Seattle City Light Regional Power Management Records, 1943-1982
Overview of the Collection
- Creator
- Seattle City Light
- Title
- Seattle City Light Regional Power Management Records
- Dates
- 1943-1982 (inclusive)19431982
- Quantity
- 7.4 cubic feet, (8 boxes)
- Collection Number
- 1206-13
- Summary
- Records relating to power management and regional power associations.
- Repository
-
Seattle Municipal Archives
Seattle Municipal Archives
Office of the City Clerk
City of Seattle
PO Box 94728
98124-4728
Seattle, WA
Telephone: 2062337807
Fax: 2063869025
archives@seattle.gov - Access Restrictions
-
Records are open to the public.
- Languages
- English
- Sponsor
- Funding for processing this record series was provided through a grant from the National Historical Publications and Records Commission.
Historical NoteReturn to Top
City Light provides electricity and electrical and conservation services to its public and private customers. It is the largest public utility in the Pacific Northwest. Public responsibility for electrical energy dates to 1890 with creation of the Department of Lighting and Water Works. In 1902, Seattle voters passed a bond issue to develop hydroelectric power on the Cedar River under the administration of the Water Department. Electricity from this development began to serve Seattle in 1905. A City Charter amendment in 1910 created the Lighting Department. Under the leadership of Superintendent James D. Ross, the department developed the Skagit River hydroelectric project which began supplying power in 1924. Both public and private power was supplied to Seattle until 1951 when the City purchased the private electrical power supply operations, making the Lighting Department the sole supplier. The Boundary Project in northeastern Washington began operations in 1967 and supplied over half of City Light's power generation. By the early 21st century, approximately ten percent of City Light's income came from the sale of surplus energy to customers in the Northwest and Southwest with the remainder of City Light's financial support coming from customer revenue. The current name of the agency was adopted in 1978 when the Department was reorganized.
Content DescriptionReturn to Top
Correspondence, contracts, financial records and related material of the power management branch relating to power purchases, interchanges and regional power planning. Included are minutes, correspondence, studies and reports of regional power associations, including the Northwest Power Pool, Northwest Public Power Association, Pacific Northwest Governors’ Power Policy Committee, Pacific Northwest Utilities Conference Committee and the Federal Power Commission Task Force on Downstream Benefits Provided by Headwater Improvements on the Columbia. Topics include an independent review of WPPSS nuclear power projects 4 and 5, wholesale electric rates, and the “Model Electric Power and Conservation Plan for the Pacific Northwest” by the Natural Resources Defense Council. Additional records concerning regional power associations are found in Regional Power Planning Records, series 1200-15.
Use of the CollectionReturn to Top
Preferred Citation
[Item and date], Seattle City Light Regional Power Management Records , Record Series 1206-13. Box [number], Folder [number]. Seattle Municipal Archives.
Administrative InformationReturn to Top
Detailed Description of the CollectionReturn to Top
The following section contains a detailed listing of the materials in the collection.
Power Interchanges, 1948-1976Return to Top
Container(s) | Description | Dates |
---|---|---|
Box/Folder | ||
1/1 | Bonneville Power
Administration (BPA) - Correspondence - NW Network Analyzer studies |
1960-1962 |
1/2 | British Columbia Electric
Railway Co. - Customs Invoices |
1949-1950 |
1/3 | Canadian Entitlement Exchange
Agreement - BPA - Columbia Storage |
1964 |
1/4 | Canadian Entitlement Exchange
Agreement - BPA - Columbia Storage |
1964 |
1/5 | Columbia River Development
(Canada) |
1964 |
1/6 | Columbia River Treaty Review
of Canadian Entitlement |
1962 |
1/7 | Columbia Storage Power
Exchange |
1964 |
1/8 | Coordination
Agreements |
1964 |
1/9 | Flexibility Account
(Interchange ) |
1974-1975 |
1/10 | Interchange
Ledger |
1974-1975 |
1/11 | Interchange
Energy |
1974-1975 |
1/12 | Purchased and Interchanged
Power |
1958 |
1/13 | Purchased and Interchanged
Power |
1959 |
1/14 | Purchased and Interchanged
Power |
1960 |
1/15 | Purchased and Interchanged
Power |
1961 |
1/16 | Purchased and Interchanged
Power |
1962 |
1/17 | Priest Rapids - Assignment
Agreement - Grant County Public Utility District |
1967 |
1/18 | Priest Rapids - Boundary,
Telemetered Interchange Adjustments |
1975-1976 |
1/19 | Priest Rapids - Energy
Reports |
1973-1974 |
1/20 | Puget Sound Power and Light
(PSPL) |
1963-1966 |
1/21 | Purchase and Interchange
Power |
1974 |
1/22 | Purchase and Interchange
Power |
1974-1975 |
1/23 | Purchased Power |
1974-1975 |
1/24 | Seattle - Tacoma Interchange
Agreement |
1962-1965 |
1/25 | Summary of Scheduled
Interchange |
1975-1976 |
1/26 | Tacoma Letters - Energy
Transactions |
1974-1975 |
1/27 | Transfers - Bonneville Power
Administration to Puget Sound Power and Light - Snohomish and Canal
Substation |
1948-1953 |
1/28 | Transfers - British Columbia
Electric Railway Co for Inter Company Pool |
1948-1952 |
Power Associations, 1943-1982Return to Top
Container(s) | Description | Dates |
---|---|---|
Box/Folder | ||
1/29 | American Public Power
Association (APPA) |
1963-1967 |
1/30 | American Public Power
Association (APPA) - John Day Project |
1963-1967 |
1/31 | American Public Power
Association (APPA) - Rate Committee |
1958-1962 |
1/32 | American Public Power
Association (APPA) - Rate Committee |
1954-1957 |
2/1 | American Public Power
Association (APPA) - Rate Committee - Programs |
1958-1959 |
2/2 | North American Power Systems
Interconnection Committee |
1963-1967 |
2/3 | North American Power Systems
Interconnection Committee - Northwest Power Pool (NWPP) |
1964-1967 |
2/4 | North American Power Systems
Interconnection Committee - Northwest Power Pool (NWPP) -Operating
Committee |
1966 |
2/5 | North American Power Systems
Interconnection Committee - Northwest Power Pool (NWPP) -Western operations
Subcommittee |
1965 |
2/6 | North American Power Systems
Interconnection Committee - Northwest Power Pool (NWPP) -Western Operations
Subcommittee |
1966-1967 |
2/7 | North American Power Systems
Interconnection Committee - Northwest Power Pool (NWPP) -Load and Generation
Shedding |
1967 |
2/8 | Northwest Power Pool (NWPP)
Coordinating Committee - Area Control Error |
1967 |
2/9 | Northwest Power Pool (NWPP)
Coordinating Committee - Communication Engineers Meetings - Minutes |
1964 |
2/10 | Northwest Power Pool (NWPP)
Coordinating Committee - Content Curve and System Energy Content
Curves |
1965-1964 |
2/11 | Northwest Power Pool (NWPP)
Coordinating Committee - Coordinated Operating |
1947 |
2/12 | Northwest Power Pool (NWPP)
Coordinating Committee - Weekly Report of Coordinated Operating |
1963-1964 |
2/13 | Northwest Power Pool (NWPP)
Coordinating Committee - Weekly Report of Coordinated Operating |
1963-1964 |
2/14 | Northwest Power Pool (NWPP)
Coordinating Committee - Weekly Report of Coordinated Operating |
1967 |
2/15 | Northwest Power Pool (NWPP) -
General Information and Correspondence |
1943-1967 |
2/16 | Northwest Power Pool (NWPP) -
Hydro Generation - Probabilities and Potential Energy Levels |
1959-1964 |
2/17 | Northwest Power Pool (NWPP) -
Hydro Unit Governor Adjustments |
1964-1965 |
2/18 | Northwest Power Pool (NWPP) -
Load Dropping During Pool Emergencies |
1956-1961 |
2/19 | Northwest Power Pool (NWPP) -
Load Dropping and Load Shedding |
1963-1967 |
2/20 | Northwest Power Pool (NWPP) -
Maintenance Engineers |
1964-1967 |
2/21 | Northwest Power Pool (NWPP) -
Maintenance Program |
1955-1965 |
2/22 | Northwest Power Pool (NWPP) -
Maintenance Program |
1965-1967 |
2/23 | Northwest Power Pool (NWPP)
Coordinating Committee - Membership |
1964 |
2/24 | Northwest Power Pool (NWPP)
Coordinating Committee - Notice of Power and Reactive Flow and Voltage Level
Tests |
1965-1966 |
2/25 | Northwest Power Pool (NWPP)
Coordinating Committee - Pacific Northwest Coordination Agreement |
1965-1966 |
2/26 | Northwest Power Pool (NWPP)
Coordinating Committee - Pacific Northwest Coordination Agreement - Operating
Data |
1965-1967 |
2/27 | Northwest Power Pool (NWPP)
Coordinating Committee - Pacific Northwest Coordination Agreement - Summary of
Operating Data |
1965-1967 |
2/28 | Pacific Northwest
Coordination Agreement - Meetings |
1964-1967 |
2/29 | Northwest Power Pool (NWPP)
Power 1970 Level of Development |
undated |
3/1 | Northwest Power Pool (NWPP)
Symposium by Operating Committee |
1948 |
3/2 | Northwest Power Pool (NWPP)
Relay Engineers' Meetings Minutes |
1964-1967 |
3/3 | Northwest Power Pool (NWPP)
Relay Engineers and communications engineers Meetings |
1964-1967 |
3/4 | Northwest Power Pool (NWPP)
Coordinating Group |
1964-1967 |
3/5 | Northwest Power Pool (NWPP)
Coordinating Group Misc Reports |
1964 |
3/6 | Northwest Power Pool (NWPP)
Western Group Reports to Defense Power Administration, Power Load and
Capabilities |
1951-1957 |
3/7 | Northwest Power Pool (NWPP)
Spinning Reserve Subcommittee |
1967 |
3/8 | Northwest Power Pool (NWPP)
Summary of Inadvertent Interchange Energy |
1964-1967 |
3/9 | Northwest Power Pool (NWPP)
Western Interconnection Information |
1964-1968 |
3/10 | Northwest Power Pool (NWPP)
Western Operations Committee, East-West Tie Closure Task Force |
1967 |
3/11 | Northwest Power Pool (NWPP)
Western Operations Committee, Organization and Assignments of Oregon -
California Task Force |
1966-1967 |
3/12 | Northwest Power Pool (NWPP)
Western Operations Committee, Western Systems Coordinating Council |
1967 |
3/13 | Northwest Power Pool Carrier
Current Channel Data |
1956-1963 |
3/14 | Northwest Power Pool
Operating Program |
1954-1955 |
3/15 | Northwest Power Pool
Operating Program |
1956-1958 |
3/16 | Northwest Power Pool
Operating Program |
1959 |
3/17 | Northwest Power Pool
Operating Program |
1960-1961 |
3/18 | Northwest Power Pool -
Average and Peak Megawatts |
1959-1960 |
3/19 | Northwest Power Pool -
Average and Peak Megawatts |
1961-1962 |
3/20 | Northwest Power Pool -
Average and Peak Megawatts |
1962-1963 |
3/21 | Northwest Power Pool -
Average and Peak Megawatts |
1964-1965 |
3/22 | Northwest Power Pool -
Average and Peak Megawatts |
1965-1966 |
3/23 | Northwest Power Pool
Operating Program |
1964-1965 |
3/24 | Northwest Power Pool
Operating Program and Fuel Requirements |
1965-1966 |
3/25 | Northwest Power Pool
Operations Review |
1954-1957 |
3/26 | Northwest Power Pool
Operations Review |
1959-1960 |
3/27 | Northwest Power Pool
Coordinating Group - Tests of Power and Reactive Flows and Voltage
Level |
1955-1956 |
3/38 | Northwest Power Pool
Coordinating Group - Tests of Power and Reactive Flows and Voltage
Level |
1957 |
4/1 | Northwest Power Pool
Coordinating Group - Tests of Power and Reactive Flows and Voltage
Level |
1958-1960 |
4/2 | Northwest Power Pool
Coordinating Group - Tests of Power and Reactive Flows and Voltage
Level |
1966-1967 |
4/3 | Northwest Power Pool
Coordinating Group - Maps of Service Areas |
1959 |
4/4 | Northwest Power Pool
Coordinating Group - Coordinated Operation, Principles and
Procedures |
1956-1960 |
4/5 | Northwest Power Pool
Coordinating Group - Proposed Western Utility Teletype Circuit |
1966 |
4/6 | Northwest Public Power
Association |
1960-1963 |
4/7 | Northwest Public Power
Association Power Supply Committee, Resource Task Force |
1966 |
4/8 | Northwest Public Power
Association - Wholesale Rate Committee |
1955-1956 |
4/9 | Northwest Public Power
Association - Wholesale Rate Committee |
1957 |
4/10 | Northwest Public Power
Association - Wholesale Rate Committee |
1958 |
4/11 | Northwest Public Power
Association - Wholesale Rate Committee |
1959-1960 |
4/12 | Northwest Public Power
Association - Wholesale Rate Committee |
1961-1967 |
4/13 | Northwest Utilities
Coordination Negotiations |
1961-1965 |
4/14 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1953-1958 |
4/15 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1954 |
4/16 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1954 |
4/17 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1954 |
4/18 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1954 |
5/1 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1955 |
5/2 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1955 |
5/3 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1955 |
5/4 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1956 |
5/5 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1956 |
5/6 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1957 |
5/7 | Pacific Northwest Governors'
Power Policy Committee, Engineering Committee |
1957 |
5/8 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review |
undated |
5/9 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review Draft Final Reports |
1982 |
5/10 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review |
1981 |
5/11 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review Progress Report |
1982 |
5/12 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review Executive Summaries |
- |
5/13 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review |
1982 |
5/14 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Price Waterhouse Review |
1982 |
5/15 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Draft Final Report Module
V |
1981 |
5/16 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review |
1982 |
5/17 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Interim Report, Module V |
1981 |
5/18 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Interim Report of Supply Alternatives
and Cost |
1981 |
5/19 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Report Module IV |
1981 |
5/20 | Pacific Northwest Utilities
Conference Committee WPSS 4 and 5 Review, Module II |
1981 |
6/1 | Pacific Northwest Utilities
Conference Committee - Near Term Cost Effectiveness |
1981-1982 |
6/2 | Pacific Northwest Utilities
Conference Committee - Near Term Cost Effectiveness Subcommittee |
1981 |
6/3 | Pacific Northwest Utilities
Conference Committee - Near-Term Cost Effectiveness Methodology
Subcommittee |
1981 |
6/4 | Pacific Northwest Utilities
Conference Committee - Cost Effectiveness Report |
undated |
6/5 | Pacific Northwest Utilities
Conference Committee, Study - Forecasted Supply Function
Relationships |
undated |
6/6 | Pacific Northwest Utilities
Conference Committee, Study - Forecasted Supply Function
Relationships |
undated |
6/7 | Pacific Northwest Utilities
Conference Committee (PNUCC) - BPA Rates and Resources |
1981-1982 |
6/8 | PNUCC - Natural Resources
Defense Council Model Electric Power and Conservation Plan for the Pacific
Northwest |
1982 |
6/9 | PNUCC - Natural Resources
Defense Council Model Electric Power and Conservation Plan for the Pacific
Northwest |
1982 |
6/10 | PNUCC - Natural Resources
Defense Council Model Electric Power and Conservation Plan for the Pacific
Northwest |
1982 |
6/11 | PNUCC - Natural Resources
Defense Council Model Electric Power and Conservation Plan for the Pacific
Northwest - Comments |
1982 |
6/12 | Regional Power Planning
Program |
1977 |
6/13 | Regional Power Planning
Program |
1977 |
6/14 | Regional Power Planning
Program |
1977 |
6/15 | Regional Power Planning
Program |
1977 |
6/16 | Regional Power Planning
Program |
1977 |
6/17 | Regional Power Planning
Program |
1977 |
6/18 | Regional Power Planning
Program |
1977 |
6/19 | Regional Power Planning
Program |
1977 |
7/1 | Regional Power Planning
Program |
1977 |
7/2 | Regional Power Planning
Program |
1977 |
7/3 | Regional Power Planning
Program |
1977 |
7/4 | Regional Power Management
Program |
1978 |
7/5 | Regional Power Management
Program |
1978 |
7/6 | Regional Power Management
Program |
1978 |
7/7 | Regional Power Management
Program |
1978 |
7/8 | Regional Power Planning
Program |
1978 |
7/9 | Regional Power Planning
Program |
1978 |
7/10 | Regional Power Management
Program |
1978 |
7/11 | Regional Power Management
Program |
1978 |
7/12 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1956-1957 |
7/13 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1955-1956 |
7/14 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1954 |
7/15 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1953-1954 |
7/16 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1952-1953 |
7/17 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1954-1960 |
8/1 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvement of Certain Columbia Basin Licensed
Projects and FPC Projects |
1957-1959 |
8/2 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvements - Natural Flow Studies at
Hydroelectric Projects |
1955 |
8/3 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvements - Legislation |
1959 |
8/4 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvements - Legislation |
1957-1959 |
8/5 | FPC Task Force On Downstream
Benefits Provided By Headwater Improvements - Legislation |
1960-1961 |
8/6 | Columbia River Basin
Headwater Benefit Determination, FPC |
1965 |
8/7 | Washington Public Power
Supply Syster - Nez Perce Project |
1960-1962 |
Names and SubjectsReturn to Top
Subject Terms
- Electric Utilities--Northwest, Pacific
- Interconnected electric utility systems
- Nuclear energy--Washington (State)
- Water-power--Washington (State)
Corporate Names
- Seattle City Light
- Natural Resources Defense Council
- Northwest Power Pool
- Northwest Power Pool. Coordinating Group
- Northwest Public Power Association
- Pacific Northwest Governors’ Power Policy Committee
- Pacific Northwest Utilities Conference Committee
- Seattle (Wash.). Lighting Dept.
Geographical Names
- Seattle (Wash.)