. April 1988.
30 To procure equipment for the Punjab Irrigation Research Institute expeditiously. June 1988.
31 Develop an analysis plan for the database being developed by Watercourse Monitoring and Evaluation. [Dr. Shane Ryland] December 1988.
32 To install laboratory equipment according to design and to use and maintain it correctly and effectively. June 1988.
33 To conduct a midterm review of progress on the Irrigation and Nitrogen Fertilizer Management Sub-project and on the Biotic and Chemical Reclamation Sub-project of the Farm Water Management Project, to recommend possible improvements in these programs for the remainder of the current project term, and to suggest fruitful lines of future research on Irrigation and nitrogen fertilizer management and on biotic and chemical reclamation of sodic soils. [Denny V. Naylor] June 1988.
34 To review the progress and work plans of the Irrigation Systems Outside the Indus Basin sub-project. July 1988.
35 To combine small tubewell discharge with canal supplies in order to optimize production per unit area on a watercourse area where more than one farmer is involved by delivering irrigation water according to crop demand. August 1988.
36 To review the design and progress of the ISM Research Project mid-way through implementation in order to make corrections and/or modifications in design, content or procedures. August 1988.
37 To review the Groundwater modelling and tubewell performance projects evaluate the final two-year work plan. To assess the suitability of the nominated hydrologist for the long- term assignment to the ISMR field team. September 1988.
38 The short term advisor (an applied anthropologist) is required to help the collaborators in organizing the research on scientific methods and to assist them in collection of data during field research and its presentation, under EWU component of ISM-R Project. he will prepare guidelines to monitor and evaluate the research activities under EWU component and see that these guidelines are followed in EWU studies. [Bradley Parlin] August 1988.
39 To learn more about the role of women in water management. [Dr. Samina Khan] September 1988.
40 To implement the Competitive grants program according to design and as expeditiously as practical. January 1989.
41 Prepare a PC-1 for establishment of an adaptive research unit within the Irrigation Department of the Northwest Frontier Province. [Dr. C.E. Brockway] November 1988.
42 Prepare a PC-1 for establishment of an adaptive research unit within the Irrigation Department of Baluchistan Province. [Gilbert Corey] November 1988.
43 To review the progress and work plans of the Irrigation Systems Outside the Indus Basin sub-project. [Jim Bondurant] December 1988.
44 Provide technical assistance in problem identification and description through qualitative rapid appraisal for the EWU Project. [Dr. Mark Lusk] December 1988.
45 Continuation of technical assistance for a salt transport model of SCARP VI, Unit I - Allahbad. [Dr. Yavuz Corapcioglu] December 1988.
46 Provide statistical support for on-going WM& ED advanced analytical review and for monitoring and evaluation survey techniques. Provide editorial support for preparation of publication reporting results of advanced analytical review. [Dr. Shane Ryland] March 1989.
47 Provide technical assistance in data management and analysis for organizations collaborating with ISM research. [Edward Wiser] January 1989.
48 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Bradley W. Parlin] April 1989.
49 To review the progress and work plans and to assist with implementation of these plans for the Irrigation Systems Outside the Indus Basin sub-project. [James Bondurant] April 1989.
50 To provide technical assistance in the installation of sprinkler irrigation system, in implementation of irrigation/crop selection study, to develop a research study on irrigation of fruit trees with a trickle system, and for preparation of manuscripts and reports. [D.L. Bassett] April 1989.
51 Missing
52 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Dr. Bradley Parlin] April 30, 1989.
53 Missing
54 To assist with designing a system for the monitoring and evaluation of WAPDA sub-surface tile drainage project at Mona. [Dr. Larry King] June 1, 1989.
55 Redraft, update, and correct the "Bluebook of CGP (Competitive Grants Program) Guidelines and Policies". draft PIC operations manual, and assist with format and editing of the Annual Research Progress Reports to be presented at the CGP annual conference and published by PCRWR. [Maurice Wiese] May 1989.
56 Provide engineering, hydrology, instrumentation, and data processing and analysis assistance to the technical assistance team and its collaborators on the Irrigation Systems Management Research Project. [Dr. Edward Wiser] May 1989.
57 To provide assistance to nine collaborating laboratories and institutions that need specialized skills/techniques for the maintenance, repair, and replacement of any equipment procured under ISM/R project. To impart in-country training to the Pakistani scientists in designing a modern scientific laboratory. [Dr. Leonard R. Mattick] June 1989.
58 To assist the PCRWR director of the competitive grants program on design and technical advice for four research projects funded under the CGP. [Dr. Chaudry Haniff] June 1989.
59 To provide technical assistance to the Irrigation Systems Outside the Indus Basin sub-project and to the Competitive Grants Program. [Dr. Larry King] August 8, 1989.
60 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Bradley Parlin] August 21, 1989.
61 Conduct workshop III on Conclusions and Policy Implications in Irrigation Organization Research for PIs involved in the EWU sub-project. [Dr. Gilbert Corey] August 21, 1989.
62 To analyze the available Chabba Distributary data to identify a range of flow and farm field sizes that are easily and efficiently manageable for optimum conveyance and application efficiencies and distribution uniformities under the existing irrigation farming practices. [James Bondurant] August 1989.
63 To produce a film based on the systems-research conducted under ISM/R on irrigation in various habitats and provinces of Pakistan. October 1989.
64 To review the progress and work plans and to assist with implementation of these plans for the Irrigation Systems Outside the Indus Basin sub-project. [James Bondurant] December 1989.
65 To assist WAPDA scientists involved with sub-projects in integrated watercourse management to write technical reports concerning their ISM/R research programs. [Dr. Gilbert Corey] December 1989.
66 To provide technical assistance to Planning South Directorate of WAPDA to help develop a design manual for the improvement and rehabilitation of karezes in Balochistan Province. [Larry King] February 7, 1990.
67 To review concept, design and progress of the Competitive Grants Program being implemented by the Pakistan Council for Research in Water Resources (PCRWR) and to make recommendations to USAID regarding continuation of the program. January 1990.
68 Assist with the program and agenda for a CGP conference and with editing and formatting CGP Annual Progress Reports to be presented at the CGP conference and published by PCRWR. [Maurice Wiese] February 1990.
69 Provide soils and hydraulics laboratories of the Sindh Provincial Irrigation Department with the latest laboratory and field equipment. [Denny Naylor & Dell Fitzsimmons] April 10, 1990.
70 To assist the participant researchers under the Encouraging Water Users Project to conclude their on-going research programs. [Michael Toney] May 21, 1990.
71 Assist ISM/R cooperators in writing of technical reports and manuscripts which summarize their research programs. [William Stellmon] April 1990
72 Refresher course in basic statistics (no formal TD), August 1990
73 Continuation of technical assistance on the "salt transport model" for SCARP VI, Unit I - Allahabad. [Yavuz Corapcioglu] April 1990
74 Provide engineering, hydrology, instrumentation, and data processing and analysis assistance to the technical assistance team and its collaborators on the Irrigation Systems Management Research Project. [Edward H. Wiser] March 1990
75 To provide technical assistance to Planning South Directorate, WAPDA, for the condition survey of Karezes in Baluchistan. [James Bondurant] September 1990
76 To review projects in progress, to assist in the development and implementation of further project plans for the Irrigation Systems Outside the Indus Basin sub-project and to assist in data analysis and report formulation on- going projects. [James Bondurant] May 1990
77 To give training on flow measurement in open channel and piped distribution systems for irrigation research plot work and to assist in implementation of flow measurement on research plots for various ISM/R cooperators. [John Replogle] August 1990
78 Assist ISM/R cooperators in writing of technical reports and manuscripts which summarize their research programs. [Day Bassett] April 1990
79 To introduce water management research leaders of ISM/R - senior engineers, soil scientists and agronomists - to the social science perspective and methodology. [Peter Reiss] August 1990
80 Set up one EM-38 unit for operation in Pakistani soil conditions and train personnel of WMED, WAPDA in its use. July 1990
81 To provide an understanding of research findings on the socio-economic impact of agricultural development programs and to teach practical methods for evaluating these programs. [Robert Howell] August 1990
82 To assist with the installation and to provide hands-on- training on the use and maintenance of the sophisticated laboratory equipment expected to arrive soon in Pakistan for LIM Hyderabad. Visit each of the nine ISM/R collaborating laboratories for providing assistance with the repairs, replacement and maintenance of the equipment supplied under ISM/R Project which are in use for about two years or more. [Leonard Mattick] July 1990
83 Assist with review of papers for the ISM/Research November 1990 symposium and preparation of a report containing important findings, major issues and recommendations for program continuation and/or technology transfer to end users. [Gilbert Corey] September 1990.
84 Continuation of technical assistance on the "salt transport model" for SCARP VI, Unit I - Allahabad. [Yavuz Corapcioglu] September 1990.
85 To evaluate research presentations at the ISM research symposium and select the best. September 1990.
86 To assist with the program and agenda for CGP Phase-IV workshops and review of CGP in general. [Maurice Wiese] September 1990
87 First phase of the ISM-R project is going to be exhausted. The evaluation and monitoring of 1st phase and review of the development plant of ISM-R project phase II is required to be carried out. October 1990,
88 To review projects in progress, to assist in the development and implementation of further project plans for the Irrigation Systems Outside the Indus Basin sub-project and to assist in data analysis and report formulation on- going project. [James Bondurant] December 1990.
89 To provide technical assistance to Planning South Directorate, WAPDA, for the condition survey of Karezes in Baluchistan. [Larry King] December 1990.
unnumbered To commission a special task force to conduct an in-depth analysis of all available information that might provide a better understanding of the agricultural and irrigation interface when the supply of irrigation water is insufficient for full production on all land served by the irrigation system. December 1988.
Other Descriptive Information
1A Nordin, C.F. Irrigation Research Institute, Punjab Irrigation Research Institute, 10 February-27 March 1986
1B Robinson, A.R. Irrigation Research institute, Sind Irrigation Research Institute, 20 February-27 March 1986
2A King, Larry. ISM Project, Equipment specifications. 18 May- 19 June 1986.
2B Brockway, C.E. ISM Project, Equipment specifications. 25 May-12 June 1986
3 Hanson, Donna. Library, documentation and information centre, Pakistan Council of Research on Water Resources. April 17, 1986
4 Johnson, Gary S. Ground water modelling, Work plans, 9 June-3 July 1986
5 Bassett, Day L. Farm water management, Project initiation review, 6 June-5 July 1986
6 Hamilton, Joel R. Beyond watercourse improvement, Project initiation, 11 July-16 August 1986
7 King, Larry G. Surface drainage and water table control, Drainage design, 21 September-29 October 1986
8 Wiese, Maurice. Competitive grants program, Grants program format, 19 October-5 December 1986
9 Hanson, Donna M. Library/Documentation center, Organizing information service 22 March-11 June 1988.
10 Dow, A. Irving. Farm water management, Nitrogen fertilizer management, 1 November-13 December 1986
11 Bondurant, James A. Irrigation systems outside the Indus basin, Small scale irrigation, 10 November-18 December, 1986
12 Moden, Walter L. and Niel Dimik. Integrated watercourse management, Mechanical watercourse construction, 30 December 1986-13 February, 1987
14 Ra1ston, Dale R. Public and private tubewells, SCARP tubewell performance, 2 April-29 April 1987
15 Bondurant, James. Irrigation systems outside the indus basin, Sailaba irrigation reconnaissance, 4 September - 10 October 1987; 21 -29 November, 1987
16 Naylor, Denny. Farm water management, project review, 16 June-30 July 1987
17 Doering, E.J. Farm water management, Reclamation and drainage, 7 September-18 October 1987
18 King, Larry. Irrigation systems outside the Indus Basin, Enhancing Karez discharge, Larry G. King, 4 July-9 August 1987
19 Wiese, M.V. Competitive grants program, Grants handbook, 1 February-12 March 1988
20 Carlson, John E. Encouraging water users, Social science sub-project review, 1 February-2 March 1988
21 Watts, F.J. Selection of equipment for upgrading research, draft report, computer print out, 19 July 1987
22A King, Larry. Surface drainage and water table control. Design of small drains (Seminar paper), 13 March-18 April 1988
22B King, Larry G. Surface drainage and water table control, Field drainage review, Larry G. King, 10 November-9 December 1987
23 Brockway, C.E. Integrated watercourse management, Fractional weel study design, 8 February-15 March 1988
24 Hine, Patricia L. Beyond watercourse improvement, Database management, 1 February-2 March 1988
25 Hamilton, Joel R. Beyond watercourse improvement, Field data evaluation and analysis, 1-31 March 1988
26 King, Larry G. Irrigation systems outside the Indus basin, Karez discharge augmentation, 13 March-12 April, 1988
26A King, Larry G. Surface drainage and water table control, Design of small drains (seminar paper) 13 March-18 April 1988
27 Bondurant, James. Irrigation systems outside the Indus basin, Sailaba irrigation design, 9 May 1988-6 June 1988
28 Schreiber, David L. SCARP monitoring, (computer print out, not in published form) 18 September-26 October 1988
31 Ryland, Shane. Analysis plan for watercourse monitoring, 2 February-21 March 1989
32 Mattick, Leonard R. Report, TDY assignment, 3 September- 13 October 1988
33 Naylor, Denny V. Report - TDY assignment, 27 December 1988-12 February 1989
34 Bondurant, James A. Out of Indus Irrigation Systems project, Report - TDY assignment, 26 September-1 October 1988
35 Bondurant, James A. Conjunctive use utilizing a fractional tubewell and Chabba distributary data analysis, 18 January-7 April 1989
37 Wiser, Edward H. Field report, 3 October-2 November, 1988
38 Doering, Eugene J. Project report, ISM/R, PCRWR, EWU project, November 1988 (Not in published form)
40 Wiese, Maurice V. Competitive grants program, TDY Report, 10 April-16 May 1989
41 Brockway, C.E. Report on Technical Directive No.41, 12 October-14 November 1989
42 Corey, G.L. Report on Technical Directive no. 42, 30 January-10 March, 1989
43 Bondurant, James A. Out of Indus project, 18 January- 7 April, 1989
44 Lusk, Mark W. Report on Technical Directive No.44, 17 February-7 March 1989
45 Corapcioglu, Yavuz. Report on Technical Directive No.45, January-February 1990
46 Ryland, Shane. Report on Technical Directive no.46, 15 July-13 December 1989
47 Wiser, Edward. Beyond Watercourse improvement and Public and private tubewell performance, Report. 25 March-25 May 1989
48 Parlin, Bradley. Report on Technical Directive No.48, 24 April-19 June 1989
49 Bondurant, James. Irrigation systems outside the Indus Basin, Sailaba irrigation design Karez improvements, 16 September-12 November 1989
50 Bassett, D.L. Report on Technical Directive No.50, June- August 1989
51 Lusk, Mark. Report on Technical Directive No.51, 31 May-19 June 1989
53 Toney, Michael B. Report on Technical Directive No.53, 23 July-19 August, 1989
54 King, Larry G. Report on Technical Directives Nos.54 & 59, 4 August-12 September 1989
55 Wiese, Maurice. Competitive Grants Program, Technical Directive No.55, 29 January-25 February, 1990
57 Mattick, Leonard R. Report on Technical Directive No.57, 26 September-19 December 1989
58 Chaudhry, M. Haniff. Report on TDY assignment under Technical Directive No.58, 5 September-2 October 1989
59 See Report 54.
60 Parlin, Bradley. Report on Technical Directive No.60, 11 February-14 March 1990
61 Corey, Gilbert. Report on Technical directive No.61, 18-22 February, 1990
62 Bondurant, James A. Chabba distributary data analysis and report, 13 November-7 December 1989
64 Bondurant, James A. Irrigation systems outside the Indus basin, Improved irrigation systems project reports Sailaba structures, 8 March-10 May, 1990
65 Corey, Gilbert. Integrated watercourse management, Technical directive No.65, 24 February-19 March 1990
66 King, Larry. Report on Technical Directive No.66, 23 February-31 May, 1990
67 Becker, D.F. and Anis Ahmad. Report of review of the competitive grants program, of the Pakistan Council for Research in Water Resources, 6 April-5 May 1990
68 Wiese, Maurice. Competitive grants program (CGP), Technical Directive No.68, 10-31 May 1990
69 Naylor, Denny. Trip report, TDY assignment, Technical directive No.69, 9-28 July 1990
69 Naylor, Denny. Equipment specifications for soils and hydraulics laboratories Sind provincial irrigation department, Technical Directive No.69, November 1990
73 Corapcioglu, Yavuz. Report on Technical directive no.73, June-July 1990
82 Mattick, Leonard R. Report on TDY assignment, October 4 to November 8, 1990
Other Descriptive Information
2 To provide staff of the Watercourse Monitoring and Evaluation unit with hand-on experience in the use of computers for the management and analysis of data. April 1987
3 To provide engineers and technicians with improved and accurate methods and techniques to measure water in research projects. April 1987
4 To have all concerned staff of all institutions involved in the ISM Research Project conversant with computer use and to have their computers fully utilized in the pursuit of project objectives. September 1987
5 To have all concerned staff of all institutions involved in the ISM Research Project conversant with computer use and to have their computers fully utilized in the pursuit of project objectives. September 1987
7 To introduce computer aided techniques into water management research concerned with scheduling irrigation water to crops, keeping in view that canal supplies are delivered on a fixed schedule. March 1988
8 To provide on-the-job training to NADLIN and cooperating library staff who manage and operate the ISMR Documentation and Information network. April 1988
9 To make the best use video equipment, procured under the ISM Research project, as a research and information dissemination tool. June 1988
10 To introduce the application of Geographical Information Systems, operating on personal computers, to the field of water resources management. [Toru Otawa] August 1988
11 To introduce agricultural drainage theory and construction techniques to research engineers. [Larry King] August 1988
12 Provide training in simulation of ground-water flow to a well so that trainees may subsequently use simulation to study and understand well characteristics and be able to analyze results of pumping tests of deteriorating tubewells. [Gary Johnson] January 1989.
13 To provide on the job training to officers of NADLIN and to librarians and documentalists of collaborating libraries. [Gail Kostinko] January 1989.
14 To train drainage engineers and planners in evaluation and monitoring of drainage projects in order to assess project benefits. [Larry King] April 1989.
15 To train junior and senior engineers in the use of various methods for determining "potential ET" and "actual water requirements" of irrigated crops. [William O. Pruitt] April 1989.
16 To get the irrigation/agricultural researchers and engineers acquainted with the use of tensiometers for irrigation research at the farm level for increasing water use efficiency. [Akhtar Bhatti] April 1989.
17 Provide intensive training in database management through the use of dBase III Plus software for SCARPS monitoring organization officials. [Wilson Lear] August 1989
18 Provide a unified presentation of material basic to use of computers for modelling and data base operations. [Edward Wiser] August 1989
19 To inculcate ability for reconnaissance of irrigation organization and impart skills for rapid assessment of research requirements for eventual intervention to the principal investigators of the EWU sub-project. In addition, to introduce the practice of active review of peer research sites as an integral feature of quality research activity. [Jamshed Tirmizi and John Baxter. August 1989
20 To increase analytical output and promote assay results that are accurate and reproducible. To optimize available resources and to produce results in an efficient way. [Leonard R. Mattick] December 1989
21 To review ISM/R results from experiments that have been conducted in the areas of N leaching, and biotic and chemical reclamation. To analyze successes and problems with the above two phases of the Farm Water Management Research sub-project. Introduce format and reporting procedures to be utilized by the Pakistani scientists to publish the results of their experiments, and to create a first draft of the final report for these experiments. To identify and coordinate future direction of cooperative research in these areas. [ John C. Baxter] September 1989.
22 To train selected SCARPS monitoring organization officials in the BASIC programming language. [Wilson Lear] January 1990
23 Present a general introduction to SPSS/PC+, including data entry, access to DBASE files, and elementary statistical analysis; Present a detailed introduction to the analysis of variance using SPSS/PC+. [Edward Wiser] January 1990
28 To get the GOP participants acquainted with recording, inserting and editing techniques through sophisticated VHS video and editing systems distributed under ISM/R to various research collaborators in Pakistan [Erik Anderson] April 1990.
Other Descriptive Information
11 King, Larry G. Design and construction of horizontal drains. December 1989
12 Johnson, Gary S. Computer simulation of ground-water flow to a well. January 1989
14 King, Larry G. [Monitoring and evaluation of drainage.] May 1990
15 Pruitt, William O. Evapotranspiration and irrigation water requirements. February 1990
16 Bhatti, M. Akhtar and Hayat Ullah Khan. Tensiometers and their use in irrigation management. June 1989
18 Wiser, Edward H. Advanced programming techniques. August 1989
20 Mattick, Leonard R. Laboratory management for analytical laboratories in developing countries. December 1989
27 Khan, Abdul Ghaffar and Hayat-Ullah Khan. Training course on the calibration, use and maintenance of the surveying equipment including EDM theodolites. July 1990.
Other Descriptive Information
PIO/T (Project Implementation Order/Technical Services) no.391-0467-3-30412, 1985ISM Research, Master work plan. December 1985
Proposal: Extension of ISM Research Contract #391-0467-C-00-5044-00, University of Idaho, September 7, 1989
Technical Assistance Team, University of Idaho. Mid-term status of Irrigation Systems Management Research Project. October 1988
ISM/R Program evaluation, first draft, April 13, 1989
Final report: Project review/Technical evaluation, April 17, 1989
Irrigation Systems Management Research, Quarterly meeting, 23 August 1989 Quarterly meeting 18 November 1989 Quarterly meeting 15 February, 1990
Allen, Richard G. Pakistan irrigation scheduling program for Wara Bundi and demand irrigation systems, August 1988
Kahn, Hayat Ullah, et al. Evaluation on methods of water course construction in Pakistan. November 1988
Trimmer, Walter L. Partial irrigation and its application in Pakistan. September 1988
Lusk, Mark W. and Jamshed Tirmizi. Description and hypothesis formulation in irrigation organization research: a workshop. Workshop readings and notes, February 25-March 2, 1989
Toney, Michael H., Jamshed Tirmizi and Bradley W. Parlin. Operationalization of the conceptual framework in irrigation organization research: workshop readings, August 6-10, 1989
Papers presented at the ISM/R all-project workshop organized by the University of Idaho, session IV: Water and fertilizer management. Lahore, May 1990
Course on 21-X micrologger programming operation & data manipulation techniques, conducted by ISM/Research project, June 18-21, 1990.
Butterfield, Samuel H. How foreign aid works. Title XII strengthening grant program seminar, 18 January 1982
Corey, G.L. Size of farm in relation to irrigation pumping costs. For presentation at the 1968 annual meeting of the Pacific Northwest Region and the American Society of Agricultural Engineers, Boise, Idaho, October 16-19, 1968
Curtis, Ronald V. and Russell Backus. Discussion paper: Irrigation systems management. March 8, 1982
Hafeez, Abdul. Irrigation analysis of Chabba distributary. (Directed study) submitted to G.L. Corey, December 1989
Renfro, Raymond Z.H. and Edward W. Sparling. Private Tubewell and canal water trade on Pakistan Punjab watercourses. September 1982.
Women in Development proposal, 1988-1989.
Corey, G.L., et al. Similitude for non-steady drainage of partially saturated soils, August 1965
Blaney, Harry F. and Wayne D. Criddle. Determining water requirements in irrigated areas from climatological and irrigation data. USDA August 1950.
Johnson, Sam H., et al. Medium scale irrigation systems in northeast Thailand: future directions. ISPAN, September 1989
Potential for irrigated agricultural development in Pakistan, July 1981
Lower Indus water management and reclamation research project, Sind, July 1983.
Water management research at Mona proposed for funding by U.S. AID during 1983-1988, undated
Tirmizi, Jamshed and Bradley Parlin. Societal dynamics and irrigation systems; a compilation of working papers - phase I. June 1989.
Research on traditional irrigation systems, July 1988
Munir, Muhammad and Muhammad Akram Kahlown. Sailaba irrigation in Baluchistan; bench mark study. December 1988.
US. AID. Project paper, India irrigation management and training. 2 v. April-May 1983
Fujioka, Y. and T. Kitamura. Approximate solution of a vertical drainage problem. Journal of Geophysical Research, December 15, 1964.
Wright, James L. and Marvin E. Jensen. Peak water requirements of crops in southern Idaho. Journal of the Irrigation and Drainage Division, Proceedings of the American Society of Civil Engineers, June 1972.
Ferozsons Atlas for Pakistan, 1986.
Other Descriptive Information
Return to TopOther Descriptive Information
AZRI | Arid Zone Research Institute |
CGP | Competitive Grants Program |
DRIP | Drainage and Reclamation Institute of Pakistan |
EWU | Encouraging Water Users project |
GOP | Government of Pakistan |
ISM/R | Irrigation Systems Management Research Project |
IRI | Irrigation Research Institute |
LIM | Lower Indus Mona (Water Management and Reclamation Plan) |
NADLIN | National Documentation Centre, Library & Information Network |
NARC | National Agricultural Research Center |
PARC | Pakistan Agricultural Research Council |
PC-1 | Planning Commission-1 (Reports and requisition authorization) |
PCRWR | Pakistan Council for Research in Water Resources |
PIO/T | Project implementation order/Technical services |
PIRI | Punjab Irrigation Research Institute |
SCARP | Salinity Control and Reclamation Project |
USAID | United States Agency for International Development |
WAPDA | Water and Power Development Authority |
WM&ED | Watercourse Monitoring and Evaluation Directorate |
Administrative Information
Arrangement
A majority of the material in this archival group was in labeled folders when received. The records represent the files of both the Field Office in Lahore, Pakistan and the Home Office at the University of Idaho. Although duplication of material does occur, most notably in the technical directives, TDY reports and telexes and faxes, both sets of records were retained to reflect the activities and interrelationship of both offices. Each of these two series has parallel subseries which are designated financial, reports, procurement of equipment, personnel, office, and photographs.
The first series contains the records of the Field Office. Subseries one contains the financial records and includes cash and voucher journals, checkbook stubs, travel claims and bank statements, all of which show expenditures by the office for local goods and services. These expenses were reimbursed by USAID.
The reports include technical directives, called task orders early in the project, which authorized and described in detail the various projects undertaken by the program. Also included are short- term advisor reports whose numbers correspond to the technical directives, in-country training program proposals and reports, and symposium proceedings. The proposals and reports are in numerical order and a complete list is contained in appendices I-IV.
The third subseries is Procurement which consists of lists of equipment purchased for use by the project.
Personnel, the fourth subseries, contains reports on the participant training program, lists of expatriates working in Pakistan on ISM/R, and personnel files for Pakistani employees of the project.
The final subseries contains photographs of several irrigation projects in Pakistan and views of the surrounding countryside.
Home Office Records comprise the second series. The subseries are in the same order as the Field Office Records.
The financial records contain detailed yearly budgets for the project including projected and actual expenditures.
The reports section consists of technical directives and short-term advisor or TDY reports. These are arranged alphabetically by author as opposed to the numerical arrangement in the Field Office Records.
The procurement of equipment subseries contains extensive records concerning the authorization for and purchase of the equipment shipped to Pakistan. It also contains records of the transfer of this equipment to the Government of Pakistan at the conclusion of the project. This equipment included computers, desks and other office equipment as well as scientific equipment.
The personnel material includes recruitment information for all advisory positions and personnel files of the expatriates working on the project. The third area covered in this subseries is the participant training program which provided for the training in American universities of Pakistani engineers and other professionals who would take over the management of the irrigation systems at the conclusion of the project. Included are correspondence files which detail the setting up of the individual programs, and files on the participants and programs.
The office files contain the project contract, program management information, correspondence, including telexes and faxes, semi-annual and end of tour reports, project reviews, orientation materials for Americans going to Pakistan, copies of the ISM/R newsletter, and reports on the various ISM/R subprojects and training programs.
The photographs in this series include slides used in an introduction to the Palouse for Pakistani visitors, and photographs taken during the Pakistani Project directors tour of Idaho irrigation projects. Also included are a map of the Indian subcontinent and a Lahore guide map.
Because the voucher registers exist, and there is also other summary expenditure information, the vouchers and attached documenting receipts were discarded. Also removed from the collection were duplicate copies of technical directives and reports, and applications of unsuccessful candidates for positions with ISM/R project. In all the records were reduced by 11 cubic feet.
Detailed Description of the Collection
-
Series I. Field Office, 1985-1991
-
A. Financial Records, 1985-1991
-
Description: General ledger1 itemDates: 1985-1991Container: Box/Folder 1/1
-
Description: Petty cash journal, W.E.F.2 itemsDates: 1987-March 1991Container: Box/Folder 1/2-3
-
Description: Imprest petty cash journal2 itemsDates: August 1985-March 1991Container: Box/Folder 1/4-5
-
Description: Voucher registers I & II2 itemsDates: 1985-1991Container: Box/Folder 1/6-7
-
Description: Checkbook stubs, Rupee account21 itemsDates: 1985-1991Container: Box/Folder 1/8-9
-
Description: Deposit slips4 itemsDates: 1985-1990Container: Box/Folder 1/10
-
Description: Dollar account bank statements and related correspondence113 itemsDates: 1986-1991Container: Box/Folder 1/11
-
Description: Receipt vouchers, Account 488179 itemsDates: 1985-1990Container: Box/Folder 1/12
-
Description: Receipt vouchers, IMPREST50 itemsDates: 1986-1991Container: Box/Folder 1/13
-
Description: Receipt vouchers, USAID advances3 itemsDates: 1987Container: Box/Folder 1/14
-
Description: Monthly voucher summaries59 itemsDates: 1985-1991Container: Box/Folder 1/15-17
-
Description: Vouchers for advances6 itemsDates: 1987-1989Container: Box/Folder 1/18
-
Description: Travel claims, local (arranged by person)284 itemsDates: 1985-1989Container: Box/Folder 1/19-25
-
Description: Travel claims, local99 itemsDates: 1985-1989Container: Box/Folder 2/26-28
-
Description: Travel claims, expatriate284 itemsDates: 1985-1990Container: Box/Folder 2/29-32
-
Description: Bills for collection, personal telephone calls102 itemsDates: 1987-1991Container: Box/Folder 2/33
-
Description: Bank statements and related correspondence, American Express Bank, Lahore179 itemsDates: 1985-1991Container: Box/Folder 2/34-35
-
Description: Journal sheet, monthly totals, U.S, dollar1 itemDates: 1985-1990Container: Box/Folder 2/36
-
Description: Commitment liquidation record1 itemDates: 1990Container: Box/Folder 2/37
-
Description: Budget41 itemsDates: 1985-1988Container: Box/Folder 2/38
-
Description: Budget management69 itemsDates: 1985-1990Container: Box/Folder 2/39
-
Description: Research component, budget32 itemsDates: 1985Container: Box/Folder 2/40
-
-
B. Reports, 1985-1990
-
Description: Technical directives (See appendix I for complete list) 1-83679 itemsDates: 1985-1990Container: Box/Folder 2/41-68
-
Description: Technical directives, 84-8925 itemsDates: 1990Container: Box/Folder 3/69-70
-
Description: Short term advisor reports (See appendix II for complete list), 1-8278 itemsDates: 1986-1990Container: Box/Folder 3/71-88
-
Description: In country training program: Approvals, projects 2-1314 itemsDates: 1988-1989Container: Box/Folder 3/89
-
Description: In country training program: Proposals and correspondence, projects 10-27 (see appendix III for complete list)164 itemsDates: 1988-1990Container: Box/Folder 3/90-98
-
Description: In country training program: Reports 11-14 (see appendix IV for complete list)3 itemsDates: 1989-1990Container: Box/Folder 3/99-100
-
Description: In country training program: Reports 15-275 itemsDates: 1989-1990Container: Box/Folder 4/101-103
-
Description: Other ISM/R reports (See appendix V for complete list)53 itemsDates: 1985-1990Container: Box/Folder 4/104-111
-
Description: ISM document listing1 itemDates: undatedContainer: Box/Folder 4/112
-
Description: Symposium: Awards and budget24 itemsDates: 1990Container: Box/Folder 4/113
-
Description: Symposium: Mailing list15 itemsDates: 1990Container: Box/Folder 4/114
-
Description: Symposium: Proceedings, 5v5 itemsDates: 1990Container: Box/Folder 4/115
-
-
C. Procurement of Equipment, 1989
-
Description: Equipment lists4 itemsDates: 1989Container: Box/Folder 5/116
-
-
D. Personnel, 1985-1990
-
Description: Quarterly training reports6 itemsDates: 1989-1990Container: Box/Folder 5/117
-
Description: Participant training plans9 itemsDates: 1987-1990Container: Box/Folder 5/118
-
Description: Participant training printouts4 itemsDates: 1990Container: Box/Folder 5/119
-
Description: Participant training--Pakistan Computing Consultants, training program documents1 itemDates: 1987-1991Container: Box/Folder 5/120
-
Description: Public relations expenses (U of I added expenses for workshops, e.g. lunches, dinners in conjunction with certificate presentation ceremonies)1 itemDates: 1989Container: Box/Folder 5/121
-
Description: USAID report of long term and short term persons in the country on ISM/R9 itemsDates: 1990Container: Box/Folder 5/122
-
Description: Embassy report (Americans in the country with ISM/R)14 itemsDates: 1990Container: Box/Folder 5/123
-
Description: Locator file (where expatriates are staying)13 itemsDates: 1989-1990Container: Box/Folder 5/124
-
Description: Personnel files (locals), A-Z (see appendix VI for complete list of names)412 itemsDates: 1985-1990Container: Box/Folder 5/125-150
-
Description: Leave status reports, expatriates14 itemsDates: 1988-1990Container: Box/Folder 5/151
-
Description: Leave applications, locals778 itemsDates: 1985-1990Container: Box/Folder 5/152-169
-
-
E. Office, 1985-1991
-
Description: Telexes424 itemsDates: 1985-1990Container: Box/Folder 5/170-172
-
Description: Faxes280 itemsDates: June-December 1990Container: Box/Folder 5/173-174
-
Description: Faxes, Outgoing: Local and unofficial26 itemsDates: 1990Container: Box/Folder 5/175
-
Description: Faxes: Shane Ryland33 itemsDates: March-November 1990Container: Box/Folder 5/176
-
Description: Faxes: Shipment of goods and equipment to U.S.23 itemsDates: 1990Container: Box/Folder 5/177
-
Description: Faxes to/from UI57 itemsDates: December 1990-March 1991Container: Box/Folder 6/178
-
Description: Research program specialist, correspondence26 itemsDates: 1988-1989Container: Box/Folder 6/179
-
Description: Research management institution building, readings8 itemsDates: 1970-1984Container: Box/Folder 6/180
-
Description: Revised compensation plan46 itemsDates: 1985-1990Container: Box/Folder 6/181-182
-
Description: ISM/R policy documents3 itemsDates: 1989-1990Container: Box/Folder 6/183
-
Description: Publications list3 itemsDates: 1990Container: Box/Folder 6/184
-
Description: Tarus W. foil project7 itemsDates: 1989Container: Box/Folder 6/185
-
Description: Upgrading soil mechanics and hydraulics labs at Karachi and Hyderabad17 itemsDates: 1989-1990Container: Box/Folder 6/186
-
-
F. Photographs, 1988-1990
-
Description: 35mm color negatives: oriental carpets, irrigation work5 itemsDates: 1988-1989Container: Box/Folder 6/187
-
Description: Photographs of irrigation projects and surrounding scenery164 itemsDates: 1988-1990Container: Box/Folder 6/188
-
-
-
Series II. Home Office, 1983-1992
-
A. Financial Records, 1985-1992
-
Description: Budgets6 itemsDates: FY 1985-1987Container: Box/Folder 6/189-194
-
Description: Budgets13 itemsDates: FY 1987-1990Container: Box/Folder 7/195-207
-
Description: Budgets7 itemsDates: FY 1990-1992Container: Box/Folder 8/208-214
-
Description: Miscellaneous financial Records5 itemsDates: 1990-1991Container: Box/Folder 8/215
-
-
B. Reports, 1985-1991
-
Description: Technical directives and training programs3 itemsDates: 1986-1991Container: Box/Folder 8/216-218
-
Description: TDY reports--Guidelines1 itemContainer: Box/Folder 8/219
-
Description: Bassett, D.L.2 itemsDates: 1989Container: Box/Folder 8/220
-
Description: Bondurant, James8 itemsDates: 1986-1991Container: Box/Folder 8/221
-
Description: Brockway, C.E.5 itemsDates: 1986-1989Container: Box/Folder 8/222
-
Description: Carlson, John1 itemDates: 1988Container: Box/Folder 8/223
-
Description: Chaudhry, M. Haniff1 itemDates: 1989Container: Box/Folder 8/224
-
Description: Corapcioglu, Yavuz1 itemDates: 1990Container: Box/Folder 8/225
-
Description: Corey, Gilbert L.15 itemsDates: 1985-1990Container: Box/Folder 8/226
-
Description: Doering, E.J.2 itemsDates: 1987Container: Box/Folder 8/227
-
Description: Dow, A. Irving2 itemsDates: 1986Container: Box/Folder 8/228
-
Description: Fitzsimmons, D.W.2 itemsDates: 1986-1988Container: Box/Folder 8/229
-
Description: Haggerty, Bob2 itemsDates: 1986-1989Container: Box/Folder 8/230
-
Description: Hamilton, Joel7 itemsDates: 1986-1988Container: Box/Folder 8/231
-
Description: Hanson, Donna14 itemsDates: 1986-1988Container: Box/Folder 8/232
-
Description: Hine, Patricia1 itemDates: 1988Container: Box/Folder 8/233
-
Description: Howell, Robert E.1 itemDates: 1990Container: Box/Folder 8/234
-
Description: Johnson, Gary S.1 itemDates: 1986Container: Box/Folder 8/235
-
Description: King, Larry G.9 itemsDates: 1986-1990Container: Box/Folder 8/236-238
-
Description: Kostinko, Gail1 itemDates: 1989Container: Box/Folder 8/239
-
Description: Lusk, Mark W.2 itemsDates: 1989Container: Box/Folder 9/240
-
Description: Mattick, Leonard4 itemsDates: 1988-1990Container: Box/Folder 9/241
-
Description: Moden, Walter4 itemsDates: 1987Container: Box/Folder 9/242
-
Description: Naylor, Denny V.3 itemsDates: 1987-1990Container: Box/Folder 9/243
-
Description: Nordin, Carl and A.R. Robinson4 itemsDates: 1986Container: Box/Folder 9/244
-
Description: Parlin, Bradley4 itemsDates: 1988-1990Container: Box/Folder 9/245
-
Description: Pruitt, W.O.1 itemDates: 1990Container: Box/Folder 9/246
-
Description: Ra1ston, Dale2 itemsDates: 1987Container: Box/Folder 9/247
-
Description: Reiss, Peter12 itemsDates: 1985-1986Container: Box/Folder 9/248
-
Description: Replogle, John A.1 itemDates: 1990Container: Box/Folder 9/249
-
Description: Ryland, Shane3 itemsDates: 1989-1991Container: Box/Folder 9/250
-
Description: Schreiber, David L.1 itemDates: 1988Container: Box/Folder 9/251
-
Description: Stellmon, M. William1 itemDates: 1990Container: Box/Folder 9/252
-
Description: Toney, Michael B.1 itemDates: 1989Container: Box/Folder 9/253
-
Description: Trimmer, Walter L.1 itemDates: 1988Container: Box/Folder 9/254
-
Description: Watts, Fred1 itemDates: 1987Container: Box/Folder 9/255
-
Description: Wiese, Maury7 itemsDates: 1986-1990Container: Box/Folder 9/256
-
Description: Wiser, Edward3 itemsDates: 1988-1989Container: Box/Folder 9/257
-
Description: Irshad, S.M., Study report of field tours (northwest)1 itemDates: May 18-28 and June 8-July 2, 1988Container: Box/Folder 9/258
-
Description: The irrigation systems management research project1 itemDates: ca. 1990Container: Box/Folder 9/259
-
-
C. Procurement of Equipment, 1984-1990
-
Description: PC-I: GOP approvals7 itemsDates: 1985-1987Container: Box/Folder 9/260
-
Description: Miscellaneous purchases33 itemsDates: 1985-1988Container: Box/Folder 9/261
-
Description: IBM XTs W/power supply29 itemsDates: 1986-1987Container: Box/Folder 9/262
-
Description: Equipment, Miscellaneous17 itemsDates: 1986-1988Container: Box/Folder 9/263
-
Description: Field Office report1 itemDates: 1989Container: Box/Folder 9/264
-
Description: PC-I 400-RP-01: Computer procurement41 itemsDates: 1986-1987Container: Box/Folder 9/265
-
Description: 02: Photo/video procurement2 itemsDates: 1987Container: Box/Folder 9/266
-
Description: 03: Library procurement87 itemsDates: 1987-1988Container: Box/Folder 9/267
-
Description: 04: Office equipment procurement14 itemsDates: 1987Container: Box/Folder 9/268
-
Description: 05: Surveying equipment procurement16 itemsDates: 1987Container: Box/Folder 9/269
-
Description: 06: Field equipment procurement19 itemsDates: 1987-1988Container: Box/Folder 9/270
-
Description: 07: Meteorological procurement19 itemsDates: 1987Container: Box/Folder 9/271
-
Description: 08: Laboratory equipment procurement25 itemsDates: 1987Container: Box/Folder 9/272-273
-
Description: 09: Office/photo procurement12 itemsDates: 1987-1988Container: Box/Folder 9/274
-
Description: 10: Field equipment 220 itemsDates: 1987-1988Container: Box/Folder 9/275
-
Description: 11: Lab equipment 236 itemsDates: 1988Container: Box/Folder 10/276-277
-
Description: 12: Well inspection system16 itemsDates: 1987-1988Container: Box/Folder 10/278
-
Description: 13: Well logger23 itemsDates: 1987-1988Container: Box/Folder 10/279
-
Description: 14: Nitrogen analyzer38 itemsDates: 1987-1989Container: Box/Folder 10/280
-
Description: Communications with DAI (Development Alternatives, Inc.)75 itemsDates: 1986-1988Container: Box/Folder 10/281
-
Description: Communications with DAI - electronic procurement121 itemsDates: 1987-1988Container: Box/Folder 10/282
-
Description: USAID, GOP approvals5 itemsDates: 1986Container: Box/Folder 10/283
-
Description: Equipment costs, 1st, 2nd orders7 itemsDates: 1987-1989Container: Box/Folder 10/284
-
Description: Equipment locations4 itemsDates: 1986-1987Container: Box/Folder 10/285
-
Description: Export license16 itemsDates: 1984-1985Container: Box/Folder 10/286
-
Description: International transportation network19 itemsDates: 1986Container: Box/Folder 10/287
-
Description: Procurement procedures6 itemsDates: 1986-1989Container: Box/Folder 10/288
-
Description: PC-I Proforma: Irrigation Systems Management Research Project, PCRWR, Islamabad1 itemDates: 1985Container: Box/Folder 10/289
-
Description: Irrigation System Management Research PARC research, Islamabad1 itemDates: 1986Container: Box/Folder 10/290
-
Description: Irrigation Systems Management Research, WAPDA, Lahore1 itemDates: 1985Container: Box/Folder 10/291
-
Description: Mona Reclamation Experiment Project, 1984-1988, Bahlwal, October 19841 itemContainer: Box/Folder 10/292
-
Description: Lower Indus Water Management and Reclamation Research Project, Sind, Lahore292 itemsDates: July 1983Container: Box/Folder 10/293
-
Description: Masterplan5 itemsDates: 1985-1987Container: Box/Folder 10/294
-
Description: Annual work plan14 itemsDates: 1985/1986-1989/1990Container: Box/Folder 10/295-299
-
Description: Equipment lists and specifications5 itemsDates: 1988-1989Container: Box/Folder 10/300
-
Description: Equipment notebook: reports, inventory, correspondence, transfers, packing lists1 itemDates: 1987-1988Container: Box/Folder 10/301-303
-
Description: Equipment lists, specifications reports59 itemsDates: 1988-1989Container: Box/Folder 10/304
-
Description: Original equipment lists submitted to USAID for approval1 itemDates: 1986Container: Box/Folder 11/305
-
Description: Equipment, first order100 itemsDates: 1986-1988Container: Box/Folder 11/306
-
Description: IRI equipment50 itemsDates: 1988-1989Container: Box/Folder 11/307
-
Description: Sind IRI specifications6 itemsDates: 1990Container: Box/Folder 11/308
-
Description: LIM equipment12 itemsDates: 1988-1989Container: Box/Folder 11/309
-
Description: Equipment, second order31 itemsDates: 1985-1987Container: Box/Folder 11/310
-
Description: IRI equipment lists/requirements13 itemsDates: 1987-1988Container: Box/Folder 11/311
-
Description: USAID approvals, equipment9 itemsDates: 1989Container: Box/Folder 11/312
-
Description: Source/origin wavers27 itemsDates: 1986-1990Container: Box/Folder 11/313
-
Description: Equipment maintenance & miscellaneous7 itemsDates: 1989-1990Container: Box/Folder 11/314
-
Description: Equipment transfer4 itemsDates: 1990Container: Box/Folder 11/315
-
Description: Equipment procurement61 itemsDates: 1990Container: Box/Folder 11/316
-
Description: Equipment procurement under ISM/R contract, LIM & IRI specifications1 itemDates: May 1989Container: Box/Folder 11/317
-
Description: Record of equipment delivered to GOP agencies, first procurement1 itemDates: October 15, 1990Container: Box/Folder 11/318
-
Description: Equipment31 itemsDates: 1987-1989Container: Box/Folder 11/319
-
Description: Equipment inventory21 itemsDates: 1988-1990Container: Box/Folder 11/320
-
Description: Air compressor for SMO7 itemsDates: 1990Container: Box/Folder 11/321
-
Description: Equipment summaries8 itemsDates: 1989-1990Container: Box/Folder 11/322-323
-
Description: Notebook I, WSU purchase orders66 itemsDates: 1989-1990Container: Box/Folder 11/324
-
Description: Notebook II, Property inventories, nonexpendable63 itemsDates: 1987-1990Container: Box/Folder 11/325
-
-
D. Personnel, 1984-1990
-
1. Recruitment, 1984-1989
-
Description: Recruitment, General information26 itemsDates: 1987-1988Container: Box/Folder 11/326
-
Description: Chief of Party28 itemsDates: 1988Container: Box/Folder 11/327
-
Description: Data Management Specialist1 itemDates: 1989Container: Box/Folder 11/328
-
Description: Field Director1 itemDates: 1989Container: Box/Folder 11/329
-
Description: Hydrologist69 itemsDates: 1986-1988Container: Box/Folder 11/330-332
-
Description: Irrigation Agronomist69 itemsDates: 1986-1988Container: Box/Folder 11/333-335
-
Description: Program Assistant60 itemsDates: 1984-1989Container: Box/Folder 11/336-339
-
Description: Research Program Specialist11 itemsDates: 1986-1988Container: Box/Folder 12/340
-
Description: Social Scientist118 itemsDates: 1986-1988Container: Box/Folder 12/341-343
-
Description: Training Coordinator9 itemsDates: 1986Container: Box/Folder 12/344
-
-
2. Personnel Files, 1984-2003
-
Description: Administrators trip to Pakistan2 itemsDates: 1989Container: Box/Folder 12/345
-
Description: Allen, Richard30 itemsDates: 1988Container: Box/Folder 12/346
-
Description: Baxter, John115 itemsDates: 1988-1991Container: Box/Folder 12/347
-
Description: Bassett, Day L.23 itemsDates: 1986-1990Container: Box/Folder 12/348
-
Description: Becker, Clarence18 itemsDates: 1990Container: Box/Folder 12/349
-
Description: Bloomsburg, George4 itemsDates: 1990Container: Box/Folder 12/350
-
Description: Bondurant, James A.109 itemsDates: 1987-1991Container: Box/Folder 12/351
-
Description: Branen, Larry5 itemsDates: 1987Container: Box/Folder 12/352
-
Description: Brockway, Charles40 itemsDates: 1986-1989Container: Box/Folder 12/353
-
Description: Busch, John20 itemsDates: 1989Container: Box/Folder 12/354
-
Description: Carlson, John26 itemsDates: 1987-1988Container: Box/Folder 12/355
-
Description: Corapcioglu, Yavuz9 itemsDates: 1989Container: Box/Folder 12/356
-
Description: Corey, Gilbert132 items : Added in 2023: Nomination of Gilbert Lee Corey for the John Deere Gold Medal Award, 1987; Nomination of Gilbert Lee Corey for the Kishida International Award, 1988; obituary for Gilbert Corey, 2003Dates: 1986-2003Container: Box/Folder 12/357
-
Description: Dimick, Niel26 itemsDates: 1986-1987Container: Box/Folder 12/358
-
Description: Doering159 itemsDates: 1986-1991Container: Box/Folder 12/359-360
-
Description: Dow, Irving7 itemsDates: 1986-1987Container: Box/Folder 12/361
-
Description: English, Marshall6 itemsDates: 1989Container: Box/Folder 12/362
-
Description: Fedale, Scott27 itemsDates: 1986-1988Container: Box/Folder 12/363
-
Description: Fitzsimmons, Delbert47 itemsDates: 1985-1988Container: Box/Folder 12/364
-
Description: Geiger, Joseph13 itemsDates: 1988-1989Container: Box/Folder 12/365
-
Description: George, Paulette1 itemDates: 1984Container: Box/Folder 12/366
-
Description: Haggerty, Robert61 itemsDates: 1987-1990Container: Box/Folder 12/367
-
Description: Hamilton, Joel26 itemsDates: 1986-1988Container: Box/Folder 12/368
-
Description: Hanson, Donna36 itemsDates: 1985-1988Container: Box/Folder 12/369
-
Description: Hine, Patricia14 itemsDates: 1987-1988Container: Box/Folder 12/370
-
Description: Howell, Bob5 itemsDates: 1990-1991Container: Box/Folder 12/371
-
Description: Johnson, Gary76 itemsDates: 1985-1990Container: Box/Folder 12/372
-
Description: Kemper, W. Doral26 itemsDates: 1989Container: Box/Folder 12/373
-
Description: Khan, Samina20 itemsDates: 1988-1989Container: Box/Folder 12/374
-
Description: King, Larry3 itemsDates: 1986-1989Container: Box/Folder 12/375
-
Description: Kostinko, Gail32 itemsDates: 1988-1989Container: Box/Folder 12/376
-
Description: Leonhart, Cynthia17 itemsDates: 1989-1991Container: Box/Folder 12/377
-
Description: Lingg, Al15 itemsDates: 1989Container: Box/Folder 12/378
-
Description: Lowdermilk, Max1 itemDates: 1987-1988Container: Box/Folder 12/379
-
Description: Lusk, Mark38 itemsDates: 1989Container: Box/Folder 12/380
-
Description: Mattick, Leonard67 itemsDates: 1988-1990Container: Box/Folder 12/381
-
Description: Moden, Walter11 itemsDates: 1986-1987Container: Box/Folder 12/382
-
Description: Moore, Rae Ellen23 itemsDates: 1987-1989Container: Box/Folder 12/383
-
Description: Naylor, Denny36 itemsDates: 1987-1990Container: Box/Folder 13/384
-
Description: Nordin, Carl F.36 itemsDates: 1986-1990Container: Box/Folder 13/385
-
Description: Otawa, Toru23 itemsDates: 1989Container: Box/Folder 13/386
-
Description: Parlin, Bradley86 itemsDates: 1988-1990Container: Box/Folder 13/387
-
Description: Pruitt, William30 itemsDates: 1989Container: Box/Folder 13/388
-
Description: Ra1ston, Dale R.11 itemsDates: 1985-1987Container: Box/Folder 13/389
-
Description: Reiss, Peter5 itemsDates: 1986-1987Container: Box/Folder 13/390
-
Description: Replogle, John15 itemsDates: 1990Container: Box/Folder 13/391
-
Description: Riley, John A.5 itemsDates: 1988Container: Box/Folder 13/392
-
Description: Robichaud, Peter11 itemsDates: 1989Container: Box/Folder 13/393
-
Description: Robinson, A.R.29 itemsDates: 1985-1996Container: Box/Folder 13/394
-
Description: Robinson, Clarence35 itemsDates: 1987-1991Container: Box/Folder 13/395
-
Description: Ryland, Shane23 itemsDates: 1988-1990Container: Box/Folder 13/396
-
Description: Schreiber, David40 itemsDates: 1988-1989Container: Box/Folder 13/397
-
Description: Schwennesen, Jean9 itemsDates: 1986-1987Container: Box/Folder 13/398
-
Description: Simmons, George6 itemsDates: 1988Container: Box/Folder 13/399
-
Description: Stellmon, M. William15 itemsDates: 1989-1990Container: Box/Folder 13/400
-
Description: Toney, Michael26 itemsDates: 1988-1990Container: Box/Folder 13/401
-
Description: Trimmer, Walter16 itemsDates: 1986Container: Box/Folder 13/402
-
Description: Watts, F.J.21 itemsDates: 1987Container: Box/Folder 13/403
-
Description: Wiese, Maury79 itemsDates: 1987-1990Container: Box/Folder 13/404-405
-
Description: Williams, Doris27 itemsDates: 1988-1989Container: Box/Folder 13/406
-
Description: Wiser, Edward130 itemsDates: 1988-1990Container: Box/Folder 13/407
-
Description: Wray, Gleanne4 itemsDates: 1987Container: Box/Folder 13/408
-
Description: Zakrajsek, Dorothy4 itemsDates: 1987Container: Box/Folder 13/409
-
Description: Agreement to pay annual leave9 itemsDates: 1990Container: Box/Folder 13/410
-
Description: Biodata forms41 itemsDates: 1986-1990Container: Box/Folder 13/411
-
Description: Consulting and long term agreements7 itemsDates: 1988Container: Box/Folder 13/412
-
Description: Insurance50 itemsDates: 1984-1989Container: Box/Folder 13/413
-
Description: Returned overhead18 itemsDates: 1989Container: Box/Folder 13/414
-
Description: Sunday pay24 itemsDates: 1988-1990Container: Box/Folder 13/415
-
Description: Travel costs46 itemsDates: 1987-1989Container: Box/Folder 13/4l6
-
-
3. Participant Training, 1986-1990
-
Description: Asian Institute of Technology10 itemsDates: 1987-1988Container: Box/Folder 13/417
-
Description: Study tour, S.E. Asia Water Users Associations5 itemsDates: 1988Container: Box/Folder 13/418
-
Description: ISM/R Correspondence, in-coming26 itemsDates: 1987-1990Container: Box/Folder 13/4l9
-
Description: ISM/R Correspondence, out-going17 itemsDates: 1987-1990Container: Box/Folder 13/420
-
Description: ISM/R Telexes and faxes197 itemsDates: 1987-1990Container: Box/Folder 13/421
-
Description: ISM/R in-country training2 itemsDates: 1987Container: Box/Folder 13/422
-
Description: ISM/R non-degree training evaluations2 itemsDates: 1987-1988Container: Box/Folder 13/423
-
Description: ISM/R training certificates of completion4 itemsDates: 1988-1989Container: Box/Folder 13/424
-
Description: ISM/R training plans45 itemsDates: 1986-1988Container: Box/Folder 13/425-426
-
Description: ISM/R internships28 itemsDates: summer 1988Container: Box/Folder 13/427
-
Description: ISM/R trip reports, Haggerty4 itemsDates: 1986-1989Container: Box/Folder 13/428
-
Description: Pakistan Participant Training Program, Academy for Educational Development5 itemsDates: 1988Container: Box/Folder 13/429
-
Description: Ahmad, Muhammad Naseer and Sheikh Mazhar Saeed, Groundwater modeling short course, 4 weeks29 itemsDates: Fall 1988Container: Box/Folder 13/430
-
Description: Ahmad, Rashid (PCRWR), Technical writing, editing, publications, Colorado State University1 itemDates: 1990Container: Box/Folder 13/431
-
Description: Ahmed, Manzoor and Banaras H. Niazi, Soil reclamation internship11 itemsDates: 1988-1989Container: Box/Folder 13/432
-
Description: Ahmed, Manzoor, Private and public tubewell performance, 3 month internship, Utah State University19 itemsDates: 1990Container: Box/Folder 13/433
-
Description: Ahmed, Dr. Nazir, Biotic and chemical reclamation of soils25 itemsDates: 1987-1989Container: Box/Folder 13/434
-
Description: Ali, Naimat and Umed Ali Buriro (PARC), Soil, water fertilizer interaction, UI, Mahler/Hammel49 itemsDates: 1989Container: Box/Folder 13/435
-
Description: Arain, Khalid Saeed (WAPDA), Water management8 itemsDates: 1988Container: Box/Folder 13/436
-
Description: Aslam, Muhammad, Soil reclamation internship31 itemsDates: 1988-1989Container: Box/Folder 13/437
-
Description: Bajwa, Ather Rashid (WAPDA), Agronomy, Tuskegee University5 itemsDates: 1989Container: Box/Folder 14/438
-
Description: Bhatti, Munir, (CSU USAID/PPTP ISM/R), Research proposal7 itemsDates: 1989Container: Box/Folder 14/439
-
Description: Chaudhry, M.R., Southwestern U.S. trip12 itemsDates: February 1987Container: Box/Folder 14/440
-
Description: Faizi, Fazal Ahmet, Ground and surface water modeling5 itemsDates: Fall 1990Container: Box/Folder 14/441
-
Description: Hydraulic Research Administration Training16 itemsDates: 1990-1991Container: Box/Folder 14/442
-
Description: Iqbal, Jawed (PCRWR), Problems and practices of irrigation systems, Colorado State University3 itemsDates: June-August 1989Container: Box/Folder 14/443
-
Description: Iqbal, Shamin, Short course (18 weeks), Administrative management37 itemsDates: 1989-1990Container: Box/Folder 14/444
-
Description: Irrigation and fertilizer application methods, 5 weeks, PSES/AgEng11 itemsDates: May 20-June 21, 1991Container: Box/Folder 14/445
-
Description: Irrigation management research methodology29 itemsDates: June 3-August 9, 1991Container: Box/Folder 14/446
-
Description: Ismail, Shoaib. Soil reclamation internship, CSU53 itemsDates: 1989Container: Box/Folder 14/447
-
Description: Kazi, Adil Amin (PCRWR/NADLIN), information and dissemination internship27 itemsDates: 1989-1990Container: Box/Folder 14/448
-
Description: Khaleeq, Anjum, Advanced techniques in information technology internship (6 months)28 itemsDates: 1988-1989Container: Box/Folder 14/449
-
Description: Khan, Nasrullah (PCRWR), Hydrology internship30 itemsDates: 1989-1991Container: Box/Folder 14/450
-
Description: Kumbhar, Abdul Majeed Abdullah (PARC), Soil reclamation internship21 itemsDates: 1989Container: Box/Folder 14/451
-
Description: Memon, Shafi Mohammad and Zafar Ullah Khan, Irrigation, soil, water, and fertilizer management internship60 itemsDates: 1989-1990Container: Box/Folder 14/452
-
Description: Moinuddin, Sheikh (WAPDA), Geochemistry of water29 itemsDates: 1989Container: Box/Folder 14/453
-
Description: Nazir, Dr. M. Shafi, Soil, water, fertilizer interaction12 itemsDates: 1989Container: Box/Folder 14/454
-
Description: On-farm irrigation scheduling, design, and evaluation16 itemsDates: May-July 1991Container: Box/Folder 14/455
-
Description: Pakistan ISM/R project directors study tour62 itemsDates: October-November 1987Container: Box/Folder 14/456
-
Description: Research administration study tour31 itemsDates: 1989Container: Box/Folder 14/457
-
Description: Research methodology short course27 itemsDates: 1991Container: Box/Folder 14/458
-
Description: Soil and water conservation and management, USU12 itemsDates: 1989-1990Container: Box/Folder 14/459
-
Description: Salim, Mohammed, Nitrogen management in soils37 itemsDates: 1987-1988Container: Box/Folder 14/460
-
Description: Soomro, Abdul Qayoom (DRIP/PCRWR), Soil and water chemistry22 itemsDates: 1990-1992Container: Box/Folder 14/461
-
Description: Tahir, M. Aslam (PCRWR), Soil and water chemistry, WSU14 itemsDates: June-August, 1990, 1990-1992Container: Box/Folder 14/462
-
Description: Well logging training (COMPROBE/USGS/USBR)23 itemsDates: July-August 1988Container: Box/Folder 14/463
-
Description: Yahya, Muhammad (WAPDA), Biotic reclamation of sodic soils, 8 week short course7 itemsDates: 1990Container: Box/Folder 14/464
-
Description: Yasmin, Muzhat (PCRWR/NADLIN), Information and dissemination internship28 itemsDates: 1989-1990Container: Box/Folder 14/465
-
Description: Zaffar, Ismail, Soil, water, fertilizer interaction19 itemsDates: 1988-1989Container: Box/Folder 14/466
-
Description: Irrigation, water, fertilizer management, UI, Mahler/Hammel, outline and participants55 itemsDates: 1989-1990Container: Box/Folder 14/467-468
-
Description: Nitrogen irrigation crop management, outline and participants60 itemsDates: April 30-September 21, 1990Container: Box/Folder 14/469-470
-
Description: Irrigation management research methodology, short course, outline and participants119 itemsDates: 1989Container: Box/Folder 14/471-473
-
Description: Irrigation management research methodology, short course, outline and participants99 itemsDates: 1990Container: Box/Folder 14/474-475
-
-
-
E. Office, 1983-1991
-
Description: USAID project paper: Pakistan--management of agricultural research and technology1 itemDates: August, 1984Container: Box/Folder 14/476
-
Description: Contract3 itemsDates: 1985Container: Box/Folder 14/477
-
Description: Contract notebook1 itemDates: 1985-1991Container: Box/Folder 14/478-479
-
Description: Program management notebook1 itemDates: 1985-1989Container: Box/Folder 15/480
-
Description: International Association for the Exchange of Students for Technical Experience4 itemsDates: undatedContainer: Box/Folder 15/481
-
Description: Program design - Fitzsimmons67 itemsDates: 1983-1984Container: Box/Folder 15/482
-
Description: Project management - Fitzsimmons32 itemsDates: 1984Container: Box/Folder 15/483
-
Description: Competitive grants review1 itemDates: 1990Container: Box/Folder 15/484
-
Description: Equipment17 itemsDates: 1989-1991Container: Box/Folder 15/485
-
Description: ISM/R stationery4 itemsDates: undatedContainer: Box/Folder 15/486
-
Description: Travel, general2 itemsDates: 1983-1989Container: Box/Folder 15/487
-
Description: Correspondence, John Anania (USAID)/Gilbert Corey16 itemsDates: 1984-1986Container: Box/Folder 15/488
-
Description: Correspondence, USAID contracting office18 itemsDates: 1990Container: Box/Folder 15/489
-
Description: Letters/Memos663 itemsDates: 1983-1991Container: Box/Folder 15/490-497
-
Description: Telexes/Faxes944 itemsDates: 1984-1988Container: Box/Folder 15/495-504
-
Description: Telexes/Faxes611 itemsDates: 1989-1991Container: Box/Folder 16/505-512
-
Description: Reports: End of tour7 itemsDates: 1987-1990Container: Box/Folder 16/513
-
Description: Reports: Semi-annual12 itemsDates: 1987-1991Container: Box/Folder 16/514-515
-
Description: Reports: Project review/evaluation2 itemsDates: 1989Container: Box/Folder 16/516
-
Description: Reports: Progress13 itemsDates: 1986-1989Container: Box/Folder 16/517
-
Description: Advisory committee22 itemsDates: 1984-1989Container: Box/Folder 16/518
-
Description: Air freight shipments61 itemsDates: 1985-1990Container: Box/Folder 16/519
-
Description: Orientation programs: Consultants, VIP, Long-term45 itemsDates: 1987-1988Container: Box/Folder 16/520
-
Description: Travel regulations10 itemsDates: 1985-1991Container: Box/Folder 16/521
-
Description: Announcements, short-term positions9 itemsDates: 1987Container: Box/Folder 16/522
-
Description: Recruitment/Advertising18 itemsDates: 1986-1988Container: Box/Folder 16/523
-
Description: Newsletter9 itemsDates: 1985-1989Container: Box/Folder 16/524
-
Description: Press releases68 itemsDates: 1985-1989Container: Box/Folder 16/525
-
Description: Policy issues, general and specific38 itemsDates: 1985-1989Container: Box/Folder 16/526
-
Description: Institutional policy16 itemsDates: 1984-1990Container: Box/Folder 16/527
-
Description: University of Illinois contract5 itemsDates: 1984-1985Container: Box/Folder 16/528
-
Description: IRIs9 itemsDates: 1989-1990Container: Box/Folder 16/529
-
Description: Technical assistance costs/summary8 itemsDates: 1988-1989Container: Box/Folder 16/530
-
Description: NADLIN4 itemsDates: 1989Container: Box/Folder 16/531
-
Description: Progress reviews4 itemsDates: 1986-1988Container: Box/Folder 16/532
-
Description: IRICO10 itemsDates: 1984-1986Container: Box/Folder 16/533
-
Description: Irrigation research institutes10 itemsDates: 1985-1986Container: Box/Folder 16/534
-
Description: Tours: G.M. Ghattak4 itemsDates: 1986Container: Box/Folder 16/535
-
Description: Tours: SMO training tour1 itemDates: 1988Container: Box/Folder 16/536
-
Description: Tours: Evaluations1 itemDates: 1987Container: Box/Folder 16/537
-
Description: Tours: Project directors82 itemsDates: 1987Container: Box/Folder 17/538
-
Description: Training correspondence9 itemsDates: 1986-1989Container: Box/Folder 17/539
-
Description: Tubewell performance reports3 itemsDates: 1986-1987Container: Box/Folder 17/540
-
Description: Watercourse monitoring/evaluation4 itemsDates: 1986-1987Container: Box/Folder 17/541
-
Description: Surface drainage/water table control3 itemsDates: 1986-1988Container: Box/Folder 17/542
-
Description: Outside Indus3 itemsDates: 1986-1987Container: Box/Folder 17/543
-
Description: Library/Documentation Center2 itemsDates: 1988Container: Box/Folder 17/544
-
Description: Watercourse management2 itemsDates: 1986-1988Container: Box/Folder 17/545
-
Description: Ground and surface water modeling3 itemsDates: 1986-1987Container: Box/Folder 17/546
-
Description: Farm water management8 itemsDates: 1986-1988Container: Box/Folder 17/547
-
Description: Encouraging water users4 itemsDates: 1986-1988Container: Box/Folder 17/548
-
Description: Competitive grants3 itemsDates: 1986-1988Container: Box/Folder 17/549
-
Description: In country training programs10 itemsDates: 1987-1988Container: Box/Folder 17/550
-
Description: Technical directives65 itemsDates: 1986-1989Container: Box/Folder 17/551-554
-
Description: Internship/short course training25 itemsDates: 1987-1989Container: Box/Folder 17/555
-
Description: Training needs25 itemsDates: 1986-1991Container: Box/Folder 17/556
-
Description: Training, non-degree programs5 itemsDates: 1987-1988Container: Box/Folder 17/557
-
Description: Internship: Salim; Ali and Buriro16 itemsDates: 1988-1989Container: Box/Folder 17/558
-
Description: Internship: Khaleeq; Zafar, Nazir20 itemsDates: 1988-1989Container: Box/Folder 17/559
-
Description: Internship: soil reclamation; Groundwater modeling; Irrigation, soil, water and nitrogen fertilizer management6 itemsDates: 1989-1990Container: Box/Folder 17/560
-
Description: Training: Biotic reclamation of salt-affected soils; Geochemistry of water; Administrative management16 itemsDates: 1989Container: Box/Folder 17/561
-
Description: Training: Information dissemination; Soil, water, irrigation management; Soil and water chemistry19 itemsDates: 1990Container: Box/Folder 17/562
-
Description: Training: Tubewell performance; Irrigation and fertilizer application; Soil and water chemistry10 itemsDates: 1990-1991Container: Box/Folder 17/563
-
Description: Training39 itemsDates: 1989-1990Container: Box/Folder 17/564
-
Description: Orientation materials for Americans36 itemsDates: 1986-1988Container: Box/Folder 17/565-566
-
Description: Administrative assistant report, design phase1 itemDates: 1984Container: Box/Folder 17/567
-
Description: An overview of the irrigation systems management research project1 itemDates: October 1987Container: Box/Folder 17/568
-
Description: Women in Development proposal for Pakistan6 itemsDates: 1984-1985Container: Box/Folder 17/569
-
Description: Final report ISM/R design1 itemDates: 1984Container: Box/Folder 17/570
-
Description: Per diem allowances8 itemsDates: 1985-1988Container: Box/Folder 17/571
-
5 1/4" computer diskettes
Container: Box/Folder 17/572
-
Description: 1.: Jean-Pak. (Symphony). Correspondence and instructions, Records of Jean Schwennesen and Rae Ellen MooreDates: 1986-1988
-
Description: 2.: M89Newltr/Travel tips. (Word Perfect) March 1989 newsletter; travel trips for travellers to PakistanDates: 1988-1989
-
Description: 3.: Travel and other ISMR. (Symphony). Correspondence and memos of D.W. Fitzsimmons & Ray Ellen MooreDates: 1986-1988
-
Description: 4.: IMM data disk, (cannot read)Dates: 1-26-1988
-
Description: 5.: IMM w/DOS. (Binary)Dates: 9/26/1988
-
Description: 6.: Address labels. (Text)Dates: 1986
-
Description: 7.: Corresp. (Wordperfect), Correspondence and memos re: travel to PakistanDates: 1988-1989
-
Description: 8.: MCI-3 (Symphony), MCI telexesDates: 1988
-
Description: 9.: Symphony (Mono) (Binary) Program disk
-
Description: 10-11.: Symphony (Mono) with niceprint for MCI mail (binary)
-
Description: 12.: IMM data disk. (Text), TelexesDates: 1988-1989
-
Description: 13.: IMM w/DOS workdisk (Binary)13 items
-
-
-
F. Photographs and maps, 1982-1987
-
Description: Slides: Introduction to the Palouse; Pakistan irrigation canals3 itemsDates: 1987Container: Box/Folder 17/573
-
Description: Photographs: Project directors tour; Miscellaneous34 itemsDates: ca. 1987Container: Box/Folder 17/574
-
Description: Maps: Indian subcontinent; Lahore guide map2 itemsDates: 1982-1987Container: Box/Folder 17/575
-
Description: Photos from Scrapbook1 folder : Maps, description of the project, and photographs with captions, removed from sticky scrapbook album pages and placed in archival envelopes.Container: Box: 17, Folder 576
-
-