- Hollingbery Field House - Bldg. 9
- Proposed Psychology Building - Bldg. 74
- Heald Hall - 5th Floor Addition - Bldg. 82
- McCluskey Addition - Bldg. 85
- Design Disciplines Bldg., Phase I (Fine Arts)- Bldg. 97
- Controlled Environment Laboratories, Phase I - Bldg. 114
- Controlled Environment Laboratories, Phase II - Bldg. 114
- Veterinary Barn Remodel - Bldg. 141G
- KWSC Transmitter Tower - Bldg. 403A
- Turnkey Student Housing - Bldg. 675
- Speech Building (Daggy Hall)- Bldg. 803
- Arts Hall Remodel (Murrow East)- Bldg. 33
- Expo '74 - Waterworld Pavillion
- Jogging Track
- KWSU Translator Tower - Lind
- Pavement Test Track Rings
- Paths and Steps (Small Jobs)
- Walks and Steps, Gym Area
- Names and Subjects
Washington State University Facilities Planning Building File, 1961-1977
Overview of the Collection
- Creator
- Washington State University. Department of Facilities Planning
- Title
- Washington State University Facilities Planning Building File
- Dates
- 1961-1977 (inclusive)19611977
- Quantity
- 5 Linear feet of shelf space, (5 Boxes)
- Collection Number
- Archives 150 (collection)
- Summary
- The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of Washington State University buildings.
- Repository
-
Washington State University Libraries' Manuscripts, Archives, and Special Collections (MASC)
Manuscripts, Archives, and Special Collections
Terrell Library Suite 12
Pullman, WA
99164-5610
Telephone: 509-335-6691
mascref@wsu.edu - Access Restrictions
-
This collection is open and available for research use.
- Languages
- English
Historical NoteReturn to Top
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Content DescriptionReturn to Top
The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of Washington State University buildings.
Use of the CollectionReturn to Top
Restrictions on Use
Copyright restrictions may apply.
Preferred Citation
[Item description]
Washington State University Facilities Planning Building File, 1961-1977 (Archives 150)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Administrative InformationReturn to Top
Arrangement
The collection is maintained in the order in which it was received in the Archives from Facilities Planning, ordered by building number.
Acquisition Information
This segment of the Buildings File of the Washington State University Facilities Planning office was transferred to the Washington State University Libraries in 1984 (UA84-21).
Processing Note
The records were processed in July 1984 by Ann Klavano. The descriptions were expanded in Summer 2000 by Brenda Jackson.
Related Materials
The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.
Detailed Description of the CollectionReturn to Top
Hollingbery Field House - Bldg. 9 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 1 | Dedicatory Plaque |
1963 |
1 | 2 | General Correspondence |
1966-1974 |
Proposed Psychology Building - Bldg. 74 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 3 | Correspondence |
1966 |
Heald Hall - 5th Floor Addition - Bldg. 82 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 4 | Budget |
|
1 | 5 | General Correspondence |
1966-1967 |
1 | 6 | General Correspondence |
1968-1979 |
1 | 7 | Warren, Little & Lund, Inc.,
Correspondence |
1967-1969 |
1 | 8 | Warren, Little & Lund, Contract &
C.O.s |
|
1 | 9 | Decker, Kolb, Stansfield, Architects,
Corres. |
1967-1969 |
1 | 10 | Decker, Kolb, Stansfield, Architects,
Corres. |
1966-197- |
1 | 11 | Decker, Kolb, Stansfield, Architects,
Contract & C.O.s |
|
1 | 12 | Decker, Kolb & Stansfield,
Construction Reports |
|
1 | 13 | Concrete Testing |
|
1 | 14 | Kehne-Crabtree Electric Co.,
Correspondence |
1967-1968 |
1 | 15 | Kehne-Crabtree Electric Co., Contract
& C.O.s |
|
1 | 16 | C&S Builders, Inc., Correspondence |
1967-1968 |
1 | 17 | C&S Builders, Inc., Contract &
C.O.s |
|
1 | 18 | N.S.F. (National Science Foundation) &
N.I.H (National Institutes of Health) Correspondence |
1967 |
1 | 19 | N.I.H. Grant Application |
|
1 | 20 | N.S.F. Proposal |
|
1 | 21 | Rejected Bids - General |
1967 |
1 | 22 | Rejected Bids - Mechanical |
1967 |
1 | 23 | Rejected Bids - Electrical |
1967 |
1 | 24 | Projected Equipment Expenditures
|
McCluskey Addition - Bldg. 85 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 25 | Budget |
|
1 | 26 | General Correspondence |
1973-1974 |
1 | 27 | Diary Inspection Report |
1973 |
1 | 28 | Victor L. Wulff, Arch., Correspondence |
1973-1974 |
1 | 29 | Victor L. Wulff, Arch., Contract,
Estimates, C.O.s |
|
1 | 30 | Space Builders, General Correspondence |
1973-1974 |
1 | 31 | Space Builders, Contract, Payments, C.O.s
|
|
1 | 32 | Rejected Bids |
Design Disciplines Bldg., Phase I (Fine Arts)- Bldg. 97 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 33 | Parking Structure Budget |
|
1 | 34 | Building Program |
|
1 | 35 | Budget |
|
1 | 36 | HEFA Correspondence |
1968-1971 |
1 | 37 | General Correspondence |
1966-July 1968 |
1 | 38 | General Correspondence |
July 1968-December 1968 |
1 | 39 | General Correspondence |
January 1969 - December 1970 |
1 | 40 | General Correspondence |
January 1971 - 1974 |
1 | 41 | General Correspondence, Parking
Correspondence |
|
1 | 42 | Parking Study, Tippetts, Abbett, McCarthy,
Stratton |
|
1 | 43 | Naramore, Bain, Brady & Johanson,
Corres. |
1966-1967 |
2 | 44 | Naramore, Bain, Brady & Johanson,
Corres., 1-68-6/68 |
|
2 | 45 | Naramore, Bain, Brady & Johanson,
Corres., 7/68 - 12/68 |
|
2 | 46 | Naramore, Bain, Brady & Johanson,
Corres. |
1969 |
2 | 47 | Naramore, Bain, Brady & Johanson,
Corres. |
1970 |
2 | 48 | Naramore, Bain, Brady & Johanson,
Corres., 1/71 - 6/71 |
|
2 | 49 | Naramore, Bain, Brady & Johanson,
Corres., 7/71 - 4/77 |
|
2 | 50 | Naramore, Bain, Brady & Johanson,
Contract & C.O.s |
|
2 | 51 | Naramore, Bain, Brady & Johanson, Site
Visit Reports |
|
2 | 52 | Weekly Progress Reports & Employee
Interview Reports |
|
2 | 53 | Naramore, Bain, Brady, et al., Conference
Notes |
|
2 | 54 | Bouillon, Christofferson & Schairer,
Cons. Eng., Report of Site Visit |
|
2 | 55 | Max J. Kuney Co., Contract & C.O.s
|
|
2 | 56 | Max J. Kuney Co., Correspondence |
1968-1979 |
2 | 57 | Shannon & Wilson, Inc., Soils
Investigations |
|
2 | 58 | Shannon & Wilson, Inc., Correspondence |
1967 |
2 | 59 | Warren, Little & Lund, Inc., Contract
& C.O.s |
|
2 | 60 | Warren, Little & Lund, Inc., Corres. |
1968-1971 |
2 | 61 | Babbitt Electric & Refrigeration,
Corres. |
1968-1972 |
2 | 62 | Babbitt Electri Co., Contract & C.O.s
|
|
2 | 63 | Babbitt Electric Co., Claim |
|
2 | 64 | Hardware Schedule |
|
2 | 65 | Pittsburgh Testing Labs, Concrete Testing
|
|
2 | 66 | Keying Schedule |
|
2 | 67 | Furnishings, Correspondence |
1967 |
2 | 68 | Rejected Bids, Mechanical |
|
2 | 69 | Rejected Bids, General |
|
2 | 70 | Rejected Bids, Electrical |
|
2 | 71 | Awards Brochure |
Controlled Environment Laboratories, Phase I - Bldg. 114 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
3 | 72 | Budget |
|
3 | 73 | General Correspondence |
1970-1974 |
3 | 74 | Diary Inspection Reports |
|
3 | 75 | Carlson & James, Architects,
Correspondence |
1970-1972 |
3 | 76 | Carlson & James, Contract, Payments
& C.O.s |
|
3 | 77 | C&S Builders, Inc., Correspondence |
1970-1972 |
3 | 78 | C&S Builders, Inc., Contract,
Payments, C.O.s |
|
3 | 79 | Elling Halvorson, Inc., Correspondence |
1970-1971 |
3 | 80 | Elling Halvorson, Inc., Contract,
Payments, C.O.s |
|
3 | 81 | Sub-Grade Investigation |
|
3 | 82 | Rejected Bids - General |
|
3 | 83 | Rejected Bids |
|
3 | 84 | Rejected Bids |
Controlled Environment Laboratories, Phase II - Bldg. 114 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
3 | 85 | Budget |
|
3 | 86 | General Correspondence |
1970 |
3 | 87 | Carlson & James, Architects,
Correspondence |
1970 |
Veterinary Barn Remodel - Bldg. 141G Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
3 | 88 | Budget |
|
3 | 89 | Diary Inspection Reports |
|
3 | 90 | General Correspondence |
1973 |
3 | 91 | Victor L. Wulff, Architect., Corres. |
1973-1974 |
3 | 92 | Victor L. Wulff, Arch., Contract,
Payments, C.O.s |
|
3 | 93 | Gil Bauer Construction Co., Correspondence |
1974 |
3 | 94 | Gil Bauer Construction Co., Contract,
Payments, C.O.s |
|
3 | 95 | Rejected Bids |
KWSC Transmitter Tower - Bldg. 403A Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
3 | 96 | Budget |
|
3 | 97 | Specifications |
|
3 | 98 | General Correspondence |
1961-1968 |
3 | 99 | Correspondence |
1969-1974 |
3 | 100 | Midwest Tower Inc., Correspondence |
1968-1969 |
3 | 101 | Midwest Tower, Inc., Contract & C.O.s
|
|
3 | 102 | Pittsburgh Testing Labs., Contract &
C.O.s |
|
3 | 103 | Vern W. Johnson & Sons, Correspondence |
1968-1969 |
3 | 104 | Vern W. Johnson & Sons, Contract &
Change Orders |
|
3 | 105 | Rejected Bids |
|
3 | 106 | Rejected Bids, Contractors |
Turnkey Student Housing - Bldg. 675 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
3 | 107 | Budget |
|
3 | 108 | Program |
|
3 | 109 | HUD Correspondence |
1971-1973 |
3 | 110 | General Correspondence |
1969-1970 |
3 | 111 | General Correspondence |
1971-1974 |
3 | 112 | Daily Inspection Reports |
1970-1971 |
3 | 113 | Heating & Close-Out Problems |
1972-1977 |
3 | 114 | United Homes Corp., Correspondence |
1970-1973 |
3 | 115 | Olson-Richert-Bignold, Correspondence |
1970-1971 |
4 | 116 | Olson-Richert-Bignold, Contract, Payments,
C.O.s |
|
4 | 117 | United Homes Corp., Contract, Payments,
C.O.s |
|
4 | 118 | United Homes Corp., Proposal |
|
4 | 119 | United Homes Corp., Affirmative Action
Reports |
|
4 | 120 | Pittsburgh Testing Labs., Concrete Testing
|
|
4 | 121 | Furnishings, Correspondence |
1970-1974 |
4 | 122 | Neill Furniture Stores, Inc.,
Correspondence |
1971-1972 |
4 | 123 | Neill Furniture Stores, Contract,
Estimates, C.O.s |
|
4 | 124 | Richard D. Rosell, Int. Design, Contract,
Payments, C.O.s |
|
4 | 125 | Rejected Bids |
|
4 | 126 | Rejected Bids, Furniture |
|
4 | 127 | Rejected Bids, Furnishings |
Speech Building (Daggy Hall)- Bldg. 803 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
4 | 128 | Budget |
|
4 | 129 | General Correspondence, 3/70 - 12/71
|
|
4 | 130 | General Correspondence, 1/72 - 8/77
|
|
4 | 131 | Diary Inspection Reports |
|
4 | 132 | Fred Bassetti & Co., Correspondence,
2/70 - 12/71 |
|
4 | 133 | Fred Bassetti & Co., Correspondence,
1/72 - 6/72 |
|
4 | 134 | Fred Bassetti & Co., Correspondence,
7/72 - 12/72 |
|
4 | 135 | Fred Bassetti & Co., Correspondence,
1/73 - 6/75 |
|
4 | 136 | Fred Bassetti & Co., Site Visit &
Monthly Construc. Mtg. |
|
4 | 137 | Fred Bassetti & Co., Contract,
Payments, C.O.s |
|
4 | 138 | Warren, Little & Lund, Correspondence |
1971-1973 |
4 | 139 | Warren, Little & Lund, Contract,
Payments, C.O.s |
|
4 | 140 | Warren, Little & Lund, Affirmative
Action Reports |
|
4 | 141 | Halvorson-Berg, Correspondence |
1971-1974 |
4 | 142 | Halvorson-Berg, Contract, Payments, C.O.s
|
|
4 | 143 | Halvorson-Berg, Affirmative Action Reports
|
|
4 | 144 | Electric Smith & Rod's Electric,
Corres. |
1971-1973 |
4 | 145 | Electric Smith & Rod's Electric,
Affirmative Action Repts. |
|
4 | 146 | Electric Smith & Rod's Electric,
Contract, Payments, C.O.s |
|
4 | 147 | Stagecraft Industries, Correspondence |
1971-1975 |
4 | 148 | Stagecraft Industries, Contract, Payments,
C.O.s |
|
4 | 149 | Stagecraft Industries, Affirmative Action
Reports |
|
4 | 150 | Pittsburgh Testing Labs., Concrete Testing
|
|
4 | 151 | Pittsburgh Testing Labs., Steel, Mortar,
Grout Testing |
|
4 | 152 | Hardware Schedule |
|
4 | 153 | Geolabs, Inc., Inspections Reports &
Add'l Recommendations |
|
4 | 154 | Rejected Bids, General Construction
|
|
4 | 155 | Rejected Bids, Electrical Construction
|
|
4 | 156 | Rejected Bids, Mechanical Construction
|
|
4 | 157 | Rejected Bids, Stage Equipment
|
|
4 | 158 | Rejected Bids, General |
|
4 | 159 | Rejected Bids, Mechanical |
|
4 | 160 | Rejected Bids, Electrical |
Arts Hall Remodel (Murrow East)- Bldg. 33 Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 161 | Skyline Construction Co., Contract,
Payments, C.O.s |
|
5 | 162 | Diary - Inspection Reports |
|
5 | 163 | Skyline Construction Co., Correspondence |
1971-1972 |
Expo '74 - Waterworld Pavillion Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 164 | Correspondence |
1974 |
5 | 165 | Lydig Construction, Inc., Correspondence |
1974 |
5 | 166 | Lydig Construction, Inc., Contract &
Payments |
|
5 | 167 | AAA Construction Co., Contract, Payments,
C.O.s |
Jogging Track Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 168 | General Construction |
1982-1983 |
KWSU Translator Tower - Lind Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 169 | Budget |
|
5 | 170 | General Correspondence |
1967-1969 |
5 | 171 | Fort Worth Tower Co., Correspondence |
1969-1970 |
5 | 172 | Fort Worth Tower Co., Contract, Payments,
C.O.s |
|
5 | 173 | Rejected Bids |
Pavement Test Track Rings Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 174 | Budget |
|
5 | 175 | General Correspondence |
1967-1973 |
5 | 176 | United Paving Co., Inc., Correspondence |
1967-1969 |
5 | 177 | United Paving Co., Inc., Contract &
C.O.s |
Paths and Steps (Small Jobs) Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 178 | Correspondence |
1968-1974 |
Walks and Steps, Gym Area Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
5 | 179 | Sceva Construction Co., Correspondence |
1968 |
5 | 180 | Sceva Construction Co., Contract &
C.O.s |
|
5 | 181 | Rejected Bids |
Names and SubjectsReturn to Top
Subject Terms
- College buildings -- Washington (State)
Corporate Names
- Washington State University -- Buildings -- History -- Archives
- Washington State University. Department of Facilities Planning -- Records and correspondence
- Washington State University. University Architect -- Records and correspondence
Other Creators
-
Corporate Names
- Washington State University. University Architect (creator)