Archives West Finding Aid
Table of Contents
- Overview of the Collection
-
Biographical Note
- Content Description
- Use of the Collection
- Administrative Information
-
Detailed Description of the Collection
- I: Kananaskis
- II: High Desert
- III: Starwood Ranch/ASPCOL
- IV: Summerlin
- V: The Domain
- VI: Grand Traverse
- VII: Kierland
- VIII: Kennecott
- IX: Verde River Greenway
- X: Biltmore Estate (North Carolina)
- XI: Basalt River Corridor
- XII: Crested Butte
- XIII: Quernecia
- XIV: Amaranth/Montage
- XV: La Posada
- XVI: KUSA
- XVII: Idarado
- XVIII: Banff
- XIX: Landwell
- XX: Amoco Refinery Reuse Plan
- XXI: City of Mesa
- XXII: Mesa Performing Arts Center
- XXIII: Santa Fe Railyard
- XXIV: Crown Residence
- XXV: Santa Teresa
- XXVI: Commons Due Diligence
- XXVII: IMBT/Pine Hall
- XXVIII: Wildcat Ranch
- XXIX: Freed Development
- XXX: McDowell Mountain Ranch
- XXXI: East Village
- XXXII: Goldberg Residence
- XXXIII: Central Platte Valley
- XXXIV: Korean War Veterans Park (Albuquerque, NM)
- XXXV: University of Arizona Highland Community
- XXXVI: Trillium
- XXXVII: Blackcomb
- XXXVIII: Wickenburg
- XXXIX: Cherokee Gates Redevelopment
- XL: Arbolera
- XLI: Copper Mountain
- XLII: Scottsdale/Goldwater Art Wall
- XLIII: Tempe Performing Arts Center
- XLIV: 16th Street Mall Extension
- XLV: Lionshead
- XLVI: Maroon Creek
- XLVII: Homestead
- XLVIII: The Meadows Castle Rock, Colorado
- XLIX:Owl Creek
- L: Nevada Department of Transportation (NDOT)
- LI: Arizona Canal at Scottsdale
- LII: Hurst Ranch
- LIII: Resnick Property
- LIV: Rocky Mountain Arsenal National Wildlife Refuge
- LV: The Gant
- LVI: Teton Village
- LVII: Muar District (Malyasia)
- LVIII: Muju Resort (South Korea)
- LIX: North Lake Tahoe
- LX: Keystone
- LXI: Flathead County
- LXII: Canyon Village (Yellowstone)
- LXIII: RidgeGate
- LXIV: Grand Targhee
- LXV: Big Mountain
- LXVI: Walnut Creek
- LXVII: Braun Ranch
- LXVIII: Veteran's Cemetery of Western Colorado
- LXIX: Primland Resort
- LXX: Avon
- LXXI: Northstar
- LXXII: Deep Creek Mountain Resort
- LXXIII: Estrella
- LXXIV: Maricopa Association of Governments
- LXXV: Spring Valley
- LXXVI: Pima Community College
- LXXVII: Rancho Viejo
- LXXVIII: Breckenridge
- LXXIX: Park Avenue
- LXXX: Winter Park
- LXXXI: I-70/I-25 Interchange (Colorado)
- LXXXII: Four Seasons, Jackson Hole
- LXXXIII: Aspen (ADEPP)
- LXXXIV: Jackson Hole Ski Corporation
- LXXXV: Canyon Forest Village
- LXXXVI: Burlingame & Brush Creek
- LXXXVII: Lowry
- LXXXVIII: Mariposa
- LXXXIX: Snowmass
- XC: SMALL PROJECTS
- XCI: Daybreak
- Names and Subjects
Design Workshop records, 1979-2007
Overview of the Collection
- Title
- Design Workshop records
- Dates
- 1979-2007 (inclusive)19792007
- Quantity
- 35 boxes, (37 linear feet)
- Collection Number
- UUS_COLL MSS 347
- Summary
- This collection contains the administrative papers and landscape architectural drawings of multiple projects from Design Workshop, Inc.
- Repository
-
Utah State University, Merrill-Cazier Library, Special Collections and Archives Division
Special Collections & Archives
Merrill-Cazier Library
Utah State University
Logan, UT
84322-3000
Telephone: 4357978248
Fax: 4357972880
scweb@usu.edu - Access Restrictions
-
No restrictions on use, except: not available through interlibrary loan.
- Languages
- English
Biographical NoteReturn to Top
Design Workshop, Inc. is a leading international landscape architecture firm founded in 1969 by Joe Porter and Don Ensign while they were professors at North Carolina State University. Both received bachelor's degree from Utah State University in 1963 in landscape architecture. Other USU graduates who joined the firm were Richard Shaw, Todd Johnson and Terrall Budge. The firm's projects range from private gardens to resort development. The design teams are highly praised for their innovative use of attractive features while having the least impact on the site's ecology and natural views. Although based in Denver, Colorado, the firm has offices in Asheville, North Carolina; Aspen, Colorado; Austin, Texas, Lake Tahoe, Nevada; and Salt Lake City, Utah.
In addition to various awards received by Design Workshop, Inc., in 2008 the firm was named the top landscape architecture firm in the country by the American Society of Landscape Architects. For additional information, please refer to Design Workshop, Inc.'s website.
Content DescriptionReturn to Top
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by inquiring at the Special Collections and Archives reference desk.
Use of the CollectionReturn to Top
Restrictions on Use
It is the responsibility of the researcher to obtain any necessary copyright clearances.
Permission to publish material from the Design Workshop records must be obtained from the Special Collections and Archives manuscript curator and/or the Special Collections and Archives department head.
Preferred Citation
Initial Citation: Design Workshop records. USU_Coll MSS 347, Box [ ]. Special Collections and Archives. Utah State University Merrill-Cazier Library. Logan, Utah.
Following Citations: USU_Coll Mss 347, USUSCA.
Administrative InformationReturn to Top
Arrangement
The filing system has been kept substantially in its original form, only placing materials in archival folders and boxes. The processor devised the basic organization scheme for the collection, and where necessary, reorganized the papers within alphabetical order.
Location of Collection
Manuscript materials are located in Row ARC 104 and drawings are located in the tube enclave.Processing Note
Processed in May of 2010.
Acquisition Information
Materials in this collection were donated to Special Collections and Archives by Design Workshop, Inc. in 2009, 2010 & 2012.
Related Materials
To search and view the Utah State University Digital Library's collection, visit Design Workshop® Landscape Architecture Digital Collection.
Moses, Val. Toward Legacy: Design Workshop's Pursuit of Ideals in Landscape, Architecture, Planning and Urban Design, NA 9085 .D47 M67 2007.
Shaw, Sarah Chase. New Gardens of the American We4st: Residential Landscapes of Design Workshop, SB 472.45 .N49.
Separated Materials
The photographs and slides have been removed and placed into a separate photograph collection, P0394.
Detailed Description of the CollectionReturn to Top
I: I: Kananaskis, 1979-1986Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
1 | 1 | Area Utility Plan |
undated |
1 | 2 | Cinquefoil Hotel Enterprises Balance Sheet |
1981 |
1 | 3 | Common Elements Plan |
undated |
1 | 4 | Conceptual Grading Plan |
undated |
1 | 5 | Correspondence |
1980-1986 |
1 | 6 | Developer Package & Proposal Call |
1981-1983 |
1 | 7 | Elevations |
1982 |
1 | 8 | Evan-Thomas Development Existing Features & Regional Map |
undated |
1 | 9 | Evan-Thomas Development List of Responsibilities & Program Summary |
undated |
1 | 10 | Golf Course |
undated |
1 | 11 | Ground Level Plan |
undated |
1 | 12 | Illustrative Plan |
undated |
1 | 13 | J.H. Cook Architects & Engineers, ground floor plan and elevations |
undated |
1 | 14 | Landscape Concept Plan |
undated |
1 | 15 | Meeting Minutes |
1982 |
1 | 16 | Package "A" Level One (Basement) Plan |
undated |
1 | 17 | Package "A" Level Two (Ground Level) Plan |
undated |
1 | 18 | Package "A" Level Three |
undated |
1 | 19 | Package "A" Level Four Plan |
undated |
1 | 20 | Package "A" Level Five Plan |
undated |
1 | 21 | Package C Reissued Proposal Call |
1982 |
1 | 22 | Parcel A Master Plan |
1985 |
1 | 23 | Parcel A Operating and Expense Assumptions |
1982 |
1 | 24 | Parking & Circulation Plan |
undated |
1 | 25 | Phase One Master Plan |
undated |
1 | 26 | Plucer Holdings LTD. Financial Statements |
1982 |
1 | 27 | Pro Forma Cash Flow Analysis |
1981 |
1 | 28 | Project Approach |
undated |
1 | 29 | Project Description |
undated |
1 | 30 | Project Performa "A" and "C" |
1982 |
1 | 31 | Project Working Paper |
1979 |
1 | 32 | Proposal Form |
1982 |
1 | 33 | Proposal Package "C" |
1982 |
1 | 34 | Proposal for Planning and Design of the Evan-Thomas Development Area |
1979 |
2 | 1 | Schematic Utility Plan |
undated |
2 | 2 | Sterling Group history |
undated |
2 | 3 | Sterling Montana, Inc. Financial Statements |
1982 |
2 | 4 | Subdivision Plan |
undated |
2 | 5 | Valley Elevations |
undated |
2 | 6 | Village Sections |
undated |
2 | 7 | Walnor Projects LTD. Financial Statements |
1982 |
2 | 8 | Work Programs |
1981-1982 |
2 | 9 | Work Schedule |
undated |
3 | 1 | ASLA Awards Submission Category I Landscape Architecture |
1990 |
3 | 2 | ASLA Awards Submission Category I Landscape Architecture |
1989 |
3 | 3 | Commercial Signage Policy- Design Standards for Kananaskis Village |
undated |
3 | 4 | Evan-Thomas Development Area- Date Inventory Phase |
1979 July 6 |
3 | 5 | Initial Information Development Area- Date Inventory Phase |
1979 July 6 |
3 | 6 | Initial Information Package |
1979 |
3 | 7 | Project Narrative |
undated |
3 | 8 | Presentation on Kananaskis |
1990 October |
4 | 1 | Evans-Thomas Data Inventory Phase |
1979 July 6 |
4 | 2 | Ribbon Creek Project Manual |
1986 March 5 |
4 | 3 | Ribbon Creek Developer Proposal Evaluation |
1985 February 21 |
4 | 4 | Ribbon Creek Project Manual |
1981 |
4 | 5 | Ribbon Creek Economic Analysis |
1986 July 16 |
4 | 6 | Evans-Thomas Development Program Site Location Analysis |
1979 |
KANANASKIS LANDSCAPE DRAWINGS
14 tubes and 655 drawings
|
1979-1992 | ||
Illustrative Plans
15 landscape drawings
|
|||
tube | |||
1 | 1.1.1A: Illustrative landscape plan of the Village core
Pen & Ink on Mylar
|
undated | |
1 | 1.1.1B: Illustrative landscape plan of the Village core
Pen & Ink on Mylar
|
undated | |
1 | 1.1.2: Illustrative landscape plan of the Village core
Pencil on Mylar
|
undated | |
1 | 1.1.3: Illustrative landscape plan of the Village core
Pencil on Mylar
|
undated | |
1 | 1.1.4: Illustrative plan of Kananaskis with staff housing
Print on Acetate
|
undated | |
1 | 1.1.5: Illustrative landscape plan of staff housing
Pen & Ink on Mylar
|
undated | |
1 | 1.1.6: Illustrative landscape plan of Kananaskis with staff housing
Pen &Ink on Mylar
|
undated | |
1 | 1.1.7: Illustrative plan of Kananaskis with staff housing
Print on Mylar
|
undated | |
1 | 1.1.8: Illustrative landscape plan of Village core
Blueprint on Bond
|
undated | |
1 | 1.1.9: Illustrative plan Village core
Blueprint on Bond
|
1986 January 29 | |
1 | 1.1.10: Illustrative plan of Kananaskis with staff housing
Print splices on Mylar
|
undated | |
1 | 1.1.11: Illustrative plan of Kananaskis with staff housing
Print & Ink on Mylar
|
undated | |
1 | 1.1.12: Illustrative plan of Kananaskis with staff housing
Print on Vellum
|
undated | |
1 | 1.1.13: Illustrative plan of Kananaskis with staff housing
Print on Vellum
|
undated | |
1 | 1.1.14: Illustrative plan of Kananaskis with staff housing
Print on Acetate
|
undated | |
1 | 1.1.15: Illustrative plan stressing buildings, hardscape, and vegetation
Print & Marker on Photo Paper
|
undated | |
1 | 1.1.16: Illustrative landscape plan of Village core
Print on Photo Paper
|
undated | |
1 | 1.1.17: Illustrative plan of Village core and surroundings
Print, Ink, & Pencil on Mylar
|
undated | |
1 | 1.1.18: Illustrative landscape plan with building uses and spot elevations
Blueprint on Bond
|
undated | |
1 | 1.1.19: Color illustrative landscape plan of Kananaskis and staff housing
Print, Marker, & Colored Pencil on Bond
|
undated | |
1 | 1.1.20: Color illustrative landscape plan of Kananaskis Village core
Print, Marker, & Colored Pencil on Bond
|
undated | |
Site Analysis & Inventory
|
1979-1987 | ||
tube | |||
2 | 1.2.1: Canmore Corridor Sub-Region: Recreation Facilities Map
Print & Pencil on Mylar
|
undated | |
2 | 1.2.2: Site plan with existing features labeled
Blueprint on Bond
|
undated | |
2 | 1.2.3: Nakiska/Mount Allan map of ski runs/routes and chairlifts
Reduction on Acetate
|
undated | |
2 | 1.2.4A-B: Survey map of topography
Print on Mylar. Compiled by Walter E. Bright A.L.S. (2 sheets)
|
1979 | |
2 | 1.2.5: Survey map of topography with Village footprint
Print on Mylar. Compiled by Walter E. Bright A.L.S.
|
1982 May 5 | |
2 | 1.2.6: Survey map of topography with Village footprint
Blueprint on Bond. Compiled by Walter E. Bright A.L.S.; includes handwritten notes
|
1982 May 5 | |
2 | 1.2.7: Regional contour map
Print on Mylar
|
undated | |
2 | 1.2.8: Regional contour map with 5 meter intervals containing vegetated boundaries, roads, poles, etc
Print on Bond
|
undated | |
2 | 1.2.9: Filed plan of survey of Parcel 1
Print on Mylar
|
1987 January 2 | |
2 | 1.2.10: Schedule A Property Subject to Common Area Lease
Print on Mylar
|
1985 May 5 | |
2 | 1.2.11: Schedule A Property Subject to Common Area Lease
Print on Mylar
|
1986 October 7 | |
2 | 1.2.12: Pan of Survey of Subdivision of a Protion of Parcel 1
Blueprint on Bond
|
1986 April 1 | |
2 | 1.2.13: Evan Thomas Development Area Outline Plan Alternatives Alternative 1
Print on Acetate
|
undated | |
2 | 1.2.14: Evan Thomas Development Area Outline Plan Alternatives Alternative 2
Print on Acetate
|
undated | |
2 | 1.2.15: Evan Thomas Development Area Outline Plan Alternatives Alternative 3
Sepia Print
|
undated | |
2 | 1.2.16: Evan Thomas Development Area Outline Plan Alternatives Alternative 4
Print on Acetate
|
undated | |
2 | 1.2.17: Plan showing location of select trees and access road cross sections
Blueprint on Bond. Compiled by D.R. McWilliam, A.L.S.
|
1982 | |
2 | 1.2.18: Plan showing control monuments established access road existing clearings and utilities
Blueprint on Bond. D.R. McWilliam, A.L.S.
|
1982 | |
2 | 1.2.19A-M: Kananaskis Country Recreation Plan Regional Utilities
Blueprint Package. Compiled by Reid, Crowther & Partners Limited (18 sheets)
|
1981 January | |
2 | 1.2.20: Ribbon Creek Village Regional Plan
Print & Ink on Mylar
|
1985 July | |
2 | 1.2.21: Ribbon Creek Village Regional Plan
Print & Marker on Bond
|
1986 July | |
2 | 1.2.22: Developable land summary
Print & Colored Pencil on Bond
|
1986 May 19 | |
2 | 1.2.23: Analysis of slopes, critical wildlife area, and sun points
Print & Marker on Bond
|
undated | |
Studies & Schematics
|
1985-1986 | ||
tube | |||
3 | 1.3.1: Parcel C: Roof height calculations
Pencil on Trace
|
undated | |
3 | 1.3.2: Day Lodge: Roof height calculations
Pencil on Trace
|
undated | |
3 | 1.3.3: Day Lodge: Ground floor plan
Designed by Cook, Culham, Montgomery, Pedersen, & Valentine
|
1985 June 1 | |
3 | 1.3.4: Calculations for support, parking, and vehicular circulation
Pencil on Trace
|
undated | |
3 | 1.3.5: Calculations for food and beverage, parking, and support
Pencil on Trace
|
undated | |
3 | 1.3.6: Calculations for circulation, storage, and bay windows
Pencil on Trace
|
undated | |
3 | 1.3.7: Site plan circulation study
Print on Mylar
|
undated | |
3 | 1.3.8: Site plan circulation study
Print on Mylar
|
undated | |
3 | 1.3.9: Site plan circulation study
Print on Mylar
|
undated | |
3 | 1.3.10: Design constraints including paving, water features, open space, fire lanes, and pedestrian circulation
Marker on Blueprint
|
undated | |
3 | 1.3.11: Circulation study
Marker on Trace
|
undated | |
3 | 1.3.12: Landscape plan with limit of irrigation highlighted
Marker on Blueprint
|
undated | |
3 | 1.3.13: Concept drawing of Village and surroundings
Ink on Trace
|
undated | |
3 | 1.3.14: Concept drawing of Village and surroundings
Sepia on Mylar
|
undated | |
3 | 1.3.15: Concept drawing of Village and surroundings
Ink & Marker on Trace
|
undated | |
3 | 1.3.16: Concept drawing of Village and surroundings
Ink & Marker on Trace
|
undated | |
3 | 1.3.17: Vegetation layer for proposed entry revisions Parcels B & C
Ink on Mylar
|
undated | |
3 | 1.3.18: Proposed entry revisions for Parcel B & C
Print & Marker on Bond
|
1986 October 27 | |
3 | 1.3.19: Proposed entry revisions for Parcel B & C
Pencil on Trace
|
1986 September 25 | |
3 | 1.3.20: Vegetation layer for Proposed Entry Revision for Parcels B & C
Ink on Mylar
|
undated | |
3 | 1.3.21: Hardscape and Grading Layer for Proposed Entry Revision for Parcels B & C
Pencil & Ink on Mylar
|
undated | |
3 | 1.3.22: Study for service and parking entry for Parcel B
Ink on Vellum
|
1985 August 12 | |
3 | 1.3.23: Study for entry, lobby, and service for Parcel B
Ink on Vellum
|
1985 August 12 | |
3 | 1.3.24: Proposed entry revisions for Parcels B & C
Pencil on Trace. Attributed to Don Ensign
|
1986 September 25 | |
3 | 1.3.25: Concept drawing for Village core
Ink & Marker on Trace. Attributed to Sergio Santana
|
undated | |
3 | 1.3.26: Concept drawing for proposed entry for Parcels B & C
Marker on Blueprint
|
undated | |
3 | 1.3.27: Pool level and lobby level plan transferred into site section
Ink on Trace
|
undated | |
3 | 1.3.28: Constraint map
Pencil on Trace
|
undated | |
3 | 1.3.29: Concept drawing of Village core with spot elevations
Pencil & Marker on Trace
|
undated | |
3 | 1.3.30: Proposed entry revisions for Parcels B & C
Ink & Pencil on Trace. Attributed to Richard Shaw
|
1986 January 14 | |
3 | 1.3.31A-B: Concept drawing of Village core including hardscape & Grading
Pencil on Mylar
|
undated | |
Graphic Process
|
undated | ||
tube | |||
4 | 1.4.1: Spot enlargements of contour map
Print on Photo Paper
|
undated | |
4 | 1.4.2: Spot enlargements of contour map
Print on Photo Paper
|
undated | |
4 | 1.4.3: Limit of irrigation throughout Kananaskis
Red Contact Paper on Mylar
|
undated | |
4 | 1.4.4: Limit of irrigation
Red Contact Paper on Mylar
|
undated | |
4 | 1.4.5: Landscape plan of Village core
Negative for Printing
|
undated | |
4 | 1.4.6: Illustrative Plan title block
Negative for Printing
|
undated | |
4 | 1.4.7: Illustrative plan of Kananaskis with staff housing
Negative for Printing
|
undated | |
4 | 1.4.8: Parcel A Master Plan elevations and unit plans
Negative for Printing
|
undated | |
Timelines
|
undated | ||
tube | |||
4 | 1.5.1A-B: Proposed Work Program – Kananaskis Country
Print on Acetate (2 sheets)
|
undated | |
4 | 1.5.2: Proposed Work Program – Kananaskis Country
Print on Mylar
|
undated | |
4 | 1.5.3: Proposed Work Program – Kananaskis Country
Print on Mylar
|
undated | |
4 | 1.5.4: Master Development Schedule
Print on Mylar
|
undated | |
4 | 1.5.5: Master Development Schedule
Ink on Vellum
|
undated | |
4 | 1.5.6A-C: Kananaskis Work Schedule
Pencil on Mylar (3 sheets(
|
undated | |
4 | 1.5.7: Tentative Schedule for Resort Related Operations
Pencil on Mylar
|
undated | |
4 | 1.5.8: Draft resort association activity schedule resort resources
Ink on Mylar
|
undated | |
4 | 1.5.9A-B: Summary Plan Evaluation: Outline Plan Alternatives
Print on Acetate (2 sheets)
|
undated | |
4 | 1.5.10: Conceptual Design Process
Print on Acetate
|
undated | |
4 | 1.5.11: Conceptual Design Process
Print on Bond
|
undated | |
4 | 1.5.12: Conceptual Design Process
Print on Bond
|
undated | |
4 | 1.5.13A-B: Conceptual Design Process
Print on Photo Paper (2 sheets)
|
undated | |
4 | 1.5.14: Conceptual Design Process
Negative for Printing
|
undated | |
4 | 1.5.15: Conceptual Design Process
Negative for Printing
|
undated | |
Grading & Topography
|
1985-1986 | ||
tube | |||
5 | 1.6.1: Grading plan surrounding Parcel A
Print & Ink on Bond
|
undated | |
5 | 1.6.2A-C: Visual simulation material of old Kananaskis with spot elevations
Print & Pencil on Mylar (3 sheets)
|
undated | |
5 | 1.6.3: Spot Elevations
Pencil on Mylar
|
undated | |
5 | 1.6.4: Spot Elevations
Pencil & Ink on Blueprint on Bond
|
undated | |
5 | 1.6.5A-B: Road ROW and recommended 40 meter setback
Ink on Mylar (2 sheets)
|
undated | |
5 | 1.6.6A-B: Road ROW and recommended 40 meter setback revision
Ink on Mylar (2 sheets)
|
undated | |
5 | 1.6.7: Site grading plan
Ink on Mylar
|
1985 January | |
5 | 1.6.8: Road ROW and recommended 40 meter setback; Sheet 2
Ink on Mylar
|
undated | |
5 | 1.6.9A-C: Existing site topography
Ink on Mylar (3 sheets)
|
1986 January | |
5 | 1.6.10: Existing site topography
Print on Mylar
|
undated | |
5 | 1.6.11: Existing site topograph
Print on Mylar
|
1985 January | |
5 | 1.6.12: Existing site topography, revised
Print on Mylar
|
1985 June | |
5 | 1.6.13: Existing site topography
Print on Mylar
|
1986 January | |
5 | 1.6.14: Regional topography map
Sepia on Mylar
|
undated | |
5 | 1.6.15: Regional topography map
Sepia print
|
undated | |
5 | 1.6.16: Site Grading Plan
Blueprint on Bond
|
undated | |
5 | 1.6.17: Phase One Master Plan with spot elevations and site grading
Print on Diazo Mylar
|
1985 January | |
Construction Details & Specifications
|
1988 | ||
tube | |||
6 | 1.7.1: South Play Structure Layout
Blueprint on Bond
|
1988 February 19 | |
6 | 1.7.2: North Play Structure Layout
Blueprint on Bond
|
1988 February | |
6 | 1.7.3: Play Structure Details
Blueprint on Bond
|
1988 February 19 | |
6 | 1.7.4: Tennis court layout and fencing
Blueprint on Bond
|
undated | |
Master Plans
|
1985-1986 | ||
tube | |||
6 | 1.8.1: Master Plan
Print on Mylar
|
1985 July 31 | |
6 | 1.8.2: Signage Master Plan
Splices on Mylar
|
1986 January | |
6 | 1.8.3: Village Master Plan
Print and Ink on Mylar
|
1985 January | |
6 | 1.8.4: Master Plan
Print on Mylar; revised June 1985
|
1985 January | |
6 | 1.8.5: Master Plan
Print and Ink on Mylar
|
1985 January | |
6 | 1.8.6: Village Master Plan
Print and Ink on Diazo Mylar; revised June 1985
|
1985 January | |
6 | 1.8.7: Master Plan
Print and Ink on Diazo Mylar; revised June 1985 revised August 1985 revised 15 October 1985
|
1985 January-1985 October | |
6 | 1.8.8: Master Plan
Print and Ink on Diazo Mylar; revised June 1985 revised August 1985 revised 15 October 1985
|
1985 January-1985 October | |
6 | 1.8.9A-B: Landscape Master Plan
Print on Diazo Mylar
|
1986 January | |
6 | 1.8.10: Master Plan
Print, Ink, & Pencil on Diazo Mylar
|
1985 January | |
6 | 1.8.11: Master Plan
Print, Ink, & Pencil on Diazo Mylar
|
1985 January | |
6 | 1.8.12: Master Plan with snow maintenance provided by Alberta Transportation
Print and Splices on Diazo Mylar
|
1987 October 29 | |
6 | 1.8.13: Lighting Master Plan
Print and Splices on Diazo Mylar
|
1985 | |
6 | 1.8.14: Master Plan with building ground floor plans
Print and Ink on Diazo Mylar
|
1985 January | |
6 | 1.8.15: Master Plan
Print on Mylar
|
1985 January | |
6 | 1.8.16: Master Plan; Scale
Print and Ink on Mylar
|
undated | |
6 | 1.8.17: Master Plan drawn by Gin and Bon
Print and Ink on Mylar
|
1986 January | |
6 | 1.8.18: Site Plan
Pencil on Mylar
|
undated | |
6 | 1.8.19: Site Plan
Pencil on Mylar
|
undated | |
6 | 1.8.20: Use Allocation Plan
Print and Ink on Spliced Mylar
|
undated | |
6 | 1.8.21: Master Plan
Print and Pencil on Diazo Mylar
|
1986 February 19 | |
6 | 1.8.22: Master Plan
Print and Ink on Diazo Mylar
|
1986 January | |
6 | 1.8.23: Use Allocation Site Plan
Print on Mylar
|
undated | |
6 | 1.8.24: Village Master Plan
Print on Acetate
|
1982 June 30 | |
6 | 1.8.25: Village Master Plan
Ink and Pencil on Mylar
|
1982 June 30 | |
6 | 1.8.26: Limit of Irrigation
Print on Mylar
|
undated | |
6 | 1.8.27: Landscape Master Plan
Print on Mylar
|
undated | |
6 | 1.8.28: Phase One Master Plan attributed to Sergio Santana
Sepia Print on Mylar
|
1985 January | |
6 | 1.8.29: Use Allocation Site Plan
Ink and Pencil on Mylar
|
undated | |
6 | 1.8.30: Master Plan
Sepia Print; revised June 1985
|
1985 January | |
6 | 1.8.31: Landscape Master Plan
Ink on Sepia Print
|
1986 January | |
6 | 1.8.32: Master Plan
Print on Acetate; revised June 1985
|
1985 January | |
6 | 1.8.33: Master Plan
Blueprint on Bond
|
1985 January | |
6 | 1.8.34: Phase One Master Plan with Parcel A view analysis
Print on Bond
|
undated | |
6 | 1.8.35: Phase One Master Plan
Print, Ink, & Pencil on Mylar
|
1985 January | |
6 | 1.8.36A: Pin Bar Master Plan Documents: Landscape
Ink on Mylar
|
undated | |
6 | 1.8.36B: Pin Bar Master Plan Documents: Buildings and Surrounding Vegetation
Ink on Mylar
|
undated | |
6 | 1.8.37: Village Core Hardscape Pin Bar Document
Print on Mylar
|
undated | |
6 | 1.8.38: Master Plan
Ink on mylar
|
1986 January | |
6 | 1.8.39: Landscape Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.40: Site Lighting Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.41: Fire Access Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.42: Grading Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.43: Landscape Master Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.44: Master Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.45: Landscape Vegetation Plan
Ink on mylar
|
undated | |
6 | 1.8.46: Landscape Vegetation Plan Pin Bar Document
Ink on mylar
|
undated | |
6 | 1.8.47: Monuments and Markers
Ink on mylar
|
undated | |
Day Lodge
31 landscape drawings
|
1982-1986 | ||
tube | |||
7 | 1.9.1A: Site Plan and Drawing Index
Blueprint Package; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 October | |
7 | 1.9.1B: Ground Floor Plan
Blueprint Package
|
1985 October | |
7 | 1.9.1C: Ground Floor Plan
Blueprint Package
|
1985 October | |
7 | 1.9.1D: Site Plan and Legend
Blueprint Package
|
1985 October | |
7 | 1.9.2: Ground Floor Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 April 15-17 | |
7 | 1.9.3: Site Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 May | |
7 | 1.9.4A: Site Plan and Drawing Index
Blueprint Package; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 October 4 | |
7 | 1.9.4B: Ground Floor Plan
Blueprint Package
|
1985 October 4 | |
7 | 1.9.5A: Site Plan
Blueprint Package: J.H. Cook Architects and Engineers
|
1982 July 8 | |
7 | 1.9.5B: Ground Floor Plan
Blueprint Package
|
1982 July 8 | |
7 | 1.9.6A: Site Plan
Blueprint Package; J.H. Cook Architects and Engineers
|
1982 June 2 | |
7 | 1.9.6B: Ground Floor Plan
Blueprint Package
|
1982 June 2 | |
7 | 1.9.7: Ground Floor Plan
Print on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 June 10 | |
7 | 1.9.8: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
|
1986 November 10 | |
7 | 1.9.9: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
|
1986 November 10 | |
7 | 1.9.10: Day Lodge Use Allocation
Print on Diazo Mylar Spliced on Mylar
|
undated | |
7 | 1.9.11: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
|
1986 November 10 | |
7 | 1.9.12: Day Lodge Use Allocation
Ink on Blueprint
|
1986 November 10 | |
7 | 1.9.13: Day Lodge Use Allocation
Ink on Blueprint
|
1986 November 10 | |
7 | 1.9.14: Day Lodge Use Allocation
Ink on Blueprint
|
1986 November 10 | |
7 | 1.9.15: Day Lodge Use Allocation
Ink on Blueprint
|
1986 November 10 | |
7 | 1.9.16A: Site Plan
Print on Bond; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 July 23 | |
7 | 1.9.16B: Ground Floor Plan
Print on Bond
|
1985 July 23 | |
7 | 1.9.16C: Elevation
Print on Bond
|
1985 July 23 | |
7 | 1.9.16D: Elevation
Print on Bond
|
1985 July 23 | |
7 | 1.9.16E: Elevation
Print on Bond
|
1985 July 23 | |
7 | 1.9.16F: Elevation
Print on Bond
|
1985 July 23 | |
7 | 1.9.17: Day Lodge Facility at Ribbon Creek
Pencil on Mylar
|
undated | |
7 | 1.9.18: Day Lodge Facility at Ribbon Creek
Pencil on Mylar
|
undated | |
Parcel A
|
1981-1986 | ||
tube | |||
8 | 1.10.1A: Parking Level Floor Plan
Ink on Mylar
|
undated | |
8 | 1.10.1B: Lobby Level Floor Plan
Ink on Mylar
|
undated | |
8 | 1.10.1C: Level Two Floor Plan
Ink on Mylar
|
undated | |
8 | 1.10.1D: Level Three Floor Plan
Ink on Mylar
|
undated | |
8 | 1.10.1E: Loft Level Floor Plan
Ink on Mylar
|
undated | |
8 | 1.10.1F: Roof Plan
Ink on Mylar
|
undated | |
8 | 1.10.1G: Sections
Ink on Mylar
|
undated | |
8 | 1.10.1H: Unit Plans
Ink on Mylar
|
undated | |
8 | 1.10.1I: Detail Elevations
Ink on Mylar
|
undated | |
8 | 1.10.2A: Lower Level
Ink on Mylar
|
undated | |
8 | 1.10.2B: Ground Level
Ink on Mylar
|
undated | |
8 | 1.10.2C: 2nd Level
Ink on Mylar
|
undated | |
8 | 1.10.2D: 3rd Level
Ink on Mylar
|
undated | |
8 | 1.10.3A: Lower Level
Ink on Mylar
|
undated | |
8 | 1.10.3B: Ground Level
Ink on Mylar
|
undated | |
8 | 1.10.3C: 2nd Level
Ink on Mylar
|
undated | |
8 | 1.10.3D: 3rd Level
Ink on Mylar
|
undated | |
8 | 1.10.3E: 4th Level
Ink on Mylar
|
undated | |
8 | 1.10.4A: Lower Level
Ink on Mylar
|
undated | |
8 | 1.10.4B: Ground Level
Ink on Mylar
|
undated | |
8 | 1.10.4C: 2nd Level
Ink on Mylar
|
undated | |
8 | 1.10.4D: 3rd Level
Ink on Mylar
|
undated | |
8 | 1.10.5A: Lower Level
Print and Ink on Bond
|
undated | |
8 | 1.10.5B: Ground Level
Print and Ink on Bond
|
undated | |
8 | 1.10.5C: 2nd Level
Print and Ink on Bond
|
undated | |
8 | 1.10.5D: 3rd Level
Print and Ink on Bond
|
undated | |
8 | 1.10.6A: Ground Level
Print and Ink on Bond
|
undated | |
8 | 1.10.6B: 2nd Level
Print and Ink on Bond
|
undated | |
8 | 1.10.6C: 3rd Level
Print and Ink on Bond
|
undated | |
8 | 1.10.6D: Lower Level
Print and Ink on Bond
|
undated | |
8 | 1.10.7: Parcel A Program Summary 3rd Level
Pencil on Mylar
|
undated | |
8 | 1.10.8: Parcel A Program Summary Ground Level
Pencil on Vellum
|
undated | |
8 | 1.10.9: Master Plan
Blueprint on Bond; by Rick Balbi Architect
|
undated | |
8 | 1.10.10: Main Floor Plan
Pencil on Blueprint; by Rick Balbi Architect
|
undated | |
8 | 1.10.11: Main Floor Plan
Blueprint on Bond; by Rick Balbi Architect
|
undated | |
8 | 1.10.12: Site Plan and Main Floor Plan
Blueprint on Bond; by Balbi Architects
|
1985 June | |
8 | 1.10.13: Main Floor Plan
Ink on Blueprint; by Balbi Architects
|
1985 May 29 | |
8 | 1.10.14: Main Floor Plan
Print on Acetate; by Balbi Architects
|
1985 May 6 | |
8 | 1.10.15: Main Floor Plan
Blueprint on Bond; by Balbi Architects
|
1985 May 25 | |
8 | 1.10.16: Main Floor Plan
Ink on Blueprint; by Balbi Architects
|
1985 May 6 | |
8 | 1.10.17: Main Floor Plan
Blueprint on Bond; by Balbi Archtiects
|
1985 August | |
8 | 1.10.18: Main Floor Plan
Blueprint on Bond; by Balbi Architects
|
1985 May 6 | |
8 | 1.10.19: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
undated | |
8 | 1.10.20: Section
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November 18 | |
8 | 1.10.21: Entrance and Exit Ramps
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 December 5 | |
8 | 1.10.22: Loading Area
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 December 3 | |
8 | 1.10.23: Entrance Court Area
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November 25 | |
8 | 1.10.24: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
|
1985 December 23 | |
8 | 1.10.25: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
|
1985 December 17 | |
8 | 1.10.26: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
|
undated | |
8 | 1.10.27: Main Floor
Marker on Blueprint; by Proppe Architect Ltd
|
undated | |
8 | 1.10.28: Main Floor
Marker on Blueprint; by Proppe Architect Ltd
|
1986 February 4 | |
8 | 1.10.29: Paving at Front Entrance
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers;
|
1985 November 15 | |
8 | 1.10.30: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November 22 | |
8 | 1.10.31: Nightclub/Bar Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November 25 | |
8 | 1.10.32: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November | |
8 | 1.10.33: Hotel at Parcel A Lobby Level
Blueprint on Bond
|
1985 October 25 | |
8 | 1.10.34: Lobby Level Floor Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
|
1985 November 11 | |
8 | 1.10.35A: Ribbon Creek Hotel Main Floor
Ink on Blueprint; by B. James Wensley
|
1984 March 29 | |
8 | 1.10.35B: Parking Level
Ink on Blueprint
|
undated | |
8 | 1.10.35C: Second Floor
Ink on Blueprint
|
undated | |
8 | 1.10.35D: Third Floor |
undated | |
8 | 1.10.36: Parcel A area calculations
Ink on Trace
|
1985 | |
8 | 1.10.37: Schedule A Parcel A
Ink on Mylar
|
1985 May | |
8 | 1.10.38: Schedule A Parcel A
Ink and Print on Mylar
|
undated | |
8 | 1.10.39: Plan of Survey of Parcel A in the N.E. ¼ Sec. 15, Twp. 21, Rge. 9, W. 5th M
Print on Mylar
|
1983 | |
8 | 1.10.40A-B: Concept Plans
Blueprint on Bond; by McKellar Architects (2 sheets)
|
1981 October | |
8 | 1.10.41A: Program Calculation Sheet Ground
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.41B: Program Calculation Sheet 2nd
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.41C: Program Calculation Sheet 3rd
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.42A: Program Calculation Sheets Level 3
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.42B: Program Calculation Sheets Ground Level
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.42C: Program Calculation Sheets Ground Level
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.42D: Program Calculation Sheets Level 2
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.42E: Program Calculation Sheets Lower Level
Ink on Blueprint
|
1985 May 19 | |
8 | 1.10.43A: Use Location Diagram Package A Level One (Basement) Plan
Print on Acetate
|
undated | |
8 | 1.10.43B: Use Location Diagram Package A Level Two (Ground Level) Plan
Print on Acetate
|
undated | |
8 | 1.10.43C: Use Location Diagram Package A Level Three Plan
Print on Acetate
|
undated | |
8 | 1.10.43D: Use Location Diagram Package A Level Four Plan
Print on Acetate
|
undated | |
8 | 1.10.43E: Use Location Diagram Package A Level Five Plan
Print on Acetate
|
undated | |
8 | 1.10.44A: Design Concept Diagram Package A Level One (Basement) Plan
Print on Acetate
|
undated | |
8 | 1.10.44B: Design Concept Diagram Package A Level Two (Ground Level) Plan
Print on Acetate
|
undated | |
8 | 1.10.44C: Design Concept Diagram Package A Level Three Plan
Print on Acetate
|
undated | |
8 | 1.10.44D: Design Concept Diagram Package A Level Four Plan
Print on Acetate
|
undated | |
8 | 1.10.44E: Design Concept Diagram Package A Level Five Plan
Print on Acetate
|
undated | |
8 | 1.10.45: Parcel A Floor Plan
Print on Acetate
|
undated | |
8 | 1.10.46: Parcel A Floor Plan
Print on Acetate
|
undated | |
8 | 1.10.47: Parcel A Floor Plan
Print on Acetate
|
undated | |
8 | 1.10.48: Parcel A Floor Plan
Print on Acetate
|
undated | |
8 | 1.10.49: Parcel A Floor Plan
Print on Acetate
|
undated | |
8 | 1.10.50: Parcel A Second Floor
Print on Acetate
|
undated | |
8 | 1.10.51: Parcel A Third Floor
Print on Acetate
|
undated | |
8 | 1.10.52: Parcel A Fourth Floor
Print on Acetate
|
undated | |
Parcel B
|
1981-1986 | ||
tube | |||
9 | 1.11.1: Schedule A Parcel B
Ink on Diazo Mylar
|
1985 December 10 | |
9 | 1.11.2: Schedule A Parcel B
Ink on Mylar
|
1985 February | |
9 | 1.11.3: Parcel B Floor Plan
Pencil on Mylar
|
1985 February | |
9 | 1.11.4: Ground Floor by Nelson MacDonald Design Ltd
Blueprint on Bond
|
undated | |
9 | 1.11.5: Ground Floor
Blueprint on Bond; by Nelson MacDonald Design Ltd
|
undated | |
9 | 1.11.6: The Heathwood Resort at Ribbon Creek
Blueprint on Bond; by Nelson MacDonald Design
|
1985 August 29 | |
9 | 1.11.7: Heathwood Hotel Ground Floor Plan
Blueprint on Bond; by Nelson MacDonald Design Ltd
|
1985 August 14 | |
9 | 1.11.8: Hotel – Ribbon Creek – Parcel B Ground Floor
Colored Pencil on Blueprint
|
1985 February 13 | |
9 | 1.11.9: Heathwood at Ribbon Creek Building Section
Marker on Blueprint; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 October 28 | |
9 | 1.11.10: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 August 10 | |
9 | 1.11.11: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 August 10 | |
9 | 1.11.12: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 August 10 | |
9 | 1.11.13: Heathwood at Ribbon Creek Building Section
Ink on Blueprint on Bond; Ink on Blueprint on Bond
|
1981 August 10 | |
9 | 1.11.14: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 August 10 | |
9 | 1.11.15: Parcel B
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
|
1986 January 31 | |
9 | 1.11.16: Master Plan for Parcel B
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
|
1986 January 31 | |
9 | 1.11.17: Hotel – Ribbon Creek Village – Parcel B Ground Floor
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
|
1985 October 13 | |
9 | 1.11.18: Ground Floor Plan for the Inn at Ribbon Creek
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
|
1985 December 5 | |
9 | 1.11.19: Ground Floor Plan for the Inn at Ribbon Creek
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
|
undated | |
9 | 1.11.20: Heathwood at Ribbon Creek Floor Plans
Marker on Blueprint; Marker on Blueprint
|
1981 October 30 | |
9 | 1.11.21: Nakiska Hotel Site Plan
Marker on Blueprint; by Proppe Architects Ltd
|
1986 October 6 | |
9 | 1.11.22: The Manor at Kananaskis Main Entrance Layout
Blueprint on Bond; by Proppe Architects Ltd
|
undated | |
9 | 1.11.23: The Manor at Kananaskis Ground Floor Plan
Blueprint on Bond; by Proppe Architects
|
undated | |
9 | 1.11.24: The Manor at Kananaskis Site Plan
Blueprint on Bond; by Proppe Architects Ltd
|
1986 October 6 | |
9 | 1.11.25: Nakiska Hotel Ground Floor
Marker on Blueprint' by Proppe Architects Ltd
|
undated | |
9 | 1.11.26: Heathwood at Ribbon Creek Site Plan
Sepia Print
|
undated | |
9 | 1.11.27: Heathwood at Ribbon Creek Site Plan
Marker on Print on Bond
|
undated | |
9 | 1.11.28: Heathwood at Ribbon Creek Ground Level
Sepia Print
|
1981 November 20 | |
9 | 1.11.29: Heathwood at Ribbon Creek Ground Level
Marker on Print on Bond
|
1981 November 20 | |
Parcel C
|
1985-1986 | ||
tube | |||
10 | 1.12.1: Parcel C Boundaries and Utilities
Print on Mylar
|
undated | |
10 | 1.12.2: Schedule A Parcel C
Print on Mylar
|
undated | |
10 | 1.12.3: Schedule A Parcel C
Print on Mylar
|
undated | |
10 | 1.12.4: Schedule A Parcel C
Print on Mylar
|
undated | |
10 | 1.12.5: Schedule A Parcel C
Print on Mylar
|
undated | |
10 | 1.12.6: Schedule A Parcel C Description of Tentative Lease Area |
undated | |
10 | 1.12.7A: Pocaterra Lodge Master Plan on Sheet a-1
Blueprint Package; by Lemermeyer Architect Ltd
|
1985 December 2 | |
10 | 1.12.7B: Pocaterra Lodge Main Floor Plan on Sheet a-3
Blueprint Package; by Lemermeyer Architect Ltd
|
1985 December 2 | |
10 | 1.12.7C: Pocaterra Lodge Elevations on Sheet a-8
Blueprint Package; by Lemermeyer Architect Ltd
|
1985 December 2 | |
10 | 1.12.8A: Red Ribbon Inn Site Plan on Sheet 1
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
|
1985 July 23 | |
10 | 1.12.8B: Red Ribbon Inn Main Floor Plan on Sheet 3
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
|
1985 July 23 | |
10 | 1.12.8C: Red Ribbon Inn Elevations on Sheet 7
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
|
1985 July 23 | |
10 | 1.12.9A: Pocaterra Lodge Master Plan on Sheet a-1
Blueprint Package; created by Lemermeyer Architect Ltd
|
1986 January 28 | |
10 | 1.12.9B: Pocaterra Lodge Main Floor Plan on Sheet a-3
Blueprint Package; created by Lemermeyer Architect Ltd
|
1986 January 28 | |
10 | 1.12.9C: Pocaterra Lodge Elevations on Sheet a-8
Blueprint Package; created by Lemermeyer Architect Ltd
|
1986 January 28 | |
Fortress Junction Service Centre
|
undated | ||
tube | |||
10 | 1.13.1A: Site Plan
Blueprint on Bond; Ron Boruk Architect
|
undated | |
10 | 1.13.1B: Main Floor Plan
Blueprint on Bond; Ron Boruk Architect
|
undated | |
10 | 1.13.1C: Floor Plan for Proposed Residence
Blueprint on Bond; Ron Boruk Architect
|
undated | |
10 | 1.13.2: Blueprint on Bond
Floor Plan by Ron Boruk Architect
|
1983 April 12 | |
Maintenance Building
|
undated | ||
tube | |||
10 | 1.14.1A: Village of Ribbon Creek Maintenance Facility Floor Plans
Blueprint Package
|
undated | |
10 | 1.14.1B: Village of Ribbon Creek Maintenance Facility Elevations
Blueprint Package
|
undated | |
10 | 1.14.1C: Village of Ribbon Creek Maintenance Facility Site Plan (1)
Blueprint Package
|
undated | |
10 | 1.14.1D: Village of Ribbon Creek Maintenance Facility Site Plan (2)
Blueprint Package
|
undated | |
Staff Housing
|
1985-1986 | ||
tube | |||
11 | 1.15.1: Employee Housing Site Plan
Print & Contact Paper on Diazo Mylar
|
1986 January 15 | |
11 | 1.15.2: Staff Housing Parking Phase I
Blueprint on Bond
|
1986 June 14 | |
11 | 1.15.3: Existing Topography
Ink on Mylar
|
undated | |
11 | 1.15.4: Existing Topography
Print on Diazo Mylar
|
1985 January 15 | |
11 | 1.15.5: Employee Housing
Blueprint on Bond
|
1986 February 4 | |
11 | 1.15.6: Employee Housing
Ink on Blueprint on Bond
|
undated | |
11 | 1.15.7: Staff Housing Concept
Blueprint on Bond
|
1986 June 6 | |
11 | 1.15.8: Ribbon Creek Employee Housing Scheme Two
Blueprint on Bond
|
undated | |
11 | 1.15.9: Employee Housing Site Plan
Pencil on Blueprint on Bond
|
1986 January 15 | |
11 | 1.15.10: Ribbon Creek Staff Housing Plans and Elevations
Blueprint on Bond
|
1986 April | |
11 | 1.15.11: Employee Housing Scheme #1
Marker on Blueprint on Bond
|
1986 May 27 | |
11 | 1.15.12: Employee Housing
Marker on Blueprint on Bond
|
undated | |
11 | 1.15.13: Employee Housing Site Plan Grading Rough Draft
Pencil on Mylar
|
undated | |
11 | 1.15.14: Employee Housing Site Plan Grading
Pencil and Ink on Trace
|
undated | |
11 | 1.15.15: Employee Housing Site Plan
Blueprint
|
undated | |
11 | 1.15.16: Employee Housing Site Plan
Print and Ink on Diazo Mylar
|
1986 January 15 | |
11 | 1.15.17: Grading and Utilities Ground Survey of Staff Housing Area
Blueprint on Bond; by Reid, Crowther, & Partners Ltd.
|
1986 June 13 | |
11 | 1.15.18: Employee Housing Site Plan
Pencil on Mylar
|
1986 February 4 | |
11 | 1.15.19: Landscape Plan
Pencil and Ink on Mylar
|
undated | |
11 | 1.15.20: Site Plan
Ink on Mylar
|
undated | |
11 | 1.15.21: Employee Housing Scheme #1
Pencil and Ink on Mylar
|
1986 May 27 | |
11 | 1.15.22: Topography of Employee Housing Site
Print on Acetate
|
undated | |
11 | 1.15.23: Site Plan
Ink on Trace
|
undated | |
11 | 1.15.24: Site Plan
Ink on Mylar
|
undated | |
11 | 1.15.25: Site Plan
Pencil and Ink on Trace
|
undated | |
11 | 1.15.26: Site Plan
Ink on Trace
|
undated | |
11 | 1.15.27: Employee Housing Master Plan
Pencil and Ink on Trace
|
1986 June 19 | |
11 | 1.15.28: Concept Plan
Ink and Marker on Trace
|
undated | |
11 | 1.15.29: Employee Housing Site Plan
Pencil and Print on Diazo Mylar
|
1986 January 15 | |
11 | 1.15.30: Concept Plan
Pencil on Mylar
|
undated | |
11 | 1.15.31: Employee Housing Site Plan
Print on Diazo Mylar
|
1986 January 22 | |
11 | 1.15.32: Employee Housing Concept
Blueprint on Bond
|
undated | |
11 | 1.15.33: Parking Study
Pencil on Trace
|
undated | |
11 | 1.15.34: Parking and Circulation Study Option 1
Pencil on Trace
|
undated | |
11 | 1.15.35: Employee Housing Scheme Four
Marker on Blueprint
|
undated | |
11 | 1.15.36: Employee Housing Scheme One
Ink and Pencil on Mylar
|
undated | |
11 | 1.15.37: Employee Housing Scheme Two
Blueprint on Bond
|
1986 May 13 | |
11 | 1.15.38: Employee Housing Scheme Three
Ink and Pencil on Mylar
|
undated | |
11 | 1.15.39: Employee Housing Scheme Four
Ink on Mylar
|
undated | |
11 | 1.15.40: Concept Drawing
Pencil on Trace
|
undated | |
11 | 1.15.41: Employee Housing Scheme Four;
Ink on Blueprint
|
undated | |
11 | 1.15.42: Fire Access Plan Pin Bar Document
Ink on Blueprint
|
undated | |
11 | 1.15.43: Site Plan Pin Bar Document
Ink on Mylar
|
undated | |
11 | 1.15.44: The Village at Ribbon Creek Employee Housing Pin Bar Document
Ink and Pencil on Mylar
|
1981 October 27 | |
11 | 1.15.45: Employee Housing Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
|
1986 January 15 | |
11 | 1.15.46: Financial Trustco Proposed Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
|
1986 January 15 | |
11 | 1.15.47: Grading Employee Housing Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
|
1986 Janaury 15 | |
11 | 1.15.48: Grading Employee Housing Site Plan Pin Bar Document
Pencil and Ink on Mylar
|
undated | |
11 | 1.15.49: Employee Housing Site Plan Pin Bar Document
Ink on Mylar
|
undated | |
11 | 1.15.50: Lot Delineation Pin Bar Document
Ink on Mylar
|
1986 April 29 | |
11 | 1.15.51: Right of Way and Topography Pin Bar Document
Ink on Mylar
|
undated | |
11 | 1.15.52: Site Plan Pin Bar Document
Print on Diazo Mylar
|
1986 June 25 | |
11 | 1.15.53: Grading Plan Pin Bar Document
Pencil and Ink on Diazo Mylar
|
undated | |
11 | 1.15.54: Schedule A Area Subject to Lease Pin Bar Document
Ink on Mylar
|
1986 October 31 | |
11 | 1.15.55: Employee Housing master Plan Pin Bar Document
Print on Diazo Mylar
|
undated | |
11 | 1.15.56: Employee Housing Grading Plan Pin Bar Document
Pencil and Ink on Diazo Mylar
|
undated | |
11 | 1.15.57: Suitability Study Pin Bar Document
Ink on Mylar
|
undated | |
11 | 1.15.58: Proposed Circulation Plan
Print and Ink on Mylar
|
1986 January 15 | |
11 | 1.15.59: Ribbon Creek Employee Housing Scheme Two
Ink on Trace
|
undated | |
11 | 1.15.60: Employee Housing Scheme Two
Ink on Trace
|
undated | |
11 | 1.15.61: Fire Access Plan
Blueprint on Bond
|
undated | |
11 | 1.15.62: Employee Housing Landscape Plan
Blueprint on Bond
|
undated | |
11 | 1.15.63: Employee Housing Master Plan Pin Bar Document
Print on Acetate
|
1986 June 25 | |
11 | 1.15.64: Cut and Fill Calculations from 1st Pass Grading
Pencil on Trace
|
1986 June 22 | |
11 | 1.15.65A: Employee Housing Study; Plan View
Ink and Pencil on Trace
|
1986 January 14 | |
11 | 1.15.65B: Employee Housing Study; Cross-sections
Ink and Pencil on Trace
|
1986 January 14 | |
11 | 1.15.66A: Staff Housing Package; (Clearing) Layout Plan
Blueprint on Bond
|
1986 July 2 | |
11 | 1.15.66B: Staff Housing Package; Grading and Utilities: Road and Parking Layout
Blueprint on Bond
|
1986 July 2 | |
11 | 1.15.66C: Staff Housing Package; Grading and Utilities: Road and Parking Grading
Blueprint on Bond
|
1986 July 2 | |
11 | 1.15.66D: Staff Housing Package; (Utilities) Layout Plan
Blueprint on Bond
|
1986 July 2 | |
11 | 1.15.67A: Walkway, Turf, and Lighting Area Calculations; Walkway Area Calculations
Marker on Blueprint w/Yellow Sheet
|
1986 June 23 | |
11 | 1.15.67B: Walkway, Turf, and Lighting Area Calculations; Site Plan with Calculations
Marker on Blueprint w/Yellow Sheet
|
1986 June 23 | |
11 | 1.15.68A: Staff Housing Lot One Site Development Plan
Blueprint on Bond; by Snihur Consulting Ltd
|
1987 April | |
11 | 1.15.68B: Staff Housing Lot One Floor Plans
Blueprint on Bond; by Snihur Consulting Ltd.
|
1987 April | |
11 | 1.15.69: Staff Housing by McKellar Architects
Blueprint on Bond
|
1981 August 10 | |
11 | 1.15.70: Ribbon Creek Staff Housing
Blueprint on Bond; by Proppe Architect Ltd.
|
1985 December 24 | |
11 | 1.15.71: Ribbon Creek Staff Housing 76 Unit Complex Plans and Elevations
Blueprint on Bond; by Proppe Architect Ltd.
|
1986 April 7 | |
11 | 1.15.72A: 88-Pillow Staff Housing Street Elevations
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 August 10 | |
11 | 1.15.72B: 88-Pillow Staff Housing Front Elevations
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 August 10 | |
11 | 1.15.73A: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 August 10 | |
11 | 1.15.73B: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 August 10 | |
11 | 1.15.74A: Staff Housing Floor Plan Main Level
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 September 10 | |
11 | 1.15.74B: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
1986 September 10 | |
11 | 1.15.74C: Staff HousingFloor Plan Main Level
Blueprint on Bond; by Western Professional Design Centre Ltd.
|
undated | |
11 | 1.15.75A: Employee Housing Site Plan Sections Section A
Pencil on Mylar
|
1986 January 15 | |
11 | 1.15.75B: Employee Housing Site Plan Sections Section B
Pencil on Mylar
|
1986 January 15 | |
11 | 1.15.75C: Employee Housing Site Plan Sections Section C
Pencil on Mylar
|
1986 January 15 | |
11 | 1.15.75D: Employee Housing Site Plan Sections Section D
Pencil on Mylar
|
1986 January 15 | |
11 | 1.15.75E: Employee Housing Site Plan Sections Titleblock
Pencil on Mylar
|
1986 January 15 | |
11 | 1.15.76: Employee Housing Site Plan Sections
Sepia Print on Acetate
|
1986 January 15 | |
Illustrations
|
|||
tube | |||
12 | 1.16.1: Axonometric Drawing of Village
Ink on Mylar
|
undated | |
12 | 1.16.2: Axonometric Drawing of Village
Print and Ink on Mylar; by Robert L. McIlhargey
|
1982 | |
12 | 1.16.3: Perspective of Village
Print on Bond
|
1981 August | |
12 | 1.16.4: Perspective of West Gateway in Winter
Print on Bond
|
undated | |
12 | 1.16.5A: Computer-Aided Perspective View 1
Marker on Bond
|
undated | |
12 | 1.16.5B: Computer-Aided Perspective View 2
Marker on Bond
|
undated | |
12 | 1.16.5C: Computer-Aided Perspective View 3
Marker on Bond
|
undated | |
12 | 1.16.5D: Computer-Aided Perspective View 4
Marker on Bond
|
undated | |
12 | 1.16.6: Day Lodge Roof Plan
Pencil on Trace
|
undated | |
12 | 1.16.7: Day Lodge Roof Plan
Marker on Trace
|
undated | |
12 | 1.16.8: Day Lodge Second Floor Plan
Blueprint on Bond; by CCMP&V Architects and Engineers
|
1985 June 10 | |
12 | 1.16.9A: Day Lodge Elevations South Elevation
Marker on Trace
|
undated | |
12 | 1.16.9B: Day Lodge Elevations South Elevation
Marker on Trace
|
undated | |
12 | 1.16.9C: Day Lodge Elevations East Elevation
Marker on Trace
|
undated | |
12 | 1.16.10: Roof Plan and Calculations
Pencil on Trace
|
undated | |
12 | 1.16.11: Main Floor; Scale
Blueprint on Bond
|
undated | |
12 | 1.16.12A: Building Elevations Unnamed
Marker on Trace
|
undated | |
12 | 1.16.12B: Building Elevations Unnamed
Marker on Trace
|
undated | |
12 | 1.16.12C: Building Elevations East
Marker on Trace
|
undated | |
12 | 1.16.12D: Building Elevations South
Marker on Trace
|
undated | |
12 | 1.16.12E: Building Elevations South
Marker on Trace
|
undated | |
12 | 1.16.12F: Building Elevations North
Marker on Trace
|
undated | |
12 | 1.16.12G: Building Elevations West
Marker on Trace
|
undated | |
12 | 1.16.13: Proposed Entry Revisions for Parcel B & C: Section Looking Northeast to Parcel B & C
Pencil on Trace
|
1986 September 25 | |
12 | 1.16.14: North Elevation
Pencil on Trace
|
undated | |
12 | 1.16.15: Parcel A Elevation Studies
Pencil on Trace
|
1985 July | |
12 | 1.16.16: West and East Elevations
Pencil on Trace
|
1985 July 10 | |
12 | 1.16.17A: Elevations Package East
Blueprint on Bond
|
undated | |
12 | 1.16.17B: Elevations Package South
Blueprint on Bond
|
undated | |
12 | 1.16.17C: Elevations Package Roof Plan
Blueprint on Bond
|
undated | |
12 | 1.16.18: Sections for Worksheet on Rooms and Cold Roof Details
Pencil and Ink on Mylar
|
undated | |
12 | 1.16.19: Snow Deflection Studies for Architectural Design Guidelines
Ink on Mylar
|
undated | |
12 | 1.16.20: East Elevation Parcel A Master Plan
Ink on Mylar
|
1986 March 4 | |
12 | 1.16.21: East Elevation Parcel A Master Plan
Pencil and Print on Diazo Mylar
|
1986 March 4 | |
12 | 1.16.22: South Elevation Parcel A Master Plan
Ink on Mylar
|
1986 March 4 | |
12 | 1.16.23: South Elevation Parcel A Master Plan
Pencil and Print on Diazo Mylar
|
1986 March 4 | |
12 | 1.16.24: Elevations of Ribbon Creek Village
Sepia Print and Pencil on Mylar
|
undated | |
12 | 1.16.25: Day Lodge and Building C Elevation
Pencil on Mylar
|
undated | |
12 | 1.16.26: Section and Elevations
Sepia on Mylar; by Stevenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
|
1981 November 20 | |
12 | 1.16.27: Roof Plan for Ribbon Creek Package A with Hagman Yaw
Pencil on Vellum
|
1982 June 29 | |
12 | 1.16.28: Sections
Pencil on Vellum
|
undated | |
12 | 1.16.29: Section B-B
Pencil on Vellum
|
undated | |
12 | 1.16.30: Composite Elevation
Pencil on Sepia on Mylar
|
undated | |
12 | 1.16.31: Composite Elevation
Marker and Print on Bond
|
undated | |
12 | 1.16.32: Sections
Print on Acetate
|
undated | |
12 | 1.16.33: Sections
Print on Photopaper
|
undated | |
12 | 1.16.34: Composite Elevation
Print on Photopaper
|
undated | |
Document Packages
|
|||
tube | |||
13 | 1.17.1A: The Village at Ribbon Creek Master Plan Fire Access Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1B: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1C: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1D: The Village at Ribbon Creek Master Plan Landscape Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1E: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1F: The Village at Ribbon Creek Master Plan Lighting Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1G: The Village at Ribbon Creek Master Plan Grading Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1H: The Village at Ribbon Creek Master Plan Illustrative Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.1I: The Village at Ribbon Creek Master Plan Signage Master Plan
Print on Photopaper
|
1986 January | |
13 | 1.17.2A: Commercial Signage Policy Design Standards and Approval Process Cover Page
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2B: Commercial Signage Policy Design Standards and Approval Process Page 9
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2C: Commercial Signage Policy Design Standards and Approval Process Pages 4 & 5
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2D: Commercial Signage Policy Design Standards and Approval Process Contents
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2E: Commercial Signage Policy Design Standards and Approval Process Pages 3 & 6
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2F: Commercial Signage Policy Design Standards and Approval Process Pages 2 & 7
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.2G: Commercial Signage Policy Design Standards and Approval Process Pages 1 & 8
Print on Photopaper
|
1987 March 13 | |
13 | 1.17.3A: Printing Package Site Analysis
Print on Mylar
|
undated | |
13 | 1.17.3B: Printing Package Illustrative Plan
Print on Mylar
|
undated | |
13 | 1.17.3C: Printing Package Parking and Circulation Plan
Print on Mylar
|
undated | |
13 | 1.17.3D: Printing Package Ground Level Plan
Print on Mylar
|
undated | |
13 | 1.17.3E: Printing Package Landscape Concept Plan
Print on Mylar
|
undated | |
13 | 1.17.3F: Printing Package Common Elements Plan
Print on Mylar
|
undated | |
13 | 1.17.3G: Printing Package Subdivision Plan
Print on Mylar
|
undated | |
13 | 1.17.3H: Printing Package Area Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.3I: Printing Package Schematic Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.3J: Printing Package Conceptual Grading Plan
Print on Mylar
|
undated | |
13 | 1.17.4A: Village Master Plan Cover
Print on Bond
|
undated | |
13 | 1.17.4B: Village Master Plan Building Location
Print on Bond
|
undated | |
13 | 1.17.4C: Village Master Plan Landscape Plan
Print on Bond
|
undated | |
13 | 1.17.4D: Village Master Plan Landscape Plan
Print on Bond
|
undated | |
13 | 1.17.4E: Village Master Plan Grading Plan
Print on Bond
|
undated | |
13 | 1.17.4F: Village Master Plan Site Lighting Plan
Print on Bond
|
undated | |
13 | 1.17.4G: Village Master Plan Signage Plan
Print on Bond
|
undated | |
13 | 1.17.4H: Village Master Plan Fire Access Plan
Print on Bond
|
undated | |
13 | 1.17.5A: Printing Package Site Analysis Iterations
Print on Acetate
|
undated | |
13 | 1.17.5B: Printing Package Site Analysis Iterations
Print on Photopaper
|
undated | |
13 | 1.17.5C: Printing Package Site Analysis Iterations
Print on Photopaper
|
undated | |
13 | 1.17.5D: Printing Package Site Analysis Iterations
Print on Vellum
|
undated | |
13 | 1.17.6A: Printing Package Parking and Circulation Plan Iterations
Print on Vellum
|
undated | |
13 | 1.17.6B: Printing Package Parking and Circulation Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.6C: Printing Package Parking and Circulation Plan Iterations
Marker and Print on Photopaper
|
undated | |
13 | 1.17.7A: Printing Package Ground Level Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.7B: Printing Package Ground Level Plan Iterations
Sepia on Acetate
|
undated | |
13 | 1.17.7C: Printing Package Ground Level Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.7D: Ground Level Plan
Print on Acetate
|
undated | |
13 | 1.17.8A: Printing Package Landscape Concept Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.8B: Printing Package Landscape Concept Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.9A: Printing Package Common Elements Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.9B: Printing Package Common Elements Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.9C: Printing Package Common Elements Plan Iterations
Print on Vellum
|
undated | |
13 | 1.17.9D: Printing Package Common Elements Plan Iterations
Print on Avetate
|
undated | |
13 | 1.17.10A: Printing Package Subdivision Plan Iterations
Print on Vellum
|
undated | |
13 | 1.17.10B: Printing Package Subdivision Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.10C: Printing Package Subdivision Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.10D: Printing Package Subdivision Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.11A: Printing Package Area Utility Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.11B: Printing Package Area Utility Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.12A: Printing Package Schematic Utility Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.12B: Printing Package Schematic Utility Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.13A: Printing Package Conceptual Grading Plan Iterations
Print on Acetate
|
undated | |
13 | 1.17.13B: Printing Package Conceptual Grading Plan Iterations
Print on Photopaper
|
undated | |
13 | 1.17.14: Village Master Plan Site Analysis
Print and Ink on Mylar
|
undated | |
13 | 1.17.15: Village Master Plan Site Analysis
Print on Mylar
|
undated | |
13 | 1.17.16: Village Master Plan Area Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.17: Village Master Plan Landscape Concept Plan
Print on Mylar
|
undated | |
13 | 1.17.18: Village Master Plan Area Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.19: Village Master Plan Schematic Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.20: Village Master Plan Subdivision Plan
Print on Mylar
|
undated | |
13 | 1.17.21: Village Master Plan Subdivision Plan
Print on Mylar
|
undated | |
13 | 1.17.22: Village Master Plan Subdivision Plan
Print on Mylar
|
undated | |
13 | 1.17.23: Village Master Plan Conceptual Grading Plan
Print on Mylar
|
undated | |
13 | 1.17.24: Village Master Plan Parking and Circulation Plan
Print on Mylar
|
undated | |
13 | 1.17.25: Village Master Plan Parking and Circulation Plan
Print on Mylar
|
undated | |
13 | 1.17.26: Village Master Plan Ground Level Plan
Print on Mylar
|
undated | |
13 | 1.17.27: Village Master Plan Schematic Utility Plan
Print on Mylar
|
undated | |
13 | 1.17.28A: Mid-Point Document Package Elevations and Sections
Pencil on Sepia Print
|
undated | |
13 | 1.17.28B: Mid-Point Document Package Subdivision Plan
Pencil on Sepia Print
|
undated | |
13 | 1.17.28C: Mid-Point Document Package Elevations
Pencil on Sepia Print
|
undated | |
13 | 1.17.28D: Mid-Point Document Package Landscape Concept Plan
Pencil on Sepia Print
|
undated | |
13 | 1.17.28E: Mid-Point Document Package Concept Diagram
Pencil on Sepia Print
|
undated | |
13 | 1.17.28F: Mid-Point Document Package Elevations and Sections
Pencil on Sepia Print
|
undated | |
13 | 1.17.28G: Mid-Point Document Package Bill Johnson Sketches
Pencil on Sepia Print
|
undated | |
13 | 1.17.28H: Mid-Point Document Package Road Exposure and Alignment
Pencil on Sepia Print
|
undated | |
13 | 1.17.28I: Mid-Point Document Packages Perspective Sketches
Pencil on Sepia Print
|
undated | |
Banff Downtown Enhancement
|
|||
tube | |||
14 | 1.18.1: Area Map
Blueprint on Bond
|
undated | |
14 | 1.18.2: Banff Alberta Downtown Enhancement
Blueprint on Bond
|
1992 March 11 | |
14 | 1.18.3: Banff Calculation Studies
Blueprint on Bond
|
undated | |
14 | 1.18.4: 2 Lane Scheme
Blueprint on Bond
|
undated | |
14 | 1.18.5: 4 Lanes Section
Blueprint on Bond
|
undated | |
14 | 1.18.6: 3 Lanes – 2 Lanes in One Direction
Blueprint on Bond
|
undated | |
14 | 1.18.7: 3 Lane Options
Blueprint on Bond
|
undated | |
14 | 1.18.8: Boundaries and Circulation
Marker on Blueprint on Bond
|
undated | |
14 | 1.18.9: Boundaries and Circulation
Blueprint on Bond
|
undated | |
14 | 1.18.10: Visitor Auto Access and Parking
Blueprint on Bond
|
undated | |
14 | 1.18.11: Parking Management
Blueprint on Bond
|
1992 | |
14 | 1.18.12: Shuttle Stops and Route
Blueprint on Bond
|
undated | |
14 | 1.18.13: 2 Lane One-Way System
Blueprint on Bond
|
undated | |
14 | 1.18.14: Modified Street Section with Review of Parking Lanes
Blueprint on Bond
|
undated | |
14 | 1.18.15: Circulation Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.16: Existing Service Access
Blueprint on Bond
|
undated | |
14 | 1.18.17: Circulation Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.18: Intersection Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.19: Intersection Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.20: Entry in Plan View and Section
Blueprint on Bond
|
undated | |
14 | 1.18.21: Entry Concept Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.22: Entry Concept Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.23: Circulation Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.24: Parking Study
Blueprint on Bond
|
undated | |
14 | 1.18.25: Routes and Nodes
Blueprint on Bond
|
undated | |
14 | 1.18.26: Banff Avenue Paving
Blueprint on Bond
|
undated | |
14 | 1.18.27: Banff Avenue Paving
Blueprint on Bond
|
undated | |
14 | 1.18.28: Intersection Plans and Sections
Blueprint on Bond
|
undated | |
14 | 1.18.29: Off Banff Avenue Schematic
Blueprint on Bond
|
undated | |
14 | 1.18.30: Area Map with Circulation
Blueprint on Bond
|
undated | |
14 | 1.18.31: BDEP Design Component: Traffic
Blueprint on Bond
|
undated | |
14 | 1.18.32: Circulation Schematics
Blueprint on Bond
|
undated | |
14 | 1.18.33: BDEP Design Component: Linkages
Blueprint on Bond
|
undated | |
14 | 1.18.34: BDEP Design Component: Intersections and Nodes
Blueprint on Bond
|
undated | |
14 | 1.18.35: Banff Springs Hotel Signage
Blueprint on Bond
|
undated |
II: II: High Desert, 1989-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
1 | 1 | Academy Lands East Correspondence
(A.2, #219)
|
1989 |
1 | 2 | Albuquerque Academy Lands East Meeting Minutes
(A.4, #219)
|
1989 |
1 | 3 | Albuquerque Academy Planned Communities Criteria
(#219)
|
1989 |
1 | 4 | High Desert Proposal/Contracts
(A.1, #551)
|
1991 |
1 | 5 | High Desert Proposals/Contracts
(A.1, #551)
|
1991-1992 |
1 | 6 | High Desert Proposals/Contracts
(A.1, #551)
|
1994 |
1 | 7 | High Desert Correspondence
(A.2, #551)
|
1991 |
1 | 8 | High Desert Correspondence
(A.2, #551)
|
1992 |
1 | 9 | High Desert Correspondence
(A.2, #551)
|
1995 |
1 | 10 | High Desert Correspondence – Agency
(A.2c, #551)
|
1991-1993 |
1 | 11 | High Desert Transmittals
(A.3, #551)
|
1992-1994 |
1 | 12 | High Desert Meeting Minutes
(A.4, #551)
|
1988-1991 |
1 | 13 | High Desert Meeting Minutes |
1991 September |
2 | 1 | High Desert Administrative
(A.4, #551)
|
1991 October |
2 | 2 | High Desert Meeting Minutes
(A.4, #551)
|
1991 November-December |
2 | 3 | High Desert Meeting Minutes
(A.4, #551)
|
1992 January-February |
2 | 4 | High Desert Meeting Minutes
(A.4, #551)
|
1992 March-July |
2 | 5 | High Desert Work Program
(A.5, #551)
|
1991-1993 |
2 | 6 | High Desert Clippings
(A.6, #551)
|
1991-1993 |
2 | 7 | High Desert Billing
(A.8, #551)
|
1992 |
2 | 8 | High Desert Faxes – Sketch Modifications
(A.9, #551)
|
1993 |
2 | 9 | High Desert Biological
(B.2, #551)
|
1992 |
2 | 10 | High Desert Programming - Golf Course
(B.5e, #551)
|
1989-1993 |
2 | 11 | High Desert Programming – Conference Center/Resort
(B.5f, #551)
|
1990-1991 |
2 | 12 | High Desert Programming – High Tension Lines
(B.5g, #551)
|
1988-1992 |
2 | 13 | High Desert Programming – Grading
(B.5h, #551)
|
1992 |
3 | 1 | High Desert Design
(B.6, #551)
|
1991 |
3 | 2 | High Desert Cost Estimates / Financial Feasibility
(B.6, #551)
|
1991 |
3 | 3 | High Desert Cost Estimates
(B.6, #551)
|
1991-1992 |
3 | 4 | High Desert Cost Estimates
(B.6, #551)
|
1993-1994 |
3 | 5 | High Desert Design Sketches
(B.7, #551)
|
1991-1992 |
3 | 6 | Political Process
(B.8, #551)
|
1990-1991 February |
3 | 7 | Political Process
(B.8, #551)
|
1991 September-October |
3 | 8 | Political Process
(B.8, #551)
|
1991 October |
3 | 9 | Political Process
(B.8, #551)
|
1991 November |
3 | 10 | Political Process
(B.8, #551)
|
1991 December |
3 | 11 | Political Process
(B.8, #551)
|
1992 |
3 | 12 | High Desert Retirement Community
(B.9, #551)
|
1991 |
3 | 13 | Zoning
(B.10, #551)
|
1992-1993 |
4 | 1 | High Desert
(B.11, #551)
|
1992 |
4 | 2 | Sierra Club
(B.13, #551)
|
1992 |
4 | 3 | High Desert Assisted Living Facility
(B.14, #551)
|
1992 |
4 | 4 | High Desert Streets
(B.15, #551)
|
1992 |
4 | 5 | High Desert Streets
(B.15, #551)
|
1993-1994 |
4 | 6 | Lighting
(B.16, #551)
|
1987-1994 |
4 | 7 | High Desert Canada Reservoir
(B.17, #551)
|
1992 |
4 | 8 | Open Space Task Force
(B.18, #551)
|
1992 |
4 | 9 | Albuquerque Conservation Trust
(B.19, #551)
|
1992 |
4 | 10 | Water Conservation Task Force
(B.20, #551)
|
1992-1994 |
4 | 11 | Development Review Board
(B.21, #551)
|
1992 |
4 | 12 | Open Space
(B.22, #551)
|
1992 |
4 | 13 | Trails
(B.23, #551)
|
1992-1993 |
4 | 14 | Forest Service
(B.24, #551)
|
1992-1993 |
4 | 15 | 404 Permits
(B.25, #551)
|
1993 |
4 | 16 | Archaeology
(B.27, #551)
|
1993 |
4 | 17 | Parcel Proforma
(B.28, #551)
|
1993 |
4 | 18 | Homeowner's Association
(B.29, #551)
|
1993 |
4 | 19 | Comprehensive Plan Amendment
(B.30, #551)
|
1993 |
4 | 20 | Commercial Covenants
(B.32, #551
|
1993 |
4 | 21 | Unit Counts
(B.33, #551)
|
1993 |
4 | 22 | Parcel 2
(B.34, #551)
|
1995 |
4 | 23 | Trailhead
(B.35, #551)
|
1993 |
4 | 24 | Trailhead
(B.35, #551)
|
1994 |
4 | 25 | Parcel 3
(B.36, #551)
|
1994-1995 |
5 | 1 | Apartments
(B.37, #551)
|
1993 |
5 | 2 | Apartments
(B.37, #551)
|
1994 |
5 | 3 | Art piece competition
(B.38, #551)
|
1994-1995 |
5 | 4 | Office building
(B.39, #551)
|
1994 |
5 | 5 | Building heights
(B.40, #551)
|
1993-1995 |
5 | 6 | Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
|
1991 |
5 | 7 | Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
|
1992-1993 |
5 | 8 | Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
|
1994 |
5 | 9 | Specifications Architecture
(D.2, #551)
|
1991 |
5 | 10 | Specifications Architecture
(D.2, #551)
|
1991 |
5 | 11 | Architecture
(D.2, #551)
|
1993 |
5 | 12 | Design Guidelines Sector Plan
(D.3, #551)
|
1986 |
5 | 13 | Design Guidelines Sector Plan
(D.3, #551)
|
1992 March–June |
5 | 14 | Design Guidelines Sector Plan
(D.3, #551)
|
1992 July–September |
6 | 1 | Design Guidelines Sector Plan
D. 3, #551)
|
1992 |
6 | 2 | Design Guidelines Sector Plan, Volume On
(D.3, #551)
|
1993 |
6 | 3 | Design Guidelines Sector Plan
(D.3, #551)
|
1993 |
6 | 4 | Design Guidelines Sector Plan
(D.3, #551)
|
1994 |
6 | 5 | Covenants, Conditions & Restrictions Economic Model
(D. 4, #551)
|
1992 |
6 | 6 | Planned Unit Developments Environmental Evaluation
(D.5, #551)
|
1992 |
6 | 7 | Marketing Consultants
(D.7, #551)
|
1992 |
6 | 8 | Fund Raising
(D.8, #551)
|
1992 |
6 | 9 | Graphic Designers
(D.9, #551)
|
1993 |
6 | 10 | Conservation Easements
(D.10, #551)
|
1992 |
6 | 11 | Conservation Easements
(D.10, #551)
|
1993 |
6 | 12 | Conservation Easements
(D.10, #551)
|
1993 |
6 | 13 | Conservation Easements
(D.10, #551)
|
1993 |
6 | 14 | Conservation Easements
(D.10, #551)
|
1993 |
6 | 15 | Conservation Easements
(D.10, #551)
|
1993 |
7 | 1 | Conservation Easements Deed
(D.10, #551)
|
1993 |
7 | 2 | Conservation Easement Plat
(D.10, #551)
|
1993 |
7 | 3 | Drainage Easements
(D.11, #551)
|
1993 |
7 | 4 | Bulk land plat |
1993 |
7 | 5 | Distribution list |
undated |
7 | 6 | Conceptual drainage plan |
1994 |
7 | 7 | Cross-lot drainage plan |
1992 |
7 | 8 | Marketing graphics |
undated |
7 | 9 | Press release |
undated |
7 | 10 | Slope maps |
1993 |
7 | 11 | Proposal/Contracts
(A.1, #853)
|
1992-1993 |
7 | 12 | Proposal/Contracts
(A.1, #853)
|
1994 February |
7 | 13 | Proposal/Contracts
(A.1, #853)
|
1994 February-December |
7 | 14 | Proposal/Contracts
(A.1, #853)
|
1995 |
8 | 1 | Proposal/Contracts Phase II Streetscapes
(A.1a, #853)
|
1993-1995 May |
8 | 2 | Proposal/Contracts
(A.1a, #853)
|
1995 August-1997 |
8 | 3 | Proposal/Contracts
(A.1b, #853)
|
1996 |
8 | 4 | Correspondence
(A.2, #853)
|
1993-1994 |
8 | 5 | Correspondence - Owner
(A.2a, #853)
|
1994 |
8 | 6 | Correspondence - Owner
(A.2a, #853)
|
1995 January–May |
8 | 7 | Correspondence/ Owner
(A.2a, #853)
|
1995 June-1997 |
8 | 8 | Correspondence – Consultant
(A.2b, #853)
|
1993-1995 |
8 | 9 | Correspondence - Agency
(A.2c, #853)
|
1991-1997 |
8 | 10 | Conversation Records
(A.2d, #853)
|
1994-1996 |
8 | 11 | Transmittals
(A.3a, #853)
|
1995 |
8 | 12 | Meeting Minutes
(A.4, #853)
|
1994-1996 |
8 | 13 | Work Program
(A.5, #853)
|
undated |
9 | 1 | Billing/Invoices
(A.7, #853)
|
1993-1994 May |
9 | 2 | Billing/Invoices
(A.7, #853)
|
1994 June–October |
9 | 3 | Billing/Invoices
(A.7, #853)
|
1994 November–1995 |
9 | 4 | Billing/Invoices
(A.7, #853)
|
1996 |
9 | 5 | Billing/Invoices
(A.7 #853)
|
1997 |
9 | 6 | Notes to File
(A.8, #853)
|
1995-1997 |
9 | 7 | Facsimiles; contains plant list
(A.9, #853)
|
1994-1995 |
9 | 8 | Facsimiles; contains plant list
(A.9, #853)
|
1996-1997 |
9 | 9 | Geology/Soils
(B.1a, #853)
|
1995-1996 |
9 | 10 | Streetscape irrigation
(B.2, #853)
|
1994 |
9 | 11 | Programming; contains plant and tree lists
(B.5, #853)
|
1993 |
9 | 12 | Cost Estimates
(B.6, #853)
|
1993-1994 |
9 | 13 | Cost Estimates
(B.6, #853)
|
1995-1997 |
9 | 14 | Design Sketches
(B.7, #853)
|
1995-1997 |
10 | 1 | Construction Bids
(C.1, #853)
|
1996 |
10 | 2 | Pay Requests
(C.3, #853)
|
1995-1996 |
10 | 3 | Pay Requests
(C.3, #853)
|
1997 |
10 | 4 | Field Reports
(C.4, #853)
|
1995-1997 |
10 | 5 | Change Orders
(C.5, #853)
|
1995-1996 |
10 | 6 | Construction Communications
(C.7, #853)
|
1995-1997 |
10 | 7 | Marketing/Presentations
(D.1, #853)
|
1992-1993 |
10 | 8 | Marketing/Presentations
(D.1, #853)
|
1993 |
10 | 9 | Specifications; restoration and enhancement plan
(D.2, #853)
|
1994 |
11 | 1 | On-Call Consulting Proposals/Contracts
(A.1a, #1398)
|
1996 |
11 | 2 | Correspondence
(A.2a, #1398)
|
1996-1997 |
11 | 3 | Correspondence/Agency
(A.2c, #1398)
|
1996 |
11 | 4 | Conversation Records
(A.2d, #1398)
|
1996 |
11 | 5 | Billing/Invoices
(A.7, #1398)
|
1996-1998 |
11 | 6 | Notes to File
(A.8, #1398)
|
1996 |
11 | 7 | Facsimiles
(A.9, #1398)
|
1996 |
11 | 8 | Design Sketches
(B.7, #1398)
|
1996-1997 |
11 | 9 | Proposal/Contracts – Owner/Landscape Architect
(A.1a, #1401)
|
1996 |
11 | 10 | Meeting Minutes
(A.4, #1401)
|
1996 |
11 | 11 | Billing/Invoices
(A.7, #1401)
|
1996 |
11 | 12 | Notes to File
(A.8, #1401)
|
1996 |
11 | 13 | Facsimiles
(A.9, #1401)
|
1996 |
11 | 14 | Programming/Architectural
(B.5a, #1401)
|
1996 |
11 | 15 | Programming/Recreational
(B.5b, #1401)
|
1996 |
11 | 16 | Cost Estimates
(B.6, #1401)
|
1996 |
11 | 17 | Design Sketches/Product Information
(B.7, #1401)
|
1996 |
11 | 18 | Design Guidelines
(D.3, #1401)
|
1996 |
12 | 1 | Neighborhood Park & Albuquerque Academy Projects
(A.1a, #1621)
|
1993-2007 |
12 | 2 | Correspondence – Owner
(A.2a, #1621)
|
1997-1998 |
12 | 3 | Correspondence – Agency
(A.2c, #1621)
|
1997 |
12 | 4 | Conversation Records
(A.2d, #1621)
|
1997-1998 |
12 | 5 | Transmittals
(A.3, #1621)
|
1997-1998 |
12 | 6 | Meeting Minutes
(A.4, #1621)
|
1995-1997 |
12 | 7 | Notes to File
(A.8, #1621)
|
1997 |
12 | 8 | Facsimiles
(A.9, #1621)
|
1997-1998 |
12 | 9 | Facsimiles
(A.9. #1621)
|
1998 February–September |
12 | 10 | Cost Estimates
(B.6, #1621)
|
1997 |
12 | 11 | Cost Estimates
(B.6, #1621)
|
1998 |
12 | 12 | Design Sketches
(B.7, #1621)
|
1997 August–October |
12 | 13 | Design Sketches
(B.7, #1621)
|
1997-1998 |
12 | 14 | Construction Bids/Proposals
(C.1, #1621)
|
1998 |
12 | 15 | Field Reports
(C.4, #1621)
|
1998 |
12 | 16 | Submittals/Shop Drawings
(C.6, #1621)
|
1998 |
12 | 17 | Construction Communications
(C.7, #1621)
|
1998 |
12 | 18 | Specifications
(D.2, #1621)
|
1998 |
12 | 19 | Albuquerque Academy Invoices
(A.7, #4186)
|
2007 |
12 | 20 | Albuquerque Academy Project Description
(#4186)
|
2007 |
13 | 1 | A – Gu
(includes history of the project)
|
1992-1994 |
13 | 2 | Building Material Alternatives |
1991-1992 |
13 | 3 | Community Garden |
1992 |
13 | 4 | Declaration of Covenants, Conditions, and Restrictions |
1992 |
13 | 5 | Design Guidelines |
1992-1993 |
13 | 6 | Environmental Planning Commission (EPC) |
1992 |
13 | 7 | Environmental Planning Commission (EPC) |
1992 |
13 | 8 | Fencing |
1993 |
13 | 9 | Field Guide |
undated |
13 | 10 | Gate Design |
1994 |
13 | 11 | Guidelines for Sustainability Builder Homes |
1995 |
13 | 12 | Guidelines for Sustainability Estate and Premiere Homes
(rough draft)
|
1993 |
13 | 13 | Guidelines for Sustainability Estate and Premiere Homes |
1994 |
14 | 1 | Guidelines for Sustainability Estate and Premiere Homes |
1995 |
14 | 2 | Guidelines for Sustainability Multi-Family Homes |
1993 |
14 | 3 | Housing |
1991 |
14 | 4 | Irrigation Narrative |
undated |
14 | 5 | Land development material from Charles Harris |
1991 |
14 | 6 | Landscape permit |
1994 |
14 | 7 | Native landscape and tree list |
1993 |
14 | 8 | Neighborhood park agreement |
1993 |
14 | 9 | Newsletters |
1991-1993 |
14 | 10 | Nonresidential properties |
1993 |
14 | 11 | Parcel 3A sketches |
1995 |
14 | 12 | Project Manual Tramway Boulevard Streetscape |
1994 |
14 | 13 | Project Manual Academy Boulevard, Spain Road, Coradia Street |
1994 |
14 | 14 | Restoration and enhancement plan |
1994 |
14 | 15 | Slope comparisons |
1992 |
14 | 16 | Student involvement and the environment |
1992 |
14 | 17 | Utility design |
1993 |
14 | 18 | Water efficiency |
1992 |
14 | 19 | Wood burning stoves |
1990-1992 |
15 | 1 | ASLA Submission |
1993 |
15 | 2 | Community Organizational Documents |
undated |
15 | 3 | Design for a Quality Living Environment |
undated |
15 | 4 | Guidelines for Sustainability |
1993 |
15 | 5 | Highlands Subdivision Unit 1 |
1995 |
15 | 6 | Image Idea Book for High Desert Park |
undated |
15 | 7 | Magazines and Pamphlets |
undated |
15 | 8 | Master Planned Community for the City of Albuquerque |
1992 October 1 |
15 | 9 | Project Manual for Academy Boulevard, Spain Road & Cortaderia Street |
1994 July 8 |
15 | 10 | Sector Plans |
1992 October 1 |
15 | 11 | Site Design & Product Information |
undated |
16 | 1 | Trillium Proposals/Contracts |
1995 |
16 | 2 | Trillium Correspondence/Owner |
1995 |
16 | 3 | Trillium Correspondence/Consultant |
1995 |
16 | 4 | Trillium Conversation Record |
1995 |
16 | 5 | Trillium Cost Estimates |
1995 |
16 | 6 | Trillium Sketches |
1995 |
16 | 7 | Parcel II Site Study Proposals/Contracts |
1995 |
16 | 8 | Parcel II Site Study Notes to File |
1995 |
16 | 9 | Academy Road Proposals/Contracts/Owner |
1999 |
16 | 10 | Academy Road Correspondence |
1999 |
16 | 11 | Academy Road Meeting Minutes |
1999 |
16 | 12 | Academy Road Invoices |
1999-2000 |
16 | 13 | Academy Road Master Plan |
undated |
16 | 14 | Academy Road Notes to File |
1998 |
16 | 15 | Academy Road Design Sketches |
undated |
16 | 16 | Guidelines for Sustainability Builder Homes |
1999 November |
16 | 17 | Guidelines for Sustainability |
1995 March 1 |
16 | 18 | Site Design |
1995 |
16 | 19 | Unit 1 Correspondence |
1995 |
16 | 20 | Unit 1 Notes to File |
1995 |
16 | 21 | Unit 1 Grading |
1995 |
16 | 22 | Unit 1 Cost Estimates |
1995 |
16 | 23 | Unit 1 Construction Bids/Proposals |
1995 |
16 | 24 | Unit 1 Construction Contracts |
1996 |
16 | 25 | Unit 1 Pay Requests |
1996 |
16 | 26 | Unit 1 Change Orders |
1995-1996 |
16 | 27 | Unit 1 Construction Documents |
1995 |
16 | 28 | Neighborhood Center Documents |
1991-1992 |
16 | 29 | Neighborhood Center Invoices |
1995 |
17 | 1 | Entry Features Correspondence |
1995 |
17 | 2 | Entry Features Conversation Records |
1995 |
17 | 3 | Entry Features Design Sketches |
1995 |
17 | 4 | Entry Features Construction Contracts |
1995 |
17 | 5 | Entry Features Pay Requests |
1995 |
17 | 6 | Entry Features Change Orders |
1995 |
17 | 7 | Entry Signage Proposals/Contracts |
1995-1996 |
17 | 8 | Entry Signage Conversation Record |
1996 |
17 | 9 | Entry Signage Correspondence |
1996 |
17 | 10 | Entry Signage Meeting Minutes |
1996 |
17 | 11 | Entry Signage Billing/Invoices |
1996-1997 |
17 | 12 | Entry Signage Notes to File |
1996 |
17 | 13 | Entry Signage Vegetation |
undated |
17 | 14 | Entry Signage Design Sketches |
1995 |
17 | 15 | Entry Signage Marketing Presentation |
1996 |
17 | 16 | Office/Demo Correspondence |
1995 |
17 | 17 | Office/Demo Conversation Record |
1995 |
17 | 18 | Office/Demo Meeting Minutes |
1995 |
17 | 19 | Office/Demo Billing Invoices |
1995 |
17 | 20 | Office/Demo Notes to File |
1995 |
17 | 21 | Office/Demo Cost Estimates |
1995 |
17 | 22 | Office/Demo Construction Contract |
1995 |
17 | 23 | Office/Demo Pay Requests |
1995 |
17 | 24 | Office/Demo Field Reports |
1995 |
17 | 25 | Office/Demo Change Orders |
1995 |
17 | 26 | Office/Demo Construction Communications |
1995 |
17 | 27 | Office/Demo Design Guidelines |
1995 |
17 | 28 | Parcel 3 Proposals/Contracts |
1995 |
17 | 29 | Parcel 3 Correspondence |
1995 |
17 | 30 | Parcel 3 Notes to File |
1995 |
17 | 31 | Parcel 3 Design Sketches |
1995 |
17 | 32 | Parcel 3 Construction Contracts |
1995-1996 |
HIGH DESERT LANDSCAPE DRAWINGS 23 tubes
|
1991-2000 | ||
Parcel 1: High Desert Trailhead
|
1993-1994 | ||
tube | |||
1 | 2.1.1: High Desert Trailhead Parcel Revised Plan
Ink on Trace
|
23 November 1993 | |
1 | 2.1.2.A: Pin Bar Document Package; Finished Site Grading
Ink on Mylar
|
undated | |
1 | 2.1.2.B: Pin Bar Document Package; Building Footprints with Setback
Ink on Mylar
|
undated | |
1 | 2.1.2.C: Pin Bar Document Package; Roadways & Property Boundaries
Ink on Mylar
|
undated | |
1 | 2.1.3: The Trailhead Setbacks and ROW
Ink on Mylar
|
1993 December 14 | |
1 | 2.1.4A-B: Setback and Lot Line Dimensioning
Ink on Trace
|
1993 November 5 | |
1 | 2.1.5: The Trailhead Site Plan
Marker on Print on Bond
|
1993 December 14 | |
1 | 2.1.6A: Pin Bar Documents; Base Lines
Ink on Mylar
|
undated | |
1 | 2.1.6B: Plan Pin Bar Documents; Sheet 18 of 25
Ink on Mylar
|
undated | |
1 | 2.1.6C: Plan Pin Bar Documents; Setbacks and ROW
Ink on Mylar
|
undated | |
1 | 2.1.6D: Plan Pin Bar Documents; Labels
Ink on Mylar
|
undated | |
1 | 2.1.6E: Plan Pin Bar Documents; Sheet 19 of 25
Ink on Mylar
|
undated | |
1 | 2.1.6F: Plan Pin Bar Documents; Title Block
Ink on Mylar
|
undated | |
1 | 2.1.6G: Plan Pin Bar Documents; Base Lines
Ink on Mylar
|
undated | |
1 | 2.1.6H: Plan Pin Bar Documents; Labels
Ink on Mylar
|
undated | |
1 | 2.1.6I: Plan Pin Bar Documents; Sheet 20 of 25
Ink on Mylar
|
undated | |
1 | 2.1.7: Tree Streetscape Pin Bar Document
Ink on Mylar
|
undated | |
1 | 2.1.8: Topography
Print on Acetate
|
undated | |
1 | 2.1.9: Juniper, Pine & Oak Streetscape
Colored Pencil on Blueprint on Bond
|
undated | |
1 | 2.1.10: Tree Streetscape with Cul-de-Sacs
Colored Pencil on Blueprint on Bond
|
undated | |
1 | 2.1.11: Tree Streetscape with Cul-de-Sacs
Colored Pencil on Blueprint on Bond
|
undated | |
1 | 2.1.12: High Desert Area Map
Print on Bond
|
undated | |
1 | 2.1.13: Tract 8 Area Calculations
Print on Bond
|
undated | |
1 | 2.1.14: Tract A Sheet 6
Blueprint on Bond
|
undated | |
1 | 2.1.15: Tract A Sheet 7
Blueprint on Bond
|
undated | |
1 | 2.1.16: Preliminary Utility Layout
Ink & Print on Vellum
|
undated | |
1 | 2.1.17: Preliminary Plat of Trailhead Subdivision Albuquerque, New Mexico
Print on Bond
|
1994 January | |
1 | 2.1.18: High Desert Trailhead Parcel 28 Lot Scheme Alternative 'A': Phase 1 Landscape Plan
Print on Bond
|
1993 October 12 | |
1 | 2.1.19: Simms Reservoir No. 2 Site Development Plan |
undated | |
2 | 2.1.20A: Trailhead Subdivision Grading/Drainage Plan; Revisions
Ink on Trace
|
undated | |
2 | 2.1.20B: Trailhead Subdivision Grading/Drainage Plan; Base Map
Print on Bond
|
undated | |
2 | 2.1.21: Embudito Trail Planting Plan
Ink on Blueprint on Bond
|
undated | |
2 | 2.1.22: La Luz Trail Planting Plan
Ink on Blueprint on Bond
|
undated | |
2 | 2.1.23: Lotting Plan with Grading
Print on Mylar
|
undated | |
2 | 2.1.24: High Desert Trailhead Parcel Revised Plan
Print on Bond
|
1993 November 23 | |
2 | 2.1.25: Lot & Building Footprint Arrangement on Trace
Ink on Trace
|
undated | |
2 | 2.1.26: Aerial Photograph with Grading & Lotting Plan
Sepia Print on Acetate
|
undated | |
2 | 2.1.27: Setbacks and Lotting Plan
Blueprint on Bond
|
1993 November 5 | |
2 | 2.1.28: High Desert Trailhead Parcel 28 Lot Scheme Alternative 'B' |
1993 October 12 | |
2 | 2.1.29: Aerial Photograph with square footage
Ink on Blueprint on Bond
|
undated | |
2 | 2.1.30: Topography
Print on Photo paper
|
undated | |
2 | 2.1.31: La Luz Trail Place Spot Elevations
Adhesive on Mylar
|
undated | |
2 | 2.1.32: La Luz Trail Place Spot Elevations
Adhesive on Mylar
|
undated | |
2 | 2.1.33: Lotting Plan
Print on Photo paper
|
undated | |
2 | 2.1.34: The Trailhead Site Plan
Print on Mylar
|
undated | |
2 | 2.1.35: Sections for Seeding with native grass mix
Adhesive on Mylar
|
undated | |
2 | 2.1.36: High Desert Trailhead Landscape Plan
Sepia Print on Acetate
|
1994 March 7 | |
2 | 2.1.37A-B: Lotting Plan with Square Footage
Print on Acetate
|
undated | |
2 | 2.1.38: Plat of Trailhead Subdivision Albuquerque New Mexico Sheet 2 of 2; |
1994 January | |
2 | 2.1.39: Trailhead Perimeter Planting Alternative 2 Sheet 2
Ink on Trace
|
1994 March 7 | |
2 | 2.1.40: Trailhead Perimeter Planting Alternative 1 Sheet 1 of 2
Ink on Trace
|
1994 March 7 | |
2 | 2.1.41: Trailhead Parcel Adjacent Subdivision Footprint/Lot Size Comparison
Ink on Trace
|
1993 November 15 | |
2 | 2.1.42: Lotting Plan
Print on Vellum
|
undated | |
2 | 2.1.43: The Trailhead Cul-de-Sac Concepts
Ink on Trace
|
undated | |
Parcel 2
|
1993-1994 | ||
tube | |||
3 | 2.2.1: Proposed Planting and Berm Grading
Ink on Mylar
|
undated | |
3 | 2.2.2: Trees and Turf
Ink on Mylar
|
undated | |
3 | 2.2.3: Pedestrian Routes and Signage
Ink on Mylar
|
undated | |
3 | 2.2.4: Building Footprints and Setbacks
Ink on Mylar
|
undated | |
3 | 2.2.5: High Desert Tract 2-A
Ink on Mylar
|
undated | |
3 | 2.2.6: Parcel 2 Building Footprints and Setbacks
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.7: Lotting Plan with Pedestrian Routes
Sepia Print on Acetate
|
undated | |
3 | 2.2.8: Trees and Turf
Sepia Print on Acetate
|
29 November 1993 | |
3 | 2.2.9: Labels
Sepia Print on Acetate
|
29 November 1993 | |
3 | 2.2.10: Grading and Drainage
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.11: Building Footprints and Setbacks
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.12: Labels
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.13: Roads
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.14: Grading
Sepia Print on Acetate
|
undated | |
3 | 2.2.15: Landscape
Sepia Print on Acetate
|
undated | |
3 | 2.2.16: Parcel 2 Cul-de-Sac Plan
Print on Bond
|
undated | |
3 | 2.2.17A: Parcel 2 Notes on Site Plan
Pencil & Ink on Trace
|
1993 September 20 | |
3 | 2.2.17B: Parcel 2 Notes on Site Plan
Acetate
|
1993 September 20 | |
3 | 2.2.18: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
|
undated | |
3 | 2.2.19: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
|
undated | |
3 | 2.2.20: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.21: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Mylar
|
undated | |
3 | 2.2.22: Parcel 2 Sections, Trace Studies, & Working Prints
Sepia Print on Acetate
|
undated | |
3 | 2.2.23: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.24: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.25: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.26: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.27: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.28: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.29: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Mylar
|
undated | |
3 | 2.2.30: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
|
undated | |
3 | 2.2.31: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.32: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.33: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.34: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.35: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.36: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
|
undated | |
3 | 2.2.37: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.38: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.39: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
|
undated | |
3 | 2.2.40: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.41: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
|
undated | |
3 | 2.2.42: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Print on Mylar
|
undated | |
3 | 2.2.43: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
|
undated | |
3 | 2.2.44: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
|
undated | |
3 | 2.2.45: High Desert Parcel 2
Sepia Print on Acetate
|
1993 November 29 | |
3 | 2.2.46: High Desert Tracts 2A-1A & 2A-1B Scheme A |
1994 May 2 | |
3 | 2.2.47: High Desert Tracts 2A-1A & 2A-1B Scheme C |
1994 May 2 | |
3 | 2.2.48: Land Survey for Parcel A |
undated | |
3 | 2.2.49: Parcel 2 Grading & Spot Elevations |
1993 November 29 | |
Parcel 3
|
1993-1994 | ||
tube | |||
4 | 2.3.1A: Parcel 3 Pin Bar Documents Labeled "Final"; Setbacks
Ink on Mylar
|
1994 February 25 | |
4 | 2.3.1B: Parcel 3 Pin Bar Documents Labeled "Final"; Grading and Drainage
Ink on Mylar
|
1993 November 24 | |
4 | 2.3.1C: Parcel 3 Pin Bar Documents Labeled "Final"; Labels
Ink on Mylar
|
undated | |
4 | 2.3.1D: Parcel 3 Pin Bar Documents Labeled "Final"; Trees and Turf
Ink on Mylar
|
undated | |
4 | 2.3.1E: Parcel 3 Pin Bar Documents Labeled "Final"; Pedestrian Routes and Signage
Ink on Mylar
|
undated | |
4 | 2.3.1F: Parcel 3 Pin Bar Documents Labeled "Final"; Parcel Boundaries
Ink on Mylar
|
undated | |
4 | 2.3.2A: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Grading and Drainage
Ink on Mylar
|
undated | |
4 | 2.3.2B: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Trees
Ink on Mylar
|
undated | |
4 | 2.3.2C: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Turf
Ink on Mylar
|
undated | |
4 | 2.3.2D: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Pedestrian Routes and Signage
Ink on Mylar
|
undated | |
4 | 2.3.2E: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Building Footprints and Setbacks
Ink on Mylar
|
undated | |
4 | 2.3.3: High Desert Parcel 3 Alternative
Ink on Trace
|
1993 June 30 | |
4 | 2.3.4: Parcel 3 Utility Layout Plan Discussion Level
Sepia Print on Mylar
|
1993 October 11 | |
4 | 2.3.5: Parcel 3 Grading and Drainage
Sepia Print on Acetate
|
1993 November 24 | |
4 | 2.3.6: Parcel 3 Pedestrian Circulation & Signage
Sepia Print on Acetate
|
undated | |
4 | 2.3.7: Parcel 3 Master Plan of Combined Pin Bar Documents
Sepia Print on Acetate
|
undated | |
4 | 2.3.8: Parcel 3 Grading;
Sepia Print on Acetate
|
1993 November 24 | |
4 | 2.3.9: Parcel 3 Combined Pin Bar Documents from Final
Sepia Print on Acetate
|
1993 November 24 | |
Site Analysis & Inventory
|
1991-1993 | ||
tube | |||
5 | 2.4.1: Scenario 1
Ink on Trace
|
1991 October 25 | |
5 | 2.4.2: Scenario 2
Ink on Trace
|
1991 October 25 | |
5 | 2.4.3: Scenario 3
Ink on Trace
|
1991 October 25 | |
5 | 2.4.4: Scenario 4
Ink on Trace
|
1991 October 25 | |
5 | 2.4.5: Scenario 5
Ink on Trace
|
1991 October 25 | |
5 | 2.4.6: Scenarios #1-4
Ink & Marker on Trace
|
undated | |
5 | 2.4.7: Scenario #2a
Ink & Marker on Trace
|
undated | |
5 | 2.4.8: Scenario
Ink & Marker on Trace
|
undated | |
5 | 2.4.9: Scenario 2A
Ink & Marker on Trace
|
undated | |
5 | 2.4.10: Scenario 2B
Ink & Marker on Trace
|
undated | |
5 | 2.4.11: Scenario 2C
Ink & Marker on Trace
|
undated | |
5 | 2.4.12: Open Space Governance
Ink & Marker on Trace
|
undated | |
5 | 2.4.13: Draft Zoning Plan
Ink & Marker on Trace
|
undated | |
5 | 2.4.14: High Desert Phasing Plan
Blueprint on Bond
|
undated | |
5 | 2.4.15: Developable Land Summary
Blueprint on Bond
|
undated | |
5 | 2.4.16: Landscape Concept Plan
Blueprint on Bond
|
undated | |
5 | 2.4.17: Land Use Plan with Golf
Blueprint on Bond
|
undated | |
5 | 2.4.18: Cultural and Community Centers: Retirement Center, Teens, Golf, & Cultural Center
Blueprint on Bond
|
undated | |
5 | 2.4.19: Cultural and Community Centers: School, Neighborhood Commercial, Park, & Church
Blueprint on Bond
|
undated | |
5 | 2.4.20: Cultural and Community Centers: Roads, Reservoir, Potential Land Trade, & Lot Size
Blueprint on Bond
|
undated | |
5 | 2.4.21: Academy Lands East Conceptual Master Plan
Blueprint on Bond
|
undated | |
5 | 2.4.22: Circulation Diagram
Ink on Trace
|
undated | |
5 | 2.4.23: Utility Plan
Ink on Mylar
|
undated | |
6 | 2.4.24: Building Footprints & Travel Routes
Ink on Mylar
|
undated | |
6 | 2.4.25: Vegetation
Ink on Mylar
|
undated | |
6 | 2.4.26: Drainage Concept Plan
Ink on Mylar
|
undated | |
6 | 2.4.27: Circulation Plan
Ink on Mylar
|
undated | |
6 | 2.4.28: Floodplain
Ink on Mylar
|
undated | |
6 | 2.4.29: Landscape Concept Plan
Ink on Mylar
|
undated | |
6 | 2.4.30: Open Space/Trails Plan
Ink on Mylar
|
undated | |
6 | 2.4.31: Phasing Plan
Ink on Mylar
|
undated | |
6 | 2.4.32: Street Names Plan
Ink on Mylar
|
undated | |
6 | 2.4.33: Soils Plan
Ink on Mylar
|
undated | |
6 | 2.4.34: Land Use Plan
Ink on Mylar
|
undated | |
6 | 2.4.35: Road Use Diagram
Ink & Marker on Blueprint on Bond
|
undated | |
6 | 2.4.36A: Site Suitability on Trace
Colored Pencil on Trace
|
undated | |
6 | 2.4.36B: Site Suitability on Trace
Colored Pencil on Trace
|
undated | |
6 | 2.4.37: Riparian Vegetation Zone & Floodplain with Building Envelopes |
1992 December 16 | |
6 | 2.4.38: Aerial Photograph with Existing Topography
Print on Diazo Mylar
|
undated | |
6 | 2.4.39: Aerial Photograph with Existing Topography
Print on Vellum
|
undated | |
6 | 2.4.40: Dam Locations/Arroyo Delineation
Print on Mylar
|
undated | |
6 | 2.4.41: Site Inventory & Analysis
Print on Bond
|
undated | |
6 | 2.4.42: 100 Year Flood Plain Map |
undated | |
6 | 2.4.43: Tracts & Floodplains Diagram |
undated | |
6 | 2.4.44A: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44B: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44C: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44D: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44E: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44F: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44G: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44H: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44I: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44J: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44K: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44L: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.44M: Plat of High Desert Albuquerque New Mexico
Print on Bond
|
1993 October 18 | |
6 | 2.4.45: Soils Map
Print on Bond
|
undated | |
High Desert Office
|
1995 | ||
tube | |||
7 | 2.5.1: Topographic Survey for High Desert Sales Office
Print on Bond
|
1995 February | |
7 | 2.5.2: Topographic Survey for High Desert Sales Office with Plant Relocation Program
Print & Ink on Vellum
|
1995 February | |
7 | 2.5.3: High Desert Sales Office Grading and Utility Plan
Print on Bond
|
1995 June 28 | |
7 | 2.5.4: High Desert Office Revised Planting Plan
Blueprint on Bond
|
1995 May 22 | |
7 | 2.5.5: Context Diagram
Red Colored Pencil on Blueprint on Bond
|
1995 June 28 | |
7 | 2.5.6: Grass Location Diagram, Aesthetic Groupings, & Boulder Placement
Print on Bond
|
undated | |
7 | 2.5.7: Plan with Sections A-A & B-B
Pencil on Trace
|
undated | |
7 | 2.5.8: Planting Plan
Pencil on Trace
|
undated | |
7 | 2.5.9: High Desert Office Grading with Section
Print on Vellum
|
1995 January 25 | |
7 | 2.5.10: High Desert Office Planting with Section
Print on Vellum
|
1995 January 25 | |
7 | 2.5.11: Context Diagram
Ink on Mylar
|
1995 June 2 | |
7 | 2.5.12: Natural Plant Associations Diagram
Print on Bond
|
1995 June 2 | |
7 | 2.5.13: Spatial Diagram and Circulation Loops
Print on Bond
|
1995 June 2 | |
7 | 2.5.14: Genus/Plant Type Comparison Groupings
Print on Bond
|
1995 June 2 | |
7 | 2.5.15: Water Use
Print on Bond
|
1995 June 2 | |
7 | 2.5.16: Seasonal Color Diagram
Print on Bond
|
undated | |
7 | 2.5.17: Planting L-1.1
Ink on Mylar
|
undated | |
7 | 2.5.18: Planting
Ink on Mylar
|
undated | |
7 | 2.5.19A: High Desert Office; Cover Sheet
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19B: Details D-1.0
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19C: Planting Plan Detail
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19D: High Desert Office; L-5.0
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19E: Planting Plan Title block
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19F: High Desert Office; L-4.0;
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19G: Planting Plan Title block
Pencil & on Mylar
|
1995 July 14 | |
7 | 2.5.19H: High Desert Office; L-3.0;
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19I: Planting Plan Details
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.1J: High Desert Office; Base 1
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19K: High Desert Office; L-2.0
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19L: Grading
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19M: Plant Details
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19N: Plant Details
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19O: Planting Plan L-1.0
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.1.P: Planting Details
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19Q: Groundcovers
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.19R: Path Layout Plan L-1.1
Pencil & Ink on Mylar
|
1995 July 14 | |
7 | 2.5.20A: Blueprint Package; Cover Page
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20B: Blueprint Package; Planting Plan L-1
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20C: Blueprint Package; Planting Plan L-2
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20D: Blueprint Package; Planting Plan L-3
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20E: Blueprint Package; Planting Plan L-4
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20F: Blueprint Package; Planting Plan L-5
Marker & Pencil on Blueprint on Bond
|
undated | |
7 | 2.5.20G: Blueprint Package; Details D-1
Marker & Pencil on Blueprint on Bond
|
undated | |
Planting Design
|
undated | ||
tube | |||
7 | 2.6.1: Plant Schedule by Region
Pencil & Ink on Bond
|
undated | |
7 | 2.6.2: Planting Plan
Blueprint on Bond
|
undated | |
Parcel 7: Apartments
|
1993-1994 | ||
tube | |||
8 | 2.7.1: Parcel 7 Apartments
Ink on Print on Photo paper
|
1993 May 26 | |
8 | 2.7.2: Parcel 7 Apartments
Ink on Print on Photo paper
|
1993 May 26 | |
8 | 2.7.3: Parcel 7 Apartments
Ink on Print on Photo paper
|
1993 May 26 | |
8 | 2.7.4: Vegetation Regions
Ink & Marker on Trace Paper
|
undated | |
8 | 2.7.5: Concept Diagram
Marker on Trace
|
undated | |
8 | 2.7.6: Illustrative Master Plan
Ink on Trace
|
undated | |
8 | 2.7.7: Illustrative Master Plan
Ink on Trace
|
undated | |
8 | 2.7.8: Illustrative Master Plan
Print on Photo paper
|
undated | |
8 | 2.7.9A: Parcel 7 Notes on Trace with Acetate Site Plan
Trace Paper
|
1993 September 30 | |
8 | 2.7.9B: Parcel 7 Notes on Trace with Acetate Site Plan
Print on Acetate
|
undated | |
8 | 2.7.10: Planting Concept
Ink on Trace Paper
|
1994 March 25 | |
8 | 2.7.11: Thompson Fiasco Grading and Drainage
Ink on Trace Paper
|
undated | |
8 | 2.7.12: Culbertson Creation Grading Concept
Ink on Trace Paper
|
1994 March 25 | |
8 | 2.7.13A: Concept Site Plan
Acetate
|
undated | |
8 | 2.7.13B: Concept Site Plan
Print on Diazo Mylar
|
undated | |
8 | 2.7.14: Potential Stub Locations
Print on Bond
|
1993 September 23 | |
8 | 2.7.15: High Desert Parcel 7
Print on Acetate
|
undated | |
8 | 2.7.16: Parcel 7 Pedestrian Routes and Signage
Ink on Mylar
|
1993 November 11 | |
8 | 2.7.17: Parcel 7 Site Plan
Blueprint on Bond
|
1993 November 11 | |
8 | 2.7.18: Turf Pin Bar Document
Ink on Mylar
|
1993 November 11 | |
8 | 2.7.19: Roadway Curvature Study
Pencil on Mylar
|
undated | |
8 | 2.7.20: Trees and Turf Pin Bar Document
Ink on Mylar
|
1993 June | |
8 | 2.7.21: Grading and Drainage
Ink on Mylar
|
1993 June | |
8 | 2.7.22: Parcel 7 Spot Elevations and Grading Pin Bar Document
Ink on Mylar
|
1993 November 11 | |
8 | 2.7.23: Parcel 7 Trees Pin Bar Document
Ink on Mylar
|
1993 November 11 | |
8 | 2.7.24: Parcel 7 Pin Bar Document Compilation
Sepia Print on Acetate
|
1993 November 11 | |
8 | 2.7.25: Parcel 7 Site Plan with Acreage and Unit Calculations
Ink on Blueprint on Bond
|
undated | |
8 | 2.7.26: Site Plan with List of Elements to Address
Ink on Blueprint on Bond
|
undated | |
8 | 2.7.27: Concept Diagram with Analysis
Marker on Trace Paper
|
undated | |
8 | 2.7.28: Concept of Roadways and Lots
Ink on Trace Paper
|
undated | |
8 | 2.7.29: Parcel 7 Title block Pin Bar Document
Print on Acetate
|
1993 May 26 | |
8 | 2.7.30: Alternative A with Floodplain Delineation
Ink on Blueprint on Bond
|
1993 May 26 | |
8 | 2.7.31: Alternative B with Floodplain Delineation
Ink on Blueprint on Bond
|
1993 May 26 | |
8 | 2.7.32: Site Plan
Ink on Mylar
|
undated | |
8 | 2.7.33: Parcel 7 Unit and Parking Concentration Study
Ink on Trace
|
undated | |
8 | 2.7.34: Parcel 7 Apartments Site Plan Pin Bar Document
Ink on Mylar
|
1993 April 23 | |
8 | 2.7.35: Parcel 7 Proposed Contours Pin Bar Document
Ink on Mylar
|
undated | |
8 | 2.7.36: Parcel 7 Section
Marker on Trace Paper
|
1993 June 7 | |
8 | 2.7.37: Parcel 7 Apartments Alternative A
Print on Diazo Mylar
|
1993 May 26 | |
8 | 2.7.38: Parcel 7 Apartments Alternative B
Print on Diazo Mylar
|
1993 May 26 | |
8 | 2.7.39: Topographic Map with Parcel Boundaries
Acetate Spliced on Mylar
|
undated | |
9 | 2.7.40: Trammell Crow Residential High Desert Apartments
Print on Bond; by Todd & Associates, Inc. Preliminary Building Plans (2)
|
1993 April 11 | |
9 | 2.7.41: Trammell Crow Residential High Desert Apartments
Print on Bond; by Todd & Associates, Inc. Perspective
|
1993 April 5 | |
9 | 2.7.42: Trammel Crow Residential High Desert Apartments Preliminary Site Plan
Print on Bond; by Todd & Associates, Inc.
|
1993 May 11 | |
9 | 2.7.43: Site Plan
Print on Vellum; by Todd & Associates, Inc.
|
1994 January 21 | |
9 | 2.7.44: Tract 7 Conceptual Grading/Drainage Plan
Ink on Blueprint on Bond; by Todd & Associates, Inc.
|
era="ce" calendar="gregorian" certainty="approximate" encodinganalog="date"1994 March | |
9 | 2.7.45: Tract 7 Conceptual Grading/Drainage Plan
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 March | |
9 | 2.7.46: Tract 7 Conceptual Utility Plan
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 March 3 | |
9 | 2.7.47: Tract 7 Preliminary Site Plan
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 February 28 | |
9 | 2.7.48: Tract 7 Preliminary Site Plan
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 February 28 | |
9 | 2.7.49: Pinnacle at High Desert The Hilltop Landscape Cover Sheet
Blueprint on Bond
|
1994 April 14 | |
9 | 2.7.50: Tract 7 Landscape Plan
Blueprint on Bond
|
1994 March 8 | |
9 | 2.7.51A: Pinnacle at High Desert Landscape Site Plan; L2
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.51B: Pinnacle at High Desert Landscape Site Plan; L3
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.51C: Pinnacle at High Desert Landscape Site Plan; L4
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.52A: Pinnacle at High Desert Landscape Schematic; L5
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.52B: Pinnacle at High Desert Landscape Schematic; L6
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.53A: Pinnacle at High Desert Landscape Schematic; L7
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.53B: Pinnacle at High Desert Landscape Schematic; L8
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.53C: Pinnacle at High Desert Landscape Schematic; L9
Blueprint on Bond; by Todd & Associates, Inc.
|
1994 April 14 | |
9 | 2.7.54: High Desert Parcel 7
Ink on Mylar
|
undated | |
The Parks at High Desert
|
1993-2000 | ||
tube | |||
10 | 2.8.1A: Cover Sheet
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1B: Park Performance Stage & Picnic Shelter
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1C: Bike Storage, Sign, & Wall Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1D: Site Amenities Legend
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1E: Enlargement of Play Areas
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1F: Proposed Park Site Grading Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1G: Layout Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1H: Layout Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1I: Layout Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1J: Layout Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1K: Electrical Site Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1L: Electrical Site Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1M: Park Irrigation Plans
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1N: Park Irrigation Plans
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1O: Park Irrigation Plans
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1P: Park Irrigation Plans
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1Q: Park Irrigation Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1R: Planting Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1S: Planting Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1T: Planting Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1U: Planting Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1V: Planting Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1W: Planting & Seeding Legend
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1X: Basketball Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1Y: Tennis & Sand Volleyball Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1Z: Play Equipment Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1AA: Site Furnishings Details
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1BB: Signing & Construction Traffic Control Standards
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1CC: Typical Traffic Control & Signing Examples
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.1DD: Proposed Park Site Grading Plan
Blueprint on Bond
|
1998 January 22 | |
10 | 2.8.2A: Lot Allocations; Sheet 1
Print on Acetate
|
undated | |
10 | 2.8.2B: Lot Allocations; Sheet 2
Print on Acetate
|
undated | |
10 | 2.8.2C: Lot Allocations; Sheet 3
Print on Acetate
|
undated | |
10 | 2.8.2D: Lot Allocations; Sheet 4
Print on Acetate
|
undated | |
10 | 2.8.3A: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Site Plan & Arroyo
Pencil & Ink on Trace
|
undated | |
10 | 2.8.3B: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Base Map
Print on Bond
|
undated | |
10 | 2.8.3C: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; West
Trace Paper
|
undated | |
10 | 2.8.3D: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Fountain A
Colored Pencil & Ink on Trace
|
undated | |
10 | 2.8.3E: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Fountain B
Colored Pencil & Ink on Trace
|
undated | |
10 | 2.8.4: Pathway Office Park: New Mexico Educators Federal Credit Union Landscaping Plan |
1997 August 29 | |
10 | 2.8.5: Vista Del Norte Park Layout Plan (2)
Colored Pencil & Ink on Mylar
|
undated | |
10 | 2.8.6: Vista Del Norte Park Schematic Plan
Ink on Mylar
|
2000 February 8 | |
10 | 2.8.7: Tracts 8A, 8B, and 8C Drainage Plan Proposed Phase I Conditions and Drainage Basins Map |
1994 March 31 | |
10 | 2.8.8: Jogging/Walking Trail |
undated | |
10 | 2.8.9: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
|
2000 February 8 | |
10 | 2.8.10: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
|
2000 February 8 | |
10 | 2.8.11: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
|
2000 February 8 | |
10 | 2.8.12: Phase I of Vista Del Norte Park
Print on Bond
|
undated | |
10 | 2.8.13A: Vista Del Norte Layout Plan; Angle Parking
Trace
|
undated | |
10 | 2.8.13B: Vista Del Norte Layout Plan; Base Map
Copy on Bond
|
undated | |
10 | 2.8.14: Boca Negra Trail Overlook Design Development Plan
Print on Vellum
|
undated | |
10 | 2.8.15: Topographic Map
Print on Vellum
|
undated | |
10 | 2.8.16: Topographic Map
Print on Photo paper
|
undated | |
10 | 2.8.17: Arial Photograph with Contours
Print on Mylar
|
undated | |
10 | 2.8.18A: Plat of High Desert Bernalillo County New Mexico; Sheet 1
Print on Acetate
|
1993 June | |
10 | 2.8.18B: Plat of High Desert Bernalillo County New Mexico; Sheet 2
Print on Acetate
|
1993 June | |
10 | 2.8.18C: Plat of High Desert Bernalillo County New Mexico; Sheet 3
Print on Acetate
|
1993 June | |
10 | 2.8.18D: Plat of High Desert Bernalillo County New Mexico; Sheet 4
Print on Acetate
|
1993 June | |
Century Theaters
|
1985 | ||
tube | |||
10 | 2.9.1: Century Theaters Landscape Concept Plan A
Pencil & Ink on Vellum
|
1985 July 28 | |
Streetscapes
|
1992-1995 | ||
tube | |||
11 | 2.10.1: Tramway Corridor: Existing Power Poles and 12 VHP Gas Line Locations |
1993 July 24 | |
11 | 2.10.2A: Revised Proposed Landform Along Tramway Boulevard with Trace Revision Overlay; Revision Overlay
Pencil on Trace
|
1993 July 2 | |
11 | 2.10.2B: Revised Proposed Landform Along Tramway Boulevard with Trace Revision Overlay; Base
Ink on Blueprint on Bond
|
1993 July 2 | |
11 | 2.10.3: Roadway Map |
undated | |
11 | 2.10.4: Spot Elevations |
undated | |
11 | 2.10.5A: 9th and I Street Improvements; Revision A: Sheet 1
Print on Bond
|
30 June 1997 | |
11 | 2.10.5B: 9th and I Street Improvements; Revision A; Sheet 2
Print on Bond
|
30 June 1997 | |
11 | 2.10.5C: 9th and I Street Improvements; Revision A; Sheet 3
Print on Bond
|
30 June 1997 | |
11 | 2.10.5D: 9th and I Street Improvements; Revision A; Sheet 4
Print on Bond
|
30 June 1997 | |
11 | 2.10.5E: 9th and I Street Improvements; Revision A; Sheet 5
Print on Bond
|
30 June 1997 | |
11 | 2.10.5F: 9th and I Street Improvements; Revision A; Sheet 6
Print on Bond
|
30 June 1997 | |
11 | 2.10.5G: 9th and I Street Improvements; Revision A; Sheet 7
Print on Bond
|
30 June 1997 | |
11 | 2.10.5H: 9th and I Street Improvements; Revision A; Sheet 8
Print on Bond
|
30 June 1997 | |
11 | 2.10.5I: 9th and I Street Improvements; Revision A; Sheet 9
Print on Bond
|
30 June 1997 | |
11 | 2.10.5J: 9th and I Street Improvements; Revision A; Sheet 10
Print on Bond
|
30 June 1997 | |
11 | 2.10.5K: 9th and I Street Improvements; Revision A; Sheet 11
Print on Bond
|
30 June 1997 | |
11 | 2.10.5L: 9th and I Street Improvements; Revision A; Sheet 12
Print on Bond
|
30 June 1997 | |
11 | 2.10.5M: 9th and I Street Improvements; Revision A; Sheet 13
Print on Bond
|
30 June 1997 | |
11 | 2.10.5N: 9th and I Street Improvements; Revision A; Sheet 14
Print on Bond
|
30 June 1997 | |
11 | 2.10.5O: 9th and I Street Improvements; Revision A; Sheet 15
Print on Bond
|
30 June 1997 | |
11 | 2.10.5P: 9th and I Street Improvements; Revision A; Sheet 16
Print on Bond
|
30 June 1997 | |
11 | 2.10.5Q: 9th and I Street Improvements; Revision A; Sheet 17
Print on Bond
|
30 June 1997 | |
11 | 2.10.5R: 9th and I Street Improvements; Revision A; Sheet 18
Print on Bond
|
30 June 1997 | |
11 | 2.10.5S: 9th and I Street Improvements; Revision A; Sheet 19
Print on Bond
|
30 June 1997 | |
11 | 2.10.5T: 9th and I Street Improvements; Revision A; Sheet 20
Print on Bond
|
30 June 1997 | |
11 | 2.10.5U: 9th and I Street Improvements; Revision A; Sheet 21
Print on Bond
|
30 June 1997 | |
11 | 2.10.5V: 9th and I Street Improvements; Revision A; Sheet 22
Print on Bond
|
30 June 1997 | |
11 | 2.10.5W: 9th and I Street Improvements; Revision A; Sheet 23
Print on Bond
|
30 June 1997 | |
11 | 2.10.5X: 9th and I Street Improvements; Revision A; Sheet 24
Print on Bond
|
30 June 1997 | |
11 | 2.10.5Y: 9th and I Street Improvements; 30 June 1997 Revision A; Sheet 25
Print on Bond
|
30 June 1997 | |
11 | 2.10.5Z: 9th and I Street Improvements; Revision A; Sheet 26
Print on Bond
|
30 June 1997 | |
11 | 2.10.5AA: 9th and I Street Improvements; Revision A; Sheet 27
Print on Bond
|
30 June 1997 | |
11 | 2.10.6A: Proposed Sidewalk Layout
Marker on Trace
|
1995 November 12 | |
11 | 2.10.6B: Proposed Sidewalk Layout; Option #1
Marker on Trace
|
1995 November 5 | |
11 | 2.10.6C: Proposed Sidewalk Layout; Option #2
Marker on Trace
|
1995 November 5 | |
11 | 2.10.6D: Proposed Sidewalk Layout; Option #3
Marker on Trace
|
1995 November 5 | |
11 | 2.10.7: Proposed Sidewalk Layout
Marker & Print on Bond
|
1995 November 12 | |
11 | 2.10.8: Sidewalk Plan
Pencil & Print on Bond
|
1995 December | |
11 | 2.10.9: Sidewalk Plan
Pencil & Ink on Print on Bond
|
1995 December 12 | |
12 | 2.10.10A: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cover SheetCity
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10B: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10C: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10D: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10E: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Boulevard Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10F: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Boulevard Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10G: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10H: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Mirror Planting
Trace Paper
|
1995 April 13 | |
12 | 2.10.10I: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10J: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10K: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Planting Details
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10L: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10M: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10N: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10O: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10P: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10Q: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10R: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Irrigation
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10S: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Irrigation Details
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.10T: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Irrigation Details
Blueprint on Bond
|
1995 April 13 | |
12 | 2.10.11A: Streetscape Phase II: Academy, Spain, and High Desert St. Medians; Cover Sheet
Blueprint on Bond
|
undated | |
12 | 2.10.11B: Streetscape Phase II: Academy, Spain, and High Desert St. Medians; Spain Road Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11C: Streetscape Phase II: Academy, Spain, and Street Medians; Spain Road Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11D: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11E: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11F: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11G: Streetscape Phase II: Academy, Spain, and Street Medians; High Desert Road Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11H: Streetscape Phase II: Academy, Spain, and Street Medians; High Desert Road Planting
Blueprint on Bond
|
undated | |
12 | 2.10.11I: Streetscape Phase II: Academy, Spain, and Street Medians; Planting Details
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12A: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street; Cover Sheet
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12B: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12C: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12D: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12E: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12F: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12G: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12H: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12I: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12J: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12K: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.12L: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13A: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13B: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13C: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13D: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13E: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13F: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13G: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13H: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13I: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13J: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13K: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
12 | 2.10.13L: Streetscape: Tramway Boulevard
Blueprint on Bond
|
1994 July 8 | |
13 | 2.10.14: Design Development Plan Phase One Streetscape
Print on MylarLOCATED IN TUBE 13
|
1994 April 7 | |
12 | 2.10.15: Schematic Streetscape Plan for Imperata Street Typical Landscape Plan
Colored Pencil on Blueprint on Bond
|
1993 September 14 | |
12 | 2.10.16: Schematic Streetscape Plan for Spain Street Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
|
undated | |
12 | 2.10.17: Schematic Streetscape Plan for Cortaderia Street Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
|
1993 September 14 | |
12 | 2.10.18: Schematic Streetscape Plan for Academy Road Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
|
1993 September 8 | |
12 | 2.10.19: Schematic Streetscape Plan for Tramway Boulevard Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
|
1993 September 8 | |
12 | 2.10.20A: Unit 1 Streetscape Design Development; Cover Sheet
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20B: Unit 1 Streetscape Design Development; List of Drawings
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20C: Unit 1 Streetscape Design Development; Academy Boulevard (Tramway to Cortaderia)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20D: Unit 1 Streetscape Design Development; Academy Boulevard (Cortaderia to High Desert)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20E: Unit 1 Streetscape Design Development; Spain Road (Tramway to Cortaderia)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20F: Unit 1 Streetscape Design Development; Spain Road (Cortaderia to Imperata St.)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20G: Unit 1 Streetscape Design Development; Cortaderia Street (Spain Road to Academy Blvd.)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.20H: Unit 1 Streetscape Design Development; Imperata Street (Spain Road to Cul-de-sac)
Print & Acetate Splices on Vellum
|
1995 July 25 | |
12 | 2.10.21: Streetscape Unit 1: Highlands at High Desert
Blueprint on Bond
|
undated | |
12 | 2.10.22A: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
|
undated | |
12 | 2.10.22B: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
|
undated | |
12 | 2.10.22C: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
|
undated | |
12 | 2.10.23: Planting Plan along Unlabeled Roadway
Colored Pencil & Print on Bond
|
undated | |
13 | 2.10.24: Street Sections; with Utilities
Print on Diazo Mylar
|
1992 April 11 | |
13 | 2.10.25: Rancho Viejo Streetscapes
Print on Bond
|
1997 June | |
13 | 2.10.26A: Streetscape Highlands at High Desert Package (Incomplete) Cover Sheet
Blueprint on Bond
|
undated | |
13 | 2.10.26B: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26C: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26D: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan and Sidewalk Layout
Blueprint on Bond
|
undated | |
13 | 2.10.26E: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
|
undated | |
13 | 2.10.26F: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26G: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
|
undated | |
13 | 2.10.26H: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26I: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26J: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26K: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
|
undated | |
13 | 2.10.26L: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26M: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26N: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
|
undated | |
13 | 2.10.26-O: Streetscape Highlands at High Desert Package (Incomplete); Detail Sheet
Blueprint on Bond
|
undated | |
Topography & Grading
|
1992 | ||
tube | |||
14 | 2.11.1: Topographic Map
Print on Acetate
|
undated | |
14 | 2.11.2: Enlargement of Retention Basin
Print on Photo paper
|
undated | |
14 | 2.11.3: Topography & Spot Elevations
Print on Diazo Mylar
|
undated | |
14 | 2.11.4: Topographic Map
Print on Diazo Mylar
|
undated | |
14 | 2.11.5: Simms Park Trail Plan
Print on Diazo Mylar with Redlining
|
1992 April 16 | |
14 | 2.11.6: Simms Park Trail Plan
Print on Diazo Mylar with Redlining
|
1992 April 16 | |
14 | 2.11.7: Flood Control Authority Portion of East Heights Topographic Map
Sepia Print on Mylar
|
undated | |
14 | 2.11.8: Portion of Elena Gallegos Grant Topographic Map
Sepia Print on Mylar
|
undated | |
14 | 2.11.9: Topographic Map
Print on Diazo Mylar
|
1992 April 11 | |
14 | 2.11.10: Topographic Map
Print on Acetate
|
undated | |
14 | 2.11.11: Topographic Map
Ink on Mylar
|
undated | |
Studies & Schematics
|
|||
tube | |||
15 | 2.12.1A: Sediment Pond Proposals
Spliced Print on Acetate
|
1993 | |
15 | 2.12.1B: Sediment Pond Proposals
Spliced Print on Acetate
|
undated | |
15 | 2.12.1C: Sediment Pond Proposals
Spliced Print on Acetate
|
undated | |
15 | 2.12.1D: Sediment Pond Proposals
Spliced Print on Acetate
|
undated | |
15 | 2.12.2: Estate Lot Study
Ink on Mylar
|
undated | |
15 | 2.12.3: Estate Lot Study with Topography
Blueprint on Bond
|
undated | |
15 | 2.12.4: Estate Lot Study
Ink on Mylar
|
1993 April 8- | |
15 | 2.12.5: Concept Diagram
Ink on Yellow Trace
|
undated | |
15 | 2.12.6: Site Plan on Trace
Ink on Trace
|
undated | |
15 | 2.12.7: 50x100 Single Family Detached Lots |
undated | |
High Desert Master Plan
|
undated | ||
tube | |||
15 | 2.13.1: Vicinity Map
Ink on Mylar
|
undated | |
15 | 2.13.2: Location Map |
undated | |
15 | 2.13.3: Site Plan
Print on Bond
|
undated | |
15 | 2.13.4: Lotting Plan
Ink on Mylar
|
undated | |
15 | 2.13.5: Lotting Plan
Ink on Mylar
|
undated | |
15 | 2.13.6: Topographic Map
Print on Mylar
|
undated | |
Illustrations & Imagery
|
1993 | ||
tube | |||
16 | 2.14.1: Perspective Sketch of Project Area
Pencil on Vellum
|
undated | |
16 | 2.14.2: Color Perspective Sketch of Project Area
Pencil on Bond
|
undated | |
16 | 2.14.3: Non-Native Planting Zone Inside Walled Yards
Pencil on Vellum
|
undated | |
16 | 2.14.4: Native L.S. Front Yards: Taller Non-Native Trees in Rear Yards
Pencil on Vellum
|
undated | |
16 | 2.14.5: Contemporary Ranch Style (Approved)
Ink on Trace
|
undated | |
16 | 2.14.6: Approved Pueblo Style (One Story)
Ink on Trace
|
undated | |
16 | 2.14.7: Territorial (Approved)
Ink on Trace
|
undated | |
16 | 2.14.8: Colonial Spanish
Ink on Trace
|
undated | |
16 | 2.14.9: Doors & Entrance Windows
Ink on Trace
|
undated | |
16 | 2.14.10: Contemporary Style (Approved)
Ink on Trace
|
undated | |
16 | 2.14.11: Ranch Style (Approved)
Ink on Trace
|
undated | |
16 | 2.14.12: Approved Pueblo Style (2 Story)
Ink on Trace
|
undated | |
16 | 2.14.13: Not Approved Styles
Ink on Trace
|
undated | |
16 | 2.14.14: Stepped Fascia: Contemporary or territorial
Ink on Trace
|
undated | |
16 | 2.14.15: Stepped Fascia Territorial
Ink on Trace
|
undated | |
16 | 2.14.16: Balcony Detail
Ink on Trace
|
undated | |
16 | 2.14.17: Stepped Fascia: Colonial Spanish or Mediterranean
Ink on Trace
|
undated | |
16 | 2.14.18: Column Alternatives
Ink on Trace
|
undated | |
16 | 2.14.19: Archway Alternatives
Ink on Trace
|
undated | |
16 | 2.14.20: Chimney Designs
Ink on Trace
|
undated | |
16 | 2.14.21: Exterior Stairs
Ink on Trace
|
undated | |
16 | 2.14.22: A/C Unit Location
Ink on Trace
|
undated | |
16 | 2.14.23: Wind Orientation
Ink on Trace
|
undated | |
16 | 2.14.24: Cul-De-Sac Schematic
Ink on Trace
|
undated | |
16 | 2.14.25: Create Undulating Landform and Gentle Slope Transition
Ink on Trace
|
undated | |
16 | 2.14.26: Wall Alternatives
Ink on Trace
|
undated | |
16 | 2.14.27: Exterior Lighting
Ink on Trace
|
undated | |
16 | 2.14.28: Curb Drops
Ink on Trace
|
undated | |
16 | 2.14.29: Switch Box Alternatives
Ink on Trace
|
undated | |
16 | 2.14.30: Building/Site Relationship Cross-Section
Ink on Trace
|
undated | |
16 | 2.14.31: Parking Screens Alternatives
Ink on Trace
|
undated | |
16 | 2.14.32: Wall Grade Change & Horizontal Direction Change
Ink on Trace
|
1993 June 23 | |
16 | 2.14.33: Ornamental Iron at Cow Walls
Ink on Trace
|
undated | |
16 | 2.14.34: Residential Lane Cross Section
Ink on Trace
|
undated | |
16 | 2.14.35: Residential Street Cross Section
Ink on Trace
|
undated | |
16 | 2.14.36: Residential Collector Cross Section
Ink on Trace
|
undated | |
16 | 2.14.37: Minor Collector Road Cross Section
Ink on Trace
|
undated | |
16 | 2.14.38: Major Collector Road Cross Section
Ink on Trace
|
undated | |
16 | 2.14.39: Elevation
Ink on Trace
|
undated | |
16 | 2.14.40: High Desert Guidelines for Sustainability Cover Page
Print on Photo paper
|
undated | |
16 | 2.14.41: Computer Generated Perspective of Project Area
Print on Photo paper
|
undated | |
16 | 2.14.42: Computer Generated Perspective
Print on Photo paper
|
undated | |
16 | 2.14.43: Computer Generated Perspective
Print on Photo paper
|
undated | |
16 | 2.14.44: Pueblo Style Cross-Section in Color |
undated | |
Parcel 15
|
1994 | ||
tube | |||
17 | 2.15.1: Lotting Plan for Parcel 15
Blueprint on Bond
|
undated | |
17 | 2.15.2: Lotting Plan for Parcel 15
Print & Ink on Mylar
|
undated | |
17 | 2.15.3: Lotting Plan with Existing Topography
Blueprint on Bond
|
undated | |
17 | 2.15.4: Lotting Plan with Existing Topography; Version 2 June 1994
Ink on Blueprint on Bond
|
1994 June 2 | |
17 | 2.15.5: Lotting Plan with Existing Topography
Marker on Blueprint on Bond
|
undated | |
17 | 2.15.6: Lotting Plan with Existing Topography; Version 21 June 1994
Blueprint on Bond
|
1994 June 21 | |
17 | 2.15.7: Lotting Plan with Existing Topography
Blueprint on Bond
|
undated | |
17 | 2.15.8A: Lotting Plan with Existing Topography
Pencil on Blueprint on Bond
|
undated | |
17 | 2.15.8B: Lotting Plan with Existing Topography
Trace of Intersection
|
undated | |
17 | 2.15.8C: Lotting Plan with Existing Topography
Trace of Intersection
|
undated | |
17 | 2.15.9A: Trace of Intersection
Pencil on Trace
|
undated | |
17 | 2.15.9B: Trace of Lotting Plan
Pencil on Trace
|
undated | |
17 | 2.15.9C: Trace of Intersections
Pencil on Trace
|
undated | |
17 | 2.15.10: Lotting Plan with Existing Topography
Pencil & Ink on Blueprint
|
undated | |
17 | 2.15.11: High Desert Panhandle Aerial Photograph with Topography
Print on Mylar
|
undated | |
17 | 2.15.12: Lotting Plan with Existing Topography with Phase 1 Delineation
Ink on Blueprint on Bond
|
undated | |
17 | 2.15.13: Lotting Plan
Ink & Print on Mylar
|
undated | |
17 | 2.15.14: Highlands Planting Plan Schematic Plan; 30 August 1994
Ink on Blueprint on Bond
|
1994 August 20 | |
17 | 2.15.15: Orthophoto Contour Map of the Highlands Units 1. 2. & 3 at High Desert Subdivision
Print & Ink on Bond
|
undated | |
17 | 2.15.16: Property Allocation for Parcel 16
Print on Photo paper
|
undated | |
Parcel 16: The Highlands
|
undated | ||
tube | |||
18 | 2.16.1: Lot Allocations for Parcel 16: The Highlands
Print on Photo paper
|
undated | |
18 | 2.16.2A: Planting Concept Plan over Highlands Planting Plan
Pencil & Ink on Trace
|
undated | |
18 | 2.16.2B: Planting Concept Plan over Highlands Planting Plan
Blueprint on Bond
|
undated | |
18 | 2.16.3: Highlands Planting Concept Plan
Colored Pencil on Trace
|
undated | |
18 | 2.16.4: Highlands Planting Concept Plan
Colored Pencil on Trace
|
undated | |
18 | 2.16.5A: Highlands Grading Plan with Mylar Sheet of Grading Revision
Print on Bond
|
undated | |
18 | 2.16.5B: Highlands Grading Plan with Mylar Sheet of Grading Revision
Ink on Mylar
|
undated | |
18 | 2.16.6A: Highlands Planting Plan with Mylar Sheet of Grading Revision
Print on Bond
|
undated | |
18 | 2.16.6B: Highlands Planting Plan with Mylar Sheet of Grading Revision
Ink on Mylar
|
undated | |
18 | 2.16.7: Highlands Planting Plan
Marker on Blueprint on Bond
|
undated | |
18 | 2.16.8: Planting Concept Plan
Pencil & Ink on Trace
|
undated | |
Master Development Schedule
|
undated | ||
tube | |||
18 | 2.17.1: Enlarged Master Development Schedule
Print on Acetate
|
undated | |
18 | 2.17.2: Master Development Schedule
Print on Acetate
|
undated | |
18 | 2.17.3: Master Development Schedule High Desert
Marker on Print on Bond
|
undated | |
Consultant Works
|
undated | ||
tube | |||
18 | 2.18.1.A: Irrigation Master Plan; Control Sytem
Blueprint on Bond
|
undated | |
18 | 2.18.1.B: Irrigation Master Plan; Phase I Water Sources
Blueprint on Bond
|
undated | |
18 | 2.18.2.A: Street/Transition Landscape Concept and Entry Monumentation Elevation
Blueprint on Bond
|
8 June 1994 | |
18 | 2.18.2.B: High Desert Apartments Cross Sections
Blueprint on Bond
|
undated | |
18 | 2.18.2.C: Plant Material Zones
Blueprint on Bond
|
undated | |
Engineering/Utility Packages
|
undated | ||
tube | |||
19 | 2.19.1.: Gas
Print on Bond
|
undated | |
19 | 2.19.2A: Overall Paving Plan Phase I-B
Print on Bond with Redlining
|
undated | |
19 | 2.19.2B: Overall Paving Plan Phase I-A
Print on Bond with Redlining
|
undated | |
19 | 2.19.2C: Paving Plan and Profile Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.2D: Paving Plan and Profile Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.2E: Paving Plan and Profile Imperata Street Station (South)
Print on Bond with Redlining
|
undated | |
19 | 2.19.2F: Paving Plan and Profile Imperata Street Station (South)
Print on Bond with Redlining
|
undated | |
19 | 2.19.2G: Paving Plan and Profile Cortaderia Street Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.2H: Paving Plan and Profile Cortaderia Street Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3A: Utility Plan Profile: Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3B: Utility Plan Profile: Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3C: Utility Plan Profile: Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3D: Utility Plan Profile: Academy Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3E: Utility Plan Profile: High Desert Street
Print on Bond with Redlining
|
undated | |
19 | 2.19.3F: Utility Plan Profile: Spain Road Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3G: Utility Plan Profile: Spain Road Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3H: Utility Plan Profile: Cortaderia Street Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3I: Utility Plan Profile: Cortaderia Street Station
Print on Bond with Redlining
|
undated | |
19 | 2.19.3J: Utility Plan Profile: Imperata Street Station (South)
Print on Bond with Redlining
|
undated | |
19 | 2.19.3K: Utility Plan Profile: Imperata Street Station (South)
Print on Bond with Redlining
|
undated | |
19 | 2.19.4A: Title Sheet
Print on Bond
|
undated | |
19 | 2.19.4B: Paving Plan and Profile: Elena Gallegos Place Station
Print on Bond
|
undated | |
19 | 2.19.4C: Paving Plan and Profile: Elena Gallegos Place Station
Print on Bond
|
undated | |
19 | 2.19.4D: Paving Plan and Profile: Canada Del Oso Station
Print on Bond
|
undated | |
19 | 2.19.4E: Paving Plan and Profile: Canada del Oso Station
Print on Bond
|
undated | |
19 | 2.19.4F: Paving Plan and Profile: Canada del Oso Station
Print on Bond
|
undated | |
19 | 2.19.4G: Paving Plan and Profile: Apache Plume Place
Print on Bond
|
undated | |
19 | 2.19.4H: Paving Plan and Profile: Fringe Sage Court Station
Print on Bond
|
undated | |
19 | 2.19.4I: Paving Plan and Profile: Blue Flax Court Station
Print on Bond
|
undated | |
19 | 2.19.4J: Paving Plan and Profile: Elena Gallegos Court Station
Print on Bond
|
undated | |
19 | 2.19.4K: Paving Plan and Profile: Bear Grass Court Station
Print on Bond
|
undated | |
19 | 2.19.4L: Paving Plan and Profile: Buffalo Grass Court Station
Print on Bond
|
undated | |
19 | 2.19.4M: Utility Plan: Elena Gallegos Place Station
Print on Bond
|
undated | |
19 | 2.19.4N: Utility Plan: Elena Gallegos Place Station
Print on Bond
|
undated | |
19 | 2.19.4O: Utility Plan: Canada Del Oso Station
Print on Bond
|
undated | |
19 | 2.19.4P: Utility Plan: Canada del Oso Station
Print on Bond
|
undated | |
19 | 2.19.4Q: Utility Plan: Canada del Oso Station Utility Plan
Print on Bond
|
undated | |
19 | 2.19.4R: Utility Plan: Apache Plume Place Station
Print on Bond
|
undated | |
19 | 2.19.4S: Utility Plan: Fringe Sage Court Station
Print on Bond
|
undated | |
19 | 2.19.4T: Utility Plan: Blue Flax Court Station
Print on Bond
|
undated | |
20 | 2.19.5A: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Title Sheet/Vicinity Map
Blueprint on Bond
|
undated | |
20 | 2.19.5B: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile Station
Blueprint on Bond
|
undated | |
20 | 2.19.5C: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5D: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5E: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan & Profile: Academy and North Bear Tributary Arroyo Desiltation Pond
Blueprint on Bond
|
undated | |
20 | 2.19.5F: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5G: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); North Bear Tributary Pond
Blueprint on Bond
|
undated | |
20 | 2.19.5H: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5I: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan and Profile: Academy Boulevard and South Bear Tributary Arroyo Desiltation Pond
Blueprint on Bond
|
undated | |
20 | 2.19.5J: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5K: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); South Bear Tributary Pond Finished Grade Grid Map
Blueprint on Bond
|
undated | |
20 | 2.19.5L: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
|
undated | |
20 | 2.19.5M: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Desiltation Ponds Details
Blueprint on Bond
|
undated | |
20 | 2.19.5N: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Desiltation Ponds Details
Blueprint on Bond
|
undated | |
20 | 2.19.5O: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Riprap Details
Blueprint on Bond
|
undated | |
20 | 2.19.5P: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Tramway Ponds Grading Plan and Miscellaneous Details
Blueprint on Bond
|
undated | |
20 | 2.19.5Q: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Wire Enclosed Riprap Details
Blueprint on Bond
|
undated | |
20 | 2.19.5R: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Structural Detail
Blueprint on Bond
|
undated | |
20 | 2.19.5S: Construction Plans Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP
Blueprint on Bond
|
undated | |
20 | 2.19.5T: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP
Blueprint on Bond
|
undated | |
20 | 2.19.6A: Construction Plans for Subdivision Phase I-A; Title Sheet
Print on Bond
|
undated | |
20 | 2.19.6B: Construction Plans for Subdivision Phase I-A; General Notes
Print on Bond
|
undated | |
20 | 2.19.6C: Construction Plans for Subdivision Phase I-A; Key Map
Print on Bond
|
undated | |
20 | 2.19.6D: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6E: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6F: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6G: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6H: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6I: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6J: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.6K: Construction Plans for Subdivision Phase I-A; Typical Road and Pavement Sections
Print on Bond
|
undated | |
20 | 2.19.6L: Construction Plans for Subdivision Phase I-A; Typical Road and Pavement Sections
Print on Bond
|
undated | |
20 | 2.19.6M: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
|
undated | |
20 | 2.19.6N: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
|
undated | |
20 | 2.19.6O: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
|
undated | |
20 | 2.19.6P: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6Q: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6R: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6S: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6T: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile High Desert Street
Print on Bond
|
undated | |
20 | 2.19.6U: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Spain Road
Print on Bond
|
undated | |
20 | 2.19.6V: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.6W: Construction Plans for Subdivision Phase I-A; Intersection Details: Academy/Tramway Intersection Detail
Print on Bond
|
undated | |
20 | 2.19.6X: Construction Plans for Subdivision Phase I-A; Intersection Details: Spain/Tramway Intersection Detail
Print on Bond
|
undated | |
20 | 2.19.6Y: Construction Plans for Subdivision Phase I-A; Intersection Details: Tramway Bike/Pedestrian Path Details
Print on Bond
|
undated | |
20 | 2.19.6Z: Construction Plans for Subdivision Phase I-A; Storm Drain Plan and Profile: Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6AA: Construction Plans for Subdivision Phase I-A; Storm Drain Plan and Profile: Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.6BB: Construction Plans for Subdivision Phase I-A; Drainage Plans: Desiltation Pond #6 and Academy Storm & Drain Outlet Works
Print on Bond
|
undated | |
20 | 2.19.6CC: Construction Plans for Subdivision Phase I-A; Drainage Plans: Desiltation Pond #7
Print on Bond
|
undated | |
20 | 2.19.6DD: Construction Plans for Subdivision Phase I-A; Drainage Plans: Miscellaneous Drainage Details
Print on Bond
|
undated | |
20 | 2.19.6EE: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard Includes Storm Drain
Print on Bond
|
undated | |
20 | 2.19.6FF: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6GG: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard, Includes Storm Drain
Print on Bond
|
undated | |
20 | 2.19.6HH: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard
Print on Bond
|
undated | |
20 | 2.19.6II: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: High Desert Street
Print on Bond
|
undated | |
20 | 2.19.6JJ: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road & SAS Extension
Print on Bond
|
undated | |
20 | 2.19.6KK: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road & SAS Extension; Utility Plan and Profile: Sanitary Sewer Extension in Spain Road
Print on Bond
|
undated | |
20 | 2.19.6LL: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Sanitary Sewer Extension in Spain Road
Print on Bond
|
undated | |
20 | 2.19.6MM: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road Station, Includes Storm Drain
Print on Bond
|
undated | |
20 | 2.19.6NN: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.6OO: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Waterline Details
Print on Bond
|
undated | |
20 | 2.19.6PP: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Notes and Legend
Print on Bond
|
undated | |
20 | 2.19.6QQ: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal/Lighting Estimated Quantities
Print on Bond
|
undated | |
20 | 2.19.6RR: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Signal Demolition/Construction Plan
Print on Bond
|
undated | |
20 | 2.19.6SS: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Plan
Print on Bond
|
undated | |
20 | 2.19.6TT: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Conduits and Cables
Print on Bond
|
undated | |
20 | 2.19.6UU: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Functions and Detectors
Print on Bond
|
undated | |
20 | 2.19.6VV: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Demolition/Construction Plan
Print on Bond
|
undated | |
20 | 2.19.6WW: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Plan
Print on Bond
|
undated | |
20 | 2.19.6XX: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Conduits and Cables
Print on Bond
|
undated | |
20 | 2.19.6YY: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Functions and Detectors
Print on Bond
|
undated | |
20 | 2.19.6ZZ: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Lighting Plans
Print on Bond
|
undated | |
20 | 2.19.6AAA: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Lighting Plans
Print on Bond
|
undated | |
20 | 2.19.6BBB: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6CCC: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6DDD: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6EEE: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6FFF: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6GGG: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6HHH: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6III: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
|
undated | |
20 | 2.19.6JJJ: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: Sequence of Construction
Print on Bond
|
undated | |
20 | 2.19.6KKK: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: COA-Signing and Construction Traffic Control Standards
Print on Bond
|
undated | |
20 | 2.19.6LLL: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: COA-Typical Traffic Control and Signing Examples
Print on Bond
|
undated | |
20 | 2.19.6MMM: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Academy State
Print on Bond
|
undated | |
20 | 2.19.6NNN: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Academy Station and High Desert Station
Print on Bond
|
undated | |
20 | 2.19.6OOO: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Spain Road and Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.6PPP: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.6QQQ: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.6RRR: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.6SSS: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.6TTT: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.6UUU: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
|
undated | |
20 | 2.19.7A: Construction Plans for Subdivision Phase I-B; Title Sheet
Print on Bond
|
undated | |
20 | 2.19.7B: Construction Plans for High Desert Subdivision Phase I-B; General Notes
Print on Bond
|
undated | |
20 | 2.19.7C: Construction Plans for Subdivision Phase I-B; Key Map
Print on Bond
|
undated | |
20 | 2.19.7D: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7E: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7F: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7G: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7H: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7I: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7J: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
|
undated | |
20 | 2.19.7K: Construction Plans for Subdivision Phase I-B; Typical Road and Pavement Sections
Print on Bond
|
undated | |
20 | 2.19.7L: Construction Plans for Subdivision Phase I-B; Typical Road and Pavement Sections
Print on Bond
|
undated | |
20 | 2.19.7M: Construction Plans for Subdivision Phase I-B; Overall Paving Plan
Print on Bond
|
undated | |
20 | 2.19.7N: Construction Plans for Subdivision Phase I-B; Overall Paving Plan
Print on Bond
|
undated | |
20 | 2.19.7O: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7P: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7Q: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.7R: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7S: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7T: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7U: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Storm Drain
Print on Bond
|
undated | |
20 | 2.19.7V: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7W: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7X: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.7Y: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7Z: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7AA: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Miscellaneous Drainage Details
Print on Bond
|
undated | |
20 | 2.19.7BB: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #1
Print on Bond
|
undated | |
20 | 2.19.7CC: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Ponds #2 and #2A
Print on Bond
|
undated | |
20 | 2.19.7DD: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #3
Print on Bond
|
undated | |
20 | 2.19.7EE: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #4, #5A and #5B
Print on Bond
|
undated | |
20 | 2.19.7FF: Construction Plans for Subdivision Phase I-B; Drainage Plans: Spain Storm Drain Connection at Tramway
Print on Bond
|
undated | |
20 | 2.19.7GG: Construction Plans for Subdivision Phase I-B; Drainage Plans: Spain Storm Drain Connection Details
Print on Bond
|
undated | |
20 | 2.19.7HH: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7II: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7JJ: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Cortaderia Street
Print on Bond
|
undated | |
20 | 2.19.7KK: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7LL: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7MM: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7NN: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Waterline Details
Print on Bond
|
undated | |
20 | 2.19.7OO: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Spain Road
Print on Bond
|
undated | |
20 | 2.19.7PP: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Cortaderia Street Station and Imperata Street
Print on Bond
|
undated | |
20 | 2.19.7QQ: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Imperata Street
Print on Bond
|
undated | |
21 | Academy Lands East Mylar's Physical location: CCA 8 Column 3, Row 1
|
undated | |
22 | Existing Communities Facilities Physical location: CCA 8 Column 3, Row 1
|
undated | |
23 | School Bank Beautification Physical location: CCA 8 Column 3, Row 1
|
undated |
III: III: Starwood Ranch/ASPCOL, 1989-1993Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
1 | 1 | Proposals/Contracts
(A.1, #186)
|
1989-1992 |
1 | 2 | Correspondence
(A.2, #186)
|
1989 January–September |
1 | 3 | Correspondence
A.2, #186)
|
1989 October–December |
1 | 4 | Correspondence
(A.2, #186)
|
1990-1993 |
1 | 5 | Meeting Notes
(A.4, #186)
|
1989 March–September |
1 | 6 | Meeting Notes
(A.4, #186)
|
1989 October–December |
1 | 7 | Meeting Notes
(A.4, #186)
|
1990 |
1 | 8 | Meeting Notes
(A.4, #186)
|
1991 March–September |
1 | 9 | Meeting Notes
(A.4, #186)
|
1991-1992 |
1 | 10 | Notes to File
(A.8, #186)
|
1992 |
1 | 11 | Facsimiles [bids?]
(A.9, #186)
|
1989-1990 |
1 | 12 | Hydrology/Drainage
(B.1b, #186)
|
1991 |
1 | 13 | Biological/aeration tubing
(B.2, #186)
|
1990 |
1 | 14 | Visual of satellite placement
(B.3, #186)
|
1989 |
1 | 15 | Engineering – subsoil study, equestrian irrigation and pond
(B.4, #186)
|
1989-1992 |
1 | 16 | Cost Estimates
(B.6, #186)
|
1989 |
1 | 17 | Design Sketches
(B.7, #186)
|
1991-1993 |
1 | 18 | Irrigation
(B.11, #186)
|
1989-1992 |
1 | 19 | Construction Bids/Proposals
(C.1, #186)
|
1989 |
1 | 20 | Field Reports
(C.4, #186)
|
1989-1990 |
1 | 21 | Change Orders
(C.5, #186)
|
1989-1991 |
1 | 22 | Entry gate details |
1990 |
1 | 23 | Proposals/Contracts |
2002-2003 |
1 | 24 | Design Sketches |
undated |
1 | 25 | Correspondence |
2002-2004 |
STARWOOD/ASPCOL LANDSCAPE DRAWINGS 11 tubes
|
1986-1992 | ||
Topography and Grading
15 landscape drawings
|
|||
3.1.1.A: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | ||
3.1.1.B: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | ||
tube | |||
1 | 3.1.1.C: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | |
3.1.1.D: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | ||
tube | |||
1 | 3.1.1.E: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | |
1 | 3.1.1.F: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
|
1989 October 10 | |
1 | 3.1.2: Unlabeled Plat
Print on Vellum
|
undated | |
1 | 3.1.3: Starwood Plat Layout
Print on Bond
|
undated | |
1 | 3.1.4: Plat of Stern Ranch Subdivision and Starwood Subdivision
Print on Vellum
|
undated | |
1 | 3.1.5: Plat of Lots R-17-A and R-18-A, Starwood and Plat of Starwood Fourteen
Print on Bond
|
undated | |
1 | 3.1.6: Amended and Restated Plat of Starwood Ranch Lot Split by Alpine Surveys, Inc.
Blueprint on Bond
|
1989 March 23 | |
1 | 3.1.7: Second Amended and Restated Plat of Starwood Ranch Lot Split by Alpine Surveys, Inc.
Blueprint on Bond
|
1989 August 22 | |
1 | 3.1.8: Star Mountain Ranch/Starwood Ranch; Lot Line Adjustment by Alpine Surveys, Inc.
Blueprint on Bond
|
1986 December 8 | |
1 | 3.1.9: Star Mesa 35 Acre Parcel Vicinity Map
Print on Bond
|
undated | |
1 | 3.1.10: ASPCOL/Starwood Ranch Subdivision: Summary of Area Irrigated by Red Mountain Ditch
Print on Bond
|
1991 August 5 | |
Master Plan
32 landscape drawings
|
|||
tube | |||
2 | 3.2.1: ASPCOL Illustrative Master Plan
Colored Pencil and Marker on Print on Bond
|
undated | |
2 | 3.2.2: ASPCOL Residence Master Plan: Existing Conditions Prepared by Design Workshop, Inc.
Ink & Adhesive on Diazo Mylar
|
1989 December 8 | |
2 | 3.2.3: ASPCOL Residence Master Plan: Existing Conditions Prepared by Design Workshop, Inc.
Print on Mylar
|
1990 February 2 | |
2 | 3.2.4: Topographic Map of ASPCOL and Surroundings with Lot Lines
Ink and Print on Mylar
|
undated | |
2 | 3.2.5: ASPCOL Topographic Map
Print on Mylar
|
undated | |
2 | 3.2.6: ASPCOL Schematic Ranch Master Plan
Ink on Mylar
|
1990 February 26 | |
2 | 3.2.7: ASPCOL Master Plan with Ski Amenities
Print on Diazo Mylar
|
1990 April 1 | |
2 | 3.2.8.A: ASPCOL Master Plan
Pencil and Ink on Trace
|
undated | |
2 | 3.2.8.B: ASPCOL Master Plan
Pencil and Ink on Trace
|
undated | |
2 | 3.2.8.C: ASPCOL Master Plan
Ink on Print on Diazo Mylar
|
undated | |
2 | 3.2.9.A: ASPCOL Master Plan
Colored Pencil and Ink on Trace
|
undated | |
2 | 3.2.9.B: ASPCOL Master Plan
Blueprint on Bond
|
1990 April 1 | |
2 | 3.2.10: ASPCOL Master Plan
Ink on Mylar
|
1990 April 1 | |
2 | 3.2.11: ASPCOL Master Plan
Sepia on Acetate
|
1990 April 1 | |
2 | 3.2.12: ASPCOL Master Plan
Print on Diazo Mylar
|
1990 April 1 | |
2 | 3.2.13: ASPCOL Master Plan
Ink and Print on Diazo Mylar
|
1991 July 3 | |
2 | 3.2.14.A: ASPCOL Master Plan
Print on Acetate
|
undated | |
2 | 3.2.14.B: ASPCOL Master Plan
Mylar
|
undated | |
2 | 3.2.15: ASPCOL Master Plan
Ink and Print on Diazo Mylar
|
1991 August 5 | |
2 | 3.2.16: ASPCOL Master Plan
Blueprint on Bond
|
1991 August 5 | |
2 | 3.2.17: ASPCOL Master Plan
Blueprint on Bond
|
1992 January 7 | |
2 | 3.2.18: ASPCOL Master Plan: Irrigation Quantities
Sepia on Acetate
|
1990 April 1 | |
2 | 3.2.191: ASPCOL Master Plan: Irrigation Quantities
Sepia on Acetate
|
1990-1991 August 8 | |
2 | 3.2.20: ASPCOL Master Plan: Additional Landscape Zones
Adhesive, Ink, and Print on Diazo Mylar
|
1991 October 23 | |
2 | 3.2.21: ASPCOL Master Plan: Additional Landscape Zones
Blueprint on Bond
|
1991 October 23 | |
2 | 3.2.22: ASPCOL Master Plan
Print on Diazo Mylar
|
1991 October 9 | |
2 | 3.2.23: ASPCOL Master Plan with Surroundings and Measurements
Red Pencil on Print on Bond
|
undated | |
2 | 3.2.24.A: ASPCOL Pin Bar Document Set
Ink on Mylar
|
undated | |
2 | 3.2.24.B: ASPCOL Pin Bar Document Set
Ink on Mylar
|
undated | |
2 | 3.2.24.C: ASPCOL Pin Bar Document Set
Ink on Mylar
|
undated | |
2 | 3.2.25: ASPCOL Master Plan: Bricol Access Alternatives
Blueprint on Bond
|
1991 October 9 | |
2 | 3.2.26: ASPCOL Master Plan: Grounds Maintenance Bid Package: Exhibit Four: Limit of Work
Ink on Mylar
|
1992 March-May | |
Planting and Irrigation Plans
20 landscape drawings
|
|||
tube | |||
3 | 3.3.1.A: Bricol Log Home; L-1: Site Plan
Sepia on Acetate
|
undated | |
3 | 3.3.1.B: Bricol Log Home; L-4: Tree Planting Plan
Sepia on Acetate
|
undated | |
3 | 3.3.1.C: Bricol Log Home' L-5: Shrub & Groundcover Planting Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.A: Starwood Ranch Lot Two; L4.1: Entry Drive Planting Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.B: Starwood Ranch Lot Two; L4.2: House Planting Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.C: Starwood Ranch Lot Two; L4.3: Planting Plan Courtyards
Sepia on Acetate
|
undated | |
3 | 3.3.2.D: Starwood Ranch Lot Two; L4.4: Planting Plan Stream Terrace
Sepia on Acetate
|
undated | |
3 | 3.3.2.E: Starwood Ranch Lot Two; L5.1: Irrigation Pump Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.F: Starwood Ranch Lot Two; L5.2: Entry Drive Irrigation Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.G: Starwood Ranch Lot Two; L5.3: House Irrigation Plan
Sepia on Acetate
|
undated | |
3 | 3.3.2.H: Starwood Ranch Lot Two; L5.4: Irrigation Details
Sepia on Acetate
|
undated | |
3 | 3.3.3.A: Starwood Ranch Lot Two; L4.1: Entry Drive Planting Plan
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.B: Starwood Ranch Lot Two; L4.2: House Planting Plan
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.C: Starwood Ranch Lot Two' L4.3: Planting Plan Courtyards
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.D: Starwood Ranch Lot Two; L4.4: Planting Plan Stream Terrace
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.E: Starwood Ranch Lot Two; L5.1: Irrigation Pump Plan
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.F: Starwood Ranch Lot Two; L5.2: Entry Drive Irrigation Plan
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.G: Starwood Ranch Lot Two; L5.3: House Irrigation Plan
Sepia Print on Mylar
|
undated | |
3 | 3.3.3.H: Starwood Ranch Lot Two; L5.4: Irrigation Details
Sepia Print on Mylar
|
undated | |
3 | 3.3.4: ASPCOL Landscape Plan
Print on Photo paper
|
undated | |
Equestrian Center
9 landscape drawings
|
|||
tube | |||
4 | 3.4.1.A: Starwood Ranch Lot Two; Equestrian Center Grading
Sepia on Acetate
|
1990 August 13 | |
4 | 3.4.1.B 14: Starwood Ranch Lot Two; Equestrian Center Layout
Sepia on Acetate
|
1990 August | |
4 | 3.4.1.C: Starwood Ranch Lot Two; Equestrian Center Planting Plan
Print on Mylar
|
undated | |
4 | 3.4.1.D: Starwood Ranch Lot Two; Equestrian Center Details
Pencil & Print on Mylar
|
1990 August 22 | |
4 | 3.4.2 13: Equestrian Center Grading Plan
Pencil and Ink on Mylar
|
1990 August | |
4 | 3.4.314: Equestrian Center Layout
Pencil on Mylar
|
1990 August | |
4 | 3.4.4: Equestrian Center Planting Plan
Pencil and Ink on Mylar
|
undated | |
4 | 3.4.5: Equestrian Center Hardscape
Ink on Mylar
|
undated | |
4 | 3.4.6: Equestrian Center Planting Plan
Ink on Mylar
|
undated | |
Tennis Court
29 landscape drawings
|
|||
tube | |||
5 | 3.5.1: ASPCOL Residence: Tennis Court Plan with Section
Pencil and Ink on Mylar
|
1990 January 1 | |
5 | 3.5.2: Starwood Ranch Lot Two; Construction Documents; Proposed Tennis Court
Print on Mylar
|
undated | |
5 | 3.5.3.A: Tennis Court Construction Documents; Issued for Construction
Print on Mylar
|
1990 July 30 | |
5 | 3.5.3.B: Tennis Court Construction Documents; Issued for Construction
Ink and Print on Mylar
|
1990 July 30 | |
5 | 3.5.3.C: Tennis Court Construction Documents; Details; Issued for Construction
Print on Mylar
|
1990 July 30 | |
5 | 3.5.3.D: Tennis Court Construction Documents; Details; Issued for Construction
Print on Mylar
|
1990 July 30 | |
5 | 3.5.4.A: Starwood Ranch Lot Two; Construction Documents Progress Print; Dimension Plan
Blueprint on Bond
|
1990 June 5 | |
5 | 3.5.4.B: Starwood Ranch Lot Two; Construction Documents Progress Print; Grading Plan
Blueprint on Bond
|
1990 June 5 | |
5 | 3.5.4.C: Starwood Ranch Lot Two; Construction Documents Progress Print
Retaining Wall/Fence Elevation and Tennis House/Retaining Wall/Fence Elevation. Blueprint on Bond
|
1990 June 5 | |
5 | 3.5.4.D: Starwood Ranch Lot Two; Construction Documents Progress Print
Guard Rail Elevation, Gate Elevation, Sandstone Paving/Steps, Retaining Wall @ Tennis Court, Tennis Net Post, Paving Over Structure, Concrete Band/Fence Post Connection, Tennis Court/Light Connection/FootingPrinted. Blueprint on Bond.
|
1990 June 5 | |
5 | 3.5.5: Starwood Ranch Lot Two; Construction Documents; Dimension Plan
Print on Mylar
|
undated | |
5 | 3.5.6: Schematic Tennis Court Grading
Marker on Mylar
|
1990 February 22 | |
5 | 3.5.7.A: Schematic Tennis Court Grading; Base Map
Pencil on Mylar
|
undated | |
5 | 3.5.7.B: Schematic Tennis Court Grading; Contours
Pencil and Ink on Trace
|
undated | |
5 | 3.5.7.C: Schematic Tennis Court Grading; Contours
Pencil and Ink on Trace
|
undated | |
5 | 3.5.8: Tennis Court Grading Plan
Print on Mylar
|
undated | |
5 | 3.5.9: Starwood Ranch Lot Two; Construction Documents; Grading Plan
Print on Mylar
|
undated | |
5 | 3.5.10: Tennis Court Details
Pencil and Print on Mylar
|
undated | |
5 | 3.5.11: Starwood Ranch Lot Two; Construction Documents
Print on Mylar
|
undated | |
5 | 3.5.12.A: Tennis Court Details
Mylar
|
undated | |
5 | 3.5.12.B: Tennis Court Details
Print on Mylar
|
undated | |
5 | 3.5.12.C: Tennis Court Details; Typical Section - Paving Over Structure
Pencil on Graph Paper
|
undated | |
5 | 3.5.12.D: Tennis Court Details; Sandstone Paving/Steps
Pencil on Graph Paper
|
undated | |
5 | 3.5.12.E: Tennis Court Details; Retaining Wall at Tennis Court
Print on Mylar
|
undated | |
5 | 3.5.12.F: Tennis Court Details; Tennis Net Post
Pencil and Print on Graph Paper
|
undated | |
5 | 3.5.12.G: Tennis Court Details; Tennis Court Light Detail
Pencil on Graph Paper
|
undated | |
5 | 3.5.12.H: Tennis Court Details; Concrete Band/Fence Post Connection
Pencil and Print on Graph Paper
|
undated | |
5 | 3.5.12.I: Tennis Court Details; Fence Elevation
Print on Mylar
|
undated | |
5 | 3.5.13: ASPCOL Residence Foundation Plan
Print on Vellum
|
1990 June 8 | |
Pond
20 landscape drawings
|
|||
tube | |||
6 | 3.6.1: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
|
1991 January 9 | |
6 | 3.6.2: ASPCOL Pond Grading Plan
Pencil & Black Ink on Mylar
|
1991 January 9 | |
6 | 3.6.3: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
|
1991 January 9 | |
6 | 3.6.4: ASPCOL Pond Study Alternative "A"
Ink on Mylar
|
1991 August 13 | |
6 | 3.6.5: ASPCOL Supplemental Pond Alternative A
Ink on Mylar
|
1991 October 29 | |
6 | 3.6.6: ASPCOL Supplemental Pond Alternative B
Ink on Mylar
|
1991 October 29 | |
6 | 3.6.7: ASPCOL Pond #2 Pin Bar Document
Red & Black Ink on Mylar
|
1991 October 30 | |
6 | 3.6.8: ASPCOL Pond Alternative
Blueprint on Bond
|
1991 December 23 | |
6 | 3.6.9: ASPCOL Pond Alternative
Ink on Mylar
|
1991 December 23 | |
6 | 3.6.10: ASPCOL Pond Alternative
Ink on Mylar
|
1991 December 23 | |
6 | 3.6.11.A: Bricol E.T. Beds; Site Plan and Sections
Ink on Mylar
|
1992 January 29 | |
6 | 3.6.11.B: Bricol E.T. Beds; Grading Plan
Ink on Mylar
|
undated | |
6 | 3.6.12: Pond with Existing and Proposed Topography
Ink on Mylar
|
undated | |
6 | 3.6.13: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
|
undated | |
6 | 3.6.14: Pond and Existing Topography
Ink on Mylar
|
undated | |
6 | 3.6.15.A: Preliminary ASPCOL Supplemental Pond Plan View by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
|
1992 March 12 | |
6 | 3.6.15.B: Preliminary ASPCOL Supplemental Pond Details by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
|
1992 March 12 | |
6 | 3.6.16.A: Preliminary ASPCOL Supplemental Pond Plan View by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
|
1992 March 26 | |
6 | 3.6.16.B: Preliminary ASPCOL Supplemental Pond Details by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
|
1992 March 26 | |
6 | 3.6.17: ASPCOL Site Grading
Ink on Mylar
|
undated | |
7 | Aspcol Physical location:CCA 8 Column 3, Row 2
|
undated | |
8 | Lot 84 Physical location:CCA 8 Column 3, Row 2
|
undated | |
9 | Aspcol Physical location:CCA 8 Column 3, Row 2
|
undated | |
10 | Plant Schedule Physical location:Barn Box 2
|
undated | |
11 | Parking Lot dock and barns Physical location:CCA 8 Column 4, Row 1
|
undated |
IV: IV: Summerlin, 1986-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
SUMMERLIN MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
1 | 1 | Administration and Design |
undated |
1 | 2 | Contracts/Proposals
(A.1, #126)
|
1987-1989 |
1 | 3 | Correspondence
(A.2, #126)
|
1988-1989 |
1 | 4 | Correspondence
(A.2, #126)
|
1989-1990 |
1 | 5 | Correspondence with Consultant
(A.2b, #126)
|
1988-1989 |
1 | 6 | Correspondence with Agency
(A.2c, #126)
|
1988-1990 |
1 | 7 | Transmittals
(A.3, #126)
|
1989-1990 |
1 | 8 | Meeting Minutes/Notes to File
(A.4, #126)
|
1989-1990 |
1 | 9 | Work Program
(A.5, #126)
|
1988 |
1 | 10 | Clippings
(A.6, #126)
|
undated |
1 | 11 | Billing/Invoices
(A.7, #126)
|
1988 |
1 | 12 | Engineering Civil/Traffic
(B. 4a, #126)
|
undated |
1 | 13 | Programming Recreational
(B.5b, #126)
|
undated |
1 | 14 | Programming Land Use
(B.5c #126)
|
1988-1989 |
1 | 15 | Cost Estimates
(B.5, #126)
|
1989 |
1 | 16 | Construction Bids/Proposals/Addendum
(C.1, #126)
|
1988 |
1 | 17 | Marketing/Presentations
(D.1, #126)
|
1988-19789 |
1 | 18 | Specifications
(D.2, #126)
|
1988 |
1 | 19 | Proposals/Contracts
(A.1, #127)
|
1989 |
1 | 20 | Correspondence
(A.2, #127)
|
1989-1990 |
1 | 21 | Transmittals
(A.3, #127)
|
1989 |
1 | 22 | Meeting Minutes/Notes to File
(A.4, #127)
|
1988-1989 |
1 | 23 | Work Program
(A.5, #127)
|
1988-1989 |
1 | 24 | Engineering
(B.4, #127)
|
1988 |
1 | 25 | Engineering Civil/Traffic
(B.4a, #127)
|
undated |
1 | 26 | Programming
(B.5, #127)
|
1988 |
1 | 27 | Cost Estimates
(B.6, #127)
|
1988 |
1 | 28 | Marketing/Presentations
(D.1, #127)
|
1988-1989 |
1 | 29 | Marketing/Presentation Start-Up Meeting
(D.1, #127)
|
1989 |
1 | 30 | Marketing/Presentations Design Criteria Draft Outline
(D.1, #127)
|
1989 |
1 | 31 | Marketing/Presentations Design Criteria Draft Outline
(D.1, #127)
|
1989 |
1 | 32 | Marketing/Presentations Design Criteria
(D.1, #127)
|
1989 |
1 | 33 | Marketing/Presentations Design Criteria
(D.1, #127)
|
1989 |
1 | 34 | Marketing/Presentations
(D.1, #127)
|
1990 |
1 | 35 | Marketing/Presentations
(D.1, #127)
|
1989 |
1 | 36 | Proposal/Contracts
(A.1, #128)
|
1989 |
1 | 37 | Correspondence with Owner
(A.2a, #128)
|
1988-1989 |
1 | 38 | Correspondence with Consultant
(A.2b, #128)
|
1989 |
1 | 39 | Meeting Minutes/Notes to File
(A.4, #128)
|
1988-1989 |
1 | 40 | Work Program
(A.5, #128)
|
1988-1989 |
1 | 41 | Billing/Invoices
(A.7, #128)
|
1989 |
1 | 42 | Physical
(B.1, #128)
|
1988-1989 |
1 | 43 | Engineering
(B.4, #128)
|
1989 |
1 | 44 | Programming
(B.5, #128)
|
1988-1989 |
1 | 45 | Cost Estimates
(B.6, #128)
|
1988-1989 |
1 | 46 | Design Sketches
(B.7, #128)
|
1988 |
1 | 47 | Marketing/Presentations
(D.1, #128)
|
1988 |
1 | 48 | Proposals/Contracts
(A.1, #134)
|
1988 |
1 | 49 | Correspondence with Owner
(A.2a, #134)
|
1988 |
1 | 50 | Meeting Minutes/Notes to File
(A.4, #134)
|
1989 |
1 | 51 | Work Program
(A.5, #134)
|
1988 |
1 | 52 | Billing/Invoices
(A.7, #134)
|
1988-1989 |
1 | 53 | Proposals/Contracts
(A.1, #167)
|
1988 |
1 | 54 | Work Program
(A.5, #167)
|
1988 |
1 | 55 | Proposals/Contracts
(A.1, #168)
|
1989 |
1 | 56 | Correspondence with Consultants
(A.2b, #168)
|
1989 |
1 | 57 | Meeting Minutes/Notes to File
A.4, #168)
|
1989-1990 |
1 | 58 | Work Program
(A.5, #168)
|
1988-1989 |
1 | 59 | Billing/Invoice
(A.7, #168)
|
1989 |
1 | 60 | Engineering
(B.4, #168)
|
1988 |
1 | 61 | Programming
(B.5, #168)
|
1989 |
1 | 62 | Cost Estimates
(B.6, #168)
|
1988 |
2 | 1 | Proposal/Contracts
(A.1, #173)
|
1990 |
2 | 2 | Correspondence
A.3, #173)
|
1988-1989 |
2 | 3 | Meeting Notes
(A.4, #173)
|
1988-1989 |
2 | 4 | Work Program
(A.5, #173)
|
1988-1990 |
2 | 5 | Physical
(B.1, #173)
|
1989 |
2 | 6 | Programming
(B.5, #173)
|
1989 |
2 | 7 | Marketing/Presentations Development Standards
(D.2, #173)
|
1988 |
2 | 8 | Proposal/Contracts
(A.1, #174)
|
1989 |
2 | 9 | Proposal/Contracts
(A.1, #174)
|
1990 |
2 | 10 | Correspondence
(A.2, #174)
|
1989 |
2 | 11 | Correspondence
(A.2, #174)
|
1990 |
2 | 12 | Correspondence
(A.2, #174)
|
1990-1992 |
2 | 13 | Transmittals
(A.3, #174)
|
1989-1991 |
2 | 14 | Meeting Minutes/Notes to File
(A.4, #174)
|
1988-1989 |
2 | 15 | Meeting Minutes/Notes to File
(A.4, #174)
|
1989 April–June |
2 | 16 | Meeting Minutes/Notes to File
(A.4, #174)
|
1989 July–August |
2 | 17 | Meeting Minutes/Notes to File
(A.4, #174)
|
1989 September |
2 | 18 | Meeting Minutes/Notes to File
(A.4, #174)
|
1989 October–December |
2 | 19 | Meeting Minutes/Notes to File
(A.4, #174)
|
1990 January–February |
2 | 20 | Meeting Minutes/Notes to File
(A.4, #174)
|
1990 March–December |
2 | 21 | Meeting Minutes/Notes to File
(A.4, #174)
|
1990-1991 |
2 | 22 | Billing/Invoices
(A.7, #174)
|
1991 |
2 | 23 | Engineering Civil/Traffic
(B.4a, #174)
|
1990 |
2 | 24 | Programming
(B.5, #174)
|
1989 |
2 | 25 | Cost Estimates
(B.6, #174)
|
1990 |
2 | 26 | Design Sketches/Product Information
(B.7, #174)
|
1990 |
2 | 27 | Construction Bids/Proposals/Addendum
(C.1, #174)
|
1990 |
2 | 28 | Proposal/Contracts
(A.1a, #175)
|
1989-1991 |
2 | 29 | Correspondence with Owner
(A.2a, #175)
|
1989 |
2 | 30 | Correspondence with Owner
(A.2a, #175)
|
1989 |
2 | 31 | Correspondence with Owner
(A.2a, #175)
|
1989 |
2 | 32 | Correspondence with Owner
(A.2a, #175)
|
1990-1991 |
2 | 33 | Correspondence with Consultants
(A.2b, #175)
|
1989 |
2 | 34 | Correspondence with Consultants
(A.2b, #175)
|
1990 |
2 | 35 | Correspondence with Agencies
(A.2c, #175)
|
1989 |
3 | 1 | Transmittals
(A.2, #175)
|
1989-1990 |
3 | 2 | Meeting Notes/Notes to File
(A.4, #175)
|
1989-1990 |
3 | 3 | Work Program
(A.5, #175)
|
1989 |
3 | 4 | Billing/Invoices
(A.7, #175)
|
1989 |
3 | 5 | Billing/Invoices
(A.7, #175)
|
1989 |
3 | 6 | Billing/Invoices
(A.7, #175)
|
1990 |
3 | 7 | Physical
(B.1, #175)
|
1989 |
3 | 8 | Plant Materials List
(B.3, #175)
|
1989 |
3 | 9 | Engineering
(B.4, #175)
|
1982-1989 |
3 | 10 | Engineering Civil/Traffic
(B.4a, #175)
|
1989 |
3 | 11 | Programming
(B.5, #175)
|
1989 |
3 | 12 | Cost Estimates
(B.6, #175)
|
1988-1989 |
3 | 13 | Cost Estimates
(B.6, #175)
|
1989 |
3 | 14 | Cost Estimates
(B.6, #175)
|
1989-1990 |
3 | 15 | Design Sketches/Product Information
(B.7, #175)
|
1989 |
3 | 16 | Design Sketches/Product Information
(B.7, #175)
|
1989 |
3 | 17 | Design Sketches/Product Information
(B.7, #175)
|
1989 |
3 | 18 | Design Sketches/Product Information
(B.7, #175)
|
1989-1990 |
3 | 19 | Construction Bids/Proposals/Addendum
(C.1, #175)
|
1989-1990 |
3 | 20 | Construction Bids/Proposals/Addendum
(C.1, #175)
|
1990 |
3 | 21 | Change Orders
(C.5, #175)
|
1990 |
3 | 22 | Hillpointe and Entries Project Manual
(D.1, #175)
|
1990 |
3 | 23 | Landscape Maintenance Manual
(D.1, #175)
|
1990 |
3 | 24 | The Hills Park Project Manual
(D.1, #175)
|
1991 |
3 | 25 | The Hills Park Project Manual
(D.2, #175)
|
1991 |
3 | 26 | The Hills Park Project Manual
(D.2, #175)
|
1991 |
3 | 27 | The Hills Park Project Manual
(D.2, #175)
|
1991 |
3 | 28 | The Hills Park Project Manual
(D.2, #175)
|
1991 |
3 | 29 | Design Guidelines
(D.3, #175)
|
1989-1990 |
4 | 1 | Landscape Maintenance Manual
(#175)
|
1991 |
4 | 2 | Issue to Construct Project Manual
(#175)
|
1991 |
4 | 3 | Streetscape Schematic Design
(#175)
|
1989 |
4 | 4 | Proposal/Contracts
(A.1, #177)
|
1989-1990 |
4 | 5 | Proposal/Contracts
(A.1, #177)
|
1990-1991 |
4 | 6 | Correspondence with Owner
(A.2a, #177)
|
1989 January–July |
4 | 7 | Correspondence with Owner
(A.2a, #177)
|
1989 August–November |
4 | 8 | Correspondence with Owner
(A.2a, #177)
|
1989 December |
4 | 9 | Correspondence with Owner
(A.2a, #177)
|
1990 January–March |
4 | 10 | Correspondence with Owner
(A.2a, #177)
|
1990 April–May |
4 | 11 | Correspondence with Owner
(A.2a, #177)
|
1990 June–September |
4 | 12 | Correspondence with Owner
(A.2a, #177)
|
1990-1991 |
4 | 13 | Correspondence with Consultant
(A.2b, #177)
|
1988-1989 |
4 | 14 | Correspondence with Consultant
(A.2b, #177)
|
1989 October–December |
4 | 15 | Correspondence with Consultant
(A.2b, #177)
|
1990 January–April |
4 | 16 | Correspondence with Consultant
(A.2b, #177),
|
1990-1991 |
4 | 17 | Transmittals
(A.3, #177)
|
1990-1991 |
4 | 18 | Meeting Minutes/Notes to File
(A.4, #177)
|
1988-1991 |
4 | 19 | Billing/Invoices
(A.7, #177)
|
1989-1990 |
4 | 20 | Billing/Invoices
(A.7, #177)
|
1990-1991 |
4 | 21 | Programming
(B.5, #177)
|
1989-1990 |
4 | 22 | Cost Estimates
(B.6, #177)
|
1989 January–May |
4 | 23 | Cost Estimates
(B.6, #177)
|
1989 July 1-1990 December 31 |
4 | 24 | Design Sketches
(B.7, #177)
|
1989 |
4 | 25 | Design Sketches
(B.7, #177)
|
1990 |
4 | 26 | Construction Bids/Proposals/Addendum
(C.1, #177)
|
1990 |
4 | 27 | Construction Bids/Proposals/Addendum
(C.1, #177)
|
1990 |
4 | 28 | Construction Contracts
(C.2, #177)
|
1989 |
5 | 1 | Field Reports
(C.4, #177)
|
1989 |
5 | 2 | Change Orders
(C.5, #177)
|
1990 |
5 | 3 | Specifications
(D.1, #177)
|
1990 |
5 | 4 | Design Guidelines
(D.3, #177)
|
1988-1989 |
5 | 5 | Clark County Health Department Approved Forms
(#177)
|
1990 |
5 | 6 | Facility Maintenance Manual
(#177)
|
1990 |
5 | 7 | Landscape Maintenance Manual
(#177)
|
1990 |
5 | 8 | Landscape Maintenance Manual
(#177)
|
1990 |
5 | 9 | Parcel Summary
(#177)
|
undated |
5 | 10 | Correspondence
(A.2, #203)
|
1989-1990 |
5 | 11 | Work Program
(A.5, #203)
|
1989 |
5 | 12 | Billing/Invoices
(A.7, #203)
|
1989 |
5 | 13 | Engineering Civil/Traffic
(B.4a, #203)
|
1989 |
5 | 14 | Programming Architectural
(B.5a, #203)
|
1989 |
5 | 15 | Cost Estimates
(B.6, #203)
|
1989 |
5 | 16 | Marketing/Presentations Design Guidelines
(D.1 #203)
|
1989 |
5 | 17 | Proposal/Contracts
(A.1, #214)
|
1989 |
5 | 18 | Transmittals
(A.3, #214)
|
1989 |
5 | 19 | Meeting Minutes/Notes to File
(A.4, #214)
|
1989 |
5 | 20 | Cost Estimates
(B.6, #214)
|
1989 |
5 | 21 | Proposal/Contracts
(A.1, #221)
|
1989-1990 |
5 | 22 | Meeting Minutes/Notes to File
(A.4, #221)
|
1989 |
5 | 23 | Work Program
(A.5, #221)
|
1986 |
5 | 24 | Programming Architectural
(B.5a, #221)
|
1986-1989 |
5 | 25 | Cost Estimates
(B.6, #221)
|
1989 |
5 | 26 | Marketing/Presentations
(D.1, #221)
|
1989 |
5 | 27 | Specifications
(D.2, #221)
|
1989 |
5 | 28 | Proposal/Contracts
(A.1, #222)
|
1989 |
5 | 29 | Correspondence
(A.2, #222)
|
1989 |
5 | 30 | Transmittals
(A.3, #222)
|
1989 |
5 | 31 | Meeting Minutes/Notes to File
(A.4, #222)
|
1989 |
5 | 32 | Work Program
(A.5, #222)
|
1989 |
5 | 33 | Work Program
(A.5, #222)
|
1990 |
5 | 34 | Engineering Civil/Traffic
(B.4a, #222)
|
1989 |
5 | 35 | Cost Estimates
(B.6, #222)
|
1989 |
5 | 36 | Proposal/Contracts
(A.1, #228)
|
1989-1990 |
5 | 37 | Meeting Minutes/ Notes to File
(A.4, #228)
|
1989 |
5 | 38 | Work Program
(A.5, #228)
|
1989 |
5 | 39 | Proposal/Contracts
(A.1, #230)
|
1989 |
5 | 40 | Correspondence
(A.2, #230)
|
1989-1990 |
5 | 41 | Meeting Minutes/Notes to File
(A.4, #230)
|
1989 |
5 | 42 | Work Program
(A.5, #230)
|
1989 |
5 | 43 | Proposal/Contracts
(A.1, #234)
|
1989-1990 |
5 | 44 | Correspondence
(A.2, #234)
|
1989-1990 |
5 | 45 | Transmittals
(A.3, #234)
|
1990 |
5 | 46 | Work Program
(A.5, #234)
|
1989 |
5 | 47 | Billing/Invoices
(A.7, #234)
|
1989 |
5 | 48 | Proposal/Contracts
(A.1, #236)
|
1989 |
5 | 49 | Correspondence
(A.2, #236)
|
1989-1990 |
5 | 50 | Meeting Minutes/Notes to File
(A.4, #236)
|
1989-1990 |
5 | 51 | Work Program
(A.5, #236)
|
1989 |
5 | 52 | Billing/Invoices
(A.7, #236)
|
1990 |
5 | 53 | Programming
(B.5, #236)
|
1989 |
5 | 54 | Cost Estimates
(B.6, #236)
|
1989-1990 |
5 | 55 | Proposal/Contracts
(A.1, #237)
|
1989 |
5 | 56 | Proposal/Contracts
(A.1, #237)
|
1990 |
5 | 57 | Proposal/Contracts
(A.1, #237)
|
1991-1993 |
5 | 58 | Correspondence
(A.1, #237)
|
1989-1991 |
5 | 59 | Correspondence with Consultants
(A.2b, #239)
|
1989-1990,; 1992 |
5 | 60 | Transmittals
(A.3, #237)
|
1989-1991 |
5 | 61 | Meeting Minutes/Notes to File
(A.4, #237)
|
1989-1992 |
5 | 62 | Work Program
(A.5, #237)
|
1989 |
5 | 63 | Cost Estimates
(B.6, #237)
|
1989 |
5 | 64 | Billing/Invoices
(A.7, #237)
|
1989 |
5 | 65 | Billing/Invoices
(A.7, #237)
|
1990 January-April |
5 | 66 | Billing/Invoices
(A.7, #237)
|
1990 May-December |
5 | 67 | Billing/Invoices
(A.7, #237)
|
1991 |
5 | 68 | Billing/Invoices
(A.7, #237)
|
1992-1993 |
6 | 1 | Cost Estimates
(B.6, #237)
|
1989 |
6 | 2 | Cost Estimates
(B.6, #237)
|
1990 |
6 | 3 | Design Sketches/Product Information
(B.7, #237)
|
1989-1990 |
6 | 4 | Construction Bids/Proposals
(C.1, #237)
|
undated |
6 | 5 | Marketing/Presentations Schematic Designs
(D.1, #237)
|
1989 |
6 | 6 | Marketing/Presentations Schematic Designs
(D.1, #237)
|
1989 |
6 | 7 | Marketing/Presentations Schematic Designs
(D.1, #237)
|
1990 |
6 | 8 | Design Sketches
(D.3, #237)
|
1990 |
6 | 9 | Specifications
(D.6, #237)
|
1992 |
6 | 10 | The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Project Manual |
1991 |
6 | 11 | The Pueblo at Summerlin Streetscape Project Manual Issue to Bid |
1991 |
6 | 12 | The Pueblo at Summerlin Wall Mock-Up Project Manual
(#237)
|
1990 |
6 | 13 | Landscape Maintenance Manual for the Temporary Information Center |
1990 |
6 | 14 | Temporary Manual Center Project Manual |
1990 |
6 | 15 | Village Two South Streetscape Maintenance Manual
(#237)
|
1990 |
6 | 16 | Village Two South Streetscape Project Manual |
1990 |
6 | 17 | Proposal/Contracts
(A.1, #240)
|
1989 |
6 | 18 | Correspondence
(A.2, #240)
|
1989-1990 |
6 | 19 | Meeting Minutes/Notes to File
(A.4, #240)
|
1989-1990 |
6 | 20 | Work Program
(A.5, #240)
|
1989 |
6 | 21 | Proposal/Contracts
(A.1, #245)
|
1989-1990 |
6 | 22 | Correspondence
(A.2, #245)
|
1989-1990 |
6 | 23 | Correspondence with Owner
(A.2a, #245)
|
1989-1990 |
6 | 24 | Correspondence with Consultant
(A.2b, #245)
|
1989-1990 |
6 | 25 | Meeting Minutes
(A.4, #245)
|
1989-1990 |
6 | 26 | Billing/Invoices
(A.7, #245)
|
1989 |
6 | 27 | Billing/Invoices
(A.7, #245)
|
1990 |
6 | 28 | Billing/Invoices
(A.7, #245)
|
1989 |
6 | 29 | Programming
(B.5, #245)
|
1989 |
6 | 30 | Cost Estimates
(B.6, #245)
|
1989-1990 |
6 | 31 | Design Sketches/Product Information
(B.7, #245)
|
1989 |
6 | 32 | Design Criteria
(D.1, #245)
|
1990 |
6 | 33 | Design Criteria
(D.1, #245)
|
1990 |
6 | 34 | Meeting Minutes/Notes to File
(A.4, #254)
|
1989 |
7 | 1 | Correspondence
(A.2, #267)
|
1989 |
7 | 2 | Meeting Minutes
(A.4, #267)
|
1989 |
7 | 3 | Cost Estimates
(B.6, #267)
|
1990 |
7 | 4 | Proposal/Contracts
(A.1, #276)
|
1989 |
7 | 5 | Work Program
(A.5, #276)
|
1989 |
7 | 6 | Billing/Invoice
(A.7, #276)
|
1990 |
7 | 7 | Proposal/Contracts
(A.1, #277)
|
1989-1990 |
7 | 8 | Proposal/Contracts
(A.1, #277)
|
1991-1992 |
7 | 9 | Correspondence – Owner
(A.2a, #277)
|
1989-1990 |
7 | 10 | Correspondence – Owner
(A.2a, #277)
|
1991-1992 |
7 | 11 | Correspondence – Consultant
(A.2b, #277)
|
1990-1992 |
7 | 12 | Transmittals
(A.3, #277)
|
1990-1992 |
7 | 13 | Meeting Minutes
(A.4, #277)
|
1990-1991 |
7 | 14 | Work Program
(A.5, #277)
|
1989-1990 |
7 | 15 | Billing/Invoices
(A.7, #277)
|
1989-1990 |
7 | 16 | Billing/Invoices
(A.7, #277)
|
1990 March–December |
7 | 17 | Billing/Invoices
(A.7, #277)
|
1991 |
7 | 18 | Billing/Invoices
(A.7, #277)
|
1992 |
7 | 19 | Engineering
(B.4, #277)
|
1990 |
7 | 20 | Cost Estimates
(B.6, #277)
|
1989-1992 |
7 | 21 | Design Sketches/Product Information
(B.7, #277)
|
1990 |
7 | 22 | Specifications
(D.2, #277)
|
1990-1991 |
7 | 23 | Design Guidelines/Graphics
(D.3, #277)
|
undated |
7 | 24 | Bid Tabs
(#277)
|
1990-1991 |
7 | 25 | Interior Streets and Hillpointe Road Project Manual
(#277)
|
1990 |
7 | 26 | Schematic Design Technical Demo |
1990 |
7 | 27 | The Hills and Summerlin Maintenance Manual
(#277)
|
1990 |
7 | 28 | The Hills at Summerlin Streetscape Landscape Maintenance Manual
(#277)
|
1990 |
7 | 29 | The Hills at Summerlin Streetscape Village One South Issue to Construct Project Manual
(#277)
|
1991 |
7 | 30 | Village One South Project Manual
(#277)
|
1991 July-August |
7 | 31 | Proposals/Contracts
(A.1, #285)
|
1989 |
7 | 32 | Billing/Invoices
(A.7, #285)
|
1989-1990 |
7 | 33 | Proposals/Contracts
(A.1, #288)
|
1990 |
7 | 34 | Correspondence – Owner
(A.2a, #288)
|
1990 |
7 | 35 | Correspondence – Consultant
(A.2b, #288)
|
1990 |
7 | 36 | Meeting Minutes
(A.4, #288)
|
1989 |
7 | 37 | Programming
(B.5, #288)
|
1990 |
7 | 38 | Cost Estimates
(B.6, #288)
|
1990 |
7 | 39 | Construction Bids/Proposals/Addendum
(C.1, #288)
|
1990 |
7 | 40 | Proposal/Contracts
(A.1, #289)
|
1990-1992 |
7 | 41 | Correspondence
(A.2a, #289)
|
1990-1992 |
7 | 42 | Transmittals
(A.3, #289)
|
1990-1991 |
7 | 43 | Programming
(B.5, #289)
|
1990 |
7 | 44 | Cost Estimates
(B.6, #289)
|
1990 |
7 | 45 | Design Sketches/Schematic Design
(B.7, #289)
|
1990 |
7 | 46 | Proposal/Contracts
(A.1, #294)
|
1990 |
7 | 47 | Correspondence
(A.2, #294)
|
1989 |
7 | 48 | Programming
(B.5, #294)
|
1989 |
7 | 49 | Marketing/Presentation
(D.1, #294)
|
undated |
8 | 1 | Proposals/Contracts
(A.1, #295)
|
1990-1991 |
8 | 2 | Correspondence
(A.2, #295)
|
1990-1991 |
8 | 3 | Transmittals
(A.3, #295)
|
1990 |
8 | 4 | Meeting Minutes/Notes to File
(A.4, #295)
|
1990 |
8 | 5 | Work Program
(A.5, #295)
|
1989-1990 |
8 | 6 | Programming
(B.5, #295)
|
1990 |
8 | 7 | Programming Summary Spreadsheet
(B.5, #295)
|
1990 |
8 | 8 | Programming/Architectural
(B.5a, #295)
|
1990 |
8 | 9 | Cost Estimates
(B.6, #295)
|
1990 |
8 | 10 | Construction Bids/Proposals/Addendum
(C.1, #295)
|
1990 |
8 | 11 | Summerlin Master Plan
(#295)
|
1990 |
8 | 12 | Summerlin Master Plan Technical Memo
(#295)
|
1990 |
8 | 13 | Maintenance Manual Comments with blueprints |
1990 |
8 | 14 | Proposals/Contracts
(A.1, #302)
|
1990 |
8 | 15 | Correspondence with Owner
(A. 2a, #302)
|
1989 |
8 | 16 | Billing/Invoices
(A.7, #302)
|
1991 |
8 | 17 | Proposal/Contract
(A.1, #307)
|
1990 |
8 | 18 | Correspondence
(A.2a, #307)
|
1990 |
8 | 19 | Meeting Minutes/Notes to File
(A.4, #307)
|
1990 |
8 | 20 | Proposal/Contracts
( A.1, #311)
|
1990 |
8 | 21 | Correspondence with Owner
(A.2a, #311)
|
1990 |
8 | 22 | Correspondence with Consultant
(A.2b, #311)
|
1990 |
8 | 23 | Meeting Minutes/Notes to File
(A.4, #311)
|
1990 |
8 | 24 | Work Programs
(A.5, #311)
|
1990 |
8 | 25 | Billing/Invoices
(A.7, #311)
|
1990 January-March |
8 | 26 | Billing/Invoices
(A.7, #311)
|
1990 April-August |
8 | 27 | Engineering
(B.4, #311)
|
1990 |
8 | 28 | Programming/Architectural
(B.5a, #311)
|
1990 |
8 | 29 | Cost Estimates
(B.6, #311)
|
1990 |
8 | 30 | Design Sketches/Product Information
(B.7, #311)
|
1990 |
8 | 31 | Planning Summary Information
(#311)
|
1990 |
8 | 32 | Marketing/Presentation Summary Notebook
(D.1, #321)
|
1989 |
8 | 33 | Marketing/Presentation Summary Notebook
(D.1, #321)
|
1990 |
8 | 34 | Correspondence
(A.2, #331)
|
1989-1990 |
8 | 35 | Meeting Minutes/Notes to File
(A.4, #331)
|
1989-1990 |
8 | 36 | Work Program
(A.5, #331)
|
1990 |
8 | 37 | Billing/Invoices
(A.7, #331)
|
1991 |
8 | 38 | Marketing/Presentation Decision Memo
(D.1, #331)
|
1990 |
8 | 39 | Proposal/Contracts
(A.1, #355)
|
1990 |
8 | 40 | Proposal/Contracts
(A.1, #355)
|
1991 |
8 | 41 | Proposal/Contracts
(A.1, #355)
|
1992 |
8 | 42 | Proposal/Contracts
(A.1, #355)
|
1993-1994 |
8 | 43 | Correspondence with Owner
(A.2a, #355)
|
1990-1991 |
8 | 44 | Correspondence with Owner
(A.2a, #355)
|
1992-1993 |
8 | 45 | Correspondence with Consultants
(A.2b, #355)
|
1991 |
8 | 46 | Correspondence with Consultants
(A.2b, #355)
|
1992 |
8 | 47 | Correspondence with Consultants
(A.2b, #355)
|
1993 |
9 | 1 | Transmittals
(A.3, #355)
|
1990-1993 |
9 | 2 | Meeting Minutes/Notes to File
(A.4, #355)
|
1990-1991 |
9 | 3 | Meeting Minutes/Notes to File
(A.4, #355)
|
1992-1993 |
9 | 4 | Billing/Invoices
(A.7, #355)
|
1991 |
9 | 5 | Billing/Invoices
(A.7, #355)
|
1991 |
9 | 6 | Billing/Invoices
(A.7, #355)
|
1991 |
9 | 7 | Billing/Invoices
(A.7, #355)
|
1991 |
9 | 8 | Billing/Invoices
(A.7, #355)
|
1992 |
9 | 9 | Billing/Invoices
(A.7, #355)
|
1992 |
9 | 10 | Billing/Invoices
1992 (A.7, #355)
|
1992 June-October |
9 | 11 | Billing/Invoices
(A.7, #355)
|
1992 November-December |
9 | 12 | Billing/Invoices
(A.7, #355)
|
1993 January-April |
9 | 13 | Billing/Invoices
(A.7, #355)
|
1993 May-August |
9 | 14 | Billing/Invoices
(A.7, #355)
|
1993 September-December |
9 | 15 | Billing/Invoices
( A.7, #355)
|
1994 |
9 | 16 | Cost Estimates
(A.7, #355)
|
1992-1993 |
9 | 17 | Design Sketches/Product Information
(B.7, #355)
|
1992 |
9 | 18 | Construction Bids/Proposals
(C.1, #355)
|
1990 May-July |
9 | 19 | Construction Bids/Proposals
(C.1, #355)
|
1990 August-September |
9 | 20 | Construction Bids/Proposals
(C.1, #355)
|
1990 October-December |
9 | 21 | Construction Bids/Proposals
(C.1, #355)
|
1991-1992 |
9 | 22 | Construction Bids/Proposals
(C.1, #355)
|
1992 |
9 | 23 | Pay Requests
(C.3, #355)
|
1991-1992 |
9 | 24 | Field Reports
(C.4, #355)
|
1990 |
9 | 25 | Field Reports
(C.4, #355)
|
1991-1992 |
9 | 26 | Field Reports
(C.4, #355)
|
1993 |
9 | 27 | Change Orders
(C.5, #355)
|
1990-1992 February |
9 | 28 | Change Orders
(C.5, #355)
|
1992 March-April |
9 | 29 | Change Orders
(C.5, #355)
|
1992 May-September |
9 | 30 | Change Orders
(C.5, #355)
|
1992-1993 |
9 | 31 | Submittals/Shop Drawings
(C.6, #355)
|
1988-1991 March |
10 | 1 | Submittals/Shop Drawings
(C.6, #355)
|
1991 April |
10 | 2 | Submittals/Shop Drawings
(C.6, #355)
|
1991 May-June |
10 | 3 | Submittals/Shop Drawings
(C.6, #355)
|
1991 June-September |
10 | 4 | Submittals/Shop Drawings
(C.6, #355)
|
1992 January |
10 | 5 | Submittals/Shop Drawings
(C.6, #355)
|
1992 February-March |
10 | 6 | Submittals/Shop Drawings
(C.6, #355)
|
1992 August-September |
10 | 7 | Submittals/Shop Drawings
( C.6, #355)
|
1993 |
10 | 8 | Submittals/Shop Drawings
(C.6, #355)
|
1993 |
10 | 9 | Proposal/Contracts
(A.1, #394)
|
1990 |
10 | 10 | Programming
(B.5, #394)
|
1990 |
10 | 11 | Proposal/Contracts
(A.1, #398)
|
1990-1991 |
10 | 12 | Correspondence
(A.2, #398)
|
1990 |
10 | 13 | Billing/Invoices
(A.7, #398)
|
1990 |
10 | 14 | Billing/Invoices
(A.7, #398)
|
1991 |
10 | 15 | Proposals/Contracts
(A.1, #405)
|
1990 |
10 | 16 | Billings/Invoices
(A.7, #405)
|
1990 |
10 | 17 | Correspondence
(A.2b, #432)
|
1992 |
10 | 18 | Billing/Invoices
(A.7, #432)
|
1991 |
10 | 19 | Billing/Invoices
(A.7, #432)
|
1992 |
10 | 20 | Specifications
(D.6, #432)
|
1990 |
10 | 21 | Specifications
(D.6, #432)
|
1991 |
10 | 22 | Specifications/Maintenance Manual
(D.6, #432)
|
1991 |
10 | 23 | Proposal/Contracts
(A.1, #459)
|
1991 |
10 | 24 | Billing/Invoices
(A.4, #459)
|
1991-1992 |
10 | 25 | Cost Estimates
(B.6, #459)
|
1991 |
10 | 26 | Correspondence with Owner
(A.2a, #462)
|
1991 |
10 | 27 | Meeting Minutes/Notes to File
(A.4, #462)
|
1991 |
10 | 28 | Programming
(B.5, #462)
|
1990 |
10 | 29 | Landscape Improvement Standards |
1990 |
10 | 30 | Proposal/Contracts
(A.1, #488)
|
1991-1993 |
10 | 31 | Correspondence
(A.2, #488)
|
1990-1991 August |
10 | 32 | Correspondence
(A.2, #488)
|
1991 September-1993 February |
10 | 33 | Transmittals
(A.3, #488)
|
1991-1992 |
10 | 34 | Meeting Minutes
(A.4, #488)
|
1991 |
10 | 35 | Billing/Invoices
(A.7, #488)
|
1991 May-August |
10 | 36 | Billing/Invoices
(A.7, #488)
|
1991 September-December |
10 | 37 | Billing/Invoices
(A.7, #488)
|
1992 |
10 | 38 | Billing/Invoices
(A.7, #488)
|
1993-1994 |
11 | 1 | Cost Estimates
(B.6, #488)
|
1991-1992 |
11 | 2 | Design Sketches
(B.7, #488)
|
1991 |
11 | 3 | Project Manual
(C.6, #488)
|
1993 |
11 | 4 | Specifications/Issue to Bid
(D.2, #488)
|
1991 |
11 | 5 | Proposal/Contracts
(A.1, #577)
|
1991-1993 |
11 | 6 | Correspondence
(A.2, #577)
|
1991-1992 |
11 | 7 | Transmittals
(A.3, #577)
|
1992 |
11 | 8 | Meeting Minutes
(A.4, #577)
|
1992 |
11 | 9 | Billing/Invoices
(A.7, #577)
|
1991-1992 August |
11 | 10 | Billing/Invoices
(A.7. #577)
|
1992-1993 |
11 | 11 | Meeting Minutes
(A.4, #577)
|
1992 |
11 | 12 | Cost Estimates
(B.6, #577)
|
1992 |
11 | 13 | Design Sketches
(B.7, #577)
|
1992 |
11 | 14 | Marketing/Presentation Project Manual
(D.1, #577)
|
1992 |
11 | 15 | Issue for Construction Project Manual
(D.1, #577)
|
1992 |
11 | 16 | Proposal/Contracts
(A.1, #586)
|
1991-1995 |
11 | 17 | Correspondence
(A.2, #586)
|
1991-1992 |
11 | 18 | Correspondence
(A.2, #586)
|
1993 |
11 | 19 | Correspondence
(A.2, #586)
|
1994-1996 |
11 | 20 | Transmittals
(A.4, #586)
|
1992-1993 |
11 | 21 | Meeting Notes
(A.4, #586)
|
1992-1993 |
11 | 22 | Work Program
(A.5, #586)
|
1992 |
11 | 23 | Billing/Invoices
(A.7, #586)
|
1992 |
11 | 24 | Billing/Invoices
(A.7, #586)
|
1993-1994 |
11 | 25 | Cost Estimates
(B.6, #586)
|
1991-1992 |
11 | 26 | Design Sketches
(B.7, #586)
|
1993 |
11 | 27 | Design Sketches
(B.7, #586)
|
undated |
11 | 28 | Design Sketches
(B.7, #586)
|
1995 |
11 | 29 | Construction Bids/Proposals/Addendum
(C.1, #586)
|
1992 |
11 | 30 | Marketing/Presentation
(D.1, #586)
|
undated |
11 | 31 | Correspondence
(A.2, #620)
|
1989 |
11 | 32 | Proposal/Contracts
(A.1, #635)
|
1992-1993 |
11 | 33 | Correspondence with Owner
(A.2a, #635)
|
1992 |
11 | 34 | Correspondence with Owner
(A.2a, #635)
|
1993 |
11 | 35 | Meeting Minutes
(A.4, #635)
|
1993 |
11 | 36 | Billing/Invoices
(A.7, #635)
|
1992-1993 |
11 | 37 | Correspondence
(A.2, #659)
|
1992-1993 |
11 | 38 | Meeting Minutes
(A.4, #659)
|
1992 |
12 | 1 | Proposal/Contracts
(A.1, #669)
|
1992-1994 |
12 | 2 | Correspondence with Owner
(A.2a, #669)
|
1992-1996 |
12 | 3 | Correspondence with Consultant
(A.2b, #669)
|
1992 |
12 | 4 | Meeting Minutes
(A.4, #669)
|
1992 January-September |
12 | 5 | Meeting Minutes
(A.4, #669)
|
1992 October-November |
12 | 6 | Meeting Minutes
(A.4, #669)
|
1992 November-December |
12 | 7 | Meeting Minutes
(A.4, #669)
|
1993-1994 |
12 | 8 | Billing/Invoices
(A.7, #669)
|
1992 |
12 | 9 | Billing/Invoices
(A.7, #669)
|
1993 |
12 | 10 | Billing/Invoices
(A.7, #669)
|
1994-1996 |
12 | 11 | Programming/Architectural
(B.5a, #669)
|
1992-1993 |
12 | 12 | Cost Estimates
(B.6, #669)
|
1992-1993 |
12 | 13 | Design Sketches/Product Information
(B.7, #669)
|
1991-1993 |
12 | 14 | Marketing/Presentations
(D.1, #669)
|
1993 |
12 | 15 | Marketing/Presentations
(D.1, #669)
|
1994 |
12 | 16 | Proposal/Contracts
(A.1, #693)
|
1992-1993 |
12 | 17 | Proposal/Contracts
(A.1, #693)
|
1993 |
12 | 18 | Proposal/Contracts
(A.1, #693)
|
1994-1995 |
12 | 19 | Correspondence with Owner
(A.2a, #693)
|
1993-1994 |
12 | 20 | Correspondence with Owner
(A.2a, #693)
|
1994 |
12 | 21 | Correspondence with Owner
(A.2a, #693)
|
1994 |
12 | 22 | Correspondence with Owner
(A.2a, #693)
|
1995 |
12 | 23 | Correspondence with Owner
(A.2a, #693)
|
1995-1997 |
12 | 24 | Correspondence with Consultant
(A.2b, #693)
|
1992-1993 |
12 | 25 | Correspondence with Consultant
(A.2b, #693)
|
1994 |
12 | 26 | Correspondence with Consultant
(A.2b, #693)
|
1995 |
12 | 27 | Correspondence with Agency, mainly blueprints
(A.2c, #693)
|
1992 |
12 | 28 | Correspondence with Agency
(A.2c, #693)
|
1994 |
12 | 29 | Correspondence with Agency
(A.2c, #693)
|
1995 |
12 | 30 | Transmittals
(A.3, #693)
|
1992-1995 |
13 | 1 | Meeting Minutes
(A.4, #693)
|
1992-1993 |
13 | 2 | Meeting Minutes
(A.4, #693)
|
1994 |
13 | 3 | Meeting Minutes
(A.4, #693)
|
1994 March-April |
13 | 4 | Meeting Minutes
(A.4, #693)
|
1994 May-June |
13 | 5 | Meeting Minutes
(A.4, #693)
|
1994 August-October |
13 | 6 | Meeting Minutes
(A.4, #693)
|
1994 November-December |
13 | 7 | Meeting Minutes
(A.4, #693)
|
1995 |
13 | 8 | Meeting Minutes
(A.4, #693)
|
1995 |
13 | 9 | Billing/Invoices
(A.7, #693)
|
1992-1993 |
13 | 10 | Billing/Invoices
(A.7, #693)
|
1994 January-June |
13 | 11 | Billing/Invoices
(A.7, #693)
|
1994-1995 |
13 | 12 | Geology/Soils
(B.1a, #693)
|
1991 |
13 | 13 | Engineering
(B.4, #693)
|
1992-1993 |
13 | 14 | Engineering
(B.4, #693)
|
1994 |
13 | 15 | Programming
(B.5, #693)
|
1992 |
13 | 16 | Programming
(B.5, #693)
|
1993 |
13 | 17 | Cost Estimates
(B.6, #693)
|
1992-1993 |
13 | 18 | Cost Estimates
(B.6, #693)
|
1994-1995 |
13 | 19 | Design Sketches/Product Information
(B.7, #693)
|
1993-1994 |
13 | 20 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 21 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 22 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 23 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 24 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 25 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 26 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 27 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 28 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
13 | 29 | Design Sketches/Product Information
(B.7, #693)
|
1994 |
14 | 1 | Construction Bids
(C.1, #693)
|
1993-1994 |
14 | 2 | Construction Bids
(C.1, #693)
|
1994 |
14 | 3 | Construction Bids
(C.1, #693)
|
1994 |
14 | 4 | Construction Bids
(C.1, #693)
|
1994-1995 |
14 | 5 | Pay Requests
(C.3, #693)
|
1994 |
14 | 6 | Field Reports
(C.4, #693)
|
1993-1995 |
14 | 7 | Change Orders
(C.5, #693)
|
1993-1994 |
14 | 8 | Submittals/Shop Drawings
(C.6, #693)
|
1993 |
14 | 9 | Submittals/Shop Drawings
(C.6, #693)
|
1993-1994 |
14 | 10 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 11 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 12 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 13 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 14 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 15 | Submittals/Shop Drawings
(C.6, #693)
|
1994 |
14 | 16 | Marketing/Presentations
(D.1, #693)
|
1994 |
14 | 17 | Specifications
(D.2, #693)
|
1993 |
14 | 18 | Proposal/Contracts
(A.1a, #712)
|
1993 |
14 | 19 | Proposal/Contracts
(A.1a, #712)
|
1994-1995 |
14 | 20 | Proposal/Contracts
(A.1a, #712)
|
1996 |
14 | 21 | Proposal/Contracts
(A.1a, #712)
|
1993-1995 |
14 | 22 | Correspondence with Owner
(A.2a, #712)
|
1992-1993 |
14 | 23 | Correspondence with Owner
(A.2a, #712)
|
1994 January-June |
14 | 24 | Correspondence with Owner
(A.2a, #712)
|
1994 July-December |
14 | 25 | Correspondence with Owner
(A.2a, #712)
|
1995 January-August |
14 | 26 | Correspondence with Owner
(A.2a, #712)
|
1995 September-October |
14 | 27 | Correspondence with Owner
(A.2a, #712)
|
1995 November-December |
14 | 28 | Correspondence with Owner
(A.2a, #712)
|
1996 January-April |
14 | 29 | Correspondence with Owner
(A.2a, #712)
|
1996-1997 |
14 | 30 | Correspondence with Consultant
(A.2b, #712)
|
1993-1994 |
14 | 31 | Correspondence with Consultant
(A.2b, #712)
|
1995 |
14 | 32 | Correspondence with Consultant
(A.2b, #712)
|
1996 |
15 | 1 | Correspondence - Consultant
(A.2b, #712)
|
1992-1993 |
15 | 2 | Correspondence - Consultant
(A.2b, #712)
|
1994-1995 |
15 | 3 | Transmittals
(A.3, #712)
|
1993-1996 |
15 | 4 | Meeting Minutes
(A.4, #712)
|
1993-1994 |
15 | 5 | Meeting Minutes
(A.4, #712)
|
1995-1996 |
15 | 6 | Billing/Invoices
(A.7, #712)
|
1992-1993 |
15 | 7 | Billing/Invoices
(A.7, #712)
|
1993 August-November |
15 | 8 | Billing/Invoices
(A.7, #712)
|
1994 |
15 | 9 | Billing/Invoices
(A.7, #712)
|
1995 January–February |
15 | 10 | Billing/Invoices
(A.7, #712)
|
1995 March–June |
15 | 11 | Billing/Invoices
(A.7, #712)
|
1995 July-September |
15 | 12 | Billing/Invoices
(A.7, #712)
|
1995 November-December |
15 | 13 | Billing/Invoices
(A.7, #712)
|
1996 February–June |
15 | 14 | Billing/Invoices
(A.7, #712)
|
1996 July-September |
15 | 15 | Notes to File
(A.8, #712)
|
1996 |
15 | 16 | Engineering
(B.4, #712)
|
1993 |
15 | 17 | Engineering
(B.4, #712)
|
1994 |
15 | 18 | Cost Estimates
(B.6, #712)
|
1992 |
15 | 19 | Cost Estimates
(B.6, #712)
|
1993 |
15 | 20 | Cost Estimates
(B.6, #712)
|
1994 January-July |
15 | 21 | Cost Estimates
(B.6., #712)
|
1994 August |
15 | 22 | Cost Estimates
(B.6, #712)
|
1995 |
15 | 23 | Design Sketches/Product Information
(B.7, #712)
|
1993 January-March |
15 | 24 | Design Sketches/Product Information
(B.7, #712)
|
1993-1994 |
15 | 25 | Design Sketches/Product Information
(B.7, #712)
|
1995 |
15 | 26 | Construction Bids/Proposals/Addendum
(C.1, #712)
|
1994 |
15 | 27 | Construction Bids/Proposals/Addendum
(C.1, #712)
|
1995 July-August |
15 | 28 | Construction Bids/Proposals/Addendum
(C.1, #712)
|
1995 September-December |
15 | 29 | Construction Contracts
(C.2, #712)
|
1994 |
15 | 30 | Change Orders
(C.5, #712)
|
1995-1997 |
16 | 1 | Specifications/Construction Agreement
(D.2, #712)
|
1994 |
16 | 2 | Specifications/Construction Agreement
(D.2, #712)
|
1994 |
16 | 3 | Specifications/Construction Agreement
(D.2, #712)
|
1994 |
16 | 4 | Specifications/Construction Agreement
(D.2, #712)
|
1994 |
16 | 5 | Specifications/Construction Agreement
(D.2, #712)
|
1995 |
16 | 6 | Specifications/Construction Agreement Project Manual
(D.2, #712)
|
1995 |
16 | 7 | Specifications/Construction Agreement Project Manual
(D.2, #712)
|
1995 |
16 | 8 | Specifications/Construction Agreement Project Manual
(D.2, #712)
|
1995 |
16 | 9 | Specifications/Construction Agreement Project Manual
(D.2, #712)
|
1996 February |
16 | 10 | Specifications/Project Manual
(D.2, #712)
|
1996 April |
16 | 11 | Specifications/Project Manual
(D.2, #712)
|
1996 April |
16 | 12 | Specifications/Project Manual
(D.2, #712)
|
1996 July |
16 | 13 | Specifications/Project Manual
(D.2, #712)
|
1996 September |
16 | 14 | Proposal/Contracts
(A.1, #723)
|
1993 |
16 | 15 | Billing/Invoices
(A.7, #723)
|
1993 |
16 | 16 | Proposal/Contracts
(A.1, #726)
|
1992-1993 |
16 | 17 | Proposal/Contracts
(A.1, #726)
|
1994-1995 |
16 | 18 | Proposal/Contracts/Consultants
(A.1b, #726)
|
1993-1994 |
16 | 19 | Correspondence/Owner
(A.2a, #726)
|
1992-1994 |
16 | 20 | Correspondence/Owner
(A.2a, #726)
|
1994 |
16 | 21 | Correspondence/Owner
(A.2a, #726)
|
1995-1998 |
16 | 22 | Correspondence/Consultant
(A.2b, #726)
|
1992-1993 |
16 | 23 | Correspondence/Consultant
(A.2b, #726)
|
1994 |
16 | 24 | Correspondence/Consultant
(A.2b, #726)
|
1993-1994 |
16 | 25 | Transmittals
(A.3, #726)
|
1994 |
16 | 26 | Meeting Minutes
(A.4, #726)
|
1994-1995 |
16 | 27 | Billing/Invoices
(A.7, #726)
|
1992-1993 |
16 | 28 | Billing/Invoices
(A.7, #726)
|
1994 January-August |
16 | 29 | Billing/Invoices
(A.7, #726)
|
1994-1995 |
16 | 30 | Engineering
(B.4, #726)
|
1991-1993 |
16 | 31 | Engineering
(B.4, #726)
|
1994 |
16 | 32 | Engineering/Utility
(B.4c, #726)
|
1994 |
16 | 33 | Engineering/Structural
(B.4d, #726)
|
1994-1998 |
16 | 34 | Programming
(B.5, #726)
|
1993 |
16 | 35 | Cost Estimates
(B.6, #726)
|
1992-1994 |
16 | 36 | Design Sketches/Product Information
(B.7, #726)
|
1992-1994 |
17 | 1 | Construction Bids/Proposals/Addendum
(C.1, #726)
|
1994 |
17 | 2 | Construction Bids/Proposals/Addendum Project Manual
(C.1, #726)
|
1994 |
17 | 3 | Construction Bids/Proposals/Addendum Project Manual
(C.1, #726)
|
1995 |
17 | 4 | Pay Requests
(C.3, #726)
|
1992 |
17 | 5 | Submittals/Shop Drawings
(C.6, #726)
|
1995 |
17 | 6 | Billing/Invoices
(A.7, #726)
|
1993 |
17 | 7 | Proposed Contract Dead Horse Ranch State Park, Arizona
(#806)
|
1986-1987 |
17 | 8 | Meeting Minutes Estrella Symposium
(A.4, #809)
|
1986-1987 |
17 | 9 | Proposal/Contracts
(A.1, #811)
|
1993 |
17 | 10 | Correspondence
(A.2, #811)
|
1993 |
17 | 11 | Correspondence/Owner
(A.2a, #811)
|
1993 |
17 | 12 | Transmittals
(A.3, #811)
|
1993 |
17 | 13 | Billing/Invoices
(A.7, #811)
|
1993 |
17 | 14 | Cost Estimates
(B.6, #811)
|
1993 |
17 | 15 | Pay Requests
(C.3, #811)
|
1993 |
17 | 16 | Change Orders
(C.5, #811)
|
1993 |
17 | 17 | Submittals/Shop Drawings
(C.6, #811)
|
1993 |
17 | 18 | Specifications/Project Manual
(D.2, #811)
|
1993 |
17 | 19 | Field Reports/Lower Buckeye Road
(C.4, #827)
|
1987 |
17 | 20 | Field Reports/Bacqueira Beret
(C.4, #829)
|
1987 |
17 | 21 | Proposal/Contracts
(A.1, #834)
|
1987-1990 |
17 | 22 | Correspondence/Owner
(A.2, #834)
|
1987-1988 |
17 | 23 | Correspondence/Consultant
(A.2b, #8340)
|
1987 |
17 | 24 | Transmittals
(A.3, #834)
|
1987 |
17 | 25 | Meeting Minutes
(A.4, #834)
|
1987 |
17 | 26 | Engineering/Civil
(B.4, #834)
|
undated |
17 | 27 | Engineering/Traffic
(B.4, #834)
|
1987 |
17 | 28 | Programming
(B.5, #834)
|
1987 |
17 | 29 | Programming/Schools, Churches, Libraries
(B.5, #834)
|
1986-1987 |
17 | 30 | Programming/Recreational
(B.5, #834)
|
1986-1987 |
17 | 31 | Programming/Land Use
(B.5, #834)
|
1986-1987 |
17 | 32 | Marketing/Presentation/Zoning Submission
(D.1, #834)
|
1986 |
17 | 33 | Design Guidelines
(D.3, #834)
|
1987 |
17 | 34 | Clippings
(D.6, #834)
|
1987 |
17 | 35 | Meeting Minutes
(A.4, #847)
|
1986-1987 |
17 | 36 | Proposal/Contracts
(A.1, #866)
|
1987-1988 |
17 | 37 | Correspondence
(A.2, #866)
|
1988 |
17 | 38 | Meeting Minutes
(A.4, #866)
|
1987-1988 |
17 | 39 | Work Program
(A.5, #866)
|
1987 |
17 | 40 | Cost Estimates
(B.6, #866)
|
1988 |
17 | 41 | Correspondence
(A.2, #869)
|
1987 |
17 | 42 | Billing/Invoices
(A.7, #869)
|
1987 |
17 | 43 | Design Guidelines
(D.3, #869)
|
1987 |
17 | 44 | City of South Lake Tahoe Department of Public Works report
(#892)
|
1995 |
17 | 45 | Proposal/Contracts
(A.1, #947)
|
1995-1996 |
17 | 46 | Correspondence
(A.2, #947)
|
1995 |
17 | 47 | Correspondence
(A.2, #947)
|
1996 January-June |
17 | 48 | Correspondence/Consultant
(A.2b, #947)
|
1995-1995 |
17 | 49 | Correspondence/Consultant
(A.2b, #947)
|
1995-1996 |
18 | 1 | Meeting Minutes
(A.4, #947)
|
1995 |
18 | 2 | Billing/Invoices
(A.7, #947)
|
1995-1996 |
18 | 3 | Billing/Invoices
(A.7, #947)
|
1996-1997 |
18 | 4 | Construction Bids/Proposals/Addendum
(C.1, #947)
|
1995 |
18 | 5 | Construction Bids/Proposals/Addendum
(C.1, #947)
|
1996 April |
18 | 6 | Construction Bids/Proposals/Addendum
(C.1, #947)
|
1996 June |
18 | 7 | Field Reports
(C.4, #947)
|
1995-1996 |
18 | 8 | Change Orders
(C.5, #947)
|
1995 |
18 | 9 | Change Orders
(C.5, #947)
|
1996-1997 |
18 | 10 | Submittals/Shop Drawings
(C.6, #947)
|
1995 January-September |
18 | 11 | Submittals/Shop Drawings
(C.6, #947)
|
1995 September-December |
18 | 12 | Submittals/Shop Drawings
(C.6, #947)
|
1996 January-February |
18 | 13 | Submittals/Shop Drawings
(C.6, #947)
|
1996 July-September |
18 | 14 | Proposal/Contracts
( A.1, #1287)
|
1995 |
18 | 15 | Correspondence – Owner
(A.2a, #1287)
|
1995 |
18 | 16 | Billing/Invoices
(A.7, #1287)
|
1995-1996 |
18 | 17 | Proposal/Contracts-Owner/Landscape Architect
(A.1a, #1288)
|
1995-1996 |
18 | 18 | Correspondence
(A.2, #1288)
|
1995-1997 |
18 | 19 | Meeting Minutes
(A.4, #1288)
|
1997 |
18 | 20 | Billing/Invoices
(A.7, #1288)
|
1995-1996 |
18 | 21 | Billing/Invoices
(A.7, #1288)
|
1996-1997 |
18 | 22 | Notes to File
(A.8, #1288)
|
1996 |
18 | 23 | Design Sketches/Product Information
(B.7, #1288)
|
1996 |
18 | 24 | Billing/Invoices
(A.7, #1328)
|
1996 |
18 | 25 | Proposal/Contracts – Owner/Landscape Architect
(A.1a, #1329)
|
1995-1996 |
18 | 26 | Correspondence – Owner
(A.2a, #1329)
|
1995-1996 |
18 | 27 | Billing/Invoices
(A.7, #1329)
|
1996 |
18 | 28 | Proposal/Contracts
(A.1a, #1386)
|
1996 |
18 | 29 | Billing/Invoices
(A.7, #1386)
|
1996 |
18 | 30 | Proposal/Contracts
(A.1, #2979)
|
2002 |
18 | 31 | Correspondence
( A.2, #2979)
|
2002-2003 |
18 | 32 | Meeting Minutes
(A.4, #2979)
|
2005 |
18 | 33 | Design Guidelines
(D.6, #2979)
|
1990 |
18 | 34 | Development Guidelines
(#2979)
|
2002-2003 |
18 | 35 | Master Plan
(#2979)
|
1996 |
18 | 36 | Summerlin Community Map |
undated |
SUMMERLIN LANDSCAPE DRAWINGS 75 tubes
|
|||
Summerlin Master Plan
|
|||
tube | |||
1 | 4.1.1: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.2: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.3: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.4: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.5: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.6: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.7: Road Network Diagram
Sepia Print with Adhesive
|
1990 October 17 | |
1 | 4.1.8: Village Delineation/Community Structure Diagram
Sepia Print with Adhesive
|
1990 September 19 | |
1 | 4.1.9: Village Cluster Diagram Preliminary Draft
Sepia Print with Adhesive & Marker
|
1990 August 6 | |
1 | 4.1.10: 1990 Master Plan Preliminary Draft Retail Alternative
Sepia Print with Ink
|
1990 August 31 | |
1 | 4.1.11: Preliminary Master Plan Zoning Document
Sepia Print with Adhesive
|
1990 October 17 | |
1 | 4.1.12: 1990 Draft Plan Village Delineation/Community Structure Diagram
Sepia Print with Adhesive & Ink
|
1990 October 17 | |
1 | 4.1.13: Village Delineation/Community Structure Diagram
Sepia Print
|
undated | |
1 | 4.1.14: Village Delineation/Community Structure Diagram
Sepia Print with Marker
|
1990 August 6 | |
1 | 4.1.15: Town Center/Transit Zoning
Colored Pencil & Ink on Trace
|
undated | |
1 | 4.1.16: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.17: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.18: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.19: Pathway Cross-Section
Ink on Trace
|
undated | |
1 | 4.1.20: 1990 Summerlin General Plan
Print & Adhesive on Mylar
|
1990 October 31 | |
1 | 4.1.21: 1990 Summerlin General Plan
Sepia Print on Mylar
|
1990 October 31 | |
1 | 4.1.22: 1990 Summerlin General Plan
Sepia Print on Mylar
|
1990 October 31 | |
1 | 4.1.23: 1990 Draft Master Plan
Sepia Print on Mylar
|
1990 October 31 | |
1 | 4.1.24: Summerlin Transit and Walking Distance Diagram Preliminary Draft
Sepia Print with Adhesive & Ink
|
1990 August 6 | |
1 | 4.1.25: Village Delineation/Community Structure Diagram
Print & Adhesive on Mylar
|
undated | |
1 | 4.1.26: Town Center/Transit Zoning (Large Scale)
Print on Mylar
|
undated | |
1 | 4.1.27: Town Center Property Boundaries (Large Scale)
Print & Adhesive on Mylar
|
undated | |
1 | 4.1.28: Community Facilities Plan 1990 Draft Plan
Print & Marker on Bond
|
1990 October 17 | |
1 | 4.1.29: Parks, Open Space, and School Facilities Plan 1990 Draft Plan
Print & Marker on Bond
|
1990 October 17 | |
1 | 4.1.30: 1990 Draft Master Plan
Sepia Print on Mylar
|
1990 October 31 | |
1 | 4.1.31: 1990 Master Plan Preliminary Draft
Sepia Print with Marker
|
1990 August 31 | |
1 | 4.1.32: Activity Spines Diagram Preliminary Draft
Sepia Print with Adhesive
|
1990 August 6 | |
1 | 4.1.33: Activity Spines
Sepia with Adhesive & Ink on Diazo Mylar
|
1990 October 17 | |
1 | 4.1.34: Storm Water Management Plan
Sepia with Adhesive & Ink on Diazo Mylar
|
1990 October 17 | |
1 | 4.1.35: Site Conditions Summary
Print & Ink on Diazo Mylar
|
1990 August 6 | |
1 | 4.1.36: Community Facilities Plan 1990 Draft Plan
Sepia Print with Adhesive on Mylar
|
1990 October 17 | |
1 | 4.1.37: Parks, Open Space, and School Facilities Plan 1990 Draft Plan
Sepia Print with Adhesive on Mylar
|
1990 October 17 | |
1 | 4.1.38: Village Delineation/Community Structure Diagram
Sepia Print on Mylar
|
undated | |
1 | 4.1.39: 1990 Draft Plan Transit/Activity Spines
Sepia with Adhesive & Ink on Diazo Mylar
|
1990 October 17 | |
1 | 4.1.40: Study Draft Master Plan 1989
Sepia Print with Adhesive & Ink
|
1989 November 7 | |
1 | 4.1.41: Arroyo Delineation
Print & Ink on Mylar
|
undated | |
1 | 4.1.42: Town Center/Transit Zoning (Large Scale)
Print on Mylar
|
undated | |
1 | 4.1.43: 1990 Draft Master Plan
Adhesive on Mylar
|
1990 October 31 | |
1 | 4.1.44: Map of Acreages
Sepia & Adhesive on Mylar
|
undated | |
Summerlin Village 1
|
|||
tube | |||
2 | 4.2.1: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.2: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.3: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.4: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.5: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.6: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.7: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.8: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.9: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.10: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.11: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.12: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
|
undated | |
2 | 4.2.13: Hills North Road Hierarchy; Scale 1"=100'; 23 February 1990
Sepia Print on Mylar
|
1990 February 23 | |
2 | 4.2.14: Summerlin Village One and Village Seven Phase I Development Plan Site Summary Plan
Sepia Print
|
undated | |
2 | 4.2.15: Summerlin Hills North Road Hierarchy
Print on Mylar
|
1990 February 23 | |
Summerlin Base Topography Analysis
|
|||
tube | |||
3 | 4.3.1: Topographic Map
Print & Adhesive on Mylar
|
undated | |
3 | 4.3.2: Topographic Map of Region
Print on Mylar
|
undated | |
3 | 4.3.3: Topographic Map with Buildings and Roads
Print on Mylar
|
undated | |
3 | 4.3.4: Topographic Map
Print on Mylar
|
undated | |
3 | 4.3.5: Building Limitation Restriction Suitability Study
Adhesive on Sepia Print on Mylar
|
undated | |
3 | 4.3.6: Existing Drainage Patterns
Sepia Print on Mylar
|
undated | |
3 | 4.3.7: Project Boundaries over Topographic Map
Adhesive & Print on Spliced Mylar
|
undated | |
3 | 4.3.8: Soil Map North Overlay
Adhesive & Ink on Mylar
|
undated | |
3 | 4.3.9: Soil Map South Overlay
Adhesive & Ink on Mylar
|
undated | |
3 | 4.3.10: Suitability Map North Overlay
Ink on Mylar
|
undated | |
3 | 4.3.11: Suitability Map South Overlay
Ink on Mylar
|
undated | |
3 | 4.3.12: Floodplain Diagram
Sepia Print on Mylar
|
undated | |
Summerlin Village 8
|
|||
tube | |||
4 | 4.4.1: Summerlin Parkway & Town Center Site Plan (Large Scale)
Print on Vellum
|
undated | |
4 | 4.4.2: Summerlin Parkway & Town Center Site Plan
Print on Bond
|
undated | |
Summerlin Lake Mead & Town center parkway
|
|||
tube | |||
4 | 4.5.1 A: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.1 B: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.1 C: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.1 D: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.1 E: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.2 A: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.2 B: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.2 C: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.2 D: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
4 | 4.5.2 E: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
|
1993 June 11 | |
Summerlin Streetscape
|
|||
tube | |||
4 | 4.6.1: Site Planting Plan
Pencil & Ink on Mylar
|
undated | |
4 | 4.6.2: Site Planting Plan
Pencil & Ink on Mylar
|
undated | |
4 | 4.6.3: Site Planting Plan
Pencil & Ink on Mylar
|
undated | |
4 | 4.6.4: Village One North Parcel Development Concept and Criteria
Print on Vellum
|
1989 February 15 | |
4 | 4.6.5: Entry Feature at Town Center Drive and Mustache Road
Ink & Marker on Trace
|
1989 February 27 | |
4 | 4.6.6: Town Center and Mustache Road Entry Feature
Print on Vellum
|
1989 February 27 | |
4 | 4.6.7: Village One and Seven Entry Feature with Town Center Drive Streetscape Wall
Print on Vellum
|
1989 February 27 | |
4 | 4.6.8: Mustache Road Landscape Plan
Ink on Trace
|
1989 February 25 | |
4 | 4.6.9: Ground Plane Planting and Gravel Mulch Plan Streetscape Plan
Ink on Trace
|
1989 February 25 | |
4 | 4.6.10: Mustache Road at Rampart Entry Feature Elevation
Ink on Trace
|
1989 February 25 | |
4 | 4.6.11: Ramp and Crosswalk Layout
Print on Vellum
|
undated | |
4 | 4.6.12: Mustache Road Along Park and Commercial Streetscape Plan
Ink on Trace
|
undated | |
4 | 4.6.13: Mustache Road Streetscape Section
Print on Vellum
|
1989 February 25 | |
4 | 4.6.14: Park Loop Collector Streetscape Plan
Print on Vellum
|
1989 February 25 | |
4 | 4.6.15: Park Loop Road with and without Parking Streetscape Section
Print on Vellum
|
1989 February 24 | |
4 | 4.6.16: Horn Road Streetscape Plan
Print on Vellum
|
1989 February 25 | |
4 | 4.6.17: Horn Road C at Lake Mead Entry Feature Plan
Ink on Trace
|
undated | |
4 | 4.6.18: Horn Road C at Lake Mead Entry Feature Elevation
Ink on Trace
|
1989 February 25 | |
4 | 4.6.19: Horn Road C Lake Mead Entry Streetscape Section
Print on Vellum
|
1989 February 14 | |
4 | 4.6.20: Ramp and Crosswalk Layout
Print on Vellum
|
1989 February 27 | |
4 | 4.6.21: Neighborhood Promenade
Ink on Trace
|
1989 March 1 | |
4 | 4.6.22: Drainage North of Park Loop
Ink on Trace
|
1989 March 1 | |
4 | 4.6.23: Drainage Section North of Park Loop
Ink on Trace
|
1989 March 1 | |
4 | 4.6.24: Street Lights Traffic
Print on Mylar
|
undated | |
4 | 4.6.25: Street Lights Traffic
Print on Mylar
|
undated | |
5 | 4.6.26: Street Lights Traffic
Print on Mylar
|
undated | |
5 | 4.6.27: Mustache Road at Lake Mead
Print on Mylar
|
undated | |
5 | 4.6.28: Mustache Road at Lake Mead
Colored Pencil on Trace
|
undated | |
5 | 4.6.29 B: Street Lights Traffic
Print on Mylar
|
undated | |
5 | 4.6.29 A: Street Lights Traffic
Colored Pencil on Trace
|
undated | |
5 | 4.6.30: Street Lights Traffic
Print on Mylar
|
undated | |
5 | 4.6.31: Site Planting Plan
Pencil & Print on Mylar
|
undated | |
5 | 4.6.32: Site Planting Plan
Pencil & Print on Mylar
|
undated | |
5 | 4.6.33 A: The Hills at Summerlin: Drainage Channel
Ink on Trace
|
1989 October 6 | |
5 | 4.6.33 B: The Hills at Summerlin: Drainage Channel
Ink on Trace
|
1989 October 6 | |
5 | 4.6.33 C: The Hills at Summerlin: Drainage Channel
Ink on Trace
|
1989 October 6 | |
5 | 4.6.33 D: The Hills at Summerlin: Drainage Channel
Adhesive on Mylar
|
1989 October 6 | |
5 | 4.6.34: The Hills at Summerlin: Drainage Channel
Sepia Print
|
1989 October 6 | |
5 | 4.6.35: Landscape Plan for Springfield Street
Pencil & Print on Mylar
|
1989 June 22 | |
5 | 4.6.36: Landscape Plan for Pinewood Hills Drive
Pencil & Print on Mylar
|
1989 June 22 | |
5 | 4.6.37: Landscape Plan for Hill Pointe Road
Pencil & Print on Mylar
|
1989 June 22 | |
5 | 4.6.38: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
|
1989 July 5 | |
5 | 4.6.39: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
|
1989 July 5 | |
5 | 4.6.40: Vicinity Map for Summerlin
Adhesive on Mylar
|
undated | |
5 | 4.6.41: Village One Streetscape Planting Plan
Print on Mylar
|
1989 July 5 | |
5 | 4.6.42: Village One Streetscape Planting Plan
Print on Mylar
|
1989 July 5 | |
5 | 4.6.43: Village One Streetscape Planting Plan
Pencil & Print on Mylar
|
1989 July 5 | |
5 | 4.6.44: Village One Streetscape Planting Plan
Pencil on Mylar
|
1989 July 5 | |
5 | 4.6.45: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
|
1989 July 5 | |
5 | 4.6.46: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
|
1989 July 5 | |
5 | 4.6.47: Concept Plan - Village One North
Ink & Adhesive on Mylar
|
1989 July 5 | |
5 | 4.6.48: Walk 4' Above Channel Bottom
Ink on Trace
|
undated | |
5 | 4.6.49: The Hills at Summerlin: Drainage Channel
Print on Vellum
|
1989 October 6 | |
Summerlin Village 1 Hills Park, Schools & Schematic Design
|
|||
tube | |||
6 | 4.7.1: Neighborhood Focus Master Plan
Marker on Bond
|
undated | |
6 | 4.7.2: Neighborhood Focus Phase 1 Plan
Marker on Bond
|
undated | |
6 | 4.7.3: Computer Generated Perspective of housing and Cul-de-sacs
Print on Bond
|
undated | |
6 | 4.7.4: Computer Generated Perspective of housing and Cul-de-sacs
Print on Bond
|
undated | |
6 | 4.7.5: Computer Generated Site Plan
Print on Bond
|
undated | |
6 | 4.7.6: Hills Park School Site Plan
Pencil on Vellum
|
undated | |
6 | 4.7.7: Village 1 Neighborhood Park Program Illustrative
Marker on Trace
|
1988 October 5 | |
6 | 4.7.8: Village 1 Neighborhood Park Isometric Sketch
Print on Vellum
|
undated | |
6 | 4.7.9: Village 1 Neighborhood Park Elevation Sketches
Print on Vellum
|
undated | |
6 | 4.7.10: Village 1 Neighborhood Park Pavilion Construction Specifications
Print on Vellum
|
undated | |
6 | 4.7.11: Summerlin Parkway Community Entry Pylons and Shelters Specifications
Ink on Trace
|
undated | |
6 | 4.7.12: Village 1 Neighborhood Park Site Plan
Print on Vellum
|
undated | |
6 | 4.7.13: Village 1 Program
Photocopy on Bond
|
1989 September 29 | |
6 | 4.7.14: Hills Park Swimming Pool Site Plan
Photocopy on Bond
|
1989 November 3 | |
6 | 4.7.15: Neighborhood Focus Phase 1 Plan
B&W Print on Bond
|
undated | |
6 | 4.7.16: Neighborhood Focus Master Plan
B&W Print on Bond
|
undated | |
6 | 4.7.17: Hills Park Swimming Pool Site Plan
Photocopy on Vellum
|
1989 November 3 | |
6 | 4.7.18 A: Elementary School Schematic Drawings
Pen and Marker on Trace
|
undated | |
6 | 4.7.18 B: Elementary School Schematic Drawings
Pen and Marker on Trace
|
undated | |
6 | 4.7.18 C: Elementary School Schematic Drawings
Pen and Marker on Trace
|
undated | |
6 | 4.7.19: Village 1 Neighborhood Park Specifications; Period; Metal
Ink on Trace
|
undated | |
6 | 4.7.20: Village 1 Neighborhood Park Specifications; Southwest; Stucco
Ink on Trace
|
undated | |
Summerlin Community Entry Design Drawings
|
|||
tube | |||
7 | 4.8.1 A: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.1 B: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.1 C: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.1 D: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.1 E: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.1 F: Community Entry Design Development Design Package
Blueprint on Bond
|
undated | |
7 | 4.8.2: Summerlin Community Entry 100% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 October 4 | |
7 | 4.8.3: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 October 4 | |
7 | 4.8.4: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 October 4 | |
7 | 4.8.5: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 October 4 | |
7 | 4.8.6: Summerlin Village 2
Blueprint on Bond
|
undated | |
7 | 4.8.7: South Shores
Blueprint on Bond
|
undated | |
7 | 4.8.8 A: Summerlin Community Entry 90% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 B: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 C: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 D: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
undated | |
7 | 4.8.8 E: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 F: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 G: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 H: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 I: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 J: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 12 | |
7 | 4.8.8 K: Community Entry Lake Mead Blvd. & Buffalo Dr. Lighting Plan
Blueprint on Bond
|
1991 August 7 | |
7 | 4.8.8 L: Community Entry Lake Mead Blvd. & Buffalo Dr.; Lighting Plan
Blueprint on Bond
|
1991 August 7 | |
7 | 4.8.8 M: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 7 | |
7 | 4.8.8 N: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 August 7 | |
7 | 4.8.9 A: Summerlin Community Entry 100% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 B: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 C: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 D: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 E: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 F: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 G: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 H: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 I: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 J: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 K: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.9 L: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
|
1991 September 11 | |
7 | 4.8.10: Village 2 Streetscape
Print on Bond
|
1989 August 3 | |
Summerlin Timeline
|
|||
tube | |||
7 | 4.9.1: Summerlin Timeline
Print on Bond
|
1989 March 8 | |
Summerlin Village Center
|
|||
tube | |||
8 | 4.10.1: Summerlin Preferred Alternative Village Center Concept
Blueprint on Bond
|
1990 July 6 | |
8 | 4.10.2: Closed Circle Alternative Village Center Concept
Sepia Print on Vellum
|
1990 July 13 | |
8 | 4.10.3 A: Summerlin Village Center Concept Plan
Sharpie on Vellum
|
undated | |
8 | 4.10.3 B: Summerlin Village Center Concept Plan
Sharpie on Vellum
|
undated | |
8 | 4.10.3 C: Summerlin Village Center Concept Plan
Sharpie on Vellum
|
undated | |
8 | 4.10.3 D: Summerlin Village Center Blueprint Schematic Plan
Blueprint on Bond
|
undated | |
8 | 4.10.4: Summerlin Village Center Schematic Plan
Pen on Vellum
|
undated | |
8 | 4.10.5: Closed Circle Alternative Village Center Concept
Blueprint on Bond
|
1990 May 29 | |
8 | 4.40.6: Summerlin Village Center/ Village 7 Planning Study
Blueprint on Bond
|
1990 June 11 | |
8 | 4.10.7: Summerlin Village Center/ Village 7 Planning Study
Sepia Print on Vellum
|
1990 June 11 | |
8 | 4.10.8: Summerlin Village Center Preliminary Design Analysis
Photocopy on Bond
|
1990 December 4 | |
8 | 4.10.9: Summerlin Village Center Preliminary Grading Concept
Photocopy on Bond
|
1990 December 4 | |
8 | 4.10.10: Summerlin Village Center Preliminary Landscape Diagram
Photocopy on Bond
|
1990 December 4 | |
8 | 4.10.11: Summerlin Village Center Preliminary Site Summary
Photocopy on Bond
|
1990 December 4 | |
8 | 4.10.12: Summerlin Village Center Preliminary Landscape Concept
Photocopy on bond
|
1990 December 4 | |
8 | 4.10.13 A: Summerlin Village Center
Sharpie on Vellum
|
undated | |
8 | 4.10.13 B: Summerlin Village Center
Sharpie on Vellum
|
undated | |
8 | 4.10.13 C: Summerlin Village Center
Sharpie on Vellum
|
undated | |
8 | 4.10.13 D: Summerlin Village Center
Sharpie on Vellum
|
undated | |
8 | 4.10.14: Summerlin Village Center Concept Plan
Marker on Trace
|
undated | |
8 | 4.10.15: Summerlin Village Center Concept Plan
Marker on Trace
|
undated | |
8 | 4.10.16: Community Center Study Initial Phase
Blueprint on Bond
|
1987 June 26 | |
8 | 4.10.17: Community Center Concept Plan
Marker on Trace
|
undated | |
8 | 4.10.18: Community Center Systems Diagram
Marker on Trace
|
1987 August 26 | |
8 | 4.10.19: Community Center Study Land Use and Access
Blueprint on Bond
|
undated | |
8 | 4.10.20: Community Center Schematic
Photocopy on Bond
|
undated | |
8 | 4.10.21: Village Center Concept
Sepia Print on Mylar
|
1990 July 6 | |
8 | 4.10.22: Village Center Concept Preferred Alternative
Sepia Print on Mylar
|
1990 July 6 | |
8 | 4.10.23: Village Center Phase 1 Development
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.24: Village Center Phase 2 Development
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.25: Village Center Phase 3 Development
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.26: Village Center Phase 4 Development
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.27: Village Center Phase 5 Ultimate Build Out
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.28: Village Center Phase 5 (B) Development
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.29: Village Center Pedestrian and Vehicular Circulation
Photocopy on Bond
|
1990 May 4 | |
8 | 4.10.30: Closed Circle Alternative Village Center Concept
Photocopy on Bond
|
1990 May 29 | |
8 | 4.10.31: Village Center Concept Color Rendering
Marker on Mylar
|
undated | |
Summerlin Village 1 South Streetscapes
|
|||
tube | |||
9 | 4.11.1: The Hills at Summerlin Streetscape Master Plan
Sepia Print on Mylar
|
undated | |
9 | 4.11.2: The Hills at Summerlin Conceptual Walkway Plan
Print on Bond
|
undated | |
9 | 4.11.3: The Hills at Summerlin Streetscape Site Analysis
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.4: The Hills at Summerlin Streetscape Site Analysis
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.5: The Hills at Summerlin Conceptual Planting Plan
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.6: The Hills at Summerlin Ground Plane Plan
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.7: The Hills at Summerlin Conceptual Planting Plan
Sepia Print on Mylar
|
1990 April 9 | |
9 | 4.11.8: The Hills at Summerlin Street 'X' Entry Feature
Blueprint on Bond
|
1990 April 23 | |
9 | 4.11.9: The Hills at Summerlin Street 'Z' Entry Feature
Blueprint on Bond
|
1990 April 23 | |
9 | 4.11.10: The Hills at Summerlin Street 'Z' Entry Feature
Blueprint on Bond
|
1990 April 23 | |
9 | 4.11.11: The Hills at Summerlin Street 'X' Entry Area
Blueprint on Bond
|
1990 April 23 | |
9 | 4.11.12: The Hills at Summerlin Ground Plane Plan
Sepia Print on Mylar
|
1990 April 9 | |
9 | 4.11.13: The Hills at Summerlin Village 1 South Streets Ground Plane Plan
Marker on Trace
|
1990 April 23 | |
9 | 4.11.14: The Hills at Summerlin Street "Z" Entry & Street "Y" Streetscape
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.15: The Hills at Summerlin Street "Y" Landscape
Blueprint on Bond
|
1990 April 9 | |
9 | 4.11.16: The Hills at Summerlin Street 'Y' Rough Planting Design
Ink and Pencil on Bond
|
undated | |
9 | 4.11.17: The Hills at Summerlin Street 'Y' Rough Planting Design
Ink and Pencil on Bond
|
undated | |
9 | 4.11.18: The Hills at Summerlin Street 'V' Rough Planting Design
Ink and Pencil on Bond
|
undated | |
Husite Topographic Map
|
|||
tube | |||
10 | 4.12.1: Husite Topographic Northern 1/2 Village #1
Print on Mylar
|
undated | |
10 | 4.12.2: Husite Topographic Map Index
Print and Marker on Bond
|
1989 August 7 | |
10 | 4.12.3: Husite Topography Map
Print on Diazo Mylar
|
undated | |
10 | 4.12.4: Husite Topography Map
Print on Diazo Mylar
|
undated | |
10 | 4.12.5: Husite Topography Map
Print on Diazo Mylar
|
undated | |
10 | 4.12.6: Husite Topography Map
Print on Diazo Mylar
|
undated | |
10 | 4.12.7: Husite Topography Map
Print on Diazo Mylar
|
undated | |
Summerlin Village Center
|
|||
tube | |||
11 | 4.13.1: Village Center Alternative 'B'
Sepia Print on Vellum
|
1990 May 20 | |
11 | 4.13.2: Village Center Phase 1 Development
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.3: Village Center Phase 2 Development
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.4: Village Center Phase 5 (B) Development
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.5: Village Center Pedestrian and Vehicular Circulation
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.6: Village Center Phase 4 Development
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.7: Village Center Phase 3 Development
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.8: Village Center Concept Alternative 'A'
Sepia Print on Vellum
|
undated | |
11 | 4.13.9: Village Center Concept Alternative 'B'
Sepia Print on Vellum
|
undated | |
11 | 4.13.10: Village Center Concept Alternative 'C'
Sepia Print on Vellum
|
undated | |
11 | 4.13.11: Village Center Phase 5 Ultimate Build Out
Marker on Vellum
|
1990 May 4 | |
11 | 4.13.12: Village 1 PGA Course
Print on bond
|
1990 March 31 | |
11 | 4.13.13: Village 1 South Golf Alternative
Marker on Bond
|
1990 March 31 | |
11 | 4.13.14: Village 1 South Golf Alternative "C" Concept Diagram
Marker on Bond
|
1990 March 31 | |
11 | 4.13.15: Closed Circle Alternative Village Center Concept
Blueprint on Bond
|
1990 May 29 | |
11 | 4.13.16: Village 7 - Village 8 Corridors
Print on Diazo Mylar
|
undated | |
11 | 4.13.17: Phase 1 Village Center Landscape Concept Diagram
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.18: Phase 1 Village Center Proposed Land use
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.19: Phase 1 Village Center Connections and Access
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.20: Phase 1 Village Center Grading and Drainage Concept
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.21: Phase 1 Village Center Existing Elevations
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.22: Phase 1 Village Center Master Plan
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.23: Phase 1 Village Center Land Use
Marker on Trace
|
undated | |
11 | 4.13.24: Phase 1 Village Center Connections and Access
Marker on Trace
|
undated | |
11 | 4.13.25: Phase 1 Village Center Landscape Concept
Marker on Trace
|
1990 December 4 | |
11 | 4.13.26: Village Center Landscape Concept
Marker on Mylar
|
1991 February 11 | |
11 | 4.13.27: Village Center Circle Phase 1 Concept Plan
Marker on Trace
|
1991 January 28 | |
11 | 4.13.28: Village Center Design Schematic Package Cover Page
Marker and Sepia Print on Mylar
|
undated | |
11 | 4.13.29: Village Center Design Schematic Package Parcelization Diagram
Marker and Sepia Print on Mylar
|
1991 February 11 | |
11 | 4.13.30: Village Center Design Schematic Package Parcelization Diagram
Marker and Sepia Print on Mylar
|
1991 February 11 | |
11 | 4.13.31: Village Center Design Schematic Package Concept Diagram
Marker on Trace
|
undated | |
11 | 4.13.32: Village Center Design Schematic Package Connections Diagram
Marker and Sepia Print on Mylar
|
1991 February 11 | |
11 | 4.13.33: Phase 1 Development Village Center Phasing Diagram
Sepia Print on Mylar
|
1990 May 4 | |
11 | 4.13.34: Phase 2 Development Village Center Phasing Diagram
Sepia Print on Mylar
|
1990 May 4 | |
11 | 4.13.35: Village Center Land Use Context Plan Alternative "B"
Marker and Sepia Print on Diazo Mylar
|
1990 May 1 | |
11 | 4.13.36: Village 7 Alternative "A"
Marker and Sepia Print on Diazo Mylar
|
1990 May 20 | |
11 | 4.13.37: Village Center Land Use Context Plan Alternative "A"
Marker and Sepia Print on Diazo Mylar
|
1990 May 1 | |
11 | 4.13.38: Phase 1 Illustrative Plan
Marker and Sepia Print on Diazo Mylar
|
1990 November 8 | |
11 | 4.13.39: Phase 1 Office Building Garden Terrace
Marker on Trace
|
1991 February 11 | |
11 | 4.13.40: Phase 1 Office Building Formal Entry
Marker on Trace
|
1991 February 11 | |
11 | 4.13.41: Closed Circle Concept Diagram
Marker on Trace
|
undated | |
11 | 4.13.42: Village Center Circle Landscape Concept
Marker on Trace
|
1991 January 28 | |
11 | 4.13.43: Village Center Circle Axonometric Schematic
Marker on Trace
|
undated | |
11 | 4.13.44: Summerlin Village Center Preliminary Design Analysis
Marker on Trace
|
1990 December 4 | |
11 | 4.13.45: Summerlin Village Center Preliminary Landscape Diagram
Marker on Trace
|
1990 December 4 | |
11 | 4.13.46: Village Center Circle Phase 1 and Phase 2 Concept Plan
Marker and Sepia Print on Mylar
|
1991 February 11 | |
11 | 4.13.47: Village Center Circle Phase 1 Concept Vignette
Marker and Sepia Print on Mylar
|
1991 February 11 | |
11 | 4.13.48: Drawing by Craig Wickersham
Pen on Trace
|
undated | |
11 | 4.13.49: Drawing by Craig Wickersham
Pen on Trace
|
undated | |
11 | 4.13.50: Drawing by Craig Wickersham
Pen on Trace
|
undated | |
11 | 4.13.51: Drawing by Craig Wickersham
Pen on Trace
|
undated | |
11 | 4.13.52: Village Center Schematic Plan
Pen on Trace
|
1990 November | |
11 | 4.13.53: Revised Village Center Sketch Plan
Pen on Trace
|
1990 October 31 | |
11 | 4.13.54: Summerlin Village Center Preliminary Site Summary
Marker on Trace
|
1990 December 4 | |
11 | 4.13.55 A: Summerlin Village Center Package
Blueprint on Bond
|
undated | |
11 | 4.13.55 B: Summerlin Village Center Package
Blueprint on Bond
|
undated | |
11 | 4.13.55 C: Summerlin Village Center Package
Blueprint on Bond
|
undated | |
11 | 4.13.55 D: Summerlin Village Center Package Site Analysis
Blueprint on Bond
|
undated | |
11 | 4.13.55 E: Summerlin Village Center Package Land Use Consumption
Blueprint on Bond
|
undated | |
11 | 4.13.55 F: Summerlin Village Center Package Alternate 1
Blueprint on Bond
|
undated | |
11 | 4.13.55 G: Summerlin Village Center Package Alternate 2
Blueprint on Bond
|
undated | |
11 | 4.13.55 H: Summerlin Village Center Package Alternate 3
Blueprint on Bond
|
undated | |
11 | 4.13.55 I: Summerlin Village Center Package Development Parcels
Blueprint on Bond
|
undated | |
11 | 4.13.56 A: Summerlin Village Center Urban Form Concept
Photocopy on Vellum
|
undated | |
11 | 4.13.56 B: Summerlin Village Center Potential Land Use
Photocopy on Vellum
|
undated | |
11 | 4.13.56 C: Summerlin Village Center Connections
Photocopy on Vellum
|
undated | |
Summerlin Historic Plan Documents
|
|||
tube | |||
10 | 4.14.1: Summerlin Draft Master Plan Alternative 'A'
Sepia Print on Mylar
|
1990 June 6 | |
10 | 4.14.2: Summerlin Draft Master Plan Alternative 'B'
Sepia Print on Mylar
|
1990 June 6 | |
10 | 4.14.3: Site Analysis Thick Caliche
Marker on Trace
|
undated | |
10 | 4.14.4: Site Analysis Moderate Caliche
Marker on Trace
|
undated | |
10 | 4.14.5: Site Analysis Thin Caliche
Marker on Trace
|
undated | |
10 | 4.14.6: Site Analysis Topographic Map
Print on Mylar
|
undated | |
10 | 4.14.7: Blocks of Land BLM, Private, Federal Withheld
Pencil on Trace
|
undated | |
10 | 4.14.14: Summerlin Regional System Link and Walking Distance Diagram
Pen and Marker on Trace
|
1990 July 30 | |
10 | 4.14.8: Summerlin Park and Recreation School Facilities
Pen and Marker on Trace
|
1990 July 30 | |
10 | 4.14.9: Community Facilities
Pen and Marker on Trace
|
1990 July 30 | |
10 | 4.14.10: Husite Existing Roadways
Print on Mylar
|
undated | |
10 | 4.14.11: Draft Master Plan Alternative "A"
Sepia Print on Vellum
|
1990 June 6 | |
10 | 4.14.12: Draft Master Plan Alternative "B"
Sepia Print on Vellum
|
1990 June 6 | |
10 | 4.14.13: Existing Roadway Plan Overlay
Marker on Trace
|
undated | |
Summerlin Parcel G2 & H2 Streets
|
|||
tube | |||
10 | 4.15.1: The Trails Streetscape Issue for Construction
Print on Bond
|
1996 September 6 | |
10 | 4.15.2: The Trails Streetscape- Planting and Sidewalk Details
Print on Mylar
|
1996 September 6 | |
10 | 4.15.3: The Trails Streetscape- Landscape and Sidewalk Layout
Print on Bond
|
1996 September 6 | |
Summerlin Village 1 Master Plan Renderings
|
|||
tube | |||
12 | 4.16.1: Summerlin Master Plan Regional Context Map
Print and Marker on Bond
|
undated | |
12 | 4.16.2: Summerlin Phase 1 Land Use
Print and Marker on Bond
|
1988 September 29 | |
12 | 4.16.3: Summerlin Annexation Map and Restrictive Building Limitations
Print and Marker on Bond
|
undated | |
12 | 4.16.4: Summerlin Annexation Map
Print and Marker on Bond
|
undated | |
12 | 4.16.5: Summerlin Master Plan Preliminary Draft
Print and Marker on Bond
|
1990 July 30 | |
12 | 4.16.6: Summerlin 1990 Master Plan Preliminary Draft
Print and Marker on Bond
|
1990 August 31 | |
12 | 4.16.7: Summerlin Phase 1 1990 Draft Plan Land Use Concept
Print and Marker on Bond
|
1990 October 15 | |
12 | 4.16.8: The Hills at Summerlin Design Concept
Print and Marker on Bond
|
1989 October 6 | |
12 | 4.16.9: Summerlin Phase 1 Alternative 'B' Land Use Concept
Print and Marker on Bond
|
1990 July 2 | |
12 | 4.16.10: Summerlin 1990 Draft Master Plan
Color Print on Bond
|
1989 February 1 | |
12 | 4.16.11: Summerlin Preliminary Site Conditions Summary
Print and Marker on Bond
|
1990 July 26 | |
Summerlin Village Center Commercial Studies
|
|||
tube | |||
10 | 4.17.1: Conceptual Vehicular and Pedestrian Circulation
Marker on Trace
|
undated | |
10 | 4.17.2: Plaza Section A-A and Plaza Plan View
Ink on Mylar
|
undated | |
10 | 4.17.3: Schematic of Village Center
Marker on Trace
|
undated | |
10 | 4.17.4: Husite Village Center Very Preliminary Plan
Marker and Pencil on Bond
|
1987 August 26 | |
10 | 4.17.5: Husite Commercial Center Alternative at Town Center Drive and Lake Mead
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.6: Husite Commercial Center Alternative at Outer Parkway and Lake Mead Blvd.
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.7: Husite Circulation Alternative "A" with Streetscape Criteria
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.8: Husite Commercial Center Criteria at Lake Mead & Hualapai
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.9: Husite Circulation Alternative "B"
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.10: Husite Commercial Center Criteria on Town Center Drive
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.11: Husite Circulation Alternative "C"
Photocopy on Bond
|
1987 August 28 | |
10 | 4.17.12: Typical Multi-Corner Commercial Center
Marker on Trace
|
1987 September 1 | |
10 | 4.17.13: Conceptual Circulation and Building Site Plan
Marker on Trace
|
undated | |
10 | 4.17.14: Commercial Center Criteria
Marker on Trace
|
1987 August 28 | |
10 | 4.17.15: Conceptual Circulation and Building Site Plan
Marker on Trace
|
undated | |
10 | 4.17.16: Conceptual Vehicular and Pedestrian Circulation
Marker on Trace
|
undated | |
Summerlin & Red Rocks Trails
|
|||
tube | |||
12 | 4.18.1: Summerlin Red Rocks Trail Master Plan
Sepia Print on Mylar
|
1993 June 9 | |
12 | 4.18.2: Summerlin Red Rocks Trail Topographical Map
Blueprint on Bond
|
undated | |
The Hills Parks Stage Conceptual Designs Base Mapping Summerlin Concepts
|
|||
tube | |||
12 | 4.19.1 A: Summerlin Hills Park Stage Schematic Design
Ink and Marker on Trace/Mylar
|
1992 May 27 | |
12 | 4.19.1 B: Summerlin Hills Park Stage Schematic Design
Ink and Marker on Trace/Mylar
|
1992 May 27 | |
12 | 4.19.2: Hills Park Stage Concept Plan With Details
Print on Bond
|
undated | |
12 | 4.19.3: Hills Park Stage Concept Plan With Details
Ink on Bond
|
1992 April 6 | |
Summerlin Village 1
|
|||
tube | |||
13 | 4.20.1: Perspective Sketch of Golf Hole
Print on Vellum
|
undated | |
13 | 4.20.2: Isometric Sketch of Village Circle
Pencil on Vellum
|
undated | |
13 | 4.20.3: Isometric Sketch of Baseball Diamonds and Surrounding Buildings
Pencil on Vellum
|
undated | |
13 | 4.20.4: Illustrative Perspective of Golf Hole and Surrounding Housing
Pen and Marker on Trace
|
undated | |
13 | 4.20.5: Villages 1, 2 & 3 Parcelization Map
Pen on Vellum
|
undated | |
13 | 4.20.6: Village 1 Master Plan
Marker on Vellum
|
undated | |
13 | 4.20.7: Village 1 Closed Circle
Marker on Graph Vellum
|
undated | |
13 | 4.20.8: Village 1 Isometric Sketch of Shopping Area
Pencil on Vellum
|
undated | |
13 | 4.20.9: Computer Generated Perspective of Village Center
Print on Printer Paper
|
undated | |
13 | 4.20.10: Plan View of Baseball Diamonds and Surrounding Buildings
Marker on Vellum
|
undated | |
13 | 4.20.11: Las Vegas Major Roadways
Tape on Graph Vellum
|
undated | |
13 | 4.20.12: Las Vegas Major Roadways
Photocopy and Tape on Vellum
|
undated | |
13 | 4.20.13: Schematic Landscape Plan
Sepia Print on Vellum
|
1989 March 2 | |
13 | 4.20.14: Schematic Landscape Plan
Marker on Vellum
|
1989 April 19 | |
13 | 4.20.15: Summerlin Street Sections
Marker on Velum
|
undated | |
13 | 4.20.16: Neighborhood Focus Phase 1 Plan
Print on Vellum
|
undated | |
13 | 4.20.17: Neighborhood Focus Master Plan
Print on Vellum
|
undated | |
Summerlin Village 3
|
|||
tube | |||
14 | 4.21.1: Village 3
Print on Bond
|
1989 March 30 | |
14 | 4.21.2: Village 3 Concept Plan
Marker on Trace
|
1989 February 17 | |
14 | 4.21.3: Village 3 Site Summary Map
Blueprint on Bond
|
1989 February 3 | |
14 | 4.21.4: Village 3 Design Concept
Blueprint on Bond
|
1989 October 20 | |
14 | 4.21.5: Village 3 Land Use Rough Trace Overlay
Marker on Trace
|
undated | |
14 | 4.21.6: Village 3 Land Use Trace Overlay
Marker on Trace
|
undated | |
14 | 4.21.7: Village 3 Contextual Issues
Print on Vellum
|
1990 January 31 | |
14 | 4.21.8: Village Center/ Village 7 Planning Study
Blueprint on Bond
|
undated | |
14 | 4.21.9: Village 3 Parcel Map
Sepia Print on Mylar
|
undated | |
14 | 4.21.10: Village 3 Entries and Accesses
Print on Vellum
|
1989 September 21 | |
Summerlin Parcels H & I Drainage
|
|||
tube | |||
13 | 4.22.1: Village 1 North Parcels H & I Drainage Way Planting Plan
Print on Mylar
|
1993 August 12 | |
13 | 4.22.2: Village 1 North Parcels H & I Drainage Way Planting Detail
Print on Acetate
|
1993 August 12 | |
Summerlin City Presentation
|
|||
tube | |||
14 | 4.23.1: The Pueblo Illustrative Master Plan
Marker on Vellum
|
undated | |
14 | 4.23.2: Las Vegas Major Roadways
Print and Tape on Mylar
|
undated | |
14 | 4.23.3: Street Sections
Marker on Trace
|
undated | |
14 | 4.23.4: Street Sections
Marker on Trace
|
undated | |
14 | 4.23.5: Regional Context Map
Print on Bond
|
1990 July 25 | |
14 | 4.23.6: Regional Context Map
Print on Mylar
|
1990 July 26 | |
14 | 4.23.7: Las Vegas Major Roadways
Sepia Print on Mylar
|
undated | |
14 | 4.23.8: PGA Tour Tournament Players Club at Summerlin- Golf Course and Subdivision Master
Print on Poster Paper
|
undated | |
14 | 4.23.9: PGA Tour Tournament Players Club at Summerlin
Sepia Print on Mylar
|
1988 | |
14 | 4.23.10: Villages 1, 2 & 3 Master Plan
Print on Mylar
|
undated | |
14 | 4.23.11: PGA Tour Tournament Players Club at Summerlin- Golf Course Layout
Print on Mylar
|
undated | |
Summerlin Village 3 Employment Center
|
|||
tube | |||
15 | 4.24.1: Village 3 Land Plan
Marker on Trace
|
1988 October | |
15 | 4.24.2: Village 3 - Land Acreage Study
Marker on Trace
|
1988 February 17 | |
15 | 4.24.3: Village 3 Bubble Diagram
Marker on Trace
|
undated | |
15 | 4.24.4: Village 3 Analysis Map
Marker on Print
|
undated | |
15 | 4.24.5: Village 3 Open Space Configuration
Marker on Trace
|
1988 September | |
15 | 4.24.6: Village 3 Site Related Concept Plan
Marker on Trace
|
undated | |
15 | 4.24.7: Village 3 Preliminary Parcelization Alternative 2
Blueprint on Bond
|
1987 August 26 | |
15 | 4.24.8: Husite - Freeway Relationship to Site
Sepia Print on Vellum
|
undated | |
15 | 4.24.9: Village 3 Hotel Location Study
Marker on Trace
|
1988 September | |
15 | 4.24.10: Summerlin Business Park
Marker on Trace
|
undated | |
15 | 4.24.11: Village 3 Slope Percentages
Colored Pencil on Trace
|
undated | |
15 | 4.24.12: Village 3 Preliminary Parcelization Alternative 1
Blueprint on Bond
|
1988 August 26 | |
15 | 4.24.13: Village 3 Golf Course Concept Plan
Marker on Trace
|
undated | |
Summerlin Village 7
|
|||
tube | |||
16 | 4.25.1: Village 7 Alternative E
Blueprint on Vellum
|
undated | |
16 | 4.25.2: Village 7 Concepts
Blueprint on Vellum
|
1990 January 30 | |
16 | 4.25.3: Village 7 Alternative A
Blueprint on Vellum
|
1990 January 30 | |
16 | 4.25.4: Village 7 Alternative B
Blueprint on Vellum
|
1990 January 30 | |
16 | 4.25.5: Village 7 Alternative C
Blueprint on Vellum
|
1990 January 30 | |
16 | 4.25.6 A: Village 7 Trash Alternatives- Trace Overlay
Marker and Pen on Trace
|
undated | |
16 | 4.25.6 B: Village 7 Trash Alternatives- Trace Overlay
Marker and Pen on Trace
|
undated | |
16 | 4.25.7: Village 7 Design Analysis Map
Marker on Trace
|
undated | |
16 | 4.25.8: Village 7 Conceptual Housing Configuration
Marker on Trace
|
undated | |
16 | 4.25.9: Village 7 Golf Course Configuration
Marker on Trace
|
undated | |
16 | 4.25.10: Village 7 Golf Course Acreage Study
Marker on Trace
|
undated | |
16 | 4.25.11: Village 7 Overlay A
Pen and Marker on Trace
|
undated | |
16 | 4.25.12: Village 7 Conceptual Golf Course Layout
Pen and Marker on Trace
|
undated | |
16 | 4.25.13: Village 7 Conceptual Golf Course Layout and Housing Frontage
Pen and Marker on Trace
|
undated | |
16 | 4.25.14: Village 7 Site Conditions Summary Plan
Blueprint on Vellum
|
1990 January 25 | |
16 | 4.25.15: Village 7 Conceptual Golf Course Layout and Housing Frontage
Pen and Marker on Trace
|
undated | |
16 | 4.25.16: Village 7 Alternative I
Blueprint on Bond
|
1990 February 9 | |
16 | 4.25.17: Village 7 Conceptual Plan
Marker on Trace
|
undated | |
16 | 4.25.18: Village 7 Alternative C
Marker on Trace
|
undated | |
16 | 4.25.19: Village 7 Alternative D - Trace Overlay
Marker on Trace
|
1990 February 7 | |
16 | 4.25.20: Village 7 Alternative B
Marker on Trace
|
undated | |
16 | 4.25.21: Golf Course Yardage Study
Marker on Trace
|
undated | |
16 | 4.25.22: Grading/Planting Objectives
Marker on Trace
|
undated | |
16 | 4.25.23: Drainage Objectives
Marker on Trace
|
undated | |
16 | 4.25.24: Village 7 Golf Course Concept and Access Roads
Marker on Trace
|
undated | |
16 | 4.25.25: Village 7 Alternative D
Blueprint on Bond
|
1990 January 30 | |
16 | 4.25.26: Village 7 Concept Diagram - Trace Overlay
Marker on Trace
|
1990 January 30 | |
16 | 4.25.27: Village 7 Golf Course Concept and Access Roads
Pencil on Trace
|
undated | |
16 | 4.25.28: Village 7 Rough Conceptual Golf Course Layout
Pen and Marker on Trace
|
undated | |
16 | 4.25.29 A: Village 1 Design Issues - Trace Overlay
Marker on Trace
|
1988 August 24 | |
16 | 4.25.29 B: Village 1 Design Issues - Trace Overlay
Marker on Trace
|
1988 August 24 | |
17 | 4.25.30 A: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 B: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 C: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 D: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 E: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 F: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.30 G: Functional Diagram Package
Marker on Trace
|
undated | |
17 | 4.25.31: Village 7 Context Phase 1
Marker on Trace
|
undated | |
17 | 4.25.32: Village 7 Concept Alternative C
Marker on Trace
|
undated | |
17 | 4.25.33: Village 7 Golf Course Putting Greens Concept
Marker on Trace
|
undated | |
17 | 4.25.34: Village 7 Analysis Alternative C
Marker on Trace
|
undated | |
17 | 4.25.35: Village 7 Program Requirements
Marker on Trace
|
undated | |
17 | 4.25.36: Village 7 Base Map
Print on Bond
|
undated | |
17 | 4.25.37: Village 7 Utilities Base Map
Print on Bond
|
undated | |
17 | 4.25.38: Village 7 Inventory
Blueprint on Bond
|
undated | |
17 | 4.25.39: Village 7 Number Summary
Marker on Trace
|
undated | |
17 | 4.25.40: Village 7 Analysis
Marker on Trace
|
1990 February 19 | |
17 | 4.25.41: Village Conceptual Golf Course Layout
Marker on Trace
|
undated | |
17 | 4.25.42: Village 7 Golf Course Layout A
Marker on Trace
|
1990 February 21 | |
17 | 4.25.43: Village 7 Golf Course Layout B
Marker on Trace
|
1990 February 21 | |
17 | 4.25.44: Village & Analysis
Marker on Trace
|
undated | |
17 | 4.25.45: Village 7 Alternative 2 - Trace Overlay
Marker on Trace
|
1990 February 8 | |
17 | 4.25.46 A: Village 7 Conceptual Layout - Trace Overlay
Marker on Trace
|
undated | |
17 | 4.25.46 B: Village 7 Conceptual Layout - Trace Overlay
Marker on Trace
|
undated | |
17 | 4.25.47: Summerlin Summary of Recommendations
Print on Bond
|
undated | |
17 | 4.25.48: Village 7 Context Plan
Sepia Print on Vellum
|
undated | |
17 | 4.25.49: Village 7 Design Analysis
Blueprint on Bond
|
1990 February 16 | |
17 | 4.25.50: Village 7 Conceptual Housing Frontage Alternative A
Marker on Trace
|
undated | |
17 | 4.25.51: Village 7 Conceptual Parcel
Marker on Trace
|
undated | |
17 | 4.25.52: Village 7 Concept Diagram
Blueprint on Bond
|
1990 January 30 | |
17 | 4.25.53: Village 7 Pedestrian Ways
Blueprint on Bond
|
1990 January 30 | |
Summerlin Illustrative Sketches
|
|||
tube | |||
17 | 4.26.1: Summerlin Park Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
|
undated | |
17 | 4.26.2: Baseball Diamond Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
|
undated | |
17 | 4.26.3: Subdivision Entrance Perspective
Marker and Pen on Bond
|
undated | |
17 | 4.26.4: Subdivision Entrance Perspective
Marker and Pen on Bond
|
undated | |
17 | 4.26.5: The Hills Tournament Players Club Golf Course Relationship
Pen and Colored Pencil on Vellum
|
1990 April 10 | |
17 | 4.26.6: The Hills Tournament Players Custom Home Concepts
Pen and Colored Pencil on Vellum
|
1990 April 10 | |
17 | 4.26.7: The Hills Tournament Players Club Multi-Family Concepts
Pen and Colored Pencil on Vellum
|
1990 April 10 | |
17 | 4.26.8: Summerlin Park Isometric View by Craig Wickersham
Pen and Colored Pencil on Vellum
|
undated | |
17 | 4.26.9: Summerlin Trail Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
|
undated | |
17 | 4.26.10: The Hills at Summerlin Criteria Exhibits
Print on Bond
|
1989 September 1 | |
17 | 4.26.11: Village 2 Streetscape Perspective
Pen and Colored Pencil on Vellum
|
1989 August 23 | |
17 | 4.26.12: The Hills Tournament Players Club Residential Concepts
Pen and Colored Pencil on Vellum
|
1990 April 10 | |
17 | 4.26.13: Subdivision Entrance Perspective
Pen on Bond
|
undated | |
17 | 4.26.14: Subdivision Entrance Perspective
Pen on Bond
|
undated | |
17 | 4.26.15: Summerlin Master Plan
Pen on Vellum
|
undated | |
17 | 4.26.16: Summerlin Master Plan
Print and Colored Pencil on Bond
|
undated | |
Summerlin The Trails Commercial Property
|
|||
tube | |||
17 | 4.27.1: Proposed K-Mart Revised Plan Design Criteria
Blueprint on Bond
|
1992 July 8 | |
17 | 4.27.2: Proposed K-Mart Optional Layout - Trace Overlay
Marker on Trace
|
undated | |
Summerlin The Trails Builder Walls Parcel A-3
|
|||
tube | |||
17 | 4.28.1: The Trails Builder Walls Cantabria Parcel- Trails Hollow Drive Elevation L-1.1
Print and Pen on Mylar
|
1996 May 2 | |
17 | 4.28.2: The Trails Builder Walls Cantabria Parcel A-3; Cover Sheet
Print on Vellum
|
1996 January 17 | |
17 | 4.28.3: The Trails Builder Walls Cantabria Parcel A-3; Trails Hollow Drive Elevation L-1.2
Print and Pen on Mylar
|
1996 May 2 | |
17 | 4.28.4: The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.3
Print and Pen on Mylar
|
1996 February 2 | |
17 | 4.28.5: The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.4
Print and Pen on Mylar
|
1996 February 2 | |
17 | 4.28.6: The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.5
Print and Pen on Mylar
|
1996 May 2 | |
17 | 4.28.7: The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.6
Print and Pen on Mylar
|
1996 May 2 | |
17 | 4.28.8: The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.7
Print and Pen on Mylar
|
1996 February 2 | |
17 | 4.28.9: The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.8
Print and Pen on Mylar
|
1996 February 2 | |
17 | 4.28.10: The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.2
Print on Vellum
|
1996 January 17 | |
17 | 4.28.11: The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.3
Print on Vellum
|
1996 February 2 | |
Summerlin Village 3
|
|||
tube | |||
18 | 4.29.1: Draft Master Plan 1990
Marker on Vellum
|
1989 February 1 | |
18 | 4.29.2 A: Angel Park Golf Course Analysis; Trace Overlay
Marker on Trace
|
undated | |
18 | 4.29.2 B: Angel Park Golf Course Analysis; Trace Overlay
Marker on Trace
|
undated | |
18 | 4.29.3: Village Planning Criteria;
Print on Mylar
|
undated | |
18 | 4.29.4: Angel Park Context Map
Print on Bond
|
undated | |
18 | 4.29.5: Angel Park Topography Map
Sepia Print on Mylar
|
undated | |
18 | 4.29.6: Village Park Adjacencies
Print on Mylar
|
undated | |
18 | 4.29.7: Village 3 Centers, Connections and Land Use;
Pen on Trace
|
1990 January 31 | |
18 | 4.29.8: Village 3 Urban Design Plan;
Pen on Trace
|
1990 January 31 | |
18 | 4.29.9: Village 3 Suggested Development Concept
Print on Bond
|
1989 September 21 | |
18 | 4.29.10: Village 3 Village Design Concept
Print on Bond
|
1989 September 21 | |
18 | 4.29.11: Village 3 Context Plan
Print on Bond
|
1989 September 21 | |
18 | 4.29.12: Village 3 Village Summary Statement
Print on Mylar
|
1989 September 21 | |
18 | 4.29.13: Rampart Boulevard Street Section
Pen on Bond
|
undated | |
18 | 4.29.14: Street Sections
Pen on Laminated Poster Board
|
undated | |
18 | 4.29.15: Street Section
Pen on Bond
|
undated | |
18 | 4.29.16: Street Section
Pen on Bond
|
undated | |
18 | 4.29.17: Street Section
Pen on Bond
|
undated | |
18 | 4.29.18: Village 3 Current Land Use Plan
Print on Vellum
|
1990 January 31 | |
18 | 4.29.19: Village 3 Context Plan
Print on Mylar
|
1990 June 1 | |
18 | 4.29.20: Review Process Diagram
Print on Vellum
|
1990 June 1 | |
18 | 4.29.21: Village 3 Village Summary Statement
Print on Mylar
|
1990 June 1 | |
18 | 4.29.22: Village 3 Design and Engineering Criteria Title Page
Print on Mylar
|
undated | |
18 | 4.29.23: Village 3 Site Summary
Blueprint on Bond
|
1990 June 1 | |
18 | 4.29.24: Village 3 Perimeter Street Sections
Print on Mylar
|
1990 June 1 | |
18 | 4.29.25: Village 3 Dwelling Zoning
Blueprint on bond
|
undated | |
18 | 4.29.26: Village 3 Summary Map
Print on Bond
|
1989 February 3 | |
Summerlin Village 2 Park
|
|||
tube | |||
18 | 4.30.1: Village 2
Sepia Print on Mylar
|
undated | |
18 | 4.30.2: Summerlin Draft Master Plan
Print on Vellum
|
1990 May 21 | |
18 | 4.30.3: Summerlin North East Quadrant Master Plan
Pen on Mylar
|
undated | |
18 | 4.30.4: Village 2 Open Space Conceptual Cost Allocation
Print on Bond
|
1989 August 8 | |
Summerlin Contract Documents
|
|||
tube | |||
19 | 4.31.1: The Hills Park Construction Documents; 60 Pages
Print on Vellum
|
1990 January 16 | |
Summerlin TPC Parking Schematic Design Base Originals
|
|||
tube | |||
20 | 4.32.1 A: TPC Parking Analysis
Blueprint on Bond
|
1991 February 26 | |
20 | 4.32.1 B: TPC Parking Analysis
Blueprint on Bond
|
1991 February 26 | |
20 | 4.32.1 C: TPC Parking Analysis
Blueprint on Bond
|
1991 February 26 | |
20 | 4.32.2 A: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 B: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 C: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 D: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 E: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 F: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 G: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 H: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 I: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.2 J: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
|
1992 February 26 | |
20 | 4.32.3 A: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
|
1992 June 25 | |
20 | 4.32.3 B: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
|
1992 June 25 | |
20 | 4.32.3 C: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
|
1992 June 25 | |
20 | 4.32.3 D: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
|
1992 June 25 | |
20 | 4.32.4 A: TPC Parking Lot
Blueprint on Bond
|
undated | |
20 | 4.32.4 B: TPC Parking Lot
Blueprint on Bond
|
undated | |
20 | 4.32.4 C: TPC Parking Lot
Blueprint on Bond
|
undated | |
20 | 4.32.5: The Hills at Summerlin TPC Parking Lot; Scheme A
Print on Vellum
|
1991 February 26 | |
20 | 4.32.6: The Hills at Summerlin TPC Parking Lot; Drawing Underlay
Pen on Trace
|
1991 February 26 | |
20 | 4.32.7: The Hills at Summerlin TPC Parking Lot; Scheme B
Pen and Marker on Vellum
|
1991 February 26 | |
20 | 4.32.8: TPC Parking Lot; Drawing Underlay
Sepia Print on Mylar
|
undated | |
20 | 4.32.9: The Hills at Summerlin TPC Parking Lot; Parcel Analysis
Pen and Marker on Vellum
|
1991 February 26 | |
Summerlin Village 8 D-Criterion Exhibit
|
|||
tube | |||
20 | 4.33.1: The Crossing Town Center Drive; Image Character
Print on Vellum
|
1992 September 24 | |
20 | 4.33.2: The Crossing Town Center Drive; Concept Statement
Print on Vellum
|
1992 September 24 | |
20 | 4.33.3: The Crossing Comparative Walls
Print on Vellum
|
1992 September 24 | |
20 | 4.33.4: The Crossing Wall Concepts
Print on Vellum
|
1992 September 24 | |
20 | 4.33.5: The Crossing Wall Concepts; Color Scheme
Print and Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.6: The Crossing Town Center Drive Concept Statement
Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.7: The Crossing Wall Layout Diagram; Phase One
Print on Vellum
|
1992 September 24 | |
20 | 4.33.8: The Crossing Wall Concepts; Alternative Fencing
Print on Vellum
|
1992 September 24 | |
20 | 4.33.9: The Crossing Entry Concept
Print on Vellum
|
1992 September 24 | |
20 | 4.33.10: The Crossing Wall Concepts; Wall Types
Print on Vellum
|
1992 September 16 | |
20 | 4.33.11: The Crossing Entry Concept
Print on Vellum
|
undated | |
20 | 4.33.12: Phase 1 Projections
Print on Acetate
|
undated | |
20 | 4.33.13: The Crossing Cover Page
Print on Vellum
|
undated | |
20 | 4.33.14: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
|
1992 September 16 | |
20 | 4.33.15: The Crossing Entry Concept in Color
Pen and Marker on Bond
|
1992 September 16 | |
20 | 4.33.16: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.17: The Crossing Comparative Walls in Color
Marker and Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.18: The Crossing Town Center Drive in Color; Image Character
Pen and Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.19: The Crossing Wall Layout Diagram in Color; Phase One
Print on Bond
|
1992 September 24 | |
20 | 4.33.20: The Crossing Character Photos
Images on Bond
|
1992 September 24 | |
20 | 4.33.21: The Crossing Landscape and Entry Concept Plan
Images and Marker on Bond
|
1992 September 24 | |
20 | 4.33.22: The Crossing Entry Concept in Color
Pen and Colored Pencil on Bond
|
1992 September 24 | |
20 | 4.33.23: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
|
1992 September 16 | |
20 | 4.33.24: The Crossing Photo
Images on Bond
|
1992 September 16 | |
Summerlin Village 1 South Preliminary Studies
|
|||
tube | |||
21 | 4.34.1: Village One South Village Design Concept Plan
Marker on Bond
|
undated | |
21 | 4.34.2: Preliminary Neighborhood Design Concept
Blueprint on Bond
|
1989 May 30 | |
21 | 4.34.3: Phase one Image Concept
Print and Marker on Bond
|
undated | |
21 | 4.34.4: Model Home Concept
Marker on Trace
|
1988 September 14 | |
21 | 4.34.5: Village One
Marker on Trace
|
1988 September 27 | |
21 | 4.34.6: Circulation Diagram
Marker on Trace
|
undated | |
21 | 4.34.7: Concept Diagram
Marker on Trace
|
undated | |
21 | 4.34.8: Preliminary Neighborhood Design Concept
Marker on Trace
|
1990 May 23 | |
The Hills Point Road and Entries
|
|||
tube | |||
21 | 4.35.1: The Hills Streetscape Hillpointe Road and Entries- Cover Page
Print on Mylar
|
1990 April 15 | |
21 | 4.35.2: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.1
Print on Mylar
|
1989 November 22 | |
21 | 4.35.3: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.2
Print on Mylar
|
1989 November 22 | |
21 | 4.35.4: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.3
Print on Mylar
|
1989 November 22 | |
21 | 4.35.5: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.4
Print on Mylar
|
1989 November 22 | |
21 | 4.35.6: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.5
Print on Mylar
|
1989 November 22 | |
21 | 4.35.7: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.6
Print on Mylar
|
1989 November 22 | |
21 | 4.35.8: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.7
Print on Mylar
|
1989 November 22 | |
21 | 4.35.9: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.8
Print on Mylar
|
1989 November 22 | |
21 | 4.35.10: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.1
Print on Mylar
|
1989 November 22 | |
21 | 4.35.11: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.2
Print on Mylar
|
1989 November 22 | |
21 | 4.35.12: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.3
Print on Mylar
|
1989 November 22 | |
21 | 4.35.13: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.4
Print on Mylar
|
1989 November 22 | |
21 | 4.35.14: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.5
Print on Mylar
|
1989 November 22 | |
21 | 4.35.15: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.6
Print on Mylar
|
1989 November 22 | |
21 | 4.35.16: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.7
Print on Mylar
|
1989 November 22 | |
21 | 4.35.17: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.8
Print on Mylar
|
1989 November 22 | |
21 | 4.35.18: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.9
Print on Vellum
|
1989 November 22 | |
21 | 4.35.19: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.10
Print on Vellum
|
1989 November 22 | |
21 | 4.35.20: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.1
Print on Mylar
|
1989 November 22 | |
21 | 4.35.21: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.2
Print on Mylar
|
1989 November 22 | |
21 | 4.35.22: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.3
Print on Mylar
|
1989 November 22 | |
21 | 4.35.23: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.4
Print on Mylar
|
1989 November 22 | |
21 | 4.35.24: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.5
Print on Mylar
|
1989 November 22 | |
21 | 4.35.25: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.6
Print on Mylar
|
1989 November 22 | |
21 | 4.35.26: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.7
Print on Mylar
|
1989 November 22 | |
21 | 4.35.27: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.8
Print on Mylar
|
1989 November 22 | |
21 | 4.35.28: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.9
Print on Mylar
|
1989 November 22 | |
21 | 4.35.29: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.10
Print on Mylar
|
1989 November 22 | |
21 | 4.35.30: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.11
Print on Mylar
|
1989 November 22 | |
21 | 4.35.31: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.12
Print on Mylar
|
1989 November 22 | |
21 | 4.35.32: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Details 3.13
Print on Mylar
|
1989 November 22 | |
21 | 4.35.33: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Details 3.14
Print on Mylar
|
1989 November 22 | |
21 | 4.35.34: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Details 4.1
Print on Mylar
|
1989 November 20 | |
21 | 4.35.35: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Details 4.2
Print on Mylar
|
1989 November 20 | |
21 | 4.35.36: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.3
Print on Mylar
|
1989 November 20 | |
21 | 4.35.37: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.4
Print on Mylar
|
1989 November 20 | |
21 | 4.35.38: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.5
Print on Mylar
|
1989 November 20 | |
21 | 4.35.39: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.6
Print on Mylar
|
1989 November 20 | |
21 | 4.35.40: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.7
Print on Mylar
|
1989 November 20 | |
21 | 4.35.41: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.8
Print on Mylar
|
1989 November 20 | |
21 | 4.35.42: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.1
Print on Mylar
|
1989 November 22 | |
21 | 4.35.43: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.2
Print on Mylar
|
1989 November 22 | |
21 | 4.35.44: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.3
Print on Mylar
|
1990 July 5 | |
The Pueblo
|
|||
tube | |||
22 | 4.36.1: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Cover Page
Print on Vellum
|
1992 September 22 | |
22 | 4.36.2: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout and Grading C-1
Print on Vellum
|
1992 September 22 | |
22 | 4.36.3: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout and Grading C-2
Print on Vellum
|
1992 September 22 | |
22 | 4.36.4: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout Details C-3
Print on Vellum
|
1992 September 22 | |
22 | 4.36.5: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Plan L-1
Print on Vellum
|
1992 September 22 | |
22 | 4.36.6: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Plan L-2
Print on Mylar
|
1992 September 22 | |
22 | 4.36.7: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Details L-3
Print on Vellum
|
1992 September 22 | |
22 | 4.36.8: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Plan I-1
Print on Mylar
|
1992 September 22 | |
22 | 4.36.9: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Plan I-2
Print on Mylar
|
1992 September 22 | |
22 | 4.36.10: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Details I-3
Print on Mylar
|
1992 September 22 | |
The Trails Park
|
|||
tube | |||
22 | 4.37.1: The Trails Park at Summerlin- Park Site Plan L-1
Print on Vellum
|
1994 May 20 | |
22 | 4.37.2: The Trails Park at Summerlin- Planting Plan L-2
Print on Vellum
|
1994 May 20 | |
22 | 4.37.3: The Trails Park at Summerlin- Planting Plan L-3
Print on Vellum
|
1994 May 20 | |
22 | 4.37.4: The Trails Park at Summerlin- Planting Plan L-4
Print on Mylar
|
1994 May 20 | |
22 | 4.37.5: The Trails Park at Summerlin- Enlarged Layout Plan L-5
Print on Vellum
|
1994 May 20 | |
22 | 4.37.6: The Trails Park at Summerlin- Enlarged Layout Plan L-6
Print on Vellum
|
1994 May 20 | |
22 | 4.37.7: The Trails Park at Summerlin- Landscape Details L-7
Print on Vellum
|
1994 May 20 | |
22 | 4.37.8: The Trails Park at Summerlin- Landscape Details L-8
Print on Mylar
|
1994 May 20 | |
22 | 4.37.9: The Trails Park at Summerlin- Landscape Detail L-9
Print on Vellum
|
1994 May 20 | |
22 | 4.37.10: The Trails Park at Summerlin Community Center- Community Building Site Plan L-1
Print on Vellum
|
1994 October 10 | |
22 | 4.37.11: The Trails Park at Summerlin Community Center- Community Building Planting Plan L-2
Print on Vellum
|
1994 October 10 | |
22 | 4.37.12: The Trails Park at Summerlin Community Center- Enlarged Layout Plan L-3
Print on Vellum
|
1994 October 10 | |
22 | 4.37.13: The Trails Park at Summerlin Community Center- Landscape Details L-4
Print on Mylar
|
1994 October 10 | |
22 | 4.37.14: The Trails Park at Summerlin Community Center- Landscape Details L-5
Print on Mylar
|
1994 October 10 | |
22 | 4.37.15: The Trails Park at Summerlin Community Center- Irrigation Plan L-6
Print on Vellum
|
1994 October 10 | |
22 | 4.37.16: The Trails Park at Summerlin Community Center- Enlarged Layout Plan L-6
Print on Vellum
|
1994 October 10 | |
22 | 4.37.17: The Trails Park at Summerlin Community Center- Irrigation Details L-7
Print on Vellum
|
1994 October 10 | |
22 | 4.37.18: The Trails Park at Summerlin Community Center- Irrigation Schedule and Notes L-8
Print on Vellum
|
1994 October 10 | |
22 | 4.37.19: The Trails Park at Summerlin Concession Building- Park Site Plan L-1
Print on Vellum
|
1994 October 10 | |
22 | 4.37.20: The Trails Park at Summerlin Concession Building- Enlarged Layout Plan L-2
Print on Vellum
|
1994 October 10 | |
22 | 4.37.21: The Trails Park at Summerlin Concession Building- Landscape Details L-3
Print on Vellum
|
1994 October 10 | |
22 | 4.37.22: The Trails Park at Summerlin Concession Building- Landscape Details L-4
Print on Vellum
|
1994 October 10 | |
22 | 4.37.23: The Trails Park at Summerlin Community Park- Park Site Plan L-1
Print on Vellum
|
1994 October 10 | |
22 | 4.37.24: The Trails Park at Summerlin Community Park- Planting Plan L-2
Print on Vellum
|
1994 October 10 | |
22 | 4.37.25: The Trails Park at Summerlin Community Park- Planting Plan L-3
Print on Vellum
|
1994 October 10 | |
22 | 4.37.26: The Trails Park at Summerlin Community Park- Planting Plan L-4
Print on Vellum
|
1994 October 10 | |
22 | 4.37.27: The Trails Park at Summerlin Community Park- Enlarged Layout Plan L-6
Print on Vellum
|
1994 October 10 | |
22 | 4.37.28: The Trails Park at Summerlin Community Park- Landscape Details L-7
Print on Vellum
|
1994 October 10 | |
22 | 4.37.29: The Trails Park at Summerlin Community Park- Landscape Details L-8
Print on Vellum
|
1994 October 10 | |
22 | 4.37.30: The Trails Park at Summerlin Community Park- Landscape Details L-9
Print on Vellum
|
1994 October 10 | |
22 | 4.37.31: The Trails Park at Summerlin Community Park- Irrigation Site Plan L-10
Print on Vellum
|
1994 October 10 | |
22 | 4.37.32: The Trails Park at Summerlin Community Park- Irrigation Plan L-11
Print on Vellum
|
1994 October 10 | |
22 | 4.37.33: The Trails Park at Summerlin Community Park- Irrigation Plan L-12
Print on Vellum
|
1994 October 10 | |
22 | 4.37.34: The Trails Park at Summerlin Community Park- Irrigation Plan L-13
Print on Vellum
|
1994 October 10 | |
22 | 4.37.35: The Trails Park at Summerlin Community Park- Irrigation Details L-14
Print on Vellum
|
1994 October 10 | |
22 | 4.37.36: The Trails Park at Summerlin Community Park- Irrigation Details L-15
Print on Vellum
|
1994 October 10 | |
22 | 4.37.37: The Trails Park at Summerlin Community Park- Irrigation Details, Notes and Schedule L-16
Print on Vellum
|
1994 October 10 | |
22 | 4.37.38: The Trails Park at Summerlin Community Center and Park- Park Site Plan L-1
Print on Bond
|
1994 July 8 | |
22 | 4.37.39: The Trails Park at Summerlin Community Center and Park- Planting Plan L-2
Print on Bond
|
1994 July 8 | |
22 | 4.37.40: The Trails Park at Summerlin Community Center and Park- Planting Plan L-3
Print on Bond
|
1994 July 8 | |
22 | 4.37.41: The Trails Park at Summerlin Community Center and Park- Planting Plan L-4
Print on Bond
|
1994 July 8 | |
22 | 4.37.42: The Trails Park at Summerlin Community Center and Park- Enlarged Layout Plan L-5
Print on Bond
|
1994 July 8 | |
22 | 4.37.43: The Trails Park at Summerlin Community Center and Park- Park Site Plan L-1
Print on Blueprint
|
1994 July 8 | |
22 | 4.37.44: The Trails Park at Summerlin Community Center and Park- Landscape Details L-7
Print on Blueprint
|
1994 July 8 | |
The Trails Streetscape Parcel B-3
|
|||
tube | |||
22 | 4.38.1: The Trails Streetscape Parcel B-3 Units 1 and 5- Cover Page
Print on Vellum
|
1996 March 22 | |
22 | 4.38.2: The Trails Streetscape Parcel B-3 Units 1 and 5- Landscape and Sidewalk Layout L-2.1
Print on Vellum
|
1996 March 22 | |
22 | 4.38.3: The Trails Streetscape Parcel B-3 Units 1 and 5- Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1996 March 22 | |
22 | 4.38.4: The Trails Streetscape Parcel B-3 Units 1 and 5- Planting and Sidewalk Details L-2.3
Print on Mylar
|
1996 March 22 | |
22 | 4.38.5: The Trails Streetscape Parcel B-3 Units 1 and 5- Typical Grading Sections L-2.4
Print on Mylar
|
1996 March 22 | |
22 | 4.38.6: The Trails Streetscape Parcel B-3 Units 1 and 5- Planting and Sidewalk Details L-2.5
Print on Mylar
|
1996 March 22 | |
The Trails Streetscape Parcel N-2
|
|||
tube | |||
23 | 4.39.1: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Cover Page
Print on Bond
|
1995 August 4 | |
23 | 4.39.2: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout Enlarged Plan L-2.1
Print on Bond
|
1995 August 4 | |
23 | 4.39.3: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1995 August 4 | |
23 | 4.39.4: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.3
Print on Bond
|
1995 August 4 | |
23 | 4.39.5: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.4
Print on Bond
|
1995 August 4 | |
23 | 4.39.6: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.5
Print on Bond
|
1995 August 4 | |
23 | 4.39.7: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.6
Print on Bond
|
1995 August 4 | |
23 | 4.39.8: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- L-2.7
Print on Mylar
|
1995 August 4 | |
23 | 4.39.9: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Typical Grading Section L-2.8
Print on Mylar
|
1995 August 4 | |
23 | 4.39.10: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Wall and Entry Monument Details L-2.9
Print on Mylar
|
1995 August 4 | |
23 | 4.39.11: The Trails Streetscape Parcel N-2 landscape and Irrigation- Cover Page
Print on Bond
|
1995 August 4 | |
23 | 4.39.12: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.1
Print on Bond
|
1995 August 4 | |
23 | 4.39.13: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1995 August 4 | |
23 | 4.39.14: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.3
Print on Bond
|
1995 August 4 | |
23 | 4.39.15: The Trails Streetscape Parcel N-2 Landscape and Irrigation- L-2.4
Print on Mylar
|
1995 August 4 | |
23 | 4.39.16: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Typical Grading Sections L-2.5
Print on Mylar
|
1995 August 4 | |
Summerlin Engineer Drawings
|
|||
tube | |||
23 | 4.40.1 A: Typical Parcel Entry Hacienda Style
Pen on Mylar
|
undated | |
23 | 4.40.1 B: Typical Parcel Entry Hacienda Style
Pen on Mylar
|
undated | |
23 | 4.40.1 C: Typical Parcel Entry Hacienda Style
Pen on Mylar
|
undated | |
23 | 4.40.2 A: Typical Parcel Entry Traditional Style
Pen on Mylar
|
undated | |
23 | 4.40.2 B: Typical Parcel Entry Traditional Style
Pen on Mylar
|
undated | |
23 | 4.40.2 C: Typical Parcel Entry Traditional Style
Pen on Mylar
|
undated | |
23 | 4.40.3 A: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
|
1993 October 21 | |
23 | 4.40.3 B: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
|
1993 October 21 | |
23 | 4.40.3 C: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
|
1993 October 21 | |
23 | 4.40.4 A: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
|
1994 March 21 | |
23 | 4.40.4 B: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
|
1994 March 21 | |
23 | 4.40.4 C: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
|
1994 March 21 | |
23 | 4.40.5 A: Typical Parcel Entry Contemporary Style
Pen on Mylar
|
undated | |
23 | 4.40.5 B: Typical Parcel Entry Contemporary Style
Pen on Mylar
|
undated | |
23 | 4.40.5 C: Typical Parcel Entry Contemporary Style
Pen on Mylar
|
undated | |
Summerlin Trails Builder Walls Indian Hills
|
|||
tube | |||
23 | 4.41.1: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Cover Page
Print on Vellum
|
1997 February 6 | |
23 | 4.41.2: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Layout and Grading Plan L-1.1
Print on Mylar
|
1997 February 6 | |
23 | 4.41.3: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Layout and Grading Plans L-1.2
Print on Mylar
|
1997 February 6 | |
23 | 4.41.4: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Wall and Site Details L-3.2
Print on Bond
|
1997 February 6 | |
23 | 4.41.5: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Wall and Site Details L-3.3
Print on Bond
|
1997 February 6 | |
Summerlin Trails Park, Ball Fields
|
|||
tube | |||
24 | 4.42.1: Trails Park Ball Field Little League Dugout Detail
Pen on Mylar
|
undated | |
24 | 4.42.2: Trails Park Ball Field Dugout Plan View
Pen on Mylar
|
undated | |
24 | 4.42.3: Trails Park Ball Field Senior League Dugout Detail
Pen on Mylar
|
undated | |
24 | 4.42.4: Trails Park Ball Field Gate Detail
Pen on Mylar
|
undated | |
24 | 4.42.5 A: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
|
1993 November 22 | |
24 | 4.42.5 B: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
|
1993 November 22 | |
24 | 4.42.5 C: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
|
1993 November 22 | |
24 | 4.42.5 D: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
|
1993 November 22 | |
Summerlin Village 3
|
|||
tube | |||
24 | 4.43.1: Village 3 Parcel Map
Sepia Print on Vellum
|
undated | |
24 | 4.43.2: Village 3 Land Use Diagram
Marker on Trace
|
undated | |
24 | 4.43.3: Village 3 Concept Plan
Marker on Trace
|
1988 November 29 | |
24 | 4.43.4: Summerlin Business Park Alternative E
Marker on Trace
|
undated | |
24 | 4.43.5: Village 3 golf Course Layout
Pen on Trace
|
undated | |
24 | 4.43.6: Village 3 Land Use
Marker on Trace
|
undated | |
24 | 4.43.7: Village 3 Resort Hotel Concept A
Marker on Trace
|
1988 October 9 | |
24 | 4.43.8: Summerlin Business Park Alternative D
Marker on Trace
|
undated | |
24 | 4.43.9: Summerlin Business Park Alternative C
Marker on Trace
|
undated | |
24 | 4.43.10: Summerlin Business Park Alternative B
Marker on Trace
|
undated | |
24 | 4.43.11: Summerlin Business Park Alternative A
Marker on Trace
|
undated | |
24 | 4.43.12: Village 3 Resort Hotel Concept B
Marker on Trace
|
1988 October 9 | |
24 | 4.43.13: Village 3 Resort Hotel Concept C
Marker on Trace
|
1988 October 9 | |
24 | 4.43.14: Village 3 Parcel Map
Blueprint on Bond
|
undated | |
24 | 4.43.15: Village 3 Perspective 1
Pen on Bond
|
undated | |
24 | 4.43.16: Village 3 Perspective 2
Pen on Bond
|
undated | |
24 | 4.43.17: Village 3 Perspective 3
Pen on Bond
|
undated | |
24 | 4.43.18: Summerlin Parkway; Station 465
Pencil on Trace
|
1989 February 9 | |
24 | 4.43.19: Summerlin Parkway; Station 434
Pencil on Trace
|
1989 February 10 | |
24 | 4.43.20: Summerlin Parkway; Station 444
Pencil on Trace
|
1989 February 10 | |
24 | 4.43.21: Golf Course B
Marker on Trace
|
1989 March 28 | |
24 | 4.43.22: Village 3 Circulation
Sepia Print on Vellum
|
undated | |
The Hills at Summerlin Park Drainage
|
|||
tube | |||
24 | 4.44.1: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Cover Page
Print on Bond
|
1994 March 25 | |
24 | 4.44.2: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Planting Plan and Details L-1.0
Print on Bond
|
1994 March 25 | |
24 | 4.44.3: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Irrigation Plan I-1
Print on Bond
|
1994 March 25 | |
24 | 4.44.4: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Irrigation Details I-2
Print on Bond
|
1994 March 25 | |
Preliminary Master Sidewalk and Trail Plan
|
|||
tube | |||
24 | 4.45.1: Preliminary Master Sidewalk and Trail Plan Village 7
Sharpie on Bond
|
1992 March 11 | |
Summerlin Village 2 North Streetscape Pueblo Vista Drive
|
|||
tube | |||
24 | 4.46.1: Village Two North Streetscape Pueblo Vista Drive- Cover Page
Print on Vellum
|
1994 February 1 | |
24 | 4.46.2: Village Two North Streetscape Pueblo Vista Drive- Entry Feature Layout Plan 1.1
Print on Mylar
|
1994 February 1 | |
24 | 4.46.3: Village Two North Streetscape Pueblo Vista Drive- Streetscape Layout Plan 1.2
Print on Mylar
|
1994 February 1 | |
24 | 4.46.4: Village Two North Streetscape Pueblo Vista Drive- Construction Details 1.3
Print on Vellum
|
1994 February 1 | |
24 | 4.46.5: Village Two North Streetscape Pueblo Vista Drive- Construction Details 1.4
Print on Vellum
|
1994 February 1 | |
24 | 4.46.6: Village Two North Streetscape Pueblo Vista Drive- Entry Planting Plan 2.1
Print on Mylar
|
1994 February 1 | |
24 | 4.46.7: Village Two North Streetscape Pueblo Vista Drive- Streetscape Planting Plan 2.2
Print on Mylar
|
1994 February 1 | |
24 | 4.46.8: Village Two North Streetscape Pueblo Vista Drive- Planting Details 2.3
Print on Mylar
|
1994 February 1 | |
24 | 4.46.9 A: Village Two North Streetscape Pueblo Vista Drive- Streetscape Irrigation Plan 3.2
Print on Mylar
|
1994 February 1 | |
24 | 4.46.9 B: Village Two North Streetscape Pueblo Vista Drive- Streetscape Irrigation Plan 3.2
Print on Vellum
|
1994 February 1 | |
24 | 4.46.10: Village Two North Streetscape Pueblo Vista Drive- Irrigation Details 3.3
Print on Mylar
|
1994 February 1 | |
24 | 4.46.11: Village Two North Streetscape Pueblo Vista Drive- Entry Feature Electrical Layout 4.1
Print on Vellum
|
1994 February 1 | |
24 | 4.46.12: Village Two North Streetscape Pueblo Vista Drive- Electrical Details 4.2
Print on Vellum
|
1994 February 1 | |
Summerlin Trails Open Space and Builder Walls
|
|||
tube | |||
25 | 4.47.1: The Trails Open Space Phase Two- Cover Page
Print on Vellum
|
1994 September 1 | |
25 | 4.47.2: The Trails Open Space Phase Two- Grading Plan L-1.1
Print on Vellum
|
1994 September 1 | |
25 | 4.47.3: The Trails Open Space Phase Two- Grading Plan L-1.2
Print on Vellum
|
1994 September 1 | |
25 | 4.47.4: The Trails Open Space Phase Two- Grading Plan L-1.3
Print on Vellum
|
1994 September 1 | |
25 | 4.47.5: The Trails Open Space Phase Two- Grading Plan L-1.4
Print on Vellum
|
1994 September 1 | |
25 | 4.47.6: The Trails Open Space Phase Two- Grading Plan L-1.5
Print on Vellum
|
1994 September 1 | |
25 | 4.47.7: The Trails Open Space Phase Two- Grading Plan L-1.6
Print on Vellum
|
1994 September 1 | |
25 | 4.47.8: The Trails Open Space Phase Two- Grading Plan L-1.7
Print on Vellum
|
1994 September 1 | |
25 | 4.47.9: The Trails Open Space Phase Two- Layout Plan L-2.1
Print on Vellum
|
1994 September 1 | |
25 | 4.47.10: The Trails Open Space Phase Two- Layout Plan L-2.2
Print on Vellum
|
1994 September 1 | |
25 | 4.47.11: The Trails Open Space Phase Two- Layout Plan L-2.3
Print on Vellum
|
1994 September 1 | |
25 | 4.47.12: The Trails Open Space Phase Two- Layout Plan L-2.4
Print on Vellum
|
1994 September 1 | |
25 | 4.47.13: The Trails Open Space Phase Two- Layout Plan L-2.5
Print on Vellum
|
1994 September 1 | |
25 | 4.47.14: The Trails Open Space Phase Two- Layout Plan L-2.6
Print on Vellum
|
1994 September 1 | |
25 | 4.47.15: The Trails Open Space Phase Two- Layout Plan L-2.7
Print on Vellum
|
1994 September 1 | |
25 | 4.47.16: The Trails Open Space Phase Two- Site Details L-2.8
Print on Mylar
|
1994 September 1 | |
25 | 4.47.17: The Trails Open Space Phase Two- Site Details L-2.9
Print on Mylar
|
1994 September 1 | |
25 | 4.47.18: The Trails Open Space Phase Two- Landscape Plan L-3.1
Print on Vellum
|
1994 September 1 | |
25 | 4.47.19: The Trails Open Space Phase Two- Landscape Plan L-3.2
Print on Vellum
|
1994 September 1 | |
25 | 4.47.20: The Trails Open Space Phase Two- Landscape Plan L-3.3
Print on Vellum
|
1994 September 1 | |
25 | 4.47.21: The Trails Open Space Phase Two- Landscape Plan L-3.4
Print on Vellum
|
1994 September 1 | |
25 | 4.47.22: The Trails Open Space Phase Two- Landscape Plan L-3.5
Print on Vellum
|
1994 September 1 | |
25 | 4.47.23: The Trails Open Space Phase Two- Landscape Plan L-3.6
Print on Vellum
|
1994 September 1 | |
25 | 4.47.24: The Trails Open Space Phase Two- Landscape Plan L-3.7
Print on Vellum
|
1994 September 1 | |
25 | 4.47.25: The Trails Open Space Phase Two- Plant Schedule and Details L-3.8
Print on Mylar
|
1994 September 1 | |
25 | 4.47.26: The Trails Open Space Phase Two- Irrigation Plan I-4.1
Print on Vellum
|
1994 September 1 | |
25 | 4.47.27: The Trails Open Space Phase Two- Irrigation Plan I-4.2
Print on Vellum
|
1994 September 1 | |
25 | 4.47.28: The Trails Open Space Phase Two- Irrigation Plan I-4.3
Print on Vellum
|
1994 September 1 | |
25 | 4.47.29: The Trails Open Space Phase Two- Irrigation Plan I-4.4
Print on Vellum
|
1994 September 1 | |
25 | 4.47.30: The Trails Open Space Phase Two- Irrigation Plan I-4.5
Print on Vellum
|
1994 September 1 | |
25 | 4.47.31: The Trails Open Space Phase Two- Irrigation Plan I-4.6
Print on Vellum
|
1994 September 1 | |
25 | 4.47.32: The Trails Open Space Phase Two- Irrigation Plan I-4.7
Print on Vellum
|
1994 September 1 | |
25 | 4.47.33: The Trails Open Space Phase Two- Irrigation Details I-4.8
Print on Vellum
|
1994 September 1 | |
25 | 4.47.34: The Trails Open Space Phase Two- Irrigation Details I-4.9
Print on Vellum
|
1994 September 1 | |
25 | 4.47.35: The Trails Open Space Phase Two- Irrigation Plan I-4.10
Print on Vellum
|
1994 September 1 | |
25 | 4.47.36: The Trails Open Space Phase Two- Electrical Site Plan E-5.1
Print on Vellum
|
1994 September 1 | |
25 | 4.47.37: The Trails Open Space Phase Two- Electrical Site Plan E-5.2
Print on Vellum
|
1994 September 1 | |
25 | 4.47.38: The Trails Open Space Phase Two- Electrical Site Plan E-5.3
Print on Vellum
|
1994 September 1 | |
25 | 4.47.39: The Trails Open Space Phase Two- Electrical Schedules and Details E-5.4
Print on Vellum
|
1994 September 1 | |
25 | 4.47.40: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Cover Page
Print on Bond
|
1995 November 10 | |
25 | 4.47.41: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall Plan L-1.1
Print on Mylar
|
1995 November 10 | |
25 | 4.47.42: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall Plan L-1.2
Print on Mylar
|
1995 November 10 | |
25 | 4.47.43: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall and site Details L-3.2
Print on Bond
|
1995 November 10 | |
25 | 4.47.44: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall and Site Details L-3.3
Print on Bond
|
1995 November 10 | |
Summerlin Information Center and Pueblo Walls
|
|||
tube | |||
25 | 4.48.1: The Pueblo Walls Mock-Up
Print on Mylar
|
1990 February-March | |
25 | 4.48.2: The Pueblo Walls Mock-Up Layout and Planting Plan 1.1
Print on Bond
|
1990 March 23 | |
25 | 4.48.3: The Pueblo Walls Mock-Up Layout Details 1.2
Print on Bond
|
1990 March 23 | |
25 | 4.48.4: The Pueblo Walls Mock-Up Layout Details 1.3
Print on Bond
|
1990 March 23 | |
25 | 4.48.5: The Pueblo Walls Mock-Up Planting Details 1.4
Print on Bond
|
1990 March 23 | |
25 | 4.48.6: The Pueblo Walls Mock-Up Irrigation Plan 2.1
Print on Bond
|
1990 March 23 | |
25 | 4.48.7: The Pueblo Walls Mock-Up Irrigation Details 2.2
Print on Bond
|
1990 March 23 | |
25 | 4.48.8: The Pueblo Walls Mock-Up Wall Details 2.1
Print on Bond
|
1989 December 14 | |
25 | 4.48.9: The Pueblo Walls Mock-Up Site Details 2.2
Print on Bond
|
1989 December 18 | |
25 | 4.48.10: The Pueblo Walls Mock-Up Layout Plan 1
Print on Bond
|
1989 December 18 | |
25 | 4.48.11: Summerlin Temporary Information Center Site Plan Planting L-1
Print on Mylar
|
1990 February 14 | |
25 | 4.48.12: Summerlin Temporary Information Center Site Plan Grading L-1
Print on Mylar
|
1990 February 6 | |
25 | 4.48.13: Summerlin Temporary Information Center Site Plan I-1
Print on Mylar
|
1990 February 14 | |
25 | 4.48.14: Summerlin Temporary Information Center I-2
Print on Mylar
|
1990 February 14 | |
Summerlin The Trails Miscellaneous Entries and Streetscapes
|
|||
tube | |||
26 | 4.49.1: The Trails Builder Entries Beazer Homes
Sepia Print on Vellum
|
1995 October 20 | |
26 | 4.49.2: The Trails Builder Entries Pulte Homes; Electrical Site Plan
Sepia Print on Vellum
|
1995 October 20 | |
26 | 4.49.3: The Trails Builder Entries Durable Homes; Irrigation Plans
Sepia Print on Vellum
|
1995 October 30 | |
26 | 4.49.4: The Trails Builder Entries Durable Homes; Electrical Site Plan
Sepia Print on Vellum
|
1995 October 20 | |
26 | 4.49.5: The Trails Open Space- Phase Two; Grade Plan
Print on Vellum
|
1995 November 17 | |
26 | 4.49.6: The Trails Open Space- Phase Two; Grade Plan
Print on Vellum
|
1994 November 17 | |
26 | 4.49.7: The Trails Builder Entries Beazer Homes; Irrigation Details
Sepia Print on Mylar
|
1995 October 30 | |
26 | 4.49.8: Sequoia Durable Homes Parcel E-2; Concept Plan
Pen on Vellum
|
1994 November 11 | |
26 | 4.49.9: Crestdale Lane Planting Plan
Pen on Vellum
|
1996 April 30 | |
26 | 4.49.10: Willow Bend Builder Entry
Pen on Trace
|
1994 August 4 | |
26 | 4.49.11: Sierra Ridge Builder Entry Parcel D-2
Pen on Trace
|
1994 July 27 | |
26 | 4.49.12: Sierra Ridge Builder Entry Parcel D-2; Option B
Pen on Trace
|
1995 July 27 | |
26 | 4.49.13: Sierra Ridge Builder Entry Parcel D-2; Option A
Pen on Trace
|
1996 July 27 | |
26 | 4.49.14: The Trails Streetscape; Landscape Upgrade Concept
Sepia Print on Vellum
|
1995 March 8 | |
26 | 4.49.15: The Trails Streetscape; Landscape Upgrade Concept
Sepia Print on Vellum
|
1995 March 8 | |
Summerlin Village 1 North Contract Documents
|
|||
tube | |||
26 | 4.50.1: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Cover Page
Print on Vellum
|
1997 April 3 | |
26 | 4.50.2: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Layout Plan L1
Print on Vellum
|
1997 April 3 | |
26 | 4.50.3: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Construction Details L2
Print on Vellum
|
1997 April 3 | |
26 | 4.50.4: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Planting Plan L3
Print on Vellum
|
1997 April 3 | |
26 | 4.50.5: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Cover Page
Print on Vellum
|
1991 November 25 | |
26 | 4.50.6: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting and Layout Plan L-1
Print on Vellum
|
1991 November 25 | |
26 | 4.50.7: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting and Layout Plan L-2
Print on Vellum
|
1991 November 25 | |
26 | 4.50.8: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting Layout Plan and Details L-3
Print on Vellum
|
1991 November 25 | |
26 | 4.50.9: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-1
Print on Mylar
|
1991 November 25 | |
26 | 4.50.10: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-2
Print on Mylar
|
1991 November 25 | |
26 | 4.50.11: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-3
Print on Mylar
|
1991 November 25 | |
Summerlin Open Space
|
|||
tube | |||
27 | 4.51.1: Village 1, 2 and 3 Parks and Open Space Connections
Print on Mylar
|
undated | |
27 | 4.51.2: Village 1, 2 and 3 Parks and Open Space Connections
Print on Sepia
|
undated | |
27 | 4.51.3: Monument and Entry Features
Print on Mylar
|
undated | |
27 | 4.51.4: The Hills Design Concept Plan
Print on Mylar
|
undated | |
27 | 4.51.5: Community Wide Streetscape Arterials and Parkway
Print on Mylar
|
undated | |
27 | 4.51.6: The Hills Streetscape and Open Space
Print on Mylar
|
undated | |
Summerlin Streetscapes
|
|||
tube | |||
27 | 4.52.1: Parks Open Space and School Facilities Plan
Marker on Bond
|
1990 August 8 | |
27 | 4.52.2: 1990 Draft Plan Village Delineation and community Structure Diagram
Marker on Bond
|
undated | |
Summerlin Drainage Plan
|
|||
tube | |||
27 | 4.53.1: Summerlin Proposed Drainage Plan
Marker on Bond
|
undated | |
27 | 4.53.2: Summerlin Proposed Drainage Plan; Option B Elevations
Marker on Bond
|
undated | |
27 | 4.53.3: Summerlin Activity Spines
Print on Bond
|
1990 October 17 | |
The Trails Streetscape Anasazi Drive
|
|||
tube | |||
27 | 4.54.1: The Trails Streetscape Anasazi Drive Cover Page
Print on Bond
|
1996 April 5 | |
27 | 4.54.2: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout Enlarged Plan L-2.1
Print on Bond
|
1996 April 5 | |
27 | 4.54.3: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1996 April 5 | |
27 | 4.54.4: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.3
Print on Bond
|
1996 April 5 | |
27 | 4.54.5: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.4
Print on Bond
|
1996 April 5 | |
27 | 4.54.6: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.5
Print on Bond
|
1996 April 5 | |
27 | 4.54.7: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.6
Print on Bond
|
1996 April 5 | |
27 | 4.54.8: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.7
Print on Bond
|
1996 April 5 | |
27 | 4.54.9: The Trails Streetscape Anasazi Drive Planting and Sidewalk Details L-2.8
Print on Mylar
|
1996 April 5 | |
27 | 4.54.10: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.9
Print on Vellum
|
1996 April 5 | |
27 | 4.54.11: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.1
Print on Vellum
|
1996 April 5 | |
27 | 4.54.12: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.2
Print on Vellum
|
1996 April 5 | |
27 | 4.54.13: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.3
Print on Vellum
|
1996 April 5 | |
27 | 4.54.14: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.4
Print on Vellum
|
1996 April 5 | |
27 | 4.54.15: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.5
Print on Vellum
|
1996 April 5 | |
27 | 4.54.16: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.6
Print on Vellum
|
1996 April 5 | |
27 | 4.54.17: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.7
Print on Vellum
|
1996 April 5 | |
27 | 4.54.18: The Trails Streetscape Anasazi Drive Irrigation Details I-3.8
Print on Vellum
|
1996 April 5 | |
27 | 4.54.19: The Trails Streetscape Anasazi Drive Irrigation Notes and Schedule I-3.9
Print on Vellum
|
1996 April 5 | |
27 | 4.54.20: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.10
Print on Vellum
|
1996 April 5 | |
27 | 4.54.21: The Trails Streetscape Anasazi Drive Electrical Site Plan E-4.1
Print on Vellum
|
1996 April 5 | |
Illustrative Site Plan The Trails Park at Summerlin
|
|||
tube | |||
27 | 4.55.1: Illustrative Site Plan The Trails Park at Summerlin
Print on Bond
|
undated | |
Summerlin Unit Phase 1 and 2 Trails and Streetscape
|
|||
tube | |||
28 | 4.56.1: The Trails Streetscape- Phase 2 Parcel G-1 Cover Page
Print on Vellum
|
1991 February 15 | |
28 | 4.56.2: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.1
Print on Vellum
|
1991 February 15 | |
28 | 4.56.3: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1991 February 15 | |
28 | 4.56.4: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1991 February 15 | |
28 | 4.56.5: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1991 February 15 | |
28 | 4.56.6: The Trails Streetscape- Phase 2 Parcel G-1 Typical Grading Sections 2.5
Print on Vellum
|
1991 February 15 | |
28 | 4.56.7: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.1
Print on Vellum
|
1991 February 15 | |
28 | 4.56.8: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.2
Print on Vellum
|
1991 February 15 | |
28 | 4.56.9: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.3
Print on Vellum
|
1991 February 15 | |
28 | 4.56.10: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.4
Print on Vellum
|
1991 February 15 | |
28 | 4.56.11: The Trails Streetscape- Parcel K-2 Cover Page
Print on Vellum
|
1995 July 21 | |
28 | 4.56.12: The Trails Streetscape- Parcel K-2 Landscape and Monument Layout L-2.1
Print on Vellum
|
1995 July 21 | |
28 | 4.56.13: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1995 July 21 | |
28 | 4.56.14: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1995 July 21 | |
28 | 4.56.15: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1995 July 21 | |
28 | 4.56.16: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
|
1995 July 21 | |
28 | 4.56.17: The Trails Streetscape- Parcel K-2 Sidewalk and Landscape Layout L-2.6
Print on Vellum
|
1995 July 21 | |
28 | 4.56.18: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.7
Print on Vellum
|
1995 July 21 | |
28 | 4.56.19: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.8
Print on Vellum
|
1995 July 21 | |
28 | 4.56.20: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk L-2.9
Print on Vellum
|
1995 July 21 | |
28 | 4.56.21: The Trails Streetscape- Parcel K-2 Planting and Sidewalk Details L-2.10
Print on Mylar
|
1995 July 21 | |
28 | 4.56.22: The Trails Streetscape- Parcel K-2 Typical Grading Sections L-2.11
Print on Mylar
|
1995 July 21 | |
28 | 4.56.23: The Trails Streetscape- Parcel K-2 Irrigation L-3.1
Print on Vellum
|
1995 July 21 | |
28 | 4.56.24: The Trails Streetscape- Parcel K-2 Irrigation L-3.2
Print on Vellum
|
1995 July 21 | |
28 | 4.56.25: The Trails Streetscape- Parcel K-2 Irrigation L-3.3
Print on Vellum
|
1995 July 21 | |
28 | 4.56.26: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.4
Print on Vellum
|
1995 July 21 | |
28 | 4.56.27: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.5
Print on Vellum
|
1995 July 21 | |
28 | 4.56.28: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.6
Print on Vellum
|
1995 July 21 | |
28 | 4.56.29: The Trails Streetscape- Parcel K-2 Irrigation L-3.7
Print on Vellum
|
1995 July 21 | |
28 | 4.56.30: The Trails Streetscape- Parcel K-2 Irrigation L-3.8
Print on Vellum
|
1995 July 21 | |
28 | 4.56.31: The Trails Streetscape- Parcel K-2 Irrigation L-3.9
Print on Vellum
|
1995 July 21 | |
28 | 4.56.32: The Trails Streetscape- Parcel K-2 Irrigation Details L-3.10
Print on Vellum
|
1995 July 21 | |
28 | 4.56.33: The Trails Streetscape- Parcel K-2 Irrigation Notes and Schedule L-3.11
Print on Vellum
|
1995 July 21 | |
28 | 4.56.34: The Trails Streetscape- Parcel K-2 Electrical Streetscape Lighting Plan E-4.1
Print on Vellum
|
1995 July 21 | |
28 | 4.56.35: The Trails Streetscape- Phase 1 and 2 Parcel K-2
Print on Vellum
|
1995 April 7 | |
28 | 4.56.36: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Monument Layout L-2.1
Print on Vellum
|
1995 April 7 | |
28 | 4.56.37: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1995 April 7 | |
28 | 4.56.38: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1995 April 7 | |
28 | 4.56.39: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1995 April 7 | |
28 | 4.56.40: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
|
1995 April 7 | |
28 | 4.56.41: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout tL-2.6
Print on Vellum
|
1995 April 7 | |
28 | 4.56.42: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.7
Print on Vellum
|
1995 April 7 | |
28 | 4.56.43: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.8
Print on Vellum
|
1995 April 7 | |
28 | 4.56.44: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.9
Print on Vellum
|
1995 April 7 | |
28 | 4.56.45: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Planting and Sidewalk Details L-2.10
Print on Vellum
|
1995 April 7 | |
28 | 4.56.46: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Typical Grading Sections L-2.11
Print on Vellum
|
1995 April 7 | |
28 | 4.56.47: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Monument Details L-2.12
Print on Vellum
|
1995 April 7 | |
28 | 4.56.48: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.2
Print on Sepia Mylar
|
1995 April 5 | |
28 | 4.56.49: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.3
Print on Sepia Mylar
|
1995 April 5 | |
28 | 4.56.50: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.4
Print on Mylar
|
1995 April 5 | |
28 | 4.56.51: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.5
Print on Mylar
|
1995 April 5 | |
28 | 4.56.52: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.6
Print on Mylar
|
1995 April 5 | |
28 | 4.56.53: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.8
Print on Mylar
|
1995 April 5 | |
28 | 4.56.54: The Trails Streetscape- Parcel M-2 Cover Page
Print on Vellum
|
1995 October 9 | |
28 | 4.56.55: The Trails Streetscape- Parcel M-2 Landscape and Monument Layout L-2.1
Print on Vellum
|
1995 October 9 | |
28 | 4.56.56: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1995 October 9 | |
28 | 4.56.57: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1995 October 9 | |
28 | 4.56.58: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1995 October 9 | |
28 | 4.56.59: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
|
1995 October 9 | |
28 | 4.56.60: The Trails Streetscape- Parcel M-2 Typical Grading Sections L-2.6
Print on Vellum
|
1995 October 9 | |
28 | 4.56.61: The Trails Streetscape- Parcel M-2 Entry Monument Details L-2.7
Print on Mylar
|
1995 October 9 | |
28 | 4.56.62: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.1
Print on Sepia Mylar
|
1995 October 9 | |
28 | 4.56.63: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.2
Print on Sepia Mylar
|
1995 October 9 | |
28 | 4.56.64: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.3
Print on Sepia Mylar
|
1995 October 9 | |
28 | 4.56.65: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.4
Print on Sepia Mylar
|
1995 October 9 | |
28 | 4.56.66: The Trails Streetscape- Parcel M-2 Irrigation Details, Notes and Schedule I-3.5
Print on Sepia Mylar
|
1995 October 9 | |
28 | 4.56.67: The Trails Streetscape- Parcel M-2 Electrical Streetscape Lighting Plan E-4.1
Print on Sepia Mylar
|
1995 October 9 | |
Neighborhood Plan Village 1 and 7
|
|||
tube | |||
29 | 4.57.1: Neighborhood Plan Village 1 and 7
Marker and Pen on Trace
|
undated | |
The Hills at Summerlin Streetscape
|
|||
tube | |||
29 | 4.58.1: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Cover Page
Print on Vellum
|
1991 February 15 | |
29 | 4.58.2: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Planting and Layout 1.1
Print on Vellum
|
1991 February 15 | |
29 | 4.58.3: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Planting and Layout 1.2
Print on Vellum
|
1991 February 15 | |
29 | 4.58.4: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Plan 2.1
Print on Vellum
|
1991 February 15 | |
29 | 4.58.5: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Plan 2.2
Print on Vellum
|
1991 February 15 | |
29 | 4.58.6: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Details 2.3
Print on Vellum
|
1991 February 15 | |
29 | 4.58.7: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Details 2.4
Print on Vellum
|
1991 February 15 | |
Summerlin Draft Master Plan
|
|||
tube | |||
29 | 4.59.1: Summerlin Draft Master Plan Alternative B
Marker on Bond
|
1990 June 6 | |
29 | 4.59.2 A: Summerlin Draft Master Plan Road Hierarchy
Trace Overlay
|
undated | |
29 | 4.59.2 B: Summerlin Draft Master Plan Road Hierarchy
Trace Overlay
|
undated | |
29 | 4.59.3: Summerlin Preliminary Draft
Sepia Print on Vellum
|
1990 July 30 | |
29 | 4.59.4: Summerlin Land Use Concept
Sepia Print on Vellum
|
undated | |
Summerlin Pueblo
|
|||
tube | |||
29 | 4.60.1: The Pueblo at Summerlin Village Two Streetscape
Sepia Print on Vellum
|
undated | |
The Hills at Summerlin
|
|||
tube | |||
30 | 4.61.1: The Hills at Summerlin - The Hills Park Stage - Cover Page
Print on Vellum
|
1992 August 12 | |
30 | 4.61.2: The Hills at Summerlin - The Hills Park Stage - L-1.1
Print on Mylar
|
1992 August 12 | |
30 | 4.61.3: The Hills at Summerlin - The Hills Park Stage - L-1.2
Print on Mylar
|
1992 August 12 | |
30 | 4.61.4: The Hills at Summerlin - The Hills Park Stage - L-2.1
Print on Mylar
|
1992 August 12 | |
30 | 4.61.5: The Hills at Summerlin - The Hills Park Stage - L-2.2
Print on Mylar
|
1992 August 12 | |
30 | 4.61.6: The Hills at Summerlin - The Hills Park Stage - L-2.3
Print on Mylar
|
1992 August 12 | |
30 | 4.61.7: The Hills at Summerlin - The Hills Park Stage - L-2.4
Print on Mylar
|
1992 August 12 | |
30 | 4.61.8: The Hills at Summerlin - The Hills Park Stage - L-2.5
Print on Mylar
|
1992 August 12 | |
30 | 4.61.9: The Hills at Summerlin - The Hills Park Stage - L-2.6
Print on Mylar
|
1992 August 12 | |
30 | 4.61.10: The Hills at Summerlin - The Hills Park Stage - L-3.1
Print on Mylar
|
1992 August 12 | |
30 | 4.61.11: The Hills at Summerlin - The Hills Park Stage - L-3.2
Print on Mylar
|
1992 August 12 | |
30 | 4.61.12: The Hills at Summerlin - The Hills Park Stage - L-4.1
Print on Sepia Vellum
|
1992 August 12 | |
30 | 4.61.13: The Hills at Summerlin - The Hills Park Stage - L-4.2
Print on Sepia Vellum
|
1992 August 12 | |
30 | 4.61.14: The Hills at Summerlin - The Hills Park Stage - S1.0
Print on Vellum
|
1992 August 12 | |
30 | 4.61.15: The Hills at Summerlin - The Hills Park Stage - S1.1
Print on Vellum
|
1992 August 12 | |
30 | 4.61.16: The Hills at Summerlin - The Hills Park Stage - S2.1
Print on Vellum
|
1992 August 12 | |
30 | 4.61.17: The Hills at Summerlin - The Hills Park Stage - S2.2
Print on Vellum
|
1992 August 12 | |
30 | 4.61.18: The Hills at Summerlin - The Hills Park Stage - S2.3
Print on Vellum
|
1992 August 12 | |
30 | 4.61.19: The Hills at Summerlin - The Hills Park Stage - S2.4
Print on Vellum
|
1992 August 12 | |
30 | 4.61.20: The Hills at Summerlin - The Hills Park Stage - E1
Print on Vellum
|
1992 August 12 | |
30 | 4.61.21: The Hills at Summerlin - The Hills Park Stage - E2
Print on Sepia Vellum
|
1992 August 12 | |
The Trails Builder Walls Sierra Ridge
|
|||
tube | |||
30 | 4.62.1: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Cover Page
Print on Vellum
|
1995 December 4 | |
30 | 4.62.2: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Layout and Grading Plans L-1.1
Print on Mylar
|
1995 December 4 | |
30 | 4.62.3: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Layout and Grading L-1.2
Print on Mylar
|
1995 December 4 | |
30 | 4.62.4: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Wall and Site Grading L-3.2
Print on Mylar
|
1995 December 4 | |
30 | 4.62.5: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Wall and Site Details L-3.3
Print on Mylar
|
1995 December 4 | |
Summerlin Phase 1 Entry Features and Signs for Unit 2
|
|||
tube | |||
31 | 4.63.1: The Trails Streetscape Unit Two Phase One- Cover Page
Print on Vellum
|
1994 November 14 | |
31 | 4.63.2: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.1
Print on Vellum
|
1994 November 14 | |
31 | 4.63.3: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1994 November 14 | |
31 | 4.63.4: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1994 November 14 | |
31 | 4.63.5: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1994 November 14 | |
31 | 4.63.6: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.5
Print on Vellum
|
1994 November 14 | |
31 | 4.63.7: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.6
Print on Vellum
|
1994 November 14 | |
31 | 4.63.8: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.7
Print on Vellum
|
1994 November 14 | |
31 | 4.63.9: The Trails Streetscape Unit Two Phase One- Planting and Sidewalk Details L-2.8
Print on Vellum
|
1994 November 14 | |
31 | 4.63.10: The Trails Streetscape Unit Two Phase One- Sidewalk Horizontal Control Data L-2.9
Print on Vellum
|
1994 November 14 | |
31 | 4.63.11: The Trails Streetscape Unit 3 Phase One- Cover Page
Print on Vellum
|
1994 December | |
31 | 4.63.12: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.1
Print on Vellum
|
1994 December | |
31 | 4.63.13: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1994 December | |
31 | 4.63.14: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.3
Print on Vellum
|
1994 December | |
31 | 4.63.15: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.4
Print on Vellum
|
1994 December | |
31 | 4.63.16: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.5
Print on Vellum
|
1994 December | |
31 | 4.63.17: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.6
Print on Vellum
|
1994 December | |
31 | 4.63.18: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.7
Print on Vellum
|
1994 December | |
31 | 4.63.19: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.8
Print on Vellum
|
1994 December | |
31 | 4.63.20: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.9
Print on Vellum
|
1994 December | |
31 | 4.63.21: The Trails Streetscape Unit 3 Phase One- Entry Feature Planting and Sidewalk Details L-2.10
Print on Vellum
|
1994 December | |
31 | 4.63.22: The Trails Streetscape Unit 3 Phase One- Pillars
Print on Vellum
|
1994 December | |
31 | 4.63.23: Highline at the Trails- Cover Page
Print on Vellum
|
1994 November 23 | |
31 | 4.63.24: Highline at the Trails- Wall Layout and Grading
Print on Vellum
|
1994 November 23 | |
31 | 4.63.25: Highline at the Trails- Layout and Grading Plan L-1.2
Print on Vellum
|
1994 November 23 | |
31 | 4.63.26: Highline at the Trails- Wall Layout and Grading Plan L-1.4
Print on Vellum
|
1994 November 23 | |
31 | 4.63.27: Highline at the Trails- Wall Layout and Grading L-1.3
Print on Vellum
|
1994 November 23 | |
31 | 4.63.28: Highline at the Trails- Wall and Site Details L-1.5
Print on Vellum
|
1994 November 23 | |
31 | 4.63.29: Highline at the Trails- Wall and Site Details L-1.6
Print on Vellum
|
1994 November 23 | |
31 | 4.63.30: The Trails Streetscape Phase One Entry Features and Signs- Cover Page
Print on Mylar
|
1994 March 21 | |
31 | 4.63.31: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.1
Print on Mylar
|
1994 March 21 | |
31 | 4.63.32: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading
Print on Mylar
|
1994 March 21 | |
31 | 4.63.33: The Trails Streetscape Phase One Entry Features and Signs- Hillpointe Road
Print on Mylar
|
1994 March 21 | |
31 | 4.63.34: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.3
Print on Mylar
|
1994 March 21 | |
31 | 4.63.35: The Trails Streetscape Phase One Entry Features and Signs- Village Center Circle
Print on Mylar
|
1994 March 21 | |
31 | 4.63.36: The Trails Streetscape Phase One Entry Features and Signs- 2.4
Print on Mylar
|
1994 March 21 | |
31 | 4.63.37: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.4
Print on Mylar
|
1994 March 21 | |
31 | 4.63.38: The Trails Streetscape Phase One Entry Features and Signs- Base II 2.5
Print on Mylar
|
1994 March 21 | |
31 | 4.63.39: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.5
Print on Mylar
|
1994 March 21 | |
31 | 4.63.40: The Trails Streetscape Phase One Entry Features and Signs- Entry Monument Details 1.6
Print on Mylar
|
1994 March 21 | |
31 | 4.63.41: The Trails Streetscape Phase One Entry Features and Signs- Wall Details 1.7
Print on Mylar
|
1994 March 21 | |
31 | 4.63.42: The Trails Streetscape Phase One Entry Features and Signs- Sign Details 1.8
Print on Mylar
|
1994 March 21 | |
31 | 4.63.43: The Trails Streetscape Phase One Entry Features and Signs- Wall and Entry Monument Details L-2.9
Print on Mylar
|
1994 March 21 | |
Summerlin Village 7
|
|||
tube | |||
32 | 4.64.1: Village 7
Print on Vellum
|
1990 June 11 | |
32 | 4.64.2: Village 7
Trace Overlay
|
undated | |
32 | 4.64.3: Village 7 alternative 3
Print on Vellum
|
1990 March 21 | |
32 | 4.64.4: Village 7 Alternative 4
Print on Vellum
|
1990 March 21 | |
32 | 4.64.5: Village 7 Alternative 5
Print on Vellum
|
1990 March 21 | |
Summerlin Trails Builder Walls
|
|||
tube | |||
32 | 4.65.1: Trails at Summerlin Design Criteria Primary Village Entry
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.2: Trails at Summerlin Design Criteria Secondary Village Entry
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.3: Trails at Summerlin Hillpointe Road
Blueprint on Bond
|
1993 March 29 | |
32 | 4.65.4: Trails at Summerlin Trails Center Drive
Blueprint on Bond
|
1993 March 29 | |
32 | 4.65.5: Trails at Summerlin Design Criteria Open Space Plan
Sepia Print on Bond
|
1992 July 1 | |
32 | 4.65.6: Trails at Summerlin Design Criteria Underpass Concept Studies
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.7: Trails at Summerlin Design Criteria Underpass Final Alternatives
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.8: Trails at Summerlin Design Criteria Preliminary Site Plan
Print on Vellum
|
1992 July 1 | |
32 | 4.65.9: Trails at Summerlin Design Criteria Village Landscape Concept Diagram
Print on Vellum
|
undated | |
32 | 4.65.10: Trails at Summerlin Design Criteria Entry Concept Study
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.11: Trails at Summerlin Design Criteria Parcel Entry- Traditional
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.12: Trails at Summerlin Design Criteria Parcel Entry- Hacienda
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.13: Trails at Summerlin Design Criteria Parcel entry- Contemporary Southwest
Sepia Print on Vellum
|
1992 July 1 | |
32 | 4.65.14: Trails at Summerlin Design Criteria Road Sections
Print on Vellum
|
1992 July 1 | |
32 | 4.65.15: Trails at Summerlin Design Criteria Wall Concept
Sepia on Vellum
|
1992 July 1 | |
32 | 4.65.16: Trails at Summerlin Design Criteria Village Wall Elevations
Sepia on Vellum
|
1992 July 1 | |
32 | 4.65.17: Trails at Summerlin Design Criteria Village Wall Elevation
Sepia on Vellum
|
1992 July 1 | |
32 | 4.65.18: Trails at Summerlin Design Criteria Road Sections
Sepia on Vellum
|
1992 July 1 | |
32 | 4.65.19: Trails at Summerlin Design Criteria Village Parks and Open Space Diagram
Sepia on Vellum
|
1992 July 1 | |
32 | 4.65.20: Trails at Summerlin Design Criteria Park Program Analysis
Blueprint on Bond
|
1992 July 1 | |
32 | 4.65.21: Trails at Summerlin Design Criteria Park Alternatives
Print on Bond
|
1992 July 1 | |
32 | 4.65.22: Trails at Summerlin Design Criteria Park Alternatives
Print on Bond
|
1992 July 1 | |
32 | 4.65.23: Trails at Summerlin Design Criteria Retail Center Criteria
Print on Bond
|
1992 July 1 | |
Summerlin Phase 1
|
|||
tube | |||
33 | 4.66.1: Village Seven Context Plan Color
Blueprint on Mylar
|
undated | |
33 | 4.66.2: Village Seven Context Plan Black and White
Print in Mylar
|
undated | |
33 | 4.66.3: Village Seven Context Plan
Print on Bond
|
1988 October 12 | |
33 | 4.66.4: Village Seven Topography Map
Print on Mylar
|
undated | |
33 | 4.66.5: Village Seven Concept Plan
Print on Bond
|
1988 October 12 | |
33 | 4.66.6: Village Seven Concept Plan
Print on Bond
|
1988 October 12 | |
33 | 4.66.7: Summerlin Phase 1
Print on Bond
|
undated | |
33 | 4.66.8: Summerlin Phase 1
Print on Mylar
|
undated | |
33 | 4.66.9: Sun City Summerlin Del Webb
Print on Bond
|
undated | |
33 | 4.66.10: Desert Shores Concept Plan
Print on Bond
|
undated | |
33 | 4.66.11: Concept Diagram
Marker on Trace
|
undated | |
33 | 4.66.12: Environmental Analysis
Marker on Trace
|
1988 September 1 | |
33 | 4.66.13: Drainage Ways & Boundaries
Marker on Trace
|
1988 September 1 | |
33 | 4.66.14: Utilities
Marker on Trace
|
1988 September 1 | |
33 | 4.66.15: Measurements
Marker on Trace
|
undated | |
33 | 4.66.16: Study Area Analysis
Marker on Trace
|
undated | |
33 | 4.66.17: Summerlin Alternative 'B' Land Use Concept
Print on Bond
|
1990 July 2 | |
33 | 4.66.18: Summerlin Phase 1
Marker on Bond
|
undated | |
33 | 4.66.19: Summerlin Phase 1
Marker on Bond
|
undated | |
33 | 4.66.20: Phase One Utilities
Tape on Bond
|
1988 September 29 | |
Summerlin Hills Park Children's Fountain and Adult Pool
|
|||
tube | |||
34 | 4.67.1: Bath House HVAC Plan, M-1,
Print on Vellum
|
1989 December 13 | |
34 | 4.67.2: Public Restrooms-Pluming, P-1
Print on Vellum
|
1989 December 13 | |
34 | 4.67.3: Bath House HVAC Plan, P-2
Print on Vellum
|
1989 December 13 | |
34 | 4.67.4: The Hills Park Main Pool Project Info SP-1
Print on Vellum
|
undated | |
34 | 4.67.5: The Hills Park Mechanical Room, SP-2
Print on Vellum
|
undated | |
34 | 4.67.6: The Hills Park Plumbing and Water, SP-3
Print on Vellum
|
undated | |
34 | 4.67.7: The Hills Park Deck and Safety Equipment
Print on Vellum
|
undated | |
34 | 4.67.8: Summerlin The Hills Park Title Page
Print on Mylar
|
undated | |
34 | 4.67.9: Summerlin The Hills Park Site Plan, CS1.1
Print on Mylar
|
1989 September 29 | |
34 | 4.67.10: Summerlin The Hills Park Site Landscape Plan, CS1.2
Print on Mylar
|
1989 September 29 | |
34 | 4.67.11: Summerlin The Hills Park Ramada, CS2.3
Print on Vellum
|
1989 September 20 | |
34 | 4.67.12: Summerlin The Hills Park Portal, CS2.5
Print on Vellum
|
1989 September 20 | |
34 | 4.67.13: Summerlin The Hills Park Pavilion, CS2.1
Print on Vellum
|
1989 September 20 | |
34 | 4.67.14: Summerlin The Hills Park Pavilion, CS2.2
Print on Vellum
|
1989 September 20 | |
34 | 4.67.15: Summerlin The Hills Park Toilet Building, CS2.4
Print on Vellum
|
1989 September 20 | |
34 | 4.67.16: Summerlin The Hills Park Children's Fountain Layout, L-3.8
Print on Vellum
|
1989 December 22 | |
34 | 4.67.17: Summerlin The Hills Park Site Plan
Print on Vellum
|
1989 December 12 | |
34 | 4.67.18: Summerlin The Hills Park Plaza Fountain Layout, L-3.7
Print on Mylar
|
1989 December 22 | |
34 | 4.67.19: Summerlin The Hills Park Sunken Garden Layout, L-3.5
Print on Mylar
|
1989 December 22 | |
34 | 4.67.20: Summerlin The Hills Park Site Plan
Print on Mylar
|
undated | |
34 | 4.67.21: Summerlin The Hills Park Site Grading Plan, L-2.1
Print on Mylar
|
undated | |
34 | 4.67.22: Typographical Map
Print on Mylar
|
undated | |
Summerlin Village 1 Walls
|
|||
tube | |||
35 | 4.68.1: Village One Streetscape Schematic Design Package; 22 Pages
Blueprint and Pen on Bond
|
1989 March 17 | |
35 | 4.68.2: Summerlin Street C: Tree and Light Layout
Print on Bond
|
1989 May 22 | |
35 | 4.68.3: Summerlin Street A: Tree and Light Layout
Print on Bond
|
1989 May 22 | |
35 | 4.68.4: Summerlin Street B: Tree and Light Layout
Print on Bond
|
1989 May 22 | |
35 | 4.68.5: Summerlin Village One Streetscape Wall Types
Print on Vellum
|
undated | |
35 | 4.68.6: Summerlin Village One Streetscape Wall Types
Print on Vellum
|
undated | |
35 | 4.68.7: Summerlin Village One Streetscape Wall Type B (pre-drawing)
Variety on Bond
|
undated | |
35 | 4.68.8: Summerlin Village One Streetscape Wall Type A
Print on Bond
|
undated | |
35 | 4.68.9: Summerlin Village One Streetscape Wall Type B
Print on Bond
|
undated | |
35 | 4.68.10: Summerlin Concept Plan Village One North; 4 pages
Print on Vellum
|
1989 June 22 | |
35 | 4.68.11: Summerlin Wall Type Matrix
Print on Bond
|
undated | |
35 | 4.68.12: Summerlin Ground Plane Plan
Print on Bond
|
undated | |
35 | 4.68.13: Summerlin Village One Streetscape Planting Plant, 8 pages
Blue Print on Bond
|
1989 July 5 | |
35 | 4.68.14: Summerlin Village One Streetscape Slopes Greater Than 3.3%
Print and Marker on Bond
|
1989 June 8 | |
35 | 4.68.15: Summerlin Village One Streetscape View Wall Locations
Print and Marker on Bond
|
1986 June 8 | |
35 | 4.68.16: Pillar Sketches
Pencil on Trace
|
undated | |
35 | 4.68.17 A: Alternate A: Steep Slope Pilaster Spacing greater than 3.3%
Marker on Trace
|
1989 June 8 | |
35 | 4.68.17 B: Alternate A: Steep Slope Pilaster Spacing greater than 3.3%
Marker on Trace
|
1989 June 8 | |
35 | 4.68.18: Wall Step Detail "B"
Marker on Trace
|
1989 June 8 | |
35 | 4.68.19: Village One North Streetscape Wall Colors
Print on Bond
|
1989 July 21 | |
35 | 4.68.20: View Wall Exhibits
Print on Bond
|
1989 June 6 | |
35 | 4.68.21: Custom Precast Concrete Coping
Print on Bond
|
1989 June 6 | |
35 | 4.68.22: Fence Drawing
Pencil on Graph
|
undated | |
35 | 4.68.23: Fence Drawing
Pencil on Graph
|
undated | |
35 | 4.68.24: Summerlin Hills Village Drive Alt. A
Pencil on Graph
|
undated | |
35 | 4.68.25: Summerlin Town Center Alt. A
Pencil on Graph
|
undated | |
35 | 4.68.26: Summerlin Rampart/L. Mead
Pencil on Graph
|
undated | |
35 | 4.68.27: Summerlin Crosswalk and Wheelchair Ramp and Village Arterial Connector 5 pages
Print on Bond
|
undated | |
35 | 4.68.28: Streetscape Detail
Print on Vellum
|
undated | |
Summerlin Village 7 Planning
|
|||
tube | |||
36 | 4.69.1: Alternative 5 Village Seven
Print on Bond
|
1990 March 21 | |
36 | 4.69.2: Shared Clubhouse Alternative A Village Seven Summerlin
Print on Vellum
|
1990 July 2 | |
36 | 4.69.3: Village Seven Site Conditions Summary Plan
Print on Bond
|
1990 January 25 | |
36 | 4.69.4: Village Seven Context Plan Summerlin
Print on Bond
|
1990 January 30 | |
36 | 4.69.5: Design Analysis Village Seven Summerlin
Print on Bond
|
1990 January 30 | |
36 | 4.69.6: Concept Diagram; Village Seven Summerlin
Print on Bond
|
1990 January 30 | |
36 | 4.69.7: Concepts Village Seven
Print on Bond
|
undated | |
36 | 4.69.8: Alternative A Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.9: Alternative B Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.10: Alternative C Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.11: Alternative D Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.12: Alternative E Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.13: Alternative 1 Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.14: Alternative 2 Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.15: Concept Diagram
Print on Bond
|
1990 February 16 | |
36 | 4.69.16: Alternative 3 Village Seven
Print on Bond
|
1990 January 30 | |
36 | 4.69.17: Alternative 4 Village Seven
Print on Bond
|
1990 January 30 | |
Summerlin Village 2 Park
|
|||
tube | |||
37 | 4.70.1: Street Perspective Detail
Print on Vellum
|
undated | |
37 | 4.70.2: Street Perspective Detail Round-A-Bout
Print on Vellum
|
undated | |
37 | 4.70.3: Street Perspective Detail Entry
Print on Vellum
|
undated | |
37 | 4.70.4: Street Perspective Detail Entry 2
Print on Vellum
|
undated | |
37 | 4.70.5: Summerlin Village 1 Parcel Entry 1
Print on Vellum
|
undated | |
37 | 4.70.6: Village One Streetscape Town Center Entry
Print on Vellum
|
undated | |
37 | 4.70.7: Village One Streetscape Primary Entry
Print on Vellum
|
undated | |
37 | 4.70.8: Village One Streetscape Primary Entry 2
Print on Vellum
|
undated | |
37 | 4.70.9: Village One Streetscape Secondary Entry
Print on Vellum
|
undated | |
37 | 4.70.10: The Hills Open Space System
Print on Vellum
|
1991 February 1 | |
37 | 4.70.11: The Pueblo Open Space System
Print on Vellum
|
1991 February 1 | |
37 | 4.70.12: Open Space Plan Identifying Neighborhood Parks
Print on Vellum
|
undated | |
37 | 4.70.13: Typographical Map
Print on Clear Mylar
|
undated | |
37 | 4.70.14: Phase One Village Center Summerlin
Print on Vellum
|
undated | |
37 | 4.70.15: Street Concept Overlay
Print on Vellum
|
undated | |
37 | 4.70.16: Summerlin Village 1
Print on Vellum
|
undated | |
37 | 4.70.17: Typographical Map
Print on Vellum Graph
|
undated | |
Summerlin The Trails Planning Documents
|
|||
tube | |||
38 | 4.71.1: The Trails Park Concept Plan
Blueprint on bond
|
1992 December 17 | |
38 | 4.71.2: The Trails at Summerlin Image Concepts; 25 pages
Blueprint on bond
|
1992 July 1 | |
The Hills at Summerlin Village Design
|
|||
tube | |||
38 | 4.72.1: The Hills at Summerlin Village Design Concept
Print on Bond
|
1989 October 6 | |
Summerlin Trails Builder Walls
|
|||
tube | |||
39 | 4.73.1: The Trails Streetscape-Phase One, 1.8
Print on Vellum
|
undated | |
39 | 4.73.2: The Trails Streetscape-Phase One, 1.7
Print on Vellum
|
undated | |
39 | 4.73.3: The Trails Streetscape-Phase One, 1.6
Print on Vellum
|
undated | |
39 | 4.73.4: The Trails Streetscape-Phase One, 1.5
Print on Vellum
|
undated | |
39 | 4.73.5: The Trails Streetscape-Phase One, 1.4
Print on Vellum
|
undated | |
39 | 4.73.6: The Trails Streetscape-Phase One, 1.3
Print on Vellum
|
undated | |
39 | 4.73.7: The Trails Streetscape-Phase One, 1.2
Print on Vellum
|
undated | |
39 | 4.73.8: The Trails Streetscape-Phase One, 1.1
Print on Vellum
|
undated | |
39 | 4.73.9: The Trails Streetscape Summerlin Title and Key
Print on Vellum
|
undated | |
39 | 4.73.10: The Trails Streetscape-Phase One, 2.18
Print on Vellum
|
undated | |
39 | 4.73.11: The Trails Streetscape-Phase One, 2.17
Print on Vellum
|
undated | |
39 | 4.73.12: The Trails Streetscape-Phase One, 2.16 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.13: The Trails Streetscape-Phase One, 2.15 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.14: The Trails Streetscape-Phase One, 2.14 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.15: The Trails Streetscape-Phase One, 2.13a Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.16: The Trails Streetscape-Phase One, 2.13 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.17: The Trails Streetscape-Phase One, 2.12
Print on Vellum
|
undated | |
39 | 4.73.18: The Trails Streetscape-Phase One, 2.9 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.19: The Trails Streetscape-Phase One, 2.8 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.20: The Trails Streetscape-Phase One, 2.7 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.21: The Trails Streetscape-Phase One, 2.6 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.22: The Trails Streetscape-Phase One, 2.5 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.23: The Trails Streetscape-Phase One, 2.4 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.24: The Trails Streetscape-Phase One, 2.3 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.25: The Trails Streetscape-Phase One, 2.2 Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.26: The Trails Open Space-Phase One Title
Print on Vellum
|
1994 May 2 | |
39 | 4.73.27: The Trails Open Space-Phase One, Grading Plan, L-1.1, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.28: The Trails Open Space-Phase One, Grading Plan, L-1.2, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.29: The Trails Open Space-Phase One, Grading Plan, L-1.3, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.30: The Trails Open Space-Phase One, Grading Plan, L-1.4, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.31: The Trails Open Space-Phase One, Layout Plan, L-2.1, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.32: The Trails Open Space-Phase One, Layout Plan, L-2.2, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.33: The Trails Open Space-Phase One, Layout Plan, L-2.3, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.34: The Trails Open Space-Phase One, Layout Plan, L-2.4, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.35: The Trails Open Space-Phase One, Site Details, L-2.6, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.36: The Trails Open Space-Phase One, Landscape Plan, L-3.1, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.37: The Trails Open Space-Phase One, Landscape Plan, L-3.2, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.38: The Trails Open Space-Phase One, Landscape Plan, L-3.3, 1'=20"
Print on Vellum
|
1994 May 2 | |
39 | 4.73.39: The Trails Open Space-Phase One, Landscape Plan, L-3.4, 1'=20"
Print on Vellum
|
1995 May 2 | |
39 | 4.73.40: The Trails Open Space-Phase One, L-3.5, 1'=20"
Print on Vellum
|
1996 May 2 | |
39 | 4.73.41: The Trails Streetscape-Phase One, 2.1 Landscape and Sidewalk Layout
Print on Vellum
|
1994 April 25 | |
39 | 4.73.42: The Trails Streetscape-Phase One Title
Print on Vellum
|
1994 May 2 | |
39 | 4.73.43: The Trails at Summerlin Colored Street Plan
Marker on Bond
|
undated | |
39 | 4.73.44: The Trails Streetscape Parcel H-2/C-3 Title
Print on Vellum
|
undated | |
39 | 4.73.45: The Trails Streetscape Parcel H-2/C-3, L-2.1, Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.46: The Trails Streetscape Parcel H-2/C-3, L-2.2, Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.47: The Trails Streetscape Parcel H-2/C-3, L-2.3, Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.48: The Trails Streetscape Parcel H-2/C-3, L-2.3, Landscape and Sidewalk Layout
Print on Vellum
|
undated | |
39 | 4.73.49: The Trails Streetscape Parcel H-2/C-3, L-2.1, Landscape and Sidewalk Layout without Plantings
Print on Vellum
|
undated | |
39 | 4.73.50: The Trails Streetscape Parcel H-2/C-3, L-2.2, Landscape and Sidewalk Layout without Plantings
Print on Vellum
|
undated | |
39 | 7.73.51: The Trails Streetscape Parcel H-2/C-3, L-2.4, Landscape and Sidewalk Details
Print on Vellum
|
undated | |
39 | 4.73.52: The Trails Streetscape Parcel H-2/C-3, L-2.5, Typical Grading Sections
Print on Vellum
|
undated | |
39 | 4.73.53: The Trails Streetscape Parcel H-2/C-3, L-3.1, Irrigation Plan
Print on Vellum
|
undated | |
39 | 4.73.54: The Trails Streetscape Parcel H-2/C-3, L-3.2, Irrigation Plan
Print on Vellum
|
undated | |
39 | 4.73.55: The Trails Streetscape Parcel H-2/C-3, L-3.3, Irrigation Plan
Print on Vellum
|
undated | |
39 | 4.73.56: The Trails Streetscape Parcel H-2/C-3, L-3.4, Irrigation Details
Print on Vellum
|
undated | |
39 | 4.73.57: The Trails as Summerlin Spring Gate Lane
Marker and Photos on Bond
|
1933 March 29 | |
39 | 4.73.58: The Trails as Summerlin Spring Lake Mead Boulevard
Marker and Photos on Bond
|
1993 March 29 | |
Summerlin Village 2
|
|||
tube | |||
40 | 4.74.1 A: Site Summary Map Village 2
Print on Bond
|
1989 January 9 | |
40 | 4.74.1 B: Site Summary Map Village 2
Print on Bond
|
1989 January 9 | |
40 | 4.74.2: Summerlin Village Two Open Space Concept
Marker on Trace
|
1988 November 29 | |
40 | 4.74.3: Site Drainage
Marker on Trace
|
undated | |
40 | 4.74.4: Typographical Map
Print on Bond
|
undated | |
40 | 4.74.5: Typographical Map
Print on Vellum
|
undated | |
40 | 4.74.6: Typographical Map (Large Scale)
Print on Vellum
|
undated | |
40 | 4.74.7: Parcel Concept Map
Marker on Trace
|
undated | |
40 | 4.74.8: Parcel Concept Map
Marker on Trace
|
1989 January 12 | |
40 | 4.74.9: Concept Drawing
Marker on Trace
|
undated | |
40 | 4.74.10: Parcel Concept Map
Marker on Trace
|
undated | |
40 | 4.74.11: Summerlin Village Two Use and Circulation Concept Plan
Marker on Trace
|
1988 November 29 | |
40 | 4.74.12: Parcel Concept Map
Marker on Trace
|
undated | |
40 | 4.74.13: Acreage Count Parcel Concept Map
Marker on Trace
|
undated | |
40 | 4.74.14: Alternate A: "The Tied Together Neighborhood"
Marker on Trace
|
1988 November 16 | |
40 | 4.74.15: Alternate B: "Separate Neighborhood"
Marker on Trace
|
1988 November 16 | |
40 | 4.74.16: Drainage #1 Section A-A Summerlin Village 2
Marker on Trace
|
undated | |
40 | 4.74.17: Drainage #1 Section C-C Summerlin Village 2
Marker on Trace
|
undated | |
40 | 4.74.18: Site Summary Map Village 2 Typographical Map and Slopes
Print on Vellum
|
1989 January 9 | |
40 | 4.74.19: Schematic Parcel Plan Village 2 Village Center
Print on Bond
|
1990 May 2 | |
40 | 4.74.20: Village 2 Illustrative Plan Summerlin
Print on Bond
|
1990 December | |
40 | 4.74.21: Line Schematic Drawing
Print on Bond
|
undated | |
40 | 4.74.22: The Pueblo Walkway/Trail System
Print on Bond
|
undated | |
Summerlin Community Entry Design Drawings
|
|||
tube | |||
41 | 4.75.1: Entry Sketch
Marker on Trace
|
undated | |
41 | 4.75.2: Community Entry Detailed Layout
Pencil on Trace
|
1992 March 16 | |
41 | 4.75.3: Summerlin Community Entry
Print on Bond
|
1991 June 11 | |
41 | 4.75.4: Community Entry, L-3.2
Print on Vellum
|
1991 October 18 | |
41 | 4.75.5: Community Entry, L-3.3
Print on Vellum
|
1991 October 18 | |
41 | 4.75.6: Cross Section Summerlin Community Entry
Marker on Trace
|
undated | |
41 | 4.75.7: North Entry Planting Plan
Print on Vellum
|
undated | |
41 | 4.75.8: North Entry Layout and Grading
Print on Vellum
|
undated | |
41 | 4.75.9: Community Entry Planting and Site Details, L-3.1
Print on Vellum
|
1991 October 18 | |
41 | 4.75.10: Community Entry South Entry Planting Plan, L-2.1
Print on Vellum
|
1991 October 18 | |
41 | 4.75.11: Community Entry South Entry Layout and Grading, L-1.1
Print on Vellum
|
1991 October 18 | |
41 | 4.75.12: Community Entry South Irrigation Plan, I-1
Print on Vellum
|
1991 October 18 | |
41 | 4.75.13: Community Entry North Irrigation Plan, I-2
Print on Vellum
|
1991 October 18 | |
41 | 4.75.14: Community Entry Irrigation Details, I-3
Print on Vellum
|
1991 October 18 | |
41 | 4.75.15: Community Entry South Irrigation Schedule, I-4
Print on Vellum
|
1991 October 18 | |
41 | 4.75.16: Summerlin Community Entry South Lighting Plan, E-1
Print on Vellum
|
1991 October 18 | |
41 | 4.75.17: Summerlin Community Entry Electric Schedules and Details, E-3
Print on Vellum
|
1991 October 18 | |
41 | 4.75.18: Summerlin Community Entry Electrical Details, E-4
Print on Vellum
|
1991 October 18 | |
41 | 4.75.19: Irrigation Details, I-3
Print on Vellum
|
undated | |
41 | 4.75.20: Irrigation Schedule, I-4
Print on Vellum
|
undated | |
41 | 4.75.21: Plan View Sketch Entry
Marker on Trace
|
undated | |
41 | 4.75.22: Summerlin Parkway/Rampart Blvd Entry Statement- Phase 2, L-3
Blueprint on Bond
|
1990 January 23 | |
41 | 4.75.23: Summerlin Community Entry Lake Mead and Buffalo Option B
Print on Bond
|
undated | |
41 | 4.75.24: Summerlin Community Entry Lake Mead and Buffalo Option A
Print on Bond
|
undated | |
41 | 4.75.25: Summerlin Community Entry Electrical Schedules and Details, E-1
Print on Vellum
|
1991 August 7 | |
41 | 4.75.26: Summerlin Community Entry North Lighting Plan, E-2
Print on Vellum
|
1991 August 7 | |
41 | 4.75.27: Summerlin Community Entry South Lighting Plan, E-3
Print on Vellum
|
1991 August 7 | |
41 | 4.75.28: Summerlin Community Entry Electrical Details, E-4
Print on Vellum
|
1991 August 7 | |
41 | 4.75.29: Entry Perspective Drawing
Marker on Trace
|
undated | |
41 | 4.75.30: Entry Sign Details, L-3.2
Print on Mylar
|
undated | |
41 | 4.75.31: Summerlin Community Entry Pyramid and Wall Detail, L-3.1
Print on Mylar
|
undated | |
41 | 4.75.32: The Pueblo at Summerlin Irrigation Schedule
Print on Mylar
|
undated | |
41 | 4.75.33: Community Entry Lake Mead and Buffalo Drive
Print on Mylar
|
undated | |
41 | 4.75.34: Community Entry Lake Mead and Buffalo Drive Irrigation
Print on Mylar
|
undated | |
41 | 4.75.35 A: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 7.75.35 B: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 C: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 D: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 E: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 F: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 G: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.35 H: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
|
1990 March 2 | |
41 | 4.75.36: Summerlin Community Entry General Details, L-3.2
Print on Mylar
|
undated | |
41 | 4.75.37: Oasis Landscape Entry The Pueblo at Summerlin
Print on Vellum
|
undated | |
41 | 4.75.38: Desert Landscape Entry The Pueblo at Summerlin
Print on Vellum
|
undated | |
41 | 4.75.39: Entry Section Elevation
Marker on Trace
|
undated | |
41 | 4.75.40: Entry Statement Elevation Option B
Print on Vellum
|
undated | |
41 | 4.75.41: Entry Statement Elevation Option A
Print on Vellum
|
undated | |
41 | 4.75.42: Construction Detail of Intersection
Print on Vellum
|
undated | |
Summerlin Village 1 North Parcel Criteria
|
|||
tube | |||
42 | 4.76.1: The Hills at Summerlin Parcel NFA Design and Engineering Criteria
Print on Photo paper
|
undated | |
42 | 4.76.2: Summerlin Density and Rating
Print on Mylar
|
1989 March 14 | |
42 | 4.76.3: The Hills at Summerlin Parcel Program Summary
Print on Mylar
|
undated | |
42 | 4.76.4: The Hills at Summerlin Village Design Concept
Print on Mylar
|
1989 September 1 | |
42 | 4.76.5: The Hills at Summerlin Parcel A Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.6: The Hills at Summerlin Parcel B Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.7: The Hills at Summerlin Parcel C Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.8: The Hills at Summerlin Parcel D Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.9: The Hills at Summerlin Parcel DD Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.10: The Hills at Summerlin Parcel E Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.11: The Hills at Summerlin Parcel F Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.12: The Hills at Summerlin Parcel G Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.13: The Hills at Summerlin Parcel H Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.14: The Hills at Summerlin Parcel I Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.15: The Hills at Summerlin Parcel J Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.16: The Hills at Summerlin Parcel K Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.17: The Hills at Summerlin Parcel KK Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.18: The Hills at Summerlin Neighborhood Focus (NFC) Parcel Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.19: The Hills at Summerlin- The Hills Park and School Complex- 1st Phase Improvement
Print on Mylar
|
1989 September 1 | |
42 | 4.76.20: The Hills at Summerlin- The Hills Park and School Complex- Planning Criteria
Print on Mylar
|
1989 September 1 | |
42 | 4.76.21: The Hills at Summerlin- Parcel Entry and Model Home Complex
Print on Mylar
|
undated | |
42 | 4.76.22: Summerlin Village One Pods Preliminary Design Package
Print on Various
|
undated | |
42 | 4.76.23: The Hills at Summerlin Parcel A-KK
Print on Mylar
|
1989 September 1 | |
42 | 4.76.24: The Hills at Summerlin- Parcel K, Alternate A and B
Marker on Trace
|
1989 October 27 | |
42 | 4.76.25: The Hills at Summerlin- Parcel I, Alternate A and B
Marker on Trace
|
1989 October 27 | |
Summerlin Streetscapes The Trails Streetscape Super Ceded Drawings
|
|||
tube | |||
43 | 4.77.1: The Trails Streetscape Title
Print on Bond
|
undated | |
43 | 4.77.2: The Trails Streetscape Landscape and Sidewalk Layout, L-2.1
Print on Bond
|
1955 November 29 | |
43 | 4.77.3: The Trails Streetscape Landscape and Sidewalk Layout, L-2.2
Print on Bond
|
1955 November 29 | |
43 | 4.77.4: The Trails Streetscape Landscape and Sidewalk Layout, L-2.3
Print on Bond
|
1955 November 29 | |
43 | 4.77.5: The Trails Streetscape Landscape and Sidewalk Layout, L-2.4
Print on Bond
|
1955 November 29 | |
43 | 4.77.6: The Trails Streetscape Landscape and Sidewalk Layout, L-2.5
Print on Bond
|
1955 November 29 | |
43 | 4.77.7: The Trails Streetscape Landscape and Sidewalk Layout, L-2.6
Print on Bond
|
1955 November 29 | |
43 | 4.77.8: The Trails Streetscape, L-2.7
Print on Mylar
|
1995 October 23 | |
43 | 4.77.9: The Trails Streetscape, L-2.8
Print on Mylar
|
1995 October 23 | |
43 | 4.77.10: The Trails Streetscape Irrigation Plan, I-3.1
Print on Vellum
|
1995 October 23 | |
43 | 4.77.11: The Trails Streetscape Irrigation Plan, I-3.2
Print on Vellum
|
1995 October 23 | |
43 | 4.77.12: The Trails Streetscape Irrigation Plan, I-3.3
Print on Vellum
|
1995 October 23 | |
43 | 4.77.13: The Trails Streetscape Irrigation Plan, I-3.4
Print on Vellum
|
1995 October 23 | |
43 | 4.77.14: The Trails Streetscape Irrigation Plan, I-3.5
Print on Vellum
|
1995 October 23 | |
43 | 4.77.15: The Trails Streetscape Irrigation Plan, I-3.6
Print on Vellum
|
1995 October 23 | |
43 | 4.77.16: The Trails Streetscape Irrigation Plan, I-3.7
Print on Vellum
|
1995 October 23 | |
43 | 4.77.17: The Trails Streetscape Irrigation Plan, I-3.8
Print on Vellum
|
1995 October 23 | |
Summerlin Village 2 Park
|
|||
tube | |||
43 | 4.78.1: Overlook of Summerlin
Print on Mylar
|
undated | |
The Trails Illustrative Plan
|
|||
tube | |||
43 | 4.79.1: The Trails Park Illustrative Site Plan
Colored Pencil on Mylar
|
undated | |
43 | 4.79.2: The Trails Open Space Phase I Illustrative Site Plan
Colored Pencil on Mylar
|
undated | |
43 | 4.79.3: The Trails Open Space Phase II and III Illustrative Site Plan
Colored Pencil on Mylar
|
undated | |
The Trails Phase 2
|
|||
tube | |||
44 | 4.80.1: Proposed Future Design Grade
Print and Pencil on Bond
|
undated | |
44 | 4.80.2: The Trails Streetscape Phase 2 Overlay 2.1 (3 pgs)
Print on Variety
|
1995 June 8 | |
44 | 4.80.3: The Trails Streetscape Phase 2 Overlays 2.2 (3 pgs)
Print on Mylar
|
1995 February-June | |
44 | 4.80.4: The Trails Streetscape Phase 2 Overlay 2.3 (3 pgs)
Print on Variety
|
1995 June 8 | |
44 | 4.80.5: Phase 2 Overlay 2.4
Print on Mylar
|
1995 June 7 | |
44 | 4.80.6: The Trails Streetscape Phase 2 Overlay 2.4 ( 4 pgs)
Print on Mylar
|
1995 February-June | |
44 | 4.80.7: The Trails Streetscape Phase 2 Overlay 2.5 (3 pgs)
Print on Mylar
|
1995 June 8 | |
44 | 4.80.8: Phase 2 Overlay 2.5
Print on Mylar
|
1995 June 7 | |
44 | 4.80.9: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.1
Print on Vellum
|
1995 September 1 | |
44 | 4.80.10: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.2
Print on Vellum
|
1995 September 1 | |
44 | 4.80.11: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.3
Print on Vellum
|
1995 September 1 | |
44 | 4.80.12: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.4
Print on Vellum
|
1995 September 1 | |
44 | 4.80.13: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.5
Print on Vellum
|
1995 September 1 | |
44 | 4.80.14: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.6
Print on Vellum
|
1995 September 1 | |
44 | 4.80.15: The Trails Streetscape Parcel D-1/E-1/J-1/A-1
Print on Bond
|
undated | |
44 | 4.80.16: Parcel E-1/D-1/A-1/J-1 Landscape and Sidewalk Layout
Print on Mylar
|
undated | |
44 | 4.80.17: Parcel E-1/D-1/A-1/J-1 Landscape and Sidewalk Layout
Print on Mylar
|
1995 September 1 | |
44 | 4.80.18: Parcel E-1/D-1/A-1/J-1
Print on Mylar
|
undated | |
44 | 4.80.19: Parcel E-1/D-1/A-1/J-1
Print on Mylar
|
1995 September 1 | |
44 | 4.80.20: Parcel E-1/ D-1/A-1/J-1 Landscape and Sidewalk Layout L-2.5
Print on Mylar
|
1995 September 1 | |
44 | 4.80.21: The Trails Streetscape Parcel E-1/J-1 Planting and Sidewalk Details L-2.5
Print on Mylar
|
undated | |
44 | 4.80.22: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Typical Grading
Print on Mylar
|
1995 September 1 | |
44 | 4.80.23: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 Cover Page
Print on Mylar
|
undated | |
44 | 4.80.24: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2 Landscape and Sidewalk Layout L-2.1
Sepia Print on Vellum
|
1995 June 8 | |
44 | 4.80.25: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2 Landscape and Sidewalk Layout L-2.2
Sepia Print on Vellum
|
1995 June 8 | |
44 | 4.80.26: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.3
Sepia Print on Vellum
|
1995 June 8 | |
44 | 4.80.27: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 L-2.4
Print on Mylar
|
undated | |
44 | 4.80.28: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.4
Sepia Print on Vellum & Colored Pencil
|
1995 June 8 | |
44 | 4.80.29: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.5
Sepia Print on Vellum & Colored Pencil
|
1995 June 8 | |
44 | 4.80.30: The Trails Streetscape Parcel I-1/H-1/A-2 Planting and Sidewalk Details L-2.6
Sepia Print on Vellum & Colored Pencil
|
1995 June 8 | |
44 | 4.80.31: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 L-2.7
Print on Mylar
|
1995 February 16 | |
44 | 4.80.32: The Trails Streetscape Parcels I-1/ H-1/A-2 L-2.7
Print on Mylar
|
1995 February 16 | |
44 | 4.80.33: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2
Sepia Print on Vellum
|
1995 June 8 | |
44 | 4.80.34: The Trails Streetscape Parcel I-1/H-1/A-2 Typical Grading Section L-2.7
Sepia Print on Vellum & Colored Pencil
|
1995 June 8 | |
44 | 4.80.35: The Trails Streetscape Parcel I-1/H-1/A-2 Irrigation I-3.1
Print on Bond
|
1995 June 8 | |
44 | 4.80.36: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.2
Print on Bond
|
1995 February 15 | |
44 | 4.80.37: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.3
Print on Bond
|
1995 February 15 | |
44 | 4.80.38: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.4
Print on Bond
|
1995 February 15 | |
44 | 4.80.39: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.5
Print on Bond
|
1995 February 15 | |
44 | 4.80.40: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation Details Notes & Schedules I-3.6
Print on Bond
|
1995 February 15 | |
44 | 4.80.41: The Trails Streetscape Parcel G-1/H-1/B-1
Print on Mylar
|
undated | |
44 | 4.80.42: The Trails Streetscape Parcel I-1/D-2/D-1
Print on Mylar
|
undated | |
44 | 4.80.43: The Trails Streetscape Parcel H-1/X/I-1/W
Print on Mylar
|
undated | |
44 | 4.80.44: The Trails Streetscape Spring Gate Lane
Print on Mylar
|
undated | |
44 | 4.80.45: The Trails Streetscape Parcel E-1/J-1 2.13a
Print on Mylar
|
undated | |
44 | 4.80.46: Planting Plan Landscape and Sidewalk Layout
Print on Mylar
|
undated | |
44 | 4.80.47: Planting Plan Landscape and Sidewalk Layout
Print on Mylar
|
undated | |
44 | 4.80.48: Planting Plan
Print on Mylar
|
undated | |
44 | 4.80.49: Landscape and Sidewalk Layout and Planting Plan
Print on Mylar
|
undated | |
The Trails Open Space
|
|||
tube | |||
45 | 4.81.1: The Trails Open Space Phase II and III Illustrative Site Plan
Print on Mylar
|
undated | |
45 | 4.81.2: The Trails at Summerlin Park and Open Space Plan
Marker on Trace
|
undated | |
45 | 4.81.3: The Trails Open Space at Summerlin Illustrative Site Plan
Colored Print on Bond
|
undated | |
45 | 4.81.4: The Trails Open Space Phase I Illustrative Site Plan
Print on Mylar
|
undated | |
The Hills Park
|
|||
tube | |||
46 | 4.82.1: The Hills Park Contract Document Issued for Construction Cover Page
Print on Mylar
|
1991 February 4 | |
46 | 4.82.2: The Hills Park Site Utilities Overall Plan C-1
Print on Bond
|
1990 October 1 | |
46 | 4.82.3: The Hills Park Site Utilities Core Area C-2
Print on Bond
|
1990 October 1 | |
46 | 4.82.4: The Hills Park Storm Sewer Plan and Profile C-3
Print on Bond
|
1990 October 1 | |
46 | 4.82.5: The Hills Park Site Grading Plan L-2.1
Print on Mylar
|
1990 October 1 | |
46 | 4.82.6: The Hills Park Core Area Grading Plan L-2.2
Print on Mylar
|
1990 October 1 | |
46 | 4.82.7: The Hills Park Site Layout Plan L-3.1
Print on Mylar
|
1990 October 1 | |
46 | 4.82.8: The Hills Park Core Area Layout Plan L-3.2
Print on Mylar
|
1990 October 1 | |
46 | 4.82.9: The Hills Park Core Area Layout Plan L-3.2
Print & Marker on Bond
|
1990 October 1 | |
46 | 4.82.10: The Hills Park Plaza/Entry Court Layouts L-3.3
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.11: The Hills Park Playground Layout and Details L-3.6
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.12: The Hills Park General Site Details L-4.3
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.13: The Hills Park Details-Sports Courts L-4.2
Print on Mylar
|
1990 October 1 | |
46 | 4.82.14: The Hills Park General Site Details L-4.1
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.15: The Hills Park Site Planting Plan L-5.1
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.16: The Hills Park Core Area Planting Layout Plan L-5.2
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.17: The Hills Park Plaza/Entry Courts Planting L-5.3
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.18: The Hills Park Planting Details L-5.5
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.19: The Hills Park Site Irrigation Plan I-1
Print on Bond
|
1990 October 1 | |
46 | 4.82.20: The Hills Park Core Area Irrigation plan I-2
Print on Bond
|
1990 October 1 | |
46 | 4.82.21: Plaza/Entry Courts Irrigation Plan I-3
Print on Bond
|
1990 October 1 | |
46 | 4.82.22: The Hills Park Site Irrigation Plan I-1
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.23: The Hills Park Core Area Irrigation Plan I-2
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.24: Plaza/Entry Courts Irrigation Plans I-3
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.25: The Hills Park Irrigation details I-4
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.26: The Hills Park Irrigation Details I-5
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.27: The Hills Park Fountain Mechanical Details F-1
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.28: The Hills Park Pavilion Floor Plan Elevation A1
Sepia on Mylar
|
1990 October 1 | |
46 | 4.82.29: The Hills Park Pavilion Sections A2
Print on Mylar and Colored Pencil
|
1990 October 1 | |
46 | 4.82.30: The Hills Park Pavilion Framing Plans and Details A3
Print on Mylar and Colored Pencil
|
1990 October 1 | |
46 | 4.82.31: The Hills Park Ramada Layout and Details A4
Print on Mylar
|
1990 October 1 | |
46 | 4.82.32: The Hills Park Ramada Elevations Details A5
Print on Mylar
|
1990 October 1 | |
46 | 4.82.33: The Hills Park Public Toilets Plans Elevation Details A7
Print on Mylar
|
1990 October 1 | |
46 | 4.82.34: The Hills Park Sections and Details A10
Print on Mylar
|
1990 October 1 | |
46 | 4.82.35: The Hills Park A11
Print on Mylar
|
1990 October 1 | |
46 | 4.82.36: The Hills Park Pavilion Foundation Plan S-1
Print on Bond
|
1990 October 1 | |
46 | 4.82.37: The Hills Park Pavilion Roof Framing Plan S-2
Print on Bond
|
1990 October 1 | |
46 | 4.82.38: The Hills Park Ramada and Public Toilets Foundations and Roof Framing Plans S-3
Print on Bond
|
1990 October 1 | |
46 | 4.82.39: The Hills Park Typical Structural Details S-7
Print on Bond
|
1990 October 1 | |
46 | 4.82.40: The Hills Park Site Electrical Plan E1-E3
Blueprint
|
1990 October 1 | |
46 | 4.82.41: The Hills Park Electrical Details E-4
Print on Bond
|
1990 October 1 | |
46 | 4.82.42: The Hills Park Core Area Electrical Plan E-2
Print & Marker on Bond
|
1990 October 1 | |
46 | 4.82.43: The Hills Park Public Toilets Plumbing Floor Plan P-1
Print on Bond
|
1990 October 1 | |
Summerlin
|
|||
tube | |||
47 | 4.83.1: The Trails Streetscape Phase I Entry Features & Design (9 pgs)
Blueprint
|
1994 March 21 | |
47 | 4.83.2: The Trails Builder Entries - Lewis Homes (Willow Bend) (8 pgs)
Blueprint
|
1994 November 29 | |
47 | 4.83.3: The Trails Builder Entries Pulte Homes (9 pgs)
Blueprint
|
1995 April 24 | |
47 | 4.83.4: The Trails Streetscape landscape, Irrigation & Electrical (18 pgs)
Blueprint
|
1995 August 4 | |
47 | 4.83.5: The Trails Streetscape Landscape & Irrigation (7 pgs)
Blueprint
|
1996 August 1 | |
47 | 4.83.6: The Trails Builder Walls Durable Homes (7 pgs)
Blueprint
|
1995 January 13 | |
47 | 4.83.7: The Trails Builder Walls Indian Hills (4 pgs)
Blueprint
|
1996 January 27 | |
Summerlin Trails Pools and Bathhouse
|
|||
tube | |||
48 | 4.84.1: The Trails Park at Summerlin Pool and Bathhouse Cover Sheet
Print on Mylar
|
1991 February 14 | |
48 | 4.84.2: The Trails Park at Summerlin Pool and Bathhouse General Notes, Drawing Index C-1
Print on Mylar
|
1991 February 14 | |
48 | 4.84.3: The Trails Park at Summerlin Pool and Bathhouse Horizontal Control Plan C-2
Print on Mylar
|
1991 February 14 | |
48 | 4.84.4: The Trails Park at Summerlin Pool and Bathhouse Site Utility Plan Notes and Quantity C-3
Print on Mylar
|
1991 February 14 | |
48 | 4.84.5: The Trails Park at Summerlin Pool and Bathhouse Site Utility Plan C-4
Print on Mylar
|
1991 February 14 | |
48 | 4.84.6: The Trails Park at Summerlin Pool and Bathhouse Grading Plan C-5
Print on Mylar
|
1991 February 14 | |
48 | 4.84.7: The Trails Park at Summerlin Pool and Bathhouse Misc. Sections and Details C-6
Print on Mylar
|
1991 February 14 | |
48 | 4.84.8: The Trails Park at Summerlin Pool and Bathhouse Planting Plan L-1
Print on Vellum
|
1991 February 14 | |
48 | 4.84.9: The Trails Park at Summerlin Pool and Bathhouse Planting Plan L-2
Print on Mylar
|
1991 February 14 | |
48 | 4.84.10: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Mylar
|
1991 February 14 | |
48 | 4.84.11: The Trails Park at Summerlin Pool and Bathhouse Irrigation Plan L-4
Print on Mylar
|
1991 February 14 | |
48 | 4.84.12: The Trails Park at Summerlin Pool and Bathhouse Irrigation Details L-5
Print on Mylar
|
1991 February 14 | |
48 | 4.84.13: The Trails Park at Summerlin Pool and Bathhouse General Structural Notes S101
Print on Mylar
|
1991 February 14 | |
48 | 4.84.14: The Trails Park at Summerlin Pool and Bathhouse Foundation Plan and Details S201
Print on Mylar
|
1991 February 14 | |
48 | 4.84.15: The Trails Park at Summerlin Pool and Bathhouse High and Low Floor Framing Plan Details S301
Print on Mylar
|
1991 February 14 | |
48 | 4.84.16: The Trails Park at Summerlin Pool and Bathhouse Building Walls Sections and Details S401
Print on Mylar
|
1991 February 14 | |
48 | 4.84.17: The Trails Park at Summerlin Pool and Bathhouse Details S501
Print on Mylar
|
1991 February 14 | |
48 | 4.84.18: The Trails Park at Summerlin Pool and Bathhouse Details S601
Print on Mylar
|
1991 February 14 | |
48 | 4.84.19: The Trails Park at Summerlin Pool and Bathhouse Details S602
Print on Mylar
|
1991 February 14 | |
48 | 4.84.20: The Trails Park at Summerlin Pool and Bathhouse Floor Plan and Schedules A100
Print on Mylar
|
1991 February 14 | |
48 | 4.84.21: The Trails Park at Summerlin Pool and Bathhouse Roof Plan and Details A101
Print on Mylar
|
1991 February 14 | |
48 | 4.84.22: The Trails Park at Summerlin Pool and Bathhouse Exterior Elevation and Building Sections A200
Print on Vellum
|
1991 February 14 | |
48 | 4.84.23: The Trails Park at Summerlin Pool and Bathhouse Wall Section and Details A300
Print on Vellum
|
1991 February 14 | |
48 | 4.84.24: The Trails Park at Summerlin Pool and Bathhouse Interior Elevations and Casework A400
Print on Vellum
|
1991 February 14 | |
48 | 4.84.25: The Trails Park at Summerlin Pool and Bathhouse Details A500
Print on Vellum
|
1991 February 14 | |
48 | 4.84.26: The Trails Park at Summerlin Pool and Bathhouse Plumbing Legend and Schedules P100
Print on Mylar
|
1991 February 14 | |
48 | 4.84.27: The Trails Park at Summerlin Pool and Bathhouse Plumbing Floor Plan and Details P200
Print on Mylar
|
1991 February 14 | |
48 | 4.84.28: The Trails Park at Summerlin Pool and Bathhouse Plumbing Riser Diagram P300
Print on Mylar
|
1991 February 14 | |
48 | 4.84.29: The Trails Park at Summerlin Pool and Bathhouse Electrical Site Plan E100
Print on Mylar
|
1991 February 14 | |
48 | 4.84.30: The Trails Park at Summerlin Pool and Bathhouse Electrical Lighting and Power Plan E200
Print on Mylar
|
1991 February 14 | |
48 | 4.84.31: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Print on Vellum
|
1994 January 31 | |
48 | 4.84.32: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Print on Vellum
|
1994 January 31 | |
48 | 4.84.33: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Vellum
|
1994 January 31 | |
48 | 4.84.34: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Print on Vellum
|
1994 January 31 | |
48 | 4.84.35: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Print on Vellum
|
1994 January 31 | |
48 | 4.84.36: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Print on Vellum
|
1994 January 31 | |
48 | 4.84.37: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Print on Vellum
|
1994 January 31 | |
48 | 4.84.38: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.39: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.40: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.41: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.42: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.43: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.44: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Sepia on Vellum
|
1994 January 31 | |
48 | 4.84.45: The Trails Park at Summerlin Pool and Bathhouse Floor Plan and Schedules A100
Print on Mylar
|
1994 January 31 | |
48 | 4.84.46: The Trails Park at Summerlin Pool and Bathhouse Exterior Elevation and Building Sections A200
Print on Mylar
|
1994 January 31 | |
48 | 4.84.47: The Trails Park at Summerlin Pool and Bathhouse Wall Section and Details A300
Print on Mylar
|
1994 January 31 | |
48 | 4.84.48: The Trails Park at Summerlin Pool and Bathhouse Interior Elevations and Casework A400
Print on Mylar
|
1994 January 31 | |
48 | 4.84.49: The Trails Park at Summerlin Pool and Bathhouse Details A500
Print on Mylar
|
1994 January 31 | |
48 | 4.84.50: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Vellum
|
1994 January 31 | |
48 | 4.84.51: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Print on Mylar
|
1994 January 31 | |
48 | 4.84.52: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Print on Mylar
|
1994 January 31 | |
48 | 4.84.53: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Mylar
|
1994 January 31 | |
48 | 4.84.54: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Print on Mylar
|
1994 January 31 | |
48 | 4.84.55: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Print on Mylar
|
1994 January 31 | |
48 | 4.84.56: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Print on Mylar
|
1994 January 31 | |
48 | 4.84.57: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Print on Mylar
|
1994 January 31 | |
48 | 4.84.58: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Mylar
|
1994 January 31 | |
48 | 4.84.59: The Trails Park at Summerlin Pool and Bathhouse SP-1-SP-7 (7 pgs)
Blueprint
|
1994 January 31 | |
48 | 4.84.60: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Vellum
|
1994 March 7 | |
The Trails Image Concept
|
|||
tube | |||
49 | 4.85.1: The Trails Image Concept (25 pgs)
Blueprint on Bond
|
1992 July 1 | |
49 | 4.85.2: The Trails Streetscape Phase 1 Entry Features and Signs (16 pgs)
Blueprint on Bond
|
1994 March 21 | |
Summerlin Village 1 North Streetscapes Parcels; A, E, H, and K
|
|||
tube | |||
50 | 4.86.1: The Hills at Summerlin Streetscape Village I North Interior Streets CD's- Parcels- A, E, H and K
Print on Variety
|
1992 June 29 | |
The Trails at Summerlin Streetscape Mock-Up
|
|||
tube | |||
51 | 4.87.1: The Trails: Hillpointe Road
Print on Vellum
|
undated | |
51 | 4.87.2: The Trails at Summerlin
Print on Vellum
|
undated | |
51 | 4.87.3: The Trails Four Trails Drive
Sepia on Mylar
|
1993 March 29 | |
51 | 4.87.4: The Trails Spring Gate Lane
Print on Mylar
|
1993 March 29 | |
51 | 4.87.5: The Trails Trails Center Drive
Print On Mylar
|
undated | |
51 | 4.87.6: Summerlin Walkway
Pen on Trace
|
undated | |
51 | 4.87.7: The Trails at Summerlin Streetscape Mock-Up
Print on Vellum
|
undated | |
51 | 4.87.8: Village 7 Units 2 and 3 CL & Street Control as Proposed
Print and Marker on Bond
|
undated | |
51 | 4.87.9 A: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 B: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 C: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 D: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 E: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 F: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.9 G: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
|
1993 April 22 | |
51 | 4.87.10: The Trails at Summerlin- Trails Drive
Blueprint and Pictures
|
1993 March 29 | |
51 | 4.87.11: The Trails Lake Mead Boulevard
Print on Mylar
|
1993 March 29 | |
51 | 4.87.12: The Trails at Summerlin Walls
Pen on Trace
|
undated | |
51 | 4.87.13: The trails Village Wall Along Summerlin Parkway Pilasters at Property Line
Pen on Vellum
|
1994 February 4 | |
51 | 4.87.14: The Trails Village Wall Along Summerlin Parkway Pilasters Intervals
Pen on Vellum
|
1994 February 4 | |
51 | 4.87.15: The Trails at Summerlin- Village Wall Along Summerlin Parkway
Pen on Trace
|
1994 February 4 | |
51 | 4.87.16: The Trails at Summerlin- Village Wall Along Summerlin Parkway
Pen on Bond
|
1994 February 4 | |
51 | 4.87.17: The Trails at Summerlin: Tree Size
Pen on Vellum
|
undated | |
51 | 4.87.18: The Trails at Summerlin: Tree Size
Pencil on Mylar
|
undated | |
51 | 4.87.19: Village Center Landscape Development Master Plan
Blueprint
|
undated | |
51 | 4.87.20: Tree Types Overlay
Marker on Trace
|
undated | |
51 | 4.87.21: The Trails Village Context
Print and Marker on Mylar
|
undated | |
51 | 4.87.22: The Trails Village Context
Print and Colored Pencil on Bond
|
undated | |
51 | 4.87.23 A: Ground Plane and Entry Hierarchy
Marker on Trace
|
undated | |
51 | 4.87.23 B: The Trails Village Context
Marker and Sepia Print on Mylar
|
undated | |
51 | 4.87.24: The Trails Village Context
Print on Bond
|
undated | |
51 | 4.87.25: The Trails at Summerlin- Village Context
Print and Marker on Vellum
|
undated | |
51 | 4.87.26: The Trails at Summerlin- Village Context
Print on Vellum
|
undated | |
51 | 4.87.27: Summerlin Village 7 Primary Village Entry
Blueprint
|
1992 April 29 | |
51 | 4.87.28: Summerlin Village 7 Secondary Village Entry
Blueprint
|
1992 April 29 | |
51 | 4.87.29 A: PRL Precast
Trace and Bond
|
undated | |
51 | 4.87.29 B: PRL Precast
Trace and Bond
|
undated | |
51 | 4.87.29 C: PRL Precast
Trace and Bond
|
undated | |
51 | 4.87.30: The Trails Comparative Exhibit Streetscape-Contextual Comparison
Print on Bond
|
1993 March 3 | |
51 | 4.87.31: The Trails Comparative Exhibit Wall Design- Cost vs. Image
Print, Pen and Pictures on Bond
|
1993 March 3 | |
51 | 4.87.32: The Trails Comparative Exhibit- Cost Summary
Print and Pen on Bond
|
1993 March 3 | |
51 | 4.87.33: The Trails Comparative Exhibit Streetscape-Size Decision Matrix
Print, Pen and Pictures on Bond
|
1993 March 3 | |
51 | 4.87.34: The Trails Design Criteria: Park Alternatives
Print on Vellum
|
1992 July 1 | |
51 | 4.87.35: The Trails Preliminary Site Plan
Marker and Pen on Blueprint
|
1992 July 1 | |
51 | 4.87.36: The Trails Design Criteria: Preliminary Site Plan
Sepia on Mylar
|
1992 July 1 | |
51 | 4.87.37: The Trails at Summerlin Design Criteria: Road Sections
Marker and Pen on Trace
|
1992 July 1 | |
51 | 4.87.38: The Trails at Summerlin Design Criteria: Road Sections
Pen on Vellum
|
1992 July 1 | |
51 | 4.87.39: The Trails Entry Drawing
Pencil on Bond
|
undated | |
51 | 4.87.40: The Trails at Summerlin
Pencil on Trace
|
undated | |
51 | 4.87.41: The Trails at Summerlin
Print on Vellum
|
undated | |
51 | 4.87.42: Trails Study Summerlin
Blueprint
|
undated | |
The Hills Streetscape Hillpointe Road and Village Entries
|
|||
tube | |||
52 | 4.88.1: The Hills Streetscape: Hillpointe Road & Village Entries (46 pgs)
Blueprint
|
1989 November 22 | |
The Hills Park Contact Documents
|
|||
tube | |||
53 | 4.89.1: The Hills Park Contract Documents Issued for Construction (40 pgs)
Blueprint
|
1991 February 4 | |
The Hills at Summerlin Streetscape: Hillpointe Road
|
|||
tube | |||
54 | 4.90.1: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Cover Sheet
Print on Vellum
|
1992 January 15 | |
54 | 4.90.2: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-1
Print on Vellum
|
1992 January 15 | |
54 | 4.90.3: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-2
Print on Vellum
|
1992 January 15 | |
54 | 4.90.4: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-3
Print on Vellum
|
1992 January 15 | |
54 | 4.90.5: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-4
Print on Vellum
|
1992 January 15 | |
54 | 4.90.6: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-5
Print on Vellum
|
1992 January 15 | |
54 | 4.90.7: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-6
Print on Vellum
|
1992 January 15 | |
54 | 4.90.8: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-7
Print on Vellum
|
1992 January 15 | |
54 | 4.90.9: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-8
Print on Vellum
|
1992 January 15 | |
54 | 4.90.10: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Detail C-9
Print on Vellum
|
1992 January 15 | |
54 | 4.90.11: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Detail C-10
Print on Vellum
|
1992 January 15 | |
54 | 4.90.12: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-11
Print on Vellum
|
1992 January 15 | |
54 | 4.90.13: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-12
Print on Vellum
|
1992 January 15 | |
54 | 4.90.14: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-1
Print on Vellum
|
1992 January 15 | |
54 | 4.90.15: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-2
Print on Vellum
|
1992 January 15 | |
54 | 4.90.16: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-3
Print on Vellum
|
1992 January 15 | |
54 | 4.90.17: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-4
Print on Vellum
|
1992 January 15 | |
54 | 4.90.18: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-5
Print on Vellum
|
1992 January 15 | |
54 | 4.90.19: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-6
Print on Vellum
|
1992 January 15 | |
54 | 4.90.20: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-7
Print on Vellum
|
1992 January 15 | |
54 | 4.90.21: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Details L-8
Print on Vellum
|
1992 January 15 | |
54 | 4.90.22: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-1
Print on Mylar
|
1992 January 15 | |
54 | 4.90.23: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-2
Print on Mylar
|
1992 January 15 | |
54 | 4.90.24: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-3
Print on Mylar
|
1992 January 15 | |
54 | 4.90.25: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-4
Print on Mylar
|
1992 January 15 | |
54 | 4.90.26: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-5
Print on Mylar
|
1992 January 15 | |
54 | 4.90.27: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-6
Print on Mylar
|
1992 January 15 | |
54 | 4.90.28: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-7
Print on Mylar
|
1992 January 15 | |
54 | 4.90.29: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Schedules and Details E-1
Sepia on Mylar
|
1992 January 15 | |
54 | 4.90.30: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Lighting Plan E-2
Sepia on Mylar
|
1992 January 15 | |
54 | 4.90.31: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Sign Lighting Plan E-3
Sepia on Mylar
|
1992 January 15 | |
54 | 4.90.32: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Lighting Plan E-4
Sepia on Mylar
|
1992 January 15 | |
The Hills at Summerlin Hillshire Drive
|
|||
tube | |||
54 | 4.91.1: The Hills at Summerlin Hillshire Drive Streetscape
Print on Vellum
|
1992 July 16 | |
54 | 4.91.2: The Hills at Summerlin Hillshire Drive Streetscape Layout Plan C-1
Print on Vellum
|
1992 July 16 | |
54 | 4.91.3: The Hills at Summerlin Hillshire Drive Streetscape Layout Plan C-2
Print on Vellum
|
1992 July 16 | |
54 | 4.91.4: The Hills at Summerlin Hillshire Drive Streetscape Construction Details C-3
Print on Vellum
|
1992 July 16 | |
54 | 4.91.5: The Hills at Summerlin Hillshire Drive Streetscape Construction Details C-4
Print on Vellum
|
1992 July 16 | |
54 | 4.91.6: The Hills at Summerlin Hillshire Drive Streetscape Planting Plan L-1
Print on Vellum
|
1992 July 16 | |
54 | 4.91.7: The Hills at Summerlin Hillshire Drive Streetscape Planting Plan L-2
Print on Vellum
|
1992 July 16 | |
54 | 4.91.8: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-1
Sepia on Vellum
|
1992 July 16 | |
54 | 4.91.9: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-2
Sepia on Vellum
|
1992 July 16 | |
54 | 4.91.10: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-3
Sepia on Vellum
|
1992 July 16 | |
Summerlin The Trails Pools and Bathhouse
|
|||
tube | |||
55 | 4.92.1: The Trails Park Pool and Bathhouse
Print on Vellum
|
1994 March | |
55 | 4.92.2: The Trails Park Pool and Bathhouse General Notes Drawing Index Quantities C-1
Print on Vellum
|
1994 March | |
55 | 4.92.3: The Trails Park Pool and Bathhouse Horizontal Control Plan C-2
Print on Vellum
|
1994 March | |
55 | 4.92.4: The Trails Park Pool and Bathhouse Site Utility Plan Notes and Quantities C-3
Print on Vellum
|
1994 March | |
55 | 4.92.5: The Trails Park Pool and Bathhouse Site Utility Plan C-4
Print on Vellum
|
1994 March | |
55 | 4.92.6: The Trails Park Pool and Bathhouse Grading Plan C-5
Print on Vellum
|
1994 March | |
55 | 4.92.7: The Trails Park Pool and Bathhouse Misc. Sections and Details C-6
Print on Vellum
|
1994 March | |
55 | 4.92.8: The Trails Park Pool and Bathhouse Park Site Plan L-1
Print on Vellum
|
1994 March | |
55 | 4.92.9: The Trails Park Pool and Bathhouse Planting Plan L-2
Print on Vellum
|
1994 March | |
55 | 4.92.10: The Trails Park Pool and Bathhouse Planting Plan L-3
Print on Vellum
|
1994 March | |
55 | 4.92.11: The Trails Park Pool and Bathhouse Planting Plan L-4
Print on Vellum
|
1994 March | |
55 | 4.92.12: The Trails Park Pool and Bathhouse Enlarged Layout Plan L-5
Print on Vellum
|
1994 March | |
55 | 4.92.13: The Trails Park Pool and Bathhouse Enlarged Layout Plan L-6
Print on Vellum
|
1994 March | |
55 | 4.92.14: The Trails Park Pool and Bathhouse Landscape Details L-7
Print on Vellum
|
1994 March | |
55 | 4.92.15: The Trails Park Pool and Bathhouse Irrigation Plan L-9
Print on Vellum
|
1994 March | |
55 | 4.92.16: The Trails Park Pool and Bathhouse Details L-13
Print on Vellum
|
1994 March | |
55 | 4.92.17: The Trails Park Pool and Bathhouse Details L-14
Print on Vellum
|
1994 March | |
55 | 4.92.18: The Trails Park Pool and Bathhouse Details, Notes and Schedule L-15
Print on Vellum
|
1994 March | |
55 | 4.92.19: The Trails Park Pool and Bathhouse General Structural Notes S101
Print on Vellum
|
1994 March | |
55 | 4.92.20: The Trails Park Pool and Bathhouse Foundation Plan S201
Print on Vellum
|
1994 March | |
55 | 4.92.21: The Trails Park Pool and Bathhouse Foundation Plan and Details S202
Print on Vellum
|
1994 March | |
55 | 4.92.22: The Trails Park Pool and Bathhouse Roof Forming Plan community Center S301
Print on Vellum
|
1994 March | |
55 | 4.92.23: The Trails Park Pool and Bathhouse Roof Framing Plan and Details S302
Print on Vellum
|
1994 March | |
55 | 4.92.24: The Trails Park Pool and Bathhouse Building, Wall Sections and Details S401
Print on Vellum
|
1994 March | |
55 | 4.92.25: The Trails Park Pool and Bathhouse Wall Sections S402
Print on Vellum
|
1994 March | |
55 | 4.92.26: The Trails Park Pool and Bathhouse Details S501
Print on Vellum
|
1994 March | |
55 | 4.92.27: The Trails Park Pool and Bathhouse Details S502
Print on Vellum
|
1994 March | |
55 | 4.92.28: The Trails Park Pool and Bathhouse Details S601
Print on Vellum
|
1994 March | |
55 | 4.92.29: The Trails Park Pool and Bathhouse Details S602
Print on Vellum
|
1994 March | |
55 | 4.92.30: The Trails Park Pool and Bathhouse Floor Plan A100
Print on Vellum
|
1994 March | |
55 | 4.92.31: The Trails Park Pool and Bathhouse Roof Plan A101
Print on Vellum
|
1994 March | |
55 | 4.92.32: The Trails Park Pool and Bathhouse Exterior Elevations A200
Print on Vellum
|
1994 March | |
55 | 4.92.33: The Trails Park Pool and Bathhouse Building Sections and Details A300
Print on Vellum
|
1994 March | |
55 | 4.92.34: The Trails Park Pool and Bathhouse Wall Sections A301
Print on Vellum
|
1994 March | |
55 | 4.92.35: The Trails Park Pool and Bathhouse Reflected Ceiling plan A400
Print on Vellum
|
1994 March | |
55 | 4.92.36: The Trails Park Pool and Bathhouse Enlarged Plans, Interior, elevations, finished Sched A500
Print on Vellum
|
1994 March | |
55 | 4.92.37: The Trails Park Pool and Bathhouse Door Sched, Door types, Window types A600
Print on Vellum
|
1994 March | |
55 | 4.92.38: The Trails Park Pool and Bathhouse Floor Plans A100C
Print on Vellum
|
1994 March | |
55 | 4.92.39: The Trails Park Pool and Bathhouse Roof Plan A101C
Print on Vellum
|
1994 March | |
55 | 4.92.40: The Trails Park Pool and Bathhouse Ext. Elevations and Building Sections A200C
Print on Vellum
|
1994 March | |
55 | 4.92.41: The Trails Park Pool and Bathhouse Legend, Schedule M100
Print on Vellum
|
1994 March | |
55 | 4.92.42: The Trails Park Pool and Bathhouse Mechanical floor Plan M200
Print on Vellum
|
1994 March | |
55 | 4.92.43: The Trails Park Pool and Bathhouse Legend, Schedules P100
Print on Vellum
|
1994 March | |
55 | 4.92.44: The Trails Park Pool and Bathhouse Plumbing Floor Plan P200
Print on Vellum
|
1994 March | |
55 | 4.92.45: The Trails Park Pool and Bathhouse Mechanical Plan P100C
Print on Vellum
|
1994 March | |
55 | 4.92.46: The Trails Park Pool and Bathhouse Electrical Site Plan E100
Print on Vellum
|
1994 March | |
55 | 4.92.47: The Trails Park Pool and Bathhouse Electrical Lighting and Power Plan E200
Print on Vellum
|
1994 March | |
55 | 4.92.48: The Trails Park Pool and Bathhouse Electrical Lighting and Power Plan E300
Print on Vellum
|
1994 March | |
55 | 4.92.49: The Trails Park Pool and Bathhouse Electrical Panel board Schedules E400
Print on Vellum
|
1994 March | |
55 | 4.92.50: The Trails Park Planting Plan L-7
Sepia on Mylar
|
1994 November 9 | |
55 | 4.92.51: The Trails Park Site Plan L-1
Sepia on Mylar
|
1994 November 9 | |
55 | 4.92.52: The Trails Park Planting Plan L-2
Trace and Blueprint
|
1994 November 9 | |
55 | 4.92.53: The Trails Park Perspective
Pen on Bond
|
1994 November 9 | |
55 | 4.92.54: The Trails Park Sections
Pen on Bond
|
1994 November 9 | |
55 | 4.92.55: The Trails Park Plan View
Blueprint
|
1994 November 9 | |
55 | 4.92.56: The Trails Park Parking Summary
Print on Vellum
|
1994 March 15 | |
55 | 4.92.57: The Trails Ball field Plan Phase I Cover Sheet
Print on Bond
|
1993 August | |
55 | 4.92.58: The Trails Ball field Plan Phase I Ball field Layout
Print on Vellum
|
1993 August | |
55 | 4.92.59: The Trails Ball field Plan Phase I Ball field Grading Plan 1
Blueprint
|
1993 August | |
55 | 4.92.60: The Trails Ball field Plan Phase I Ball field Grading Plan 2
Print on Mylar
|
1993 August | |
Summerlin Trails Builder Walls
|
|||
tube | |||
56 | 4.93.1: The Trails Builder Walls Canyon Oaks (Parcel J-2) 4 pgs
Blueprint
|
1995 November 12 | |
56 | 4.93.2: The Trails Builder Walls Sierra Ridge II (Parcel C-2) 5 pgs
Blueprint
|
1995 December 3 | |
56 | 4.93.3: The Trails Builder wall Indian Hills (Parcel B-3) 65 pgs
Blueprint
|
1996 January 17 | |
56 | 4.93.4: The Trails Builder Walls Cantabria (Parcel A-3) 11 pgs
Blueprint
|
1996 August 1 | |
56 | 4.93.5: The Trails Builder Walls Indian Hills (Parcel B-3 Units 2 and 4) 6 pgs
Blueprint
|
1996 August 1 | |
56 | 4.93.6: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3) 4 pgs
Blueprint
|
1997 February 6 | |
Summerlin Community Center and Golf Course
|
|||
tube | |||
57 | 4.94.1: Summerlin Design
Marker on Trace
|
undated | |
57 | 4.94.2: Summerlin Cross Section
Marker on Trace
|
undated | |
57 | 4.94.3: PGA Players Club
Marker on Trace
|
undated | |
57 | 4.94.4: Summerlin Cross Section
Marker on Trace
|
undated | |
57 | 4.94.5: Community Building Layout
Print on Vellum
|
undated | |
57 | 4.94.6: Summerlin Village Layout
Blueprint
|
undated | |
57 | 4.94.7: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.1
Print on Vellum
|
1995 August 4 | |
57 | 4.94.8: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.2
Print on Vellum
|
1995 August 4 | |
57 | 4.94.9: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.3
Print on Vellum
|
1995 August 4 | |
57 | 4.94.10: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.4
Print on Vellum
|
1995 August 4 | |
57 | 4.94.11: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.5
Print on Vellum
|
1995 August 4 | |
57 | 4.94.12: The Trails Streetscape- Parcel N-2 Irrigation Details I-3.6
Print on Vellum
|
1995 August 4 | |
57 | 4.94.13: The Trails Streetscape- Parcel N-2 Irrigation Notes and Schedules I-3.7
Print on Vellum
|
1995 August 4 | |
57 | 4.94.14: Golf Course Drawing
Pencil on Mylar
|
undated | |
57 | 4.94.15: Golf Course Drawing
Pencil on Mylar
|
undated | |
57 | 4.94.16: Golf Course Drawing
Pencil on Mylar
|
undated | |
Summerlin Illustrative Plan
|
|||
tube | |||
58 | 4.95.1: Large Summerlin Illustrative Plan
Print on Bond
|
undated | |
58 | 4.95.2: Colored Cut Out Illustrative Plan
Print/Marker on Bond
|
undated | |
Community Entry Lake Mead Boulevard and Buffalo Drive
|
|||
tube | |||
58 | 4.96.1: Community Entry Lake Mead Boulevard and Buffalo Drive Northern Entry Planting Plan L-2.2
Print on Vellum
|
1991 October 18 | |
58 | 4.96.2: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Vellum
|
1991 October 18 | |
58 | 4.96.3: Community Entry Lake Mead Boulevard and Buffalo Drive Northern Entry Layout L-1.2
Print on Vellum
|
1991 October 18 | |
58 | 4.96.4: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-1
Print on Vellum
|
1992 March 12 | |
58 | 4.96.5: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-2
Print on Vellum
|
1992 March 12 | |
58 | 4.96.6: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Vellum
|
1991 October 18 | |
58 | 4.96.7: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Vellum
|
1991 October 18 | |
58 | 4.96.8: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Vellum
|
1991 October 18 | |
58 | 4.96.9: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Mylar
|
undated | |
58 | 4.96.10: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Planting Plan 2.1
Print on Vellum
|
undated | |
58 | 4.96.11: Summerlin Drawing
Pen on Trace
|
undated | |
58 | 4.96.12: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Vellum
|
1991 October 18 | |
58 | 4.96.13: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Vellum
|
1991 October 18 | |
58 | 4.96.14: South Entry Layout and Grading L-1.1
Print on Vellum
|
undated | |
58 | 4.96.15: The Pueblo at Summerlin Irrigation Details I-3
Print on Mylar
|
1992 March 12 | |
58 | 4.96.16: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading 1.2
Print on Vellum
|
undated | |
58 | 4.96.17: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading 1.1
Print on Vellum
|
undated | |
58 | 4.96.18: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
|
1991 October 18 | |
58 | 4.96.19: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Mylar
|
1991 October 18 | |
Summerlin Village 1 North Contract Documents
|
|||
tube | |||
59 | 4.97.1: Community Entry Lake Mead Boulevard and Buffalo Drive Cover Page
Print on Mylar
|
1991 October 18 | |
59 | 4.97.2: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.3: Community Entry Lake Mead Boulevard and Buffalo Drive South entry Planting Plan L-2.1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.4: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.5: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Mylar
|
1991 October 18 | |
59 | 4.97.6: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Mylar
|
1991 October 18 | |
59 | 4.97.7: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.8: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Schedules and Details E-1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.9: Community Entry Lake Mead Boulevard and Buffalo Drive South Lighting Plan E-3
Print on Mylar
|
1991 October 18 | |
59 | 4.97.10: Community Entry Lake Mead Boulevard and Buffalo Drive Cover Page
Print on Mylar
|
1991 October 18 | |
59 | 4.97.11: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Mylar
|
1991 October 18 | |
59 | 4.97.12: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Planting Plan L-2.2
Print on Mylar
|
1991 October 18 | |
59 | 4.97.13: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.14: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Vellum
|
1991 October 18 | |
59 | 4.97.15: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Mylar
|
1991 October 18 | |
59 | 4.97.16: Community Entry Lake Mead Boulevard and Buffalo Drive I-2
Print on Mylar
|
1991 October 18 | |
59 | 4.97.17: Community Entry Lake Mead Boulevard and Buffalo Drive I-3
Print on Mylar
|
1991 October 18 | |
59 | 4.97.18: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Schedules and Details E-1
Print on Mylar
|
1991 October 18 | |
59 | 4.97.19: Community Entry Lake Mead Boulevard and Buffalo Drive North Lighting Plan E-2
Print on Mylar
|
1991 October 18 | |
59 | 4.97.20: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Details E-4
Print on Mylar
|
1991 October 18 | |
Summerlin Village 1 South
|
|||
tube | |||
60 | 4.98.1: Village One South Entry Location Plan
Print on Mylar
|
1989 October 12 | |
60 | 4.98.2: The Hills at Summerlin Village Design Concept
Print on Bond
|
1989 October 6 | |
60 | 4.98.3: Village One South Topography Map
Print on Mylar
|
undated | |
60 | 4.98.4: Parcel Change Resulting from Village Center Redesign Overlay
Colored Pencil on Trace
|
1990 July 18 | |
60 | 4.98.5: The Hills Village Design Concept
Print on Mylar
|
1990 October 6 | |
60 | 4.98.6: Village One South- Entry Location Plan
Print on Mylar
|
1989 October 12 | |
60 | 4.98.7: Village One South
Print on Mylar
|
undated | |
The Trails Design Plans
|
|||
tube | |||
60 | 4.99.1: The Trails Street view
Colored Pencil on Trace
|
undated | |
60 | 4.99.2: The Trails Builder Walls Canyon Oaks (Parcel J-2)
Print on Vellum
|
1995 December 12 | |
60 | 4.99.3: The Trails Builder Walls Canyon Oaks (Parcel J-2) Layout and Grading L-1.1
Print on Mylar
|
1995 December 12 | |
60 | 4.99.4: The Trails Builder Walls Canyon Oaks (Parcel J-2) Wall and Site Details L-3.2
Print on Vellum
|
1995 December 12 | |
60 | 4.99.5: The Trails Builder Walls Canyon Oaks (Parcel J-2) Wall and Site Details L-3.3
Print on Vellum
|
1995 December 12 | |
60 | 4.99.6: Summerlin Village 7 Design Criteria Village entries
Marker on Trace
|
1992 May 27 | |
60 | 4.99.7: The Trails at Summerlin Design Criteria Wall Concept
Colored Pencil on Trace
|
1992 July 1 | |
60 | 4.99.8: The Trails at Summerlin Design Criteria
Marker on Trace
|
1992 July 1 | |
60 | 4.99.9: The Trails at Summerlin Design Criteria
Marker on Trace
|
1992 July 1 | |
60 | 4.99.10: The Trails at Summerlin Design Criteria
Marker on Trace
|
1992 July 1 | |
60 | 4.99.11: The Trails at Summerlin Design Criteria
Marker on Trace
|
1992 July 1 | |
60 | 4.99.12: The Trails at Summerlin Design Criteria
Marker on Trace
|
1992 July 1 | |
60 | 4.99.13: The Trails at Summerlin Design Criteria
Colored Pencil on Trace
|
1992 July 1 | |
60 | 4.99.14: The Trails at Summerlin Tree Type and Size
Blueprint on Bond
|
undated | |
60 | 4.99.15: The Trails at Summerlin Tree Types
Marker on Bond
|
undated | |
60 | 4.99.16: Study Area Boundary
Marker on Trace
|
undated | |
60 | 4.99.17: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Cover Page
Print on Vellum
|
1995 January 13 | |
60 | 4.99.18: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading L-1.1
Print on Vellum
|
1995 January 13 | |
60 | 4.99.19: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading L-1.2
Print on Vellum
|
1995 January 13 | |
60 | 4.99.20: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.3
Print on Vellum
|
1995 January 13 | |
60 | 4.99.21: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.4
Print on Vellum
|
1995 January 13 | |
60 | 4.99.22: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-2.1
Print on Vellum
|
1995 January 13 | |
60 | 4.99.23: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-2.2
Print on Vellum
|
1995 January 13 | |
60 | 4.99.24: The Trails at Summerlin Comparative Exhibit Streetscape: Exploded Cost and Components
Print and Pen on Bond
|
1993 March 3 | |
60 | 4.99.25: The Trails at Summerlin Comparative Exhibit Sidewalk Design: Sidewalk Layout Plan
Print and Marker on Bond
|
1993 March 3 | |
60 | 4.99.26: The Trails at Summerlin Comparative Exhibit Wall Design: Village Wall Layout Plan
Print and Marker on Bond
|
1993 March 3 | |
Summerlin Trails Open Space Parcel Connection
|
|||
tube | |||
61 | 4.100.1: The Trails Open Space- Parcel Connection Cover Page
Print on Vellum
|
1996 April 18 | |
61 | 4.100.2: The Trails Open Space- Parcel Connection Grading Plan L-1.1
Print on Mylar
|
1996 April 18 | |
61 | 4.100.3: The Trails Open Space- Parcel Connection Grading Plan L-1.2
Print on Mylar
|
1996 April 18 | |
61 | 4.100.4: The Trails Open Space- Parcel Connection Grading Plan L-1.3
Print on Mylar
|
1996 April 18 | |
61 | 4.100.5: The Trails Open Space- Parcel Connection Grading Plan L-1.4
Print on Mylar
|
1996 April 18 | |
61 | 4.100.6: The Trails Open Space- Parcel Connection Grading Plan L-1.1 A
Print on Mylar
|
1996 April 18 | |
61 | 4.100.7: The Trails Open Space- Parcel Connection Grading Plan L-1.2 A
Print on Mylar
|
1996 April 18 | |
61 | 4.100.8: The Trails Open Space- Parcel Connection Layout and Grading L-1.3 A
Print on Mylar
|
1996 April 18 | |
61 | 4.100.9: The Trails Open Space- Parcel Connection Grading Plan L-1.5 A
Print on Mylar
|
1996 April 18 | |
61 | 4.100.10: The Trails Open Space- Parcel Connection Grading Plan L-1.6 A
Print on Mylar
|
1996 April 18 | |
Summerlin the Trails
|
|||
tube | |||
61 | 4.101.1: The Trails Streetscape- Parcel B-3 Units 2 & 4 Cover Page
Print on Vellum
|
1996 August 1 | |
61 | 4.101.2: The Trails Streetscape- Parcel B-3 Units 2 & 4 Landscape and Sidewalk
Print on Vellum
|
1996 August 1 | |
61 | 4.101.3: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
|
1996 August 1 | |
61 | 4.101.4: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Mylar
|
1996 August 1 | |
61 | 4.101.5: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
|
1996 August 1 | |
61 | 4.101.6: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
|
1996 August 1 | |
61 | 4.101.7: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
|
1996 August 1 | |
Summerlin Village 7
|
|||
tube | |||
61 | 4.102.1: The Trails of Summerlin Layout
Marker, Pen on Mylar
|
undated | |
Village 1 North
|
|||
tube | |||
62 | 4.103.1: Village 1 North Rough Grading (7 pgs)
Blueprint
|
1989 April 28 | |
62 | 4.103.2: Village 1 North Improvements (8 pgs)
Blueprint
|
1990 June 18 | |
62 | 4.103.3: Village 1 North Improvements Water and Sewer (6 pgs)
Blueprint
|
1990 May 16 | |
62 | 4.103.4: Village 1 North Improvements (4 pgs)
Blueprint
|
1990 June 20 | |
62 | 4.103.5: Village 1 North- Village Walls and Village Entries Phase 2 (7 pgs)
Blueprint
|
1990 January 16 | |
62 | 4.103.6: Village 1 North- Village Walls Phase 1 Town Center Drive (7 pgs)
Blueprint
|
1989 November 16 | |
Summerlin Construction Document
|
|||
tube | |||
63 | 4.104.1: The Hills Park Contract Documents Issued for Construction (40 pgs)
Blueprint
|
1991 February 4 | |
Summerlin Village 1 South Parcel Criteria
|
|||
tube | |||
64 | 4.105.1: The Hills at Summerlin Parcel 2
Print on Mylar
|
1990 March 11 | |
64 | 4.105.2: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.3: The Hills at Summerlin Parcel 3
Print on Mylar
|
1990 March 11 | |
64 | 4.105.4: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.5: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.6: The Hills at Summerlin Parcel 4
Print on Mylar
|
undated | |
64 | 4.105.7: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.8: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.9: The Hills at Summerlin Parcel 6
Print on Mylar
|
1990 May 11 | |
64 | 4.105.10: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.11: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.12: the Hills at Summerlin Parcel 8
Print on Mylar
|
1990 May 11 | |
64 | 4.105.13: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.14: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.15: The Hills at Summerlin Parcel 9
Print on Mylar
|
1990 May 11 | |
64 | 4.105.16: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.17: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.18: The Hills at Summerlin Parcel 11
Print on Mylar
|
1990 May 11 | |
64 | 4.105.19: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.20: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.21: The Hills at Summerlin Parcel 12
Print on Mylar
|
1990 May 11 | |
64 | 4.105.22: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.23: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.24: The Hills at Summerlin Parcel 13
Print on Mylar
|
1990 May 11 | |
64 | 4.105.25: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.26: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.27: The Hills at Summerlin Parcel 17
Print on Mylar
|
1990 May 11 | |
64 | 4.105.28: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.29: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.30: The Hills at Summerlin Parcel 19
Print on Mylar
|
1990 April 10 | |
64 | 4.105.31: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.32: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.33: The Hills at Summerlin Parcel 5
Print on Mylar
|
1990 May 11 | |
64 | 4.105.34: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.35: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.36: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.37: The Hills at Summerlin Parcel 7
Print on Mylar
|
1990 May 11 | |
64 | 4.105.38: The Hills at Summerlin Parcel 5- Planning Criteria
Print on Mylar
|
1989 October 6 | |
64 | 4.105.39: The Hills at Summerlin Parcel 14
Print on Mylar
|
1990 May 11 | |
64 | 4.105.40: Planning Criteria
Print on Mylar
|
undated | |
64 | 4.105.41: Lotting Plan
Print on Mylar
|
undated | |
64 | 4.105.42: Lotting Plan
Print on Mylar
|
undated | |
Summerlin Hillpointe and Village Streetscape Contract Documents
|
|||
tube | |||
65 | 4.106.1: The Hills Streetscape Hillpointe and Village Entries Cover Page
Print on Vellum
|
1989 November 22 | |
65 | 4.106.2: Site Layout and Grading Plan 1.1
Print on Mylar
|
undated | |
65 | 4.106.3: Site Layout and Grading Plan 1.2
Print on Mylar
|
undated | |
65 | 4.106.4: Site Layout and Grading Plan 1.3
Print on Mylar
|
undated | |
65 | 4.106.5: Site Layout and Grading Plan 1.4
Print on Mylar
|
undated | |
65 | 4.106.6: Site Layout and Grading Plan 1.6
Print on Mylar
|
undated | |
65 | 4.106.7: Site Layout and Grading Plan 1.7
Print on Mylar
|
undated | |
65 | 4.106.8: Site Layout and Grading Plan 1.8
Print on Mylar
|
undated | |
65 | 4.106.9: Site Planting Plan 2.1
Print on Mylar
|
undated | |
65 | 4.106.10: Site Planting Plan 2.2
Print on Mylar
|
undated | |
65 | 4.106.11: Site Planting Plan 2.3
Print on Mylar
|
undated | |
65 | 4.106.12: Site Planting Plan 2.4
Print on Mylar
|
undated | |
65 | 4.106.13: Site Planting Plan 2.6
Print on Mylar
|
undated | |
65 | 4.106.14: Site Planting Plan 2.7
Print on Mylar
|
undated | |
65 | 4.106.15: Site Planting Plan 2.8
Print on Mylar
|
undated | |
65 | 4.106.16: Hillpointe Road and Village Entries The Hills Site Location Plan- Site Planting Plan 2.9
Print on Vellum
|
1989 November 22 | |
65 | 4.106.17: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.10
Print on Vellum
|
1989 November 22 | |
65 | 4.106.18: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.11
Print on Vellum
|
1989 November 22 | |
65 | 4.106.19: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.12
Print on Vellum
|
1989 November 22 | |
65 | 4.106.20: Hillpointe Road and Village Entries Site Irrigation Plan 3.1
Print on Vellum
|
1989 November 22 | |
65 | 4.106.21: Hillpointe Road and Village Entries Site Irrigation Plan 3.2
Print on Vellum
|
1989 November 22 | |
65 | 4.106.22: Hillpointe Road and Village Entries Site Irrigation Plan 3.3
Print on Vellum
|
1989 November 22 | |
65 | 4.106.23: Hillpointe Road and Village Entries Site Irrigation Plan 3.4
Print on Vellum
|
1989 November 22 | |
65 | 4.106.24: Hillpointe Road and Village Entries Site Irrigation Plan 3.5
Print on Vellum
|
1989 November 22 | |
65 | 4.106.25: Hillpointe Road and Village Entries Site Irrigation Plan 3.6
Print on Vellum
|
1989 November 22 | |
65 | 4.106.26: Hillpointe Road and Village Entries Site Irrigation Plan 3.7
Print on Vellum
|
1989 November 22 | |
65 | 4.106.27: Hillpointe Road and Village Entries Site Irrigation Plan 3.8
Print on Vellum
|
1989 November 22 | |
65 | 4.106.28: Hillpointe Road and Village Entries Site Irrigation Plan 3.9
Print on Vellum
|
1989 November 22 | |
65 | 4.106.29: Hillpointe Road and Village Entries Site Irrigation Plan 3.10
Print on Vellum
|
1989 November 22 | |
65 | 4.106.30: Hillpointe Road and Village Entries Site Irrigation Plan 3.11
Print on Vellum
|
1989 November 22 | |
65 | 4.106.31: Hillpointe Road and Village Entries Site Irrigation Details 3.13
Print on Vellum
|
1989 November 22 | |
65 | 4.106.32: Hillpointe Road and Village Entries Site Irrigation Details 3.14
Print on Vellum
|
1989 November 22 | |
65 | 4.106.33: Hillpointe Road and Village Entries Site Irrigation Details 3.15
Print on Vellum
|
1989 November 22 | |
65 | 4.106.34: The Hills Streetscape Hillpointe and Village Entries Site Electrical Details 4.1
Print on Mylar
|
1989 November 20 | |
65 | 4.106.35: The Hills Streetscape Hillpointe and Village Entries Site Electrical Details 4.2
Print on Mylar
|
1989 November 20 | |
65 | 4.106.36: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.3
Print on Mylar
|
1989 November 20 | |
65 | 4.106.37: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.4
Print on Mylar
|
1989 November 20 | |
65 | 4.106.38: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.5
Print on Mylar
|
1989 November 20 | |
65 | 4.106.39: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.6
Print on Mylar
|
1989 November 20 | |
65 | 4.106.40: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.7
Print on Mylar
|
1989 November 20 | |
65 | 4.106.41: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.8
Print on Mylar
|
1989 November 20 | |
65 | 4.106.42: 5.2
Print on Mylar
|
undated | |
65 | 4.106.43: Site Details 5.2
Print on Mylar
|
undated | |
65 | 4.106.44: Hillpointe Road and Village Entries The Hills Summerlin Seating Area Details
Print on Vellum
|
1990 May 23 | |
65 | 4.106.45: Village One North Streetscape
Print on Mylar
|
undated | |
Summerlin Parcel A-3
|
|||
tube | |||
66 | 4.107.1: The Trails Streetscape Parcel A-3 Cover Page
Print on Bond
|
1996 January 2 | |
66 | 4.107.2: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.1
Print on Bond
|
1996 January 2 | |
66 | 4.107.3: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1996 January 2 | |
66 | 4.107.4: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.3
Print on Bond
|
1996 January 2 | |
66 | 4.107.5: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.4
Print on Bond
|
1996 January 2 | |
66 | 4.107.6: The Trails Streetscape Parcel A-3 Cover Page
Print on Bond
|
1995 February 23 | |
66 | 4.107.7: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.1
Print on Bond
|
1996 February 23 | |
66 | 4.107.8: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1996 February 23 | |
66 | 4.107.9: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.3
Print on Bond
|
1996 February 23 | |
66 | 4.107.10: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.4
Print on Bond
|
1996 April 5 | |
66 | 4.107.11: The Trails Streetscape Parcel A-3 Planting and Sidewalk Details L-2.5
Print on Mylar
|
1996 February 23 | |
66 | 4.107.12: The Trails Streetscape Parcel A-3 Typical Grading Section L-2.6
Print on Mylar
|
1996 February 23 | |
66 | 4.107.13: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.1
Print on Bond
|
1996 February 23 | |
66 | 4.107.14: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.2
Print on Bond
|
1996 February 23 | |
66 | 4.107.15: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.3
Print on Bond
|
1996 February 23 | |
66 | 4.107.16: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.4
Print on Bond
|
1996 February 23 | |
66 | 4.107.17: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.5
Print on Bond
|
1996 February 23 | |
66 | 4.107.18: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.6
Print on Bond
|
1996 February 23 | |
Summerlin Unit 1 Phase 2 Streetscapes
|
|||
tube | |||
67 | 4.108.1: The Trails Streetscape Parcel B-2 Cover Page
Print on Bond
|
1995 February 23 | |
67 | 4.108.2: The Trails Streetscape Parcel B-2 Landscape and Sidewalk Layout L-2.1
Print on Bond
|
1995 February 23 | |
67 | 4.108.3: The Trails Streetscape Parcel B-2 Landscape and Sidewalk Layout L-2.2
Print on Bond
|
1995 February 23 | |
67 | 4.108.4: The Trails Streetscape Parcel B-2 Planting and Sidewalk Details L-2.3
Print on Mylar
|
1995 February 23 | |
67 | 4.108.5: The Trails Streetscape Parcel B-2 Typical Grading Sections L-2.4
Print on Mylar
|
1995 February 23 | |
67 | 4.108.6: The Trails Streetscape Parcel B-2 Irrigation Plan I-3.1
Print on Bond
|
1995 February 23 | |
67 | 4.108.7: The Trails Streetscape Parcel B-2 Irrigation Plan I-3.2
Print on Bond
|
1995 February 23 | |
67 | 4.108.8: The Trails Streetscape Parcel B-2 Irrigation Details I-3.3
Print on Bond
|
1995 February 23 | |
67 | 4.108.9: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Cover Page
Print on Vellum
|
1995 February 23 | |
67 | 4.108.10: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Plan I-3.1
Print on Vellum
|
1995 February 23 | |
67 | 4.108.11: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Plan I-3.2
Print on Vellum
|
1995 February 23 | |
67 | 4.108.12: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Details Notes and Schedules I-3.3
Print on Vellum
|
1995 February 23 | |
67 | 4.108.13: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Landscape and Sidewalk Layout L-2.1
Print on Vellum
|
1995 February 23 | |
67 | 4.108.14: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1995 February 23 | |
67 | 4.108.15: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Sidewalk Horizontal Control Data L-2.3
Print on Vellum
|
1995 February 23 | |
67 | 4.108.16: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Typical Grading Section L-2.5
Print on Mylar
|
1995 February 23 | |
67 | 4.108.17: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Cover Page
Print on Mylar
|
1995 February 23 | |
67 | 4.108.18: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Plan I-3.1
Print on Mylar
|
1995 January 20 | |
67 | 4.108.19: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Wall Details 1.2
Print on Mylar
|
1995 January 20 | |
67 | 4.108.20: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Sign Details 1.3
Print on Mylar
|
1995 January 20 | |
67 | 4.108.21 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
|
1995 February 15 | |
67 | 4.108.21 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
|
1995 February 15 | |
67 | 4.108.21 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
|
1995 February 15 | |
67 | 4.108.22 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
|
1995 February 15 | |
67 | 4.108.22 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
|
1995 February 15 | |
67 | 4.108.22 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
|
1995 February 15 | |
67 | 4.108.23 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
|
1995 February 15 | |
67 | 4.108.23 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
|
1995 February 15 | |
67 | 4.108.23 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
|
1995 February 15 | |
67 | 4.108.23 D: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
|
1995 February 15 | |
67 | 4.108.24: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Planting and Sidewalk Details 2.4
Print on Mylar
|
1995 February 15 | |
67 | 4.108.25: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Typical Grading Sections 2.5
Print on Mylar
|
1995 February 15 | |
67 | 4.108.26: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.1
Print on Vellum
|
1995 January 20 | |
67 | 4.108.27: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.2
Print on Vellum
|
1995 January 20 | |
67 | 4.108.28: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.3
Print on Vellum
|
1995 January 20 | |
67 | 4.108.29: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Details I-3.4
Print on Vellum
|
1995 January 20 | |
67 | 4.108.30: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Details Schedule and Notes I-3.5
Print on Vellum
|
1995 January 20 | |
67 | 4.108.31: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Lighting 4.1
Print on Vellum
|
1995 January 20 | |
67 | 4.108.32: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Cover Page
Print on Vellum
|
1995 February 16 | |
67 | 4.108.33: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.1
Print on Vellum
|
1995 February 16 | |
67 | 4.108.34: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.2
Print on Vellum
|
1995 February 16 | |
67 | 4.108.35: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.3
Print on Vellum
|
1995 February 16 | |
67 | 4.108.36: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.4
Print on Vellum
|
1995 February 16 | |
67 | 4.108.37: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Planting and Sidewalk Details 2.5
Print on Vellum
|
1995 February 16 | |
67 | 4.108.38: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Typical Grading Section 2.6
Print on Vellum
|
1995 February 16 | |
67 | 4.108.39: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.3
Print on Vellum
|
1995 June 1 | |
67 | 4.108.40: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.4
Print on Vellum
|
1995 June 1 | |
67 | 4.108.41: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.5
Print on Vellum
|
1995 June 1 | |
67 | 4.108.42: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.1 Overlay
Print on Mylar
|
1995 February 16 | |
67 | 4.108.43: Phase 2 Overlay 2.1
Print on Mylar
|
undated | |
67 | 4.108.44: The Trails Streetscape Phase 2 Base 2.1
Print on Mylar
|
undated | |
67 | 4.108.45: Phase 2 Overlay 2.2
Print on Mylar
|
undated | |
67 | 4.108.46: Phase 2 Overlay 2.2
Print on Mylar
|
undated | |
67 | 4.108.47: Phase 2 Overlay 2.3 a
Print on Mylar
|
undated | |
67 | 4.108.48: Phase 2 Overlay 2.3 a
Print on Mylar
|
undated | |
67 | 4.108.49: Phase 2 Base 2.3
Print on Mylar
|
undated | |
67 | 4.108.50: Phase 2 Overlay 2.4 a
Print on Mylar
|
undated | |
67 | 4.108.51: Phase 2 Overlay 2.4
Print on Mylar
|
undated | |
67 | 4.108.52: Phase 2 Base
Print on Mylar
|
1995 February 3 | |
67 | 4.108.53: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.1
Print on Vellum
|
1995 January 24 | |
67 | 4.108.54: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.2
Print on Vellum
|
1995 January 24 | |
67 | 4.108.55: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.3
Print on Vellum
|
1995 January 24 | |
67 | 4.108.56: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation Plan I-3.4
Print on Vellum
|
1995 January 14 | |
67 | 4.108.57: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation Details Notes and Schedules I-3.5
Print on Vellum
|
1995 January 24 | |
67 | 4.108.58: Phase 2 Overlay 2.3
Print on Mylar
|
1995 April 26 | |
67 | 4.108.59: The Trails Streetscape- Phase 2 Parcel D-2/E-2 2.1
Print on Mylar
|
1995 February 16 | |
67 | 4.108.60: The Trails Streetscape- Phase 1 and 2 Parcel D-2/E-2 Cover Page
Print on Vellum
|
1995 February 16 | |
67 | 4.108.61: Phase 2 Overlay 2.4
Print on Mylar
|
1995 April 26 | |
Summerlin The Trails Builder Entries
|
|||
tube | |||
68 | 4.109.1: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Cover Page
Print on Bond
|
1995 October 10 | |
68 | 4.109.2: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall Layout and Grading Plan L-1.1
Print on Bond
|
undated | |
68 | 4.109.3: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Landscape Plan 2.1
Print on Bond
|
1995 October 9 | |
68 | 4.109.4: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall and Site Details L-3.3
Print on Bond
|
1995 October 9 | |
68 | 4.109.5: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall and Site Details L-3.2
Print on Bond
|
1995 October 9 | |
68 | 4.109.6: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Landscape Details L-3.1
Print on Bond
|
1995 October 9 | |
68 | 4.109.7: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Plan I-4.1
Print on Vellum
|
1995 October 9 | |
68 | 4.109.8: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Details I-4.2
Print on Vellum
|
1995 October 9 | |
68 | 4.109.9: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Details Note Schedule I-4.3
Print on Vellum
|
1995 October 9 | |
68 | 4.109.10: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Electrical Site Plan E-5.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.11: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Cover Page
Print on Vellum
|
1995 February 10 | |
68 | 4.109.12: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall Layout and Grading L-1.1
Print on Mylar
|
1995 February 10 | |
68 | 4.109.13: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall Layout and Grading Plan L-1.2
Print on Mylar
|
1995 February 10 | |
68 | 4.109.14: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Plan L-2.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.15: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Plan L-2.2
Print on Vellum
|
1995 February 10 | |
68 | 4.109.16: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Details L-3.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.17: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall and Site Details L-3.2
Print on Vellum
|
1995 February 10 | |
68 | 4.109.18: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Plan I-4.1
Print on Vellum
|
1995 January 21 | |
68 | 4.109.19: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Plan I-4.2
Print on Vellum
|
1995 January 25 | |
68 | 4.109.20: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Details Notes and Schedule I-4.3
Print on Vellum
|
1995 January 21 | |
68 | 4.109.21: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Cover Page
Print on Vellum
|
1995 February 10 | |
68 | 4.109.22: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall Layout and Grading Plan L-1.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.23: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Plan Grading Plan L-2.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.24: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Plan L-2.1
Print on Vellum
|
1995 January 6 | |
68 | 4.109.25: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Details L-3.1
Print on Vellum
|
1995 February 10 | |
68 | 4.109.26: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall and Site Details L-3.2
Print on Vellum
|
1995 February 10 | |
68 | 4.109.27: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Irrigation Details Notes and Schedule L-3.2
Print on Vellum
|
1995 January 13 | |
68 | 4.109.28: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall and Site Details L-3.3
Print on Vellum
|
1995 February 10 | |
68 | 4.109.29: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Cover Page
Print on Bond
|
1995 January 20 | |
68 | 4.109.30: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.1
Print on Bond
|
1995 January 13 | |
68 | 4.109.31: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.2
Print on Bond
|
1995 January 13 | |
68 | 4.109.32: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Plan and Grading L-2.1
Print on Bond
|
1995 January 13 | |
68 | 4.109.33: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Plan L-2.2
Print on Bond
|
1995 January 13 | |
68 | 4.109.34: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Details L-3.1
Print on Bond
|
1995 January 13 | |
68 | 4.109.35: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-3.2
Print on Bond
|
1995 January 13 | |
68 | 4.109.36: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-3.3
Print on Vellum
|
1995 January 13 | |
68 | 4.109.37: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Irrigation Plan I-4.1
Print on Vellum
|
1995 January 13 | |
68 | 4.109.38: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) I-4.2
Print on Vellum
|
1995 January 13 | |
68 | 4.109.39: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Irrigation Details Notes and Schedule I-4.3
Print on Vellum
|
1995 January 13 | |
68 | 4.109.40: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Electrical Site Plan E-5.1
Print on Vellum
|
1995 January 11 | |
68 | 4.109.41: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Electrical Site Plan E-5.2
Print on Vellum
|
1995 January 11 | |
68 | 4.109.42: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Cover Page
Print on Vellum
|
1994 November 15 | |
68 | 4.109.43: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Layout and Grading Plan L-1.1
Print on Vellum
|
1994 November 15 | |
68 | 4.109.44: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Layout and Grading L-1.2
Print on Vellum
|
1994 November 16 | |
68 | 4.109.45: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Details L-1.3
Print on Vellum
|
1994 November 15 | |
68 | 4.109.46: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Details L-1.4
Print on Vellum
|
1994 November 15 | |
68 | 4.109.47: The Trails Streetscape- Builder Entry
Print on Vellum
|
1994 September 6 | |
68 | 4.109.48: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Cover Page
Print on Bond
|
1995 January 13 | |
68 | 4.109.49: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall Layout and Grading Plan L-1.2
Print on Bond
|
undated | |
68 | 4.109.50: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Landscape Plan L-2.2
Print on Bond
|
1995 January 13 | |
68 | 4.109.51: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Landscape Details L-3.1
Print on Bond
|
1995 January 9 | |
68 | 4.109.52: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall and Site Details L-3.2
Print on Mylar
|
undated | |
68 | 4.109.53: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall and Site Details L-3.3
Print on Mylar
|
undated | |
68 | 4.109.54: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Plan I-3.1
Print on Vellum
|
1995 January 9 | |
68 | 4.109.55: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Plan I-3.2
Print on Vellum
|
1995 January 9 | |
68 | 4.109.56: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Details Notes and Schedule I-3.3
Print on Vellum
|
1995 January 9 | |
68 | 4.109.57: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Cover Page
Print on Bond
|
1994 November 29 | |
68 | 4.109.58: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Landscape and Sidewalk Layout L-2.1
Print on Bond
|
1994 November 29 | |
68 | 4.109.59: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Landscape and Sidewalk Layout L-2.2
Print on Vellum
|
1994 November 29 | |
68 | 4.109.60: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Planting and Sidewalk Details L-2.3
Print on Vellum
|
1994 November 29 | |
68 | 4.109.61: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation Plan I-3.1
Print on Vellum
|
1994 December 18 | |
68 | 4.109.62: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation plan I-3.2
Print on Vellum
|
1994 December 18 | |
68 | 4.109.63: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation Details, Notes and Schedule I-3.3
Print on Vellum
|
1994 December 18 | |
68 | 4.109.64: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) E-1
Print on Vellum
|
1994 November 29 | |
68 | 4.109.65: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Cover Page
Print on Vellum
|
1995 April 24 | |
68 | 4.109.66: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall Layout and Grading Plan L-1.1
Print on Vellum
|
1995 April 24 | |
68 | 4.109.67: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Landscape Plan L-2.1
Print on Vellum
|
1995 April 24 | |
68 | 4.109.68: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Landscape Details L-3.1
Print on Vellum
|
1995 April 24 | |
68 | 4.109.69: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall and Site Details L-3.2
Print on Vellum
|
1995 April 24 | |
68 | 4.109.70: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall and site details L-3.3
Print on Vellum
|
1995 April 24 | |
68 | 4.109.71: The Trails Builder Entries- Pulte Homes (Highpoint Parcel N-2) Irrigation Plan I-3.1
Print on Bond
|
1995 April 24 | |
68 | 4.109.72: The Trails Builder Entries- Pulte Homes (Highpoint, Parcel N-2) Irrigation Details Notes and Schedule I-3.2
Print on Bond
|
1995 April 24 | |
68 | 4.109.73: The Trails Builder Entries- Pulte Homes (Highpoint, Parcel N-2) Electrical Site Plan E-5.1
Print on Vellum
|
1995 April 24 | |
Summerlin Trails Open Space Phase 1 and 2
|
|||
tube | |||
69 | 4.110.1: The Trails Open Space- Phase Two- Cover Page
Print on Vellum
|
1995 January 9 | |
69 | 4.110.2: The Trails Open Space- Phase Two- Grading Plan L-1.1
Print on Vellum
|
1994 November 17 | |
69 | 4.110.3: The Trails Open Space- Phase Two- Grading Plan L-1.2
Print on Vellum
|
1994 November 17 | |
69 | 4.110.4: The Trails Open Space- Phase Two- Grading Plan L-1.5
Print on Vellum
|
1994 November 17 | |
69 | 4.110.5: The Trails Open Space- Phase Two- Grading Plan L-1.6
Print on Vellum
|
1994 November 17 | |
69 | 4.110.6: The Trails Open Space- Phase Two- Grading Plan L-1.7
Print on Vellum
|
1994 November 17 | |
69 | 4.110.7: The Trails Open Space- Phase Two- Layout Plan L-2.1
Print on Vellum
|
1994 November 17 | |
69 | 4.110.8: The Trails Open Space- Phase Two- Layout Plan L-2.2
Print on Vellum
|
1994 November 17 | |
69 | 4.110.9: The Trails Open Space- Phase Two- Layout Plan L-2.3
Print on Vellum
|
1994 November 17 | |
69 | 4.110.10: The Trails Open Space- Phase Two- Layout Plan L-2.4
Print on Vellum
|
1994 November 17 | |
69 | 4.110.11: The Trails Open Space- Phase Two- Layout Plan L-2.5
Print on Vellum
|
1994 November 17 | |
69 | 4.110.12: The Trails Open Space- Phase Two- Layout Plan L-2.6
Print on Vellum
|
1994 November 17 | |
69 | 4.110.13: The Trails Open Space- Phase Two- Layout Plan L-2.7
Print on Vellum
|
1994 November 17 | |
69 | 4.110.14: The Trails Open Space- Phase Two- Site Details L-2.8
Print on Vellum
|
1994 November 17 | |
69 | 4.110.15: The Trails Open Space- Phase Two- Site Details L-2.9
Print on Vellum
|
1994 November 17 | |
69 | 4.110.16: The Trails Open Space- Phase Two- Landscape Plan L-3.1
Print on Vellum
|
1994 November 17 | |
69 | 4.110.17: The Trails Open Space- Phase Two- Landscape Plan L-3.2
Print on Vellum
|
1994 November 17 | |
69 | 4.110.18: The Trails Open Space- Phase Two- Landscape Plan L-3.3
Print on Vellum
|
1994 November 17 | |
69 | 4.110.19: The Trails Open Space- Phase Two- Landscape Plan L-3.4
Print on Vellum
|
1994 November 17 | |
69 | 4.110.20: The Trails Open Space- Phase Two- Landscape Plan L-3.5
Print on Vellum
|
1994 November 17 | |
69 | 4.110.21: The Trails Open Space- Phase Two- Landscape Plan L-3.6
Print on Vellum
|
1994 November 17 | |
69 | 4.110.22: The Trails Open Space- Phase Two- Landscape Plan L-3.7
Print on Vellum
|
1994 November 17 | |
69 | 4.110.23: The Trails Open Space- Phase Two- Plant Schedule and Details L-3.8
Print on Vellum
|
1994 November 17 | |
69 | 4.110.24: The Trails Open Space- Phase Two- Irrigation Plan I-4.1
Print on Vellum
|
1994 October 19 | |
69 | 4.110.25: The Trails Open Space- Phase Two- Irrigation Plan I-4.2
Print on Vellum
|
1994 October 19 | |
69 | 4.110.26: The Trails Open Space- Phase Two- Irrigation Plan I-4.3
Print on Vellum
|
1994 October 19 | |
69 | 4.110.27: The Trails Open Space- Phase Two- Irrigation Plan I-4.4
Print on Vellum
|
1994 October 19 | |
69 | 4.110.28: The Trails Open Space- Phase Two- Irrigation Plan I-4.5
Print on Vellum
|
1994 October 19 | |
69 | 4.110.29: The Trails Open Space- Phase Two- Irrigation Plan I-4.6
Print on Vellum
|
1994 October 19 | |
69 | 4.110.30: The Trails Open Space- Phase Two- Irrigation Plan I-4.7
Print on Vellum
|
1994 October 19 | |
69 | 4.110.31: The Trails Open Space- Phase Two- Irrigation Details I-4.8
Print on Vellum
|
1994 October 19 | |
69 | 4.110.32: The Trails Open Space- Phase Two- Irrigation Details I-4.9
Print on Vellum
|
1994 October 19 | |
69 | 4.110.33: The Trails Open Space- Phase Two- Irrigation Plan I-4.10
Print on Vellum
|
1994 October 19 | |
69 | 4.110.34: The Trails Open Space- Phase Two- Electrical Site Plan E-5.1
Print on Vellum
|
1994 October 18 | |
69 | 4.110.35: The Trails Open Space- Phase Two- Electrical Site Plan E-5.2
Print on Vellum
|
1994 October 18 | |
69 | 4.110.36: The Trails Open Space- Phase Two- Electrical Site Plan E-5.3
Print on Vellum
|
1994 October 18 | |
69 | 4.110.37: The Trails Open Space- Phase Two- Electrical Schedule and Details E-5.4
Print on Vellum
|
1994 October 18 | |
69 | 4.110.38: The Trails Open Space- Phase One- Cover Page
Print on Vellum
|
1994 June 6 | |
69 | 4.110.39: The Trails Open Space- Phase One- Grading Plan L-1.1
Print on Vellum
|
1994 May 2 | |
69 | 4.110.40: The Trails Open Space- Phase One- Grading Plan L-1.2
Print on Vellum
|
1994 May 2 | |
69 | 4.110.41: The Trails Open Space- Phase One- Grading Plan L-1.3
Print on Vellum
|
1994 May 2 | |
69 | 4.110.42: The Trails Open Space- Phase One- Grading Plan L-1.4
Print on Vellum
|
1994 May 2 | |
69 | 4.110.43: The Trails Open Space- Phase One- Layout Plan L-2.1
Print on Vellum
|
1994 May 2 | |
69 | 4.110.44: The Trails Open Space- Phase One- Layout Plan L-2.2
Print on Vellum
|
1994 May 2 | |
69 | 4.110.45: The Trails Open Space- Phase One- Layout Plan L-2.3
Print on Vellum
|
1994 May 2 | |
69 | 4.110.46: The Trails Open Space- Phase One- Layout Plan L-2.4
Print on Vellum
|
1994 May 2 | |
69 | 4.110.47: The Trails Open Space- Phase One- Site Details L-2.5
Print on Vellum
|
1994 May 2 | |
69 | 4.110.48: The Trails Open Space- Phase One- L-2.6
Print on Vellum
|
1994 May 2 | |
69 | 4.110.49: The Trails Open Space- Phase One- Landscape Plan L-3.1
Print on Vellum
|
1994 May 2 | |
69 | 4.110.50: The Trails Open Space- Phase One- Landscape Plan L-3.2
Print on Vellum
|
1994 June 7 | |
69 | 4.110.51: The Trails Open Space- Phase One- Landscape Plan L-3.3
Print on Vellum
|
1994 May 2 | |
69 | 4.110.52: The Trails Open Space- Phase One- Landscape Plan L-3.4
Print on Vellum
|
1994 June 7 | |
69 | 4.110.53: The Trails Open Space- Phase One- Plant Schedule and Details L-3.5
Print on Vellum
|
1994 May 2 | |
69 | 4.110.54: The Trails Open Space- Phase One- Irrigation Plan I-4.1
Print on Vellum
|
1994 March 24 | |
69 | 4.110.55: The Trails Open Space- Phase One- Irrigation Plan I-4.2
Print on Vellum
|
1994 March 24 | |
69 | 4.110.56: The Trails Open Space- Phase One- Irrigation Plan I-4.3
Print on Vellum
|
1994 March 24 | |
69 | 4.110.57: The Trails Open Space- Phase One- Irrigation Plan I-4.4
Print on Vellum
|
1994 March 24 | |
69 | 4.110.58: The Trails Open Space- Phase One- Irrigation Details I-4.5
Print on Vellum
|
1994 March 24 | |
69 | 4.110.59: The Trails Open Space- Phase One- Irrigation Details I-4.6
Print on Vellum
|
1994 March 24 | |
69 | 4.110.60: The Trails Open Space- Phase One- Irrigation Schedule I-4.7
Print on Vellum
|
1994 March 24 | |
69 | 4.110.61: The Trails Open Space- Phase One- Electrical Site Plan E5.01
Print on Vellum
|
1994 May 2 | |
69 | 4.110.62: The Trails Open Space- Phase One- Electrical Schedule and Details E5.02
Print on Vellum
|
1994 May 2 | |
69 | 4.110.63: The Trails at Summerlin- Pedestrian Underpass Details
Marker on Vellum
|
1993 February 6 | |
69 | 4.110.64: The Trails at Summerlin- Park and Open Space Plan
Blueprint
|
undated | |
Summerlin Standard Sheets
|
|||
tube | |||
70 | 4.111.1: The Trails Streetscape- Cover Page
Print on Mylar
|
1994 March 21 | |
70 | 4.111.2: The Trails Streetscape- Typical Grading Sections
Print on Mylar
|
undated | |
70 | 4.111.3: The Trails Streetscape- Planting and Sidewalk Details
Print on Mylar
|
undated | |
70 | 4.111.4: The Trails Streetscape- Typical Grading Sections
Print on Mylar
|
undated | |
70 | 4.111.5: The Trails Streetscape- Parcel K-2 Wall and Entry Monument Details l-2.12
Print on Mylar
|
1994 April 7 | |
71 | Transportation Master Plans Physical location: CCA 8 Column 3, Row 2
|
||
72 | Site Analysis Physical location: CCA 8 Column 3, Row 2
|
||
73 | Hills S Parcel Diagrams Physical location: CCA 8 Column 3, Row 2
|
||
74 | Hills Entries Physical location: CCA 8 Column 3, Row 2
|
||
75 | Hills Wall Mock-Up Physical location: CCA 8 Column 3, Row 2
|
V: V: The Domain, 2006-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2006-2007 | ||
Box | Folder | ||
1 | 1 | Project Description |
2007 |
1 | 2 | Proposals/Contracts |
2006-2007 |
1 | 3 | Proposals/Contracts |
2007-2008 |
1 | 4 | Plant Lists |
undated |
1 | 5 | Meeting Agendas and Minutes |
2006 |
1 | 6 | Correspondence |
2007 |
1 | 7 | Correspondence |
2008 |
1 | 8 | Cost Estimates |
2007 |
1 | 9 | Design Sketches |
2007 |
1 | 10 | Design Guidelines |
2007 |
Tubes 12 tubes
|
|||
tube | |||
1 | Phase 1 & 2 Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Parkway Streetscape Design Physical location: CCA 6 Column 1, Row 2
|
undated | |
3 | Office Building Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | Central Park Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Central Park Physical location: CCA 8 Column 4, Row 3
|
undated | |
6 | Phase II Physical location: CCA 8 Column 4, Row 3
|
undated | |
7 | Phase II Physical location: CCA 8 Column 5, Row 1
|
undated | |
8 | Phase II Physical location: CCA 8 Column 5, Row 1
|
undated | |
9 | Phase II Physical location: Barn Box 9
|
undated | |
10 | Phase II Physical location: Barn Box 9
|
undated | |
11 | Phase II Physical location: Barn Box 14
|
undated | |
12 | Phase II Physical location: Barn Box 14
|
undated |
VI: VI: Grand Traverse, 1996-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-1998 | ||
Box | Folder | ||
1 | 1 | Lot 19 Proposals/Contracts |
1996 |
1 | 2 | Lot 18 Meeting Minutes |
1996 |
1 | 3 | Resort Proposals/Contracts |
1998 |
1 | 4 | Resort Programming |
1998 |
1 | 5 | Resort Charrette |
1998 |
1 | 6 | Lot 12 Correspondence |
1998 |
1 | 7 | Resort Report |
1997 |
1 | 8 | Resort Report |
1997 |
1 | 9 | Resort Report |
1997 |
1 | 10 | Resort Report |
1997 |
1 | 11 | Resort Report |
1997 |
1 | 12 | Resort Report |
1997 |
TUBES 4 tubes
|
|||
tube | |||
1 | Sketches Physical loation: Barn Box 3
|
undated | |
2 | Real Estate Physical loation: Barn Box 3
|
undated | |
3 | Resort Physical loation: Barn Box 4
|
undated | |
4 | DMC Physical loation: CCA 8 Column 5, Row 3
|
undated |
VII: VII: Kierland, 1996-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-2008 | ||
Box | Folder | ||
1 | 1 | Propsals/Contracts |
1997-1998 |
1 | 2 | Additional Services Proposals/Contracts |
2005-2008 |
1 | 3 | Meeting Minutes |
2005 |
1 | 4 | Spa Entry Drive |
2006 |
1 | 5 | Plant List |
undated |
1 | 6 | Correspondenc |
1997-1998 |
1 | 7 | Marketing/Presentations |
1996-1998 |
1 | 8 | Design Handbook |
1998 |
1 | 9 | Kierland Commons Residential Lofts Construction |
2007 |
TUBES 17 tubes
|
|||
tube | |||
1 | Sketches Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Landscape Construction Documents Physical location: CCA 6 Column 2, Row 7
|
2001 May 5; undated | |
3 | Conceptual Base Physical location: CCA 6 Column 2, Row 7
|
undated | |
4 | Schematics Physical location: CCA 6 Column 2, Row 8
|
undated | |
5 | Documents Physical location: CCA 6 Column 1, Row 9
|
undated | |
6 | Design Development Documents, Landscape Construction Documents Physical location: Barn Box 5
|
undated | |
7 | Construction Documents Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Site Plan Physical location: CCA 6 Column 1, Row 4
|
undated | |
9 | Commons Physical location: CCA 8 Column 5, Row 1
|
undated | |
10 | Landscape Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
11 | Construction Documents Structure Details Physical location: CCA 8 Column 5, Row 2
|
undated | |
12 | Clubhouse Physical location: Barn box 6
|
undated | |
13 | Commons Physical location: Barn Box 6
|
undated | |
14 | Commons Physical location: Barn Box 10
|
undated | |
15 | Westin Resorts Physical location: Barn Box 11
|
undated | |
16 | Tower Lofts Physical location: Barn Box 11
|
undated | |
17 | Westin Resorts Physical location: Barn Box 11
|
undated |
VIII: VIII: Kennecott, 1995-1997Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-2008 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1995-1996 |
1 | 2 | Correspondence |
1995 |
1 | 3 | Correspondence |
1995-1996 |
1 | 4 | Design Basis Memorandum |
undated |
1 | 5 | Work Program |
1995 |
1 | 6 | Cost Estimates |
1996 |
1 | 7 | Specifications |
1995 |
1 | 8 | Phase 2 Proposals/Contracts |
1996 |
1 | 9 | Phase 2 Correspondence |
1996-1997 |
1 | 10 | Phase 2 Field Reports |
1995-1996 |
TUBES |
|||
tube | |||
1 | Complete Drawings Physical location: Barn Box 6
|
undated | |
2 | Issues for Owners Approval Physical location: Barn Box 6
|
undated | |
3 | Working, Drawings, Site Physical location: Barn Box 6
|
undated | |
4 | Parcels for Construction Physical location: Barn Box 6
|
undated | |
5 | Northern Trail System Physical location: Barn Box 6
|
undated |
IX: IX: Verde River Greenway, 1990-1993Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-1993 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1991-1993 |
1 | 2 | Correspondence |
1990-1993 |
1 | 3 | Correspondence w/Client |
1991-1993 |
1 | 4 | Correspondence w/Other Agencies |
1991-1993 |
1 | 5 | Meeting Minutes/Notes to File |
1991-1993 |
1 | 6 | Work Program |
1991-1993 |
1 | 7 | Conversation Record |
1991-1992 |
1 | 8 | Cultural |
1991 |
1 | 9 | Land Use |
1991 |
1 | 10 | Programming |
1990 |
1 | 11 | Work Schedule |
1991 |
1 | 12 | Inventory Analysis |
1991 |
1 | 13 | Appendices |
undated |
2 | 1 | Planning Process Report |
undated |
2 | 2 | Management Plan Report |
undated |
2 | 3 | Draft Report for Phase 1 |
1992 March 24 |
TUBES 3 tubes
|
|||
tube | |||
1 | Preliminary Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Soils Physical location: CCA 8 Column 4, Row 3
|
undated | |
3 | Master Plan/Design Concept Physical location: CCA 8 Column 4, Row 3
|
undated |
X: X: Biltmore Estate (North Carolina), 1997-2003Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2003 | ||
Box | Folder | ||
1 | 1 | Master Plan Proposals/Contracts |
2003 |
1 | 2 | Master Plan Correspondence Consultant |
2003 |
1 | 3 | Master Plan Correspondence |
1998-2000 |
1 | 4 | Master Plan Transmittals |
2001 |
1 | 5 | Master Plan Conceptural Design |
2002 |
1 | 6 | Field Report |
1999 |
1 | 7 | Progress Report |
1999 |
1 | 8 | Progress Report |
1999 |
1 | 9 | Progress Report |
2000 |
1 | 10 | Meeting Minutes |
1998-1999 |
1 | 11 | Engineering |
1999 |
1 | 12 | Programming |
1998-1999 |
1 | 13 | Change Orders |
1999-2000 |
1 | 14 | Master Plan Historic/Cultural |
2002-2003 |
1 | 15 | Master Plan Transportation |
2002 |
1 | 16 | Pay Requests |
2000 |
2 | 1 | Correspondence |
1997-1998 |
2 | 2 | Correspondence |
1999 |
2 | 3 | Correspondence |
2000 |
2 | 4 | Correspondence |
2001 |
2 | 5 | Design Sketches/Product Information |
1998 |
2 | 6 | Design Sketches/Product Information |
1999 |
2 | 7 | Design Sketches/Product Information |
2000 |
2 | 8 | Design Sketches/Product Information |
2001 |
3 | 1 | Cost Estimate |
1999 |
3 | 2 | Cost Estimates |
1998 |
3 | 3 | Cost Estimates |
1999 |
3 | 4 | Construction Bids/Proposals/Addendum |
1999-2000 |
3 | 5 | Construction Bids/Proposals/Addendum |
1999-2000 |
TUBES 5 tubes
|
|||
tube | |||
1 | Master Plan Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | Winery Village Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Master Plan Physical location: CCA 6 Column 1, Row 9
|
undated | |
4 | Trail System Physical location: CCA 8 Column 6, Row 3
|
undated | |
5 | City Resubmittal Physical location: Barn Box 8
|
undated |
XI: XI: Basalt River Corridor, 1997-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2005 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003-2004 |
1 | 2 | Correspondence |
1996-2004 |
1 | 3 | Meeting Minutes/Notes to File |
1997-2005 |
1 | 4 | Work Schedule |
2003 |
1 | 5 | Topography |
2002 |
1 | 6 | Fiscal Impact Analysis |
2001-2003 |
1 | 7 | Housing and Development Documents |
2003 |
1 | 8 | Housing Fees and Permits |
2003 |
1 | 9 | Parks & Recreation |
undated |
1 | 10 | Transportation |
2003 |
1 | 11 | Design Sketches |
2003 |
1 | 12 | Survey and Base Map Information |
2003 |
1 | 13 | Master Plan Development |
2003 |
1 | 14 | Financial
[has oversized]
|
2003-2005 |
2 | 1 | Community Area Plan |
2003 |
2 | 2 | Master Plan Report |
2002 |
2 | 3 | Master Plan Report |
2002 |
2 | 3 | Master Plan Documents |
2003-2005 |
2 | 4 | Social Capital Measurements |
2003-2004 |
2 | 5 | Public participation |
2003 |
2 | 6 | Schematic Design |
2003 |
XII: XII: Crested Butte, 1985-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1985-1998 | ||
Box | Folder | ||
1 | 1 | Design & Submission Marketing/Presentations |
1994 |
1 | 2 | Programming |
1993-1995 |
1 | 3 | South Village |
1985 |
1 | 4 | North Village Subdivision Proposals/Contracts |
1995-1997 |
1 | 5 | North Village Subdivision Correspondence |
1995 |
1 | 6 | North Village Subdivision Correspondence |
1995-1996 |
1 | 7 | Meeting Minutes/Notes to File |
1992-1995 |
1 | 8 | Sketches |
undated |
1 | 9 | Design Sketches |
1998 |
1 | 10 | Design Guidelines |
1985-1992 |
1 | 11 | Illustrative Plan |
1996 |
1 | 12 | Crested Mountain Village Program Summaries |
1996 |
1 | 13 | Crested Mountain Village Graphics |
undated |
1 | 14 | Parcel Proforma |
1993 |
1 | 15 | North Village Subdivision Works Program |
undated |
1 | 16 | Work Program |
1993-1998 |
2 | 1 | Site Plans |
1998 |
2 | 2 | North Village Proposals/Contracts |
1992 |
2 | 3 | Planning Work Session Proposals/Contract |
1992 |
2 | 4 | Transmittals |
1994-1995 |
2 | 5 | Planning Work Session Correspondence |
1992-1993 |
2 | 6 | North Village Correspondence |
1994-1995 |
2 | 7 | Subdivision I Correspondence |
1986-1992 |
2 | 8 | North Village Meeting Minutes/Notes to File |
1994-1995 |
2 | 9 | Planning Work Session Meeting Mintues/Notes to File |
1993 |
2 | 10 | North Village 1 Meetingt Minutes/Notes to File |
1984-1993 |
2 | 11 | North Village Subdivision Meeting Minutes/Notes to File |
1992 |
2 | 12 | Meeting Minutes/Notes to File |
1994-1995 |
2 | 13 | Meeting Minutes/Notes to File |
1997-1998 |
2 | 14 | Meeting Minutes/Notes to File |
1998 |
2 | 15 | Miscellaneous Meeting Minutes/Notes to Fiel |
1995 |
2 | 16 | Crested Mountain Living Correspondence |
1996-1997 |
2 | 17 | Correspondence |
1996-1997 |
2 | 18 | Correspondence |
1998 |
2 | 19 | Reserve Correspondence |
1998 |
TUBES 10 tubes
|
|||
tube | |||
1 | Geological Review Physical location: CCA 6 Column 2, Row 4
|
undated | |
2 | North Village Mylar's Physical location: CCA 6 Column 2, Row 4
|
undated | |
3 | The Reserve Physical location: CCA 6 Column 2, Row 4
|
undated | |
4 | The Reserve Physical location: CCA 6 Column 2, Row 4
|
undated | |
5 | Village Planning Studies Physical location: CCA 6 Column 2, Row 5
|
undated | |
6 | Parcel Studies Reserve Studios Physical location: CCA 6 Column 2, Row 5
|
undated | |
7 | North Village Study Originals CCA 6 Column 2, Row 8
|
1993; undated | |
8 | Gold Link Subdivision Entry Design Physical location: CCA 6 Column 1, Row 9
|
undated | |
9 | Housing Site Plans Physical location: Barn Box 11
|
undated | |
10 | Hotel Physical location: Barn Box 11
|
undated |
XIII: XIII: Quernecia, 1998-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1998-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1999-2006 |
1 | 2 | Meeting Minutes |
1999-2000 |
1 | 3 | Notes to File |
1999 |
1 | 4 | Design Sketches |
1998-1999 |
1 | 5 | Design Sketches |
1999 |
1 | 6 | Design Sketches |
1999-2000 |
1 | 7 | Field Report |
1999-2001 |
1 | 8 | Field Report |
2006 |
1 | 9 | Correspondence |
1999-2002 |
1 | 10 | Billing/Invoices |
2002 |
1 | 11 | Plant Lists |
1999-2000 |
2 | 1 | Work Program |
1998 |
2 | 2 | Golf Course Meeting Notes |
1999-2000 |
2 | 3 | Golf Course Notes to File |
1999 |
2 | 4 | Golf Course Cost Estimate |
1999-2000 |
2 | 5 | Golf Course Correspondence |
1999-2000 |
2 | 6 | Golf Course Guiding Principles |
1999-2000 |
XIV: XIV: Amaranth/Montage, 2006-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2006-2007 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2006-2007 |
1 | 2 | Montage Invoices |
2007-2008 |
1 | 3 | Montage Meeting Minutes |
2006-2007 |
1 | 4 | Montage Design Sketches |
2006 |
1 | 5 | Design Standards Propsals/Contracts |
2006-2007 |
1 | 6 | Correspondence |
2006 |
1 | 7 | Preliminary Drainage Report |
2007 |
1 | 8 | Urban Design & Landscape Architecture Report |
2007 |
1 | 9 | 690 Urban Design & Open Space Report |
2007 |
1 | 10 | 690 Urban Design & Open Space Report |
2007 |
2 | 1 | Final Development Plan |
2006 July |
2 | 2 | Amaranth Area 1 Final Planned Area Devlopment |
2007 February |
2 | 2 | Amaranth Preliminary Planned Area Development |
2007 April 26 |
2 | 4 | Amaranth Area 2 GIS Tasks |
2007 July 12 |
2 | 5 | Amaranth Area 1 Site Improvement Program |
2007 October 18 |
2 | 6 | Amaranth PAD Comparison Report |
2007 March 28 |
2 | 7 | Amaranth Area 1 Design Standards |
2007 September 1 |
2 | 8 | Amaranth Area 1 Landscape Cost Analysis |
2007 |
TUBES 4 tubes
|
|||
tube | |||
1 | Soccer Park Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Holdings Physical location: CCA 8 Column 5, Row 3
|
undated | |
3 | Parks Physical location: CCA 6 Column 1, Row 3
|
undated | |
4 | Village Center Physical location: CCA 6 Column 1, Row 3
|
undated |
XV: XV: La Posada, 1996-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-2000 | ||
Box | Folder | ||
1 | 1 | Change Orders |
1997-1999 |
1 | 2 | Contract Administration |
1999-2000 |
1 | 3 | Correspondence Master Plan |
1997-1999 |
1 | 4 | Correspondence Agency- Master Plan |
1997-1998 |
1 | 5 | Correspondence Owner Master Plan |
1997-2000 |
1 | 6 | Correspondence Owner- Metro |
2000 |
1 | 7 | Cost Estimates |
1997-1998 |
1 | 8 | Design Sketches |
1998 |
1 | 9 | Facsimiles |
1997 |
1 | 10 | Field Reports |
1998 |
1 | 11 | Maintenance Guidelines |
2000 |
1 | 12 | Marketing Presentations |
1998 |
1 | 13 | Master Plan Addendums |
1998 |
1 | 14 | Master Plan DD's |
1998 |
1 | 15 | Master Plan |
1999 |
1 | 16 | Maps |
undated |
1 | 17 | Master Plan Renovations |
1998 |
1 | 18 | Meeting Notes- Base Renovation |
1996-1998 |
1 | 19 | Meeting Minutes- CD Phase |
1998 |
1 | 20 | Meeting Notes/Minutes |
1997-1999 |
2 | 1 | Notes |
undated |
2 | 2 | Notes |
1997-1998 |
2 | 3 | Notes to File- Master Plan |
1997-1998 |
2 | 4 | Physical- Geology |
1998 |
2 | 5 | Plant Proposals |
1997-2000 |
2 | 6 | Programming- Architectural |
1997 |
2 | 7 | Programming |
1997-1998 |
2 | 8 | Proposal/Contracts- Base Renovation |
1997 |
2 | 9 | Proposal/Contracts- Master Plan |
1997-1999 |
2 | 10 | Proposal/Contract/Owner- Metro |
2000 |
2 | 11 | Proposal of Additional Landscape Architectural |
2000 |
2 | 12 | Site Observation |
1998-2000 |
2 | 13 | Specifications- La Posada |
1998 |
2 | 14 | Specifications |
1998 |
XVI: XVI: KUSA, 1989-1991Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1989-1991 | ||
Box | Folder | ||
1 | 1 | Site Plan Proposals/Contracts |
1990 |
1 | 2 | Site Plan Correspondence |
1990 |
1 | 3 | Site Plan Correspondence |
1991 |
1 | 4 | Site Plan Correspondence |
1992 |
1 | 5 | Site Plan Meeting Minutes/Notes to File |
1990-1991 |
1 | 6 | Site Plan Work Program |
1990 |
1 | 7 | Site Plan Engineering |
1990-1991 |
1 | 8 | Site Plan Programming |
1989 |
1 | 9 | Site Plan Cost Estimates |
1990-1991 |
1 | 10 | Site Plan Design Sketches/Product Information |
1990-1991 |
1 | 11 | Site Plan Design Sketches/Product Information |
1991-1992 |
2 | 1 | Site Plan Specifications |
1990-1991 |
2 | 2 | Rezoning Meeting Minutes/Notes to File |
1989 |
2 | 3 | Rezoning Correspondence |
1989-1990 |
2 | 4 | Rezoning Programming |
1989 |
2 | 5 | Rezoning Design Sketches/Product Information |
1989 |
2 | 6 | Rezoning Engineering |
1989 |
2 | 7 | Rezoning Cost Estimates |
1989-1990 |
2 | 8 | Rezoning Construction Bids/Proposals |
1989 |
2 | 9 | Work Program |
1989 |
2 | 10 | Construction Bids/Proposals |
1991 |
2 | 11 | Submittals/Shop Drawings |
1991 |
2 | 12 | P.U.D. |
1989 |
2 | 13 | Proposal Graphics |
1990 |
TUBES 4 tubes
|
|||
tube | |||
1 | Broadcast Facility Design Development Physical location: Barn Box 5
|
undated | |
2 | Planting Plan Barn Box 5
|
undated | |
3 | Site Analysis Barn Box 5
|
undated | |
4 | Landscape Plans CCA 8 Column 5, Row 1
|
undated |
XVII: XVII: Idarado, 1999-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1999-2001 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1999 |
1 | 2 | Correspondence |
1999 |
1 | 3 | Correspondence |
2000 |
1 | 4 | Correspondence |
2001 |
1 | 5 | Meeting Minutes/Notes to File |
1999-2001 |
1 | 6 | Work Program |
2001 |
1 | 7 | Cost Estimate |
1999 |
1 | 8 | Documentation |
1999 |
1 | 9 | Bridal Veil Development |
2000 |
1 | 10 | Idarado Property |
1999 |
1 | 11 | Property Proposal/Contract |
1999 |
1 | 12 | Legacy Project Engineering |
2000-2001 |
1 | 13 | Legacy Project Engineering |
2000-2001 |
1 | 14 | Design Sketches |
2000-2001 |
2 | 1 | Physical |
2000-2001 |
2 | 2 | Field Reports |
2000 |
2 | 3 | Programming |
2000-2001 |
2 | 4 | Programming |
2000-2001 |
TUBES 12 tubes
|
|||
tube | |||
1 | Bridal veil, liberty ball, drainage, grading, roads, Damp;D mill, eco center Physical location: CCA 8 Column 5, Row 3
|
undated | |
2 | Illustrative Site Plans Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Legacy Project Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
5 | Conceptual Design, Colored Pencil Illustrative, Site Analysis Physical location: Barn Box 9
|
undated | |
6 | Bridal Veil Development Physical location: Barn Box 9
|
undated | |
7 | Design Development Physical location: Barn Box 9
|
undated | |
8 | Legacy Project Physical location: Barn Box 9
|
undated | |
9 | Legacy Project Physical location: Barn Box 9
|
undated | |
10 | Legacy Project Physical location: Barn Box 9
|
undated | |
11 | Legacy Project Physical location: Barn Box 9
|
undated | |
12 | Early studies, sections, illustrative plan (pencil) Physical location:Barn Box 10
|
undated |
XVIII: XVIII: Banff, 1992-1995Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1992-1995 | ||
Box | Folder | ||
1 | 1 | Banff Redevelopment |
1992 |
1 | 2 | Biological (Vegetation and Wildlife) |
1994 |
1 | 3 | Clippings/Related Articles |
1992 |
1 | 4 | Comp. Studies |
1992 |
1 | 5 | Construction Drawings |
1994-1995 |
1 | 6 | Correspondence for Downtown Enhancement |
1992-1994 |
1 | 7 | Cost Estimates |
1993 |
1 | 8 | Downtown Enhancement Design Sketches/Signage |
1992 |
1 | 9 | Downtown Enhancement Design Sketches/Signage |
1992 |
1 | 10 | Downtown Enhancement Conceptual Plan |
1992 |
1 | 11 | Downtown Enhancement Plan |
undated |
1 | 12 | Engineering (Civil/Traffic) |
1992 |
2 | 1 | Presentation Text |
undated |
2 | 2 | Meeting Minutes/Notes to File |
1992 |
2 | 3 | Meeting Minutes/Notes to File |
1992 |
2 | 4 | Meeting Minutes |
1992-1994 |
2 | 5 | Downtown Enhancement Plan Story Board |
undated |
2 | 6 | Physical (Geology/Soils/Draining) |
undated |
2 | 7 | Proposals/Contracts for Downtown Enhancement |
1992-1994 |
2 | 8 | Programming (Architectural) |
1992 |
2 | 9 | Transmittals |
1993 |
2 | 10 | Visual |
1992 |
2 | 11 | Work Program |
1993-1994 |
TUBES 9 tubes
|
|||
tube | |||
1 | Downtown Enhancement Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Downtown Enhancement Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
3 | Originals Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Downtown Enhancement Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | Originals Physical location: CCA 8 Column 5, Row 1
|
undated | |
6 | Site Location and Demo Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
7 | Site Grading Physical location: CCA 8 Column 5, Row 1
|
undated | |
8 | Plant List Physical location: CCA 8 Column 5, Row 1
|
undated | |
9 | Enhancement Blacklines Physical location: Barn Box 14
|
undated |
XIX: XIX: Landwell, 2003-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2003-2007 | ||
Box | Folder | ||
1 | 1 | Visitor's Center Proposals/Contracts |
2005 |
1 | 2 | Visitor's Center Meeting Agendas & Minutes |
2005 |
1 | 3 | Urban Core Proposals/Contracts |
2005 |
1 | 4 | Urban Core Meeting Agendas & Minutes |
2005 |
1 | 5 | Urban Core Transportation |
2005 |
1 | 6 | Urban Core Design Guidelines |
2005 |
1 | 7 | Urban Core Design Guidelines |
2005 |
1 | 8 | Urban Core Design Guidelines |
2005 |
1 | 9 | East Property Proposals/Contracts |
2005 |
1 | 10 | East Property Correspondence |
2004-2006 |
1 | 11 | East Property Invoices |
2004-2005 |
1 | 12 | East Property Invoices |
2005-2007 |
1 | 13 | East Property Meeting Minutes |
2004-2007 |
2 | 1 | East Property Schedule |
2004 |
2 | 2 | East Property Plant Lists |
2003-2004 |
2 | 3 | East Property Parks and Recreation |
2004 |
2 | 4 | East Property Analysis Maps |
undated |
2 | 5 | East Property Urban Core Block Studies |
2005 |
2 | 6 | East Property Urban Design Standards |
2003 |
TUBES 6 tubes
|
|||
tube | |||
1 | Illustrative Master Plan, Renderings, Zone Plans, Intersection Diagrams, Regional Context Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Context, diagrams, site analysis Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | East Property Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | East Property Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | East Property Physical location: Barn Box 11
|
undated | |
6 | East Property Physical location: Barn Box 15
|
undated |
XX: XX: Amoco Refinery Reuse Plan, 1996-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-2004 | ||
Box | Folder | ||
1 | 1 | Articles |
2005 |
1 | 2 | Construction |
2001 |
1 | 3 | Correspondence |
2001-2004 |
1 | 4 | Correspondence |
2001-2003 |
1 | 5 | Cost Estimates |
1999 |
1 | 6 | Cost Estimates |
2002 |
1 | 7 | Master Plan |
1999-2002 |
1 | 8 | Master Plan |
2003-2004 |
1 | 9 | Meeting Minutes |
2000-2002 |
1 | 10 | Meeting Minutes |
2001-2003 |
1 | 11 | Meeting Minutes |
2001-2004 |
1 | 12 | Meeting Record |
2001-2003 |
2 | 1 | Physical |
undated |
2 | 2 | Plant List |
2001-2003 |
2 | 3 | Programming |
1998-1999 |
2 | 4 | Proposal/Contracts |
1998-2002 |
2 | 5 | Proposal/Contracts |
2001-2002 |
2 | 6 | Schedule |
2001-2002 |
2 | 7 | Signage |
2001-2004 |
2 | 8 | Water |
1998-1999 |
2 | 9 | Work Program |
1996-2000 |
2 | 10 | Work Program |
2001-2002 |
TUBES 4 tubes
|
|||
tube | |||
1 | Illustrative, re-use plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Platt River Commons Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | CD Set Physical location: Barn Box 8
|
undated | |
4 | Mylar Site Drawings Physical location: Barn Box 13
|
undated |
XXI: XXI: City of Mesa, 1993-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-2001 | ||
Box | Folder | ||
1 | 1 | Comprehensive Plan Proposals/Contracts |
1994 |
1 | 2 | Comprehensive Plan Correspondence |
1993-1994 |
1 | 3 | Comprehensive Plan Meeting Minutes |
1994 |
1 | 4 | Comprehensive Plan Notes to File |
1994 |
1 | 5 | Comprehensive Plan Focus Group Meeting |
1994 |
1 | 6 | Comprehensive Guide Summary of Tour |
1994 |
1 | 7 | Comprehensive Guide Plan |
1994 |
1 | 8 | General Plan Proposals/Contracts |
1995 |
1 | 9 | General Plan Correspondence |
1995 |
1 | 10 | General Plan Meeting Minutes |
1995 |
1 | 11 | General Plan Goals/Objectives |
1995 |
1 | 12 | General Plan Existing Conditions |
1995 |
1 | 13 | General Plan Land Use Alternatives |
1995 |
1 | 14 | General Plan Public Workshops |
1995 |
1 | 15 | General Plan Draft Plan |
1995 |
2 | 1 | 1 General Plan Implementation |
1996 |
2 | 2 | General Plan Final Plan |
1996 |
2 | 3 | Comprehensive Guide |
1994 |
2 | 4 | Comprehensive Guide |
1994 |
2 | 5 | Megacorp Correspondence |
1994-2001 |
2 | 6 | Megacorp Proposals/Contracts |
1994 |
2 | 7 | Megacorp Meeting Minutes |
1994 |
2 | 8 | Megacorp Working Papers |
1994 |
2 | 9 | Megacorp Main Street Drawings |
1994 |
2 | 10 | Megacorp Notes To File |
1994 |
2 | 11 | Megacorp Action Plan Draft |
1994 |
XXII: XXII: Mesa Performing Arts Center, 1998-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1998-2005 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1998-1999 |
1 | 2 | Cost Estimates |
2000 |
1 | 3 | Cost Estimates |
2000 |
1 | 4 | Cost Estimates |
2001 |
1 | 5 | Environmental |
2002 |
1 | 6 | Correspondence |
1999-2000 |
1 | 7 | Correspondence |
2001 |
1 | 8 | Correspondence |
2002-2004 |
1 | 9 | Notes to File |
2000 |
1 | 10 | Notes to File |
2001-2003 |
2 | 1 | Meeting Minutes |
2000 |
2 | 2 | Meeting Minutes |
2000 |
2 | 3 | Meeting Minutes |
2001 |
2 | 4 | Meeting Minutes |
2001 |
2 | 5 | Meeting Minutes |
2002-2003 |
2 | 6 | Submittals/Shop Drawings |
2002-2005 |
2 | 7 | Change Orders |
2002-2004 |
2 | 8 | Construction Observation |
2003-2004 |
2 | 9 | Sketches |
2000 |
2 | 10 | Schematic Design |
2000 |
TUBES 1 tube
|
|||
tube | |||
1 | Schematic Design Physical location: CCA 8 Column 6, Row 2
|
undated |
XXIII: XXIII: Santa Fe Railyard, 1999-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1999-2005 | ||
Box | Folder | ||
1 | 1 | Agency Communication |
2002 |
1 | 2 | Articles |
2000-2002 |
1 | 3 | Brief History of the Planning of the Railyard |
2001 |
1 | 4 | Civil/Traffic |
2001-2002 |
1 | 5 | Correspondence |
2001 |
1 | 6 | Correspondence Agency |
2002 |
1 | 7 | Design Sketches |
2001 |
1 | 8 | Design Sketches/Product Info |
2001 |
1 | 9 | Fiscal Statement |
2001-2002 |
1 | 10 | Facsimiles |
2000-2001 |
1 | 11 | Finances |
1999-2001 |
1 | 12 | General Meeting Minutes |
2001 |
1 | 13 | Historic Architecture |
2001-2002 |
1 | 14 | Land Use |
2001-2002 |
1 | 15 | Marketing/Presentation |
2001 |
1 | 16 | Master Plan |
2001-2002 |
1 | 17 | Meeting Record |
2000-2001 |
2 | 1 | News Clippings |
2000 |
2 | 2 | Programming |
2001 |
2 | 3 | Programming |
undated |
2 | 4 | Proposals/Contracts |
2000-2001 |
2 | 5 | Proposals/Contracts |
2001-2002 |
2 | 6 | Proposals/Contracts |
2002-2005 |
2 | 7 | Public Participation |
2001 |
TUBES 30 tubes
|
|||
tube | |||
1 | Base plans, process drawings, red lines, infrastructure, 3D Perspectives, Main Railyard Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Master Plan Utilities Physical location: CCA 8 Column 4, Row 3
|
undated | |
3 | Community Days Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | "What Would 'Good' Look Like?" Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Haison Group Physical location: CCA 8 Column 4, Row 3
|
undated | |
6 | Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
7 | Master Plan Land Use Physical location: CCA 8 Column 4, Row 3
|
undated | |
8 | Parcelization Options Physical location: CCA 8 Column 4, Row 3
|
undated | |
9 | Master Plan Design Team Physical location: CCA 8 Column 4, Row 3
|
undated | |
10 | Master Plan Series Base Maps Physical location: CCA 8 Column 4, Row 3
|
undated | |
11 | City of Santa Fe Physical location: CCA 8 Column 4, Row 3
|
undated | |
12 | Liaison Group Physical location:CCA 8 Column 4, Row 3
|
undated | |
13 | Parcel Info Physical location: CCA 8 Column 4, Row 3
|
undated | |
14 | Transportation/Regionals Physical location: CCA 8 Column 4, Row 3
|
undated | |
15 | Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
16 | Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
17 | Master Plan Inventory Utilities Physical location: CCA 8 Column 5, Row 1
|
undated | |
18 | Master Plan- Historic Districts Physical location: CCA 8 Column 5, Row 1
|
undated | |
19 | Master Plan Parking Circulation Physical location: CCA 8 Column 5, Row 1
|
undated | |
20 | Master Plan Land Use and Zoning Physical location: CCA 8 Column 5, Row 1
|
undated | |
21 | Master Plan Architecture History Buildings Physical location: CCA 8 Column 5, Row 1
|
undated | |
22 | Master Plan Base Maps Physical location: CCA 8 Column 5, Row 1
|
undated | |
23 | Master Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
24 | Master Plan Site Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
25 | Master Plan Aerials Photos Physical location: CCA 8 Column 5, Row 1
|
undated | |
26 | Tenant Parking Plans Proposed Development Physical location: CCA 8 Column 5, Row 1
|
undated | |
27 | Master Plan Physical location: Barn Box 10
|
undated | |
28 | Submittals Physical location: Barn Box 11
|
undated | |
29 | Schematic Sketches Physical location: Barn Box 14
|
undated | |
30 | Master Plan Physical location: Barn Box 16
|
undated |
XXIV: XXIV: Crown Residence, 1998-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1998-2005 | ||
Box | Folder | ||
1 | 1 | Change Orders |
2004 |
1 | 2 | Conference Call Notes |
2003 |
1 | 3 | Construction Bids/Proposals |
2003 |
1 | 4 | Correspondence |
1998-2000 |
1 | 5 | Correspondence |
2002-2003 |
1 | 6 | Correspondence |
2002-2004 |
1 | 7 | Detail Design Studies |
2003 |
1 | 8 | Design Review |
undated |
1 | 9 | Drainage |
2003 |
1 | 10 | Engineering |
1998-1999 |
1 | 11 | Field Reports |
1998-1999 |
1 | 12 | Field Report Instructions |
2003-2005 |
1 | 13 | Five Tree Regulations |
2002 |
1 | 14 | Materials Research |
2003 |
1 | 15 | Meeting Minutes |
1998 |
1 | 16 | Meeting Minutes |
1998-2000 |
1 | 17 | Meeting Minutes |
2002-2005 |
2 | 1 | Planting Plan |
1998 |
2 | 2 | Proposals/Contracts |
1998-1999 |
2 | 3 | Proposals/Contracts |
2002-2003 |
2 | 4 | Schematic Design |
1998-1999 |
2 | 5 | Sketches/Image Graphic |
undated |
2 | 6 | Specifications |
2003 |
2 | 7 | Images
[photocopies]
|
2003 |
2 | 8 | Image Book |
2003 |
TUBES 6 tubes
|
|||
tube | |||
1 | Schematic Design Drawings, Water Feature Details Physical location: CCA 8 Column 5, Row 3
|
undated | |
2 | Design Development Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Base Maps, Original Sketches, Illustrative Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | Design Development, Original Sketches, Plans, Details, Grading Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Watercolor and Trace Physical location: Barn Box 10
|
undated | |
6 | Construction Document Physical location: Barn Box 11
|
undated |
XXV: XXV: Santa Teresa, 1989-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1989-2000 | ||
Box | Folder | ||
1 | 1 | Santa Teresa Clippings |
1995-1996 |
1 | 2 | Santa Teresa Charette Clippings |
1999 |
1 | 3 | Santa Teresa Coversation Records |
1995-1996 |
1 | 4 | Santa Teresa Correspondence Owner |
1995-1997 |
1 | 5 | Santa Teresa Suncor Correspondence Owner |
1999 |
1 | 6 | Santa Teresa Correspondence |
1996-1999 |
1 | 7 | Santa Teresa Correspondence Agency |
1995-1996 |
1 | 8 | Santa Teresa Cultural Resources |
1995-1996 |
1 | 9 | Santa Teresa Design |
1989-1997 |
1 | 10 | Santa Teresa Development |
1995-1996 |
1 | 11 | Santa Teresa Development |
1999-2000 |
1 | 12 | Santa Tersa Development Data |
1996-1997 |
1 | 13 | Santa Teresa Development Program |
1995-1996 |
1 | 14 | Santa Teresa Facsimiles |
undated |
1 | 15 | Santa Teresa Market Data |
1996 |
1 | 16 | Santa Teresa Master Plan |
1990 |
1 | 17 | Santa Teresa Meeting Minutes |
1999 |
1 | 18 | Santa Teresa Meeting Notes |
1995-1996 |
1 | 19 | Santa Teresa Meeting Minutes |
1995-1996 |
1 | 20 | Santa Teresa Progress |
1996 |
2 | 1 | Santa Teresa Project Update |
1995 |
2 | 2 | Santa Teresa Proposals |
1995-1997 |
2 | 3 | Santa Teresa Proposals/Contracts Owner & Landscape Architects |
1996 |
2 | 4 | Santa Teresa Suncor Proposal/Contracts |
1999-2000 |
2 | 5 | Santa Teresa Proposal |
undated |
2 | 6 | Santa Teresa Resource Inventory and Assessment Report |
1996 |
2 | 7 | Santa Teresa Survey/Base Map |
1995 |
2 | 8 | Santa Teresa Water-Sewer |
1995-1996 |
2 | 9 | Santa Teresa Suncor Work Program |
1996-1999 |
TUBES 2 tubes
|
|||
tube | |||
1 | Map Studies Physical location: CCA 8 Column 5, Row 2
|
undated | |
2 | Border Crossing, Road Sections, Master Plan, Conceptual, Draft Master Plan, Soils, Notes Physical location: CCA 8 Column 5, Row 2
|
undated |
XXVI: XXVI: Commons Due Diligence, 1992-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1992-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1998-2000 |
1 | 2 | Correspondence |
1998-1999 |
1 | 3 | Correspondence |
1999-2000 |
1 | 4 | Meeting Minutes |
1998 |
1 | 5 | Meeting Minutes |
1999 |
1 | 6 | Report |
1999 |
1 | 7 | Design Sketches |
undated |
1 | 8 | Infrastructure |
1999 |
1 | 9 | Programming |
1998-1999 |
1 | 10 | Programming |
1999 |
1 | 11 | Parcel Land Use Plan |
1999 April 20 |
2 | 1 | Design Review Board |
2005-2006 |
2 | 2 | PUD Application |
1992 |
2 | 3 | PUD Application |
1992 |
2 | 4 | PUD Application |
1997 |
2 | 5 | Fire Access |
1997 |
2 | 6 | Zoning |
1996 |
2 | 7 | Neighborhood Briefing |
1997 |
2 | 8 | Parking Commons |
1996 |
TUBES
|
|||
tube | |||
1 | Misc. Maps/Drawings Physical location:CCA 6 Column 2, Row 1
|
undated | |
2 | Final Plan Black and White Physical location:CCA 6 Column 2, Row 4
|
undated | |
3 | PUD Studies Physical location:CCA 6 Column 2, Row 3
|
undated | |
4 | Parking Studies Physical location:CCA 6 Column 2, Row 4
|
undated | |
5 | Neighborhood Sections Physical location:CCA 6 Column 2, Row 4
|
undated | |
6 | Early Illustrative Physical location:CCA 6 Column 2, Row 4
|
undated | |
7 | River Front Park Physical location: CCA 6 Column 2, Row 4
|
1999; undated | |
8 | Zone Physical location: CCA 6 Column 2, Row 4
|
undated | |
9 | Presentation on Water Physical location: CCA 6 Column 2, Row 7
|
undated | |
10 | Black and White Presentation Sketch Physical location: CCA 6 Column 1, Row 9
|
undated | |
11 | Layout Drawings Physical location: CCA 6 Column 2, Row 8
|
undated | |
12 | Design Standards Physical location: CCA 6 Column 2, Row 8
|
undated | |
13 | Design Standards Physical location: CCA 8 Column 6, Row 1
|
undated | |
14 | Site Testing Physical location: CCA 8 Column 6, Row 3
|
undated | |
15 | Parking Studies Physical location: CCA 8 Column 6, Row 1
|
undated | |
16 | Presentation Drawings Physical location: CCA 6 Column 1, Row 9
|
undated | |
17 | PUD Studies Physical location: CCA 8 Column 6, Row 1
|
undated | |
18 | Schematic Physical location: CCA 8 Column 6, Row 1
|
undated | |
19 | Diagrams Physical location: CCA 8 Column 6, Row 3
|
undated | |
20 | Elevation Physical location: CCA 8 Column 6, Row 1
|
undated | |
21 | Site Design Details Physical location: Barn Box 3
|
undated | |
22 | Construction Documents Physical location: Barn Box 3
|
undated | |
23 | Schematic Design Physical location: Barn Box 3
|
undated | |
24 | Schematic Design Set Physical location: Barn Box 3
|
undated | |
25 | Schematic and Conceptual Design Physical location: Barn Box 3
|
undated | |
26 | Phase 1 and 2 Physical location: Barn Box 5
|
undated | |
27 | Monograph Physical location: CCA 8 Column 4, Row 2
|
undated | |
28 | Bicycle Mapping Physical location: CCA 8 Column 5, Row 2
|
undated | |
29 | Site Test Physical location: CCA 8 Column 5, Row 2
|
undated | |
30 | Water Feature Site Plan Physical location: Barn Box 8
|
undated | |
31 | Construction Documents Physical location: Barn Box 8
|
undated | |
32 | Water Feature Submittals Plan Physical location: Barn Box 8
|
undated | |
33 | Design Development Physical location: Barn Box 8
|
undated | |
34 | Grading and Drawing Progress Set Physical location: Barn Box 8
|
undated | |
35 | Streets Studies Physical location: Barn Box 13
|
undated | |
36 | Project Presentations Sheets Physical location: Barn Box 16
|
undated |
XXVII: XXVII: IMBT/Pine Hall, 2003-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2003-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003-2005 |
1 | 2 | General Master Plan |
2006 |
1 | 3 | Meeting Minutes/Notes to File |
2003 |
1 | 4 | Meeting Minutes/Notes to File |
2004 |
1 | 5 | Meeting Minutes/Notes to File |
2004 |
1 | 6 | Meeting Minutes/Notes to File |
2005-2006 |
1 | 7 | Work Program |
2004-2006 |
1 | 8 | Utilities |
2005-2006 |
1 | 9 | Correspondence |
2003-2006 |
2 | 1 | Pine Hall Design Standards |
2004-2006 |
2 | 2 | Economic Model |
2003-2004 |
XXVIII: XXVIII: Wildcat Ranch, 1988-1997Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1988-1997 | ||
Box | Folder | ||
1 | 1 | Clippings |
1995-1997 |
1 | 2 | Construction |
1991 |
1 | 3 | Detailed Submission |
1990 |
1 | 4 | Engineering |
1991 |
1 | 5 | General Submission |
1993 |
1 | 6 | Information Packet |
1993 |
1 | 7 | P.U.D |
1990 |
1 | 8 | Physical |
1989-1994 |
1 | 9 | Residential Growth Management |
1993 |
2 | 1 | Planning |
1989-1994 |
2 | 2 | Purchasers Packet |
undated |
2 | 3 | Wildlife Study |
1988 |
TUBES 9 tubes
|
|||
tube | |||
1 | Douglas Ranch Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | 335, miscellaneous Physical location: CCA 6 Column 2, Row 3
|
1989; 1989 | |
3 | Boatdock CD's Physical location: CCA 6 Column 2, Row 3
|
undated | |
4 | Prop. Studies Physical location: CCA 6 Column 2, Row 3
|
undated | |
5 | Douglas Ranch Physical location: Barn Box 1
|
undated | |
6 | Douglas Ranch Physical location: Barn Box 1
|
undated | |
7 | Plat Mylar's Physical location: Barn Box 13
|
undated | |
8 | Planning Studies Physical location: Barn Box 13
|
1986; undated | |
9 | Monograph Physical location: Barn Box 16
|
undated |
XXIX: XXIX: Freed Development, 2006-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2006-2008 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2006-2007 |
1 | 2 | Correspondence |
2006-2007 |
1 | 3 | Correspondence |
2007 |
1 | 4 | Correspondence |
2007 |
1 | 5 | Correspondence |
2007 |
1 | 6 | Correspondence |
2007 |
1 | 7 | Correspondence |
2007 |
1 | 8 | Correspondence |
2007 |
1 | 9 | Correspondence |
2007 |
1 | 10 | Correspondence |
2007 |
2 | 1 | Correspondence |
2007 |
2 | 2 | Correspondence |
2007 |
2 | 3 | Correspondence |
2007 |
2 | 4 | Correspondence |
2007-2008 |
2 | 5 | Meeting Records/Notes to File |
2006-2007 |
2 | 6 | Invoices |
2006-2007 |
2 | 7 | Invoices |
2007 |
2 | 8 | Invoices |
2007-2008 |
XXX: XXX: McDowell Mountain Ranch, 1993-1995Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-1995 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1993-1995 |
1 | 2 | Correspondence/Owner |
1993-1995 |
1 | 3 | Correspondence/Agency |
1994-1995 |
1 | 4 | Correspondence with Consultant |
1994 |
1 | 5 | Meeting Minutes/Notes to File |
1994-1995 |
1 | 6 | Design Sketches |
1994 |
1 | 7 | McDowell Mountain Trails Proposals/Contracts |
1994 |
1 | 8 | McDowell Mountain Trails Cost Estimates |
1994 |
1 | 9 | McDowell Mountain Trails Design Sketches/Product Information |
1994 |
1 | 10 | McDowell Mountain Trails Project Manual |
1994 |
1 | 11 | McDowell Mountain Trails Transmittals |
1994-1995 |
1 | 12 | McDowell Mountain Trails Construction Documents |
1994-1995 |
1 | 13 | McDowell Mountain Ranch Electrical |
1994-1995 |
1 | 14 | McDowell Mountain Parks Correspondence |
1994 |
2 | 1 | McDowell Mountain Parks Meeting Mintues/Notes to File |
1994 |
2 | 2 | McDowell Mountain Parks Meeting Mintues/Notes to File |
1994-1995 |
2 | 3 | McDowell Mountain Parks Vegetation |
1994 |
2 | 4 | McDowell Mountain Parks Engineering |
1994 |
2 | 5 | McDowell Mountain Parks Info/Community Center Correspondence/Owner |
1994 |
2 | 6 | McDowelll Mountain Parks Info/Community Center Design Sketches |
1994 |
2 | 7 | McDowelll Mountain Parks Info/Community Center Design Sketches |
1994-1995 |
2 | 8 | McDowell Mountain Parks Specifications |
1994 September 6 |
TUBES 12 tubes
|
|||
tube | |||
1 | Schematic Analysis Plan Physical location: CCA 6 Column 2, Row 6
|
undated | |
2 | Design Development and Graphics Physical location: CCA 6 Column 2, Row 6
|
undated | |
3 | 100% Review Set Physical location: CCA 6 Column 2, Row 6
|
undated | |
4 | Construction Set Physical location: CCA 6 Column 2, Row 6
|
undated | |
5 | MTG Park Physical location: CCA 8 Column 5, Row 1
|
undated | |
6 | Issue for Bid Physical location: CCA 8 Column 5, Row 3
|
undated | |
7 | Community Park and Info Center Physical location: CCA 8 Column 5, Row 3
|
undated | |
8 | Issue for Bid Physical location: Barn Box 6
|
1994 December; undated | |
9 | Community Park Info Center Physical location: Barn Box 6
|
undated | |
10 | Originals Physical location: Barn Box 6
|
undated | |
11 | Community Park and Info Center Physical location: Barn Box 6
|
undated | |
12 | Illustrative Physical location: Barn Box 14
|
undated |
XXXI: XXXI: East Village, 1990-1996Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-1996 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1990 |
1 | 2 | Proposals/Contracts |
1991 |
1 | 3 | Proposals/Contracts |
1991 |
1 | 4 | Proposals/Contracts |
1992 |
1 | 5 | Proposals/Contracts |
1993-1994 |
1 | 6 | Correspondence |
1990-1991 |
1 | 7 | Correspondence |
1994 |
1 | 8 | Correspondence |
1994-1996 |
2 | 1 | Hydrology |
1990-1991 |
2 | 2 | Hydrology |
1992-1993 |
2 | 3 | Hydrology |
1994 |
2 | 4 | Wetlands |
1993-1996 |
2 | 5 | Wildlife |
1993-1994 |
2 | 6 | Geology/Soils |
1990-1991 |
TUBES 17 tubes
|
|||
tube | |||
1 | Progress Slicks Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Base area parking, concept Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Road Profiles Physical location: CCA 8 Column 6, Row 2
|
undated | |
4 | Court at alpine springs, two creeks, layout & grading Physical location: CCA 8 Column 6, Row 2
|
undated | |
5 | Road cross sections, two creeks studies Physical location: CCA 8 Column 6, Row 2
|
undated | |
6 | Conceptual, Wall and Bridge details Physical location: CCA 8 Column 6, Row 2
|
undated | |
7 | Early Mylar's on Trace Physical location: CCA 6 Column 2, Row 7
|
undated | |
8 | Wall Sections Physical location: CCA 6 Column 2, Row 7
|
undated | |
9 | 200 Scale Physical location: CCA 6 Column 2, Row 7
|
undated | |
10 | Design Development Physical location: CCA 6 Column 2, Row 7
|
undated | |
11 | Conceptual Submissions Physical location: CCA 6 Column 2, Row 1
|
undated | |
12 | Walls, Bridges, Roads Submission Slicks Physical location: CCA 6 Column 2, Row 6
|
1994 January 28; undated | |
13 | Site Analysis Physical location: CCA 6 Column 2, Row 7
|
undated | |
14 | Preliminary Studies Physical location: CCA 6 Column 2, Row 6
|
undated | |
15 | Bridge Studies Physical location:Barn Box 2
|
undated | |
16 | Sails and Wetlands Physical location: CCA 8 Column 4, Row 2
|
undated | |
17 | Lift Profiles Physical location: CCA 8 Column 4, Row 2
|
undated |
XXXII: XXXII: Goldberg Residence, 1988-1996Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1988-1996 | ||
Box | Folder | ||
1 | 1 | Goldberg Residence Project Memorandum |
1998 |
1 | 2 | Goldberg Residence Propsals/Contracts |
1992-1993 |
1 | 3 | Goldberg Residence Correspondence |
1992-1993 |
1 | 4 | Goldberg Residence Correspondence |
1994-1996 |
1 | 5 | Goldberg Residence Meeting Minutes/Notes |
1992-1995 |
1 | 6 | Goldberg Residence Work Program |
1988-1992 |
1 | 7 | Goldberg Residence Work Program |
1993 |
1 | 8 | Goldberg Residence Work Program |
1994-1996 |
1 | 9 | Goldberg Residence Physical |
1988-1993 |
1 | 10 | Goldberg Residence Engineering |
1989-1995 |
2 | 1 | Goldberg Residence Programming |
1993 |
2 | 2 | Goldberg Residence Cost Estimates |
1992-1995 |
2 | 3 | Goldberg Residence Design Sketches/Product Information |
1992-1996 |
2 | 4 | Goldberg Residence Specifications |
1993 |
2 | 5 | Goldberg Residence Field Reports |
1993-1995 |
2 | 6 | Goldberg Residence Change Orders |
1992-1994 |
2 | 7 | Goldberg Residence Change Orders |
1995 |
2 | 8 | Goldberg Residence Change Orders |
1995-1996 |
2 | 9 | Goldberg Residence Submittals/Shop Drawings |
1992-1996 |
2 | 10 | Goldberg Residence Construction Documents |
1993 July 14 |
TUBES 7 tubes
|
|||
tube | |||
1 | Illustrative Drawings Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Preliminary Studies Physical location: Barn Box 3
|
undated | |
3 | Mylar's Physical location: Barn Box 3
|
undated | |
4 | Overlays Physical location: Barn Box 3
|
undated | |
5 | Work Physical location: Barn Box 3
|
1998; undated | |
6 | Design Development Physical location: CCA 8 Column 4, Row 2
|
undated | |
7 | Specification Plan Physical location: CCA 8 Column 4, Row 1
|
undated |
XXXIII: XXXIII: Central Platte Valley, 1987-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1987-2001 | ||
Box | Folder | ||
1 | 1 | Air Quality |
1994 |
1 | 2 | Articles |
2001 |
1 | 3 | Biological |
1992 |
1 | 4 | Clippings |
1987-1995 |
1 | 5 | Correspondence |
1991-1994 |
1 | 6 | Design Sketches/Product Info |
undated |
1 | 7 | Engineering |
1994 |
1 | 8 | Master Plan Examples of Phase 1, 2 and 3 Deliverables |
undated |
1 | 9 | Meeting Minutes/Notes to File |
1994 |
1 | 10 | Meeting Minutes/Notes to File |
2000 |
1 | 11 | Outdoor Resource Master Plan |
1997 |
1 | 12 | Outdoor Resource Master Plan |
1997 |
1 | 13 | Programming |
1994 |
2 | 1 | Proposal/Contracts |
2000 |
2 | 2 | Trillium Central Platte Valley Plan |
1994 |
2 | 3 | Trillium Site |
1994 |
2 | 4 | Trillium Site |
1994 |
XXXIV: XXXIV: Korean War Veterans Park (Albuquerque, NM), 1997-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2000 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1997-1998 |
1 | 2 | Correspondence |
1997-1998 |
1 | 3 | Meeting Minutes |
1997-1998 |
1 | 4 | Billings/Invoices |
1997-1998 |
1 | 5 | Schematic Design Proposals/Contracts |
1997-1998 |
1 | 6 | Schematic Design Correspondence |
1998 |
1 | 7 | Schematic Design Notes to File |
undated |
1 | 8 | Schematic Design Work Program |
1998 |
1 | 9 | Schematic Design Billing/Invoices |
1997-1998 |
1 | 10 | Schematic Design Cost Estimates |
1998 |
1 | 11 | Phase 2 Project Manual |
1999 June 30 |
1 | 12 | Phase 2 Proposals/Contracts |
1998-2000 |
1 | 13 | Phase 2 Correspondence |
1998-1999 |
1 | 14 | Phase 2 Correspondence |
1999-2000 |
1 | 15 | Phase 2 Meeting Minutes |
1999-2000 |
1 | 16 | Phase 2 Construction Bids/Proposals/Addendum |
2000 |
1 | 17 | Phase 2 Field Reports |
2000 |
1 | 18 | Phase 2 Billing/Invoices |
2000 |
2 | 1 | Phase 2 Notes to File |
1998-1999 |
2 | 2 | Phase 2 Work Program |
1998 |
2 | 3 | Phase 2 Engineering |
1997 |
2 | 4 | Phase 2 Cost Estimates |
1998-1999 |
2 | 5 | Phase 2 Design Sketches |
1999 |
2 | 6 | Phase 2 Construction Bids/Proposals/Addendum |
1999 |
2 | 7 | Phase 2 Field Reports |
2000 |
2 | 8 | Phase 2 Submittals/Shop Drawings |
1999-2000 |
2 | 9 | Phase 2 Construction Communications |
1999-2000 |
XXXV: XXXV: University of Arizona Highland Community, 1990-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-2004 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2000-2001 |
1 | 2 | Owner Contracts |
2000-2002 |
1 | 3 | Correspondence |
2000-2001 |
1 | 4 | Correspondence |
2002-2004 |
1 | 5 | Change Orders |
2002 |
1 | 6 | Design Development |
2001-2003 |
1 | 7 | Construction Documents |
2001-2002 |
1 | 8 | Land Use |
2002 |
1 | 9 | Meeting Minutes |
2000-2001 |
1 | 10 | Meeting Minutes |
2002-2004 |
1 | 11 | Construction Observations |
2001-2003 |
1 | 12 | Paving Patterns Products |
undated |
1 | 13 | Engineering |
1990 |
2 | 1 | Construction Bids/Proposals |
2001 |
2 | 2 | Additional Services Proposals/Contracts |
2003 |
2 | 3 | Open Space Proposals/Contracts |
2001-2004 |
2 | 4 | Open Space Design Development |
2001-2003 |
2 | 5 | Open Space Meeting Minutes |
2002-2004 |
2 | 6 | Open Space Schedule |
2002-2003 |
2 | 7 | Open Space Shematic Design |
2003 |
2 | 8 | Open Space Correspondence |
2003-2004 |
2 | 9 | Open Space Land Use |
2002-2003 |
2 | 10 | Open Space Infrastructure |
2002-2004 |
2 | 11 | Open Space Field Notes |
2004 |
2 | 12 | Quad North Proposals/Contracts |
2001-2002 |
2 | 13 | Quad North Meeting Minutes |
2002-2003 |
2 | 14 | Quad North Correspondence |
2002 |
2 | 15 | Quad North Notes to File |
2002 |
2 | 16 | Quad North Water |
2002 |
2 | 17 | Quad North Schematic Design |
2002-2003 |
2 | 18 | Quad North Land Use |
2002 |
2 | 19 | Quad North Site Observation |
2002-2004 |
2 | 20 | Concept Design |
2000 November 15 |
TUBES 3 tubes
|
|||
tube | |||
1 | Landscape Construction Record Set Physical location: CCA 8 Column 5, Row 2
|
2005 March 24; undated | |
2 | Design Development Physical location: Barn Box 10
|
undated | |
3 | Construction Documents Physical location: Barn Box 12
|
undated |
XXXVI: XXXVI: Trillium, 2000-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2000-2004 | ||
Box | Folder | ||
1 | 1 | Surface Parking Proposals/Contracts |
2003 |
1 | 2 | Surface Parking Meeting Minutes |
2003 |
1 | 3 | Surface Parking Specifications |
2003 |
1 | 4 | Surface Parking Infrastructure |
2003 |
1 | 5 | Surface Parking Change Orders |
2003 |
1 | 6 | Parking Proposals/Contracts |
2000-2001 |
1 | 7 | Parking Correspondence |
2000-2002 |
1 | 8 | Parking Meeting Minutes |
2001-2002 |
1 | 9 | Parking Design Development |
2000-2002 |
1 | 10 | Parking Development Review Responses |
untitled |
1 | 11 | Parking Proposals/Contracts |
2004 |
1 | 12 | Parking Notes to File |
2003 |
1 | 13 | Parking Correspondence |
2003-2004 |
1 | 14 | Parking Meeting Minutes |
2003-2004 |
1 | 15 | Community Master Plan |
2003 October 1 |
1 | 16 | Design Development |
2004 |
1 | 17 | Environmental |
undated |
1 | 18 | Transportation |
2004 |
2 | 1 | Proposals/Contracts |
2003 |
2 | 2 | Drawings |
2003 |
2 | 3 | Drawings |
2003-2004 |
2 | 4 | Drawings |
2004 |
2 | 5 | Drawings |
2004 |
2 | 6 | Meeting Notes |
2003 |
2 | 7 | Master Plan Alternative |
2003 December 23 |
2 | 8 | Parks Planning |
2004 January 20 |
2 | 9 | Correspondence |
2003-2004 |
2 | 10 | Conceptual Plan |
2004 |
2 | 11 | Notes to File |
2004 |
TUBES 9 tubes
|
|||
tube | |||
1 | Surface Parking Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Slope Analysis Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Final GIS Presentation Maps Physical location: CCA 8 Column 6, Row 2
|
undated | |
4 | Planning Base Map Physical location: CCA 8 Column 6, Row 2
|
undated | |
5 | Village Neighborhood Plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
6 | Surface Parking Physical location: CCA 8 Column 5, Row 3
|
undated | |
7 | Lotting Plans Redlines Physical location: Barn Box 1
|
undated | |
8 | Site Testing Physical location: CCA 8 Column 4, Row 1
|
undated | |
9 | City Side Physical location:Barn Box 16
|
undated |
XXXVII: XXXVII: Blackcomb, 1978-1986Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1978-1986 | ||
Box | Folder | ||
1 | 1 | Plan Review |
1986 September |
1 | 2 | Development Proposal |
1978 |
1 | 3 | Proposal Appendix |
1978 |
1 | 4 | Proposal Map Appendix |
undated |
1 | 5 | Proposal Map Appendix |
undated |
1 | 6 | Development Plan |
1981 |
2 | 1 | Development Plan Phase 1 |
1986 December |
2 | 2 | Architectural Program |
1979 |
2 | 3 | Director's Report |
1982 |
2 | 4 | Planning and Design Report |
1982 |
2 | 5 | Mountain Development Maps |
undated |
2 | 6 | Mountain Development Maps |
undated |
TUBES 13 tubes
|
|||
tube | |||
1 | Master Plans Physical location: CCA 8 Column 5, Row 1
|
undated | |
2 | 1986 Negatives Physical location: CCA 8 Column 5, Row 1
|
undated | |
3 | Technical Concept Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Development Suitability Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | Originals Physical location: CCA 6 Column 1, Row 5
|
undated | |
6 | Phase 2 Phase III Physical location: Barn Box 8
|
undated | |
7 | Sky Plan Physical location: Barn Box 8
|
undated | |
8 | Parcel Testing Physical location: Barn Box 8
|
undated | |
9 | Phase III Physical location: Barn Box 8
|
undated | |
10 | Originals Physical location: Barn Box 8
|
undated | |
11 | Originals Physical location: Barn Box 8
|
undated | |
12 | Illustrative Mylar Physical location: Barn Box 8
|
undated | |
13 | Miscellaneous Prints Physical location: Barn Box 8
|
undated |
XXXVIII: XXXVIII: Wickenburg, 1997-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2002 | ||
Box | Folder | ||
1 | 1 | Propsals/Contracts |
1997-1999 |
1 | 2 | Propsals/Contracts |
1999 |
1 | 3 | Propsals/Contracts |
2000-2001 |
1 | 4 | Propsals/Contracts |
2001-2002 |
1 | 5 | Correspondence |
2000-2002 |
1 | 6 | Meeting Minutes |
2000-2001 |
1 | 7 | Work Program |
2000-2001 |
1 | 8 | Notes to File |
2000-2002 |
1 | 9 | Notes to File |
2000-2002 |
1 | 10 | Land Use |
2000 |
1 | 11 | Memorandums |
1999-2002 |
1 | 12 | Zoning |
2001-2002 |
1 | 13 | Design Sketches |
undated |
2 | 1 | Plan Report |
2001 September |
2 | 2 | Plan Report |
2002 June |
2 | 3 | Plan Report |
2002 June |
XXXIX: XXXIX: Cherokee Gates Redevelopment, 1991-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1991-2006 | ||
Box | Folder | ||
1 | 1 | Appendix |
undated |
1 | 2 | Clippings |
2001-2006 |
1 | 3 | Correspondence |
2001-2002 |
1 | 4 | Correspondence |
2001-2005 |
1 | 5 | Design Guidelines |
2002 |
1 | 6 | Flyover Modifications |
2002 |
1 | 7 | Informational Packet |
2002 |
1 | 8 | Light Rail |
2002 |
1 | 9 | Meeting Record |
2001-2002 |
1 | 10 | Schedule |
2001 |
1 | 11 | Urban Standards |
2005 |
1 | 12 | Design Development |
2001 |
1 | 13 | Redevelopment Story |
2002 |
1 | 14 | Rezoning |
undated |
1 | 15 | Villa Park Neighborhood Plan |
1991 |
1 | 16 | Athmar Park Neighborhood Permineter Plan |
undated |
1 | 17 | Transportation |
undated |
2 | 1 | Development Agreement |
undated |
2 | 2 | Meeting Minutes |
2001 |
2 | 3 | Correspondence |
2001 |
2 | 4 | Affordable Housing |
2002 |
2 | 5 | Finances |
2002 |
2 | 6 | Engineering Qualifications |
undated |
2 | 7 | South Broadway Improvement Plan |
2002 |
2 | 8 | Land Ownership |
2002 |
TUBES 2 tubes
|
|||
tube | |||
1 | Cherokee Denver Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Illustrative Physical location: CCA 6 Column 1, Row 2
|
undated |
XL: XL: Arbolera, 1997-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2002 | ||
Box | Folder | ||
1 | 1 | Arbolera de Villa |
undated |
1 | 2 | Arbolera Master Development Plan |
1998 |
1 | 3 | Arbolera Place Design Submission |
2001 |
1 | 4 | Clippings |
1999-2001 |
1 | 5 | City Plans |
1997 |
1 | 6 | Construction |
2000-2002 |
1 | 7 | Correspondence |
1998-2001 |
1 | 8 | Design |
1998 |
1 | 9 | Master Development Plan |
1998 |
1 | 10 | Meeting Notes/Notes to File |
1998-2001 |
1 | 11 | Owner/Landscape Architect for Sawmill |
1998-2000 |
1 | 12 | Programming |
undated |
1 | 13 | Proposal/Contract |
2000 |
2 | 1 | Redevelopment Plan for Sawmill |
1997 |
2 | 2 | Sawmill Advisory Council |
1997 |
2 | 3 | Sawmill Development |
1997 |
2 | 4 | Sawmill Real Estate |
1997 |
2 | 5 | Meeting Minutes |
1997-1998 |
2 | 6 | Sawmill Redevelopment Project |
1997 |
XLI: XLI: Copper Mountain, 1985-1997Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1985-1997 | ||
Box | Folder | ||
1 | 1 | Proposal |
1985-1986 |
1 | 2 | Correspondence |
1997 |
1 | 3 | Master Plan Proposals/Contracts |
1990-1991 |
1 | 4 | Master Plan Correspondence |
1990-1992 |
1 | 5 | Master Plan Meeting Minutes |
1990-1991 |
1 | 6 | Master Plan Addendum Proposals/Contracts |
1990-1991 |
1 | 7 | Master Plan Addendum Correspondence |
1990-1991 |
1 | 8 | Master Plan Addendum Correspondence |
1991 |
1 | 9 | Master Plan Addendum Correspondence |
1992 |
1 | 10 | Master Plan Addendum Meeting Minutes/Notes to File |
1991 |
1 | 11 | Master Plan Addendum Meeting Agendas |
1991 |
1 | 12 | Master Plan Addendum Meeting Summaries |
1991-1992 |
1 | 13 | Master Plan Addendum Notes To File |
1991 |
1 | 14 | Master Plan Addendum Work Program |
1990-1992 |
1 | 15 | Master Plan Addendum Physical |
1991 |
1 | 16 | Master Plan Addendum Programming |
1991 |
2 | 1 | Entry Proposals/Contracts |
1993-1996 |
2 | 2 | Entry Correspondence |
1992-1993 |
2 | 3 | Entry Programming |
undated |
2 | 4 | Entry Cost Estimates |
1993 |
2 | 5 | Meeting Summaries |
1990-1991 |
2 | 6 | Correspondence |
1989-1992 |
2 | 7 | Meeting Agendas |
1991-1992 |
2 | 8 | Soils/Geology |
1991 |
2 | 9 | Hydrology |
1991 |
2 | 10 | Village Core Proposals/Contracts |
1996 |
2 | 11 | Village Core Urban Design Study |
1997 |
2 | 12 | Village Core Programming |
1996-1997 |
2 | 13 | Maps |
1991 |
TUBES 16 tubes
|
|||
tube | |||
1 | Central Day Lodge Physical location: CCA 6 Column 1, Row 7
|
||
2 | Urban Design and Misc. Drawings Physical location: CCA 6 Column 1, Row 7
|
undated | |
3 | Presentation Drawings Physical location: CCA 6 Column 1, Row 7
|
undated | |
4 | Negative Aerial Photo Mylar's Physical location: CCA 6 Column 1, Row 7
|
undated | |
5 | West Parcel Studies Physical location: CCA 6 Column 2, Row 3
|
undated | |
6 | Illustrations Physical location: CCA 6 Column 1, Row 9
|
undated | |
7 | Design Studies Physical location: CCA 6 Column 1, Row 9
|
undated | |
8 | Master Plans Physical location: CCA 6 Column 1, Row 8
|
undated | |
9 | Trade Parcel Physical location: CCA 8 Column 6, Row 1
|
undated | |
10 | Entry Physical location: CCA 8 Column 6, Row 1
|
undated | |
11 | Preliminary Analysis Physical location: CCA 6 Column 2, Row 1
|
undated | |
12 | East Trade Parcel Physical location: CCA 6 Column 2, Row 1
|
undated | |
13 | Mylar Negatives Physical location: CCA 8 Column 6, Row 1
|
undated | |
14 | Trade Parcel Physical location: CCA 8 Column 6, Row 1
|
undated | |
15 | Parcel Studies Physical location: CCA 8 Column 6, Row 1
|
undated | |
16 | Urban Design Studies Physical location: CCA 6 Column 1, Row 5
|
undated |
XLII: XLII: Scottsdale/Goldwater Art Wall, 1993-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-2000 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts Owner |
1997-1999 |
1 | 2 | Proposals/Contracts Consultants |
1997-1998 |
1 | 3 | Correspondence Owner |
1997-1998 |
1 | 4 | Correspondence Owner |
1998-1999 |
1 | 5 | Correspondence Consultant |
1997-1998 |
1 | 6 | Correspondence Consultant |
1998-1999 |
1 | 7 | Meeting Minutes |
1997-2000 |
1 | 8 | Notes to File |
1997 |
1 | 9 | Engineering |
1998 |
1 | 10 | Cost Estimate |
1997-1998 |
1 | 11 | Design Sketches |
undated |
2 | 1 | Specifications |
1998 |
2 | 2 | Field Reports |
1998 |
2 | 3 | Design Sketches/Product Info for Scottsdale Path |
1994 |
2 | 4 | Meeting Minutes for Multi-Use Path |
1993-1994 |
2 | 5 | Correspondence for Multi-Use Path |
1994-1995 |
2 | 6 | Proposals/Contracts for Multi-Use Path |
1996 |
2 | 7 | Specifications for Multi-Use Path |
1995 |
2 | 8 | Submittals/Shop Drawings for Scottsdale Path |
1994 |
2 | 9 | Cost Estimates for Multi-Use Path |
1993-1994 |
XLIII: XLIII: Tempe Performing Arts Center, 2001-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2001-2006 | ||
Box | Folder | ||
1 | 1 | Meeting Agenda & Minutes |
2002 |
1 | 2 | Meeting Agenda & Minutes |
2002 |
1 | 3 | Meeting Agenda & Minutes |
2003 |
1 | 4 | Schedules & Deliverables |
2002 |
1 | 5 | Topographical |
2001 |
1 | 6 | Design Sketches |
2002 |
1 | 7 | Design Sketches |
2001-2006 |
1 | 8 | Cost Estimates |
2001-2002 |
1 | 9 | Cost Estimates |
2002-2004 |
1 | 10 | Specifications |
undated |
1 | 11 | Specifications |
undated |
1 | 12 | Design Development |
2002 |
1 | 13 | Design Development |
2002-2003 |
1 | 14 | Correspondence |
2001-2002 |
1 | 15 | Correspondence |
2002 |
1 | 16 | Correspondence |
2003 |
1 | 17 | Correspondence |
2003 |
1 | 18 | Correspondence |
2003-2006 |
1 | 19 | Correspondence |
2007 |
1 | 20 | Correspondence |
2007 |
1 | 21 | Correspondence |
2007 |
1 | 22 | Correspondence |
2007 |
1 | 23 | Correspondence |
2007 |
1 | 24 | Correspondence |
2007 |
1 | 25 | Correspondence |
2007 |
2 | 1 | Project Planning Guide |
2001 December |
2 | 2 | Schematic Design |
2002 |
2 | 3 | Schematic Design |
2002 |
2 | 4 | Design Development Cost Check |
2002 |
2 | 5 | Drawings |
2003 |
2 | 6 | Notes To File |
2001 |
2 | 7 | Design Study |
2002-2003 |
TUBES 3 tubes
|
|||
tube | |||
1 | Arts Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Schematic Design Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Design Drawings Physical location: Barn Box 4
|
undated |
XLIV: XLIV: 16th Street Mall Extension, 1993-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-2007 | ||
Box | Folder | ||
1 | 1 | Administration |
1999-2007 |
1 | 2 | Proposals/Contracts |
1997-1998 |
1 | 3 | Proposals/Contracts |
1999-2000 |
1 | 4 | Proposals/Contracts |
2001 |
1 | 5 | Correspondence |
1998-1999 |
1 | 6 | Correspondence |
2000 |
1 | 7 | Correspondence |
2001-2002 |
1 | 8 | Engineering |
1997-1999 |
1 | 9 | Engineering |
2000 |
1 | 10 | Design Sketches |
1998-2001 |
1 | 11 | Submittals/Shop Drawings |
2002 |
1 | 12 | Urban Design Standards & Guidelines |
1997 |
1 | 13 | Park Tower Condeos Correspondence |
2000 |
1 | 14 | Park Tower Condos Design Development |
2000 |
1 | 15 | Promenade Lots Specifications |
2000 |
1 | 16 | Loop Road Proposals/Contracts |
1999-2001 |
1 | 17 | Commons Streetscape Correspondence |
1999-2004 |
1 | 18 | Meeting Minutes |
1997-1999 |
1 | 19 | Meeting Minutes |
2000 |
1 | 20 | Meeting Minutes |
2001 |
1 | 21 | Meeting Minutes |
2001 |
1 | 22 | Meeting Minutes |
2001 |
1 | 23 | Meeting Minutes |
2002 |
1 | 24 | Meeting Minutes |
2002 |
1 | 25 | Meeting Minutes |
2002 |
1 | 26 | Mall Extension |
2000-2001 |
1 | 27 | Mall Enhancement Workshop |
1993 |
1 | 28 | Mall Proposals/Contracts |
1993 |
1 | 29 | Mall Transmittals |
1993 |
1 | 30 | Mall Meeting Minutes |
1993 |
1 | 31 | Mall Work Program |
1993 |
1 | 32 | Mall Correspondence |
1993 |
1 | 33 | Mall Engineering |
1993 |
1 | 34 | Mall Visual |
undated |
1 | 35 | Programming |
1993 |
1 | 36 | Cost Estimates |
1992 |
2 | 1 | Design Sketches |
undated |
2 | 2 | Market Square Proposals/Contracts |
1999-2001 |
2 | 3 | Market Square Correspondence |
2000-2001 |
2 | 4 | Market Square Correspondence |
2001 |
2 | 5 | Market Square Meeting Minutes |
2000 |
2 | 6 | Market Square Physical |
2000 |
2 | 7 | Market Square Physical |
2000 |
2 | 8 | Market Square Shop Drawings/Submittals |
2000 |
2 | 9 | Market Square Design Development |
2000 |
2 | 10 | Market Square Restaruant Corral Railings |
2000 |
TUBES 10 tubes
|
|||
tube | |||
1 | Mall Extension Physical location:CCA 8 Column 6, Row 1
|
undated | |
2 | Mall Pedestrian Ridge Physical location:CCA 8 Column 6, Row 1
|
undated | |
3 | Commons streetscape, schematic CDs Physical location:CCA 8 Column 6, Row 1
|
undated | |
4 | Market Square Physical location:CCA 8 Column 6, Row 2
|
undated | |
5 | Market Square Physical location:CCA 8 Column 6, Row 2
|
undated | |
6 | Market Square construction documents Physical location:CCA 8 Column 6, Row 2
|
undated | |
7 | Shop drawings and grading plans, Denver office, 2475 Physical location: CCA 8 Column 6, Row 2
|
2000/2001 | |
8 | Mall Physical location: CCA 8 Column 6, Row 2
|
undated | |
9 | Site Details, Sketches, Trace Physical location: CCA 8 Column 6, Row 2
|
undated | |
10 | Mall Physical location: Barn Box 15
|
undated |
XLV: XLV: Lionshead, 1988-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1988-2001 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1996 |
1 | 2 | Correspondence |
1996 |
1 | 3 | Programming |
1995-1996 |
1 | 4 | Programmimg |
1996 |
1 | 5 | Design Sketches/Product Information |
1996 |
1 | 6 | Work Program |
1993 |
1 | 7 | Work Program |
1993 |
1 | 8 | Work Program |
1994-1996 |
1 | 9 | Phase 2 Correspondence |
1993 |
1 | 10 | Phase 2 Meeting Minutes/Notes |
1988-1993 |
1 | 11 | Phase 2 Engineering |
1988-1994 |
1 | 12 | Phase 2 Design Sketches/Product Information |
1992-1995 |
1 | 13 | Redevelopment Correspondence |
1997-1998 |
1 | 14 | Redevelopment Proposals/Contracts |
1996-1998 |
1 | 15 | Redevelopment Meeting Minutes |
1997-1998 |
1 | 16 | Redeveloment Engineering |
1997 |
1 | 17 | Redevelopment Programming |
1997 |
1 | 18 | Redevelopment Construction Contracts |
1997 |
1 | 19 | Redevelopment Marketing/Presentations |
1997 |
1 | 20 | Redevelopment Notes to File |
1996 |
1 | 21 | Redevelopment Proposals/Contracts |
1997 |
1 | 22 | Redevelopment Plan |
1993 |
1 | 23 | Redevelopment Plan |
1996 |
1 | 24 | Redevelopment Project Update |
1994 |
1 | 25 | Redevelopment Preliminary Booklet |
1996 |
1 | 26 | East West Lionshead Proposals/Contracts |
2001 |
1 | 27 | East West Lionshead Correspondence |
2001 |
1 | 28 | East West Lionshead Work Program |
1996 |
1 | 29 | Concept Studies Proposals/Contracts |
2000 |
1 | 30 | Concept Studies Correspondence |
2000 |
1 | 31 | Concept Studies Meeting Minutes/Notes to File |
2000 |
1 | 32 | Concept Studies Programming |
2000 |
1 | 33 | Concept Studies Design Sketches/Product Information |
2000 |
1 | 34 | Concept Studies Master Plan |
1999 |
1 | 35 | Lions Square Lodge Proposals/Contracts |
2001 |
1 | 36 | Lions Square Lodge Correspondence |
2001 |
1 | 37 | Lions Square Lodge Design Sketches |
2001 |
1 | 38 | Lions Square Lodge Proposals/Contracts |
1999-2000 |
1 | 39 | Lions Square Lodge Correspondence |
1998-2000 |
1 | 40 | Lions Square Lodge Meeting Minutes/Notes to File |
undated |
1 | 41 | Lions Square Lodge Cost Estimates |
1999 |
TUBES 8 tubes
|
|||
tube | |||
1 | Master Plan Physical location: CCA 6 Column 1, Row 3
|
undated | |
2 | Master Plan Physical location: CCA 6 Column 1, Row 3
|
undated | |
3 | Monograph Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Lions Square Lodge Physical location: CCA 8 Column 4, Row 2
|
undated | |
5 | Elevations Physical location: CCA 8 Column 5, Row 2
|
undated | |
6 | West Lot Proposal Physical location: CCA 8 Column 5, Row 2
|
undated | |
7 | Service Yard and Interchange Physical location: Barn Box 6
|
undated | |
8 | Redevelopment Study Physical location: Barn Box 7
|
undated |
XLVI: XLVI: Maroon Creek, 1988-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1988-1998 | ||
Box | Folder | ||
1 | 1 | Landscape Specifications |
1993-1994 |
1 | 2 | Maroon Creek Club Design Sketches/Product Info |
1993-1997 |
1 | 3 | Maroon Creek Club Progress Report #24 |
1995 June 7 |
1 | 4 | Maroon Creek Construction and Design Issues |
1994 |
1 | 5 | Maroon Creek Correspondences |
1993-1994 |
1 | 6 | Maroon Creek Environment |
1996 |
1 | 7 | Maroon Creek Golf Correspondence |
1993-1995 |
1 | 8 | Maroon Creek Golf Cost Estimates |
1994-1995 |
1 | 9 | Maroon Creek Management |
1996-1997 |
1 | 10 | Maroon Creek Management |
1996-1997 |
1 | 11 | Maroon Creek Management Architectural |
1994-1995 |
1 | 12 | Maroon Creek Management Budgets |
1993-1996 |
1 | 13 | Maroon Creek Management Change Orders |
1993-1995 |
1 | 14 | Maroon Creek Management Civil |
1988-1996 |
1 | 15 | Maroon Creek Management Design Sketches/Product Info |
1993-1995 |
1 | 16 | Maroon Creek Management Design Sketches/Product Info |
1996-1997 |
1 | 17 | Maroon Creek Management Field Reports |
1993-1997 |
1 | 18 | Maroon Creek Management Golf |
1986-1990 |
1 | 19 | Maroon Creek Management Golf |
1993 |
1 | 20 | Maroon Creek Management Golf |
1994 |
1 | 21 | Maroon Creek Management Golf |
1994-1997 |
1 | 22 | Maroon Creek Management Lot 17 |
1996 August 26 |
1 | 23 | Maroon Creek Management Meeting Minutes/Notes |
1994 |
1 | 24 | Maroon Creek Management Meeting Minutes/Notes |
1995-1996 |
1 | 25 | Maroon Creek Management Owner Decisions |
1991-1998 |
1 | 26 | Maroon Creek Management Political Approvals |
1991-1996 |
1 | 27 | Maroon Creek Management Soils |
1988-1991 |
1 | 28 | Maroon Creek Management Soils |
1993 |
1 | 29 | Maroon Creek Management Soils |
1994-1995 |
1 | 30 | Maroon Creek Management Submittals/Shop Drawings |
1994 |
1 | 31 | Maroon Creek Management Water |
1988-1994 |
1 | 32 | Maroon Creek Political Correspondence |
1994-1995 |
1 | 33 | Maroon Creek Club Design Guidelines |
1995 March 31 |
1 | 34 | Maroon Creek Club Residential Master Landscape and Grading Plan |
1995 September 15 |
1 | 35 | Maroon Creek Management Meeting Minutes/Notes |
1990-1991 |
1 | 36 | Maroon Creek Golf Proposals/Contracts |
1993-1994 |
1 | 37 | Maroon Creek Golf Meeting Minutes/Notes |
1994-1995 |
1 | 38 | Maroon Creek Golf Work Program |
1993 |
1 | 39 | Maroon Creek Golf Physical |
undated |
1 | 40 | Maroon Creek Golf Engineering |
1985 |
1 | 41 | Maroon Creek Golf Field Reports |
1995 |
1 | 42 | Maroon Creek Golf Change Orders |
1995 |
2 | 1 | Maroon Creek Documents Part 1 |
undated |
2 | 2 | Maroon Creek Documents Part 2 |
undated |
2 | 3 | Maroon Creek Documents Part 3 |
undated |
2 | 4 | Maroon Creek Club Proposals/Contracts |
1993 |
2 | 5 | Maroon Creek Golf Design Sketches/Product Info |
1994 |
2 | 6 | Maroon Creek Club |
1996 |
2 | 7 | Maroon Creek Political Graphics/Sketches |
1994 |
2 | 8 | Maroon Creek Political Biological |
undated |
2 | 9 | Maroon Creek Political Programming |
1994 |
2 | 10 | Maroon Creek Review Proposal/Contracts |
1993 |
2 | 11 | Maroon Creek Management Proposals/Contracts |
1993-1997 |
TUBES 14 tubes
|
|||
tube | |||
1 | Bridge Physical location: CCA 6 Column 2, Row 5
|
undated | |
2 | 3 tubes a. aspen, b. PUT amendments, c. detailed plans, master plan, aspen Physical location: CCA 6 Column 2, Row 5
|
2001 | |
3 | Detailed Plans Master Plan Physical location: CCA 6 Column 2, Row 5
|
undated | |
4 | PUT Amendments Physical location: CCA 6 Column 2, Row 5
|
undated | |
5 | Site Plans Physical location: CCA 6 Column 2, Row 6
|
undated | |
6 | Schematic Design Physical location: CCA 6 Column 2, Row 5
|
undated | |
7 | Final Plats Physical location: Barn Box 1
|
undated | |
8 | Tiehack Physical location: Barn Box 12
|
undated | |
9 | Club Physical location: Barn Box 12
|
undated | |
10 | Pfister Physical location: Barn Box 12
|
undated | |
11 | Club Irrigation Physical location: Barn Box 12
|
undated | |
12 | Irrigation Physical location: Barn Box 12
|
undated | |
13 | Original Planned Drawings Physical location: Barn Box 12
|
undated | |
14 | Golf Course Physical location: Barn Box 12
|
undated |
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1996-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003-2005 |
1 | 2 | Base Map |
2006 |
1 | 3 | Meeting Notes |
2005-2006 |
1 | 4 | Easements |
2004 |
1 | 5 | Work Program |
2004-2006 |
1 | 6 | Cost Estimate |
2004 |
1 | 7 | Water |
1996-2004 |
1 | 8 | Plant Lists |
2004-2005 |
1 | 9 | Trail Maps |
undated |
1 | 10 | Market Analysis |
2003 June |
1 | 11 | Land Use |
2002-2004 |
1 | 12 | Construction Documents |
2004 |
1 | 13 | Phase 2 Proposals/Contracts |
2005 |
1 | 14 | Phase 2 Correspondence |
2005-2006 |
1 | 15 | Phase 2 Meeting Notes/Agendas |
2005-2006 |
1 | 16 | Phase 2 Cost Estimates |
2006 |
1 | 17 | Phase 2 Marketing |
undated |
1 | 18 | Phase 2 Grading Plans |
2005-2006 |
1 | 19 | Phase 2 Grading Plans |
2006-2007 |
1 | 20 | Dairy Proposals/Contracts |
2004-2006 |
1 | 21 | Dairy Design Book |
undated |
1 | 22 | Phase 3 Charette |
2006 |
1 | 23 | Correspondence |
2001-2003 |
1 | 24 | Parcels |
2004 |
1 | 25 | Phase 1 "What If?" |
undated |
1 | 26 | Livery Stables Schematic Design Charrette |
2006 February |
1 | 27 | Precedent Research |
undated |
1 | 28 | Precedent Research |
undated |
1 | 29 | Precedent Research |
undated |
1 | 30 | Precedent Research |
undated |
1 | 31 | Precedent Research |
undated |
TUBES 3 tubes
|
|||
tube | |||
1 | Preserve Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | Phase 1 Physical location: CCA 6 Column 1, Row 9
|
undated | |
3 | Phase 2 Physical location: Barn Box 11
|
undated |
XLVIII: XLVIII: The Meadows Castle Rock, Colorado, 1984-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1984-2007 | ||
Box | Folder | ||
1 | 1 | Boulevard Proposals/Contracts |
1986 |
1 | 2 | Boulevard General Correspondence |
1986-1988 |
1 | 3 | Boulevard Correspondence |
1986-1987 |
1 | 4 | Boulevard Meeting Notes/Agendas |
1986-1987 |
1 | 5 | Boulevard Vegetation |
1986 |
1 | 6 | Boulevard Design Sketches/Details |
1986 |
1 | 7 | Boulevard Structural Engineering |
1986 |
1 | 8 | Boulevard Cost Estimates |
1986 |
1 | 9 | Boulevard Civil/Traffic Engineering |
1986 |
1 | 10 | Boulevard Utility Engineering |
1986-1987 |
1 | 11 | Boulevard Construction Contracts |
1986-1987 |
1 | 12 | Boulevard Submittals/Shop Drawings |
1986 |
1 | 13 | Boulevard Specifications |
1986 |
1 | 14 | Phase 1 Work Program |
1985 |
1 | 15 | Phase 1 Specifications |
1985 |
1 | 16 | Phase 1 Soil Reports |
1985 |
1 | 17 | Phase 1 Marketing |
1985 |
1 | 18 | Phase 1 Irrigation Proposal |
1985 |
1 | 19 | Phase 1 Final Checklist |
1986 |
1 | 20 | Phase 1 Cost Estimates |
1985-1986 |
1 | 21 | Phase 1 Active Plants |
1985 |
1 | 22 | Phase 1 Schedule |
1985 |
1 | 23 | Phase 1 Recreational Program |
1986 |
1 | 24 | Phase 1 PUD Program |
1984 |
1 | 25 | Phase 1 Program Summary |
1985-1986 |
1 | 26 | Phase 1 Project Report |
1985 June 17 |
1 | 27 | Phase 1 Transmittals |
1985 |
1 | 28 | Phase 1 Site Report |
1985 |
1 | 29 | Vision Proposals/Contracts |
1998 |
1 | 30 | Vision Correspondence |
1997-1998 |
1 | 31 | Vision Meeting Minutes/Notes to File |
1998-1999 |
1 | 32 | Vision Biological |
1998 |
1 | 33 | Vision Engineering |
1998 |
1 | 34 | Vision Programming |
1997-1998 |
1 | 35 | Vision Cost Estimates |
1998-1999 |
1 | 36 | Vision Design Sketches/Product Information |
1998 |
1 | 37 | Park Proposals/Contracts |
1999-2001 |
1 | 38 | Park Meeting Notes |
1999-2001 |
1 | 39 | Park Correspondence/Transmittals |
2000-2003 |
1 | 40 | Park Schedule |
1999-2000 |
1 | 41 | Park City/County Plan |
1996 |
1 | 42 | Park Program |
1998-1999 |
1 | 43 | Park Construction Bids/Proposals/Specs |
1999-2003 |
1 | 44 | Park Schematic Design |
undated |
1 | 45 | Park Programming |
1999 |
1 | 46 | Park Cost Estimates |
1998-2003 |
1 | 47 | Park Construction Documents |
2000-2001 |
1 | 48 | Park Conceptual Design |
1999 |
1 | 49 | Park Value Engineering |
2003 |
1 | 50 | Parkway Proposals/Contracts |
1985-1986 |
1 | 51 | Parkway General Correspondence |
1986-1987 |
1 | 52 | Parkway Correspondence |
1985-1986 |
1 | 53 | Parkway Meeting Notes |
1986 |
1 | 54 | Parkway Work Program |
1985-1986 |
1 | 55 | Parkway Cost Estimates |
1985 |
1 | 56 | Parkway Design Sketches/Details |
1986 |
1 | 57 | Parkway PUD Submittals |
1986 |
1 | 58 | Parkway Segment 1 Utility Engineering |
1986 |
1 | 59 | Parkway Segment 1 Proposal/Contracts |
1986 |
1 | 60 | Parkway Segment 1 Legal Description |
undated |
1 | 61 | Parkway Segment 2 General Correspondence |
1986-1987 |
1 | 62 | Parkway Segment 2 Work Program/Schedules |
1986 |
1 | 63 | Parkway Segment 2 Meeting Notes |
1986 |
1 | 64 | Parkway Segment 2 Structural Engineering |
1986 |
1 | 65 | Parkway Segment 2 Utility Engineering |
1986 |
1 | 66 | Parkway Segment 2 Cost Estimates |
1986 |
1 | 67 | Parkway Segment 2 Design Sketches/Details |
1986 |
1 | 68 | Parkway Segment 2 Specifications |
undated |
1 | 69 | Annexation Proposals/Contracts |
1988 |
1 | 70 | Annexation Meeting Notes |
1986 |
1 | 71 | Annexation Water Studies |
1984 |
1 | 72 | Annexation Submittal Checklists |
undated |
1 | 73 | Annexation Research |
undated |
1 | 74 | Annexation Program Summary |
undated |
1 | 75 | Annexation Design Guidelines |
undated |
1 | 76 | Town Center Neighborhood Parks Meeting Minutes |
2006 |
1 | 77 | Town Center Neighborhood Parks Plants |
2006 |
1 | 78 | Town Center Neighborhood Parks Schedule |
undated |
1 | 79 | Town Center Neighborhood Parks Images |
undated |
1 | 80 | Town Center Neighborhood Parks Correspondence |
2006-2007 |
2 | 1 | Correspondence |
1993 |
2 | 2 | Programming |
1992-1993 |
2 | 3 | PUD Submittals |
1986 |
2 | 4 | Cost Estimate |
1985-1987 |
2 | 5 | Engineering |
1987 |
2 | 6 | Design Sketches/Product Information |
1987-1988 |
2 | 7 | Land Use Program |
1986 |
2 | 8 | General Correspondence |
1986 |
2 | 9 | Work Programs/Schedules |
1985-1986 |
2 | 10 | Work Programs/Schedules |
1993 |
2 | 11 | Zoning Ordinance |
1986 |
2 | 12 | Meeting Notes |
1986-1987 |
2 | 13 | PUD Ordinance |
undated |
2 | 14 | Parkway |
1987-1988 |
2 | 15 | Parkway Construction Bids/Proposals |
1987 |
2 | 16 | Parkway Change Orders |
1987 |
2 | 17 | Parkway Submittals Shop Drawings |
1987 |
2 | 18 | Parkway Construction Contracts |
1987 |
2 | 19 | Parkway Consultant Proposals |
1985-1986 |
2 | 20 | Court Proposals/Contracts |
1996-1997 |
2 | 21 | Planning Commission and Town Board |
1984 |
2 | 22 | Visual Simulation |
undated |
2 | 23 | Program |
1986 |
2 | 24 | Site Visit |
1984-1985 |
2 | 25 | Monument Soils and Geology |
2002 |
2 | 26 | Monument Proposals/Contracts |
2001-2002 |
2 | 27 | Monument Correspondence |
1999-2003 |
2 | 28 | Monument Meeting Notes |
2001-2002 |
2 | 29 | Monument Billing |
2002 |
2 | 30 | Monument Conceptual |
1991-2002 |
2 | 31 | Monument Design Development |
2002 |
2 | 32 | Monument Schedules |
2002 |
2 | 33 | Monument Site Analysis |
undated |
2 | 34 | Monument Cost Estimates |
2001-2003 |
2 | 35 | Monument Construction Documents |
2001 |
2 | 36 | Monument Schematic |
undated |
2 | 37 | Monument Specifications |
2002-2003 |
2 | 38 | Development Guidelines Subdivision Regulation |
1986 |
2 | 39 | Development Guidelines Land Use |
undated |
2 | 40 | Infrastructure Correspondence |
1985 |
2 | 41 | Infrastructure Cost Estimate |
1985 |
2 | 42 | The Meadows Report |
undated |
2 | 43 | South Meadows Notes/Meetings/Agendas |
1985 |
2 | 44 | South Meadows Correspondence |
1985 |
2 | 45 | South Meadows P.U.D. Submittal |
1985 |
2 | 46 | South Meadows P.U.D. Ordinance |
1984 |
2 | 47 | South Meadows Approval Meeting |
1985 |
2 | 48 | South Meadows Planning & Design Services |
1985 |
2 | 49 | South Meadows Land Use Application |
1985 |
2 | 50 | The Meadows Project Manual |
1987 October |
2 | 51 | Riparian Corridor- Boulders |
2006 |
2 | 52 | Meadows Boulevard Proposals |
2004-2007 |
2 | 53 | Riparian Corridor- Meeting Minutes |
2006 |
2 | 54 | Meadows Town Center Illustrative Views |
2002 |
3 | 1 | North Meadows Butterfield Crossing Drive Correspondence |
1987-1989 |
3 | 2 | North Meadows Butterfield Crossing Drive Cost Estimates |
1987 |
3 | 3 | North Meadows Butterfield Crossing Drive Construction Bids/Proposals |
1987 |
3 | 4 | North Meadows Butterfield Crossing Drive Construction Contracts |
1987 |
3 | 5 | North Meadows Butterfield Crossing Drive Field Reports |
1988 |
3 | 6 | North Meadows Butterfield Crossing Drive Change Orders |
1987-1988 |
3 | 7 | North Meadows Butterfield Crossing Drive Specifications |
1987 |
3 | 8 | Meadows Office/Industrial Correspondence |
1985-1986 |
3 | 9 | Meadows Office/Industrial Work Program/Schedules |
1985 |
3 | 10 | Meadows Entry Features Proposals/Contracts |
1986 |
3 | 11 | Meadows Entry Features Consultant Proposals |
1986 |
3 | 12 | Meadows Entry Features General Correspondence |
1986-1987 |
3 | 13 | Meadows Entry Features Meeting Notes |
1986 |
3 | 14 | Meadows Entry Features Structural Engineering |
1986 |
3 | 15 | Meadows Entry Features Cost Estimates |
1986 |
3 | 16 | Meadows Entry Features Design Sketches/Details |
1986 |
3 | 17 | Meadows Entry Features Construction Bids/Proposals |
1986 |
3 | 18 | Meadows Entry Features Change Orders/Field Orders |
1987 |
3 | 19 | Meadows Entry Features Submittals |
1986 |
3 | 20 | Meadows Entry Features Specifications |
1986 |
3 | 21 | Meadows Neighborhood C & D Proposal |
1986-1987 |
3 | 22 | Meadows Neighborhood C & D Meeting Notes |
1986 |
3 | 23 | Meadows Neighborhood C & D Civil/Traffic Engineering |
1986 |
3 | 24 | Meadows Neighborhood C & D Hydrology/Drainage |
1986 |
3 | 25 | Meadows Neighborhood C & D Utility Engineering |
1986 |
3 | 26 | Meadows Neighborhood C & D Land and Program |
1986 |
3 | 27 | Meadows Neighborhood C & D Plat Submittals |
1987 |
3 | 28 | Meadows Planting Plans |
1985-1986 |
3 | 29 | Coachline Road Park Meeting Notes |
1986 |
3 | 30 | Coachline Road Park Consultant Proposal |
1986 |
3 | 31 | Coachline Road Park Hydrology/Drainage |
1986 |
3 | 32 | Coachline Road Park Elements |
undated |
3 | 33 | Castle Highlands PUD Site Plans |
1984 |
3 | 34 | Meadows Proposal |
1984 |
3 | 35 | Meadows MP Referrals & Correspondence |
1984-1986 |
3 | 36 | Meadows Schedules |
1984-1985 |
3 | 37 | Meadows Updated Subdivision Plan |
1993 |
3 | 38 | The Meadows Architectural Guidelines |
1987 December 1 |
3 | 39 | The Meadows Sign Guidelines |
1988 January 8 |
3 | 40 | The Meadows Development Guidelines |
1986 October |
3 | 41 | Amendments to the Preliminary P.U.D. Site Plan |
1986 May |
3 | 42 | Amendments to the Preliminary P.U.D. Site Plan |
1986 September |
3 | 43 | Preliminary P.D. Site Plan |
1986 September |
3 | 44 | The Meadows Planning Documents |
undated |
3 | 45 | The Meadows Planning Documents |
undated |
3 | 46 | The Meadows Phase One Development |
1986 July |
3 | 47 | The Meadows Phase One Development (copy 2) |
1986 July |
3 | 48 | Meadows Miscellaneous Artwork/Graphics |
1985 |
3 | 49 | Town Center Meeting Minutes |
2003 |
3 | 50 | Town Center Proposals/Contracts |
2006-2007 |
3 | 51 | Town Center Neighborhood Parks Construction Observations |
2006 |
3 | 52 | Town Center Neighborhood Parks Construction Documents |
2006 |
3 | 53 | Town Center Neighborhood Parks Bidding |
2006 |
3 | 54 | Town Center Neighborhood Parks Cost Estimates |
2006 |
3 | 55 | Development Guidelines |
1986 |
3 | 56 | Residential Development Guidelines |
1987 |
3 | 57 | Meadows Parkway Phase 1 Landscape Development |
undated |
3 | 58 | Program Quantities |
1984 |
TUBES 67 tubes
|
1984-2007 | ||
tube | |||
1 | Meadows Town Center Riparian Corridor Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Meadows Town Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | Meadows Town Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
4 | Meadows Town Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
5 | Meadows Town Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
6 | Meadows Town Center Riparian Corridor Physical location: CCA 8 Column 3, Row 3
|
undated | |
7 | South Meadows Physical location: CCA 8 Column 3, Row 3
|
undated | |
8 | Signage Master Plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
9 | Site Analysis Physical location: CCA 8 Column 6, Row 2
|
undated | |
10 | Open space; neighborhood parks Physical location: CCA 6 Column 1, Row 2
|
undated | |
11 | Landscape Improvement Physical location: CCA 6 Column 1, Row 1
|
undated | |
12 | Institute architecture Physical location: CCA 6 Column 1, Row 2
|
undated | |
13 | Harris Grove Amenity Physical location: CCA 8 Column 5, Row 3
|
undated | |
14 | Record Prints North Meadows Butterfield Crossing Signage Physical location: CCA 6 Column 1, Row 8
|
undated | |
15 | PUD Graphics Physical location: CCA 6 Column 1, Row 8
|
undated | |
16 | Meadows Parkway Segment One Physical location: CCA 6 Column 1, Row 8
|
undated | |
17 | Design Guidelines Physical location: CCA 6 Column 1, Row 8
|
undated | |
18 | Construction Documents Physical location: CCA 6 Column 1, Row 8
|
undated | |
19 | Early Concept Studies Physical location: CCA 6 Column 1, Row 8
|
undated | |
20 | Record Prints Meadows Blvd Underpass Entry Walls Physical location: CCA 6 Column 1, Row 8
|
undated | |
21 | Neigh. "C" Final Lot Test and Marketing Plans on Mylar Physical location: CCA 6 Column 1, Row 8
|
undated | |
22 | Base Map Negatives Physical location: CCA 6 Column 1, Row 8
|
undated | |
23 | Parkway Pre-Entry Bridges Physical location: CCA 6 Column 1, Row 8
|
undated | |
24 | Prelim. Plat & Final P.D. Site Plans Physical location: CCA 6 Column 1, Row 8
|
undated | |
25 | PD Site Plan Amendment Number 7 Physical location: CCA 6 Column 1, Row 9
|
undated | |
26 | Office and Industry Physical location: Barn Box 4
|
undated | |
27 | Landscape Maintenance Physical location: Barn Box 4
|
1987; undated | |
28 | Boulevard Planting and Access Study Physical location: Barn Box 4
|
undated | |
29 | Butterfield Crossing Park Physical location: Barn Box 4
|
undated | |
30 | Parkway Segment II Physical location: Barn Box 4
|
undated | |
31 | Parkway Physical location: Barn Box 4
|
undated | |
32 | Neighborhood Amendment Physical location: Barn Box 4
|
undated | |
33 | Contract Documents Physical location: Barn Box 4
|
undated | |
34 | Mylar Prints Physical location: Barn Box 4
|
undated | |
35 | Site Analysis Mylar's Physical location: Barn Box 4
|
undated | |
36 | Open Space Physical location: Barn Box 4
|
undated | |
37 | Mylar Topo's and Slope Physical location: Barn Box 4
|
undated | |
38 | Record Prints Physical location: Barn Box 4
|
undated | |
39 | Site Planned Development Physical location: Barn Box 5
|
undated | |
40 | Color Graphics Physical location: CCA 8 Column 4, Row 2
|
undated | |
41 | Castle Rock Physical location: CCA 8 Column 4, Row 2
|
undated | |
42 | Illustrative Site Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
43 | Final Lot Test and Marketing Plans Physical location: CCA 8 Column 5, Row 3
|
undated | |
44 | Marketing Original Graphics Physical location: CCA 8 Column 5, Row 3
|
undated | |
45 | Meadows Boulevard Physical location: CCA 8 Column 5, Row 3
|
undated | |
46 | Visual Simulation Line Drawing, Study Sketches, Original Mylar's Physical location: CCA 8 Column 5, Row 3
|
undated | |
47 | Parkway Segment 1 & 2 Physical location: CCA 8 Column 5, Row 3
|
undated | |
48 | Current Graphics Physical location: CCA 8 Column 5, Row 3
|
undated | |
49 | PUD Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
50 | Promotional Graphics Physical location: CCA 8 Column 5, Row 1
|
undated | |
51 | Contract Documents Physical location: CCA 8 Column 5, Row 1
|
undated | |
52 | Design Files Physical location: CCA 8 Column 5, Row 3
|
undated | |
53 | Contract Documents Physical location: CCA 8 Column 5, Row 1
|
undated | |
54 | Superseded Alignments Physical location: CCA 8 Column 5, Row 1
|
undated | |
55 | Original Mylar's Illustrations Physical location: CCA 8 Column 5, Row 1
|
undated | |
56 | Neighborhood C&D Preliminary Lot Test Physical location: CCA 8 Column 5, Row 3
|
undated | |
57 | Contract Documents Physical location: CCA 8 Column 5, Row 3
|
undated | |
58 | Meadows Underpass Physical location: CCA 8 Column 5, Row 3
|
undated | |
59 | Analysis-Consultant Data Physical location: CCA 8 Column 5, Row 3
|
undated | |
60 | Contract Documents Physical location: CCA 8 Column 5, Row 3
|
undated | |
61 | Site Design Studies Physical location: CCA 8 Column 5, Row 1
|
undated | |
62 | Parkway Topo Originals Physical location: CCA 8 Column 5, Row 1
|
undated | |
63 | Castleton Center Parkway Physical location: CCA 8 Column 5, Row 3
|
undated | |
64 | Landscape Improvements Physical location: Barn Box 11
|
undated | |
63 | Landscape Improvements Physical location: Barn Box 11
|
undated | |
64 | Ranch Physical location: Barn Box 12
|
undated | |
65 | Ranch Physical location: Barn Box 12
|
undated | |
66 | Pipeline Facilities Physical location: Barn Box 12
|
undated | |
67 | Preliminary Physical location: Barn Box 16
|
undated |
XLIX: XLIX:Owl Creek, 1973-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1973-2004 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1990 |
1 | 2 | Correspondence |
2003-2004 |
1 | 3 | Meeting Mintues/Notes |
2004 |
1 | 4 | Work Program |
1990 |
1 | 5 | Engineering |
1990 |
1 | 6 | Programming |
1990 |
1 | 7 | Design Criteria |
1990 |
1 | 8 | Design Sketches/Product Information |
1990 |
1 | 9 | P.U.D. |
1990 |
1 | 10 | Water Rights |
2003 |
1 | 11 | Contracts for Golf Course |
1991 |
1 | 12 | Land Use |
2004 |
1 | 13 | Habitat (Wildlife) |
2004 |
1 | 14 | Visual Analysis |
2004 |
1 | 15 | Marketing Materials |
2003 |
1 | 16 | Appraisals |
2004 |
1 | 17 | Analysis Maps and Diagrams |
2000 |
1 | 18 | Development Programs |
1998 |
1 | 19 | Master Plan Alternatives |
2004 |
1 | 20 | Master Plan Documents |
2000 |
1 | 21 | Other Town Codes |
2004 |
1 | 22 | Golf Course Addition |
1991 |
1 | 23 | Legal Documents |
2004 |
1 | 24 | Special Review Process/Town Approval of Documents |
2004 |
1 | 25 | Correspondence with Design Team |
2004 |
1 | 26 | Open File (Misc) |
1994 |
1 | 27 | Open File (Misc) |
2003 |
1 | 28 | Open File (Misc) |
2002-2003 |
1 | 29 | Open File (Misc) |
2003-2004 |
1 | 30 | Owl Creek 1976 Submission |
1976 |
1 | 31 | Owl Creek Ranch |
1984 |
1 | 32 | Owl Creek Homes East Village PUD |
1996 |
2 | 1 | Introduction |
undated |
2 | 2 | Development Programs |
undated |
2 | 3 | Enviornmental Studies |
undated |
2 | 4 | Master Plan |
undated |
2 | 5 | Development Impacts |
undated |
2 | 6 | Owl Creek Workbook |
undated |
2 | 7 | Meteorology |
1974 |
2 | 8 | Hydrology |
1974 |
2 | 9 | Visual Analysis |
undated |
2 | 10 | Geology |
undated |
2 | 11 | Surface Hydrology |
1974 |
2 | 12 | Utilites |
1974 |
2 | 13 | Cultural Facilities |
1974 |
2 | 14 | Sewer and Water |
1974 |
2 | 15 | Recreation |
1974 |
2 | 16 | Housing |
1973 |
2 | 17 | Wildlife |
1974 |
2 | 18 | Soils |
1974 |
2 | 19 | Base Material |
undated |
2 | 20 | Design Meeting Notes |
1974 |
2 | 21 | Proposals |
1974 |
2 | 22 | Transportation |
1975 |
2 | 23 | Correspondence |
1975 |
2 | 24 | Bibliography |
1973 |
2 | 25 | Regulations |
undated |
2 | 26 | Growth-Income |
undated |
2 | 27 | Skiing |
undated |
2 | 28 | Budget/Cost Schedule |
1975 |
2 | 29 | Program Calculations |
1974 |
2 | 30 | Appendices G through P |
undated |
3 | 1 | Appendices R through V |
undated |
3 | 2 | Architectural and Site Development |
1985 |
3 | 3 | Owl Creek Townhomes Notes |
1999 |
3 | 4 | Snowmass Entry |
2000 |
3 | 5 | Owl Creek Townhomes Descriptions |
1999 |
3 | 6 | Owl Creek Burnt Mountain |
1999 |
3 | 7 | East Village Land Use |
1994 |
3 | 8 | Owl Creek Townhouse Sketches |
1999 |
3 | 9 | Final Submission Doc Info |
1996 |
3 | 10 | Signage Studies |
1997-1999 |
3 | 11 | Final Resolution |
1999 |
3 | 12 | EV Townhomes |
1994 |
3 | 13 | Townhomes II Work Program |
1996 |
3 | 14 | Townhome II Meeting Mintues/Notes to File |
1995-1996 |
3 | 15 | Townhomes II Correspondence |
1996 |
3 | 16 | Townhomes II Proposals/Contracts |
1995 |
3 | 17 | Townhomes Phase III Base Mapping |
1996 |
3 | 18 | Townhomes Phase III Meeting Minutes/Notes to File |
1996 |
3 | 19 | Townhomes Phase III Proposals/Contracts |
1996 |
3 | 20 | Owl Creek Townhomes Notes |
1994 |
3 | 21 | Town Submission Meeting |
1996 |
3 | 22 | Graphics |
undated |
3 | 23 | Simulation Site Studies #10 |
undated |
3 | 24 | Simulation Site Studies #9 |
undated |
3 | 25 | Simulation Site Studies #8 |
undated |
3 | 26 | Simulation Site Studies #7 |
undated |
3 | 27 | Simulation Site Studies #6 |
undated |
3 | 28 | Simulation Site Studies #5 |
undated |
3 | 29 | Simulation Site Studies #4 |
undated |
3 | 30 | Simulation Site Studies #3 |
undated |
3 | 31 | Simulation Site Studies #2 |
undated |
3 | 32 | Simulation Site Studies #1 |
undated |
3 | 33 | Owl Creek Appendix One |
undated |
3 | 34 | Marx Residence PUD |
1990 |
3 | 35 | Architectural Review Process |
1984 |
3 | 36 | Owl Creek Submission |
1976-1978 |
3 | 37 | Submission Appendix |
1978 |
3 | 38 | Drawings for Owl Creek Townhomes |
1995 |
3 | 39 | Owl Creek Details |
1994 |
3 | 40 | Owl Creek Townhomes Landscape |
undated |
TUBES 18 tubes
|
|||
tube | |||
1 | Townhomes Physical location: CCA 8 Column 6, Row 1
|
1973-2004; undated | |
2 | Owl Creek Townhomes Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Grading Plan, Enlargements, Layout, Planting Schedule Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Owl Creek Townhomes Physical location: CCA 8 Column 6, Row 1
|
undated | |
5 | Phase 4 Physical location: CCA 8 Column 6, Row 1
|
undated | |
6 | Townhomes Physical location: CCA 8 Column 4, Row 1
|
undated | |
7 | Townhomes Phase 4 Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Grand Bay Owl Creek Studies Physical location: CCA 8 Column 4, Row 2
|
undated | |
9 | Project 94 Mylar's Physical location: CCA 8 Column 5, Row 1
|
undated | |
10 | Townhomes Physical location: CCA 8 Column 5, Row 1
|
undated | |
11 | Homes Physical location: CCA 8 Column 5, Row 1
|
undated | |
12 | Townhomes Physical location: CCA 8 Column 5, Row 1
|
undated | |
13 | Homes-Mylar's Physical location: CCA 8 Column 5, Row 1
|
undated | |
14 | Phase III Part 2 Physical location: CCA 8 Column 5, Row 1
|
undated | |
15 | Homes Physical location: CCA 8 Column 5, Row 1
|
undated | |
16 | Conceptual Submission Physical location: CCA 8 Column 5, Row 1
|
undated | |
17 | Townhomes Physical location: CCA 8 Column 5, Row 1
|
undated | |
18 | Homes I Grading Study Concept Submittals Physical location: Barn Box 15
|
undated |
L: L: Nevada Department of Transportation (NDOT), 2002-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2002-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003 |
1 | 2 | Proposals/Contracts |
2003 April 17 |
1 | 3 | Meeting Minutes/Notes to File |
2003-2004 |
1 | 4 | Meeting Minutes/Notes to File |
2004 |
1 | 5 | Meeting Minutes/Notes to File |
2004 |
1 | 6 | Meeting Minutes/Notes to File |
2004 |
1 | 7 | Meeting Minutes/Notes to File |
2005 |
1 | 8 | Meeting Minutes/Notes to File |
2005-2006 |
1 | 9 | Scope of Work |
2003 |
1 | 10 | Scope of Work |
2004 |
1 | 11 | Scope of Work |
2004 |
1 | 12 | Correspondence |
2003 |
1 | 13 | Correspondence |
2004 |
1 | 14 | Correspondence |
2004 |
1 | 15 | Correspondence |
2004 |
1 | 16 | Correspondence |
2005-2006 |
1 | 17 | Design Sketches |
2004 |
1 | 18 | Design Sketches |
2004 |
1 | 19 | Cost Estimates |
2004 |
1 | 20 | Cost Estimates |
2004-2006 |
1 | 21 | Design Guidelines |
2004 |
1 | 22 | Design Guidelines |
2004 |
1 | 23 | Design Guidelines |
2004 |
1 | 24 | Invoices |
2004-2006 |
1 | 25 | Master Plan Draft |
2003 |
1 | 26 | Project Schedule |
2004 |
1 | 27 | Project Schedule |
2004 |
1 | 28 | Plant Lists |
undated |
1 | 29 | Landscape presentation |
undated |
1 | 30 | Analysis Maps & Diagrams |
2004 |
1 | 31 | Design Development |
2004 |
1 | 32 | Design Development |
2004 |
2 | 1 | Landscape and Aesthetics Corridor Plans |
2004 February |
2 | 2 | Landscape and Aesthetics Corridor Plans |
2004 February |
2 | 3 | Landscape and Aesthetics Corridor Plans |
2004 February |
2 | 4 | Landscape and Aesthetics Corridor Plans Draft |
undated |
2 | 5 | Landscape and Aesthetics Corridor Plan Draft |
2004 April |
2 | 6 | Fee Schedule |
2004-2005 |
2 | 7 | Development Plan |
2002 November |
2 | 8 | Design Sketches |
2005-2006 |
TUBES 2 tubes
|
|||
tube | |||
1 | NDOT Physical location: CCA 8 Column 6, Row 1
|
2002-2006 | |
2 | Phase II Charrette, Southern CCA 8 Column 4, Row 1
|
LI: LI: Arizona Canal at Scottsdale, 1997-2003Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2003 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2002 |
1 | 2 | Proposals/Contracts |
2003 |
1 | 3 | Design Concept Report |
1997 March |
1 | 4 | Community Workshop Report |
2002 May |
1 | 5 | Focus Group Reports |
2002 |
1 | 6 | Transportation Enhancement Report |
2004 November 5 |
1 | 7 | Change Orders |
2001 |
1 | 8 | Design Sketches |
2002-2003 |
1 | 9 | Design Sketches |
2002-2003 |
1 | 10 | Design Sketches |
2002-2003 |
1 | 11 | Design Sketches |
2002-2003 |
1 | 12 | Design Sketches |
2002-2003 |
1 | 13 | Design Sketches |
2002-2003 |
1 | 14 | Design Sketches |
2002-2003 |
1 | 15 | Design Sketches |
2002-2003 |
1 | 16 | Design Sketches |
2002-2003 |
1 | 17 | Project Description |
2002 |
1 | 18 | Design Phase Notebook |
2003 |
1 | 19 | Meeting Minutes/Notes to File |
2002 |
1 | 20 | Meeting Minutes/Notes to File |
2002 |
1 | 21 | Meeting Minutes/Notes to File |
2003 |
1 | 22 | Meeting Minutes/Notes to File |
2003 |
1 | 23 | Correspondence/Transmittals |
2002-2003 |
1 | 24 | Design Criteria |
undated |
2 | 1 | Images |
2002 |
2 | 2 | Land Use Drawings |
2002 |
2 | 3 | Development Plan |
2002 |
2 | 4 | Canal Bank Improvement |
2004 |
2 | 5 | Contract |
2002-2003 |
2 | 6 | Contract |
2002 |
2 | 7 | Canal Park Drawings |
undated |
2 | 8 | Compendium |
2002-2003 |
2 | 9 | Water Wall Design |
2003 |
2 | 10 | Drawings |
2003 |
2 | 11 | Sketches |
2003 |
2 | 12 | Roundabout Meeting |
2003 |
2 | 13 | Meeting Minutes for Planting |
2003 |
2 | 14 | Kurt Culbertson Drawings |
2002 |
2 | 15 | Roundabout Drawings |
2003 |
2 | 16 | Waterside Scottsdale |
1993 |
2 | 17 | Drainage Reports |
2002 |
2 | 18 | Arizona Canal Workbook |
2003 |
2 | 19 | Arizona Canal Workbook |
2003 |
2 | 20 | Meeting Notes |
2003 |
2 | 21 | Design Sketches |
2002 |
2 | 22 | Project Manual |
2003 |
TUBES 17 tubes
|
|||
tube | |||
1 | Design Principles, section iteration, Mylar grading Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Development Plans Studies, Site Plan, Bridge Plaza Sections Physical location: CCA 6 Column 2, Row 3
|
undated | |
3 | Conceptual street design, Marshall way sheet set Physical location: CCA 6 Column 2, Row 7
|
undated | |
4 | Development Plans, Summer Plans/Sections Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | Early Development Plans Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Public Workshop Input Physical location: CCA 8 Column 4, Row 1
|
undated | |
7 | Phase I Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Construction Documents Physical location: CCA 8 Column 5, Row 2
|
undated | |
9 | Phase I Redline CD's Physical location: CCA 8 Column 5, Row 2
|
undated | |
10 | Original Set Bid Packages Physical location: Barn Box 8
|
undated | |
11 | Bridge Options Physical location: Barn Box 8
|
undated | |
12 | Design Decision Physical location: Barn Box 8
|
undated | |
13 | Site Design Physical location: Barn Box 8
|
undated | |
14 | LOT layout Physical location: Barn Box 8
|
undated | |
15 | Grading Options Physical location: Barn Box 10
|
undated | |
16 | Shop Drawings Physical location: Barn Box 10
|
undated | |
17 | Beam Concept Physical location: Barn Box 15
|
undated |
LII: LII: Hurst Ranch, 2003-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2003-2008 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2004 |
1 | 2 | Proposals/Contracts |
2004 |
1 | 3 | Proposals/Contracts |
2005-2007 |
1 | 4 | Correspondence |
2003-2004 |
1 | 5 | Correspondence |
2004 |
1 | 6 | Correspondence |
2005 |
1 | 7 | Correspondence |
2005 |
1 | 8 | Correspondence |
2006 |
1 | 9 | Correspondence |
2007 |
1 | 10 | Invoices |
2004-2005 |
1 | 11 | Invoices |
2005 |
1 | 12 | Invoices |
2005 |
1 | 13 | Invoices |
2006 |
1 | 14 | Invoices |
2007 |
1 | 15 | Invoices |
2007-2008 |
1 | 16 | Meeting Minutes/Notes to File |
2003-2004 |
1 | 17 | Meeting Minutes/Notes to File |
2004-2005 |
1 | 18 | Meeting Minutes/Notes to File |
2005 |
1 | 19 | Meeting Minutes/Notes to File |
2006 |
1 | 20 | Meeting Minutes/Notes to File |
2006 |
1 | 21 | Meeting Minutes/Notes to File |
2007 |
1 | 22 | Schedule |
2004 |
1 | 23 | Survey |
2004-2005 |
1 | 24 | Water Rights |
2004-2006 |
1 | 25 | Soils and Geology |
2005 |
1 | 26 | Habitat |
2004-2005 |
1 | 27 | ater Tank |
2004-2005 |
1 | 28 | Sketches/Graphics |
2004 |
1 | 29 | Sketches/Graphics |
2004-2005 |
1 | 30 | Project Manual |
2005 March 15 |
1 | 31 | Schematic Design |
2006 |
1 | 32 | Construction Documents |
2004 |
1 | 33 | Construction Documents |
2005 |
1 | 34 | Construction Documents |
2005 |
1 | 35 | Construction Documents |
2006-2007 |
TUBES 8 tubes
|
|||
tube | |||
1 | Hurst Ranch Physical location: CCA 8 Column 6, Row 1
|
2003-2008 | |
2 | Hurst Ranch Physical location: CCA 8 Column 6, Row 1
|
2003-2008 | |
3 | Ranch Physical location: CCA 6 Column 1, Row 3
|
undated | |
4 | Schematic Design Physical location: CCA 6 Column 1, Row 3
|
undated | |
5 | Original studies, florella, Solomon Physical location: CCA 6 Column 1, Row 3
|
undated | |
6 | Schematic Design/Design Development Physical location: CCA 8 Column 5, Row 3
|
undated | |
7 | Water Tank Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Illustrative Renderings, Sections, Schematics Physical location: CCA 8 Column 4, Row 1
|
undated |
LIII: LIII: Resnick Property, 1993-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-2004 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1993-1994 |
1 | 2 | Proposals/Contracts |
1994-1995 |
1 | 3 | Proposals/Contracts |
1994-1996 |
1 | 4 | Correspondence |
1993-1994 |
1 | 5 | Correspondence |
1995-1996 |
1 | 6 | Meeting Minutes/Notes to File |
1994-1995 |
1 | 7 | Meeting Minutes/Notes to File |
1995 |
1 | 8 | Meeting Minutes/Notes to File |
1995-1996 |
1 | 9 | Work Program |
1994-1995 |
1 | 10 | Physical |
1993-1994 |
1 | 11 | Physical |
1994-1995 |
1 | 12 | Biological |
1993-1995 |
1 | 13 | Biological |
1995 |
1 | 14 | Biological |
1995 |
1 | 15 | Engineering |
1993-1994 |
1 | 16 | Engineering |
1994-1996 |
1 | 17 | Design Sketches |
2004 |
1 | 18 | Programming |
1994 |
1 | 19 | Cost Estimate |
1993-1994 |
1 | 20 | Cost Estimate |
1994-1995 |
1 | 21 | Design Sketches |
1994 |
1 | 22 | Design Sketches |
1995-1996 |
1 | 23 | Site Plan |
1994 |
1 | 24 | Imagery Notebook |
1993 |
1 | 25 | Imagery Notebook |
1993 |
1 | 26 | Construction Bids/Proposals |
1994-1995 |
1 | 27 | Construction Bids/Proposals |
1995 |
1 | 28 | Construction Bids/Proposals |
1995 |
1 | 29 | Construction Bids/Proposals |
1995-1996 |
1 | 30 | Construction Contracts |
1995-1996 |
1 | 31 | Pay Requests |
1995-1997 |
1 | 32 | Documentation/Specs |
1994 |
2 | 1 | Field Reports |
1994-1995 |
2 | 2 | Field Reports |
1996 |
2 | 3 | Change Orders |
1994 |
2 | 4 | Change Orders |
1995 |
2 | 5 | Change Orders |
1996 |
2 | 6 | Submittals/Shop Drawings |
1995-1996 |
TUBES 2 tubes
|
|||
tube | |||
1 | Design Studies 3 Physical location: CCA 8 Column 6, Row 1
|
1993-2004 | |
2 | Design Studies Physical location: CCA 8 Column 5, Row 3
|
1993-2004 |
LIV: LIV: Rocky Mountain Arsenal National Wildlife Refuge, 1991-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1991-2002 | ||
Box | Folder | ||
1 | 1 | Comprehensive Management Plan |
1996 |
1 | 2 | Comprehensive Management Plan Draft |
1995 |
1 | 3 | Organizational Charts |
undated |
1 | 4 | Proposals/Contracts |
1995-2002 |
1 | 5 | Correspondence |
1995-1999 |
1 | 6 | Meeting Minutes |
1999-2002 |
1 | 7 | Project Work Plan |
1991-1995 |
1 | 8 | Project Work Plan |
1991-1995 |
1 | 9 | Vision Workshop |
1994 |
1 | 10 | Public Involvement Program |
1994 |
1 | 11 | Design Project Graphics, Mapping Format & Standards |
1994 |
1 | 12 | Conduct Focus Groups |
1994-1995 |
1 | 13 | Issues & Concerncs |
1994 |
1 | 14 | Goals & Objectives Statement |
1994 |
1 | 15 | Meeting Transcript |
1994 September 14 |
1 | 16 | Conduct Scoping Meeting |
1994 |
1 | 17 | Scoping Report |
1994 |
1 | 18 | Identify Biological Communities Needs/Uses |
1994 |
1 | 19 | Identify Existing & Potential Public Uses |
1994 |
1 | 20 | User Needs |
1994 |
1 | 21 | Environmental Education Needs/Programs |
1994 |
1 | 22 | Preliminary Program |
1994-1995 |
1 | 23 | Newsletter |
1994-1995 |
1 | 24 | Evaluation Criteria |
1994 |
1 | 25 | Alternatives |
1994-1995 |
1 | 26 | Public Review of Alternative Plans |
1995 |
1 | 27 | Public Use & Interpretive Plan |
1995 |
1 | 28 | Public Use & Interpretive Plan Draft |
1995 |
1 | 29 | Public Use Plan Draft |
1996 |
1 | 30 | Preliminary Environmental Impact Study (EIS) Draft |
1995 |
1 | 31 | Refuge Program Master Copy |
1996 |
1 | 32 | Preliminary Illustrative Plan |
1995 |
1 | 33 | Statement of Goals & Objectives |
1995-1996 |
1 | 34 | Draft Master Plan |
1995-1996 |
1 | 35 | Preliminary Design Concepts |
1994-1996 |
1 | 36 | Schematic Plans |
1995 |
1 | 37 | Urban Design Forum |
1991-1994 |
1 | 38 | Billing |
1994-1996 |
1 | 39 | Revegetation |
1994 |
1 | 40 | Stapelton |
1994-1996 |
1 | 41 | West Zone |
1994 |
1 | 42 | Master Plan and EIS Documents |
undated |
TUBES 2 tubes
|
|||
tube | |||
1 | Site Survey Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Site Survey Physical location: CCA 6 Column 1, Row 1
|
undated |
LV: LV: The Gant, 2003-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
2003-2007 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003-2004 |
1 | 2 | Proposals/Contracts |
2004-2006 |
1 | 3 | Correspondence |
2003-2007 |
1 | 4 | Invoices |
2003-2004 |
1 | 5 | Invoices |
2004 |
1 | 6 | Invoices |
2005 |
1 | 7 | Invoices |
2006 |
1 | 8 | Invoices |
2007-2009 |
1 | 9 | Meeting Minutes/Notes to File |
2003-2004 |
1 | 10 | Schedule |
2003-2004 |
1 | 11 | Schedule |
2004 |
1 | 12 | Soils & Geology |
2004 |
1 | 13 | Sketches/ Images |
2002-2003 |
1 | 14 | Sketches/ Images
[photocopies]
|
2003-2004 |
1 | 15 | Entry Sign Specifications |
2009 August 18 |
1 | 16 | Fire Place Design |
undated |
1 | 17 | Design Review |
2004 |
1 | 18 | Design Development |
2004 |
1 | 19 | Design Development |
2004 |
1 | 20 | Specifications Manual |
2004 |
1 | 21 | Specifications Manual |
2005 |
1 | 22 | Cost Estimate |
2003-2004 |
1 | 23 | Work Program |
2003 |
1 | 24 | Project Summary |
2004 |
TUBES 3 tubes
|
|||
tube | |||
1 | Water Features Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Enhancement Phase V- Lower Pool Physical location: CCA 8 Column 4, Row 1
|
undated | |
3 | Phase 1 Physical location: Barn Box 11
|
undated |
LVI: LVI: Teton Village, 1990-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-2002 | ||
Box | Folder | ||
1 | 1 | Teton Village Master Plan |
1990 December |
1 | 2 | Master Plan Proposals/Contracts |
1996-1997 |
1 | 3 | Master Plan Correspondence |
1996-1997 |
1 | 4 | Master Plan Meeting Minutes |
1996-1997 |
1 | 5 | Master Plan Work Program |
1997 |
1 | 6 | Master Plan Visual Design Guidelines |
undated |
1 | 7 | Master Plan Engineering |
undated |
1 | 8 | Master Plan Programming |
1996 |
1 | 9 | Master Plan Economic/Fiscal Data |
1996 |
1 | 10 | Teton Club Proposals/Contracts |
1997-1999 |
1 | 11 | Teton Club Correspondence |
1998-2000 |
1 | 12 | Teton Club Meeting Minutes |
1999 |
1 | 13 | Teton Club Legal Description |
1999-2002 |
1 | 14 | Teton Club Festival Hall |
1999 |
1 | 15 | Teton Club Design Sketches |
1999 |
1 | 16 | Teton Club Signage |
1999 |
1 | 17 | Teton Club Field Reports |
2000 |
1 | 18 | Teton Club Change Orders |
1999-2000 |
1 | 19 | Teton Club Addendums |
1999 |
1 | 20 | Teton Club Geological Soils |
1997-1999 |
1 | 21 | Teton Club Hydrology |
1999 |
1 | 22 | Teton Club Engineering |
1999 |
1 | 23 | Teton Club Spa |
1999 |
1 | 24 | Teton Club Programming |
1998 |
1 | 25 | Teton Club Cost Estimates |
1999-2000 |
1 | 26 | Teton Club Stone |
1999 |
1 | 27 | Teton Club Sketch Plan |
1998 |
1 | 28 | Teton Club Sketch Plan |
1998 |
1 | 29 | Teton Club Sketch Plan |
1999-2000 |
1 | 30 | Teton Club Final Plan |
1999 |
1 | 31 | Teton Club Marketing |
1999 |
1 | 32 | Teton Club Meeting Minutes |
1998 |
1 | 33 | Teton Village Approvals Correspondence |
1997 |
1 | 34 | Teton Village Approvals Meeting Notes |
1997 |
1 | 35 | Teton Village Approvals Meeting Notes |
1998 |
1 | 36 | Teton Village Approvals Meeting Notes |
1998 |
1 | 37 | Teton Village Primary Pumphouse Correspondence |
1998 |
1 | 38 | Teton Village Pumphouse Plan Submission |
1998 |
2 | 1 | Teton Village Master Plan Proposals/Contracts |
1996-1997 |
2 | 2 | Teton Village Master Plan Correspondence |
1996 |
2 | 3 | Teton Village Master Plan Correspondence |
1997 |
2 | 4 | Teton Village Master Plan Meeting Minutes |
1997 |
2 | 5 | Teton Village Master Plan Work Program |
1996-1997 |
2 | 6 | Teton Village Master Plan Legal |
1996-1998 |
2 | 7 | Teton Village Master Plan Physical |
1997-1998 |
2 | 8 | Teton Village Master Plan Wetlands |
1997 |
2 | 9 | Teton Village Master Plan Parking |
1993-1995 |
2 | 10 | Teton Village Master Plan Parking |
1996-1997 |
2 | 11 | Teton Village Master Plan Programming |
1997 |
2 | 12 | Teton Village Master Plan Fiscal Impact Analysis |
1997 |
2 | 13 | Teton Village Master Plan Capital Improvements |
1997-1998 |
2 | 14 | Teton Village Master Plan Employee Housing |
1997 |
2 | 15 | Teton Village Master Plan Transportation |
1997-1998 |
2 | 16 | Teton Village Master Plan Tram Area |
1995 |
2 | 17 | Teton Village Master Plan Charette Manual |
1990 |
2 | 18 | Teton Village Proposals/Contracts |
1990 |
2 | 19 | Teton Village Master Plan Correspondence |
1993 |
2 | 20 | Teton Village Master Plan Meeting Minutes |
1993 |
2 | 21 | Teton Village Master Plan Weekly Meeting Packets |
1993 |
2 | 22 | Teton Village Joint Proposal/Contracts |
1990 |
2 | 23 | Teton Village Joint Planning Work Program |
1990 |
2 | 24 | Teton Village Programming Correspondence |
1990 |
2 | 25 | Teton Pines Proposals/Contracts |
1994 |
2 | 26 | Teton Village Skier Plaza Correspondence |
1993 |
2 | 27 | Teton Village Planning Proposals/Contracts |
1992 |
2 | 28 | Teton Village Land Use Planning |
1988 |
2 | 29 | Teton Village Joint Planning Programming |
undated |
2 | 30 | Teton Village Skier Plaza Proposals/Contracts |
1993 |
2 | 31 | Teton Village Joint Planning Master Plans CCRS |
1990 |
2 | 32 | Teton Village Joint Planning Correspondence |
1992-1993 |
2 | 33 | Teton Village Joint Planning Meeting Minutes/Notes |
1992 |
2 | 34 | Teton Village Visual Analysis/Text |
1990 |
2 | 35 | Teton Village Marketing/Presentations |
undated |
2 | 36 | Teton Village Design Sketches/Product Info |
1994 |
2 | 37 | Teton Village Master Plan Charette Documentation |
1990 |
2 | 38 | Grand Teton Music Festival Sketches |
1998 |
2 | 39 | Teton village Master Plan with SRA |
1995 |
2 | 40 | Land Use Illustrations |
undated |
2 | 41 | Skier Plaza Conceptual Plan |
1993 |
2 | 42 | Land Trade |
1990 |
2 | 43 | Village Density Studies |
undated |
2 | 44 | Teton Village Charette |
2001 |
2 | 45 | Master Plan Village Illustrative Plan |
1997 |
2 | 46 | Village Master Plan Drawings |
1997 |
2 | 47 | Master Plan Village Expansion |
1998-1999 |
2 | 48 | Village Master Plan PUD |
1997 |
2 | 49 | Master Plan Village Signage |
1997 |
2 | 50 | Village Master Plan Resort Association |
1997 |
2 | 51 | Charette Manual |
1990 |
TUBES 4 tubes
|
|||
tube | |||
1 | Teton Pines Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Village Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Visual Simulation Physical location: Barn Box 9
|
undated |
LVII: LVII: Muar District (Malyasia), 1995-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS
[Photos removed]
|
1995-1998 | ||
Box | Folder | ||
1 | 1 | Briefing Package |
1997 |
1 | 2 | Design Sketches |
1997 |
1 | 3 | Proposals/Contracts |
1996-1997 |
1 | 4 | Proposals/Contracts |
1997-1998 |
1 | 5 | Meeting Minutes |
1997 |
1 | 6 | Work Program |
1996-1997 |
1 | 7 | Work Program |
1997 |
1 | 8 | Invoices |
1995-1998 |
1 | 9 | Notes to File |
1996 |
1 | 10 | Notes to File |
1997 |
1 | 11 | Notes to File |
1997-1998 |
1 | 12 | Development Plan |
1997 |
1 | 13 | Watershed |
1996-1997 |
1 | 14 | Physical |
1997 |
1 | 15 | Design Guidelines |
undated |
1 | 16 | Mapping |
1997 |
1 | 17 | Correspondence |
1995-1996 |
1 | 18 | Correspondence |
1996 |
1 | 19 | Correspondence |
1996 |
1 | 20 | Correspondence |
1997 |
1 | 21 | Correspondence |
1997 |
1 | 22 | Correspondence |
1997 |
1 | 23 | Correspondence |
1997 |
1 | 24 | Correspondence |
1997 |
1 | 25 | Correspondence |
1997 |
1 | 26 | Correspondence |
1997 |
1 | 27 | Correspondence |
1997 |
1 | 28 | Correspondence |
1998 |
1 | 29 | Correspondence |
1998 |
1 | 30 | Budget |
1995-1997 |
1 | 31 | Internal Correspondence |
1996 |
1 | 32 | Presentation |
1997 |
1 | 33 | River Basin Study |
1996-1997 |
1 | 34 | Inception Report |
1997 July |
1 | 35 | Soil and Plants |
1997 |
LVIII: LVIII: Muju Resort (South Korea), 1995-1997Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS
[Some pages in Korean]
|
1995-1997 | ||
Box | Folder | ||
1 | 1 | Correspondence |
1995 |
1 | 2 | Correspondence |
1996 January |
1 | 3 | Correspondence |
1996 February |
1 | 4 | Correspondence |
1996 March |
1 | 5 | Correspondence |
1996 March |
1 | 6 | Correspondence |
1996 April |
1 | 7 | Correspondence |
1996 May |
1 | 8 | Correspondence |
1996 June |
1 | 9 | Correspondence |
1996 July |
1 | 10 | Correspondence |
1996 August |
1 | 11 | Correspondence |
1996 September |
1 | 12 | Correspondence |
1996 September |
1 | 13 | Correspondence |
1996 October-November |
1 | 14 | Correspondence |
1997 |
1 | 15 | Meeting Minutes |
1995 |
1 | 16 | Meeting Minutes |
1996 |
1 | 17 | Billings/Invoices |
1996 |
1 | 18 | Chapter Notes |
1995-1996 |
1 | 19 | Concept Book |
1996 |
1 | 20 | Notes to File |
1996 |
1 | 21 | Design Sketches/Product Information |
1995 |
1 | 22 | Design Sketches/Product Information |
1995 |
1 | 23 | Design Sketches/Product Information |
1996 |
1 | 24 | Design Sketches/Product Information |
1996 |
1 | 25 | Design Sketches/Product Information |
1996 |
1 | 26 | Design Sketches/Product Information |
1996 |
1 | 27 | Design Sketches/Product Information |
1996 |
2 | 1 | Plant Lists |
1995-1996 |
2 | 2 | Illustrative Sketches |
1996 |
2 | 3 | Design Concept |
1996 |
2 | 4 | Physical |
1994 |
2 | 5 | Biological |
1995 |
2 | 6 | Engineering |
1994-1995 |
2 | 7 | Transportation |
undated |
2 | 8 | Peak Two |
1994 |
2 | 9 | Meeting Notes |
1995 |
2 | 10 | Meeting Notes |
1996 |
2 | 11 | Mini Golf Proposals/Contracts |
1996 |
2 | 12 | Mini Golf Correspondence |
1996 |
2 | 13 | Architectural Correspondence |
1995 |
2 | 14 | Architectural Correspondence |
1995 |
2 | 15 | Architectural Correspondence |
1995 |
2 | 16 | Architectural Correspondence |
1995 |
2 | 17 | Architectural Meeting Minutes/Notes to File |
1995 |
2 | 18 | Architectural Programming |
1995 |
2 | 19 | Architectural Design Sketches/Product Info |
1995 |
2 | 20 | Kid's Land Correspondence |
1996 |
2 | 21 | Kid's Land Design Sketches |
1996 |
2 | 22 | Kid's Land Finish Schedule |
1997 |
2 | 23 | Zoo Consultant Contract |
1995-1996 |
2 | 24 | Structural Contract |
1995-1996 |
2 | 25 | Water Feature Contract |
1995-1996 |
2 | 26 | Illustrator Contract |
1995-1996 |
2 | 27 | Details |
1995-1996 |
2 | 28 | Plants Information |
1995-1996 |
2 | 29 | Project Plants |
1996 |
2 | 30 | SBW Memos |
1995 |
2 | 31 | SBW Memos |
1996 |
2 | 32 | SBW Memos |
1996 |
2 | 33 | SBW Memos |
1996 |
2 | 34 | Image Book |
1997 |
TUBES 23 tubes
|
|||
tube | |||
1 | Base Material Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Cultural Art Center Physical location: CCA 6 Column 1, Row 8
|
undated | |
3 | Snowmaking Lake Flat File Physical location: CCA 6 Column 1, Row 8
|
1996 August; undated | |
4 | Main street Base 1 Do Sets Physical location: CCA 6 Column 1, Row 8
|
undated | |
5 | Cultural Art Center, Design Development, Original Sketches, Schematic Physical location: CCA 6 Column 2, Row 3
|
undated | |
6 | Layout and Materials Plan Physical location: Barn Box 4
|
1996; undated | |
7 | Roadway Landscape Physical Location: Barn Box 4
|
undated | |
8 | Construction Documents Physical Location: CCA 8 Column 4, Row 3
|
undated | |
9 | Main Street Construction Documents Physical Location: CCA 8 Column 4, Row 3
|
undated | |
10 | Circulation/ Land Use Physical Location: CCA 8 Column 5, Row 1
|
undated | |
11 | Mother Load Physical Location: CCA 8 Column 5, Row 2
|
undated | |
12 | Mother Load Physical Location: CCA 8 Column 5, Row 2
|
undated | |
13 | Yorth Hotel Physical Location: Barn Box 12
|
undated | |
14 | Recent Retail Mall Physical Location: Barn Box 12
|
undated | |
15 | Renderings Physical Location: Barn Box 12
|
undated | |
16 | Kids Land Physical Location: Barn box 12
|
undated | |
17 | Base Info Main Street Physical Location: Barn Box 12
|
undated | |
18 | Parking Lots and Arrival Facilities Physical Location: Barn Box 12
|
undated | |
19 | Retail Malls Physical Location: Barn Box 12
|
undated | |
20 | Hotel B Physical Location: Barn Box 12
|
undated | |
21 | Ski House 1 Hotel B Physical Location: Barn Box 12
|
undated | |
22 | Roadway Landscape Physical Location: Barn Box 12
|
undated | |
23 | Conceptual Drawings Physical Location: Barn Box 15
|
undated |
LIX: LIX: North Lake Tahoe, 1995-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1995-2006 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2003 |
1 | 2 | Meeting Notes |
2003-2004 |
1 | 3 | Committee Meeting Notes |
2003 |
1 | 4 | Committee Meeting Notes |
2003-2004 |
1 | 5 | Situation Analysis |
2003 |
1 | 6 | Workshops |
2004 |
1 | 7 | Correspondence |
2004 |
1 | 8 | Potential Projects |
2004 |
1 | 9 | Economic Report |
2001-2003 |
1 | 10 | Master Plan |
2004 |
1 | 11 | Master Plan |
2004 |
1 | 12 | Redevelopment Agency |
2003-2004 |
1 | 13 | Redevelopment Agency |
2004 |
1 | 14 | Tourism Redevelopment Proposals/Contracts |
2004-2005 |
1 | 15 | Tourism Redevelopment Meeting Notes |
2005 |
1 | 16 | Tourism Redevelopment Schneider Property Design Review |
2005 |
1 | 17 | Tourism Redevelopment Memo and Maps |
2005 |
1 | 18 | Tourism Redevelopment Site Visit |
2004-2005 |
1 | 19 | Tourism Redevelopment Conceptual Plan Draft |
2005 August 31 |
1 | 20 | Tourism Redevelopment Conceptual Plan |
2005 December 15 |
1 | 21 | Tourism Redevelopment Master Plan |
1995 April |
1 | 22 | Redevlopment Conceptual Design |
2006 |
1 | 23 | Sands Programming |
undated |
1 | 24 | Sands Correspondence |
2001 |
1 | 25 | Marina Correspondence |
2000-2002 |
1 | 26 | Marina Meeting Minutes |
2000-2001 |
1 | 27 | Tahoe City Marina Expansion Master Plan |
2005 |
1 | 28 | Tahoe Beach Club- Estate House |
undated |
TUBES 8 tubes
|
undated | ||
tube | |||
1 | Shoreline Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | final approvals package Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Project Level Approval Set Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Mechanical drawings, park avenue soil maps, rendered, schematic set Physical Location: CCA 8 Column 6, Row 2
|
2002-2003 | |
5 | Lake Tahoe Inn Physical location: Barn Box 7
|
undated | |
6 | Final Approval Package Physical location: Barn Box 9
|
undated | |
7 | Shoreline Physical location: Barn Box 10
|
undated | |
8 | Redevelopment Physical location: Barn Box 12
|
undated |
LX: LX: Keystone, 1989-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1989-1998 | ||
Box | Folder | ||
1 | 1 | Amenity Building- Ski Tip II undated |
undated |
1 | 2 | Construction Contracts- Ski Tip |
1995 |
1 | 3 | Correspondence |
1992-1993 |
1 | 4 | Correspondence |
1996-1998 |
1 | 5 | Correspondence- Ski Tip |
1993-1994 |
1 | 6 | Correspondence- Snake River Basin |
1993-1994 |
1 | 7 | Correspondence- Tender Foot |
1994-1995 |
1 | 8 | Correspondence- Tender Foot |
1995 |
1 | 9 | Cost Estimates Urban Design |
1992 |
1 | 10 | Design Sketches/Product Info- Ski Tip |
1994 |
1 | 11 | Existing Planned Unit Developments |
undated |
1 | 12 | Keystone Stuff |
1994 |
1 | 13 | Master Plan |
1990-1991 |
1 | 14 | Master Development Plan Update |
1996 |
1 | 15 | Meeting Notes |
1991 December |
1 | 16 | Meeting Minutes- Parcel Site Tests |
1993 |
1 | 17 | Meeting Minutes- Snake River Basin |
1993 |
1 | 18 | Meeting Minutes/Notes to File- Urban Design |
1993 |
1 | 19 | Mountain Master Plan Amendment |
1989 |
1 | 20 | Original Layout Concept and Graphics |
1994 |
1 | 21 | Planned Unit Development Technical Appendix Part 1 |
undated |
1 | 22 | Planned Unit Development Technical Appendix Part 2 |
undated |
1 | 23 | Programming- Sketch Plans |
1993 |
1 | 24 | Proposals/Contracts- Tender Foot |
1994 |
1 | 25 | PUD- Community Standards |
undated |
1 | 26 | Planned Unit Development Density Summary |
1994 |
1 | 27 | Planting Plan- Ski Tip II |
undated |
1 | 28 | Programming- Snake River Basin |
1992-1994 |
1 | 29 | Proposals/Contracts- Ski Tip |
1994 |
1 | 30 | Proposals/Contracts- Ski Tip |
1995 |
1 | 31 | Proposals/Contracts- Snake River Basin |
1993 |
1 | 32 | Proposals/Contracts- Tenderfoot |
1995 |
1 | 33 | PUD- Neighborhood Standards |
undated |
1 | 34 | Revised Planting Plan- Ski Tip II |
undated |
1 | 35 | River Run Village Skier Bridges and Ski Lift Submittals |
1997 |
1 | 36 | Skiing |
1994 |
1 | 37 | Snake River Master Plan |
1993 |
1 | 38 | Summit County Keystone Base I |
1990 |
1 | 39 | Tender Foot Fire Station |
1995 |
1 | 40 | Physical- Tender Foot |
1994 |
1 | 41 | Trade Parcel Rezoning Request Appendices |
1993 |
1 | 42 | Trade Parcel Rezoning Request |
1993 |
1 | 43 | Wetlands- Aquatic and Wetlands Consult |
undated |
1 | 44 | Wildlife |
1994 |
1 | 45 | Work Program- Snake River Basin |
1994 |
TUBES 9 tubes
|
|||
tube | |||
1 | Wintergreen Resort Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Wintergreen Resort Physical location: CCA 8 Column 6, Row 3
|
undated | |
3 | Blackrock Village Physical location: CCA 6 Column 1, Row 1
|
undated | |
4 | 4-Lane Physical location: CCA 6 Column 2, Row 3
|
undated | |
5 | Tenderfoot BMR Housing CCA 6 Column 2, Row 3
|
1996 August; undated | |
6 | Blackrock Village Center Improvements Physical location: CCA 6 Column 2, Row 5
|
undated | |
7 | Wintergreen Resort Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Housing Physical location: Barn Box 6
|
undated | |
9 | Employee Housing Physical location: Barn Box 6
|
undated |
LXI: LXI: Flathead County, 1993-1995Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-1995 | ||
Box | Folder | ||
1 | 1 | Articles |
1994-1995 |
1 | 2 | Articles |
undated |
1 | 3 | Citizen Comments |
1994 |
1 | 4 | Clippings |
1993-1995 |
1 | 5 | Commercial Industrial |
1993 |
1 | 6 | Commissioner Sign Off |
1993 |
1 | 7 | Correspondence |
1993 |
1 | 8 | Demographic |
1992 |
1 | 9 | Ecosystem Management |
1993-1994 |
1 | 10 | Clippings |
1993-1994 |
1 | 11 | Fire Safety |
1993-1994 |
1 | 12 | Forestry |
1993 |
1 | 13 | Fundraising |
1993 |
1 | 14 | Goals |
1993 |
1 | 15 | Growth Projection |
1993 |
1 | 16 | Handouts |
undated |
1 | 17 | Historical Info |
1993 |
1 | 18 | Land Use Implementation |
1993-1994 |
1 | 19 | Master Plan Survey |
1993 |
1 | 20 | Master Plan Update |
1993 |
1 | 21 | Master Plan Update Implementation Document |
1994 |
1 | 22 | Master Plan Update Land Use Refinement Process |
1994 |
1 | 23 | Master Plan Update Map Atlas |
1994 |
1 | 24 | Master Plan Update Policy Document |
1994 |
1 | 25 | Master plan Update Resource Document |
1994 |
1 | 26 | Master Plan Updates |
1993 |
1 | 27 | Meeting Notes |
undated |
1 | 28 | Miscellaneous |
1993-1994 |
1 | 29 | Montana Magazine |
1993 |
1 | 30 | Northern Rockies Ecosystem |
1993-1994 |
1 | 31 | Notes to File |
1993 |
1 | 32 | Parks |
1993 |
1 | 33 | Planning Coalition |
1993 |
1 | 34 | Revisions to Master Plan |
1993 |
1 | 35 | Subdivision Regulations |
1994 |
1 | 36 | Summary of First Public Meeting |
undated |
1 | 37 | Work Program |
1993 |
TUBES 11 tubes
|
undated | ||
tube | |||
1 | Monographs Physical location: CCA 8 Column 5, Row 3
|
undated | |
2 | Existing Land-use, zoning Physical location: CCA 6 Column 2, Row 2
|
undated | |
3 | Master Plan Physical location: CCA 6 Column 2, Row 2
|
undated | |
4 | Master Plan Physical location: CCA 6 Column 2, Row 2
|
undated | |
5 | Master Plan Physical location: CCA 6 Column 2, Row 2
|
undated | |
6 | Site Analysis Maps Physical location: CCA 6 Column 2, Row 2
|
undated | |
7 | master Plan Update Physical location: CCA 6 Column 2, Row 9
|
undated | |
8 | Monographs Physical location: Barn Box 10
|
undated | |
9 | Monographs Physical location: Barn Box 10
|
undated | |
10 | Monographs Physical location: Barn Box 14
|
undated | |
11 | Monographs Physical location: Barn Box 14
|
undated |
LXII: LXII: Canyon Village (Yellowstone), 1982-1997Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1982-1997 | ||
Box | Folder | ||
1 | 1 | Canyon Village |
1987 |
1 | 2 | Canyon Village Biological |
undated |
1 | 3 | Canyon Village Complex- Phase I Project Summary |
1988 |
1 | 4 | Canyon Village Lagoons Correspondence |
1989 |
1 | 5 | Canyon Village Correspondence |
1987-1988 |
1 | 6 | Canyon Village Correspondence |
1996-1997 |
1 | 7 | Canyon Village Cost Estimates |
1989-1990 |
1 | 8 | Canyon Village Design Sketches/Product Info. |
1983 |
1 | 9 | Canyon Village Details |
undated |
1 | 10 | Canyon Village Economic Analysis |
1982-1986 |
1 | 11 | Canyon Village Details |
1989 |
1 | 12 | Canyon village Engineering-Civil |
1988-1989 |
1 | 13 | Canyon Village Engineering-Legal Description |
undated |
1 | 14 | Canyon Village Engineering- Mechanical |
undated |
1 | 15 | Canyon Village Engineering- Utility |
1987-1988 |
1 | 16 | Canyon Village Graphics |
undated |
1 | 17 | Canyon Village Lagoons (NPS) |
1989 |
1 | 18 | Canyon Village Lagoons Proposal/Contracts |
1989 |
1 | 19 | Canyon Village Lagoons Visual |
1989 |
1 | 20 | Canyon Village Marketing/Video/Visual |
1987-1988 |
1 | 21 | Canyon Village Master Plan |
1987 |
1 | 22 | Canyon Village Meeting Minutes/Notes to File |
1987-1989 |
1 | 23 | Canyon Village Meeting Minutes/Notes to File |
1987 |
1 | 24 | Canyon Village Lagoons Meeting Minutes/Notes to File |
1989 |
1 | 25 | Canyon Village Phase I |
1987 |
1 | 26 | Canyon Village Phase II Construction Bids/Proposals |
1997 |
1 | 27 | Canyon Village Physical |
undated |
1 | 28 | Canyon Village Physical |
1987 |
1 | 29 | Canyon Village Physical- Geology/Soils |
1987 |
1 | 30 | Canyon Village Programming-Architectural |
undated |
1 | 31 | Canyon Village Programming-Architectural |
1987 |
1 | 32 | Canyon Village Proposals/Contracts |
1996 |
1 | 33 | Canyon Village Proposals/Contracts |
undated |
1 | 34 | Canyon Village Proposals/Contracts |
undated |
1 | 35 | Canyon Village Proposals/Contracts |
1987 |
1 | 36 | Canyon Village Redevelopment Phase 1 |
1987 |
1 | 37 | Canyon village Specs |
undated |
1 | 38 | Canyon Village Transmittals |
1987-1990 |
1 | 39 | Canyon Video III |
1988 |
1 | 40 | Canyon Village Work Program |
1987 |
1 | 41 | Canyon Village Lagoons Work Program |
1989 |
1 | 42 | Grant Village Video |
1988 |
1 | 43 | Lodging Redevelopment Phase One |
1987 |
1 | 44 | Lodging Redevelopment Phase One |
1987 |
1 | 45 | Lodging Redevelopment |
1987 |
TUBES 6 tubes
|
undated | ||
tube | |||
1 | Existing Circulation Diagram Physical location: CCA 6 Column 2, Row 4
|
undated | |
2 | Illustrative Plan Physical location: CCA 6 Column 2, Row 8
|
undated | |
3 | Presentation Drawing Base Info Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | graphics Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | Phasing Plan Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Site Analysis Physical location: CCA 8 Column 4, Row 3
|
undated |
LXIII: LXIII: RidgeGate, 1993-1995Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-1995 | ||
Box | Folder | ||
1 | 1 | RidgeGate Parks Proposals/Contracts |
2004-2005 |
1 | 2 | RidgeGate Parks Meeting Records |
2004-2005 |
1 | 3 | RidgeGate Parks Correspondence |
2003-2006 |
1 | 4 | RidgeGate Parks Project Schedules |
2004-2005 |
1 | 5 | RidgeGate Target Proposals/Contracts |
2003-2005 |
1 | 6 | RidgeGate Target Meeting Minutes |
2003 |
1 | 7 | RidgeGate Target Correspondence |
2003-2005 |
1 | 8 | RidgeGate Retail Meeting Minutes |
2002-2003 |
1 | 9 | RidgeGate Retail Proposals/Contracts |
2002-2003 |
1 | 10 | RidgeGate Retail Correspondence |
2002-2003 |
1 | 11 | RidgeGate Retail Preliminary Plans |
2002 |
1 | 12 | RidgeGate Retail Design Sketches |
2002 |
1 | 13 | RidgeGate General Services Proposals/Contracts |
2005 |
1 | 14 | RidgeGate General Services Meeting Minutes/Notes To File |
2005-2006 |
1 | 15 | RidgeGate General Services Correspondence |
2005 |
1 | 16 | RidgeGate General Services Pedestrian Underpass |
2007 |
1 | 17 | RidgeGate General Services Diagram |
2004-2005 |
1 | 18 | RidgeGate Interchange Proposals/Contracts |
2006 |
1 | 19 | RidgeGate Illustrative |
2003 |
1 | 20 | Ridgegate Graphics |
2000-2004 |
1 | 21 | Sculpture |
2004-2006 |
1 | 22 | Correspondence for Light Rail |
2002 |
1 | 23 | Proposals/Contracts for Retail Streets |
2003-2004 |
1 | 24 | Correspondence for Retail Streets |
2003 |
1 | 25 | Correspondence for Tree Procurement |
2001-2002 |
1 | 26 | Proposals/Contracts for Tree Procurement |
2001-2002 |
1 | 27 | Meeting Notes for Tree Procurement |
2002 |
1 | 28 | Plant List |
undated |
1 | 29 | Correspondence for RidgeGate Streets |
2001-2003 |
1 | 30 | Proposals/Contracts for RidgeGate Streets |
2001-2003 |
1 | 31 | Construction Documents |
2003 |
1 | 32 | Infrastructure for Irrigation |
2001 |
1 | 33 | Meeting Notes for Landscape and Irrigation |
2001-2003 |
1 | 34 | Meeting Notes for Irrigation |
2001 |
1 | 35 | Irrigation Master Plan |
2003 |
1 | 36 | Phase I/Residential |
2002 |
1 | 37 | Design Standards and Guidelines |
2001 |
1 | 38 | Meeting Minutes for Sub Plan |
2001 |
1 | 39 | Proposals/Contracts for Sub Plan |
2002 |
1 | 40 | Sub Area Plan |
2003 |
1 | 41 | Meeting Notes Parks and Open Space |
2002 |
1 | 42 | Hydrology for Parks/Open Space |
2001 |
1 | 43 | Proposals/Contracts for Parks and Open Space |
2001-2002 |
1 | 44 | Parks and Open Space Master Plan Task 1 and 2 |
2002 |
1 | 45 | Parks and Open Space Master Plan Draft 2 |
2003 |
1 | 46 | Parks/Open Space Master Plan |
2001-2003 |
1 | 47 | Design Sketches for the Interchange |
undated |
1 | 48 | Meeting Notes for Lincoln Commons |
2004 |
1 | 49 | Circle Streetscapes Plans |
2001 |
1 | 50 | Design Notes for Circle Streetscapes |
2004 |
1 | 51 | Proposals/Contracts for Circle Streetscapes |
2003-2004 |
1 | 52 | Environmental for District Coordination |
2002-2003 |
1 | 53 | Pond 302 |
2001-2002 |
1 | 54 | Schematic Design District Coordination |
2002 |
1 | 55 | Design Sketches for Pedestrian Tunnel Specs. |
undated |
1 | 56 | Meeting Minutes for District Coordination |
2001-2004 |
1 | 57 | Design Sketches for District Coordination |
2003 |
1 | 58 | Meeting Minutes for Landscape Maintenance |
2003 |
1 | 59 | Proposals/Contracts for District Coordination |
2001-2003 |
1 | 60 | Correspondence for District Coordination |
2002-2003 |
1 | 61 | Sign Permit Phase 1 |
2002 |
1 | 62 | Cost Estimates for Phase 1 |
2002 |
1 | 63 | Engineering for Phase 1 |
2002 |
1 | 64 | Soil for Phase 1 Streets |
2001-2002 |
1 | 65 | Land Use for Phase 1 Streets |
2001 |
1 | 66 | Estimates for Phase 1 Streets |
2001 |
1 | 67 | Plants for Phase 1 Streets |
2001-2002 |
1 | 68 | Meeting Minutes for Phase 1 Streets |
2001-2002 |
1 | 69 | Correspondence for Phase 1 Streets |
2001-2002 |
1 | 70 | Proposals/Contracts for Phase 1 Streets |
2001-2003 |
1 | 71 | Land Use for Rampart Range |
2002 |
1 | 72 | Illustrative Concept Plan for Rampart Range |
2003 |
1 | 73 | Office District Sub Area Plan |
2001 |
1 | 74 | Retail Planning for Rampart Range |
2001 |
2 | 1 | Meeting Notes for Rampart Range |
1999-2004 |
2 | 2 | Correspondence |
1999-2005 |
2 | 3 | Rampart Range Proposals/Contracts |
1999 |
2 | 4 | Phase II Streets Proposals/Contracts |
2007 |
2 | 5 | Meeting Minutes |
2000-2001 |
2 | 6 | Weekly Reports |
2004 |
TUBES 7 tubes
|
undated | ||
tube | |||
1 | Phase 1 Streetscape Physical location: CCA 8 Column 6, Row 1
|
1993-1995; undated | |
2 | LMIS study; engineering sections, plans, station design, grading study Physical location: CCA 6 Column 1, Row 2
|
undated | |
3 | Streetscapes Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Phase 1 Streetscape Physical location: CCA 8 Column 5, Row 3
|
undated | |
5 | Circle Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Pastel schematic sections, signage, precedents, project image Physical location: Barn Box 10
|
undated | |
7 | Streetscapes Physical location: Barn Box 10
|
undated |
LXIV: LXIV: Grand Targhee, 1995-2010Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1995-2010 | ||
Box | Folder | ||
1 | 1 | Correspondence |
1999-2003 |
1 | 2 | Meeting Minutes |
1998 |
1 | 3 | Forest Service Land Exchange |
1998-1999 |
1 | 4 | Programming |
2001 |
1 | 5 | Programming |
2001 |
1 | 6 | Squirrel Meadows |
1998 |
1 | 7 | Squirrel Meadows |
1998 |
1 | 8 | Socio-Economic Analysis |
1996-1998 |
1 | 9 | Squirrel Meadows Environmental Impact Statement |
1999 June |
1 | 10 | Proposals/Contracts |
2004-2008 |
1 | 11 | Invoices |
2003-2004 |
1 | 12 | Invoices |
2005 |
1 | 13 | Invoices |
2006 |
1 | 14 | Invoices |
2007-2008 |
1 | 15 | Invoices |
2009-2010 |
1 | 16 | Hydrology |
2006 |
1 | 17 | Habitat |
2005-2006 |
1 | 18 | Correspondence |
2003-2004 |
1 | 19 | Correspondence |
2005 |
1 | 20 | Correspondence |
2005 |
1 | 21 | Correspondence |
2005 |
1 | 22 | Correspondence |
2005 |
1 | 23 | Correspondence |
2005 |
1 | 24 | Correspondence |
2006 |
2 | 1 | Correspondence |
2007 |
2 | 2 | Correspondence |
2007-2008 |
2 | 3 | Meeting Minutes |
2001-2004 |
2 | 4 | Meeting Minutes |
2005 |
2 | 5 | Meeting Minutes |
2006 |
2 | 6 | Meeting Minutes |
2007 |
2 | 7 | "Progress Toward a Vision for Colorado's Future" by Kurt Culbertson |
undated |
2 | 8 | Presentations |
2005-2007 |
2 | 9 | Environmental Impact |
2003-2005 |
2 | 10 | Market Research |
1999-2006 |
2 | 11 | Financial Proforma |
2004-2005 |
2 | 12 | Sewer |
2007 |
2 | 13 | Ground water |
2004-2006 |
2 | 14 | Affordable Housing |
2004-2006 |
2 | 15 | Transportation |
2006 |
2 | 16 | Prior Studies |
1995-1999 |
2 | 17 | Development Program |
2003-2004 |
2 | 18 | Detail Design Study |
2004 |
2 | 19 | Sketches/Image Graphics |
2007 |
2 | 20 | Cost Estimates |
2004 |
2 | 21 | Specific/Development Plan |
2003-2006 |
2 | 22 | Design Guidelines |
2004 |
2 | 23 | Special Review Processes |
2004-2005 |
2 | 24 | Programming |
2006 |
2 | 25 | Schematic Design |
2004-2005 |
2 | 26 | Master Plan Alternatives |
1996 |
2 | 27 | Master Plan Alternatives |
2004 |
2 | 28 | Master Plan Alternatives |
2004 |
2 | 29 | Master Plan Alternatives |
2004 |
2 | 30 | Master Plan Alternatives |
2004 |
2 | 31 | Master Plan Alternatives |
2005 |
2 | 32 | Master Plan Alternatives |
2007 |
2 | 33 | Water Rights |
2004-2008 |
2 | 34 | Contractual Agreements |
2004 |
2 | 35 | Vegetation |
2004-2005 |
2 | 36 | Market |
1998-2001 |
2 | 37 | Master Plan |
2001 |
TUBES 1 tube
|
undated | ||
tube | |||
1 | Grand Targhee Physical location: CCA 8 Column 6, Row 1
|
1995-2010; undated |
LXV: LXV: Big Mountain, 1990-2004Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-2004 | ||
Box | Folder | ||
1 | 1 | Big Mountain Proposals/Contracts |
2000-2004 |
1 | 2 | Big Mountain Correspondence |
2000 |
1 | 3 | Big Mountain Correspondence |
2001 January-May |
1 | 4 | Big Mountain Correspondence |
2001 April - 2002 |
1 | 5 | Big Mountain Meeting Minutes |
2000 May-September |
1 | 6 | Big Mountain Meeting Minutes |
2000 October-December |
1 | 7 | Big Mountain Meeting Minutes |
2002 |
1 | 8 | Big Mountain Schedule |
2000-2001 |
1 | 9 | Big Mountain Land Use |
2000 |
1 | 10 | Big Mountain Soils and Geology |
1992-2000 |
1 | 11 | Big Mountain Hydrology |
2003 |
1 | 12 | Big Mountain Hydrology |
undated |
1 | 13 | Big Mountain Vegetation |
undated |
1 | 14 | Big Mountain Market Research |
2000 |
1 | 15 | Big Mountain Financial Proformas |
2000 |
1 | 16 | Big Mountain Sewer |
2000 |
1 | 17 | Big Mountain Fire Protection |
2001 |
1 | 18 | Big Mountain Prior Studies |
1999-2001 |
1 | 19 | Big Mountain Developable Land Summary |
2000 |
1 | 20 | Big Mountain Development Program |
2000 |
1 | 21 | Big Mountain Development Program |
2001-2003 |
1 | 22 | Big Mountain Master Plan Document |
2000-2001 |
1 | 23 | Big Mountain master Plan Document |
undated |
1 | 24 | Big Mountain Detail Design Studies |
2001 |
1 | 25 | Big Mountain Land Use Approvals |
2000-2001 |
1 | 26 | Big Mountain Guidelines for Sustainability |
undated |
1 | 27 | Big Mountain Cad Files |
2000 |
1 | 28 | Big Mountain Program |
2000 |
1 | 29 | Big Mountain Design Development |
2000 |
1 | 30 | Big Mountain Precedents |
1998 |
1 | 31 | Big Mountain Ski Facilities |
2000 |
1 | 32 | Big Mountain Wildlife |
1997 |
1 | 33 | Big Mountain Wildlife |
1996 |
1 | 34 | Big Mountain Wildlife |
1997 |
1 | 35 | Big Mountain People Movers Report |
2000 |
2 | 1 | Big Mountain Architectural Sketches |
2000 |
2 | 2 | Big Mountain Architectural Sketches |
2001 |
2 | 3 | Big Mountain Architectural Sketches |
undated |
2 | 4 | Big Mountain Transportation |
1991 |
2 | 5 | Big Mountain Transportation |
2000 |
2 | 6 | Big Mountain Transportation |
2000-2001 |
2 | 7 | Big Mountain Phase One |
2000-2001 |
2 | 8 | Big Mountain Design Guidelines |
1996-2001 |
2 | 9 | Big Mountain Phase Two |
2001 |
2 | 10 | Big Mountain Conference Center |
2000 |
2 | 11 | Big Mountain Retail Studies |
2000 |
2 | 12 | Big Mountain Conference Center Proposals/Contracts |
1996 |
2 | 13 | Big Mountain Conference Center Correspondence |
1997 |
2 | 14 | Big Mountain Conference Center Meeting Minutes/Notes to File |
1996-1997 |
2 | 15 | Big Mountain Conference Center Work Program |
1996-1997 |
2 | 16 | Big Mountain Phase 1 Design Proposals/Contracts |
1991 |
2 | 17 | Big Mountain Proposals/Contracts |
1990-1991 |
2 | 18 | Big Mountain Proposals/Contracts |
1996-1997 |
2 | 19 | Big Mountain Correspondence |
1991-1992 |
2 | 20 | Big Mountain Correspondence |
1996-1997 |
2 | 21 | Big Mountain Meeting Minutes/Notes to File |
1991 |
2 | 22 | Big Mountain Meeting Minutes/Notes to File |
1996-1997 |
2 | 23 | Big Mountain Work Program |
1991-1996 |
2 | 24 | Big Mountain Engineering |
1991-1997 |
2 | 25 | Big Mountain Programming |
1991-1996 |
2 | 26 | Big Mountain Design Sketches/Product Info |
1991 |
2 | 27 | Big Mountain Design Sketches/Product Info |
1993 |
2 | 28 | Big Mountain Market/Presentation |
1991 |
2 | 29 | Big Mountain Physical |
1993 |
2 | 30 | Big Mountain Visual |
1991 |
2 | 31 | Big Mountain Resort Executive Summary Report |
2001 |
2 | 32 | Big Mountain Resort Master Plan Report |
2001 |
2 | 33 | Big Mountain Resort Master Plan Addendum |
2001 |
2 | 34 | Big Mountain Ski and Summer Resort Master Plan Draft |
2001 |
2 | 35 |
Hellroaring: Fifty Years on The Big Mountain
|
1996 |
2 | 36 | Big Mountain Zoning Regulations Report |
1993-2000 |
TUBES 15 tubes
|
undated | ||
tube | |||
1 | Architectural Drawings Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Grading Plans Master Plan Sketches Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Glacier Village Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Glacier Village Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | Tenderfoot Ridge Physical location: CCA 8 Column 5, Row 3
|
undated | |
6 | Tenderfoot Ridge, Mooserun Physical location: CCA 8 Column 5, Row 3
|
undated | |
7 | Glacier Village Physical location: Barn Box 6
|
undated | |
8 | Tenderfoot Physical location: Barn Box 6
|
undated | |
9 | Tenderfoot Physical location: Barn Box 6
|
undated | |
10 | Master Plan 2000 Physical location: Barn Box 6
|
undated | |
11 | Glacier Village Physical location: Barn Box 6
|
undated | |
12 | Glacier Village, Parcel Plan, Sketch Plan, Ski Linkages, Water Plan, Concept Plans Physical location: Barn Box 6
|
undated | |
13 | Adjacent Lands Physical location: Barn Box 6
|
undated | |
14 | Glacier Village, Parcel Plan, Sketch Plan, Ski Linkages, Water Plan, Concept Plans Physical location: Barn Box 6
|
undated | |
15 | Master Plan Physical location: Barn Box 6
|
undated |
LXVI: LXVI: Walnut Creek, 1993-1995Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1993-1995 | ||
Box | Folder | ||
1 | 1 | Walnut Creek Title 1 Proposals/Contracts |
1993 |
1 | 2 | Walnut Creek Title 1 Correspondence |
1993 May-June |
1 | 3 | Walnut Creek Title 1 Correspondence |
1993 July-August |
1 | 4 | Walnut Creek Title 1 Correspondence |
1993 September-October |
1 | 5 | Walnut Creek Title 1 Meeting Minutes/Notes to File |
1993 |
1 | 6 | Walnut Creek Title 1 Project Memorandum |
1993 |
1 | 7 | Walnut Creek Title 1 Engineering |
1993 January 11 |
1 | 8 | Walnut Creek Title 1 Engineering |
1993 April-July |
1 | 9 | Walnut Creek Title 1 Engineering |
1993 August |
1 | 10 | Walnut Creek Title 1 Engineering |
1993 September |
1 | 11 | Walnut Creek Title 1 Design Sketches/Product Information |
1993 |
1 | 12 | Walnut Creek Title 1 Physical |
1993 |
1 | 13 | Walnut Creek Title 1 Biological |
1991-1993 |
1 | 14 | Walnut Creek Title 1 Programming |
1993 |
1 | 15 | Walnut Creek Title 1 Cost Estimates |
1993 |
1 | 16 | Walnut Creek Regulations |
1993 |
1 | 17 | Walnut Creek Exhibits |
1993 |
1 | 18 | Walnut Creek Sign Plan |
1994 February |
1 | 19 | Walnut Creek Specifications |
1995 April 20 |
TUBES 6 tubes
|
|||
tube | |||
1 | Schematic Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Master Sheet Set Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Miscellaneous Analysis Art Physical location: Barn Box 13
|
undated | |
4 | Demo Physical location: Barn Box 13
|
undated | |
5 | Site Analysis Planning Physical location: Barn Box 13
|
undated | |
6 | Road Design Physical location: Barn Box 13
|
undated |
LXVII: LXVII: Braun Ranch, 1987-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1987-2001 | ||
Box | Folder | ||
1 | 1 | Braun Ranch Proposals/Contracts |
1998-2001 |
1 | 2 | Braun Ranch Correspondence/Transmittals |
1998 |
1 | 3 | Braun Ranch Correspondence/Transmittals |
1999-2000 |
1 | 4 | Braun Ranch Schedule |
1998-2001 |
1 | 5 | Braun Ranch Meeting Minutes/Notes |
1998 |
1 | 6 | Braun Ranch Meeting Minutes/Notes |
1999 |
1 | 7 | Braun Ranch Land Use/Vicinity Map |
1998-2000 |
1 | 8 | Braun Ranch Water |
1998-2000 |
1 | 9 | Braun Ranch Master Plan |
1999 |
1 | 10 | Braun Ranch Environment |
1998-2000 |
1 | 11 | Braun Ranch Visual Analysis |
1999 July 14 |
1 | 12 | Braun Ranch Engineering |
1998-1999 |
1 | 13 | Braun Ranch Engineering |
1999-2000 |
1 | 14 | Braun Ranch Programming |
1996-1999 |
1 | 15 | Braun Ranch Design Sketches |
1991-1999 |
1 | 16 | Braun Ranch Entitlement |
2000 |
1 | 17 | Braun Ranch Graphics |
1999 |
1 | 18 | Braun Ranch Legal |
1987-1998 |
1 | 19 | Braun Ranch Legal |
1999 |
1 | 20 | Braun Ranch Legal |
2000 |
1 | 21 | Braun Ranch Specifications/Submissions |
1995-998 |
1 | 22 | Braun Ranch Specifications/Submissions |
1999-2000 |
1 | 23 | Braun Ranch Specifications/Submissions |
2001 |
1 | 24 | Braun Ranch Land Use Application |
1998 Octobter 20 |
1 | 25 | Braun Ranch Protective Development Options |
1995 November |
1 | 26 | Braun Ranch Executive Summary & Photo Documentation |
1999 July 14 |
TUBES 1 tube
|
|||
tube | |||
1 | Property 1392 Base Mapping Physical location: CCA 8 Column 5, Row 1
|
undated |
LXVIII: LXVIII: Veteran's Cemetery of Western Colorado, 1999-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1999-2002 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1999-2001 |
1 | 2 | Correspondence |
1999-2000 |
1 | 3 | Correspondence |
2001 |
1 | 4 | Correspondence |
2001 |
1 | 5 | Correspondence |
2001 |
1 | 6 | Correspondence |
2002 |
1 | 7 | Meeting Minutes/Notes to File |
1999-2000 |
1 | 8 | Meeting Minutes/Notes to File |
2001-2002 |
1 | 9 | Work Program |
2001 |
1 | 10 | Physical |
2000-2001 |
1 | 11 | Engineering |
1999-2001 |
1 | 12 | Programming |
1999-2000 |
1 | 13 | Cost Estimates |
1999-2001 |
1 | 14 | Design Sketches/Product Information |
1999-2001 |
1 | 15 | Architecture |
2000 |
1 | 16 | Specifications |
2000 |
1 | 17 | Product Master Plan |
2000 |
1 | 18 | Construction Documents |
2001 |
1 | 19 | Construction Documents |
2001 |
1 | 20 | Construction Documents |
2001 |
1 | 21 | Architect's Supplemental Instructions |
2001 |
1 | 22 | Construction Meeting Minutes |
2001 |
1 | 23 | Construction Meeting Minutes |
2001 |
1 | 24 | Construction Meeting Minutes |
2002 |
1 | 25 | Construction Change Orders |
2001-2002 |
LXIX: LXIX: Primland Resort, 1999-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1999-2006 | ||
Box | Folder | ||
1 | 1 | Primland Proposals/Contracts |
2001-2003 |
1 | 2 | Primland Proposals/Contracts |
2004-2005 |
1 | 3 | Primland Correspondence |
2001-2005 |
1 | 4 | Primland Environmental |
2003-2004 |
1 | 5 | Primland Cost Estimate |
2004 |
1 | 6 | Primland Notes to File |
undated |
1 | 7 | Primland Field Notes and Reports |
undated |
1 | 8 | Primland Construction Documents |
2001-2002 |
1 | 9 | Primland Construction Documents |
2003 |
1 | 10 | Primland Construction Documents |
2005 |
1 | 11 | Primland Transportation |
2003 |
1 | 12 | Primland Infrastructure |
2003 |
1 | 13 | Primland Utilities |
2004 |
1 | 14 | Primland Golf Course |
2003 |
1 | 15 | Primland Golf Course Feasibility Analysis |
1999 November 1 |
1 | 16 | Primland Golf Course Character Image Portfolio |
undated |
1 | 17 | Primland Schematic Design |
2003 |
1 | 18 | Primland Design Development |
2001 |
1 | 19 | Primland Sketches/Image Graphics |
undated |
1 | 20 | Primland Meeting Notes |
2001-2006 |
1 | 21 | Primland Project Schedule |
2003-2004 |
1 | 22 | Primland Conceptual Design |
2004 |
1 | 23 | Primland Visual |
2003-2004 |
1 | 24 | Primland Legal |
2001 |
1 | 25 | Primland Legal |
2001 |
1 | 26 | Primland Financial Analysis |
2002-2003 |
1 | 27 | Primland Lodge & Grounds Character Image Portfolio |
undated |
1 | 28 | Primland Lodge Proposals/Contracts |
2005 |
TUBES 8 tubes
|
|||
tube | |||
1 | Developmental Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Lodge Concept and Site Plan Physical location: Barn Box 4
|
undated | |
3 | Site Plans Physical location: Barn Box 4
|
undated | |
4 | Imagery Physical location: Barn Box 4
|
undated | |
5 | Site Analysis; Plan; Landscape Concept 1 Physical location: Barn Box 4
|
undated | |
6 | Lodge Concept and Site Plan Physical location: Barn Box 4
|
undated | |
7 | Alternate Plans Maintenance Facility Physical location:Barn Box 11
|
undated | |
8 | Alternative Plans Maintenance Facility Golf Physical location: Barn Box 11
|
undated |
LXX: LXX: Avon, 1990-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-2007 | ||
Box | Folder | ||
1 | 1 | Avon Proposals/Contracts |
1990-2005 |
1 | 2 | Avon Meeting Minutes |
2002-2005 |
1 | 3 | Avon Meeting Minutes |
2006 |
1 | 4 | Avon Correspondence/Transmittals |
2004-2005 |
1 | 5 | Avon Market Research |
2004 |
1 | 6 | Avon Financial Proformas |
2005 |
1 | 7 | Avon Master Plan Prior Studies |
2003-2005 |
1 | 8 | Avon Analysis Maps and Diagrams |
undated |
1 | 9 | Avon Master Plan Documents |
2005-2006 |
1 | 10 | Avon Source Data |
2004 |
1 | 11 | Avon Public Library |
1994 April 29 |
1 | 12 | Avon Town Center Transportation |
1996 November 5 |
1 | 13 | Avon Town Center Community/Area Plan |
1996 |
1 | 14 | Avon Town Center Design Program Summary |
2003 |
1 | 15 | Avon Town Center Correspondence/Transmittals |
2006 |
1 | 16 | Avon East Town Proposals/Contracts |
2006 |
1 | 17 | Avon East Town Meeting Minutes/Notes |
2006-2007 |
1 | 18 | Avon East Town Prior Studies |
undated |
1 | 19 | Avon East Town Analysis Maps and Diagrams |
undated |
1 | 20 | Avon East Town Master Plan Alternatives |
2006 |
1 | 21 | Avon East Town Specific/Development Plan |
1999-2000 |
1 | 22 | Avon East Town Public Participation |
2007 |
1 | 23 | Avon East Town Source Data |
1998 October 13 |
1 | 24 | Avon Tract C Proposals/Contracts |
1997 |
1 | 25 | Avon Tract C Meeting Minutes/Notes To File |
1997 |
1 | 26 | Avon Correspondence |
undated |
1 | 27 | Avon Tract C Programming/Design Sketches |
1996 |
1 | 28 | Avon Lighting Plan Invoices |
2007-2008 |
1 | 29 | Avon Lighting Plan Street Lighting Master Plan |
2008 |
1 | 30 | Avon Town Center West Proposals/Contracts |
2007 |
1 | 31 | Avon Town Center West Snowmelt Invoices |
2007-2008 |
1 | 32 | Avon Town Center West Snow Removal/Cost Review |
2007 |
1 | 33 | Avon Town Center West Investment Meeting Minutes/Notes |
2006-2007 |
1 | 34 | Avon Town Center West Investment Financial Analysis |
2006 |
1 | 35 | Avon Town Center West Investment Analysis/History |
2006 |
1 | 36 | Avon Town Center West Investment Plan Sketches |
undated |
2 | 1 | Avon Town Center West Investment Plan Subdivision |
2004 |
2 | 2 | Avon Town Center West Investment Urban Renewal |
2006 |
2 | 3 | Avon Town Center West Investment Proposals/Contracts |
2006-2008 |
2 | 4 | Avon Town Center West Investment Proposals/Contracts |
undated |
2 | 5 | Avon Town Center West Investment Correspondence/Transmittals |
2006 |
2 | 6 | Avon Town Center West Investment Invoices |
2006-2007 |
2 | 7 | Village at Avon Proposals/Contracts |
2002-2003 |
2 | 8 | Village at Avon Correspondence Client Incoming |
2002-2003 |
2 | 9 | Village at Avon Correspondence Client Outgoing |
2002-2003 |
2 | 10 | Village at Avon Correspondence Consultants Incoming |
2002-2003 |
2 | 11 | Village at Avon Correspondence Consultants Outgoing |
2002-2003 March |
2 | 12 | Village at Avon Correspondence Consultants Incoming |
2003 April-November |
2 | 13 | Village at Avon Correspondence Town |
2003 |
2 | 14 | Village at Avon Meeting Minutes |
2002-2003 March |
2 | 15 | Village at Avon Meeting Minutes |
2003 April-October |
2 | 16 | Village at Avon Design Sketches |
2002-2003 |
2 | 17 | Village at Avon Schedules |
2003 |
2 | 18 | Village at Avon Bidding |
2003 |
2 | 19 | Village at Avon Construction Correspondence |
2003 |
2 | 20 | Village at Avon Construction Field Reports |
2003 |
2 | 21 | Village at Avon Lighting |
2003 |
2 | 22 | Village at Avon Gas, Electric Water Applications |
2003 |
2 | 23 | Village at Avon Tract E submittals |
2003 |
2 | 24 | Village at Avon Lot 2 Proposals/Contracts |
2004 |
2 | 25 | Village at Avon Lot 2 Invoices |
2004-2006 |
2 | 26 | Village at Avon Lot 2 Charging Station |
2005 |
2 | 27 | Village at Avon Lot 2 Master Plan |
undated |
TUBES 6 tubes
|
|||
tube | |||
1 | Aspen Town Center East Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Trail Recreation Master Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Center West Physical location: Barn Box 10
|
undated | |
4 | Town Center Transit Physical location: Barn Box 11
|
undated | |
5 | Town Center Physical location: Barn Box 15
|
undated | |
6 | Crewset Physical location: Barn Box 15
|
undated |
LXII: LXXI: Northstar, 1995-2003Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1995-2003 | ||
Box | Folder | ||
1 | 1 | Historical and Cultural Resources |
1998-2000 |
1 | 2 | Water Rights |
1995-2000 |
1 | 3 | Analysis |
1999 |
1 | 4 | Biological Resources Survey |
2000-2001 |
1 | 5 | Housing |
2000 |
1 | 6 | Housing |
2001 |
1 | 7 | Environmental Audit |
1996-2001 |
1 | 8 | Parks and Recreation |
2000 |
1 | 9 | Transportation |
2000 |
1 | 10 | Development Program |
1999-2000 |
1 | 11 | Correspondence |
2000 |
1 | 12 | Water Analysis |
2001 |
1 | 13 | Analysis Maps & Diagrams |
2000-2003 |
1 | 14 | Schematic Design |
undated |
1 | 15 | Visual Study |
2002 |
1 | 16 | Overview of Planning & Environmental Issues |
2000 |
1 | 17 | Completion of the 1971 Master Plan Approval |
undated |
1 | 18 | Articles |
1968-1995 |
1 | 19 | Master Plan EIR Info |
2001 |
1 | 20 | Proposals |
2000 |
1 | 21 | Zoning |
1999-2000 |
1 | 22 | Village 3 and 4 First Submittals |
2005 |
1 | 23 | Village Phase 3 Pools |
2006 |
1 | 24 | Phase II Design |
2002 |
1 | 25 | Village Construction Phase I |
2000 |
1 | 26 | Review of Northstar |
2003-2004 |
1 | 27 | Village Design Review |
2003 |
1 | 28 | Village Site Plan |
2003 |
1 | 29 | Village- Golf |
2000 |
1 | 30 | Village Enviornmental |
2001 |
1 | 31 | Village Comm Arts |
undated |
1 | 32 | Village Parking |
2001 |
1 | 33 | Village Design |
2002 |
1 | 34 | The Village Working Model |
2001 |
1 | 35 | Heritage Plaza Correspondence |
2004 |
1 | 36 | Heritage Plaza Design |
2004 |
1 | 37 | Submittals |
2005-2006 |
1 | 38 | Northstar at Tahoe Due Diligence |
2000 |
1 | 39 | Northstar at Tahoe Due Diligence |
2000 |
1 | 40 | Northstar Nature Preserve |
1989 |
1 | 41 | Tahoe City Public Utility District |
2005 |
1 | 42 | Heritage Plaza Plans |
2006 |
TUBES 11 tubes
|
|||
tube | |||
1 | Recreation Physical location: CCA 6 Column 1, Row 7
|
undated | |
2 | Design Development Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Heritage Plaza Physical location: CCA 6 Column 1, Row 9
|
undated | |
4 | Master Plan Drawings Physical location: Barn Box 1
|
undated | |
5 | Village Acetate Physical location: Barn Box 2
|
undated | |
6 | Village Originals Mylar's Physical location: Barn Box 1
|
undated | |
7 | Conceptual Master Plan Physical location: Barn Box 2
|
undated | |
8 | Original Rendered Site Plan and Sketches Physical location: Barn Box 1
|
undated | |
9 | Crested Butte Physical location: Barn Box 14
|
undated | |
10 | Crested Butte Physical location: Barn Box 14
|
undated | |
11 | Tahoe Physical location: Barn Box 14
|
undated |
LXXII: LXXII: Deep Creek Mountain Resort, 1997-2007Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2007 | ||
Box | Folder | ||
1 | 1 | Deep Creek Mountain Resort |
2003 |
1 | 2 | Deep Creek Mountain Resort Adventure Sports Center International |
undated |
1 | 3 | Deep Creek Mountain Resort Strategic Plan for Tourism Case Studies |
2001 February |
1 | 4 | Deep Creek Mountain Resort Residential and Retail Market Analysis |
undated |
1 | 5 | Deep Creek Mountain Resort Strategic Plan for Tourism (Appendices) |
undated |
1 | 6 | Deep Creek Mountain Resort Zoning |
1997 |
1 | 7 | Deep Creek Mountain Resort Metro Regional Information System Inc. |
2002 |
1 | 8 | Deep Creek Mountain Resort Source Data |
2002 |
1 | 9 | Deep Creek Mountain Resort Proposals/Contracts |
2001-2002 |
1 | 10 | Deep Creek Mountain Resort Meeting Minutes |
2002 |
1 | 11 | Deep Creek Mountain Resort Correspondence/Transmittals |
2002 |
1 | 12 | Deep Creek Lakeside Club Conceptual Design |
undated |
1 | 13 | Deep Creek Lakeside Club Infrastructure |
2004 |
1 | 14 | Deep Creek Lakeside Club Environmental |
undated |
1 | 15 | Deep Creek Lakeside Club Correspondence |
2004 |
1 | 16 | Deep Creek Lakeside Club Contracts |
2004 |
1 | 17 | Deep Creek Design Development |
2004 |
1 | 18 | Deep Creek Correspondence |
2002-2005 |
1 | 19 | Deep Creek Mountain Resort Preliminary Findings and Conclusions |
2003-2005 |
1 | 20 | Deep Creek Mountain Resort Land Use |
2002 |
1 | 21 | Deep Creek Mountain Resort Market Research |
1997-2002 |
1 | 22 | Deep Creek Mountain Resort Conceptual Development Plan |
2002 |
1 | 23 | Deep Creek Correspondence |
2004-2005 |
1 | 24 | Deep Creek Master Plan Meeting Minutes |
2004 |
1 | 25 | Deep Creek Correspondence |
2002-2003 |
1 | 26 | Deep Creek Mountain Resort Conceptual Signage Package |
undated |
1 | 27 | Deep Creek Schematic Planting Design |
2004 June 30 |
1 | 28 | Deep Creek Field Report |
2005 |
1 | 29 | Deep Creek Golf Topography |
undated |
1 | 30 | Deep Creek Master Plan |
2004 |
1 | 31 | Lodestone Golf Clubhouse |
2007 |
1 | 32 | Watershed Zoning Ordinance |
1997-2002 |
1 | 33 | Western Maryland Plan for Tourism |
2001 February |
1 | 34 | Wisp Golf Course Remodel Meeting Minutes |
2004 |
1 | 35 | Wisp Golf Course Remodel |
2003-2004 |
1 | 36 | Wisp Golf Course Remodel |
2005-2006 |
1 | 37 | Wisp Phase 1 Proposal |
2006 |
1 | 38 | Wisp Master Planning |
2006 |
1 | 39 | Wisp Signage Program |
2006 |
1 | 40 | Wisp Resort Sign Program Design |
2007 |
1 | 41 | Wisp Golf Course Remodel Surveying |
2007 |
1 | 42 | Wisp Golf Course Remodel Project Management Plan |
2005 |
TUBES 10 tubes
|
1997-2007 | ||
tube | |||
1 | Deep Creek Adventure Sports Center Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Adventure Sports Fork Run Parcel Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | Detention Pond Survey, Master Plans Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Master and Schematics Physical location: CCA 8 Column 6, Row 1
|
undated | |
5 | Lodestone Physical location: CCA 8 Column 6, Row 3
|
undated | |
6 | Village Phase 1 Site Design Physical location: CCA 6 Column 1, Row 1
|
undated | |
7 | Mountain Resort Physical location: Barn Box 1
|
undated | |
8 | Mountain Resort Physical location: Barn Box 1
|
undated | |
9 | Mountain Village Physical location: Barn Box 4
|
undated | |
10 | Lakeside Club Physical location: Barn Box 11
|
undated |
LXXIII: LXXIII: Estrella, 1985-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1985-2008 | ||
Box | Folder | ||
1 | 1 | Maricopa Association of Governments Open Space Plans |
1994-1996 |
1 | 2 | Goodyear Open Space & Trails Proposals/Contracts |
1996-1997 |
1 | 3 | Goodyear Open Space & Trails Correspondence |
1997 |
1 | 4 | Estrella Phase 1 Roads Work Program |
1987 |
1 | 5 | Estrella Phase 1 Roads Meeting Notes |
1987 |
1 | 6 | Estrella Phase 1 Roads Correspondence |
1987-1988 |
1 | 7 | Estrella Phase 1 Roads Engineering |
1986-1987 |
1 | 8 | Estrella Phase 1 Roads Plan Materials List |
1988 |
1 | 9 | Estrella Phase 1 Roads Economic Analysis |
undated |
1 | 10 | Estrella Phase 1 Report |
1987 |
1 | 11 | Estrella Phase 1 Report |
1987 |
1 | 12 | Estrella Design Guidelines |
undated |
1 | 13 | Estrella Design Guidelines Meeting Minutes/Notes to File |
1987-1988 |
1 | 14 | Estrella Supplemental Design Guidelines for Parcel 58 |
1988 |
1 | 15 | Estrella Design Guidelines for Residential Developments |
1988 |
1 | 16 | Non-Residential Guidelines Proposals/Contracts |
2000-2003 |
1 | 17 | Non-Residential Guidelines Report |
2003 July |
1 | 18 | Non-Residential Guidelines Design Guidelines |
2001 |
1 | 19 | Non-Residential Guidelines Correspondence |
2003-2008 |
1 | 20 | Non-Residential Guidelines Conceptual Design |
2003 |
1 | 21 | Non-Residential Guidelines Meeting Minutes/Notes to File |
2000-2001 |
1 | 22 | Non-Residential Guidelines Sketches |
undated |
1 | 23 | Non-Residential Guidelines Design Guidelines Examples |
1998-2000 |
1 | 24 | Non-Residential Guidelines Drafts |
1998-2001 |
1 | 25 | Streetscape |
1996 |
1 | 26 | Streetscape Proposal/Contracts |
1996 |
1 | 27 | Streetscape Correspondence |
1996-1997 |
1 | 28 | Sign Guidelines |
1988 |
1 | 29 | Sign Guidelines Proposals/Contracts |
2002 |
1 | 30 | Estrella Mountain Ranch |
2001 |
1 | 31 | Supplemental Design Guidelines for Estrella Mountain Estates |
1988 |
1 | 32 | Estrella Aerospace & Industrial Park Proposal/Contract |
1995 |
1 | 33 | Estrella Aerospace & Industrial Park Correspondence |
1995 |
1 | 34 | Estrella Aerospace & Industrial Park Meeting Minutes/Notes to File |
1995-1998 |
1 | 35 | Estrella Industrial Park Design Guidelines |
1997 |
1 | 36 | Estrella Industrial Park Streets Proposals/Contracts |
1998-2000 |
1 | 37 | Estrella Industrial Park Proposals/Contracts |
undated |
1 | 38 | Estrella Industrial Park Correspondence |
1996-1997 |
1 | 39 | Estrella Industrial Park Thematic Image book |
undated |
1 | 40 | Estrella Aerospace Cost Analysis |
1988 |
1 | 41 | Estrella Aerospace Proposals/Contracts |
1998 |
1 | 42 | Estrella Aerospace Design Guidelines |
1997 |
1 | 43 | Estrella Aerospace & Industrial Park CCRs |
1996 |
1 | 44 | Estrella Aerospace CCR |
1996 |
2 | 1 | Estrella Aerospace CCR |
1997 |
2 | 2 | Estrella Aerospace Additional Services Proposals/Contracts |
2006-2007 |
2 | 3 | Estrella Aerospace Center Thematic Image book |
undated |
2 | 4 | Estrella Aerospace Proposals/Contracts |
2000 |
2 | 5 | Estrella Aerospace Streets Proposals/Contracts |
1998 |
2 | 6 | Estrella Aerospace Street Trace Overlays |
1996 |
2 | 7 | Estrella Parkway South Proposals/Contracts |
1997 |
2 | 8 | Estrella Parkway South Meeting Minutes |
1997 |
2 | 9 | Estrella Streetscape Phase 2 Proposals/Contracts |
1997 |
2 | 10 | Estrella Streetscape Phase 2 Correspondence |
1997 |
2 | 11 | Estrella Lakes & Open Spaces Schematic Design |
1987 |
2 | 12 | Estrella Commercial Park |
2005-2007 |
2 | 13 | Hidden Valley |
1987 |
2 | 14 | Estrella Lake Park North Technical Specifications |
undated |
2 | 15 | Estrella Non-Residential Design Standards Draft |
2007 |
2 | 16 | Technical Specifications for Lake Park- North |
1988 |
2 | 17 | Technical Specifications |
1988 |
2 | 18 | Sign Guidelines |
1988 |
2 | 19 | Materials and Furnishings |
1987 |
2 | 20 | Phase One Roadway Landscape |
1987 |
2 | 21 | Phase One Sign Guidelines |
1988 |
2 | 22 | Phase One Landscape and Design Guidelines |
undated |
2 | 23 | Design Guidelines for the Lake Village |
2003 |
2 | 24 | Meeting Notes for Mountain Village |
1985-1986 |
2 | 25 | Brochure Drawings |
1988 |
2 | 26 | Preliminary Planning Studies |
1985 |
2 | 27 | General Correspondence |
1985 |
2 | 28 | Work Programs/Schedules |
1985 |
2 | 29 | Clippings |
1986-1988 |
2 | 30 | Biological |
1986 |
2 | 31 | Land Use Program |
1986 |
2 | 32 | Master Plan Drawings |
undated |
2 | 33 | Proposals |
1985 |
2 | 34 | Correspondence |
1988 |
2 | 35 | Work Programs/Schedules |
1988 |
2 | 36 | Cost Estimates |
1988 |
2 | 37 | Design Sketches/Product Info |
1988 |
2 | 38 | Construction Bids/Proposals |
1988 |
2 | 39 | Meeting Minutes/Notes to File |
undated |
2 | 40 | Work Program |
1987-1988 |
2 | 41 | Transmittals |
1987 |
2 | 42 | Correspondence Signage - Entry Project |
1987-1988 |
2 | 43 | Cost Estimates |
1993 |
2 | 44 | Land Use- Phase II |
1987-1988 |
2 | 45 | General File |
1987 |
2 | 46 | Clippings |
1993 |
2 | 47 | Correspondence |
1987-1989 |
2 | 48 | Proposals/Contracts |
1994 |
2 | 49 | Signage |
2005 |
2 | 50 | Clippings |
1987 |
2 | 51 | Notes |
undated |
2 | 52 | Preliminary PAD Submission |
1986 |
2 | 53 | Design Guidelines for Commerce Park |
2007 |
2 | 54 | Design Guidelines for Non- Residential Area at Lakeside Village |
2003 |
TUBES 70 tubes
|
1985-2008 | ||
tube | |||
1 | Phase 2 Symposium Graphics & New Title Blocks Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Signs Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | Phase Two, schematic planning studies Physical location: CCA 8 Column 3, Row 3
|
undated | |
4 | Phase two base Mylar's Physical location: CCA 8 Column 3, Row 3
|
undated | |
5 | Group properties Physical location: CCA 8 Column 3, Row 3
|
undated | |
6 | Estrella Physical location: CCA 8 Column 3, Row 3
|
undated | |
7 | Planting plan Mylar's, parcels Physical location: CCA 8 Column 3, Row 3
|
undated | |
8 | Phase One Physical location: CCA 8 Column 3, Row 3
|
undated | |
9 | Air photos Physical location: CCA 8 Column 3, Row 3
|
undated | |
10 | Park Physical location: CCA 8 Column 3, Row 3
|
undated | |
11 | Village center prints Physical location: CCA 8 Column 6, Row 2
|
undated | |
12 | Regional maps, studies Physical location: CCA 8 Column 6, Row 2
|
undated | |
13 | Print set Physical location: CCA 8 Column 6, Row 2
|
undated | |
14 | Phase Two base Mylar's, parcels, parcels sold, zoning Physical location: CCA 8 Column 6, Row 2
|
undated | |
15 | Signage, conceptual studies, logo designs, road sections, phase II, final grading Physical location: CCA 8 Column 6, Row 2
|
undated | |
16 | Lakes and open space, base Mylar's Physical location: CCA 8 Column 6, Row 2
|
undated | |
17 | Phase One Physical location: CCA 8 Column 6, Row 2
|
undated | |
18 | Roadway cross sections, good year aero space park Physical location: CCA 8 Column 6, Row 2
|
undated | |
19 | Brochure, original Mylar's, final submission Physical location: CCA 8 Column 6, Row 2
|
undated | |
20 | Record Prints; Lake Park Fountain; Spillway Physical location: CCA 8 Column 6, Row 2
|
undated | |
21 | Resort, roads, aspen Physical location: CCA 8 Column 6, Row 2
|
undated | |
22 | Paving Plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
23 | Phase two, roadway sections Mylar's, original illustrative Physical location: CCA 8 Column 6, Row 2
|
undated | |
24 | Trails plans, master plan, Mylar, planning objectives Physical location: CCA 8 Column 6, Row 2
|
undated | |
25 | Signage Physical location: CCA 8 Column 6, Row 2
|
undated | |
26 | Flood Plain Data,200 Scale Physical location: CCA 8 Column 6, Row 2
|
undated | |
27 | Proposal plans Physical location: CCA 8 Column 6, Row 2
|
undated | |
28 | Record prints, north lake park, pricing Physical location: CCA 8 Column 6, Row 2
|
undated | |
29 | Phase two base data, w/blm, cut and fill Physical location: CCA 8 Column 6, Row 2
|
undated | |
30 | Grading/Paving Mylar's Physical location: CCA 8 Column 6, Row 3
|
undated | |
31 | Village Center, Fountain Construction Package, Details Physical location: CCA 8 Column 6, Row 3
|
undated | |
32 | Lakes Physical location: CCA 8 Column 6, Row 3
|
undated | |
33 | Spillway Physical location: CCA 8 Column 6, Row 3
|
undated | |
34 | Spillway background Physical location: CCA 8 Column 6, Row 3
|
undated | |
35 | Base maps Physical location: CCA 8 Column 6, Row 3
|
undated | |
36 | Lakes, open space Physical location: CCA 8 Column 6, Row 3
|
undated | |
37 | Lakes Physical location: CCA 8 Column 6, Row 3
|
undated | |
38 | Lakes Physical location: CCA 8 Column 6, Row 3
|
undated | |
39 | Lakes, cds Physical location: CCA 8 Column 6, Row 3
|
1987; undated | |
40 | Commercial parcel, resort Physical location: CCA 8 Column 6, Row 3
|
undated | |
41 | Lakes Physical location: CCA 8 Column 6, Row 3
|
undated | |
42 | Lakes, grading Physical location: CCA 8 Column 6, Row 3
|
undated | |
43 | Lakes Physical location: CCA 8 Column 6, Row 3
|
undated | |
44 | Presentation drawings Physical location: CCA 8 Column 6, Row 3
|
undated | |
45 | Aerospace, streetscape Physical location: CCA 6 Column 1, Row 6
|
undated | |
46 | Design process, trace, parkway south, aerospace Physical location: CCA 6 Column 1, Row 6
|
undated | |
47 | Mountain Estates Physical location: CCA 6 Column 1, Row 6
|
undated | |
48 | base Mylar's Physical location: CCA 6 Column 2, Row 2
|
undated | |
49 | Phase 1 Streets Physical location: CCA 6 Column 2, Row 2
|
undated | |
50 | Phase 1 Master Plan Physical location: CCA 6 Column 2, Row 2
|
undated | |
51 | Base Data Physical location: CCA 6 Column 2, Row 1
|
undated | |
52 | Master Plan 500 Scale Physical location: CCA 6 Column 2, Row 1
|
undated | |
53 | South Lake Park negatives Physical location: CCA 6 Column 2, Row 2
|
undated | |
54 | Master Plan Black and White Drawings Physical location: CCA 6 Column 2, Row 2
|
undated | |
55 | Phase One Mylar's Physical location: CCA 6 Column 2, Row 1
|
undated | |
56 | Mylar's A, Mylar's B Physical location: Barn Box 3
|
undated | |
57 | Lot Tests/Water Requirements Physical location: Barn Box 2
|
undated | |
58 | Elementary School/Park Physical location: Barn Box 2
|
undated | |
59 | Phase Two Base Mylar's Physical location: Barn Box 2
|
undated | |
60 | Phase One Physical location: Barn Box 2
|
undated | |
61 | Aerial Photos Physical location: Barn Box 1
|
undated | |
62 | North and South Lake Parks Physical location: Barn Box 1
|
undated | |
63 | Pre Phase One Physical location: Barn Box 2
|
undated | |
64 | Main Pavilion Physical location: Barn Box 2
|
undated | |
65 | Town Center Schematic Studies Physical location: Barn Box 2
|
undated | |
66 | Illustrative Plan Physical location: Barn Box 2
|
undated | |
67 | Master Plan Physical location: Barn Box 3
|
undated | |
68 | Construction Documents, Notes and Revisions Physical location: CCA 8 Column 4, Row 1
|
undated | |
69 | Master Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
70 | Final Print Set Physical location: CCA 6 Column 1, Row 5
|
undated |
LXXIV: LXXIV: Maricopa Association of Governments, 1992-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1992-2002 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1992-1995 |
1 | 2 | Correspondence |
1993-1995 |
1 | 3 | Meeting Minutes/Notes to File |
1993 |
1 | 4 | Meeting Minutes/Notes to File |
1994-1995 |
1 | 5 | Desert Spaces Final Report |
1996 |
1 | 6 | Programming |
1993 |
1 | 7 | Specifications |
1993 |
1 | 8 | Specifications |
1994 |
1 | 9 | Design Guidelines Working Paper |
1993 |
1 | 10 | Focus Group |
1993-1994 |
1 | 11 | Open Space Management Plan |
1994 |
1 | 12 | Open Space Management Plan |
1994 |
1 | 13 | Western Canal Enhancement Project |
1996 |
1 | 14 | Gilbert Gateway |
1999 |
1 | 15 | Comprehensive Guide Update |
1994 |
1 | 16 | Skate Park Feasibility Study |
1998 |
1 | 17 | Project Manual |
1994 |
1 | 18 | Executive Summary |
undated |
1 | 19 | Open Space Plan |
undated |
1 | 20 | Parks of the Canals Master Plan |
2000 |
1 | 21 | Northeast Quadrant Action Plan |
1994 |
1 | 22 | Site Inventory and Analysis |
2002 |
1 | 23 | Community Trail |
1994 |
1 | 24 | Rio Salado Design Concept Report |
2001 |
TUBES 2 tubes
|
|||
tube | |||
1 | Task 4 Inventory Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Grading Physical location: Box 11
|
undated |
LXXV: LXXV: Spring Valley, 1998-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1998-2001 | ||
Box | Folder | ||
1 | 1 | Spring Valley Ranch P.U.D. Preliminary Plan Application |
2000-2001 |
1 | 2 | Spring Valley Ranch P.U.D. Preliminary Plan Application |
2000-2001 |
1 | 3 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 4 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 5 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 6 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 7 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 8 | Spring Valley Ranch P.U.D. Appendix Items A-F |
2000-2001 |
1 | 9 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 10 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 11 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 12 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 13 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 14 | Spring Valley Ranch P.U.D. Appendix Items G-R |
2000-2001 |
1 | 15 | Spring Valley Ranch P.U.D. Appendix #2 Items J-R |
2000-2001 |
1 | 16 | Spring Valley Ranch P.U.D. Appendix #2 Items J-R |
2000-2001 |
1 | 17 | Spring Valley Ranch P.U.D. Appendix #2 Items J-R |
2000-2001 |
1 | 18 | Spring Valley Ranch P.U.D. Appendix #2 Items J-R |
2000-2001 |
1 | 19 | Spring Valley Ranch P.U.D. Appendix #2 Items J-R |
2000-2001 |
1 | 20 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
1 | 21 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
1 | 22 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
2 | 1 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
2 | 2 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
2 | 3 | Spring Valley Ranch P.U.D. Rezoning Binder |
1998-1999 |
2 | 4 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 5 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 6 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 7 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 8 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 9 | Spring Valley Ranch Appendix #1 Items A-I |
2000-2001 |
2 | 10 | Spring Valley Ranch Responses to Staff Report Book 2 |
1998-1999 |
2 | 11 | Spring Valley Ranch Responses to Staff Report Book 2 |
1998-1999 |
2 | 12 | Spring Valley Ranch Responses to Staff Report Book 2 |
1998-1999 |
2 | 13 | Spring Valley Ranch P.U.D. Amendment Exhibits |
2000-2001 |
2 | 14 | Spring Valley Ranch P.U.D. Amendment Exhibits |
2000-2001 |
2 | 15 | Spring Valley Ranch P.U.D. Amendment Exhibits |
2000-2001 |
2 | 16 | Spring Valley Ranch P.U.D. Amendment Exhibits |
2000-2001 |
TUBES 4 tubes
|
|||
tube | |||
1 | Spring Valley Physical location: CCA 8 Column 6, Row 1
|
1998-2001 | |
2 | Grading, Main Access Entrance Study, Village Center Site Plan, Cabin Sketch Plans, Conceptual Equestrian Plan Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | PUD, maps Physical location: CCA 8 Column 6, Row 2
|
undated | |
4 | Parking Design Physical location: CCA 8 Column 5, Row 1
|
undated |
LXXVI: LXXVI: Pima Community College, 1998-2005Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1998-2005 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
1998-2005 |
1 | 2 | Correspondence |
1998-2000 |
1 | 3 | Correspondence |
2002-2004 |
1 | 4 | Meeting Minutes/Notes to File |
1999-2000 |
1 | 5 | Programming |
1999 |
1 | 6 | Design Sketches/Product Information |
1999 |
1 | 7 | Design Sketches/Product Information |
2000 |
1 | 8 | Design Sketches/Product Information |
2001 |
1 | 9 | Design Sketches/Product Information |
undated |
1 | 10 | Design Sketches/Product Information |
undated |
1 | 11 | Budget Analysis |
2000 |
1 | 12 | Master File List/Project Number |
1999 |
1 | 13 | Proposals/Contracts |
2002-2003 |
1 | 14 | Owner Correspondence |
1999-2002 |
1 | 15 | Consultant Correspondence |
1999-2001 |
1 | 16 | Transmittals |
2000-2002 |
1 | 17 | Meeting Mintues |
1999-2001 |
1 | 18 | Meeting Mintues |
2003 |
1 | 19 | Notes to File |
1999 |
1 | 20 | Notes to File |
2000 |
1 | 21 | Notes to File |
2000 |
1 | 22 | Engineering |
2000-2001 |
1 | 23 | Cost Estimate |
1999-2001 |
1 | 24 | Submittals/Shop Drawings |
2000 |
1 | 25 | Project Request Form |
2003 |
1 | 26 | Soils and Geology |
2003 |
1 | 27 | Masonary Sitwalls at Amphitheater |
2003 |
1 | 28 | Request For Information |
2003 |
1 | 29 | Design Development |
2004 |
1 | 30 | Design Development |
2004 |
1 | 31 | Project Schedules |
2003 |
1 | 32 | Construction Observations |
2003 |
1 | 33 | Field Notes/Reports |
2003 |
1 | 34 | Environmental |
2003 |
1 | 35 | Master Plan Draft |
undated |
1 | 36 | Bid Package |
2002 January 7 |
1 | 37 | Bid Package #2 |
2001 December 17 |
1 | 38 | Plant Contract |
1998 |
1 | 39 | Specifications |
2003 |
1 | 40 | Project Description |
2000 |
2 | 1 | Schematic Design Narrative |
2000 March 10 |
2 | 2 | Design Development Narrative |
2001 January 26 |
2 | 3 | Design Development |
2001 |
2 | 4 | Design Development |
2001 |
2 | 5 | Design Development |
2001 |
2 | 6 | Design Development |
2001 |
2 | 7 | Project Folder |
2001 |
2 | 8 | Project Folder |
2002 |
TUBES 2 tubes
|
|||
tube | |||
1 | Master Site Plan Physical location: CCA 6 Column 2, Row 3
|
undated | |
2 | Baseline Park Canals Physical location: CCA 6 Column 2, Row 3
|
undated |
LXXVII: LXXVII: Rancho Viejo, 1988-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1988-2006 | ||
Box | Folder | ||
1 | 1 | Biological RV Village II |
1999 January 3 |
1 | 2 | CCR's |
1996 September 6 |
1 | 3 | CCR's RV Turquoise Trail BP |
1997 March 16 |
1 | 4 | Clippings RV Village II |
1999 July |
1 | 5 | Clippings Rancho Viejo |
1999 |
1 | 6 | Clippings RV Village I Final Plat |
undated |
1 | 7 | Clippings Rancho Viejo Village Master Plan |
1996-1998 |
1 | 8 | College North Master Plan Report |
1995 September |
1 | 9 | Commercial Market Analysis |
2002 March 15 |
1 | 10 | Construction Bids for Village 1 |
1998 |
1 | 11 | Construction Bids/Proposals/Addendums |
2000 |
1 | 12 | Construction Bids RV Village I Tot Lot |
1998 |
1 | 13 | Construction Bids RV Village Unit I Plaza |
1998 |
1 | 14 | Correspondence |
1996-1997 |
1 | 15 | Correspondence- Agency Rancho Viejo Village Mplan |
1996-1997 |
1 | 16 | Correspondence- Consultant Rancho Viejo Village Master Plan |
1997 |
1 | 17 | Correspondence- General RV Village |
1998 June 15 |
1 | 18 | Correspondence- Owner RV Nike Propsal |
1997 |
1 | 19 | Correspondence- Owner RV Turquoise Trail BP |
1997-1998 |
1 | 20 | Correspondence- Owner Rancho Viejo Village Mplan |
1996-1998 |
1 | 21 | Correspondence- Owner Rancho Viejo Vison Plan |
1996-2000 |
1 | 22 | Correspondence- RV Village I Final Plat |
1997-1998 |
1 | 23 | Correspondence- RV Village I Landscape |
1998-1999 |
1 | 24 | Correspondence- RV Village I Model Homes |
1999 |
1 | 25 | Correspondence- RV Village Unit 1 Irrigation |
1998 |
1 | 26 | Correspondence- RV Village Plaza |
1998-2000 |
1 | 27 | Correspondence- RV Village Unit I Signage |
1998 |
1 | 28 | Correspondence- Agency RV College Heights |
1997 |
1 | 29 | Correspondence- Agency Rancho Viejo Master Plan |
1995-2000 |
1 | 30 | Correspondence- Consultant Rancho Viejo Master Plan |
1996 July 1 |
1 | 31 | Correspondence- Agencies RV Village II |
1999 |
1 | 32 | Correspondence- Consultant |
2000 October 20 |
1 | 33 | Correspondence- Consultant |
2001 |
1 | 34 | Correspondence Owner |
2000 August 31 |
1 | 35 | Correspondence Owner Rancho Viejo Master Plan |
1991-2001 |
1 | 36 | Correspondence Owner RV Village II |
1999-2002 |
1 | 37 | Cost Estimates Village One |
1998 |
1 | 38 | Cost Estimates Rancho Viejo Village II |
undated |
1 | 39 | Cost Estimates RV Turquoise Trail |
1997 |
1 | 40 | Cost Estimates RV Village I Final Plat |
1997-1998 |
1 | 41 | Cost Estimates RV Village I Model Homes |
1998 |
1 | 42 | Cost Estimates RV Village I Signage |
1998 |
1 | 43 | Cost Estimates Rancho Viejo Village Master Plan |
1996-1998 |
1 | 44 | Cost Estimates RV Village Unit I Plaza |
1998 July |
1 | 45 | Cost Estimates RV Village I Tot Lot |
1998 |
1 | 46 | Design Guidelines RV Nike Proposal |
1997 |
1 | 47 | Design Guidelines RV Turquoise Trail BP |
1997 June 27 |
1 | 48 | Design Guidelines RV Village General |
1998 August 11 |
1 | 49 | Design Guidelines RV Village I Unit 1 Landscape |
1999 |
1 | 50 | Design Sketches RV Turquoise Trail BP |
1998 |
1 | 51 | Design Sketches RV Village I final Plat |
undated |
1 | 52 | Design Sketches RV Village I On-Lot From Yard |
1998-1999 |
1 | 53 | Design Sketches RV Village I Unit I Landscape |
1998 |
1 | 54 | Design Guidelines |
1999 September |
1 | 55 | Design Sketches for Rancho Viejo |
1996 |
1 | 56 | Design Sketches/Product RV Village II |
1998-2001 |
1 | 57 | Design Sketches Rancho Viejo Village Master Plat |
1996-1997 |
1 | 58 | Design Sketches RV Village Unit I Signage |
1998 |
1 | 59 | Design Sketches/Product Info RV Village I Model Homes |
1998 |
1 | 60 | Design Sketches/Product Info RV Village I Plaza |
1998 |
1 | 61 | Engineering- Civil Traffic RV Village Master Plan |
1996 July |
1 | 62 | Engineering- Civil/Traffic RV TTBP |
1997 |
1 | 63 | Engineering RV Village I Plaza |
1998 August |
1 | 64 | Engineering -Utility RV Nike Proposal |
1997 |
1 | 65 | Engineering- Utility RV Turquoise Trail BP |
1997 |
1 | 66 | Engineering- Utility RV Village I Final Plat |
1997 |
1 | 67 | Facsimile |
1999 |
1 | 68 | Facsimiles Rancho Viejo |
1996-2001 |
1 | 69 | Field Reports |
1999-2002 |
1 | 70 | Facsimiles RV Village I Final Plan |
1997 |
1 | 71 | Framework Plan Rancho Viejo Village Center |
2002 December |
1 | 72 | General CCR's |
undated |
1 | 73 | General Correspondence- Consultant Rancho Viejo General |
1996 |
1 | 74 | General Proposal/Contracts Rancho Viejo General |
1996-2001 |
1 | 75 | General Rancho Viejo |
1996-1999 |
1 | 76 | General Work Program Rancho Viejo General |
1996 |
1 | 77 | Geplogy/Soils |
1996-1997 |
1 | 78 | Information Packet |
undated |
1 | 79 | Permaculture Site Assessment for Contenta Village |
undated |
1 | 80 | Urban Design Plan |
2002 |
1 | 81 | Unit 3 Preliminary Development |
2002 |
1 | 82 | Land Development |
2001-2005 |
2 | 1 | Land Use Rancho Viejo |
1996-2000 |
2 | 2 | La Entrada Phase 1 Preliminary and Final Development Plan Report |
2006 June 9 |
2 | 3 | Land Use Rancho Viejo Village Master Plan |
1996-1997 |
2 | 4 | Land Use Rancho Viejo Vision Plan |
1996-2000 |
2 | 5 | Marketing |
undated |
2 | 6 | Marketing/Presentation |
undated |
2 | 7 | Meeting Minutes |
2000-2001 |
2 | 8 | Meeting Notes Rancho Viejo Master Plan |
1996-2001 |
2 | 9 | Marketing/Presentation Rancho Viejo Village General |
1996 |
2 | 10 | Meeting Notes RV Village I Final Plat |
1997 |
2 | 11 | Meeting Notes Rancho Viejo Village Master Plan |
1996-1998 |
2 | 12 | Meeting Notes RV Village Plaza |
1998 August 24 |
2 | 13 | Memos |
1996-1997 |
2 | 14 | Meeting Notes Rancho Viejo Village II |
1998 December 14 |
2 | 15 | Notes to File |
2000-2001 |
2 | 16 | Notes to File Rancho Viejo Village Master Plan |
1996-1997 |
2 | 17 | Notes to File Rancho Viejo Vision Plan |
1996 February |
2 | 18 | Programming for Rancho Viejo |
1999-2001 |
2 | 19 | Programming RV Village II |
1998-1999 |
2 | 20 | Proposals/Contracts |
1998 |
2 | 21 | Proposal/Contracts Consultant RV Village II |
1999 February 4 |
2 | 22 | Proposal/Contract RV Village II |
1998-2002 |
2 | 23 | Proposal/Contract |
1998-2001 |
2 | 24 | Proposal/Contract- Consultants |
2000 June 19 |
2 | 25 | Proposals/Contracts- Consultants for Rancho Viejo Signage |
2001 |
2 | 26 | Presentations RV Nike Proposal |
1996-1997 |
2 | 27 | Presentations RV Village I Final Plan |
1997 |
2 | 28 | Programming RV Village I Tot Lot |
1998 August 20 |
2 | 29 | Programming RV Village Unit I Plaza |
1998 July 22 |
2 | 30 | Proposal/Contract Model Homes Landscaping |
1998 |
2 | 31 | Proposal/Contract On-Lot Front Yard Schematics |
1998 |
2 | 32 | Proposal/Contract Plaza and Village Center |
1998 May 11 |
2 | 33 | Proposal/Contract RV Village I Final Plan |
1996 |
2 | 34 | Proposal/Contract RV Turquoise Trail BP |
1997-1998 |
2 | 35 | Proposal/Contract Signage |
1998 |
2 | 36 | Proposal/Contract Tot Lot |
1998 May 11 |
2 | 37 | Proposal/Contract Village Mainline Irrigation |
1998 |
2 | 38 | Proposal/Contracts Rancho Viejo Vision Plan |
1996-1997 |
2 | 39 | Project Info |
1996-1997 |
2 | 40 | Project Info |
1996-1997 |
2 | 41 | Project Info |
1996-1997 |
2 | 42 | Rancho Viejo Tract G Correspondence/Consultant |
2000-2001 |
2 | 43 | Rancho Viejo Tract G Correspondence/Owner |
2000-2001 |
2 | 44 | Rancho Viejo Tract G Design Sketches/Product Info |
2000 |
2 | 45 | Rancho Viejo Tract G General Administration Meeting Minutes |
2000 January 20 |
2 | 46 | Rancho Viejo Tract G Notes to File |
2000 June 19 |
2 | 47 | RV Village I Unit 2 Construction Bids/Proposals/Addendum |
2000-2001 |
2 | 48 | RV Village I Unit II Construction Communications |
2001 |
2 | 49 | RV Village I Unit 2 Correspondence/Owner |
2000-2001 |
2 | 50 | RV Village I Unit 2 Field Reports |
2001 |
2 | 51 | RV Village I Unit II Sketches/Product Information |
2000-2001 |
2 | 52 | RV Village I Unit 2 Notes to File |
2000-2001 |
2 | 53 | RV Village I Unit 2 Proposal/Contract Owner |
2000-2001 |
2 | 54 | RV Village II |
undated |
2 | 55 | Rancho Viejo Village II |
2000-2001 |
2 | 56 | Rancho Viejo Village II |
2001 May 29 |
2 | 57 | Rancho Viejo Village II |
2001 July 26 |
2 | 58 | Rancho Viejo Village II Correspondence Consultant |
2001 |
2 | 59 | Rancho Viejo Village II Meeting Minutes |
2001 February 1 |
2 | 60 | RV Water Plan Correspondence Owner |
undated |
2 | 61 | Rancho Viejo Windmill Ridge |
2001 December 3 |
2 | 62 | Rancho Viejo Windmill Ridge Model Complex |
2001 |
2 | 63 | Rancho Viejo Windmill Ridge Mode |
2001 July 26 |
2 | 64 | Rancho Viejo Windmill Ridge On Lot Lands |
2001 |
2 | 65 | Rancho Viejo Windmill Ridge Unit 1 |
2002 April 12 |
2 | 66 | Rancho Viejo Windmill Ridge Unit 1 |
undated |
2 | 67 | Rancho Viejo Windmill Ridge Unit 1 Walls and Gates |
2002 |
2 | 68 | Rancho Viejo Windmill Ridge Unit II |
2001 December 13 |
2 | 69 | Rancho Viejo Reference/Research Materials |
1996 |
2 | 70 | Rancho Viejo Image Files |
2000-2001 |
2 | 71 | Rancho Viejo New Community #4 |
1999-2000 |
2 | 72 | Rancho Viejo New Community #6 |
1999-2001 |
2 | 73 | Rancho Viejo New Community #9 |
1998-2000 |
2 | 74 | Rancho Viejo New Community #10 |
1999-2000 |
2 | 75 | Rancho Viejo New Community #11 Clippings |
2000-2001 |
2 | 76 | Rancho Viejo New Community #13 |
2000 |
2 | 77 | Rancho Viejo New Community #15 Engineering |
1999 |
2 | 78 | Rancho Viejo New Community #16 Programming |
1998-2000 |
2 | 79 | Rancho Viejo New Community #17 Product Information |
1999 |
2 | 80 | Rancho Viejo New Community #18 |
1996-2000 |
2 | 81 | RV Partnership #3 |
2000-2002 |
2 | 82 | RV Partnership #5 |
2002 |
2 | 83 | RV Partnership #6 |
1990-2002 |
2 | 84 | RV Partnership #7 |
2001-2002 |
2 | 85 | RV Partnership #8 |
2002 |
2 | 86 | RV Partnership #9 |
2002 January |
2 | 87 | Rancho Viejo Ranch Master Plan |
2002 August |
2 | 88 | Rancho Viejo Surface Water Management Manual |
2003 July |
2 | 89 | Rancho Viejo Owner/Landscape Architect |
2002 January 18 |
2 | 90 | Entry Signage |
2000 |
2 | 91 | Front Yard Landscape |
1999 |
2 | 92 | Proposals/Contracts |
2001 |
2 | 93 | Planning and Design for Village Center |
2003 |
3 | 1 | Rancho Viejo the Village at Rancho Viejo de Santa Fe |
1997 March 10 |
3 | 2 | Rancho Viejo Village West Summary Report |
2005 Summer |
3 | 3 | Ranch Master Plan |
2002 August |
3 | 4 | Rancho Viejo de Santa Fe Master Plan Report |
1988 November |
3 | 5 | Rancho Viejo de Santa Fe Master Plan Report |
1988 November |
3 | 6 | Rancho Viejo de Santa Fe Master Plan Report |
1988 November |
3 | 7 | Rancho Viejo Reference/Research Materials |
1996-1997 |
3 | 8 | RV Contract Boiler Plate |
undated |
3 | 9 | Rancho Viejo Design Sketches |
2000-2001 |
3 | 10 | RV College Heights Construction Bids/Proposals/Addendum |
2001 |
3 | 11 | RV College Heights Design Sketches/Product Info |
2000 |
3 | 12 | RV College Heights Engineering Structural |
2001 |
3 | 13 | Rancho Viejo Meeting Minutes |
2001 August 21 |
3 | 14 | Rancho Viejo Misc. |
2001 August 22 |
3 | 15 | Rancho Viejo Misc. |
2001 July 30 |
3 | 16 | Rancho Viejo Misc. Construction Bids/Proposals/Addendum |
2000 March 14 |
3 | 17 | Rancho Viejo Misc. Design Sketches/Product Info |
2000-2001 |
3 | 18 | Rancho Viejo Misc. Owner Landscape Architect |
2001 |
3 | 19 | Rancho Viejo Misc. Proposal/Contracts |
2001 |
3 | 20 | Rancho Viejo Misc. Notes to File |
2001 |
3 | 21 | Rancho Viejo Notes to File |
2001 February 25 |
3 | 22 | Rancho Viejo Physical/Geology/Soils |
2001 |
3 | 23 | Rancho Viejo Retail Correspondence/Agency |
2000 |
3 | 24 | Rancho Viejo Retail Correspondence/Consultant |
2000-2001 |
3 | 25 | Rancho Viejo Retail Correspondence/Owner |
2000 |
3 | 26 | Rancho Viejo Retail Facsimiles |
2001 |
3 | 27 | Rancho Viejo Signage Construction Communications |
2000-2001 |
3 | 28 | RV Signage Cost Estimates |
2001 |
3 | 29 | Rancho Viejo Signage Meeting Minutes |
2001 |
3 | 30 | Site Observation |
2001 |
3 | 31 | Submittals RV Unit II |
2000 December 20 |
3 | 32 | Submitted Version of the 1989 Master Plan Report |
1989-1990 |
3 | 33 | Specifications RV Village I Landscape |
1998 |
3 | 34 | Santa Fe Ordinances Correspondence |
1996-1997 |
3 | 35 | Technical Appendix I Community Charter for La Entrada at Rancho Viejo |
2006 June 9 |
3 | 36 | Transmittals Rancho Viejo |
1999 |
3 | 37 | Turquoise Trail Park Master Plan Report |
1990 June |
3 | 38 | Village West Correspondence |
2005 |
3 | 39 | Village West Cost Estimates |
2005 |
3 | 40 | Village Center Proposal/Contract |
2005 |
3 | 41 | The Village at Rancho Viejo de Santa Fe Unit 1 |
1997 October 14 |
3 | 42 | The Village at Rancho Viejo Unit 2 |
1998 September 3 |
3 | 43 | Village West Master Plan Report |
2005 December 8 |
3 | 44 | Village West Master Plan Report Technical Appendix I |
2005 December 8 |
3 | 45 | Village West Master Plan Report Technical Appendix II |
2005 December 8 |
3 | 46 | Windmill Ridge Work Program |
2001 |
3 | 47 | RV Village West |
2003 |
3 | 48 | Windmill Ridge Unit 3 |
2001-2002 |
3 | 49 | Proposals for Santa Fe Estates |
2002 |
3 | 50 | Meeting Record |
2001 |
4 | 1 | Village West Master Plan Report Technical Appendix III |
2005 December 8 |
4 | 2 | Village West Public Participation |
2005 |
4 | 3 | Village West Reports |
2005 |
4 | 4 | Village West Research |
2005 July |
4 | 5 | The Village at Rancho Viejo de Santa Fe |
1997 April 1 |
4 | 6 | The Village at Rancho Viejo Drainage Report |
1997 March 5 |
4 | 7 | Village West Correspondence |
2006 |
4 | 8 | Village West Meeting Minutes |
2005 |
4 | 9 | Village West Schematic Design |
undated |
4 | 10 | Vision Document for Rancho Viejo |
1996 April 22 |
4 | 11 | Visual Design RV Nike Proposal |
1997 |
4 | 12 | Village Center Preliminary and Final Development Plan Report |
2004 June 4 |
4 | 13 | Village West Master Plan Report |
2005 December 8 |
4 | 14 | Windmill Ridge Model Home Contract Administrator/Field Reports |
2001 |
4 | 15 | Windmill Ridge Construction Bids/Proposals/Addendum |
2001 |
4 | 16 | Windmill Ridge Brochure |
2005 August |
4 | 17 | Windmill Ridge at Rancho Viejo Unit 2 |
2001 October 5 |
4 | 18 | Windmill Ridge at Rancho Viejo Unit III Final Development Plan Report |
2003 July 14 |
4 | 19 | Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report |
2002 July 8 |
4 | 20 | Windmill Ridge Unit IV Cost Estimates |
2005 |
4 | 21 | Work Program Rancho Viejo Village I Final Plat |
undated |
4 | 22 | Work Program Rancho Viejo Village Master Plan |
1996-1998 |
4 | 23 | Work Program Rancho Viejo Vision Plan |
undated |
4 | 24 | Windmill Ridge at Rancho Viejo Unit 1 final Development Plan |
1999 December 6 |
4 | 25 | Correspondence |
2003 |
4 | 26 | Final Plat for Village 1 |
undated |
4 | 27 | Meeting Minutes |
2000-2001 |
4 | 28 | Cost Estimates for Turquoise Trail |
1997 |
4 | 29 | Signage- RV |
undated |
4 | 30 | Turquoise Trail Signage |
1997 |
4 | 31 | Village Unit 1 Cost Estimates |
1997 |
4 | 32 | Adjacent Subdivisions Plans |
undated |
4 | 33 | RV Nike Proposal and Updates |
1997 |
4 | 34 | Copies of RV Letters and Applications |
1997 |
4 | 35 | RV Plaza Cost |
1997 |
4 | 36 | RV Village Unit 1 Codes |
undated |
4 | 37 | Preliminary Plat Report for Village Unit 1 and 2 |
undated |
4 | 38 | RV Overall Master Plat Meeting Minutes |
1996-1997 |
4 | 39 | RV Master Plan Context Maps |
1996 |
4 | 40 | Vision Plan Exhibit Originals |
1996 |
4 | 41 | Traffic Analysis |
undated |
4 | 42 | RV Fire Protection Ordinances |
1996 |
4 | 43 | Budget and Plan |
1996 |
4 | 44 | RV Soils Info |
undated |
4 | 45 | Fire and Rescue Impact Fees |
1997 |
4 | 46 | Meeting Notes |
1996-1997 |
4 | 47 | Windmill Ridge Master Plan Report Technical Appendix III |
1995 September 22 |
4 | 48 | Windmill Ridge Master Plan Report Technical Appendix IV |
2002 March 21 |
4 | 49 | Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report Appendix I |
2002 July 8 |
4 | 50 | Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report Appendix III |
2002 July 8 |
4 | 51 | Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report |
2002 July 8 |
4 | 52 | Windmill Ridge at Rancho Viejo Unit III Final Development Plan Report Appendix III |
2003 July 14 |
4 | 53 | Windmill Ridge Master Plan Report Technical Appendix II Traffic Impact Study |
2002 March 21 |
TUBES 41 tubes
|
undated | ||
tube | |||
1 | Windmill Ridge House Plans Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Windmill Ridge Site Analysis Physical location: CCA 6 Column 2, Row 1
|
undated | |
3 | Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | Phase I/IV Product Types Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Vision- Land Use, Master Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
6 | Presentation Graphics Physical location: CCA 8 Column 5, Row 1
|
undated | |
7 | Master Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
8 | Master Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
9 | Streetscape Studies Physical location: CCA 8 Column 5, Row 1
|
undated | |
10 | Land Analysis, Ranch Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
11 | Master Plan Original Mylar's land analysis bases Physical location: CCA 8 Column 5, Row 1
|
undated | |
12 | Village I Sketch Studies Land Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
13 | Design and Planning Physical location: CCA 8 Column 5, Row 1
|
undated | |
14 | Windmill Ridge Phase I Landscape Construction Documents Physical location: CCA 8 Column 5, Row 1
|
undated | |
15 | Phase II and on Original Construction Documents Physical location: CCA 8 Column 5, Row 1
|
undated | |
16 | Windmill Ridge Drainage Restoration Plans Physical location: CCA 8 Column 5, Row 1
|
undated | |
17 | Village 1 Physical location: CCA 8 Column 5, Row 2
|
undated | |
18 | Village 1 Original Submittals Physical location: CCA 8 Column 5, Row 2
|
undated | |
19 | Village Center Physical location: CCA 8 Column 5, Row 2
|
undated | |
20 | Windmill Ridge Site Analysis Plan Physical location: Barn Box 9
|
undated | |
21 | Windmill Physical location: Barn Box 11
|
undated | |
22 | Windmill Phase 1 Physical location: Barn Box 11
|
undated | |
23 | Unit 1 Physical location: Barn Box 13
|
undated | |
24 | Master Plan Physical location: Barn Box 13
|
undated | |
25 | On Lot Renderings Physical location: Barn Box 13
|
undated | |
26 | Trees Hand Drawn Physical location: Barn Box 13
|
undated | |
27 | Windmill Ridge Model Complex Physical location: Barn Box 13
|
undated | |
28 | Village 1 Physical location: Barn Box 13
|
undated | |
29 | Master Plans Physical location: Barn Box 13
|
undated | |
30 | Monument Physical location: Barn Box 13
|
undated | |
31 | Windmill Ridge Master Plan Physical location: Barn Box 13
|
undated | |
32 | Development Programs Physical location: Barn Box 13
|
undated | |
33 | Layout Plan for Village Physical location: Barn Box 14
|
undated | |
34 | Residential Physical location: Barn Box 15
|
undated | |
35 | Process Map, Site Analysis Physical location: Barn Box 15
|
undated | |
36 | Schematic Design Physical location: Barn Box 15
|
undated | |
37 | Windmill Ridge Physical location: Barn Box 16
|
undated | |
38 | Windmill Ridge IV Physical location: Barn Box 16
|
undated | |
39 | Signage Turquoise Trail Physical location: Barn Box 16
|
undated | |
40 | Unit II and III Master Plan Physical location: Barn Box 14
|
undated | |
41 | Unit II Master Plan Physical location: Barn Box 14
|
undated |
LXXVIII: LXXVIII: Breckenridge, 1979-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1979-2006 | ||
Box | Folder | ||
1 | 1 | Articles |
2001 |
1 | 2 | Background Information for the Village |
1999-2001 |
1 | 3 | Biological- Vegetation |
undated |
1 | 4 | Biological- Wildlife |
1988 |
1 | 5 | Biological for the Village |
undated |
1 | 6 | Breckenridge |
1991 |
1 | 7 | Breckenridge |
1995 |
1 | 8 | Breckenridge Peak |
1987 |
1 | 9 | Breckenridge Properties Development Options |
1995 |
1 | 10 | Breck/Summit Data |
1997-1998 |
1 | 11 | Clippings for Main Street Revitalization |
2003-2005 |
1 | 12 | Comparable Resort Communities |
1998 |
1 | 13 | Contracts River walk Extension |
2002 |
1 | 14 | Correspondence Affordable Housing |
2000 |
1 | 15 | Correspondence Cucumber Creek |
1995 |
1 | 16 | Correspondence Planning |
1995 |
1 | 17 | Correspondence Planning |
1997 |
1 | 18 | Correspondence- Owner |
1987-1989 |
1 | 19 | Correspondence- Sawmill |
1995 |
1 | 20 | Correspondence- Highlands |
1998 |
1 | 21 | Correspondence- Main Street Revitalization |
2004 |
1 | 22 | Correspondence- Ranch |
1992 |
1 | 23 | Correspondence- River Walk Extension |
undated |
1 | 24 | Correspondence- Village |
1996 |
1 | 25 | Correspondence- Village |
2000-2001 |
1 | 26 | Cost Village- Peak 8 |
1987-1989 |
1 | 27 | Cost Estimates- Village |
undated |
1 | 28 | Cucumber Creek Preliminary Program Plan |
1995 |
1 | 29 | Cucumber Creek Background |
1996 |
1 | 30 | Data Collection Report Main Street Project |
2004 |
1 | 31 | Design Development for Village |
2000 |
1 | 32 | Design- Peak 8 |
1987-1988 |
1 | 33 | Design Sketches/Product Info |
undated |
1 | 34 | Development Program- Retail II |
2000 |
1 | 35 | Engineering- Cucumber Creek |
1995 |
1 | 36 | Engineering- Village |
1995 |
1 | 37 | Engineering- Legal Description |
1981-1986 |
1 | 38 | Financial Proformas |
2006 |
1 | 39 | Gondola Breckenridge Planning |
1992-1993 |
1 | 40 | Gondola at Breckenridge |
1996 |
1 | 41 | Meeting Minutes River Walk Extension |
2005 |
1 | 42 | Highlands Breckenridge |
1999-2000 |
1 | 43 | Historical and Cultural Resources for Main Street |
undated |
1 | 44 | Master Plans |
1988 |
1 | 45 | Meeting Minutes/Notes to File- Cucumber Creek |
1995 |
1 | 46 | Meeting Minutes/Notes to File- Breckenridge Planning |
1997 |
1 | 47 | Meeting Minutes/Notes- Retail |
1997-1998 |
1 | 48 | Meeting Minutes- Retail II |
undated |
1 | 49 | Meeting Minutes/Notes to File- Highlands |
1998 |
1 | 50 | Meeting Notes/Minutes- The Lodge |
1998 |
1 | 51 | Meeting Minutes Main Street Revitalization |
2002-2005 |
1 | 52 | Meeting Minutes/Notes to File |
1988 |
1 | 53 | Meeting Minutes/Notes to File- Ranch |
1992 |
1 | 54 | Meeting Minutes/Notes to File- Village |
undated |
1 | 55 | Notes for Village |
2001 |
1 | 56 | Physical- Retail |
undated |
1 | 57 | Physical- Village |
undated |
1 | 58 | Prior Studies |
2005 |
1 | 59 | Programming- Ranch |
1992 |
1 | 60 | Programming- Village |
1996 |
1 | 61 | Proposals/Contracts- Affordable Housing |
2000 |
1 | 62 | Highlands Programming |
1999 |
1 | 63 | Highlands Proposals/Contracts |
1999 |
1 | 64 | Highlands Correspondence |
1999-2000 |
1 | 65 | Highlands Notes |
1999 |
2 | 1 | Proposal/Contracts- Cucumber Creek |
1994-1995 |
2 | 2 | Proposal/Contracts- Peak 8 |
1987-1988 |
2 | 3 | Proposal/Contracts- Sawmill Estate |
1995 |
2 | 4 | Proposal/Contracts- Ski |
1991-1994 |
2 | 5 | Proposal/Contracts- Retail |
1997 |
2 | 6 | Proposal/Contracts- Retail II |
2000 |
2 | 7 | Proposal/Contracts- Highlands |
1998 |
2 | 8 | Proposal/Contract- The Lodge |
1998 |
2 | 9 | Proposals/Contracts Main Street Revitalization |
2005-2006 |
2 | 10 | Proposal/Contracts for Planning Properties |
1994 |
2 | 11 | Proposal/Contracts- Ranch |
1992 |
2 | 12 | Proposal/Contracts- River walk Extensions |
2006 |
2 | 13 | Proposal/Contracts for Village 1 |
2000 |
2 | 14 | Transmittals- Cucumber Creek |
1994-1995 |
2 | 15 | Transmittals- Village |
1996-1997 |
2 | 16 | Village At Breckenridge |
1979-1996 |
2 | 17 | Visual- Cucumber Creek |
undated |
2 | 18 | Work Programs- Cucumber Creek |
1995 |
2 | 19 | Work Programs- Village |
1996 |
2 | 20 | Commercial Summary |
1995 |
2 | 21 | Mountain Valley Lodge |
undated |
TUBES 27 tubes
|
1979-2006 | ||
tube | |||
1 | Streetscape Physical location: CCA 8 Column 6, Row 1
|
1979-2006; undated | |
2 | GIS Analysis Physical location: CCA 8 Column 6, Row 2
|
undated; undated | |
3 | Main street Physical location: CCA 6 Column 1, Row 3
|
undated | |
4 | Conceptual Drawings Physical location: CCA 6 Column 2, Row 8
|
undated | |
5 | Geological Physical location: CCA 6 Column 2, Row 8
|
undated | |
6 | Peak 9 Physical location: CCA 6 Column 2, Row 8
|
undated | |
7 | Village Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Village Physical location: CCA 8 Column 4, Row 1
|
undated | |
9 | Village Physical location: CCA 8 Column 4, Row 1
|
undated | |
10 | Village Physical location: CCA 8 Column 4, Row 1
|
undated | |
11 | Schematic Physical location: CCA 8 Column 4, Row 1
|
undated | |
12 | Ski Area Peak 8 Physical location: CCA 8 Column 5, Row 1
|
undated | |
13 | Cucumber Creek Physical location: CCA 8 Column 4, Row 3
|
undated | |
14 | Cucumber Creek Physical location: CCA 8 Column 5, Row 3
|
undated | |
15 | Planning Physical location: CCA 8 Column 5, Row 3
|
undated | |
16 | Villages Physical location: Barn Box 6
|
undated | |
17 | Villages Physical location: Barn Box 6
|
undated | |
18 | Villages Physical location: Barn Box 6
|
undated | |
19 | Village Riverwalk Physical location: Barn Box 10
|
undated | |
20 | Cucumber Creek Physical location: Barn Box 12
|
undated | |
21 | Peak 8 Physical location: Barn Box 12
|
undated | |
22 | Cucumber Creek Physical location: Barn box 12
|
undated | |
23 | Cucumber Creek Physical location: Barn Box 12
|
undated | |
24 | GIS Analysis Physical location: Barn Box 12
|
undated | |
25 | Cucumber Creek Physical location: Barn Box 13
|
undated | |
26 | Cucumber Creek Physical location: Barn Box 13
|
undated | |
27 | Village Riverwalk Physical location: Barn Box 15
|
undated |
LXXIX: LXXIX: Park Avenue, 1972-2002Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1972-2002 | ||
Box | Folder | ||
1 | 1 | Annual Organizational Meeting - Richard Shaw |
1978-1980 |
1 | 2 | Cecil's Market Building Setbacks |
2001 |
1 | 3 | Cecil's Market Invoices |
2001-2002 |
1 | 4 | Cecil's Market and Hotels in Park Avenue |
1995-2001 |
1 | 5 | Design Management File - Richard Shaw |
1972-1980 |
1 | 6 | Development Process File - Richard Shaw |
1975-1979 |
1 | 7 | Office Organizational Meeting |
1981 November 30 |
1 | 8 | Park Avenue 17 Acre Architectural |
1997-2000 |
1 | 9 | Park Avenue 17 Acre Correspondence |
1998-2000 |
1 | 10 | Park Avenue 17 Acre Cost Estimates |
1996-1998 |
1 | 11 | Park Avenue 17 Acre Design Sketches |
1998-2000 |
1 | 12 | Park Avenue 17 Acre Engineering Gondola |
1999-2000 |
1 | 13 | Park Avenue 17 Acre Engineering, Civil |
1996-2000 |
1 | 14 | Park Avenue 17 Acre Engineering, Transportation |
1994-1999 |
1 | 15 | Park Avenue 17 Acre Land Coverage |
1988-1996 |
1 | 16 | Park Avenue 17 Acre Meeting Minutes/ Notes |
1998-2000 |
1 | 17 | Park Avenue 17 Acre Program Numbers |
1999 December 13 |
1 | 18 | Park Avenue 17 Acre Proposal/Contracts |
1998 |
1 | 19 | Park Avenue 17 Acre Proposed Amendment, Building Height |
1994 March 14 |
1 | 20 | Park Avenue Architecture |
1996 |
1 | 21 | Park Avenue Budget Summary |
1993-1994 |
1 | 22 | Park Avenue Correspondence |
1994-1996 |
1 | 23 | Park Avenue Density Calculations |
1995-1996 |
1 | 24 | Park Avenue Drainage Report |
1993-1996 |
1 | 25 | Park Avenue Executive Summary |
1993-1994 |
1 | 26 | Park Avenue Landscape Materials - Design Standards, Guidelines and Check List |
1995 |
1 | 27 | Park Avenue Parking Info |
1996 |
1 | 28 | Park Avenue Programming |
1995-1996 |
1 | 29 | Park Avenue Proposition |
1992 |
1 | 30 | Park Avenue Public Art |
1995-1996 |
1 | 31 | Park Avenue Redevelopment Civil Engineering |
1996 |
1 | 32 | Park Avenue Redevelopment Community Plans/Design Guide |
undated |
1 | 33 | Park Avenue Redevelopment Contact List |
undated |
1 | 34 | Park Avenue Redevelopment Contract Drafts |
1992-1993 |
1 | 35 | Park Avenue Redevelopment Correspondence Part 1 |
1992-1996 |
1 | 36 | Park Avenue Redevelopment Correspondence Part 2 |
1992-1996 |
1 | 37 | Park Avenue Redevelopment Correspondence |
1993-1996 |
2 | 1 | Park Avenue Redevelopment Cost Estimate |
1991-1996 |
2 | 2 | Park Avenue Redevelopment Design Sketches/Product Info |
1994-1996 |
2 | 3 | Park Avenue Redevelopment Engineering Gondola |
1994-1999 |
2 | 4 | Park Avenue Redevelopment Engineering Transportation |
1989-1996 |
2 | 5 | Park Avenue Redevelopment Environmental Analysis Req. B |
1993-1996 |
2 | 6 | Park Avenue Redevelopment Plan Executive Summary |
1994 August 8 |
2 | 7 | Park Avenue Redevelopment Existing Regulations/TRPA Code |
1989-1993 |
2 | 8 | Park Avenue Redevelopment Lighting Issues |
1994-1996 |
2 | 9 | Park Avenue Redevelopment Population Project |
1995 May |
2 | 10 | Park Avenue Redevelopment Programming |
1992-1997 |
2 | 11 | Park Avenue Redevelopment Prop. Amend. Building Hgt. |
1993 |
2 | 12 | Park Avenue Redevelopment Proposal/Interview |
undated |
2 | 13 | Park Avenue Redevelopment Proposed Amend. Excav |
1993 |
2 | 14 | Park Avenue Redevelopment Regulatory Issues |
1993-1994 |
2 | 15 | Park Avenue Redevelopment Subconsultants |
1992-1996 |
2 | 16 | Park Avenue Redevelopment Work Program |
1994-1995 |
2 | 17 | Park Avenue Simulations |
1994-1995 |
2 | 18 | Park Avenue Stateline Ski Area Summary of Impact |
1989 May 2 |
2 | 19 | Park Avenue Transit Approvals |
2002 |
2 | 20 | Parking Garage |
2002 January 3 |
2 | 21 | Project Cost File- Richard Shaw |
1979-1980 |
2 | 22 | Proposals- Richard Shaw |
1979-1981 |
2 | 23 | Proposals/Contracts |
2001 May |
2 | 24 | Reading Material in Relation to Park Avenue |
1992 |
2 | 25 | Visual Simulations |
1994-1995 |
2 | 26 | Park Avenue Redevelopment Meeting Minutes/Notes to File |
1992-1993 |
2 | 27 | Park Avenue Redevelopment Meeting Minutes/Notes to File |
1994-1995 |
2 | 28 | Park Avenue Redevelopment Meeting Minutes/Notes to File |
1996-1997 |
2 | 29 | Park Avenue Team Memos |
1994-1995 |
2 | 30 | Park Avenue Redevelopment To Do Lists |
1996 |
2 | 31 | Park Avenue Redevelopment Physical |
1992-1995 |
2 | 32 | Park Avenue Redevelopment Solar Analysis |
1992-1995 |
2 | 33 | Park Avenue Redevelopment Visual Simulations |
1995 |
2 | 34 | Park Avenue Redevelopment Visual |
1986-1991 |
2 | 35 | Park Avenue Redevelopment Visual |
1993-1994 |
3 | 1 | Park Avenue Redevelopment Visual |
1995-1997 |
3 | 2 | Park Avenue Redevelopment Soils |
1992-1993 |
3 | 3 | Park Avenue Redevelopment Soils |
1994-1996 |
3 | 4 | Park Avenue Regional Plan Scenic Quality |
1994-1995 |
3 | 5 | Park Avenue Cost Estimates |
1995-1996 |
3 | 6 | Park Avenue Transportation |
1994-1996 |
3 | 7 | Park Avenue Architecture |
1994-1996 |
3 | 8 | Park Avenue Architecture |
1996-1997 |
3 | 9 | Park Avenue PUD's |
1994 |
3 | 10 | Park Avenue Drainage Plan |
1994-1995 |
3 | 11 | Park Avenue Signage |
1995-1996 |
3 | 12 | Park Avenue Utility |
1996 |
3 | 13 | Park Avenue Design Guidelines |
1996 |
3 | 14 | Park Avenue Earthwork Calculations |
1995 |
3 | 15 | Park Avenue Redevelopment Floor Area Calculations |
1996 |
3 | 16 | Park Avenue Redevelopment Schematic Alternative |
1993 |
3 | 17 | Park Avenue Redevelopment Executive Summary |
1993 |
3 | 18 | Park Avenue Redevelopment Executive Summary |
1994-1996 |
3 | 19 | Park Avenue Project Program |
1979-1995 |
3 | 20 | Manual of Professional Practice |
1982-1996 |
3 | 21 | Manual of Professional Practice |
1982-1996 |
3 | 22 | Manual of Professional Practice |
1982-1996 |
3 | 23 | Manual of Professional Practice |
1982-1996 |
3 | 24 | Plan Criteria |
1993-1994 |
3 | 25 | Executive Summary |
1993 |
3 | 26 | Executive Summary |
1996 |
3 | 27 | Proposed Amendment to Ch. 22 |
1994 |
3 | 28 | Lake Tahoe Correspondence |
1992 |
3 | 29 | Park Ave Contracts |
1994 |
3 | 30 | Correspondence |
1993-1994 |
3 | 31 | Meeting Minutes |
1992-1994 |
3 | 32 | Park Ave Programming |
1994 |
3 | 33 | Park Ave Billing |
1994 |
3 | 34 | Park Ave Existing Regs/TRPA Code |
1994 |
3 | 35 | Misc. |
1993-1994 |
TUBES 38 tubes
|
1972-2002 | ||
tube | |||
1 | Project Approved Package Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | GMP Sets Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Original Sketches Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Redevelopment Project 3 Physical location: CCA 8 Column 6, Row 1
|
undated | |
5 | Prints/Mylar's Physical location: CCA 8 Column 6, Row 1
|
undated | |
6 | Trace Studies Physical location: CCA 8 Column 6, Row 1
|
undated | |
7 | Approval Set with Revised Sheets Physical location: CCA 8 Column 6, Row 1
|
undated | |
8 | Prints/Mylar's Physical location: CCA 8 Column 6, Row 1
|
undated | |
9 | Grading Plans, Groundwater Physical location: CCA 8 Column 6, Row 1
|
undated | |
10 | CD Set Physical location: CCA 8 Column 6, Row 1
|
undated | |
11 | Illustrative plan, park avenue development plan, construction document, half size Physical location: CCA 8 Column 6, Row 1
|
undated | |
12 | 100% DD Set; Turning Radius Analysis; Approvals Set; Snowmelt Plan Physical location: CCA 8 Column 6, Row 1
|
2002-2003; undated | |
13 | Grading, Site Plan, Alternatives, Road Plans Physical location: CCA 8 Column 6, Row 2
|
undated | |
14 | Phase 1 Physical location: CCA 6 Column 1, Row 1
|
undated | |
15 | Redevelopment Project 3 Physical location: CCA 8 Column 5, Row 3
|
undated | |
16 | Proposed Land Coverage Plan Physical location: CCA 6 Column 2, Row 3
|
undated | |
17 | Original Approved Set Physical location: Barn Box 5
|
undated | |
18 | Ground Summit Arch Physical location: CCA 8 Column 4, Row 2
|
undated | |
19 | Process to Approval Set Physical location: CCA 8 Column 4, Row 3
|
undated | |
20 | Mylar's, Illustrative, Grading, Schedule Physical location: CCA 8 Column 5, Row 2
|
undated | |
21 | Streetscape Physical location: CCA 8 Column 5, Row 2
|
undated | |
22 | Prints/Mylar's Physical location: CCA 8 Column 5, Row 2
|
undated | |
23 | Site Info Mylar's Physical location: CCA 8 Column 5, Row 2
|
undated | |
24 | Approval Set Physical location: Barn Box 9
|
undated | |
25 | Construction Documents Physical location: Barn Box 9
|
undated | |
26 | Streetscape Physical location: Barn Box 9
|
undated | |
27 | Redevelopment Project 3 Physical location: Barn Box 10
|
undated | |
28 | Construction Documents Physical location: Barn Box 10
|
undated | |
29 | Construction Documents Physical location: Barn Box 10
|
undated | |
30 | Trace Studies Physical location: Barn Box 13
|
undated | |
31 | Signage Physical location: Barn Box 16
|
undated | |
32 | Analysis and Visual Studies Physical location: Barn Box 16
|
undated | |
33 | Base Maps Physical location: Barn Box 16
|
undated | |
34 | Analysis Mylar's Physical location: Barn Box 16
|
undated | |
35 | Site Process Physical location: Barn Box 16
|
undated | |
36 | Environmental Assessment Physical location: Barn Box 16
|
undated | |
37 | Old Mylar's Physical location: Barn Box 13
|
undated | |
38 | Monograph Physical location: Barn Box 14
|
undated |
LXXX: LXXX: Winter Park, 1989-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1989-2000 | ||
Box | Folder | ||
1 | 1 | Architectural and Development Standards |
undated |
1 | 2 | Biological |
1989 |
1 | 3 | Biological |
1992-1994 |
1 | 4 | Biological FDP |
1997 |
1 | 5 | Clippings |
1992 |
1 | 6 | Clippings for the Town |
1992 |
1 | 7 | Clippings |
1994 |
1 | 8 | Clippings FDP |
1998 |
1 | 9 | Clippings |
1990 |
1 | 10 | Condominium and Retail Markets |
1994 |
1 | 11 | Conference Facility |
1996 |
1 | 12 | Contracts/Proposal Miscellaneous |
1995 |
1 | 13 | Correspondence |
1989-1990 |
1 | 14 | Correspondence |
1996 |
1 | 15 | Correspondence |
1993 |
1 | 16 | Correspondence |
1993-1994 |
1 | 17 | Correspondence |
1997-1998 |
1 | 18 | Correspondence FDP |
1994-1998 |
1 | 19 | Correspondence Miscellaneous |
1995-1997 |
1 | 20 | Correspondence |
1992 |
1 | 21 | Correspondence - City Land Site Planning |
1996 |
1 | 22 | Correspondence Site Plan |
1998 |
1 | 23 | Correspondence Circulation |
1998-1999 |
1 | 24 | Correspondence Park Buildings |
1997-1999 |
1 | 25 | Correspondence Parking Structure |
1994-1995 |
1 | 26 | Correspondence Village Subdivision |
1997 |
1 | 27 | Correspondence Urban Design |
1997 |
1 | 28 | Cost Estimates |
1990 |
1 | 29 | Cost Estimates |
1991 |
1 | 30 | Cost Estimates |
1993-1994 |
1 | 31 | Cost Estimates- Miscellaneous |
1993-1995 |
1 | 32 | Cost Estimates Town of Winter Park |
1992-1993 |
1 | 33 | Cost Estimates Landscape Architect |
1998 |
1 | 34 | Cost Estimates Hines Miscellaneous |
1997 |
1 | 35 | Design Guidelines |
1994 |
1 | 36 | Design Regulations and Guidelines |
1997 |
1 | 37 | Design Sketches Due Diligence |
undated |
1 | 38 | Design Sketches Due Diligence |
1994 |
1 | 39 | Design Sketches Landscape Architect |
1997-1999 |
1 | 40 | Documentation/Design Guidelines |
1990 |
1 | 41 | Economic |
1990 |
1 | 42 | Economic Impact to Ski Operations |
1994 |
1 | 43 | Economic Model |
1994 |
1 | 44 | Engineering |
1993-1994 |
1 | 45 | Engineering Parking Study |
1996 |
1 | 46 | Engineering Village Subdivision |
1997 |
1 | 47 | Engineering/Civil |
1989-1990 |
1 | 48 | Executive Summary and Village Site Development Studies |
1997 |
1 | 49 | FDP Application |
1997 |
1 | 50 | Geology/Soils |
1990 |
1 | 51 | Illustrations |
1998 |
1 | 52 | Illustrative |
1999 |
1 | 53 | Marketing Studies |
1993 |
1 | 54 | Marketing/Presentations |
1997 |
1 | 55 | Market Study |
1992 |
1 | 56 | Master Plan |
1999 |
1 | 57 | Meeting Agendas, Notes, Minutes |
1989-1990 |
1 | 58 | Meeting Minutes/Notes to File |
1991 |
1 | 59 | Meeting Minutes/Notes to File |
1993-1995 |
1 | 60 | Meeting Minutes/Notes to File |
1993 |
2 | 1 | Meeting Minutes Ice Rink |
1996 |
2 | 2 | Meeting Minutes/Notes to File FDP |
1994-1997 |
2 | 3 | Meeting Minutes/Notes to File |
1992 |
2 | 4 | Meeting Minutes/Notes to File Landscape Architect |
1997-1998 |
2 | 5 | Meeting Minutes/Notes to File Mapping |
1991 |
2 | 6 | Meeting Minutes/Notes to File Parking Structure |
1993-1994 |
2 | 7 | Meeting Minutes/Notes to File Parking Study |
1997-1998 |
2 | 8 | Meeting Minutes/Notes Planning |
1999 |
2 | 9 | Meeting Minutes/Notes to File Urban Design |
1997 |
2 | 10 | Meeting Minutes/Notes to File- Village |
1996 |
2 | 11 | Meeting Minutes |
1992 |
2 | 12 | Physical |
1990 |
2 | 13 | Physical |
1994 |
2 | 14 | Physical |
1992 |
2 | 15 | Preliminary Development Plan Submission |
1990 |
2 | 16 | Programming |
1991 |
2 | 17 | Programming |
1994 |
2 | 18 | Programming Landscape Architecture |
1997-1999 |
2 | 19 | Programming FDP |
1998 |
2 | 20 | Programming Hines Miscellaneous |
1997 |
2 | 21 | Programming Rec. Association |
1993-1994 |
2 | 22 | Programming Rec. Association |
1994 |
2 | 23 | Programming Parking Study |
1998 |
2 | 24 | Programming Urban Design |
1997 |
2 | 25 | Programming/Land Use |
1990 |
2 | 26 | Programming/Recreational |
1990 |
2 | 27 | Proposal/Contracts |
1989 |
2 | 28 | Proposal/Contracts |
1991 |
2 | 29 | Proposal/Contracts |
1992 |
2 | 30 | Proposal/Contracts |
1993-1994 |
2 | 31 | Proposal/Contracts |
1997 |
2 | 32 | Proposal and Contracts FDP |
1997-1998 |
2 | 33 | Proposal/Contracts Mapping |
1991 |
2 | 34 | Proposal/Contracts Meeting |
1992 |
2 | 35 | Proposal/Contracts |
1992 |
2 | 36 | Proposal/Contracts Parking Study |
1996 |
2 | 37 | Proposal/Contracts Village Subdivision |
1997 |
2 | 38 | Proposal/Contracts Urban Design |
1997 |
2 | 39 | Proposal/Qualifications |
1989 |
2 | 40 | Proposal/Qualifications - Consultants |
1989 |
2 | 41 | Replacement Parking Plan for the Village |
undated |
2 | 42 | Resort Operations Planning Study |
1999 |
2 | 43 | Streetscape Scenario Design |
undated |
2 | 44 | Technical Appendix |
1998 |
2 | 45 | Village for Winter Park |
1997 |
2 | 46 | Winter Park Resort |
1997-1998 |
2 | 47 | Work Program Master Plan |
1990 |
2 | 48 | Zephyr Mountain Lodge Hydrology |
2000 |
2 | 49 | Correspondence |
1988-1994 |
2 | 50 | Master Plan |
1992-1993 |
2 | 51 | Regulations and Design Guidelines |
undated |
2 | 52 | Notes to File |
1991-1992 |
2 | 53 | Sunrise Ski Report |
1989 |
2 | 54 | Proposals |
1992-1995 |
TUBES 10 tubes
|
1997 | ||
tube | |||
1 | Various Physical location: CCA 6 Column 2, Row 1
|
undated | |
2 | Conceptual Master Plan Physical location: CCA 6 Column 1, Row 2
|
undated | |
3 | Marketing Presentation Materials Physical location: CCA 6 Column 2, Row 3
|
undated | |
4 | Illustrative Plan Physical location:CCA 6 Column 2, Row 6
|
1997; undated | |
5 | Interview Physical location: Barn Box 5
|
undated | |
6 | Mylar Base Grading Physical location: Barn Box 5
|
undated | |
7 | Village Structural Physical location: CCA 6 Column 1, Row 5
|
undated | |
8 | Park Zoning Maps Physical location: CCA 8 Column 5, Row 2
|
undated | |
9 | Renderings Original Physical location: Barn Box 16
|
1997 June; undated | |
10 | Conceptual Master Plan Physical location: Barn Box 16
|
undated |
LXXXI: LXXXI: I-70/I-25 Interchange (Colorado), 1975-2006Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1975-2006 | ||
Box | Folder | ||
1 | 1 | I-25 Phase 2 Correspondence |
2006 |
1 | 2 | I-25 Phase 2 Meeting Minutes/Notes to File |
1996 |
1 | 3 | I-25 Phase 2 Work Program |
1996 |
1 | 4 | I-25 Phase 2 Marketing/Presentations |
1995-1999 |
1 | 5 | I-25 Phase 2 Engineering |
1995 |
1 | 6 | I-25 Visual Analysis Proposals/Contracts |
1995 |
1 | 7 | I-25 Visual Analysis Meeting Notes |
1998 |
1 | 8 | I-25 Visual Analysis Billing/Invoices |
1998 |
1 | 9 | I-25 Incorporation/Annexation |
1975-1997 |
1 | 10 | I-25 Visual Analysis Work Program |
1995 |
1 | 11 | I-25 Visual Analysis Demographics |
1994-1995 |
1 | 12 | I-25 Visual Analysis Biological |
1994-1995 |
1 | 13 | I-25 Visual Analysis Engineering |
1993-1994 |
1 | 14 | I-25 Visual Analysis Marketing/Presentations |
1993-1995 |
1 | 15 | I-25 Broadway Streetscapes Proposals/Contracts |
2004 |
1 | 16 | I-25 Broadway Streetscapes Meeting Agendas & Minutes |
2001-2003 |
1 | 17 | I-25 Broadway Streetscapes Meeting Agendas & Minutes |
2004-2006 |
1 | 18 | I-25 Broadway Streetscapes Meeting Agendas & Minutes |
2006 |
1 | 19 | I-25 Broadway Streetscape Correspondence |
2001-2003 |
1 | 20 | I-25 Broadway Streetscape Correspondence |
2003 |
1 | 21 | I-25 Broadway Streetscape Correspondence |
2004 |
1 | 22 | I-25 Broadway Streetscape Correspondence |
2004-2006 |
1 | 23 | I-25 Broadway Streetscape Conceptual Design |
undated |
1 | 24 | I-25 Broadway Streetscape Schematic Design |
2003 |
1 | 25 | I-25 Broadway Streetscape Survey |
2003 |
1 | 26 | I-25 Broadway Environmental Impact Statement (EIS) |
2003 September |
1 | 27 | I-25 Broadway Environmental Impact Statement (EIS) |
2003 September |
1 | 28 | I-25 Broadway Environmental Impact Statement (EIS) |
2006 |
1 | 29 | I-25 Broadway EIS Cost Estimates |
2003 |
1 | 30 | I-25 Broadway EIS Aesthetics and Urban Design Report Draft |
2004 March 4 |
1 | 31 | I-25 Broadway EIS Scope of Work |
1998 November |
1 | 32 | I-25 Broadway EIS Correspondence |
1998-2000 |
1 | 33 | I-25 Broadway EIS Correspondence |
2003 |
1 | 34 | I-25 Broadway EIS Viaduct |
2001-2004 |
1 | 35 | I-25 Broadway EIS Meeting Minutes |
1998-2000 |
1 | 36 | I-25 Broadway EIS Meeting Minutes |
2001-2002 |
1 | 37 | I-25 Broadway EIS Meeting Minutes |
2003-2004 |
1 | 38 | I-25 Broadway EIS Design Sketches |
1999-2000 |
1 | 39 | I-25 Broadway EIS Viaduct Reconstruction |
2001 |
1 | 40 | I-25 Broadway EIS Summary of Public Meeting |
2003 September 15 |
1 | 41 | I-25 Broadway EIS Meeting Handouts |
2004 |
1 | 42 | I-25 Phase 2 Management & Facilities |
1996 |
1 | 43 | I-25 Corridor Preservation Model |
1986 |
1 | 44 | Mousetrap Proposals/Contracts |
1989-1990 |
1 | 45 | Mousetrap Meeting Minutes/Notes to File |
1989-1990 |
1 | 46 | Mousetrap Work Program |
1990 |
1 | 47 | Mousetrap Correspondence |
1989-1990 |
1 | 48 | I-70/I-225 Meeting Minutes/Notes to File |
1988 |
1 | 49 | I-70/I-225 Phase 2 Proposals/Contracts |
1993-1997 |
1 | 50 | I-70/I-225 Phase 2 Meeting Minutes/Notes to File |
1994 |
1 | 51 | I-70/I-225 Phase III Work Program |
1993 |
2 | 1 | I-70/I-225 Interchange Correspondence |
1990-1995 |
2 | 2 | I-70/I-225 Interchange Work Program |
1987 |
2 | 3 | I-70/I-225 Interchange Landscape Plan |
1988 |
2 | 4 | I-70/I-225 Design Guidelines Proposals/Contracts |
1990-1991 |
2 | 5 | I-70/I-225 Design Guidelines Correspondence |
1990-1991 |
2 | 6 | I-70/I-225 Design Guidelines Meeting Minutes/Notes to File |
1990-1991 |
2 | 7 | I-70/I-225 Design Guidelines Work Program |
1989 |
2 | 8 | I-70/I-225 Landscape Proposals/Contracts |
1997 |
2 | 9 | I-70/I-225 Landscape Correspondence |
1997 |
2 | 10 | I-70/I-225 Landscape Meeting Minutes/Notes to File |
1997 |
2 | 11 | E-470/I-70 Correspondence |
2003-2004 |
2 | 12 | E-470/I-70 Correspondence |
undated |
2 | 13 | E-470/I-70 Market Research/Analysis |
2002 |
2 | 14 | E-470/I-70 Market Research/Analysis |
2003 |
2 | 15 | E-470/I-70 Education |
2005 |
2 | 16 | E-470/I-70 Meeting Minutes |
2003-2004 |
2 | 17 | E-470/I-70 Nolte Correspondence |
2003-2004 |
2 | 18 | E-470/I-70 FDP Submittal |
2004 |
2 | 19 | E-470/I-70 Design Guidelines |
2004 March |
2 | 20 | E-470/I-70 Market Study |
2003 November |
2 | 21 | E-470/I-70 COA Correspondence |
2004-2005 |
TUBES 12 tubes
|
|||
tube | |||
1 | EIS Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Aerial Conservation Corridor Physical location: Barn Box 1
|
undated | |
3 | Conservation Corridor Physical location: Barn Box 2
|
undated | |
4 | Buckley Physical location: CCA 8 Column 4, Row 2
|
undated | |
5 | Topography Physical location: CCA 6 Column 1, Row 4
|
undated | |
6 | Interchange Physical location: CCA 8 Column 4, Row 3
|
undated | |
7 | Broadway Physical location: CCA 8 Column 5, Row 1
|
undated | |
8 | Sound wall Large Drawings Physical location: Barn Box 10
|
undated | |
9 | Broadway Viaduct Replacement Physical location: Barn Box 11
|
undated | |
10 | Seeding and Sleeving Plans Physical location: Barn Box 14
|
undated | |
11 | Sound Wall Physical location: Barn Box 14
|
undated | |
12 | Alameda Physical location: Barn Box 14
|
undated |
LXXXII: LXXXII: Four Seasons, Jackson Hole, 1997-2003Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1997-2003 | ||
Box | Folder | ||
1 | 1 | Proposals/Contracts |
2000 |
1 | 2 | Proposals/Contracts |
2000 |
1 | 3 | Proposals/Contracts |
2001 |
1 | 4 | Proposals/Contracts |
2001 |
1 | 5 | Proposals/Contracts |
2002-2003 |
1 | 6 | Correspondence |
1997-1999 |
1 | 7 | Correspondence |
2000 |
1 | 8 | Correspondence |
2000 |
1 | 9 | Correspondence |
2000 |
1 | 10 | Correspondence |
2000 |
1 | 11 | Correspondence |
2000 |
1 | 12 | Correspondence |
2000 |
1 | 13 | Correspondence |
2000 |
1 | 14 | Correspondence |
2001 |
1 | 15 | Correspondence |
2001 |
1 | 16 | Correspondence |
2001 |
1 | 17 | Correspondence |
2001 |
1 | 18 | Correspondence |
2001 |
1 | 19 | Correspondence |
2001 |
1 | 20 | Correspondence |
2002 |
1 | 21 | Correspondence |
2002 |
1 | 22 | Correspondence |
2003 |
1 | 23 | Design Sketches |
2000-2001 |
1 | 24 | Meeting Minutes/Notes to File |
2000 |
1 | 25 | Meeting Minutes/Notes to File |
2000 |
1 | 26 | Meeting Minutes/Notes to File |
2001-2002 |
1 | 27 | Work Program |
2000 |
1 | 28 | Design Guidelines |
2001 |
1 | 29 | Plant Material Imagery |
2000 |
1 | 30 | Sketch Plan Application |
2000 |
1 | 31 | Final Development Plan Supplement |
2001 |
1 | 32 | Final Development Plan Application |
2001 |
1 | 33 | Amendment Application |
2001 |
1 | 34 | Discovery Center Proposals/Contracts |
2003 |
TUBES 13 tubes
|
|||
tube | |||
1 | Four Seasons Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Grading, Maintenance Facility, 40% Design Development, Construction Documents Physical location: CCA 6 Column 2, Row 5
|
undated | |
3 | Arcade Diagram Physical location: CCA 6 Column 2, Row 5
|
undated | |
4 | Resort Hotel Physical location: CCA 6 Column 2, Row 5
|
undated | |
5 | Master Plan Details Physical location: CCA 6 Column 2, Row 5
|
undated | |
6 | Large Scale Sketch Plans Submissions Physical location: CCA 6 Column 2, Row 6
|
undated | |
7 | Grading Plan Physical location: CCA 6 Column 2, Row 5
|
undated | |
8 | Sketch Plan Physical location: CCA 6 Column 2, Row 9
|
2001; undated | |
9 | Sketch Plans and Progress Prints Physical location: CCA 6 Column 2, Row 8
|
undated | |
10 | Renderings Physical location: CCA 6 Column 2, Row 9
|
undated | |
11 | GMP Physical location: CCA 6 Column 2, Row 9
|
undated | |
12 | Progress Prints Physical location: CCA 6 Column 2, Row 8
|
undated | |
13 | Build out Renderings Physical location: CCA 6 Column 2, Row 9
|
undated |
LXXXIII: LXXXIII: Aspen (ADEPP), 1980-2001Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1980-2001 | ||
Box | Folder | ||
1 | 1 | Highlands Proposals/Contracts |
1992-1993 |
1 | 2 | Highlands Correspondence |
1991-1993 |
1 | 3 | Highlands Correspondence |
1994 |
1 | 4 | Highlands Meeting Minutes |
1993 |
1 | 5 | Highlands Reports |
1980 |
1 | 6 | Highlands Physical |
1993 |
1 | 7 | Highland Engineering |
1992-1995 |
1 | 8 | Aspen Highland Programming |
1995 |
1 | 9 | Highlands Cost Estimates |
1993 |
1 | 10 | Highlands Design Sketches/Product Info. |
1993-1994 |
1 | 11 | Highlands AF-Ski Master Plan |
1993 |
1 | 12 | Highlands Employee Housing |
undated |
1 | 13 | Highlands Environmental Assessment |
1994 |
1 | 14 | Highlands General Submission Report Volume 1 |
1993 June |
1 | 15 | Highlands General Sumbission Report Volume 2 |
1993 June |
1 | 16 | Highlands General Submission Report Appendix |
1993 June |
1 | 17 | Highlands General Submission Report Appendix |
1993 June |
1 | 18 | Aspen Club Proposals/Contracts |
1996-1997 |
1 | 19 | Aspen Club Correspondence |
1996 |
1 | 20 | Aspen Club Correspondence |
1997 |
1 | 21 | Aspen Club Meeting Minutes |
1996-1997 |
1 | 22 | Aspen Club Work Program |
1997 |
1 | 23 | Aspen Club Physical |
1996-1997 |
1 | 24 | Aspen Club Visual |
1997 |
1 | 25 | Aspen Club Engineering |
1996-1997 |
1 | 26 | Aspen Club Programming |
1997 |
1 | 27 | Aspen Club Cost Estimates |
1996-1997 |
1 | 28 | Aspen Club Design Sketches/Product Info |
1996-1997 |
1 | 29 | Aspen Club Construction Bids/Proposals |
1997 |
1 | 30 | Aspen Club Remodel Report |
1997 May 20 |
1 | 31 | Aspen Club Remodel Phase 1 Specifications |
1997 May 5 |
1 | 32 | Aspen Club Entry Improvements Plan |
1994 June 29 |
1 | 33 | Downtown Enhancement Proposals/Contracts |
1996-1999 |
1 | 34 | Downtown Enhancement Proposal |
1996 October 23 |
1 | 35 | Downtown Enhancement Correspondence/Transmittals |
1997-1999 |
1 | 36 | Downtown Enhancement Construction Documents |
1999 |
1 | 37 | Downtown Enhancement Meeting Minutes |
1997 |
1 | 38 | Mountain Ski Area Drawings |
undated |
1 | 39 | Mountain Ski Area Master Plan |
1985 |
2 | 1 | Downtown Enhancement Submittals/Shop Drawings |
1998-1999 |
2 | 2 | Downtown Enhancement Engineering |
1997 |
2 | 3 | Downtown Enhancement User Survey |
1997 |
2 | 4 | Downtown Enhancement User Survey |
1997 |
2 | 5 | Downtown Enhancement Programming |
1996 |
2 | 6 | Downtown Enhancement Concept Plans |
1997 |
2 | 7 | Downtown Enhancement Cost Estimates |
1997-1999 |
2 | 8 | Downtown Enhancement Market Analysis |
1995 |
2 | 9 | Downtown Enhancement Meeting Notes |
1999 |
2 | 10 | Downtown Enhancement Public Process |
1999 |
2 | 11 | Downtown Enhancement Technical |
1998-1999 |
2 | 12 | Downtown Enhancement Slope of Work |
1999 |
2 | 13 | Downtown Enhancement Worksession |
1997 |
2 | 14 | Downtown Enhancement Worksession |
1998-1999 |
2 | 15 | Downtown Enhancement Background Information |
1998 |
2 | 16 | Downtown Enhancement Project Management |
1998 |
2 | 17 | Downtown Enhancement Design Phase |
1998 |
2 | 18 | Downtown Enhancement Phase Three Summary |
1998 |
2 | 19 | Downtown Enhancement Phase 3 |
1998-2001 |
2 | 20 | Field Reports |
1999-2000 |
2 | 21 | Aspen Post Office |
undated |
2 | 22 | Downtown Enhancement Mall |
1998 |
2 | 23 | Downtown Enhancement Inventory and Analysis/Working Paper |
1997 |
2 | 24 | CCASLA Award Submittal |
1999 |
2 | 25 | Aspen Institute |
1978 |
2 | 26 | Aspen Meadows- Proposals/Contracts |
1992 |
2 | 27 | Aspen Grove |
1985 |
2 | 28 | Aspen Inn Architectural Drawings |
undated |
TUBES 28 tubes
|
|||
tube | |||
1 | Sketches Phase II and III Physical location: CCA 6 Column 1, Row 7
|
undated | |
2 | Pedestrian Malls Physical location: CCA 6 Column 1, Row 7
|
undated | |
3 | Site Furnishings Physical location: CCA 6 Column 1, Row 7
|
undated | |
4 | Phase II Plans Physical location: CCA 6 Column 1, Row 7
|
undated | |
5 | Maps Aerials Photos Physical location: CCA 6 Column 1, Row 7
|
undated | |
6 | Surveys, grading, utility plans Physical location: CCA 6 Column 1, Row 7
|
undated | |
7 | Handicap Parking Info Physical location: CCA 6 Column 1, Row 7
|
undated | |
8 | Circulation Diagram, Plan rendering, perspectives proposed streetscape Physical location: CCA 6 Column 1, Row 7
|
undated | |
9 | Phase III Plans Parking Special Events Schedule Physical location: CCA 6 Column 1, Row 7
|
undated | |
10 | Schematic Physical location: CCA 6 Column 1, Row 7
|
undated | |
11 | Aspen Mall Architectural Drawings Physical location: CCA 6 Column 1, Row 7
|
undated | |
12 | Phase II Rendered Plans and Originals Physical location: CCA 6 Column 1, Row 7
|
undated | |
13 | Aspen Club Topography Physical location: CCA8 Column 6, Row 3
|
undated | |
14 | Schematic/Site Analysis Physical location: CCA 6 Column 1, Row 9
|
undated | |
15 | Site Analysis Physical location: CCA 8 Column 6, Row 1
|
undated | |
16 | Master Plan Physical location: CCA 8 Column 6, Row 1
|
undated | |
17 | Phase 3 Physical location: CCA 8 Column 6, Row 1
|
undated | |
18 | Commons Drawings Physical location: Barn Box 1
|
undated | |
19 | Aspen Highlands Physical location: CCA 8 Column 4, Row 1
|
undated | |
20 | Village Physical location: CCA 8 Column 4, Row 2
|
undated | |
21 | Highlands Physical location: CCA 8 Column 4, Row 2
|
undated | |
22 | Club Slicks and Mylar's Physical location: CCA 8 Column 4, Row 2
|
undated | |
23 | Highlands Detailed Plans Physical location: CCA 8 Column 4, Row 2
|
undated | |
24 | Highlands Mapping and Plans Physical location: CCA 8 Column 4, Row 2
|
undated | |
25 | Aspen Quickmart Physical location: CCA 8 Column 4, Row 2
|
undated | |
26 | Landscape Layout Physical location: CCA 8 Column 5, Row 3
|
undated | |
27 | Highlands Physical location: CCA 8 Column 5, Row 2
|
undated | |
28 | Land Use Summary Physical location: Barn Box 6
|
undated |
LXXXIV: LXXXIV: Jackson Hole Ski Corporation, 1994-1998Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1994-1998 | ||
Box | Folder | ||
1 | 1 | Kids Ranch Proposals/Contracts |
1997 |
1 | 2 | Kids Ranch Sketches |
undated |
1 | 3 | Kids Ranch Sketches/Others |
undated |
1 | 4 | Hay Meadow CUP Final Development Plan |
2002 |
1 | 5 | Hay Meadow CUP Proposals/Contracts |
2002 |
1 | 6 | Commons Area Proposals/Contracts |
1997 |
1 | 7 | Business Plan Program |
1999 |
1 | 8 | Business Plan Meeting Minutes |
1999 |
1 | 9 | Business Plan Design |
undated |
1 | 10 | Business Plan Revenue Estimates |
1997-1998 |
1 | 11 | Business Plan Correspondence |
1996-1998 |
1 | 12 | JHMR Parking Correspondence |
2001-2002 |
1 | 13 | JHMR Bowman Road |
2003 |
1 | 14 | JHMR Proposal Review |
2003 |
1 | 15 | JHMR Seed Mix |
1998 |
1 | 16 | JHMR Parking Structures Cost Estimates |
2001 |
1 | 17 | Pumphouse- Minor Development Plan Submission |
1998 |
1 | 18 | JHMR Teton Village Map |
undated |
1 | 19 | Pumphouse Transmittals |
1998 |
1 | 20 | Pumphouse Proposals/Contracts |
1998 |
1 | 21 | Bridger Area Design Development |
undated |
1 | 22 | Mall Pond Correspondence |
1997-1998 |
1 | 23 | Mall Pond Proposals/Contracts |
1997 |
1 | 24 | Mall Pond Sketch Plan Submission |
1998 |
1 | 25 | Mall Pond Design Sketches |
undated |
1 | 26 | Mall Pond Meeting Notes |
1998 |
1 | 27 | Maintenance Facility Submission Design Sketches |
undated |
1 | 28 | Maintenance and Skier Plaza |
1996-1997 |
1 | 29 | JHMR Wall Finishes Approvals |
2003 |
1 | 30 | JHMR Site Detail |
2001 |
1 | 31 | JHMR Product Info |
undated |
1 | 32 | JHMR Notes |
2000-2001 |
1 | 33 | JHMR Meeting Minutes |
2001 |
1 | 34 | JHMR Maintenance Facility Sketch Plan Application |
2001 |
1 | 35 | Correspondence |
2000 |
1 | 36 | Proposals/Contract |
2000-2001 |
1 | 37 | Rock Spring Hut |
undated |
1 | 38 | Rock Spring Yurt Final Development Plan |
2002 |
1 | 39 | Village Height Proposal |
2000 |
1 | 40 | Newsletter Illustrative Plan |
1998 |
1 | 41 | Newsletter Correspondence |
1998-2001 |
1 | 42 | Land Exchange |
1997-1998 |
1 | 43 | Gondola Details |
1997 |
1 | 44 | Gondola Meeting Minutes |
1997 |
1 | 45 | Gondola Transmittals |
1997 |
1 | 46 | Gondola Correspondence |
1997 |
1 | 47 | Kids Ranch Final Development |
1997-1998 |
1 | 48 | Business Plan Market Report |
1997 |
1 | 49 | Ski Corporation Proposals/Contracts |
1997 |
1 | 50 | Ski Corporation Development Opportunities |
1997 |
1 | 51 | Parking Study Programming |
1994 |
1 | 52 | Michael Drive Design Sketches/Product Information |
1997 |
1 | 53 | Base Area Master Plan Proposals/Contracts |
1994-1997 |
1 | 54 | Base Area Master Plan Correspondence |
1994-1996 |
1 | 55 | Base Area Work Program |
1994-1995 |
1 | 56 | Base Area Meeting Minutes |
1994-1995 |
1 | 57 | Base Area Engineering |
1996 |
1 | 58 | Base Area Programming |
1996-1997 |
1 | 59 | Base Area Design Sketches/Product Information |
1996 |
1 | 60 | Base Area Plan Reductions |
1995 |
1 | 61 | Base Area Master Plan |
1996 March 1 |
1 | 62 | Ski Corporation Business Plan Proposals/Contracts |
1997 |
1 | 63 | Ski Corporation Business Plan Meeting Minutes/Notes |
1997 |
1 | 64 | Ski Corporation Business Plan Real Estate Data |
1997 |
1 | 65 | Ski Corporation Business Plan Cost Data |
1997 |
1 | 66 | Ski Corporation Business Plan Client Comments |
1997 |
1 | 67 | Ski Corporation Business Plan Proforma |
1997 |
1 | 68 | Gondola/Skier Services Final Development Plan |
1996 |
2 | 1 | Gondola/Skier Services Correspondence |
1996 |
2 | 2 | Gondola/Skier Meeting Notes |
1996 |
2 | 3 | Gondola/Skier Drawing/Sketches |
undated |
2 | 4 | Cody House Proposals/Contracts |
1997 |
2 | 5 | Cody House Correspondence |
1997 |
2 | 6 | Cody House Correspondence |
1998 |
2 | 7 | Cody House Correspondence |
1998 |
2 | 8 | Cody House Meeting Minutes |
1997-1998 |
2 | 9 | Cody House Work Program |
1998 |
2 | 10 | Cody House Geological/Soils |
1997 |
2 | 11 | Cody House Sketches |
1997 |
2 | 12 | Cody House Details |
1997 |
2 | 13 | Cody House Final Plan/County |
1998 |
2 | 14 | Cody House Sketch Plan Submission |
1998 |
TUBES 4 tubes
|
|||
tube | |||
1 | Teton Club, conceptual Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Teton Club Physical location: CCA 6 Column 2, Row 9
|
undated | |
3 | Cody House Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Mall Pond Physical location: CCA 8 Column 4, Row 2
|
undated |
LXXXV: LXXXV: Canyon Forest Village, 1992-2000Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1992-2000 | ||
Box | Folder | ||
1 | 1 | Canyon Forest Village Proposals/Contracts |
1992-1999 |
1 | 2 | Canyon Forest Village Proposals/Contracts Sub-consultants |
1994 |
1 | 3 | Canyon Forest Village Correspondence |
1992-1996 |
1 | 4 | Canyon Forest Village Client Memos |
1998 |
1 | 5 | Canyon Forest Village Original Scoping Document |
undated |
1 | 6 | Canyon Forest Village Transmittals |
1992 |
1 | 7 | Canyon Forest Village Meeting Minutes/Notes To File |
1992-1993 |
1 | 8 | Canyon Forest Village Schedule |
1992 |
1 | 9 | Canyon Forest Village Transportation |
1996 |
1 | 10 | Canyon Forest Village Site Information |
1996-1998 |
1 | 11 | Canyon Forest Village Physical |
undated |
1 | 12 | Canyon Forest Village Biological |
1992 |
1 | 13 | Canyon Forest Village Programming |
1992-1994 |
1 | 14 | Canyon Forest Village Cost Estimate |
1994 |
1 | 15 | Canyon Forest Village Public Relations |
1992 |
1 | 16 | Canyon Forest Village Employee Housing |
1994 |
1 | 17 | Canyon Forest Village Alternatives |
1998 |
1 | 18 | Canyon Forest Village Bubble Diagrams |
1994-1996 |
1 | 19 | Canyon Forest Village Insight Center |
1994 |
1 | 20 | USGS Outparcel Information |
1996 |
1 | 21 | Canyon Forest Village Legal Description |
1996 |
1 | 22 | Canyon Forest Village Scoping Documents |
1992 |
1 | 23 | Canyon Forest Village Video Preparation |
1992 |
1 | 24 | Canyon Forest Village Marketing Plans/Brochures |
1999 |
1 | 25 | Canyon Forest Village Jeffrey Joyce Sketches |
undated |
1 | 26 | Canyon Forest Village School Site |
undated |
1 | 27 | Canyon Forest Village Guidelines for Sustainability |
1999 |
1 | 28 | Canyon Forest Village Proposal |
1996 August |
1 | 29 | Canyon Forest Village Legal Documents |
1999 |
1 | 30 | Canyon Forest Village Legal |
1999 |
1 | 31 | Canyon Forest Village Legal |
undated |
1 | 32 | Canyon Forest Village Interdisciplinary Team Directed Proposal |
1996 September |
1 | 33 | Canyon Forest Village Design Standards |
1998-1999 |
1 | 34 | Canyon Forest Village Design Standards |
1998-1999 |
1 | 35 | Canyon Forest Village Design Standards |
1998-1999 |
1 | 36 | Canyon Forest Village Design Standards |
1999 |
1 | 37 | Correspondence |
1999 |
1 | 38 | Design Guidelines |
1999 |
1 | 39 | Standard and Guidelines |
2000 |
1 | 40 | Zoning |
1998-1999 |
1 | 41 | Education |
1999-2000 |
1 | 42 | Sketch for Parking |
undated |
1 | 43 | Visual Analysis |
1999 |
1 | 44 | Hydrology |
1999 |
1 | 45 | Land Use |
1999 |
1 | 46 | Design |
undated |
1 | 47 | Schedule |
1999 |
1 | 48 | Applicant's Narrative |
1999 |
1 | 49 | Proposed Zoning Regulation |
1999 |
1 | 50 | Design Sketches |
1999 |
1 | 51 | History |
undated |
TUBES 4 tubes
|
|||
tube | |||
1 | Village Maps Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Development Studies Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Conceptual Master Plan Diagram Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | Village Studies Physical location: Barn Box 16
|
undated |
LXXXVI: LXXXVI: Burlingame & Brush Creek, 1995-2010Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1995-2010 | ||
Box | Folder | ||
1 | 1 | Meeting Notes/Minutes |
1995-1996 |
1 | 2 | Programming |
1995 |
1 | 3 | Cost Estimates |
1995 |
1 | 4 | Design Sketches/Product Info |
undated |
1 | 5 | Memos |
1995-1998 |
1 | 6 | Memos |
2006 |
1 | 7 | Proposal/Contracts |
2002 |
1 | 8 | Proposal/Contracts |
2002 |
1 | 9 | Proposal/Contracts |
2003 |
1 | 10 | Proposal/Contracts |
2003 |
1 | 11 | Proposal/Contracts |
2003 |
1 | 12 | Meeting Minutes |
2002-2010 |
1 | 13 | Schedule |
2003-2004 |
1 | 14 | Title Policy |
1997 |
1 | 15 | Land Use |
2003 |
1 | 16 | Soil |
2003 May 13 |
1 | 17 | Environmental Audits |
2003 |
1 | 18 | Drainage |
2003 |
1 | 19 | Roads |
undated |
1 | 20 | Design Sketches/Product Info |
2006 |
1 | 21 | City/County General Plan |
2000-2003 |
1 | 22 | Development Plan |
2003 |
1 | 23 | Development Plan |
undated |
1 | 24 | Zoning |
2003 June 2 |
1 | 25 | Design Review |
2003 June 12 |
1 | 26 | Public Participation |
2003 |
1 | 27 | Special Review Processes |
1997-2003 |
1 | 28 | Construction Bids |
2003 |
1 | 29 | Field Reports |
2004 |
1 | 30 | Change Orders |
2003-2006 |
1 | 31 | Land Use Application Report |
undated |
1 | 32 | Project Manual |
2003 September 18 |
1 | 33 | Project Manual |
2003 September 18 |
1 | 34 | Project Manual |
2003 September 18 |
1 | 35 | Project Manual |
2003 September 18 |
1 | 36 | Project Delivery Design Report |
2010 March |
1 | 37 | Project Delivery Design Report |
2010 March |
1 | 38 | Project Delivery Design Report |
2010 March |
1 | 39 | Design Plans |
2010 May 7 |
2 | 1 | Project Report |
2005-2010 |
2 | 2 | Project Report |
2005-2010 |
2 | 3 | Project Report |
2005-2010 |
2 | 4 | Project Report |
2005-2010 |
2 | 5 | Sketches |
2004 July 5 |
2 | 6 | Financial |
2004 |
2 | 7 | Meeting Minutes |
2004 |
2 | 8 | Plant Lists |
undated |
2 | 9 | Code Sections |
2004 April |
2 | 10 | Conceptual Plans |
undated |
2 | 11 | Conceptual Plan |
undated |
2 | 12 | Water Connection |
undated |
2 | 13 | Housing |
2004 April 9 |
2 | 14 | Housing |
2004 April 9 |
2 | 15 | Conceptual Design Plan |
2004 October |
2 | 16 | Conceptual Design Plan |
2004 October |
2 | 17 | Conceptual Design Plan |
2004 October |
2 | 18 | Plaza/Conoco Review |
2002-2003 |
2 | 19 | Plaza/Conoco Zoning |
2002 |
2 | 20 | Plaza/Conoco Articles |
2001-2002 |
2 | 21 | Plaza/Conoco Meeting Minutes |
2001-2002 |
2 | 22 | Plaza/Conoco Development Program |
2001 |
2 | 23 | Plaza/Conoco Design Studies |
2002 |
2 | 24 | Plaza/Conoco Correspondence |
2001-2003 |
2 | 25 | Plaza/Conoco Proposals/Contracts |
2001-2002 |
TUBES 6 tubes
|
1995-2004 | ||
tube | |||
1 | Preliminary Grading Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Original Schematic Physical location: CCA 8 Column 6, Row 1
|
2004; undated | |
3 | "Early Master Plan Sketches; Aerial Photos; Slope Map; 3D Topo Map; Master Plan; Master Plan; Aspect Maps; Layout and Concept Grading; Final Plan, Grading and Illustrative; Planting Plan Sketches" Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Old Pets./Sight Plan Physical location: Barn Box 5
|
undated | |
5 | Process Architecture Physical location: Barn Box 5
|
undated | |
6 | Preliminary Submissions Physical location: CCA 8 Column 4, Row 3
|
undated |
LXXXVII: LXXXVII: Lowry, 1990-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1990-2008 | ||
Box | Folder | ||
1 | 1 | Lowry Range Market Research |
2004 May-June |
1 | 2 | Lowry Range Contracts/Proposals |
2004 February-August |
1 | 3 | Lowry Range Meeting Agendas & Minutes |
2003-2004 |
1 | 4 | Lowry Range Meeting Agendas & Minutes |
2003-2004 |
1 | 5 | Lowry Range Meeting Agendas & Minutes |
2003-2004 |
1 | 6 | Lowry Range Contact List |
2004 |
1 | 7 | Lowry Range Cost Estimates |
2004 December |
1 | 8 | Lowry Range Transmittals |
2004 June and December |
1 | 9 | Lowry Range Property Maps |
2004 |
1 | 10 | Lowry Range Onsite Analysis |
2004 June 1-4 |
1 | 11 | Lowry Range Community Facilities |
2004 December 30 |
1 | 12 | Lowry Range Infrastructure |
2004 December 24 |
1 | 13 | Lowry Range Transportation |
2004 August-November |
1 | 14 | Lowry Range Correspondence |
2004 July-August |
1 | 15 | Lowry Range Correspondence |
2004 September-October |
1 | 16 | Lowry Range Correspondence |
2004 December |
1 | 17 | Lowry Range Correspondence |
2005 January-June |
1 | 18 | Lowry Range Water |
2004 July-October |
1 | 19 | Lowry Range Water |
2004 October |
1 | 20 | Lowry Range Water Report |
2004 September 8 |
1 | 21 | Lowry Range Energy |
2004 |
1 | 22 | Lowry Range Land Use |
2004 August 10 |
1 | 23 | Lowry Range Correspondence From Client |
2004 August - 2005 February |
1 | 24 | Lowry Range Parks/Open Spaces |
2004 October |
1 | 25 | Lowry Range Vision |
2004 November |
1 | 26 | Lowry Range Proposals/Contracts |
undated |
1 | 27 | Lowry Range Source Data |
2001-2003 |
1 | 28 | Lowry Range Source Data |
2004-2006 |
1 | 29 | Lowry Range Proposal to SLB |
2006 November 8 |
1 | 30 | Lowry Range Work Session |
2004 August 19 |
1 | 31 | Lowry Range Cost Estimates |
2006 January 16 |
1 | 32 | Lowry Range Biological Survey |
2005 |
1 | 33 | Lowry Range Mission & Absolutes |
2003 August 1 |
1 | 34 | Lowry Range Parks, Trails, & Open Space Summary |
2005 January 10 |
1 | 35 | Lowry Range Water Supply Report |
2005 January |
1 | 36 | Lowry Range Vision Process |
2002 August 28 |
1 | 37 | Lowry Range Development Study |
2003 August 1 |
1 | 38 | Lowry Range Restoration Advisory Board |
2004 |
1 | 39 | Lowry Range Restoration Advisory Board |
2004 |
1 | 40 | Lowry Range Restoration Advisory Board Meeting Minutes |
2003 November 19 |
1 | 41 | Lowry Range Materials/Project Timelines |
2004 |
1 | 42 | Lowry Range Restoration Advisory Board Presentation |
2004 May 19 |
1 | 43 | Lowry Range Conservation Proposals |
2006 April 20 |
1 | 44 | Lowry Range Design Guidelines |
2002 October |
1 | 45 | Lowry Range Design Guidelines |
2002 October |
1 | 46 | Lowry Range Background Report |
2005-2006 |
1 | 47 | Lowry Range Background Report |
2005-2006 |
1 | 48 | Lowry Range East Linear Park |
2006 |
2 | 1 | Master Plan Review Proposal/Contracts |
1998 |
2 | 2 | Master Plan Review Correspondence |
1998 August - 2001 December |
2 | 3 | Lowry Land Board Promo |
1990 |
2 | 4 | Lowry Land Board Promo |
1990 |
2 | 5 | Master Plan Review Meeting Minutes/Memos |
1998 July-August |
2 | 6 | Master Plan Review Meeting Minutes/Memos |
1999 |
2 | 7 | Master Plan Review Programming |
undated |
2 | 8 | Master Plan Review Design Sketches |
1997-1998 |
2 | 9 | Time and Materials (T&M) Correspondence |
2002-2004 |
2 | 10 | T&M Proposals/Contract |
2002-2006 |
2 | 11 | T&M Construction Bids/Proposals |
2001-2003 |
2 | 12 | T&M Due Diligence Reports |
2002 |
2 | 13 | T&M Meeting Minutes |
2002-2004 |
2 | 14 | T&M Financial Proformas |
2000 |
2 | 15 | T&M Market Research |
2002 May 22 |
2 | 16 | T&M Special Review Process |
2002 August 2 |
2 | 17 | T&M Vegetation |
2002 October 29 |
2 | 18 | T&M Program |
2002 December |
2 | 19 | T&M Schematic Design |
2003 May-December |
2 | 20 | T&M Design Sketches |
2002 June-July |
2 | 21 | T&M Design Review |
2003 May 30 |
2 | 22 | T&M Submittals/Shop Drawings |
2003 July 31 |
2 | 23 | 10th Anniversary Program |
2004 September 11 |
2 | 24 | Crescent Park Correspondence/Transmittals |
2001 March-August |
2 | 25 | Crescent Park Correspondence/Transmittals |
2001 September-October |
2 | 26 | Crescent Park Design Guidelines |
2002 February |
2 | 27 | Crescent Park Meeting Minutes |
2001 May-June |
2 | 28 | Crescent Park Development Plan |
2000 April-November |
2 | 29 | Crescent Park Design Specifications |
2003 March 17 |
2 | 30 | Design Specifications for 11th & Quebec Street |
2003 March 31 |
2 | 31 | Traffic Impact Analysis Addendum |
2000 January |
2 | 32 | Preliminary Geotechnical Investigation |
2000 October 9 |
2 | 33 | Sunset Village Park Project Manual |
2003 August 1 |
2 | 34 | Reading Garden Project Manual |
2003 June 9 |
2 | 35 | Lowry Golf Proposal/Contract |
2004 July-August |
2 | 36 | Lowry Golf Community North Meeting Records |
2004 May-July |
2 | 37 | Lowry Golf Community North Meeting Records |
2004 July-December |
2 | 38 | Lowry Golf Community North Monuments |
2004 April-July |
2 | 39 | Lowry Golf Community North Design Guidelines |
2004 March 9 |
2 | 40 | Lowry Golf Community Programming |
undated |
2 | 41 | Lowry Golf Development Program |
2003 April |
2 | 42 | Lowry Golf Transmittals |
2003 July-August |
2 | 43 | Lowry East Contact/Proposals |
2005-2008 |
2 | 44 | Lowry East Meeting Minutes & Agendas |
2003-2006 |
2 | 45 | Lowry East Correspondence |
2004-2006 |
2 | 46 | Lowry East Correspondence |
2004-2006 |
2 | 47 | Lowry East Plant List |
undated |
2 | 48 | Lowry East Schematic Design |
2004 March 9 |
2 | 49 | Lowry East Design Development |
2005 |
2 | 50 | Lowry East Design Guidelines |
2002-2005 September |
2 | 51 | Lowry East Design Guidelines |
2005 October |
2 | 52 | Lowry East Design Guidelines |
undated |
2 | 53 | Lowry East Construction Documents |
2004-2008 |
2 | 54 | Lowry East Dog Park |
2006 January 20 |
2 | 55 | Lowry East Cost Estimates |
2005 June 22 |
2 | 56 | Lowry East Open Spaces |
2005-2006 |
2 | 57 | Lowry East Park Shelter |
2006 July-August |
3 | 1 | Lowry Campus Redevelopment Proposal/Contract |
undated |
3 | 2 | Lowry Campus Redevelopment Phase II Planning Report |
2007 February 9 |
3 | 3 | Lowry Campus Redevelopment Land Use Plan |
2007 August |
3 | 4 | Lowry Campus Redevelopment Strategic Plan |
2005 May |
3 | 5 | Lowry Campus Redevelopment Plan for Use Report |
2008 April 22 |
3 | 6 | Lowry Campus Redevelopment Concept Plan |
2001 July 17 |
3 | 7 | Lowry Buckley Annex Correspondence |
2006 December - 2007 July |
TUBES 56 tubes
|
|||
tube | |||
1 | Lowry Range Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
4 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
5 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
6 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
7 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
8 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
9 | Lowry East Schematic Design, shade structure details, CDs Physical location: CCA 8 Column 3, Row 3
|
undated | |
10 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
11 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
12 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
13 | Schematic Design Plans Physical location: CCA 8 Column 3, Row 3
|
undated | |
14 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
15 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
16 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
17 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
18 | Lowry East SD Monumentation Physical location: CCA 8 Column 3, Row 3
|
undated | |
19 | Lowry Range Physical location: CCA 8 Column 3, Row 3
|
undated | |
20 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
21 | Lowry T&M Physical location: CCA 8 Column 3, Row 3
|
undated | |
22 | Lowry Range Physical location: CCA 8 Column 3, Row 3
|
undated | |
23 | Illustrative Master Plans Physical location: CCA 6 Column 1, Row 2
|
undated | |
24 | T&M Physical location: CCA 6 Column 1, Row 2
|
undated | |
25 | T&;M Physical location: CCA 6 Column 1, Row 2
|
undated | |
26 | Buckley Annex Physical location: CCA 6 Column 1, Row 1
|
undated | |
27 | Lowry T&M Physical location: CCA 8 Column 5, Row 3
|
undated | |
28 | Crescent Park Physical location: CCA 6 Column 2, Row 4
|
undated | |
29 | Crescent Park Physical location: CCA 6 Column 2, Row 4
|
undated | |
30 | Crescent Park Physical location: CCA 6 Column 2, Row 3
|
undated | |
31 | Lowry T&M Physical location: CCA 6 Column 1, Row 9
|
undated | |
32 | Schematic Design, shade structure details Physical location: CCA 8 Column 4, Row 1
|
undated | |
33 | T&M Reading Garden Physical location: CCA 8 Column 4, Row 1
|
undated | |
34 | T&M Physical location: CCA 8 Column 4, Row 1
|
undated | |
35 | T&M Physical location: Barn Box 7
|
undated | |
36 | T&M Physical location: Barn Box 7
|
undated | |
37 | T&M Physical location: Barn Box 7
|
undated | |
38 | T&M Physical location: Barn Box 7
|
undated | |
39 | T&M Physical location: Barn Box 7
|
undated | |
40 | T&M Physical location: Barn Box 7
|
undated | |
41 | T&M Physical location: Barn Box 7
|
undated | |
42 | T&M Physical location: Barn Box 7
|
undated | |
43 | T&M Physical location: Barn Box 7
|
undated | |
44 | Northwest Neighbors Physical location: Barn Box 7
|
undated | |
45 | Employment Campus Physical location: Barn Box 7
|
undated | |
46 | Sites Development Physical location: Barn Box 7
|
undated | |
47 | Golf Physical location: Barn Box 7
|
undated | |
48 | Golf Physical location: Barn Box 7
|
undated | |
49 | Business Park Physical location: Barn Box 7
|
undated | |
50 | T&M Physical location: Barn Box 7
|
undated | |
51 | T&M Physical location: Barn Box 9
|
undated | |
52 | T&M Physical location: Barn Box 9
|
undated | |
53 | East Physical location: Barn Box 9
|
undated | |
54 | Range Physical location: Barn Box 9
|
undated | |
55 | Community North Redesign Physical location: Barn Box 11
|
undated | |
56 | Golf Community North Redesign Physical location: Barn Box 15
|
undated |
LXXXVIII: LXXXVIII: Mariposa, 1995-2003Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1995-2003 | ||
Box | Folder | ||
1 | 1 | Mariposa Image Notebook |
1999 May 26 |
1 | 2 | Mariposa Land Use Application |
1999 June 1 |
1 | 3 | Mariposa Master Plan |
2001 November 26 |
1 | 4 | Mariposa Streetscape and Mapping |
2001 |
1 | 5 | Mariposa Supporting Documents to the Master Plan Volume I Part 1 |
2001 July 6 |
1 | 6 | Mariposa Supporting Documents to the Master Plan Volume I Part 2 |
2001 July 6 |
1 | 7 | Reference Notebook |
1999 May 26 |
1 | 8 | Standards and Guidelines for Sustainability |
1999 July 26 |
1 | 9 | Supplemental Documents |
2001 November 26 |
1 | 10 | Supporting Documents to the Mariposa Master Plan Volume I |
2001 November 26 |
1 | 11 | Supporting Documents to the Mariposa Master Plan Volume II |
2001 November 26 |
1 | 12 | Supporting Documents to the Master Plan Volume I |
2001 October 30 |
1 | 13 | Mariposa Proposal/Contracts |
2002 |
1 | 14 | Mariposa Correspondence |
1995-1996 |
1 | 15 | Mariposa Correspondence |
2001-2003 |
1 | 16 | Mariposa Meeting Minutes |
1995-2002 |
1 | 17 | Mariposa Facsimiles |
1995 |
1 | 18 | Mariposa Facsimiles |
2001-2003 |
1 | 19 | Mariposa Programming |
1995-2003 |
1 | 20 | Mariposa Zoning |
2001 |
1 | 21 | Mariposa Zoning |
2002 |
1 | 22 | Mariposa Design Guidelines |
2002 |
1 | 23 | U.S. Department of Agriculture Soil Survey |
1995 |
1 | 24 | Mariposa Drainage Plan |
1995 |
1 | 25 | Mariposa Basin Correspondence- Conversation and Meeting Records |
1994 |
1 | 26 | Mariposa Basin Cost Estimates and Information |
1994 |
1 | 27 | Mariposa Basin Miscellaneous Notes and Sketches |
1994 |
1 | 28 | Mariposa Basin Trail Connection Proposals/Contracts |
1998-2001 |
1 | 29 | Mariposa Basin Trail Connection Correspondence |
1998-1999 |
1 | 30 | Mariposa Basin Trail Connection Meeting Minutes |
1998-1999 |
1 | 31 | Mariposa Basin Trail Connection Work Program |
1998-1999 |
1 | 32 | Mariposa Basin Trail Connection Notes to File |
undated |
1 | 33 | Mariposa Basin Trail Connection Facsimiles |
1998-2000 |
1 | 34 | Mariposa Basin Trail Connection Hydrology/Drainage |
1999 |
1 | 35 | Mariposa Basin Trail Connection Cost Estimates |
1999 |
1 | 36 | Mariposa Basin Trail Connection Field Reports |
1999-2000 |
1 | 37 | Mariposa Basin Park Phase III Proposals/Contracts |
1996-2000 |
1 | 38 | Mariposa Basin Park Phase III Correspondence |
1995-1999 |
1 | 39 | Mariposa Basin Park Phase III Meeting Minutes |
1995-2000 |
1 | 40 | Mariposa Basin Park Phase III Notes to File |
1995-2000 |
2 | 1 | Mariposa Basin Park Phase III Facsimiles |
1997-2002 |
2 | 2 | Mariposa Basin Park Phase III Engineering |
1998 |
2 | 3 | Mariposa Basin Park Phase III Cost Estimates |
1995-1998 |
2 | 4 | Mariposa Basin Park Phase III Design Sketches |
1996-1997 |
2 | 5 | Mariposa Basin Park Design Guidelines |
1990 |
2 | 6 | Mariposa Basin Park Change Orders |
1996 |
2 | 7 | Mariposa Streetscape |
2005-2006 |
2 | 8 | Mariposa Basin Parking Lot Proposals/Contracts |
1997-1998 |
2 | 9 | Mariposa Basin Parking Lot Correspondence |
1997-1998 |
2 | 10 | Mariposa Basin Parking Lot Meeting Minutes |
1997-1998 |
2 | 11 | Mariposa Basin Parking Lot Facsimiles |
1998 |
2 | 12 | Mariposa Basin Parking Lot Cost Estimates |
1997 |
2 | 13 | Mariposa Basin Parking Lot Design Sketches |
1998 |
2 | 14 | Mariposa Basin Parking Lot Field Reports |
1998 |
2 | 15 | Mariposa Basin Parking Lot Construction Communications |
1998 |
2 | 16 | Mariposa Ranch Work in Progress Part 1 |
1995 November |
2 | 17 | Mariposa Ranch Work in Progress Part 2 |
1995 November |
2 | 18 | Mariposa Ranch Proposals/Contracts |
1998-2001 |
2 | 19 | Mariposa Ranch Correspondence |
1995-1999 |
2 | 20 | Mariposa Ranch Correspondence |
1999 |
2 | 21 | Mariposa Ranch Correspondence |
2000 |
2 | 22 | Mariposa Ranch Correspondence |
2001-2002 |
2 | 23 | Mariposa Ranch Notes to File |
1998-2001 |
2 | 24 | Mariposa Ranch Facsimiles |
1998-1999 |
2 | 25 | Mariposa Ranch Facsimiles |
2000 |
2 | 26 | Mariposa Ranch Facsimiles |
2001 |
2 | 27 | Mariposa Ranch Meeting Minutes |
1998-1999 |
2 | 28 | Mariposa Ranch Meeting Minutes |
2000 |
2 | 29 | Mariposa Ranch Meeting Minutes |
2001 |
2 | 30 | Mariposa Ranch Meeting Minutes |
2001 |
2 | 31 | Mariposa Ranch Meeting Minutes |
2001 |
2 | 32 | Mariposa Ranch Meeting Minutes |
2001-2002 |
2 | 33 | Mariposa Ranch Clippings |
1999-2001 |
2 | 34 | Mariposa Ranch Notes to File |
2001 |
2 | 35 | Mariposa Ranch Facsimiles |
1998-1999 |
2 | 36 | Mariposa Ranch Facsimiles |
2000 |
2 | 37 | Mariposa Ranch Facsimiles |
2001 |
3 | 1 | Mariposa Ranch Physical |
1995-1998 |
3 | 2 | Mariposa Ranch Visual |
1995 |
3 | 3 | Mariposa Ranch Engineering Property Analysis |
undated |
3 | 4 | Mariposa Ranch Engineering |
1989-1997 |
3 | 5 | Mariposa Ranch Engineering |
1998-2000 |
3 | 6 | Mariposa Ranch Engineering |
2001 |
3 | 7 | Mariposa Ranch Programming |
1999 March-June |
3 | 8 | Mariposa Ranch Programming |
1999 July |
3 | 9 | Mariposa Ranch Programming |
1999 October-November |
3 | 10 | Mariposa Ranch Programming |
2000 January-April |
3 | 11 | Mariposa Ranch Programming |
2000 May-October |
3 | 12 | Mariposa Ranch Programming |
2000 November-December |
3 | 13 | Mariposa Ranch Programming |
2001 |
3 | 14 | Mariposa Ranch Cost Estimates |
2000-2001 |
3 | 15 | Mariposa Ranch Design Sketches |
2001 |
3 | 16 | Mariposa Ranch Fiscal Analysis |
2000-2001 |
3 | 17 | Mariposa Ranch Plan Alternatives |
1995 |
3 | 18 | Mariposa Ranch Design Guidelines |
2000 |
3 | 19 | Mariposa Ranch Design Guidelines |
2001 |
3 | 20 | Mariposa Ranch Covenance, Conditions & Restrictions |
2001 |
3 | 21 | Mariposa Ranch Master Plans |
1999 |
3 | 22 | Mariposa Ranch Master Plans |
2001 |
3 | 23 | Mariposa Ranch Master Plans |
2002 |
3 | 24 | Zoning Recommendations |
2000 |
3 | 25 | Job/Housing Balance |
1999 |
3 | 26 | Water |
1999 |
3 | 27 | Images Jeffery Joyce |
2001 |
3 | 28 | Images Steve Mullen |
2001 |
3 | 29 | Master Plan for Mariposa Ranch |
2000-2001 |
3 | 30 | Mariposa Ranch |
2000 |
3 | 31 | Public Facilities |
1999-2000 |
3 | 32 | Conservation/Development Model |
undated |
3 | 33 | Transportation |
1999-2000 |
3 | 34 | Meeting Notes |
1998 |
3 | 35 | Articles |
1999-2001 |
3 | 36 | To Do Lists |
1999 |
3 | 37 | Meeting Minutes |
1999-2001 |
3 | 38 | Correspondence |
1999-2000 |
3 | 39 | Land Planning Services |
1999 |
TUBES 19 tubes
|
2002 | ||
tube | |||
1 | Existing Conditions, Zoning, Site Analysis, Sections, Village Center Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | Master Plan Physical location: CCA 8 Column 4, Row 1
|
undated | |
3 | Concept Land use, Layout Plan Phase II Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | Concept Plan Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | Concept Design Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Concept Design Physical location: CCA 8 Column 4, Row 1
|
undated | |
7 | Concept Design Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | Presentation Drawings Physical location: CCA 8 Column 4, Row 2
|
2002; undated | |
9 | Ranch Physical location: CCA 8 Column 5, Row 1
|
undated | |
10 | Most Recent Drawings Physical location: CCA 8 Column 5, Row 1
|
undated | |
11 | Ranch Physical location: CCA 8 Column 5, Row 1
|
undated | |
12 | Base Map Physical location: CCA 8 Column 5, Row 1
|
undated | |
13 | Little Lake Lodge Stagecoach Physical location: CCA 8 Column 5, Row 2
|
undated | |
14 | Lotting Plans Physical location: CCA 8 Column 5, Row 2
|
undated | |
15 | Topo/Aerial Physical location: CCA 8 Column 5, Row 2
|
undated | |
16 | Park Entry Design Physical location: Barn Box 9
|
undated | |
17 | Base Map Physical location: Barn Box 11
|
undated | |
18 | Miscellaneous Drawings Physical location: Barn Box 13
|
undated | |
19 | Academy Physical location: Barn Box 13
|
undated |
LXXXIX: LXXXIX: Snowmass, 1968-2008Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
MANUSCRIPT MATERIALS |
1968-2008 | ||
Box | Folder | ||
1 | 1 | Snowmass Center Proposals/Contracts |
2000-2001 |
1 | 2 | Snowmass Center Proposals/Contracts |
2002 |
1 | 3 | Snowmass Center Proposals/Contracts |
2003-2006 |
1 | 4 | Snowmass Center Correspondence |
2000-2002 |
1 | 5 | Snowmass Center Correspondence |
2003-2005 |
1 | 6 | Snowmass Center Meeting Minutes |
2000-2002 |
1 | 7 | Snowmass Center Meeting Minutes |
2003 |
1 | 8 | Snowmass Center Schedule |
2002 |
1 | 9 | Snowmass Center Title Policy |
1968-1985 |
1 | 10 | Snowmass Center Title Policy |
1999-2003 |
1 | 11 | Snowmass Center Surveys |
1983-2002 |
1 | 12 | Snowmass Center Water Rights |
1983-2001 |
1 | 13 | Snowmass Center Land Use |
undated |
1 | 14 | Snowmass Center Topography |
2002 |
1 | 15 | Snowmass Center Soils & Geography |
1997-2003 |
1 | 16 | Snowmass Center Hydrology |
2002 |
1 | 17 | Snowmass Center Art Walk Master Plan |
2002 |
1 | 18 | Snowmass Center Habitat |
2002 |
1 | 19 | Snowmass Center Environmental |
2002-2003 |
1 | 20 | Snowmass Center Financial Performas |
2002 |
1 | 21 | Snowmass Center Appraisals |
2002-2003 |
1 | 22 | Snowmass Center Fiscal Impact Analysis |
2002-2003 |
1 | 23 | Snowmass Center Drainage |
2002-2003 |
1 | 24 | Snowmass Center Engineering |
1994-1999 |
1 | 25 | Snowmass Center Engineering |
2000-2001 |
1 | 26 | Snowmass Center Engineering |
2002 |
1 | 27 | Snowmass Center Engineering |
2003-2005 |
1 | 28 | Snowmass Center Health & Emergency Services |
2001-2003 |
1 | 29 | Snowmass Center Marketing |
2000 |
1 | 30 | Snowmass Center Marketing |
2001 |
1 | 31 | Snowmass Center Marketing |
2002 |
1 | 32 | Snowmass Center City/County General Plan |
2002-2003 |
1 | 33 | Snowmass Center Zoning |
1999 |
1 | 34 | Snowmass Center Zoning |
2000 |
1 | 35 | Snowmass Center Zoning |
2002-2003 |
1 | 36 | Snowmass Center Design Sketches |
undated |
1 | 37 | Snowmass Center CCR's |
2000-2002 |
2 | 1 | Snowmass Center Public Hearing |
2003 |
2 | 2 | Snowmass Center Affordable Housing |
2000-2002 |
2 | 3 | Snowmass Center Schematic Design |
2002 |
2 | 4 | Snowmass Center Land Use Approvals |
2000-2001 |
2 | 5 | Snowmass Center Master Plans |
2000-2002 |
2 | 6 | Snowmass Center Housing Standards |
undated |
2 | 7 | Snowmass Center Preliminary Plans |
2000-2001 |
2 | 8 | Snowmass Center Preliminary Plans |
2002-2003 |
2 | 9 | Snowmass Center Programming |
2000-2003 |
2 | 10 | Snowmass Center Specifications |
2003 |
2 | 11 | Snowmass Center Construction Contracts |
undated |
2 | 12 | Snowmass Center Field Reports |
1999-2003 |
2 | 13 | Snowmass-Capitol Creek Meeting Minutes |
2001 |
2 | 14 | Snowmass-Capitol Creek Survey |
1998 |
2 | 15 | Snowmass-Capitol Creek Land Use |
undated |
2 | 16 | Snowmass-Capitol Creek Historic & Cultural Resources |
undated |
2 | 17 | Snowmass-Capitol Visual Analysis |
2001 |
2 | 18 | Snowmass-Capitol Environmental Permits |
2001-2002 |
2 | 19 | Snowmass-Capitol City/Council General Plan |
2001 |
2 | 20 | Snowmass-Capitol Zoning |
2001 |
2 | 21 | Snowmass-Capitol Public Participation |
2001 |
2 | 22 | Snowmass Parcels Proposals/Contracts |
2001 |
2 | 23 | Snowmass Parcels Survey |
undated |
2 | 24 | Snowmass Parcels Transportation |
undated |
2 | 25 | Snowmass Parcels Prior Studies |
undated |
2 | 26 | Snowmass Parcels Analysis Maps & Diagrams |
2001 |
2 | 27 | Snowmass Roundabout Proposals/Contracts |
2005-2006 |
2 | 28 | Snowmass Roundabout Correspondence |
2005-2006 |
2 | 29 | Snowmass Roundabout Meeting Minutes |
2005-2006 |
2 | 30 | Snowmass Entranceway Proposals/Contracts |
2005 |
2 | 31 | Snowmass Entranceway Correspondence |
2005 |
2 | 32 | Snowmass Entranceway Meeting Minutes |
2005 |
2 | 33 | Snowmass Base Village Proposals/Contracts |
2000 |
2 | 34 | Snowmass Base Village Correspondence |
1997-2000 |
2 | 35 | Snowmass Base Village Meeting Minutes |
2000 |
2 | 36 | Snowmass Base Village Land Use |
undated |
2 | 37 | Snowmass Base Village Soils & Geology |
1983-1990 |
2 | 38 | Snowmass Base Village Market Research |
undated |
2 | 39 | Snowmass Base Village Transportation |
1990-2001 |
2 | 40 | Snowmass Base Village Prior Studies |
2000 |
2 | 41 | Snowmass Base Village Schematic Design |
2000 |
2 | 42 | Snowmass Base Village Development Program |
2000-2001 |
2 | 43 | Snowmass Base Village Detail Design Studies |
1998 |
2 | 44 | Snowmass Base Village Program |
2000 |
2 | 45 | Snowmass Base Village Schematic Design |
2000 |
2 | 46 | Snowmass Base Village Schematic Design |
undated |
2 | 47 | Snowmass Base Village Marketing/Presentations |
1998 April 27 |
2 | 48 | Snowmass Base Village Planning Data |
1980-1983 |
2 | 49 | Snowmass Base Village Planning Data |
1980-1983 |
2 | 50 | Snowmass Base Village Memos, Reports & Notes |
1982-1983 |
2 | 51 | Snowmass Base Village Memos, Reports & Notes |
1982-1983 |
3 | 1 | Snowmass Base Village General Project Description |
1982 |
3 | 2 | Snowmass Base Village Planned Unit Development |
1982 October 18 |
3 | 3 | Snowmass Base Village Criteria Package |
1982-1983 |
3 | 4 | Snowmass Base Village Project Manual |
1983 |
3 | 5 | Snowmass Base Village Land Use Plan & Gross Parcel Plat |
1983 December 12 |
3 | 6 | Snowmass Base Village Stage One Technical Issues & Development Intent |
1983 April 26 |
3 | 7 | Snowmass Base Village P.U.D. Amendment Notes |
1983 |
3 | 8 | Snowmass Base Village P.U.D. Amendment Notes |
1983 |
3 | 9 | Snowmass Base Village P.U.D. Amendment Notes |
1983 |
3 | 10 | Snowmass Base Village Parcel B |
1984 November 14 |
3 | 11 | Snowmass Base Village Parcel B |
1984 November 14 |
3 | 12 | Snowmass Sanctuary Proposals/Contracts |
2002-2003 |
3 | 13 | Snowmass Sanctuary Housing |
2001-2003 |
3 | 14 | Snowmass Sanctuary Fractionals |
2002-2003 |
3 | 15 | Snowmass Sanctuary Economic Indicators |
2001-2003 |
3 | 16 | Snowmass Sanctuary Aspen Visitor Study |
2000 December |
3 | 17 | Snowmass Sanctuary Sales Analysis |
2003 May 21 |
3 | 18 | Snowmass Stage 1 Submission |
1984 July 2 |
3 | 19 | Snowmass Building L Stage 1 Submission |
1982 October 22 |
3 | 20 | Snowmass Conference Center Submission |
1982 October 29 |
3 | 21 | Snowmass Village Intrawest Proposals/Contract |
2003 |
3 | 22 | Snowmass Village Intrawest Maps and Plans |
undated |
3 | 23 | Snowmass Village Intrawest Building Storylines |
2003 |
3 | 24 | Snowmass Village Intrawest Situation Analysis |
2001 |
3 | 25 | Snowmass Village Intrawest Pricing Matrix |
2003 |
3 | 26 | Snowmass Village Intrawest Correspondence |
2003 |
3 | 27 | Snowmass Village Intrawest Market Investigation |
2003 |
3 | 28 | Snowmass Ski Area Expansion Proposals/Contracts |
1991 |
3 | 29 | Snowmass Ski Area Expansion Meeting Minutes/Notes |
1991 |
3 | 30 | Snowmass Ski Area Expansion Work Program |
undated |
3 | 31 | Snowmass Ski Area Expansion SPA, PUD Plan |
1991 April 22 |
3 | 32 | Snowmass Ski Area Master Development Plan |
1994 February |
3 | 33 | Snowmass Ski Area Final SPA Plan |
1994 |
3 | 34 | Snowmass Ski Area Final SPA Plan |
1994 |
3 | 35 | Snowmass Ski Area Final SPA Plan |
1994 |
3 | 36 | Snowmass Golf Feasibility Correspondence |
1989 March 13 |
3 | 37 | Snowmass Intercept Lot Proposals/Contracts |
1991 |
3 | 38 | Snowmass Intercept Lot Correspondence |
1991 |
3 | 39 | Snowmass Community Park Meeting Minutes/Notes to File |
1991 |
3 | 40 | Snowmass Community Park Programming (Land Use) |
1991 |
3 | 41 | Snowmass Community Park Cost Estimates |
1991 |
3 | 42 | Snowmass Master Plan Land Use Programming |
1990-1991 |
3 | 43 | Snowmass Master Plan Cost Estimates |
1991 |
3 | 44 | Snowmass Master Plan Employee Housing |
1989-1991 |
3 | 45 | Snowmass Master Plan Economic Projections |
1990 |
3 | 46 | Snowmass Master Plan Town Master Planning Doc. |
1988-1992 |
3 | 47 | Snowmass Ordinance Correspondence |
1990-1991 |
3 | 48 | Snowmass Ordinance Meeting Minutes/Notes to File |
1991 |
3 | 49 | Snowmass Ordinance Engineering (Traffic/Transportation) |
1990-1991 |
4 | 1 | Snowmass Parcel 'N' Final PUD and Plat Submission |
1978 October 23 |
4 | 2 | Snowmass Rodeo Parcel Proposals/Contracts |
2001 |
4 | 3 | Snowmass Club Pool/Spa Proposals/Contracts |
2007-2008 |
4 | 4 | Snowmass Club Pool/Spa Billing/Invoices |
2007 |
4 | 5 | Snowmass Club Proposals/Contracts |
1990-1997 |
4 | 6 | Snowmass Club Proposals/Contracts |
1998-2000 |
4 | 7 | Snowmass Club Correspondence |
1992-1998 |
4 | 8 | Snowmass Club Correspondence |
1999 |
4 | 9 | Snowmass Club Correspondence |
2000-2002 |
4 | 10 | Snowmass Club Meeting Minutes |
1996-1998 |
4 | 11 | Snowmass Club Meeting Minutes |
1999 |
4 | 12 | Snowmass Club Meeting Minutes |
2000-2001 |
4 | 13 | Snowmass Club Title Policy |
1970-1981 |
4 | 14 | Snowmass Club Title Policy |
1998-1999 |
4 | 15 | Snowmass Club Survey |
1998-2000 |
4 | 16 | Snowmass Club Due Diligence Report |
2000 |
4 | 17 | Snowmass Club Soils and Geology |
1980-1999 |
4 | 18 | Snowmass Club Appraisals |
1999 |
4 | 19 | Snowmass Club Fiscal Impact Analysis |
1998-1999 |
4 | 20 | Snowmass Club Drainage |
2000 |
4 | 21 | Snowmass Club Drainage |
undated |
4 | 22 | Snowmass Club Fire Protection |
undated |
4 | 23 | Snowmass Club Housing/Maintenance Facility |
1998-2000 |
4 | 24 | Snowmass Club Traffic/Parking |
1998-2000 |
4 | 25 | Snowmass Club Design Sketches |
1997-1999 |
4 | 26 | Snowmass Club P.U.D. Preliminary Plan |
1999 |
4 | 27 | Snowmass Club Joint Planning Process |
1997 |
4 | 28 | Snowmass Club Joint Planning Process |
1998 |
4 | 29 | Snowmass Club Joint Planning Process |
1999 |
4 | 30 | Snowmass Club Programming |
1991-2000 |
4 | 31 | Snowmass Club Planting Plan |
2000-2001 |
4 | 32 | Snowmass Club Cost Estimate |
1997-1998 |
4 | 33 | Snowmass Club Pool and Terrace |
1997-2000 |
4 | 34 | Snowmass Club Construction |
1999-2000 |
4 | 35 | Snowmass Club Specifications |
1999-2000 |
5 | 1 | Snowmass Club Firepit |
2000 |
5 | 2 | Snowmass Club Site Visits |
2000-2001 |
5 | 3 | Snowmass Club Phase 1 Gross Parcel Plat |
1980 January 25 |
5 | 4 | Snowmass Club Project Documents |
undated |
5 | 5 | Snowmass Club 2 Correspondence |
1998-2000 |
5 | 6 | Snowmass Club 2 Correspondence |
2001 January-February |
5 | 7 | Snowmass Club 2 Correspondence |
2001 March-May |
5 | 8 | Snowmass Club 2 Correspondence |
2001 June-August |
5 | 9 | Snowmass Club 2 Correspondence |
2001 September-November |
5 | 10 | Snowmass Club 2 Correspondence |
2001 December |
5 | 11 | Snowmass Club 2 Correspondence |
2002 January |
5 | 12 | Snowmass Club 2 Correspondence |
2002 February-March |
5 | 13 | Snowmass Club 2 Correspondence |
2002 May-December |
5 | 14 | Snowmass Club 2 Correspondence |
2003-2004 |
5 | 15 | Snowmass Club 2 Meeting Minutes |
2000 |
5 | 16 | Snowmass Club 2 Meeting Minutes |
2001 January-August |
5 | 17 | Snowmass Club 2 Meeting Minutes |
2001 September-December |
5 | 18 | Snowmass Club 2 Meeting Minutes |
2002-2003 |
5 | 19 | Snowmass Club 2 Survey |
1998-2001 |
5 | 20 | Snowmass Club 2 Survey |
2002-2003 |
5 | 21 | Snowmass Club 2 Hydrology |
2000-2003 |
5 | 22 | Snowmass Club 2 Vegetation |
2001-2002 |
5 | 23 | Snowmass Club 2 Environmental Permits |
2001 |
5 | 24 | Snowmass Club 2 Electric |
2000-2002 |
5 | 25 | Snowmass Club 2 Water |
2002 |
5 | 26 | Snowmass Club 2 Fire Protection |
2001-2002 |
5 | 27 | Snowmass Club 2 Impact fees |
2001-2002 |
5 | 28 | Snowmass Club 2 Parks & Recreation |
2001 |
5 | 29 | Snowmass Club 2 Transportation |
2000-2003 |
5 | 30 | Snowmass Club 2 Analysis Maps & Diagrams |
2001 |
5 | 31 | Snowmass Club 2 Development Program |
2002 |
5 | 32 | Snowmass Club 2 Master Plan Document |
2001 |
5 | 33 | Snowmass Club 2 Detail Design Studies |
2001 |
5 | 34 | Snowmass Club 2 Sketches/Image Graphics |
2001-2002 |
5 | 35 | Snowmass Club 2 City/County General Plan |
2001-2002 |
5 | 36 | Snowmass Club 2 Community/Area plan |
1998-1999 |
5 | 37 | Snowmass Club 2 Community/Area plan |
2000 June |
5 | 38 | Snowmass Club 2 Community/Area plan |
2000 September |
5 | 39 | Snowmass Club 2 Community/Area plan |
2000 October-December |
5 | 40 | Snowmass Club 2 Community/Area plan |
2001 |
5 | 41 | Snowmass Club 2 Community/Area plan |
2002 |
6 | 1 | Snowmass Club 2 Special Review Process |
1997-1998 |
6 | 2 | Snowmass Club 2 Special Review Process |
2000-2002 |
6 | 3 | Snowmass Club 2 Schematic Design |
2000-2001 |
6 | 4 | Snowmass Club 2 Design Development |
2001 |
6 | 5 | Snowmass Club 2 Construction Documents |
2002-2003 |
6 | 6 | Snowmass Club 2 Specifications |
2002 |
6 | 7 | Snowmass Club 2 Construction Bids |
2001-2003 |
6 | 8 | Snowmass Club 2 Construction Contracts |
2002-2003 |
6 | 9 | Snowmass Club 2 Pay Requests |
2003 February 27 |
6 | 10 | Snowmass Club 2 Field Reports |
2000-2003 |
6 | 11 | Snowmass Club 2 Change Orders |
2003 |
6 | 12 | Snowmass Club 2 Submittals/Shop Drawings |
2002-2003 |
6 | 13 | Snowmass Club Phase 2 Final Plat Submission |
undated |
6 | 14 | Snowmass Club Phase 2 Exhibit Package |
2001 August 29 |
6 | 15 | Snowmass Club Phase 2 Exhibit Package |
2001 August 29 |
6 | 16 | Snowmass Club Phase 2 Exhibit Package |
2001 August 29 |
6 | 17 | Snowmass Club Preliminary P.U.D. and Plat Submission |
1979 August 17 |
6 | 18 | Snowmass Club Preliminary P.U.D. and Plat Submission |
1979 August 17 |
6 | 19 | Snowmass Club Final P.U.D. Submission |
1980 January 25 |
6 | 20 | Snowmass Village Entry Notes to File |
1997-1998 |
6 | 21 | Snowmass Village Entry Sketches |
1999 |
6 | 22 | Snowmass Village Entry Meeting Minutes |
1998 |
6 | 23 | Snowmass Village Entry Correspondence |
1998 |
6 | 24 | Snowmass Village Entry Correspondence |
1999 |
6 | 25 | Snowmass Village Entry Proposed Parcel Information |
1999 May 16 |
6 | 26 | Snowmass Village Entry Probable Costs |
1999 |
6 | 27 | Snowmass Village Entry Parcel Summaries |
1998-1999 |
6 | 28 | Snowmass Club Plat Submission |
1981 |
6 | 29 | Snowmass Club Planned Unit Submission |
1992 January 23 |
6 | 30 | Snowmass Club Phase 2 Specifications |
1981 October |
6 | 31 | Snowmass Club Final Plat Submission |
1982 |
6 | 32 | Snowmass Comprehensive Plan Correspondence |
1999 |
6 | 33 | Snowmass Comprehensive Plan Invoice |
undated |
6 | 34 | Snowmass Mountain SPA Proposal/Contract |
2002 |
6 | 35 | Snowmass Mountain SPA Correspondence |
2002 |
6 | 36 | Snowmass Rodeo Property |
2000-2001 |
6 | 37 | Snowmass Lawsuit |
1996 |
6 | 38 | Snowmass Nature Center |
1998-1999 |
7 | 1 | General Admin/Minutes |
1993-1994 |
7 | 2 | Preliminary PUD and Plat Submission |
1980 |
7 | 3 | Request for Nationwide Permit |
1994 |
7 | 4 | Building L Stage Two PUD |
1983 |
7 | 5 | Building L PUD |
1984 |
7 | 6 | Building L Memos, Reports, Notes |
1982 |
7 | 7 | Club Villas III Specifications |
1984 |
7 | 8 | East Village Draft Nationwide Permit Request |
1992 |
7 | 9 | Snowmass Club PUD Parcel 4 |
undated |
7 | 10 | Ski Area Final SPA Plan |
undated |
7 | 11 | East Village PUD Development Plans Volume One |
undated |
7 | 12 | East Village PUD Support Documents Volume Two |
undated |
7 | 13 | East Village PUD |
1991 |
7 | 14 | Ski Area Specially Planned Area |
1993 |
7 | 15 | The Divide Lot Description Package |
undated |
7 | 16 | Meeting Minutes |
2001 |
7 | 17 | Storied Place Construction Observation |
2005 |
7 | 18 | Meeting Minutes |
1994 |
7 | 19 | Snowmass Transit Aspen Colo. |
1994 |
7 | 20 | Aspen Skiing Contracts |
2002 |
7 | 21 | Horse Ranch Physical |
1990 |
7 | 22 | Horse Ranch Permanent Housing |
1991-1994 |
7 | 23 | Horse Ranch Signage |
1991-1992 |
7 | 24 | Park Hydro |
1991 |
7 | 25 | Horse Ranch Phase Two Design Development |
1991 |
7 | 26 | Notes |
1990 |
7 | 27 | Horse Ranch Engineering |
1990 |
TUBES 70 tubes
|
1968-2005 | ||
tube | |||
1 | Conceptual plan Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | EIS Alternatives Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | Ski Area Burnt Mountain Physical location: CCA 8 Column 3, Row 3
|
undated | |
4 | The Divide caretaker unit, improvement plan, land use, character plan Physical location: CCA 8 Column 3, Row 3
|
undated | |
5 | The Divide grading, maintenance facility, section elevations, lot descriptions Physical location: CCA 8 Column 3, Row 3
|
undated | |
6 | The Divide Schematic Design, Parcel Plans, Sections, Floorplans, Water Storage Plans, Final Documents Physical location: CCA 8 Column 3, Row 3
|
undated | |
7 | Visual Simulation Physical location: CCA 8 Column 6, Row 1
|
undated | |
8 | Town of Snowmass Village Physical location: CCA 8 Column 6, Row 1
|
undated | |
9 | Town Center Physical location: CCA 8 Column 6, Row 1
|
undated | |
10 | Improvements Physical location: CCA 8 Column 6, Row 1
|
undated | |
11 | Base Village Parcel A Schematic Physical location: CCA 8 Column 6, Row 1
|
undated | |
12 | Base Maps, Site Grading, Existing conditions Physical location: CCA 8 Column 6, Row 2
|
undated | |
13 | Parcel A Schematics, Sections, Base Village Architecture schematic Physical location: CCA 8 Column 6, Row 2
|
undated | |
14 | Schematic design, image sheet Physical location: CCA 8 Column 6, Row 2
|
undated | |
15 | Maintenance Study Physical location: CCA 8 Column 6, Row 2
|
undated | |
16 | East Fork Physical location: CCA 8 Column 6, Row 2
|
undated | |
17 | Peter Alford snowmaking stuff Physical location: CCA 8 Column 6, Row 2
|
undated | |
18 | Parking Physical location: CCA 8 Column 6, Row 2
|
undated | |
19 | Maintenance Facility Physical location: CCA 8 Column 6, Row 2
|
undated | |
20 | Lotting summary, grading, irrigation schedule Physical location: CCA 8 Column 6, Row 3
|
undated | |
21 | The Divide topo and final site plan Physical location: CCA 8 Column 6, Row 3
|
undated | |
22 | The Divide concept plan Physical location: CCA 8 Column 6, Row 3
|
undated | |
23 | The Divide concept plan Physical location: CCA 8 Column 6, Row 3
|
undated | |
24 | Tennis Center Physical location: CCA 8 Column 6, Row 3
|
undated | |
25 | Zoning Master Plan Physical location: CCA 6 Column 1, Row 3
|
undated | |
26 | Misc. Village Physical location: CCA 8 Column 5, Row 3
|
undated | |
27 | Club Phase II Physical location: CCA 8 Column 5, Row 3
|
undated | |
28 | Rodeo Physical location: CCA 8 Column 5, Row 3
|
undated | |
29 | Improvements Physical location: CCA 8 Column 5, Row 3
|
undated | |
30 | Town Center Physical location: CCA 8 Column 5, Row 3
|
undated | |
31 | Base Area Physical location: CCA 8 Column 5, Row 3
|
undated | |
32 | Concept plans, grading, drainage Physical location: CCA 8 Column 5, Row 3
|
undated | |
33 | Rodeo Entry Master Plan Physical location: CCA 8 Column 5, Row 3
|
undated | |
34 | Conference Center Physical location: CCA 8 Column 5, Row 3
|
undated | |
35 | Parcel B Physical location: CCA 8 Column 6, Row 3
|
undated | |
36 | Ski Area Working Prints Physical location: CCA 8 Column 6, Row 3
|
undated | |
37 | The Draw Physical location: CCA 6 Column 2, Row 4
|
undated | |
38 | Sewer Physical location: Barn Box 2
|
undated | |
39 | Midstation Physical location: Barn Box 2
|
undated | |
40 | Club 2 Physical location: Barn Box 2
|
undated | |
41 | Plan Base Negatives and 1990 Study Physical location: Barn Box 1
|
undated | |
42 | Lift Number 4 Physical location: Barn Box 1
|
undated | |
43 | Summit Station Studies Physical location: Barn Box 1
|
undated | |
44 | The Draw Schematic Designs/Site Analysis Physical location: Barn Box 1
|
undated | |
45 | Interfaith Chapel Physical location: Barn Box 2
|
undated | |
46 | Graphics Mylar's and Films Physical location: Barn Box 1
|
undated | |
47 | Club 3 Physical location: Barn Box 2
|
undated | |
48 | Maintenance Facility Physical location: Barn Box 2
|
undated | |
49 | Conference Center Physical location: Barn Box 3
|
undated | |
50 | Club Phase II Construction Documents Physical location: Barn Box 3
|
undated | |
51 | Master Plan Physical location: Barn box 3
|
undated | |
52 | Phase 2 Construction Document Set Physical location: CCA 8 Column 4, Row 1
|
undated | |
53 | The Divide Physical location: CCA 8 Column 4, Row 1
|
undated | |
54 | Horse Ranch Marketing Pricing Physical location: CCA 8 Column 4, Row 2
|
undated | |
55 | Clubhouse Physical location: CCA 8 Column 4, Row 2
|
undated | |
56 | Burnt Mountain Physical location: CCA 8 Column 4, Row 1
|
undated | |
57 | Horse Ranch Finished Documents Physical location: CCA 8 Column 4, Row 2
|
undated | |
58 | Horse Ranch Physical location: CCA 8 Column 4, Row 2
|
undated | |
59 | Area Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
60 | Club Phase II Schematic Design Physical location: CCA 8 Column 4, Row 2
|
undated | |
61 | Phase II Schematic Design Illustrative Physical location: CCA 8 Column 4, Row 2
|
undated | |
62 | Preliminary Studies for Horse Ranch Physical location: CCA 8 Column 4, Row 2
|
undated | |
63 | Landscaping Physical location: CCA 8 Column 4, Row 2
|
undated | |
64 | Club and Lodge Physical location: CCA 8 Column 4, Row 2
|
undated | |
65 | Early Schematic Site Design Physical location: CCA 8 Column 4, Row 2
|
undated | |
66 | Horse Ranch Physical location: CCA 8 Column 4, Row 3
|
undated | |
67 | Horse Ranch Physical location: CCA 8 Column 4, Row 2
|
undated | |
68 | Horse Ranch Base Mylar's Physical location: CCA 8 Column 4, Row 2
|
undated | |
69 | Horse Ranch Bid Set Physical location: CCA 8 Column 4, Row 3
|
undated | |
70 | Horse Ranch Preliminary Concept Study Physical location: CCA 8 Column 4, Row 3
|
undated |
XC: XC: SMALL PROJECTS, 1981-2010Return to Top
Container(s) | Description | Dates | |
---|---|---|---|
Project 1: Allegheny World War II Memorial |
2002-2005 | ||
MANUSCRIPT MATERIALS |
2002-2005 | ||
Box | Folder | ||
1 | 1 | Competition Submission |
2002-2005 |
1 | 2 | Competition Correspondence |
2002-2003 |
1 | 3 | Proposals/Contracts |
2005 |
1 | 4 | Correspondence |
2005 |
1 | 5 | Cost Estimates |
2002-2005 |
Project 2: Mill Creek |
1994 | ||
MANUSCRIPT MATERIALS |
1994 | ||
Box | Folder | ||
1 | 6 | Community Benefits |
undated |
1 | 7 | Concept |
undated |
1 | 8 | Village Center |
1994 |
TUBES 3 tubes
|
|||
tube | |||
1 | Regional Park Design, Final Engineering, Rendered Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Early Master Plan Options CCA 8 Column 4, Row 2
|
undated | |
3 | Main Street CCA 8 Column 5, Row 3
|
undated | |
Project 3: Veteran's Memorial (Asheville, NC) |
2002-2005 | ||
MANUSCRIPT MATERIALS |
2002-2005 | ||
Box | Folder | ||
1 | 9 | Correspondence |
2002-2005 |
1 | 10 | Meeting Minutes |
2004 |
1 | 11 | Concept Estimate |
2004 May 5 |
1 | 12 | Design Sketches |
2005 |
TUBES |
|||
tube | |||
1 | Veterans Memorial Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Construction Documents Set Physical location: Barn Box 1
|
undated | |
3 | Cemetery Grand Junction Physical location: Barn Box 1
|
undated | |
4 | Cemetery Physical location: Barn Box 1
|
undated | |
5 | Cemetery Physical location: Barn Box 1
|
undated | |
6 | Cemetery Physical location: Barn Box 1
|
undated | |
7 | Cemetery Physical location: Barn Box 1
|
undated | |
8 | Cemetery Physical location: Barn Box 1
|
undated | |
9 | Cemetery Physical location: Barn Box 2
|
undated | |
Project 4: Aspen Airport |
1988-1998 | ||
MANUSCRIPT MATERIALS |
1988-1998 | ||
Box | Folder | ||
1 | 13 | Correspondence |
1988-1998 |
1 | 14 | Cost Estimates |
1988 |
TUBES |
|||
tube | |||
1 | FAA Tower Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | FBO Proposal Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 5: Colorado Rocky Mountain School |
1992-1994 | ||
MANUSCRIPT MATERIALS |
1992-1994 | ||
Box | Folder | ||
1 | 15 | Master Plan |
1993-1994 |
1 | 16 | Retreat |
1993 |
1 | 17 | Correspondence |
1990-1993 |
1 | 18 | Design Sketches/ Product Info |
1993 |
1 | 19 | Meeting Minutes |
1993 |
1 | 20 | Programing |
1992 |
TUBES |
|||
tube | |||
1 | Campus Inventory Phyiscal location: CCA 8 Column 4, Row 3
|
undated | |
2 | Topography Phyiscal location: CCA 8 Column 5, Row 2
|
undated | |
Project 6: Four Seasons Resort at Troon (California) |
1997-2002 | ||
MANUSCRIPT MATERIALS |
1997-2002 | ||
Box | Folder | ||
1 | 21 | Proposals/Contracts |
2001-2002 |
1 | 22 | Meeting Minutes |
1997 |
Project 7: Ogden Downtown |
2000-2002 | ||
MANUSCRIPT MATERIALS |
2000-2002 | ||
Box | Folder | ||
1 | 23 | Feasibility |
2002 |
1 | 24 | Summary of Market Investigation |
2002 |
1 | 25 | Correspondence |
2002 |
1 | 26 | Design Sketches |
2002 |
1 | 27 | Framework Study |
2001 |
1 | 28 | Notes to File |
2000 |
Project 8: Gray Ranch |
2005 | ||
MANUSCRIPT MATERIALS |
2005 | ||
Box | Folder | ||
1 | 29 | Proposals/Contracts |
2005 |
1 | 30 | Design Sketches |
undated |
1 | 31 | Concept Design |
2005 May 31 |
Project 9: Silver Triangle |
2005 | ||
MANUSCRIPT MATERIALS |
2005 | ||
Box | Folder | ||
1 | 32 | Framework Plan Final Draft |
2005 October |
1 | 33 | Framework Plan Final Draft |
2005 August |
Project 10: Cordillera |
1999 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 34 | Proposals/Contracts |
1999 |
1 | 35 | Correspondence |
1999 |
1 | 36 | Meeting Minutes/Notes to File |
1999 |
1 | 37 | Construction Documents |
undated |
1 | 38 | Design Sketches |
1999 |
TUBES |
|||
tube | |||
1 | Eagle Chase Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Blackhorse Physical location: Barn Box 6
|
undated | |
Project 11: Salmon Run Institute |
2000-2004 | ||
MANUSCRIPT MATERIALS |
2000-2004 | ||
Box | Folder | ||
1 | 39 | Proposals/Contracts |
2003-2004 |
1 | 40 | Correspondence |
2004 |
1 | 41 | Meeting Minutes/Notes to File |
2003-2004 |
1 | 42 | Cost Estimates |
2004 |
TUBES |
|||
tube | |||
1 | Sketches, Concept Plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
Project 12: Cove Ranch |
2004-2005 | ||
MANUSCRIPT MATERIALS |
2004-2005 | ||
Box | Folder | ||
1 | 43 | Proposals/Contracts |
2004-2005 |
1 | 44 | Meeting Minutes/Notes to File |
2004 |
1 | 45 | Correspondence |
2004 |
Project 13: Equipetrol Norte (Bolivia) |
1999-2000 | ||
MANUSCRIPT MATERIALS |
1999-2000 | ||
Box | Folder | ||
1 | 46 | Correspondence |
1999 |
1 | 47 | Notes to File |
undated |
1 | 48 | Brochure |
2000 |
Project 14: HILB Property |
1995 | ||
MANUSCRIPT MATERIALS |
1995 | ||
Box | Folder | ||
1 | 49 | Meeting Notes/Notes to File |
1995 |
TUBES |
1995 | ||
tube | |||
1 | Parcel Plan Alternative One Physical location: CCA 8 Column 4, Row 2
|
1995; undated | |
Project 15: Denver Union Terminal |
1988-1999 | ||
MANUSCRIPT MATERIALS |
1988-1999 | ||
Box | Folder | ||
1 | 50 | Correspondence |
1999 |
1 | 51 | Proposal/Contracts |
1999 |
1 | 52 | Land Use |
1988-1997 |
1 | 53 | Meeting Minutes |
1999 |
1 | 54 | Memorandum |
1991 |
1 | 55 | Rail Related Track Records |
undated |
Project 16: World Trade Center |
2003-2004 | ||
MANUSCRIPT MATERIALS |
2003-2004 | ||
Box | Folder | ||
1 | 56 | Construction Review |
2004 |
1 | 57 | Meeting Minutes |
2003-2004 |
1 | 58 | Plaza Renovation |
2003-2004 |
1 | 59 | Pricing |
2003 |
Project 17: Smith Residence |
2003 | ||
MANUSCRIPT MATERIALS |
2003 | ||
Box | Folder | ||
1 | 60 | Smith Residence Proposal/Contracts |
2003 |
TUBES |
|||
tube | |||
1 | Smith Residence Physical location: CCA 8 Column 6, Row 2
|
undated | |
Project 18: Casper |
1999 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 61 | Correspondence |
1999 |
1 | 62 | Transmittals |
1999 |
1 | 63 | Design Sketches |
undated |
1 | 64 | Programing |
1999 |
Project 19: Incline Village (Nevada) |
1999-2000 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 65 | Cost Estimates |
1999 |
1 | 66 | Cost Estimates |
2000 |
1 | 67 | Design Sketches |
2000 |
1 | 68 | Feasibility |
1999 |
1 | 69 | Recreation Facilities Master Plan |
1999 May |
1 | 70 | Proposals/Contracts |
1999 |
1 | 71 | Correspondence |
1999-2000 |
1 | 72 | Meeting Minutes/Notes to File |
1999 |
1 | 73 | Assessment Report |
1999 |
Project 20: Pole Residence |
1999-2001 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 74 | Proposals/Contracts |
1999-2001 |
1 | 75 | Correspondence |
1999-2001 |
1 | 76 | Meeting Minutes/Notes to File |
2000 |
Project 21: Hotel Jerome |
1986 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 77 | Specification Report |
1986 October 21 |
TUBES |
|||
tube | |||
1 | Design Development Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Early Studies Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | C.D. Slicks Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 22: Kyungsan |
1997-1998 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
1 | 78 | Conceptual Master Plan |
1998 |
1 | 79 | Kyungsan Notes |
1997-1998 |
TUBES |
|||
tube | |||
1 | Competition Physical location: CCA 6 Column 1, Row 6
|
undated | |
Project 23: Edgemont Highlands |
2004-2006 | ||
MANUSCRIPT MATERIALS |
2004-2006 | ||
Box | Folder | ||
2 | 1 | Proposals/Contracts |
2005 |
2 | 2 | Meeting Agendas & Minutes |
2004 |
2 | 3 | Correspondence |
2004-2006 |
2 | 4 | Market Analysis |
2005 February 3 |
TUBES |
|||
tube | |||
1 | Conceptual Master Plan Physical location: CCA 6 Column 1, Row 1
|
undated | |
Project 24: Buckeye |
2004 | ||
MANUSCRIPT MATERIALS |
2004 | ||
Box | Folder | ||
2 | 5 | Proposals/Contracts |
2004 |
2 | 6 | Meeting Agendas & Minutes |
2004 |
Project 25: Aspen Ritz Carlton |
1988-1992 | ||
MANUSCRIPT MATERIALS |
1988-1992 | ||
Box | Folder | ||
2 | 7 | Field Reports |
1990 |
2 | 8 | Proposals/Contracts |
1989-1991 |
2 | 9 | Design Sketches |
1988-1991 |
2 | 10 | Meeting Minutes/Notes to File |
1990-1991 |
2 | 11 | Schedule |
1989 |
2 | 12 | Correspondence |
1988-1989 |
2 | 13 | Correspondence |
1990 |
2 | 14 | Correspondence |
1990 |
2 | 15 | Correspondence |
1990 |
2 | 16 | Correspondence |
1990 |
2 | 17 | Correspondence |
1991 |
2 | 18 | Correspondence |
1991 |
2 | 19 | Correspondence |
1992 |
2 | 20 | Correspondence |
1992 |
2 | 21 | Correspondence |
1992 |
2 | 22 | Schematic Design Details |
undated |
2 | 23 | Schematic Design Specifications |
undated |
2 | 24 | Schematic Design Details |
undated |
TUBES |
|||
tube | |||
1 | Construction Documents Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Details, Planting Schedule, Schematic Sketches, Mylar, Originals Physical location: CCA 6 Column 1, Row 3
|
undated | |
3 | Original Mylar's Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Site Plan Physical location: CCA 6 Column 1, Row 4
|
undated | |
5 | Phase 1 Physical location: CCA 8 Column 5, Row 1
|
1991-1992; undated | |
6 | Details Physical location: CCA 8 Column 5, Row 1
|
undated | |
7 | Spa Grotto Physical location: CCA 8 Column 5, Row 3
|
undated | |
8 | Illustrative Physical location: Barn Box 14
|
undated | |
9 | Illustrative Physical location: Barn Box 14
|
undated | |
10 | Renderings Design Studies Physical location: Barn Box 14
|
undated | |
11 | Illustrative Physical location: Barn Box 15
|
undated | |
12 | Hotel Physical location: Barn Box 15
|
undated | |
Project 26: Silver Bow Greenway (Montana) |
1995 | ||
MANUSCRIPT MATERIALS |
1995 | ||
Box | Folder | ||
2 | 25 | Proposals/Contracts |
1995 |
2 | 26 | Meeting Minutes/Notes to File |
1995 |
2 | 27 | Work Program |
1995 |
TUBES |
|||
tube | |||
1 | Miscellaneous Physical location: CCA 8 Column 5, Row 2
|
undated | |
2 | Greenway Physical location: Barn Box 8
|
undated | |
3 | Greenway Physical location: Barn Box 8
|
undated | |
4 | Greenway Physical location: Barn Box 8
|
undated | |
5 | Greenway Concept Physical location: Barn Box 8
|
undated | |
6 | Miscellaneous Physical location: Barn Box 8
|
undated | |
Project 27: Shawnigan Lake School |
1995-1996 | ||
MANUSCRIPT MATERIALS |
1995-1996 | ||
Box | Folder | ||
2 | 28 | Proposals/Contracts |
1995-1996 |
2 | 29 | Correspondence/Owner |
1995-1996 |
2 | 30 | Correspondence/Consultant |
1995 |
2 | 31 | Converstation Record |
1996 |
2 | 32 | Meeting Minutes |
1995 |
2 | 33 | Notes to File |
1995 |
2 | 34 | Design Guidelines |
1995 |
2 | 35 | Design Plans |
1995 |
2 | 36 | Design Plans |
1995 |
2 | 37 | Master Plan |
1995 December 30 |
MANUSCRIPT MATERIALS |
|||
tube | |||
1 | Illustrative Master Plan Physical location: CCA 6 Column 1, Row 6
|
undated | |
2 | Concept Master Plan Physical location: CCA 6 Column 1, Row 6
|
undated | |
Project 28: Boot Jack Ranch |
1990-1996 | ||
MANUSCRIPT MATERIALS |
1990-1996 | ||
Box | Folder | ||
2 | 38 | Proposal/Contracts |
1990-1991 |
2 | 39 | Proposals/Contracts |
1995-1996 |
2 | 40 | Correspondence |
1991-1996 |
2 | 41 | Meeting Minutes |
1990-1996 |
2 | 42 | Work Program |
undated |
2 | 43 | Programming |
1995-1996 |
2 | 44 | Engineering |
1995 |
2 | 45 | Cost Estimates |
1995 |
2 | 46 | Design Sketches |
1990 |
2 | 47 | Specs |
1990 |
2 | 48 | Engingeering Report |
1996 |
Project 29: Las Campanas (Santa Fe) |
1991-1995 | ||
MANUSCRIPT MATERIALS |
1991-1995 | ||
Box | Folder | ||
2 | 49 | Notes to File |
1993-1994 |
2 | 50 | Plant Lists |
1995 |
2 | 51 | Design Sketches |
1993-1994 |
2 | 52 | Landscape Guidelines |
undated |
2 | 53 | Correspondence |
1991-1993 |
2 | 54 | Correspondence |
1994 |
2 | 55 | Correspondence |
1994 |
2 | 56 | Correspondence |
1995 |
2 | 57 | Proposal/Contracts |
1993 |
2 | 58 | Cost Estimates |
1993 |
TUBES |
|||
tube | |||
1 | Commercial Center Physical location: CCA 6 Column 1, Row 7
|
undated | |
2 | Base Maps Physical location: CCA 6 Column 1, Row 7
|
undated | |
3 | Walter Residence Physical location: CCA 6 Column 1, Row 9
|
undated | |
Project 30: White Pine Canyon (Park City) |
2000 | ||
MANUSCRIPT MATERIALS |
2000 | ||
Box | Folder | ||
2 | 59 | Correspondence |
2000 |
2 | 60 | Vegetation |
undated |
2 | 61 | Sketches |
2000 |
2 | 62 | Preliminary Sketch Plan |
undated |
TUBES |
|||
tube | |||
1 | Entry Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Proposed Master Plan, Site Analysis, Mylar Sections, Study Diagrams, Sketches, Grading Physical location: Barn Box 2
|
undated | |
3 | Analysis and Base maps Physical location: CCA 8 Column 5, Row 2
|
undated | |
4 | Site Analysis, Grading, Sketches, Conceptual Design, Existing Conditions, Sections Physical location: CCA 8 Column 5, Row 3
|
undated | |
Project 31: Fox Run |
1985 | ||
MANUSCRIPT MATERIALS |
1985 | ||
Box | Folder | ||
2 | 63 | Stage Three Submission |
1985 February 20 |
2 | 64 | Stage Four Submission |
1985 April 30 |
TUBES |
|||
tube | |||
1 | Construction Print Set Physical location: CCA 6 Column 1, Row 2
|
undated | |
Project 32: Holeson Hill |
1991 | ||
MANUSCRIPT MATERIALS |
1991 | ||
Box | Folder | ||
2 | 65 | Proposals/Contracts |
1991 |
2 | 66 | Notes to File |
undated |
2 | 67 | Skteches |
undated |
Project 33: Buffington Harbor |
1995 | ||
MANUSCRIPT MATERIALS |
1995 | ||
Box | Folder | ||
2 | 68 | Report |
1995 November 30 |
TUBES |
|||
tube | |||
1 | Grading and Layout Physical location: CCA 6 Column 1, Row 4
|
undated | |
2 | CD Prints, Sketches Physical location: CCA 8 Column 5, Row 1
|
undated | |
3 | Design Development Prints Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Joyce sketches, details, perspectives, diagrams Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | New Composites Physical location: Barn Box 15
|
undated | |
Project 34: San Luis Valley |
1996 | ||
MANUSCRIPT MATERIALS |
1996 | ||
Box | Folder | ||
2 | 69 | Proposals/Contracts |
1996 |
Project 35: Porter Residence |
1996-1998 | ||
MANUSCRIPT MATERIALS |
1996-1998 | ||
Box | Folder | ||
3 | 1 | Construction Proposals |
1998 |
3 | 2 | Correspondence - Consultant |
1997 |
3 | 3 | Correspondence - Owner |
1997-1998 |
3 | 4 | Correspondence |
1994 |
3 | 5 | Correspondence |
1994 |
3 | 6 | Correspondence |
1994 |
3 | 7 | Correspondence |
1995 |
3 | 8 | Correspondence |
1995 |
3 | 9 | Correspondence |
1995 |
3 | 10 | Correspondence |
1995 |
3 | 11 | Correspondence |
1995 |
3 | 12 | Design Sketches/Product Info |
1997-1998 |
3 | 13 | Meeting Notes |
1998 |
3 | 14 | Transmittals |
1996 |
3 | 15 | Construction Specifications |
1994 March 18 |
3 | 16 | Wetlands Maintenance |
1995 January 28 |
Project 36: 7th & Main (Aspen) |
1999-2001 | ||
MANUSCRIPT MATERIALS |
1999-2001 | ||
Box | Folder | ||
3 | 17 | Proposals/Contracts |
1999 |
3 | 18 | Design Sketches |
1999-2000 |
3 | 19 | Correspondence |
1999-2001 |
3 | 20 | Conceptual Application |
1999-2001 |
TUBES |
1999-2000 | ||
tube | |||
1 | Final Drawings Physical location: CCA 8 Column 6, Row 1
|
1999-2000; undated | |
Project 37: Airport Boulevard (Denver) |
1988-1990 | ||
MANUSCRIPT MATERIALS |
1988-1990 | ||
Box | Folder | ||
3 | 21 | Proposals/Contracts |
1988-1990 |
3 | 22 | Work Program |
1990 |
3 | 23 | Design Sketches |
1999 |
3 | 24 | Correspondence |
1988 |
3 | 25 | Cost Estimates |
1988 |
3 | 26 | Notes to File |
undated |
3 | 27 | Qualifications Statement |
1988 June 15 |
3 | 28 | Character Study Text |
1990 |
Project 38: Aurora City Center |
1998 | ||
MANUSCRIPT MATERIALS |
1998 | ||
Box | Folder | ||
3 | 29 | Correspondence |
1998 |
TUBES |
|||
tube | |||
1 | Illustrative Plan Physical location: CCA 6 Column 1, Row 1
|
undated | |
Project 39: Adam's Ranch |
1984 | ||
MANUSCRIPT MATERIALS |
1984 | ||
Box | Folder | ||
3 | 30 | Site Characteristics |
1984 |
Project 40: Anderson Ranch |
1982-1987 | ||
MANUSCRIPT MATERIALS |
1982-1987 | ||
Box | Folder | ||
3 | 31 | Proposal, Design Sketches |
1982-1987 |
TUBES |
|||
tube | |||
1 | Land Use CCA 8 Column 5, Row 3
|
undated | |
2 | Arts Center Dorm Housing CCA 8 Column 5, Row 2
|
undated | |
Project 41: Angel Fire (New Mexico) |
1985-1996 | ||
MANUSCRIPT MATERIALS |
1985-1996 | ||
Box | Folder | ||
3 | 32 | Proposals/Contracts |
1990-1996 |
3 | 33 | Correspondence/Owner |
1990 |
3 | 34 | Correspondence/Consultant |
1996 |
3 | 35 | Correspondence |
1985-1986 |
3 | 36 | Correspondence |
1986-1987 |
3 | 37 | Converstation Record |
1996 |
3 | 38 | Transmittals |
1996 |
3 | 39 | Work Program |
1990 |
3 | 40 | Meeting Minutes/Notes to File |
1990-1996 |
3 | 41 | Cost Estimates |
1990-1995 |
3 | 42 | Design Sketches |
1996 |
3 | 43 | Programming |
1990 |
3 | 44 | Master Plan |
1987 |
3 | 45 | Plant Lists/Design Guidelines |
1998 |
Project 42: Marolt Ranch |
1989-1991 | ||
MANUSCRIPT MATERIALS |
1989-1991 | ||
Box | Folder | ||
3 | 46 | Correspondence |
1989-1991 |
3 | 47 | Meeting Minutes/Notes to File |
1989-1990 |
3 | 48 | Engineering |
1989-1990 |
3 | 49 | Proposals/Contracts |
1989 |
3 | 50 | Proposals/Contracts |
1990 |
3 | 51 | Design Sketches |
1989-1990 |
3 | 52 | Addendum |
1989-1990 |
3 | 53 | Planning and Design Study |
1988 June |
3 | 54 | PUD Application |
1989 December 29 |
TUBES |
1989 | ||
tube | |||
1 | Student internship Physical location: CCA 8 Column 6, Row 2
|
1989; undated | |
2 | RTad studies, grading and drainage plan cds, site analysis, visual & design analysis Physical location: Barn Box 12
|
undated | |
3 | Mylar's Physical location: Barn Box 12
|
undated | |
4 | Details, development map, interview, graphics Physical location: Barn Box 12
|
undated | |
Project 43: Sunday River |
1998-1999 | ||
MANUSCRIPT MATERIALS |
1998-1999 | ||
Box | Folder | ||
4 | 1 | Development Plan |
1999 |
4 | 2 | Jordan Bowl |
1998 |
4 | 3 | Programming |
1998-1999 |
4 | 4 | Proposal/Contracts |
1998-1999 |
4 | 5 | Meeting Minutes/Notes to File |
1998 |
4 | 6 | Design Sketches |
undated |
TUBES |
|||
tube | |||
1 | Jordan Bowl Physical location: CCA 8 Column 5, Row 2
|
undated | |
2 | Jordan Bowl Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Design Development Jordan Bowl Physical location: CCA 8 Column 5, Row 2
|
undated | |
4 | Village plan, schematic design, design development, original perspectives, prints, grading Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Design Brief Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 44: Kanozan (Japan) |
1989 | ||
MANUSCRIPT MATERIALS |
1989 | ||
Box | Folder | ||
4 | 7 | Written Statement |
1989 February 1 |
4 | 8 | Biological/Plant List |
undated |
TUBES |
|||
tube | |||
1 | Mylar's Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Presentation Prints Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 45: 7th Street Esplanade (Glenwood Springs, CO) |
1983-1984 | ||
MANUSCRIPT MATERIALS |
1983-1984 | ||
Box | Folder | ||
4 | 9 | Conceptual Design |
1983 |
4 | 10 | Correspondence |
1983-1984 |
Project 46: Alemeda & Federal (Englewood, CO) |
1992-1993 | ||
MANUSCRIPT MATERIALS |
1992-1993 | ||
Box | Folder | ||
4 | 11 | Proposals/Contracts |
1993 |
4 | 12 | Correspondence |
1992 |
4 | 13 | Meeting Minutes/Notes to File |
undated |
4 | 14 | Cost Estimates |
1992 |
TUBES |
|||
tube | |||
1 | Base Mylar's Physical location: CCA 8 Column 6, Row 2
|
undated | |
Project 47: Wexner Residence |
1984-1992 | ||
MANUSCRIPT MATERIALS |
1984-1992 | ||
Box | Folder | ||
4 | 15 | Correspondence |
1984-1989 |
4 | 16 | Correspondence |
1990 |
4 | 17 | Correspondence |
1991-1992 |
4 | 18 | Specification |
1986 July 24 |
4 | 19 | Specification |
1991 May 8 |
4 | 20 | Landscape Maintenance Manual |
1989 |
TUBES |
|||
tube | |||
1 | CD Slicks Physical location: Barn Box 13
|
undated | |
2 | First Originals Physical location: Barn Box 13
|
undated | |
3 | Illustrative Physical location: Barn Box 13
|
undated | |
4 | Design Development Process Drawings Physical location: Barn Box 13
|
undated | |
5 | Design Studies and Prints Physical location: Barn Box 16
|
undated | |
6 | Planting and Revegetation Physical location: Barn Box 16
|
undated | |
Project 48: Goodyear City Center |
1999-2003 | ||
MANUSCRIPT MATERIALS |
1999-2003 | ||
Box | Folder | ||
4 | 21 | Proposal/Contracts |
1999-2000 |
4 | 22 | Proposal/Contracts |
2001-2003 |
4 | 23 | Invoices/Billings |
2000 |
4 | 24 | Invoices/Billings |
2001-2002 |
4 | 25 | Correspondence |
2000 |
4 | 26 | Notes to File |
2000-2003 |
4 | 27 | Design Sketches |
2000-2003 |
4 | 28 | Design Development |
2003 |
4 | 29 | Environmental |
2000 |
4 | 30 | Project Schedules |
2000-2003 |
Project 49: Skyline Park (Denver) |
1997-2000 | ||
MANUSCRIPT MATERIALS |
1997-2000 | ||
Box | Folder | ||
4 | 31 | Correspondence |
1998-2000 |
4 | 32 | Notes to File |
2000 |
4 | 33 | Master Plan |
1997 September |
TUBES |
1997-2000 | ||
tube | |||
1 | Master Plan Project Physical location: CCA 8 Column 6, Row 1
|
1997-2000 | |
2 | Submittals Physical location: CCA 8 Column 4, Row 3
|
undated | |
3 | Park Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | Park Physical location: CCA 6 Column 1, Row 4
|
undated | |
5 | Planting and Playground Physical location: CCA 8 Column 5, Row 1
|
undated | |
6 | Base Materials Physical location: CCA 8 Column 5, Row 2
|
undated | |
7 | Lawrence Halprin Original Prints Physical location: CCA 8 Column 5, Row 2
|
undated | |
8 | Presentation Exhibits Physical location: CCA 8 Column 5, Row 2
|
undated | |
9 | Design Sketches Physical location: CCA 8 Column 5, Row 2
|
undated | |
10 | Park Physical location: Barn Box 15
|
undated | |
Project 50: Tessler Residence |
2001-2003 | ||
MANUSCRIPT MATERIALS |
2001-2003 | ||
Box | Folder | ||
4 | 34 | Correspondence |
2001-2003 |
TUBES |
|||
tube | |||
1 | Lot 16 Bar B Bar Physical location: CCA 8 Column 6, Row 2
|
undated | |
Project 51: Starr Pass |
2001-2003 | ||
MANUSCRIPT MATERIALS |
2001-2003 | ||
Box | Folder | ||
4 | 35 | Rezoning Application |
1992 June 4 |
4 | 36 | Rezoning Application |
1992 June 4 |
4 | 37 | Design Sketches |
undated |
Project 52: Getz Residence |
1987 | ||
MANUSCRIPT MATERIALS |
1987 | ||
Box | Folder | ||
4 | 38 | Specifications |
1987 |
TUBES |
|||
tube | |||
1 | Survey and Architectural Info Physical location: Barn Box 2
|
undated | |
2 | Preliminary Site Plan Physical location: Barn Box 3
|
undated | |
Project 53: Little Nell Hotel |
1983-1986 | ||
MANUSCRIPT MATERIALS |
1983-1986 | ||
Box | Folder | ||
4 | 39 | Growth Management Submission |
1986 August |
4 | 40 | Report |
1983-1986 |
4 | 41 | Report |
1983-1986 |
TUBES |
|||
tube | |||
1 | Courtyard Remodel Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Trellis Physical location: CCA 8 Column 5, Row 1
|
undated | |
3 | Phase I Design Development/Study Diagram/Base Maps/Grading Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Base Development Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | Construction Documents Originals Physical location: Barn Box 7
|
undated | |
6 | Construction Documents Physical location: Barn Box 7
|
undated | |
7 | Design Analysis Studies Physical location: Barn Box 7
|
undated | |
8 | Plan Illustrative Physical location: Barn Box 7
|
undated | |
9 | Schematic Design Physical location: Barn Box 7
|
undated | |
10 | Design Development Physical location: Barn Box 7
|
undated | |
11 | Monograph Physical location: Barn Box 16
|
undated | |
12 | Phase 1 Grading Plan Physical location: Barn Box 16
|
undated | |
Project 54: Santa Fe Community College |
1997-2001 | ||
MANUSCRIPT MATERIALS |
1997-2001 | ||
Box | Folder | ||
4 | 42 | Proposals/Contracts |
1997-1999 |
4 | 43 | Correspondence |
1999-2001 |
4 | 44 | Meeting Minutes |
2001 |
TUBES |
|||
tube | |||
1 | Development Plan Physical location: CCA 6 Column 2, Row 4
|
undated | |
Project 55: Bachelor Gulch |
1996-1999 | ||
MANUSCRIPT MATERIALS |
1997-2001 | ||
Box | Folder | ||
5 | 1 | Proposals/Contracts |
1999 |
5 | 2 | Correspondence |
1997-1999 |
5 | 3 | Meeting Minutes/Notes to File |
1997 |
5 | 4 | Cost Estimates |
1997 |
5 | 5 | Biological |
undated |
5 | 6 | Design Sketches/Product Information |
1997-1999 |
5 | 7 | Hotel/Spa Proposals/Contracts |
1999 |
5 | 8 | Hotel/Spa Correspondence |
1999 |
5 | 9 | Hotel/Spa Notes to File |
1999 |
5 | 10 | Hotel/Spa Design Sketches |
1999 |
5 | 11 | Project Manual |
1996 |
TUBES |
|||
tube | |||
1 | Bachelor Gulch Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Elevation of Entrance Road and Hotel Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Lodge and Spa Physical location: CCA 8 Column 5, Row 2
|
undated | |
4 | Entrance Road and Hotel Elevation Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 56: Wolf Creek Valley |
1984 | ||
MANUSCRIPT MATERIALS |
1984 | ||
Box | Folder | ||
5 | 12 | Planning Criteria and Program |
1983 August 9 |
5 | 13 | PUD Submission |
1984 May 29 |
5 | 14 | PUD Submission |
1984 May 29 |
TUBES |
|||
tube | |||
1 | Inventory Design Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 57: Burnt Mountain |
1981-1982 | ||
MANUSCRIPT MATERIALS |
1984 | ||
Box | Folder | ||
5 | 15 | Visual Analysis |
1982 November |
5 | 16 | Consultant Reports |
1981 |
5 | 17 | Consultant Reports |
1981 |
Project 58: Castle Rock |
1982-2000 | ||
MANUSCRIPT MATERIALS |
1982-2000 | ||
Box | Folder | ||
5 | 18 | Land Use Master Plan |
1982 July |
5 | 19 | Meeting Minutes/Notes to File |
1999 |
5 | 20 | Correspondence |
1997-2000 |
5 | 21 | Design Sketches |
undated |
5 | 22 | Townhomes Master Plan |
1999 August |
TUBES |
|||
tube | |||
1 | Presentation Mylar's Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | The Village Preliminary Land Use Studies Physical location: CCA 8 Column 4, Row 1
|
undated | |
3 | The Village Land Use Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | The Village Original Topography Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | The Villages Physical location: CCA 8 Column 4, Row 3
|
undated | |
6 | The Village Memmem Young Physical location: CCA 8 Column 4, Row 2
|
undated | |
7 | Master Plan Preliminary Studies Physical location: CCA 8 Column 5, Row 2
|
undated | |
8 | Final Master Plan Doc Physical location: CCA 8 Column 5, Row 2
|
undated | |
9 | Master Plan Preliminary Presentation Physical location: CCA 8 Column 5, Row 2
|
undated | |
10 | Master Plan Site Inventory Info Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 59: Red Mesa |
1987 | ||
MANUSCRIPT MATERIALS |
1987 | ||
Box | Folder | ||
5 | 23 | Visual Analysis |
undated |
5 | 24 | Supporting Documentation/Site Analysis |
1987 |
5 | 25 | Supporting Documentation/Site Analysis |
1987 |
5 | 26 | Supporting Documentation/Site Analysis |
1987 |
Project 60: Dead Horse |
1987 | ||
MANUSCRIPT MATERIALS |
1987 | ||
Box | Folder | ||
5 | 27 | Visual Impact Study |
1987 October |
TUBES |
|||
tube | |||
1 | Snake River Ranch Physical location: CCA 8 Column 5, Row 2
|
undated | |
2 | Snake River Ranch Physical location: Barn Box 9
|
undated | |
3 | Mapping Analysis Physical location: Barn Box 15
|
undated | |
Project 61: Grand Junction Parks |
1993 | ||
MANUSCRIPT MATERIALS |
1993 | ||
Box | Folder | ||
5 | 28 | Proposals/Contracts |
1991-1993 |
5 | 29 | Correspondence |
1991-1993 |
5 | 30 | Summary Priority Recommendations |
1992 September |
5 | 31 | Master Plan Volume 1 |
1993 |
5 | 32 | Master Plan Volume 2 |
1993 |
5 | 33 | Master Plan Volume 3 |
1993 |
5 | 34 | Master Plan Appendix |
1993 |
5 | 35 | Open Space Master Plan Volume 1 |
1993 |
TUBES |
|||
tube | |||
1 | Open Space Master Plan Physical location: CCA 6 Column 2, Row 6
|
undated | |
Project 62: Temixco |
2008 | ||
MANUSCRIPT MATERIALS |
2008 | ||
Box | Folder | ||
5 | 36 | Proposals/Contracts |
2008 |
TUBES |
|||
tube | |||
1 | Open Space Physical location: CCA 6 Column 1, Row 1
|
undated | |
Project 63: Furnace Creek Ranch |
1996-1997 | ||
MANUSCRIPT MATERIALS |
1996-1997 | ||
Box | Folder | ||
5 | 37 | Correspondence |
1996-1997 |
Project 64: Gary Property |
1991-1993 | ||
MANUSCRIPT MATERIALS |
1991-1993 | ||
Box | Folder | ||
5 | 38 | Proposals/Contracts |
1991-1993 |
5 | 39 | Correspondence |
1991-1993 |
5 | 40 | Meeting Minutes/Notes to File |
1991 |
TUBES |
|||
tube | |||
1 | Water Service Areas Phyiscial location: CCA 6 Column 2, Row 6
|
undated | |
2 | Bond Utility Maps Phyiscial location: CCA 6 Column 2, Row 6
|
undated | |
3 | Master Plan Entry Design Phyiscial location: CCA 6 Column 2, Row 7
|
undated | |
4 | Firing Range Phyiscial location: CCA 6 Column 2, Row 6
|
undated | |
5 | Prints and Sketches Phyiscial location: Barn Box 3
|
||
Project 65: CS Ranch |
1996 | ||
MANUSCRIPT MATERIALS |
1996 | ||
Box | Folder | ||
5 | 41 | Design Sketches |
1996 |
TUBES |
|||
tube | |||
1 | Proposals Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | Final Design Physical location: CCA 8 Column 5, Row 1
|
undated | |
3 | Angel Fire Concept Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
4 | Angel Fire Concept Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Angel Fire Concept Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
6 | Angel Fire Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 66: Nuevo Centro Urbano Morelos |
2009 | ||
MANUSCRIPT MATERIALS |
2009 | ||
Box | Folder | ||
5 | 42 | Analysis and Planning |
2009 |
Project 67: Sierra Sunset |
2009 | ||
MANUSCRIPT MATERIALS |
2009 | ||
Box | Folder | ||
6 | 1 | Visual Analysis |
2002 |
6 | 2 | Correspondence |
2002-2004 |
6 | 3 | Design Sketches |
2002 |
Project 68: Seven Falls |
2007 | ||
MANUSCRIPT MATERIALS |
2007 | ||
Box | Folder | ||
6 | 4 | Proposals/Contracts |
2007 |
Project 69: Trout Creek |
2006-2007 | ||
MANUSCRIPT MATERIALS |
2006-2007 | ||
Box | Folder | ||
6 | 5 | Proposals/Contracts |
2006-2007 |
6 | 6 | Correspondence |
2006-2007 |
TUBES |
2007 | ||
tube | |||
1 | Visual Sensitivity Physical location: Barn Box 4
|
2007 | |
Project 70: Boston Ranch |
2004 | ||
MANUSCRIPT MATERIALS |
2004 | ||
Box | Folder | ||
6 | 7 | Cultural Resource Report |
2004 January |
6 | 8 | Market Assessment |
2004 November |
6 | 9 | Charette |
2004 |
6 | 10 | Study of Development |
2004 |
TUBES |
|||
tube | |||
1 | Conceptual Designs Physical location: CCA 6 Column 1, Row 7
|
undated | |
Project 71: Cornerstone Ranch |
2003-2008 | ||
MANUSCRIPT MATERIALS |
2003-2008 | ||
Box | Folder | ||
6 | 11 | Proposals/Contracts |
2003-2008 |
Project 72: St. Albans |
1992-1993 | ||
MANUSCRIPT MATERIALS |
1992-1993 | ||
Box | Folder | ||
6 | 12 | Design Guidelines |
1993 June |
6 | 13 | Documentation Graphics |
1992 |
6 | 14 | Design Sketches |
1992 |
6 | 15 | Proposals/Contracts |
1992 |
6 | 16 | Meeting Minutes/Notes to File |
1992 |
6 | 17 | Image Notebook |
undated |
6 | 18 | Correspondence |
1992 |
6 | 19 | Correspondence |
1992 |
6 | 20 | Correspondence |
1992 |
TUBES |
|||
tube | |||
1 | Master Plan Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Regional Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 73: Sunrise Resort |
1990 | ||
MANUSCRIPT MATERIALS |
1990 | ||
Box | Folder | ||
6 | 21 | Master Plan |
1990 December 21 |
Project 74: Ucross Ranch (Wyoming) |
1994 | ||
MANUSCRIPT MATERIALS |
1994 | ||
Box | Folder | ||
6 | 22 | Master Plan |
1994 June 14 |
Project 75: Urschel Property |
1991-1992 | ||
MANUSCRIPT MATERIALS |
1991-1992 | ||
Box | Folder | ||
6 | 23 | General Submission for Rezoning |
1992 June 1 |
6 | 24 | Proposals/Contracts |
1991 |
6 | 25 | Correspondence |
1991-1992 |
6 | 26 | Physical |
1992 |
6 | 27 | Engineering |
1992 |
Project 76: Lobo Ranch |
2006 | ||
MANUSCRIPT MATERIALS |
2006 | ||
Box | Folder | ||
6 | 28 | Proposals/Contracts |
2006 |
6 | 29 | Executive Summary |
undated |
TUBES |
|||
tube | |||
1 | Entry Sequence Physical location: CCA 6 Column 2, Row 5
|
undated | |
Project 77: Legacy |
2000-2003 | ||
MANUSCRIPT MATERIALS |
2000-2003 | ||
Box | Folder | ||
6 | 30 | Proposals/Contracts |
2000-2001 |
6 | 31 | Correspondence |
2001-2002 |
6 | 32 | Meeting Minutes/Notes to File |
2000-2003 |
6 | 33 | Design Sketches |
2001-2002 |
6 | 34 | Operations & Maintenance Manual |
2002 November 13 |
TUBES |
|||
Plaza Physical location: CCA 8 Column 5, Row 3
|
undated | ||
Project 78: Kapyung Four Seasons Resort (Korea) |
2000-2003 | ||
MANUSCRIPT MATERIALS |
2000-2003 | ||
Box | Folder | ||
6 | 35 | Meeting Minutes/Notes to File |
1997 |
6 | 36 | General Administration |
1997-1998 |
6 | 37 | Proposals/Contracts |
1996 |
TUBES |
|||
tube | |||
1 | Site Analysis Physical location: CCA 8 Column 6, Row 1
|
undated | |
Project 79: Lake Arrowhead |
1984-1985 | ||
MANUSCRIPT MATERIALS |
1984-1985 | ||
Box | Folder | ||
6 | 38 | Correspondence |
1984-1985 |
Project 80: Johnson Residence (Wildcat) |
1995-1997 | ||
MANUSCRIPT MATERIALS |
1995-1997 | ||
Box | Folder | ||
6 | 39 | Proposals/Contracts |
1995 |
6 | 40 | Correspondence |
1996 |
6 | 41 | Cost Estimates |
1997 |
6 | 42 | Construction Bids/Proposals |
1995 |
TUBES |
|||
tube | |||
1 | The Landscape Base Drawings Physical location: CCA 6 Column 2, Row 4
|
||
2 | Phase I Slicks Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Drawings Physical location: CCA 8 Column 4, Row 3
|
undated | |
4 | Schematic Landscape Design Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Electrical CDs, Schematic Landscape Design, Original Pool-Patio-Lawn Section, Garden Expansion Physical location: CCA 8 Column 5, Row 2
|
undated | |
6 | Preliminary CD with Redline Notes Physical location: CCA 8 Column 4, Row 3
|
undated | |
Project 81: Chang An Center |
2003 | ||
MANUSCRIPT MATERIALS |
2003 | ||
Box | Folder | ||
6 | 43 | Proposals/Contracts |
2003 |
TUBES |
2003 | ||
tube | |||
1 | Chang An Center Physical location: CCA 8 Column 6, Row 1
|
2003 | |
Project 82: Lakeside (British Columbia) |
2005 | ||
MANUSCRIPT MATERIALS |
2005 | ||
Box | Folder | ||
6 | 44 | Envisioning Session |
2005 |
TUBES |
|||
tube | |||
1 | Deer Valley Physical location: CCA 6 Column 1, Row 3
|
undated | |
2 | Inn Signage/Visual Analysis Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 83: Guapilo New Town |
1995-2005 | ||
MANUSCRIPT MATERIALS
Some documents in Spanish
|
1995-2005 | ||
Box | Folder | ||
6 | 45 | Proposals/Contracts |
1996-2005 |
6 | 46 | Conceptual Plan |
2005 |
6 | 47 | Design Sketches |
2005 |
6 | 48 | Programming |
1995 |
6 | 49 | Report
[In Spanish]
|
undated |
TUBES |
|||
tube | |||
1 | Guapilo II (Campos Del Este) #3485, project and charrette archive drawings Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Mylar's Base Drawings Physical location: CCA 6 Column 2, Row 6
|
undated | |
3 | Large Format negatives Physical location: CCA 6 Column 2, Row 7
|
undated | |
Project 84: Goodman Residence |
2007 | ||
MANUSCRIPT MATERIALS |
2007 | ||
Box | Folder | ||
6 | 50 | Proposals/Contracts |
2007 |
TUBES |
|||
tube | |||
1 | Overflow approvals Physical location: CCA 8 Column 6, Row 1
|
2007 | |
2 | Construction Set Physical location: Barn Box 2
|
undated | |
3 | Entry Court Garden Physical location: Barn box 3
|
undated | |
4 | Complete Set of Construction Drawings Physical location: Barn Box 4
|
undated | |
5 | Original Overlay Physical location: Barn Box 4
|
undated | |
6 | Planting Plan Physical location: Barn Box 4
|
undated | |
Project 85: Glen Cove |
1984-1997 | ||
MANUSCRIPT MATERIALS |
1984-1997 | ||
Box | Folder | ||
6 | 51 | Proposals/Contracts |
1997 |
6 | 52 | Correspondence |
1996-1997 |
6 | 53 | Meeting Minutes/Notes to File |
1996-1997 |
6 | 54 | Design Sketches |
undated |
6 | 55 | Engineering |
1984-1997 |
6 | 56 | Visual |
1993-1997 |
TUBES |
|||
tube | |||
1 | Existing Conditions Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 86: Great Lakes Marina |
1988-1990 | ||
MANUSCRIPT MATERIALS |
1988-1990 | ||
Box | Folder | ||
6 | 57 | Proposals/Contracts |
1990 |
6 | 58 | Incoming Transmittals |
1988-1990 |
Project 87: Ice Rink-Savanah |
1991-1993 | ||
MANUSCRIPT MATERIALS |
1991-1993 | ||
Box | Folder | ||
6 | 59 | Proposals/Contracts |
1991-1992 |
6 | 60 | Meeting Notes |
1991-1993 |
6 | 61 | Cost Estimates |
1991 |
6 | 62 | Physical |
1993 |
6 | 63 | Engineering |
1993 |
6 | 64 | Design Sketches |
1993 |
Project 88: Chalalan |
undated | ||
MANUSCRIPT MATERIALS
Some documents in Spanish
|
undated | ||
Box | Folder | ||
6 | 65 | Illustrative |
undated |
TUBES |
|||
tube | |||
1 | Exhibits Physical location: Barn Box 2
|
undated | |
Project 89: Cadence |
2003-2005 | ||
MANUSCRIPT MATERIALS
Some documents in Spanish
|
2003-2005 | ||
Box | Folder | ||
6 | 66 | Meeting Notes |
2005 |
6 | 67 | Correspondence |
2005 |
6 | 68 | Design Sketches |
2003-2005 |
Project 90: Marriott Vail |
1999 | ||
MANUSCRIPT MATERIALS |
1999 | ||
Box | Folder | ||
7 | 1 | Proposals/Contracts |
1999 |
7 | 2 | Correspondence |
1999 |
7 | 3 | Notes |
1999 |
7 | 4 | Sketches |
1999 |
Project 91: Museum of Northern Arizona |
1994 | ||
MANUSCRIPT MATERIALS |
1994 | ||
Box | Folder | ||
7 | 5 | Proposals/Contracts |
1994 |
TUBES |
|||
tube | |||
1 | Schematic Design Physical location: CCA 6 Column 2, Row 5
|
undated | |
Project 92: Powderhorn |
1996 | ||
MANUSCRIPT MATERIALS |
1996 | ||
Box | Folder | ||
7 | 6 | Charette Notion |
1996 |
Project 93: Red Brick Arts |
|||
MANUSCRIPT MATERIALS |
1996-1997 | ||
Box | Folder | ||
7 | 7 | Proposals/Contracts |
1996-1997 |
7 | 8 | Correspondence |
1996 |
7 | 9 | Meeting Minutes/Notes |
1996 |
7 | 10 | Design Sketches |
1996 |
TUBES |
|||
tube | |||
1 | School Physical location: Barn Box 2
|
undated | |
Project 94: Blue Mountain |
1982-1984 | ||
MANUSCRIPT MATERIALS |
1982-1984 | ||
Box | Folder | ||
7 | 11 | Land Use Plan |
1982-1984 |
7 | 12 | Land Use Plan |
1982-1984 |
7 | 13 | Land Use Plan |
1982-1984 |
TUBES |
|||
tube | |||
1 | Tennis Center Physical location: Barn Box 12
|
undated | |
Project 95: Squaw Creek Resort |
1985-2005 | ||
MANUSCRIPT MATERIALS |
1985-2005 | ||
Box | Folder | ||
7 | 14 | Design Guidelines |
2002 |
7 | 15 | Project Manual |
2005 |
7 | 16 | Proposals/Contracts |
1997 |
7 | 17 | Program Memo |
1985 |
7 | 18 | Design Concept |
undated |
TUBES |
|||
tube | |||
1 | Site Design Physical location: CCA 8 Column 5, Row 3
|
undated | |
2 | Design Reviews Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Composite Design Workshop Construction Drawings and Water Featured Construction Documents Physical location: CCA 8 Column 5, Row 2
|
undated | |
4 | Schematic Design Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Design Development Reproducible Physical location: CCA 8 Column 5, Row 2
|
undated | |
6 | Construction Documents Physical location: Barn Box 9
|
undated | |
7 | Retaining Wall with redlines, vellum CDs Physical location: Barn Box 9
|
undated | |
Project 96: Three Sisters Resort |
1986 | ||
MANUSCRIPT MATERIALS |
1986 | ||
Box | Folder | ||
7 | 19 | Notes to File |
1986 |
Project 97: Chase Residence |
1997 | ||
MANUSCRIPT MATERIALS |
1997 | ||
Box | Folder | ||
7 | 20 | Proposals/Contracts |
1997 |
7 | 21 | Correspondence |
1997 |
7 | 22 | Programming |
undated |
Project 98: Budagher Market & Festival Center |
2000 | ||
MANUSCRIPT MATERIALS |
2000 | ||
Box | Folder | ||
7 | 23 | Correspondence |
2000 |
7 | 24 | Proposal/Contracts |
2000 |
7 | 25 | Design Sketches |
2000 |
Project 99: Cherry Creek |
1987-2010 | ||
MANUSCRIPT MATERIALS |
1987-2010 | ||
Box | Folder | ||
7 | 26 | Proposals/Contracts |
1997 |
7 | 27 | Field Reports |
2010 |
7 | 28 | Notes to File |
1987-1998 |
7 | 29 | Correspondence |
1997-2010 |
TUBES |
|||
tube | |||
1 | Concept Plans Physical location: CCA 6 Column 2, Row 4
|
undated | |
2 | Concepts, Aerial Photos Misc. Physical location: CCA 6 Column 2, Row 5
|
undated | |
3 | Concepts, Phasing Plans Physical location: CCA 6 Column 2, Row 4
|
undated | |
4 | Grading Topography, Utility Plans and Concepts Physical location: CCA 6 Column 2, Row 4
|
undated | |
5 | Concepts Misc. Physical location: CCA 6 Column 2, Row 4
|
undated | |
6 | Negatives Physical location: CCA 6 Column 2, Row 1
|
undated | |
Project 100: Whistler |
2000 | ||
MANUSCRIPT MATERIALS |
2000 | ||
Box | Folder | ||
7 | 30 | Meeting Minutes/Notes to File |
2000 |
Project 101: Booth Creek |
2003 | ||
MANUSCRIPT MATERIALS |
2003 | ||
Box | Folder | ||
7 | 31 | Proposals/Contracts |
2003 |
Project 102: Powell Butte |
2002 | ||
MANUSCRIPT MATERIALS |
2002 | ||
Box | Folder | ||
7 | 32 | Proposals/Contracts |
2002 |
7 | 33 | Correspondence |
2002 |
7 | 34 | Notes to File |
2002 |
Project 103: Blue Heron Bay |
undated | ||
MANUSCRIPT MATERIALS |
2002-2003 | ||
Box | Folder | ||
7 | 35 | Concept Plan |
undated |
7 | 36 | Detail Design Studies |
2002 |
7 | 37 | Development Program |
2002 |
7 | 38 | Meeting Minutes |
2002 |
7 | 39 | Proposals/Contracts |
2003 |
7 | 40 | Vegetation |
undated |
TUBES |
|||
tube | |||
1 | "Site analysis; design analysis-trace; marina alternatives - trace; road grading; aerial phots; Barn renovation sketches; interview drawings (developable land summary, existing conditions, site analysis, elevation analysis, water view analysis); conceptual master plan illustrative; master development concept plan; club center design and alternatives; townhouse sections and elevations" CCA 8 Column 3, Row 1
|
undated | |
Project 104: Strang Ranch |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 41 | Correspondence |
1984-1985 |
Project 105: Limestone Springs |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 42 | Development Plan |
undated |
7 | 43 | Master Plan Document |
2001 |
7 | 44 | Meeting Minutes/Notes to File |
2002 |
7 | 45 | Work Program |
2002 |
Project 106: Republic Plaza |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 46 | Correspondence |
1997-1999 |
TUBES |
|||
tube | |||
1 | Landscape Plans and Details Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 107: Springwoods |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 47 | Conceptual Design |
2009 |
Project 108: Design Workshop, Inc. Projects |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 48 | Parks and Recreation Projects |
undated |
7 | 49 | Miscellaneous Projects Binder |
undated |
Project 109: Denargo Market |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 50 | Proposals/Contracts |
2006 |
7 | 51 | Budget/Financial |
2007 |
7 | 52 | Meeting Minutes/Notes to File |
2006 |
7 | 53 | Design |
2006 |
7 | 54 | Correspondence |
2006 |
TUBES |
|||
tube | |||
1 | Redevelopment Physical location: Barn Box 9
|
undated | |
Project 110: Bellingham Harbor |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 55 | Proposals/Contracts |
2005 |
7 | 56 | Meeting Minutes/Notes to File |
2005-2006 |
7 | 57 | Correspondence |
2005-2006 |
7 | 58 | Master Plan Project Position Paper |
2006 |
TUBES |
|||
tube | |||
1 | Bellingham Harbor Physical location: CCA 8 Column 3, Row 3
|
undated | |
Project 111: Tanbara Woodland Resort |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 59 | Master Plan Report |
1991 |
Project 112: Aizu Resort |
|||
MANUSCRIPT MATERIALS |
1991 | ||
Box | Folder | ||
7 | 60 | Site Analysis |
1991 March 11 |
TUBES |
|||
item | |||
1 | Site Analysis Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 113: Old Town Plaza |
|||
MANUSCRIPT MATERIALS |
2008-2010 | ||
Box | Folder | ||
7 | 61 | Proposals/Contracts |
2008 |
7 | 62 | Proposals/Contracts |
2009 |
7 | 63 | Correspondence |
2009-2010 |
7 | 64 | Project Matrix |
2009 |
7 | 65 | Invoices |
2009 |
Project 114: Fourth Ward Redevelopment (Houston) |
|||
MANUSCRIPT MATERIALS |
2008-2010 | ||
Box | Folder | ||
7 | 66 | Master Agreement |
2009 |
7 | 67 | Utility & Street Condition Assessment Study |
2008 February 21 |
Project 115: Harvest Design |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 68 | Proposals/Contracts |
2005 |
7 | 69 | Meeting Minutes/Notes to File |
2005 |
7 | 70 | Correspondence |
2005 |
Project 116: Superstition Area Land Plan |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 71 | Proposals/Contracts |
2005 |
7 | 72 | Proposals/Contracts/Owner |
1998 |
7 | 73 | Proposals/Contracts/Consultants |
1998-1999 |
7 | 74 | Correspondence |
1999-2001 |
7 | 75 | Meeting Minutes |
1998 |
7 | 76 | Notes to File |
2001 |
7 | 77 | Cost Estimates |
1999 |
7 | 78 | Work Program |
2001 |
7 | 79 | Report |
2001 |
7 | 80 | Report |
2001 |
TUBES |
|||
tube | |||
1 | Topography Physical location: CCA 6 Column 2, Row 3
|
undated | |
Project 117: Landow Residence |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
7 | 81 | Proposals/Contracts |
2003 |
7 | 82 | Design Sketches |
undated |
TUBES |
|||
tube | |||
1 | Schematic Layout Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 118: Buck Creek |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 1 | Proposals/Contracts |
1996-1997 |
8 | 2 | Correspondence |
1996-1998 |
8 | 3 | Meeting Minutes/Notes to File |
1997-1998 |
8 | 4 | Finance |
1997-1998 |
8 | 5 | Physical |
1996-1997 |
8 | 6 | Programming |
1996-1997 |
Project 119: Kemmerer Residence |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 7 | Proposals/Contracts |
1997 |
8 | 8 | Correspondence |
1997-1998 |
8 | 9 | Correspondence/Consultant |
1998 |
8 | 10 | Correspondence/Owner |
1997-1998 |
8 | 11 | Meeting Minutes/Notes to File |
1997-1998 |
8 | 12 | Design Sketches |
undated |
8 | 13 | Design Guidelines |
1998 |
Project 120: Macmillan Residence (Jackson, WY) |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 14 | Proposals/Contracts |
1994-1996 |
8 | 15 | Correspondence |
1995 |
8 | 16 | Meeting Minutes/Notes to File |
1995-1996 |
8 | 17 | Cost Estimates |
1995-1996 |
8 | 18 | Design Sketches |
1995-1996 |
8 | 19 | Construction Bids/Proposals/Addendum |
1996 |
TUBES |
|||
tube | |||
1 | Irrigation and Stream Pumps Physical location: CCA 6 Column 1, Row 8
|
undated | |
2 | Planting Beds Physical location: Barn Box 4
|
undated | |
3 | Conceptual Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Conceptual Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Design Physical location: Barn Box 6
|
undated | |
6 | Concept diagrams, planting schedule ,illustrative site plan, trace sketches, sections Physical location: Barn Box 7
|
undated | |
Project 121: Chandler Skate Park |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 20 | Proposals/Contracts/Consultants |
1998 |
8 | 21 | Proposals/Contracts/Owner |
1997-1998 |
8 | 22 | Billing/Invoices |
1998-1999 |
8 | 23 | Design Sketches |
1998 |
8 | 24 | Feasibility Report |
1998 |
Project 122: Pines Grading |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 25 | Correspondence |
1997 |
Project 123: Beaver Creek |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 26 | Proposals/Contracts |
1995 |
8 | 27 | Notes to File |
undated |
8 | 28 | Billing/Invoices |
1995 |
8 | 29 | Correspondence |
1995 |
8 | 30 | Design Regulations |
1979 |
8 | 31 | Elk Track Townhomes Proposals |
2001 |
8 | 32 | Elk Track Townhomes Design Review |
2001-2002 |
8 | 33 | Elk Track Townhomes Encroachment Approvals |
2002 |
8 | 34 | Elk Track Townhomes Cost Estimates |
2002 |
TUBES |
|||
tube | |||
1 | Disney Vacation Club Physical location: CCA 8 Column 4, Row 3
|
undated | |
Project 124: Gauer Estate |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 35 | Correspondence |
1991-1994 |
8 | 36 | Legal |
1994 |
8 | 37 | Meeting Notes |
1992 |
8 | 38 | Programming |
1992-1994 |
8 | 39 | Proposal/Contracts |
1992-1994 |
TUBES |
|||
tube | |||
1 | Vineyard Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Alternates Physical location: Barn Box 2
|
1993-1999; undated | |
3 | Vineyard Original Mylar's Physical location: Barn Box 2
|
undated | |
4 | Base Mapping Physical location: CCA 6 Column 1, Row 5
|
undated | |
5 | Development Plan Physical location: CCA 6 Column 1, Row 5
|
undated | |
Project 125: Sand Creek Parkway |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 40 | Correspondence |
2002-2004 |
8 | 41 | Cost Estimates |
2003 |
8 | 42 | Design Development |
undated |
8 | 43 | Lighting |
2003 |
8 | 44 | Master Plan |
1994 |
8 | 45 | Meeting Minutes |
2002-2003 |
8 | 46 | Meeting Minutes/Notes to File |
undated |
8 | 47 | Proposal/Contracts |
1993 |
8 | 48 | Proposal/Contracts |
2003 |
TUBES |
|||
tube | |||
1 | Blueprints Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Parkway Physical location: CCA 8 Column 5, Row 3
|
undated | |
3 | Parkway Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Blue Prints Physical location: Barn Box 15
|
undated | |
5 | Original Mylar's Physical location: Barn Box 15
|
undated | |
Project 126: Bear Mountain |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
8 | 49 | Articles |
1989 |
8 | 50 | Base Area Plan |
1998 |
8 | 51 | Biological |
1988 |
8 | 52 | Correspondence |
1989 |
8 | 53 | Correspondence |
1992 |
8 | 54 | Development Plan |
1989 |
8 | 55 | Economic Analysis |
1992 |
8 | 56 | Environmental Assessment |
1989 |
8 | 57 | Meeting Minutes/Notes to File |
1989 |
8 | 58 | Physical |
1992 |
8 | 59 | Programming |
1989 |
8 | 60 | Proposal/Contracts |
1988 |
8 | 61 | Proposal/Contracts |
1989 |
8 | 62 | Text Reference |
1989 |
8 | 63 | Work Program |
1989 |
TUBES |
|||
tube | |||
1 | Conceptual Studies Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Illustrative Physical location: CCA 6 Column 1, Row 2
|
undated | |
3 | Bear Mountain Physical location: CCA 6 Column 1, Row 2
|
undated | |
4 | Base Physical location: Barn Box 8
|
undated | |
5 | Mylar Physical location: Barn Box 8
|
undated | |
Project 127: Fitzsimmons |
|||
MANUSCRIPT MATERIALS |
2000-2006 | ||
Box | Folder | ||
8 | 64 | Commons Development |
2001 |
8 | 65 | Correspondence |
2001-2004 |
8 | 66 | Correspondence |
2004 |
8 | 67 | General Development Plan |
undated |
8 | 68 | Meeting Minutes |
2001 |
8 | 69 | Meeting Minutes |
2006 |
8 | 70 | Proposals/Contracts |
2001-2002 |
8 | 71 | Proposals/Contracts |
2002 |
8 | 72 | Research |
2000-2001 |
8 | 73 | Text |
2000-2001 |
TUBES |
|||
tube | |||
1 | Parkway Parcel Study Physical location: CCA 6 Column 1, Row 1
|
undated | |
Project 128: City North |
|||
MANUSCRIPT MATERIALS |
2007-2010 | ||
Box | Folder | ||
8 | 74 | Images |
2007 |
8 | 75 | Meeting Minutes |
undated |
8 | 76 | Proposals/Contracts |
2007-2010 |
Project 129: Chechessee Bluffs |
|||
MANUSCRIPT MATERIALS |
1993-1994 | ||
Box | Folder | ||
9 | 1 | Correspondence |
1993-1994 |
9 | 2 | Cost Estimates |
1993 |
9 | 3 | Design Sketches |
undated |
9 | 4 | Engineering |
1993 |
9 | 5 | Marketing/Presentations |
1993 |
9 | 6 | Notes to File |
undated |
9 | 7 | Programming |
1993 |
9 | 8 | Proposals/Contracts |
1993-1994 |
9 | 9 | Conceptual Master Plan |
1994 |
Project 130: Bishop's Lodge |
|||
MANUSCRIPT MATERIALS |
1996-1998 | ||
Box | Folder | ||
9 | 10 | Carefree Resorts Study |
1997 |
9 | 11 | Construction Communications |
1998 |
9 | 12 | Correspondence |
1998 |
9 | 13 | Cost Estimates |
1998 |
9 | 14 | Cost Estimates- Charette |
1998 |
9 | 15 | Design Sketches |
1998 |
9 | 16 | Layout |
1996 |
9 | 17 | Meeting Minutes |
1998 |
9 | 18 | Marketing/Presentations |
1997 |
9 | 19 | Programming |
1998 |
9 | 20 | Proposal/Contract |
1998 |
9 | 21 | Work Program |
1998 |
TUBES |
|||
Drawings Physical location: Barn Box 13
|
undated | ||
Project 131: Ambergris Cay (Turks and Caicos Islands) |
|||
MANUSCRIPT MATERIALS |
2003-2006 | ||
Box | Folder | ||
9 | 22 | Contracts |
2003 |
9 | 23 | Correspondence- Other |
2004 |
9 | 24 | Environmental |
2005 |
9 | 25 | Environmental Soils and Ground |
undated |
9 | 26 | Environmental Vegetation |
2005 |
9 | 27 | Field Notes |
2005 |
9 | 28 | Historic/Cultural- Existing Buildings |
2003 |
9 | 29 | Meeting Record |
2005-2006 |
9 | 30 | Market Studies |
2003 |
9 | 31 | Pamphlets |
undated |
9 | 32 | Plants |
undated |
9 | 33 | Professional Services Agreement |
2004 |
9 | 34 | Research |
undated |
9 | 35 | Signage |
2005 |
9 | 36 | Spa |
2005 |
Project 132: Clark County Wetlands |
|||
MANUSCRIPT MATERIALS |
1993-2000 | ||
Box | Folder | ||
9 | 37 | Construction Documents |
undated |
9 | 38 | Cost Estimates |
1999 |
9 | 39 | Marketing/Presentations |
undated |
9 | 40 | Programming/Architectural |
undated |
9 | 41 | Proposals/Contracts |
1998 |
9 | 42 | Proposals/Contracts- Agency |
1993 |
9 | 43 | Valley Crest- The Nature Center |
2000 |
9 | 44 | Work Program |
1994 |
TUBES |
|||
tube | |||
1 | Review Physical location: CCA 8 Column 5, Row 2
|
undated | |
2 | Review Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 133: Tamandua |
|||
MANUSCRIPT MATERIALS
[Some items in Spanish]
|
1991-1993 | ||
Box | Folder | ||
9 | 45 | Correspondence |
1991-1993 |
9 | 46 | Meeting Minutes/Notes to File |
1991-1992 |
9 | 47 | Proposals/Contracts |
1991-1992 |
9 | 48 | Work Program |
1991 |
Project 134: Chateau Roaring Fork |
|||
MANUSCRIPT MATERIALS |
1995-1997 | ||
Box | Folder | ||
9 | 49 | Design |
1996 |
9 | 50 | Design Sketches |
1996 |
9 | 51 | Engineering |
1996 |
9 | 52 | Meeting Notes |
1996 |
9 | 53 | Meeting Notes |
1996-1997 |
9 | 54 | Physical |
1996 |
9 | 55 | Proposal/Contracts |
1996 |
9 | 56 | Roaring Fork Club |
1995-1997 |
9 | 57 | Trail Plan |
1996 |
9 | 58 | Transmittal |
1996 |
TUBES |
|||
tube | |||
1 | Illustrative Site Plans Physical location: CCA 8 Column 5, Row 1
|
undated | |
2 | Club-Admin/Clubhouse/Entry Drawings Physical location: CCA 8 Column 6, Row 3
|
undated | |
3 | Prelim Site/ Master Plans Including Golf Layout Roads Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Condominiums Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Signage Physical location: Barn Box 11
|
undated | |
6 | School Physical location: Barn Box 14
|
undated | |
7 | Grading/Drainage Drawings Physical location: Barn Box 15
|
undated | |
Project 135: Geneva |
|||
MANUSCRIPT MATERIALS |
1987-1994 | ||
Box | Folder | ||
9 | 59 | Clippings/Research |
1987-1989 |
9 | 60 | Correspondence |
1993 |
9 | 61 | Design Sketches |
undated |
9 | 62 | Engineering |
1992 |
9 | 63 | Meeting Minutes/Notes to File |
undated |
9 | 64 | Meeting Minutes/Notes to File |
undated |
9 | 65 | Proposals/Contracts |
1989 |
9 | 66 | Proposals/Contracts |
1992-1993 |
9 | 67 | Proposals/Contracts |
1993 |
9 | 68 | Work Program |
1993-1994 |
Project 136: Christus St. Michael |
|||
MANUSCRIPT MATERIALS |
2004-2006 | ||
Box | Folder | ||
9 | 69 | Proposals/Contracts |
2004-2005 |
9 | 70 | Transportation Charette |
2005-2006 |
9 | 71 | Budget/Financials |
2005-2006 |
9 | 72 | Correspondence |
2005-2006 |
9 | 73 | Meeting Agendas & Minutes |
2005 |
TUBES |
|||
tube | |||
1 | Hospital Master plans and Sketches Barn Box 5
|
undated | |
Project 137: Johnson Residence (California) |
|||
MANUSCRIPT MATERIALS |
1995-1996 | ||
Box | Folder | ||
9 | 74 | Proposals/Contracts |
1995-1996 |
9 | 75 | Correspondence |
1996 |
9 | 76 | Engineering |
1995 |
9 | 77 | Cost Estimates |
1995-1996 |
9 | 78 | Design Sketches/Production Information |
1996 |
9 | 79 | Project Manual |
1996 June 7 |
9 | 80 | Specificaitons |
1995 |
Project 138: Flatiron Marketplace |
|||
MANUSCRIPT MATERIALS |
1999-2002 | ||
Box | Folder | ||
10 | 1 | Correspondence |
2000-2001 |
10 | 2 | Correspondence |
2001 |
10 | 3 | Correspondence |
2001-2002 |
10 | 4 | Cost Estimates |
1999 |
10 | 5 | Design Sketches |
undated |
10 | 6 | Landscape Specifications Manual |
2000 |
10 | 7 | Meeting Record |
2002 |
10 | 8 | Proposals/Contracts |
2000-2001 |
TUBES |
|||
tube | |||
1 | Record Set Physical location: CCA 6 Column 2, Row 9
|
undated | |
2 | Bid Set Originals Physical location: CCA 6 Column 2, Row 9
|
undated | |
3 | Fashion Bid Set Physical location: CCA 6 Column 2, Row 9
|
undated | |
4 | Redlined as Built Physical location: CCA 6 Column 2, Row 9
|
undated | |
5 | Lifestyle Gardens Physical location: CCA 6 Column 2, Row 9
|
undated | |
6 | Irrigation Physical location: CCA 6 Column 2, Row 7
|
undated | |
7 | lifestyle Record Physical location: CCA 6 Column 2, Row 8
|
undated | |
8 | Original Drawings Physical location: CCA 6 Column 2,, Row 9
|
undated | |
9 | 90% Submittals Physical location: CCA 6 Column 2, Row 8
|
undated | |
10 | VE Diagrams Physical location: CCA 6 Column 2, Row 9
|
undated | |
11 | Lifestyle Bid Set Physical location: CCA 6 Column 2, Row 9
|
undated | |
12 | 90% Submittals Physical location: CCA 6 Column 2, Row 8
|
undated | |
Project 139: Thoms Property |
|||
MANUSCRIPT MATERIALS |
2005-2008 | ||
Box | Folder | ||
10 | 9 | Proposals/Contracts |
2008 |
10 | 10 | Final Lot Portfolios |
2006 |
10 | 11 | Design Sketches |
undated |
10 | 12 | Design Sketches |
undated |
10 | 13 | Stormwater Symposium |
2007 June 5 |
10 | 14 | Meeting Minutes/Notes to File |
2006-2007 |
10 | 15 | Submittal Requirement |
2006-2007 |
10 | 16 | Images
[Photocopies]
|
undated |
10 | 17 | Correspondence |
2005-2007 |
TUBES |
|||
tube | |||
1 | Various Project Documents Physical location: Barn Box 2
|
||
2 | Sketches Physical location: Barn Box 2
|
undated | |
Project 140: Valle San Pedro |
|||
MANUSCRIPT MATERIALS
[Some materials in Spanish]
|
2004-2008 | ||
Box | Folder | ||
10 | 18 | Proposals/Contracts |
2004-2008 |
10 | 19 | Plant List |
2004 |
10 | 20 | Presentation
[In Spanish]
|
2004 October |
10 | 21 | ERA Report |
2004 |
10 | 22 | Master Plan
[In Spanish]
|
2004 |
10 | 23 | Symbols Manual
[In Spanish]
|
undated |
TUBES |
|||
tube | |||
1 | Schematic and Illustrative Plans Physical location: CCA 8 Column 3, Row 3
|
2004-2006; undated | |
2 | Phase One Schematics Physical location: CCA 6 Column 2, Row 7
|
undated | |
3 | Residential Physical location: CCA 6 Column 2, Row 7
|
2006; undated | |
4 | Sketches Physical location: CCA 6 Column 1, Row 9
|
undated | |
5 | Zoning and Land Use Physical location: Barn Box 3
|
undated | |
6 | Design Development Physical location: Barn Box 3
|
undated | |
7 | Land Use Physical location: Barn Box 3
|
undated | |
8 | Work Session Physical location: Barn Box 4
|
undated | |
9 | Land Use Physical location: Barn Box 5
|
undated | |
10 | Land use Plans Physical location: Barn Box 5
|
undated | |
11 | Design Development Package Physical location: Barn Box 5
|
undated | |
Project 141: Beckwith Interchange Property |
|||
MANUSCRIPT MATERIALS |
2008 | ||
Box | Folder | ||
10 | 24 | Submittal Package |
2008 |
10 | 25 | Proposals/Contracts |
2008 |
10 | 26 | Construction Costs |
2008 |
10 | 27 | Correspondence |
2008 |
10 | 28 | Master Declaration of Protective Covenants |
undated |
Project 142: Orchard at Picacho |
undated | ||
MANUSCRIPT MATERIALS |
2006-2007 | ||
Box | Folder | ||
10 | 29 | Proposals/Contracts |
2006-2007 |
10 | 30 | PAD Submittal Draft |
2006 |
10 | 31 | PAD Submittal |
2006 |
10 | 32 | PAD Submittal |
2007 |
10 | 33 | Notes to File |
2007 |
TUBES |
|||
tube | |||
1 | Conceptual Land Use Plan CCA 6 Column 2, Row 1
|
undated | |
2 | Entry Plans Barn Box 3
|
undated | |
3 | Conceptual Land Use Plan Barn Box 3
|
undated | |
Project 143: Barr Lake |
undated | ||
MANUSCRIPT MATERIALS |
1993 | ||
Box | Folder | ||
10 | 34 | Proposals/Contracts |
1995 |
10 | 35 | Meeting Minutes/Notes to File |
1995 |
10 | 36 | Biological |
1995 |
10 | 37 | Programming |
1993 |
10 | 38 | Marketing/Presentations |
1995 |
10 | 39 | Final Documents |
1996 |
Project 144: Taos Ski Resort |
undated | ||
MANUSCRIPT MATERIALS |
1997-2006 | ||
Box | Folder | ||
10 | 40 | Correspondence |
1999-2000 |
10 | 41 | Design Sketches/Product Info |
1999 |
10 | 42 | Development Alternatives |
2000 |
10 | 43 | History of Taos |
undated |
10 | 44 | Market Analysis |
1999 |
10 | 45 | Notes |
1999 |
10 | 46 | Notes |
2000-2006 |
10 | 47 | Proposal/Contracts |
1997-2000 |
10 | 48 | Proposal/Contracts |
1999 |
10 | 49 | Real Estate Market Analysis |
1998 |
10 | 50 | Taos Resort |
1997-1999 |
Project 145: Sun Valley |
undated | ||
MANUSCRIPT MATERIALS |
1991-1998 | ||
Box | Folder | ||
10 | 51 | Proposals/Contracts |
1991 |
10 | 52 | Proposals/Contracts |
1997 |
10 | 53 | Correspondence |
1997 |
10 | 54 | Meeting Minutes |
1997-1998 |
10 | 55 | Physical |
undated |
10 | 56 | Engineering |
1997 |
10 | 57 | Cost Estimates |
1997 |
10 | 58 | Design Sketches |
1997 |
10 | 59 | Imagery Book |
1997 |
10 | 60 | Master Plan Marketing/Presentations |
1991 |
TUBES |
|||
tube | |||
1 | Master Plan Physical location: CCA 8 Column 6, Row 1
|
||
2 | Master Plan Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Architectural Sheet Set, Lighting Plan, Conceptual Grading, Parking Lot Improvements (Half-size sheet set) Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Master Plan Physical location: CCA 6 Column 1, Row 1
|
undated | |
5 | CDs, Details, Irrigation, Design Development on trace Physical location: CCA 8 Column 4, Row 2
|
undated | |
6 | Construction Documents Physical location: CCA 8 Column 4, Row 2
|
undated | |
7 | Construction Documents Physical location: CCA 8 Column 4, Row 2
|
undated | |
8 | Conceptual Alternatives, CD's, Details, Facilities, Original sketches, existing conditions Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 146: Adam's Rib |
undated | ||
MANUSCRIPT MATERIALS |
1989-1991 | ||
Box | Folder | ||
10 | 61 | Proposals/Contracts |
1989 March 6 |
10 | 62 | Correspondence |
1989-1991 |
10 | 63 | Master Plans |
1989-1990 |
10 | 64 | Engineering |
undated |
10 | 65 | Scope of Work |
1992 July 1 |
10 | 66 | Water Consumption Report |
1992 June |
10 | 67 | Mountain Lift Numbers |
1989 June 26 |
10 | 68 | Phasing and Costs |
undated |
10 | 69 | Programming |
1989 |
10 | 70 | Master Development Plan |
1989 November 28 |
TUBES |
|||
tube | |||
1 | Phase 1 Physical location: CCA 8 Column 4, Row 1
|
undated | |
2 | Phase 1 Site Condition Summary Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 147: Douglas County |
|||
MANUSCRIPT MATERIALS |
1987-2006 | ||
Box | Folder | ||
11 | 1 | Correspondence |
1991 |
11 | 2 | Cost Estimates |
1991 |
11 | 3 | Design Guidelines |
1991 |
11 | 4 | Design Sketches/Product Info |
1987 |
11 | 5 | Impact Fees |
2005 |
11 | 6 | Master Plan |
2005 |
11 | 7 | Meeting Minutes |
2006 |
11 | 8 | Proposal/Contracts |
1991 |
11 | 9 | Proposal/Contracts |
2006 |
11 | 10 | Work Program |
undated |
Project 148: Delta County |
undated | ||
MANUSCRIPT MATERIALS |
1996-1997 | ||
Box | Folder | ||
11 | 11 | Construction Bids |
undated |
11 | 12 | Construction Contracts |
1997 |
11 | 13 | Correspondence |
1996-1997 |
11 | 14 | Design Guidelines |
undated |
11 | 15 | Design Sketches/Product Info |
undated |
11 | 16 | Examples |
1996 |
11 | 17 | Meeting Minutes/Notes |
1997 |
11 | 18 | Product Info |
1997 |
11 | 19 | Proposals/Contracts |
1997 |
11 | 20 | Worksession Number 1 |
1997 |
11 | 21 | Worksession Number 2 |
1997 |
11 | 22 | Work Program |
undated |
TUBES |
|||
tube | |||
1 | Agricultural Construction Plans Physical location: Barn Box 1
|
undated | |
2 | Agricultural Construction Plans Physical location: Barn Box 2
|
undated | |
Project 149: Frisco |
undated | ||
MANUSCRIPT MATERIALS |
1989-1996 | ||
Box | Folder | ||
11 | 23 | Correspondence |
1995-1996 |
11 | 24 | Engineering |
undated |
11 | 25 | Final PUD Submission |
1996 |
11 | 26 | Fisco Triangle PUD |
undated |
11 | 27 | Meeting Minutes/Notes to File |
1996 |
11 | 28 | Physical |
1995 |
11 | 29 | Preliminary Plan and PUD Submission |
undated |
11 | 30 | Proposal/Contracts |
1995 |
11 | 31 | Promo Frisco Lakefront Development |
1989 |
TUBES |
|||
tube | |||
1 | Trails, wetlands, trade parcel,1757,aspen office Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Frisco the Reserve CCA 8 Column 6, Row 3
|
undated | |
3 | Final Plat Drawings CCA 8 Column 5, Row 3
|
undated | |
4 | Buildable Area Analysis, PUD Setback Analysis,3/1996 Site Plan, Civil CDs, Final PLATT CCA 8 Column 5, Row 2
|
undated | |
5 | Slope Analysis CCA 8 Column 5, Row 2
|
undated | |
6 | Road Studies/Architectural Barn Box 10
|
undated | |
7 | Environmental Analysis Barn Box 10
|
undated | |
8 | Preliminary Site Plan Barn Box 10
|
undated | |
9 | Preliminary Plat Drawings Barn Box 10
|
undated | |
10 | North Village Barn Box 10
|
undated | |
11 | Planting Illustrative Drawings Barn Box 10
|
undated | |
12 | Trails, Wetland Trails Parcel Barn Box 10
|
undated | |
Project 150: Marriott Canyons (Park City) |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
11 | 32 | Correspondence |
1999 |
11 | 33 | Work Program/Schedules |
1999 |
11 | 34 | Meeting Minutes/Notes |
1999 February-May |
11 | 35 | Meeting Minutes/Notes |
1999 June-August |
11 | 36 | Proposals/Contracts |
1999 |
11 | 37 | Physical |
1999 |
11 | 38 | Engineering |
1999 |
11 | 39 | Cost Estimates |
1999 |
Project 151: Coleman Residence |
|||
MANUSCRIPT MATERIALS |
1998-2001 | ||
Box | Folder | ||
11 | 40 | Proposals/Contracts |
1998-2000 |
11 | 41 | Correspondence |
1998-1999 |
11 | 42 | Correspondence |
2000 |
11 | 43 | Meeting Minutes |
1999-2000 |
11 | 44 | Programming/Architecture |
2000 |
11 | 45 | Design Details |
undated |
11 | 46 | Field Reports |
2000-2001 |
Project 152: South Farm (Utah) |
|||
MANUSCRIPT MATERIALS |
|||
Box | Folder | ||
11 | 47 | Proposals/Contracts |
1997 |
11 | 48 | Correspondence |
1997 |
11 | 49 | Meeting Minutes |
1997 |
11 | 50 | Work Program |
1997 |
11 | 51 | Commercial Retail Data |
1997 |
11 | 52 | Amenity Trends |
1997 |
11 | 53 | Market Report |
1997 |
TUBES |
|||
tube | |||
1 | Lotting Schemes, Conceptual Zoning, Map Studies Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Base Maps Barn Box 7
|
undated | |
3 | Schematic Conceptual Design Barn Box 7
|
undated | |
Project 153: Loveland |
|||
MANUSCRIPT MATERIALS |
1992-1995 | ||
Box | Folder | ||
11 | 54 | Correspondence |
1995 |
11 | 55 | Marketing/Presentation |
1995 |
11 | 56 | Meeting Minutes/Notes to File |
1994-1995 |
11 | 57 | Natural Areas |
1993 |
11 | 58 | Proposals/Contracts |
1992-1996 |
11 | 59 | Proposals/Contracts |
1993-1995 |
11 | 60 | Supporting Graphics |
1995 |
TUBES |
|||
tube | |||
1 | Miscellaneous Maps and Photos Physical location: Barn Box 7
|
undated | |
Project 154: Berger Residence |
|||
MANUSCRIPT MATERIALS |
1991-2006 | ||
Box | Folder | ||
12 | 1 | Contract/Proposals |
2003 |
12 | 2 | Gate Contract/Proposals |
2006 |
12 | 3 | Correspondence |
1993 |
12 | 4 | Design |
undated |
12 | 5 | Meeting Minutes / Notes to File |
1994 |
12 | 6 | Proposal/Contracts |
1993 |
12 | 7 | Regulations |
2006 |
12 | 8 | Schematic Design |
undated |
12 | 9 | Stone Dimension Drawings |
undated |
12 | 10 | Stone Documentation and Drawings |
2003 |
TUBES |
1991-2006 | ||
tube | |||
1 | Bleeker SF Physical location: CCA 8 Column 6, Row 1
|
1991-2006 | |
Project 155: Little America |
|||
MANUSCRIPT MATERIALS |
1997 | ||
Box | Folder | ||
12 | 11 | Biological |
undated |
12 | 12 | Correspondence |
1997 |
12 | 13 | Cost Estimates |
1997 |
12 | 14 | Engineering |
undated |
12 | 15 | Marketing/Presentation |
undated |
12 | 16 | Meeting Minutes/Notes |
1997 |
12 | 17 | Programming |
1997 |
12 | 18 | Proposal/Contract |
1997 |
Project 156: Sunflower |
|||
MANUSCRIPT MATERIALS |
2007 | ||
Box | Folder | ||
12 | 19 | Sunflower Redevelopment |
2007 |
12 | 20 | Sunflower Redevelopment |
undated |
TUBES |
|||
tube | |||
1 | Schematic Designs Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Surrounding Area Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 157: Nassau/Bethel Estate |
|||
MANUSCRIPT MATERIALS |
1999-2007 | ||
Box | Folder | ||
12 | 21 | Correspondence |
2004-2005 |
12 | 22 | Key Issues |
2004 |
12 | 23 | The Living Waterfront |
2008 |
12 | 24 | Maps |
undated |
12 | 25 | Market Booklet |
undated |
12 | 26 | Ownership Issues/Leases |
1999 |
12 | 27 | Proposals/Contracts |
2004-2007 |
12 | 28 | References |
undated |
12 | 29 | Sanitized Report for John Alfred Dock |
2004 |
12 | 30 | Scheduling |
2004 |
12 | 31 | Sketches |
undated |
Project 158: Dorros Residence |
|||
MANUSCRIPT MATERIALS |
2000-2003 | ||
Box | Folder | ||
12 | 32 | Design Sketches/Product Info |
2000-2002 |
12 | 33 | Environmental Audits/Hazardous Materials |
2001-2002 |
12 | 34 | Proposals/Contracts |
2000-2001 |
12 | 35 | Vegetation |
2001-2003 |
TUBES |
|||
tube | |||
1 | Construction Documents Physical location: CCA 6 Column 2, Row 9
|
undated | |
2 | Conceptual Landscape Plan Physical location: Barn Box 1
|
undated | |
3 | Schematic Landscape Plan Physical location: Barn Box 1
|
undated | |
Project 159: Patience Residence |
|||
MANUSCRIPT MATERIALS |
2002-2005 | ||
Box | Folder | ||
12 | 36 | Patience Residence Construction |
2003-2005 |
12 | 37 | Patience Residence Correspondence |
2002-2005 |
12 | 38 | Patience Residence Cost Estimates |
2002 |
12 | 39 | Patience Residence Design Info |
2002-2003 |
12 | 40 | Patience Residence Field Reports |
2004-2005 |
12 | 41 | Patience Residence Proposals/Contracts |
2002-2003 |
12 | 42 | Patience Residence Survey |
2002-2003 |
TUBES |
|||
tube | |||
1 | Schematic Design Physical location: CCA 8 Column 5, Row 1
|
undated | |
2 | Native Plants Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 160: Bow Canmore |
|||
MANUSCRIPT MATERIALS |
1990-1998 | ||
Box | Folder | ||
12 | 43 | Bow Canmore |
1990 |
12 | 44 | Canmore Urban Design |
1998 |
12 | 45 | Landscape Reference |
1990 |
12 | 46 | Proposal/Contract |
1990 |
12 | 47 | Visual Impact Assessment Design Manual |
1991 |
12 | 48 | Visual Impact Assessment Executive Summary |
1991 |
12 | 49 | Visual Impact Assessment Report |
1991 |
12 | 50 | Visual Impact Assessment Summary of Findings |
undated |
12 | 51 | Visual Impact Assessment Part One- Process Documentation |
1990 |
12 | 52 | Visual Impact Assessment Part Three- Design Manual |
1990 |
TUBES |
|||
tube | |||
1 | Monographs Physical location: Barn Box 14
|
undated | |
Project 161: Luther Residence |
|||
MANUSCRIPT MATERIALS |
2000-2001 | ||
Box | Folder | ||
12 | 53 | Luther Residence Correspondence |
2000-2001 |
12 | 54 | Luther Residence Proposals/Contracts |
2000-2001 |
12 | 55 | Luther Residence Correspondence |
2001 |
TUBES |
|||
tube | |||
1 | Construction Documents Physical location: CCA 6 Column 2, Row 8
|
undated | |
2 | Courtyard Perspectives Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 162: Union Park Design |
|||
MANUSCRIPT MATERIALS |
2004 | ||
Box | Folder | ||
12 | 56 | Clippings |
2004 |
12 | 57 | Contracts/Proposals |
2004 |
12 | 58 | Correspondence |
2004 |
12 | 59 | LEED Book |
undated |
12 | 60 | Meeting Minutes |
2004 |
12 | 61 | Sustainability |
2004 |
TUBES |
|||
tube | |||
1 | Design Guidelines, schematic Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Schematic Design Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 163: Artist Point Overlook (Yellowstone) |
|||
MANUSCRIPT MATERIALS |
2000-2003 | ||
Box | Folder | ||
12 | 62 | Correspondence |
2000-2003 |
12 | 63 | Design/Sketches |
2000 |
12 | 64 | Design Standards |
undated |
12 | 65 | Meeting Minutes |
2000-2003 |
12 | 66 | Proposal/Contracts |
2001-2002 |
12 | 67 | Road and Bridge Standards |
undated |
TUBES |
|||
tube | |||
1 | Schematic Design Physical location: CCA 6 Column 2, Row 8
|
undated | |
2 | Conditions Physical location: CCA 6 Column 2, Row 8
|
undated | |
Project 164: Jacobs Residence |
|||
MANUSCRIPT MATERIALS |
1997-2006 | ||
Box | Folder | ||
13 | 1 | Budget/Finances |
2005-2006 |
13 | 2 | Construction Bids |
1999 |
13 | 3 | Correspondence |
1989-1992 |
13 | 4 | Correspondence |
1999 |
13 | 5 | Correspondence-Consultant |
1999 |
13 | 6 | Correspondence-Owner |
1999 |
13 | 7 | Design and Construction Standards |
2000 |
13 | 8 | Design Sketches/Product Info |
1999 |
13 | 9 | Fishing Cabin |
1998-1999 |
13 | 10 | Meeting Minutes |
2005 |
13 | 11 | Notes |
2008 |
13 | 12 | Notes to File |
1999 |
13 | 13 | Plants |
1997 |
13 | 14 | Programming-Land Use |
1998 |
13 | 15 | Proposal/Contracts |
2005-2006 |
TUBES |
|||
tube | |||
1 | Drawings Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Drawings Physical location: CCA 6 Column 1, Row 3
|
undated | |
3 | Drawings Physical location: CCA 6 Column 1, Row 2
|
undated | |
Project 165: Buttermilk (Aspen) |
|||
MANUSCRIPT MATERIALS |
1993-2003 | ||
Box | Folder | ||
13 | 16 | Master Plan Study |
undated |
13 | 17 | Proposals/Contracts |
2003 |
13 | 18 | Correspondence |
2003 |
13 | 19 | Grading |
2002 |
13 | 20 | Correspondence |
1994-1995 |
13 | 21 | Meeting Minutes/Notes |
1995 |
13 | 22 | Engineering |
1993 |
13 | 23 | Programming |
undated |
13 | 24 | Cost Estimates |
1995 |
13 | 25 | MDP |
1995 |
TUBES |
|||
tube | |||
1 | Master Plan Studies Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Obsolete Drawings Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Conceptual Plans Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Base Physical location: CCA 8 Column 5, Row 3
|
undated | |
5 | Prints Physical location: Barn Box 5
|
undated | |
6 | Base Village Physical location: Barn Box 15
|
undated | |
Project 166: Heard Museum Amphitheater |
|||
MANUSCRIPT MATERIALS |
1997-1999 | ||
Box | Folder | ||
13 | 26 | Proposals/Contracts Consultants |
1998 |
13 | 27 | Proposals/Contracts Owner |
1998 |
13 | 28 | Correspondence/Owner |
1998 |
13 | 29 | Correspondence/Consultant |
1998-1999 |
13 | 30 | Conversataion Record |
1998 |
13 | 31 | Meeting Minutes |
1997-1998 |
13 | 32 | Notes to File |
1998 |
13 | 33 | Facsimiles |
1998 |
13 | 34 | Cost Estimates |
1998 |
13 | 35 | Design Sketches |
1998-1999 |
13 | 36 | Field Reports |
1999 |
TUBES |
|||
tube | |||
1 | Site Details Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 167: Design Week: MSU |
|||
MANUSCRIPT MATERIALS |
2005-2006 | ||
Box | Folder | ||
13 | 37 | Correspondence |
2005-2006 |
13 | 38 |
Bumwad
|
2006 |
13 | 39 | Schedules |
2006 |
Project 168: Albuquerque Botanical Garden |
|||
MANUSCRIPT MATERIALS |
1992 | ||
Box | Folder | ||
13 | 40 | Master Plan |
1992 |
13 | 41 | Master Plan |
1992 |
13 | 42 | Master Plan |
1992 |
13 | 43 | Master Plan |
1992 |
13 | 44 | Master Plan |
1992 |
Project 169: Snowbasin (Utah) |
|||
MANUSCRIPT MATERIALS |
1997 | ||
Box | Folder | ||
13 | 45 | Proposals/Contracts |
1997 |
13 | 46 | Correspondence |
1997 |
13 | 47 | Work Program |
1997 |
13 | 48 | Meeting Minutes |
1997 |
13 | 49 | Programming |
1997 |
Project 170: South Y (City of South Lake Tahoe) |
|||
MANUSCRIPT MATERIALS |
1993-1996 | ||
Box | Folder | ||
13 | 50 | Proposals/Contracts |
1993-1994 |
13 | 51 | Correspondence/Owner |
1994-1996 |
13 | 52 | Correspondence/Consultant |
1995-1996 |
13 | 53 | Meeting Minutes |
1994-1996 |
13 | 54 | Work Program |
1994 |
13 | 55 | Design Sketches |
1994-1996 |
13 | 56 | Programming |
1994-1996 |
13 | 57 | Cost Estimates |
1994 |
13 | 58 | Engineering |
1994 |
13 | 59 | Marketing |
1994 |
13 | 60 | Visual |
undated |
TUBES |
|||
tube | |||
1 | Blueprints of Construction Documents Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | CD Mylar's Physical location: CCA 6 Column 1, Row 4
|
undated | |
3 | Bus Transfer Facility Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Record Set Physical location: CCA 8 Column 5, Row 2
|
undated | |
5 | Irrigation Plans, Approval Set Physical location: CCA 8 Column 5, Row 2
|
undated | |
6 | Final Infrastructure Package Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 171: Grand Calumet (Indiana) |
|||
MANUSCRIPT MATERIALS |
1997 | ||
Box | Folder | ||
14 | 1 | Client Correspondence |
1997 |
14 | 2 | Team Correspondence |
1997 |
14 | 3 | Project Information |
1997 |
14 | 4 | Proposals/Contract |
1997 |
14 | 5 | Internal Correspondence |
1997 |
14 | 6 | Inteview for Planning Project |
1997 |
14 | 7 | Invoices |
1997 |
14 | 8 | Correspondence |
1997 |
14 | 9 | Correspondence |
1997 |
TUBES |
|||
tube | |||
1 | Vision Physical location: CCA 6 Column 1, Row 6
|
undated | |
Project 172: Sand Point/Sand Harbor Nevada State Park |
|||
MANUSCRIPT MATERIALS |
1998-2005 | ||
Box | Folder | ||
14 | 10 | Project Description/Proposals/Contracts |
2004-2005 |
14 | 11 | Correspondence |
1998 |
14 | 12 | Correspondence |
1999 |
14 | 13 | Correspondence |
2005 |
14 | 14 | Meeting Minutes |
1998 |
14 | 15 | Architecture |
1999 |
14 | 16 | Fire Marshal |
1999 |
14 | 17 | Public Works |
1999 |
14 | 18 | Cost Estimates |
1999 |
Project 173: Gardening on El Paso |
|||
MANUSCRIPT MATERIALS |
1997-1998 | ||
Box | Folder | ||
14 | 19 | Proposals/Contracts |
1997-1998 |
14 | 20 | Proposals/Contracts |
1999 |
14 | 21 | Correspondence |
1997-1998 |
14 | 22 | Correspondence |
1997 |
14 | 23 | Correspondence |
1998 |
14 | 24 | Meeting Minutes |
1997-1998 |
14 | 25 | Work Program |
1997 |
14 | 26 | Cost Estimates |
1997 |
14 | 27 | Cost Estimates |
1997 |
14 | 28 | Submittals/Shop Drawings |
1998 |
14 | 29 | Physical |
undated |
14 | 30 | Change Orders |
1998 |
14 | 31 | Design Sketches |
1998 |
TUBES |
|||
tube | |||
1 | Present Drawings Physical location: Barn Box 2
|
undated | |
2 | Miscellaneous Drawings Physical location: Barn Box 2
|
undated | |
Project 174: High Prairie Farms |
|||
MANUSCRIPT MATERIALS |
1996-2003 | ||
Box | Folder | ||
14 | 32 | Proposals/Contracts |
1996 |
14 | 33 | Correspondence |
1996-1997 |
14 | 34 | Meeting Minutes/Notes to File |
1996-1997 |
14 | 35 | Programming |
1996-1997 |
14 | 36 | Residential Data |
1996 |
14 | 37 | Development Proformas |
1997 |
14 | 38 | Master Plan Adjustment Meeting Minutes |
2003 |
14 | 39 | Master Plan Adjustment Survey |
2003 |
14 | 40 | Master Plan Equestrian Park Analysis |
1997 |
14 | 41 | Master Plan Prior Studies |
undated |
14 | 42 | Master Plan Detail Design Studies |
2003 |
14 | 43 | Master Plan Sketches/Image Graphics |
2003 |
14 | 44 | Master Plan Proposal |
2003 |
14 | 45 | Horse Park Work Program |
1991-1999 |
TUBES |
|||
tube | |||
1 | Renderings Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Engineering and Site Regional Maps Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 175: Hirsch/Snowmass |
|||
MANUSCRIPT MATERIALS |
2002-2004 | ||
Box | Folder | ||
14 | 46 | Proposals/Contracts |
2003 |
14 | 47 | Correspondence/Transmittals |
2002-2004 |
14 | 48 | Meeting Minutes |
2002-2003 |
14 | 49 | Vegetatation |
2002 May |
14 | 50 | Sketches/Image Graphics |
2003 |
14 | 51 | Source Data |
2002 |
14 | 52 | Specifications |
2003 |
14 | 53 | Construction Bids/Proposals |
2002-2003 |
14 | 54 | Change Orders |
2003 |
14 | 55 | Water |
2003 |
TUBES |
|||
tube | |||
1 | Landscape design and all plats Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Architects set sketch; schematic design original; schematic design copies Mylar; schematic design planting; schematic design grading Physical location: CCA 8 Column 6, Row 3
|
undated | |
3 | Landscape design and plats Physical location: Barn Box 1
|
undated | |
Project 176: Lake Catamount |
|||
MANUSCRIPT MATERIALS |
1989-1995 | ||
Box | Folder | ||
15 | 1 | Clippings |
1993 |
15 | 2 | Correspondence |
1989-1990 |
15 | 3 | Correspondence |
1993-1994 |
15 | 4 | Correspondence |
1994 |
15 | 5 | Design Sketches |
1994 |
15 | 6 | Drawings |
1995 |
15 | 7 | Issues Summary |
1994 |
15 | 8 | Issues Summary |
1994 |
15 | 9 | Land Use |
undated |
15 | 10 | Meeting Minutes/Notes |
1993-1994 |
15 | 11 | Plan and Program |
1995 |
15 | 12 | Proposal/Contracts |
1994 |
15 | 13 | Work Program |
1993-1994 |
15 | 14 | Work Program |
1994-1995 |
Project 177: Snowshoe |
|||
MANUSCRIPT MATERIALS |
1995-1998 | ||
Box | Folder | ||
15 | 15 | Proposals/Contracts |
1995-1997 |
15 | 16 | Correspondence |
1996 |
15 | 17 | Correspondence |
1996-1998 |
15 | 18 | Meeting Minutes/Notes to File |
1995-1996 |
15 | 19 | Plant List |
1996 |
15 | 20 | Wok Program |
1996 |
15 | 21 | Design Sketches |
1996 |
15 | 22 | Resort Meeting Minutes |
1996 |
15 | 23 | Resort Master Plan |
1996 |
15 | 24 | Resort Programming |
1996 |
15 | 25 | Resort Programming |
1996 |
15 | 26 | Resort Cost Estimates |
1997 |
15 | 27 | Resort Master Plan |
1997 |
TUBES |
|||
tube | |||
1 | Ridge Development Concept Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Resort Physical location: CCA 8 Column 5, Row 2
|
undated | |
3 | Resort Physical location: Barn Box 7
|
undated | |
4 | Design Concept on Trace Physical location: Barn Box 7
|
undated | |
5 | Monograph Physical location: Barn Box 14
|
undated | |
Project 178: Centennial Airport |
|||
MANUSCRIPT MATERIALS |
1998 | ||
Box | Folder | ||
15 | 28 | Proposals/Contracts |
1998 |
15 | 29 | Correspondence |
1998 |
15 | 30 | Land Use Study |
1998 |
15 | 31 | Land Use Study Draft |
1998 |
15 | 32 | Meeting Minutes/Notes |
1998 |
15 | 33 | Work Program |
1999 |
15 | 34 | Background Information |
1998 |
Project 179: Pfister Ranch |
|||
MANUSCRIPT MATERIALS |
1988-1991 | ||
Box | Folder | ||
15 | 35 | Permit Application |
undated |
15 | 36 | Growth Management Application |
1991 June |
15 | 37 | Growth Management Application |
1991 September |
15 | 38 | Golf Development Submission |
1988 July 1 |
15 | 39 | Study of Project Comparables |
1988 September 19 |
15 | 40 | Growth Management Application |
1990 June 1 |
15 | 41 | Detailed Submission |
1990 September |
15 | 42 | GMP & Amended General Submission |
1989 June 1 |
Project 180: Pflugerville |
|||
MANUSCRIPT MATERIALS |
2006-2010 | ||
Box | Folder | ||
16 | 1 | Proposals/Contracts |
2009 |
16 | 2 | Meeting Minutes/Notes To File |
2008-2009 |
16 | 3 | Meeting Minutes/Notes To File |
2009 |
16 | 4 | Meeting Minutes/Notes To File |
2009 |
16 | 5 | Billing/Invoices |
2009 |
16 | 6 | Sub-consultant Contracts |
2009 |
16 | 7 | Public Input |
2009 |
16 | 8 | Zoning |
2006 |
16 | 9 | Zoning |
2006 |
16 | 10 | Correspondence |
2009-2010 |
16 | 11 | Maps |
2009 |
16 | 12 | Parks, Recreation & Open Spacer Public Review Draft |
2010 August |
16 | 13 | Comprehensive Plan Draft |
2010 July |
16 | 14 | Comprehensive Plan Draft |
2009 |
16 | 15 | Citizen Advisory Committee Draft |
2009 November |
TUBES |
|||
tube | |||
1 | Comprehensive Plan Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 181: Dittman Residence |
|||
MANUSCRIPT MATERIALS |
1995-2002; 1995 | ||
Box | Folder | ||
16 | 16 | Consultants |
1998 |
16 | 17 | Correspondence |
1995-2000 |
16 | 18 | Correspondence |
1995-2002 |
16 | 19 | Cost Estimates |
undated |
16 | 20 | Design |
1996 |
16 | 21 | Design Team/Coordination |
1998 |
16 | 22 | Field Reports |
1998 |
16 | 23 | Geology |
undated |
16 | 24 | Graphics |
undated |
16 | 25 | Master Plan |
undated |
16 | 26 | Meeting Notes |
1995-1996 |
16 | 27 | Owner |
1998 |
16 | 28 | Physical |
1995-2000 |
16 | 29 | Planting Plan |
1996 |
16 | 30 | Planting Plan |
1998-2000 |
16 | 31 | Proposal/Contracts |
1995-1998 |
16 | 32 | Sketches |
1998 |
16 | 33 | Specialties |
2000 |
16 | 34 | Specifications |
undated |
16 | 35 | Subdivision |
1996 |
16 | 36 | Water |
1996 |
16 | 37 | Wildlife/Vegetation |
1996 |
TUBES |
|||
tube | |||
1 | Blue Prints Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Master Plan Physical location: CCA 6 Column 2, Row 9
|
undated | |
Project 182: Stolper Residence |
|||
MANUSCRIPT MATERIALS |
2005-2009 | ||
Box | Folder | ||
16 | 38 | Proposals/Contracts |
2005-2009 |
16 | 39 | Correspondence |
2005-2006 |
16 | 40 | Correspondence |
2006-2007 |
16 | 41 | Invoices |
2005-2007 |
16 | 42 | Meeting Minutes |
2006 |
16 | 43 | Visual Analysis
[photocopies]
|
undated |
16 | 44 | Schematic Design |
2006 |
16 | 45 | Design Sketches |
2006 |
16 | 46 | Design Development |
2006-2007 |
16 | 47 | Planting Specifications |
2006-2007 |
16 | 48 | Construction Bids/Proposals |
2006 |
16 | 49 | Construction Bids/Proposals |
2007 |
16 | 50 | Construction Bids/Proposals |
2008-2009 |
16 | 51 | Field Reports |
2008 |
Project 183: The Rocks at Reata Pass |
|||
MANUSCRIPT MATERIALS |
1997-2003 | ||
Box | Folder | ||
16 | 52 | Construction Documents |
2002 |
16 | 53 | Construction Correspondence |
2002 |
16 | 54 | Correspondence Client |
2001-2002 |
16 | 55 | Correspondence Owner |
2002-2003 |
16 | 56 | Electrical/Mechanical |
1997 |
16 | 57 | Landscape Specifications |
2002 |
16 | 58 | Work Plan |
2002 |
TUBES |
|||
tube | |||
1 | Commerce/Gantzel Residence Physical location: CCA 6 Column 2, Row 4
|
undated | |
2 | Design Development Concepts Physical location: CCA 6 Column 2, Row 4
|
undated | |
3 | Grading Plans, Design Development Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | Final Drawings Originals Physical location: CCA 8 Column 4, Row 1
|
undated | |
5 | Submittals Vellum Originals Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Pre-Bid Construction Document Physical location: CCA 8 Column 4, Row 1
|
undated | |
7 | 1st Submittals Physical location: CCA 8 Column 4, Row 1
|
undated | |
8 | 2nd Submittal on Vellum Physical location: CCA 8 Column 4, Row 1
|
undated | |
9 | First Submittals Constitution Documents Physical location: CCA 6 Column 1, Row 4
|
undated | |
10 | Grading Plans, Design Development Physical location: CCA 6 Column 1, Row 5
|
undated | |
Project 184: Institute of American Indian Arts (IAIA) |
|||
MANUSCRIPT MATERIALS |
1992-2000 | ||
Box | Folder | ||
17 | 1 | Proposals/Contracts |
1996-2000 |
17 | 2 | Work Program |
1997-1999 |
17 | 3 | Engineering Design Standards |
1997-1999 |
17 | 4 | Programming |
1997-1999 |
17 | 5 | Cost Estimates |
1997-1998 |
17 | 6 | Design Sketches |
1992-1999 |
17 | 7 | Communications |
1999 |
17 | 8 | Documentation Master Plans |
1993 |
17 | 9 | Documentation Master Plans |
1993 |
17 | 10 | Meeting Notes |
1999 |
17 | 11 | Correspondence |
1998-1999 |
17 | 12 | Proposal for Landscape Design |
1996 |
Project 185: Biltmore Fashion Park, AZ |
|||
MANUSCRIPT MATERIALS |
2005-2006 | ||
Box | Folder | ||
17 | 13 | Proposals/Contracts |
2005 |
17 | 14 | Meeting Agendas/Records |
2005 |
17 | 15 | Tenant Criteria Manual |
2006 |
17 | 16 | Correspondence |
2005 |
17 | 17 | Cost Estimates |
2005 |
17 | 18 | Meeting Notes |
2005 |
17 | 19 | Work Plans |
2005 |
17 | 20 | Plant Lists |
2005 |
17 | 21 | Schematic Designs |
2005 |
17 | 22 | Concept Plans |
2005 |
TUBES |
|||
tube | |||
1 | Design Development Drawings & Sketches Physical location: CCA 8 Column 3, Row 3
|
undated | |
2 | Schematic Designs Physical location: CCA 8 Column 3, Row 3
|
undated | |
3 | City Resubmittals Physical location: Barn Box 3
|
undated | |
4 | City Comments Physical location: Barn Box 3
|
undated | |
5 | Schematic Design Physical location: Barn Box 3
|
undated | |
6 | Design Development Set Physical location: Barn Box 5
|
undated | |
7 | Site Notes Physical location: Barn Box 5
|
undated | |
Project 186: Lair of the Golden Bear |
|||
MANUSCRIPT MATERIALS |
1998-2005 | ||
Box | Folder | ||
17 | 23 | Meeting Minutes |
2002-2005 |
17 | 24 | Permit |
1998 |
17 | 25 | Opportunities and Constraints Report |
2002 December |
17 | 26 | Environmental Assessment |
undated |
17 | 27 | Project Description |
2005 April 15 |
17 | 28 | Master Plan Appendix |
2003 |
17 | 29 | Master Plan |
2003 |
Project 187: Great Valley Corp Center |
|||
MANUSCRIPT MATERIALS |
2005-2007 | ||
Box | Folder | ||
17 | 30 | Proposals/Contracts |
2005-2007 |
17 | 31 | Meeting Minutes/Notes to File |
2006 |
17 | 32 | Correspondence |
2005-2006 |
17 | 33 | Site Testing |
2006 |
17 | 34 | Maps |
2006 |
17 | 35 | Maps |
2007 |
17 | 36 | Maps |
2007 |
17 | 37 | Master Plan |
2007 February |
17 | 38 | Master Plan |
2007 February |
TUBES |
|||
tube | |||
1 | Containing most project presentation boards, sketches and construction documents Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Containing most project presentation boards, sketches and construction documents Physical location: CCA 6 Column 1, Row 1
|
undated | |
3 | Containing most project presentation boards, sketches and construction documents Physical location: CCA 6 Column 1, Row 1
|
undated | |
4 | Ranch Hotel Physical location: Barn Box 9
|
undated | |
Project 188: Early Winters |
|||
MANUSCRIPT MATERIALS |
1988-1992; 1988 | ||
Box | Folder | ||
18 | 1 | Clippings |
1991-1992 |
18 | 2 | Master Plan Cost Estimates |
1990 |
18 | 3 | Master Plan Design Sketches/Product Info |
1990 |
18 | 4 | Master Plan Economics Analysis |
1988-1989 |
18 | 5 | Master Plan EIS |
1990 |
18 | 6 | Miscellaneous Engineering |
undated |
18 | 7 | Village Plan Marketing/Presentations |
1990 |
18 | 8 | Miscellaneous Meeting Minutes/Notes to File |
1990 |
18 | 9 | Village Plan Meeting Minutes/Notes to File |
1989 |
18 | 10 | Master Plan PDR |
1989-1990 |
18 | 11 | Master Plan Programming |
1989-1990 |
18 | 12 | Village Plan Programming |
1990 |
18 | 13 | Miscellaneous Proposal/Contracts |
1990 |
18 | 14 | Master Plan Submittal Requirements |
1989-1990 |
18 | 15 | Village Plan Work Programs |
1990 |
18 | 16 | Miscellaneous Work Program |
1990 |
TUBES |
|||
tube | |||
1 | Land Ownership Mylar's, Land Study Analysis Physical location: CCA 8 Column 6, Row 2
|
||
2 | Schematic, soils, geology, wildlife, visual analysis Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | IDP/EIS, Original Mylar Physical location: CCA 8 Column 6, Row 2
|
undated | |
4 | GIS Map Analysis Physical location: CCA 8 Column 6, Row 3
|
undated | |
5 | Village Originals Mylar Physical location: CCA 8 Column 2, Row 2
|
undated | |
6 | Preliminary Master Plan, Topography, Presentation Drawings Physical location: CCA 8 Column 2, Row 2
|
undated | |
7 | Property Ownership Physical location: CCA 6 Column 2, Row 2
|
undated | |
8 | Village Center Physical location: CCA 6 Column 2, Row 2
|
undated | |
9 | EIS Original Physical location: CCA 6 Column 2, Row 2
|
undated | |
10 | PDR Final Graphics Physical location: CCA 6 Column 2, Row 2
|
undated | |
11 | Flood Plain Map Physical location: CCA 6 Column 2, Row 2
|
undated | |
12 | Sketches, Preliminary Analysis, Trace Diagramming Physical location: Barn Box 2
|
undated | |
13 | Village Studies, Base Info, Alternatives A&B, Sections Physical location: Barn Box 2
|
undated | |
14 | Originals Physical location: CCA 8 Column 5, Row 2
|
undated | |
15 | Framework Development Plan Physical location: CCA 8 Column 5, Row 2
|
undated | |
16 | Master Plan First Phase Physical location: CCA 8 Column 5, Row 2
|
undated | |
17 | Monographs Physical location: Barn Box 14
|
undated | |
Project 189: Los Padillas Elementary School |
|||
MANUSCRIPT MATERIALS |
1992-1994 | ||
Box | Folder | ||
18 | 17 | Proposals/Contracts |
1992 |
18 | 18 | Proposals/Contracts |
1993 |
18 | 19 | Correspondence |
1992 |
18 | 20 | Correspondence |
1993 |
18 | 21 | Correspondence |
1993 |
18 | 22 | Correspondence |
1994 |
18 | 23 | Change Orders |
1993 |
18 | 24 | Notes to File |
1992 |
18 | 25 | Design Sketches |
undated |
Project 190: Sundance (Utah) |
|||
MANUSCRIPT MATERIALS |
1994-1996 | ||
Box | Folder | ||
18 | 26 | Proposals/Contracts |
1995 |
18 | 27 | Correspondence/Owner |
1995-1996 |
18 | 28 | Correspondence/Consultant |
1996 |
18 | 29 | Conversation Record |
1996 |
18 | 30 | Meeting Minutes |
1995-1996 |
18 | 31 | Notes to File |
1996 |
18 | 32 | Facsimiles |
1995-1996 |
18 | 33 | Facsimiles |
1996 |
18 | 34 | Design Sketches/Product Information |
1994-1995 |
18 | 35 | Vegetation |
undated |
18 | 36 | Cost Estimates |
1995-1996 |
18 | 37 | Field Reports |
1996 |
18 | 38 | Change Orders |
undated |
18 | 39 | Master Plans |
1996 |
TUBES |
|||
tube | |||
1 | Master Plan Physical location: Barn Box 8
|
undated | |
Project 191: Vail |
|||
MANUSCRIPT MATERIALS |
1980-2001 | ||
Box | Folder | ||
18 | 40 | Arrowhead Correspondence |
1993-1994 |
18 | 41 | Programming |
1980-1994 |
18 | 42 | Programming |
1994 |
18 | 43 | Lodge at Vail Proposals/Contracts |
1996-1997 |
18 | 44 | Lodge at Vail Correspondence |
1997-1998 |
18 | 45 | Lot P3 Proposals/Contracts |
1995-1996 |
18 | 46 | Lot P3 Meeting Minutes/Notes to File |
1995 |
18 | 47 | Lot P3 Design Sketches/Product Information |
1995 |
18 | 48 | Open Lands Proposals/Contracts |
1993 |
18 | 49 | Open Lands Correspondence |
1993 |
18 | 50 | Open Lands Meeting Minutes/Notes to File |
1993 |
18 | 51 | Open Lands Work Program |
1993 |
18 | 52 | Proposal/Contract for Community Facilities |
1999 |
18 | 53 | Cost Estimates for the Ski Club |
1999 |
18 | 54 | Design Sketches/Product Info for Ski Club |
2000 |
18 | 55 | Meeting Minutes for Ski Club |
1999-2000 |
18 | 56 | Clippings for Ski Club |
undated |
18 | 57 | Proposal/Contract for Ski Club |
2000 |
18 | 58 | Correspondence for Ski Club |
1999-2000 |
18 | 59 | Transmittals for Ski Club |
1999-2001 |
18 | 60 | Programming for Common Ground |
1998 |
18 | 61 | Proposals/Contracts for Common Ground |
1998 |
18 | 62 | Proposals/Contracts for Common Ground |
1998 |
18 | 63 | Meeting Minutes/Notes for Common Ground |
1998 |
18 | 64 | Clippings for Common Ground |
1998 |
18 | 65 | Finance for Common Ground |
1998 |
18 | 66 | Proposal/Contracts |
2000 |
TUBES |
|||
tube | |||
1 | Lodge Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Westin Resort Physical location: CCA 6 Column 1, Row 2
|
undated | |
3 | Resort Renovation Design Development Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Site Plan Physical location: CCA 8 Column 5, Row 3
|
undated | |
5 | Retail Physical location: CCA 8 Column 4, Row 2
|
undated | |
6 | Lodge Physical location: CCA 8 Column 5, Row 3
|
undated | |
7 | Cascade Physical location: CCA 8 Column 4, Row 3
|
undated | |
8 | Western Vail/Cascade Physical location: CCA 8 Column 5, Row 2
|
undated | |
9 | Lodge at Vail Resorts Physical location: CCA 8 Column 4, Row 3
|
undated | |
10 | Westin Design Development Prints Physical location: CCA 8 Column 5, Row 3
|
undated | |
11 | Old Vail Valley Dr. Engineer Drawings Physical location: CCA 8 Column 5, Row 2
|
undated | |
12 | Lodge Physical location: CCA 8 Column 5, Row 2
|
undated | |
13 | Cascade Lodge Physical location: Barn Box 6
|
undated | |
Project 192: Gary Redevelopment |
|||
MANUSCRIPT MATERIALS |
1995-1999 | ||
Box | Folder | ||
19 | 1 | City of Gary Downtown Redevelopment Plan Appendix |
1998 |
19 | 2 | Plan Correspondence Consultant |
undated |
19 | 3 | Correspondence Owner |
1996-1997 |
19 | 4 | Development Plan |
1995-1996 |
19 | 5 | Development Plan Proposal/Contract Consultant |
1997-1998 |
19 | 6 | Proposal/Contract Owner |
1997-1999 |
19 | 7 | Work Program |
1996-1997 |
19 | 8 | Development Planning |
1997 |
19 | 9 | Concept Master Plan |
1997 |
TUBES |
|||
tube | |||
1 | Aerial Photograph Physical location: CCA 6 Column 2, Row 6
|
undated | |
2 | Trace and Vellum Renderings Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 193: Great Western Park |
|||
MANUSCRIPT MATERIALS |
1998-2004 | ||
Box | Folder | ||
19 | 10 | Proposals/Contracts |
1999-2000 |
19 | 11 | Correspondence |
1999-2000 |
19 | 12 | Correspondence |
2000 |
19 | 13 | Correspondence |
2000-2001 |
19 | 14 | Meeting Minutes/Notes |
1998-2000 |
19 | 15 | Schematic Design |
2000 |
19 | 16 | Detail Design Studies |
2001 |
19 | 17 | Firing Range Correspondence |
2000-2004 |
19 | 18 | Firing Range Utilities |
2001 |
19 | 19 | Firing Range Schematic Design |
2004 |
19 | 20 | Firing Range Design Development |
2003 |
Project 194: Agua Claras Mine Project |
1980-1993 | ||
MANUSCRIPT MATERIALS |
1980-1993 | ||
Box | Folder | ||
19 | 21 | Proposals/Contracts |
1990-1991 |
19 | 22 | Correspondence |
1990-1991 |
19 | 23 | Meeting Minutes/Notes to File |
1990-1991 |
19 | 24 | Phase 1 Summary Report |
1991 January 18 |
19 | 25 | Video Story Board |
1992 |
19 | 26 | Correspondence |
1991-1992 |
19 | 27 | Case Study |
1992-1993 |
19 | 28 | Phase 2 Proposals/Contracts |
1991 |
19 | 29 | Phase 2 Correspondence |
1991 |
19 | 30 | Phase 2 Meeting Minutes/Notes to File |
1991 |
19 | 31 | Phase 2 Work Program |
1990-1992 |
19 | 32 | Engineering |
1991 |
19 | 33 | Office Parcel Correspondence |
1991 |
19 | 34 | Programming |
1980 |
19 | 35 | Phase 3 Proposals/Contracts |
1991 |
19 | 36 | Phase 3 Correspondence |
1991 |
TUBES |
|||
tube | |||
1 | Phase I and II Physical location: CCA 8 Column 4, Row 2
|
||
Project 195: Perisher Valley |
1995-1996 | ||
MANUSCRIPT MATERIALS |
1995-1996 | ||
Box | Folder | ||
19 | 37 | Base Area Plan |
undated |
19 | 38 | Correspondence |
1996 |
19 | 39 | Correspondence Ski |
1996 |
19 | 40 | Design Sketches/Product Info |
undated |
19 | 41 | Meeting Minutes/Notes |
1996 |
19 | 42 | Project Reference |
1991 |
19 | 43 | Project Reference |
1991 |
19 | 44 | Physical |
undated |
19 | 45 | Proposals |
1995 |
19 | 46 | Ski Area Plans |
undated |
19 | 47 | Traffic Study |
1996 |
19 | 48 | Mountain Master Plan |
1995 |
TUBES |
|||
tube | |||
1 | Resort Physical location: CCA 6 Column 2, Row 5
|
undated | |
2 | Resort Physical location: CCA 6 Column 2, Row 9
|
undated | |
3 | Trails Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 196: Cove Springs Refinement |
2003-2006 | ||
MANUSCRIPT MATERIALS |
2003-2006 | ||
Box | Folder | ||
19 | 49 | Proposals/Contracts |
2004-2006 |
19 | 50 | Meeting Minutes |
2004 |
19 | 51 | Meeting Minutes |
2005 |
19 | 52 | Correspondence |
2004-2005 |
19 | 53 | Cost Estimates |
2004 |
19 | 54 | Environmental |
2005 |
19 | 55 | Illustrative Maps |
2003 |
19 | 56 | Infrastructure |
2004 |
19 | 57 | Conceptual Design |
2004 |
Project 197: Lake Las Vegas Wash |
1993-1998 | ||
MANUSCRIPT MATERIALS |
1993-1998 | ||
Box | Folder | ||
20 | 1 | Articles |
1997 |
20 | 2 | Biological |
1998 |
20 | 3 | Correspondence - Consultant |
1998 |
20 | 4 | Correspondence |
1997-1998 |
20 | 5 | Correspondence |
1997 |
20 | 6 | Correspondence - Conversation Records |
1998 |
20 | 7 | Correspondence - Owner |
1997 |
20 | 8 | Correspondence - Owner |
1998 |
20 | 9 | Cost Estimates |
1997 |
20 | 10 | Cost Estimates |
1997 |
20 | 11 | Design Sketches |
1997 |
20 | 12 | Design Sketches/Product Info |
1998 |
20 | 13 | Design Sketches/Product Info |
undated |
20 | 14 | Master Plans |
undated |
20 | 15 | Meeting Minutes/Notes |
1997-1998 |
20 | 16 | Meeting Minutes/Notes |
1998 |
20 | 17 | Meeting Minutes |
undated |
20 | 18 | Programming |
1997 |
20 | 19 | Proposal/Contracts |
1997-1998 |
20 | 20 | Proposal/Contracts |
1993 |
20 | 21 | Proposal/Contracts |
1998 |
20 | 22 | Proposal/Contracts - Owner/Landscape |
1997 |
20 | 23 | Proposal/Contracts - Owner/Landscape - Hyatt |
1997 |
20 | 24 | Water Features |
1997-1998 |
20 | 25 | Work Program |
1998 |
TUBES |
1997 | ||
tube | |||
1 | Presentation Interview Physical location: Barn Box 5
|
undated | |
2 | Master Plan Physical location: Barn Box 5
|
undated | |
3 | Hyatt Lake Las Vegas Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Mylar's Physical location: CCA 6 Column 1, Row 5
|
undated | |
5 | Illustrative Renderings and Sketches Physical location: CCA 8 Column 4, Row 3
|
undated | |
6 | Hyatt Regency Trace Sketches Physical location: CCA 8 Column 4, Row 3
|
1997; undated | |
7 | Conceptual Illustrative Site Plan Physical location: Barn Box 6
|
undated | |
8 | Planting Physical location: Barn Box 14
|
undated | |
Project 198: JY Ranch |
2002 | ||
MANUSCRIPT MATERIALS |
2002 | ||
Box | Folder | ||
20 | 26 | Correspondence |
2002 |
20 | 27 | County Documents |
2002 |
20 | 28 | Design Development |
2002 |
20 | 29 | Design Development |
2002 |
20 | 30 | Meeting Minutes |
2002 |
20 | 31 | Market Research |
2002 |
TUBES |
|||
tube | |||
1 | Trail Map Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 199: Hunt/Garza |
1997-2007 | ||
MANUSCRIPT MATERIALS |
1997-2007 | ||
Box | Folder | ||
20 | 32 | Clippings |
1998 |
20 | 33 | Correspondence-Garza |
1997-1998 |
20 | 34 | Correspondence-Hunt Affordable |
1998 |
20 | 35 | Correspondence-Market Study |
1998 |
20 | 36 | Cost Estimates |
1998 |
20 | 37 | Design Sketches |
undated |
20 | 38 | Master Plan |
2006-2007 |
20 | 39 | Meeting Minutes/Notes to File |
1998 |
20 | 40 | Meeting Minutes/Notes to File-Market Study |
1998 |
20 | 41 | Notes |
1998 |
20 | 42 | Programming-Garza Properties |
1998 |
20 | 43 | Programming-Hunt Affordable |
1998 |
20 | 44 | Proposals/Contracts |
1997-1998 |
20 | 45 | Proposals/Contracts-Market Study |
1998 |
20 | 46 | Proposal of Service |
1997 |
20 | 47 | Vision Plan |
1998 |
TUBES |
|||
tube | |||
1 | Vision Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Hunt Affordable Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Hunt Affordable Conceptual Sections Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Hunt Affordable Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 200: Green Valley Ranch |
1997-2005 | ||
MANUSCRIPT MATERIALS |
1997-2005 | ||
Box | Folder | ||
20 | 48 | Proposals/Contracts |
2002 |
20 | 49 | Correspondence/Transmittals |
2002-2003 |
20 | 50 | Meeting Minutes/Notes To File |
2002 |
20 | 51 | Meeting Minutes/Notes To File |
2002 |
20 | 52 | Meeting Minutes/Notes To File |
2002 |
20 | 53 | Meeting Minutes/Notes To File |
2002 |
20 | 54 | Enginineering |
2002 |
20 | 55 | Cost Estimates |
2002-2003 |
20 | 56 | Design Review |
2001 |
20 | 57 | City Requirements |
1997-2003 |
20 | 58 | Proposals/Contracts |
2004 |
20 | 59 | Conceptual Design |
2005 |
20 | 60 | Zoning Requirements |
undated |
20 | 61 | Image Booklet |
2002 May 1 |
TUBES |
|||
tube | |||
1 | Bumwad plan sketches Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Golf Resort Physical location: CCA 6 Column 2, Row 1
|
undated | |
3 | Shops Physical location: CCA 8 Column 5, Row 3
|
undated | |
4 | Shops Physical location: CCA 8 Column 5, Row 3
|
undated | |
5 | Shops at Green Valley Ranch Physical location: CCA 6 Column 1, Row 8
|
undated | |
6 | Shops at Green Valley Ranch Physical location: CCA 6 Column 1, Row 8
|
undated | |
Project 201: Glacier Club/Tamarron |
2001-2006 | ||
MANUSCRIPT MATERIALS |
2001-2006 | ||
Box | Folder | ||
21 | 1 | Proposals |
2006 |
21 | 2 | Schematic Design |
2006 |
21 | 3 | Field Notes |
2004 |
21 | 4 | Construction Documents |
2003 August 5 |
21 | 5 | Design Sketches |
undated |
21 | 6 | Pool |
2003-2004 |
21 | 7 | Firepit |
2004-2006 |
21 | 8 | Meeting Records |
2001 |
21 | 9 | Correspondence |
2001-2002 |
21 | 10 | Land Use |
2001-2002 |
21 | 11 | Site Map |
2001 |
21 | 12 | Grading Plan |
2002 |
21 | 13 | Construction Summary |
2002-2003 |
21 | 14 | Tamarron Proposals |
2000-2004 |
TUBES |
|||
item | |||
1 | Conceptual Master Development Plan Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Hand Drawn Conceptual Plans Physical location: CCA 8 Column 5, Row 3
|
undated | |
3 | Signage Physical location: Barn Box 9
|
undated | |
4 | Golf Physical location: Barn Box 10
|
undated | |
5 | Golf Physical location: Barn Box 15
|
undated | |
6 | Mix Studies Physical location: Barn Box 16
|
undated | |
Project 202: Callaway Gardens |
1999-2006 | ||
MANUSCRIPT MATERIALS |
1999-2006 | ||
Box | Folder | ||
21 | 15 | Project Information |
2003 |
21 | 16 | Contracts/Proposals |
2005 |
21 | 17 | Environmental |
1999-2004 |
21 | 18 | Environmental |
2005 |
21 | 19 | Federal Grants |
2005 |
21 | 20 | Historic/Cultural |
undated |
21 | 21 | Infrastructure |
2005 |
21 | 22 | Marketing |
2005 |
21 | 23 | Meeting Agendas/Notes |
2006 |
21 | 24 | Summary |
2000-2005 |
Project 203: Cuchara |
1998 | ||
MANUSCRIPT MATERIALS |
1998 | ||
Box | Folder | ||
21 | 25 | Correspondence |
1998 |
21 | 26 | Correspondence-Develop Plan |
1998 |
21 | 27 | Documentation |
undated |
21 | 28 | Images |
undated |
21 | 29 | Meeting Minutes/Notes |
1998 |
21 | 30 | Programming |
1998 |
21 | 31 | Proposals/Contracts |
1998 |
21 | 32 | PUD |
1998 |
Project 204: Mesdag Residence |
1997-2000 | ||
MANUSCRIPT MATERIALS |
1997-2000 | ||
Box | Folder | ||
21 | 33 | Residence Building Permits |
undated |
21 | 34 | Residence Cost Estimates |
1997-1999 |
21 | 35 | Residence Correspondence |
1997-1999 |
21 | 36 | Residence Field Reports |
1998-2000 |
21 | 37 | Residence Gate |
1998-2000 |
21 | 38 | Residence Grading Plan |
1999 |
21 | 39 | Residence Lighting |
1998 |
21 | 40 | Residence Legal Document |
1998-1999 |
21 | 41 | Residence Proposals/Contracts |
1997-2000 |
21 | 42 | Residence Site Visits |
1998-1999 |
21 | 43 | Residence Soil Earth Moving Permit |
1998 |
21 | 44 | Residence Subdivision |
1997 |
21 | 45 | Residence Visual Analysis |
1999 |
21 | 46 | Residence Water Rights |
1998-1999 |
TUBES |
|||
tube | |||
1 | Mesdag Residence Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Illustrations Physical location: CCA 6 Column 2, Row 6
|
undated | |
3 | Analysis Physical location: CCA 6 Column 2, Row 6
|
undated | |
4 | Layout and Materials Details Physical location: Barn Box 15
|
undated | |
Project 205: Stoneridge |
1989-1998 | ||
MANUSCRIPT MATERIALS |
1989-1998 | ||
Box | Folder | ||
21 | 47 | Clippings |
1998 |
21 | 48 | Correspondence Agency |
1998 |
21 | 49 | Correspondence Consultant |
1998 |
21 | 50 | Correspondence Owner |
1998 |
21 | 51 | Engineering Civil/Traffic |
undated |
21 | 52 | Engineering Legal Description |
1998 |
21 | 53 | Engineering Utility |
1989-1998 |
21 | 54 | Facsimiles |
1998 |
21 | 55 | Marketing/Presentation |
1998 |
21 | 56 | Meeting Minutes |
1998 |
21 | 57 | Notes to File |
1998 |
21 | 58 | Programming Land Use |
1998 |
21 | 59 | Proposal/Contracts |
1998 |
21 | 60 | PUD |
undated |
21 | 61 | Work Program |
undated |
TUBES |
|||
tube | |||
1 | Master Plan Physical location: CCA 6 Column 1, Row 4
|
undated | |
Project 206: Landau Residence |
1992-1996 | ||
MANUSCRIPT MATERIALS |
1992-1996 | ||
Box | Folder | ||
22 | 1 | Proposals/Contracts |
1993-1996 |
22 | 2 | Billings/Invoices |
1993-1994 |
22 | 3 | Site Visit Reports |
1994 |
22 | 4 | Notes and Sketches |
1993-1996 |
22 | 5 | Correspondence |
1992-1993 |
22 | 6 | Correspondence |
1994 |
22 | 7 | Correspondence |
1994 |
22 | 8 | Correspondence |
1994 |
22 | 9 | Correspondence |
1994 |
22 | 10 | Correspondence |
1995 |
22 | 11 | Correspondence |
1995 |
22 | 12 | Correspondence |
1996 |
TUBES |
|||
tube | |||
1 | Saddle Back Ranch Physical location: CCA 6 Column 1, Row 2
|
undated | |
2 | Irrigation Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 207: Base Village |
1994-1995 | ||
MANUSCRIPT MATERIALS |
1994-1995 | ||
Box | Folder | ||
22 | 13 | Biological |
1994-1995 |
22 | 14 | Correspondence |
1995 |
22 | 15 | Design Sketches |
undated |
22 | 16 | Employee Housing |
undated |
22 | 17 | Engineering |
1995 |
22 | 18 | Meeting Minutes/Notes |
1995 |
22 | 19 | Programming |
1995 |
22 | 20 | Proposal/Contract |
1995 |
22 | 21 | Transmittal |
1995 |
22 | 22 | Work Program |
1995 |
TUBES |
|||
tube | |||
1 | Parcel A Sketches, parking plan w/ notes Physial location: CCA 8 Column 6, Row 2
|
undated | |
2 | Base Village Physial location: CCA 8 Column 6, Row 2
|
undated | |
3 | Overlay Originals Physial location: CCA 8 Column 6, Row 2
|
undated | |
Project 208: Delgany Street in Central Platte Valley |
1999-2006 | ||
MANUSCRIPT MATERIALS |
1999-2006 | ||
Box | Folder | ||
22 | 23 | Comments |
2001-2002 |
22 | 24 | Construction Documents |
2000-2004 |
22 | 25 | Contracts |
1999-2000 |
22 | 26 | Correspondence |
2002-2003 |
22 | 27 | Cost Estimates |
2000 |
22 | 28 | Design Development |
2003 |
22 | 29 | Maps |
2002-2003 |
22 | 30 | Meeting Minutes |
1999-2002 |
22 | 31 | Meeting Minutes |
2002-2003 |
22 | 32 | Meeting Minutes |
2004 |
22 | 33 | Notes |
1999 |
22 | 34 | Proposal/Contracts |
2004 |
22 | 35 | Proposal/Contracts |
2004-2006 |
22 | 36 | Schematic Design |
2004-2006 |
22 | 37 | Site Plan |
2004 |
Project 209: Golden Peak Redevelopment |
1993-1996 | ||
MANUSCRIPT MATERIALS |
1993-1996 | ||
Box | Folder | ||
22 | 38 | Proposals/Contracts |
1994-1995 |
22 | 39 | Correspondence |
1992-1996 |
22 | 40 | Meeting/Minutes Notes |
1995 |
22 | 41 | Meeting/Minutes Notes |
1995-1996 |
22 | 42 | Meeting/Minutes Notes |
1995-1996 |
22 | 43 | Meeting/Minutes Notes |
1996 |
22 | 44 | Meeting/Minutes Notes |
1996 |
22 | 45 | Meeting/Minutes Notes |
1996 |
22 | 46 | Meeting/Minutes Notes |
1996 |
22 | 47 | Meeting/Minutes Notes |
1996 |
22 | 48 | Biological |
1996 |
22 | 49 | Engineering |
1995 |
22 | 50 | Design Sketches |
1994-1995 |
22 | 51 | Zoning |
1993-1994 |
22 | 52 | Work Program |
1995 |
22 | 53 | Cost Estimate |
1995 |
TUBES |
|||
tube | |||
1 | Final CD originals, Illustrative copies Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Pre-SD originals, old vail valley drive studies, early concept and context studies Physical location: CCA 8 Column 6, Row 3
|
undated | |
3 | Pre-DD process originals, approval process originals Physical location: CCA 8 Column 6, Row 3
|
undated | |
4 | Illustrative Plans Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 210: Lauder Residence |
1990-2001 | ||
MANUSCRIPT MATERIALS |
1990-2001 | ||
Box | Folder | ||
23 | 1 | Proposals/Contracts |
1990-2000 |
23 | 2 | Correspondence |
1990-1994 |
23 | 3 | Correspondence |
1998-2000 |
23 | 4 | Meeting Minutes |
2000-2001 |
23 | 5 | Survey |
1995-2000 |
23 | 6 | Physical Geotech |
2000 |
23 | 7 | Construction Details |
2000 |
23 | 8 | Cost Estimates |
2001 |
23 | 9 | Construction Documents |
2000 |
TUBES |
|||
tube | |||
1 | Lots 1-7 Trees Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Spa Details and Deck Physical location: CCA 8 Column 5, Row 3
|
undated | |
3 | Tennis House Physical location: Barn Box 1
|
undated | |
Project 211: Gunnison Parks |
1992-1997 | ||
MANUSCRIPT MATERIALS |
1992-1997 | ||
Box | Folder | ||
23 | 10 | Master Plan Proposals/Contracts |
1996-1997 |
23 | 11 | Master Plan Correspondence |
1996-1997 |
23 | 12 | Master Plan Meeting Minutes/Notes to File |
1996 |
23 | 13 | Master Plan Interview Information |
1996 |
23 | 14 | Master Plan Engineering |
1994 |
23 | 15 | Master Plan Engineering |
1996 |
23 | 16 | Master Plan Programming |
1990-1995 |
23 | 17 | Master Plan Programming |
1996 |
23 | 18 | Agricultural Lease Agreement |
1992 |
23 | 19 | Master Plan Design Sketches/Product Information |
1992-1993 |
23 | 20 | Master Plan Design Sketches/Product Information |
1996 |
23 | 21 | Master Plan Marketing/Presentations |
1996 |
TUBES |
|||
tube | |||
1 | Final Drawings Physical location: Barn Box 1
|
undated | |
2 | Master Plan Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 212: Woodrun V |
1978-1983 | ||
MANUSCRIPT MATERIALS |
1978-1983 | ||
Box | Folder | ||
23 | 22 | Final P.U.D. and Plat Submission |
1978 |
23 | 23 | Final Plat Submission |
1982 |
23 | 24 | Feasibility Cost Analysis |
1980 |
23 | 25 | Architectural Program |
1979 |
23 | 26 | Architectural Program |
1979 |
23 | 27 | Parcel 9 Final Plat Submission |
1982 |
23 | 28 | Parcel 10 Final Plat Submission |
1983 |
23 | 29 | Parcel 12 Final Plat Submission |
1981 |
23 | 30 | Investor's Package |
1982 |
23 | 31 | Townhouses Schematic Design |
undated |
TUBES |
|||
tube | |||
1 | Signage Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 213: Adventure Sports Center |
2002-2006 | ||
MANUSCRIPT MATERIALS |
2002-2006 | ||
Box | Folder | ||
24 | 1 | Proposals/Contracts |
2003-2006 |
24 | 2 | Precident Study |
2003 |
24 | 3 | Meeting Minutes |
2002-2006 |
24 | 4 | Correspondence |
2002-2003 |
24 | 5 | Correspondence |
2003 |
24 | 6 | Correspondence |
2004-2005 |
24 | 7 | Cost Estimates |
2004-2006 |
24 | 8 | Conceptual Design |
2004 |
24 | 9 | Schematic Design |
2003 |
24 | 10 | Design Development |
2004 |
24 | 11 | Specifications |
2004-2005 |
24 | 12 | Construction Bids |
2003 |
24 | 13 | Construction Contracts |
2006 |
24 | 14 | Change Orders |
2004-2006 |
Project 214: Cave Creek |
1992-1997 | ||
MANUSCRIPT MATERIALS |
1992-1997 | ||
Box | Folder | ||
24 | 15 | Proposals |
1995 |
24 | 16 | Proposals |
1996-1997 |
24 | 17 | Correspondence |
1995-1997 |
24 | 18 | Correspondence |
1997 |
24 | 19 | Correspondence |
1997 |
24 | 20 | Meeting Minutes |
1995-1997 |
24 | 21 | Notes to File |
1996-1997 |
24 | 22 | Programming |
1996 |
24 | 23 | Cost Estimates |
1996-1997 |
24 | 24 | Construction Bids/Proposals |
1992-1996 |
TUBES |
|||
tube | |||
1 | Granding and Planting Plans Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 215: Camp Hillard |
1995-2003 | ||
MANUSCRIPT MATERIALS |
1995-2003 | ||
Box | Folder | ||
24 | 25 | Design Deveopment Proposals/Contracts |
1995-1996 |
24 | 26 | Design Development Correspondence |
1995-1996 |
24 | 27 | Design Development Transmittals |
1995-1996 |
24 | 28 | Design Development Physical |
1995-1996 |
24 | 29 | Design Development Programming |
1995-1996 |
24 | 30 | Design Development Design Sketches/Product Infromation |
1995-1996 |
24 | 31 | Design Development Marketing/Presentations |
undated |
24 | 32 | Master Plan Revisions Proposals/Contracts |
1997 |
24 | 33 | Master Plan Revisions Correspondence |
1997-1998 |
24 | 34 | Master Plan Revisions Design Sketches/Production Information |
1997 |
24 | 35 | Mini Golf & Creative Play Proposals/Contracts |
1996 |
24 | 36 | Mini Golf & Creative Play Correspondence |
1996-1997 |
24 | 37 | Mini Golf & Creative Play Programming |
1996 |
24 | 38 | Mini Golf & Creative Play Design Sketches/Product Information |
1996-1997 |
24 | 39 | Proposals/Contracts |
2001-2002 |
24 | 40 | Meeting Minutes |
2001 |
24 | 41 | Notes to File |
2001 |
24 | 42 | Cost Estimates |
2002 |
24 | 43 | Design Sketches |
2001 |
24 | 44 | Memos/Emails |
2001-2002 |
24 | 45 | Memos to Client |
2001-2002 |
24 | 46 | Presentataion Drawings |
2001 |
24 | 47 | Construction Documents |
2002 |
24 | 48 | Design Development |
2003 |
24 | 49 | Request for Information |
2003 |
24 | 50 | Equipment |
2003 |
TUBES |
|||
tube | |||
1 | Creative Play Development Physical location: CCA 6 Column 2, Row 3
|
undated | |
2 | Creative Play Development Physical location: CCA 6 Column 2, Row 4
|
undated | |
3 | Mini Golf Physical location: CCA 6 Column 1, Row 9
|
undated | |
4 | Creative Play Development Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Preliminary Programming, Bunkhouse plans and details, bubble diagram Physical location: CCA 8 Column 4, Row 3
|
undated | |
6 | The Hamptons Physical location: CCA 8 Column 5, Row 2
|
undated | |
7 | Lower Field Redevelopment Physical location: Barn Box 10
|
undated | |
Project 216: Snake River |
1989-1995 | ||
MANUSCRIPT MATERIALS |
1989-1995 | ||
Box | Folder | ||
25 | 1 | Trade-Site Correspondence |
1989-1990 |
25 | 2 | Trade Site Meeting Minutes/Notes to File |
undated |
25 | 3 | Trade Site Proposal/Contract |
1989-1990 |
25 | 4 | Proposal/Contracts |
1989 |
25 | 5 | Conceptual Site Planning |
1995 |
25 | 6 | Correspondence |
1995 |
25 | 7 | Master Plan |
undated |
Project 217: Pike's Peak |
1987-1999 | ||
MANUSCRIPT MATERIALS |
1987-1999 | ||
Box | Folder | ||
25 | 8 | Proposal/Contracts |
1997-1999 |
25 | 9 | Correspondence |
1997-1999 |
25 | 10 | Project Information |
1991 |
25 | 11 | Work Program |
1987-1999 |
25 | 12 | Meeting Minutes |
1998 June |
25 | 13 | Public Meeting Notes |
1998-1999 |
25 | 14 | Public Meeting Notes |
1998 |
25 | 15 | Public Meeting Notes |
1998 |
25 | 16 | Appendices |
undated |
25 | 17 | Multi-Use Plan |
1998 |
25 | 18 | Multi-Use Report |
1999 September |
25 | 19 | Multi-Use Report |
1999 September |
Project 218: Bonderman Residence |
1992-2000 | ||
MANUSCRIPT MATERIALS |
1992-2000 | ||
Box | Folder | ||
25 | 20 | Proposal/Contracts |
1993-1995 |
25 | 21 | Proposal/Contracts |
1996-2000 |
25 | 22 | Correspondence |
1993-1995 |
25 | 23 | Correspondence |
1996-1998 |
25 | 24 | Correspondence |
1999-2000 |
25 | 25 | Transmittals |
1992-1995 |
25 | 26 | Transmittals |
1996-1999 |
25 | 27 | Water Resources |
2000 |
25 | 28 | Notes to File |
1995 |
25 | 29 | Cost Estimates |
1994-1996 |
25 | 30 | Change Orders |
1994-1997 |
25 | 31 | Meeting Minutes |
1994-1995 |
25 | 32 | Meeting Minutes |
1995-2000 |
25 | 33 | Design Sketches |
undated |
25 | 34 | Imagery Notebook |
1994 |
25 | 35 | Landscape Specs |
1996 January 3 |
TUBES |
|||
tube | |||
1 | Site Planning Plan Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 219: Arroyo Del Oso |
1995-1997 | ||
MANUSCRIPT MATERIALS |
1995-1997 | ||
Box | Folder | ||
26 | 1 | Billing/Invoices |
1996 |
26 | 2 | Change Orders |
1996 |
26 | 3 | Clippings |
1996 |
26 | 4 | Conceptual Plan |
1997 |
26 | 5 | Construction Contract |
1996 |
26 | 6 | Conversation Record |
1996 |
26 | 7 | Correspondence-Consultant |
1997 |
26 | 8 | Correspondence-Owner |
1996 |
26 | 9 | Correspondence |
1994-1996 |
26 | 10 | Cost Estimates |
1996 |
26 | 11 | Design Sketches/Product Info |
1996 |
26 | 12 | Facsimiles |
1996 |
26 | 13 | Facsimiles |
1996-1997 |
26 | 14 | Meeting Minutes |
1995-1996 |
26 | 15 | Meeting Minutes |
1998 |
26 | 16 | Proposal/Contracts |
1996 |
26 | 17 | Proposal/Contracts |
1998 |
26 | 18 | Recreational |
undated |
26 | 19 | Transmittals |
1996 |
26 | 20 | Memos |
1997 |
26 | 21 | Work Program |
1998 |
TUBES |
|||
tube | |||
1 | Park Phase 1 Improvements Physical location: CCA 8 Column 4, Row 3
|
undated | |
Project 220: Job's Peak |
1995-1997 | ||
MANUSCRIPT MATERIALS |
1995-1997 | ||
Box | Folder | ||
26 | 22 | Five Creek |
undated |
26 | 23 | Conversation Record |
1996 |
26 | 24 | Correspondence Owner |
1995-1997 |
26 | 25 | Proposal/Contracts |
1996 |
26 | 26 | Design Sketches/Product Info |
undated |
26 | 27 | Legal Description |
undated |
26 | 28 | Geology/Soils |
1995 |
26 | 29 | Land Use |
undated |
26 | 30 | Marketing/Presentations |
1995 |
26 | 31 | Meeting Minutes/Notes to File |
1995 |
26 | 32 | Proposal/Contracts |
1995-1996 |
26 | 33 | Market Assessment for Five Creek |
1995 September |
26 | 34 | Architectural and Landscape Coucil Rules and Regulations |
2005 |
26 | 35 | Declartation of Covenants, Conditions and Restrictions |
undated |
26 | 36 | Design Guidelines |
1996 |
Project 221: Silvertip Resorts |
1993-2000 | ||
MANUSCRIPT MATERIALS |
1993-2000 | ||
Box | Folder | ||
26 | 37 | Proposals/Contracts |
1998-2000 |
26 | 38 | Meeting Minutes |
1993 |
26 | 39 | Meeting Minutes |
1994-1998 |
26 | 40 | Engineering |
1993-1995 |
26 | 41 | Land Analysis |
1996 |
26 | 42 | Design Sketches |
1991-1998 |
26 | 43 | Programming |
1998 |
26 | 44 | Marketing/Presentations |
1998-1999 |
26 | 45 | Village Design Manual |
1999 |
TUBES |
|||
tube | |||
1 | Silvertip Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Silvertip Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Site Plan Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Schematic Design Plan Physical location: CCA 6 Column 2, Row 3
|
undated | |
5 | Data Inventory Bases Physical location: Barn Box 15
|
undated | |
Project 222: Oxbow |
1997-2001 | ||
MANUSCRIPT MATERIALS |
1997-2001 | ||
Box | Folder | ||
26 | 46 | Charrette Summary |
2001 |
26 | 47 | Plaza Report |
1997 |
26 | 48 | Plaza Report |
1997 |
26 | 49 | Plaza Documents |
1997-2001 |
Project 223: Yampa Valley |
1992 | ||
MANUSCRIPT MATERIALS |
1992 | ||
Box | Folder | ||
26 | 50 | Master Plan |
1992 |
Project 224: Jemez Springs Park |
1999-2000 | ||
MANUSCRIPT MATERIALS |
1999-2000 | ||
Box | Folder | ||
26 | 51 | Design Sketches |
1999-2000 |
26 | 52 | Irrigation |
2000 |
26 | 53 | Meeting Notes |
1999 |
Project 225: Rio Grande State Park |
1997 | ||
MANUSCRIPT MATERIALS |
1997 | ||
Box | Folder | ||
26 | 54 | Correspondence |
1997 |
Project 226: Running Y |
1996-2005 | ||
MANUSCRIPT MATERIALS |
1996-2005 | ||
Box | Folder | ||
27 | 1 | Meeting Minutes for Pine Valley |
2004-2005 |
27 | 2 | Ranch Contracts |
2004-2005 |
27 | 3 | Ranch Hydrology |
1995-2001 |
27 | 4 | Ranch Land Use |
2004 |
27 | 5 | Ranch Resort Analysis Map and Diagram |
undated |
27 | 6 | Ranch Resort Caledonia Marsh Restoration |
1999 October 8 |
27 | 7 | Ranch Resort Master Plan Documents |
2004 May 12 |
27 | 8 | Resort-Habitat |
1996-2004 |
27 | 9 | Visual Analysis |
undated |
Project 227: Furry Creek |
1996-1997 | ||
MANUSCRIPT MATERIALS |
1996-1997 | ||
Box | Folder | ||
27 | 10 | Biological |
undated |
27 | 11 | Correspondence |
1996-1997 |
27 | 12 | Correspondence-Furry Creek |
1996-1997 |
27 | 13 | Design |
1995 |
27 | 14 | Design Sketches |
1997 |
27 | 15 | Development |
1997 |
27 | 16 | Marketing/Proposals |
1997 |
27 | 17 | Meeting Minutes/Notes |
1997 |
27 | 18 | Programming |
1997 |
27 | 19 | Phone Conversation |
1996-1997 |
27 | 20 | Proposals/Contracts |
1996 |
27 | 21 | Proposals/Contracts |
1997 |
27 | 22 | Transmittals |
1997 |
27 | 23 | Visual |
1996 |
27 | 24 | Work Program |
1996 |
27 | 25 | Project Summary |
1997 |
TUBES |
|||
tube | |||
1 | Renderings Physical location: CCA 6 Column 2, Row 8
|
undated | |
Project 228: Mesa Del Sol |
1995-1999 | ||
MANUSCRIPT MATERIALS |
1996-1997 | ||
Box | Folder | ||
27 | 26 | EPC Submittal Package Regional Recreation Complex |
1996 July |
27 | 27 | Construction Cost Estimates |
1996-1999 |
27 | 28 | Conversation Records |
1996 |
27 | 29 | Hydrology/Drainage |
undated |
27 | 30 | Master Plan |
1996 |
27 | 31 | Phase 1 Notes |
1996-1999 |
27 | 32 | Recreation Complex- Clippings |
1996 |
27 | 33 | Recreation Complex Correspondence Agency |
1996 |
27 | 34 | Recreation Complex Correspondence Owner |
1996 |
27 | 35 | Recreation Complex Cost Estimates |
1996 |
27 | 36 | Recreation Complex Master File List |
1996 |
27 | 37 | Recreation Complex Meeting Minutes |
1996 |
27 | 38 | Recreation Complex Notes to File |
1996 |
27 | 39 | Recreation Complex Owner/Landscape Architect |
1996 |
27 | 40 | Recreation Complex Utility |
1995 |
27 | 41 | Soils and Geography |
1999 |
27 | 42 | Notes to File |
1998 |
27 | 43 | Notes to File |
1998 |
27 | 44 | Feasibility Study |
1997 |
27 | 45 | Feasibility Study |
1997 |
Project 229: Eastern Hills |
2000-20005 | ||
MANUSCRIPT MATERIALS |
2000-20005 | ||
Box | Folder | ||
28 | 1 | Survey Map |
2001 |
28 | 2 | Market Analysis |
2000 |
28 | 3 | Vision Plan |
2001 |
28 | 4 | Design Standards |
2001 |
28 | 5 | Design Standards |
2002 |
28 | 6 | Design Standards |
2002 |
28 | 7 | Design Standards |
2002 |
28 | 8 | Design Standards |
undated |
28 | 9 | Design Standards |
undated |
28 | 10 | Land Use & Density Plan |
2002 |
28 | 11 | Zoning |
2001-2003 |
28 | 12 | Meeting Minutes/Notes to File |
2001-2002 |
28 | 13 | Meeting Minutes/Notes to File |
2002 |
28 | 14 | Meeting Minutes/Notes to File |
2003-2005 |
28 | 15 | Plotting Plans |
2003 |
28 | 16 | Cost Estimate |
2001-2003 |
28 | 17 | Correspondence |
2001-2003 |
28 | 18 | Correspondence |
2003 |
28 | 19 | Design Sketches |
2003 |
28 | 20 | Park Plaza as Interpretive Art |
2004 |
TUBES |
|||
tube | |||
1 | Neighborhood Park Three Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | FDP Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Framework Development Plan Physical location: CCA 8 Column 6, Row 2
|
undated | |
4 | Draining Corridor Physical location: CCA 6 Column 1, Row 3
|
undated | |
5 | Land Use Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Community Planning Physical location: CCA 8 Column 5, Row 2
|
undated | |
7 | Community Planning Physical location: CCA 8 Column 5, Row 2
|
undated | |
8 | Community Center Physical location: Barn Box 11
|
undated | |
9 | Park 3 Physical location: Barn Box 11
|
undated | |
10 | Park 3 Physical location: Barn Box 11
|
undated | |
11 | Monographs Physical location: Barn Box 16
|
undated | |
Project 230: Edith Wharton Restoration |
2000 | ||
MANUSCRIPT MATERIALS |
2000 | ||
Box | Folder | ||
28 | 21 | Planning Workshop |
2000 |
28 | 22 | Planning Workshop |
2000 |
Project 231: Canyons Lower Village (Park City, Utah) |
1999-2001 | ||
MANUSCRIPT MATERIALS |
1999-2001 | ||
Box | Folder | ||
28 | 23 | Proposals/Contracts |
2001 |
28 | 24 | Correspondence |
2001 |
28 | 25 | Meeting Minutes |
2000 |
28 | 26 | Subconsultant Agreement |
2001 |
28 | 27 | Land Use |
1999 |
28 | 28 | Transportation |
2001 |
28 | 29 | Prior Studies |
undated |
28 | 30 | Developable Land Summary |
2001 |
28 | 31 | Analysis Maps and Diagrams |
2001 |
28 | 32 | Development Program |
2001 |
28 | 33 | Specific Development Plan |
1999 |
28 | 34 | Submittals/Shop Drawings |
2000 |
TUBES |
|||
tube | |||
1 | Canyons Streetscape Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | Canyons North Sketch Plan No. 1 Canyons North PD Canyons North Master PD Physical location: CCA 6 Column 1, Row 1
|
undated | |
3 | Village Master Plan Physical location: CCA 6 Column 2, Row 3
|
undated | |
4 | Village Master Plan Physical location: Barn Box 2
|
undated | |
5 | Foothills Park Physical location: Barn Box 4
|
undated | |
Project 232: Crayson Residence |
1992-1993 | ||
MANUSCRIPT MATERIALS |
1992-1993 | ||
Box | Folder | ||
28 | 35 | Correspondence |
1992-1993 |
Project 233: Heavenly 8 tubes
|
|||
TUBES |
2005-2006 | ||
tube | |||
1 | Heavenly Ranch Physical location: CCA 8 Column 3, Row 3
|
2005-2006 | |
2 | Streetscapes Physical location: CCA 6 Column 1, Row 6
|
undated | |
3 | Stagecoach Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Stagecoach Physical location: CCA 8 Column 4, Row 2
|
undated | |
5 | Master Plan Physical location: CCA 8 Column 4, Row 1
|
undated | |
6 | Stagecoach Physical location: CCA 8 Column 4, Row 1
|
undated | |
7 | Grand Summit Resort Hotel Architect's Construction Documents Physical location: CCA 8 Column 4, Row 3
|
undated | |
8 | Architects CD's Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 234: Gilbert South Recharge 1 tube
|
|||
TUBES |
2005 | ||
tube | |||
1 | Process and Base Physical location: CCA 8 Column 3, Row 3
|
2005 | |
Project 235: Santa Ana 1 tube
|
|||
TUBES |
1997 | ||
tube | |||
1 | Recreation Area Physical location: CCA 8 Column 3, Row 3
|
1997 | |
Project 236: Tuckasegee 1 tube
|
|||
TUBES |
2006 | ||
tube | |||
1 | River Rock Erosion Control Physical location: CCA 8 Column 3, Row 3
|
2006 | |
Project 237: Promontory (Park City) 9 tubes
|
|||
TUBES |
|||
tube | |||
1 | Master Plan Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Clubhouse planting plans Physical location: CCA 6 Column 1, Row 8
|
undated | |
3 | Golf Course Construction Plan Physical location: CCA 6 Column 2, Row 5
|
undated | |
4 | Master Plan Physical location: CCA 6 Column 2, Row 5
|
undated | |
5 | Standard Details Physical location: Barn Box 4
|
undated | |
6 | Clubhouse Complex Physical location: Barn Box 4
|
undated | |
7 | Drawings Physical location: CCA 8 Column 4, Row 2
|
undated | |
8 | Grading Package Physical location: CCA 8 Column 4, Row 2
|
undated | |
9 | Site Inventory Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 238: Rio Salado 13 tubes
|
|||
TUBES |
undated | ||
tube | |||
1 | North Bank Sketches Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Crossing Physical location: CCA 6 Column 1, Row 6
|
undated | |
3 | Crossing Physical location: CCA 6 Column 1, Row 6
|
undated | |
4 | 100% Submittals Physical location: CCA 6 Column 2, Row 8
|
undated | |
5 | Crossing Trace Physical location: CCA 6 Column 1, Row 4
|
undated | |
6 | Crossing Physical location: CCA 6 Column 1, Row 4
|
undated | |
7 | Project Drawings Physical location: CCA 8 Column 5, Row 2
|
undated | |
8 | Landscape Plans Physical location: Barn Box 9
|
undated | |
9 | Crossing Physical location: Barn Box 14
|
undated | |
10 | Base CASS Physical location: Barn Box 14
|
undated | |
11 | Conceptual Development Physical location: Barn Box 15
|
undated | |
12 | Crossing Physical location: Barn Box 15
|
undated | |
13 | South Bank Trail Proposal Physical location: Barn Box 15
|
undated | |
Project 239: McCabe (Capitol Valley Ranch) 5 tubes
|
|||
TUBES |
|||
tube | |||
1 | McCabe Ranch Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | CD's Tract B Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Light Residence Physical location: Barn Box 5
|
undated | |
4 | Light Residence Physical location: CCA 8 Column 5, Row 1
|
undated | |
5 | Light Residence Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 240: Donovan Park 5 tubes
|
|||
TUBES |
|||
tube | |||
1 | Construction Package 1 of 2 Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Construction Package 2 of 2 Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Donovan Park Physical location: CCA 8 Column 6, Row 1
|
undated | |
4 | Facilities Physical location: CCA 8 Column 6, Row 3
|
undated | |
5 | Donovan Park Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 241: Manchester Road 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Manchester Road Physical location: CCA 8 Column 3, Row 1
|
undated | |
Project 242: Utah Museum Natural History 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Construction Documents Physical location: CCA 8 Column 5, Row 3
|
undated | |
2 | Schematic Design Physical location: CCA 8 Column 5, Row 3
|
undated | |
Project 243: UMORE Park 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Site Design Physical location: CCA 8 Column 6, Row 1
|
undated | |
2 | Context Map, Sketching and Renderings Physical location: CCA 8 Column 6, Row 1
|
undated | |
3 | Schematic Drawings Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 244: Isla Palenque 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Sketches and Renderings Physical location: CCA 8 Column 6, Row 1
|
undated | |
Project 245: Goldwater Tributary Wall 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Topo, grading & drainage cds, conceptual details, trace Physical location: CCA 6 Column 1 Row 6
|
undated | |
2 | Wall Physical location: CCA 6 Column 1, Row 4
|
1999; undated | |
3 | Wall Physical location: CCA 6 Column 1, Row 4
|
undated | |
Project 246: Hotel Park City 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Schematic Design Site package, golf course sketches, conceptual landscape plan sketch, utility plan, stair and ramp plans from D&H Stell Physical location: CCA 8 Column 3, Row 1
|
undated | |
2 | The Cottages Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 247: Blum Residence 4 tubes
|
|||
TUBES |
|||
tube | |||
1 | Mylar's Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Mylar's Physical location: CCA 8 Column 6, Row 2
|
undated | |
3 | Planting Plans, Aerial Photos Physical location: CCA 8 Column 5, Row 1
|
undated | |
4 | Arch Blueprints Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 248: Ridgemoor 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Ridgemoor Physical location: CCA 8 Column 6, Row 2
|
undated | |
2 | Lot Plans Physical location: CCA 8 Column 4, Row 3
|
undated | |
3 | Base Sheets Analysis Physical location: Barn Box 14
|
undated | |
Project 249: Pioneer Park 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Master Plan Drawings Physical location: CCA 8 Column 6, Row 3
|
undated | |
2 | Construction Documents Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 250: Coe Ranch (Santa Clara County, California) 3 tubes
|
|||
TUBES |
1992 | ||
tube | |||
1 | Topography Physical location: CCA 6 Column 1, Row 7
|
undated | |
2 | Land Overlays Physical location: CCA 6 Column 1, Row 7
|
undated | |
3 | Drawings Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 251: Minturn Railyard 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Civic Center Railyard Physical location: CCA 6 Column 1, Row 3
|
undated | |
2 | Civic Center Railyard Physical location: CCA 6 Column 1, Row 3
|
undated | |
3 | Civic Center Railyard Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 252: Habuka 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Habuka Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 253: Lincoln Street (Washington) 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Parking Lot Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 254: City North 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Sketches Physical location: CCA 6 Column 1, Row 3
|
undated | |
Project 255: Summit/Kendall Yards (Washington) 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Retail plans Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Site Illustrations Physical location: CCA 6 Column 1, Row 1
|
undated | |
3 | Concept Plan, Sections (originals - Gene Dyer),illustrative Physical location: CCA 6 Column 1, Row 1
|
undated | |
Project 256: Eaton Headquarters 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Construction Documents Physical location: CCA 6 Column 1, Row 2
|
undated | |
Project 257: Zheng Bei 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Golf Course Conceptual Master Plan and Sketches Physical location: CCA 6 Column 1, Row 1
|
undated | |
2 | Sketches Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 258: James Island 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Sight Plans Physical location: CCA 6 Column 1, Row 3
|
2005 December 1; undated | |
Project 259: Lewisville 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Old Town Plaza Master Plan Physical location: CCA 8 Column 6, Row 3
|
undated | |
Project 260: Querencia 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Design Development Set Physical location: CCA 6 Column 2, Row 3
|
undated | |
2 | Los Cabos Physical location: CCA 6 Column 1, Row 4
|
undated | |
3 | Preliminary Drawings Physical location: CCA 6 Column 1, Row 4
|
undated | |
Project 261: Norefjell 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Design Analysis Physical location: CCA 6 Column 2, Row 6
|
undated | |
Project 262: Butterfield Park 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Phase 1 Plan Physical location: CCA 6 Column 1, Row 9
|
undated | |
2 | Analysis Studies Physical location: Barn Box 9
|
undated | |
Project 263: Dakota Springs 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Mylar's Architect Plans Original Art Physical location: Barn Box 2
|
undated | |
Project 264: Redstone Parkside 1 tube
|
|||
TUBES |
|||
tube | |||
1 | New Park Physical location: CCA 8 Column 5, Row 1
|
undated | |
Project 265: Rio Grande Botanical Garden 1 tube
|
|||
TUBES |
|||
tube | |||
1 | trace rendering, planting plan Physical location: Barn Box 4
|
undated | |
Project 266: Cornerstone Park (Nevada) 1 tube
|
2000 | ||
TUBES |
|||
tube | |||
1 | Concept Plan Physical location: Barn Box 5
|
2000; undated | |
Project 267: Aspen Mountain 5 tubes
|
|||
TUBES |
|||
tube | |||
1 | Master Plan Physical location: Barn Box 5
|
undated | |
2 | Subdivisions Physical location: CCA 8 Column 4, Row 1
|
undated | |
3 | Master Plan Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | Master Plan Physical location: Barn Box 11
|
undated | |
5 | Master Plan Physical location: Barn Box 15
|
undated | |
Project 268: La Farge 5 tubes
|
|||
TUBES |
|||
tube | |||
1 | Revegetation Plans Physical location: Barn Box 5
|
undated | |
2 | Existing Conditions Physical location: Barn Box 5
|
undated | |
3 | Site Planning Physical location: CCA 8 Column 4, Row 1
|
undated | |
4 | Exshaw Quarry Physical location: CCA 8 Column 4, Row 3
|
undated | |
5 | Revegetation Plans Physical location: CCA 8 Column 4, Row 3
|
undated | |
Project 269: Casteel Creek Ranch 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Site Details Physical location: CCA 8 Column 4, Row 1
|
2001; undated | |
2 | Site Details Physical location: CCA 8 Column 4, Row 1
|
undated | |
3 | Levine Physical location: CCA 8 Column 5, Row 3
|
undated | |
Project 270: Andorra 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Gondola Base Area Program Physical location: CCA 8 Column 4, Row 1
|
undated | |
2 | Community Department Physical location: CCA 8 Column 5, Row 2
|
undated | |
Project 271: Agate Fossil Beds National Monuments 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Design Considerations Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 272: Sioux City 6 tubes
|
|||
TUBES |
|||
tube | |||
1 | Design Standards Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Urban Design Guidelines Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Design Guidelines Physical location: CCA 8 Column 4, Row 2
|
undated | |
4 | Design Guidelines Physical location: CCA 8 Column 4, Row 2
|
undated | |
5 | Design Standards Physical location: CCA 8 Column 4, Row 2
|
undated | |
6 | North Side Vision Physical location: Barn Box 14
|
undated | |
Project 273: David A. Duffield Trust 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Drawings Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 274: Howelsen Hill 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Olympic Grove Physical location: CCA 8 Column 4, Row 2
|
undated | |
2 | Mylar's Physical location: CCA 8 Column 4, Row 2
|
undated | |
3 | Schematic Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 275: Wimberley Blue Hole 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Regional Park Development Physical location: CCA 8 Column 4, Row 2
|
undated | |
Project 276: Hemmeter 1 tube
|
|||
TUBES |
|||
tube | |||
1 | Design Info Physical location: CCA 8 Column 4, Row 1
|
undated | |
Project 277: Williams Village 2 tubes
|
|||
TUBES |
|||
tube | |||
1 | Design Development Physical location: CCA 8 Column 4, Row 3
|
undated | |
2 | Plans and Diagrams Physical location: CCA 8 Column 6, Row 2
|
undated | |
Project 278: Marx Residence 3 tubes
|
|||
TUBES |
|||
tube | |||
1 | Drawings Physical location: CCA 8 Column 5, Row 1
|
undated | |
2 | Illustrative Physical location: Barn Box 6
|
undated | |
3 | Originals Physical location: Barn Box 6
|
undated |
XCI: XCI: DaybreakReturn to Top
Container(s) | Description | Dates |
---|---|---|
TUBES |
||
tube | ||
1 | Sunrise Mountain Park, Conceptual Physical location: CCA 8 Column 6, Row 3
|
undated |
2 | Westside MvC, 50% schematic design Physical location: CCA 8 Column 6, Row 3
|
undated |
3 | Village Center 1, Charrette, Schematic, Commercial, Corporate center, Parking Physical location: CCA 8 Column 6, Row 3
|
undated |
4 | Entry Physical location: CCA 8 Column 6, Row 3
|
undated |
5 | Phase 2 and 3 Physical location: CCA 8 Column 6, Row 3
|
undated |
6 | Oquirrh Lake Phase II-II Physical location: CCA 8 Column 6, Row 3
|
undated |
7 | Oquirrh Lake Phase I Physical location: CCA 8 Column 6, Row 3
|
undated |
8 | Oquirrh Lake Process Drawings Physical location: CCA 8 Column 6, Row 3
|
undated |
9 | Oquirrh Lake Process Drawings Physical location: CCA 8 Column 6, Row 3
|
undated |
10 | Village Center One Physical location: CCA 8 Column 5, Row 1
|
undated |
11 | Oquirrh Lake Phase I Physical location: CCA 8 Column 5, Row 3
|
undated |
12 | Daybreak Village II/III Open Space Master Plan Physical location: CCA 8 Column 5, Row 3
|
undated |
13 | Daybreak Phase II Roundabout Physical location: CCA 8 Column 5, Row 1
|
undated |
14 | Water Circulation Physical location: CCA 8 Column 5, Row 3
|
undated |
15 | Sunrise Physical location: CCA 6 Column 2, Row 5
|
undated |
16 | Circle West Physical location: Barn Box 11
|
undated |
17 | Circle West Physical location: Barn Box 11
|
undated |
18 | Phase I Schematic Design Physical location: Barn Box 16
|
undated |
19 | Design Development Sets Physical location: Barn Box 16
|
undated |
20 | Phase 1 Schematic Design Set Physical location: Barn Box 16
|
undated |
21 | 11400 South Physical location: Barn Box 16
|
undated |