Archives West Finding Aid
Table of Contents
- Overview of the Collection
-
Biographical Note
- Content Description
- Use of the Collection
- Administrative Information
-
Detailed Description of the Collection
- Histories
- Reports, Bingham
- Reports, South and North End
- Reports, Magna, South Arm, and North Facilities
- Reports, Arthur Step-Back Repository
- Reports, Kennecott
- Reports, Kennecott and North Facilities
- Reports, Sampling and Analysis
- Reports and Assessments
- Environmental Protection Agency
- Refinery
- Sampling and Analysis
- Properties: Butterfield Canyon, and North Facilities
- Butterfield Canyon and Butterfield Creek
- Butterfield Creek
- Herriman
- Analysis and Reports
- Analysis and Reports
- Bingham Creek
- Bingham Creek
- Bingham Creek
- Bingham Creek
- Kennecott
- Kennecott
- Kennecott
- Kennecott
- Kennecott
- Kennecott
- Miscellaneous Reports
- Articles and Reports
- Newsclippings
- Newsclippings and Miscellaneous Documents
- Oversized Documents
- Maps
- Names and Subjects
Superfund Records Center records, 1990-2002
Overview of the Collection
- Title
- Superfund Records Center records
- Dates
- 1990-2002 (inclusive)19902002
- Quantity
- 27 linear feet
- Collection Number
- ACCN 2107
- Summary
- The Superfund Records Center records (1990-2002) contains reports, histories, news clippings, and other documents pertaining to the Environmental Protection agency in relation to Kennecott Copper Mines North Facilities, South Arm, and surrounding areas within Utah. Superfund was initialized by concerns related to properties which resulted in uncontrolled or abandoned hazardous waste sites, for instance, abandoned warehouses and landfills. Citizen concern encouraged Congress to establish the Superfund Program in 1980 in order investigate and clean-up the areas in question. The EPA administers the Superfund Program in cooperation with various states and communities.
- Repository
-
University of Utah Libraries, Special Collections
Special Collections, J. Willard Marriott Library
University of Utah
295 South 1500 East
Salt Lake City, UT
84112-0860
Telephone: 8015818863
special@library.utah.edu - Access Restrictions
-
Twenty-four hour advanced notice encouraged. Materials must be used on-site. Access to parts of this collection may be restricted under provisions of state or federal law.
- Languages
- English
Biographical NoteReturn to Top
Superfund was initialized by concerns related to properties which resulted in uncontrolled or abandoned hazardous waste sites, for instance, abandoned warehouses and landfills. Citizen concern encouraged Congress to establish the Superfund Program in 1980 in order investigate and clean-up the areas in question. The EPA administers the Superfund Program in cooperation with various states and communities.
Content DescriptionReturn to Top
The Superfund Records Center records (1990-2002) contains reports, histories, news clippings, and other documents pertaining to the Environmental Protection agency in relation to Kennecott Copper Mines North Facilities, South Arm, and surrounding areas within Utah.
Use of the CollectionReturn to Top
Restrictions on Use
The library does not claim to control copyright for all materials in the collection. An individual depicted in a reproduction has privacy rights as outlined in Title 45 CFR, part 46 (Protection of Human Subjects). For further information, please review the J. Willard Marriott Library's Use Agreement and Reproduction Request forms.
Preferred Citation
Collection Name, Collection Number, Box Number, Folder Number. Special Collections, J. Willard Marriott Library, The University of Utah.
Administrative InformationReturn to Top
Detailed Description of the CollectionReturn to Top
HistoriesReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 1 | William Spencer, "History of Utah Copper" |
1991 |
1 | 2 | T. A. Rickard, "The Utah Copper Enterprise" |
1991 |
1 | 3-4 | George M. Addy, "The Economic and Social History of Bingham Canyon" |
1991 |
1 | 5-6 | Kennecott history documents |
1991 |
2 | 1 | John L. Clark, History of Utah's Salt Industry
|
1971 |
2 | 2-3 |
History of Milling Developments From Date of Inception to Present Time
|
|
2 | 4 |
Site Investigations for Historic Mines in the Oquirrh Range of Northern Utah
|
1996 |
2 | 5-6 | Historical sites and fact sheets |
1990-1997 |
3 | 1 | Thomas Parry Billing, "History of the Bingham District" |
1952 |
3 | 2 | Bingham Creek History |
|
3 | 3-4 | Bingham Canyon History |
|
3 | 5 |
Historic Response to EPA Priority Two Sites, Robbes-Copperton |
1997 |
3 | 6 |
History Sites Response to EPA Priority Three Sites, Lead Mill-What Cheer Mill |
1997-1998 |
4 | 1 | Copperton-Magna |
1995-1996 |
4 | 2 | Bonneville Crusher-Pine Canyon |
1995-1996 |
4 | 3-4 | Engineering bulletins for remediation of Superfund sites |
1990-2000 |
4 | 5 | Magna Tailings Pond |
Reports, BinghamReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 1-3 | Bingham Creek Channel Report, Volume II |
1994-1996 |
5 | 4 | Bingham and Kennecott documents
Mine tailings corrective action, Salt Lake County, Mountain View Golf Course, Bingham Creek culvert, 8410 South 2700 West, West Jordan, Utah, dated September 1996; a public health assessment for Kennecott properties near Copperton, Utah, dated September 30, 1997; and an enforcement action memorandum on West Jordan properties near Bingham Creek, issued June 8, 1995.
|
1995-1997 |
5 | 5 |
Bingham Creek Study, data dictionary |
1994 |
6 | 1 | Bingham Creek Channel sampling |
1990-1996 |
6 | 2 |
Bingham Canyon hydrologic/geotechnical study phase II project report: interim study report
|
1985 |
6 | 3 | Soil and tailings sample test results: Bingham Creek Channel Phase III removal action |
1996 |
6 | 4 | Bingham Creek channel sampling results, University of Colorado
This folder also contains related correspondence from 1992 to 1996, and copies of articles, abstracts and conference papers related to mine waste remediation from the mid-1990s.
|
1992-1996 |
6 | 5 | Articles regarding Old Bingham Tunnel |
1992-1994 |
7 | 1 | Reports on Bingham Creek residences soil remediation activities |
1994-1995 |
7 | 2 | Soil / tailings sampling test results report, Bingham Creek channel, Phase III removal action, Salt Lake County, Utah |
1996 |
7 | 3-4 | Final report for Kennecott work activities related to the unilateral administrative order for removal action: Site T4, Bingham Creek channel, Phase II, Robbe cells and tailwater ditches |
1994 |
7 | 5 | Closure report, Fahnian Ranchettes, Lot no. 3 |
1995 |
7 | 6 | Final report for Kennecott Work Activities, related to the unilateral administrative order for removal action: Bingham Creek channel, Phase II, Site T4: Bingham Flats, evaporation pond canals and Pond AO [part three] |
1994 |
Reports, South and North EndReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
8 | 1 | Bingham Creek environmental and human health lead and arsenic exposure study: final report |
1996 |
8 | 2 | Sampling data, Bingham Creek Superfund cleanup project |
1996-1998 |
8 | 3 | Record of decision: Kennecott south zone, operable unit 2, southwest Jordan River Valley ground water plumes |
|
8 | 4 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B: miscellaneous sampling reports and addenda from Magna and Bonneville areas |
1994-1998; 2002 |
8 | 5 | Work plan, remedial investigation and feasibility study for ground water in the southwest Salt Lake Valley |
Reports, Magna, South Arm, and North FacilitiesReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
9 | 1 |
Sampling and Analysis Plan for the Engineering Evaluation/Cost Analysis for the Operable Unit 9-Kennecott North Soils
|
1991; 1994 |
9 | 2 |
Sample Analysis Plan for South Arm of the Great Salt Lake
|
1995 |
9 | 3-4 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action SSID#4B, Magna
|
1997 |
9 | 5-6 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action SSID#4B, Arthur Area |
1997 |
9 | 7 |
Wastewater Treatment Plant Sludge Characterization,Volume I |
1994 |
Reports, Arthur Step-Back RepositoryReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
10 | 1-3 |
Summary Report: Arthur Step-Back Repository: Magna, Utah, Volume I |
1997 |
10 | 3-6 |
Summary Report: Arthur Step-Back Repository: Magna, Utah, Volume 2 |
1997 |
Reports, KennecottReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
11 | 1 | Kennecott North End Technical Review Committee materials |
1970; 1996-1997 |
11 | 2 | U.S. Environmental Protection Agency Region 8 records on toxicology: Articles, agreements, reports, draft regulations, etc. |
1990-1999 |
11 | 3 | Review of, Watershed Reclamation, Preliminary Assessment, Surface Media Investigation
|
1992 |
11 | 4 | Reports
This folder contains the following reports:
|
1998; 2001 |
11 | 5 | Utah Department of Environmental Quality correspondence on Kennecott Priority Three historic sites
This folder also contains "To move a mountain: railroads and mining in Bingham Canyon, Utah."
|
1998; 2001 |
Reports, Kennecott and North FacilitiesReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
12 | 1-2 |
Environmental Analysis and Technical Appendices for the Kennecott Tailing Modernization Project,Magna, Utah |
1995 |
12 | 3 | U.S. Environmental Protection Agency Region 8 correspondence and Kennecott Superfund document index |
1994-1995; 1998 |
12 | 4 |
Wastewater Treatment Plant Site Characterization and Sludge Stabilization Study
This folder also contains some correspondence.
|
1995-1998 |
12 | 5 |
Soils Sampling and Analysis Report for Operable Unit A, Kennecott Soils
|
1994 |
12 | 6 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action SSID#4B, Magna |
1997 |
12 | 7-8 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action SSID#4B, Arthur Step-Back Report |
1994; 1996-1997 |
Reports, Sampling and AnalysisReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
13 | 1 |
Report on the May 1997 Sampling of Lee Creek Outfall, the C-7 Ditch Outfall, and the Great Salt Lake
|
1997 |
13 | 2 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Refinery area site summaries and characterization sampling reports [part 1] |
1998 |
13 | 3 | Inorganic analysis reports for Kennecott sites: electrolyte purification building, wastewater treatment plant pond B |
1996-1997 |
13 | 4 | Miscellaneous papers concerning reclamation projects on Kennecott north area sites |
1983; 1989; 1995-1997; 1999; 2002 |
13 | 5 | Environmental Protection Agency Region 8 reports and correspondence |
1994-1995 |
13 | 6 | Papers related to environmental effects of Kennecott mining activity and waste
This folder contains the following reports:
|
1970; 1995 |
13 | 7 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Refinery area site summaries and characterization sampling reports [part 2] |
1997 |
14 | 1 |
Focused Feasability Study Work Plan for Sulfates in Ground Water
|
1992 |
14 | 2 |
Focused Feasability Study for Sulfates in Ground Water
|
1993 |
14 | 3 | Reports
This folder contains the following reports:
|
1993 |
14 | 4-5 | Sampling reports, South Jordan and West Jordan, Utah |
1994-1996 |
14 | 6 | Bingham Creek residential removal action reports and Groundwater characterization and monitoring plan, volume 1 |
1991-1993 |
Reports and AssessmentsReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
15 | 1-2 | Historic sites and potential source fact sheets |
1992-1997 |
15 | 3 | Kennecott off-site environmental assessments for Butterfield, Midas and Copper Creeks |
1995 |
15 | 4 | Reports
This folder contains the following reports:
|
1993-1996 |
15 | 5 | Articles and plans concerning lead in the environment |
1981; 1992-1997 |
16 | 1 |
The Acute Toxicity of Selenate to the Brine Shrimp, Artemia Franciscana
|
1999 |
16 | 2 |
Evaluation of Selenium Toxicity to the Larvae of the Brine Fly, Ephydra Cinerea
|
1998 |
16 | 3 |
Chronic Toxicity of Selenium to Brine Shrimp, Artemia Franciscana
|
1999 |
16 | 4 |
Kennecott Utah Copper Corporation, North End Ground Water Remedial Investigation Conceptual Model Report
|
1999 |
16 | 5 |
Chronic Toxicity of Arsenic to Brine Shrimp
|
1996 |
16 | 6 | Miscellaneous Kennecott reports and correspondence on environmental cleanup |
1995-2002 |
17 | 1-3 |
Analysis Report Screening Level for the Ecological Risk Assessment of Kennecott Utah Copper
|
1995 |
17 | 4 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action, SSID#4B, Magna Area |
2001 |
17 | 5-7 |
North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action, SSID#4B, Refinery Area |
1999 |
Environmental Protection AgencyReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
18 | 1-2 | Correspondence |
1991-2002 |
18 | 3 | Problem formulation report, screening level for the ecological risk assessment, Kennecott Utah Copper, Salt Lake City, Utah |
1995 |
18 | 4 |
Analysis Report: Screening Level for the Ecological Risk Assessment
|
1995 |
18 | 5-6 | Correspondence and reports |
1996-1998 |
18 | 7 | Detail facility reports, released to the public on Nov. 26, 2001 |
2001 |
18 | 8 | TRI Explorer report |
2001 |
18 | 9 | Correspondence and data |
1995-2001 |
18 | 10 | "Copper mining communities and their people" and "Kennecott's Bingham Canyon Mine: the world's first open-pit copper mine" |
1993-1994 |
18 | 11 | Correspondence on Kennecott water studies |
1984-1994 |
19 | 1 | Legal Documents |
1996-2001 |
19 | 2 | Kennecott environmental assessment documents and EPA correspondence |
1987-1998 |
19 | 3 | Oquirrh Range Site Investigations |
1996 |
19 | 4 | Correspondence regarding Bingham Creek |
1992-1998 |
19 | 5 | Superfund documents |
1984; 1994-1998 |
19 | 6 | Correspondence concerning Bastian Ditch, Bastian Pit, and Cemetery Pond |
1909; 1929; 1991-1994 |
19 | 7 | Correspondence on Superfund sites concerning Trans Jordan, Debris Basin, Bingham Flats, Kennecott Uranium, Bingham Reservoir, Dry Fork, and Copper Gulch Mines |
1981; 1986; 1990-1994 |
20 | 1 | Environmental issues news clippings |
1993-2004 |
20 | 2-3 | Correspondence and documents
These folders contains correspondence and documents regarding Kennecott's inclusion on the National Priorities List of Superfund sites.
|
1987-1995 |
20 | 4 | Correspondence on Kennecott Superfund site cleanup work |
1995-1997 |
21 | 1 |
Butterfield Canyon Ecological Risk Assessment
|
1997 |
21 | 2 | Region 8 correspondence and documents concerning soil contamination |
1995-1998 |
21 | 3-5 | South Jordan evaporation ponds correspondence and documents |
1994-2003 |
21 | 6-7 | Correspondence and documents about risk assessment at Superfund sites
These folders also contain the following reports:
|
1995-2001 |
22 | 1 | Correspondence regarding South Jordan and evaporation ponds |
1993-1995 |
22 | 2 | Correspondence and documentation for public meetings, workshops, and task force meetings on Kennecott Superfund sites |
1990-1997 |
22 | 3 | Correspondence and documents regarding Kennecott Superfund sites |
1992-1997 |
22 | 4 | Bingham Creek Channel Superfund site documents |
1993-1995 |
22 | 5 | Booklet and articles on hazardous chemicals |
1992-1996 |
23 | 1 | Reports
This folder contains the following reports:
|
1995-1997 |
23 | 2 | Public health assessment, Kennecott (north zone), Magna, Salt Lake County, Utah; Public health assessment, Kennecott (south zone), Magna, Salt Lake County, Utah |
1996-1997 |
23 | 3 | Data summary report for Phase I of the vegetative uptake study at the Kennecott sites, Oquirrh Mountains, Utah; and Phase II, sampling and analysis plan for the vegetative uptake study at the Kennecott sites, Oquirrh Mountains, Utah |
1993 |
23 | 4 | Phase I sampling and analysis plan for the study of the uptake of lead and arsenic into agricultural crops at the Kennecott sites, Oquirrh Mountains, Utah; and Uptake of arsenic and lead by wheat at the Kennecott sites, Oquirrh Mountains, Utah |
1994-1995 |
23 | 5 | Confirmatory sample results, West Jordan soil sampling |
1996 |
23 | 6-7 | Bingham Creek Channel Superfund site data and correspondence |
1991-1996 |
23 | 8 | Reports and correspondence on Bingham Creek residential properties soil removal and cleanup |
1991-1997 |
23 | 9 |
Bioaccumulation of Lead, Cadmium, Arsenic, and Zinc in Garden Vegetables Grown in Mine Tailings
|
1995 |
24 | 1 | Action memorandum: Request for a time-critical removal action at the residential subdivisions of the Bingham Creek Channel site (Phase 3), West Jordan, Salt Lake County, Utah: PRP-Lead removal action |
1991 |
24 | 2 | Bingham Creek residential removal action: lots and zones sorted by lead concentrations |
1990-1992 |
24 | 3 | Proposed land use and building controls, unincorporated Salt Lake County properties in the Bingham Canyon area |
1993-1996 |
24 | 4 | Sample results for Bingham Creek channel Superfund site |
1995-1996 |
24 | 5 | Region 8 correspondence |
1998-2001 |
24 | 6 | Region 8 correspondence and reports |
1995-2002 |
RefineryReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
25 | 1-2 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B, Refinery area post removal and reclamation: volume 1 |
1998 |
25 | 3-4 | North facilities soils and wastewater treatment plant ponds site removal action SSID#4B, Refinery area post removal/post reclamation: volume 2 |
1998 |
25 | 5 | North facilities soils and wastewater treatment plant ponds site removal action SSID#4B, Refinery area post removal/post reclamation: volume 3 |
1998 |
26 | 1-2 | North facilities soils and wastewater treatment plant ponds site removal action SSID#4B, Refinery area post removal/post reclamation: volume 4 |
1998 |
26 | 3-5 | North facilities soils and wastewater treatment plant ponds site removal action SSID#4B, Refinery area post removal/post reclamation: volume 5 |
1998 |
Sampling and AnalysisReturn to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
27 | 1-2 | Sharon Steel tailings Superfund site correspondence and documents |
1992-1994 |
27 | 3 | Alternatives Analysis for the Tailings Modernization Project |
1994 |
27 | 4 | Reports
This folder contains the following reports:
|
1995 |
27 | 5 | EDR area study reports for Kennecott |
1995 |
27 | 6 | Sampling reports, Kennecott smelter area |
1996; 2002 |
27 | 7 | Sample analysis plan for south arm of the Great Salt Lake; and final report, soil and sediment sampling, south arm beach area of the Great Salt Lake |
1995 |
Properties: Butterfield Canyon, and North Facilities, 1992-1997Return to Top
Container(s): Box 28
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Morton Salt Property |
1995 |
2 | Chevron Property |
|
3-4 |
Butterfiled Creek/Herriman Soil Investigation Report
|
1996-1997 |
5 | North Facilities |
1992-1997 |
6 |
Estimates of Background Concetrations of Metals and Non-Metals in Water
|
1995 |
7 |
Post Removal Sampling of the Butterfield Waste Rock Pile Area
|
1992 |
Butterfield Canyon and Butterfield Creek, 1996-1998Return to Top
Container(s): Box 29
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-2 |
Butterfield Creek/Herriman Soil Investigation Report
|
1996-1997 |
3 |
Butterfield Site Removal Action
|
1997 |
4-5 |
Butterfield Site Removal Action, Final Report
|
1998 |
Butterfield Creek, 1997Return to Top
Container(s): Box 30
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-5 |
Butterfield Creek, Herriman Soil Historical Investigations, Volumes 2-4 |
1997 |
Herriman, 1999Return to Top
Container(s): Box 31
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-5 |
Herriman Residential Soils, Volumes 1 and 2 |
1999 |
Analysis and Reports, 1991-1998Return to Top
Container(s): Box 32
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Kennecott |
1991-1994 |
2 |
Record of Decision: Kennecott South Zone Site
|
1998 |
3 | Bingham Creek |
1993 |
4 | Lark and Bingham Canyon Analysis |
1992 |
5-7 |
Closure Report: Arco Copperton Tailings, Bingham Creek Channel
|
1997 |
8 | Herriman |
1997 |
Analysis and Reports, 1996-1997Return to Top
Container(s): Box 33
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 |
Ecological Risk Assessment, Southshore Wetlands, Final Report |
1997 |
2 |
Final Report for Kennecott Work Activities Related to the Administrative Order on Consent for Removal Action, Site No. T4 Bingham Creek Channel, Phase II, Holy Cross Jordan Valley Hospital |
1996 |
3-4 | Kennecott North Facilities |
1996 |
Bingham Creek, 1990-1998Return to Top
Container(s): Box 34
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Bingham Creek, Final Data Package |
|
2 | Data |
1998 |
3 | Actions and Studies |
1994-1995 |
4 | Kennecott and Bingham Creek |
1990-1993 |
5 | Articles and Memos |
1990-1998 |
6 | Meetings, Memos, and Reports |
1993-1998 |
Bingham Creek, 1992-1996Return to Top
Container(s): Box 35
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-2 |
Soil Tailings Sampling Test Results, Bingham Creek Channel Phase III Removal Action, Salt Lake County, Utah |
1996 |
3-4 |
Bingham Creek Post-Remocal Sampling on Holy Cross Jordan Valley Hospital Property
|
1992 |
5 | Legal Documents and Reports |
1992-1993 |
Bingham Creek, 1991-2001Return to Top
Container(s): Box 36
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 |
Preliminary Risk Evaluation of Sulfate Report for the Bingham Creek, Ground Water
|
1993 |
2-3 | Removal Action |
1991-2001 |
5 |
Bingham Creek Channel Phase III Site
|
1996 |
6 | Mining Operations |
2001 |
Bingham Creek, 1991-1996Return to Top
Container(s): Box 37
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Arsenic and Lead Study |
1993-1994 |
2 |
Work Plan for the Removal Assessment for Bingham Creek Phase III, Kennecott Sites Oquirrh Mountains, Utah, Volume I |
1993 |
3 | Removal Action and Analysis |
1991-1996 |
4-5 | West Jordan Residential Sampling Results |
1995 |
6 |
Bingham Creek Large Reservoir Sludge, Work Plan
|
1991 |
Kennecott, 1989-1999Return to Top
Container(s): Box 38
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Environmental Issues |
1989-1991 |
2 | Environmental Analysis and Reports |
1991-1999 |
3 | Reports |
1994-1996 |
4 |
Kennecott Utah Copper Corporation North End Ground Water RI Draft Conceptual Model Report
|
1998 |
5 | Kennecott North Facilities Work Plan |
1996 |
6 | Utah Department of Water, South Arm |
1994 |
Kennecott, 1991-2002Return to Top
Container(s): Box 39
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Kennecott Utah Copper Environmental Reponse |
1991 |
2 |
Post-Removal Sampling of the Butterfield Waste Rock Pile Area
|
1992 |
3 | Lark Waste Rock and Tailings Site, Addendum 2 |
1996 |
4 | Lark Waste Rock and Tailings Site, Addendum 3 |
1996 |
5 | Lark Waste Rock and Tailings Site, Addendum 4 |
1998 |
6-8 | Lark Removal |
1993-2002 |
Kennecott, 1992-2002Return to Top
Container(s): Box 40
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Screening |
1993-1995 |
2 | Removal Action |
1996-2002 |
3 | Lark Soil Sampling |
1993-1997 |
4 | Work Plan, North Facilities |
1995-1996 |
5 |
Sources and Pathways of Lead Exposure in Sandy, Utah
|
1994 |
6 | Reports |
1992-1995 |
Kennecott, 1983-1994Return to Top
Container(s): Box 41
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Work Plan |
1992-1995 |
2 | Voluntary Clean-up |
1991 |
3 | Lead Exposure |
1993-1994 |
4-5 | Kennecott Sludge Removal Action |
1993 |
6 |
Anatomy of a Mine: From Prospect to Production
|
1983 |
7 |
Large Reservoir Sludge Removal Action, Final Air Monitoring Report
|
1993 |
Kennecott, 1991-2002Return to Top
Container(s): Box 42
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Project Summary |
1993-1997 |
2-3 | EPA Printouts |
1991-2002 |
4 | Clean-up |
1995-2000 |
5 | North Facility |
1993-2001 |
Kennecott, 1988-2000Return to Top
Container(s): Box 43
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 |
Chronic Toxicity of Selenium to Brine Shrimp
|
1997 |
2 |
Drilling Activities Report, Kennecott Tailings Ponds
|
1988 |
3 | Wastewater Treatment, Kennecott North Facilities Soils |
1996 |
4-7 | North Facilities |
1994-2000 |
Miscellaneous Reports, 1992-2003Return to Top
Container(s): Box 44
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1 | Endangerment Assessment |
1997-2003 |
2-3 |
Evaluation of Selenite Toxicity to the Algae, Dunaliella Viridis
|
1998-1999 |
4 |
North End Remedial Investigation, Feasability Study: Garfield and Smelter Wetlands Surface Water Sampling Results
|
1999 |
5 |
Final Report: Soil and Sediment Sampling South Arm Beach Area of the Great Salt Lake
|
1995 |
6 | State of Utah Water Quality |
1998 |
7 | West Valley Highway |
1992 |
Articles and Reports, 1993-2003Return to Top
Container(s): Box 45
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-2 | Articles, Great Salt Lake |
1999-2003 |
3 | Articles, Utah Environmental |
2002-2003 |
4 |
Environmental Remediation Project
|
|
5 |
Focused Feasability Study for Sulfates in Ground Water
|
1993 |
Newsclippings, 1990-1998Return to Top
Container(s): Box 46
Newsclippings and Miscellaneous Documents, 1998-2004Return to Top
Container(s): Box 47
Oversized Documents, 1994-1996Return to Top
Container(s): Box 48
Container(s) | Description | Dates |
---|---|---|
Folder | ||
1-3 | Bingham Zone Maps |
1996 |
4-5 | Miscellaneous Maps |
|
6 | U.S.G.S. Surface Water Quality Data |
1994 |
7 | Asphalt Design |
Maps, 1992-2001Return to Top
Container(s): Box 49