- HOLLAND LIBRARY ADDITION (and PACKAGE No.2)
- HANDICAPPED ACCESS IMPROVEMENTS
- HOLLAND LIBRARY RENEWAL
- WSU VANCOUVER PHASE II - FEMA
- STUDENT ALUMNI CENTER
- NORTH CAMPUS SUBSTATION
- GC/CM REVIEW
- RESIDENCE HALL FIRE SPRINKLERS
- SEPTIC SYSTEM REPLACEMENT IAREC - PROSSER
- OLYMPIC WEIGHT ROOM EXPANSION
- SOUTH CAMPUS ELECTRICAL
- STEVENS HALL RENOVATION
- STUDENT HOUSING PROJECT
- BOHLER GYM ADDITION
- CHILLED WATER STORAGE
- VANCOUVER PHASE II EARLY CHILDHOOD EDUCATION FACILITY
- CAMPUS INFRASTRUCTURE - VANCOUVER PH II
- TWO ACADEMIC BUILDINGS
- USGS VOLCANO LABORATORY
- HILLTOP HOUSING PROJECT
- HOLLLINGBERY FIELDHOUSE RENOVATION
- JOINT CENTER FOR HIGHER EDUCATION
- FACILITIES SERVICES CENTER
- FACILITY CONDITION SURVEY KRUEGEL/McALLISTER
- CONSULTANT SELECTION
- MISCELLANEOUS
- Names and Subjects
Capital Planning Building Files, 1980-2001
Overview of the Collection
- Creator
- Washington State University. Capital Planning
- Title
- Capital Planning Building Files
- Dates
- 1980-2001 (inclusive)19802001
- Quantity
- 24 Linear feet of shelf space, (24 boxes)
- Collection Number
- Archives 271 (collection)
- Summary
- The collection consists of correspondence and contracts relating to several Washington State University construction projects from the early 1990s.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
The majority of this collection is open and available for research use. A few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues and Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such.
- Languages
- English
Historical NoteReturn to Top
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Content DescriptionReturn to Top
The collection consists of correspondence and contracts relating to several WSU construction projects from the early 1990s.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions may apply.
Preferred Citation
[Item Description] Capital Planning Building Files, 1980-2001 (UA 271)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
The collection is maintained in the order in which it was received in the Archives from Capital Planning. It consists of several series organized by building (there appears to be no discernible order to the buildings).
Acquisition Information
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on July 11, 2005 (UA 2005-11).
Processing Note
This collection was processed by Tim Mace and University Archivist Mark O'English in early 2009.
Related Materials
The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.
Detailed Description of the CollectionReturn to Top
HOLLAND LIBRARY ADDITION (and PACKAGE No.2)Return to Top
Container(s): Box
Container(s) | Description |
---|---|
Box | |
1 | Budgets 8/1989 - 8/1994 |
1 | Regents Reports 4/1989 - 3/1994 |
1 | Burke/Lee, A Joint Venture 3/1988 - 4/1991 |
1 | Mahan DeSalvo 12/1989 - 3/1994 |
1 | Robert Fossatti 5/1994 - 9/1994 |
1 | Coopers and Lybrand 3/1994 |
1 | E.I.S. 4/1990 |
1 | Gifford Consultants, Inc. Summary Report of Geotechnical Material Testing |
1 | Pitsburgh Testing - Concrete Tests |
1 | Morson Knudson Weekly Activity reports 5/1991 7/1991 |
1 | Building Committee Meeting Minutes 7/1980 - 7/1989 |
1 | General Correspondence 7/1987 - 3/1990 |
1 | Artwork Correspondence 6/1990 |
1 | Addendums 1991 |
1 | Wyatt Jaykirn #2 4/1993 - 11/1993 |
1 | ALSC R.F.I.'s 7/1993 |
1 | Construction Reports #4 9/1993 - 1/1994 |
1 | ALSC - Submittals 2/1991 - 12/1992 |
1 | ALSC - Contract #7 6/1994 - 6/1995 |
1 | MA Mortenson Contract 2/1993 - 6/1995 |
1 | Shea Construction Contract #2 7/1991 5/1992 |
1 | General Correspondence #14 5/1995 - 8/1997 |
2 | M.A. Mortenson - General Correspondence #6 9/1994 - 12/1996 |
2 | ALSC - General Correspondence #21 10/1994 - 12/1996 |
2 | Shea Construction - 1 of 2 Delay Claim 4/26/1991 |
2 | Pending Change Proposals and Log |
2 | Pending Change Proposals and Log |
2 | Pending Change Proposals and Log |
2 | Holland Early Bird Photos |
2 | Shelving Layouts and other Shelving Information |
2 | Shelving and Compact Storage System General Correspondence 8/1993 - 1/1996 |
2 | Shelving and Compact Storage System General Correspondence 7/1993 - 9/1996 |
2 | Tab Product CO - Shelving and Compact Storage System 8/1993 - 7/1994 |
2 | Rejected Bids Shelving and Compact Storage System 6/1993 - 9/1993 |
2 | Rejected Bids |
2 | Construction Reports #3 3/1993 - 8/1993 |
3 | Library Un - Marked Folder Possibly Architect Selection 1988 |
3 | Construction Reports #2 7/1992 - 2/1993 |
3 | Wyatt - Jaykim #1 9/1989 3/1993 |
3 | General Correspondence #13 6/1994 - 4/1995 |
3 | General Correspondence #12 1/1994 - 5/1994 |
4 | General Correspondence #11 8/1993 - 12/1993 |
4 | General Correspondence #10 2/1993 7/1993 |
4 | General Correspondence #9 7/1992 - 1/1993 |
4 | General Correspondence #8 10/1991 - 9/1991 |
4 | General Correspondence #7 3/1991 - 5/1991 |
4 | General Correspondence #6 3/1991 5/1991 |
4 | General Correspondence #5 10/1990 - 1/1991 |
4 | General Correspondence #4 5/1990 - 1/1991 |
4 | General Correspondence #3 2/1990 - 4/1990 |
5 | General Correspondence #2 8/1989 - 1/1990 |
5 | General Correspondence #1 4/1988 7/1989 |
5 | ALSC Architect General Correspondence #20 3/1994 - 9/1994 |
5 | ALSC Architect General Correspondence #19 9/1993 - 2/1994 |
5 | ALSC Architect General Correspondence #18 3/1993 - 8/1993 |
5 | ALSC Architect General Correspondence #17 10/1992 2/1993 |
5 | ALSC Architect General Correspondence #16 7/1992 - 9/1992 |
5 | ALSC Architect General Correspondence #15 3/1992 6/1992 |
5 | ALSC Architect General Correspondence #14 11/1991 2/1992 |
5 | ALSC Architect General Correspondence #13 8/1991 - 10/1991 |
6 | ALSC Architect General Correspondence #12 6/1991 - 7/1991 |
6 | ALSC Architect General Correspondence #11 5/1/1991 - 5/30/1991 |
6 | ALSC Architect General Correspondence #10 4/1/1991/ - 4/30/1991 |
6 | ALSC Architect General Correspondence # 9 2/1991 - 3/1991 |
6 | ALSC Architect General Correspondence #8 1/1991 - 2/1991 |
6 | ALSC Architect General Correspondence #7 11/1990 - 12/1990 |
6 | ALSC Architect General Correspondence #6 9/1990 - 10/1990 |
6 | ALSC Architect General Correspondence #5 5/1990 - 8/1990 |
6 | ALSC Architect General Correspondence #3 9/1989 - 2/1990 |
7 | ALSC Architect General Correspondence #2 7/1989 - 8/1989 |
7 | ALSC Architect General Correspondence #1 9/1988 6/1989 |
7 | For Student Projects |
7 | MA Mortenson Correspondence #5 9/1993 - 8/1994 |
7 | MA Mortenson Correspondence #4 4/1993 - 8/1993 |
7 | MA Mortenson Correspondence #3 2/1993 - 3/1993 |
7 | MA Mortenson Correspondence #2 7/1992 1/1993 |
7 | MA Mortenson Correspondence #1 10/1991 - 6/1992 |
7 | ALSC Contract #9801 #6 12/1992 - 6/1994 |
8 | ALSC Contract #980 1 #5 12/1991 - 1/1993 |
8 | ALSC Contract #9801 #4 3/1991 - 10/1991 |
8 | ALSC Contract #9801 #3 11/1989 - 2/1991 |
8 | ALSC Contract #980 1 #2 7/1989 |
8 | ALSC Contract #9801 #1 2/1989 - 6/1989 |
8 | MA Mortenson Contract Correspondence # 14 10/1991 - 11/1993 |
8 | MA Mortenson Contract Correspondence #13 10/1991 - 10/1993 |
8 | MA Mortenson Contract Correspondence #12 10/1991 - 4/1993 |
8 | MA Mortenson Contract Correspondence #11 10/1991 - 10/1993 |
8 | MA Mortenson Contract Correspondence #10 9/7/1993 - 9/16/1993 |
8 | MA Mortenson Contract Correspondence #9 11/1992 - 8/1993 |
9 | MA Mortenson Contract Correspondence #8 10/1991 - 7/1993 |
9 | MA Mortenson Contract Correspondence #6 and #7 8/1992 - 6/1993 |
9 | MA Mortenson Contract Correspondence #5 1/1993 - 2/1993 |
9 | MA Mortenson Contract Correspondence #4 12/1992 |
9 | MA Mortenson Contract Correspondence #3 11/1992 |
9 | MA Mortenson Contract Correspondence #2 8/1992 - 10/1992 |
9 | MA Mortenson Contract Correspondence #1 9/1991 - 7/1992 |
9 | Shea Construction - Contract #1 5/1990 - 6/1991 |
HANDICAPPED ACCESS IMPROVEMENTSReturn to Top
Container(s) | Description |
---|---|
Box | |
9 | Budget 1 1/1980 12/1992 |
HOLLAND LIBRARY RENEWALReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Budget 1/1993 - 3/1993 |
10 | Holland Library Fire Pump. - Creighton Brooked Engineers. General Correspondence 5/1994 - 7/1994 |
10 | Mahan and Desalvo 12/1992 |
10 | Building Committee Meeting 10/1991 - 7/1992 |
10 | General Correspondence 3/1992 - 4/1997 |
10 | Handicapped Accessibility Improvements - General Correspondence 1990 - 4/1994 |
10 | ALSC Architect Correspondence #1 2/1992 - 7/1994 |
10 | ALSC Architect Contract 10975 4/1992 - 7/1994 |
WSU VANCOUVER PHASE II - FEMAReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | General Correspondence E-Mail 3/1997 - 8/1997 |
10 | General Correspondence 3/1997 - 6/1998 |
10 | Meeting Minutes 4/1997 |
10 | Heery International General Correspondence 8/1997 - 9/1997 |
10 | Z.G.F. - General Correspondence 2/1997 - 9/1997 |
10 | Z.G.F. E-Mail 4/1997 |
10 | General Correspondence - Drawings |
STUDENT ALUMNI CENTERReturn to Top
Container(s) | Description |
---|---|
Box | |
10 | Budget Empty |
10 | Project Planning Committee 5/1993 - 4/1999 |
10 | Attorney General Correspondence 7/1995 - 5/1999 RESTRICTED
|
10 | Studioz/Architects Associates E-Mail 3/1996 |
10 | Studioz/Architects Associates - General Correspondence 4/1995 - 5/1996 |
10 | Z.G.F. E-Mail 7/1995 |
10 | Z.G.F. General Correspondence 6/1995 - 8/1995 |
10 | Z.G.F. Contract 8/1995 |
NORTH CAMPUS SUBSTATIONReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | General Correspondence #1 4/1995 |
GC/CM REVIEWReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | General Contractor/Construction Manager Program Review 1/1999 |
11 | Proposal By Vanir 12/1998 |
11 | GC/CM Program Assessment 12/1998 |
11 | Statement of Qualifications Presented to WSU Proposal to Provide Program Review and Risk Assessment of Alternative Public Works Procedures |
RESIDENCE HALL FIRE SPRINKLERSReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Budget - Empty |
11 | Residence Hall Implementation |
11 | General Correspondence 6/1991 - 5/2001 |
11 | Patriot Fire Protection Contract 10/1994 |
11 | Rolf Jenson and Associates Various Projects |
11 | Rolf Jenson and Associates - Residence Hall Sprinkler Feasibility Study |
SEPTIC SYSTEM REPLACEMENT IAREC - PROSSERReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Preliminary Engineering Report for Large On - Site Sewage System at WSU - IAREC Prepared by J.U.B. 11/1993 |
11 | Preliminary Engineering Evaluation - Task 5 Alternative Comparison Prepared by J.U.B. 8/1993 |
OLYMPIC WEIGHT ROOM EXPANSIONReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Budget - Empty |
11 | Regents 2/1995 |
11 | Attorney - Empty |
11 | General E-Mail 11/1994 - 1/1996 |
11 | Project Planning Committee 11/1994 - 1/1996 |
11 | General Correspondence 11/1994 - 2/1998 |
11 | ALSC General Correspondence 10/1995 - 4/1996 |
11 | ALSCCO 1/1996 - 4/1996 |
SOUTH CAMPUS ELECTRICALReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | CO 12709 12/1997 - 6/1998 |
STEVENS HALL RENOVATIONReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Budget 8/1997 |
11 | General Correspondence 5/1997 - 6/1997 |
11 | Kovalenko Architects - General Correspondence 9/1995 |
STUDENT HOUSING PROJECTReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Regents 1/1995 |
11 | IRA Fink and Associates CO 11923 2/1995 |
11 | Unmarked Folder 2/1994 |
11 | General Correspondence #2 2/1995 - 4/1996 |
11 | General Correspondence #1 11/1993 - 8/1994 |
BOHLER GYM ADDITIONReturn to Top
Container(s) | Description |
---|---|
Box | |
11 | Budget 8/1992 - 4/1998 |
11 | Regents 10/1991 - 6/1998 |
11 | E.I.S. 6/1995 |
11 | Attorney General Correspondence 7/1998 RESTRICTED
|
11 | Public Information Requests 5/1999 |
11 | Burke/Lee Correspondence 9/1992 |
11 | Disputes Review Board - Thomas P. Cochran 9/1996 - 12/1996 |
11 | Hainline and Associates CO #1 5/1996 - 8/1997 |
11 | HCI Howard Consultants Inc./Strata CO 12254 1/1996 - 6/1997 |
11 | The Redicheck Firm 11/1995 |
12 | Robert Fossatti Associates 8/1994 - 5/1997 |
12 | Disputes Review Board General Correspondence #1 |
12 | Strata Geotechnical Engineering and Material Testing Co. 2/1997 - 6/1997 |
12 | Professional Services Industries - Inspection Reports 8/1996 - 11/1996 |
12 | Strata Geotechnical Engineering - Concrete Test Reports 8/1997 10/1997 |
12 | Geotechnical Report 12/1994 |
12 | General E-Mail Correspondence 8/1996 - 3/1997 |
12 | General Correspondence #3 11/1996 - 8/1998 |
12 | Value Engineering Study 1/1995 - 3/1995 |
12 | Shea Construction #2 7/1997 - 2/1998 |
12 | Shea Construction Non - Compliance Reports 10/1996 - 4/1997 |
12 | Shea Construction General Correspondence #3 3/1997 10/1998 |
12 | Buhler Gym Addition Pre - Design Study |
12 | Sasaki Associates General Correspondence #8 6/1997 1/01 |
12 | Shea Contract Change Proposals #s 88 - 01 |
12 | Rejected Bids - Bid Opening 3/1996 |
12 | Sasaki Associates Construction meeting minutes #1 4/1996 |
13 | Sasaki General Correspondence #7 1/1997 - 5/1997 |
13 | Strata Geotech. Engineering Concrete Testing Reports 4/1996 - 10/1996 |
13 | Strata Geotech. Engineering - #2 11/1996 - 7/1997 |
13 | Shea General Correspondence #2 8/1996 - 3/1997 |
13 | Sasaki General Correspondence #2 8/1994 - 2/1995 |
13 | Sasaki General Correspondence #1 2/1991 - 7/1994 |
13 | Shea General Correspondence #1 3/1996 - 7/1996 |
13 | Sasaki General #6 9/1996 - 12/1996 |
13 | Sasaki General #5 6/1996 - 8/1996 |
13 | Sasaki General #4 1/1996 - 5/1996 |
14 | Sasaki General #3 3/1995 - 12/1995 |
14 | General Correspondence #2 9/1995 - 10/1996 |
14 | General Correspondence #1 10/1991 - 8/1995 |
14 | Shea - Contract #1 3/1996 - 6/1997 |
14 | Sasaki Architects Contract 3/1992 - 6/1995 |
14 | Sasaki Architects - Contract #2 5/1992 - 9/1996 |
14 | Sasaki Architects Contract #3 10/1996 - 6/1998 |
14 | Requests for Information #s 176 - 256 |
14 | CD/Logs/Bulletins |
14 | Requests for Information #s 101 - 175 |
15 | Requests for Information 1 - 100 |
CHILLED WATER STORAGEReturn to Top
Container(s) | Description |
---|---|
Box | |
15 | Regents 9/1992 - 9/1994 |
15 | Budget 9/1991 - 2/1992 |
15 | Mahan Partnership Correspondence 3/1997 - 4/1997 |
15 | Robt. Bein, WM. Frost and Associates General Correspondence 3/1997 4/1997 |
15 | E.I.S. 11/1991 - 1/1991 |
15 | General Correspondence #1 5/1990 - 4/1995 |
15 | Shea Construction General Correspondence #1 4/1993 6/1993 |
15 | Shea Construction Contract 8/1993 |
VANCOUVER PHASE II EARLY CHILDHOOD EDUCATION FACILITYReturn to Top
Container(s) | Description |
---|---|
Box | |
15 | Budget 3/1995 - 3/1998 |
15 | Regents 1/1996 - 9/1999 |
15 | Finance, Audit, Capital Comm. (FAC) 7/1999 - 9/1999 |
15 | Attorney General Correspondence 2/1996 - 7/1997 RESTRICTED
|
15 | AGRA Earth and Environmental, Inc. 10/1997 - 7/1998 |
15 | Carlson Testing, Inc. #1 9/1996 - 10/1996 |
15 | AGRA Earth and Environmental, Inc. - Concrete Test Reports 9/1997 - 1/1998 |
15 | Consultant Value Specification CO 12285 4/1996 6/1990 |
15 | Heery Int. CO 12306 |
15 | Heery Int. CO 12308 |
15 | Value Engineering Study 5/23/1996 |
15 | Project Planning Committee |
15 | Ileery Tnt. E-Mail #1 6/1996 3/1992 |
15 | I leery Jut. General Correspondence #1 4/1996 5/1998 |
15 | Meeting Minutes #1 4/1992 - 2/1998 |
15 | General E-Mail 9/1995 - 4/1998 |
15 | General Correspondence #7 4/1997 |
15 | ZGF Contract 12128 #3 11/1997 - 8/1999 |
15 | ZGF General Correspondence 3/1997 9/1998 |
15 | Shimizu America Corp. General Correspondence #1 6/1997 - 11/1999 |
16 | Shimzu Contract 6/1997 - 11/1998 |
16 | Certified Payroll Reports 1/1999 - 2/1999 |
16 | Shirnizu Contract Change Proposals Numbers 079 - 1R |
16 | Rejected Bids Re-Bid Date 6/12/1997 |
16 | Rejected Bids Bid Date 4/1997 |
16 | Closeout File 6/1999 - 8/1999 |
16 | General Correspondence #6 11/1996 - 3/1997 |
16 | General Correspondence #5 6/1996 - 10/1996 |
16 | General Correspondence #4 2/1996 - 5/1996 |
16 | General Correspondence #3 12/1995 - 1/1996 |
16 | General Correspondence #2 11/1/1995 - 11/30/1995 |
17 | General Correspondence #1 6/1995 - 10/1995 |
17 | Z.G.F. General Correspondence #7 12/1996 - 3/1997 |
17 | Z. G. F General Correspondence #6 9/1996 - 11/1996 |
17 | Z.G.F General Correspondence #5 7/1996 - 8/1996 |
17 | Z.G.F General Correspondence #4 5/1996 - 6/1996 |
17 | Z.G.F General Correspondence #3 2/1996 1/1996 |
17 | 7.G.F General Correspondence #2 1/1996 - 1/1996 |
17 | Z.G.F General Correspondence #1 1/1995 - 12/1996 |
17 | Z.G.F. Contract #2 9/1996 - 10/1997 |
17 | Z.G.F. Contract #1 10/1995 - 8/1996 |
CAMPUS INFRASTRUCTURE - VANCOUVER PH IIReturn to Top
Container(s): Box
Container(s) | Description |
---|---|
Box | |
18 | Design Development - Preliminary Calculations and Cut Sheets 2/1996 |
18 | Budget 4/1996 - 3/1998 |
18 | Attorney General Correspondence 4/1997 RESTRICTED
|
18 | AGRA Earth and Environmental 2/1996 - 5/1997 |
18 | AGRA Earth and Environmental CO 12022 6/1997 |
18 | Consulting Value Specialists 4/1996 - 6/1996 |
18 | Disputes Review Board - General Correspondence 4/1997 - 6/1997 |
18 | Disputes Review Board E-Mail 4/1997 - 6/1997 |
18 | Disputes Review Board Agreement 12658 - Kim DeRubcrtis |
18 | Disputes Review Board Agrcemcnt 12658 - Kerry Lawrence |
18 | Heery International CO 12309 |
18 | Heery International CO 12307 |
18 | Mayer/Reed C013368 9/1999 |
18 | Value Engineering Study 4/1996 - 6/1996 |
18 | Project Meeting Minutes 4/1997 - 9/1997 |
18 | Heery International - E-Mail Correspondence 6/1996 - 5/1997 |
18 | Heery International General Correspondence #2 7/1997 - 4/1998 |
18 | Storm water Pollution Prevention Plan 6/1996 |
18 | Heery Constructability Review 7/1996 |
18 | Project Planning Committee 10/1995 - 2/1996 |
18 | General E-Mail Correspondence 11/1995 - 2/1998 |
18 | Landis and Staefa Submittal data for WSU, Phase II Infrastructure 8/1997 |
18 | Zimmer Gunsul Frasca (Z.G.F.) - General E-Mail 7/1996 - 5/1997 |
18 | Z.G.F. General Correspondence 10/1997 - 8/1998 |
18 | Z.G.F. General Correspondence #4 7/1997 - 10/1999 |
18 | Z.G.F. Contract #3 6/1997 - 3/1999 |
18 | Good Fellow Brothers General E-Mail 7/1997 |
18 | Good Fellow Brothers General Correspondence 3/1997 - 1/1999 |
18 | Good Fellow Brothers - Contract 7/1997 - 2/1998 |
18 | Good Fellow Brother - Certified Payroll Reports 5/1997 - 1/1998 |
19 | Statement of Compliance 5/1997 - 1/1998 |
19 | Submittal for Section 16402 Prepared by Leed Electric, Inc. for Good Fellow Brothers Inc |
19 | Nutter Underground 8/1996 - 9/1997 |
19 | Good Fellow Contract #?s32 - 01 |
19 | Rejected Bids Bid Date 3/4/1997 |
19 | Estimate of Probable Construction Cost |
19 | Constructability Review |
19 | Value Engineering Study for Campus Infrastructure |
19 | Preliminary Design Campus Infrastructure Work |
19 | General Correspondence #3 12/1996 - 6/1997 |
19 | General Correspondence #2 4/1996 - 11/1996 |
19 | General Correspondence #1 11/1995 - 3/1996 |
19 | Heery International - General Correspondence 11/1995 - 7/1997 |
19 | Z.G.F. General Correspondence #6 4/1997 - 9/1997 |
20 | Z.G.F. - General Correspondence #5 1/1997 - 3/1997 |
20 | Z.G.F. - General Correspondence #4 9/1996 12/1996 |
20 | Z.G.F. General Correspondence #3 7/1996 - 8/1996 |
20 | Z.G.F. - General Correspondence #2 3/1996 - 6/1996 |
20 | Z.G.F. - General Correspondence #1 1 10/1995 - 2/1996 |
20 | Z.G.F Contract 12138 #2 9/1996 - 5/1997 |
20 | Z.G.F. Contract 12138 #1 10/1995 - 8/1996 |
20 | Second Draft Report 1 12/1995 |
20 | Z.G.F. - Campus Infrastructure Work Preliminary Design - Estimation of Probable Construction Cost 2/1996 |
20 | Campus Infrastructure Project Program - Prepared by Project Planning Committee 2/1996 |
TWO ACADEMIC BUILDINGSReturn to Top
Container(s) | Description |
---|---|
Box | |
20 | Budget - Empty |
20 | Attorney General Correspondence - Empty |
20 | Project Planning Committee 2/1996 |
20 | General Correspondence E-Mail 1/1996 - 6/1997 |
20 | General Correspondence #3 4/1996 - 5/1996 |
20 | General Correspondence #2 4/1996 - 3/1996 |
20 | General Correspondence #1 1/1995 - 3/1996 |
20 | Z. G. F. - General Correspondence #1 6/1995 - 1/1998 |
20 | Z.G.F. - CO#l 12147 11/1995 - 3/1998 |
USGS VOLCANO LABORATORYReturn to Top
Container(s) | Description |
---|---|
Box | |
21 | Budget 8/1996 |
21 | Regents 8/1996 |
21 | Project Planning Committee 9/1995 - 6/1996 |
21 | Attorney General Correspondence 8/1995 - 2/1997 RESTRICTED
|
21 | General E-Mail Correspondence 3/1995 - 2/1998 |
21 | General Correspondence #3 11/1996 |
21 | Z.G.F. E-Mail #1 4/1996 5/1997 |
21 | Z.G.F. General Correspondence #2 11/1996 - 8/1998 |
21 | Z.G.F. Contract CO 12178 #1 1/1996 - 7/1997 |
21 | General Correspondence #2 4/1996 - 1 0/1996 |
21 | General Correspondence #1 10/1992 - 3/1996 |
21 | Z.G.F. General Correspondence 3/1995 - 10/1996 |
21 | Estimate for Probable Construction Cost for USGS Cascades Volcano Observatory |
21 | Program Requirements |
HILLTOP HOUSING PROJECTReturn to Top
Container(s) | Description |
---|---|
Box | |
21 | Regents 9/1996 |
21 | E.I.S. 6/1996 |
21 | General E-Mail 8/1996 |
21 | General Correspondence 7/1995 - 5/1997 |
21 | Long General Correspondence 9/1996 |
21 | Ground Lease Housing Development Application Providence Court Partners |
21 | Long Association LLC. - Response to Requests for Information for the Ground Lease |
HOLLLINGBERY FIELDHOUSE RENOVATIONReturn to Top
Container(s) | Description |
---|---|
Box | |
21 | Regents - Empty |
21 | Project Planning Committee - Empty |
21 | General Correspondence 8/1997 - 8/1999 |
21 | Hollinghery General Folder Un-Named 8/1996 |
22 | Housing Development of Student Housing Facilities at WSU |
22 | Ground Lease Housing Proposal /Providence Court Partners |
22 | Ground Lease Housing TRIAD Development Inc. |
JOINT CENTER FOR HIGHER EDUCATIONReturn to Top
Container(s) | Description |
---|---|
Box | |
22 | Budget - Empty |
22 | Regents - Empty |
22 | BEST Study 10/1996 |
22 | Project Planning Committee |
22 | General C-Mail 1/1996 |
22 | Integrus Architecture. Executive Committee Minutes 1/1995 - 8/1997 |
22 | Integrus - General Correspondence 12/1995 - 5/1998 |
22 | General Correspondence 9/1995 - 1/1998 |
22 | Pinnacle - Realty Management Package |
22 | PinnaclE-Monthly Financial Statement 5/1996 |
FACILITIES SERVICES CENTERReturn to Top
Container(s) | Description |
---|---|
Box | |
22 | Kruegel/McAllister Residence Halls - SCM Consultants Correspondence 4/1990 - 4/1993 |
22 | UnMarked Folder Architect Correspondence 2/1992 - 4/1993 |
22 | General Correspondence 4/1996 |
FACILITY CONDITION SURVEY KRUEGEL/McALLISTERReturn to Top
Container(s) | Description |
---|---|
Box | |
22 | Budget 4/1990 |
22 | Burke/Lee Correspondence 3/1990 |
22 | SCM Consultants - Contract # 10153 3/1990 - 7/1990 |
22 | SCM Consultants - Contract # 11063 9/1991 - 2/1993 |
CONSULTANT SELECTIONReturn to Top
Container(s) | Description |
---|---|
Box | |
23 | Carpenter - McCoy - Neill Hall: Architect Selection + Letter of Interest NBBJ Interview Evaluation Forms 1986 |
23 | Dairy Forage Facility - Interview Evaluations Pullman 1986 |
23 | Food - Human Nutrition Facility Phase II + NAC letter of Interest - Interview Evaluation Forms 1987 |
23 | Holland Library Addition and Renewal Interview Evaluation Forms + Letter of Interest from WMFL |
23 | Spokane Center - Interview Evaluation Forms + WMFL Letter of Interest |
23 | Tn - Cities Center Addition - Interview Evaluations + Letter of Interest from McKinley |
23 | Veterinary Teaching Hospital - Evaluation 1987 |
23 | Veterinary Teaching Hospital - Diagnostic Center - Evaluation 1987 |
23 | Consultant Selection/3rd Package #3 1991 |
23 | Consultant Selection/3rd Package #2 - General Correspondence |
23 | Consultant Selection/2nd Package (4 Projects) 1991 |
23 | Projects: Coliseum Asbestos Removal |
23 | Childcare Facility |
23 | Wilson Hall Renewal |
23 | Residence Hall Fire Sprinklers Systems |
23 | Student Services Building - To French Administration Building |
23 | Records Maintenance Material Storage |
23 | South Fairway Intramural Fields |
23 | Hazardous. Pathological, Radioactive Waste Handling Facilities |
23 | Veterinary Teaching Hospital Misc. Correspondence |
23 | Holland Library Addition - Miscellaneous Correspondence 1991 |
23 | USDA Greenhouse. Head house - Master plan |
23 | Animal Sciences Laboratory Building - WSU Consultant Selection Second Package 1991 |
MISCELLANEOUSReturn to Top
Container(s) | Description |
---|---|
Box | |
24 | Pullman Memorial Hospital - Power Operated Entry Doors 10/1991 |
24 | New University Water Well No. 7 10/1987 |
24 | City Entry Sign 6/1982 |
24 | City of Pullman Capital improvement Program (C.I.P.) 4/1989 |
24 | Veterans Memorial (Bldg.No. 791) 3/1992 |
24 | Burger King (Colorado/D Street) Bldg.No.831 10/1988 |
24 | Daggy Hall - Audiometric Booths - Handicapped Accessible (Bldg.No.808) 6/1985 |
24 | Tennis Courts (Bldg.No. 31 9C) 4/1982 |
24 | Buckley Lagoon (WWREC) - Bldg.No. 1510 10/1986 |
24 | WSU - Depot (Visitor Information Center) Bldg.No. 830 2/1989 |
24 | Consultant Selection |
24 | Vancouver - Phase I Campus Development - Project Submittals 1991 |
24 | Student Services Addition - Project Submittals 1991 |
24 | Hazardous Waste (Pathological/Radioactive Handling Facility Records, Maintenance Materials Storage and Recycling, Phase I (Archos) 1991; South Fairway Intramural Field (Carothers) 1991; Asbestos Removal - Coliseum (Alpha) 1991; Residence Hall Fire Sprinkl |
24 | Consultant Selection - Plant Growth Facility 1991 |
24 | Consolidated Information Center - Tri-Cities Consultant Selection (Integrus) 1993 |
24 | Greenhouse Replacements Puyallup - Consultant Selection (Stafford Architects)1 993 |
24 | ICNE Nursing Center - Yakima - Consultant Selection (Integrus) 1993 |
24 | Animal Sciences Laboratory. Second Package Interview of Finalists/General Correspondence: Bouillon Christofferson and Schairer Inc.; MBT; Mahlum Nordfors McKinley Gordon; Northwest Architectural Company. 9/1991 |
24 | WSU Spokane - Building Plan 7/1988 |
Names and SubjectsReturn to Top
Subject Terms
- College buildings -- Washington (State)
Corporate Names
- Washington State University -- Buildings -- History -- Archives.
- Washington State University. Capital Planning -- Records and correspondence.
- Washington State University. Capital Planning and Development -- Records and correspondence.
- Washington State University. Department of Facilities Development -- Records and correspondence.
- Washington State University. Department of Facilities Planning -- Records and correspondence.
Other Creators
-
Corporate Names
- >Washington State University. Capital Planning. (creator)
- Washington State University. Capital Planning and Development. (creator)
- Washington State University. Department of Facilities Development. (creator)
- Washington State University. Department of Facilities Planning. (creator)