University of Idaho Hartung Theater photographs, 1972-1974
Table of Contents
Overview of the Collection
- Title
- University of Idaho Hartung Theater photographs
- Dates
- 1972-1974 (inclusive)19721974
- Quantity
- 1 folder, (1 folder containing 5 sheets holding 91 slides)
- Collection Number
- PG 069
- Summary
- This collection consists of photographs of the construction, exterior, and interior of Hartung Theater on the University of Idaho campus.
- Repository
-
University of Idaho Library, Special Collections and Archives
Special Collections and Archives
University of Idaho Library
875 Perimeter Drive
MS 2350
Moscow, ID
83844-2350
Telephone: 2088850845
libspec@uidaho.edu - Access Restrictions
-
Collection is open for research.
- Languages
- English
Content Description
This collection consists of 91 photographs of the construction as well as interior and exterior of the University of Idaho's Hartung Theater built between 1972 and 1973 with the theater officially opening in April of 1974. Originally called the Performing Arts Center, the building was renamed Hartung Theater in 1977 in honor of Ernest W. Hartung, UI president from 1965-1977 and director of the University Foundation from 1977-1981.
Historical Note
The Hartung Theater, initially named the Performing Arts Center, was built between 1972 and 1973 and opened in 1974. It was renamed in 1977 in honor of Ernest Hartung, who had served as University of Idaho President for 11 years. During his first year at the university in 1965, President Hartung attended the theater department's fall production of Oklahoma. This experience convinced him that the university needed a dedicated performing arts facility.
Fundraising for the building began in 1967 when the University of Idaho Alumni Association created the Fund for the Performing Arts Center (FPAC) with a goal of over $2 million. The center was envisioned to serve as both a performance venue for traditional and contemporary theater and as an educational facility for teaching performing arts. The Associated Students of the University of Idaho (ASUI) contributed $140,000 in 1972, alongside donations from parents, foundations, and corporations, helping to fund the project. Construction took two years and proceeded in three phases, with the total cost estimated around $1.5 million.1
Use of the Collection
Preferred Citation
FOR PHOTOS: Photographer, "Title," date. Collection name, object ID. University of Idaho Library Special Collections and Archives, Moscow, ID.
Administrative Information
Names and SubjectsReturn to Top
Subject Terms
- Construction projects
- Performing Arts
- University of Idaho
- University of Idaho--Buildings
Corporate Names
- Hartung Theater (University of Idaho, Moscow ID)
