Irrigation Systems Management/Research (Pakistan Project) records, 1983-2003

Overview of the Collection

Title
Irrigation Systems Management/Research (Pakistan Project) records
Dates
1983-2003 (inclusive)
Quantity
17 cubic feet
Collection Number
UG 045
Summary
Financial records, reports, papers concerning the procurement of equipment personnel files, correspondence and other office files, and photographs and slides of the Pakistan field office in the University of Idaho home office relating to a water resource management project in Lahore.
Repository
University of Idaho Library, Special Collections and Archives
Special Collections and Archives
University of Idaho Library
875 Perimeter Drive
MS 2350
Moscow, ID
83844-2350
Telephone: 2088850845
libspec@uidaho.edu
Access Restrictions

Collection is open for research.

Languages
Sponsor
Funding for encoding this finding aid was provided through a grant awarded by the National Endowment for the Humanities.

Historical NoteReturn to Top

The Irrigation Systems Management/Research (ISM/R) project was based on the premise that resource management can be improved through interdisciplinary, interagency sponsored research that is directed to participants. These participants included both government officials and farmers who needed new techniques and information in order to maintain good water resource management. The objective of the ISM research project was "to improve the capability of scientists and institutions to manage and conduct irrigation research which will lead to better use of irrigation water in Pakistan."

This project was a cooperative venture between the University of Idaho, Washington State University and Development Alternatives, Inc., in collaboration with the Government of Pakistan, the U.S. Agency for International Development and the World Bank to design and later implement a comprehensive water management research program for the Punjab and Sind regions of Pakistan. The program began in the fall of 1985 and continued through March 1991.

The ISM research program was made up of two interrelated and complementary parts: a) a set of water management research projects which addressed national objectives and research needs of Pakistan and b) institution-building activities which focused on technical training and the development of a well-organized, well-managed, and integrated water management research program for Pakistan. The eight projects and the agencies responsible for their management were: Farm Water Management (PARC and WAPDA), Beyond Watercourse Improvement (WAPDA), Farmer Involvement in Water Management (PCRWR), Integrated Watercourse Management (WAPDA), Public and Private Tubewell Performance, (WAPDA), Irrigation Systems Outside the Indus Basin (WAPDA), Surface Drainage and Water Table Control (DRIP), and Groundwater Models (WAPDA). Each project's designated lead institution was responsible for overall project management. Principal investigators from participating agencies worked closely with University of Idaho advisors on project design and implementation.

In addition to short term and long term Americans advisors working in Pakistan, the project provided for Pakistani engineers and other professionals involved in water resource management to attend short courses or training sessions at American Universities.

Content DescriptionReturn to Top

The Records of the ISM/R project span the years 1983 to 1992, with the bulk of the papers covering the years 1985 to 1990.

The papers include the records of the field office in Lahore, Pakistan and the home office at the University of Idaho. Both include financial records, reports, papers concerning the procurement of equipment, personnel files, correspondence and other office files, and photographs, photographic negatives and slides relating to the project.

Other Descriptive InformationReturn to Top

1 To upgrade the Irrigation Research Institutes in Punjab and Sind by improving their capability to conduct active and relevant research projects with modern equipment and trained personnel. October 20, 1985.

2 To provide equipment specifications in order to expedite procurement and insure that micro computers and software are compatible with needs. April 7, 1986.

3 To prepare equipment specifications to expedite procurement and insure that documentation equipment is compatible with needs. To assist the Pakistan Council for Research in Water Resources with the development of a training plan and procedure for library acquisition. To assist PCRWR with the final selection of staff for the Documentation/Information Center. To conduct training in documentation and information dissemination techniques for staff of the center. January 27, 1986.

4 In consultation and working with the professionals of SCARP Monitoring to prepare plans for initiation of the ground water modeling program; evaluate existing data bases and recommend format for collecting and collating data for later use in models; Define the role of the Analog Modeling Cell in the Project. To evaluate the suitability of the Advisor for assignment as the Hydrologist on the Long-term resident contractor team in Pakistan. April 1986

5 To provide needed assistance and advice to personnel implementing the Farm Water Management sub-project. To evaluate the suitability of the Advisor for assignment as the Irrigation Agronomist on the Long term resident contractor team in Pakistan. April 1986.

6 To initiate the Beyond Watercourse Management subproject expeditiously and along lines that permit best use of the available data base. June 1986.

7 To initiate the Surface Drainage and Water Table Control subproject expeditiously and according to the original design. [Larry King]. August 1986.

8 To assist with design of the format for the Competitive Grants activity. [Maurice V. Wiese]. August 1986.

9 To provide on-the-job training to the PCRWR staff who will manage and operate the Documentation/Information Center. September 1986.

10 To initiate the Nitrogen Recovery component of the Farm Water Management subproject with the latest techniques and knowledge. To develop reliable and appropriate techniques to collect data for the Water and Salt Balance study. September 1986.

11 To initiate the Irrigation System outside the Indus Basin subproject expeditiously. October 1986.

12 To construct and maintain earthen watercourses using tractor powered machines. To test machines available in Pakistan for this purpose. To design a role for mechanization in the ISM Research program. October 1986.

13 To conduct an assessment of the computer training needs of researchers and support staff from institutions collaborating with ISMR and design a training program which seeks to enhance the use of computers in their research and management activities. December 10, 1986.

14 To design training courses in groundwater simulation and well hydraulics and performance analysis. To finalize research plans for the public and Private Tubewell subproject. February 1987.

15 To finalize sailaba studies and work plant to be conducted under the Irrigation Systems Outside the Indus Basin subproject. April 1987.

16 To design a three-year research plan for the Biotic and Chemical Reclamation of Soils and the Salt Balance studies that are part of the Farm Water management sub-project. March 1987.

17 To review the progress of ISMR in the areas relating to salinity, drainage and water table control, to determine the adequacy of content and degree of duplication with other national programs and, finally, to recommend a course of action for the remaining three project years. April 1987.

18 To determine feasibility of increasing karez discharge. To understand the influence of delay action dams on the adjacent ground water conditions. May 1987.

19 The Short Term Advisor is to assist in the conduction of workshop for the potential collaborators under the Competitive Grants Programme. The participants of the workshop would be trained in writing proposals, and reports/papers. They will also be trained in designing, carrying out and collection and presentation of information obtained from the studies. May 1987.

20 The Short Term Advisor (An Agri-Economist) is to help, organize and train the collaborators for carrying out field research. He may also be required to train the collaborators in the collection and presentation of data obtained from the research under this component of the ISM-R project. May 1987.

21 To select appropriate equipment and provide specifications to expedite procurement. June 1987.

22 To evaluate the Surface Drainage and Water Table Control sub-project and plan its implementation strategy for the next two years. October 1987.

23 To design and test an appropriate method of combining small tubewells with canal supplies in order to optimize production per unit area on a watercourse area. September 1987.

24 To understand dBase III+, its application and where its use is applicable. To design a data base for the mass of data previously collected by the Watercourse Monitoring and Evaluation Directorate. December 1987.

25 To analyse existing data to provide outputs useful to researchers and planners. February 1988.

26 To evaluate the groundwater inventory test sites surrounding pilot karezes and make adjustments where and if needed and prepare a work plan for use of the data in Karez flow augmentation. February 1988.

27 To implement studies and research on the sailaba method of irrigation under the Irrigation Systems Outside the Indus Basin sub-project. March 1988.

28 The objective of the short-term advisor visit will be to develop ground-water flow and transport modelling skills of SCARP Monitoring researchers through in- country training and cooperative research. March 1988.

29 To compile, from local institutions, relevant research results on the subject of optimizing crop production from limited irrigation water supplies. April 1988.

30 To procure equipment for the Punjab Irrigation Research Institute expeditiously. June 1988.

31 Develop an analysis plan for the database being developed by Watercourse Monitoring and Evaluation. [Dr. Shane Ryland] December 1988.

32 To install laboratory equipment according to design and to use and maintain it correctly and effectively. June 1988.

33 To conduct a midterm review of progress on the Irrigation and Nitrogen Fertilizer Management Sub-project and on the Biotic and Chemical Reclamation Sub-project of the Farm Water Management Project, to recommend possible improvements in these programs for the remainder of the current project term, and to suggest fruitful lines of future research on Irrigation and nitrogen fertilizer management and on biotic and chemical reclamation of sodic soils. [Denny V. Naylor] June 1988.

34 To review the progress and work plans of the Irrigation Systems Outside the Indus Basin sub-project. July 1988.

35 To combine small tubewell discharge with canal supplies in order to optimize production per unit area on a watercourse area where more than one farmer is involved by delivering irrigation water according to crop demand. August 1988.

36 To review the design and progress of the ISM Research Project mid-way through implementation in order to make corrections and/or modifications in design, content or procedures. August 1988.

37 To review the Groundwater modelling and tubewell performance projects evaluate the final two-year work plan. To assess the suitability of the nominated hydrologist for the long- term assignment to the ISMR field team. September 1988.

38 The short term advisor (an applied anthropologist) is required to help the collaborators in organizing the research on scientific methods and to assist them in collection of data during field research and its presentation, under EWU component of ISM-R Project. he will prepare guidelines to monitor and evaluate the research activities under EWU component and see that these guidelines are followed in EWU studies. [Bradley Parlin] August 1988.

39 To learn more about the role of women in water management. [Dr. Samina Khan] September 1988.

40 To implement the Competitive grants program according to design and as expeditiously as practical. January 1989.

41 Prepare a PC-1 for establishment of an adaptive research unit within the Irrigation Department of the Northwest Frontier Province. [Dr. C.E. Brockway] November 1988.

42 Prepare a PC-1 for establishment of an adaptive research unit within the Irrigation Department of Baluchistan Province. [Gilbert Corey] November 1988.

43 To review the progress and work plans of the Irrigation Systems Outside the Indus Basin sub-project. [Jim Bondurant] December 1988.

44 Provide technical assistance in problem identification and description through qualitative rapid appraisal for the EWU Project. [Dr. Mark Lusk] December 1988.

45 Continuation of technical assistance for a salt transport model of SCARP VI, Unit I - Allahbad. [Dr. Yavuz Corapcioglu] December 1988.

46 Provide statistical support for on-going WM&amp ED advanced analytical review and for monitoring and evaluation survey techniques. Provide editorial support for preparation of publication reporting results of advanced analytical review. [Dr. Shane Ryland] March 1989.

47 Provide technical assistance in data management and analysis for organizations collaborating with ISM research. [Edward Wiser] January 1989.

48 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Bradley W. Parlin] April 1989.

49 To review the progress and work plans and to assist with implementation of these plans for the Irrigation Systems Outside the Indus Basin sub-project. [James Bondurant] April 1989.

50 To provide technical assistance in the installation of sprinkler irrigation system, in implementation of irrigation/crop selection study, to develop a research study on irrigation of fruit trees with a trickle system, and for preparation of manuscripts and reports. [D.L. Bassett] April 1989.

51 Missing

52 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Dr. Bradley Parlin] April 30, 1989.

53 Missing

54 To assist with designing a system for the monitoring and evaluation of WAPDA sub-surface tile drainage project at Mona. [Dr. Larry King] June 1, 1989.

55 Redraft, update, and correct the "Bluebook of CGP (Competitive Grants Program) Guidelines and Policies". draft PIC operations manual, and assist with format and editing of the Annual Research Progress Reports to be presented at the CGP annual conference and published by PCRWR. [Maurice Wiese] May 1989.

56 Provide engineering, hydrology, instrumentation, and data processing and analysis assistance to the technical assistance team and its collaborators on the Irrigation Systems Management Research Project. [Dr. Edward Wiser] May 1989.

57 To provide assistance to nine collaborating laboratories and institutions that need specialized skills/techniques for the maintenance, repair, and replacement of any equipment procured under ISM/R project. To impart in-country training to the Pakistani scientists in designing a modern scientific laboratory. [Dr. Leonard R. Mattick] June 1989.

58 To assist the PCRWR director of the competitive grants program on design and technical advice for four research projects funded under the CGP. [Dr. Chaudry Haniff] June 1989.

59 To provide technical assistance to the Irrigation Systems Outside the Indus Basin sub-project and to the Competitive Grants Program. [Dr. Larry King] August 8, 1989.

60 To assist the participant researchers under the Encouraging Water Users project with their on-going research programs. [Bradley Parlin] August 21, 1989.

61 Conduct workshop III on Conclusions and Policy Implications in Irrigation Organization Research for PIs involved in the EWU sub-project. [Dr. Gilbert Corey] August 21, 1989.

62 To analyze the available Chabba Distributary data to identify a range of flow and farm field sizes that are easily and efficiently manageable for optimum conveyance and application efficiencies and distribution uniformities under the existing irrigation farming practices. [James Bondurant] August 1989.

63 To produce a film based on the systems-research conducted under ISM/R on irrigation in various habitats and provinces of Pakistan. October 1989.

64 To review the progress and work plans and to assist with implementation of these plans for the Irrigation Systems Outside the Indus Basin sub-project. [James Bondurant] December 1989.

65 To assist WAPDA scientists involved with sub-projects in integrated watercourse management to write technical reports concerning their ISM/R research programs. [Dr. Gilbert Corey] December 1989.

66 To provide technical assistance to Planning South Directorate of WAPDA to help develop a design manual for the improvement and rehabilitation of karezes in Balochistan Province. [Larry King] February 7, 1990.

67 To review concept, design and progress of the Competitive Grants Program being implemented by the Pakistan Council for Research in Water Resources (PCRWR) and to make recommendations to USAID regarding continuation of the program. January 1990.

68 Assist with the program and agenda for a CGP conference and with editing and formatting CGP Annual Progress Reports to be presented at the CGP conference and published by PCRWR. [Maurice Wiese] February 1990.

69 Provide soils and hydraulics laboratories of the Sindh Provincial Irrigation Department with the latest laboratory and field equipment. [Denny Naylor &amp Dell Fitzsimmons] April 10, 1990.

70 To assist the participant researchers under the Encouraging Water Users Project to conclude their on-going research programs. [Michael Toney] May 21, 1990.

71 Assist ISM/R cooperators in writing of technical reports and manuscripts which summarize their research programs. [William Stellmon] April 1990

72 Refresher course in basic statistics (no formal TD), August 1990

73 Continuation of technical assistance on the "salt transport model" for SCARP VI, Unit I - Allahabad. [Yavuz Corapcioglu] April 1990

74 Provide engineering, hydrology, instrumentation, and data processing and analysis assistance to the technical assistance team and its collaborators on the Irrigation Systems Management Research Project. [Edward H. Wiser] March 1990

75 To provide technical assistance to Planning South Directorate, WAPDA, for the condition survey of Karezes in Baluchistan. [James Bondurant] September 1990

76 To review projects in progress, to assist in the development and implementation of further project plans for the Irrigation Systems Outside the Indus Basin sub-project and to assist in data analysis and report formulation on- going projects. [James Bondurant] May 1990

77 To give training on flow measurement in open channel and piped distribution systems for irrigation research plot work and to assist in implementation of flow measurement on research plots for various ISM/R cooperators. [John Replogle] August 1990

78 Assist ISM/R cooperators in writing of technical reports and manuscripts which summarize their research programs. [Day Bassett] April 1990

79 To introduce water management research leaders of ISM/R - senior engineers, soil scientists and agronomists - to the social science perspective and methodology. [Peter Reiss] August 1990

80 Set up one EM-38 unit for operation in Pakistani soil conditions and train personnel of WMED, WAPDA in its use. July 1990

81 To provide an understanding of research findings on the socio-economic impact of agricultural development programs and to teach practical methods for evaluating these programs. [Robert Howell] August 1990

82 To assist with the installation and to provide hands-on- training on the use and maintenance of the sophisticated laboratory equipment expected to arrive soon in Pakistan for LIM Hyderabad. Visit each of the nine ISM/R collaborating laboratories for providing assistance with the repairs, replacement and maintenance of the equipment supplied under ISM/R Project which are in use for about two years or more. [Leonard Mattick] July 1990

83 Assist with review of papers for the ISM/Research November 1990 symposium and preparation of a report containing important findings, major issues and recommendations for program continuation and/or technology transfer to end users. [Gilbert Corey] September 1990.

84 Continuation of technical assistance on the "salt transport model" for SCARP VI, Unit I - Allahabad. [Yavuz Corapcioglu] September 1990.

85 To evaluate research presentations at the ISM research symposium and select the best. September 1990.

86 To assist with the program and agenda for CGP Phase-IV workshops and review of CGP in general. [Maurice Wiese] September 1990

87 First phase of the ISM-R project is going to be exhausted. The evaluation and monitoring of 1st phase and review of the development plant of ISM-R project phase II is required to be carried out. October 1990,

88 To review projects in progress, to assist in the development and implementation of further project plans for the Irrigation Systems Outside the Indus Basin sub-project and to assist in data analysis and report formulation on- going project. [James Bondurant] December 1990.

89 To provide technical assistance to Planning South Directorate, WAPDA, for the condition survey of Karezes in Baluchistan. [Larry King] December 1990.

unnumbered To commission a special task force to conduct an in-depth analysis of all available information that might provide a better understanding of the agricultural and irrigation interface when the supply of irrigation water is insufficient for full production on all land served by the irrigation system. December 1988.

Other Descriptive InformationReturn to Top

1A Nordin, C.F. Irrigation Research Institute, Punjab Irrigation Research Institute, 10 February-27 March 1986

1B Robinson, A.R. Irrigation Research institute, Sind Irrigation Research Institute, 20 February-27 March 1986

2A King, Larry. ISM Project, Equipment specifications. 18 May- 19 June 1986.

2B Brockway, C.E. ISM Project, Equipment specifications. 25 May-12 June 1986

3 Hanson, Donna. Library, documentation and information centre, Pakistan Council of Research on Water Resources. April 17, 1986

4 Johnson, Gary S. Ground water modelling, Work plans, 9 June-3 July 1986

5 Bassett, Day L. Farm water management, Project initiation review, 6 June-5 July 1986

6 Hamilton, Joel R. Beyond watercourse improvement, Project initiation, 11 July-16 August 1986

7 King, Larry G. Surface drainage and water table control, Drainage design, 21 September-29 October 1986

8 Wiese, Maurice. Competitive grants program, Grants program format, 19 October-5 December 1986

9 Hanson, Donna M. Library/Documentation center, Organizing information service 22 March-11 June 1988.

10 Dow, A. Irving. Farm water management, Nitrogen fertilizer management, 1 November-13 December 1986

11 Bondurant, James A. Irrigation systems outside the Indus basin, Small scale irrigation, 10 November-18 December, 1986

12 Moden, Walter L. and Niel Dimik. Integrated watercourse management, Mechanical watercourse construction, 30 December 1986-13 February, 1987

14 Ra1ston, Dale R. Public and private tubewells, SCARP tubewell performance, 2 April-29 April 1987

15 Bondurant, James. Irrigation systems outside the indus basin, Sailaba irrigation reconnaissance, 4 September - 10 October 1987; 21 -29 November, 1987

16 Naylor, Denny. Farm water management, project review, 16 June-30 July 1987

17 Doering, E.J. Farm water management, Reclamation and drainage, 7 September-18 October 1987

18 King, Larry. Irrigation systems outside the Indus Basin, Enhancing Karez discharge, Larry G. King, 4 July-9 August 1987

19 Wiese, M.V. Competitive grants program, Grants handbook, 1 February-12 March 1988

20 Carlson, John E. Encouraging water users, Social science sub-project review, 1 February-2 March 1988

21 Watts, F.J. Selection of equipment for upgrading research, draft report, computer print out, 19 July 1987

22A King, Larry. Surface drainage and water table control. Design of small drains (Seminar paper), 13 March-18 April 1988

22B King, Larry G. Surface drainage and water table control, Field drainage review, Larry G. King, 10 November-9 December 1987

23 Brockway, C.E. Integrated watercourse management, Fractional weel study design, 8 February-15 March 1988

24 Hine, Patricia L. Beyond watercourse improvement, Database management, 1 February-2 March 1988

25 Hamilton, Joel R. Beyond watercourse improvement, Field data evaluation and analysis, 1-31 March 1988

26 King, Larry G. Irrigation systems outside the Indus basin, Karez discharge augmentation, 13 March-12 April, 1988

26A King, Larry G. Surface drainage and water table control, Design of small drains (seminar paper) 13 March-18 April 1988

27 Bondurant, James. Irrigation systems outside the Indus basin, Sailaba irrigation design, 9 May 1988-6 June 1988

28 Schreiber, David L. SCARP monitoring, (computer print out, not in published form) 18 September-26 October 1988

31 Ryland, Shane. Analysis plan for watercourse monitoring, 2 February-21 March 1989

32 Mattick, Leonard R. Report, TDY assignment, 3 September- 13 October 1988

33 Naylor, Denny V. Report - TDY assignment, 27 December 1988-12 February 1989

34 Bondurant, James A. Out of Indus Irrigation Systems project, Report - TDY assignment, 26 September-1 October 1988

35 Bondurant, James A. Conjunctive use utilizing a fractional tubewell and Chabba distributary data analysis, 18 January-7 April 1989

37 Wiser, Edward H. Field report, 3 October-2 November, 1988

38 Doering, Eugene J. Project report, ISM/R, PCRWR, EWU project, November 1988 (Not in published form)

40 Wiese, Maurice V. Competitive grants program, TDY Report, 10 April-16 May 1989

41 Brockway, C.E. Report on Technical Directive No.41, 12 October-14 November 1989

42 Corey, G.L. Report on Technical Directive no. 42, 30 January-10 March, 1989

43 Bondurant, James A. Out of Indus project, 18 January- 7 April, 1989

44 Lusk, Mark W. Report on Technical Directive No.44, 17 February-7 March 1989

45 Corapcioglu, Yavuz. Report on Technical Directive No.45, January-February 1990

46 Ryland, Shane. Report on Technical Directive no.46, 15 July-13 December 1989

47 Wiser, Edward. Beyond Watercourse improvement and Public and private tubewell performance, Report. 25 March-25 May 1989

48 Parlin, Bradley. Report on Technical Directive No.48, 24 April-19 June 1989

49 Bondurant, James. Irrigation systems outside the Indus Basin, Sailaba irrigation design Karez improvements, 16 September-12 November 1989

50 Bassett, D.L. Report on Technical Directive No.50, June- August 1989

51 Lusk, Mark. Report on Technical Directive No.51, 31 May-19 June 1989

53 Toney, Michael B. Report on Technical Directive No.53, 23 July-19 August, 1989

54 King, Larry G. Report on Technical Directives Nos.54 &amp 59, 4 August-12 September 1989

55 Wiese, Maurice. Competitive Grants Program, Technical Directive No.55, 29 January-25 February, 1990

57 Mattick, Leonard R. Report on Technical Directive No.57, 26 September-19 December 1989

58 Chaudhry, M. Haniff. Report on TDY assignment under Technical Directive No.58, 5 September-2 October 1989

59 See Report 54.

60 Parlin, Bradley. Report on Technical Directive No.60, 11 February-14 March 1990

61 Corey, Gilbert. Report on Technical directive No.61, 18-22 February, 1990

62 Bondurant, James A. Chabba distributary data analysis and report, 13 November-7 December 1989

64 Bondurant, James A. Irrigation systems outside the Indus basin, Improved irrigation systems project reports Sailaba structures, 8 March-10 May, 1990

65 Corey, Gilbert. Integrated watercourse management, Technical directive No.65, 24 February-19 March 1990

66 King, Larry. Report on Technical Directive No.66, 23 February-31 May, 1990

67 Becker, D.F. and Anis Ahmad. Report of review of the competitive grants program, of the Pakistan Council for Research in Water Resources, 6 April-5 May 1990

68 Wiese, Maurice. Competitive grants program (CGP), Technical Directive No.68, 10-31 May 1990

69 Naylor, Denny. Trip report, TDY assignment, Technical directive No.69, 9-28 July 1990

69 Naylor, Denny. Equipment specifications for soils and hydraulics laboratories Sind provincial irrigation department, Technical Directive No.69, November 1990

73 Corapcioglu, Yavuz. Report on Technical directive no.73, June-July 1990

82 Mattick, Leonard R. Report on TDY assignment, October 4 to November 8, 1990

Other Descriptive InformationReturn to Top

2 To provide staff of the Watercourse Monitoring and Evaluation unit with hand-on experience in the use of computers for the management and analysis of data. April 1987

3 To provide engineers and technicians with improved and accurate methods and techniques to measure water in research projects. April 1987

4 To have all concerned staff of all institutions involved in the ISM Research Project conversant with computer use and to have their computers fully utilized in the pursuit of project objectives. September 1987

5 To have all concerned staff of all institutions involved in the ISM Research Project conversant with computer use and to have their computers fully utilized in the pursuit of project objectives. September 1987

7 To introduce computer aided techniques into water management research concerned with scheduling irrigation water to crops, keeping in view that canal supplies are delivered on a fixed schedule. March 1988

8 To provide on-the-job training to NADLIN and cooperating library staff who manage and operate the ISMR Documentation and Information network. April 1988

9 To make the best use video equipment, procured under the ISM Research project, as a research and information dissemination tool. June 1988

10 To introduce the application of Geographical Information Systems, operating on personal computers, to the field of water resources management. [Toru Otawa] August 1988

11 To introduce agricultural drainage theory and construction techniques to research engineers. [Larry King] August 1988

12 Provide training in simulation of ground-water flow to a well so that trainees may subsequently use simulation to study and understand well characteristics and be able to analyze results of pumping tests of deteriorating tubewells. [Gary Johnson] January 1989.

13 To provide on the job training to officers of NADLIN and to librarians and documentalists of collaborating libraries. [Gail Kostinko] January 1989.

14 To train drainage engineers and planners in evaluation and monitoring of drainage projects in order to assess project benefits. [Larry King] April 1989.

15 To train junior and senior engineers in the use of various methods for determining "potential ET" and "actual water requirements" of irrigated crops. [William O. Pruitt] April 1989.

16 To get the irrigation/agricultural researchers and engineers acquainted with the use of tensiometers for irrigation research at the farm level for increasing water use efficiency. [Akhtar Bhatti] April 1989.

17 Provide intensive training in database management through the use of dBase III Plus software for SCARPS monitoring organization officials. [Wilson Lear] August 1989

18 Provide a unified presentation of material basic to use of computers for modelling and data base operations. [Edward Wiser] August 1989

19 To inculcate ability for reconnaissance of irrigation organization and impart skills for rapid assessment of research requirements for eventual intervention to the principal investigators of the EWU sub-project. In addition, to introduce the practice of active review of peer research sites as an integral feature of quality research activity. [Jamshed Tirmizi and John Baxter. August 1989

20 To increase analytical output and promote assay results that are accurate and reproducible. To optimize available resources and to produce results in an efficient way. [Leonard R. Mattick] December 1989

21 To review ISM/R results from experiments that have been conducted in the areas of N leaching, and biotic and chemical reclamation. To analyze successes and problems with the above two phases of the Farm Water Management Research sub-project. Introduce format and reporting procedures to be utilized by the Pakistani scientists to publish the results of their experiments, and to create a first draft of the final report for these experiments. To identify and coordinate future direction of cooperative research in these areas. [ John C. Baxter] September 1989.

22 To train selected SCARPS monitoring organization officials in the BASIC programming language. [Wilson Lear] January 1990

23 Present a general introduction to SPSS/PC+, including data entry, access to DBASE files, and elementary statistical analysis; Present a detailed introduction to the analysis of variance using SPSS/PC+. [Edward Wiser] January 1990

28 To get the GOP participants acquainted with recording, inserting and editing techniques through sophisticated VHS video and editing systems distributed under ISM/R to various research collaborators in Pakistan [Erik Anderson] April 1990.

Other Descriptive InformationReturn to Top

11 King, Larry G. Design and construction of horizontal drains. December 1989

12 Johnson, Gary S. Computer simulation of ground-water flow to a well. January 1989

14 King, Larry G. [Monitoring and evaluation of drainage.] May 1990

15 Pruitt, William O. Evapotranspiration and irrigation water requirements. February 1990

16 Bhatti, M. Akhtar and Hayat Ullah Khan. Tensiometers and their use in irrigation management. June 1989

18 Wiser, Edward H. Advanced programming techniques. August 1989

20 Mattick, Leonard R. Laboratory management for analytical laboratories in developing countries. December 1989

27 Khan, Abdul Ghaffar and Hayat-Ullah Khan. Training course on the calibration, use and maintenance of the surveying equipment including EDM theodolites. July 1990.

Other Descriptive InformationReturn to Top

PIO/T (Project Implementation Order/Technical Services) no.391-0467-3-30412, 1985ISM Research, Master work plan. December 1985

Proposal: Extension of ISM Research Contract #391-0467-C-00-5044-00, University of Idaho, September 7, 1989

Technical Assistance Team, University of Idaho. Mid-term status of Irrigation Systems Management Research Project. October 1988

ISM/R Program evaluation, first draft, April 13, 1989

Final report: Project review/Technical evaluation, April 17, 1989

Irrigation Systems Management Research, Quarterly meeting, 23 August 1989 Quarterly meeting 18 November 1989 Quarterly meeting 15 February, 1990

Allen, Richard G. Pakistan irrigation scheduling program for Wara Bundi and demand irrigation systems, August 1988

Kahn, Hayat Ullah, et al. Evaluation on methods of water course construction in Pakistan. November 1988

Trimmer, Walter L. Partial irrigation and its application in Pakistan. September 1988

Lusk, Mark W. and Jamshed Tirmizi. Description and hypothesis formulation in irrigation organization research: a workshop. Workshop readings and notes, February 25-March 2, 1989

Toney, Michael H., Jamshed Tirmizi and Bradley W. Parlin. Operationalization of the conceptual framework in irrigation organization research: workshop readings, August 6-10, 1989

Papers presented at the ISM/R all-project workshop organized by the University of Idaho, session IV: Water and fertilizer management. Lahore, May 1990

Course on 21-X micrologger programming operation &amp data manipulation techniques, conducted by ISM/Research project, June 18-21, 1990.

Butterfield, Samuel H. How foreign aid works. Title XII strengthening grant program seminar, 18 January 1982

Corey, G.L. Size of farm in relation to irrigation pumping costs. For presentation at the 1968 annual meeting of the Pacific Northwest Region and the American Society of Agricultural Engineers, Boise, Idaho, October 16-19, 1968

Curtis, Ronald V. and Russell Backus. Discussion paper: Irrigation systems management. March 8, 1982

Hafeez, Abdul. Irrigation analysis of Chabba distributary. (Directed study) submitted to G.L. Corey, December 1989

Renfro, Raymond Z.H. and Edward W. Sparling. Private Tubewell and canal water trade on Pakistan Punjab watercourses. September 1982.

Women in Development proposal, 1988-1989.

Corey, G.L., et al. Similitude for non-steady drainage of partially saturated soils, August 1965

Blaney, Harry F. and Wayne D. Criddle. Determining water requirements in irrigated areas from climatological and irrigation data. USDA August 1950.

Johnson, Sam H., et al. Medium scale irrigation systems in northeast Thailand: future directions. ISPAN, September 1989

Potential for irrigated agricultural development in Pakistan, July 1981

Lower Indus water management and reclamation research project, Sind, July 1983.

Water management research at Mona proposed for funding by U.S. AID during 1983-1988, undated

Tirmizi, Jamshed and Bradley Parlin. Societal dynamics and irrigation systems; a compilation of working papers - phase I. June 1989.

Research on traditional irrigation systems, July 1988

Munir, Muhammad and Muhammad Akram Kahlown. Sailaba irrigation in Baluchistan; bench mark study. December 1988.

US. AID. Project paper, India irrigation management and training. 2 v. April-May 1983

Fujioka, Y. and T. Kitamura. Approximate solution of a vertical drainage problem. Journal of Geophysical Research, December 15, 1964.

Wright, James L. and Marvin E. Jensen. Peak water requirements of crops in southern Idaho. Journal of the Irrigation and Drainage Division, Proceedings of the American Society of Civil Engineers, June 1972.

Ferozsons Atlas for Pakistan, 1986.

Other Descriptive InformationReturn to Top

Other Descriptive InformationReturn to Top

AZRI Arid Zone Research Institute
CGP Competitive Grants Program
DRIP Drainage and Reclamation Institute of Pakistan
EWU Encouraging Water Users project
GOP Government of Pakistan
ISM/R Irrigation Systems Management Research Project
IRI Irrigation Research Institute
LIM Lower Indus Mona (Water Management and Reclamation Plan)
NADLIN National Documentation Centre, Library & Information Network
NARC National Agricultural Research Center
PARC Pakistan Agricultural Research Council
PC-1 Planning Commission-1 (Reports and requisition authorization)
PCRWR Pakistan Council for Research in Water Resources
PIO/T Project implementation order/Technical services
PIRI Punjab Irrigation Research Institute
SCARP Salinity Control and Reclamation Project
USAID United States Agency for International Development
WAPDA Water and Power Development Authority
WM&ED Watercourse Monitoring and Evaluation Directorate

Administrative InformationReturn to Top

Arrangement

A majority of the material in this archival group was in labeled folders when received. The records represent the files of both the Field Office in Lahore, Pakistan and the Home Office at the University of Idaho. Although duplication of material does occur, most notably in the technical directives, TDY reports and telexes and faxes, both sets of records were retained to reflect the activities and interrelationship of both offices. Each of these two series has parallel subseries which are designated financial, reports, procurement of equipment, personnel, office, and photographs.

The first series contains the records of the Field Office. Subseries one contains the financial records and includes cash and voucher journals, checkbook stubs, travel claims and bank statements, all of which show expenditures by the office for local goods and services. These expenses were reimbursed by USAID.

The reports include technical directives, called task orders early in the project, which authorized and described in detail the various projects undertaken by the program. Also included are short- term advisor reports whose numbers correspond to the technical directives, in-country training program proposals and reports, and symposium proceedings. The proposals and reports are in numerical order and a complete list is contained in appendices I-IV.

The third subseries is Procurement which consists of lists of equipment purchased for use by the project.

Personnel, the fourth subseries, contains reports on the participant training program, lists of expatriates working in Pakistan on ISM/R, and personnel files for Pakistani employees of the project.

The final subseries contains photographs of several irrigation projects in Pakistan and views of the surrounding countryside.

Home Office Records comprise the second series. The subseries are in the same order as the Field Office Records.

The financial records contain detailed yearly budgets for the project including projected and actual expenditures.

The reports section consists of technical directives and short-term advisor or TDY reports. These are arranged alphabetically by author as opposed to the numerical arrangement in the Field Office Records.

The procurement of equipment subseries contains extensive records concerning the authorization for and purchase of the equipment shipped to Pakistan. It also contains records of the transfer of this equipment to the Government of Pakistan at the conclusion of the project. This equipment included computers, desks and other office equipment as well as scientific equipment.

The personnel material includes recruitment information for all advisory positions and personnel files of the expatriates working on the project. The third area covered in this subseries is the participant training program which provided for the training in American universities of Pakistani engineers and other professionals who would take over the management of the irrigation systems at the conclusion of the project. Included are correspondence files which detail the setting up of the individual programs, and files on the participants and programs.

The office files contain the project contract, program management information, correspondence, including telexes and faxes, semi-annual and end of tour reports, project reviews, orientation materials for Americans going to Pakistan, copies of the ISM/R newsletter, and reports on the various ISM/R subprojects and training programs.

The photographs in this series include slides used in an introduction to the Palouse for Pakistani visitors, and photographs taken during the Pakistani Project directors tour of Idaho irrigation projects. Also included are a map of the Indian subcontinent and a Lahore guide map.

Because the voucher registers exist, and there is also other summary expenditure information, the vouchers and attached documenting receipts were discarded. Also removed from the collection were duplicate copies of technical directives and reports, and applications of unsuccessful candidates for positions with ISM/R project. In all the records were reduced by 11 cubic feet.

Acquisition Information

The Records of the Pakistan Project were transferred to the University of Idaho Library by the Agricultural Engineering Department which developed and directed the project, between January and October 1992.

Detailed Description of the CollectionReturn to Top

Series I. Field Office, 1985-1991Return to Top

Container(s) Description Dates
A. Financial Records
1985-1991
Box/Folder
1/1
General ledger
1 item
1985-1991
1/2-3
Petty cash journal, W.E.F.
2 items
1987-March 1991
1/4-5
Imprest petty cash journal
2 items
August 1985-March 1991
1/6-7
Voucher registers I & II
2 items
1985-1991
1/8-9
Checkbook stubs, Rupee account
21 items
1985-1991
1/10
Deposit slips
4 items
1985-1990
1/11
Dollar account bank statements and related correspondence
113 items
1986-1991
1/12
Receipt vouchers, Account 4881
79 items
1985-1990
1/13
Receipt vouchers, IMPREST
50 items
1986-1991
1/14
Receipt vouchers, USAID advances
3 items
1987
1/15-17
Monthly voucher summaries
59 items
1985-1991
1/18
Vouchers for advances
6 items
1987-1989
1/19-25
Travel claims, local (arranged by person)
284 items
1985-1989
2/26-28
Travel claims, local
99 items
1985-1989
2/29-32
Travel claims, expatriate
284 items
1985-1990
2/33
Bills for collection, personal telephone calls
102 items
1987-1991
2/34-35
Bank statements and related correspondence, American Express Bank, Lahore
179 items
1985-1991
2/36
Journal sheet, monthly totals, U.S, dollar
1 item
1985-1990
2/37
Commitment liquidation record
1 item
1990
2/38
Budget
41 items
1985-1988
2/39
Budget management
69 items
1985-1990
2/40
Research component, budget
32 items
1985
B. Reports
1985-1990
Box/Folder
2/41-68
Technical directives (See appendix I for complete list) 1-83
679 items
1985-1990
3/69-70
Technical directives, 84-89
25 items
1990
3/71-88
Short term advisor reports (See appendix II for complete list), 1-82
78 items
1986-1990
3/89
In country training program: Approvals, projects 2-13
14 items
1988-1989
3/90-98
In country training program: Proposals and correspondence, projects 10-27 (see appendix III for complete list)
164 items
1988-1990
3/99-100
In country training program: Reports 11-14 (see appendix IV for complete list)
3 items
1989-1990
4/101-103
In country training program: Reports 15-27
5 items
1989-1990
4/104-111
Other ISM/R reports (See appendix V for complete list)
53 items
1985-1990
4/112
ISM document listing
1 item
undated
4/113
Symposium: Awards and budget
24 items
1990
4/114
Symposium: Mailing list
15 items
1990
4/115
Symposium: Proceedings, 5v
5 items
1990
C. Procurement of Equipment
1989
Box/Folder
5/116
Equipment lists
4 items
1989
D. Personnel
1985-1990
Box/Folder
5/117
Quarterly training reports
6 items
1989-1990
5/118
Participant training plans
9 items
1987-1990
5/119
Participant training printouts
4 items
1990
5/120
Participant training--Pakistan Computing Consultants, training program documents
1 item
1987-1991
5/121
Public relations expenses (U of I added expenses for workshops, e.g. lunches, dinners in conjunction with certificate presentation ceremonies)
1 item
1989
5/122
USAID report of long term and short term persons in the country on ISM/R
9 items
1990
5/123
Embassy report (Americans in the country with ISM/R)
14 items
1990
5/124
Locator file (where expatriates are staying)
13 items
1989-1990
5/125-150
Personnel files (locals), A-Z (see appendix VI for complete list of names)
412 items
1985-1990
5/151
Leave status reports, expatriates
14 items
1988-1990
5/152-169
Leave applications, locals
778 items
1985-1990
E. Office
1985-1991
Box/Folder
5/170-172
Telexes
424 items
1985-1990
5/173-174
Faxes
280 items
June-December 1990
5/175
Faxes, Outgoing: Local and unofficial
26 items
1990
5/176
Faxes: Shane Ryland
33 items
March-November 1990
5/177
Faxes: Shipment of goods and equipment to U.S.
23 items
1990
6/178
Faxes to/from UI
57 items
December 1990-March 1991
6/179
Research program specialist, correspondence
26 items
1988-1989
6/180
Research management institution building, readings
8 items
1970-1984
6/181-182
Revised compensation plan
46 items
1985-1990
6/183
ISM/R policy documents
3 items
1989-1990
6/184
Publications list
3 items
1990
6/185
Tarus W. foil project
7 items
1989
6/186
Upgrading soil mechanics and hydraulics labs at Karachi and Hyderabad
17 items
1989-1990
F. Photographs
1988-1990
Box/Folder
6/187
35mm color negatives: oriental carpets, irrigation work
5 items
1988-1989
6/188
Photographs of irrigation projects and surrounding scenery
164 items
1988-1990

Series II. Home Office, 1983-1992Return to Top

Container(s) Description Dates
A. Financial Records
1985-1992
Box/Folder
6/189-194
Budgets
6 items
FY 1985-1987
7/195-207
Budgets
13 items
FY 1987-1990
8/208-214
Budgets
7 items
FY 1990-1992
8/215
Miscellaneous financial Records
5 items
1990-1991
B. Reports
1985-1991
Box/Folder
8/216-218
Technical directives and training programs
3 items
1986-1991
8/219
TDY reports--Guidelines
1 item
8/220
Bassett, D.L.
2 items
1989
8/221
Bondurant, James
8 items
1986-1991
8/222
Brockway, C.E.
5 items
1986-1989
8/223
Carlson, John
1 item
1988
8/224
Chaudhry, M. Haniff
1 item
1989
8/225
Corapcioglu, Yavuz
1 item
1990
8/226
Corey, Gilbert L.
15 items
1985-1990
8/227
Doering, E.J.
2 items
1987
8/228
Dow, A. Irving
2 items
1986
8/229
Fitzsimmons, D.W.
2 items
1986-1988
8/230
Haggerty, Bob
2 items
1986-1989
8/231
Hamilton, Joel
7 items
1986-1988
8/232
Hanson, Donna
14 items
1986-1988
8/233
Hine, Patricia
1 item
1988
8/234
Howell, Robert E.
1 item
1990
8/235
Johnson, Gary S.
1 item
1986
8/236-238
King, Larry G.
9 items
1986-1990
8/239
Kostinko, Gail
1 item
1989
9/240
Lusk, Mark W.
2 items
1989
9/241
Mattick, Leonard
4 items
1988-1990
9/242
Moden, Walter
4 items
1987
9/243
Naylor, Denny V.
3 items
1987-1990
9/244
Nordin, Carl and A.R. Robinson
4 items
1986
9/245
Parlin, Bradley
4 items
1988-1990
9/246
Pruitt, W.O.
1 item
1990
9/247
Ra1ston, Dale
2 items
1987
9/248
Reiss, Peter
12 items
1985-1986
9/249
Replogle, John A.
1 item
1990
9/250
Ryland, Shane
3 items
1989-1991
9/251
Schreiber, David L.
1 item
1988
9/252
Stellmon, M. William
1 item
1990
9/253
Toney, Michael B.
1 item
1989
9/254
Trimmer, Walter L.
1 item
1988
9/255
Watts, Fred
1 item
1987
9/256
Wiese, Maury
7 items
1986-1990
9/257
Wiser, Edward
3 items
1988-1989
9/258
Irshad, S.M., Study report of field tours (northwest)
1 item
May 18-28 and June 8-July 2, 1988
9/259
The irrigation systems management research project
1 item
ca. 1990
C. Procurement of Equipment
1984-1990
Box/Folder
9/260
PC-I: GOP approvals
7 items
1985-1987
9/261
Miscellaneous purchases
33 items
1985-1988
9/262
IBM XTs W/power supply
29 items
1986-1987
9/263
Equipment, Miscellaneous
17 items
1986-1988
9/264
Field Office report
1 item
1989
9/265
PC-I 400-RP-01: Computer procurement
41 items
1986-1987
9/266
02: Photo/video procurement
2 items
1987
9/267
03: Library procurement
87 items
1987-1988
9/268
04: Office equipment procurement
14 items
1987
9/269
05: Surveying equipment procurement
16 items
1987
9/270
06: Field equipment procurement
19 items
1987-1988
9/271
07: Meteorological procurement
19 items
1987
9/272-273
08: Laboratory equipment procurement
25 items
1987
9/274
09: Office/photo procurement
12 items
1987-1988
9/275
10: Field equipment 2
20 items
1987-1988
10/276-277
11: Lab equipment 2
36 items
1988
10/278
12: Well inspection system
16 items
1987-1988
10/279
13: Well logger
23 items
1987-1988
10/280
14: Nitrogen analyzer
38 items
1987-1989
10/281
Communications with DAI (Development Alternatives, Inc.)
75 items
1986-1988
10/282
Communications with DAI - electronic procurement
121 items
1987-1988
10/283
USAID, GOP approvals
5 items
1986
10/284
Equipment costs, 1st, 2nd orders
7 items
1987-1989
10/285
Equipment locations
4 items
1986-1987
10/286
Export license
16 items
1984-1985
10/287
International transportation network
19 items
1986
10/288
Procurement procedures
6 items
1986-1989
10/289
PC-I Proforma: Irrigation Systems Management Research Project, PCRWR, Islamabad
1 item
1985
10/290
Irrigation System Management Research PARC research, Islamabad
1 item
1986
10/291
Irrigation Systems Management Research, WAPDA, Lahore
1 item
1985
10/292
Mona Reclamation Experiment Project, 1984-1988, Bahlwal, October 1984
1 item
10/293
Lower Indus Water Management and Reclamation Research Project, Sind, Lahore
292 items
July 1983
10/294
Masterplan
5 items
1985-1987
10/295-299
Annual work plan
14 items
1985/1986-1989/1990
10/300
Equipment lists and specifications
5 items
1988-1989
10/301-303
Equipment notebook: reports, inventory, correspondence, transfers, packing lists
1 item
1987-1988
10/304
Equipment lists, specifications reports
59 items
1988-1989
11/305
Original equipment lists submitted to USAID for approval
1 item
1986
11/306
Equipment, first order
100 items
1986-1988
11/307
IRI equipment
50 items
1988-1989
11/308
Sind IRI specifications
6 items
1990
11/309
LIM equipment
12 items
1988-1989
11/310
Equipment, second order
31 items
1985-1987
11/311
IRI equipment lists/requirements
13 items
1987-1988
11/312
USAID approvals, equipment
9 items
1989
11/313
Source/origin wavers
27 items
1986-1990
11/314
Equipment maintenance & miscellaneous
7 items
1989-1990
11/315
Equipment transfer
4 items
1990
11/316
Equipment procurement
61 items
1990
11/317
Equipment procurement under ISM/R contract, LIM & IRI specifications
1 item
May 1989
11/318
Record of equipment delivered to GOP agencies, first procurement
1 item
October 15, 1990
11/319
Equipment
31 items
1987-1989
11/320
Equipment inventory
21 items
1988-1990
11/321
Air compressor for SMO
7 items
1990
11/322-323
Equipment summaries
8 items
1989-1990
11/324
Notebook I, WSU purchase orders
66 items
1989-1990
11/325
Notebook II, Property inventories, nonexpendable
63 items
1987-1990
D. Personnel
1984-1990
1. Recruitment
1984-1989
Box/Folder
11/326
Recruitment, General information
26 items
1987-1988
11/327
Chief of Party
28 items
1988
11/328
Data Management Specialist
1 item
1989
11/329
Field Director
1 item
1989
11/330-332
Hydrologist
69 items
1986-1988
11/333-335
Irrigation Agronomist
69 items
1986-1988
11/336-339
Program Assistant
60 items
1984-1989
12/340
Research Program Specialist
11 items
1986-1988
12/341-343
Social Scientist
118 items
1986-1988
12/344
Training Coordinator
9 items
1986
2. Personnel Files
1984-2003
Box/Folder
12/345
Administrators trip to Pakistan
2 items
1989
12/346
Allen, Richard
30 items
1988
12/347
Baxter, John
115 items
1988-1991
12/348
Bassett, Day L.
23 items
1986-1990
12/349
Becker, Clarence
18 items
1990
12/350
Bloomsburg, George
4 items
1990
12/351
Bondurant, James A.
109 items
1987-1991
12/352
Branen, Larry
5 items
1987
12/353
Brockway, Charles
40 items
1986-1989
12/354
Busch, John
20 items
1989
12/355
Carlson, John
26 items
1987-1988
12/356
Corapcioglu, Yavuz
9 items
1989
12/357
Corey, Gilbert
132 items : Added in 2023: Nomination of Gilbert Lee Corey for the John Deere Gold Medal Award, 1987; Nomination of Gilbert Lee Corey for the Kishida International Award, 1988; obituary for Gilbert Corey, 2003
1986-2003
12/358
Dimick, Niel
26 items
1986-1987
12/359-360
Doering
159 items
1986-1991
12/361
Dow, Irving
7 items
1986-1987
12/362
English, Marshall
6 items
1989
12/363
Fedale, Scott
27 items
1986-1988
12/364
Fitzsimmons, Delbert
47 items
1985-1988
12/365
Geiger, Joseph
13 items
1988-1989
12/366
George, Paulette
1 item
1984
12/367
Haggerty, Robert
61 items
1987-1990
12/368
Hamilton, Joel
26 items
1986-1988
12/369
Hanson, Donna
36 items
1985-1988
12/370
Hine, Patricia
14 items
1987-1988
12/371
Howell, Bob
5 items
1990-1991
12/372
Johnson, Gary
76 items
1985-1990
12/373
Kemper, W. Doral
26 items
1989
12/374
Khan, Samina
20 items
1988-1989
12/375
King, Larry
3 items
1986-1989
12/376
Kostinko, Gail
32 items
1988-1989
12/377
Leonhart, Cynthia
17 items
1989-1991
12/378
Lingg, Al
15 items
1989
12/379
Lowdermilk, Max
1 item
1987-1988
12/380
Lusk, Mark
38 items
1989
12/381
Mattick, Leonard
67 items
1988-1990
12/382
Moden, Walter
11 items
1986-1987
12/383
Moore, Rae Ellen
23 items
1987-1989
13/384
Naylor, Denny
36 items
1987-1990
13/385
Nordin, Carl F.
36 items
1986-1990
13/386
Otawa, Toru
23 items
1989
13/387
Parlin, Bradley
86 items
1988-1990
13/388
Pruitt, William
30 items
1989
13/389
Ra1ston, Dale R.
11 items
1985-1987
13/390
Reiss, Peter
5 items
1986-1987
13/391
Replogle, John
15 items
1990
13/392
Riley, John A.
5 items
1988
13/393
Robichaud, Peter
11 items
1989
13/394
Robinson, A.R.
29 items
1985-1996
13/395
Robinson, Clarence
35 items
1987-1991
13/396
Ryland, Shane
23 items
1988-1990
13/397
Schreiber, David
40 items
1988-1989
13/398
Schwennesen, Jean
9 items
1986-1987
13/399
Simmons, George
6 items
1988
13/400
Stellmon, M. William
15 items
1989-1990
13/401
Toney, Michael
26 items
1988-1990
13/402
Trimmer, Walter
16 items
1986
13/403
Watts, F.J.
21 items
1987
13/404-405
Wiese, Maury
79 items
1987-1990
13/406
Williams, Doris
27 items
1988-1989
13/407
Wiser, Edward
130 items
1988-1990
13/408
Wray, Gleanne
4 items
1987
13/409
Zakrajsek, Dorothy
4 items
1987
13/410
Agreement to pay annual leave
9 items
1990
13/411
Biodata forms
41 items
1986-1990
13/412
Consulting and long term agreements
7 items
1988
13/413
Insurance
50 items
1984-1989
13/414
Returned overhead
18 items
1989
13/415
Sunday pay
24 items
1988-1990
13/4l6
Travel costs
46 items
1987-1989
3. Participant Training
1986-1990
Box/Folder
13/417
Asian Institute of Technology
10 items
1987-1988
13/418
Study tour, S.E. Asia Water Users Associations
5 items
1988
13/4l9
ISM/R Correspondence, in-coming
26 items
1987-1990
13/420
ISM/R Correspondence, out-going
17 items
1987-1990
13/421
ISM/R Telexes and faxes
197 items
1987-1990
13/422
ISM/R in-country training
2 items
1987
13/423
ISM/R non-degree training evaluations
2 items
1987-1988
13/424
ISM/R training certificates of completion
4 items
1988-1989
13/425-426
ISM/R training plans
45 items
1986-1988
13/427
ISM/R internships
28 items
summer 1988
13/428
ISM/R trip reports, Haggerty
4 items
1986-1989
13/429
Pakistan Participant Training Program, Academy for Educational Development
5 items
1988
13/430
Ahmad, Muhammad Naseer and Sheikh Mazhar Saeed, Groundwater modeling short course, 4 weeks
29 items
Fall 1988
13/431
Ahmad, Rashid (PCRWR), Technical writing, editing, publications, Colorado State University
1 item
1990
13/432
Ahmed, Manzoor and Banaras H. Niazi, Soil reclamation internship
11 items
1988-1989
13/433
Ahmed, Manzoor, Private and public tubewell performance, 3 month internship, Utah State University
19 items
1990
13/434
Ahmed, Dr. Nazir, Biotic and chemical reclamation of soils
25 items
1987-1989
13/435
Ali, Naimat and Umed Ali Buriro (PARC), Soil, water fertilizer interaction, UI, Mahler/Hammel
49 items
1989
13/436
Arain, Khalid Saeed (WAPDA), Water management
8 items
1988
13/437
Aslam, Muhammad, Soil reclamation internship
31 items
1988-1989
14/438
Bajwa, Ather Rashid (WAPDA), Agronomy, Tuskegee University
5 items
1989
14/439
Bhatti, Munir, (CSU USAID/PPTP ISM/R), Research proposal
7 items
1989
14/440
Chaudhry, M.R., Southwestern U.S. trip
12 items
February 1987
14/441
Faizi, Fazal Ahmet, Ground and surface water modeling
5 items
Fall 1990
14/442
Hydraulic Research Administration Training
16 items
1990-1991
14/443
Iqbal, Jawed (PCRWR), Problems and practices of irrigation systems, Colorado State University
3 items
June-August 1989
14/444
Iqbal, Shamin, Short course (18 weeks), Administrative management
37 items
1989-1990
14/445
Irrigation and fertilizer application methods, 5 weeks, PSES/AgEng
11 items
May 20-June 21, 1991
14/446
Irrigation management research methodology
29 items
June 3-August 9, 1991
14/447
Ismail, Shoaib. Soil reclamation internship, CSU
53 items
1989
14/448
Kazi, Adil Amin (PCRWR/NADLIN), information and dissemination internship
27 items
1989-1990
14/449
Khaleeq, Anjum, Advanced techniques in information technology internship (6 months)
28 items
1988-1989
14/450
Khan, Nasrullah (PCRWR), Hydrology internship
30 items
1989-1991
14/451
Kumbhar, Abdul Majeed Abdullah (PARC), Soil reclamation internship
21 items
1989
14/452
Memon, Shafi Mohammad and Zafar Ullah Khan, Irrigation, soil, water, and fertilizer management internship
60 items
1989-1990
14/453
Moinuddin, Sheikh (WAPDA), Geochemistry of water
29 items
1989
14/454
Nazir, Dr. M. Shafi, Soil, water, fertilizer interaction
12 items
1989
14/455
On-farm irrigation scheduling, design, and evaluation
16 items
May-July 1991
14/456
Pakistan ISM/R project directors study tour
62 items
October-November 1987
14/457
Research administration study tour
31 items
1989
14/458
Research methodology short course
27 items
1991
14/459
Soil and water conservation and management, USU
12 items
1989-1990
14/460
Salim, Mohammed, Nitrogen management in soils
37 items
1987-1988
14/461
Soomro, Abdul Qayoom (DRIP/PCRWR), Soil and water chemistry
22 items
1990-1992
14/462
Tahir, M. Aslam (PCRWR), Soil and water chemistry, WSU
14 items
June-August, 1990, 1990-1992
14/463
Well logging training (COMPROBE/USGS/USBR)
23 items
July-August 1988
14/464
Yahya, Muhammad (WAPDA), Biotic reclamation of sodic soils, 8 week short course
7 items
1990
14/465
Yasmin, Muzhat (PCRWR/NADLIN), Information and dissemination internship
28 items
1989-1990
14/466
Zaffar, Ismail, Soil, water, fertilizer interaction
19 items
1988-1989
14/467-468
Irrigation, water, fertilizer management, UI, Mahler/Hammel, outline and participants
55 items
1989-1990
14/469-470
Nitrogen irrigation crop management, outline and participants
60 items
April 30-September 21, 1990
14/471-473
Irrigation management research methodology, short course, outline and participants
119 items
1989
14/474-475
Irrigation management research methodology, short course, outline and participants
99 items
1990
E. Office
1983-1991
Box/Folder
14/476
USAID project paper: Pakistan--management of agricultural research and technology
1 item
August, 1984
14/477
Contract
3 items
1985
14/478-479
Contract notebook
1 item
1985-1991
15/480
Program management notebook
1 item
1985-1989
15/481
International Association for the Exchange of Students for Technical Experience
4 items
undated
15/482
Program design - Fitzsimmons
67 items
1983-1984
15/483
Project management - Fitzsimmons
32 items
1984
15/484
Competitive grants review
1 item
1990
15/485
Equipment
17 items
1989-1991
15/486
ISM/R stationery
4 items
undated
15/487
Travel, general
2 items
1983-1989
15/488
Correspondence, John Anania (USAID)/Gilbert Corey
16 items
1984-1986
15/489
Correspondence, USAID contracting office
18 items
1990
15/490-497
Letters/Memos
663 items
1983-1991
15/495-504
Telexes/Faxes
944 items
1984-1988
16/505-512
Telexes/Faxes
611 items
1989-1991
16/513
Reports: End of tour
7 items
1987-1990
16/514-515
Reports: Semi-annual
12 items
1987-1991
16/516
Reports: Project review/evaluation
2 items
1989
16/517
Reports: Progress
13 items
1986-1989
16/518
Advisory committee
22 items
1984-1989
16/519
Air freight shipments
61 items
1985-1990
16/520
Orientation programs: Consultants, VIP, Long-term
45 items
1987-1988
16/521
Travel regulations
10 items
1985-1991
16/522
Announcements, short-term positions
9 items
1987
16/523
Recruitment/Advertising
18 items
1986-1988
16/524
Newsletter
9 items
1985-1989
16/525
Press releases
68 items
1985-1989
16/526
Policy issues, general and specific
38 items
1985-1989
16/527
Institutional policy
16 items
1984-1990
16/528
University of Illinois contract
5 items
1984-1985
16/529
IRIs
9 items
1989-1990
16/530
Technical assistance costs/summary
8 items
1988-1989
16/531
NADLIN
4 items
1989
16/532
Progress reviews
4 items
1986-1988
16/533
IRICO
10 items
1984-1986
16/534
Irrigation research institutes
10 items
1985-1986
16/535
Tours: G.M. Ghattak
4 items
1986
16/536
Tours: SMO training tour
1 item
1988
16/537
Tours: Evaluations
1 item
1987
17/538
Tours: Project directors
82 items
1987
17/539
Training correspondence
9 items
1986-1989
17/540
Tubewell performance reports
3 items
1986-1987
17/541
Watercourse monitoring/evaluation
4 items
1986-1987
17/542
Surface drainage/water table control
3 items
1986-1988
17/543
Outside Indus
3 items
1986-1987
17/544
Library/Documentation Center
2 items
1988
17/545
Watercourse management
2 items
1986-1988
17/546
Ground and surface water modeling
3 items
1986-1987
17/547
Farm water management
8 items
1986-1988
17/548
Encouraging water users
4 items
1986-1988
17/549
Competitive grants
3 items
1986-1988
17/550
In country training programs
10 items
1987-1988
17/551-554
Technical directives
65 items
1986-1989
17/555
Internship/short course training
25 items
1987-1989
17/556
Training needs
25 items
1986-1991
17/557
Training, non-degree programs
5 items
1987-1988
17/558
Internship: Salim; Ali and Buriro
16 items
1988-1989
17/559
Internship: Khaleeq; Zafar, Nazir
20 items
1988-1989
17/560
Internship: soil reclamation; Groundwater modeling; Irrigation, soil, water and nitrogen fertilizer management
6 items
1989-1990
17/561
Training: Biotic reclamation of salt-affected soils; Geochemistry of water; Administrative management
16 items
1989
17/562
Training: Information dissemination; Soil, water, irrigation management; Soil and water chemistry
19 items
1990
17/563
Training: Tubewell performance; Irrigation and fertilizer application; Soil and water chemistry
10 items
1990-1991
17/564
Training
39 items
1989-1990
17/565-566
Orientation materials for Americans
36 items
1986-1988
17/567
Administrative assistant report, design phase
1 item
1984
17/568
An overview of the irrigation systems management research project
1 item
October 1987
17/569
Women in Development proposal for Pakistan
6 items
1984-1985
17/570
Final report ISM/R design
1 item
1984
17/571
Per diem allowances
8 items
1985-1988
17/572
5 1/4" computer diskettes
1.: Jean-Pak. (Symphony). Correspondence and instructions, Records of Jean Schwennesen and Rae Ellen Moore
1986-1988
2.: M89Newltr/Travel tips. (Word Perfect) March 1989 newsletter; travel trips for travellers to Pakistan
1988-1989
3.: Travel and other ISMR. (Symphony). Correspondence and memos of D.W. Fitzsimmons & Ray Ellen Moore
1986-1988
4.: IMM data disk, (cannot read)
1-26-1988
5.: IMM w/DOS. (Binary)
9/26/1988
6.: Address labels. (Text)
1986
7.: Corresp. (Wordperfect), Correspondence and memos re: travel to Pakistan
1988-1989
8.: MCI-3 (Symphony), MCI telexes
1988
9.: Symphony (Mono) (Binary) Program disk
10-11.: Symphony (Mono) with niceprint for MCI mail (binary)
12.: IMM data disk. (Text), Telexes
1988-1989
13.: IMM w/DOS workdisk (Binary)
13 items
F. Photographs and maps
1982-1987
Box/Folder
17/573
Slides: Introduction to the Palouse; Pakistan irrigation canals
3 items
1987
17/574
Photographs: Project directors tour; Miscellaneous
34 items
ca. 1987
17/575
Maps: Indian subcontinent; Lahore guide map
2 items
1982-1987
Folder
Box: 17 576
Photos from Scrapbook
1 folder : Maps, description of the project, and photographs with captions, removed from sticky scrapbook album pages and placed in archival envelopes.

Names and SubjectsReturn to Top

Subject Terms

  • Irrigation--Pakistan
  • Irrigation--Study and teaching--Pakistan