Archives West Finding Aid
Table of Contents
City Light Superintendent Records, 1918-2015
Overview of the Collection
- Creator
- Seattle City Light
- Title
- City Light Superintendent Records
- Dates
- 1918-2015 (inclusive)19182006
- Quantity
- 59 cubic feet, (81 boxes)
- Collection Number
- 1200-13
- Summary
- Records documenting the administration, activities and projects of Seattle City Light
- Repository
-
Seattle Municipal Archives
Seattle Municipal Archives
Office of the City Clerk
City of Seattle
PO Box 94728
98124-4728
Seattle, WA
Telephone: 2062337807
Fax: 2063869025
archives@seattle.gov - Access Restrictions
-
Records are open to the public.
- Languages
- English
- Sponsor
- Funding for processing this record series was provided through a grant from the National Historical Publications and Records Commission.
Historical NoteReturn to Top
City Light provides electricity and electrical and conservation services to its public and private customers. It is the largest public utility in the Pacific Northwest. Public responsibility for electrical energy dates back to 1890 with creation of the Department of Lighting and Water Works. The formulation of this public utility stemmed from fear of monopolization by private companies and was reinforced by the inadequacy of those companies during the Great Fire of 1889. Unable to gain access to private water, much of the business district was burned to the ground. Citizens responded eagerly to the idea of publicly owned water and electricity, which was later encouraged as part of President Roosevelt's New Deal in the 1930s.
In 1902, Seattle voters passed a bond issue to develop hydroelectric power on the Cedar River under the administration of the Water Department. This was the nation's first municipally owned hydroelectric project. Electricity from this development began to serve customers in Seattle in 1905. A City Charter amendment in 1910 created the Lighting Department, making it a full member of the City's Board of Public Works. Under the leadership of Superintendent James D. Ross, the department developed the Skagit River hydroelectric project which began supplying power in 1924 with the completion of the Gorge Dam.
Both public and private power was supplied to Seattle until 1951 when the City purchased the local private electrical power company, the Puget Sound Power and Light Company, making the Lighting Department the sole supplier. The Boundary Project in northeastern Washington began operations in 1967 and supplied over half of City Light's power generation. By the early 21st century, approximately ten percent of City Light's income came from the sale of surplus energy to customers in the Northwest and Southwest with the remainder of City Light's financial support coming from customer revenue.
The current name of the agency was adopted in 1978 when the department was reorganized. As a municipally owned public power system, Seattle City Light is governed by elected Seattle officials. Administrative authority rests with the Superintendent and an executive team that includes the department's Chief of Staff, Service and Energy Delivery Officer, Human Resources Officer, Power Supply and Environmental Affairs Officer, and Chief Financial Officer. City Light is responsible for electrical service and streetlight service, streetlight problems, and also conservation, both residential and commercial/industrial.
City Light provides low-cost, reliable, and environmentally responsible electric power to approximately 395,000 customers in Seattle and neighboring areas, including Burien, Lake Forest Park, Normandy Park, Renton, SeaTac, Shoreline, Tukwila, and unincorporated King County. It is the ninth-largest public power system in the United States and has the lowest rates among comparably sized cities in the United States.
Content DescriptionReturn to Top
Correspondence, interdepartmental memos, reports, financial records and subject files of City Light Superintendents concerning City Light power projects and administration. Topics include acquisition of Puget Sound Power and Light Company properties in Seattle; Skagit River Projects, especially the raising of Ross Dam and flooding of Canadian land in the Skagit River basin; Boundary and Box Canyon dams; Creston coal power plant; Bonneville Power Administration; strategic plans; electric rates; labor relations and affirmative action. Early Superintendents' files also include personal correspondence. Superintendents' records for 1984-1987 are missing. Superintendents' records for 1988-1992 are included in Central Files, series 1200-16.
Other Descriptive InformationReturn to Top
A list of City Light Superintendents and their dates of tenure can be found on our website.
Use of the CollectionReturn to Top
Preferred Citation
[Item and date], Seattle City Light Superintendents' Records, Record Series 1200-13. Box [number], Folder [number]. Seattle Municipal Archives.
Administrative InformationReturn to Top
Detailed Description of the CollectionReturn to Top
J. D. Ross, 1918-1946Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
1 | 1 | Bonds - Application
Reconstruction Finance Corp. |
1932 |
1 | 2 | Boulder Dam |
1931-1937 |
1 | 3 | Canada - Hydro |
1926-1939 |
1 | 4 | Canada - Hydrography (Steam
Gauging) |
1926-1939 |
1 | 5 | Cedar Falls |
1928 |
1 | 6 | Clippings - re J.D.
Ross |
1928-1937 |
1 | 7 | Comparison of Public and
Private Ownership |
1932-1939 |
1 | 8 | Diablo Dam
Construction |
1928 |
1 | 9 | Diablo Dam
Construction |
1929-1930 |
1 | 10 | John Dore |
1932-1936 |
1 | 11 | "Duplication" City Light
Pamphlets re: Duplicate Electrical Systems |
1936 |
1 | 12 | Frank Edwards
Recall |
1928-1934 |
1 | 13 | Frank Edwards Recall -
Clippings |
1931-1932 |
1 | 14 | King County Map
(Annotated) |
undated |
1 | 15 | Municipal League of Seattle
Correspondence |
1934-1936 |
1 | 16 | Municipal
Ownership |
1911-1914 |
2 | 1 | Public Ownership
League |
undated |
2 | 2 | Publicity (re Public
Ownership) |
1932-1944 |
2 | 3 | St. Lawrence Project and
Waterway |
1931-1932 |
2 | 4 | Skagit River Power Project
Cost Estimate - J.D.Ross/Willis T. Batcheller |
1918-1946 |
2 | 5 | Skagit Timber
6/8/1934 |
1934 |
2 | 6 | Stevenson (John C.) - Brown
("Doc") Political Issues |
1932-1936 |
2 | 7 | Tennessee Valley
Authority |
1925-1953 |
2 | 8 | Tennessee Valley
Authority |
1938 |
2 | 9 | U.S.Commerce Department
Census of Business |
1932-1939 |
2 | 10 | U.S. Department of Labor -
Statistics |
1935-1940 |
2 | 11 | U.S. War Department District
Engineer |
1932-1938 |
2 | 12 | Voters Information
League |
1937-1940 |
2 | 13 | Water Department
Correspondence |
1936 |
E. R. Hoffman, 1938-1959Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
2 | 14 | Bonds - Public Utility
Revenue Bonds |
1942-1953 |
2 | 15 | Committee on Disabled
Employees |
1940-1949 |
2 | 16 | Congressional Appropriations
for Power Facilities |
1949-1952 |
2 | 17 | Downstream Benefits(Federal
Power Commission Task Force on Headwater Benefits) |
1952-1953 |
2 | 18 | Energy Storage |
1938-1953 |
3 | 1 | Foreign
Correspondence |
1940-1954 |
3 | 2 | Foreign
Correspondence |
1955-1959 |
3 | 3 | Gorge Powerhouse Extension
Efficiency Test |
1951 |
3 | 4 | Judson King, National Popular
Government League Correspondence |
1942 |
3 | 5 | King County
Correspondence |
1945-1951 |
3 | 6 | King County Engineer re
Substations, Transmissions, etc. |
1949-1954 |
3 | 7 | E.R. Hoffman Letter to
Governor Arthur B. Langlie |
1953 |
3 | 8 | Legislation |
1938-1953 |
3 | 9 | Los Angeles Power |
1939-1947 |
3 | 10 | Los Angeles Power |
1947-1954 |
3 | 11 | Missouri Valley
Authority |
1953 |
3 | 12 | Northwest Power
Shortage |
1948-1953 |
3 | 13 | Notebook (includes Data re
Skagit Power Project Costs, Work, Bonds, Reservoir, etc.) |
1939-1953 |
3 | 14 | Notebook (Puget Sound Power
and Light Properties, Skagit River Rail Road, Street Lighting, Skagit
Transmission, Skagit Flow, Right of Way |
1939-1953 |
3 | 15 | Operating Cost of Household
Appliances |
1953 |
3 | 16 | Power Planning (Includes
Willis T. Batcheller, Clarence C. Dill) |
1953-1954 |
4 | 1 | Raver, Paul J. Interview, KEX
Portland |
1939 |
4 | 2 | Requests,
Miscellaneous |
1945-1957 |
4 | 3 | Ross Dam (Includes
Photographs) |
1948-1949 |
4 | 4 | Ross Dam Curves, Discharge,
Skagit Stream flow |
1940-1949 |
4 | 5 | Ross Dam elevation
1525 |
1942 |
4 | 6 | Ross Dam, Report Proposed
Power Tunnels |
1944 |
4 | 7 | Ross Dam, Powerhouse
Contractor Claims |
1953-1954 |
4 | 8 | Rural
Electrification |
1938-1956 |
4 | 9 | Skagit - Follow - Up
Work |
1953 |
4 | 10 | Skagit Project (includes
Photographs) |
1953-1955 |
4 | 11 | Tacoma City Light |
1939-1955 |
4 | 12 | U.S. War Department District
Engineer |
1939-1944 |
4 | 13 | Whatcom County
Correspondence |
1949-1959 |
4 | 14 | Superintendent
Correspondence |
1939 |
4 | 15 | Superintendent
Correspondence |
1940 |
5 | 1 | Superintendent
Correspondence |
1941 |
5 | 2 | Superintendent
Correspondence |
1942 |
5 | 3 | Superintendent
Correspondence |
1943 |
5 | 4 | Superintendent
Correspondence |
1944 |
5 | 5 | Superintendent
Correspondence |
1945 |
5 | 6 | Superintendent
Correspondence |
1946 |
5 | 7 | Superintendent
Correspondence |
1947 |
5 | 8 | Superintendent
Correspondence |
1948 |
5 | 9 | Superintendent
Correspondence |
1949 |
6 | 1 | Superintendent
Correspondence |
1950 |
6 | 2 | Superintendent Correspondence
(I) |
1951 |
6 | 3 | Superintendent Correspondence
(II) |
1951 |
6 | 4 | Superintendent Correspondence
(1) |
1952 |
6 | 5 | Superintendent Correspondence
(II) |
1952 |
6 | 6 | Superintendent Correspondence
(I) |
1953 |
6 | 7 | Superintendent Correspondence
(II) |
1953 |
Puget Sound Power and Light Company Acquisition, 1934-1955Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
6 | 8 | Report - Consolidating
Duplicating Electrical Systems in Seattle |
1936 |
6 | 9 | Report - Consolidating
Duplicating Electrical Systems in Seattle |
1936 |
6 | 10 | Report - Consolidating
Duplicating Electrical Systems in Seattle |
1936 |
7 | 1 | Puget Sound Power and Light
Company - Purchase - Customer Poll |
1936-1937 |
7 | 2 | Puget Sound Power and Light
Company - Purchase |
1937-1948 |
7 | 3 | Puget Sound Power and Light
Company - Purchase - Proposal, Report |
1934 |
7 | 4 | Puget Sound Power and Light
Company - Purchase |
1948-1952 |
7 | 5 | Puget Sound Power and Light
Company - Property Purchase - Participating Power Contract |
1945 |
7 | 6 | Puget Sound Power and Light
Company Acquisition |
1950 |
7 | 7 | Puget Sound Power and Light
Company Acquisition |
1948-1949 |
7 | 8 | Puget Sound Power and Light
Company Acquisition |
1948 |
7 | 9 | Puget Sound Power and Light
Company Acquisition - Clippings |
1950 |
7 | 10 | Puget Sound Power and Light
Company Acquisition - Proposition C - Clippings |
1950 |
7 | 11 | Puget Sound Power and Light
Company Acquisition - Report on Power Supply |
1950 |
7 | 12 | Puget Sound Power and Light
Company (McLaughlin) To City |
1947-1950 |
7 | 13 | Puget Sound Power and Light
Company Power Plants, Engineers Meetings (R.W. Beck) |
1949 |
7 | 14 | Puget Sound Power and Light
Company Estimated Income and Expense Statement |
1939-1940 |
8 | 1 | Puget Sound Power and Light
Company Plan |
1934-1940 |
8 | 2 | Puget Sound Power and Light
Company Merger (Charts) |
1939 |
8 | 3 | Puget Sound Power and Light
Company |
1937-1945 |
8 | 4 | Puget Sound Power and Light
Company - Combined Billings - Tentative Order and Work Agreement |
1941 |
8 | 5 | Puget Sound Power and Light
Company - Agreement |
1942 |
8 | 6 | Puget Sound Power and Light
Company - Proposed Purchase by Public Utility Districts |
1945 |
8 | 7 | Puget Sound Power and Light
Company - Buy |
1944-1947 |
8 | 8 | Puget Sound Power and Light
Company v. Department of Public Utilities of Washington |
1947 |
8 | 9 | Puget Sound Power
Supply |
1949-1951 |
8 | 10 | Puget Sound Publicity
Data |
1950 |
8 | 11 | Puget Sound Power and Light
Company |
1950 |
8 | 12 | Puget Sound Power and Light
Company Franchises |
1939-1950 |
8 | 13 | Before the Department of
Public Service of Washington - Division of Public Utilities |
1937 |
8 | 14 | Puget Sound Deal Before
Agreement |
1949-1950 |
8 | 15 | Puget Contract - Wheeling
Charges |
1948-1949 |
8 | 16 | Puget Sound Power and Light
Company - Merger |
1946-1950 |
8 | 17 | Puget Sound Power and Light
Company |
1943-1948 |
8 | 18 | Puget Sound Power and Light
Company |
1947 |
9 | 1 | Puget Sound Power and Light
Company - Letters To and From |
1949-1950 |
9 | 2 | Study of Estimated Revenues
from Puget's Properties in Competitive Areas |
1940-1949 |
9 | 3 | Puget Sound Power and Light
Company - Conferences in Mayor's Office |
1949-1950 |
9 | 4 | Conferences with Puget (Maps
Included) |
1949-1950 |
9 | 5 | Sale by Puget Sound Power and
Light Company to City of Seattle - Pursuant to Agreement |
1951 |
9 | 6 | Department of Lighting -
Report on Power Supply for Proposed Acquisition of Puget Sound Power and Light
Properties |
1950 |
9 | 7 | Puget Sound Power and Light
Company Acquisition - General |
1952 |
9 | 8 | City Light Payroll and Income
Study |
1949-1950 |
9 | 9 | Meeting of Engineers on Power
Sources of Puget Sound Power and Light Company |
1949 |
9 | 10 | Power Supply and Puget's
Capabilities |
1950 |
9 | 11 | Department of Lighting -
Power Supply Purchase |
1950 |
9 | 12 | City Light
Employees |
1950-1951 |
9 | 13 | Puget Sound Power and Light
Company Submarine Cable Ship and Employees - Photographs |
1955 |
Canadian Relations, 1926-1960Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
British Columbia Power
Commission |
1955-1960 | ||
Box | Folder | ||
9 | 15 | Canada -
Correspondence |
1949 |
9 | 16 | Canada -
Correspondence |
1950 |
10 | 1 | Canada -
Correspondence |
1951 |
10 | 2 | Canada -
Correspondence |
1952 |
10 | 3 | Canada -
Correspondence |
1952 |
10 | 4 | Canada -
Correspondence |
1953 |
10 | 5 | Canada -
Correspondence |
1954 |
10 | 6 | Canada -
Correspondence |
1955 |
10 | 7 | Canada -
Correspondence |
1956-1957 |
10 | 8 | Canada -
Correspondence |
1958 |
11 | 1 | Canada -
Correspondence |
1959 |
11 | 2 | Canadian Lands
(Maps) |
1926-1946 |
11 | 3 | Canadian Lands |
1941-1958 |
11 | 4 | Flood Rights British Columbia
"A" |
1950-1951 |
11 | 5 | Flood Rights British Columbia
"A" |
1936-1951 |
11 | 6 | Flood Rights British Columbia
"B" (International Joint Commission) |
1952 |
11 | 7 | Flood Rights British Columbia
"B" |
1952 |
11 | 8 | Flood Rights British Columbia
"B" |
1952 |
12 | 1 | Flood Rights British Columbia
"C" |
1953 |
12 | 2 | Flood Rights British Columbia
"C" |
1953 |
12 | 3 | Flood Rights British Columbia
Agreement British Columbia and Seattle |
1951-1953 |
12 | 4 | Flood Rights British Columbia
"D" |
1933-1958 |
12 | 5 | Flood Rights British Columbia
"D" |
1954-1957 |
12 | 6 | Flood Rights British Columbia
"D" |
1941-1954 |
12 | 7 | Flood Rights British Columbia
Application for License for Ross Reservoir, Canada |
1956-1958 |
12 | 8 | Flood Rights British Columbia
"E" |
1958 |
12 | 9 | Flood Rights British Columbia
"E" |
1948-1958 |
12 | 10 | Flood Rights British Columbia
"E" (Includes Photos) |
1958 |
12 | 11 | Flood Rights British Columbia
"F" |
1959 |
12 | 12 | Flood Rights British Columbia
"F" |
1959 |
13 | 1 | Flood Rights British Columbia
"F" |
1959 |
13 | 2 | Flood Rights British Columbia
"G" |
1959-1960 |
13 | 3 | Flood Rights British Columbia
"G" |
1960 |
13 | 4 | Hydrography (Flooding) -
Canada, International Joint Commission |
1940-1944 |
13 | 5 | International Joint
Commission - Application to Raise the Water Level of the Skagit
River |
1940-1941 |
13 | 6 | International Joint
Commission - Application to Raise the Water Level of the Skagit
River |
1941 |
13 | 7 | International Joint
Commission - Application to Raise the Water Level of the Skagit
River |
1941 |
13 | 8 | Hydrography (Flooding) -
Canada, International Joint Commission |
1945-1947 |
13 | 9 | Hydrography (Flooding) -
Canada, International Joint Commission |
1942-1946 |
13 | 10 | Hydrography (Flooding) -
Canada, International Joint Commission |
1947-1950 |
14 | 1 | Hydrography - Canada,
International Joint Commission |
1951 |
14 | 2 | Hydrography - Canada,
International Joint Commission Hearing |
1951 |
14 | 3 | Hydrography - Canada,
International Joint Commission |
1952 |
14 | 4 | Hydrography - Canada,
International Joint Commission |
1953 |
14 | 5 | Hydrography - Canada,
International Joint Commission |
1954 |
14 | 6 | Hydrography - Canada,
International Joint Commission |
1955-1956 |
14 | 7 | Hydrography - Canada,
International Joint Commission |
1957 |
14 | 8 | Hydrography - Canada,
International Joint Commission |
1958 |
14 | 9 | Hydrography - Canada,
International Joint Commission |
1958 |
15 | 1 | International Joint
Commission, U.S. and Canada |
1954 |
15 | 2 | International Joint
Commission, City of Seattle - Skagit River |
1958 |
15 | 3 | International Joint
Commission, City of Seattle |
1954-1959 |
15 | 4 | International Joint
Commission, Libby Dam project near Libby, Montana |
1954 |
Reports, 1940-1959Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
15 | 5 | Annual Report, Transmittal
Correspondence |
1940-1947 |
15 | 6 | Annual Report
Distribution |
1947-1948 |
15 | 7 | Annual Report
Distribution |
1949-1950 |
15 | 8 | Annual Report
Distribution |
1951-1953 |
15 | 9 | Annual Report
Distribution |
1954-1955 |
15 | 10 | Annual Report
Distribution |
1956 |
15 | 11 | Annual Report
Distribution |
1957 |
15 | 12 | Annual Report, Transmittal
Correspondence |
1958-1959 |
15 | 13 | Annual Report to
Mayor |
1958-1959 |
15 | 14 | Accounting Division
Report |
1959 |
15 | 15 | Appliance Division Report,
Monthly |
1955-1959 |
15 | 16 | Appliance Division Report,
Yearly |
1949-1959 |
15 | 17 | Commercial Wiring Division
Report, Yearly |
1940-1946 |
16 | 1 | A.C. Tyler Report,
Monthly |
1942-1958 |
16 | 2 | A.C. Tyler Report,
Yearly |
1942-1958 |
16 | 3 | Communications and Relay
section |
1955 |
16 | 4 | Contracts in Progress,
Reports |
1951-1957 |
16 | 5 | Contracts in Progress,
Reports |
1957-1959 |
16 | 6 | Contracts in Progress,
Reports (i) |
1957-1959 |
16 | 7 | Contracts in Progress,
Reports (ii) |
1957-1959 |
16 | 8 | Credit Division,
Reports |
1948 |
16 | 9 | Currier, Dana,
Reports |
1940 |
16 | 10 | Division Reports |
1954-1959 |
16 | 11 | Inside Construction Division
Reports |
1953-1958 |
16 | 12 | Inside Construction Division
Reports |
1953-1958 |
16 | 13 | Inside Construction Division
Reports |
1953-1958 |
16 | 14 | Line Division Reports,
Monthly |
1953 |
16 | 15 | Line Division Reports,
Monthly |
1953-1955 |
17 | 1 | Line Division Reports,
Monthly |
1956-1958 |
17 | 2 | Line Division Reports,
Monthly |
1959 |
17 | 3 | Line Division Reports,
Yearly |
1953-1956 |
17 | 4 | Meter Division Reports,
Monthly |
1952-1953 |
17 | 5 | Meter Division Reports,
Monthly |
1954-1957 |
17 | 6 | Meter Division Reports,
Monthly |
1957-1959 |
17 | 7 | Meter Division Reports,
Yearly |
1958-1959 |
Paul J. Raver, 1954-1960Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
17 | 8 | Superintendent,
Correspondence (I) |
1954 |
17 | 9 | Superintendent,
Correspondence (II) |
1954 |
17 | 10 | Superintendent,
Correspondence (I) |
1955 |
17 | 11 | Superintendent,
Correspondence (II) |
1955 |
18 | 1 | Superintendent,
Correspondence (I) |
1956 |
18 | 2 | Superintendent,
Correspondence (II) |
1956 |
18 | 3 | Alcoa |
1955-1956 |
18 | 4 | Box Canyon |
1958-1960 |
18 | 5 | Box Canyon |
1960-1961 |
18 | 6 | Census
Information |
1955 |
18 | 7 | City Light - Hydro Plant
Resources |
1955 |
18 | 8 | Washington State Power
Commission |
1954 |
18 | 9 | Washington State Power
Commission |
1955-1957 |
John M. Nelson, 1953-1980Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
18 | 10 | Arterial Undergrounding -
General |
1967-1972 |
18 | 11 | Arterial Undergrounding -
General |
1967-1972 |
18 | 12 | Boundary Project and land
Exchange |
1968-1970 |
19 | 1 | Box Canyon Dam
Project |
1965-1966 |
19 | 2 | Box Canyon Dam Project -
Analysis of Costs |
1960-1966 |
19 | 3 | Box Canyon Dam Project -
Contract |
1963 |
19 | 4 | Box Canyon Dam
Project |
1957-1958 |
19 | 5 | Box Canyon Dam
Project |
1958 |
19 | 6 | Box Canyon Dam Project -
Contracts |
1962 |
19 | 7 | Box Canyon Dam Project -
Contracts |
1964 |
19 | 8 | Box Canyon Dam Project -
Contract - Public Utility District Pend Oreille County |
1966-1967 |
19 | 9 | Box Canyon Dam Project -
Plant Capability Data |
1956-1965 |
19 | 10 | Box Canyon Dam Project -
Contract - Power sale |
1962-1966 |
19 | 11 | Box Canyon Dam Project -
Costs |
1957-1966 |
20 | 1 | Box Canyon Dam Project -
Correspondence and Data |
1954-1955 |
20 | 2 | Box Canyon Dam Project -
Estimated Power Costs |
1955-1965 |
20 | 3 | Box Canyon Dam Project -
Insurance Matters |
1955 |
20 | 4 | Box Canyon Dam Project -
Operation |
1957-1965 |
20 | 5 | Box Canyon Dam Project -
Operation |
1957-1965 |
20 | 6 | Box Canyon Dam Project -
Operation |
1956-1958 |
20 | 7 | Box Canyon Dam Project -
Contract - Public Utility District Pend Oreille County |
1952-1956 |
20 | 8 | Cost Reduction - City
Light |
1970-1972 |
20 | 9 | Current Insurance Data - Box
Canyon Dam Project |
1965 |
20 | 10 | Doces - Tukwila
Property |
1967-1968 |
20 | 11 | Federal Power Commission
Forms and Correspondence |
1960-1966 |
21 | 1 | Information and Inquiries -
Lands |
1967 |
21 | 2 | North Cascades Conservation
Council - Federal Power Commission |
1967-1970 |
21 | 3 | Pipelines |
1965-1966 |
21 | 4 | Property, SE Corner Third and
Madison |
1967-1970 |
21 | 5 | Public Speaking
Course |
1966-1973 |
21 | 6 | Scenic Rivers - North
Cascades |
1969-1972 |
21 | 7 | Schools - Pend Oreille
County |
1962-1972 |
21 | 8 | Seattle Area Industrial
Council |
1970-1972 |
21 | 9 | Skagit -Logging, Fish
Passages. Salmon Research, etc |
1950-1964 |
21 | 10 | Skagit -Logging,
Tours |
1972 |
21 | 11 | Speeches and
Talks |
1953-1980 |
21 | 12 | Sullivan Creek (Lake)
Project, Public Utility District Pend Oreille County |
1965-1969 |
21 | 13 | Union Negotiation -
International Brotherhood of Electrical Workers |
1962-1967 |
Gordon Vickery, 1951-1981Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
22 | 1 | Account Change
Fee |
1978-1980 |
22 | 2 | Accounting and Finance
Division Operation Review |
1975-1976 |
22 | 3 | Activities - General
Employees |
1972-1973 |
22 | 4 | Affirmative
Action |
1978-1979 |
22 | 5 | Affirmative Action -
General |
1978-1979 |
22 | 6 | Affirmative Action - Citizens
Advisory Committee |
1972 |
22 | 7 | Air Pollution |
1979 |
22 | 8 | Appliance Service |
1975-1979 |
22 | 9 | Alaskan Way Viaduct
Accident |
1975-1979 |
22 | 10 | Arboretum Street
Lights |
1977 |
22 | 11 | Art Commission |
1974-1977 |
22 | 12 | Arterial Street
Lighting |
1977-1978 |
22 | 13 | Atomic Industrial
Forum |
1975-1979 |
22 | 14 | Automated inventory
System |
1977-1978 |
22 | 15 | Average Cost vs. Long Range
Incremental Costs |
1978 |
22 | 16 | Board of Public Works
Ordinance |
1977-1979 |
22 | 17 | Board of Public Works - Women
and Minority Enterprise - Specific Action |
1979 |
22 | 18 | Bond Ordinance |
1977 |
22 | 19 | Bonneville Power
Administration - Correspondence - Allocation |
1976-1978 |
22 | 20 | Bonneville Power
Administration - Preference Customers - Allocation |
1976-1977 |
22 | 21 | Bonneville Power
Administration - Preference Customers - Allocation |
1979-1980 |
22 | 22 | Bonneville Power
Administration - Correspondence - Environmental Impact Statement |
1976-1978 |
22 | 23 | Bonneville Power
Administration - Role Environmental Impact Statement - Meeting
Reports |
1977 |
22 | 24 | Bonneville Power
Administration - Sales to Los Angeles and Others |
1963-1977 |
22 | 25 | Bonneville Power
Administration - Wholesale Price Increase Correspondence |
1978 |
22 | 26 | Bonneville Power
Administration - Wholesale Price Increase Correspondence |
1979 |
22 | 27 | Boundary Unit 51
Repairs |
1977 |
22 | 28 | Box Canyon - Power Contract -
Hydro Plant |
1975-1978 |
22 | 29 | Briefing Leaders |
1976-1978 |
23 | 1 | Budget Transfers (Surcharge)
Ordinance |
1977-19777 |
23 | 2 | Cable TV |
1973 |
23 | 3 | Capital Improvement Policy
Plan |
1977 |
23 | 4 | Capital Improvement Policy
Plan |
1978 |
23 | 5 | Capital Improvement Policy
Plan |
1978 |
23 | 6 | Capital Improvement Policy
Plan |
1978 |
23 | 7 | Capital Improvement Policy
Plan |
1979 |
23 | 8 | Capital Improvement Policy
Plan |
1979 |
23 | 9 | Capital Improvement Policy
Plan |
1979 |
23 | 10 | Capital Improvement Policy
Plan - Budget |
1979-1980 |
23 | 11 | Career Development
Program |
1975-1978 |
23 | 12 | Centralia -
Contract |
1969 |
23 | 13 | Centralia Project - Fish and
Game Agreements |
1978-1979 |
23 | 14 | Centralia Steam
Plant |
1972-1978 |
23 | 15 | Charter Amendment |
1975-1978 |
23 | 16 | Charter Amendment |
1975-1978 |
23 | 17 | City Council |
1976-1977 |
23 | 18 | City Council |
1976-1977 |
23 | 19 | City Energy
Office |
1974-1978 |
23 | 20 | City Procurement Contracting
Report |
1979 |
24 | 1 | City Procurement Contracting
Study |
1979 |
24 | 2 | Combined Billing
Project |
1974-1977 |
24 | 3 | Community Affairs |
1975-1976 |
24 | 4 | Community Service
Centers |
1977-1980 |
24 | 5 | Company Store |
1977 |
24 | 6 | Conservation and Generation
Planning Resolution # 26045 (draft) |
1979 |
24 | 7 | Conservation, 4
Positions |
1976-1978 |
24 | 8 | Conservation Materials, Sale
of |
1978 |
24 | 9 | Conservation Steering
Committee |
1978-1979 |
24 | 10 | Consumer Services and
Marketing Division - Contingency Plan for Work Stoppage |
1975-1978 |
24 | 11 | Consumer Services |
1978-1979 |
24 | 12 | Contract Study |
1975 |
24 | 13 | Conversions to Electric
Heat |
1979 |
24 | 14 | Coopers - Lybrand Report -
Seattle City Light |
1973-1976 |
24 | 15 | Coopers - Lybrand - Advisory
Committee |
1973-1980 |
24 | 16 | Correspondence - City
Departments |
1976-1977 |
24 | 17 | Credit Operations |
1977 |
24 | 18 | Current Diversion |
1978 |
24 | 19 | Curtailment Plan /
Conservation |
1976-1977 |
24 | 20 | Customer Complaint
Handling |
1978-1979 |
24 | 21 | Customer Emergency
Services |
1976 |
24 | 22 | Customer Information System
(CIS) - Consumer Services and Marketing Division |
1972-1974 |
24 | 23 | Customer Information System
(CIS) - Development Project |
1974-1979 |
24 | 24 | Customer Information System
CIS) - Development Project |
1974-1979 |
24 | 25 | Customer Information System
(CIS) - Operational Review |
1977-1979 |
24 | 26 | Customer Information System
(CIS) - Operational Review - Correspondence |
1977 |
24 | 27 | Customer Information System
(CIS) - Operational Review - Studies |
1977 |
24 | 28 | Customer Information System
(CIS) - Operational Task Force - Minutes |
1977 |
25 | 1 | Customer Service and
Marketing Division |
1976-1977 |
25 | 2 | Devil's Park Arial Snow
Marker |
1975 |
25 | 3 | Distribution
Division |
1974 |
25 | 4 | Distribution
Division |
1976-1979 |
25 | 5 | Eagon Request for Information
- CL Activities 1969 to Present |
1976-1977 |
25 | 6 | The Eleven Member
Committee |
1974-1976 |
25 | 7 | Employment procedures and
Information |
1969-1974 |
25 | 8 | Department of
Energy |
1979 |
25 | 9 | Energy 1990 |
1978 |
25 | 10 | Energy 1990 |
1975-1978 |
25 | 11 | Energy 1990 - Citizens
Advisory Committee |
1975-1978 |
25 | 12 | Exempt Positions |
1973-1977 |
25 | 13 | Facilities Planning - Office
Standards |
1976-1979 |
25 | 14 | Facilities Planning -
Substation Retirement Program |
1977 |
25 | 15 | Facilities Planning
Committee |
1974-1977 |
25 | 16 | Facilities Planning
Committee |
1974-1977 |
25 | 17 | Flood - Cedar River - Maple
Valley |
1975-1977 |
25 | 18 | Forecasting |
1978 |
25 | 19 | Gasoline Conservation
Program |
1977-1978 |
25 | 20 | General Atomic
Company |
1977 |
25 | 21 | Hanford Assignment
Agreement |
1977 |
25 | 22 | Hanford Assignment
Agreement |
1977 |
25 | 23 | Health and Safety
Meetings |
1973 |
26 | 1 | High Temperature Gas Cooled
Reactor Steam Cycle |
1977-1979 |
26 | 2 | Information for Council
Member Jeanette Williams |
1977 |
26 | 3 | Insurance
(Bonding) |
1972-1973 |
26 | 4 | Joint Advisory Apprenticeship
Committee |
1973-1978 |
26 | 5 | Joint Ownership -
Poles |
1951-1978 |
26 | 6 | Kiket Island
Disposal |
1976 |
26 | 7 | Lake Union Lease
Renewal |
1977 |
26 | 8 | Lakewood Local Improvement
District, Metro, Utility Poles |
1972-1978 |
26 | 9 | Land Re-Use - Lighting
Department Ad Hoc Committee |
1973-1976 |
26 | 10 | Lighting Employees Air
Problems (LEAP) -Suggestions |
1973-1977 |
26 | 11 | Legislation |
1977 |
26 | 12 | Legislation |
1978 |
26 | 13 | Low Income Elderly Insulation
Program |
1977 |
26 | 14 | Management Benefits
Package |
1974-1976 |
26 | 15 | Management Planning and
Evaluation Audit |
1975-1977 |
26 | 16 | Management Planning and
Evaluation Audit - Arterial Underground Design Audit |
1977 |
26 | 17 | Management Review
Committee |
1973-1977 |
26 | 18 | Management Review Committee -
Charter |
1975 |
26 | 19 | Management Review Committee -
Management Study |
1976 |
26 | 20 | Management Review Committee -
1977 Appropriation Carryovers |
1978 |
26 | 21 | Management Review Committee -
Organizational Study Request |
1975 |
26 | 22 | Management Review Committee -
Management Planning and Evaluation Booklet |
1975 |
26 | 23 | Management Review Committee -
Power Management |
1979 |
26 | 24 | Management Reporting System -
Orientation Engineering Division |
1975 |
26 | 25 | Management Reporting System -
Phase Two |
1975-1976 |
26 | 26 | Matthews Beach Substation
Sale |
1977-1978 |
26 | 27 | Mayor -
Correspondence |
1977 |
26 | 28 | Mayor - Draft Resolution -
Regional Energy Program |
1978 |
26 | 29 | Mayor - Transition -
Royer |
1977-1978 |
26 | 30 | Mayor 's Reorganization
Project |
1979 |
26 | 31 | Mid Columbia Hourly
Coordination Agreement |
1978-1979 |
26 | 32 | Councilman John
Miller |
1976 |
26 | 33 | National Advisory Council on
Research in Energy Conservation |
1974-1977 |
26 | 34 | New Office of Management and
Budget Administration |
1978 |
26 | 35 | Newhalem
Campground |
1975 |
26 | 36 | Newhalem Historic
Preservation |
1976 |
27 | 1 | Odessa Brown
Clinic |
1978 |
27 | 2 | Office of Community Relations
- Workload Forecast |
1978 |
27 | 3 | Office of Management and
Budget |
1976-1978 |
27 | 4 | Office of Policy and Planning
- Agenda |
1974-1979 |
27 | 5 | Office of Policy and Planning
- Citizen Participation Questionnaire |
1976-1977 |
27 | 6 | Operation Cascade |
1975 |
27 | 7 | Operation Cascade -
Environmental Impact Statement |
1974-1975 |
27 | 8 | Operation Cascade -
Historical Site |
1970-1977 |
27 | 9 | Operation Cascade -
Meetings |
1972-1977 |
27 | 10 | Ordinance 106416 - Compliance
With |
1978 |
27 | 11 | Organization Consultants of
the Northwest |
1974-1978 |
27 | 12 | Out of Sight Citizens
Advisory Committee |
1972-1973 |
27 | 13 | Overhead / Underground
Wiring |
1973-1974 |
27 | 14 | Pacific Northwest
Construction Consumer Council |
1974-1975 |
27 | 15 | Pacific Northwest
Construction Agreement - Amendatory Agreement 14 |
1977 |
27 | 16 | Palatine Substation
Sale |
1977-1978 |
27 | 17 | Planned Outage
Procedures |
1975 |
27 | 18 | Policy Advisory
Committee |
1972-1973 |
27 | 19 | Policy Advisory
Committee |
1973-1975 |
27 | 20 | Portland Lawsuit |
1977-1979 |
27 | 21 | Portland Lawsuit -
Intervention Against BPA |
1978-1979 |
27 | 22 | Power Management |
1972-1978 |
27 | 23 | Price, Waterhouse Audits and
Reports |
1976-1979 |
27 | 24 | Project
Weathervane |
1975-1976 |
27 | 25 | Public Records |
1973-1979 |
27 | 26 | Radio Interference
Investigations |
1977-1979 |
27 | 27 | Rainier Substation
Sale |
1977 |
27 | 28 | Rate Increase Advisory
Committee |
1974-1977 |
27 | 29 | Rate Ordinance
Veto |
1977 |
27 | 30 | Renton Patrol Headquarters
Sale |
1978 |
27 | 31 | Reorganization |
1977-1978 |
27 | 32 | Reorganization |
1978 |
27 | 33 | Richmond Beach Substation
Sale |
1977 |
28 | 1 | Safety |
1976-1977 |
28 | 2 | Ad Hoc Safety
Committee |
1978-1979 |
28 | 3 | Seafirst Building -
Alternative Services |
1978-1979 |
28 | 4 | Seattle Chamber of Commerce -
Membership |
1977 |
28 | 5 | Seattle Chamber of
Commerce |
1978-1979 |
28 | 6 | Seattle 2000 Commission
Workbook |
1972-1975 |
28 | 7 | Skagit - Facilities for
Employees |
1974 |
28 | 8 | Skagit River New
License |
1977 |
28 | 9 | Skagit Tours |
1972-1974 |
28 | 10 | Skagit Tours |
1974-1979 |
28 | 11 | Skagit
Tours/Trips |
1976 |
28 | 12 | Skagit
Tours/Trips |
1976-1977 |
28 | 13 | Skagit Tours Season
Report |
1977 |
28 | 14 | Spares Inventory
System |
1977-1978 |
28 | 15 | Speakers Bureau |
1976-1977 |
28 | 16 | Speeches and
Talks |
1975 |
28 | 17 | State Energy Office
Contract |
1977 |
28 | 18 | State Legislation |
1979 |
28 | 19 | State Legislation |
1979 |
28 | 20 | Strike, City Light -
Correspondence With Union Local 77 |
1975-1976 |
28 | 21 | Strike, City Light - Manpower
Staffing |
1975-1976 |
28 | 22 | Strike, City Light -
Miscellaneous |
1975-1976 |
28 | 23 | Strike, City Light -
Picketing City Light |
1975-1976 |
28 | 24 | Strike, City Light - Public
Response |
1975-1976 |
28 | 25 | Strike, City Light -
Replacement Costs |
1975-1976 |
28 | 26 | Strike, City Light - Return
to Work Procedures |
1976 |
28 | 27 | Strike, City Light - Work
Stoppage Procedures |
1975-1976 |
28 | 28 | Street Lighting |
1977-1978 |
28 | 29 | Street Light Turn-Off
program |
1977-1978 |
28 | 30 | Surcharge |
1977 |
28 | 31 | Surcharge |
1977 |
28 | 32 | Surcharge - Adjustment -
August and September |
1977 |
28 | 33 | Surcharge - Adjustment -
October and November |
1977 |
29 | 1 | Surcharge - Handouts - AA
Bond |
1975 |
29 | 2 | Surcharge - Handouts -
Forecast/Actual |
1976-1977 |
29 | 3 | Surcharge - Handouts -
Hanford Assignment |
1977 |
29 | 4 | Surcharge - Handouts - Rate
Comparison |
1977 |
29 | 5 | Surcharge - Handouts -
Residential Consumption Comparison |
1977 |
29 | 6 | Surcharge - Final (Drought)
Proposal |
1977 |
29 | 7 | System Conditions
Report |
1975-1976 |
29 | 8 | System Conditions
Report |
1975-1976 |
29 | 9 | Thermographic
Flyover |
1978 |
29 | 10 | Thermometer -
Conservation |
1977 |
29 | 11 | Time Spent With Other
Entities Report |
1978-1980 |
29 | 12 | Transmission Line Right of
Way Project |
1977 |
29 | 13 | Tukwila Property
Sale |
1974-1977 |
29 | 14 | Union Center,
UNICO |
1955-1981 |
29 | 15 | Union - Local 17 -
International Brotherhood of Electrical Workers (IBEW) -
Negotiations |
1967-1972 |
29 | 16 | Union - Local 17 -
International Brotherhood of Electrical Workers (IBEW) - Grievance - Senior
Meter Readers |
1974-1975 |
29 | 17 | Union - Local 17 -
International Brotherhood of Electrical Workers (IBEW) - Grievances |
1973-1980 |
29 | 18 | Union - Local 77 - Contract
Agreement |
1977 |
29 | 19 | Union - Local 77 - Contract
and Grievances |
1976-1979 |
29 | 20 | Volunteer Fire
Department |
1979 |
29 | 21 | Wall Insulation
Retrofit |
1977-1979 |
29 | 22 | Water Meter Insulation
Study |
1977 |
29 | 23 | Whatcom County |
1975-1976 |
29 | 24 | Window Insulation |
1979 |
Ross Dam, 1961-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
29 | 25 | Ross Dam -
Addition |
1970 |
29 | 26 | Ross Dam -
Project |
1961-1980 |
29 | 27 | Ross Dam - Ray Williston
Address |
1970 |
29 | 28 | Ross Dam - October
1970 |
1970 |
29 | 29 | Ross Dam - November
1970 |
1970 |
29 | 30 | Ross Dam - December
1970 |
1970 |
29 | 31 | Ross Dam |
1970 |
29 | 32 | Ross Dam |
1970 |
29 | 33 | Ross Dam |
1970 |
30 | 1 | Ross High Dam |
1971 |
30 | 2 | Ross High Dam |
1971 |
30 | 3 | Ross High Dam |
1971 |
30 | 4 | Ross High Dam |
1971 |
30 | 5 | Ross High Dam |
1971 |
30 | 6 | Ross High Dam |
1971 |
30 | 7 | Ross High Dam |
1971 |
30 | 8 | Ross High Dam |
1971 |
30 | 9 | Ross High Dam |
1971 |
30 | 10 | Ross High Dam |
1972 |
30 | 11 | Ross High Dam |
1972 |
30 | 12 | Ross High Dam |
1972 |
30 | 13 | Ross High Dam |
1973 |
30 | 14 | Ross High Dam |
1969-1972 |
30 | 15 | Ross High Dam |
1971-1973 |
30 | 16 | Ross High Dam |
1971-1974 |
30 | 17 | Ross High Dam |
1977-1979 |
30 | 18 | Ross High Dam |
1980 |
30 | 19 | Ross High Dam |
1980-1981 |
31 | 1 | Ross High Dam |
1977 |
31 | 2 | Ross High Dam |
1977-1978 |
31 | 3 | Ross High Dam |
1977-1978 |
31 | 4 | Ross High Dam -
Chronological |
1982 |
31 | 5 | Ross High Dam -
Chronological |
1982 |
31 | 6 | Ross High Dam -
Chronological |
1982 |
31 | 7 | Ross High Dam |
1998 |
31 | 8 | Ross High Dam - Application
for Major License |
1979 |
31 | 9 | Ross High Dam - City Light
Application Procedures |
1969-1973 |
31 | 10 | Ross High Dam -
Miscellaneous |
1977 |
31 | 11 | Ross High Dam - International
Briefing Packet |
1967-1982 |
31 | 12 | Ross High Dam - Canada
Response |
1971-1974 |
31 | 13 | Ross High Dam - CIP Budget
Report |
1982 |
31 | 14 | Ross High Dam - City Council
Meeting |
1972 |
31 | 15 | Ross High Dam - Community
Contacts |
1972 |
31 | 16 | Ross High Dam -
Correspondence |
1972 |
31 | 17 | Ross High Dam - Cost of
Damages |
1970-1976 |
31 | 18 | Ross High Dam - Downstream
Temperature Effects |
1980 |
31 | 19 | Ross High Dam - Ecological
Commission |
1971 |
31 | 20 | Ross High Dam - Ecological
Commission |
1971 |
31 | 21 | Ross High Dam - Environmental
Effects |
1969-1970 |
31 | 22 | Ross High Dam - Draft
Environmental Impact statement |
1973 |
31 | 23 | Ross High Dam - Environmental
Matters |
1979-1984 |
31 | 24 | Ross High Dam - Federal Power
Commission |
1974 |
32 | 1 | Ross High Dam - Federal Power
Commission - Hearing Details |
1972-1973 |
32 | 2 | Ross High Dam - Federal Power
Commission - Correspondence |
1971-1973 |
32 | 3 | Ross High Dam - Federal Power
Commission - Staff Time Extension |
1973 |
32 | 4 | Ross High Dam - Federal Power
Commission - Staff Time Extension |
1974 |
32 | 5 | Ross High Dam - Federal Power
Commission - Testimony |
1974 |
32 | 6 | Ross High Dam - Federal Power
Commission - Testimony |
1974 |
32 | 7 | Ross High Dam - Federal Power
Commission - Resolution 25527 |
1977 |
32 | 8 | Ross High Dam - Flood Control
- Discharge and Dissolved Gas Data |
1972-1977 |
32 | 9 | Ross High Dam - Flooding -
Special Council - C. Francis Murphy |
1970-1974 |
32 | 10 | Ross High Dam - Hand Out -
Project Description - 1971 |
1971 |
32 | 11 | Ross High Dam - International
Joint Commission |
1977-1984 |
32 | 12 | Ross High Dam - International
Joint Commission - Consultive Group Documents |
1977-1981 |
32 | 13 | Ross High Dam - International
Joint Commission - Consultive Group Documents |
1983-1984 |
32 | 14 | Ross High Dam - International
Joint Commission - Presentations - Pros and Cons |
1954-1971 |
32 | 15 | Ross High Dam - International
Joint Commission - Reports |
1982 |
32 | 16 | Ross High Dam - International
Joint Commission |
1977-1984 |
32 | 17 | Ross High Dam - Kootenai
Diversion |
1978 |
32 | 18 | Ross High Dam - McCarty Legal
Memos |
1972 |
32 | 19 | Ross High Dam - March 31
Council Meeting |
1972 |
32 | 20 | Ross High Dam - Meeting
Outline |
1972 |
32 | 21 | Ross High Dam -
Miscellaneous |
1981-1983 |
32 | 22 | Ross High Dam - Mitigation
Plan - Study |
1978-1980 |
33 | 1 | Ross High Dam -
Motions |
1976 |
33 | 2 | Ross High Dam - Frank
Murphy |
1974 |
33 | 3 | Ross High Dam - Power
Needs |
1972 |
33 | 4 | Ross High Dam - Power
Supply |
1970-1973 |
33 | 5 | Ross High Dam - Power Supply
and Economics |
1970-1972 |
33 | 6 | Ross High Dam -
Refill |
1975-1980 |
33 | 7 | Ross High Dam - Royer
Contract |
1981-1984 |
33 | 8 | Ross High Dam - Seattle
Opening Remarks to Consultative Group |
1982 |
33 | 9 | Ross High Dam - Skagit
Agreements - Proposal - Negotiations |
1982-1983 |
33 | 10 | Ross High Dam - Skagit
Agreements - Proposal - Negotiations |
1982-1983 |
33 | 11 | Ross High Dam - State
Department |
1973 |
33 | 12 | Ross High Dam - Stikine -
Iskut |
1982 |
33 | 13 | Ross High Dam - Water
Pollution - Permit Request |
1971-1974 |
33 | 14 | Ross High Dam - Water
Pollution - Permit Request |
1971-1974 |
Robert Murray and Joseph Recchi, 1975-1985Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
33 | 15 | Affirmative Action -
General |
1979-1983 |
33 | 16 | Affirmative Action - Goal
Setting |
1980-1983 |
33 | 17 | Affirmative Action - Work
Plan |
1983-1984 |
33 | 18 | Airhart, Gladys - City Light
Black Employees Association |
1984 |
33 | 19 | Anticipated CETA Public
Service Employment |
1977-1981 |
34 | 1 | Apprenticeship
Program |
1978-1981 |
34 | 2 | Apprenticeship
Program |
1978-1981 |
34 | 3 | Apprenticeship
Program |
1981-1982 |
34 | 4 | Arboretum |
1980-1981 |
34 | 5 | Arthur Andersen - Audit -
Materials and Salvage |
1983 |
34 | 6 | Biomass Grant
Awards |
1972-1984 |
34 | 7 | Board of Public Works - Cost
Sharing for Utility Relocations - Includes Diagrams |
1979-1981 |
34 | 8 | Bonneville Power
Administration |
1982 |
34 | 9 | Bonneville Power
Administration - Long Term Conservation Contracts |
1981-1983 |
34 | 10 | Bonneville Power
Administration - Long Term Conservation Contracts |
1981-1983 |
34 | 11 | Bonneville Power
Administration - Solar Water Heating Pilot program |
1980 |
34 | 12 | Capital Improvement
Program |
1980 |
34 | 13 | Capital Improvement
Program |
1980 |
34 | 14 | Capital Improvement
Program |
1980 |
34 | 15 | Cedar Falls - Katherine
Flechner Correspondence |
1980 |
34 | 16 | Cedar Falls - Cedar River
Water Rights and Instream Flow |
1984 |
34 | 17 | Cedar Falls - Morse Lake
Project |
1981-1982 |
34 | 18 | Cedar Falls - Morse Lake
Project |
1982 |
34 | 19 | Cedar Falls - Morse Lake
Project |
1981-1983 |
34 | 20 | Cedar Falls - Morse Lake
Project - Environmental Impact Statement Alternatives |
1983 |
34 | 21 | Cedar Falls and Tolt River
Projects - Superintendents Meeting |
1983 |
34 | 22 | Cedar River - Board of
Planning System Ordinance |
1983-1985 |
34 | 23 | Cedar River - Watershed - Oil
and Gas Lease |
1982 |
34 | 24 | Cedar River - Watershed - Oil
and Gas Lease |
1982 |
34 | 25 | Centralia - Miscellaneous
Correspondence |
1973-1983 |
34 | 25 | Cedar River - Watershed - Oil
and Gas Lease |
1982-1984 |
34 | 26 | Centralia - Miscellaneous
Correspondence |
1973-1983 |
35 | 1 | Citizens Rate Advisory
Committee - 1981 Rate Increase |
1979-1982 |
35 | 2 | Citizens Rate Advisory
Committee - 1982 Rate Increase |
1981-1982 |
35 | 3 | Citizens Rate Advisory
Committee - Charter (Proposed) |
1980 |
35 | 4 | Citizens Rate Advisory
Committee - General |
1977-1980 |
35 | 5 | Citizens Rate Advisory
Committee - Gradualism |
1980 |
35 | 6 | Citizens Rate Advisory
Committee - Meetings - Summary Minutes |
1980-1981 |
35 | 7 | Citizens Rate Advisory
Committee - Meetings - Policy for Conservation Program Expenditures |
1979 |
35 | 8 | Citizens Rate Advisory
Committee - Revelle's Proposed Rate Resolution |
1979-1980 |
35 | 9 | Citizens Rate Advisory
Committee - Public Utility Regulatory Policy Act standards |
1980 |
35 | 10 | Citizens Rate Advisory
Committee - Revenue Requirements Analysis |
1980 |
35 | 11 | Citizens Rate Advisory
Committee - Washington Public Power Supply Bonds |
1979 |
35 | 12 | Citizens Rate Advisory
Committee - 1980 Rate Increase |
1980 |
35 | 13 | Citizens Rate Advisory
Committee - Washington Public Power Supply Study |
1979 |
35 | 14 | City Annual Energy
plan |
1982 |
35 | 15 | City Fair |
1979-1980 |
35 | 16 | City Personnel Ad Hoc
Committee |
1979-1980 |
35 | 17 | Columbia Basin - Interior
Department Correspondence |
1979-1980 |
35 | 18 | Comprehensive Community
Energy Management Project |
1979-1981 |
35 | 19 | Cogeneration
information |
1979-1981 |
35 | 20 | Conservation
Information |
1979-1981 |
35 | 21 | City Light - Consultant
Report - Policy |
1979 |
35 | 22 | City Light - Consultant
Report - Policy |
1980 |
35 | 23 | Copper Creek
Project |
1975-1980 |
35 | 24 | Copper Creek- Bald Eagle
Studies |
1980 |
35 | 25 | Copper Creek- Citizens
Advisory Committee |
1980 |
35 | 26 | Copper Creek- Dam
Resolution |
1980 |
35 | 27 | Copper Creek-
Drilling |
1978-1980 |
35 | 28 | Copper Creek- Environmental
impact Statement - Consultants Contract |
1975-1980 |
35 | 29 | Copper Creek- Dam Project
Information |
1978-1980 |
35 | 30 | Copper Creek- Newsletters and
Interim Reports |
1978-1979 |
35 | 31 | Copper Creek- Public
Involvement in Environmental Impact Studies |
1980 |
35 | 32 | Copper Creek-
Schedules |
1980 |
35 | 33 | Creston - Project |
1982 |
35 | 34 | Creston - Bechtel Site
Plan |
1980 |
35 | 35 | Creston - Bechtel Baseline
Schedule |
1980 |
35 | 36 | Creston - Executive
Briefings |
1980-1983 |
35 | 37 | Creston - Correspondence -
City Council - Mayor |
1980-1983 |
35 | 38 | Creston - Coal Fired
Production |
1981 |
35 | 39 | Creston - Copper
Creek |
1980-1981 |
35 | 40 | Creston - Miscellaneous
Correspondence |
1980-1982 |
35 | 41 | Creston - Dedication Ceremony
- Nelson Substation |
1982 |
35 | 42 | Creston - Description -
Introduction |
1980 |
35 | 43 | Creston - Fording Coal Export
Power Project |
1980 |
35 | 44 | Creston - Gibson - Yapp
Reports |
1981 |
35 | 45 | Creston - In - House
Memos |
1980-1983 |
35 | 46 | Creston - Letter of
Agreement |
1980-1983 |
36 | 1 | Creston - Media |
1980-1983 |
36 | 2 | Creston - Nelson
Substation |
1978-1980 |
36 | 3 | Creston - Order of Magnitude
Statement |
1980 |
36 | 4 | Creston - Project
Analysis |
1980 |
36 | 5 | Creston - Public
Hearings |
1980-1982 |
36 | 6 | Creston -
Schedules |
1981-1983 |
36 | 7 | Creston - Steering
Committee |
1983 |
36 | 8 | Creston -
Transmission |
1980 |
36 | 9 | Current Diversion Video
Production - Customer Service |
1984 |
36 | 10 | Damnation Creek
Project |
1981-1982 |
36 | 11 | Division Goals and
Objectives |
1980 |
36 | 12 | Diobsud Creek |
1981-1984 |
36 | 13 | Drought Weekly
Reports |
1977-1981 |
36 | 14 | Energy and Man's
Environment |
1979-1980 |
36 | 15 | Energy Cabinet |
1981 |
36 | 16 | Energy Office
Ordinance |
1978-1981 |
36 | 17 | Excessive
Absenteeism |
1981-1982 |
36 | 18 | Executive Work
Program |
1980 |
36 | 19 | Exhibits - Deposition of
Robert H. Murray Regarding Rates |
1981 |
36 | 20 | Exhibits - Deposition of
Robert H. Murray Regarding Rates |
1981 |
36 | 21 | Facilities Planning -
Conservation and Solar |
1978-1981 |
36 | 22 | Facilities Planning - Fire
Code |
1981 |
36 | 23 | Facilities Planning - North /
South Service Center Remodel |
1980-1981 |
36 | 24 | Facilities Planning - Parking
Policy |
1975-1981 |
36 | 25 | Facilities Planning - Solar
Art |
1980 |
36 | 26 | Facilities Planning - Water
Department, Administrative Services Leases |
1979-1981 |
36 | 27 | Federal Grants for
Conservation |
1977-1980 |
36 | 28 | Labor Reductions |
1983 |
36 | 29 | Ford Foundation
Report |
1980 |
36 | 30 | Fuel Reduction |
1979-1980 |
36 | 31 | Jack Fuller Contract
(Consultant) |
1979 |
36 | 32 | Generation Projects - Status
and Schedules |
1980 |
36 | 33 | Generation Projects - Energy
Planning |
1980 |
37 | 1 | Go 'N' Joy / Post
Intelligencer Allegations |
1979-1981 |
37 | 2 | Go 'N' Joy / Post
Intelligencer Allegations |
1979-1981 |
37 | 3 | The Highlands |
1979-1982 |
37 | 4 | Hiring Freeze |
1982 |
37 | 5 | Home Heating Energy Vendor
Agreement |
1981 |
37 | 6 | Information Gathering
Agreement |
1980 |
37 | 7 | Insulation Demonstration
Program |
1980 |
37 | 8 | Interstate 90
Project |
1979 |
37 | 9 | Landsburg Fish Hatchery and
Land Use Agreement - Legal |
1979-1982 |
37 | 10 | Legislative
Session |
1983-1984 |
37 | 11 | Lighting Rebate
Program |
1978-1980 |
37 | 12 | Load Curtailment
Plans |
1979 |
37 | 13 | Load Curtailment
Plans |
1979-1980 |
37 | 14 | Load Curtailment
Plans |
1979-1980 |
37 | 15 | Load Curtailment
Plans |
1980 |
37 | 16 | Long Range Planning Model for
Conservation |
1981 |
37 | 17 | Management Study - City Light
- Comprehensive Management Study |
1979-1980 |
37 | 18 | Management Study - City Light
- Executive Team Tasks |
1979-1980 |
37 | 19 | Management Study - City
Light |
1979-1980 |
37 | 20 | Management Study - City
Light |
1981 |
37 | 21 | Management Study - City
Light |
1981 |
37 | 22 | Management Study - City Light
- Review |
1981 |
37 | 23 | Management Study - City Light
- Review |
1981 |
37 | 24 | Management Study - City Light
- Review |
1981 |
37 | 25 | Mayor's Cabinet
Retreat |
1982 |
37 | 26 | Mayor's Employee and
Executive Development |
1982-1983 |
38 | 1 | Mayor's Policy
Planning |
1981-1982 |
38 | 2 | Mayor's Reporting
System |
1980 |
38 | 3 | Mayor's Reorganization -
Weatherization Committee |
1980 |
38 | 4 | Memorandum of Agreement -
City Energy Office |
1980-1981 |
38 | 5 | Metro Bus Pass
Program |
1978-1982 |
38 | 6 | Robert Murray - Acceptance of
Resignation |
1980 |
38 | 7 | Robert Murray -
Confirmation |
1978-1979 |
38 | 8 | Robert Murray - Confirmation
- Oath of Office |
1979 |
38 | 9 | Robert Murray - Confirmation
- Oath of Office |
1979 |
38 | 10 | Robert Murray - Confirmation
- Oath of Office |
1979 |
38 | 11 | Robert Murray - Request for
Information, Special tasks |
1979-1980 |
38 | 12 | Robert Murray -
Transition |
1978-1979 |
38 | 13 | Robert Murray -
Transition |
1978-1979 |
38 | 14 | Robert Murray -
Transition |
1978-1979 |
38 | 15 | National Urban
Fellows |
1980-1981 |
38 | 16 | Northwestern Industries -
Load Requests |
1980 |
38 | 17 | Northwest Regional
Environmental Journal |
1980 |
38 | 18 | Objectives Exercise
Meeting |
1980 |
38 | 19 | Olympic Building |
1981 |
38 | 20 | PCB Annual Report |
1979 |
38 | 21 | PCB in Light
Fixtures |
1979 |
38 | 22 | PCB Miscellaneous |
1980-1982 |
38 | 23 | Policy Planning |
1980 |
38 | 24 | Policy Planning -
Agenda |
1982-1983 |
38 | 25 | Policy Planning -
Agenda |
1982-1985 |
39 | 1 | Power Purchase and Sale
Contract - Seattle, Tacoma and Columbia Basin |
1979-1981 |
39 | 2 | President Reagan's Budget
Reductions |
1981 |
39 | 3 | Price Waterhouse Audits,
Reports |
1980-1981 |
39 | 4 | Project HIRE |
1981-1983 |
39 | 5 | Property
Management |
1979-1980 |
39 | 6 | Public Utility Regulation
Policy Act (PURPA) - Section 111 - Cost of Service |
1979-1980 |
39 | 7 | Public Utility Regulation
Policy Act (PURPA) - General |
1979-1980 |
39 | 8 | Public Utility Regulation
Policy Act (PURPA) - Hearings |
1979 |
39 | 9 | Public Utility Regulation
Policy Act (PURPA) - Section 111 - Declining Block Rates |
1979-1980 |
39 | 10 | Public Utility Regulation
Policy Act (PURPA) - Section 111 - Interruptible Rates |
1981 |
39 | 11 | Public Utility Regulation
Policy Act (PURPA) - Section 111 |
1980 |
39 | 12 | Public Utility Regulation
Policy Act (PURPA) - Section 111 |
1980-1981 |
39 | 13 | Public Utility Regulation
Policy Act (PURPA) - Section 114 - Life Line Rates |
1980 |
39 | 14 | Public Utility Regulation
Policy Act (PURPA) - Section 210 - Small Power Production Facility |
1980-1981 |
39 | 15 | Public Utility Regulation
Policy Act (PURPA) - Section 210 - Small Power Production Facility |
1981-1983 |
39 | 16 | Rate Increase |
1980 |
39 | 17 | Rate Increase -
1982 |
1980-1982 |
39 | 18 | Rate Increase |
1981-1982 |
39 | 19 | Rate Increase |
1982 |
39 | 20 | Rate Increase - Public
Comments |
1980-1982 |
39 | 21 | Electric Rate -
Ordinance |
1980-1982 |
39 | 22 | Rate Increase - Ordinance -
City Council Review |
1981-1982 |
39 | 23 | Rate Increase - Mayor's
Recommendation to City Council |
1981-1982 |
39 | 24 | Rate Increase - Policy
Issues |
1982 |
39 | 25 | Rate Increase -
Schedule |
1982 |
39 | 26 | Rate Policy
Resolution |
1980-1981 |
39 | 27 | Reorganization Project -
Second Phase |
1979 |
39 | 28 | Revenue
Requirements' |
1982 |
39 | 29 | Seasonal Rates |
undated |
39 | 30 | Seattle's Energy
Policies |
1980 |
39 | 31 | Seattle's Energy
Policies |
1981 |
39 | 32 | Service Voltage
Reduction |
1980 |
39 | 33 | Solar Siting
Survey |
1978-1981 |
39 | 34 | South Columbia Basin -
Federal Energy Regulatory Commission License |
1980 |
40 | 1 | Southwest Suburban Sewer
District |
1981 |
40 | 2 | State Auditor |
1980-1981 |
40 | 3 | State Auditor -
Recommendations |
1981-1982 |
40 | 4 | Superintendent
Recruitment |
1980-1981 |
40 | 5 | Superintendent Staff Meeting
- Agenda and Notes |
1980-1981 |
40 | 6 | Superintendent's and
Directors' Staff Meeting |
1979-1981 |
40 | 7 | Superintendent's and
Directors' Staff Meeting |
1979-1981 |
40 | 8 | Superintendent's Staff
Meeting Minutes |
1982 |
40 | 9 | Technology
Generation |
1979 |
40 | 10 | Technology Generation -
Citizen Letter |
1979 |
40 | 11 | Technology Generation
-Geothermal Report - C. Girard Davidson |
1979 |
40 | 12 | Testing and
Leasing |
1980 |
40 | 13 | Transitional Task
Force |
1980 |
40 | 14 | Women and Minority Business
Enterprise (WMBE) |
1980 |
40 | 15 | Women and Minority Business
Enterprise (WMBE) |
1980 |
Randall Hardy, 1981-1989Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
40 | 16 | Consultant Selection
Committee |
1989 |
40 | 17 | Consulting Service Contracts
- Official Documents |
1989 |
40 | 18 | Customer
Correspondence |
1981-1985 |
40 | 19 | Complaints - Customers,
etc |
1984-1985 |
40 | 20 | Complaints - Customers,
etc |
1984-1985 |
40 | 21 | Meetings |
1985 |
54 | 9 | Fast Facts Sheets (1 of
2) |
circa 1981 |
54 | 10 | Fast Facts Sheets (2 of
2) |
circa 1981 |
Roberta Bradley and Gary Zarker, 1988-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
40 | 22 | Directors' Staff Meetings -
January - June |
1999 |
40 | 23 | Directors' Staff Meetings -
July - December |
1999 |
40 | 24 | Directors' Staff Meetings -
July - December |
2000 |
40 | 25 | Directors' Staff Meetings -
January - June |
2001 |
40 | 26 | Directors' Staff
Meetings |
2002 |
40 | 27 | Directors' Staff
Meetings |
2004 |
41 | 1 | Executive Team Meetings -
January - June |
1999 |
41 | 2 | Executive Team Meetings -
July - December |
1999 |
41 | 3 | Executive Team Meetings -
January - June |
2000 |
41 | 4 | Executive Team Meetings -
July - December |
2000 |
41 | 5 | Executive Team Meetings -
January - June |
2001 |
41 | 6 | Executive Team Meetings -
July - December |
2001 |
41 | 7 | Executive Team
Meetings |
2002 |
41 | 8 | Women and Minority Businesses
(WMBE) |
1993-1996 |
41 | 9 | Outages |
1992-1993 |
41 | 10 | Third and Cedar
Outage |
1993-1994 |
41 | 11 | Executive Team
Meetings |
2003 |
41 | 12 | Executive Team
Meetings |
2004 |
41 | 13 | Executive Team
Retreat |
1995 |
41 | 14 | Executive Team
Retreat |
1993 |
41 | 15 | Executive Team
Retreat |
1994 |
41 | 16 | Executive Team
Retreat |
2004 |
41 | 17 | Executive Team
Retreat |
2004 |
41 | 18 | Executive Team
Workshops |
1999-2000 |
41 | 19 | Mission / Vision
Statements |
1993-1995 |
41 | 20 | Accountability
Agreement |
1995-1996 |
41 | 21 | Accountability
Agreement |
1995-1996 |
41 | 22 | Accountability
Agreement |
1996 |
42 | 1 | Annual Reports |
1993-1997 |
42 | 2 | Awards / Programs |
1992-1997 |
42 | 3 | Diversity |
1993-1996 |
42 | 4 | Guns / Weapons
Brochure |
1993-1994 |
42 | 5 | Nepotism policy |
1992-1997 |
42 | 6 | Night Shift |
1992-1993 |
42 | 7 | Performance
Evaluations |
1992-1998 |
42 | 8 | Retail Wheeling |
1995-1996 |
42 | 9 | All Employee
Memos |
1992 |
42 | 10 | All Employee
Memos |
1993 |
42 | 11 | All Employee
Memos |
1994-1995 |
42 | 12 | All Employee
Memos |
1996-1997 |
42 | 13 | All Employee
Memos |
1998-1999 |
42 | 14 | All Employee
Memos |
2001-2002 |
42 | 15 | Problem Solving |
1993 |
42 | 16 | Layoffs /
Abrogation's |
1991-1997 |
42 | 17 | Memoranda of Agreement
(MOA) |
1996-2003 |
42 | 18 | Productivity Improvement
Program (PIP) |
1995 |
42 | 19 | Blacks in
Government |
1995-1998 |
42 | 20 | Filipino-American City
Employees (FACES) |
1993-1997 |
42 | 21 | Concilio for the Spanish
Speaking - Scholarship Banquet |
1992-1993 |
42 | 22 | Advanced Management Program
(AMP) |
1995 |
42 | 23 | Leading Edge Training
Program |
1994-1995 |
42 | 24 | NOVA Institute |
1994-1996 |
42 | 25 | Committee for Equal Rights at
City Light (CERCL) |
1990-1994 |
42 | 26 | Whistleblower |
1991-1995 |
42 | 27 | Consultant
Contracts |
1993-1998 |
42 | 28 | Management Review |
2002-2003 |
42 | 29 | Employee Forums |
1993-1994 |
42 | 30 | Employee Forums |
1994 |
42 | 31 | Ten Reasons Why Seattle City
Light Must Change - White Paper |
1993 |
42 | 32 | Strategic Corporate
Plan |
1992-1995 |
43 | 1 | Strategic Initiatives
Program |
1994-1995 |
43 | 2 | Strategic
Resources |
2000 |
43 | 3 | Strategic Resources -
Assessment |
2000 |
43 | 4 | Strategic Resources -
Assessment |
2000 |
43 | 5 | Financial - Mid Year Rates
Problem |
2000 |
43 | 6 | Financial - Power
Issues |
2000 |
43 | 7 | Financial -
Reports |
2002 |
43 | 8 | Financial -
Reports |
2003 |
43 | 9 | Disaster Planning |
1991-1995 |
43 | 10 | Auditor |
1993-1996 |
43 | 11 | Citizen's Service
Bureau |
1992-1996 |
43 | 12 | City Council |
1993-1997 |
43 | 13 | City Council -
Building |
1997 |
43 | 14 | City Council - Correspondence
to City Light |
1999-2000 |
43 | 15 | City Council - Correspondence
to City Light |
1995-1996 |
43 | 16 | City Council - Work
Plan |
1993-1994 |
43 | 17 | Utilities and Environmental
Management Committee (UEMC) |
1992-1997 |
43 | 18 | Work Program |
1996 |
43 | 19 | Work Program - Direct
Results |
1996 |
43 | 20 | Department of Construction
and Land Use (DCLU) |
1992-1996 |
43 | 21 | Office of Economic
Development (OED) |
1993-1995 |
43 | 22 | Seattle Engineering
Department (SED) |
1992-1996 |
43 | 23 | Finance
Department |
1993-1996 |
43 | 24 | Finance
Department |
1999-2004 |
43 | 25 | Department of Housing and
Human Services (DHHS) |
1992-1995 |
43 | 26 | Office of Intergovernmental
Relations (OIR) |
1994-1997 |
44 | 1 | Legislation |
1993-1999 |
44 | 2 | Law Department |
1992-1996 |
44 | 3 | Bonneville Power
Administration - Conservation - Will Patton |
1996 |
44 | 4 | Office of Management and
Planning |
1992-1995 |
44 | 5 | Office of Management and
Planning |
1996-1997 |
44 | 6 | Utility
Restructuring |
1996 |
44 | 7 | Executive Work
Program |
1994-1996 |
44 | 8 | Suggestion Award
Program |
1992-1997 |
44 | 9 | METRO Ducts |
1994-1995 |
44 | 10 | Neighborhoods |
1993-1995 |
44 | 11 | Parks and
Recreation |
1993-1996 |
44 | 12 | Personnel
Department |
1995-1997 |
44 | 13 | Labor Negotiations and
Contracts |
1992-1997 |
44 | 14 | Gainsharing |
1992-1994 |
44 | 15 | Sick Leave -
Averages |
1995-1997 |
44 | 16 | Executive, Merit Leave-
Accomplishments |
1994-1995 |
44 | 17 | police department |
1994-1995 |
44 | 18 | Seattle Water
Department |
1993-1997 |
44 | 19 | Mayor's Office |
1993-1994 |
44 | 20 | Mayor's Office |
1995-1996 |
44 | 21 | Mayor's Office -
Transition |
1997 |
44 | 22 | Mayor's Office |
1997-1999 |
44 | 23 | Mayor's Office |
1998 |
44 | 24 | Mayor's Office |
2000-2002 |
44 | 25 | Briefing Materials for
Mayor |
1998-2001 |
44 | 26 | Performance
Measures |
1998 |
44 | 27 | Mayor's City Light Review
Committee - October 2002 |
2002 |
44 | 28 | Mayor's City Light Review
Committee - October 2002 |
2002 |
44 | 29 | Mayor's City Light Review
Committee - October 2002 |
2002 |
44 | 30 | Mayor's City Light Review
Committee - October 2002 |
2002 |
44 | 31 | Mayor's City Light Review
Committee - October 2002 |
2002 |
44 | 32 | Mayor's Cabinet |
2003-2004 |
44 | 33 | Mayor's Cabinet |
2003 |
44 | 34 | Mayor's Weekly
Reports |
1995 |
44 | 35 | Mayor's Weekly
Reports |
1996 |
45 | 1 | Mayor's Weekly
Reports |
1997 |
45 | 2 | Mayor's Weekly
Reports |
1998 |
45 | 3 | Mayor's Weekly
Reports |
1999 |
45 | 4 | Mayor's Weekly
Reports |
2000 |
45 | 5 | Mayor's Weekly
Reports |
2001 |
45 | 6 | Mayor's Weekly
Reports |
2002 |
45 | 7 | Mayor's Briefing
Book |
2001-2006 |
45 | 8 | Mayor -
Correspondence |
1996 |
45 | 9 | Mayor -
Correspondence |
1993-1994 |
45 | 10 | Mayor -
Correspondence |
1994 |
45 | 11 | Mayor -
Correspondence |
1995-1996 |
45 | 12 | Mayor -
Correspondence |
1999-2000 |
45 | 13 | Mayor - Memos To |
2002-2003 |
45 | 14 | Mayor's Accountability
Report |
2002-2003 |
45 | 15 | Special Events |
1997 |
45 | 16 | Arts Commission |
1997 |
45 | 17 | APEX (Accountability Pay for
Executives) |
1997 |
45 | 18 | Legislature - Washington
State |
1997 |
45 | 19 | Legislature - United States -
Congress |
1997 |
45 | 20 | Legislature - Washington
State - restructuring Electric Power Industry |
1997 |
45 | 21 | Broadmoor Homeowner's
Association |
1992-1994 |
45 | 22 | Regional Transit Authority
(RTA) |
1997 |
45 | 23 | Northwestern
Industries |
1997 |
45 | 24 | Bonneville Power
Administration (BPA) |
1993-1995 |
45 | 25 | Bonneville Power
Administration (BPA) - Restructuring |
1995 |
46 | 1 | Bonneville Power
Administration (BPA) |
1996 |
46 | 2 | Bonneville Power
Administration (BPA) - Settlement Group |
1998 |
46 | 3 | Bonneville Power
Administration (BPA) - Reinvention |
1986 |
46 | 4 | Bonneville Power
Administration (BPA) - Reinvention |
1994-1995 |
46 | 5 | Electric Power research
institute (EPRI) |
1992-1996 |
46 | 6 | Industry
Restructuring |
1997 |
46 | 7 | Seattle Steam
Company |
1992-1993 |
46 | 8 | The Study Group - Rate
Increase |
1992-1995 |
46 | 9 | Northwest Chapter of National
Utility Restructuring Legislation |
1998 |
46 | 10 | Third AC Intertie to
California Project |
1993-1994 |
46 | 11 | Third AC Intertie to
California Project - North - South |
1992-1993 |
46 | 12 | Treemendous
Seattle |
1992-1994 |
46 | 13 | Washington Public Power
Supply System |
1992-1998 |
46 | 14 | Franchise Areas |
1996 |
46 | 15 | Power Summit |
1998 |
46 | 16 | Washington Natural Gas, Puget
Power Merger |
1995-1996 |
46 | 17 | Chamber of
Commerce |
1998 |
46 | 18 | Finance and
Administration |
1993-1998 |
46 | 19 | Finance and
Administration |
2000-2002 |
46 | 20 | Risk Management |
2000-2003 |
46 | 21 | Risk Management |
2004 |
46 | 22 | Risk Management - Council
Review |
2002-2003 |
46 | 23 | R.W. Beck
Recommendations |
1994-1995 |
46 | 24 | Capital Improvement
Project |
2000 |
47 | 1 | Budget Reduction |
1995-1996 |
47 | 2 | Budget Reduction |
2002 |
47 | 3 | Budget - Income
Forecast |
1999 |
47 | 4 | Rates - Surcharge |
1992-1994 |
47 | 5 | Rates - Proposal |
1995-1996 |
47 | 6 | Rates - Papers |
1988 |
47 | 7 | Rates |
1999 |
47 | 8 | Rates - Surcharge |
2001 |
47 | 9 | Rates - Increases |
2000-2002 |
47 | 10 | Rates - Rates Advisory
Committee (RAC) |
1997 |
47 | 11 | Rates - Rates Advisory
Committee (RAC) |
1999 |
47 | 12 | Rates - Rates Advisory
Committee (RAC) |
2003-2004 |
47 | 13 | Rates - Schedule
44 |
1996 |
47 | 14 | Rates - Networks |
1999 |
47 | 15 | Rates -
Comparisons |
1997-1999 |
47 | 16 | Facilities
Management |
1993-1998 |
47 | 17 | Facilities
Management |
2005 |
47 | 18 | Y2K - Readiness
Program |
1999 |
47 | 19 | Suburban Cities |
1998 |
47 | 20 | Wholesale - Branch
47 |
1993-1998 |
47 | 21 | Klamath Falls Combustion
Turbine |
2000 |
47 | 22 | Nordstrom - California Direct
Access |
1999 |
47 | 23 | Nordstrom - California Direct
Access |
2000 |
48 | 1 | Power Marketing |
1996-1998 |
48 | 2 | Electrical
Services |
1992-1996 |
48 | 3 | Distribution
Branch |
1996-1998 |
48 | 4 | Distribution
Branch |
2002 |
48 | 5 | Customer Services
Branch |
1995 |
48 | 6 | Customer Services
Branch |
1995-1998 |
48 | 7 | Appliance Repair |
1992-1996 |
48 | 8 | Business Plan |
1995-1996 |
48 | 9 | Account
Executives |
1997-2000 |
48 | 10 | Boeing |
1998 |
48 | 11 | Boeing |
2000 |
48 | 12 | Martin Selig |
2003 |
48 | 13 | Conservation
Reassessment |
1995 |
48 | 14 | Conservation
Acceleration |
2000-2002 |
48 | 15 | Light Power and
Pride |
2000-2002 |
48 | 16 | Customer Organization - Unit
Information |
1998 |
48 | 17 | Engineering
Services |
1994-1995 |
48 | 18 | R. W. Beck Study |
1996-1997 |
48 | 19 | Boundary Project |
1996-1998 |
48 | 20 | Boundary Project |
1999 |
48 | 21 | Labor Relations |
1992-1998 |
48 | 22 | Veterans |
1992-1998 |
48 | 23 | Labor Management Leadership
Committee |
2003 |
48 | 24 | Accountability for Executives
Program (APEX) |
1997-1998 |
48 | 25 | Environment and
Safety |
1992-1998 |
48 | 26 | Safety and Industrial
Injury |
1997 |
48 | 27 | Electric and Magnetic
Fields |
1992-1995 |
48 | 28 | Superintendent's
Office |
1992-1994 |
49 | 1 | Superintendent's
Office |
1995-1998 |
49 | 2 | Superintendent's
Accountability |
1997-1998 |
49 | 3 | Superintendent
Reconfirmation |
2003 |
49 | 4 | Chamber of Commerce
Contracts |
1984-1996 |
49 | 5 | Inner - City Trip |
1997 |
49 | 6 | Glynda Becker Letter,
Congressional Correspondence |
1997 |
49 | 7 | State Legislature |
1996-1997 |
49 | 8 | Strategic
Planning |
1997 |
49 | 9 | Strategic Systems
Plan |
1995-1996 |
49 | 10 | Strategic Plan
Briefing |
1997 |
49 | 11 | Communication and Public
Affairs Division |
2003 |
49 | 12 | Public Engagement |
1997-1998 |
49 | 13 | Public Purposes |
2000 |
49 | 14 | Analysis of Option for
Rightsizing Areas |
1993 |
49 | 15 | City Light Owned
Art |
1995 |
49 | 16 | Art Reps - Art Selection
Committee |
1995 |
49 | 17 | City Light Audit |
2002 |
49 | 18 | City Light Audit |
2002 |
49 | 19 | Audit Work
Program |
2002-2003 |
49 | 20 | Blue Ribbon Panel - Mayor's
City Light Review Committee |
2002-2003 |
49 | 21 | Boise - Kuna Irrigation
District Review Refunding |
2002-2003 |
49 | 22 | Bond Issue |
2003 |
49 | 23 | Bonneville Power
Administration Future Role |
2002 |
49 | 24 | Bonneville Power
Administration Rate Increases |
2003 |
49 | 25 | Consolidated Customer Service
System (CCSS) |
2001-2002 |
50 | 1 | City Council -
Briefing |
2003 |
50 | 2 | City Council - Energy and
Environmental Policy Committee, Memos To |
2002 |
50 | 3 | City Council - Energy and
Environmental Policy Committee, Memos To |
2003 |
50 | 4 | City Light Black Employees
Association |
2002-2004 |
50 | 5 | City Light Council Audit,
Utility Comments |
2002 |
50 | 6 | City Light's Future - Meeting
with Mayor |
1997 |
50 | 7 | Communications
Plan |
2002 |
50 | 8 | Cost Comparisons |
2003 |
50 | 9 | Directors
Workshop |
1996-1997 |
50 | 10 | Distribution
Planning |
2001 |
50 | 11 | Endangered Species Act
Notebook - Zarker |
1999-2000 |
50 | 12 | Energy Code |
2001 |
50 | 13 | Energy Crisis
Handling |
2000-2002 |
50 | 14 | Energy Management Services
Directors Report |
2003 |
50 | 15 | Enron Bankruptcy |
2001 |
50 | 16 | Federal Energy
Policy |
2001-2003 |
50 | 17 | Finance and Administration
Housekeeping Branch |
2002-2004 |
50 | 18 | Financial Interest
Statement |
1996-1997 |
50 | 19 | Financial Policies
Review |
2001 |
50 | 20 | Goals Actions Results
Measures (GARMs) |
1999 |
50 | 21 | Governance and Public
Utilities |
2001-2002 |
50 | 22 | Governance Review |
2002 |
50 | 23 | Governance Review |
2002 |
50 | 24 | In Kind Services |
1994-1995 |
50 | 25 | Issue Papers |
1996 |
50 | 26 | Issue Papers |
1996-2001 |
51 | 1 | Low Income |
2001 |
51 | 2 | Leadership Forum |
2002-2004 |
51 | 3 | Low Income Task Force -
Customer Accounts |
1992 |
51 | 4 | Low Income Task Force -
Customer Accounts |
1993 |
51 | 5 | Lower Duwamish Early Action
Clean-Up (EAC) |
2003 |
51 | 6 | Managing for
Results |
2000 |
51 | 7 | Managing Risk |
2003 |
51 | 8 | Membership |
1998-2002 |
51 | 9 | Meter Reading |
1995 |
51 | 10 | Metrics - City
Council |
2002 |
51 | 11 | Metrics - Managing for
Results (MFRS) |
2002 |
51 | 12 | Municipal League Review of
SCL |
2002 |
51 | 13 | New Large Loads |
2000 |
51 | 14 | Northwest Power
Works |
2002 |
51 | 15 | Jane Noland |
1994-1995 |
51 | 16 | North Cascades Environmental
Learning Center |
1999-2005 |
51 | 17 | Payments to Cities, Towns and
School Districts |
1995 |
51 | 18 | Pend Oreille Boundary
project |
1999-2000 |
51 | 19 | Performance Measures
Accountability Agreement |
2002-2003 |
51 | 20 | Power Crisis - Lessons
Learned - Municipal league |
2002-2003 |
51 | 21 | Power Crisis - Lessons
Learned - Municipal league |
2002-2003 |
51 | 22 | Power Management - Annual
Review |
1999 |
51 | 23 | Power Management - Cost
Report |
1995 |
51 | 24 | Power Management - Operating
Plan Reports |
2000-2001 |
51 | 25 | Power Management - Operating
Plan Reports |
2001 |
51 | 26 | Power Management - Operating
Plan |
2001 |
51 | 27 | Power Marketing - Briefing
for Mayor |
1997 |
52 | 1 | Priest Rapids Power
Contract |
2001-2002 |
52 | 2 | Priest Rapids Power
Contract |
2001 |
52 | 3 | Regional Transmission
Organization (RTO) |
2000-2003 |
52 | 4 | Regional Transmission
Organization (RTO) - West Filings |
2000-2001 |
52 | 5 | Restructuring Electric
Utility Industry Meetings |
1997 |
52 | 6 | Jim Ritch |
1998 |
52 | 7 | Sabey Corp, |
2001 |
52 | 8 | Safety Review |
2002 |
52 | 9 | Skagit - Diablo
Housing |
1998 |
52 | 10 | Skagit Tour |
1999 |
52 | 11 | Sound Transit |
2000 |
52 | 12 | South Fork Tolt River
Compliance Report |
1997-1998 |
52 | 13 | State of the
Utility |
2000 |
52 | 14 | Strategic Resource
Plan |
2002 |
52 | 15 | Marc Sullivan |
1998 |
52 | 16 | Temporary
Generation |
2001 |
52 | 17 | Transmission - West of
Hatwai |
2001 |
52 | 18 | Utility
Benchmarks |
1994-1998 |
52 | 19 | Utility Cluster |
1998 |
52 | 20 | Utility - Miscellaneous
Data |
1995-2001 |
52 | 21 | Western
Interconnection |
2000 |
52 | 22 | Work Plan
Highlights |
2000-2002 |
52 | 23 | Work Plan Previous
Years |
1998-1999 |
52 | 24 | Work Plan |
1999-2000 |
52 | 25 | Work Plan
Tracking |
2002 |
53 | 1 | Accountability - Finance and
Administration Branch |
1995 |
53 | 2 | Accountability - Finance and
Administration Branch |
1996 |
53 | 3 | Accountability - Finance and
Administration Branch |
1997 |
53 | 4 | Accountability - Finance and
Administration Branch |
1998 |
53 | 5 | Accountability - Finance and
Administration Branch |
1998-1999 |
53 | 6 | 1% For Art
Ordinance |
1973-1995 |
53 | 7 | Art - Memorandums of
Understanding |
1994-2004 |
53 | 8 | Employee Store
Report |
1999 |
53 | 9 | Information Technology Div.
Performance Data |
1997 |
53 | 10 | Organizational
Charts |
1994-2003 |
53 | 11 | Organizational Charts - Span
of Control |
1995-1997 |
54 | 1 | Organizational
Structure |
1995 |
54 | 2 | Policies |
1995-2002 |
54 | 3 | Policies |
1995-2003 |
54 | 4 | Workplace
Expectations |
1985-1997 |
54 | 6 | Solving the Mysteries of
Managing (1 of 2) |
1995-1996 |
54 | 7 | Solving the Mysteries of
Managing (2 of 2) |
1995-1996 |
54 | 8 | Bingaman Electric
Restructuring |
2001 |
55 | 1 | RTO West |
2001 |
55 | 2 | BPA Kitchen
Cabinet |
2002 |
55 | 3 | BPA Hearing |
2002 |
55 | 4 | BPA Contract |
2000 |
55 | 5 | BPA Curtailment |
2001-2003 |
55 | 6 | BPA Slice |
1999-2000 |
55 | 7 | BPA Rates |
2001 |
55 | 8 | BPA Rates |
2001-2003 |
55 | 9 | Gary Zarker Biographical and
Confirmation |
1993-2003 |
Jorge Carrasco, 1994-2015Return to Top
Electronic correspondence is available for use onsite through ePADD software in the SMA reading room.
Container(s) | Description | Dates | |
---|---|---|---|
Box | Folder | ||
52 | 26 | Apprenticeship
Program |
2004-2006 |
52 | 27 | Calendar - Superintendent
Jorge Carrasco |
2004 |
52 | 28 | City Light Organization
Charts |
2004 |
52 | 29 | Superintendent's
Correspondence |
2004 |
54 | 5 | Power Function Review for FY
2007-09 Rate Period |
2005 |
55 | 10 | Speeches |
2005-2006 |
55 | 11 | Speaking Points |
2011 |
56 | 1 | Speaking Points |
2006 |
56 | 2 | Speaking Points |
2007 |
56 | 3 | Speaking Points |
2007 |
56 | 4 | Speaking Points |
2008 |
56 | 5 | Speaking Points |
2009 |
56 | 6 | Speaking Points |
2010 |
56 | 7 | Speaking Points |
2011 |
56 | 8 | Proclamation |
2008 |
56 | 9 | Officer Workshop |
2011 |
56 | 10 | Leadership Forums |
2006-2011 |
57 | 1 | Officers Meetings |
2005-2006 |
57 | 2 | Executive Team
Meetings |
2007 |
57 | 3 | Executive Team
Meetings |
2007 |
57 | 4 | Executive Team
Meetings |
2008 |
57 | 5 | Executive Team
Meetings |
2008 |
57 | 6 | Executive Team
Meetings |
2008 |
58 | 1 | Executive Team
Meetings |
2009 |
58 | 2 | Executive Team
Meetings |
2010 |
58 | 3 | Executive Team
Meetings |
2010 |
58 | 4 | Executive Team
Meetings |
2011 |
58 | 5 | Executive Team
Meetings |
2011 |
58 | 6 | Executive Team
Meetings |
2013 |
58 | 7 | Executive Team
Meetings |
2013 |
59 | 1 | Executive Team
Meetings |
2014 |
59 | 2 | Executive Team
Meetings |
2014 |
59 | 3 | Executive Team
Meetings |
2015 |
59 | 4 | Executive Team
Meetings |
2015 |
59 | 5 | Directors
Meetings |
2005 |
59 | 6 | Directors
Meetings |
2006 |
59 | 7 | Leadership Team
Meetings |
2007-2008 |
59 | 8 | Cabinet Meetings |
2010 |
59 | 9 | Cabinet Meetings |
2011 |
60 | 1 | Jorge Carrasco
Confirmation |
2003 |
60 | 2 | Jorge Carrasco
Reconfirmation |
2012 |
60 | 3 | Jorge Carrasco
Reconfirmation |
2008 |
60 | 4 | Accountability
Agreement |
2004-2009 |
60 | 5 | Carrasco Self
Assessment |
2006-2009 |
60 | 6 | Mayor |
2006 |
60 | 7 | Mayor Meetings |
2009-2011 |
60 | 8 | Ethan Raup
Meetings |
2010 |
60 | 9 | Jean Godden
Meetings |
2004-2005 |
60 | 10 | Bruce Harrell
Communication |
2008-2011 |
60 | 11 | Strategic
Planning |
2004-2005 |
60 | 12 | Strategic Plan |
2008-2012 |
60 | 13 | Strategic Plan Committee
Special Meeting |
2012 |
61 | 1 | Budget |
2008 |
61 | 2 | Budget Review
Material |
2009 |
61 | 3 | Retreat - Executive
Team |
2004 |
61 | 4 | Executive Retreat |
2006 |
61 | 5 | Executive Retreat |
2007 |
61 | 6 | Retreat |
2009 |
61 | 7 | Executive Retreat |
2010 |
61 | 8 | Retreat |
2011 |
61 | 9 | Cabinet Retreat |
2011 |
61 | 10 | Retreat |
2012 |
61 | 11 | Retreat |
2013 |
61 | 12 | Organizational
Transformation |
2004-2005 |
61 | 13 | Transformation and Continuous
Improvement |
2006 |
61 | 14 | Continunity of Operations
Plan |
2008 |
61 | 15 | Hurricane Sandy |
2012-2013 |
61 | 16 | Executive Orientation
Materials (1 of 3) |
2005 |
61 | 17 | Executive Orientation
Materials (2 of 3) |
2005 |
61 | 18 | Executive Orientation
Materials (3 of 3) |
2005 |
61 | 19 | Alliance of State
Leaders |
2004-2005 |
62 | 1 | Employee Survey |
2007-2008 |
62 | 2 | Employee Survey |
2007-2008 |
62 | 3 | Employee Survey |
2007 |
62 | 4 | Employee Survey |
2007 |
62 | 5 | Employee Survey |
2007 |
62 | 6 | Employee Survey |
2007 |
62 | 7 | Employee Survey |
2007 |
62 | 8 | Senator Patty
Murray |
2005-2011 |
62 | 9 | Jay Inslee |
2005 |
62 | 10 | Mark Sidran |
2005 |
62 | 11 | City Hall Energy
Use |
2005 |
62 | 12 | Pole Attachments |
2005 |
63 | 1 | Span of Control |
2009 |
63 | 2 | Executive
Compensation |
2005 |
63 | 3 | Executive
Compensation |
2005 |
63 | 4 | Superintendents Office
Workforce Planning |
circa 2005 |
63 | 5 | Grid West |
2004 |
63 | 6 | Grid West / RTO |
2004-2005 |
63 | 7 | Grid West / TIG |
2005 |
63 | 8 | Grid West / TIG |
2005 |
64 | 1 | T&D Capacity
Plan |
2003-2005 |
64 | 2 | Enron Settlement |
2006-2007 |
64 | 3 | Stateline
Transmission |
2004 |
64 | 4 | Residential
Exchange |
2006-2010 |
64 | 5 | Residential
Exchange |
2007 |
64 | 6 | Residential
Exchange |
2006-2008 |
64 | 7 | Residential
Exchange |
2009 |
64 | 8 | BPA Customer
Collaborative |
2005-2006 |
64 | 9 | BPA Customer
Collaborative |
2006-2008 |
65 | 1 | Total Retail Load |
2007 |
65 | 2 | BPA Pass Through |
2005 |
65 | 3 | Rate Design |
2007 |
65 | 4 | 9th Circuit Court of
Appeals |
ca. 2007 |
65 | 5 | Flexible Rate
Program |
2006 |
65 | 6 | BPA Market
Pricing |
2005 |
65 | 7 | BPA Prepay |
2012 |
65 | 8 | BPA Energy
Efficiency |
2010 |
65 | 9 | Conservation
Funding |
2007 |
65 | 10 | BPA Rate Case |
1996-2008 |
65 | 11 | BPA Power Function
Review |
2005-2007 |
65 | 12 | BPA Regional
Dialogue |
2004-2007 |
65 | 13 | BPA Regional
Dialogue |
2005-2006 |
65 | 14 | BPA Regional
Dialogue |
2005-2006 |
65 | 15 | BPA Regional
Dialogue |
2006-2008 |
66 | 1 | BPA General
Information |
2004-2011 |
66 | 2 | BPA |
2004-2006 |
66 | 3 | BPA Debt
Optimization |
2002-2005 |
66 | 4 | BPA Debt
Optimization |
2002-2004 |
66 | 5 | BPA Congestion
Management |
2006 |
66 | 6 | BPA 2007-2011 Proposed Policy
for Power Supply |
2004-2008 |
66 | 7 | BPA Slice |
2004-2008 |
66 | 8 | BPA Slice |
2004-2005 |
66 | 9 | Slice Survey |
2006 |
66 | 10 | Slice Review |
2005 |
66 | 11 | Block vs Slice |
2008 |
67 | 1 | BPA Slice Mediation
1 |
2005 |
67 | 2 | BPA Slice Mediation
2 |
2005 |
67 | 3 | BPA Slice Mediation
3 |
2005-2006 |
67 | 4 | BPA Slice Mediation
4 |
2005-2006 |
67 | 5 | BPA Slice Mediation (1 of
2) |
2006 |
67 | 6 | BPA Slice Mediation 5 (2 of
2) |
2006-2007 |
67 | 7 | BPA Slice Mediation
|
2003-2005 |
67 | 8 | BPA Mediation
Representation |
2010 |
68 | 1 | Labor &
Industries |
2011 |
68 | 2 | Labor Management Leadership
Committee |
2004 |
68 | 3 | Labor Management Leadership
Committee |
2005-2006 |
68 | 4 | Labor Relations Policy
Committee |
2012 |
68 | 5 | Lake Forest Park |
1998-2006 |
68 | 6 | Latino City
Employees |
2008 |
68 | 7 | Law |
2009-2013 |
68 | 8 | Leadership
Development |
2004-2008 |
68 | 9 | LED Consortium |
2010 |
68 | 10 | Legislation
Updates |
1996-2009 |
68 | 11 | LGBT |
2010 |
68 | 12 | Lifecycle Asset
Management |
2011 |
68 | 13 | Light Power and
Pride |
2004-2008 |
68 | 14 | Loads and
Resources |
2008 |
68 | 15 | Locational Marginal
Pricing |
2007 |
68 | 16 | Lora Lake
Apartments |
2007 |
68 | 17 | Low Income |
2011 |
68 | 18 | Lower Duwamish |
2012 |
68 | 19 | Lucky Peak Power Plant
Project |
2004-2006 |
68 | 20 | MJ Bradley |
2010 |
68 | 21 | Major Projects |
2005-2006 |
68 | 22 | Manager Exemption
Proposal |
2006 |
68 | 23 | Manufacturing Industrial
Council |
2008 |
68 | 24 | Maximo |
2005 |
68 | 25 | Mayor's Emergency Executive
Board |
2008-2015 |
68 | 26 | Mayor's IT
Subcabinet |
2014-2015 |
68 | 27 | Mayor's Office
Communications |
2008 |
69 | 1 | Mayor Performance
Expectations |
2011-2012 |
69 | 2 | Mayor's Cabinet |
2004 |
69 | 3 | Mayor's Retreat |
2006 |
69 | 4 | Mayor's Retreat |
2008 |
69 | 5 | Measurement and
Verification |
2009 |
69 | 6 | Media Meetings |
2006 |
69 | 7 | Membership
Recommendations |
2005-2008 |
69 | 8 | Memos Council |
2013 |
69 | 9 | Mercer Corridor |
2009-2010 |
69 | 10 | Merchants Cafe |
2006 |
69 | 11 | Mitigation Plans |
2007-2008 |
69 | 12 | MLK
Undergrounding |
2007 |
69 | 13 | Market Redesign and
Technology Upgrade (MRTU) |
2006 |
69 | 14 | Memoranda of
Understanding |
2002-2008 |
69 | 15 | Memoranda of
Understanding |
2007 |
69 | 16 | Metrics Reports |
2005-2007 |
69 | 17 | Monorail |
2004-2005 |
69 | 18 | Motor Pool |
2009 |
69 | 19 | National Incident Management
System (NIMS) |
2005-2006 |
69 | 20 | National Urban
Fellows |
2005-2011 |
69 | 21 | NERC Compliance |
2004-2010 |
70 | 1 | NERC Cyber Summit |
2008 |
70 | 2 | NERC Readiness
Audit |
2005-2008 |
70 | 3 | NERC Reliability |
2007-2010 |
70 | 4 | NERC/WECC |
2002-2010 |
70 | 5 | Networks |
2008 |
70 | 6 | Newhalem |
2011 |
70 | 7 | North Cascade |
2007 |
70 | 8 | North Downtown Load Network
Project |
2006-2011 |
70 | 9 | Northwest Balancing
Authority |
2011 |
70 | 10 | Northwest Energy Efficiency
Alliance |
2004-2009 |
70 | 11 | Northwest Power and
Conservation Council |
2005 |
70 | 12 | Northwest Power
Pool |
2012-2013 |
70 | 13 | Northwest Public Power
Association |
2005-2009 |
70 | 14 | Northwest Regional
Forecast |
2006 |
70 | 15 | Northwest Utility
Organizations |
2007 |
70 | 16 | Northwest Wind
Integration |
2007 |
70 | 17 | Birmingham Steel |
1994-2002 |
70 | 18 | Birmingham Steel |
1996-2001 |
71 | 1 | Nucor Steel |
2004-2010 |
71 | 2 | Nucor Steel
Reports |
2005 |
71 | 3 | Nucor Steel
Reports |
2006 |
71 | 4 | One Stop Permit |
2007-2008 |
71 | 5 | Open Access Transmission
Tariff |
2008 |
71 | 6 | Operating Plans |
2006-2007 |
71 | 7 | Operation Reports |
2005 |
71 | 8 | Opower |
2012 |
71 | 9 | Oregon Tax Suit |
2004-2005 |
71 | 10 | Order 693 |
2007 |
71 | 11 | Order 890 |
2007 |
71 | 12 | Order 890 |
2007 |
72 | 1 | Outage Management |
2008-2009 |
72 | 2 | Oversight
Committees |
2010 |
72 | 3 | Oversight
Committees |
2010-2011 |
72 | 4 | Oversight
Committees |
2010 |
72 | 5 | Oversupply |
2012 |
72 | 6 | Pace - Energy Risk
Management |
2004 |
72 | 7 | Pacificorp |
2007 |
72 | 8 | Pay for
Performance |
2006-2007 |
72 | 9 | Pandemic
Influenza |
2005-2006 |
72 | 10 | Public Generating Pool
(PGP) |
2005 |
72 | 11 | Public Generating Pool
(PGP) |
2004-2009 |
72 | 12 | Pend Oreille
County |
2009-2011 |
72 | 13 | Performance Audit |
2008-2010 |
72 | 14 | Performance Incentive
Plan |
2008 |
72 | 15 | Performance
Management |
2007 |
73 | 1 | Performance
Metrics |
2007-2008 |
73 | 2 | Performance Audit - Port of
Seattle |
2007 |
73 | 3 | Permit Process
Improvement |
2008 |
73 | 4 | Personnel Issues |
2012 |
73 | 5 | Pioneer Square |
2011 |
73 | 6 | Plug In Hybrids |
2005-2007 |
73 | 7 | Pole Asset
Inventory |
no date |
73 | 8 | Pole Collapse |
2005 |
73 | 9 | Policies and
Procedures |
2007 |
73 | 10 | Portfolio
Optimization |
2005 |
73 | 11 | Positive Energy |
2009 |
73 | 12 | Power Marketer Incentive
Compensation Program |
2006 |
73 | 13 | Power
Sources/Uses |
2004 |
73 | 14 | Program Performance
Budgeting |
2006 |
73 | 15 | Powerline
Clearance |
2007 |
73 | 16 | Powerex |
2004-2005 |
73 | 17 | Pre-Pay Metering |
2006 |
73 | 18 | Programmatic
Budgeting |
2010-2011 |
73 | 19 | Progress Reports |
2008 |
73 | 20 | Project Share |
2008-2011 |
73 | 21 | Property Acquisition - North
Service Center |
circa 2010 |
73 | 22 | Puget Sound Curtailment
(PSANI) |
2004-2011 |
73 | 23 | Puget Sound Curtailment
(PSANI) |
2010-2011 |
73 | 24 | Puget Sound
Steelhead |
2007 |
73 | 25 | Race and Social Justice
Initiative |
2005-2009 |
73 | 26 | Race and Social Justice
Initiative |
2004-2005 |
73 | 27 | Radio 800 MHZ |
2009 |
73 | 28 | Rates Advisory
Committee |
2009 |
74 | 1 | 2005 Rate Review
Process |
2005 |
74 | 2 | Rate Review |
2006 |
74 | 3 | Rate Review |
2006 |
74 | 4 | Rate Review |
2008-2009 |
74 | 5 | Rates |
2004-2006 |
74 | 6 | Rates |
2006 |
74 | 7 | Rate Stabilization
Act |
2011 |
74 | 8 | Regional Issues |
2012-2013 |
74 | 9 | Regional Leadership
Conference |
2007-2009 |
74 | 10 | Regulatory
Compliance |
2007 |
74 | 11 | Renewable Energy |
2007-2010 |
75 | 1 | Renewable Portfolio Standard
(RPS) |
2006 |
75 | 2 | Revenue and
Expenses |
2007-2008 |
75 | 3 | Risk Management |
2002-2004 |
75 | 4 | Risk Management |
2004-2005 |
75 | 5 | Risk Management |
2006-2007 |
75 | 6 | Risk Management |
2008-2009 |
75 | 7 | Risk Metric |
2007 |
75 | 8 | Risk Policy |
2004-2007 |
75 | 9 | 157 Roy Street |
2007 |
75 | 10 | Sabey Corporation |
2006-2010 |
75 | 11 | Safety |
2004-2008 |
75 | 12 | Safety Culture |
2007-2009 |
75 | 13 | System Average Interruption
Duration Index (SAIDI) |
2006 |
75 | 14 | Salary Studies |
2008 |
75 | 15 | Seattle Clean
Energy |
2011 |
75 | 16 | Seattle Jobs Plan |
2010 |
75 | 17 | Seattle Seahawks |
2004 |
76 | 1 | Seattle Municipal Tower
Signage |
2003-2005 |
76 | 2 | Seattle Steam |
2010 |
76 | 3 | Seattle Times |
2011-2013 |
76 | 4 | Security |
2004-2010 |
76 | 5 | Self Build |
2008-2009 |
76 | 6 | Shell Trading |
2006 |
76 | 7 | Shoreline |
1998-2011 |
76 | 8 | Shoreline Business
Owner |
2004-2005 |
76 | 9 | Shore Power
Background |
2005-2006 |
76 | 10 | Sidewalk Policy |
2008 |
76 | 11 | Skagit |
2007-2011 |
76 | 12 | Skagit Audit
Reports |
2006 |
76 | 13 | Skagit Volunteer
Firefighters |
2004-2005 |
76 | 14 | Five Year Skilled Worker
Strategy |
circa 2012 |
76 | 15 | Slip 4 Duwamish |
2005 |
76 | 16 | Smart Grid |
2008-2010 |
76 | 17 | SMUD Exchange |
2009 |
76 | 18 | Solar Demonstration
Project |
2004-2010 |
76 | 19 | Soundshake |
2005-2008 |
76 | 20 | Sound Transit
Construction |
2005 |
77 | 1 | Sound Transit |
2004-2005 |
77 | 2 | South Lake Union |
2004-2010 |
77 | 3 | South Lake Union |
2004 |
77 | 4 | South Lake Union
Network |
2006-2011 |
77 | 5 | South Lake Union
Streetcar |
2005 |
77 | 6 | South Lake Union
Substation |
2005-2006 |
77 | 7 | South Park Drainage
Improvements |
2007 |
77 | 8 | South Seattle Community
College |
2008-2009 |
77 | 9 | South Service
Center |
2007 |
77 | 10 | Space Planning |
2005 |
77 | 11 | Standard &
Poors |
2006 |
77 | 12 | State Legislative |
2007 |
77 | 13 | Stateline
Transmission |
2004 |
77 | 14 | Stateline Wind
Project |
2004-2010 |
77 | 15 | Continuity of Operations
Plan |
2008 |
77 | 16 | Storm Response |
2008-2012 |
77 | 17 | Strategic Framework Steering
Committee |
2004 |
77 | 18 | Strategic
Partnership |
2006-2007 |
77 | 19 | The Energy
Authority |
2007 |
78 | 1 | Strategic
Planning |
2006-2007 |
78 | 2 | Strategic Plan |
2007 |
78 | 3 | Strategic
Planning |
2008-2010 |
78 | 4 | Strategic Plan Outreach
Material |
2012 |
78 | 5 | Streetcar Project
Costs |
2007 |
78 | 6 | Streetlight
Program |
2009-2010 |
78 | 7 | Streetlight
Incidents |
2008-2011 |
78 | 8 | Substation
Automation |
2010 |
78 | 9 | Superfund |
2007 |
78 | 10 | Surplus
Properties |
2009-2010 |
78 | 11 | Swinomish Indian Tribal
Commission |
2010 |
78 | 12 | Time Capsule - City
Hall |
2005 |
78 | 13 | Training Needs
Assessment |
2008 |
78 | 14 | Transformation |
2004-2007 |
78 | 15 | Transformation
Initiative |
2006 |
79 | 1 | Transformation Steering
Committee |
2005 |
79 | 2 | Transformation Steering
Committee |
2006 |
79 | 3 | City of Tukwila |
2008 |
79 | 4 | Tunnel - Viaduct |
2005-2015 |
79 | 5 | UMS Group |
2010-2011 |
79 | 6 | Undergrounding |
2001-2012 |
79 | 7 | Undergrounding |
2009 |
79 | 8 | Union Substation |
2008 |
79 | 9 | UN Urban Environmental
Accords |
2005 |
79 | 10 | Upper Skagit Indian
Tribe |
2010 |
79 | 11 | Utility Discount
Program |
2015 |
79 | 12 | Utility Staff
Housing |
2007 |
80 | 1 | UW Transmission
Line |
2005-2007 |
80 | 2 | Vault Fires |
2009 |
80 | 3 | Vegetable Oil
Dielectric |
2007 |
80 | 4 | Vegetation
Management |
2006 |
80 | 5 | V2G - Vehicle to
Grid |
2005-2006 |
80 | 6 | Virchow Krause &
Co. |
2008-2009 |
80 | 7 | Vision, Mission,
Values |
2005-2006 |
80 | 8 | Vista Decision SUpport
Software |
2006 |
80 | 9 | Voluntary Protection
Program |
2005 |
80 | 10 | Volunteer Program |
circa 2009 |
80 | 11 | Volunteer Status of Off-Duty
Activities |
2008 |
80 | 12 | Wind Integration |
2006-2007 |
80 | 13 | Water District 49 |
2005 |
80 | 14 | Water Rules! |
2008 |
80 | 15 | 2005 Water Year |
2005 |
80 | 16 | Wholesale Energy Risk
Management Policy Update |
2011-2012 |
80 | 17 | West Point
Wastewater |
2008-2009 |
80 | 18 | Western Climate |
2008 |
80 | 19 | Western Electricity
Coordinating Council (WECC) |
2004-2012 |
80 | 20 | Western Electricity
Coordinating Council (WECC) Restructuring |
2011-2012 |
80 | 21 | Western Energy
Institute |
2009-2010 |
80 | 22 | Westin Building |
2011 |
81 | 1 | Whatcom County Impact
Payments |
2008-2009 |
81 | 2 | Wholesale Revenue
Forecasting |
2007 |
81 | 3 | Wind Integration
Forum |
2007-2008 |
81 | 4 | Wind Integration Steering
Committee |
2012 |
81 | 5 | Wind Storm Dec
2006 |
2006-2007 |
81 | 6 | Windstorm Response
Actions |
2006-2007 |
81 | 7 | Storm Response |
2007-2009 |
81 | 8 | Winter Storm Prep |
2008 |
81 | 9 | Wind Storm Press
Conference |
2006 |
81 | 10 | WMBE |
2004-2008 |
81 | 11 | Workplace Training - Domestic
Violence, Sexual Assault, and Stalking |
2009 |
81 | 12 | Work Plan
Activities |
2007 |
81 | 13 | Workforce Planning
Strategy |
circa 2007 |
Names and SubjectsReturn to Top
Subject Terms
- Boundary Project
- Boundary Dam (Wash.)
- Electric utilities--Rates--Washington (State)--Seattle
- Electric utilities--Washington (State)--Seattle
- Electric power--Washington (State)--Seattle
- Power resources--Washington (State)
- Public Utilities
Personal Names
- Ross, J. D. (James Delmage), 1872-1939
- Vickery, Gordon Franklin, 1920-1996
Geographical Names
- Creston (Wash.)
- Ross Dam (Wash.)
- Seattle
- Seattle (Wash.)
- Skagit River (B.C. and Wash.)