University of Idaho Department of Civil Engineering Photograph Collection, 1926-1938

Overview of the Collection

Title
University of Idaho Department of Civil Engineering Photograph Collection
Dates
1926-1938 (inclusive)
Quantity
434 photographic prints
Collection Number
PG 21
Summary
Photographs of Idaho roads, their construction and maintenance, and road building equipment.
Repository
University of Idaho Library, Special Collections and Archives
Special Collections and Archives
University of Idaho Library
875 Perimeter Drive
MS 2350
Moscow, ID
83844-2350
Telephone: 2088850845
libspec@uidaho.edu
Access Restrictions

Collection is open for research.

Languages
English

Content DescriptionReturn to Top

This collection contains over 400 photographs of Idaho roads, their construction and maintenance, and road building equipment from the University of Idaho Department of Civil Engineering.

Use of the CollectionReturn to Top

Preferred Citation

[description of item], University of Idaho Department of Civil Engineering Photograph Collection (PG 21), Special Collections and Archives, University of Idaho Library, Moscow, Idaho.

Administrative InformationReturn to Top

Detailed Description of the CollectionReturn to Top

PhotographsReturn to Top

Container(s) Description Dates
object
21-10
Bridge between McCall/Donnelly & Pollock, Idaho, washing off grade south of Pollock, Little Salmon River
1p/5n
June 1933
21-100
Dam placed in borrow pits by farmers. Water, passing around dam washing into highway grade. St. Anthony S. -county line. -F.A.P. 115 B. A.D. Stanley, Contr.
1p/2n
Summer 1933
21-102
Lack of drainage. Condition of bit. conc. pvt. entering Kimberley from West
2p/2n
Summer 1933
21-104
Collapse of base. -F.A.P. 151 A-B. Compton. Contr.
3p/139n
1936
21-105
Lumps of clay and gravel in matl. brought out for oiling. -S.A.P. 189 B-D. Compton, Contr. Hoops.
NA
undated
21-106
Example of good retention of vocer coat on seal coat const.
p
undated
21-107
Seal coat on mixed oil between Spokane & Newport. 95+ oil and pea gravel. Wash. Seal coat
p
undated
21-108
Reconstruction work state forces (Patch) near Oxford. Poorly graded and proportioned mtl. Close-up of texture
2p/2n
1932
21-109
Condition of U.S. 191 at South end of town. Sugar City, Idaho
n
1929
21-11
District 1, Idaho. -A.D. Stanley? Contractor
6p
undated
21-110
Oil. Lack of shoulder mtnc. Permitting destruction of oiled mat. through shear and ravel. Ashton/Warm River grade, Idaho
2p/2n
Summer 1933
21-111
Clay bound cr. gravel raod typical of 1927
p
1927
21-112
Complete emulsification of oiled surface near Sandpoint, Idaho
2p
Spring 1933
21-113
Shoing loss of crushed gravel surfacing on a section of hwy. Northern Washington. -Some loss attributable to snow removal and some to lack of asphaltic binder permitting stone to be shipped into...
NA
undated
21-114
Example of water preferential aggregate. Chester-Ashton sec. Yellowstone Hwy. Idaho
NA
Spring 1934
21-115
Example of capillary rise of water in a cut on highway between Spokane & Newport, Washington
NA
1934
21-116
Capillary rise of moisture until granular overlay encountered
2p
undated
21-117
Barper Green Traveling plant distributor. Union Paving Co.'s equipment. -Sacramento (Army) Airport, California
p
undated
21-118
Maintenance work. Scarifier teeth furnished by Dist. maintenance. Center hole burned instead of bored. W.W. Kading. contr.
p
1932
21-119
Warren-NW blade attachment for filling thickened edge furrow and smoothing shoulder berm at same...
NA
undated
21-12
Sugar City, Idaho. Condition of hwy prior to oiling & flooding. -F.A.P. 114-B. P.H. Cohn, Contractor.
NA
undated
21-120
Spiral type pump (distributor) Boise Iron Foundry
5p
1932
21-121
Rome grader Holt in rear towing grader
p
undated
21-122
Truck shovel Dist. 2 maintenance sheds. H.H. Ballenger. Jerome, Idaho
29p/2n
June 1936
21-123
Oregon mtnc. 1932 Bit conc. planer used by J.C. Compton on 14 yr. old pvt. between Pendleton and Wash. line. Reported to Oxley. -Cold planing chisel-like teeth in scarifier rack. Could only be successfully used when sun had warmed pavement enough to pave
1p/2n
1932
21-124
Rightway mixing mach. Rotating shaft ahead of blade equipped with mixing paddles. -S.A.P. 189 B-D. J.C. Compton, contr
p/n
1932
21-125
Photos of distributor, heater and patrols and early type of truck-shovel at Shoshone
5p
1929-1933
21-126
Demonstration of caterpillar auto patrol -Cole School. Boise, Idaho
2p
1933
21-127
Jaegar road mix machine. Demonstrated near Jerome, Idaho. Les Gardner, John Sinema
7p
May 1936
21-128
Traveling mix-drag machine (Jaeger). Jerome, Idaho
2p
May 1936
21-129
Concrete? foundations at Nampa State Hospital
Photographer: D.H. Henderson. 4p/13n
Circa 1928
21-13
Clarks Fork Highway, Idaho
1p/1n
1933
21-130
Construction. Showing autocap distributor & tank trailer & FAP 109 B oiling on Old Oregon Trail West of American Falls. -F.A.P. 109 B
8p
1930
21-131
Spring break-up due to frost heave & base conditions. Donnelly/McCall, Idaho. -F.A.P. 130 A
NA
May
21-132
Spring break-up due to frost heave & soil conditions. Donnelly/McCall, Idaho. -F.A.P. 130 A
NA
May
21-134
Spring break-up near Cocolalla, Idaho
2p
undated
21-135
Concrete paving. Caldwell, Idaho. -F.A.P. 86 B.
6p/139n
1926
21-136
Surface textures Macadam penetration. Shrinkage cracks mixed method. Bliss, Idaho. Surface texture, Payette, WA Co., Idaho. Distributor applying oil. Fruitland/New Plymouth, Idaho. Winter conditions. -snow removal, Payette, Idaho. -F.A. 86 C; S.A. 32 B E.
11p/2n
undated
21-137
Slaking treatment of emulsion treated speciments. Moscow, Idaho
2n
1935 or 1936
21-138
Emulsified asphalt stabilization test at U of I. Moscow, Idaho
p
1936
21-139
Pocatello paving (conc.) Pocatello, Idaho
1p/18n
1927
21-14
Bonners Ferry, Idaho. Soil movement on face of cut. F.A.P. 20-A
2p
1933
21-140
Pocatello paving (conc.) Pocatello, Idaho. Olof Nelson, contr
14n
1927
21-141
Oregon construction. Heavy oil treatment between Dead Ox Flat and Huntington
1p/1n + dup p
1932
21-142
1932 Maintenance. Preparatory to contract oiling J.C. Whie Maintenace. Sup. Dist. 5, Idaho. -F.A.P. 95. 1932
8p/8n
1932
21-143
Maintenance Damage done to oiled highway by steam tractor between W/H. Wilder/Homedale, Idaho
Photographer: S.B. Green 11p/11n
Fall 1931
21-144
Maintenance Condition of oiled highway north of Cd'A. Shoulder treatment under White's direction. Coeur d'Alene, Idaho. -J.C. White, contr.
1p/2n
Spring 1932
21-145
Surface texture SAS 124-A, B Sandpoint to Elmira. Under-sanded mix (Road SC-2). -S.A.P. 124 A,B.
3p
Fall 1931
21-146
1931 mtnc. Dist 5, Sandpoint, North Work performed Oct-Nov. -S.A.P. 124 A, B. J.C. White, contr. October/ November 1931
2p/6n
October/November 1931
21-147
Guard rail -Oregon type. Section between Idaho line & Huntington
Photographer: RMJ
January 1935
21-149
British Col, Canada J.F. McS/J.E.P?
3p/193n
1933
21-15
Lava Hot Springs, Idaho. Snow fence being hauled by truck to Bear Lake County
1p/2n
1932
21-150
Oil mixing machines. Clyde Wood machine -Imperial Valley, California. Gardiner machine - Gila Bend, Arizona
5p/5n
undated
21-151
Coast trip. Oregon. Bit. treated Highways. Mt. Hood, Oregon. Snoqualmie Pass, Washington
6p/7n
April & May 1933
21-152
Coast trip. Oregon & California bridges and Arizona & B.C. highways
4p/7n
April & May 1933
21-153
Coast trip. Arizona views- Casa Grande, Desert Hwy, Cactus, etc
2p/7n
April & May 1933
21-154
G.I.P. siphon expts. Solder sweated G.I.P. with Conn. band. Sealed in place with asphalt treated rope (A.R.M. Co. product) Photos show various stages of construction
6n
1933
21-155
Plant (Hardesty) assembly of bit. fiber joint on connecting band placed on solder sweated G.I.P
NA
1933
21-156
G.I.P. siphon expts. Section of solder sweated G.I.P. with concreted conn. band. California specifications. Section bit. sweated C.I.P. with conn. band placed with same material (airblown asphalt)
NA
undated
21-157
Reinf. concrete pipe test, Moscow. Con. pipe coated with emulsified asphalt (Interior). Test by Buchanan/Studebaker/Waller
4n
July 1933
21-158
Concrete siphons near Moreland and Paul, Idaho
3p
1932
21-159
G.I.P. delivered at Paul, Idaho from plant at Canton, OH Shpt. sent "nested". Spelter coating much abraded. -Spot painted with #2 road oil at suggestion at K.S. Chamberlain U.S.B.P.R. Later completely coated with "D" grade asphalt cut-back with gasoline
6p
1932
21-16
Sandpoint, Idaho. Complete base saturation, North to Co. line. -S.A.P. 124- A-B Velguth Contr. 1931 W.W. Kading
3n
April 1933
21-160
Bear River at Lava Hot Springs prior to installation of Armco culvert
7p/5n
May 1934
21-161
Placing 36" G.I.P. siphon near Emmett. Detail photos showing step by step installation
14n
Circa 1935
21-162
C.I.P. siphon extps. Original expt. in Bit. sweated G.I.P. material used furnished by fabricator. -This section & conn. band installed shipped to Moscow and tested there by J.E. Buchanan
9p
March 1933
21-165
Roadside Improvement, Clearwater River Chamberlain, Johnston, Jones. Bridge at Orofino. -F.A.P. 136.
4p/4n
1936
21-166
1-8 Bit. Distrib, applying butumuls. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
2n
1928
21-167
2-8 Bit. Distrib, applying butumuls. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
p/n
1928
21-168
3-8 Bit. Distrib, applying butumuls. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
p/n
1928
21-169
4-8 Bit. Distrib, applying butumuls. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
p/n
1928
21-17
Sandpoint, Idaho. Close-up of texture. -S.A.P. 124 A-B Velguth Contr
3p/3n
1931
21-170
5-8- Bit. Patrol mixing. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
p/n
1928
21-171
6-8- Bit. Patrol mixing. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
p/n
1928
21-172
7--8- Bit. Patrol mixing. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
2n
1928
21-173
8-8- Bit. Showing surf. texture. Lewiston, Idaho. -S.A.P. 64 A; M-K Co. Contr
8p/8n
1928
21-174
Maintenance Highway yard at Lewiston Congestion and equip unhoused
2p/2n
undated
21-175
Neat patching of oiled highway between Spirit Lake & Rathdrum. -S.A.P. 204 AIB.
n
1933
21-176
Riprap made by filling cement sacks with concrete and placing while plastiv 90' channel diversion. Rosalia, Washington
n
1936
21-177
Lack of maintenance on roadway crossing (farm) and Perpetual water standing in ditch. -F.A.P. 130? and F.A.P 95 F
2p/2n
undated
21-178
Maintenance work Dist 3, between Moscow and Genesee. Getting all width possible and keeping water as far from oil as permitted by R/W
n
Spring 1932
21-179
1932 Maintenance. Thew shovel (State) after being brought up from Whitebring
p/n
1932
21-18
Salmon River & Mullan Statue-Burns Summit, Idaho. Seal coating & misc. views. -F.A.P. 101 EH I Velguth Contr.
10p/10n
undated
21-180
Maintenance work. Rework views, etc. on U.S. 10 between Cd'A & Kellogg (Pine Creek). -W.W. Kading, contr
6p
1932
21-181
Reworked sections from Sandpoint, Idaho to County line. -S.A.P. 124 A, V; W.W. Kading, Contr., Res. Engr. State forces.
3p 193
1932
21-182
Retaining wall placed in Emida Creek. Sate mtnce. forces
n
1953
21-183
1932 Mtnce (Const. 1931) Widened ditches permitting water to go to extreme R/W. Dist. I, Idaho. -F.A.P. 35 A, B. 1932
n
1932
21-185
Condition of 4 mi. oiling done in 1931 (Photos in 1932) State forces (Max Field) south of Nampa -Maxfield, contr. Thickened edge not constructed. Material furnished by hwy Dist. also mixing equip. oil heated and applied by State as well as supervision
2p/4n
1932
21-186
Showing snow depths on Malad Summit. Also surface texture of seal coat job placed by State forces previous fall supposedly with MC-3 (Utah oil). -Actually this was an R.C. & C. coat material broke off in cold weather
Photographer: C.M Ehlen. 13p/2
1935 or 36
21-187
Targhee Improvement by CCC, Grand View, Idaho, Bullwhacker (Howard) Springs. Bridge B.P.R.) Spencer - Montana line
Photographer: H.R. Flint 6p
undated
21-188
Snow removal on Goose Creek Summit. Potlatch/Tensed. -F.A.P. 151 B.
2p/2n
undated
21-189
Rock formation -Swallows, etc. Spalding Myrtle job. Stock piles of 1"-1/4"? mat. N.W. roads job. -F.A.P. 100 A.
2193n
June 1935
21-19
Hwy between Payette Lake & Old Meadows, Idaho
1p/1n
1931
21-190
Black Canyon Dam High water Gold Fork Creek (Dist. 4) State constructed rural mail box (Dist. 3).
3p/ 193
May 1936
21-191-1
1931 construction. Idaho-Utah line Utah seal coat. -S.A.P. 41 A,D; M-K Co., Contr
p
1931
21-191-2
29-9-S. Glenns Ferr-Gooding County Construction 1928 Surface break-up due to poor base conditions. -S.A.P. 21 C; J.C. Compton, contr
n
February 1929
21-192
Force acct. preparation -Short G.I.P. for walk. -S.A.P. 41 A,D; M-K Co. Contr.
p
1931
21-193
Poor shoulder condition. 1931 constr. -S.A.P. 41 A,D; M-K. Co. Contr
2p
1931
21-194
Intermittent G.I.P for side drainage 1931 contstruction. -S.A.P. 41 A,D; M-K. Co. Contr
p
1931
21-195
Washing on Cataldo fill. B.P.R. Job 4th of July Canyon -Cataldo. -Utah Const. Co (Harry Williams).
2p/2n
May 1936
21-196
B.P.R. Condition of forest road between Banks & Smiths Ferry. B.P.R. const. & maintenance
3p/193n
Spring 1932
21-197
Spring break-up in May near Smiths Ferry B.P.R. job -Banks North
3p/193n
May 1936
21-199
30-9-S Winter condition S.A.P. 32 B Malad-Owsley Br. Const. 1928 #3 Surface texture Utah oil just east of Hagerman. -S.A.P. 32 B.
p/n
1929
21-1a
Wooden structures. Payette River, Idaho. -F.A.P. 130 A-E.
8p/1n
July 1935
21-1b
Bridge across Sake. Blackfoot, Idaho. -F.A.P. 84-C. D.J. Cavanagh, Contractor.
1p/1n
June 1936
21-20
Forest fire east side of Valley. Long Valley, Idaho
1p/1n
1931
21-200
1-9-S Const. 1927. Payette -Wash. Co. Line. -S.A.P. 104 A; Kading Unit #1
n
Circa 1927
21-201
Construction 1928. 2-9-S Bliss-Elmore Co. Line. -S.A.P. 32 D; Waller Unit #3, cont.
n
Circa 1928
21-202
Const. 1928. 3-9-S Bliss/Gooding, Idaho. -S.A.P. 39 D; Waller Unit #3, contr
n
Circa 1928
21-203
Const. 1928. 4-9-S Murtaugh-East, Idaho. -S.A.P. 55 E; J.C. Comton 3, contr
p/n
Circa 1928
21-204
Const. 1927. 5-9-S Payette-Wash Co. Line. Idaho. -S.A.P. 104 A; Kading Unit #1, cont
n
Circa 1927
21-205
Const. 1928. 6-9-S, Buhl/Salmon R, Idaho. -S.A.P. 9 B; Waller Unit #3, cont
n
February 1929
21-206
7-9-S. Non oiling. Section of F.A.P. Wendell/Jerome, Idaho. Taken same day as 6-9-S. -F.A.P. 2/29
NA
undated
21-207
Non oiling. Snow conditions 2/29 between American Falls & Massacre Rocks 8-9-S
n
February 1929
21-208
9-9-S. Non oiling. Snow conditions between Am. Falls & Yale. Snow fence
p/n
February 1929
21-209
10-9-S. Non oiling. Snow conditions at Cottrell 2/29
p/n
February 1929
21-210
11-9-S. Non oiling. Snow conditions West of American Falls, Idaho
p/n
February 1929
21-211
12-9-S. Non oiling. Snow fence along highway near Burley, Idaho
p/n
1929
21-212
13-9-S. Non oiling. Snow conditions between American Falls & Cottrell, 52 mi. West of Pocatello
p/n
February 1929
21-213
14-9-S. Non oiling. Snow conditions near Cottrell, Idaho
p/n
February 1929
21-214
15-9-S. Non oiling. Snow conditions between American Falls & Yale
p/n
February 1929
21-215
21-9-S. Snow conditions near Murtaugh Constructed in 1928. -S.A.P. 55 E; J.C.; Compton, contr
p/n
February 1929
21-216
8. -S.A.P. 55 E.; Compton, contr
p/n
February 1929
21-217
Snow conditions 2/29. Constructed 1928. 17-9-S. -S.A.P. 39 D, Waller Unit #3 contr
n
February 1929
21-218
18-9-S. Snow conditions 2/29. Constructed 1928. -S.A.P. 39 D, Waller Unit #3, contr
n
February 1929
21-219
19-9-S. Snow conditions 2/29. Const. 1928. -S.A.P. 39 D, Waller Unit #3, contr
n
February 1929
21-22
View of canyon from F.A.P. 147-A
2p/2n
1932
21-220
20-9-S. Snow conditions 2/29. Const. 1928 -S.A.P. 39 D, Waller Unit #3, cont.
n
February 1929
21-221
24-9-S. Snow conditions 2/29. Const. 1928 -S.A.P. 39 D, Waller Unit #3, cont.
n
February 1929
21-222
23-9-S. Snow conditions 2/29. Const. 1928 -S.A.P. 9B, Waller Unit #3, cont.
n
February 1929
21-223
22-9-S. Snow conditions. 2/29. Man by car. Constructed 1927. Reworked 1928. J.C. Compton, contr. -S.A.P. 9C, Waller, contr
n
February 1929
21-224
25-9-S. Snow condition. 2/29. Constructe 1928. -S.A.P. 39 B, Waller Unit #3. Contr
NA
February 1929
21-225
Winter conditions 2/29. 26-9-S. Constructed 1928. Bliss Hill, Idaho. -S.A.P. 32 B Extension, Waller Unit #3, cont
n
February 1929
21-226
27-9-S. Winter conditions. Constructed 1928. Bliss RR Xing. -S.A.P. 32 D, Waller Unite #3, contr.
NA
undated
21-227
23-30-C. Camp at Ponds-Mack'n Inn, Idaho. -G.H.P. 34 A6; A.C.W., contr
n
1930
21-228
25-30-C. K.B. Campbell, Asst Hwy Engr. U.S.B.P.R. -F.H.P. 34 A6
n
undated
21-229
26-30-C. Office at Mack's Inn, Idaho. -F.H.P. 34-A6.
n
undated
21-23
Bear Lake from Divide to Logan Canyon.
1p/1n
undated
21-230
29-30-C. Last Chance -1929 oil. Constructed 1930. Distributor leaving Trude, Idaho loaded. -F.H.P. 34-A6.
p/n
Circa 1930
21-231
Last Chance -1929 oil. Constr. 1930. Distributor applying oil. -F.H.P. 34-A6.
p/n
Circa 1930
21-232
31-30-C. Last Change -1929 oil. Construction 1930. Rolling up oiled material in rain. -F.H.P. 34-A6.
NA
undated
21-233
32-30-C. Last Chance -1929 oil. Construction 1930. Frozen lumps of oiled material. -F.H.P. 34-A6.
NA
undated
21-234
32-30-C. Last Chance -1929 oil. Construction 1930. Frozen lumps of oiled material. -F.H.P. 34-A6.
p
1930
21-235
34-30-C. Last Chance -1929. Construction 1930. 10-20's double heading to stack frozen material. -F.H.P. 34-A6.
p/n
1930
21-236
35-30-C. Last Chance -1929 oil. Construction 1930. Heating set-up at Trude, Idaho. -G.H.P. 34-A6.
p/n
October 1930
21-237
36-30-C. Last Chance -1929 oil. Construction 1930. 9 cars of oil on Trude, Idaho siding. -G.H.P. 34-A6.
p/n
1930
21-238
37-30-C. Last Chance -1929 oil. Construction 1930. Snow on oiled stack near Mack's Inn, Idaho. -F.H.P. 34-A6.
p/n
September 1930
21-239
38-30-C. Last Chance -1929 oil. Construction 1930. Snow on oiled material N of Mack's Inn, Idaho. -F.H.P. 34-A6.
p/n
September 1930
21-24
Not up to required standard for oiling. Buhl/Clover, Idaho. -S.A.P. 200-A.
2p/2n
undated
21-240
39-30-C. Last Chance -1929 oil. Construction 1930. Snow on oiled material, North Big Springs turnoff. Yellowstone Highway, Montana. -F.H.P. 34-A6.
p/n
23 September 1930
21-241
40-30-C. Last Chance -1929 oil. Construction 1930 Yellowstone Highway, Montana. 6000' elevation., Distributor applying oil after snowstorm. -F.H.P. 34-A6.
p/n
14 October 1930
21-242
1-30-C. Reconstruction F.A.P. 114 A. Rexburg North. Construction 1929. 10-20 patrol scarifying. -F.A.P. 114 A; A.C.W, contr.
p/n
June 1930
21-243
2-30-C. Reconstruction F.A.P. 114 A. Rexburg North. Construction 1929. 10-20's doubleheading -scarifying. -F.A.P. 114 A; A.C.W, contr.
p/n
June 1930
21-244
3-30-C. Construction 1930. Patrols mixing. Sugar City, Idaho. -F.A.P. 114 A; A.C.W, contr.
p
Circa 1930
21-245
Construction 1930. Patrols mixing. 4-30-C. Sugar City, Idaho. -F.A.P. 114 A; A.C.W, contr.
p/n
1930
21-246
13-9-C. Montana Line South. Construction 1929. Bullwhacker Spring section. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-247
15-9-C. Montana Line south. Construction 1929. Near top of divide. -F.H.P. 34-A5; A.C.W, contr.
NA
1929
21-248
17-9-C. Montana Line South (road scene). Construction 1929. Crew at Big Springs, Idaho. -F.H.P. 34-A5; A.C.W, contr.
2p/1n
16 September 1929
21-249
16-9-C. Montana Line South. construction 1929. Crew at Big Springs, Idaho. -F.H.P. 34-A5; A.C.W, contr.
p/n
16 September 1929
21-250
Road mix construction. Idaho U.S. 191. Yellowstone Park. Henrys Lake, Idaho.
p
1929
21-251
7-9-C. Montana Line South. Construction 1929. Road mix construction. Grader spreading material and filling groove -thickened edge. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-252
6-9-C. Montana Line South. Construction 1929. 10-20 patrol cutting groove for thickened edge. -F. H. P.34-A5; A.C.W, contr.
p/n
1929
21-253
8-9-C. Montana Line South. Constructed 1929. Profile showing crown in finished work compacted. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-254
9-9-C. Montana Line South. Constructed 1929. Material in process of mixing. -F. H. P. 34-A5; A.C.W, contr.
p
1929
21-255
10-9-C. Montana Line South. Constructed 1929. Material in process of mixing. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-256
14-9-C. Constructed 1929. Howard Creek pond section. -F.E.P. 34-A5; A.C.W, contr.
p/n
1929
21-257
11-9-C. Montana Line South. Construction 1929. Finished highway Henry Lake Flats. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-258
Construction 1929. Montana line South. Near top of Continental Divide 12-9-C. -F.H.P. 34-A5; A.C.W, contr.
p/n
1929
21-259
Construction 1929. 1-9-C. Montana line South. View South from 1/2 way to Divide. -F.H.P. 34-A5; Waller, contr.
p/n
1929
21-26
Sucker Creek Canyon, Idaho?
2p/2n
1931
21-260
Construction 1929. 2-9-c. Henry Lake outlet bridge. -F.H.P. 34-A5; Waller, contr.
n
1929
21-261
Construction 1929 3-9-C. Montana Line South. Henry Lake Flat, Idaho. -F.H.P. 34-A5; Waller, contr.
NA
undated
21-262
Montana Line S. 4-9-C. Construction 1929. Commencement --F grade to Continental Divide. -F.H.P. 34-A5; Waller, contr.
p/n
1929
21-263
5-9-C. North of McGinn's ranch. Construction in 1929 Montana Line S, Idaho. -F. H. P. 34-A5; A.C.W, contr.
p/n
1929
21-264
Lewiston Hill, Idaho. Constr. 1931. State forces. Photo immediately after completion. -F.A.P. 102 B; J.J. Keane, contr.
p
1931
21-265
No binder used. Natural c.v. of surface material sufficient-Proposed quarry for surface for F.A. 101 D abandoned & mat'l secured from quarry of 101 G. -F.A.P. 101 G.
p
1931
21-266
Condition of base after continued hauling of mat'l for Oil-Much replacement necessary. -F.A.P. 101 B.
NA
undated
21-267
Oiling by State forces. Priest Lake / Newport, Idaho. -S.A.P. 19 C; Pearson, contr.
p
1931
21-268
Quarry from which Sutherland & Burns procured mat'l for surface. Rock a variety of sugar quartz, which was too brittle for resistance to war. 1931 constr. Report to Gov. Ross. -F.A.P. 97.
5p/5n
1931
21-269
Rogerson-South, Idaho. 1931 constr. View from R.R. overhead crossing. -S.A.P. 189 D; Hoops Contr.
1p/2n
1931
21-27
Craters of the Moon, Idaho.
1p/2n
1931
21-270
Cutback asphalt. Const. summer 1932. Culdesac Hill/Winchester, Idaho. -F.A.P. 69. Spring 1933. Photographer: S.B. Green.
p/n
undated
21-271
Cutback. -F.A.P. 115 B.
4p
August/September 1932
21-272
Cutback seal applied to Rogerson/Nevada Line. F.L. McAtee, Inspr. -Hoops Const.
3p/4n
1932
21-273
Seal coating Dist 2 near Bellevue. State forces.
p/n
July 1935
21-274
2-30--Seal. Construction 1929. Seal coated 1930. Completed work. Montana Line South. -F.H.P. 34-A5.
p/n
Circa 1930
21-275
1-30-Seal. Montana Line South. Construction 1929. Seal coated 1930. Sanding 60-70 road oil applied @.1O gal. sq. Yd. -F.H.P.34-A5.
p/n
1930
21-276
Close-ups of seal coat texture. View showing effect of placing dusty c. coat material. Job North of Rigby after cleaning. McAtee. -F.A.P. 16 A.
2n
October 1934
21-277
P & H back hoe used for irrigation ditch construction.
2n
1926
21-278
1932 const. Mixing unit -Tractor and pull-type grader. -F.A.P. 96 -65-80; Diesel Oil Sales, contr.
NA
1932
21-279
MC-3 Plant mix -blade laid. M-K plant. R-C4 Plant mixed blade laid job US 95. -F.A.P. 52 B-E; M-K Co. Contr.
3p
1932
21-28
Trip with Harsch & Pendergast. Yellowstone Park.
4n
July 1932
21-280
Granite sand shoulders after snow had melted. 12 miles south of Cascade. Basalt baffles placed in borrow pits at suggestion of B.P.R. to restrain flow of run-off water and how they actually worked out in practice. -F.A.P. 130 J.
4p/4n
May 1935
21-281
surface texture B.P.R. Mc-3 P.M. Const. View of project looking toward Spencer, Idaho.
NA
August 1936
21-282
Surface textures, California highways. SC-5 (80-85) with 3/4 cover coat near San Louis Obispo-on old cement conc. emul.
3p/193n
December 1937
21-283
Surface texture, seal coated plant mix? Between Spokane & Newport. 90-95 or 95+ covered with screened pebbles. Constructed about 1931 or 1932.
n
Circa 1932
21-284
1932 seal coat. Cutback seal coat applied by State forces. Beehe's Corner -Ririe, Idaho. -F A.P. 140 F; P.H. Cohn, contr.
3p/4n
1932
21-285
Break-up before oiling. Snow at roadside contributing factor to break up of oiled surface. Winchester/ Craigmont/ Cottonwood.
5p/5n
undated
21-286
1932 construction. Winchester/Culdesac, Idaho. Cutback asphalt constn. plant etc. close-ups of texture prior to seal coat. -F.A.P. 58 & 69A; Quinn Robbins Contr. MK sub-contractors.
4p/8n
1932
21-287
Replacement ruptured areas. Winchester/Craigmont.
2p
1935
21-288
Failure April 1936 of portions of rep 386 near Winchester. F.L. McAtee. Frost heave, caused by water entering subgrade from upper ditch. -Waller, contr.
3p/193n
April 1936
21-289
Condition of cutback, plant mix. Job const. in 1932. Water beneath mat. Men removing mat'l from ruptured areas. Weeps draining. Collapsed sump. 2 views of F.A. 58-A (Hill sec.). -F.A.P. 69; F.A.58
NA
undated
21-29
View from F.A.P. 95. Pend Oreille River, Idaho. -F.A.P. 95 A-E,H.
2n
1932
21-290
2-9-M. Constr. 1928. New Plymouth S -junction with road to Emmett. -F.A.P. 27A; Kading, contr.
NA
undated
21-291
Constr. 1928. 3-9-M. Break-up oiled material; no culvert under highway. New Plymouth S, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-292
4-9-M Const. 1928. Break-up oiled material; no culvert under highway. New Plymouth S, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-293
5-9-M. Const. 1928. Break-up on grade -top -moisture from driveway. New Plymouth S, Idaho. -F.A.P. 27-A; Kading, contr.
p/n
March 1929
21-294
6-9-M Const. 1928. Break-up on grade -top -moisture from driveway. New Plymouth S, Idaho. -F.A.P. 27 A; Kading, contr.
n
March 1929
21-295
7-9-M Constr. 1928. Base saturation and resulting mt'l failure. New Plymouth N, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-296
9-9-M Constr. 1928. Saturated base causing material failure. New Plymouth N, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-297
8-9-M Const. 1928. Failure of mat'l caused by leaking siphon. New Plymouth N, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-298
10-9-M Const. 1928. Saturated base & oil break-up due to leaky siphon. New Plymouth S, Idaho. -F.A.P. 27 A; Kading, contr.
n
Circa 1929
21-299
1-9-M Const. 1928. Junction with road to Emmett. Lack of drainage. New Plymouth S, Idaho. -F.A.P. 27 A; Kading, contr.
p/n
March 1929
21-30
Big Salmon River, Idaho.
p/n
1932
21-301
8-7-E Laycold. Washing distributor pump with distillate after discharge of load of Laycold.
NA
November
21-302
7-7-E Laycold. Completed section.
NA
November 1927
21-303
Laycold. Rolling chips with Austin "Bull Pup" roller.
NA
November 1927
21-304
5-7-E Laycold. Covering by hand from piles on shoulder.
p
November 1927
21-305
4-7-E Laycold. Covering completed.
p
November 1927
21-306
2-7-E Laycold on surface treatmentoil. Dist. applying @.10 gal sq. yd. on one side treated & covered with stone chips.
p
November 1927
21-307
1-7-E Seal coating surf. treatment oil 5.25 miles E. from Boise depot. Maint. & Dist. crews. Distrib. applying "Laycold"@.10 gal sq. yd. -F.A.P. 91.
2p
November 1927
21-308
58-8-C Misc. 406 Filer City work. Const. 1928. Fairgrounds tangent. -Waller? #3, contr.
p/n
1928
21-31
Harvard/Emida, Idaho. View of B.P.R. constr.
1p
1931
21-310
60-8-C Misc. 406 Filer City work. Const. 1928, Service Station corner at junction with highway. -Waller?#3, contr.
2p/1n
1928
21-311
61-8-C Misc. 406 Filer City work. Const. 1928. Moving disc harrows -Fairgrounds. -Waller? #3, contr.
NA
undated
21-312
59-8-C Misc. 406 Filer City Work. Const. 1928, Service Station corner at Junction with highway. -Waller? #3, contr. 10-20 Russell motor grader on road mix const.
p/n
1928
21-313
5-8-C Gooding South 2 mile. Constructed 1928. -S.A.P. 119 A; Waller Unit #3, contr.
p/n
Circa 1928
21-314
4-8-C Gooding South 2 mile Constructed 1928, Damage done by combine on highway. -S.A.P. 119 A; Waller Unit #3, contr.
2n
Circa 1928
21-315
1-8-C Constructed 1928, Heater at Bliss, Idaho. Portable tank car heater made from a steam boiler and WWI Nash quad chassis. -S.A.P. 32 B; Waller Unit #3, contr.
p
Circa 1928
21-316
1-8-C Constructed 1928 Desert section Bliss/Gooding, Idaho. -S.A.P. 39D; Waller Unit #3, contr.
NA
undated
21-317
7-8-C Constructed 1928 Cultivated section near Gooding, Idaho. -S.A.P. 39 D; Waller Unit #3, contr.
NA
undated
21-318
8-8-C Constructed 1928 Entering Gooding, Idaho. -S.A.P. 39 B; Waller Unit #3, contr. 1
p/n
Circa 1928
21-319
9-8-C Constructed 1928 Surface waving over culvert Bliss/Gooding, Idaho. -S.A.P. 39 B; Waller Unit #3,contr.
p/n
Circa 1928
21-32
Views from Whitebird Hill. Whitebird, Idaho.
2n
July 1932
21-320
10-8-C Constructed 1928 Waste water saturating shoulder. Bliss/Gooding, Idaho. -S.A.P. 39 B; Waller Unit #3, contr.
p/n
Circa 1928
21-321
55-8-C Const. 1928 Equipment camp on desert. Bliss/Gooding, Idaho. -S.A.P. 39 C; Waller Unit #3, contr.
p/n`
Circa 1928
21-322
54-8-C Const. 1928 Desert section. -S.A.P. 39D; Waller Unit #3, contr.
p/n`
Circa 1928
21-323
54-8-C Crew photos. Bliss, Idaho.
3p/193n
undated
21-324
65-8-C Const. 1928. Galion towing P.A. distributor during spread. WWI Pierce Arrow being towed through job while applying oil. Malad/Owsley Br. -S.A.P 32 B; Waller Unit #3, contr.
p/n
Circa 1928
21-325
1-9-M.P. Macadam penetration. Constructed 1928. -F.A. P. 44 A; Chas Helmer Contr.
NA
February 1929
21-326
Macadam penetration Const. 1928 Spreading base course rock. Buhl/Filer, Idaho. -F.A.P. 44-A 24 B; Chas Helmer Contr.
p/n
1928
21-327
5-8-M.P. Heating setup (95+ rd oil) about 19291930. Macadam penetration. Buhl/Filer, Idaho. -F.A.P. 44A & 24 B; Chas Helmer Contr.
p/n
Circa 1929
21-328
3-9-M.P. Macadam penetration Const. 1928 Buhl/Filer, Idaho. -F.A.P. 44-A; Chas Helmer Contr.
NA
undated
21-329
4-9-M.P. Macadam penetration. -F.A.P. 44-A; Chas Helmer Contr.
n
February 1929
21-330
5-9-M.P. Macadam penetration Const. 1928. Surface texture Feb. 1929. -F.A.P. 44-A; Chas Helmer Contr.
n
February 1929
21-331
6-9-M.P. Macadam penetration Const. 1928. -F.A.P. 44-A; Chas Helmer Contr.
n
February 1929
21-332
2-9-M.P. Macadam penetration Const. 1928. -F.A.P. 44-A; Chas Helmer Contr.
n
February 1929
21-333
7-9-M.P. Macadam penetration Const. 1928. -F.P.A. 24 B; Chas Helmer Contr.
n
February 1929
21-334
8-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
NA
1928
21-335
9-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
NA
1928
21-336
10-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr. February 1
n
February 1929
21-337
11-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
n
February 1929
21-338
12-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
n
February 1929
21-339
13-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
n
February 1929
21-34
Maintenance equipment -Roller. -F.A.P. 52 A-E,H.
1p/1n
1932
21-340
14-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
p/n
February 1929
21-341
15-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
p/n
Febraury 1929
21-342
16-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
p/n
February 1929
21-343
17-9-M.P. Macadam penetration Const. 1928 Boise/Nampa, Idaho. -F.A.P. 86 C; M-K Co. Contr.
p/n
Febraury 1929
21-344
3-8-M.P. Macadam penetration. Constructed 1928. Applying 95% oil to base course rock. Buhl/Filer, Idaho. -F.A.P. 44 A & 24 B; Chas Helmer Contr.
n
Circa 1928
21-345
4-8-M.P. Macadam penetration. Constructed 1928. 95% oil spread 1/2 width -base course. Buhl/Filer, Idaho. -F.A.P. 44 A & 24 B; Chas Helmer Contr.
n
Circa 1928
21-346
Macadam penetration. Constructed 1928. Buhl/Filer, Idaho. -F.A.P. 44 A & 24 B; Chas Helmer Contr.; Fulmer-Bryant & Brown.
p/n
Circa 1928
21-348
57-8-C Misc. 409 Constructed 1928. Gooding, Idaho. -Waller? Unit #3, contr.
2p/2n
Circa 1928
21-349
2-8-C Constructed 1928. 1" mt'l ravel at R.R. Crossing at Bliss, Idaho. -S.A.P. 32 D; Waller Unit #3, contr.
p/n
1928
21-35
Maintenance equip -Roller.
1p/1n
1932
21-350
62-8-C Constructed 1928. 1" mt'l ravel at R.R. Crossing at Bliss, Idaho. -S.A.P. 32 D; Waller Unit #3, contr.
p/n
1928
21-351
3-8-C Constructed 1928. 1" mt'l ravel at R.R. Crossing at Bliss, Idaho. -S.A.P. 32 D; Waller Unit #3, contr.
p/n
1928
21-352
1-30-M. Dust palliative, Fremont County. Heater set up Warm River.
p/n
1930
21-353
2-30-M. Dust palliative, Fremont County. Pick up by traffic -shaded area.
p/n
1930
21-354
3-30-M. Dust palliative, Fremont County. Pick up by traffic -shaded area.
p/n
1930
21-355
4-30-M. Dust palliative, Fremont County. Patching by distributor and hose lines. Dust palliative that picked up due to failure to penetrate clay bound road.
p/n
1930
21-356
5-30-M. Dust palliative, Fremont County. Patching by distributor and hose lines.
p
1930
21-357
6-30-M. Dust palliative, Fremont County. Patching by distributor and hose line.
p/n
1930
21-358
7-30-M. Dust palliative, Fremont County. Patching by distributor and hose lines.
p/n
1930
21-360
9-30-M. Dust palliative, Fremont County. Hand sanding after distributor has covered bare spots due to pick up.
p
1930
21-361
Main Street, West Yellowstone, Montana.
p/n
October 1930
21-362
15-30-C Montana work, 1930 Sec. 1510-20 patrol cutting groove for thickened edge. -F.H.P. 46-A3.
NA
undated
21-363
41-30-C Construction 1930. 10-20 Galion mixing. Ashton/Warm River, Idaho. -S.A.P. 4 c.
n
1930
21-364
42-30-C Construction 1930. 10-20 Galion mixing. Ashton/Warm River, Idaho. -S.A.P. 4 c.
p/n
1930
21-365
State auxiliary landing field #4. "McGinn Field", McGinn's Ranch, Lake, Idaho. Construction 1930. Runway 3OO0' x 125'. -State Oiling Unit #2, contr.
p
1930
21-366
11-8-C Malad Br. to Owsley Br. Constructed 1928, Entering Hagerman, Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-367
Hagerman Valley 1928 construction.
p
1928
21-368
12-8-C Constructed 1928. Looking East from Kerns Corner. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-369
13-8-C Constructed 1928. Kerns Corner. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
NS
undated
21-370
14-8-C Constructed 1928. View from Owsley Br. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-371
15-8-C Constructed 1928. Condition preparatory to oiling. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-372
16-8-C Constructed 1928. Water seeping up in subgrade. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-373
17-8-C Constructed 1928. East approach to Malad Bridge -south side. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-374
18-8-C Constructed 1928. East approach to Malad Bridge -north side. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-375
19-8-C Constructed 1928. View from swamp W. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3,contr.
p/n
1928
21-276
20-8-C Constructed 1928. Rocky Hill section. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-377
49-8-C Constructed 1928. Looking West to Kern's corner. Malad/Owsley Br., Idaho. -S.A.P. 32 B;Waller Unit #3, contr.
p
1928
21-378
50-8-C Constructed 1928. View West through poplar lane. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-379
51-8-C Constructed 1928. View east through poplar lane. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-38
Ditchless road design U.S.B.P.R. Break-up of Nolan job. Wolf Lodge Bay.
2p/2n
June 1935
21-380
52-8-C Constructed 1928. Condition of highway after cont. hauling gravel. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-381
53-8-C Constructed 1928. Where gravel trucks cut through sub-base in hauling. Malad/Owsley Br., Idaho.-S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-382
63-8-C Constructed 1928. Distributor being towed up grade by Ellinger Creek. Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-383
64-8-C Constructed 1928. U.S. 30. Holt 30 pulling discs & s.t. harrows (spring tooth). Malad/Owsley Br., Idaho. -S.A.P. 32 B; Waller Unit #3, contr.
p/n
1928
21-384
66-8-C Constructed 1928. View West to Kern's corner. Malad/Owsley Br., Idaho. -S.A.P. 32 C; Waller Unit #3, contr.
p/n
1928
21-386
22-8-C. Constructed 1928. 15-30 & 10-20 on Salmon River grade (Road mixing. Austin 15-30 & Galion 10-20 motor patrol graders). Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-387
23-8-C. Constructed 1928. Finished work reworked section 9 B (1927 constr). Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-389
25-8-C. Constructed 1928. Mixing in progress. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-39
Dist. Maintenance. -Ditching. Kingston. Hill/Cataldo, Idaho.
2p
1932
21-390
26-8-C. Constructed 1928. Same view as 25-8-C after completion. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-391
27-8-C. Constructed 1928. One view showing Salmon River grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-392
28-8-C. Constructed 1928. View two showing Salmon River grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-393
29-8-C. Constructed 1928. View three showing Salmon River grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-394
30-8-C. Constructed 1928. Curve on Salmon River grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-395
31-8-C. Constructed 1928. Distributor too close to edge of fill. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-396
32-8-C. Constructed 1928. Patrol stuck on grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-397
33-8-C. Constructed 1928. Patrol off road due to broken steering gear. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-398
34-8-C. Constructed 1928. Distributor pulled off soft shoulder. Buhl/Salmon River, Idaho. -S.A. P.9 B; Waller Unit #3, contr.
p/n
1928
21-399
35-8-C. Constructed 1928. Austin 15-30 road grader on edge of fill. Buhl/Salmon River, Idaho. -S.A. P. 9B; Waller Unit #3, contr.
p/n
1928
21-3a
(Kyle's Masterpiece) Structure across Payette River. Smith's Ferry, Idaho.
2p/1n
July 1935
21-3b
Long Valley, Idaho. Forest fire.
1p/1n
July 1935
21-40
Standing water in borrow pits. Genesee, Idaho.
2p
1934
21-400
36-8-C. Constructed 1928. 10 ton pulling 15-30 Austin motor grader on the road. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-401
37-8-C. Constructed 1928. Soft edges of fill Salmon River grade. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-402
39-8-C. Constructed 1928. Standing water beside the road. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-404
40-8-C. Constructed 1928. Example of soft shoulders. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-405
42-8-C. Constructed 1928. Austin 15-30 road grader making final spread. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-407
43-8-C. Constructed 1928. Standing water beside the road. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-408
45-8-C. Constructed 1928. Perpetually wet conditions beside fill. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-41
Inundated condition of Yellowstone Hwy. Sugar City, Idaho. -F.A.P.? 114.
1n
undated
21-410
46-8-C. Constructed 1928. Uncontrolled irrigation water on highway. Buhl/Salmon River, Idaho. -S.A. P. 9 B; Waller Unit #3, contr.
p/n
1928
21-411
47-8-C. Constructed 1928. Irrigation water at road crossing -no culvert. Buhl/Salmon River, Idaho. -S.A.P. 9 B; Waller Unit #3, contr.
p/n
1928
21-413
Reworking oil mix. Scarifier breaking material. Evidence of moisture Construction 1927. Salmon River/ Owsley Bridge. -S.A.P. 9 B; Kading, contr.
2p/2n
1928
21-414
1-7-C. Constructed 1927. Close-up of Killifer scarifier towed by Holt tractor to rip up clay bound road as a source of material for road mixing oil on Idaho highway U.S. 30. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller Unit #3, contr.
n
1927
21-416
4-7-C. Constructed 1927. Close-up of distributor applying oil. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-417
5-7-C. Constructed 1927. Distributor spreading oil half width on 18' road. Other side has received its quota of oil and is stacked on & leaving half width for traffic. Hansen/Murtaugh, Idaho. -S.A. P. 9 C;
NA
undated
21-418
6-7-C. Constructed 1927. Tractor and harrows -first trip. Scarifying U.S. 30 near Hansen. Killifier scarifier pulled by Holt tractor. Scarifying road to produce material for road mix. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-419
7-7-C. Constructed 1927. Tractor and Harrows -last trip through. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
Circa 1927
21-420
8-7-C. Constructed 1927. Tractor and harrows. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
NA
undated
21-421
9-7-C. Constructed 1927. Highway cleared half width for traffic. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
Circa 1927
21-422
10-7-C. Constructed 1927. Close-up, Austin 10-20 blade while mixing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p
1927
21-423
11-7-C. Constructed 1927. Austin 10-20 patrol mixing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-424
12-7-C. Constructed 1927. Material in process of mixing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-425
13-7-C. Constructed 1927. 10 ton tractor and grader mixing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-426
14-7-C. Constructed 1927. Close-up of grader blade while mixing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-427
15-7-C. Constructed 1927. Tractor and grader ranking final spread. Holt towing Stockland grader at finish of mixing scarified roadbed material. Rakers had to be employed to remove oversize. Hansen/Murtaugh, Idaho. -S.A. P. 9 C;Waller, contr. Most aggre.
p/n
1927
21-428
16-7-C. Constructed 1927. Stockland grader making final spread. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-429
17-7-C. Constructed 1927. 10-20 Galion blading spread surfacing. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-430
18-7-C. Constructed 1927. 10-20 Galion blading finished material. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-431
19-7-C. Constructed 1927. Section of finished highway west of bridge. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-432
20-7-C. Constructed 1927. Section completed looking toward Hansen. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-433
21-7-C. Constructed 1927. Straightaway completed between 2 bridges. Hansen/Murtaugh, Idaho. -S.A. P. 9 C; Waller, contr.
p/n
1927
21-434
1932 Maintenance. Pack River bridge & approaches. Structure erected 1931; Oiling (cont.) 1931. Rework by State forces 1932. -W.W. Kading, contr.
2p
1932
21-435
1932 Maintenance. General condition Summer 1932. Maint (local) has attempted to rectify emulsified condition by placing material on surface. -S.A.P. 124 A-B; W.W. Kading, contr.
5p
1932
21-436
1932 Maintenance. Kingston Hill, looking East, after old base had been removed and Telford base const. by Dist 5 Maintenance. Later oiled by State forces. Kingston Hill, Idaho. -W.W. Kading, contr.
p
1932
21-437
1932 Maintenance. Kingston Hill section of U.S. No. 10. -W.W. Kading, contr.
2p
1932
21-438
1932 Maintenance. Tearing up old work and adding new material. State shovel procuring sand for work. -S.A. P. 124 A-B; W.W. Kading, contr.
7p
1932
21-439
1932 Maintenance Dist 5. Dist Mtnce Northern portion SAP 124 B (Elmira section) preparatory to oiling. -S.A.P. 124 B; W.W. Kading, contr.
p
1932
21-44
Maintenance equip. Gravity distributor (Dist. 5) made from G.I.P. Used by W.W. Kading. -60' galvanized iron pipe with welded ends & dome. Created in and emergency. "Sloppy Sue".
1n
1932
21-440
1932 Maintenance. 1" additional lift on 2.6 mi. of old oil const. (cont) across Cocolalla Flats. Const. State forces. -W.W. Kading, contr.
p
1932
21-442
1932 Maintenance. Stage construction views. -S.A. P. 124 A-B; W.W. Kading, contr.
16p
1932
21-443
First oiling Mr. Waller did. Hagerman Valley and near Twin Falls. The roads were dug up and oiled.
NA
undated
21-45
Olof Nelson's plant (Std. Steel Corp.) Plant mix construction. Note rotary trommel... on top of plant. Roberts, Idaho. -F.A.P. 52 B-E.
3p
undated
21-46
Constr. Early type of retort. Bellevue, Idaho. -F.A.P. 120-121-122 & 125 J.C. Compton, contr.
1n
1932
21-47
North Idaho Winter highway scenes.
Photographer: R.M. Jewell. 6p/11n
3 March 1933
21-48
Prior to application of oil1-30-C. W. Yellowstone, Montana. -F.H.P. 46-A3.
1p/1n
1930
21-49
Project after hard rain prior to oiling. 2-30-C. -F.H.P. 46A30.
1p/1n
1930
21-5
Bridge across Clarks Fork Hwy. Hope, Idaho. -(photos for H.T. Evans).
3n
1932
21-501
Equipment camp. -L-R: Swift, Maxfield (up on a visit), Schindler, Cook & Murdock.
1p
September 1930
21-502
Spring tooth harrows being moved, discs have been dispensed with.
1p
undated
21-503
Partially oiled and frozen material. Trude, Idaho.
1p
October 1930
21-504
Office at Mack's Inn.
1p
September
21-505
Distributor leaving Trude with load of oil. Traverses ground loaded which former trucks(Pierce & Mack) couldn't cover empty.
1p
October 1930
21-506a
Group of men beside equipment.
1p
undated
21-506b
Group of men beside equipment.
1p
undated
21-507
FrankHoward's "Saloon" at Trude. He collected all these bottles around the tracks and is seen giving John "a drink."
1p
undated
21-508
Five batch (dry) of PCC discharging to a Rex mixer (4 sk batch capacity). Const. is descending grade of aRR overpass. Note movable equalized to keep mixer level. Pocatello, Idaho. -PCC Construction. Art Waller Res Engr. Olof Nelson Contr.
p
1927
21-509
PCC pavement on overpass construction. Batches proportioned at gavel plant -dry. Cement & water mixed in paver. Sacked cement at right. On old highway north of Pocatello. -PCC Construction.
p
1927
21-51
Sec. 8. View East towards W. Yellowstone. 5-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-510
From a central mixing plant (Smith) trucked to job in solid tired Jeffrey Quads(later N & H). Price, Utah. -PCC Construction.
p
1923
21-511
Power(?) plant of a crushing setup. Note solid tired FWD (WWI surplus).
p
undated
21-512
PCC construction in Idaho. -Waller, contr.
p
undated
21-513
Snow removal on the Targhee. From Ponds to West Yellowstone McGinn's Ranch (Henry's Flat). 1936. Photographer: L.P. Caffar.
16p/ 2 postcards
undated
21-514
Caldwell, Idaho, pavement.
15p/1n
1926
21-515
Trenched highway const prior to placing c. gravel surface after sharp rain. Impervious shoulders retaining water. Horseshoe Bend road near Valley Road Junction.
p/n
1935
21-516
McAtee Inc. Views during 1938 construction.
7p
1938
21-517
110 H.P. autocar distributor applying oil near Buffalo River.
p
October 1930
21-518
View of a road.
p
undated
21-519
2-7-C. Constructed 1927. 10 ton towing scarifier. Hansen/Murtaugh, Idaho. -S.A.P. 9 C; Waller, contr.
NA
undated
21-52
Sec. 8. View West toward S. Fork of Madison River. 6-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-520
Paving near Pocatello.
14p
1927
21-521
Moscow lab tests on bit. sweated G.I.P. fabricated in Boise. 1st of a series of tests & experiments on G.I.P. to prove use for siphons -pipe shipped to Moscow.
2p/5n
April 1933
21-53
Sec. 10. Soft fill near Madison River. 7-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-54
Sec. 10. Soft fill near Madison River. 8-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-55
Sec. 10. Soft fill near Madison River. 9-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-56
Sec. 10-11. Constr. & completed work. Soft fill with approach of bridge. 10-30-C. -F.H.P. 46-A3.
NA
1930
21-57
Sec. 11. Soft fill bridge approach. 11-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-58
Sec. 11. Soft shoulders on approach fill. 12-30-C. -F.H.P. 46-A3.
2p/2n
1930
21-59
Road emerging into Madison Basin. 13-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-60
Sec. 13. Shaping shoulder across Madison Basin. Borrowed grader & Cletrac tractor. 14-30-C. -F.H.P. 46-A3.
2p/2n
1930
21-61
15-30 filling groove during spread. 16-30-C. -F.H.P. 46-A3.
1n
1930
21-61a
Close-up blade attachment 15-30. Sec. 15. 17-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-62
Sec. 17. Curve at bottom of grade. 18-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-63
Sec. 17. Curve at bottom of grade. 19-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-64
Sec. 21. Halfway up grade near sawmill. 20-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-65
Junction with Idaho oiling. Harrows on top of Continental Divide. 21-30-C. -F.H.P. 46-A3.
1p/1n
1930
21-66
End of work. Looking north from top of Divide. 22-30-C. -F.H.P. 46-A3.
3p/2n
1930
21-67a
15-30 tires in Ford Pickup. 27-30-C. -F.H.P. 34-A6.
1p/1n
undated
21-68
Spring tooth harrows knocked down & loaded. 28-30-C. -F. H. P. 34-A6.
1p/1n
undated
21-69
Sec. 5. View east towards West Yellowstone. 4-30-C. -F. H. P. 46-A3.
1p/1n
1930
21-71
Views of B.P.R. work by State forces in 1929 & 1930. -F.H.P. 46,-A3. F.H.P. 34-A6. F.H.P. 34-A5.
NA
undated
21-73
State crew. Constr. Trude, Idaho.
2n
1931
21-74
Construction photos. Bancroft/drying damp gravel(unoiled) old steel wheeled pull-type grader. Bancroftpit (gravel) Near Blaser. -F.A.P. 35 A-B. F.A.P. 112 & 112A 1931. Quinn Robbins Contr.
Photographer: McAtee Photos. 21p
1931
21-75
75% mix by spring tooth harrows before blading. -F.A.P. 112 A. Quinn Robbins Contr.
1p/2n
1931
21-76
Break-up near Blaser. -F.A.P. 112 A. Quinn Robbins Contr.
2n
April 1931
21-78
Construction photos Fall Creek, Idaho. F.L. McAtee, Res. Engr. -F.A.P. 108,109, 70 B. Hoops Const. Contr.
Photographer: F.L. McAtee. 27p
1932
21-79
Utah Oil treated mat. raveling out after one weeks use by traffic. -F.A.P. 108 A. Hoops Const. Contr.
1p/1n
August 1932
21-8
Bridges -Deck & rail. Huntington, Oregon.
4p/4n
October 1932
21-80
Bad base condition (scarified). -F.A.P. 108 B. Hoops Const. Contr.
2n
1932
21-81
Loss of mat. on shoulder due to placed too far out. -F.A.P. 108 A. Hoops Const. Contr.
2p/4n
1932
21-82
Views near Deep Creek. Bonners Ferry-Bonner Co. line, Idaho. -F.A.P. 20 A. Std. Asphalt Pav. Co.
NA
undated
21-83
Oil constn. View of completed work & texture of set up surf. bit treated. -F.A.P. 96 A-C. Diesel Oil Sales Contr.
1p/2n
1932
21-85
20,000 cu. yd. fill. Constn. -F.A.P. 65 A.
1p/1n
1932
21-86
Damage to newly laid p.m. job by wagons hauling wheat and Irrigation water being run down borrow pit -Same project. -F. A. P.52 B-D.
5n
1932
21-87
State forces mixing in 4th of July Canyon, Idaho. -W.W. Kading work.
1p/1n
1932
21-88
Prior to oiling. Spring making 2nd season stabilized roadbed had withstood spring saturation and break-up. -F.A.P.19 A-B.
2p/2n
April 1936
21-89
Prior to oiling. Showing impervious shoulder condition and incorrect junction with County road. -F.A.P. 151 A.
4p/1n
undated
21-9
Bridge across Big Wood River. Shoshone/Bellevue, Idaho.
1p/1n
1933
21-90
After State forces had scarified top inch of cont. oiling and relaid. Gooding/Shoshone, Idaho. -F.A.P. 120. Compton, contr.
2p/2n
1932
21-91
Condition of fill. Grade raised during summer and oiled. -F.A.P. 52 C.
3n
September 1932
21-92
Damage done to newly completed M-C 3 plant mix job by truck with no tire. Sandpoint, Idaho, county line. -F.A.P. 19 A-B.
2p
undated
21-93
Roll in oil mix on curve near Cataldo Flats. Progressing toward inside of curve. -1932.
1n
undated
21-94
Pearson &McCreedy at Colburn overpass. Washing of sand fill in and around structure -melting snow. -F.A.P. 19.
3p/193n
April 1936
21-95
Windblown sand piled against road mix in windrow. Pocatello-American Falls, Idaho.
6p
undated
21-96
Spring break-up. (Unoiled) (Oiled) Low grade. -F.A.P. 101. F.A.P. 100.
5p/5n
1935
21-97
Misc. Idaho highway views (old).
1p
undated
21-98
Loading logs on U.S. Hwy #10. Wolf Lodge Bay, Idaho.
p/n
undated
21-99
Rolling logs down onto hwy for loading near Smiths Ferry, Idaho. -F.A.P. 130-I.
2p/2n
May 1936

Names and SubjectsReturn to Top

Subject Terms

  • Construction
  • Construction projects
  • Engineering
  • Roads
  • University of Idaho

Geographical Names

  • Idaho
  • Idaho--History