Design Workshop records, 1979-2007

Overview of the Collection

Title
Design Workshop records
Dates
1979-2007 (inclusive)
Quantity
35 boxes, (37 linear feet)
Collection Number
UUS_COLL MSS 347
Summary
This collection contains the administrative papers and landscape architectural drawings of multiple projects from Design Workshop, Inc.
Repository
Utah State University, Merrill-Cazier Library, Special Collections and Archives Division
Special Collections & Archives
Merrill-Cazier Library
Utah State University
Logan, UT
84322-3000
Telephone: 4357978248
Fax: 4357972880
scweb@usu.edu
Access Restrictions

No restrictions on use, except: not available through interlibrary loan.

Languages
English

Biographical NoteReturn to Top

Design Workshop, Inc. is a leading international landscape architecture firm founded in 1969 by Joe Porter and Don Ensign while they were professors at North Carolina State University. Both received bachelor's degree from Utah State University in 1963 in landscape architecture. Other USU graduates who joined the firm were Richard Shaw, Todd Johnson and Terrall Budge. The firm's projects range from private gardens to resort development. The design teams are highly praised for their innovative use of attractive features while having the least impact on the site's ecology and natural views. Although based in Denver, Colorado, the firm has offices in Asheville, North Carolina; Aspen, Colorado; Austin, Texas, Lake Tahoe, Nevada; and Salt Lake City, Utah.

In addition to various awards received by Design Workshop, Inc., in 2008 the firm was named the top landscape architecture firm in the country by the American Society of Landscape Architects. For additional information, please refer to Design Workshop, Inc.'s website.

Content DescriptionReturn to Top

This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by inquiring at the Special Collections and Archives reference desk.

Use of the CollectionReturn to Top

Restrictions on Use

It is the responsibility of the researcher to obtain any necessary copyright clearances.

Permission to publish material from the Design Workshop records must be obtained from the Special Collections and Archives manuscript curator and/or the Special Collections and Archives department head.

Preferred Citation

Initial Citation: Design Workshop records. USU_Coll MSS 347, Box [ ]. Special Collections and Archives. Utah State University Merrill-Cazier Library. Logan, Utah.

Following Citations: USU_Coll Mss 347, USUSCA.

Administrative InformationReturn to Top

Arrangement

The filing system has been kept substantially in its original form, only placing materials in archival folders and boxes. The processor devised the basic organization scheme for the collection, and where necessary, reorganized the papers within alphabetical order.

Location of Collection

Manuscript materials are located in Row ARC 104 and drawings are located in the tube enclave.

Processing Note

Processed in May of 2010.

Acquisition Information

Materials in this collection were donated to Special Collections and Archives by Design Workshop, Inc. in 2009, 2010 & 2012.

Related Materials

To search and view the Utah State University Digital Library's collection, visit Design Workshop® Landscape Architecture Digital Collection.

Moses, Val. Toward Legacy: Design Workshop's Pursuit of Ideals in Landscape, Architecture, Planning and Urban Design, NA 9085 .D47 M67 2007.

Shaw, Sarah Chase. New Gardens of the American We4st: Residential Landscapes of Design Workshop, SB 472.45 .N49.

Separated Materials

The photographs and slides have been removed and placed into a separate photograph collection, P0394.

Detailed Description of the CollectionReturn to Top

I:  I: Kananaskis, 1979-1986Return to Top

4 boxes 57 folders; 14 tubes and 655 drawings
Container(s) Description Dates
MANUSCRIPT MATERIALS
Box Folder
1 1
Area Utility Plan
undated
1 2
Cinquefoil Hotel Enterprises Balance Sheet
1981
1 3
Common Elements Plan
undated
1 4
Conceptual Grading Plan
undated
1 5
Correspondence
1980-1986
1 6
Developer Package & Proposal Call
1981-1983
1 7
Elevations
1982
1 8
Evan-Thomas Development Existing Features & Regional Map
undated
1 9
Evan-Thomas Development List of Responsibilities & Program Summary
undated
1 10
Golf Course
undated
1 11
Ground Level Plan
undated
1 12
Illustrative Plan
undated
1 13
J.H. Cook Architects & Engineers, ground floor plan and elevations
undated
1 14
Landscape Concept Plan
undated
1 15
Meeting Minutes
1982
1 16
Package "A" Level One (Basement) Plan
undated
1 17
Package "A" Level Two (Ground Level) Plan
undated
1 18
Package "A" Level Three
undated
1 19
Package "A" Level Four Plan
undated
1 20
Package "A" Level Five Plan
undated
1 21
Package C Reissued Proposal Call
1982
1 22
Parcel A Master Plan
1985
1 23
Parcel A Operating and Expense Assumptions
1982
1 24
Parking & Circulation Plan
undated
1 25
Phase One Master Plan
undated
1 26
Plucer Holdings LTD. Financial Statements
1982
1 27
Pro Forma Cash Flow Analysis
1981
1 28
Project Approach
undated
1 29
Project Description
undated
1 30
Project Performa "A" and "C"
1982
1 31
Project Working Paper
1979
1 32
Proposal Form
1982
1 33
Proposal Package "C"
1982
1 34
Proposal for Planning and Design of the Evan-Thomas Development Area
1979
2 1
Schematic Utility Plan
undated
2 2
Sterling Group history
undated
2 3
Sterling Montana, Inc. Financial Statements
1982
2 4
Subdivision Plan
undated
2 5
Valley Elevations
undated
2 6
Village Sections
undated
2 7
Walnor Projects LTD. Financial Statements
1982
2 8
Work Programs
1981-1982
2 9
Work Schedule
undated
3 1
ASLA Awards Submission Category I Landscape Architecture
1990
3 2
ASLA Awards Submission Category I Landscape Architecture
1989
3 3
Commercial Signage Policy- Design Standards for Kananaskis Village
undated
3 4
Evan-Thomas Development Area- Date Inventory Phase
1979 July 6
3 5
Initial Information Development Area- Date Inventory Phase
1979 July 6
3 6
Initial Information Package
1979
3 7
Project Narrative
undated
3 8
Presentation on Kananaskis
1990 October
4 1
Evans-Thomas Data Inventory Phase
1979 July 6
4 2
Ribbon Creek Project Manual
1986 March 5
4 3
Ribbon Creek Developer Proposal Evaluation
1985 February 21
4 4
Ribbon Creek Project Manual
1981
4 5
Ribbon Creek Economic Analysis
1986 July 16
4 6
Evans-Thomas Development Program Site Location Analysis
1979
KANANASKIS LANDSCAPE DRAWINGS
14 tubes and 655 drawings
1979-1992
Illustrative Plans
15 landscape drawings
tube
1
1.1.1A: Illustrative landscape plan of the Village core
Pen & Ink on Mylar
undated
1
1.1.1B: Illustrative landscape plan of the Village core
Pen & Ink on Mylar
undated
1
1.1.2: Illustrative landscape plan of the Village core
Pencil on Mylar
undated
1
1.1.3: Illustrative landscape plan of the Village core
Pencil on Mylar
undated
1
1.1.4: Illustrative plan of Kananaskis with staff housing
Print on Acetate
undated
1
1.1.5: Illustrative landscape plan of staff housing
Pen & Ink on Mylar
undated
1
1.1.6: Illustrative landscape plan of Kananaskis with staff housing
Pen &Ink on Mylar
undated
1
1.1.7: Illustrative plan of Kananaskis with staff housing
Print on Mylar
undated
1
1.1.8: Illustrative landscape plan of Village core
Blueprint on Bond
undated
1
1.1.9: Illustrative plan Village core
Blueprint on Bond
1986 January 29
1
1.1.10: Illustrative plan of Kananaskis with staff housing
Print splices on Mylar
undated
1
1.1.11: Illustrative plan of Kananaskis with staff housing
Print & Ink on Mylar
undated
1
1.1.12: Illustrative plan of Kananaskis with staff housing
Print on Vellum
undated
1
1.1.13: Illustrative plan of Kananaskis with staff housing
Print on Vellum
undated
1
1.1.14: Illustrative plan of Kananaskis with staff housing
Print on Acetate
undated
1
1.1.15: Illustrative plan stressing buildings, hardscape, and vegetation
Print & Marker on Photo Paper
undated
1
1.1.16: Illustrative landscape plan of Village core
Print on Photo Paper
undated
1
1.1.17: Illustrative plan of Village core and surroundings
Print, Ink, & Pencil on Mylar
undated
1
1.1.18: Illustrative landscape plan with building uses and spot elevations
Blueprint on Bond
undated
1
1.1.19: Color illustrative landscape plan of Kananaskis and staff housing
Print, Marker, & Colored Pencil on Bond
undated
1
1.1.20: Color illustrative landscape plan of Kananaskis Village core
Print, Marker, & Colored Pencil on Bond
undated
Site Analysis & Inventory
1979-1987
tube
2
1.2.1: Canmore Corridor Sub-Region: Recreation Facilities Map
Print & Pencil on Mylar
undated
2
1.2.2: Site plan with existing features labeled
Blueprint on Bond
undated
2
1.2.3: Nakiska/Mount Allan map of ski runs/routes and chairlifts
Reduction on Acetate
undated
2
1.2.4A-B: Survey map of topography
Print on Mylar. Compiled by Walter E. Bright A.L.S. (2 sheets)
1979
2
1.2.5: Survey map of topography with Village footprint
Print on Mylar. Compiled by Walter E. Bright A.L.S.
1982 May 5
2
1.2.6: Survey map of topography with Village footprint
Blueprint on Bond. Compiled by Walter E. Bright A.L.S.; includes handwritten notes
1982 May 5
2
1.2.7: Regional contour map
Print on Mylar
undated
2
1.2.8: Regional contour map with 5 meter intervals containing vegetated boundaries, roads, poles, etc
Print on Bond
undated
2
1.2.9: Filed plan of survey of Parcel 1
Print on Mylar
1987 January 2
2
1.2.10: Schedule A Property Subject to Common Area Lease
Print on Mylar
1985 May 5
2
1.2.11: Schedule A Property Subject to Common Area Lease
Print on Mylar
1986 October 7
2
1.2.12: Pan of Survey of Subdivision of a Protion of Parcel 1
Blueprint on Bond
1986 April 1
2
1.2.13: Evan Thomas Development Area Outline Plan Alternatives Alternative 1
Print on Acetate
undated
2
1.2.14: Evan Thomas Development Area Outline Plan Alternatives Alternative 2
Print on Acetate
undated
2
1.2.15: Evan Thomas Development Area Outline Plan Alternatives Alternative 3
Sepia Print
undated
2
1.2.16: Evan Thomas Development Area Outline Plan Alternatives Alternative 4
Print on Acetate
undated
2
1.2.17: Plan showing location of select trees and access road cross sections
Blueprint on Bond. Compiled by D.R. McWilliam, A.L.S.
1982
2
1.2.18: Plan showing control monuments established access road existing clearings and utilities
Blueprint on Bond. D.R. McWilliam, A.L.S.
1982
2
1.2.19A-M: Kananaskis Country Recreation Plan Regional Utilities
Blueprint Package. Compiled by Reid, Crowther & Partners Limited (18 sheets)
1981 January
2
1.2.20: Ribbon Creek Village Regional Plan
Print & Ink on Mylar
1985 July
2
1.2.21: Ribbon Creek Village Regional Plan
Print & Marker on Bond
1986 July
2
1.2.22: Developable land summary
Print & Colored Pencil on Bond
1986 May 19
2
1.2.23: Analysis of slopes, critical wildlife area, and sun points
Print & Marker on Bond
undated
Studies & Schematics
1985-1986
tube
3
1.3.1: Parcel C: Roof height calculations
Pencil on Trace
undated
3
1.3.2: Day Lodge: Roof height calculations
Pencil on Trace
undated
3
1.3.3: Day Lodge: Ground floor plan
Designed by Cook, Culham, Montgomery, Pedersen, & Valentine
1985 June 1
3
1.3.4: Calculations for support, parking, and vehicular circulation
Pencil on Trace
undated
3
1.3.5: Calculations for food and beverage, parking, and support
Pencil on Trace
undated
3
1.3.6: Calculations for circulation, storage, and bay windows
Pencil on Trace
undated
3
1.3.7: Site plan circulation study
Print on Mylar
undated
3
1.3.8: Site plan circulation study
Print on Mylar
undated
3
1.3.9: Site plan circulation study
Print on Mylar
undated
3
1.3.10: Design constraints including paving, water features, open space, fire lanes, and pedestrian circulation
Marker on Blueprint
undated
3
1.3.11: Circulation study
Marker on Trace
undated
3
1.3.12: Landscape plan with limit of irrigation highlighted
Marker on Blueprint
undated
3
1.3.13: Concept drawing of Village and surroundings
Ink on Trace
undated
3
1.3.14: Concept drawing of Village and surroundings
Sepia on Mylar
undated
3
1.3.15: Concept drawing of Village and surroundings
Ink & Marker on Trace
undated
3
1.3.16: Concept drawing of Village and surroundings
Ink & Marker on Trace
undated
3
1.3.17: Vegetation layer for proposed entry revisions Parcels B & C
Ink on Mylar
undated
3
1.3.18: Proposed entry revisions for Parcel B & C
Print & Marker on Bond
1986 October 27
3
1.3.19: Proposed entry revisions for Parcel B & C
Pencil on Trace
1986 September 25
3
1.3.20: Vegetation layer for Proposed Entry Revision for Parcels B & C
Ink on Mylar
undated
3
1.3.21: Hardscape and Grading Layer for Proposed Entry Revision for Parcels B & C
Pencil & Ink on Mylar
undated
3
1.3.22: Study for service and parking entry for Parcel B
Ink on Vellum
1985 August 12
3
1.3.23: Study for entry, lobby, and service for Parcel B
Ink on Vellum
1985 August 12
3
1.3.24: Proposed entry revisions for Parcels B & C
Pencil on Trace. Attributed to Don Ensign
1986 September 25
3
1.3.25: Concept drawing for Village core
Ink & Marker on Trace. Attributed to Sergio Santana
undated
3
1.3.26: Concept drawing for proposed entry for Parcels B & C
Marker on Blueprint
undated
3
1.3.27: Pool level and lobby level plan transferred into site section
Ink on Trace
undated
3
1.3.28: Constraint map
Pencil on Trace
undated
3
1.3.29: Concept drawing of Village core with spot elevations
Pencil & Marker on Trace
undated
3
1.3.30: Proposed entry revisions for Parcels B & C
Ink & Pencil on Trace. Attributed to Richard Shaw
1986 January 14
3
1.3.31A-B: Concept drawing of Village core including hardscape & Grading
Pencil on Mylar
undated
Graphic Process
undated
tube
4
1.4.1: Spot enlargements of contour map
Print on Photo Paper
undated
4
1.4.2: Spot enlargements of contour map
Print on Photo Paper
undated
4
1.4.3: Limit of irrigation throughout Kananaskis
Red Contact Paper on Mylar
undated
4
1.4.4: Limit of irrigation
Red Contact Paper on Mylar
undated
4
1.4.5: Landscape plan of Village core
Negative for Printing
undated
4
1.4.6: Illustrative Plan title block
Negative for Printing
undated
4
1.4.7: Illustrative plan of Kananaskis with staff housing
Negative for Printing
undated
4
1.4.8: Parcel A Master Plan elevations and unit plans
Negative for Printing
undated
Timelines
undated
tube
4
1.5.1A-B: Proposed Work Program – Kananaskis Country
Print on Acetate (2 sheets)
undated
4
1.5.2: Proposed Work Program – Kananaskis Country
Print on Mylar
undated
4
1.5.3: Proposed Work Program – Kananaskis Country
Print on Mylar
undated
4
1.5.4: Master Development Schedule
Print on Mylar
undated
4
1.5.5: Master Development Schedule
Ink on Vellum
undated
4
1.5.6A-C: Kananaskis Work Schedule
Pencil on Mylar (3 sheets(
undated
4
1.5.7: Tentative Schedule for Resort Related Operations
Pencil on Mylar
undated
4
1.5.8: Draft resort association activity schedule resort resources
Ink on Mylar
undated
4
1.5.9A-B: Summary Plan Evaluation: Outline Plan Alternatives
Print on Acetate (2 sheets)
undated
4
1.5.10: Conceptual Design Process
Print on Acetate
undated
4
1.5.11: Conceptual Design Process
Print on Bond
undated
4
1.5.12: Conceptual Design Process
Print on Bond
undated
4
1.5.13A-B: Conceptual Design Process
Print on Photo Paper (2 sheets)
undated
4
1.5.14: Conceptual Design Process
Negative for Printing
undated
4
1.5.15: Conceptual Design Process
Negative for Printing
undated
Grading & Topography
1985-1986
tube
5
1.6.1: Grading plan surrounding Parcel A
Print & Ink on Bond
undated
5
1.6.2A-C: Visual simulation material of old Kananaskis with spot elevations
Print & Pencil on Mylar (3 sheets)
undated
5
1.6.3: Spot Elevations
Pencil on Mylar
undated
5
1.6.4: Spot Elevations
Pencil & Ink on Blueprint on Bond
undated
5
1.6.5A-B: Road ROW and recommended 40 meter setback
Ink on Mylar (2 sheets)
undated
5
1.6.6A-B: Road ROW and recommended 40 meter setback revision
Ink on Mylar (2 sheets)
undated
5
1.6.7: Site grading plan
Ink on Mylar
1985 January
5
1.6.8: Road ROW and recommended 40 meter setback; Sheet 2
Ink on Mylar
undated
5
1.6.9A-C: Existing site topography
Ink on Mylar (3 sheets)
1986 January
5
1.6.10: Existing site topography
Print on Mylar
undated
5
1.6.11: Existing site topograph
Print on Mylar
1985 January
5
1.6.12: Existing site topography, revised
Print on Mylar
1985 June
5
1.6.13: Existing site topography
Print on Mylar
1986 January
5
1.6.14: Regional topography map
Sepia on Mylar
undated
5
1.6.15: Regional topography map
Sepia print
undated
5
1.6.16: Site Grading Plan
Blueprint on Bond
undated
5
1.6.17: Phase One Master Plan with spot elevations and site grading
Print on Diazo Mylar
1985 January
Construction Details & Specifications
1988
tube
6
1.7.1: South Play Structure Layout
Blueprint on Bond
1988 February 19
6
1.7.2: North Play Structure Layout
Blueprint on Bond
1988 February
6
1.7.3: Play Structure Details
Blueprint on Bond
1988 February 19
6
1.7.4: Tennis court layout and fencing
Blueprint on Bond
undated
Master Plans
1985-1986
tube
6
1.8.1: Master Plan
Print on Mylar
1985 July 31
6
1.8.2: Signage Master Plan
Splices on Mylar
1986 January
6
1.8.3: Village Master Plan
Print and Ink on Mylar
1985 January
6
1.8.4: Master Plan
Print on Mylar; revised June 1985
1985 January
6
1.8.5: Master Plan
Print and Ink on Mylar
1985 January
6
1.8.6: Village Master Plan
Print and Ink on Diazo Mylar; revised June 1985
1985 January
6
1.8.7: Master Plan
Print and Ink on Diazo Mylar; revised June 1985 revised August 1985 revised 15 October 1985
1985 January-1985 October
6
1.8.8: Master Plan
Print and Ink on Diazo Mylar; revised June 1985 revised August 1985 revised 15 October 1985
1985 January-1985 October
6
1.8.9A-B: Landscape Master Plan
Print on Diazo Mylar
1986 January
6
1.8.10: Master Plan
Print, Ink, & Pencil on Diazo Mylar
1985 January
6
1.8.11: Master Plan
Print, Ink, & Pencil on Diazo Mylar
1985 January
6
1.8.12: Master Plan with snow maintenance provided by Alberta Transportation
Print and Splices on Diazo Mylar
1987 October 29
6
1.8.13: Lighting Master Plan
Print and Splices on Diazo Mylar
1985
6
1.8.14: Master Plan with building ground floor plans
Print and Ink on Diazo Mylar
1985 January
6
1.8.15: Master Plan
Print on Mylar
1985 January
6
1.8.16: Master Plan; Scale
Print and Ink on Mylar
undated
6
1.8.17: Master Plan drawn by Gin and Bon
Print and Ink on Mylar
1986 January
6
1.8.18: Site Plan
Pencil on Mylar
undated
6
1.8.19: Site Plan
Pencil on Mylar
undated
6
1.8.20: Use Allocation Plan
Print and Ink on Spliced Mylar
undated
6
1.8.21: Master Plan
Print and Pencil on Diazo Mylar
1986 February 19
6
1.8.22: Master Plan
Print and Ink on Diazo Mylar
1986 January
6
1.8.23: Use Allocation Site Plan
Print on Mylar
undated
6
1.8.24: Village Master Plan
Print on Acetate
1982 June 30
6
1.8.25: Village Master Plan
Ink and Pencil on Mylar
1982 June 30
6
1.8.26: Limit of Irrigation
Print on Mylar
undated
6
1.8.27: Landscape Master Plan
Print on Mylar
undated
6
1.8.28: Phase One Master Plan attributed to Sergio Santana
Sepia Print on Mylar
1985 January
6
1.8.29: Use Allocation Site Plan
Ink and Pencil on Mylar
undated
6
1.8.30: Master Plan
Sepia Print; revised June 1985
1985 January
6
1.8.31: Landscape Master Plan
Ink on Sepia Print
1986 January
6
1.8.32: Master Plan
Print on Acetate; revised June 1985
1985 January
6
1.8.33: Master Plan
Blueprint on Bond
1985 January
6
1.8.34: Phase One Master Plan with Parcel A view analysis
Print on Bond
undated
6
1.8.35: Phase One Master Plan
Print, Ink, & Pencil on Mylar
1985 January
6
1.8.36A: Pin Bar Master Plan Documents: Landscape
Ink on Mylar
undated
6
1.8.36B: Pin Bar Master Plan Documents: Buildings and Surrounding Vegetation
Ink on Mylar
undated
6
1.8.37: Village Core Hardscape Pin Bar Document
Print on Mylar
undated
6
1.8.38: Master Plan
Ink on mylar
1986 January
6
1.8.39: Landscape Plan Pin Bar Document
Ink on mylar
undated
6
1.8.40: Site Lighting Plan Pin Bar Document
Ink on mylar
undated
6
1.8.41: Fire Access Plan Pin Bar Document
Ink on mylar
undated
6
1.8.42: Grading Plan Pin Bar Document
Ink on mylar
undated
6
1.8.43: Landscape Master Plan Pin Bar Document
Ink on mylar
undated
6
1.8.44: Master Plan Pin Bar Document
Ink on mylar
undated
6
1.8.45: Landscape Vegetation Plan
Ink on mylar
undated
6
1.8.46: Landscape Vegetation Plan Pin Bar Document
Ink on mylar
undated
6
1.8.47: Monuments and Markers
Ink on mylar
undated
Day Lodge
31 landscape drawings
1982-1986
tube
7
1.9.1A: Site Plan and Drawing Index
Blueprint Package; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 October
7
1.9.1B: Ground Floor Plan
Blueprint Package
1985 October
7
1.9.1C: Ground Floor Plan
Blueprint Package
1985 October
7
1.9.1D: Site Plan and Legend
Blueprint Package
1985 October
7
1.9.2: Ground Floor Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 April 15-17
7
1.9.3: Site Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 May
7
1.9.4A: Site Plan and Drawing Index
Blueprint Package; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 October 4
7
1.9.4B: Ground Floor Plan
Blueprint Package
1985 October 4
7
1.9.5A: Site Plan
Blueprint Package: J.H. Cook Architects and Engineers
1982 July 8
7
1.9.5B: Ground Floor Plan
Blueprint Package
1982 July 8
7
1.9.6A: Site Plan
Blueprint Package; J.H. Cook Architects and Engineers
1982 June 2
7
1.9.6B: Ground Floor Plan
Blueprint Package
1982 June 2
7
1.9.7: Ground Floor Plan
Print on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 June 10
7
1.9.8: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
1986 November 10
7
1.9.9: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
1986 November 10
7
1.9.10: Day Lodge Use Allocation
Print on Diazo Mylar Spliced on Mylar
undated
7
1.9.11: Day Lodge Use Allocation
Print on Acetate Spliced on Mylar
1986 November 10
7
1.9.12: Day Lodge Use Allocation
Ink on Blueprint
1986 November 10
7
1.9.13: Day Lodge Use Allocation
Ink on Blueprint
1986 November 10
7
1.9.14: Day Lodge Use Allocation
Ink on Blueprint
1986 November 10
7
1.9.15: Day Lodge Use Allocation
Ink on Blueprint
1986 November 10
7
1.9.16A: Site Plan
Print on Bond; Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 July 23
7
1.9.16B: Ground Floor Plan
Print on Bond
1985 July 23
7
1.9.16C: Elevation
Print on Bond
1985 July 23
7
1.9.16D: Elevation
Print on Bond
1985 July 23
7
1.9.16E: Elevation
Print on Bond
1985 July 23
7
1.9.16F: Elevation
Print on Bond
1985 July 23
7
1.9.17: Day Lodge Facility at Ribbon Creek
Pencil on Mylar
undated
7
1.9.18: Day Lodge Facility at Ribbon Creek
Pencil on Mylar
undated
Parcel A
1981-1986
tube
8
1.10.1A: Parking Level Floor Plan
Ink on Mylar
undated
8
1.10.1B: Lobby Level Floor Plan
Ink on Mylar
undated
8
1.10.1C: Level Two Floor Plan
Ink on Mylar
undated
8
1.10.1D: Level Three Floor Plan
Ink on Mylar
undated
8
1.10.1E: Loft Level Floor Plan
Ink on Mylar
undated
8
1.10.1F: Roof Plan
Ink on Mylar
undated
8
1.10.1G: Sections
Ink on Mylar
undated
8
1.10.1H: Unit Plans
Ink on Mylar
undated
8
1.10.1I: Detail Elevations
Ink on Mylar
undated
8
1.10.2A: Lower Level
Ink on Mylar
undated
8
1.10.2B: Ground Level
Ink on Mylar
undated
8
1.10.2C: 2nd Level
Ink on Mylar
undated
8
1.10.2D: 3rd Level
Ink on Mylar
undated
8
1.10.3A: Lower Level
Ink on Mylar
undated
8
1.10.3B: Ground Level
Ink on Mylar
undated
8
1.10.3C: 2nd Level
Ink on Mylar
undated
8
1.10.3D: 3rd Level
Ink on Mylar
undated
8
1.10.3E: 4th Level
Ink on Mylar
undated
8
1.10.4A: Lower Level
Ink on Mylar
undated
8
1.10.4B: Ground Level
Ink on Mylar
undated
8
1.10.4C: 2nd Level
Ink on Mylar
undated
8
1.10.4D: 3rd Level
Ink on Mylar
undated
8
1.10.5A: Lower Level
Print and Ink on Bond
undated
8
1.10.5B: Ground Level
Print and Ink on Bond
undated
8
1.10.5C: 2nd Level
Print and Ink on Bond
undated
8
1.10.5D: 3rd Level
Print and Ink on Bond
undated
8
1.10.6A: Ground Level
Print and Ink on Bond
undated
8
1.10.6B: 2nd Level
Print and Ink on Bond
undated
8
1.10.6C: 3rd Level
Print and Ink on Bond
undated
8
1.10.6D: Lower Level
Print and Ink on Bond
undated
8
1.10.7: Parcel A Program Summary 3rd Level
Pencil on Mylar
undated
8
1.10.8: Parcel A Program Summary Ground Level
Pencil on Vellum
undated
8
1.10.9: Master Plan
Blueprint on Bond; by Rick Balbi Architect
undated
8
1.10.10: Main Floor Plan
Pencil on Blueprint; by Rick Balbi Architect
undated
8
1.10.11: Main Floor Plan
Blueprint on Bond; by Rick Balbi Architect
undated
8
1.10.12: Site Plan and Main Floor Plan
Blueprint on Bond; by Balbi Architects
1985 June
8
1.10.13: Main Floor Plan
Ink on Blueprint; by Balbi Architects
1985 May 29
8
1.10.14: Main Floor Plan
Print on Acetate; by Balbi Architects
1985 May 6
8
1.10.15: Main Floor Plan
Blueprint on Bond; by Balbi Architects
1985 May 25
8
1.10.16: Main Floor Plan
Ink on Blueprint; by Balbi Architects
1985 May 6
8
1.10.17: Main Floor Plan
Blueprint on Bond; by Balbi Archtiects
1985 August
8
1.10.18: Main Floor Plan
Blueprint on Bond; by Balbi Architects
1985 May 6
8
1.10.19: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
undated
8
1.10.20: Section
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November 18
8
1.10.21: Entrance and Exit Ramps
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 December 5
8
1.10.22: Loading Area
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 December 3
8
1.10.23: Entrance Court Area
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November 25
8
1.10.24: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
1985 December 23
8
1.10.25: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
1985 December 17
8
1.10.26: Main Floor Plan
Blueprint on Bond; by Proppe Architect Ltd
undated
8
1.10.27: Main Floor
Marker on Blueprint; by Proppe Architect Ltd
undated
8
1.10.28: Main Floor
Marker on Blueprint; by Proppe Architect Ltd
1986 February 4
8
1.10.29: Paving at Front Entrance
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers;
1985 November 15
8
1.10.30: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November 22
8
1.10.31: Nightclub/Bar Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November 25
8
1.10.32: Lobby Level
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November
8
1.10.33: Hotel at Parcel A Lobby Level
Blueprint on Bond
1985 October 25
8
1.10.34: Lobby Level Floor Plan
Blueprint on Bond; by Cook, Culham, Montgomery, Pedersen, & Valentine Architects & Engineers
1985 November 11
8
1.10.35A: Ribbon Creek Hotel Main Floor
Ink on Blueprint; by B. James Wensley
1984 March 29
8
1.10.35B: Parking Level
Ink on Blueprint
undated
8
1.10.35C: Second Floor
Ink on Blueprint
undated
8
1.10.35D: Third Floor
undated
8
1.10.36: Parcel A area calculations
Ink on Trace
1985
8
1.10.37: Schedule A Parcel A
Ink on Mylar
1985 May
8
1.10.38: Schedule A Parcel A
Ink and Print on Mylar
undated
8
1.10.39: Plan of Survey of Parcel A in the N.E. ¼ Sec. 15, Twp. 21, Rge. 9, W. 5th M
Print on Mylar
1983
8
1.10.40A-B: Concept Plans
Blueprint on Bond; by McKellar Architects (2 sheets)
1981 October
8
1.10.41A: Program Calculation Sheet Ground
Ink on Blueprint
1985 May 19
8
1.10.41B: Program Calculation Sheet 2nd
Ink on Blueprint
1985 May 19
8
1.10.41C: Program Calculation Sheet 3rd
Ink on Blueprint
1985 May 19
8
1.10.42A: Program Calculation Sheets Level 3
Ink on Blueprint
1985 May 19
8
1.10.42B: Program Calculation Sheets Ground Level
Ink on Blueprint
1985 May 19
8
1.10.42C: Program Calculation Sheets Ground Level
Ink on Blueprint
1985 May 19
8
1.10.42D: Program Calculation Sheets Level 2
Ink on Blueprint
1985 May 19
8
1.10.42E: Program Calculation Sheets Lower Level
Ink on Blueprint
1985 May 19
8
1.10.43A: Use Location Diagram Package A Level One (Basement) Plan
Print on Acetate
undated
8
1.10.43B: Use Location Diagram Package A Level Two (Ground Level) Plan
Print on Acetate
undated
8
1.10.43C: Use Location Diagram Package A Level Three Plan
Print on Acetate
undated
8
1.10.43D: Use Location Diagram Package A Level Four Plan
Print on Acetate
undated
8
1.10.43E: Use Location Diagram Package A Level Five Plan
Print on Acetate
undated
8
1.10.44A: Design Concept Diagram Package A Level One (Basement) Plan
Print on Acetate
undated
8
1.10.44B: Design Concept Diagram Package A Level Two (Ground Level) Plan
Print on Acetate
undated
8
1.10.44C: Design Concept Diagram Package A Level Three Plan
Print on Acetate
undated
8
1.10.44D: Design Concept Diagram Package A Level Four Plan
Print on Acetate
undated
8
1.10.44E: Design Concept Diagram Package A Level Five Plan
Print on Acetate
undated
8
1.10.45: Parcel A Floor Plan
Print on Acetate
undated
8
1.10.46: Parcel A Floor Plan
Print on Acetate
undated
8
1.10.47: Parcel A Floor Plan
Print on Acetate
undated
8
1.10.48: Parcel A Floor Plan
Print on Acetate
undated
8
1.10.49: Parcel A Floor Plan
Print on Acetate
undated
8
1.10.50: Parcel A Second Floor
Print on Acetate
undated
8
1.10.51: Parcel A Third Floor
Print on Acetate
undated
8
1.10.52: Parcel A Fourth Floor
Print on Acetate
undated
Parcel B
1981-1986
tube
9
1.11.1: Schedule A Parcel B
Ink on Diazo Mylar
1985 December 10
9
1.11.2: Schedule A Parcel B
Ink on Mylar
1985 February
9
1.11.3: Parcel B Floor Plan
Pencil on Mylar
1985 February
9
1.11.4: Ground Floor by Nelson MacDonald Design Ltd
Blueprint on Bond
undated
9
1.11.5: Ground Floor
Blueprint on Bond; by Nelson MacDonald Design Ltd
undated
9
1.11.6: The Heathwood Resort at Ribbon Creek
Blueprint on Bond; by Nelson MacDonald Design
1985 August 29
9
1.11.7: Heathwood Hotel Ground Floor Plan
Blueprint on Bond; by Nelson MacDonald Design Ltd
1985 August 14
9
1.11.8: Hotel – Ribbon Creek – Parcel B Ground Floor
Colored Pencil on Blueprint
1985 February 13
9
1.11.9: Heathwood at Ribbon Creek Building Section
Marker on Blueprint; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 October 28
9
1.11.10: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 August 10
9
1.11.11: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 August 10
9
1.11.12: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 August 10
9
1.11.13: Heathwood at Ribbon Creek Building Section
Ink on Blueprint on Bond; Ink on Blueprint on Bond
1981 August 10
9
1.11.14: Heathwood at Ribbon Creek Building Section
Blueprint on Bond; by Stephenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 August 10
9
1.11.15: Parcel B
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
1986 January 31
9
1.11.16: Master Plan for Parcel B
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
1986 January 31
9
1.11.17: Hotel – Ribbon Creek Village – Parcel B Ground Floor
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
1985 October 13
9
1.11.18: Ground Floor Plan for the Inn at Ribbon Creek
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
1985 December 5
9
1.11.19: Ground Floor Plan for the Inn at Ribbon Creek
Blueprint on Bond; by Raines, Finlayson, Barrett, & Partners
undated
9
1.11.20: Heathwood at Ribbon Creek Floor Plans
Marker on Blueprint; Marker on Blueprint
1981 October 30
9
1.11.21: Nakiska Hotel Site Plan
Marker on Blueprint; by Proppe Architects Ltd
1986 October 6
9
1.11.22: The Manor at Kananaskis Main Entrance Layout
Blueprint on Bond; by Proppe Architects Ltd
undated
9
1.11.23: The Manor at Kananaskis Ground Floor Plan
Blueprint on Bond; by Proppe Architects
undated
9
1.11.24: The Manor at Kananaskis Site Plan
Blueprint on Bond; by Proppe Architects Ltd
1986 October 6
9
1.11.25: Nakiska Hotel Ground Floor
Marker on Blueprint' by Proppe Architects Ltd
undated
9
1.11.26: Heathwood at Ribbon Creek Site Plan
Sepia Print
undated
9
1.11.27: Heathwood at Ribbon Creek Site Plan
Marker on Print on Bond
undated
9
1.11.28: Heathwood at Ribbon Creek Ground Level
Sepia Print
1981 November 20
9
1.11.29: Heathwood at Ribbon Creek Ground Level
Marker on Print on Bond
1981 November 20
Parcel C
1985-1986
tube
10
1.12.1: Parcel C Boundaries and Utilities
Print on Mylar
undated
10
1.12.2: Schedule A Parcel C
Print on Mylar
undated
10
1.12.3: Schedule A Parcel C
Print on Mylar
undated
10
1.12.4: Schedule A Parcel C
Print on Mylar
undated
10
1.12.5: Schedule A Parcel C
Print on Mylar
undated
10
1.12.6: Schedule A Parcel C Description of Tentative Lease Area
undated
10
1.12.7A: Pocaterra Lodge Master Plan on Sheet a-1
Blueprint Package; by Lemermeyer Architect Ltd
1985 December 2
10
1.12.7B: Pocaterra Lodge Main Floor Plan on Sheet a-3
Blueprint Package; by Lemermeyer Architect Ltd
1985 December 2
10
1.12.7C: Pocaterra Lodge Elevations on Sheet a-8
Blueprint Package; by Lemermeyer Architect Ltd
1985 December 2
10
1.12.8A: Red Ribbon Inn Site Plan on Sheet 1
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
1985 July 23
10
1.12.8B: Red Ribbon Inn Main Floor Plan on Sheet 3
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
1985 July 23
10
1.12.8C: Red Ribbon Inn Elevations on Sheet 7
Blueprint Package; by Wayne H. Wright and Lemermeyer Architects
1985 July 23
10
1.12.9A: Pocaterra Lodge Master Plan on Sheet a-1
Blueprint Package; created by Lemermeyer Architect Ltd
1986 January 28
10
1.12.9B: Pocaterra Lodge Main Floor Plan on Sheet a-3
Blueprint Package; created by Lemermeyer Architect Ltd
1986 January 28
10
1.12.9C: Pocaterra Lodge Elevations on Sheet a-8
Blueprint Package; created by Lemermeyer Architect Ltd
1986 January 28
Fortress Junction Service Centre
undated
tube
10
1.13.1A: Site Plan
Blueprint on Bond; Ron Boruk Architect
undated
10
1.13.1B: Main Floor Plan
Blueprint on Bond; Ron Boruk Architect
undated
10
1.13.1C: Floor Plan for Proposed Residence
Blueprint on Bond; Ron Boruk Architect
undated
10
1.13.2: Blueprint on Bond
Floor Plan by Ron Boruk Architect
1983 April 12
Maintenance Building
undated
tube
10
1.14.1A: Village of Ribbon Creek Maintenance Facility Floor Plans
Blueprint Package
undated
10
1.14.1B: Village of Ribbon Creek Maintenance Facility Elevations
Blueprint Package
undated
10
1.14.1C: Village of Ribbon Creek Maintenance Facility Site Plan (1)
Blueprint Package
undated
10
1.14.1D: Village of Ribbon Creek Maintenance Facility Site Plan (2)
Blueprint Package
undated
Staff Housing
1985-1986
tube
11
1.15.1: Employee Housing Site Plan
Print & Contact Paper on Diazo Mylar
1986 January 15
11
1.15.2: Staff Housing Parking Phase I
Blueprint on Bond
1986 June 14
11
1.15.3: Existing Topography
Ink on Mylar
undated
11
1.15.4: Existing Topography
Print on Diazo Mylar
1985 January 15
11
1.15.5: Employee Housing
Blueprint on Bond
1986 February 4
11
1.15.6: Employee Housing
Ink on Blueprint on Bond
undated
11
1.15.7: Staff Housing Concept
Blueprint on Bond
1986 June 6
11
1.15.8: Ribbon Creek Employee Housing Scheme Two
Blueprint on Bond
undated
11
1.15.9: Employee Housing Site Plan
Pencil on Blueprint on Bond
1986 January 15
11
1.15.10: Ribbon Creek Staff Housing Plans and Elevations
Blueprint on Bond
1986 April
11
1.15.11: Employee Housing Scheme #1
Marker on Blueprint on Bond
1986 May 27
11
1.15.12: Employee Housing
Marker on Blueprint on Bond
undated
11
1.15.13: Employee Housing Site Plan Grading Rough Draft
Pencil on Mylar
undated
11
1.15.14: Employee Housing Site Plan Grading
Pencil and Ink on Trace
undated
11
1.15.15: Employee Housing Site Plan
Blueprint
undated
11
1.15.16: Employee Housing Site Plan
Print and Ink on Diazo Mylar
1986 January 15
11
1.15.17: Grading and Utilities Ground Survey of Staff Housing Area
Blueprint on Bond; by Reid, Crowther, & Partners Ltd.
1986 June 13
11
1.15.18: Employee Housing Site Plan
Pencil on Mylar
1986 February 4
11
1.15.19: Landscape Plan
Pencil and Ink on Mylar
undated
11
1.15.20: Site Plan
Ink on Mylar
undated
11
1.15.21: Employee Housing Scheme #1
Pencil and Ink on Mylar
1986 May 27
11
1.15.22: Topography of Employee Housing Site
Print on Acetate
undated
11
1.15.23: Site Plan
Ink on Trace
undated
11
1.15.24: Site Plan
Ink on Mylar
undated
11
1.15.25: Site Plan
Pencil and Ink on Trace
undated
11
1.15.26: Site Plan
Ink on Trace
undated
11
1.15.27: Employee Housing Master Plan
Pencil and Ink on Trace
1986 June 19
11
1.15.28: Concept Plan
Ink and Marker on Trace
undated
11
1.15.29: Employee Housing Site Plan
Pencil and Print on Diazo Mylar
1986 January 15
11
1.15.30: Concept Plan
Pencil on Mylar
undated
11
1.15.31: Employee Housing Site Plan
Print on Diazo Mylar
1986 January 22
11
1.15.32: Employee Housing Concept
Blueprint on Bond
undated
11
1.15.33: Parking Study
Pencil on Trace
undated
11
1.15.34: Parking and Circulation Study Option 1
Pencil on Trace
undated
11
1.15.35: Employee Housing Scheme Four
Marker on Blueprint
undated
11
1.15.36: Employee Housing Scheme One
Ink and Pencil on Mylar
undated
11
1.15.37: Employee Housing Scheme Two
Blueprint on Bond
1986 May 13
11
1.15.38: Employee Housing Scheme Three
Ink and Pencil on Mylar
undated
11
1.15.39: Employee Housing Scheme Four
Ink on Mylar
undated
11
1.15.40: Concept Drawing
Pencil on Trace
undated
11
1.15.41: Employee Housing Scheme Four;
Ink on Blueprint
undated
11
1.15.42: Fire Access Plan Pin Bar Document
Ink on Blueprint
undated
11
1.15.43: Site Plan Pin Bar Document
Ink on Mylar
undated
11
1.15.44: The Village at Ribbon Creek Employee Housing Pin Bar Document
Ink and Pencil on Mylar
1981 October 27
11
1.15.45: Employee Housing Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
1986 January 15
11
1.15.46: Financial Trustco Proposed Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
1986 January 15
11
1.15.47: Grading Employee Housing Site Plan Pin Bar Document
Print and Ink on Diazo Mylar
1986 Janaury 15
11
1.15.48: Grading Employee Housing Site Plan Pin Bar Document
Pencil and Ink on Mylar
undated
11
1.15.49: Employee Housing Site Plan Pin Bar Document
Ink on Mylar
undated
11
1.15.50: Lot Delineation Pin Bar Document
Ink on Mylar
1986 April 29
11
1.15.51: Right of Way and Topography Pin Bar Document
Ink on Mylar
undated
11
1.15.52: Site Plan Pin Bar Document
Print on Diazo Mylar
1986 June 25
11
1.15.53: Grading Plan Pin Bar Document
Pencil and Ink on Diazo Mylar
undated
11
1.15.54: Schedule A Area Subject to Lease Pin Bar Document
Ink on Mylar
1986 October 31
11
1.15.55: Employee Housing master Plan Pin Bar Document
Print on Diazo Mylar
undated
11
1.15.56: Employee Housing Grading Plan Pin Bar Document
Pencil and Ink on Diazo Mylar
undated
11
1.15.57: Suitability Study Pin Bar Document
Ink on Mylar
undated
11
1.15.58: Proposed Circulation Plan
Print and Ink on Mylar
1986 January 15
11
1.15.59: Ribbon Creek Employee Housing Scheme Two
Ink on Trace
undated
11
1.15.60: Employee Housing Scheme Two
Ink on Trace
undated
11
1.15.61: Fire Access Plan
Blueprint on Bond
undated
11
1.15.62: Employee Housing Landscape Plan
Blueprint on Bond
undated
11
1.15.63: Employee Housing Master Plan Pin Bar Document
Print on Acetate
1986 June 25
11
1.15.64: Cut and Fill Calculations from 1st Pass Grading
Pencil on Trace
1986 June 22
11
1.15.65A: Employee Housing Study; Plan View
Ink and Pencil on Trace
1986 January 14
11
1.15.65B: Employee Housing Study; Cross-sections
Ink and Pencil on Trace
1986 January 14
11
1.15.66A: Staff Housing Package; (Clearing) Layout Plan
Blueprint on Bond
1986 July 2
11
1.15.66B: Staff Housing Package; Grading and Utilities: Road and Parking Layout
Blueprint on Bond
1986 July 2
11
1.15.66C: Staff Housing Package; Grading and Utilities: Road and Parking Grading
Blueprint on Bond
1986 July 2
11
1.15.66D: Staff Housing Package; (Utilities) Layout Plan
Blueprint on Bond
1986 July 2
11
1.15.67A: Walkway, Turf, and Lighting Area Calculations; Walkway Area Calculations
Marker on Blueprint w/Yellow Sheet
1986 June 23
11
1.15.67B: Walkway, Turf, and Lighting Area Calculations; Site Plan with Calculations
Marker on Blueprint w/Yellow Sheet
1986 June 23
11
1.15.68A: Staff Housing Lot One Site Development Plan
Blueprint on Bond; by Snihur Consulting Ltd
1987 April
11
1.15.68B: Staff Housing Lot One Floor Plans
Blueprint on Bond; by Snihur Consulting Ltd.
1987 April
11
1.15.69: Staff Housing by McKellar Architects
Blueprint on Bond
1981 August 10
11
1.15.70: Ribbon Creek Staff Housing
Blueprint on Bond; by Proppe Architect Ltd.
1985 December 24
11
1.15.71: Ribbon Creek Staff Housing 76 Unit Complex Plans and Elevations
Blueprint on Bond; by Proppe Architect Ltd.
1986 April 7
11
1.15.72A: 88-Pillow Staff Housing Street Elevations
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 August 10
11
1.15.72B: 88-Pillow Staff Housing Front Elevations
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 August 10
11
1.15.73A: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 August 10
11
1.15.73B: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 August 10
11
1.15.74A: Staff Housing Floor Plan Main Level
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 September 10
11
1.15.74B: Staff Housing Floor Plan
Blueprint on Bond; by Western Professional Design Centre Ltd.
1986 September 10
11
1.15.74C: Staff HousingFloor Plan Main Level
Blueprint on Bond; by Western Professional Design Centre Ltd.
undated
11
1.15.75A: Employee Housing Site Plan Sections Section A
Pencil on Mylar
1986 January 15
11
1.15.75B: Employee Housing Site Plan Sections Section B
Pencil on Mylar
1986 January 15
11
1.15.75C: Employee Housing Site Plan Sections Section C
Pencil on Mylar
1986 January 15
11
1.15.75D: Employee Housing Site Plan Sections Section D
Pencil on Mylar
1986 January 15
11
1.15.75E: Employee Housing Site Plan Sections Titleblock
Pencil on Mylar
1986 January 15
11
1.15.76: Employee Housing Site Plan Sections
Sepia Print on Acetate
1986 January 15
Illustrations
tube
12
1.16.1: Axonometric Drawing of Village
Ink on Mylar
undated
12
1.16.2: Axonometric Drawing of Village
Print and Ink on Mylar; by Robert L. McIlhargey
1982
12
1.16.3: Perspective of Village
Print on Bond
1981 August
12
1.16.4: Perspective of West Gateway in Winter
Print on Bond
undated
12
1.16.5A: Computer-Aided Perspective View 1
Marker on Bond
undated
12
1.16.5B: Computer-Aided Perspective View 2
Marker on Bond
undated
12
1.16.5C: Computer-Aided Perspective View 3
Marker on Bond
undated
12
1.16.5D: Computer-Aided Perspective View 4
Marker on Bond
undated
12
1.16.6: Day Lodge Roof Plan
Pencil on Trace
undated
12
1.16.7: Day Lodge Roof Plan
Marker on Trace
undated
12
1.16.8: Day Lodge Second Floor Plan
Blueprint on Bond; by CCMP&V Architects and Engineers
1985 June 10
12
1.16.9A: Day Lodge Elevations South Elevation
Marker on Trace
undated
12
1.16.9B: Day Lodge Elevations South Elevation
Marker on Trace
undated
12
1.16.9C: Day Lodge Elevations East Elevation
Marker on Trace
undated
12
1.16.10: Roof Plan and Calculations
Pencil on Trace
undated
12
1.16.11: Main Floor; Scale
Blueprint on Bond
undated
12
1.16.12A: Building Elevations Unnamed
Marker on Trace
undated
12
1.16.12B: Building Elevations Unnamed
Marker on Trace
undated
12
1.16.12C: Building Elevations East
Marker on Trace
undated
12
1.16.12D: Building Elevations South
Marker on Trace
undated
12
1.16.12E: Building Elevations South
Marker on Trace
undated
12
1.16.12F: Building Elevations North
Marker on Trace
undated
12
1.16.12G: Building Elevations West
Marker on Trace
undated
12
1.16.13: Proposed Entry Revisions for Parcel B & C: Section Looking Northeast to Parcel B & C
Pencil on Trace
1986 September 25
12
1.16.14: North Elevation
Pencil on Trace
undated
12
1.16.15: Parcel A Elevation Studies
Pencil on Trace
1985 July
12
1.16.16: West and East Elevations
Pencil on Trace
1985 July 10
12
1.16.17A: Elevations Package East
Blueprint on Bond
undated
12
1.16.17B: Elevations Package South
Blueprint on Bond
undated
12
1.16.17C: Elevations Package Roof Plan
Blueprint on Bond
undated
12
1.16.18: Sections for Worksheet on Rooms and Cold Roof Details
Pencil and Ink on Mylar
undated
12
1.16.19: Snow Deflection Studies for Architectural Design Guidelines
Ink on Mylar
undated
12
1.16.20: East Elevation Parcel A Master Plan
Ink on Mylar
1986 March 4
12
1.16.21: East Elevation Parcel A Master Plan
Pencil and Print on Diazo Mylar
1986 March 4
12
1.16.22: South Elevation Parcel A Master Plan
Ink on Mylar
1986 March 4
12
1.16.23: South Elevation Parcel A Master Plan
Pencil and Print on Diazo Mylar
1986 March 4
12
1.16.24: Elevations of Ribbon Creek Village
Sepia Print and Pencil on Mylar
undated
12
1.16.25: Day Lodge and Building C Elevation
Pencil on Mylar
undated
12
1.16.26: Section and Elevations
Sepia on Mylar; by Stevenson, Raines, Barrett, Christie, Hutton, Seton, & Partners
1981 November 20
12
1.16.27: Roof Plan for Ribbon Creek Package A with Hagman Yaw
Pencil on Vellum
1982 June 29
12
1.16.28: Sections
Pencil on Vellum
undated
12
1.16.29: Section B-B
Pencil on Vellum
undated
12
1.16.30: Composite Elevation
Pencil on Sepia on Mylar
undated
12
1.16.31: Composite Elevation
Marker and Print on Bond
undated
12
1.16.32: Sections
Print on Acetate
undated
12
1.16.33: Sections
Print on Photopaper
undated
12
1.16.34: Composite Elevation
Print on Photopaper
undated
Document Packages
tube
13
1.17.1A: The Village at Ribbon Creek Master Plan Fire Access Master Plan
Print on Photopaper
1986 January
13
1.17.1B: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
1986 January
13
1.17.1C: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
1986 January
13
1.17.1D: The Village at Ribbon Creek Master Plan Landscape Master Plan
Print on Photopaper
1986 January
13
1.17.1E: The Village at Ribbon Creek Master Plan Master Plan
Print on Photopaper
1986 January
13
1.17.1F: The Village at Ribbon Creek Master Plan Lighting Master Plan
Print on Photopaper
1986 January
13
1.17.1G: The Village at Ribbon Creek Master Plan Grading Master Plan
Print on Photopaper
1986 January
13
1.17.1H: The Village at Ribbon Creek Master Plan Illustrative Plan
Print on Photopaper
1986 January
13
1.17.1I: The Village at Ribbon Creek Master Plan Signage Master Plan
Print on Photopaper
1986 January
13
1.17.2A: Commercial Signage Policy Design Standards and Approval Process Cover Page
Print on Photopaper
1987 March 13
13
1.17.2B: Commercial Signage Policy Design Standards and Approval Process Page 9
Print on Photopaper
1987 March 13
13
1.17.2C: Commercial Signage Policy Design Standards and Approval Process Pages 4 & 5
Print on Photopaper
1987 March 13
13
1.17.2D: Commercial Signage Policy Design Standards and Approval Process Contents
Print on Photopaper
1987 March 13
13
1.17.2E: Commercial Signage Policy Design Standards and Approval Process Pages 3 & 6
Print on Photopaper
1987 March 13
13
1.17.2F: Commercial Signage Policy Design Standards and Approval Process Pages 2 & 7
Print on Photopaper
1987 March 13
13
1.17.2G: Commercial Signage Policy Design Standards and Approval Process Pages 1 & 8
Print on Photopaper
1987 March 13
13
1.17.3A: Printing Package Site Analysis
Print on Mylar
undated
13
1.17.3B: Printing Package Illustrative Plan
Print on Mylar
undated
13
1.17.3C: Printing Package Parking and Circulation Plan
Print on Mylar
undated
13
1.17.3D: Printing Package Ground Level Plan
Print on Mylar
undated
13
1.17.3E: Printing Package Landscape Concept Plan
Print on Mylar
undated
13
1.17.3F: Printing Package Common Elements Plan
Print on Mylar
undated
13
1.17.3G: Printing Package Subdivision Plan
Print on Mylar
undated
13
1.17.3H: Printing Package Area Utility Plan
Print on Mylar
undated
13
1.17.3I: Printing Package Schematic Utility Plan
Print on Mylar
undated
13
1.17.3J: Printing Package Conceptual Grading Plan
Print on Mylar
undated
13
1.17.4A: Village Master Plan Cover
Print on Bond
undated
13
1.17.4B: Village Master Plan Building Location
Print on Bond
undated
13
1.17.4C: Village Master Plan Landscape Plan
Print on Bond
undated
13
1.17.4D: Village Master Plan Landscape Plan
Print on Bond
undated
13
1.17.4E: Village Master Plan Grading Plan
Print on Bond
undated
13
1.17.4F: Village Master Plan Site Lighting Plan
Print on Bond
undated
13
1.17.4G: Village Master Plan Signage Plan
Print on Bond
undated
13
1.17.4H: Village Master Plan Fire Access Plan
Print on Bond
undated
13
1.17.5A: Printing Package Site Analysis Iterations
Print on Acetate
undated
13
1.17.5B: Printing Package Site Analysis Iterations
Print on Photopaper
undated
13
1.17.5C: Printing Package Site Analysis Iterations
Print on Photopaper
undated
13
1.17.5D: Printing Package Site Analysis Iterations
Print on Vellum
undated
13
1.17.6A: Printing Package Parking and Circulation Plan Iterations
Print on Vellum
undated
13
1.17.6B: Printing Package Parking and Circulation Plan Iterations
Print on Acetate
undated
13
1.17.6C: Printing Package Parking and Circulation Plan Iterations
Marker and Print on Photopaper
undated
13
1.17.7A: Printing Package Ground Level Plan Iterations
Print on Photopaper
undated
13
1.17.7B: Printing Package Ground Level Plan Iterations
Sepia on Acetate
undated
13
1.17.7C: Printing Package Ground Level Plan Iterations
Print on Acetate
undated
13
1.17.7D: Ground Level Plan
Print on Acetate
undated
13
1.17.8A: Printing Package Landscape Concept Plan Iterations
Print on Photopaper
undated
13
1.17.8B: Printing Package Landscape Concept Plan Iterations
Print on Acetate
undated
13
1.17.9A: Printing Package Common Elements Plan Iterations
Print on Photopaper
undated
13
1.17.9B: Printing Package Common Elements Plan Iterations
Print on Photopaper
undated
13
1.17.9C: Printing Package Common Elements Plan Iterations
Print on Vellum
undated
13
1.17.9D: Printing Package Common Elements Plan Iterations
Print on Avetate
undated
13
1.17.10A: Printing Package Subdivision Plan Iterations
Print on Vellum
undated
13
1.17.10B: Printing Package Subdivision Plan Iterations
Print on Acetate
undated
13
1.17.10C: Printing Package Subdivision Plan Iterations
Print on Photopaper
undated
13
1.17.10D: Printing Package Subdivision Plan Iterations
Print on Photopaper
undated
13
1.17.11A: Printing Package Area Utility Plan Iterations
Print on Acetate
undated
13
1.17.11B: Printing Package Area Utility Plan Iterations
Print on Photopaper
undated
13
1.17.12A: Printing Package Schematic Utility Plan Iterations
Print on Acetate
undated
13
1.17.12B: Printing Package Schematic Utility Plan Iterations
Print on Photopaper
undated
13
1.17.13A: Printing Package Conceptual Grading Plan Iterations
Print on Acetate
undated
13
1.17.13B: Printing Package Conceptual Grading Plan Iterations
Print on Photopaper
undated
13
1.17.14: Village Master Plan Site Analysis
Print and Ink on Mylar
undated
13
1.17.15: Village Master Plan Site Analysis
Print on Mylar
undated
13
1.17.16: Village Master Plan Area Utility Plan
Print on Mylar
undated
13
1.17.17: Village Master Plan Landscape Concept Plan
Print on Mylar
undated
13
1.17.18: Village Master Plan Area Utility Plan
Print on Mylar
undated
13
1.17.19: Village Master Plan Schematic Utility Plan
Print on Mylar
undated
13
1.17.20: Village Master Plan Subdivision Plan
Print on Mylar
undated
13
1.17.21: Village Master Plan Subdivision Plan
Print on Mylar
undated
13
1.17.22: Village Master Plan Subdivision Plan
Print on Mylar
undated
13
1.17.23: Village Master Plan Conceptual Grading Plan
Print on Mylar
undated
13
1.17.24: Village Master Plan Parking and Circulation Plan
Print on Mylar
undated
13
1.17.25: Village Master Plan Parking and Circulation Plan
Print on Mylar
undated
13
1.17.26: Village Master Plan Ground Level Plan
Print on Mylar
undated
13
1.17.27: Village Master Plan Schematic Utility Plan
Print on Mylar
undated
13
1.17.28A: Mid-Point Document Package Elevations and Sections
Pencil on Sepia Print
undated
13
1.17.28B: Mid-Point Document Package Subdivision Plan
Pencil on Sepia Print
undated
13
1.17.28C: Mid-Point Document Package Elevations
Pencil on Sepia Print
undated
13
1.17.28D: Mid-Point Document Package Landscape Concept Plan
Pencil on Sepia Print
undated
13
1.17.28E: Mid-Point Document Package Concept Diagram
Pencil on Sepia Print
undated
13
1.17.28F: Mid-Point Document Package Elevations and Sections
Pencil on Sepia Print
undated
13
1.17.28G: Mid-Point Document Package Bill Johnson Sketches
Pencil on Sepia Print
undated
13
1.17.28H: Mid-Point Document Package Road Exposure and Alignment
Pencil on Sepia Print
undated
13
1.17.28I: Mid-Point Document Packages Perspective Sketches
Pencil on Sepia Print
undated
Banff Downtown Enhancement
tube
14
1.18.1: Area Map
Blueprint on Bond
undated
14
1.18.2: Banff Alberta Downtown Enhancement
Blueprint on Bond
1992 March 11
14
1.18.3: Banff Calculation Studies
Blueprint on Bond
undated
14
1.18.4: 2 Lane Scheme
Blueprint on Bond
undated
14
1.18.5: 4 Lanes Section
Blueprint on Bond
undated
14
1.18.6: 3 Lanes – 2 Lanes in One Direction
Blueprint on Bond
undated
14
1.18.7: 3 Lane Options
Blueprint on Bond
undated
14
1.18.8: Boundaries and Circulation
Marker on Blueprint on Bond
undated
14
1.18.9: Boundaries and Circulation
Blueprint on Bond
undated
14
1.18.10: Visitor Auto Access and Parking
Blueprint on Bond
undated
14
1.18.11: Parking Management
Blueprint on Bond
1992
14
1.18.12: Shuttle Stops and Route
Blueprint on Bond
undated
14
1.18.13: 2 Lane One-Way System
Blueprint on Bond
undated
14
1.18.14: Modified Street Section with Review of Parking Lanes
Blueprint on Bond
undated
14
1.18.15: Circulation Schematic
Blueprint on Bond
undated
14
1.18.16: Existing Service Access
Blueprint on Bond
undated
14
1.18.17: Circulation Schematic
Blueprint on Bond
undated
14
1.18.18: Intersection Schematic
Blueprint on Bond
undated
14
1.18.19: Intersection Schematic
Blueprint on Bond
undated
14
1.18.20: Entry in Plan View and Section
Blueprint on Bond
undated
14
1.18.21: Entry Concept Schematic
Blueprint on Bond
undated
14
1.18.22: Entry Concept Schematic
Blueprint on Bond
undated
14
1.18.23: Circulation Schematic
Blueprint on Bond
undated
14
1.18.24: Parking Study
Blueprint on Bond
undated
14
1.18.25: Routes and Nodes
Blueprint on Bond
undated
14
1.18.26: Banff Avenue Paving
Blueprint on Bond
undated
14
1.18.27: Banff Avenue Paving
Blueprint on Bond
undated
14
1.18.28: Intersection Plans and Sections
Blueprint on Bond
undated
14
1.18.29: Off Banff Avenue Schematic
Blueprint on Bond
undated
14
1.18.30: Area Map with Circulation
Blueprint on Bond
undated
14
1.18.31: BDEP Design Component: Traffic
Blueprint on Bond
undated
14
1.18.32: Circulation Schematics
Blueprint on Bond
undated
14
1.18.33: BDEP Design Component: Linkages
Blueprint on Bond
undated
14
1.18.34: BDEP Design Component: Intersections and Nodes
Blueprint on Bond
undated
14
1.18.35: Banff Springs Hotel Signage
Blueprint on Bond
undated

II:  II: High Desert, 1989-2007Return to Top

17 boxes, 285 folders 23 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
Box Folder
1 1
Academy Lands East Correspondence
(A.2, #219)
1989
1 2
Albuquerque Academy Lands East Meeting Minutes
(A.4, #219)
1989
1 3
Albuquerque Academy Planned Communities Criteria
(#219)
1989
1 4
High Desert Proposal/Contracts
(A.1, #551)
1991
1 5
High Desert Proposals/Contracts
(A.1, #551)
1991-1992
1 6
High Desert Proposals/Contracts
(A.1, #551)
1994
1 7
High Desert Correspondence
(A.2, #551)
1991
1 8
High Desert Correspondence
(A.2, #551)
1992
1 9
High Desert Correspondence
(A.2, #551)
1995
1 10
High Desert Correspondence – Agency
(A.2c, #551)
1991-1993
1 11
High Desert Transmittals
(A.3, #551)
1992-1994
1 12
High Desert Meeting Minutes
(A.4, #551)
1988-1991
1 13
High Desert Meeting Minutes
1991 September
2 1
High Desert Administrative
(A.4, #551)
1991 October
2 2
High Desert Meeting Minutes
(A.4, #551)
1991 November-December
2 3
High Desert Meeting Minutes
(A.4, #551)
1992 January-February
2 4
High Desert Meeting Minutes
(A.4, #551)
1992 March-July
2 5
High Desert Work Program
(A.5, #551)
1991-1993
2 6
High Desert Clippings
(A.6, #551)
1991-1993
2 7
High Desert Billing
(A.8, #551)
1992
2 8
High Desert Faxes – Sketch Modifications
(A.9, #551)
1993
2 9
High Desert Biological
(B.2, #551)
1992
2 10
High Desert Programming - Golf Course
(B.5e, #551)
1989-1993
2 11
High Desert Programming – Conference Center/Resort
(B.5f, #551)
1990-1991
2 12
High Desert Programming – High Tension Lines
(B.5g, #551)
1988-1992
2 13
High Desert Programming – Grading
(B.5h, #551)
1992
3 1
High Desert Design
(B.6, #551)
1991
3 2
High Desert Cost Estimates / Financial Feasibility
(B.6, #551)
1991
3 3
High Desert Cost Estimates
(B.6, #551)
1991-1992
3 4
High Desert Cost Estimates
(B.6, #551)
1993-1994
3 5
High Desert Design Sketches
(B.7, #551)
1991-1992
3 6
Political Process
(B.8, #551)
1990-1991 February
3 7
Political Process
(B.8, #551)
1991 September-October
3 8
Political Process
(B.8, #551)
1991 October
3 9
Political Process
(B.8, #551)
1991 November
3 10
Political Process
(B.8, #551)
1991 December
3 11
Political Process
(B.8, #551)
1992
3 12
High Desert Retirement Community
(B.9, #551)
1991
3 13
Zoning
(B.10, #551)
1992-1993
4 1
High Desert
(B.11, #551)
1992
4 2
Sierra Club
(B.13, #551)
1992
4 3
High Desert Assisted Living Facility
(B.14, #551)
1992
4 4
High Desert Streets
(B.15, #551)
1992
4 5
High Desert Streets
(B.15, #551)
1993-1994
4 6
Lighting
(B.16, #551)
1987-1994
4 7
High Desert Canada Reservoir
(B.17, #551)
1992
4 8
Open Space Task Force
(B.18, #551)
1992
4 9
Albuquerque Conservation Trust
(B.19, #551)
1992
4 10
Water Conservation Task Force
(B.20, #551)
1992-1994
4 11
Development Review Board
(B.21, #551)
1992
4 12
Open Space
(B.22, #551)
1992
4 13
Trails
(B.23, #551)
1992-1993
4 14
Forest Service
(B.24, #551)
1992-1993
4 15
404 Permits
(B.25, #551)
1993
4 16
Archaeology
(B.27, #551)
1993
4 17
Parcel Proforma
(B.28, #551)
1993
4 18
Homeowner's Association
(B.29, #551)
1993
4 19
Comprehensive Plan Amendment
(B.30, #551)
1993
4 20
Commercial Covenants
(B.32, #551
1993
4 21
Unit Counts
(B.33, #551)
1993
4 22
Parcel 2
(B.34, #551)
1995
4 23
Trailhead
(B.35, #551)
1993
4 24
Trailhead
(B.35, #551)
1994
4 25
Parcel 3
(B.36, #551)
1994-1995
5 1
Apartments
(B.37, #551)
1993
5 2
Apartments
(B.37, #551)
1994
5 3
Art piece competition
(B.38, #551)
1994-1995
5 4
Office building
(B.39, #551)
1994
5 5
Building heights
(B.40, #551)
1993-1995
5 6
Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
1991
5 7
Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
1992-1993
5 8
Marketing/Presentations Guidelines for Sustainability
(D.1, #551)
1994
5 9
Specifications Architecture
(D.2, #551)
1991
5 10
Specifications Architecture
(D.2, #551)
1991
5 11
Architecture
(D.2, #551)
1993
5 12
Design Guidelines Sector Plan
(D.3, #551)
1986
5 13
Design Guidelines Sector Plan
(D.3, #551)
1992 March–June
5 14
Design Guidelines Sector Plan
(D.3, #551)
1992 July–September
6 1
Design Guidelines Sector Plan
D. 3, #551)
1992
6 2
Design Guidelines Sector Plan, Volume On
(D.3, #551)
1993
6 3
Design Guidelines Sector Plan
(D.3, #551)
1993
6 4
Design Guidelines Sector Plan
(D.3, #551)
1994
6 5
Covenants, Conditions & Restrictions Economic Model
(D. 4, #551)
1992
6 6
Planned Unit Developments Environmental Evaluation
(D.5, #551)
1992
6 7
Marketing Consultants
(D.7, #551)
1992
6 8
Fund Raising
(D.8, #551)
1992
6 9
Graphic Designers
(D.9, #551)
1993
6 10
Conservation Easements
(D.10, #551)
1992
6 11
Conservation Easements
(D.10, #551)
1993
6 12
Conservation Easements
(D.10, #551)
1993
6 13
Conservation Easements
(D.10, #551)
1993
6 14
Conservation Easements
(D.10, #551)
1993
6 15
Conservation Easements
(D.10, #551)
1993
7 1
Conservation Easements Deed
(D.10, #551)
1993
7 2
Conservation Easement Plat
(D.10, #551)
1993
7 3
Drainage Easements
(D.11, #551)
1993
7 4
Bulk land plat
1993
7 5
Distribution list
undated
7 6
Conceptual drainage plan
1994
7 7
Cross-lot drainage plan
1992
7 8
Marketing graphics
undated
7 9
Press release
undated
7 10
Slope maps
1993
7 11
Proposal/Contracts
(A.1, #853)
1992-1993
7 12
Proposal/Contracts
(A.1, #853)
1994 February
7 13
Proposal/Contracts
(A.1, #853)
1994 February-December
7 14
Proposal/Contracts
(A.1, #853)
1995
8 1
Proposal/Contracts Phase II Streetscapes
(A.1a, #853)
1993-1995 May
8 2
Proposal/Contracts
(A.1a, #853)
1995 August-1997
8 3
Proposal/Contracts
(A.1b, #853)
1996
8 4
Correspondence
(A.2, #853)
1993-1994
8 5
Correspondence - Owner
(A.2a, #853)
1994
8 6
Correspondence - Owner
(A.2a, #853)
1995 January–May
8 7
Correspondence/ Owner
(A.2a, #853)
1995 June-1997
8 8
Correspondence – Consultant
(A.2b, #853)
1993-1995
8 9
Correspondence - Agency
(A.2c, #853)
1991-1997
8 10
Conversation Records
(A.2d, #853)
1994-1996
8 11
Transmittals
(A.3a, #853)
1995
8 12
Meeting Minutes
(A.4, #853)
1994-1996
8 13
Work Program
(A.5, #853)
undated
9 1
Billing/Invoices
(A.7, #853)
1993-1994 May
9 2
Billing/Invoices
(A.7, #853)
1994 June–October
9 3
Billing/Invoices
(A.7, #853)
1994 November–1995
9 4
Billing/Invoices
(A.7, #853)
1996
9 5
Billing/Invoices
(A.7 #853)
1997
9 6
Notes to File
(A.8, #853)
1995-1997
9 7
Facsimiles; contains plant list
(A.9, #853)
1994-1995
9 8
Facsimiles; contains plant list
(A.9, #853)
1996-1997
9 9
Geology/Soils
(B.1a, #853)
1995-1996
9 10
Streetscape irrigation
(B.2, #853)
1994
9 11
Programming; contains plant and tree lists
(B.5, #853)
1993
9 12
Cost Estimates
(B.6, #853)
1993-1994
9 13
Cost Estimates
(B.6, #853)
1995-1997
9 14
Design Sketches
(B.7, #853)
1995-1997
10 1
Construction Bids
(C.1, #853)
1996
10 2
Pay Requests
(C.3, #853)
1995-1996
10 3
Pay Requests
(C.3, #853)
1997
10 4
Field Reports
(C.4, #853)
1995-1997
10 5
Change Orders
(C.5, #853)
1995-1996
10 6
Construction Communications
(C.7, #853)
1995-1997
10 7
Marketing/Presentations
(D.1, #853)
1992-1993
10 8
Marketing/Presentations
(D.1, #853)
1993
10 9
Specifications; restoration and enhancement plan
(D.2, #853)
1994
11 1
On-Call Consulting Proposals/Contracts
(A.1a, #1398)
1996
11 2
Correspondence
(A.2a, #1398)
1996-1997
11 3
Correspondence/Agency
(A.2c, #1398)
1996
11 4
Conversation Records
(A.2d, #1398)
1996
11 5
Billing/Invoices
(A.7, #1398)
1996-1998
11 6
Notes to File
(A.8, #1398)
1996
11 7
Facsimiles
(A.9, #1398)
1996
11 8
Design Sketches
(B.7, #1398)
1996-1997
11 9
Proposal/Contracts – Owner/Landscape Architect
(A.1a, #1401)
1996
11 10
Meeting Minutes
(A.4, #1401)
1996
11 11
Billing/Invoices
(A.7, #1401)
1996
11 12
Notes to File
(A.8, #1401)
1996
11 13
Facsimiles
(A.9, #1401)
1996
11 14
Programming/Architectural
(B.5a, #1401)
1996
11 15
Programming/Recreational
(B.5b, #1401)
1996
11 16
Cost Estimates
(B.6, #1401)
1996
11 17
Design Sketches/Product Information
(B.7, #1401)
1996
11 18
Design Guidelines
(D.3, #1401)
1996
12 1
Neighborhood Park & Albuquerque Academy Projects
(A.1a, #1621)
1993-2007
12 2
Correspondence – Owner
(A.2a, #1621)
1997-1998
12 3
Correspondence – Agency
(A.2c, #1621)
1997
12 4
Conversation Records
(A.2d, #1621)
1997-1998
12 5
Transmittals
(A.3, #1621)
1997-1998
12 6
Meeting Minutes
(A.4, #1621)
1995-1997
12 7
Notes to File
(A.8, #1621)
1997
12 8
Facsimiles
(A.9, #1621)
1997-1998
12 9
Facsimiles
(A.9. #1621)
1998 February–September
12 10
Cost Estimates
(B.6, #1621)
1997
12 11
Cost Estimates
(B.6, #1621)
1998
12 12
Design Sketches
(B.7, #1621)
1997 August–October
12 13
Design Sketches
(B.7, #1621)
1997-1998
12 14
Construction Bids/Proposals
(C.1, #1621)
1998
12 15
Field Reports
(C.4, #1621)
1998
12 16
Submittals/Shop Drawings
(C.6, #1621)
1998
12 17
Construction Communications
(C.7, #1621)
1998
12 18
Specifications
(D.2, #1621)
1998
12 19
Albuquerque Academy Invoices
(A.7, #4186)
2007
12 20
Albuquerque Academy Project Description
(#4186)
2007
13 1
A – Gu
(includes history of the project)
1992-1994
13 2
Building Material Alternatives
1991-1992
13 3
Community Garden
1992
13 4
Declaration of Covenants, Conditions, and Restrictions
1992
13 5
Design Guidelines
1992-1993
13 6
Environmental Planning Commission (EPC)
1992
13 7
Environmental Planning Commission (EPC)
1992
13 8
Fencing
1993
13 9
Field Guide
undated
13 10
Gate Design
1994
13 11
Guidelines for Sustainability Builder Homes
1995
13 12
Guidelines for Sustainability Estate and Premiere Homes
(rough draft)
1993
13 13
Guidelines for Sustainability Estate and Premiere Homes
1994
14 1
Guidelines for Sustainability Estate and Premiere Homes
1995
14 2
Guidelines for Sustainability Multi-Family Homes
1993
14 3
Housing
1991
14 4
Irrigation Narrative
undated
14 5
Land development material from Charles Harris
1991
14 6
Landscape permit
1994
14 7
Native landscape and tree list
1993
14 8
Neighborhood park agreement
1993
14 9
Newsletters
1991-1993
14 10
Nonresidential properties
1993
14 11
Parcel 3A sketches
1995
14 12
Project Manual Tramway Boulevard Streetscape
1994
14 13
Project Manual Academy Boulevard, Spain Road, Coradia Street
1994
14 14
Restoration and enhancement plan
1994
14 15
Slope comparisons
1992
14 16
Student involvement and the environment
1992
14 17
Utility design
1993
14 18
Water efficiency
1992
14 19
Wood burning stoves
1990-1992
15 1
ASLA Submission
1993
15 2
Community Organizational Documents
undated
15 3
Design for a Quality Living Environment
undated
15 4
Guidelines for Sustainability
1993
15 5
Highlands Subdivision Unit 1
1995
15 6
Image Idea Book for High Desert Park
undated
15 7
Magazines and Pamphlets
undated
15 8
Master Planned Community for the City of Albuquerque
1992 October 1
15 9
Project Manual for Academy Boulevard, Spain Road & Cortaderia Street
1994 July 8
15 10
Sector Plans
1992 October 1
15 11
Site Design & Product Information
undated
16 1
Trillium Proposals/Contracts
1995
16 2
Trillium Correspondence/Owner
1995
16 3
Trillium Correspondence/Consultant
1995
16 4
Trillium Conversation Record
1995
16 5
Trillium Cost Estimates
1995
16 6
Trillium Sketches
1995
16 7
Parcel II Site Study Proposals/Contracts
1995
16 8
Parcel II Site Study Notes to File
1995
16 9
Academy Road Proposals/Contracts/Owner
1999
16 10
Academy Road Correspondence
1999
16 11
Academy Road Meeting Minutes
1999
16 12
Academy Road Invoices
1999-2000
16 13
Academy Road Master Plan
undated
16 14
Academy Road Notes to File
1998
16 15
Academy Road Design Sketches
undated
16 16
Guidelines for Sustainability Builder Homes
1999 November
16 17
Guidelines for Sustainability
1995 March 1
16 18
Site Design
1995
16 19
Unit 1 Correspondence
1995
16 20
Unit 1 Notes to File
1995
16 21
Unit 1 Grading
1995
16 22
Unit 1 Cost Estimates
1995
16 23
Unit 1 Construction Bids/Proposals
1995
16 24
Unit 1 Construction Contracts
1996
16 25
Unit 1 Pay Requests
1996
16 26
Unit 1 Change Orders
1995-1996
16 27
Unit 1 Construction Documents
1995
16 28
Neighborhood Center Documents
1991-1992
16 29
Neighborhood Center Invoices
1995
17 1
Entry Features Correspondence
1995
17 2
Entry Features Conversation Records
1995
17 3
Entry Features Design Sketches
1995
17 4
Entry Features Construction Contracts
1995
17 5
Entry Features Pay Requests
1995
17 6
Entry Features Change Orders
1995
17 7
Entry Signage Proposals/Contracts
1995-1996
17 8
Entry Signage Conversation Record
1996
17 9
Entry Signage Correspondence
1996
17 10
Entry Signage Meeting Minutes
1996
17 11
Entry Signage Billing/Invoices
1996-1997
17 12
Entry Signage Notes to File
1996
17 13
Entry Signage Vegetation
undated
17 14
Entry Signage Design Sketches
1995
17 15
Entry Signage Marketing Presentation
1996
17 16
Office/Demo Correspondence
1995
17 17
Office/Demo Conversation Record
1995
17 18
Office/Demo Meeting Minutes
1995
17 19
Office/Demo Billing Invoices
1995
17 20
Office/Demo Notes to File
1995
17 21
Office/Demo Cost Estimates
1995
17 22
Office/Demo Construction Contract
1995
17 23
Office/Demo Pay Requests
1995
17 24
Office/Demo Field Reports
1995
17 25
Office/Demo Change Orders
1995
17 26
Office/Demo Construction Communications
1995
17 27
Office/Demo Design Guidelines
1995
17 28
Parcel 3 Proposals/Contracts
1995
17 29
Parcel 3 Correspondence
1995
17 30
Parcel 3 Notes to File
1995
17 31
Parcel 3 Design Sketches
1995
17 32
Parcel 3 Construction Contracts
1995-1996
HIGH DESERT LANDSCAPE DRAWINGS
23 tubes
1991-2000
Parcel 1: High Desert Trailhead
1993-1994
tube
1
2.1.1: High Desert Trailhead Parcel Revised Plan
Ink on Trace
23 November 1993
1
2.1.2.A: Pin Bar Document Package; Finished Site Grading
Ink on Mylar
undated
1
2.1.2.B: Pin Bar Document Package; Building Footprints with Setback
Ink on Mylar
undated
1
2.1.2.C: Pin Bar Document Package; Roadways & Property Boundaries
Ink on Mylar
undated
1
2.1.3: The Trailhead Setbacks and ROW
Ink on Mylar
1993 December 14
1
2.1.4A-B: Setback and Lot Line Dimensioning
Ink on Trace
1993 November 5
1
2.1.5: The Trailhead Site Plan
Marker on Print on Bond
1993 December 14
1
2.1.6A: Pin Bar Documents; Base Lines
Ink on Mylar
undated
1
2.1.6B: Plan Pin Bar Documents; Sheet 18 of 25
Ink on Mylar
undated
1
2.1.6C: Plan Pin Bar Documents; Setbacks and ROW
Ink on Mylar
undated
1
2.1.6D: Plan Pin Bar Documents; Labels
Ink on Mylar
undated
1
2.1.6E: Plan Pin Bar Documents; Sheet 19 of 25
Ink on Mylar
undated
1
2.1.6F: Plan Pin Bar Documents; Title Block
Ink on Mylar
undated
1
2.1.6G: Plan Pin Bar Documents; Base Lines
Ink on Mylar
undated
1
2.1.6H: Plan Pin Bar Documents; Labels
Ink on Mylar
undated
1
2.1.6I: Plan Pin Bar Documents; Sheet 20 of 25
Ink on Mylar
undated
1
2.1.7: Tree Streetscape Pin Bar Document
Ink on Mylar
undated
1
2.1.8: Topography
Print on Acetate
undated
1
2.1.9: Juniper, Pine & Oak Streetscape
Colored Pencil on Blueprint on Bond
undated
1
2.1.10: Tree Streetscape with Cul-de-Sacs
Colored Pencil on Blueprint on Bond
undated
1
2.1.11: Tree Streetscape with Cul-de-Sacs
Colored Pencil on Blueprint on Bond
undated
1
2.1.12: High Desert Area Map
Print on Bond
undated
1
2.1.13: Tract 8 Area Calculations
Print on Bond
undated
1
2.1.14: Tract A Sheet 6
Blueprint on Bond
undated
1
2.1.15: Tract A Sheet 7
Blueprint on Bond
undated
1
2.1.16: Preliminary Utility Layout
Ink & Print on Vellum
undated
1
2.1.17: Preliminary Plat of Trailhead Subdivision Albuquerque, New Mexico
Print on Bond
1994 January
1
2.1.18: High Desert Trailhead Parcel 28 Lot Scheme Alternative 'A': Phase 1 Landscape Plan
Print on Bond
1993 October 12
1
2.1.19: Simms Reservoir No. 2 Site Development Plan
undated
2
2.1.20A: Trailhead Subdivision Grading/Drainage Plan; Revisions
Ink on Trace
undated
2
2.1.20B: Trailhead Subdivision Grading/Drainage Plan; Base Map
Print on Bond
undated
2
2.1.21: Embudito Trail Planting Plan
Ink on Blueprint on Bond
undated
2
2.1.22: La Luz Trail Planting Plan
Ink on Blueprint on Bond
undated
2
2.1.23: Lotting Plan with Grading
Print on Mylar
undated
2
2.1.24: High Desert Trailhead Parcel Revised Plan
Print on Bond
1993 November 23
2
2.1.25: Lot & Building Footprint Arrangement on Trace
Ink on Trace
undated
2
2.1.26: Aerial Photograph with Grading & Lotting Plan
Sepia Print on Acetate
undated
2
2.1.27: Setbacks and Lotting Plan
Blueprint on Bond
1993 November 5
2
2.1.28: High Desert Trailhead Parcel 28 Lot Scheme Alternative 'B'
1993 October 12
2
2.1.29: Aerial Photograph with square footage
Ink on Blueprint on Bond
undated
2
2.1.30: Topography
Print on Photo paper
undated
2
2.1.31: La Luz Trail Place Spot Elevations
Adhesive on Mylar
undated
2
2.1.32: La Luz Trail Place Spot Elevations
Adhesive on Mylar
undated
2
2.1.33: Lotting Plan
Print on Photo paper
undated
2
2.1.34: The Trailhead Site Plan
Print on Mylar
undated
2
2.1.35: Sections for Seeding with native grass mix
Adhesive on Mylar
undated
2
2.1.36: High Desert Trailhead Landscape Plan
Sepia Print on Acetate
1994 March 7
2
2.1.37A-B: Lotting Plan with Square Footage
Print on Acetate
undated
2
2.1.38: Plat of Trailhead Subdivision Albuquerque New Mexico Sheet 2 of 2;
1994 January
2
2.1.39: Trailhead Perimeter Planting Alternative 2 Sheet 2
Ink on Trace
1994 March 7
2
2.1.40: Trailhead Perimeter Planting Alternative 1 Sheet 1 of 2
Ink on Trace
1994 March 7
2
2.1.41: Trailhead Parcel Adjacent Subdivision Footprint/Lot Size Comparison
Ink on Trace
1993 November 15
2
2.1.42: Lotting Plan
Print on Vellum
undated
2
2.1.43: The Trailhead Cul-de-Sac Concepts
Ink on Trace
undated
Parcel 2
1993-1994
tube
3
2.2.1: Proposed Planting and Berm Grading
Ink on Mylar
undated
3
2.2.2: Trees and Turf
Ink on Mylar
undated
3
2.2.3: Pedestrian Routes and Signage
Ink on Mylar
undated
3
2.2.4: Building Footprints and Setbacks
Ink on Mylar
undated
3
2.2.5: High Desert Tract 2-A
Ink on Mylar
undated
3
2.2.6: Parcel 2 Building Footprints and Setbacks
Sepia Print on Acetate
1993 November 29
3
2.2.7: Lotting Plan with Pedestrian Routes
Sepia Print on Acetate
undated
3
2.2.8: Trees and Turf
Sepia Print on Acetate
29 November 1993
3
2.2.9: Labels
Sepia Print on Acetate
29 November 1993
3
2.2.10: Grading and Drainage
Sepia Print on Acetate
1993 November 29
3
2.2.11: Building Footprints and Setbacks
Sepia Print on Acetate
1993 November 29
3
2.2.12: Labels
Sepia Print on Acetate
1993 November 29
3
2.2.13: Roads
Sepia Print on Acetate
1993 November 29
3
2.2.14: Grading
Sepia Print on Acetate
undated
3
2.2.15: Landscape
Sepia Print on Acetate
undated
3
2.2.16: Parcel 2 Cul-de-Sac Plan
Print on Bond
undated
3
2.2.17A: Parcel 2 Notes on Site Plan
Pencil & Ink on Trace
1993 September 20
3
2.2.17B: Parcel 2 Notes on Site Plan
Acetate
1993 September 20
3
2.2.18: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
undated
3
2.2.19: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
undated
3
2.2.20: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.21: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Mylar
undated
3
2.2.22: Parcel 2 Sections, Trace Studies, & Working Prints
Sepia Print on Acetate
undated
3
2.2.23: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.24: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.25: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.26: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.27: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.28: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.29: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Mylar
undated
3
2.2.30: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
undated
3
2.2.31: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.32: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.33: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.34: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.35: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.36: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Trace
undated
3
2.2.37: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.38: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.39: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil & Ink on Trace
undated
3
2.2.40: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.41: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Trace
undated
3
2.2.42: Parcel 2 Sections, Trace Studies, & Working Prints
Pencil on Print on Mylar
undated
3
2.2.43: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
undated
3
2.2.44: Parcel 2 Sections, Trace Studies, & Working Prints
Ink on Blueprint on Bond
undated
3
2.2.45: High Desert Parcel 2
Sepia Print on Acetate
1993 November 29
3
2.2.46: High Desert Tracts 2A-1A & 2A-1B Scheme A
1994 May 2
3
2.2.47: High Desert Tracts 2A-1A & 2A-1B Scheme C
1994 May 2
3
2.2.48: Land Survey for Parcel A
undated
3
2.2.49: Parcel 2 Grading & Spot Elevations
1993 November 29
Parcel 3
1993-1994
tube
4
2.3.1A: Parcel 3 Pin Bar Documents Labeled "Final"; Setbacks
Ink on Mylar
1994 February 25
4
2.3.1B: Parcel 3 Pin Bar Documents Labeled "Final"; Grading and Drainage
Ink on Mylar
1993 November 24
4
2.3.1C: Parcel 3 Pin Bar Documents Labeled "Final"; Labels
Ink on Mylar
undated
4
2.3.1D: Parcel 3 Pin Bar Documents Labeled "Final"; Trees and Turf
Ink on Mylar
undated
4
2.3.1E: Parcel 3 Pin Bar Documents Labeled "Final"; Pedestrian Routes and Signage
Ink on Mylar
undated
4
2.3.1F: Parcel 3 Pin Bar Documents Labeled "Final"; Parcel Boundaries
Ink on Mylar
undated
4
2.3.2A: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Grading and Drainage
Ink on Mylar
undated
4
2.3.2B: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Trees
Ink on Mylar
undated
4
2.3.2C: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Turf
Ink on Mylar
undated
4
2.3.2D: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Pedestrian Routes and Signage
Ink on Mylar
undated
4
2.3.2E: Parcel 3 Pin Bar Documents Labeled "Obsolete"; Building Footprints and Setbacks
Ink on Mylar
undated
4
2.3.3: High Desert Parcel 3 Alternative
Ink on Trace
1993 June 30
4
2.3.4: Parcel 3 Utility Layout Plan Discussion Level
Sepia Print on Mylar
1993 October 11
4
2.3.5: Parcel 3 Grading and Drainage
Sepia Print on Acetate
1993 November 24
4
2.3.6: Parcel 3 Pedestrian Circulation & Signage
Sepia Print on Acetate
undated
4
2.3.7: Parcel 3 Master Plan of Combined Pin Bar Documents
Sepia Print on Acetate
undated
4
2.3.8: Parcel 3 Grading;
Sepia Print on Acetate
1993 November 24
4
2.3.9: Parcel 3 Combined Pin Bar Documents from Final
Sepia Print on Acetate
1993 November 24
Site Analysis & Inventory
1991-1993
tube
5
2.4.1: Scenario 1
Ink on Trace
1991 October 25
5
2.4.2: Scenario 2
Ink on Trace
1991 October 25
5
2.4.3: Scenario 3
Ink on Trace
1991 October 25
5
2.4.4: Scenario 4
Ink on Trace
1991 October 25
5
2.4.5: Scenario 5
Ink on Trace
1991 October 25
5
2.4.6: Scenarios #1-4
Ink & Marker on Trace
undated
5
2.4.7: Scenario #2a
Ink & Marker on Trace
undated
5
2.4.8: Scenario
Ink & Marker on Trace
undated
5
2.4.9: Scenario 2A
Ink & Marker on Trace
undated
5
2.4.10: Scenario 2B
Ink & Marker on Trace
undated
5
2.4.11: Scenario 2C
Ink & Marker on Trace
undated
5
2.4.12: Open Space Governance
Ink & Marker on Trace
undated
5
2.4.13: Draft Zoning Plan
Ink & Marker on Trace
undated
5
2.4.14: High Desert Phasing Plan
Blueprint on Bond
undated
5
2.4.15: Developable Land Summary
Blueprint on Bond
undated
5
2.4.16: Landscape Concept Plan
Blueprint on Bond
undated
5
2.4.17: Land Use Plan with Golf
Blueprint on Bond
undated
5
2.4.18: Cultural and Community Centers: Retirement Center, Teens, Golf, & Cultural Center
Blueprint on Bond
undated
5
2.4.19: Cultural and Community Centers: School, Neighborhood Commercial, Park, & Church
Blueprint on Bond
undated
5
2.4.20: Cultural and Community Centers: Roads, Reservoir, Potential Land Trade, & Lot Size
Blueprint on Bond
undated
5
2.4.21: Academy Lands East Conceptual Master Plan
Blueprint on Bond
undated
5
2.4.22: Circulation Diagram
Ink on Trace
undated
5
2.4.23: Utility Plan
Ink on Mylar
undated
6
2.4.24: Building Footprints & Travel Routes
Ink on Mylar
undated
6
2.4.25: Vegetation
Ink on Mylar
undated
6
2.4.26: Drainage Concept Plan
Ink on Mylar
undated
6
2.4.27: Circulation Plan
Ink on Mylar
undated
6
2.4.28: Floodplain
Ink on Mylar
undated
6
2.4.29: Landscape Concept Plan
Ink on Mylar
undated
6
2.4.30: Open Space/Trails Plan
Ink on Mylar
undated
6
2.4.31: Phasing Plan
Ink on Mylar
undated
6
2.4.32: Street Names Plan
Ink on Mylar
undated
6
2.4.33: Soils Plan
Ink on Mylar
undated
6
2.4.34: Land Use Plan
Ink on Mylar
undated
6
2.4.35: Road Use Diagram
Ink & Marker on Blueprint on Bond
undated
6
2.4.36A: Site Suitability on Trace
Colored Pencil on Trace
undated
6
2.4.36B: Site Suitability on Trace
Colored Pencil on Trace
undated
6
2.4.37: Riparian Vegetation Zone & Floodplain with Building Envelopes
1992 December 16
6
2.4.38: Aerial Photograph with Existing Topography
Print on Diazo Mylar
undated
6
2.4.39: Aerial Photograph with Existing Topography
Print on Vellum
undated
6
2.4.40: Dam Locations/Arroyo Delineation
Print on Mylar
undated
6
2.4.41: Site Inventory & Analysis
Print on Bond
undated
6
2.4.42: 100 Year Flood Plain Map
undated
6
2.4.43: Tracts & Floodplains Diagram
undated
6
2.4.44A: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44B: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44C: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44D: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44E: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44F: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44G: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44H: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44I: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44J: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44K: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44L: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.44M: Plat of High Desert Albuquerque New Mexico
Print on Bond
1993 October 18
6
2.4.45: Soils Map
Print on Bond
undated
High Desert Office
1995
tube
7
2.5.1: Topographic Survey for High Desert Sales Office
Print on Bond
1995 February
7
2.5.2: Topographic Survey for High Desert Sales Office with Plant Relocation Program
Print & Ink on Vellum
1995 February
7
2.5.3: High Desert Sales Office Grading and Utility Plan
Print on Bond
1995 June 28
7
2.5.4: High Desert Office Revised Planting Plan
Blueprint on Bond
1995 May 22
7
2.5.5: Context Diagram
Red Colored Pencil on Blueprint on Bond
1995 June 28
7
2.5.6: Grass Location Diagram, Aesthetic Groupings, & Boulder Placement
Print on Bond
undated
7
2.5.7: Plan with Sections A-A & B-B
Pencil on Trace
undated
7
2.5.8: Planting Plan
Pencil on Trace
undated
7
2.5.9: High Desert Office Grading with Section
Print on Vellum
1995 January 25
7
2.5.10: High Desert Office Planting with Section
Print on Vellum
1995 January 25
7
2.5.11: Context Diagram
Ink on Mylar
1995 June 2
7
2.5.12: Natural Plant Associations Diagram
Print on Bond
1995 June 2
7
2.5.13: Spatial Diagram and Circulation Loops
Print on Bond
1995 June 2
7
2.5.14: Genus/Plant Type Comparison Groupings
Print on Bond
1995 June 2
7
2.5.15: Water Use
Print on Bond
1995 June 2
7
2.5.16: Seasonal Color Diagram
Print on Bond
undated
7
2.5.17: Planting L-1.1
Ink on Mylar
undated
7
2.5.18: Planting
Ink on Mylar
undated
7
2.5.19A: High Desert Office; Cover Sheet
Pencil & on Mylar
1995 July 14
7
2.5.19B: Details D-1.0
Pencil & on Mylar
1995 July 14
7
2.5.19C: Planting Plan Detail
Pencil & on Mylar
1995 July 14
7
2.5.19D: High Desert Office; L-5.0
Pencil & on Mylar
1995 July 14
7
2.5.19E: Planting Plan Title block
Pencil & on Mylar
1995 July 14
7
2.5.19F: High Desert Office; L-4.0;
Pencil & on Mylar
1995 July 14
7
2.5.19G: Planting Plan Title block
Pencil & on Mylar
1995 July 14
7
2.5.19H: High Desert Office; L-3.0;
Pencil & Ink on Mylar
1995 July 14
7
2.5.19I: Planting Plan Details
Pencil & Ink on Mylar
1995 July 14
7
2.5.1J: High Desert Office; Base 1
Pencil & Ink on Mylar
1995 July 14
7
2.5.19K: High Desert Office; L-2.0
Pencil & Ink on Mylar
1995 July 14
7
2.5.19L: Grading
Pencil & Ink on Mylar
1995 July 14
7
2.5.19M: Plant Details
Pencil & Ink on Mylar
1995 July 14
7
2.5.19N: Plant Details
Pencil & Ink on Mylar
1995 July 14
7
2.5.19O: Planting Plan L-1.0
Pencil & Ink on Mylar
1995 July 14
7
2.5.1.P: Planting Details
Pencil & Ink on Mylar
1995 July 14
7
2.5.19Q: Groundcovers
Pencil & Ink on Mylar
1995 July 14
7
2.5.19R: Path Layout Plan L-1.1
Pencil & Ink on Mylar
1995 July 14
7
2.5.20A: Blueprint Package; Cover Page
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20B: Blueprint Package; Planting Plan L-1
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20C: Blueprint Package; Planting Plan L-2
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20D: Blueprint Package; Planting Plan L-3
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20E: Blueprint Package; Planting Plan L-4
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20F: Blueprint Package; Planting Plan L-5
Marker & Pencil on Blueprint on Bond
undated
7
2.5.20G: Blueprint Package; Details D-1
Marker & Pencil on Blueprint on Bond
undated
Planting Design
undated
tube
7
2.6.1: Plant Schedule by Region
Pencil & Ink on Bond
undated
7
2.6.2: Planting Plan
Blueprint on Bond
undated
Parcel 7: Apartments
1993-1994
tube
8
2.7.1: Parcel 7 Apartments
Ink on Print on Photo paper
1993 May 26
8
2.7.2: Parcel 7 Apartments
Ink on Print on Photo paper
1993 May 26
8
2.7.3: Parcel 7 Apartments
Ink on Print on Photo paper
1993 May 26
8
2.7.4: Vegetation Regions
Ink & Marker on Trace Paper
undated
8
2.7.5: Concept Diagram
Marker on Trace
undated
8
2.7.6: Illustrative Master Plan
Ink on Trace
undated
8
2.7.7: Illustrative Master Plan
Ink on Trace
undated
8
2.7.8: Illustrative Master Plan
Print on Photo paper
undated
8
2.7.9A: Parcel 7 Notes on Trace with Acetate Site Plan
Trace Paper
1993 September 30
8
2.7.9B: Parcel 7 Notes on Trace with Acetate Site Plan
Print on Acetate
undated
8
2.7.10: Planting Concept
Ink on Trace Paper
1994 March 25
8
2.7.11: Thompson Fiasco Grading and Drainage
Ink on Trace Paper
undated
8
2.7.12: Culbertson Creation Grading Concept
Ink on Trace Paper
1994 March 25
8
2.7.13A: Concept Site Plan
Acetate
undated
8
2.7.13B: Concept Site Plan
Print on Diazo Mylar
undated
8
2.7.14: Potential Stub Locations
Print on Bond
1993 September 23
8
2.7.15: High Desert Parcel 7
Print on Acetate
undated
8
2.7.16: Parcel 7 Pedestrian Routes and Signage
Ink on Mylar
1993 November 11
8
2.7.17: Parcel 7 Site Plan
Blueprint on Bond
1993 November 11
8
2.7.18: Turf Pin Bar Document
Ink on Mylar
1993 November 11
8
2.7.19: Roadway Curvature Study
Pencil on Mylar
undated
8
2.7.20: Trees and Turf Pin Bar Document
Ink on Mylar
1993 June
8
2.7.21: Grading and Drainage
Ink on Mylar
1993 June
8
2.7.22: Parcel 7 Spot Elevations and Grading Pin Bar Document
Ink on Mylar
1993 November 11
8
2.7.23: Parcel 7 Trees Pin Bar Document
Ink on Mylar
1993 November 11
8
2.7.24: Parcel 7 Pin Bar Document Compilation
Sepia Print on Acetate
1993 November 11
8
2.7.25: Parcel 7 Site Plan with Acreage and Unit Calculations
Ink on Blueprint on Bond
undated
8
2.7.26: Site Plan with List of Elements to Address
Ink on Blueprint on Bond
undated
8
2.7.27: Concept Diagram with Analysis
Marker on Trace Paper
undated
8
2.7.28: Concept of Roadways and Lots
Ink on Trace Paper
undated
8
2.7.29: Parcel 7 Title block Pin Bar Document
Print on Acetate
1993 May 26
8
2.7.30: Alternative A with Floodplain Delineation
Ink on Blueprint on Bond
1993 May 26
8
2.7.31: Alternative B with Floodplain Delineation
Ink on Blueprint on Bond
1993 May 26
8
2.7.32: Site Plan
Ink on Mylar
undated
8
2.7.33: Parcel 7 Unit and Parking Concentration Study
Ink on Trace
undated
8
2.7.34: Parcel 7 Apartments Site Plan Pin Bar Document
Ink on Mylar
1993 April 23
8
2.7.35: Parcel 7 Proposed Contours Pin Bar Document
Ink on Mylar
undated
8
2.7.36: Parcel 7 Section
Marker on Trace Paper
1993 June 7
8
2.7.37: Parcel 7 Apartments Alternative A
Print on Diazo Mylar
1993 May 26
8
2.7.38: Parcel 7 Apartments Alternative B
Print on Diazo Mylar
1993 May 26
8
2.7.39: Topographic Map with Parcel Boundaries
Acetate Spliced on Mylar
undated
9
2.7.40: Trammell Crow Residential High Desert Apartments
Print on Bond; by Todd & Associates, Inc. Preliminary Building Plans (2)
1993 April 11
9
2.7.41: Trammell Crow Residential High Desert Apartments
Print on Bond; by Todd & Associates, Inc. Perspective
1993 April 5
9
2.7.42: Trammel Crow Residential High Desert Apartments Preliminary Site Plan
Print on Bond; by Todd & Associates, Inc.
1993 May 11
9
2.7.43: Site Plan
Print on Vellum; by Todd & Associates, Inc.
1994 January 21
9
2.7.44: Tract 7 Conceptual Grading/Drainage Plan
Ink on Blueprint on Bond; by Todd & Associates, Inc.
era="ce" calendar="gregorian" certainty="approximate" encodinganalog="date"1994 March
9
2.7.45: Tract 7 Conceptual Grading/Drainage Plan
Blueprint on Bond; by Todd & Associates, Inc.
1994 March
9
2.7.46: Tract 7 Conceptual Utility Plan
Blueprint on Bond; by Todd & Associates, Inc.
1994 March 3
9
2.7.47: Tract 7 Preliminary Site Plan
Blueprint on Bond; by Todd & Associates, Inc.
1994 February 28
9
2.7.48: Tract 7 Preliminary Site Plan
Blueprint on Bond; by Todd & Associates, Inc.
1994 February 28
9
2.7.49: Pinnacle at High Desert The Hilltop Landscape Cover Sheet
Blueprint on Bond
1994 April 14
9
2.7.50: Tract 7 Landscape Plan
Blueprint on Bond
1994 March 8
9
2.7.51A: Pinnacle at High Desert Landscape Site Plan; L2
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.51B: Pinnacle at High Desert Landscape Site Plan; L3
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.51C: Pinnacle at High Desert Landscape Site Plan; L4
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.52A: Pinnacle at High Desert Landscape Schematic; L5
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.52B: Pinnacle at High Desert Landscape Schematic; L6
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.53A: Pinnacle at High Desert Landscape Schematic; L7
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.53B: Pinnacle at High Desert Landscape Schematic; L8
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.53C: Pinnacle at High Desert Landscape Schematic; L9
Blueprint on Bond; by Todd & Associates, Inc.
1994 April 14
9
2.7.54: High Desert Parcel 7
Ink on Mylar
undated
The Parks at High Desert
1993-2000
tube
10
2.8.1A: Cover Sheet
Blueprint on Bond
1998 January 22
10
2.8.1B: Park Performance Stage & Picnic Shelter
Blueprint on Bond
1998 January 22
10
2.8.1C: Bike Storage, Sign, & Wall Details
Blueprint on Bond
1998 January 22
10
2.8.1D: Site Amenities Legend
Blueprint on Bond
1998 January 22
10
2.8.1E: Enlargement of Play Areas
Blueprint on Bond
1998 January 22
10
2.8.1F: Proposed Park Site Grading Plan
Blueprint on Bond
1998 January 22
10
2.8.1G: Layout Plan
Blueprint on Bond
1998 January 22
10
2.8.1H: Layout Plan
Blueprint on Bond
1998 January 22
10
2.8.1I: Layout Plan
Blueprint on Bond
1998 January 22
10
2.8.1J: Layout Plan
Blueprint on Bond
1998 January 22
10
2.8.1K: Electrical Site Plan
Blueprint on Bond
1998 January 22
10
2.8.1L: Electrical Site Plan
Blueprint on Bond
1998 January 22
10
2.8.1M: Park Irrigation Plans
Blueprint on Bond
1998 January 22
10
2.8.1N: Park Irrigation Plans
Blueprint on Bond
1998 January 22
10
2.8.1O: Park Irrigation Plans
Blueprint on Bond
1998 January 22
10
2.8.1P: Park Irrigation Plans
Blueprint on Bond
1998 January 22
10
2.8.1Q: Park Irrigation Details
Blueprint on Bond
1998 January 22
10
2.8.1R: Planting Plan
Blueprint on Bond
1998 January 22
10
2.8.1S: Planting Plan
Blueprint on Bond
1998 January 22
10
2.8.1T: Planting Plan
Blueprint on Bond
1998 January 22
10
2.8.1U: Planting Plan
Blueprint on Bond
1998 January 22
10
2.8.1V: Planting Plan
Blueprint on Bond
1998 January 22
10
2.8.1W: Planting & Seeding Legend
Blueprint on Bond
1998 January 22
10
2.8.1X: Basketball Details
Blueprint on Bond
1998 January 22
10
2.8.1Y: Tennis & Sand Volleyball Details
Blueprint on Bond
1998 January 22
10
2.8.1Z: Play Equipment Details
Blueprint on Bond
1998 January 22
10
2.8.1AA: Site Furnishings Details
Blueprint on Bond
1998 January 22
10
2.8.1BB: Signing & Construction Traffic Control Standards
Blueprint on Bond
1998 January 22
10
2.8.1CC: Typical Traffic Control & Signing Examples
Blueprint on Bond
1998 January 22
10
2.8.1DD: Proposed Park Site Grading Plan
Blueprint on Bond
1998 January 22
10
2.8.2A: Lot Allocations; Sheet 1
Print on Acetate
undated
10
2.8.2B: Lot Allocations; Sheet 2
Print on Acetate
undated
10
2.8.2C: Lot Allocations; Sheet 3
Print on Acetate
undated
10
2.8.2D: Lot Allocations; Sheet 4
Print on Acetate
undated
10
2.8.3A: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Site Plan & Arroyo
Pencil & Ink on Trace
undated
10
2.8.3B: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Base Map
Print on Bond
undated
10
2.8.3C: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; West
Trace Paper
undated
10
2.8.3D: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Fountain A
Colored Pencil & Ink on Trace
undated
10
2.8.3E: New Mexico Educators Federal Credit Union Pathway Office Park Site Plan & Arroyo; Fountain B
Colored Pencil & Ink on Trace
undated
10
2.8.4: Pathway Office Park: New Mexico Educators Federal Credit Union Landscaping Plan
1997 August 29
10
2.8.5: Vista Del Norte Park Layout Plan (2)
Colored Pencil & Ink on Mylar
undated
10
2.8.6: Vista Del Norte Park Schematic Plan
Ink on Mylar
2000 February 8
10
2.8.7: Tracts 8A, 8B, and 8C Drainage Plan Proposed Phase I Conditions and Drainage Basins Map
1994 March 31
10
2.8.8: Jogging/Walking Trail
undated
10
2.8.9: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
2000 February 8
10
2.8.10: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
2000 February 8
10
2.8.11: Vista Del Norte Park Schematic Plan
Blueprint on Bond with Redlining
2000 February 8
10
2.8.12: Phase I of Vista Del Norte Park
Print on Bond
undated
10
2.8.13A: Vista Del Norte Layout Plan; Angle Parking
Trace
undated
10
2.8.13B: Vista Del Norte Layout Plan; Base Map
Copy on Bond
undated
10
2.8.14: Boca Negra Trail Overlook Design Development Plan
Print on Vellum
undated
10
2.8.15: Topographic Map
Print on Vellum
undated
10
2.8.16: Topographic Map
Print on Photo paper
undated
10
2.8.17: Arial Photograph with Contours
Print on Mylar
undated
10
2.8.18A: Plat of High Desert Bernalillo County New Mexico; Sheet 1
Print on Acetate
1993 June
10
2.8.18B: Plat of High Desert Bernalillo County New Mexico; Sheet 2
Print on Acetate
1993 June
10
2.8.18C: Plat of High Desert Bernalillo County New Mexico; Sheet 3
Print on Acetate
1993 June
10
2.8.18D: Plat of High Desert Bernalillo County New Mexico; Sheet 4
Print on Acetate
1993 June
Century Theaters
1985
tube
10
2.9.1: Century Theaters Landscape Concept Plan A
Pencil & Ink on Vellum
1985 July 28
Streetscapes
1992-1995
tube
11
2.10.1: Tramway Corridor: Existing Power Poles and 12 VHP Gas Line Locations
1993 July 24
11
2.10.2A: Revised Proposed Landform Along Tramway Boulevard with Trace Revision Overlay; Revision Overlay
Pencil on Trace
1993 July 2
11
2.10.2B: Revised Proposed Landform Along Tramway Boulevard with Trace Revision Overlay; Base
Ink on Blueprint on Bond
1993 July 2
11
2.10.3: Roadway Map
undated
11
2.10.4: Spot Elevations
undated
11
2.10.5A: 9th and I Street Improvements; Revision A: Sheet 1
Print on Bond
30 June 1997
11
2.10.5B: 9th and I Street Improvements; Revision A; Sheet 2
Print on Bond
30 June 1997
11
2.10.5C: 9th and I Street Improvements; Revision A; Sheet 3
Print on Bond
30 June 1997
11
2.10.5D: 9th and I Street Improvements; Revision A; Sheet 4
Print on Bond
30 June 1997
11
2.10.5E: 9th and I Street Improvements; Revision A; Sheet 5
Print on Bond
30 June 1997
11
2.10.5F: 9th and I Street Improvements; Revision A; Sheet 6
Print on Bond
30 June 1997
11
2.10.5G: 9th and I Street Improvements; Revision A; Sheet 7
Print on Bond
30 June 1997
11
2.10.5H: 9th and I Street Improvements; Revision A; Sheet 8
Print on Bond
30 June 1997
11
2.10.5I: 9th and I Street Improvements; Revision A; Sheet 9
Print on Bond
30 June 1997
11
2.10.5J: 9th and I Street Improvements; Revision A; Sheet 10
Print on Bond
30 June 1997
11
2.10.5K: 9th and I Street Improvements; Revision A; Sheet 11
Print on Bond
30 June 1997
11
2.10.5L: 9th and I Street Improvements; Revision A; Sheet 12
Print on Bond
30 June 1997
11
2.10.5M: 9th and I Street Improvements; Revision A; Sheet 13
Print on Bond
30 June 1997
11
2.10.5N: 9th and I Street Improvements; Revision A; Sheet 14
Print on Bond
30 June 1997
11
2.10.5O: 9th and I Street Improvements; Revision A; Sheet 15
Print on Bond
30 June 1997
11
2.10.5P: 9th and I Street Improvements; Revision A; Sheet 16
Print on Bond
30 June 1997
11
2.10.5Q: 9th and I Street Improvements; Revision A; Sheet 17
Print on Bond
30 June 1997
11
2.10.5R: 9th and I Street Improvements; Revision A; Sheet 18
Print on Bond
30 June 1997
11
2.10.5S: 9th and I Street Improvements; Revision A; Sheet 19
Print on Bond
30 June 1997
11
2.10.5T: 9th and I Street Improvements; Revision A; Sheet 20
Print on Bond
30 June 1997
11
2.10.5U: 9th and I Street Improvements; Revision A; Sheet 21
Print on Bond
30 June 1997
11
2.10.5V: 9th and I Street Improvements; Revision A; Sheet 22
Print on Bond
30 June 1997
11
2.10.5W: 9th and I Street Improvements; Revision A; Sheet 23
Print on Bond
30 June 1997
11
2.10.5X: 9th and I Street Improvements; Revision A; Sheet 24
Print on Bond
30 June 1997
11
2.10.5Y: 9th and I Street Improvements; 30 June 1997 Revision A; Sheet 25
Print on Bond
30 June 1997
11
2.10.5Z: 9th and I Street Improvements; Revision A; Sheet 26
Print on Bond
30 June 1997
11
2.10.5AA: 9th and I Street Improvements; Revision A; Sheet 27
Print on Bond
30 June 1997
11
2.10.6A: Proposed Sidewalk Layout
Marker on Trace
1995 November 12
11
2.10.6B: Proposed Sidewalk Layout; Option #1
Marker on Trace
1995 November 5
11
2.10.6C: Proposed Sidewalk Layout; Option #2
Marker on Trace
1995 November 5
11
2.10.6D: Proposed Sidewalk Layout; Option #3
Marker on Trace
1995 November 5
11
2.10.7: Proposed Sidewalk Layout
Marker & Print on Bond
1995 November 12
11
2.10.8: Sidewalk Plan
Pencil & Print on Bond
1995 December
11
2.10.9: Sidewalk Plan
Pencil & Ink on Print on Bond
1995 December 12
12
2.10.10A: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cover SheetCity
Blueprint on Bond
1995 April 13
12
2.10.10B: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10C: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10D: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10E: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Boulevard Planting
Blueprint on Bond
1995 April 13
12
2.10.10F: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Boulevard Planting
Blueprint on Bond
1995 April 13
12
2.10.10G: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10H: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Mirror Planting
Trace Paper
1995 April 13
12
2.10.10I: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10J: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Planting
Blueprint on Bond
1995 April 13
12
2.10.10K: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Planting Details
Blueprint on Bond
1995 April 13
12
2.10.10L: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10M: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10N: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Spain Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10O: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10P: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Academy Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10Q: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10R: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Cortaderia Road Irrigation
Blueprint on Bond
1995 April 13
12
2.10.10S: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Irrigation Details
Blueprint on Bond
1995 April 13
12
2.10.10T: Streetscape Phase I: Academy, Spain, and Cortaderia Medians; Irrigation Details
Blueprint on Bond
1995 April 13
12
2.10.11A: Streetscape Phase II: Academy, Spain, and High Desert St. Medians; Cover Sheet
Blueprint on Bond
undated
12
2.10.11B: Streetscape Phase II: Academy, Spain, and High Desert St. Medians; Spain Road Planting
Blueprint on Bond
undated
12
2.10.11C: Streetscape Phase II: Academy, Spain, and Street Medians; Spain Road Planting
Blueprint on Bond
undated
12
2.10.11D: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
undated
12
2.10.11E: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
undated
12
2.10.11F: Streetscape Phase II: Academy, Spain, and Street Medians; Academy Boulevard Planting
Blueprint on Bond
undated
12
2.10.11G: Streetscape Phase II: Academy, Spain, and Street Medians; High Desert Road Planting
Blueprint on Bond
undated
12
2.10.11H: Streetscape Phase II: Academy, Spain, and Street Medians; High Desert Road Planting
Blueprint on Bond
undated
12
2.10.11I: Streetscape Phase II: Academy, Spain, and Street Medians; Planting Details
Blueprint on Bond
1994 July 8
12
2.10.12A: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street; Cover Sheet
Blueprint on Bond
1994 July 8
12
2.10.12B: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12C: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12D: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12E: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12F: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12G: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12H: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12I: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12J: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12K: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.12L: Streetscape: Academy Boulevard, Spain Road, Cortaderia Street
Blueprint on Bond
1994 July 8
12
2.10.13A: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13B: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13C: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13D: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13E: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13F: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13G: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13H: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13I: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13J: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13K: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
12
2.10.13L: Streetscape: Tramway Boulevard
Blueprint on Bond
1994 July 8
13
2.10.14: Design Development Plan Phase One Streetscape
Print on MylarLOCATED IN TUBE 13
1994 April 7
12
2.10.15: Schematic Streetscape Plan for Imperata Street Typical Landscape Plan
Colored Pencil on Blueprint on Bond
1993 September 14
12
2.10.16: Schematic Streetscape Plan for Spain Street Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
undated
12
2.10.17: Schematic Streetscape Plan for Cortaderia Street Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
1993 September 14
12
2.10.18: Schematic Streetscape Plan for Academy Road Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
1993 September 8
12
2.10.19: Schematic Streetscape Plan for Tramway Boulevard Typical Landscape Plan
Ink & Colored Pencil on Blueprint on Bond
1993 September 8
12
2.10.20A: Unit 1 Streetscape Design Development; Cover Sheet
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20B: Unit 1 Streetscape Design Development; List of Drawings
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20C: Unit 1 Streetscape Design Development; Academy Boulevard (Tramway to Cortaderia)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20D: Unit 1 Streetscape Design Development; Academy Boulevard (Cortaderia to High Desert)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20E: Unit 1 Streetscape Design Development; Spain Road (Tramway to Cortaderia)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20F: Unit 1 Streetscape Design Development; Spain Road (Cortaderia to Imperata St.)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20G: Unit 1 Streetscape Design Development; Cortaderia Street (Spain Road to Academy Blvd.)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.20H: Unit 1 Streetscape Design Development; Imperata Street (Spain Road to Cul-de-sac)
Print & Acetate Splices on Vellum
1995 July 25
12
2.10.21: Streetscape Unit 1: Highlands at High Desert
Blueprint on Bond
undated
12
2.10.22A: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
undated
12
2.10.22B: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
undated
12
2.10.22C: Tramway Boulevard Landscape Construction Plan Package
Print on Bond
undated
12
2.10.23: Planting Plan along Unlabeled Roadway
Colored Pencil & Print on Bond
undated
13
2.10.24: Street Sections; with Utilities
Print on Diazo Mylar
1992 April 11
13
2.10.25: Rancho Viejo Streetscapes
Print on Bond
1997 June
13
2.10.26A: Streetscape Highlands at High Desert Package (Incomplete) Cover Sheet
Blueprint on Bond
undated
13
2.10.26B: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan
Blueprint on Bond
undated
13
2.10.26C: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan
Blueprint on Bond
undated
13
2.10.26D: Streetscape Highlands at High Desert Package (Incomplete); Grading Plan and Sidewalk Layout
Blueprint on Bond
undated
13
2.10.26E: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
undated
13
2.10.26F: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26G: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
undated
13
2.10.26H: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26I: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26J: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26K: Streetscape Highlands at High Desert Package (Incomplete); Planting Concept Plan on Trace
Pencil & Ink on Trace
undated
13
2.10.26L: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26M: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26N: Streetscape Highlands at High Desert Package (Incomplete); Planting Plan
Blueprint on Bond
undated
13
2.10.26-O: Streetscape Highlands at High Desert Package (Incomplete); Detail Sheet
Blueprint on Bond
undated
Topography & Grading
1992
tube
14
2.11.1: Topographic Map
Print on Acetate
undated
14
2.11.2: Enlargement of Retention Basin
Print on Photo paper
undated
14
2.11.3: Topography & Spot Elevations
Print on Diazo Mylar
undated
14
2.11.4: Topographic Map
Print on Diazo Mylar
undated
14
2.11.5: Simms Park Trail Plan
Print on Diazo Mylar with Redlining
1992 April 16
14
2.11.6: Simms Park Trail Plan
Print on Diazo Mylar with Redlining
1992 April 16
14
2.11.7: Flood Control Authority Portion of East Heights Topographic Map
Sepia Print on Mylar
undated
14
2.11.8: Portion of Elena Gallegos Grant Topographic Map
Sepia Print on Mylar
undated
14
2.11.9: Topographic Map
Print on Diazo Mylar
1992 April 11
14
2.11.10: Topographic Map
Print on Acetate
undated
14
2.11.11: Topographic Map
Ink on Mylar
undated
Studies & Schematics
tube
15
2.12.1A: Sediment Pond Proposals
Spliced Print on Acetate
1993
15
2.12.1B: Sediment Pond Proposals
Spliced Print on Acetate
undated
15
2.12.1C: Sediment Pond Proposals
Spliced Print on Acetate
undated
15
2.12.1D: Sediment Pond Proposals
Spliced Print on Acetate
undated
15
2.12.2: Estate Lot Study
Ink on Mylar
undated
15
2.12.3: Estate Lot Study with Topography
Blueprint on Bond
undated
15
2.12.4: Estate Lot Study
Ink on Mylar
1993 April 8-
15
2.12.5: Concept Diagram
Ink on Yellow Trace
undated
15
2.12.6: Site Plan on Trace
Ink on Trace
undated
15
2.12.7: 50x100 Single Family Detached Lots
undated
High Desert Master Plan
undated
tube
15
2.13.1: Vicinity Map
Ink on Mylar
undated
15
2.13.2: Location Map
undated
15
2.13.3: Site Plan
Print on Bond
undated
15
2.13.4: Lotting Plan
Ink on Mylar
undated
15
2.13.5: Lotting Plan
Ink on Mylar
undated
15
2.13.6: Topographic Map
Print on Mylar
undated
Illustrations & Imagery
1993
tube
16
2.14.1: Perspective Sketch of Project Area
Pencil on Vellum
undated
16
2.14.2: Color Perspective Sketch of Project Area
Pencil on Bond
undated
16
2.14.3: Non-Native Planting Zone Inside Walled Yards
Pencil on Vellum
undated
16
2.14.4: Native L.S. Front Yards: Taller Non-Native Trees in Rear Yards
Pencil on Vellum
undated
16
2.14.5: Contemporary Ranch Style (Approved)
Ink on Trace
undated
16
2.14.6: Approved Pueblo Style (One Story)
Ink on Trace
undated
16
2.14.7: Territorial (Approved)
Ink on Trace
undated
16
2.14.8: Colonial Spanish
Ink on Trace
undated
16
2.14.9: Doors & Entrance Windows
Ink on Trace
undated
16
2.14.10: Contemporary Style (Approved)
Ink on Trace
undated
16
2.14.11: Ranch Style (Approved)
Ink on Trace
undated
16
2.14.12: Approved Pueblo Style (2 Story)
Ink on Trace
undated
16
2.14.13: Not Approved Styles
Ink on Trace
undated
16
2.14.14: Stepped Fascia: Contemporary or territorial
Ink on Trace
undated
16
2.14.15: Stepped Fascia Territorial
Ink on Trace
undated
16
2.14.16: Balcony Detail
Ink on Trace
undated
16
2.14.17: Stepped Fascia: Colonial Spanish or Mediterranean
Ink on Trace
undated
16
2.14.18: Column Alternatives
Ink on Trace
undated
16
2.14.19: Archway Alternatives
Ink on Trace
undated
16
2.14.20: Chimney Designs
Ink on Trace
undated
16
2.14.21: Exterior Stairs
Ink on Trace
undated
16
2.14.22: A/C Unit Location
Ink on Trace
undated
16
2.14.23: Wind Orientation
Ink on Trace
undated
16
2.14.24: Cul-De-Sac Schematic
Ink on Trace
undated
16
2.14.25: Create Undulating Landform and Gentle Slope Transition
Ink on Trace
undated
16
2.14.26: Wall Alternatives
Ink on Trace
undated
16
2.14.27: Exterior Lighting
Ink on Trace
undated
16
2.14.28: Curb Drops
Ink on Trace
undated
16
2.14.29: Switch Box Alternatives
Ink on Trace
undated
16
2.14.30: Building/Site Relationship Cross-Section
Ink on Trace
undated
16
2.14.31: Parking Screens Alternatives
Ink on Trace
undated
16
2.14.32: Wall Grade Change & Horizontal Direction Change
Ink on Trace
1993 June 23
16
2.14.33: Ornamental Iron at Cow Walls
Ink on Trace
undated
16
2.14.34: Residential Lane Cross Section
Ink on Trace
undated
16
2.14.35: Residential Street Cross Section
Ink on Trace
undated
16
2.14.36: Residential Collector Cross Section
Ink on Trace
undated
16
2.14.37: Minor Collector Road Cross Section
Ink on Trace
undated
16
2.14.38: Major Collector Road Cross Section
Ink on Trace
undated
16
2.14.39: Elevation
Ink on Trace
undated
16
2.14.40: High Desert Guidelines for Sustainability Cover Page
Print on Photo paper
undated
16
2.14.41: Computer Generated Perspective of Project Area
Print on Photo paper
undated
16
2.14.42: Computer Generated Perspective
Print on Photo paper
undated
16
2.14.43: Computer Generated Perspective
Print on Photo paper
undated
16
2.14.44: Pueblo Style Cross-Section in Color
undated
Parcel 15
1994
tube
17
2.15.1: Lotting Plan for Parcel 15
Blueprint on Bond
undated
17
2.15.2: Lotting Plan for Parcel 15
Print & Ink on Mylar
undated
17
2.15.3: Lotting Plan with Existing Topography
Blueprint on Bond
undated
17
2.15.4: Lotting Plan with Existing Topography; Version 2 June 1994
Ink on Blueprint on Bond
1994 June 2
17
2.15.5: Lotting Plan with Existing Topography
Marker on Blueprint on Bond
undated
17
2.15.6: Lotting Plan with Existing Topography; Version 21 June 1994
Blueprint on Bond
1994 June 21
17
2.15.7: Lotting Plan with Existing Topography
Blueprint on Bond
undated
17
2.15.8A: Lotting Plan with Existing Topography
Pencil on Blueprint on Bond
undated
17
2.15.8B: Lotting Plan with Existing Topography
Trace of Intersection
undated
17
2.15.8C: Lotting Plan with Existing Topography
Trace of Intersection
undated
17
2.15.9A: Trace of Intersection
Pencil on Trace
undated
17
2.15.9B: Trace of Lotting Plan
Pencil on Trace
undated
17
2.15.9C: Trace of Intersections
Pencil on Trace
undated
17
2.15.10: Lotting Plan with Existing Topography
Pencil & Ink on Blueprint
undated
17
2.15.11: High Desert Panhandle Aerial Photograph with Topography
Print on Mylar
undated
17
2.15.12: Lotting Plan with Existing Topography with Phase 1 Delineation
Ink on Blueprint on Bond
undated
17
2.15.13: Lotting Plan
Ink & Print on Mylar
undated
17
2.15.14: Highlands Planting Plan Schematic Plan; 30 August 1994
Ink on Blueprint on Bond
1994 August 20
17
2.15.15: Orthophoto Contour Map of the Highlands Units 1. 2. & 3 at High Desert Subdivision
Print & Ink on Bond
undated
17
2.15.16: Property Allocation for Parcel 16
Print on Photo paper
undated
Parcel 16: The Highlands
undated
tube
18
2.16.1: Lot Allocations for Parcel 16: The Highlands
Print on Photo paper
undated
18
2.16.2A: Planting Concept Plan over Highlands Planting Plan
Pencil & Ink on Trace
undated
18
2.16.2B: Planting Concept Plan over Highlands Planting Plan
Blueprint on Bond
undated
18
2.16.3: Highlands Planting Concept Plan
Colored Pencil on Trace
undated
18
2.16.4: Highlands Planting Concept Plan
Colored Pencil on Trace
undated
18
2.16.5A: Highlands Grading Plan with Mylar Sheet of Grading Revision
Print on Bond
undated
18
2.16.5B: Highlands Grading Plan with Mylar Sheet of Grading Revision
Ink on Mylar
undated
18
2.16.6A: Highlands Planting Plan with Mylar Sheet of Grading Revision
Print on Bond
undated
18
2.16.6B: Highlands Planting Plan with Mylar Sheet of Grading Revision
Ink on Mylar
undated
18
2.16.7: Highlands Planting Plan
Marker on Blueprint on Bond
undated
18
2.16.8: Planting Concept Plan
Pencil & Ink on Trace
undated
Master Development Schedule
undated
tube
18
2.17.1: Enlarged Master Development Schedule
Print on Acetate
undated
18
2.17.2: Master Development Schedule
Print on Acetate
undated
18
2.17.3: Master Development Schedule High Desert
Marker on Print on Bond
undated
Consultant Works
undated
tube
18
2.18.1.A: Irrigation Master Plan; Control Sytem
Blueprint on Bond
undated
18
2.18.1.B: Irrigation Master Plan; Phase I Water Sources
Blueprint on Bond
undated
18
2.18.2.A: Street/Transition Landscape Concept and Entry Monumentation Elevation
Blueprint on Bond
8 June 1994
18
2.18.2.B: High Desert Apartments Cross Sections
Blueprint on Bond
undated
18
2.18.2.C: Plant Material Zones
Blueprint on Bond
undated
Engineering/Utility Packages
undated
tube
19
2.19.1.: Gas
Print on Bond
undated
19
2.19.2A: Overall Paving Plan Phase I-B
Print on Bond with Redlining
undated
19
2.19.2B: Overall Paving Plan Phase I-A
Print on Bond with Redlining
undated
19
2.19.2C: Paving Plan and Profile Academy Station
Print on Bond with Redlining
undated
19
2.19.2D: Paving Plan and Profile Academy Station
Print on Bond with Redlining
undated
19
2.19.2E: Paving Plan and Profile Imperata Street Station (South)
Print on Bond with Redlining
undated
19
2.19.2F: Paving Plan and Profile Imperata Street Station (South)
Print on Bond with Redlining
undated
19
2.19.2G: Paving Plan and Profile Cortaderia Street Station
Print on Bond with Redlining
undated
19
2.19.2H: Paving Plan and Profile Cortaderia Street Station
Print on Bond with Redlining
undated
19
2.19.3A: Utility Plan Profile: Academy Station
Print on Bond with Redlining
undated
19
2.19.3B: Utility Plan Profile: Academy Station
Print on Bond with Redlining
undated
19
2.19.3C: Utility Plan Profile: Academy Station
Print on Bond with Redlining
undated
19
2.19.3D: Utility Plan Profile: Academy Station
Print on Bond with Redlining
undated
19
2.19.3E: Utility Plan Profile: High Desert Street
Print on Bond with Redlining
undated
19
2.19.3F: Utility Plan Profile: Spain Road Station
Print on Bond with Redlining
undated
19
2.19.3G: Utility Plan Profile: Spain Road Station
Print on Bond with Redlining
undated
19
2.19.3H: Utility Plan Profile: Cortaderia Street Station
Print on Bond with Redlining
undated
19
2.19.3I: Utility Plan Profile: Cortaderia Street Station
Print on Bond with Redlining
undated
19
2.19.3J: Utility Plan Profile: Imperata Street Station (South)
Print on Bond with Redlining
undated
19
2.19.3K: Utility Plan Profile: Imperata Street Station (South)
Print on Bond with Redlining
undated
19
2.19.4A: Title Sheet
Print on Bond
undated
19
2.19.4B: Paving Plan and Profile: Elena Gallegos Place Station
Print on Bond
undated
19
2.19.4C: Paving Plan and Profile: Elena Gallegos Place Station
Print on Bond
undated
19
2.19.4D: Paving Plan and Profile: Canada Del Oso Station
Print on Bond
undated
19
2.19.4E: Paving Plan and Profile: Canada del Oso Station
Print on Bond
undated
19
2.19.4F: Paving Plan and Profile: Canada del Oso Station
Print on Bond
undated
19
2.19.4G: Paving Plan and Profile: Apache Plume Place
Print on Bond
undated
19
2.19.4H: Paving Plan and Profile: Fringe Sage Court Station
Print on Bond
undated
19
2.19.4I: Paving Plan and Profile: Blue Flax Court Station
Print on Bond
undated
19
2.19.4J: Paving Plan and Profile: Elena Gallegos Court Station
Print on Bond
undated
19
2.19.4K: Paving Plan and Profile: Bear Grass Court Station
Print on Bond
undated
19
2.19.4L: Paving Plan and Profile: Buffalo Grass Court Station
Print on Bond
undated
19
2.19.4M: Utility Plan: Elena Gallegos Place Station
Print on Bond
undated
19
2.19.4N: Utility Plan: Elena Gallegos Place Station
Print on Bond
undated
19
2.19.4O: Utility Plan: Canada Del Oso Station
Print on Bond
undated
19
2.19.4P: Utility Plan: Canada del Oso Station
Print on Bond
undated
19
2.19.4Q: Utility Plan: Canada del Oso Station Utility Plan
Print on Bond
undated
19
2.19.4R: Utility Plan: Apache Plume Place Station
Print on Bond
undated
19
2.19.4S: Utility Plan: Fringe Sage Court Station
Print on Bond
undated
19
2.19.4T: Utility Plan: Blue Flax Court Station
Print on Bond
undated
20
2.19.5A: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Title Sheet/Vicinity Map
Blueprint on Bond
undated
20
2.19.5B: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile Station
Blueprint on Bond
undated
20
2.19.5C: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5D: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5E: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan & Profile: Academy and North Bear Tributary Arroyo Desiltation Pond
Blueprint on Bond
undated
20
2.19.5F: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5G: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); North Bear Tributary Pond
Blueprint on Bond
undated
20
2.19.5H: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5I: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan and Profile: Academy Boulevard and South Bear Tributary Arroyo Desiltation Pond
Blueprint on Bond
undated
20
2.19.5J: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5K: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); South Bear Tributary Pond Finished Grade Grid Map
Blueprint on Bond
undated
20
2.19.5L: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile
Blueprint on Bond
undated
20
2.19.5M: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Desiltation Ponds Details
Blueprint on Bond
undated
20
2.19.5N: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Desiltation Ponds Details
Blueprint on Bond
undated
20
2.19.5O: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Riprap Details
Blueprint on Bond
undated
20
2.19.5P: Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Tramway Ponds Grading Plan and Miscellaneous Details
Blueprint on Bond
undated
20
2.19.5Q: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Wire Enclosed Riprap Details
Blueprint on Bond
undated
20
2.19.5R: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Structural Detail
Blueprint on Bond
undated
20
2.19.5S: Construction Plans Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP
Blueprint on Bond
undated
20
2.19.5T: Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP
Blueprint on Bond
undated
20
2.19.6A: Construction Plans for Subdivision Phase I-A; Title Sheet
Print on Bond
undated
20
2.19.6B: Construction Plans for Subdivision Phase I-A; General Notes
Print on Bond
undated
20
2.19.6C: Construction Plans for Subdivision Phase I-A; Key Map
Print on Bond
undated
20
2.19.6D: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6E: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6F: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6G: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6H: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6I: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6J: Construction Plans for Subdivision Phase I-A; Plat/Survey Control
Print on Bond
undated
20
2.19.6K: Construction Plans for Subdivision Phase I-A; Typical Road and Pavement Sections
Print on Bond
undated
20
2.19.6L: Construction Plans for Subdivision Phase I-A; Typical Road and Pavement Sections
Print on Bond
undated
20
2.19.6M: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
undated
20
2.19.6N: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
undated
20
2.19.6O: Construction Plans for Subdivision Phase I-A; Overall Utility Plan
Print on Bond
undated
20
2.19.6P: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
undated
20
2.19.6Q: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
undated
20
2.19.6R: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
undated
20
2.19.6S: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Academy Boulevard
Print on Bond
undated
20
2.19.6T: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile High Desert Street
Print on Bond
undated
20
2.19.6U: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Spain Road
Print on Bond
undated
20
2.19.6V: Construction Plans for Subdivision Phase I-A; Paving Plan and Profile Cortaderia Street
Print on Bond
undated
20
2.19.6W: Construction Plans for Subdivision Phase I-A; Intersection Details: Academy/Tramway Intersection Detail
Print on Bond
undated
20
2.19.6X: Construction Plans for Subdivision Phase I-A; Intersection Details: Spain/Tramway Intersection Detail
Print on Bond
undated
20
2.19.6Y: Construction Plans for Subdivision Phase I-A; Intersection Details: Tramway Bike/Pedestrian Path Details
Print on Bond
undated
20
2.19.6Z: Construction Plans for Subdivision Phase I-A; Storm Drain Plan and Profile: Academy Boulevard
Print on Bond
undated
20
2.19.6AA: Construction Plans for Subdivision Phase I-A; Storm Drain Plan and Profile: Cortaderia Street
Print on Bond
undated
20
2.19.6BB: Construction Plans for Subdivision Phase I-A; Drainage Plans: Desiltation Pond #6 and Academy Storm & Drain Outlet Works
Print on Bond
undated
20
2.19.6CC: Construction Plans for Subdivision Phase I-A; Drainage Plans: Desiltation Pond #7
Print on Bond
undated
20
2.19.6DD: Construction Plans for Subdivision Phase I-A; Drainage Plans: Miscellaneous Drainage Details
Print on Bond
undated
20
2.19.6EE: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard Includes Storm Drain
Print on Bond
undated
20
2.19.6FF: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard
Print on Bond
undated
20
2.19.6GG: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard, Includes Storm Drain
Print on Bond
undated
20
2.19.6HH: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Academy Boulevard
Print on Bond
undated
20
2.19.6II: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: High Desert Street
Print on Bond
undated
20
2.19.6JJ: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road & SAS Extension
Print on Bond
undated
20
2.19.6KK: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road & SAS Extension; Utility Plan and Profile: Sanitary Sewer Extension in Spain Road
Print on Bond
undated
20
2.19.6LL: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Sanitary Sewer Extension in Spain Road
Print on Bond
undated
20
2.19.6MM: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Spain Road Station, Includes Storm Drain
Print on Bond
undated
20
2.19.6NN: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Cortaderia Street
Print on Bond
undated
20
2.19.6OO: Construction Plans for Subdivision Phase I-A; Utility Plan and Profile: Waterline Details
Print on Bond
undated
20
2.19.6PP: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Notes and Legend
Print on Bond
undated
20
2.19.6QQ: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal/Lighting Estimated Quantities
Print on Bond
undated
20
2.19.6RR: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Signal Demolition/Construction Plan
Print on Bond
undated
20
2.19.6SS: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Plan
Print on Bond
undated
20
2.19.6TT: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Conduits and Cables
Print on Bond
undated
20
2.19.6UU: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Traffic Signal Functions and Detectors
Print on Bond
undated
20
2.19.6VV: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Demolition/Construction Plan
Print on Bond
undated
20
2.19.6WW: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Plan
Print on Bond
undated
20
2.19.6XX: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Conduits and Cables
Print on Bond
undated
20
2.19.6YY: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Traffic Signal Functions and Detectors
Print on Bond
undated
20
2.19.6ZZ: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Academy/Tramway Lighting Plans
Print on Bond
undated
20
2.19.6AAA: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Spain/Tramway Lighting Plans
Print on Bond
undated
20
2.19.6BBB: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6CCC: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6DDD: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6EEE: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6FFF: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6GGG: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6HHH: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6III: Construction Plans for Subdivision Phase I-A; Traffic Signal and Lighting Plans: Traffic Signal Details
Print on Bond
undated
20
2.19.6JJJ: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: Sequence of Construction
Print on Bond
undated
20
2.19.6KKK: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: COA-Signing and Construction Traffic Control Standards
Print on Bond
undated
20
2.19.6LLL: Construction Plans for Subdivision Phase I-A; Traffic Control Plans: COA-Typical Traffic Control and Signing Examples
Print on Bond
undated
20
2.19.6MMM: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Academy State
Print on Bond
undated
20
2.19.6NNN: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Academy Station and High Desert Station
Print on Bond
undated
20
2.19.6OOO: Construction Plans for Subdivision Phase I-A; Striping and Signing Plans: Phase I-A Striping and Signing Plan for Spain Road and Cortaderia Street
Print on Bond
undated
20
2.19.6PPP: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.6QQQ: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.6RRR: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.6SSS: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.6TTT: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.6UUU: Construction Plans for Subdivision Phase I-A; Landscape and Irrigation Plans: Landscape and Irrigation Plans
Print on Bond
undated
20
2.19.7A: Construction Plans for Subdivision Phase I-B; Title Sheet
Print on Bond
undated
20
2.19.7B: Construction Plans for High Desert Subdivision Phase I-B; General Notes
Print on Bond
undated
20
2.19.7C: Construction Plans for Subdivision Phase I-B; Key Map
Print on Bond
undated
20
2.19.7D: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7E: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7F: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7G: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7H: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7I: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7J: Construction Plans for Subdivision Phase I-B; Plat/Survey Control
Print on Bond
undated
20
2.19.7K: Construction Plans for Subdivision Phase I-B; Typical Road and Pavement Sections
Print on Bond
undated
20
2.19.7L: Construction Plans for Subdivision Phase I-B; Typical Road and Pavement Sections
Print on Bond
undated
20
2.19.7M: Construction Plans for Subdivision Phase I-B; Overall Paving Plan
Print on Bond
undated
20
2.19.7N: Construction Plans for Subdivision Phase I-B; Overall Paving Plan
Print on Bond
undated
20
2.19.7O: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7P: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7Q: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Cortaderia Street
Print on Bond
undated
20
2.19.7R: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7S: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7T: Construction Plans for Subdivision Phase I-B; Paving Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7U: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Storm Drain
Print on Bond
undated
20
2.19.7V: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7W: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7X: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Cortaderia Street
Print on Bond
undated
20
2.19.7Y: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7Z: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7AA: Construction Plans for Subdivision Phase I-B; Storm Drain Plan and Profile: Miscellaneous Drainage Details
Print on Bond
undated
20
2.19.7BB: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #1
Print on Bond
undated
20
2.19.7CC: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Ponds #2 and #2A
Print on Bond
undated
20
2.19.7DD: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #3
Print on Bond
undated
20
2.19.7EE: Construction Plans for Subdivision Phase I-B; Drainage Plans: Desiltation Pond #4, #5A and #5B
Print on Bond
undated
20
2.19.7FF: Construction Plans for Subdivision Phase I-B; Drainage Plans: Spain Storm Drain Connection at Tramway
Print on Bond
undated
20
2.19.7GG: Construction Plans for Subdivision Phase I-B; Drainage Plans: Spain Storm Drain Connection Details
Print on Bond
undated
20
2.19.7HH: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7II: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Spain Road
Print on Bond
undated
20
2.19.7JJ: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Cortaderia Street
Print on Bond
undated
20
2.19.7KK: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7LL: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7MM: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Imperata Street
Print on Bond
undated
20
2.19.7NN: Construction Plans for Subdivision Phase I-B; Utility Plan and Profile: Waterline Details
Print on Bond
undated
20
2.19.7OO: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Spain Road
Print on Bond
undated
20
2.19.7PP: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Cortaderia Street Station and Imperata Street
Print on Bond
undated
20
2.19.7QQ: Construction Plans for Subdivision Phase I-B; Striping and Signing Plans: Imperata Street
Print on Bond
undated
21
Academy Lands East Mylar's
Physical location: CCA 8 Column 3, Row 1
undated
22
Existing Communities Facilities
Physical location: CCA 8 Column 3, Row 1
undated
23
School Bank Beautification
Physical location: CCA 8 Column 3, Row 1
undated

III:  III: Starwood Ranch/ASPCOL, 1989-1993Return to Top

1 box, 25 folders, 11 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
Box Folder
1 1
Proposals/Contracts
(A.1, #186)
1989-1992
1 2
Correspondence
(A.2, #186)
1989 January–September
1 3
Correspondence
A.2, #186)
1989 October–December
1 4
Correspondence
(A.2, #186)
1990-1993
1 5
Meeting Notes
(A.4, #186)
1989 March–September
1 6
Meeting Notes
(A.4, #186)
1989 October–December
1 7
Meeting Notes
(A.4, #186)
1990
1 8
Meeting Notes
(A.4, #186)
1991 March–September
1 9
Meeting Notes
(A.4, #186)
1991-1992
1 10
Notes to File
(A.8, #186)
1992
1 11
Facsimiles [bids?]
(A.9, #186)
1989-1990
1 12
Hydrology/Drainage
(B.1b, #186)
1991
1 13
Biological/aeration tubing
(B.2, #186)
1990
1 14
Visual of satellite placement
(B.3, #186)
1989
1 15
Engineering – subsoil study, equestrian irrigation and pond
(B.4, #186)
1989-1992
1 16
Cost Estimates
(B.6, #186)
1989
1 17
Design Sketches
(B.7, #186)
1991-1993
1 18
Irrigation
(B.11, #186)
1989-1992
1 19
Construction Bids/Proposals
(C.1, #186)
1989
1 20
Field Reports
(C.4, #186)
1989-1990
1 21
Change Orders
(C.5, #186)
1989-1991
1 22
Entry gate details
1990
1 23
Proposals/Contracts
2002-2003
1 24
Design Sketches
undated
1 25
Correspondence
2002-2004
STARWOOD/ASPCOL LANDSCAPE DRAWINGS
11 tubes
1986-1992
Topography and Grading
15 landscape drawings
3.1.1.A: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
3.1.1.B: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
tube
1
3.1.1.C: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
3.1.1.D: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
tube
1
3.1.1.E: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
1
3.1.1.F: Topographic Map by Schmueser Gordon Meyer Inc. by Reids Aerial Mapping
Print on Mylar
1989 October 10
1
3.1.2: Unlabeled Plat
Print on Vellum
undated
1
3.1.3: Starwood Plat Layout
Print on Bond
undated
1
3.1.4: Plat of Stern Ranch Subdivision and Starwood Subdivision
Print on Vellum
undated
1
3.1.5: Plat of Lots R-17-A and R-18-A, Starwood and Plat of Starwood Fourteen
Print on Bond
undated
1
3.1.6: Amended and Restated Plat of Starwood Ranch Lot Split by Alpine Surveys, Inc.
Blueprint on Bond
1989 March 23
1
3.1.7: Second Amended and Restated Plat of Starwood Ranch Lot Split by Alpine Surveys, Inc.
Blueprint on Bond
1989 August 22
1
3.1.8: Star Mountain Ranch/Starwood Ranch; Lot Line Adjustment by Alpine Surveys, Inc.
Blueprint on Bond
1986 December 8
1
3.1.9: Star Mesa 35 Acre Parcel Vicinity Map
Print on Bond
undated
1
3.1.10: ASPCOL/Starwood Ranch Subdivision: Summary of Area Irrigated by Red Mountain Ditch
Print on Bond
1991 August 5
Master Plan
32 landscape drawings
tube
2
3.2.1: ASPCOL Illustrative Master Plan
Colored Pencil and Marker on Print on Bond
undated
2
3.2.2: ASPCOL Residence Master Plan: Existing Conditions Prepared by Design Workshop, Inc.
Ink & Adhesive on Diazo Mylar
1989 December 8
2
3.2.3: ASPCOL Residence Master Plan: Existing Conditions Prepared by Design Workshop, Inc.
Print on Mylar
1990 February 2
2
3.2.4: Topographic Map of ASPCOL and Surroundings with Lot Lines
Ink and Print on Mylar
undated
2
3.2.5: ASPCOL Topographic Map
Print on Mylar
undated
2
3.2.6: ASPCOL Schematic Ranch Master Plan
Ink on Mylar
1990 February 26
2
3.2.7: ASPCOL Master Plan with Ski Amenities
Print on Diazo Mylar
1990 April 1
2
3.2.8.A: ASPCOL Master Plan
Pencil and Ink on Trace
undated
2
3.2.8.B: ASPCOL Master Plan
Pencil and Ink on Trace
undated
2
3.2.8.C: ASPCOL Master Plan
Ink on Print on Diazo Mylar
undated
2
3.2.9.A: ASPCOL Master Plan
Colored Pencil and Ink on Trace
undated
2
3.2.9.B: ASPCOL Master Plan
Blueprint on Bond
1990 April 1
2
3.2.10: ASPCOL Master Plan
Ink on Mylar
1990 April 1
2
3.2.11: ASPCOL Master Plan
Sepia on Acetate
1990 April 1
2
3.2.12: ASPCOL Master Plan
Print on Diazo Mylar
1990 April 1
2
3.2.13: ASPCOL Master Plan
Ink and Print on Diazo Mylar
1991 July 3
2
3.2.14.A: ASPCOL Master Plan
Print on Acetate
undated
2
3.2.14.B: ASPCOL Master Plan
Mylar
undated
2
3.2.15: ASPCOL Master Plan
Ink and Print on Diazo Mylar
1991 August 5
2
3.2.16: ASPCOL Master Plan
Blueprint on Bond
1991 August 5
2
3.2.17: ASPCOL Master Plan
Blueprint on Bond
1992 January 7
2
3.2.18: ASPCOL Master Plan: Irrigation Quantities
Sepia on Acetate
1990 April 1
2
3.2.191: ASPCOL Master Plan: Irrigation Quantities
Sepia on Acetate
1990-1991 August 8
2
3.2.20: ASPCOL Master Plan: Additional Landscape Zones
Adhesive, Ink, and Print on Diazo Mylar
1991 October 23
2
3.2.21: ASPCOL Master Plan: Additional Landscape Zones
Blueprint on Bond
1991 October 23
2
3.2.22: ASPCOL Master Plan
Print on Diazo Mylar
1991 October 9
2
3.2.23: ASPCOL Master Plan with Surroundings and Measurements
Red Pencil on Print on Bond
undated
2
3.2.24.A: ASPCOL Pin Bar Document Set
Ink on Mylar
undated
2
3.2.24.B: ASPCOL Pin Bar Document Set
Ink on Mylar
undated
2
3.2.24.C: ASPCOL Pin Bar Document Set
Ink on Mylar
undated
2
3.2.25: ASPCOL Master Plan: Bricol Access Alternatives
Blueprint on Bond
1991 October 9
2
3.2.26: ASPCOL Master Plan: Grounds Maintenance Bid Package: Exhibit Four: Limit of Work
Ink on Mylar
1992 March-May
Planting and Irrigation Plans
20 landscape drawings
tube
3
3.3.1.A: Bricol Log Home; L-1: Site Plan
Sepia on Acetate
undated
3
3.3.1.B: Bricol Log Home; L-4: Tree Planting Plan
Sepia on Acetate
undated
3
3.3.1.C: Bricol Log Home' L-5: Shrub & Groundcover Planting Plan
Sepia on Acetate
undated
3
3.3.2.A: Starwood Ranch Lot Two; L4.1: Entry Drive Planting Plan
Sepia on Acetate
undated
3
3.3.2.B: Starwood Ranch Lot Two; L4.2: House Planting Plan
Sepia on Acetate
undated
3
3.3.2.C: Starwood Ranch Lot Two; L4.3: Planting Plan Courtyards
Sepia on Acetate
undated
3
3.3.2.D: Starwood Ranch Lot Two; L4.4: Planting Plan Stream Terrace
Sepia on Acetate
undated
3
3.3.2.E: Starwood Ranch Lot Two; L5.1: Irrigation Pump Plan
Sepia on Acetate
undated
3
3.3.2.F: Starwood Ranch Lot Two; L5.2: Entry Drive Irrigation Plan
Sepia on Acetate
undated
3
3.3.2.G: Starwood Ranch Lot Two; L5.3: House Irrigation Plan
Sepia on Acetate
undated
3
3.3.2.H: Starwood Ranch Lot Two; L5.4: Irrigation Details
Sepia on Acetate
undated
3
3.3.3.A: Starwood Ranch Lot Two; L4.1: Entry Drive Planting Plan
Sepia Print on Mylar
undated
3
3.3.3.B: Starwood Ranch Lot Two; L4.2: House Planting Plan
Sepia Print on Mylar
undated
3
3.3.3.C: Starwood Ranch Lot Two' L4.3: Planting Plan Courtyards
Sepia Print on Mylar
undated
3
3.3.3.D: Starwood Ranch Lot Two; L4.4: Planting Plan Stream Terrace
Sepia Print on Mylar
undated
3
3.3.3.E: Starwood Ranch Lot Two; L5.1: Irrigation Pump Plan
Sepia Print on Mylar
undated
3
3.3.3.F: Starwood Ranch Lot Two; L5.2: Entry Drive Irrigation Plan
Sepia Print on Mylar
undated
3
3.3.3.G: Starwood Ranch Lot Two; L5.3: House Irrigation Plan
Sepia Print on Mylar
undated
3
3.3.3.H: Starwood Ranch Lot Two; L5.4: Irrigation Details
Sepia Print on Mylar
undated
3
3.3.4: ASPCOL Landscape Plan
Print on Photo paper
undated
Equestrian Center
9 landscape drawings
tube
4
3.4.1.A: Starwood Ranch Lot Two; Equestrian Center Grading
Sepia on Acetate
1990 August 13
4
3.4.1.B 14: Starwood Ranch Lot Two; Equestrian Center Layout
Sepia on Acetate
1990 August
4
3.4.1.C: Starwood Ranch Lot Two; Equestrian Center Planting Plan
Print on Mylar
undated
4
3.4.1.D: Starwood Ranch Lot Two; Equestrian Center Details
Pencil & Print on Mylar
1990 August 22
4
3.4.2 13: Equestrian Center Grading Plan
Pencil and Ink on Mylar
1990 August
4
3.4.314: Equestrian Center Layout
Pencil on Mylar
1990 August
4
3.4.4: Equestrian Center Planting Plan
Pencil and Ink on Mylar
undated
4
3.4.5: Equestrian Center Hardscape
Ink on Mylar
undated
4
3.4.6: Equestrian Center Planting Plan
Ink on Mylar
undated
Tennis Court
29 landscape drawings
tube
5
3.5.1: ASPCOL Residence: Tennis Court Plan with Section
Pencil and Ink on Mylar
1990 January 1
5
3.5.2: Starwood Ranch Lot Two; Construction Documents; Proposed Tennis Court
Print on Mylar
undated
5
3.5.3.A: Tennis Court Construction Documents; Issued for Construction
Print on Mylar
1990 July 30
5
3.5.3.B: Tennis Court Construction Documents; Issued for Construction
Ink and Print on Mylar
1990 July 30
5
3.5.3.C: Tennis Court Construction Documents; Details; Issued for Construction
Print on Mylar
1990 July 30
5
3.5.3.D: Tennis Court Construction Documents; Details; Issued for Construction
Print on Mylar
1990 July 30
5
3.5.4.A: Starwood Ranch Lot Two; Construction Documents Progress Print; Dimension Plan
Blueprint on Bond
1990 June 5
5
3.5.4.B: Starwood Ranch Lot Two; Construction Documents Progress Print; Grading Plan
Blueprint on Bond
1990 June 5
5
3.5.4.C: Starwood Ranch Lot Two; Construction Documents Progress Print
Retaining Wall/Fence Elevation and Tennis House/Retaining Wall/Fence Elevation. Blueprint on Bond
1990 June 5
5
3.5.4.D: Starwood Ranch Lot Two; Construction Documents Progress Print
Guard Rail Elevation, Gate Elevation, Sandstone Paving/Steps, Retaining Wall @ Tennis Court, Tennis Net Post, Paving Over Structure, Concrete Band/Fence Post Connection, Tennis Court/Light Connection/FootingPrinted. Blueprint on Bond.
1990 June 5
5
3.5.5: Starwood Ranch Lot Two; Construction Documents; Dimension Plan
Print on Mylar
undated
5
3.5.6: Schematic Tennis Court Grading
Marker on Mylar
1990 February 22
5
3.5.7.A: Schematic Tennis Court Grading; Base Map
Pencil on Mylar
undated
5
3.5.7.B: Schematic Tennis Court Grading; Contours
Pencil and Ink on Trace
undated
5
3.5.7.C: Schematic Tennis Court Grading; Contours
Pencil and Ink on Trace
undated
5
3.5.8: Tennis Court Grading Plan
Print on Mylar
undated
5
3.5.9: Starwood Ranch Lot Two; Construction Documents; Grading Plan
Print on Mylar
undated
5
3.5.10: Tennis Court Details
Pencil and Print on Mylar
undated
5
3.5.11: Starwood Ranch Lot Two; Construction Documents
Print on Mylar
undated
5
3.5.12.A: Tennis Court Details
Mylar
undated
5
3.5.12.B: Tennis Court Details
Print on Mylar
undated
5
3.5.12.C: Tennis Court Details; Typical Section - Paving Over Structure
Pencil on Graph Paper
undated
5
3.5.12.D: Tennis Court Details; Sandstone Paving/Steps
Pencil on Graph Paper
undated
5
3.5.12.E: Tennis Court Details; Retaining Wall at Tennis Court
Print on Mylar
undated
5
3.5.12.F: Tennis Court Details; Tennis Net Post
Pencil and Print on Graph Paper
undated
5
3.5.12.G: Tennis Court Details; Tennis Court Light Detail
Pencil on Graph Paper
undated
5
3.5.12.H: Tennis Court Details; Concrete Band/Fence Post Connection
Pencil and Print on Graph Paper
undated
5
3.5.12.I: Tennis Court Details; Fence Elevation
Print on Mylar
undated
5
3.5.13: ASPCOL Residence Foundation Plan
Print on Vellum
1990 June 8
Pond
20 landscape drawings
tube
6
3.6.1: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
1991 January 9
6
3.6.2: ASPCOL Pond Grading Plan
Pencil & Black Ink on Mylar
1991 January 9
6
3.6.3: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
1991 January 9
6
3.6.4: ASPCOL Pond Study Alternative "A"
Ink on Mylar
1991 August 13
6
3.6.5: ASPCOL Supplemental Pond Alternative A
Ink on Mylar
1991 October 29
6
3.6.6: ASPCOL Supplemental Pond Alternative B
Ink on Mylar
1991 October 29
6
3.6.7: ASPCOL Pond #2 Pin Bar Document
Red & Black Ink on Mylar
1991 October 30
6
3.6.8: ASPCOL Pond Alternative
Blueprint on Bond
1991 December 23
6
3.6.9: ASPCOL Pond Alternative
Ink on Mylar
1991 December 23
6
3.6.10: ASPCOL Pond Alternative
Ink on Mylar
1991 December 23
6
3.6.11.A: Bricol E.T. Beds; Site Plan and Sections
Ink on Mylar
1992 January 29
6
3.6.11.B: Bricol E.T. Beds; Grading Plan
Ink on Mylar
undated
6
3.6.12: Pond with Existing and Proposed Topography
Ink on Mylar
undated
6
3.6.13: ASPCOL Pond Grading Plan
Red & Black Ink on Mylar
undated
6
3.6.14: Pond and Existing Topography
Ink on Mylar
undated
6
3.6.15.A: Preliminary ASPCOL Supplemental Pond Plan View by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
1992 March 12
6
3.6.15.B: Preliminary ASPCOL Supplemental Pond Details by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
1992 March 12
6
3.6.16.A: Preliminary ASPCOL Supplemental Pond Plan View by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
1992 March 26
6
3.6.16.B: Preliminary ASPCOL Supplemental Pond Details by Schmueser Gordon Meyer, Inc.
Blueprint on Bond
1992 March 26
6
3.6.17: ASPCOL Site Grading
Ink on Mylar
undated
7
Aspcol
Physical location:CCA 8 Column 3, Row 2
undated
8
Lot 84
Physical location:CCA 8 Column 3, Row 2
undated
9
Aspcol
Physical location:CCA 8 Column 3, Row 2
undated
10
Plant Schedule
Physical location:Barn Box 2
undated
11
Parking Lot dock and barns
Physical location:CCA 8 Column 4, Row 1
undated

IV:  IV: Summerlin, 1986-2005Return to Top

18 boxes, 702 folders and 75 tubes
Container(s) Description Dates
SUMMERLIN MANUSCRIPT MATERIALS
Box Folder
1 1
Administration and Design
undated
1 2
Contracts/Proposals
(A.1, #126)
1987-1989
1 3
Correspondence
(A.2, #126)
1988-1989
1 4
Correspondence
(A.2, #126)
1989-1990
1 5
Correspondence with Consultant
(A.2b, #126)
1988-1989
1 6
Correspondence with Agency
(A.2c, #126)
1988-1990
1 7
Transmittals
(A.3, #126)
1989-1990
1 8
Meeting Minutes/Notes to File
(A.4, #126)
1989-1990
1 9
Work Program
(A.5, #126)
1988
1 10
Clippings
(A.6, #126)
undated
1 11
Billing/Invoices
(A.7, #126)
1988
1 12
Engineering Civil/Traffic
(B. 4a, #126)
undated
1 13
Programming Recreational
(B.5b, #126)
undated
1 14
Programming Land Use
(B.5c #126)
1988-1989
1 15
Cost Estimates
(B.5, #126)
1989
1 16
Construction Bids/Proposals/Addendum
(C.1, #126)
1988
1 17
Marketing/Presentations
(D.1, #126)
1988-19789
1 18
Specifications
(D.2, #126)
1988
1 19
Proposals/Contracts
(A.1, #127)
1989
1 20
Correspondence
(A.2, #127)
1989-1990
1 21
Transmittals
(A.3, #127)
1989
1 22
Meeting Minutes/Notes to File
(A.4, #127)
1988-1989
1 23
Work Program
(A.5, #127)
1988-1989
1 24
Engineering
(B.4, #127)
1988
1 25
Engineering Civil/Traffic
(B.4a, #127)
undated
1 26
Programming
(B.5, #127)
1988
1 27
Cost Estimates
(B.6, #127)
1988
1 28
Marketing/Presentations
(D.1, #127)
1988-1989
1 29
Marketing/Presentation Start-Up Meeting
(D.1, #127)
1989
1 30
Marketing/Presentations Design Criteria Draft Outline
(D.1, #127)
1989
1 31
Marketing/Presentations Design Criteria Draft Outline
(D.1, #127)
1989
1 32
Marketing/Presentations Design Criteria
(D.1, #127)
1989
1 33
Marketing/Presentations Design Criteria
(D.1, #127)
1989
1 34
Marketing/Presentations
(D.1, #127)
1990
1 35
Marketing/Presentations
(D.1, #127)
1989
1 36
Proposal/Contracts
(A.1, #128)
1989
1 37
Correspondence with Owner
(A.2a, #128)
1988-1989
1 38
Correspondence with Consultant
(A.2b, #128)
1989
1 39
Meeting Minutes/Notes to File
(A.4, #128)
1988-1989
1 40
Work Program
(A.5, #128)
1988-1989
1 41
Billing/Invoices
(A.7, #128)
1989
1 42
Physical
(B.1, #128)
1988-1989
1 43
Engineering
(B.4, #128)
1989
1 44
Programming
(B.5, #128)
1988-1989
1 45
Cost Estimates
(B.6, #128)
1988-1989
1 46
Design Sketches
(B.7, #128)
1988
1 47
Marketing/Presentations
(D.1, #128)
1988
1 48
Proposals/Contracts
(A.1, #134)
1988
1 49
Correspondence with Owner
(A.2a, #134)
1988
1 50
Meeting Minutes/Notes to File
(A.4, #134)
1989
1 51
Work Program
(A.5, #134)
1988
1 52
Billing/Invoices
(A.7, #134)
1988-1989
1 53
Proposals/Contracts
(A.1, #167)
1988
1 54
Work Program
(A.5, #167)
1988
1 55
Proposals/Contracts
(A.1, #168)
1989
1 56
Correspondence with Consultants
(A.2b, #168)
1989
1 57
Meeting Minutes/Notes to File
A.4, #168)
1989-1990
1 58
Work Program
(A.5, #168)
1988-1989
1 59
Billing/Invoice
(A.7, #168)
1989
1 60
Engineering
(B.4, #168)
1988
1 61
Programming
(B.5, #168)
1989
1 62
Cost Estimates
(B.6, #168)
1988
2 1
Proposal/Contracts
(A.1, #173)
1990
2 2
Correspondence
A.3, #173)
1988-1989
2 3
Meeting Notes
(A.4, #173)
1988-1989
2 4
Work Program
(A.5, #173)
1988-1990
2 5
Physical
(B.1, #173)
1989
2 6
Programming
(B.5, #173)
1989
2 7
Marketing/Presentations Development Standards
(D.2, #173)
1988
2 8
Proposal/Contracts
(A.1, #174)
1989
2 9
Proposal/Contracts
(A.1, #174)
1990
2 10
Correspondence
(A.2, #174)
1989
2 11
Correspondence
(A.2, #174)
1990
2 12
Correspondence
(A.2, #174)
1990-1992
2 13
Transmittals
(A.3, #174)
1989-1991
2 14
Meeting Minutes/Notes to File
(A.4, #174)
1988-1989
2 15
Meeting Minutes/Notes to File
(A.4, #174)
1989 April–June
2 16
Meeting Minutes/Notes to File
(A.4, #174)
1989 July–August
2 17
Meeting Minutes/Notes to File
(A.4, #174)
1989 September
2 18
Meeting Minutes/Notes to File
(A.4, #174)
1989 October–December
2 19
Meeting Minutes/Notes to File
(A.4, #174)
1990 January–February
2 20
Meeting Minutes/Notes to File
(A.4, #174)
1990 March–December
2 21
Meeting Minutes/Notes to File
(A.4, #174)
1990-1991
2 22
Billing/Invoices
(A.7, #174)
1991
2 23
Engineering Civil/Traffic
(B.4a, #174)
1990
2 24
Programming
(B.5, #174)
1989
2 25
Cost Estimates
(B.6, #174)
1990
2 26
Design Sketches/Product Information
(B.7, #174)
1990
2 27
Construction Bids/Proposals/Addendum
(C.1, #174)
1990
2 28
Proposal/Contracts
(A.1a, #175)
1989-1991
2 29
Correspondence with Owner
(A.2a, #175)
1989
2 30
Correspondence with Owner
(A.2a, #175)
1989
2 31
Correspondence with Owner
(A.2a, #175)
1989
2 32
Correspondence with Owner
(A.2a, #175)
1990-1991
2 33
Correspondence with Consultants
(A.2b, #175)
1989
2 34
Correspondence with Consultants
(A.2b, #175)
1990
2 35
Correspondence with Agencies
(A.2c, #175)
1989
3 1
Transmittals
(A.2, #175)
1989-1990
3 2
Meeting Notes/Notes to File
(A.4, #175)
1989-1990
3 3
Work Program
(A.5, #175)
1989
3 4
Billing/Invoices
(A.7, #175)
1989
3 5
Billing/Invoices
(A.7, #175)
1989
3 6
Billing/Invoices
(A.7, #175)
1990
3 7
Physical
(B.1, #175)
1989
3 8
Plant Materials List
(B.3, #175)
1989
3 9
Engineering
(B.4, #175)
1982-1989
3 10
Engineering Civil/Traffic
(B.4a, #175)
1989
3 11
Programming
(B.5, #175)
1989
3 12
Cost Estimates
(B.6, #175)
1988-1989
3 13
Cost Estimates
(B.6, #175)
1989
3 14
Cost Estimates
(B.6, #175)
1989-1990
3 15
Design Sketches/Product Information
(B.7, #175)
1989
3 16
Design Sketches/Product Information
(B.7, #175)
1989
3 17
Design Sketches/Product Information
(B.7, #175)
1989
3 18
Design Sketches/Product Information
(B.7, #175)
1989-1990
3 19
Construction Bids/Proposals/Addendum
(C.1, #175)
1989-1990
3 20
Construction Bids/Proposals/Addendum
(C.1, #175)
1990
3 21
Change Orders
(C.5, #175)
1990
3 22
Hillpointe and Entries Project Manual
(D.1, #175)
1990
3 23
Landscape Maintenance Manual
(D.1, #175)
1990
3 24
The Hills Park Project Manual
(D.1, #175)
1991
3 25
The Hills Park Project Manual
(D.2, #175)
1991
3 26
The Hills Park Project Manual
(D.2, #175)
1991
3 27
The Hills Park Project Manual
(D.2, #175)
1991
3 28
The Hills Park Project Manual
(D.2, #175)
1991
3 29
Design Guidelines
(D.3, #175)
1989-1990
4 1
Landscape Maintenance Manual
(#175)
1991
4 2
Issue to Construct Project Manual
(#175)
1991
4 3
Streetscape Schematic Design
(#175)
1989
4 4
Proposal/Contracts
(A.1, #177)
1989-1990
4 5
Proposal/Contracts
(A.1, #177)
1990-1991
4 6
Correspondence with Owner
(A.2a, #177)
1989 January–July
4 7
Correspondence with Owner
(A.2a, #177)
1989 August–November
4 8
Correspondence with Owner
(A.2a, #177)
1989 December
4 9
Correspondence with Owner
(A.2a, #177)
1990 January–March
4 10
Correspondence with Owner
(A.2a, #177)
1990 April–May
4 11
Correspondence with Owner
(A.2a, #177)
1990 June–September
4 12
Correspondence with Owner
(A.2a, #177)
1990-1991
4 13
Correspondence with Consultant
(A.2b, #177)
1988-1989
4 14
Correspondence with Consultant
(A.2b, #177)
1989 October–December
4 15
Correspondence with Consultant
(A.2b, #177)
1990 January–April
4 16
Correspondence with Consultant
(A.2b, #177),
1990-1991
4 17
Transmittals
(A.3, #177)
1990-1991
4 18
Meeting Minutes/Notes to File
(A.4, #177)
1988-1991
4 19
Billing/Invoices
(A.7, #177)
1989-1990
4 20
Billing/Invoices
(A.7, #177)
1990-1991
4 21
Programming
(B.5, #177)
1989-1990
4 22
Cost Estimates
(B.6, #177)
1989 January–May
4 23
Cost Estimates
(B.6, #177)
1989 July 1-1990 December 31
4 24
Design Sketches
(B.7, #177)
1989
4 25
Design Sketches
(B.7, #177)
1990
4 26
Construction Bids/Proposals/Addendum
(C.1, #177)
1990
4 27
Construction Bids/Proposals/Addendum
(C.1, #177)
1990
4 28
Construction Contracts
(C.2, #177)
1989
5 1
Field Reports
(C.4, #177)
1989
5 2
Change Orders
(C.5, #177)
1990
5 3
Specifications
(D.1, #177)
1990
5 4
Design Guidelines
(D.3, #177)
1988-1989
5 5
Clark County Health Department Approved Forms
(#177)
1990
5 6
Facility Maintenance Manual
(#177)
1990
5 7
Landscape Maintenance Manual
(#177)
1990
5 8
Landscape Maintenance Manual
(#177)
1990
5 9
Parcel Summary
(#177)
undated
5 10
Correspondence
(A.2, #203)
1989-1990
5 11
Work Program
(A.5, #203)
1989
5 12
Billing/Invoices
(A.7, #203)
1989
5 13
Engineering Civil/Traffic
(B.4a, #203)
1989
5 14
Programming Architectural
(B.5a, #203)
1989
5 15
Cost Estimates
(B.6, #203)
1989
5 16
Marketing/Presentations Design Guidelines
(D.1 #203)
1989
5 17
Proposal/Contracts
(A.1, #214)
1989
5 18
Transmittals
(A.3, #214)
1989
5 19
Meeting Minutes/Notes to File
(A.4, #214)
1989
5 20
Cost Estimates
(B.6, #214)
1989
5 21
Proposal/Contracts
(A.1, #221)
1989-1990
5 22
Meeting Minutes/Notes to File
(A.4, #221)
1989
5 23
Work Program
(A.5, #221)
1986
5 24
Programming Architectural
(B.5a, #221)
1986-1989
5 25
Cost Estimates
(B.6, #221)
1989
5 26
Marketing/Presentations
(D.1, #221)
1989
5 27
Specifications
(D.2, #221)
1989
5 28
Proposal/Contracts
(A.1, #222)
1989
5 29
Correspondence
(A.2, #222)
1989
5 30
Transmittals
(A.3, #222)
1989
5 31
Meeting Minutes/Notes to File
(A.4, #222)
1989
5 32
Work Program
(A.5, #222)
1989
5 33
Work Program
(A.5, #222)
1990
5 34
Engineering Civil/Traffic
(B.4a, #222)
1989
5 35
Cost Estimates
(B.6, #222)
1989
5 36
Proposal/Contracts
(A.1, #228)
1989-1990
5 37
Meeting Minutes/ Notes to File
(A.4, #228)
1989
5 38
Work Program
(A.5, #228)
1989
5 39
Proposal/Contracts
(A.1, #230)
1989
5 40
Correspondence
(A.2, #230)
1989-1990
5 41
Meeting Minutes/Notes to File
(A.4, #230)
1989
5 42
Work Program
(A.5, #230)
1989
5 43
Proposal/Contracts
(A.1, #234)
1989-1990
5 44
Correspondence
(A.2, #234)
1989-1990
5 45
Transmittals
(A.3, #234)
1990
5 46
Work Program
(A.5, #234)
1989
5 47
Billing/Invoices
(A.7, #234)
1989
5 48
Proposal/Contracts
(A.1, #236)
1989
5 49
Correspondence
(A.2, #236)
1989-1990
5 50
Meeting Minutes/Notes to File
(A.4, #236)
1989-1990
5 51
Work Program
(A.5, #236)
1989
5 52
Billing/Invoices
(A.7, #236)
1990
5 53
Programming
(B.5, #236)
1989
5 54
Cost Estimates
(B.6, #236)
1989-1990
5 55
Proposal/Contracts
(A.1, #237)
1989
5 56
Proposal/Contracts
(A.1, #237)
1990
5 57
Proposal/Contracts
(A.1, #237)
1991-1993
5 58
Correspondence
(A.1, #237)
1989-1991
5 59
Correspondence with Consultants
(A.2b, #239)
1989-1990,; 1992
5 60
Transmittals
(A.3, #237)
1989-1991
5 61
Meeting Minutes/Notes to File
(A.4, #237)
1989-1992
5 62
Work Program
(A.5, #237)
1989
5 63
Cost Estimates
(B.6, #237)
1989
5 64
Billing/Invoices
(A.7, #237)
1989
5 65
Billing/Invoices
(A.7, #237)
1990 January-April
5 66
Billing/Invoices
(A.7, #237)
1990 May-December
5 67
Billing/Invoices
(A.7, #237)
1991
5 68
Billing/Invoices
(A.7, #237)
1992-1993
6 1
Cost Estimates
(B.6, #237)
1989
6 2
Cost Estimates
(B.6, #237)
1990
6 3
Design Sketches/Product Information
(B.7, #237)
1989-1990
6 4
Construction Bids/Proposals
(C.1, #237)
undated
6 5
Marketing/Presentations Schematic Designs
(D.1, #237)
1989
6 6
Marketing/Presentations Schematic Designs
(D.1, #237)
1989
6 7
Marketing/Presentations Schematic Designs
(D.1, #237)
1990
6 8
Design Sketches
(D.3, #237)
1990
6 9
Specifications
(D.6, #237)
1992
6 10
The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Project Manual
1991
6 11
The Pueblo at Summerlin Streetscape Project Manual Issue to Bid
1991
6 12
The Pueblo at Summerlin Wall Mock-Up Project Manual
(#237)
1990
6 13
Landscape Maintenance Manual for the Temporary Information Center
1990
6 14
Temporary Manual Center Project Manual
1990
6 15
Village Two South Streetscape Maintenance Manual
(#237)
1990
6 16
Village Two South Streetscape Project Manual
1990
6 17
Proposal/Contracts
(A.1, #240)
1989
6 18
Correspondence
(A.2, #240)
1989-1990
6 19
Meeting Minutes/Notes to File
(A.4, #240)
1989-1990
6 20
Work Program
(A.5, #240)
1989
6 21
Proposal/Contracts
(A.1, #245)
1989-1990
6 22
Correspondence
(A.2, #245)
1989-1990
6 23
Correspondence with Owner
(A.2a, #245)
1989-1990
6 24
Correspondence with Consultant
(A.2b, #245)
1989-1990
6 25
Meeting Minutes
(A.4, #245)
1989-1990
6 26
Billing/Invoices
(A.7, #245)
1989
6 27
Billing/Invoices
(A.7, #245)
1990
6 28
Billing/Invoices
(A.7, #245)
1989
6 29
Programming
(B.5, #245)
1989
6 30
Cost Estimates
(B.6, #245)
1989-1990
6 31
Design Sketches/Product Information
(B.7, #245)
1989
6 32
Design Criteria
(D.1, #245)
1990
6 33
Design Criteria
(D.1, #245)
1990
6 34
Meeting Minutes/Notes to File
(A.4, #254)
1989
7 1
Correspondence
(A.2, #267)
1989
7 2
Meeting Minutes
(A.4, #267)
1989
7 3
Cost Estimates
(B.6, #267)
1990
7 4
Proposal/Contracts
(A.1, #276)
1989
7 5
Work Program
(A.5, #276)
1989
7 6
Billing/Invoice
(A.7, #276)
1990
7 7
Proposal/Contracts
(A.1, #277)
1989-1990
7 8
Proposal/Contracts
(A.1, #277)
1991-1992
7 9
Correspondence – Owner
(A.2a, #277)
1989-1990
7 10
Correspondence – Owner
(A.2a, #277)
1991-1992
7 11
Correspondence – Consultant
(A.2b, #277)
1990-1992
7 12
Transmittals
(A.3, #277)
1990-1992
7 13
Meeting Minutes
(A.4, #277)
1990-1991
7 14
Work Program
(A.5, #277)
1989-1990
7 15
Billing/Invoices
(A.7, #277)
1989-1990
7 16
Billing/Invoices
(A.7, #277)
1990 March–December
7 17
Billing/Invoices
(A.7, #277)
1991
7 18
Billing/Invoices
(A.7, #277)
1992
7 19
Engineering
(B.4, #277)
1990
7 20
Cost Estimates
(B.6, #277)
1989-1992
7 21
Design Sketches/Product Information
(B.7, #277)
1990
7 22
Specifications
(D.2, #277)
1990-1991
7 23
Design Guidelines/Graphics
(D.3, #277)
undated
7 24
Bid Tabs
(#277)
1990-1991
7 25
Interior Streets and Hillpointe Road Project Manual
(#277)
1990
7 26
Schematic Design Technical Demo
1990
7 27
The Hills and Summerlin Maintenance Manual
(#277)
1990
7 28
The Hills at Summerlin Streetscape Landscape Maintenance Manual
(#277)
1990
7 29
The Hills at Summerlin Streetscape Village One South Issue to Construct Project Manual
(#277)
1991
7 30
Village One South Project Manual
(#277)
1991 July-August
7 31
Proposals/Contracts
(A.1, #285)
1989
7 32
Billing/Invoices
(A.7, #285)
1989-1990
7 33
Proposals/Contracts
(A.1, #288)
1990
7 34
Correspondence – Owner
(A.2a, #288)
1990
7 35
Correspondence – Consultant
(A.2b, #288)
1990
7 36
Meeting Minutes
(A.4, #288)
1989
7 37
Programming
(B.5, #288)
1990
7 38
Cost Estimates
(B.6, #288)
1990
7 39
Construction Bids/Proposals/Addendum
(C.1, #288)
1990
7 40
Proposal/Contracts
(A.1, #289)
1990-1992
7 41
Correspondence
(A.2a, #289)
1990-1992
7 42
Transmittals
(A.3, #289)
1990-1991
7 43
Programming
(B.5, #289)
1990
7 44
Cost Estimates
(B.6, #289)
1990
7 45
Design Sketches/Schematic Design
(B.7, #289)
1990
7 46
Proposal/Contracts
(A.1, #294)
1990
7 47
Correspondence
(A.2, #294)
1989
7 48
Programming
(B.5, #294)
1989
7 49
Marketing/Presentation
(D.1, #294)
undated
8 1
Proposals/Contracts
(A.1, #295)
1990-1991
8 2
Correspondence
(A.2, #295)
1990-1991
8 3
Transmittals
(A.3, #295)
1990
8 4
Meeting Minutes/Notes to File
(A.4, #295)
1990
8 5
Work Program
(A.5, #295)
1989-1990
8 6
Programming
(B.5, #295)
1990
8 7
Programming Summary Spreadsheet
(B.5, #295)
1990
8 8
Programming/Architectural
(B.5a, #295)
1990
8 9
Cost Estimates
(B.6, #295)
1990
8 10
Construction Bids/Proposals/Addendum
(C.1, #295)
1990
8 11
Summerlin Master Plan
(#295)
1990
8 12
Summerlin Master Plan Technical Memo
(#295)
1990
8 13
Maintenance Manual Comments with blueprints
1990
8 14
Proposals/Contracts
(A.1, #302)
1990
8 15
Correspondence with Owner
(A. 2a, #302)
1989
8 16
Billing/Invoices
(A.7, #302)
1991
8 17
Proposal/Contract
(A.1, #307)
1990
8 18
Correspondence
(A.2a, #307)
1990
8 19
Meeting Minutes/Notes to File
(A.4, #307)
1990
8 20
Proposal/Contracts
( A.1, #311)
1990
8 21
Correspondence with Owner
(A.2a, #311)
1990
8 22
Correspondence with Consultant
(A.2b, #311)
1990
8 23
Meeting Minutes/Notes to File
(A.4, #311)
1990
8 24
Work Programs
(A.5, #311)
1990
8 25
Billing/Invoices
(A.7, #311)
1990 January-March
8 26
Billing/Invoices
(A.7, #311)
1990 April-August
8 27
Engineering
(B.4, #311)
1990
8 28
Programming/Architectural
(B.5a, #311)
1990
8 29
Cost Estimates
(B.6, #311)
1990
8 30
Design Sketches/Product Information
(B.7, #311)
1990
8 31
Planning Summary Information
(#311)
1990
8 32
Marketing/Presentation Summary Notebook
(D.1, #321)
1989
8 33
Marketing/Presentation Summary Notebook
(D.1, #321)
1990
8 34
Correspondence
(A.2, #331)
1989-1990
8 35
Meeting Minutes/Notes to File
(A.4, #331)
1989-1990
8 36
Work Program
(A.5, #331)
1990
8 37
Billing/Invoices
(A.7, #331)
1991
8 38
Marketing/Presentation Decision Memo
(D.1, #331)
1990
8 39
Proposal/Contracts
(A.1, #355)
1990
8 40
Proposal/Contracts
(A.1, #355)
1991
8 41
Proposal/Contracts
(A.1, #355)
1992
8 42
Proposal/Contracts
(A.1, #355)
1993-1994
8 43
Correspondence with Owner
(A.2a, #355)
1990-1991
8 44
Correspondence with Owner
(A.2a, #355)
1992-1993
8 45
Correspondence with Consultants
(A.2b, #355)
1991
8 46
Correspondence with Consultants
(A.2b, #355)
1992
8 47
Correspondence with Consultants
(A.2b, #355)
1993
9 1
Transmittals
(A.3, #355)
1990-1993
9 2
Meeting Minutes/Notes to File
(A.4, #355)
1990-1991
9 3
Meeting Minutes/Notes to File
(A.4, #355)
1992-1993
9 4
Billing/Invoices
(A.7, #355)
1991
9 5
Billing/Invoices
(A.7, #355)
1991
9 6
Billing/Invoices
(A.7, #355)
1991
9 7
Billing/Invoices
(A.7, #355)
1991
9 8
Billing/Invoices
(A.7, #355)
1992
9 9
Billing/Invoices
(A.7, #355)
1992
9 10
Billing/Invoices
1992 (A.7, #355)
1992 June-October
9 11
Billing/Invoices
(A.7, #355)
1992 November-December
9 12
Billing/Invoices
(A.7, #355)
1993 January-April
9 13
Billing/Invoices
(A.7, #355)
1993 May-August
9 14
Billing/Invoices
(A.7, #355)
1993 September-December
9 15
Billing/Invoices
( A.7, #355)
1994
9 16
Cost Estimates
(A.7, #355)
1992-1993
9 17
Design Sketches/Product Information
(B.7, #355)
1992
9 18
Construction Bids/Proposals
(C.1, #355)
1990 May-July
9 19
Construction Bids/Proposals
(C.1, #355)
1990 August-September
9 20
Construction Bids/Proposals
(C.1, #355)
1990 October-December
9 21
Construction Bids/Proposals
(C.1, #355)
1991-1992
9 22
Construction Bids/Proposals
(C.1, #355)
1992
9 23
Pay Requests
(C.3, #355)
1991-1992
9 24
Field Reports
(C.4, #355)
1990
9 25
Field Reports
(C.4, #355)
1991-1992
9 26
Field Reports
(C.4, #355)
1993
9 27
Change Orders
(C.5, #355)
1990-1992 February
9 28
Change Orders
(C.5, #355)
1992 March-April
9 29
Change Orders
(C.5, #355)
1992 May-September
9 30
Change Orders
(C.5, #355)
1992-1993
9 31
Submittals/Shop Drawings
(C.6, #355)
1988-1991 March
10 1
Submittals/Shop Drawings
(C.6, #355)
1991 April
10 2
Submittals/Shop Drawings
(C.6, #355)
1991 May-June
10 3
Submittals/Shop Drawings
(C.6, #355)
1991 June-September
10 4
Submittals/Shop Drawings
(C.6, #355)
1992 January
10 5
Submittals/Shop Drawings
(C.6, #355)
1992 February-March
10 6
Submittals/Shop Drawings
(C.6, #355)
1992 August-September
10 7
Submittals/Shop Drawings
( C.6, #355)
1993
10 8
Submittals/Shop Drawings
(C.6, #355)
1993
10 9
Proposal/Contracts
(A.1, #394)
1990
10 10
Programming
(B.5, #394)
1990
10 11
Proposal/Contracts
(A.1, #398)
1990-1991
10 12
Correspondence
(A.2, #398)
1990
10 13
Billing/Invoices
(A.7, #398)
1990
10 14
Billing/Invoices
(A.7, #398)
1991
10 15
Proposals/Contracts
(A.1, #405)
1990
10 16
Billings/Invoices
(A.7, #405)
1990
10 17
Correspondence
(A.2b, #432)
1992
10 18
Billing/Invoices
(A.7, #432)
1991
10 19
Billing/Invoices
(A.7, #432)
1992
10 20
Specifications
(D.6, #432)
1990
10 21
Specifications
(D.6, #432)
1991
10 22
Specifications/Maintenance Manual
(D.6, #432)
1991
10 23
Proposal/Contracts
(A.1, #459)
1991
10 24
Billing/Invoices
(A.4, #459)
1991-1992
10 25
Cost Estimates
(B.6, #459)
1991
10 26
Correspondence with Owner
(A.2a, #462)
1991
10 27
Meeting Minutes/Notes to File
(A.4, #462)
1991
10 28
Programming
(B.5, #462)
1990
10 29
Landscape Improvement Standards
1990
10 30
Proposal/Contracts
(A.1, #488)
1991-1993
10 31
Correspondence
(A.2, #488)
1990-1991 August
10 32
Correspondence
(A.2, #488)
1991 September-1993 February
10 33
Transmittals
(A.3, #488)
1991-1992
10 34
Meeting Minutes
(A.4, #488)
1991
10 35
Billing/Invoices
(A.7, #488)
1991 May-August
10 36
Billing/Invoices
(A.7, #488)
1991 September-December
10 37
Billing/Invoices
(A.7, #488)
1992
10 38
Billing/Invoices
(A.7, #488)
1993-1994
11 1
Cost Estimates
(B.6, #488)
1991-1992
11 2
Design Sketches
(B.7, #488)
1991
11 3
Project Manual
(C.6, #488)
1993
11 4
Specifications/Issue to Bid
(D.2, #488)
1991
11 5
Proposal/Contracts
(A.1, #577)
1991-1993
11 6
Correspondence
(A.2, #577)
1991-1992
11 7
Transmittals
(A.3, #577)
1992
11 8
Meeting Minutes
(A.4, #577)
1992
11 9
Billing/Invoices
(A.7, #577)
1991-1992 August
11 10
Billing/Invoices
(A.7. #577)
1992-1993
11 11
Meeting Minutes
(A.4, #577)
1992
11 12
Cost Estimates
(B.6, #577)
1992
11 13
Design Sketches
(B.7, #577)
1992
11 14
Marketing/Presentation Project Manual
(D.1, #577)
1992
11 15
Issue for Construction Project Manual
(D.1, #577)
1992
11 16
Proposal/Contracts
(A.1, #586)
1991-1995
11 17
Correspondence
(A.2, #586)
1991-1992
11 18
Correspondence
(A.2, #586)
1993
11 19
Correspondence
(A.2, #586)
1994-1996
11 20
Transmittals
(A.4, #586)
1992-1993
11 21
Meeting Notes
(A.4, #586)
1992-1993
11 22
Work Program
(A.5, #586)
1992
11 23
Billing/Invoices
(A.7, #586)
1992
11 24
Billing/Invoices
(A.7, #586)
1993-1994
11 25
Cost Estimates
(B.6, #586)
1991-1992
11 26
Design Sketches
(B.7, #586)
1993
11 27
Design Sketches
(B.7, #586)
undated
11 28
Design Sketches
(B.7, #586)
1995
11 29
Construction Bids/Proposals/Addendum
(C.1, #586)
1992
11 30
Marketing/Presentation
(D.1, #586)
undated
11 31
Correspondence
(A.2, #620)
1989
11 32
Proposal/Contracts
(A.1, #635)
1992-1993
11 33
Correspondence with Owner
(A.2a, #635)
1992
11 34
Correspondence with Owner
(A.2a, #635)
1993
11 35
Meeting Minutes
(A.4, #635)
1993
11 36
Billing/Invoices
(A.7, #635)
1992-1993
11 37
Correspondence
(A.2, #659)
1992-1993
11 38
Meeting Minutes
(A.4, #659)
1992
12 1
Proposal/Contracts
(A.1, #669)
1992-1994
12 2
Correspondence with Owner
(A.2a, #669)
1992-1996
12 3
Correspondence with Consultant
(A.2b, #669)
1992
12 4
Meeting Minutes
(A.4, #669)
1992 January-September
12 5
Meeting Minutes
(A.4, #669)
1992 October-November
12 6
Meeting Minutes
(A.4, #669)
1992 November-December
12 7
Meeting Minutes
(A.4, #669)
1993-1994
12 8
Billing/Invoices
(A.7, #669)
1992
12 9
Billing/Invoices
(A.7, #669)
1993
12 10
Billing/Invoices
(A.7, #669)
1994-1996
12 11
Programming/Architectural
(B.5a, #669)
1992-1993
12 12
Cost Estimates
(B.6, #669)
1992-1993
12 13
Design Sketches/Product Information
(B.7, #669)
1991-1993
12 14
Marketing/Presentations
(D.1, #669)
1993
12 15
Marketing/Presentations
(D.1, #669)
1994
12 16
Proposal/Contracts
(A.1, #693)
1992-1993
12 17
Proposal/Contracts
(A.1, #693)
1993
12 18
Proposal/Contracts
(A.1, #693)
1994-1995
12 19
Correspondence with Owner
(A.2a, #693)
1993-1994
12 20
Correspondence with Owner
(A.2a, #693)
1994
12 21
Correspondence with Owner
(A.2a, #693)
1994
12 22
Correspondence with Owner
(A.2a, #693)
1995
12 23
Correspondence with Owner
(A.2a, #693)
1995-1997
12 24
Correspondence with Consultant
(A.2b, #693)
1992-1993
12 25
Correspondence with Consultant
(A.2b, #693)
1994
12 26
Correspondence with Consultant
(A.2b, #693)
1995
12 27
Correspondence with Agency, mainly blueprints
(A.2c, #693)
1992
12 28
Correspondence with Agency
(A.2c, #693)
1994
12 29
Correspondence with Agency
(A.2c, #693)
1995
12 30
Transmittals
(A.3, #693)
1992-1995
13 1
Meeting Minutes
(A.4, #693)
1992-1993
13 2
Meeting Minutes
(A.4, #693)
1994
13 3
Meeting Minutes
(A.4, #693)
1994 March-April
13 4
Meeting Minutes
(A.4, #693)
1994 May-June
13 5
Meeting Minutes
(A.4, #693)
1994 August-October
13 6
Meeting Minutes
(A.4, #693)
1994 November-December
13 7
Meeting Minutes
(A.4, #693)
1995
13 8
Meeting Minutes
(A.4, #693)
1995
13 9
Billing/Invoices
(A.7, #693)
1992-1993
13 10
Billing/Invoices
(A.7, #693)
1994 January-June
13 11
Billing/Invoices
(A.7, #693)
1994-1995
13 12
Geology/Soils
(B.1a, #693)
1991
13 13
Engineering
(B.4, #693)
1992-1993
13 14
Engineering
(B.4, #693)
1994
13 15
Programming
(B.5, #693)
1992
13 16
Programming
(B.5, #693)
1993
13 17
Cost Estimates
(B.6, #693)
1992-1993
13 18
Cost Estimates
(B.6, #693)
1994-1995
13 19
Design Sketches/Product Information
(B.7, #693)
1993-1994
13 20
Design Sketches/Product Information
(B.7, #693)
1994
13 21
Design Sketches/Product Information
(B.7, #693)
1994
13 22
Design Sketches/Product Information
(B.7, #693)
1994
13 23
Design Sketches/Product Information
(B.7, #693)
1994
13 24
Design Sketches/Product Information
(B.7, #693)
1994
13 25
Design Sketches/Product Information
(B.7, #693)
1994
13 26
Design Sketches/Product Information
(B.7, #693)
1994
13 27
Design Sketches/Product Information
(B.7, #693)
1994
13 28
Design Sketches/Product Information
(B.7, #693)
1994
13 29
Design Sketches/Product Information
(B.7, #693)
1994
14 1
Construction Bids
(C.1, #693)
1993-1994
14 2
Construction Bids
(C.1, #693)
1994
14 3
Construction Bids
(C.1, #693)
1994
14 4
Construction Bids
(C.1, #693)
1994-1995
14 5
Pay Requests
(C.3, #693)
1994
14 6
Field Reports
(C.4, #693)
1993-1995
14 7
Change Orders
(C.5, #693)
1993-1994
14 8
Submittals/Shop Drawings
(C.6, #693)
1993
14 9
Submittals/Shop Drawings
(C.6, #693)
1993-1994
14 10
Submittals/Shop Drawings
(C.6, #693)
1994
14 11
Submittals/Shop Drawings
(C.6, #693)
1994
14 12
Submittals/Shop Drawings
(C.6, #693)
1994
14 13
Submittals/Shop Drawings
(C.6, #693)
1994
14 14
Submittals/Shop Drawings
(C.6, #693)
1994
14 15
Submittals/Shop Drawings
(C.6, #693)
1994
14 16
Marketing/Presentations
(D.1, #693)
1994
14 17
Specifications
(D.2, #693)
1993
14 18
Proposal/Contracts
(A.1a, #712)
1993
14 19
Proposal/Contracts
(A.1a, #712)
1994-1995
14 20
Proposal/Contracts
(A.1a, #712)
1996
14 21
Proposal/Contracts
(A.1a, #712)
1993-1995
14 22
Correspondence with Owner
(A.2a, #712)
1992-1993
14 23
Correspondence with Owner
(A.2a, #712)
1994 January-June
14 24
Correspondence with Owner
(A.2a, #712)
1994 July-December
14 25
Correspondence with Owner
(A.2a, #712)
1995 January-August
14 26
Correspondence with Owner
(A.2a, #712)
1995 September-October
14 27
Correspondence with Owner
(A.2a, #712)
1995 November-December
14 28
Correspondence with Owner
(A.2a, #712)
1996 January-April
14 29
Correspondence with Owner
(A.2a, #712)
1996-1997
14 30
Correspondence with Consultant
(A.2b, #712)
1993-1994
14 31
Correspondence with Consultant
(A.2b, #712)
1995
14 32
Correspondence with Consultant
(A.2b, #712)
1996
15 1
Correspondence - Consultant
(A.2b, #712)
1992-1993
15 2
Correspondence - Consultant
(A.2b, #712)
1994-1995
15 3
Transmittals
(A.3, #712)
1993-1996
15 4
Meeting Minutes
(A.4, #712)
1993-1994
15 5
Meeting Minutes
(A.4, #712)
1995-1996
15 6
Billing/Invoices
(A.7, #712)
1992-1993
15 7
Billing/Invoices
(A.7, #712)
1993 August-November
15 8
Billing/Invoices
(A.7, #712)
1994
15 9
Billing/Invoices
(A.7, #712)
1995 January–February
15 10
Billing/Invoices
(A.7, #712)
1995 March–June
15 11
Billing/Invoices
(A.7, #712)
1995 July-September
15 12
Billing/Invoices
(A.7, #712)
1995 November-December
15 13
Billing/Invoices
(A.7, #712)
1996 February–June
15 14
Billing/Invoices
(A.7, #712)
1996 July-September
15 15
Notes to File
(A.8, #712)
1996
15 16
Engineering
(B.4, #712)
1993
15 17
Engineering
(B.4, #712)
1994
15 18
Cost Estimates
(B.6, #712)
1992
15 19
Cost Estimates
(B.6, #712)
1993
15 20
Cost Estimates
(B.6, #712)
1994 January-July
15 21
Cost Estimates
(B.6., #712)
1994 August
15 22
Cost Estimates
(B.6, #712)
1995
15 23
Design Sketches/Product Information
(B.7, #712)
1993 January-March
15 24
Design Sketches/Product Information
(B.7, #712)
1993-1994
15 25
Design Sketches/Product Information
(B.7, #712)
1995
15 26
Construction Bids/Proposals/Addendum
(C.1, #712)
1994
15 27
Construction Bids/Proposals/Addendum
(C.1, #712)
1995 July-August
15 28
Construction Bids/Proposals/Addendum
(C.1, #712)
1995 September-December
15 29
Construction Contracts
(C.2, #712)
1994
15 30
Change Orders
(C.5, #712)
1995-1997
16 1
Specifications/Construction Agreement
(D.2, #712)
1994
16 2
Specifications/Construction Agreement
(D.2, #712)
1994
16 3
Specifications/Construction Agreement
(D.2, #712)
1994
16 4
Specifications/Construction Agreement
(D.2, #712)
1994
16 5
Specifications/Construction Agreement
(D.2, #712)
1995
16 6
Specifications/Construction Agreement Project Manual
(D.2, #712)
1995
16 7
Specifications/Construction Agreement Project Manual
(D.2, #712)
1995
16 8
Specifications/Construction Agreement Project Manual
(D.2, #712)
1995
16 9
Specifications/Construction Agreement Project Manual
(D.2, #712)
1996 February
16 10
Specifications/Project Manual
(D.2, #712)
1996 April
16 11
Specifications/Project Manual
(D.2, #712)
1996 April
16 12
Specifications/Project Manual
(D.2, #712)
1996 July
16 13
Specifications/Project Manual
(D.2, #712)
1996 September
16 14
Proposal/Contracts
(A.1, #723)
1993
16 15
Billing/Invoices
(A.7, #723)
1993
16 16
Proposal/Contracts
(A.1, #726)
1992-1993
16 17
Proposal/Contracts
(A.1, #726)
1994-1995
16 18
Proposal/Contracts/Consultants
(A.1b, #726)
1993-1994
16 19
Correspondence/Owner
(A.2a, #726)
1992-1994
16 20
Correspondence/Owner
(A.2a, #726)
1994
16 21
Correspondence/Owner
(A.2a, #726)
1995-1998
16 22
Correspondence/Consultant
(A.2b, #726)
1992-1993
16 23
Correspondence/Consultant
(A.2b, #726)
1994
16 24
Correspondence/Consultant
(A.2b, #726)
1993-1994
16 25
Transmittals
(A.3, #726)
1994
16 26
Meeting Minutes
(A.4, #726)
1994-1995
16 27
Billing/Invoices
(A.7, #726)
1992-1993
16 28
Billing/Invoices
(A.7, #726)
1994 January-August
16 29
Billing/Invoices
(A.7, #726)
1994-1995
16 30
Engineering
(B.4, #726)
1991-1993
16 31
Engineering
(B.4, #726)
1994
16 32
Engineering/Utility
(B.4c, #726)
1994
16 33
Engineering/Structural
(B.4d, #726)
1994-1998
16 34
Programming
(B.5, #726)
1993
16 35
Cost Estimates
(B.6, #726)
1992-1994
16 36
Design Sketches/Product Information
(B.7, #726)
1992-1994
17 1
Construction Bids/Proposals/Addendum
(C.1, #726)
1994
17 2
Construction Bids/Proposals/Addendum Project Manual
(C.1, #726)
1994
17 3
Construction Bids/Proposals/Addendum Project Manual
(C.1, #726)
1995
17 4
Pay Requests
(C.3, #726)
1992
17 5
Submittals/Shop Drawings
(C.6, #726)
1995
17 6
Billing/Invoices
(A.7, #726)
1993
17 7
Proposed Contract Dead Horse Ranch State Park, Arizona
(#806)
1986-1987
17 8
Meeting Minutes Estrella Symposium
(A.4, #809)
1986-1987
17 9
Proposal/Contracts
(A.1, #811)
1993
17 10
Correspondence
(A.2, #811)
1993
17 11
Correspondence/Owner
(A.2a, #811)
1993
17 12
Transmittals
(A.3, #811)
1993
17 13
Billing/Invoices
(A.7, #811)
1993
17 14
Cost Estimates
(B.6, #811)
1993
17 15
Pay Requests
(C.3, #811)
1993
17 16
Change Orders
(C.5, #811)
1993
17 17
Submittals/Shop Drawings
(C.6, #811)
1993
17 18
Specifications/Project Manual
(D.2, #811)
1993
17 19
Field Reports/Lower Buckeye Road
(C.4, #827)
1987
17 20
Field Reports/Bacqueira Beret
(C.4, #829)
1987
17 21
Proposal/Contracts
(A.1, #834)
1987-1990
17 22
Correspondence/Owner
(A.2, #834)
1987-1988
17 23
Correspondence/Consultant
(A.2b, #8340)
1987
17 24
Transmittals
(A.3, #834)
1987
17 25
Meeting Minutes
(A.4, #834)
1987
17 26
Engineering/Civil
(B.4, #834)
undated
17 27
Engineering/Traffic
(B.4, #834)
1987
17 28
Programming
(B.5, #834)
1987
17 29
Programming/Schools, Churches, Libraries
(B.5, #834)
1986-1987
17 30
Programming/Recreational
(B.5, #834)
1986-1987
17 31
Programming/Land Use
(B.5, #834)
1986-1987
17 32
Marketing/Presentation/Zoning Submission
(D.1, #834)
1986
17 33
Design Guidelines
(D.3, #834)
1987
17 34
Clippings
(D.6, #834)
1987
17 35
Meeting Minutes
(A.4, #847)
1986-1987
17 36
Proposal/Contracts
(A.1, #866)
1987-1988
17 37
Correspondence
(A.2, #866)
1988
17 38
Meeting Minutes
(A.4, #866)
1987-1988
17 39
Work Program
(A.5, #866)
1987
17 40
Cost Estimates
(B.6, #866)
1988
17 41
Correspondence
(A.2, #869)
1987
17 42
Billing/Invoices
(A.7, #869)
1987
17 43
Design Guidelines
(D.3, #869)
1987
17 44
City of South Lake Tahoe Department of Public Works report
(#892)
1995
17 45
Proposal/Contracts
(A.1, #947)
1995-1996
17 46
Correspondence
(A.2, #947)
1995
17 47
Correspondence
(A.2, #947)
1996 January-June
17 48
Correspondence/Consultant
(A.2b, #947)
1995-1995
17 49
Correspondence/Consultant
(A.2b, #947)
1995-1996
18 1
Meeting Minutes
(A.4, #947)
1995
18 2
Billing/Invoices
(A.7, #947)
1995-1996
18 3
Billing/Invoices
(A.7, #947)
1996-1997
18 4
Construction Bids/Proposals/Addendum
(C.1, #947)
1995
18 5
Construction Bids/Proposals/Addendum
(C.1, #947)
1996 April
18 6
Construction Bids/Proposals/Addendum
(C.1, #947)
1996 June
18 7
Field Reports
(C.4, #947)
1995-1996
18 8
Change Orders
(C.5, #947)
1995
18 9
Change Orders
(C.5, #947)
1996-1997
18 10
Submittals/Shop Drawings
(C.6, #947)
1995 January-September
18 11
Submittals/Shop Drawings
(C.6, #947)
1995 September-December
18 12
Submittals/Shop Drawings
(C.6, #947)
1996 January-February
18 13
Submittals/Shop Drawings
(C.6, #947)
1996 July-September
18 14
Proposal/Contracts
( A.1, #1287)
1995
18 15
Correspondence – Owner
(A.2a, #1287)
1995
18 16
Billing/Invoices
(A.7, #1287)
1995-1996
18 17
Proposal/Contracts-Owner/Landscape Architect
(A.1a, #1288)
1995-1996
18 18
Correspondence
(A.2, #1288)
1995-1997
18 19
Meeting Minutes
(A.4, #1288)
1997
18 20
Billing/Invoices
(A.7, #1288)
1995-1996
18 21
Billing/Invoices
(A.7, #1288)
1996-1997
18 22
Notes to File
(A.8, #1288)
1996
18 23
Design Sketches/Product Information
(B.7, #1288)
1996
18 24
Billing/Invoices
(A.7, #1328)
1996
18 25
Proposal/Contracts – Owner/Landscape Architect
(A.1a, #1329)
1995-1996
18 26
Correspondence – Owner
(A.2a, #1329)
1995-1996
18 27
Billing/Invoices
(A.7, #1329)
1996
18 28
Proposal/Contracts
(A.1a, #1386)
1996
18 29
Billing/Invoices
(A.7, #1386)
1996
18 30
Proposal/Contracts
(A.1, #2979)
2002
18 31
Correspondence
( A.2, #2979)
2002-2003
18 32
Meeting Minutes
(A.4, #2979)
2005
18 33
Design Guidelines
(D.6, #2979)
1990
18 34
Development Guidelines
(#2979)
2002-2003
18 35
Master Plan
(#2979)
1996
18 36
Summerlin Community Map
undated
SUMMERLIN LANDSCAPE DRAWINGS
75 tubes
Summerlin Master Plan
tube
1
4.1.1: Pathway Cross-Section
Ink on Trace
undated
1
4.1.2: Pathway Cross-Section
Ink on Trace
undated
1
4.1.3: Pathway Cross-Section
Ink on Trace
undated
1
4.1.4: Pathway Cross-Section
Ink on Trace
undated
1
4.1.5: Pathway Cross-Section
Ink on Trace
undated
1
4.1.6: Pathway Cross-Section
Ink on Trace
undated
1
4.1.7: Road Network Diagram
Sepia Print with Adhesive
1990 October 17
1
4.1.8: Village Delineation/Community Structure Diagram
Sepia Print with Adhesive
1990 September 19
1
4.1.9: Village Cluster Diagram Preliminary Draft
Sepia Print with Adhesive & Marker
1990 August 6
1
4.1.10: 1990 Master Plan Preliminary Draft Retail Alternative
Sepia Print with Ink
1990 August 31
1
4.1.11: Preliminary Master Plan Zoning Document
Sepia Print with Adhesive
1990 October 17
1
4.1.12: 1990 Draft Plan Village Delineation/Community Structure Diagram
Sepia Print with Adhesive & Ink
1990 October 17
1
4.1.13: Village Delineation/Community Structure Diagram
Sepia Print
undated
1
4.1.14: Village Delineation/Community Structure Diagram
Sepia Print with Marker
1990 August 6
1
4.1.15: Town Center/Transit Zoning
Colored Pencil & Ink on Trace
undated
1
4.1.16: Pathway Cross-Section
Ink on Trace
undated
1
4.1.17: Pathway Cross-Section
Ink on Trace
undated
1
4.1.18: Pathway Cross-Section
Ink on Trace
undated
1
4.1.19: Pathway Cross-Section
Ink on Trace
undated
1
4.1.20: 1990 Summerlin General Plan
Print & Adhesive on Mylar
1990 October 31
1
4.1.21: 1990 Summerlin General Plan
Sepia Print on Mylar
1990 October 31
1
4.1.22: 1990 Summerlin General Plan
Sepia Print on Mylar
1990 October 31
1
4.1.23: 1990 Draft Master Plan
Sepia Print on Mylar
1990 October 31
1
4.1.24: Summerlin Transit and Walking Distance Diagram Preliminary Draft
Sepia Print with Adhesive & Ink
1990 August 6
1
4.1.25: Village Delineation/Community Structure Diagram
Print & Adhesive on Mylar
undated
1
4.1.26: Town Center/Transit Zoning (Large Scale)
Print on Mylar
undated
1
4.1.27: Town Center Property Boundaries (Large Scale)
Print & Adhesive on Mylar
undated
1
4.1.28: Community Facilities Plan 1990 Draft Plan
Print & Marker on Bond
1990 October 17
1
4.1.29: Parks, Open Space, and School Facilities Plan 1990 Draft Plan
Print & Marker on Bond
1990 October 17
1
4.1.30: 1990 Draft Master Plan
Sepia Print on Mylar
1990 October 31
1
4.1.31: 1990 Master Plan Preliminary Draft
Sepia Print with Marker
1990 August 31
1
4.1.32: Activity Spines Diagram Preliminary Draft
Sepia Print with Adhesive
1990 August 6
1
4.1.33: Activity Spines
Sepia with Adhesive & Ink on Diazo Mylar
1990 October 17
1
4.1.34: Storm Water Management Plan
Sepia with Adhesive & Ink on Diazo Mylar
1990 October 17
1
4.1.35: Site Conditions Summary
Print & Ink on Diazo Mylar
1990 August 6
1
4.1.36: Community Facilities Plan 1990 Draft Plan
Sepia Print with Adhesive on Mylar
1990 October 17
1
4.1.37: Parks, Open Space, and School Facilities Plan 1990 Draft Plan
Sepia Print with Adhesive on Mylar
1990 October 17
1
4.1.38: Village Delineation/Community Structure Diagram
Sepia Print on Mylar
undated
1
4.1.39: 1990 Draft Plan Transit/Activity Spines
Sepia with Adhesive & Ink on Diazo Mylar
1990 October 17
1
4.1.40: Study Draft Master Plan 1989
Sepia Print with Adhesive & Ink
1989 November 7
1
4.1.41: Arroyo Delineation
Print & Ink on Mylar
undated
1
4.1.42: Town Center/Transit Zoning (Large Scale)
Print on Mylar
undated
1
4.1.43: 1990 Draft Master Plan
Adhesive on Mylar
1990 October 31
1
4.1.44: Map of Acreages
Sepia & Adhesive on Mylar
undated
Summerlin Village 1
tube
2
4.2.1: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.2: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.3: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.4: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.5: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.6: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.7: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.8: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.9: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.10: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.11: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.12: Summerlin Village 1 North: A Subdivision of Parcel 2
Sepia Print
undated
2
4.2.13: Hills North Road Hierarchy; Scale 1"=100'; 23 February 1990
Sepia Print on Mylar
1990 February 23
2
4.2.14: Summerlin Village One and Village Seven Phase I Development Plan Site Summary Plan
Sepia Print
undated
2
4.2.15: Summerlin Hills North Road Hierarchy
Print on Mylar
1990 February 23
Summerlin Base Topography Analysis
tube
3
4.3.1: Topographic Map
Print & Adhesive on Mylar
undated
3
4.3.2: Topographic Map of Region
Print on Mylar
undated
3
4.3.3: Topographic Map with Buildings and Roads
Print on Mylar
undated
3
4.3.4: Topographic Map
Print on Mylar
undated
3
4.3.5: Building Limitation Restriction Suitability Study
Adhesive on Sepia Print on Mylar
undated
3
4.3.6: Existing Drainage Patterns
Sepia Print on Mylar
undated
3
4.3.7: Project Boundaries over Topographic Map
Adhesive & Print on Spliced Mylar
undated
3
4.3.8: Soil Map North Overlay
Adhesive & Ink on Mylar
undated
3
4.3.9: Soil Map South Overlay
Adhesive & Ink on Mylar
undated
3
4.3.10: Suitability Map North Overlay
Ink on Mylar
undated
3
4.3.11: Suitability Map South Overlay
Ink on Mylar
undated
3
4.3.12: Floodplain Diagram
Sepia Print on Mylar
undated
Summerlin Village 8
tube
4
4.4.1: Summerlin Parkway & Town Center Site Plan (Large Scale)
Print on Vellum
undated
4
4.4.2: Summerlin Parkway & Town Center Site Plan
Print on Bond
undated
Summerlin Lake Mead & Town center parkway
tube
4
4.5.1 A: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.1 B: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.1 C: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.1 D: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.1 E: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.2 A: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.2 B: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.2 C: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.2 D: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
4
4.5.2 E: Summerlin Village 7 Unit No. 1; Design Workshop Review
Blueprint on Bond
1993 June 11
Summerlin Streetscape
tube
4
4.6.1: Site Planting Plan
Pencil & Ink on Mylar
undated
4
4.6.2: Site Planting Plan
Pencil & Ink on Mylar
undated
4
4.6.3: Site Planting Plan
Pencil & Ink on Mylar
undated
4
4.6.4: Village One North Parcel Development Concept and Criteria
Print on Vellum
1989 February 15
4
4.6.5: Entry Feature at Town Center Drive and Mustache Road
Ink & Marker on Trace
1989 February 27
4
4.6.6: Town Center and Mustache Road Entry Feature
Print on Vellum
1989 February 27
4
4.6.7: Village One and Seven Entry Feature with Town Center Drive Streetscape Wall
Print on Vellum
1989 February 27
4
4.6.8: Mustache Road Landscape Plan
Ink on Trace
1989 February 25
4
4.6.9: Ground Plane Planting and Gravel Mulch Plan Streetscape Plan
Ink on Trace
1989 February 25
4
4.6.10: Mustache Road at Rampart Entry Feature Elevation
Ink on Trace
1989 February 25
4
4.6.11: Ramp and Crosswalk Layout
Print on Vellum
undated
4
4.6.12: Mustache Road Along Park and Commercial Streetscape Plan
Ink on Trace
undated
4
4.6.13: Mustache Road Streetscape Section
Print on Vellum
1989 February 25
4
4.6.14: Park Loop Collector Streetscape Plan
Print on Vellum
1989 February 25
4
4.6.15: Park Loop Road with and without Parking Streetscape Section
Print on Vellum
1989 February 24
4
4.6.16: Horn Road Streetscape Plan
Print on Vellum
1989 February 25
4
4.6.17: Horn Road C at Lake Mead Entry Feature Plan
Ink on Trace
undated
4
4.6.18: Horn Road C at Lake Mead Entry Feature Elevation
Ink on Trace
1989 February 25
4
4.6.19: Horn Road C Lake Mead Entry Streetscape Section
Print on Vellum
1989 February 14
4
4.6.20: Ramp and Crosswalk Layout
Print on Vellum
1989 February 27
4
4.6.21: Neighborhood Promenade
Ink on Trace
1989 March 1
4
4.6.22: Drainage North of Park Loop
Ink on Trace
1989 March 1
4
4.6.23: Drainage Section North of Park Loop
Ink on Trace
1989 March 1
4
4.6.24: Street Lights Traffic
Print on Mylar
undated
4
4.6.25: Street Lights Traffic
Print on Mylar
undated
5
4.6.26: Street Lights Traffic
Print on Mylar
undated
5
4.6.27: Mustache Road at Lake Mead
Print on Mylar
undated
5
4.6.28: Mustache Road at Lake Mead
Colored Pencil on Trace
undated
5
4.6.29 B: Street Lights Traffic
Print on Mylar
undated
5
4.6.29 A: Street Lights Traffic
Colored Pencil on Trace
undated
5
4.6.30: Street Lights Traffic
Print on Mylar
undated
5
4.6.31: Site Planting Plan
Pencil & Print on Mylar
undated
5
4.6.32: Site Planting Plan
Pencil & Print on Mylar
undated
5
4.6.33 A: The Hills at Summerlin: Drainage Channel
Ink on Trace
1989 October 6
5
4.6.33 B: The Hills at Summerlin: Drainage Channel
Ink on Trace
1989 October 6
5
4.6.33 C: The Hills at Summerlin: Drainage Channel
Ink on Trace
1989 October 6
5
4.6.33 D: The Hills at Summerlin: Drainage Channel
Adhesive on Mylar
1989 October 6
5
4.6.34: The Hills at Summerlin: Drainage Channel
Sepia Print
1989 October 6
5
4.6.35: Landscape Plan for Springfield Street
Pencil & Print on Mylar
1989 June 22
5
4.6.36: Landscape Plan for Pinewood Hills Drive
Pencil & Print on Mylar
1989 June 22
5
4.6.37: Landscape Plan for Hill Pointe Road
Pencil & Print on Mylar
1989 June 22
5
4.6.38: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
1989 July 5
5
4.6.39: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
1989 July 5
5
4.6.40: Vicinity Map for Summerlin
Adhesive on Mylar
undated
5
4.6.41: Village One Streetscape Planting Plan
Print on Mylar
1989 July 5
5
4.6.42: Village One Streetscape Planting Plan
Print on Mylar
1989 July 5
5
4.6.43: Village One Streetscape Planting Plan
Pencil & Print on Mylar
1989 July 5
5
4.6.44: Village One Streetscape Planting Plan
Pencil on Mylar
1989 July 5
5
4.6.45: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
1989 July 5
5
4.6.46: Village One Streetscape Planting Plan
Pencil & Ink on Mylar
1989 July 5
5
4.6.47: Concept Plan - Village One North
Ink & Adhesive on Mylar
1989 July 5
5
4.6.48: Walk 4' Above Channel Bottom
Ink on Trace
undated
5
4.6.49: The Hills at Summerlin: Drainage Channel
Print on Vellum
1989 October 6
Summerlin Village 1 Hills Park, Schools & Schematic Design
tube
6
4.7.1: Neighborhood Focus Master Plan
Marker on Bond
undated
6
4.7.2: Neighborhood Focus Phase 1 Plan
Marker on Bond
undated
6
4.7.3: Computer Generated Perspective of housing and Cul-de-sacs
Print on Bond
undated
6
4.7.4: Computer Generated Perspective of housing and Cul-de-sacs
Print on Bond
undated
6
4.7.5: Computer Generated Site Plan
Print on Bond
undated
6
4.7.6: Hills Park School Site Plan
Pencil on Vellum
undated
6
4.7.7: Village 1 Neighborhood Park Program Illustrative
Marker on Trace
1988 October 5
6
4.7.8: Village 1 Neighborhood Park Isometric Sketch
Print on Vellum
undated
6
4.7.9: Village 1 Neighborhood Park Elevation Sketches
Print on Vellum
undated
6
4.7.10: Village 1 Neighborhood Park Pavilion Construction Specifications
Print on Vellum
undated
6
4.7.11: Summerlin Parkway Community Entry Pylons and Shelters Specifications
Ink on Trace
undated
6
4.7.12: Village 1 Neighborhood Park Site Plan
Print on Vellum
undated
6
4.7.13: Village 1 Program
Photocopy on Bond
1989 September 29
6
4.7.14: Hills Park Swimming Pool Site Plan
Photocopy on Bond
1989 November 3
6
4.7.15: Neighborhood Focus Phase 1 Plan
B&W Print on Bond
undated
6
4.7.16: Neighborhood Focus Master Plan
B&W Print on Bond
undated
6
4.7.17: Hills Park Swimming Pool Site Plan
Photocopy on Vellum
1989 November 3
6
4.7.18 A: Elementary School Schematic Drawings
Pen and Marker on Trace
undated
6
4.7.18 B: Elementary School Schematic Drawings
Pen and Marker on Trace
undated
6
4.7.18 C: Elementary School Schematic Drawings
Pen and Marker on Trace
undated
6
4.7.19: Village 1 Neighborhood Park Specifications; Period; Metal
Ink on Trace
undated
6
4.7.20: Village 1 Neighborhood Park Specifications; Southwest; Stucco
Ink on Trace
undated
Summerlin Community Entry Design Drawings
tube
7
4.8.1 A: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.1 B: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.1 C: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.1 D: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.1 E: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.1 F: Community Entry Design Development Design Package
Blueprint on Bond
undated
7
4.8.2: Summerlin Community Entry 100% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 October 4
7
4.8.3: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 October 4
7
4.8.4: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 October 4
7
4.8.5: Summerlin Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 October 4
7
4.8.6: Summerlin Village 2
Blueprint on Bond
undated
7
4.8.7: South Shores
Blueprint on Bond
undated
7
4.8.8 A: Summerlin Community Entry 90% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 B: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 C: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 D: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
undated
7
4.8.8 E: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 F: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 G: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 H: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 I: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 J: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 12
7
4.8.8 K: Community Entry Lake Mead Blvd. & Buffalo Dr. Lighting Plan
Blueprint on Bond
1991 August 7
7
4.8.8 L: Community Entry Lake Mead Blvd. & Buffalo Dr.; Lighting Plan
Blueprint on Bond
1991 August 7
7
4.8.8 M: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 7
7
4.8.8 N: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 August 7
7
4.8.9 A: Summerlin Community Entry 100% Submittal Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 B: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 C: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 D: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 E: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 F: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 G: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 H: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 I: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 J: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 K: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.9 L: Community Entry Lake Mead Blvd. & Buffalo Dr.
Blueprint on Bond
1991 September 11
7
4.8.10: Village 2 Streetscape
Print on Bond
1989 August 3
Summerlin Timeline
tube
7
4.9.1: Summerlin Timeline
Print on Bond
1989 March 8
Summerlin Village Center
tube
8
4.10.1: Summerlin Preferred Alternative Village Center Concept
Blueprint on Bond
1990 July 6
8
4.10.2: Closed Circle Alternative Village Center Concept
Sepia Print on Vellum
1990 July 13
8
4.10.3 A: Summerlin Village Center Concept Plan
Sharpie on Vellum
undated
8
4.10.3 B: Summerlin Village Center Concept Plan
Sharpie on Vellum
undated
8
4.10.3 C: Summerlin Village Center Concept Plan
Sharpie on Vellum
undated
8
4.10.3 D: Summerlin Village Center Blueprint Schematic Plan
Blueprint on Bond
undated
8
4.10.4: Summerlin Village Center Schematic Plan
Pen on Vellum
undated
8
4.10.5: Closed Circle Alternative Village Center Concept
Blueprint on Bond
1990 May 29
8
4.40.6: Summerlin Village Center/ Village 7 Planning Study
Blueprint on Bond
1990 June 11
8
4.10.7: Summerlin Village Center/ Village 7 Planning Study
Sepia Print on Vellum
1990 June 11
8
4.10.8: Summerlin Village Center Preliminary Design Analysis
Photocopy on Bond
1990 December 4
8
4.10.9: Summerlin Village Center Preliminary Grading Concept
Photocopy on Bond
1990 December 4
8
4.10.10: Summerlin Village Center Preliminary Landscape Diagram
Photocopy on Bond
1990 December 4
8
4.10.11: Summerlin Village Center Preliminary Site Summary
Photocopy on Bond
1990 December 4
8
4.10.12: Summerlin Village Center Preliminary Landscape Concept
Photocopy on bond
1990 December 4
8
4.10.13 A: Summerlin Village Center
Sharpie on Vellum
undated
8
4.10.13 B: Summerlin Village Center
Sharpie on Vellum
undated
8
4.10.13 C: Summerlin Village Center
Sharpie on Vellum
undated
8
4.10.13 D: Summerlin Village Center
Sharpie on Vellum
undated
8
4.10.14: Summerlin Village Center Concept Plan
Marker on Trace
undated
8
4.10.15: Summerlin Village Center Concept Plan
Marker on Trace
undated
8
4.10.16: Community Center Study Initial Phase
Blueprint on Bond
1987 June 26
8
4.10.17: Community Center Concept Plan
Marker on Trace
undated
8
4.10.18: Community Center Systems Diagram
Marker on Trace
1987 August 26
8
4.10.19: Community Center Study Land Use and Access
Blueprint on Bond
undated
8
4.10.20: Community Center Schematic
Photocopy on Bond
undated
8
4.10.21: Village Center Concept
Sepia Print on Mylar
1990 July 6
8
4.10.22: Village Center Concept Preferred Alternative
Sepia Print on Mylar
1990 July 6
8
4.10.23: Village Center Phase 1 Development
Photocopy on Bond
1990 May 4
8
4.10.24: Village Center Phase 2 Development
Photocopy on Bond
1990 May 4
8
4.10.25: Village Center Phase 3 Development
Photocopy on Bond
1990 May 4
8
4.10.26: Village Center Phase 4 Development
Photocopy on Bond
1990 May 4
8
4.10.27: Village Center Phase 5 Ultimate Build Out
Photocopy on Bond
1990 May 4
8
4.10.28: Village Center Phase 5 (B) Development
Photocopy on Bond
1990 May 4
8
4.10.29: Village Center Pedestrian and Vehicular Circulation
Photocopy on Bond
1990 May 4
8
4.10.30: Closed Circle Alternative Village Center Concept
Photocopy on Bond
1990 May 29
8
4.10.31: Village Center Concept Color Rendering
Marker on Mylar
undated
Summerlin Village 1 South Streetscapes
tube
9
4.11.1: The Hills at Summerlin Streetscape Master Plan
Sepia Print on Mylar
undated
9
4.11.2: The Hills at Summerlin Conceptual Walkway Plan
Print on Bond
undated
9
4.11.3: The Hills at Summerlin Streetscape Site Analysis
Blueprint on Bond
1990 April 9
9
4.11.4: The Hills at Summerlin Streetscape Site Analysis
Blueprint on Bond
1990 April 9
9
4.11.5: The Hills at Summerlin Conceptual Planting Plan
Blueprint on Bond
1990 April 9
9
4.11.6: The Hills at Summerlin Ground Plane Plan
Blueprint on Bond
1990 April 9
9
4.11.7: The Hills at Summerlin Conceptual Planting Plan
Sepia Print on Mylar
1990 April 9
9
4.11.8: The Hills at Summerlin Street 'X' Entry Feature
Blueprint on Bond
1990 April 23
9
4.11.9: The Hills at Summerlin Street 'Z' Entry Feature
Blueprint on Bond
1990 April 23
9
4.11.10: The Hills at Summerlin Street 'Z' Entry Feature
Blueprint on Bond
1990 April 23
9
4.11.11: The Hills at Summerlin Street 'X' Entry Area
Blueprint on Bond
1990 April 23
9
4.11.12: The Hills at Summerlin Ground Plane Plan
Sepia Print on Mylar
1990 April 9
9
4.11.13: The Hills at Summerlin Village 1 South Streets Ground Plane Plan
Marker on Trace
1990 April 23
9
4.11.14: The Hills at Summerlin Street "Z" Entry & Street "Y" Streetscape
Blueprint on Bond
1990 April 9
9
4.11.15: The Hills at Summerlin Street "Y" Landscape
Blueprint on Bond
1990 April 9
9
4.11.16: The Hills at Summerlin Street 'Y' Rough Planting Design
Ink and Pencil on Bond
undated
9
4.11.17: The Hills at Summerlin Street 'Y' Rough Planting Design
Ink and Pencil on Bond
undated
9
4.11.18: The Hills at Summerlin Street 'V' Rough Planting Design
Ink and Pencil on Bond
undated
Husite Topographic Map
tube
10
4.12.1: Husite Topographic Northern 1/2 Village #1
Print on Mylar
undated
10
4.12.2: Husite Topographic Map Index
Print and Marker on Bond
1989 August 7
10
4.12.3: Husite Topography Map
Print on Diazo Mylar
undated
10
4.12.4: Husite Topography Map
Print on Diazo Mylar
undated
10
4.12.5: Husite Topography Map
Print on Diazo Mylar
undated
10
4.12.6: Husite Topography Map
Print on Diazo Mylar
undated
10
4.12.7: Husite Topography Map
Print on Diazo Mylar
undated
Summerlin Village Center
tube
11
4.13.1: Village Center Alternative 'B'
Sepia Print on Vellum
1990 May 20
11
4.13.2: Village Center Phase 1 Development
Marker on Vellum
1990 May 4
11
4.13.3: Village Center Phase 2 Development
Marker on Vellum
1990 May 4
11
4.13.4: Village Center Phase 5 (B) Development
Marker on Vellum
1990 May 4
11
4.13.5: Village Center Pedestrian and Vehicular Circulation
Marker on Vellum
1990 May 4
11
4.13.6: Village Center Phase 4 Development
Marker on Vellum
1990 May 4
11
4.13.7: Village Center Phase 3 Development
Marker on Vellum
1990 May 4
11
4.13.8: Village Center Concept Alternative 'A'
Sepia Print on Vellum
undated
11
4.13.9: Village Center Concept Alternative 'B'
Sepia Print on Vellum
undated
11
4.13.10: Village Center Concept Alternative 'C'
Sepia Print on Vellum
undated
11
4.13.11: Village Center Phase 5 Ultimate Build Out
Marker on Vellum
1990 May 4
11
4.13.12: Village 1 PGA Course
Print on bond
1990 March 31
11
4.13.13: Village 1 South Golf Alternative
Marker on Bond
1990 March 31
11
4.13.14: Village 1 South Golf Alternative "C" Concept Diagram
Marker on Bond
1990 March 31
11
4.13.15: Closed Circle Alternative Village Center Concept
Blueprint on Bond
1990 May 29
11
4.13.16: Village 7 - Village 8 Corridors
Print on Diazo Mylar
undated
11
4.13.17: Phase 1 Village Center Landscape Concept Diagram
Marker and Sepia Print on Mylar
undated
11
4.13.18: Phase 1 Village Center Proposed Land use
Marker and Sepia Print on Mylar
undated
11
4.13.19: Phase 1 Village Center Connections and Access
Marker and Sepia Print on Mylar
undated
11
4.13.20: Phase 1 Village Center Grading and Drainage Concept
Marker and Sepia Print on Mylar
undated
11
4.13.21: Phase 1 Village Center Existing Elevations
Marker and Sepia Print on Mylar
undated
11
4.13.22: Phase 1 Village Center Master Plan
Marker and Sepia Print on Mylar
undated
11
4.13.23: Phase 1 Village Center Land Use
Marker on Trace
undated
11
4.13.24: Phase 1 Village Center Connections and Access
Marker on Trace
undated
11
4.13.25: Phase 1 Village Center Landscape Concept
Marker on Trace
1990 December 4
11
4.13.26: Village Center Landscape Concept
Marker on Mylar
1991 February 11
11
4.13.27: Village Center Circle Phase 1 Concept Plan
Marker on Trace
1991 January 28
11
4.13.28: Village Center Design Schematic Package Cover Page
Marker and Sepia Print on Mylar
undated
11
4.13.29: Village Center Design Schematic Package Parcelization Diagram
Marker and Sepia Print on Mylar
1991 February 11
11
4.13.30: Village Center Design Schematic Package Parcelization Diagram
Marker and Sepia Print on Mylar
1991 February 11
11
4.13.31: Village Center Design Schematic Package Concept Diagram
Marker on Trace
undated
11
4.13.32: Village Center Design Schematic Package Connections Diagram
Marker and Sepia Print on Mylar
1991 February 11
11
4.13.33: Phase 1 Development Village Center Phasing Diagram
Sepia Print on Mylar
1990 May 4
11
4.13.34: Phase 2 Development Village Center Phasing Diagram
Sepia Print on Mylar
1990 May 4
11
4.13.35: Village Center Land Use Context Plan Alternative "B"
Marker and Sepia Print on Diazo Mylar
1990 May 1
11
4.13.36: Village 7 Alternative "A"
Marker and Sepia Print on Diazo Mylar
1990 May 20
11
4.13.37: Village Center Land Use Context Plan Alternative "A"
Marker and Sepia Print on Diazo Mylar
1990 May 1
11
4.13.38: Phase 1 Illustrative Plan
Marker and Sepia Print on Diazo Mylar
1990 November 8
11
4.13.39: Phase 1 Office Building Garden Terrace
Marker on Trace
1991 February 11
11
4.13.40: Phase 1 Office Building Formal Entry
Marker on Trace
1991 February 11
11
4.13.41: Closed Circle Concept Diagram
Marker on Trace
undated
11
4.13.42: Village Center Circle Landscape Concept
Marker on Trace
1991 January 28
11
4.13.43: Village Center Circle Axonometric Schematic
Marker on Trace
undated
11
4.13.44: Summerlin Village Center Preliminary Design Analysis
Marker on Trace
1990 December 4
11
4.13.45: Summerlin Village Center Preliminary Landscape Diagram
Marker on Trace
1990 December 4
11
4.13.46: Village Center Circle Phase 1 and Phase 2 Concept Plan
Marker and Sepia Print on Mylar
1991 February 11
11
4.13.47: Village Center Circle Phase 1 Concept Vignette
Marker and Sepia Print on Mylar
1991 February 11
11
4.13.48: Drawing by Craig Wickersham
Pen on Trace
undated
11
4.13.49: Drawing by Craig Wickersham
Pen on Trace
undated
11
4.13.50: Drawing by Craig Wickersham
Pen on Trace
undated
11
4.13.51: Drawing by Craig Wickersham
Pen on Trace
undated
11
4.13.52: Village Center Schematic Plan
Pen on Trace
1990 November
11
4.13.53: Revised Village Center Sketch Plan
Pen on Trace
1990 October 31
11
4.13.54: Summerlin Village Center Preliminary Site Summary
Marker on Trace
1990 December 4
11
4.13.55 A: Summerlin Village Center Package
Blueprint on Bond
undated
11
4.13.55 B: Summerlin Village Center Package
Blueprint on Bond
undated
11
4.13.55 C: Summerlin Village Center Package
Blueprint on Bond
undated
11
4.13.55 D: Summerlin Village Center Package Site Analysis
Blueprint on Bond
undated
11
4.13.55 E: Summerlin Village Center Package Land Use Consumption
Blueprint on Bond
undated
11
4.13.55 F: Summerlin Village Center Package Alternate 1
Blueprint on Bond
undated
11
4.13.55 G: Summerlin Village Center Package Alternate 2
Blueprint on Bond
undated
11
4.13.55 H: Summerlin Village Center Package Alternate 3
Blueprint on Bond
undated
11
4.13.55 I: Summerlin Village Center Package Development Parcels
Blueprint on Bond
undated
11
4.13.56 A: Summerlin Village Center Urban Form Concept
Photocopy on Vellum
undated
11
4.13.56 B: Summerlin Village Center Potential Land Use
Photocopy on Vellum
undated
11
4.13.56 C: Summerlin Village Center Connections
Photocopy on Vellum
undated
Summerlin Historic Plan Documents
tube
10
4.14.1: Summerlin Draft Master Plan Alternative 'A'
Sepia Print on Mylar
1990 June 6
10
4.14.2: Summerlin Draft Master Plan Alternative 'B'
Sepia Print on Mylar
1990 June 6
10
4.14.3: Site Analysis Thick Caliche
Marker on Trace
undated
10
4.14.4: Site Analysis Moderate Caliche
Marker on Trace
undated
10
4.14.5: Site Analysis Thin Caliche
Marker on Trace
undated
10
4.14.6: Site Analysis Topographic Map
Print on Mylar
undated
10
4.14.7: Blocks of Land BLM, Private, Federal Withheld
Pencil on Trace
undated
10
4.14.14: Summerlin Regional System Link and Walking Distance Diagram
Pen and Marker on Trace
1990 July 30
10
4.14.8: Summerlin Park and Recreation School Facilities
Pen and Marker on Trace
1990 July 30
10
4.14.9: Community Facilities
Pen and Marker on Trace
1990 July 30
10
4.14.10: Husite Existing Roadways
Print on Mylar
undated
10
4.14.11: Draft Master Plan Alternative "A"
Sepia Print on Vellum
1990 June 6
10
4.14.12: Draft Master Plan Alternative "B"
Sepia Print on Vellum
1990 June 6
10
4.14.13: Existing Roadway Plan Overlay
Marker on Trace
undated
Summerlin Parcel G2 & H2 Streets
tube
10
4.15.1: The Trails Streetscape Issue for Construction
Print on Bond
1996 September 6
10
4.15.2: The Trails Streetscape- Planting and Sidewalk Details
Print on Mylar
1996 September 6
10
4.15.3: The Trails Streetscape- Landscape and Sidewalk Layout
Print on Bond
1996 September 6
Summerlin Village 1 Master Plan Renderings
tube
12
4.16.1: Summerlin Master Plan Regional Context Map
Print and Marker on Bond
undated
12
4.16.2: Summerlin Phase 1 Land Use
Print and Marker on Bond
1988 September 29
12
4.16.3: Summerlin Annexation Map and Restrictive Building Limitations
Print and Marker on Bond
undated
12
4.16.4: Summerlin Annexation Map
Print and Marker on Bond
undated
12
4.16.5: Summerlin Master Plan Preliminary Draft
Print and Marker on Bond
1990 July 30
12
4.16.6: Summerlin 1990 Master Plan Preliminary Draft
Print and Marker on Bond
1990 August 31
12
4.16.7: Summerlin Phase 1 1990 Draft Plan Land Use Concept
Print and Marker on Bond
1990 October 15
12
4.16.8: The Hills at Summerlin Design Concept
Print and Marker on Bond
1989 October 6
12
4.16.9: Summerlin Phase 1 Alternative 'B' Land Use Concept
Print and Marker on Bond
1990 July 2
12
4.16.10: Summerlin 1990 Draft Master Plan
Color Print on Bond
1989 February 1
12
4.16.11: Summerlin Preliminary Site Conditions Summary
Print and Marker on Bond
1990 July 26
Summerlin Village Center Commercial Studies
tube
10
4.17.1: Conceptual Vehicular and Pedestrian Circulation
Marker on Trace
undated
10
4.17.2: Plaza Section A-A and Plaza Plan View
Ink on Mylar
undated
10
4.17.3: Schematic of Village Center
Marker on Trace
undated
10
4.17.4: Husite Village Center Very Preliminary Plan
Marker and Pencil on Bond
1987 August 26
10
4.17.5: Husite Commercial Center Alternative at Town Center Drive and Lake Mead
Photocopy on Bond
1987 August 28
10
4.17.6: Husite Commercial Center Alternative at Outer Parkway and Lake Mead Blvd.
Photocopy on Bond
1987 August 28
10
4.17.7: Husite Circulation Alternative "A" with Streetscape Criteria
Photocopy on Bond
1987 August 28
10
4.17.8: Husite Commercial Center Criteria at Lake Mead & Hualapai
Photocopy on Bond
1987 August 28
10
4.17.9: Husite Circulation Alternative "B"
Photocopy on Bond
1987 August 28
10
4.17.10: Husite Commercial Center Criteria on Town Center Drive
Photocopy on Bond
1987 August 28
10
4.17.11: Husite Circulation Alternative "C"
Photocopy on Bond
1987 August 28
10
4.17.12: Typical Multi-Corner Commercial Center
Marker on Trace
1987 September 1
10
4.17.13: Conceptual Circulation and Building Site Plan
Marker on Trace
undated
10
4.17.14: Commercial Center Criteria
Marker on Trace
1987 August 28
10
4.17.15: Conceptual Circulation and Building Site Plan
Marker on Trace
undated
10
4.17.16: Conceptual Vehicular and Pedestrian Circulation
Marker on Trace
undated
Summerlin & Red Rocks Trails
tube
12
4.18.1: Summerlin Red Rocks Trail Master Plan
Sepia Print on Mylar
1993 June 9
12
4.18.2: Summerlin Red Rocks Trail Topographical Map
Blueprint on Bond
undated
The Hills Parks Stage Conceptual Designs Base Mapping Summerlin Concepts
tube
12
4.19.1 A: Summerlin Hills Park Stage Schematic Design
Ink and Marker on Trace/Mylar
1992 May 27
12
4.19.1 B: Summerlin Hills Park Stage Schematic Design
Ink and Marker on Trace/Mylar
1992 May 27
12
4.19.2: Hills Park Stage Concept Plan With Details
Print on Bond
undated
12
4.19.3: Hills Park Stage Concept Plan With Details
Ink on Bond
1992 April 6
Summerlin Village 1
tube
13
4.20.1: Perspective Sketch of Golf Hole
Print on Vellum
undated
13
4.20.2: Isometric Sketch of Village Circle
Pencil on Vellum
undated
13
4.20.3: Isometric Sketch of Baseball Diamonds and Surrounding Buildings
Pencil on Vellum
undated
13
4.20.4: Illustrative Perspective of Golf Hole and Surrounding Housing
Pen and Marker on Trace
undated
13
4.20.5: Villages 1, 2 & 3 Parcelization Map
Pen on Vellum
undated
13
4.20.6: Village 1 Master Plan
Marker on Vellum
undated
13
4.20.7: Village 1 Closed Circle
Marker on Graph Vellum
undated
13
4.20.8: Village 1 Isometric Sketch of Shopping Area
Pencil on Vellum
undated
13
4.20.9: Computer Generated Perspective of Village Center
Print on Printer Paper
undated
13
4.20.10: Plan View of Baseball Diamonds and Surrounding Buildings
Marker on Vellum
undated
13
4.20.11: Las Vegas Major Roadways
Tape on Graph Vellum
undated
13
4.20.12: Las Vegas Major Roadways
Photocopy and Tape on Vellum
undated
13
4.20.13: Schematic Landscape Plan
Sepia Print on Vellum
1989 March 2
13
4.20.14: Schematic Landscape Plan
Marker on Vellum
1989 April 19
13
4.20.15: Summerlin Street Sections
Marker on Velum
undated
13
4.20.16: Neighborhood Focus Phase 1 Plan
Print on Vellum
undated
13
4.20.17: Neighborhood Focus Master Plan
Print on Vellum
undated
Summerlin Village 3
tube
14
4.21.1: Village 3
Print on Bond
1989 March 30
14
4.21.2: Village 3 Concept Plan
Marker on Trace
1989 February 17
14
4.21.3: Village 3 Site Summary Map
Blueprint on Bond
1989 February 3
14
4.21.4: Village 3 Design Concept
Blueprint on Bond
1989 October 20
14
4.21.5: Village 3 Land Use Rough Trace Overlay
Marker on Trace
undated
14
4.21.6: Village 3 Land Use Trace Overlay
Marker on Trace
undated
14
4.21.7: Village 3 Contextual Issues
Print on Vellum
1990 January 31
14
4.21.8: Village Center/ Village 7 Planning Study
Blueprint on Bond
undated
14
4.21.9: Village 3 Parcel Map
Sepia Print on Mylar
undated
14
4.21.10: Village 3 Entries and Accesses
Print on Vellum
1989 September 21
Summerlin Parcels H & I Drainage
tube
13
4.22.1: Village 1 North Parcels H & I Drainage Way Planting Plan
Print on Mylar
1993 August 12
13
4.22.2: Village 1 North Parcels H & I Drainage Way Planting Detail
Print on Acetate
1993 August 12
Summerlin City Presentation
tube
14
4.23.1: The Pueblo Illustrative Master Plan
Marker on Vellum
undated
14
4.23.2: Las Vegas Major Roadways
Print and Tape on Mylar
undated
14
4.23.3: Street Sections
Marker on Trace
undated
14
4.23.4: Street Sections
Marker on Trace
undated
14
4.23.5: Regional Context Map
Print on Bond
1990 July 25
14
4.23.6: Regional Context Map
Print on Mylar
1990 July 26
14
4.23.7: Las Vegas Major Roadways
Sepia Print on Mylar
undated
14
4.23.8: PGA Tour Tournament Players Club at Summerlin- Golf Course and Subdivision Master
Print on Poster Paper
undated
14
4.23.9: PGA Tour Tournament Players Club at Summerlin
Sepia Print on Mylar
1988
14
4.23.10: Villages 1, 2 & 3 Master Plan
Print on Mylar
undated
14
4.23.11: PGA Tour Tournament Players Club at Summerlin- Golf Course Layout
Print on Mylar
undated
Summerlin Village 3 Employment Center
tube
15
4.24.1: Village 3 Land Plan
Marker on Trace
1988 October
15
4.24.2: Village 3 - Land Acreage Study
Marker on Trace
1988 February 17
15
4.24.3: Village 3 Bubble Diagram
Marker on Trace
undated
15
4.24.4: Village 3 Analysis Map
Marker on Print
undated
15
4.24.5: Village 3 Open Space Configuration
Marker on Trace
1988 September
15
4.24.6: Village 3 Site Related Concept Plan
Marker on Trace
undated
15
4.24.7: Village 3 Preliminary Parcelization Alternative 2
Blueprint on Bond
1987 August 26
15
4.24.8: Husite - Freeway Relationship to Site
Sepia Print on Vellum
undated
15
4.24.9: Village 3 Hotel Location Study
Marker on Trace
1988 September
15
4.24.10: Summerlin Business Park
Marker on Trace
undated
15
4.24.11: Village 3 Slope Percentages
Colored Pencil on Trace
undated
15
4.24.12: Village 3 Preliminary Parcelization Alternative 1
Blueprint on Bond
1988 August 26
15
4.24.13: Village 3 Golf Course Concept Plan
Marker on Trace
undated
Summerlin Village 7
tube
16
4.25.1: Village 7 Alternative E
Blueprint on Vellum
undated
16
4.25.2: Village 7 Concepts
Blueprint on Vellum
1990 January 30
16
4.25.3: Village 7 Alternative A
Blueprint on Vellum
1990 January 30
16
4.25.4: Village 7 Alternative B
Blueprint on Vellum
1990 January 30
16
4.25.5: Village 7 Alternative C
Blueprint on Vellum
1990 January 30
16
4.25.6 A: Village 7 Trash Alternatives- Trace Overlay
Marker and Pen on Trace
undated
16
4.25.6 B: Village 7 Trash Alternatives- Trace Overlay
Marker and Pen on Trace
undated
16
4.25.7: Village 7 Design Analysis Map
Marker on Trace
undated
16
4.25.8: Village 7 Conceptual Housing Configuration
Marker on Trace
undated
16
4.25.9: Village 7 Golf Course Configuration
Marker on Trace
undated
16
4.25.10: Village 7 Golf Course Acreage Study
Marker on Trace
undated
16
4.25.11: Village 7 Overlay A
Pen and Marker on Trace
undated
16
4.25.12: Village 7 Conceptual Golf Course Layout
Pen and Marker on Trace
undated
16
4.25.13: Village 7 Conceptual Golf Course Layout and Housing Frontage
Pen and Marker on Trace
undated
16
4.25.14: Village 7 Site Conditions Summary Plan
Blueprint on Vellum
1990 January 25
16
4.25.15: Village 7 Conceptual Golf Course Layout and Housing Frontage
Pen and Marker on Trace
undated
16
4.25.16: Village 7 Alternative I
Blueprint on Bond
1990 February 9
16
4.25.17: Village 7 Conceptual Plan
Marker on Trace
undated
16
4.25.18: Village 7 Alternative C
Marker on Trace
undated
16
4.25.19: Village 7 Alternative D - Trace Overlay
Marker on Trace
1990 February 7
16
4.25.20: Village 7 Alternative B
Marker on Trace
undated
16
4.25.21: Golf Course Yardage Study
Marker on Trace
undated
16
4.25.22: Grading/Planting Objectives
Marker on Trace
undated
16
4.25.23: Drainage Objectives
Marker on Trace
undated
16
4.25.24: Village 7 Golf Course Concept and Access Roads
Marker on Trace
undated
16
4.25.25: Village 7 Alternative D
Blueprint on Bond
1990 January 30
16
4.25.26: Village 7 Concept Diagram - Trace Overlay
Marker on Trace
1990 January 30
16
4.25.27: Village 7 Golf Course Concept and Access Roads
Pencil on Trace
undated
16
4.25.28: Village 7 Rough Conceptual Golf Course Layout
Pen and Marker on Trace
undated
16
4.25.29 A: Village 1 Design Issues - Trace Overlay
Marker on Trace
1988 August 24
16
4.25.29 B: Village 1 Design Issues - Trace Overlay
Marker on Trace
1988 August 24
17
4.25.30 A: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 B: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 C: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 D: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 E: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 F: Functional Diagram Package
Marker on Trace
undated
17
4.25.30 G: Functional Diagram Package
Marker on Trace
undated
17
4.25.31: Village 7 Context Phase 1
Marker on Trace
undated
17
4.25.32: Village 7 Concept Alternative C
Marker on Trace
undated
17
4.25.33: Village 7 Golf Course Putting Greens Concept
Marker on Trace
undated
17
4.25.34: Village 7 Analysis Alternative C
Marker on Trace
undated
17
4.25.35: Village 7 Program Requirements
Marker on Trace
undated
17
4.25.36: Village 7 Base Map
Print on Bond
undated
17
4.25.37: Village 7 Utilities Base Map
Print on Bond
undated
17
4.25.38: Village 7 Inventory
Blueprint on Bond
undated
17
4.25.39: Village 7 Number Summary
Marker on Trace
undated
17
4.25.40: Village 7 Analysis
Marker on Trace
1990 February 19
17
4.25.41: Village Conceptual Golf Course Layout
Marker on Trace
undated
17
4.25.42: Village 7 Golf Course Layout A
Marker on Trace
1990 February 21
17
4.25.43: Village 7 Golf Course Layout B
Marker on Trace
1990 February 21
17
4.25.44: Village & Analysis
Marker on Trace
undated
17
4.25.45: Village 7 Alternative 2 - Trace Overlay
Marker on Trace
1990 February 8
17
4.25.46 A: Village 7 Conceptual Layout - Trace Overlay
Marker on Trace
undated
17
4.25.46 B: Village 7 Conceptual Layout - Trace Overlay
Marker on Trace
undated
17
4.25.47: Summerlin Summary of Recommendations
Print on Bond
undated
17
4.25.48: Village 7 Context Plan
Sepia Print on Vellum
undated
17
4.25.49: Village 7 Design Analysis
Blueprint on Bond
1990 February 16
17
4.25.50: Village 7 Conceptual Housing Frontage Alternative A
Marker on Trace
undated
17
4.25.51: Village 7 Conceptual Parcel
Marker on Trace
undated
17
4.25.52: Village 7 Concept Diagram
Blueprint on Bond
1990 January 30
17
4.25.53: Village 7 Pedestrian Ways
Blueprint on Bond
1990 January 30
Summerlin Illustrative Sketches
tube
17
4.26.1: Summerlin Park Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
undated
17
4.26.2: Baseball Diamond Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
undated
17
4.26.3: Subdivision Entrance Perspective
Marker and Pen on Bond
undated
17
4.26.4: Subdivision Entrance Perspective
Marker and Pen on Bond
undated
17
4.26.5: The Hills Tournament Players Club Golf Course Relationship
Pen and Colored Pencil on Vellum
1990 April 10
17
4.26.6: The Hills Tournament Players Custom Home Concepts
Pen and Colored Pencil on Vellum
1990 April 10
17
4.26.7: The Hills Tournament Players Club Multi-Family Concepts
Pen and Colored Pencil on Vellum
1990 April 10
17
4.26.8: Summerlin Park Isometric View by Craig Wickersham
Pen and Colored Pencil on Vellum
undated
17
4.26.9: Summerlin Trail Perspective by Craig Wickersham
Pen and Colored Pencil on Vellum
undated
17
4.26.10: The Hills at Summerlin Criteria Exhibits
Print on Bond
1989 September 1
17
4.26.11: Village 2 Streetscape Perspective
Pen and Colored Pencil on Vellum
1989 August 23
17
4.26.12: The Hills Tournament Players Club Residential Concepts
Pen and Colored Pencil on Vellum
1990 April 10
17
4.26.13: Subdivision Entrance Perspective
Pen on Bond
undated
17
4.26.14: Subdivision Entrance Perspective
Pen on Bond
undated
17
4.26.15: Summerlin Master Plan
Pen on Vellum
undated
17
4.26.16: Summerlin Master Plan
Print and Colored Pencil on Bond
undated
Summerlin The Trails Commercial Property
tube
17
4.27.1: Proposed K-Mart Revised Plan Design Criteria
Blueprint on Bond
1992 July 8
17
4.27.2: Proposed K-Mart Optional Layout - Trace Overlay
Marker on Trace
undated
Summerlin The Trails Builder Walls Parcel A-3
tube
17
4.28.1: The Trails Builder Walls Cantabria Parcel- Trails Hollow Drive Elevation L-1.1
Print and Pen on Mylar
1996 May 2
17
4.28.2: The Trails Builder Walls Cantabria Parcel A-3; Cover Sheet
Print on Vellum
1996 January 17
17
4.28.3: The Trails Builder Walls Cantabria Parcel A-3; Trails Hollow Drive Elevation L-1.2
Print and Pen on Mylar
1996 May 2
17
4.28.4: The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.3
Print and Pen on Mylar
1996 February 2
17
4.28.5: The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.4
Print and Pen on Mylar
1996 February 2
17
4.28.6: The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.5
Print and Pen on Mylar
1996 May 2
17
4.28.7: The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.6
Print and Pen on Mylar
1996 May 2
17
4.28.8: The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.7
Print and Pen on Mylar
1996 February 2
17
4.28.9: The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.8
Print and Pen on Mylar
1996 February 2
17
4.28.10: The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.2
Print on Vellum
1996 January 17
17
4.28.11: The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.3
Print on Vellum
1996 February 2
Summerlin Village 3
tube
18
4.29.1: Draft Master Plan 1990
Marker on Vellum
1989 February 1
18
4.29.2 A: Angel Park Golf Course Analysis; Trace Overlay
Marker on Trace
undated
18
4.29.2 B: Angel Park Golf Course Analysis; Trace Overlay
Marker on Trace
undated
18
4.29.3: Village Planning Criteria;
Print on Mylar
undated
18
4.29.4: Angel Park Context Map
Print on Bond
undated
18
4.29.5: Angel Park Topography Map
Sepia Print on Mylar
undated
18
4.29.6: Village Park Adjacencies
Print on Mylar
undated
18
4.29.7: Village 3 Centers, Connections and Land Use;
Pen on Trace
1990 January 31
18
4.29.8: Village 3 Urban Design Plan;
Pen on Trace
1990 January 31
18
4.29.9: Village 3 Suggested Development Concept
Print on Bond
1989 September 21
18
4.29.10: Village 3 Village Design Concept
Print on Bond
1989 September 21
18
4.29.11: Village 3 Context Plan
Print on Bond
1989 September 21
18
4.29.12: Village 3 Village Summary Statement
Print on Mylar
1989 September 21
18
4.29.13: Rampart Boulevard Street Section
Pen on Bond
undated
18
4.29.14: Street Sections
Pen on Laminated Poster Board
undated
18
4.29.15: Street Section
Pen on Bond
undated
18
4.29.16: Street Section
Pen on Bond
undated
18
4.29.17: Street Section
Pen on Bond
undated
18
4.29.18: Village 3 Current Land Use Plan
Print on Vellum
1990 January 31
18
4.29.19: Village 3 Context Plan
Print on Mylar
1990 June 1
18
4.29.20: Review Process Diagram
Print on Vellum
1990 June 1
18
4.29.21: Village 3 Village Summary Statement
Print on Mylar
1990 June 1
18
4.29.22: Village 3 Design and Engineering Criteria Title Page
Print on Mylar
undated
18
4.29.23: Village 3 Site Summary
Blueprint on Bond
1990 June 1
18
4.29.24: Village 3 Perimeter Street Sections
Print on Mylar
1990 June 1
18
4.29.25: Village 3 Dwelling Zoning
Blueprint on bond
undated
18
4.29.26: Village 3 Summary Map
Print on Bond
1989 February 3
Summerlin Village 2 Park
tube
18
4.30.1: Village 2
Sepia Print on Mylar
undated
18
4.30.2: Summerlin Draft Master Plan
Print on Vellum
1990 May 21
18
4.30.3: Summerlin North East Quadrant Master Plan
Pen on Mylar
undated
18
4.30.4: Village 2 Open Space Conceptual Cost Allocation
Print on Bond
1989 August 8
Summerlin Contract Documents
tube
19
4.31.1: The Hills Park Construction Documents; 60 Pages
Print on Vellum
1990 January 16
Summerlin TPC Parking Schematic Design Base Originals
tube
20
4.32.1 A: TPC Parking Analysis
Blueprint on Bond
1991 February 26
20
4.32.1 B: TPC Parking Analysis
Blueprint on Bond
1991 February 26
20
4.32.1 C: TPC Parking Analysis
Blueprint on Bond
1991 February 26
20
4.32.2 A: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 B: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 C: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 D: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 E: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 F: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 G: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 H: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 I: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.2 J: The Hills at Summerlin Streetscape Hillshire Dr. South; Issue for Pricing
Blueprint on Bond
1992 February 26
20
4.32.3 A: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
1992 June 25
20
4.32.3 B: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
1992 June 25
20
4.32.3 C: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
1992 June 25
20
4.32.3 D: The Hills at Summerlin TPC Parking Lot
Blueprint on Bond
1992 June 25
20
4.32.4 A: TPC Parking Lot
Blueprint on Bond
undated
20
4.32.4 B: TPC Parking Lot
Blueprint on Bond
undated
20
4.32.4 C: TPC Parking Lot
Blueprint on Bond
undated
20
4.32.5: The Hills at Summerlin TPC Parking Lot; Scheme A
Print on Vellum
1991 February 26
20
4.32.6: The Hills at Summerlin TPC Parking Lot; Drawing Underlay
Pen on Trace
1991 February 26
20
4.32.7: The Hills at Summerlin TPC Parking Lot; Scheme B
Pen and Marker on Vellum
1991 February 26
20
4.32.8: TPC Parking Lot; Drawing Underlay
Sepia Print on Mylar
undated
20
4.32.9: The Hills at Summerlin TPC Parking Lot; Parcel Analysis
Pen and Marker on Vellum
1991 February 26
Summerlin Village 8 D-Criterion Exhibit
tube
20
4.33.1: The Crossing Town Center Drive; Image Character
Print on Vellum
1992 September 24
20
4.33.2: The Crossing Town Center Drive; Concept Statement
Print on Vellum
1992 September 24
20
4.33.3: The Crossing Comparative Walls
Print on Vellum
1992 September 24
20
4.33.4: The Crossing Wall Concepts
Print on Vellum
1992 September 24
20
4.33.5: The Crossing Wall Concepts; Color Scheme
Print and Colored Pencil on Bond
1992 September 24
20
4.33.6: The Crossing Town Center Drive Concept Statement
Colored Pencil on Bond
1992 September 24
20
4.33.7: The Crossing Wall Layout Diagram; Phase One
Print on Vellum
1992 September 24
20
4.33.8: The Crossing Wall Concepts; Alternative Fencing
Print on Vellum
1992 September 24
20
4.33.9: The Crossing Entry Concept
Print on Vellum
1992 September 24
20
4.33.10: The Crossing Wall Concepts; Wall Types
Print on Vellum
1992 September 16
20
4.33.11: The Crossing Entry Concept
Print on Vellum
undated
20
4.33.12: Phase 1 Projections
Print on Acetate
undated
20
4.33.13: The Crossing Cover Page
Print on Vellum
undated
20
4.33.14: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
1992 September 16
20
4.33.15: The Crossing Entry Concept in Color
Pen and Marker on Bond
1992 September 16
20
4.33.16: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
1992 September 24
20
4.33.17: The Crossing Comparative Walls in Color
Marker and Colored Pencil on Bond
1992 September 24
20
4.33.18: The Crossing Town Center Drive in Color; Image Character
Pen and Colored Pencil on Bond
1992 September 24
20
4.33.19: The Crossing Wall Layout Diagram in Color; Phase One
Print on Bond
1992 September 24
20
4.33.20: The Crossing Character Photos
Images on Bond
1992 September 24
20
4.33.21: The Crossing Landscape and Entry Concept Plan
Images and Marker on Bond
1992 September 24
20
4.33.22: The Crossing Entry Concept in Color
Pen and Colored Pencil on Bond
1992 September 24
20
4.33.23: The Crossing Wall Concepts in Color
Pen and Colored Pencil on Bond
1992 September 16
20
4.33.24: The Crossing Photo
Images on Bond
1992 September 16
Summerlin Village 1 South Preliminary Studies
tube
21
4.34.1: Village One South Village Design Concept Plan
Marker on Bond
undated
21
4.34.2: Preliminary Neighborhood Design Concept
Blueprint on Bond
1989 May 30
21
4.34.3: Phase one Image Concept
Print and Marker on Bond
undated
21
4.34.4: Model Home Concept
Marker on Trace
1988 September 14
21
4.34.5: Village One
Marker on Trace
1988 September 27
21
4.34.6: Circulation Diagram
Marker on Trace
undated
21
4.34.7: Concept Diagram
Marker on Trace
undated
21
4.34.8: Preliminary Neighborhood Design Concept
Marker on Trace
1990 May 23
The Hills Point Road and Entries
tube
21
4.35.1: The Hills Streetscape Hillpointe Road and Entries- Cover Page
Print on Mylar
1990 April 15
21
4.35.2: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.1
Print on Mylar
1989 November 22
21
4.35.3: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.2
Print on Mylar
1989 November 22
21
4.35.4: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.3
Print on Mylar
1989 November 22
21
4.35.5: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.4
Print on Mylar
1989 November 22
21
4.35.6: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.5
Print on Mylar
1989 November 22
21
4.35.7: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.6
Print on Mylar
1989 November 22
21
4.35.8: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.7
Print on Mylar
1989 November 22
21
4.35.9: The Hills Streetscape Hillpointe Road and Entries- Site Layout and Grading Plan 1.8
Print on Mylar
1989 November 22
21
4.35.10: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.1
Print on Mylar
1989 November 22
21
4.35.11: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.2
Print on Mylar
1989 November 22
21
4.35.12: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.3
Print on Mylar
1989 November 22
21
4.35.13: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.4
Print on Mylar
1989 November 22
21
4.35.14: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.5
Print on Mylar
1989 November 22
21
4.35.15: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.6
Print on Mylar
1989 November 22
21
4.35.16: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.7
Print on Mylar
1989 November 22
21
4.35.17: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.8
Print on Mylar
1989 November 22
21
4.35.18: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.9
Print on Vellum
1989 November 22
21
4.35.19: The Hills Streetscape Hillpointe Road and Entries- Site Planting Plan 2.10
Print on Vellum
1989 November 22
21
4.35.20: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.1
Print on Mylar
1989 November 22
21
4.35.21: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.2
Print on Mylar
1989 November 22
21
4.35.22: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.3
Print on Mylar
1989 November 22
21
4.35.23: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.4
Print on Mylar
1989 November 22
21
4.35.24: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.5
Print on Mylar
1989 November 22
21
4.35.25: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.6
Print on Mylar
1989 November 22
21
4.35.26: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.7
Print on Mylar
1989 November 22
21
4.35.27: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.8
Print on Mylar
1989 November 22
21
4.35.28: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.9
Print on Mylar
1989 November 22
21
4.35.29: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.10
Print on Mylar
1989 November 22
21
4.35.30: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.11
Print on Mylar
1989 November 22
21
4.35.31: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Plan 3.12
Print on Mylar
1989 November 22
21
4.35.32: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Details 3.13
Print on Mylar
1989 November 22
21
4.35.33: The Hills Streetscape Hillpointe Road and Entries- Site Irrigation Details 3.14
Print on Mylar
1989 November 22
21
4.35.34: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Details 4.1
Print on Mylar
1989 November 20
21
4.35.35: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Details 4.2
Print on Mylar
1989 November 20
21
4.35.36: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.3
Print on Mylar
1989 November 20
21
4.35.37: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.4
Print on Mylar
1989 November 20
21
4.35.38: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.5
Print on Mylar
1989 November 20
21
4.35.39: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.6
Print on Mylar
1989 November 20
21
4.35.40: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.7
Print on Mylar
1989 November 20
21
4.35.41: The Hills Streetscape Hillpointe Road and Entries- Site Electrical Plan 4.8
Print on Mylar
1989 November 20
21
4.35.42: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.1
Print on Mylar
1989 November 22
21
4.35.43: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.2
Print on Mylar
1989 November 22
21
4.35.44: The Hills Streetscape Hillpointe Road and Entries- Site Details 5.3
Print on Mylar
1990 July 5
The Pueblo
tube
22
4.36.1: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Cover Page
Print on Vellum
1992 September 22
22
4.36.2: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout and Grading C-1
Print on Vellum
1992 September 22
22
4.36.3: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout and Grading C-2
Print on Vellum
1992 September 22
22
4.36.4: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Layout Details C-3
Print on Vellum
1992 September 22
22
4.36.5: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Plan L-1
Print on Vellum
1992 September 22
22
4.36.6: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Plan L-2
Print on Mylar
1992 September 22
22
4.36.7: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Planting Details L-3
Print on Vellum
1992 September 22
22
4.36.8: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Plan I-1
Print on Mylar
1992 September 22
22
4.36.9: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Plan I-2
Print on Mylar
1992 September 22
22
4.36.10: The Pueblo at Summerlin Streetscape South Pueblo Vista Drive Streetscape- Irrigation Details I-3
Print on Mylar
1992 September 22
The Trails Park
tube
22
4.37.1: The Trails Park at Summerlin- Park Site Plan L-1
Print on Vellum
1994 May 20
22
4.37.2: The Trails Park at Summerlin- Planting Plan L-2
Print on Vellum
1994 May 20
22
4.37.3: The Trails Park at Summerlin- Planting Plan L-3
Print on Vellum
1994 May 20
22
4.37.4: The Trails Park at Summerlin- Planting Plan L-4
Print on Mylar
1994 May 20
22
4.37.5: The Trails Park at Summerlin- Enlarged Layout Plan L-5
Print on Vellum
1994 May 20
22
4.37.6: The Trails Park at Summerlin- Enlarged Layout Plan L-6
Print on Vellum
1994 May 20
22
4.37.7: The Trails Park at Summerlin- Landscape Details L-7
Print on Vellum
1994 May 20
22
4.37.8: The Trails Park at Summerlin- Landscape Details L-8
Print on Mylar
1994 May 20
22
4.37.9: The Trails Park at Summerlin- Landscape Detail L-9
Print on Vellum
1994 May 20
22
4.37.10: The Trails Park at Summerlin Community Center- Community Building Site Plan L-1
Print on Vellum
1994 October 10
22
4.37.11: The Trails Park at Summerlin Community Center- Community Building Planting Plan L-2
Print on Vellum
1994 October 10
22
4.37.12: The Trails Park at Summerlin Community Center- Enlarged Layout Plan L-3
Print on Vellum
1994 October 10
22
4.37.13: The Trails Park at Summerlin Community Center- Landscape Details L-4
Print on Mylar
1994 October 10
22
4.37.14: The Trails Park at Summerlin Community Center- Landscape Details L-5
Print on Mylar
1994 October 10
22
4.37.15: The Trails Park at Summerlin Community Center- Irrigation Plan L-6
Print on Vellum
1994 October 10
22
4.37.16: The Trails Park at Summerlin Community Center- Enlarged Layout Plan L-6
Print on Vellum
1994 October 10
22
4.37.17: The Trails Park at Summerlin Community Center- Irrigation Details L-7
Print on Vellum
1994 October 10
22
4.37.18: The Trails Park at Summerlin Community Center- Irrigation Schedule and Notes L-8
Print on Vellum
1994 October 10
22
4.37.19: The Trails Park at Summerlin Concession Building- Park Site Plan L-1
Print on Vellum
1994 October 10
22
4.37.20: The Trails Park at Summerlin Concession Building- Enlarged Layout Plan L-2
Print on Vellum
1994 October 10
22
4.37.21: The Trails Park at Summerlin Concession Building- Landscape Details L-3
Print on Vellum
1994 October 10
22
4.37.22: The Trails Park at Summerlin Concession Building- Landscape Details L-4
Print on Vellum
1994 October 10
22
4.37.23: The Trails Park at Summerlin Community Park- Park Site Plan L-1
Print on Vellum
1994 October 10
22
4.37.24: The Trails Park at Summerlin Community Park- Planting Plan L-2
Print on Vellum
1994 October 10
22
4.37.25: The Trails Park at Summerlin Community Park- Planting Plan L-3
Print on Vellum
1994 October 10
22
4.37.26: The Trails Park at Summerlin Community Park- Planting Plan L-4
Print on Vellum
1994 October 10
22
4.37.27: The Trails Park at Summerlin Community Park- Enlarged Layout Plan L-6
Print on Vellum
1994 October 10
22
4.37.28: The Trails Park at Summerlin Community Park- Landscape Details L-7
Print on Vellum
1994 October 10
22
4.37.29: The Trails Park at Summerlin Community Park- Landscape Details L-8
Print on Vellum
1994 October 10
22
4.37.30: The Trails Park at Summerlin Community Park- Landscape Details L-9
Print on Vellum
1994 October 10
22
4.37.31: The Trails Park at Summerlin Community Park- Irrigation Site Plan L-10
Print on Vellum
1994 October 10
22
4.37.32: The Trails Park at Summerlin Community Park- Irrigation Plan L-11
Print on Vellum
1994 October 10
22
4.37.33: The Trails Park at Summerlin Community Park- Irrigation Plan L-12
Print on Vellum
1994 October 10
22
4.37.34: The Trails Park at Summerlin Community Park- Irrigation Plan L-13
Print on Vellum
1994 October 10
22
4.37.35: The Trails Park at Summerlin Community Park- Irrigation Details L-14
Print on Vellum
1994 October 10
22
4.37.36: The Trails Park at Summerlin Community Park- Irrigation Details L-15
Print on Vellum
1994 October 10
22
4.37.37: The Trails Park at Summerlin Community Park- Irrigation Details, Notes and Schedule L-16
Print on Vellum
1994 October 10
22
4.37.38: The Trails Park at Summerlin Community Center and Park- Park Site Plan L-1
Print on Bond
1994 July 8
22
4.37.39: The Trails Park at Summerlin Community Center and Park- Planting Plan L-2
Print on Bond
1994 July 8
22
4.37.40: The Trails Park at Summerlin Community Center and Park- Planting Plan L-3
Print on Bond
1994 July 8
22
4.37.41: The Trails Park at Summerlin Community Center and Park- Planting Plan L-4
Print on Bond
1994 July 8
22
4.37.42: The Trails Park at Summerlin Community Center and Park- Enlarged Layout Plan L-5
Print on Bond
1994 July 8
22
4.37.43: The Trails Park at Summerlin Community Center and Park- Park Site Plan L-1
Print on Blueprint
1994 July 8
22
4.37.44: The Trails Park at Summerlin Community Center and Park- Landscape Details L-7
Print on Blueprint
1994 July 8
The Trails Streetscape Parcel B-3
tube
22
4.38.1: The Trails Streetscape Parcel B-3 Units 1 and 5- Cover Page
Print on Vellum
1996 March 22
22
4.38.2: The Trails Streetscape Parcel B-3 Units 1 and 5- Landscape and Sidewalk Layout L-2.1
Print on Vellum
1996 March 22
22
4.38.3: The Trails Streetscape Parcel B-3 Units 1 and 5- Landscape and Sidewalk Layout L-2.2
Print on Vellum
1996 March 22
22
4.38.4: The Trails Streetscape Parcel B-3 Units 1 and 5- Planting and Sidewalk Details L-2.3
Print on Mylar
1996 March 22
22
4.38.5: The Trails Streetscape Parcel B-3 Units 1 and 5- Typical Grading Sections L-2.4
Print on Mylar
1996 March 22
22
4.38.6: The Trails Streetscape Parcel B-3 Units 1 and 5- Planting and Sidewalk Details L-2.5
Print on Mylar
1996 March 22
The Trails Streetscape Parcel N-2
tube
23
4.39.1: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Cover Page
Print on Bond
1995 August 4
23
4.39.2: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout Enlarged Plan L-2.1
Print on Bond
1995 August 4
23
4.39.3: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.2
Print on Bond
1995 August 4
23
4.39.4: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.3
Print on Bond
1995 August 4
23
4.39.5: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.4
Print on Bond
1995 August 4
23
4.39.6: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.5
Print on Bond
1995 August 4
23
4.39.7: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Landscape and Sidewalk Layout L-2.6
Print on Bond
1995 August 4
23
4.39.8: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- L-2.7
Print on Mylar
1995 August 4
23
4.39.9: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Typical Grading Section L-2.8
Print on Mylar
1995 August 4
23
4.39.10: The Trails Streetscape Parcel N-2 Landscape, Irrigation and Electrical- Wall and Entry Monument Details L-2.9
Print on Mylar
1995 August 4
23
4.39.11: The Trails Streetscape Parcel N-2 landscape and Irrigation- Cover Page
Print on Bond
1995 August 4
23
4.39.12: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.1
Print on Bond
1995 August 4
23
4.39.13: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.2
Print on Bond
1995 August 4
23
4.39.14: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Landscape and Sidewalk Layout L-2.3
Print on Bond
1995 August 4
23
4.39.15: The Trails Streetscape Parcel N-2 Landscape and Irrigation- L-2.4
Print on Mylar
1995 August 4
23
4.39.16: The Trails Streetscape Parcel N-2 Landscape and Irrigation- Typical Grading Sections L-2.5
Print on Mylar
1995 August 4
Summerlin Engineer Drawings
tube
23
4.40.1 A: Typical Parcel Entry Hacienda Style
Pen on Mylar
undated
23
4.40.1 B: Typical Parcel Entry Hacienda Style
Pen on Mylar
undated
23
4.40.1 C: Typical Parcel Entry Hacienda Style
Pen on Mylar
undated
23
4.40.2 A: Typical Parcel Entry Traditional Style
Pen on Mylar
undated
23
4.40.2 B: Typical Parcel Entry Traditional Style
Pen on Mylar
undated
23
4.40.2 C: Typical Parcel Entry Traditional Style
Pen on Mylar
undated
23
4.40.3 A: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
1993 October 21
23
4.40.3 B: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
1993 October 21
23
4.40.3 C: The Trails Streetscape Phase 1; Planting and Sidewalk Details
Sepia Print on Vellum
1993 October 21
23
4.40.4 A: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
1994 March 21
23
4.40.4 B: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
1994 March 21
23
4.40.4 C: The Trails Streetscape Phase 1; Landscape and Sidewalk Layout
Sepia Print on Vellum
1994 March 21
23
4.40.5 A: Typical Parcel Entry Contemporary Style
Pen on Mylar
undated
23
4.40.5 B: Typical Parcel Entry Contemporary Style
Pen on Mylar
undated
23
4.40.5 C: Typical Parcel Entry Contemporary Style
Pen on Mylar
undated
Summerlin Trails Builder Walls Indian Hills
tube
23
4.41.1: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Cover Page
Print on Vellum
1997 February 6
23
4.41.2: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Layout and Grading Plan L-1.1
Print on Mylar
1997 February 6
23
4.41.3: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Layout and Grading Plans L-1.2
Print on Mylar
1997 February 6
23
4.41.4: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Wall and Site Details L-3.2
Print on Bond
1997 February 6
23
4.41.5: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3)- Wall and Site Details L-3.3
Print on Bond
1997 February 6
Summerlin Trails Park, Ball Fields
tube
24
4.42.1: Trails Park Ball Field Little League Dugout Detail
Pen on Mylar
undated
24
4.42.2: Trails Park Ball Field Dugout Plan View
Pen on Mylar
undated
24
4.42.3: Trails Park Ball Field Senior League Dugout Detail
Pen on Mylar
undated
24
4.42.4: Trails Park Ball Field Gate Detail
Pen on Mylar
undated
24
4.42.5 A: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
1993 November 22
24
4.42.5 B: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
1993 November 22
24
4.42.5 C: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
1993 November 22
24
4.42.5 D: Trails Park Ball Field Plans Phases 1 and 2 CD's
Blueprint on Bond
1993 November 22
Summerlin Village 3
tube
24
4.43.1: Village 3 Parcel Map
Sepia Print on Vellum
undated
24
4.43.2: Village 3 Land Use Diagram
Marker on Trace
undated
24
4.43.3: Village 3 Concept Plan
Marker on Trace
1988 November 29
24
4.43.4: Summerlin Business Park Alternative E
Marker on Trace
undated
24
4.43.5: Village 3 golf Course Layout
Pen on Trace
undated
24
4.43.6: Village 3 Land Use
Marker on Trace
undated
24
4.43.7: Village 3 Resort Hotel Concept A
Marker on Trace
1988 October 9
24
4.43.8: Summerlin Business Park Alternative D
Marker on Trace
undated
24
4.43.9: Summerlin Business Park Alternative C
Marker on Trace
undated
24
4.43.10: Summerlin Business Park Alternative B
Marker on Trace
undated
24
4.43.11: Summerlin Business Park Alternative A
Marker on Trace
undated
24
4.43.12: Village 3 Resort Hotel Concept B
Marker on Trace
1988 October 9
24
4.43.13: Village 3 Resort Hotel Concept C
Marker on Trace
1988 October 9
24
4.43.14: Village 3 Parcel Map
Blueprint on Bond
undated
24
4.43.15: Village 3 Perspective 1
Pen on Bond
undated
24
4.43.16: Village 3 Perspective 2
Pen on Bond
undated
24
4.43.17: Village 3 Perspective 3
Pen on Bond
undated
24
4.43.18: Summerlin Parkway; Station 465
Pencil on Trace
1989 February 9
24
4.43.19: Summerlin Parkway; Station 434
Pencil on Trace
1989 February 10
24
4.43.20: Summerlin Parkway; Station 444
Pencil on Trace
1989 February 10
24
4.43.21: Golf Course B
Marker on Trace
1989 March 28
24
4.43.22: Village 3 Circulation
Sepia Print on Vellum
undated
The Hills at Summerlin Park Drainage
tube
24
4.44.1: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Cover Page
Print on Bond
1994 March 25
24
4.44.2: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Planting Plan and Details L-1.0
Print on Bond
1994 March 25
24
4.44.3: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Irrigation Plan I-1
Print on Bond
1994 March 25
24
4.44.4: The Hills at Summerlin - The Hills Park Drainage Landscape and Irrigation - Irrigation Details I-2
Print on Bond
1994 March 25
Preliminary Master Sidewalk and Trail Plan
tube
24
4.45.1: Preliminary Master Sidewalk and Trail Plan Village 7
Sharpie on Bond
1992 March 11
Summerlin Village 2 North Streetscape Pueblo Vista Drive
tube
24
4.46.1: Village Two North Streetscape Pueblo Vista Drive- Cover Page
Print on Vellum
1994 February 1
24
4.46.2: Village Two North Streetscape Pueblo Vista Drive- Entry Feature Layout Plan 1.1
Print on Mylar
1994 February 1
24
4.46.3: Village Two North Streetscape Pueblo Vista Drive- Streetscape Layout Plan 1.2
Print on Mylar
1994 February 1
24
4.46.4: Village Two North Streetscape Pueblo Vista Drive- Construction Details 1.3
Print on Vellum
1994 February 1
24
4.46.5: Village Two North Streetscape Pueblo Vista Drive- Construction Details 1.4
Print on Vellum
1994 February 1
24
4.46.6: Village Two North Streetscape Pueblo Vista Drive- Entry Planting Plan 2.1
Print on Mylar
1994 February 1
24
4.46.7: Village Two North Streetscape Pueblo Vista Drive- Streetscape Planting Plan 2.2
Print on Mylar
1994 February 1
24
4.46.8: Village Two North Streetscape Pueblo Vista Drive- Planting Details 2.3
Print on Mylar
1994 February 1
24
4.46.9 A: Village Two North Streetscape Pueblo Vista Drive- Streetscape Irrigation Plan 3.2
Print on Mylar
1994 February 1
24
4.46.9 B: Village Two North Streetscape Pueblo Vista Drive- Streetscape Irrigation Plan 3.2
Print on Vellum
1994 February 1
24
4.46.10: Village Two North Streetscape Pueblo Vista Drive- Irrigation Details 3.3
Print on Mylar
1994 February 1
24
4.46.11: Village Two North Streetscape Pueblo Vista Drive- Entry Feature Electrical Layout 4.1
Print on Vellum
1994 February 1
24
4.46.12: Village Two North Streetscape Pueblo Vista Drive- Electrical Details 4.2
Print on Vellum
1994 February 1
Summerlin Trails Open Space and Builder Walls
tube
25
4.47.1: The Trails Open Space Phase Two- Cover Page
Print on Vellum
1994 September 1
25
4.47.2: The Trails Open Space Phase Two- Grading Plan L-1.1
Print on Vellum
1994 September 1
25
4.47.3: The Trails Open Space Phase Two- Grading Plan L-1.2
Print on Vellum
1994 September 1
25
4.47.4: The Trails Open Space Phase Two- Grading Plan L-1.3
Print on Vellum
1994 September 1
25
4.47.5: The Trails Open Space Phase Two- Grading Plan L-1.4
Print on Vellum
1994 September 1
25
4.47.6: The Trails Open Space Phase Two- Grading Plan L-1.5
Print on Vellum
1994 September 1
25
4.47.7: The Trails Open Space Phase Two- Grading Plan L-1.6
Print on Vellum
1994 September 1
25
4.47.8: The Trails Open Space Phase Two- Grading Plan L-1.7
Print on Vellum
1994 September 1
25
4.47.9: The Trails Open Space Phase Two- Layout Plan L-2.1
Print on Vellum
1994 September 1
25
4.47.10: The Trails Open Space Phase Two- Layout Plan L-2.2
Print on Vellum
1994 September 1
25
4.47.11: The Trails Open Space Phase Two- Layout Plan L-2.3
Print on Vellum
1994 September 1
25
4.47.12: The Trails Open Space Phase Two- Layout Plan L-2.4
Print on Vellum
1994 September 1
25
4.47.13: The Trails Open Space Phase Two- Layout Plan L-2.5
Print on Vellum
1994 September 1
25
4.47.14: The Trails Open Space Phase Two- Layout Plan L-2.6
Print on Vellum
1994 September 1
25
4.47.15: The Trails Open Space Phase Two- Layout Plan L-2.7
Print on Vellum
1994 September 1
25
4.47.16: The Trails Open Space Phase Two- Site Details L-2.8
Print on Mylar
1994 September 1
25
4.47.17: The Trails Open Space Phase Two- Site Details L-2.9
Print on Mylar
1994 September 1
25
4.47.18: The Trails Open Space Phase Two- Landscape Plan L-3.1
Print on Vellum
1994 September 1
25
4.47.19: The Trails Open Space Phase Two- Landscape Plan L-3.2
Print on Vellum
1994 September 1
25
4.47.20: The Trails Open Space Phase Two- Landscape Plan L-3.3
Print on Vellum
1994 September 1
25
4.47.21: The Trails Open Space Phase Two- Landscape Plan L-3.4
Print on Vellum
1994 September 1
25
4.47.22: The Trails Open Space Phase Two- Landscape Plan L-3.5
Print on Vellum
1994 September 1
25
4.47.23: The Trails Open Space Phase Two- Landscape Plan L-3.6
Print on Vellum
1994 September 1
25
4.47.24: The Trails Open Space Phase Two- Landscape Plan L-3.7
Print on Vellum
1994 September 1
25
4.47.25: The Trails Open Space Phase Two- Plant Schedule and Details L-3.8
Print on Mylar
1994 September 1
25
4.47.26: The Trails Open Space Phase Two- Irrigation Plan I-4.1
Print on Vellum
1994 September 1
25
4.47.27: The Trails Open Space Phase Two- Irrigation Plan I-4.2
Print on Vellum
1994 September 1
25
4.47.28: The Trails Open Space Phase Two- Irrigation Plan I-4.3
Print on Vellum
1994 September 1
25
4.47.29: The Trails Open Space Phase Two- Irrigation Plan I-4.4
Print on Vellum
1994 September 1
25
4.47.30: The Trails Open Space Phase Two- Irrigation Plan I-4.5
Print on Vellum
1994 September 1
25
4.47.31: The Trails Open Space Phase Two- Irrigation Plan I-4.6
Print on Vellum
1994 September 1
25
4.47.32: The Trails Open Space Phase Two- Irrigation Plan I-4.7
Print on Vellum
1994 September 1
25
4.47.33: The Trails Open Space Phase Two- Irrigation Details I-4.8
Print on Vellum
1994 September 1
25
4.47.34: The Trails Open Space Phase Two- Irrigation Details I-4.9
Print on Vellum
1994 September 1
25
4.47.35: The Trails Open Space Phase Two- Irrigation Plan I-4.10
Print on Vellum
1994 September 1
25
4.47.36: The Trails Open Space Phase Two- Electrical Site Plan E-5.1
Print on Vellum
1994 September 1
25
4.47.37: The Trails Open Space Phase Two- Electrical Site Plan E-5.2
Print on Vellum
1994 September 1
25
4.47.38: The Trails Open Space Phase Two- Electrical Site Plan E-5.3
Print on Vellum
1994 September 1
25
4.47.39: The Trails Open Space Phase Two- Electrical Schedules and Details E-5.4
Print on Vellum
1994 September 1
25
4.47.40: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Cover Page
Print on Bond
1995 November 10
25
4.47.41: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall Plan L-1.1
Print on Mylar
1995 November 10
25
4.47.42: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall Plan L-1.2
Print on Mylar
1995 November 10
25
4.47.43: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall and site Details L-3.2
Print on Bond
1995 November 10
25
4.47.44: The Trails Builder Wall Mountain Gates (Parcel H-2/C-3)- Wall and Site Details L-3.3
Print on Bond
1995 November 10
Summerlin Information Center and Pueblo Walls
tube
25
4.48.1: The Pueblo Walls Mock-Up
Print on Mylar
1990 February-March
25
4.48.2: The Pueblo Walls Mock-Up Layout and Planting Plan 1.1
Print on Bond
1990 March 23
25
4.48.3: The Pueblo Walls Mock-Up Layout Details 1.2
Print on Bond
1990 March 23
25
4.48.4: The Pueblo Walls Mock-Up Layout Details 1.3
Print on Bond
1990 March 23
25
4.48.5: The Pueblo Walls Mock-Up Planting Details 1.4
Print on Bond
1990 March 23
25
4.48.6: The Pueblo Walls Mock-Up Irrigation Plan 2.1
Print on Bond
1990 March 23
25
4.48.7: The Pueblo Walls Mock-Up Irrigation Details 2.2
Print on Bond
1990 March 23
25
4.48.8: The Pueblo Walls Mock-Up Wall Details 2.1
Print on Bond
1989 December 14
25
4.48.9: The Pueblo Walls Mock-Up Site Details 2.2
Print on Bond
1989 December 18
25
4.48.10: The Pueblo Walls Mock-Up Layout Plan 1
Print on Bond
1989 December 18
25
4.48.11: Summerlin Temporary Information Center Site Plan Planting L-1
Print on Mylar
1990 February 14
25
4.48.12: Summerlin Temporary Information Center Site Plan Grading L-1
Print on Mylar
1990 February 6
25
4.48.13: Summerlin Temporary Information Center Site Plan I-1
Print on Mylar
1990 February 14
25
4.48.14: Summerlin Temporary Information Center I-2
Print on Mylar
1990 February 14
Summerlin The Trails Miscellaneous Entries and Streetscapes
tube
26
4.49.1: The Trails Builder Entries Beazer Homes
Sepia Print on Vellum
1995 October 20
26
4.49.2: The Trails Builder Entries Pulte Homes; Electrical Site Plan
Sepia Print on Vellum
1995 October 20
26
4.49.3: The Trails Builder Entries Durable Homes; Irrigation Plans
Sepia Print on Vellum
1995 October 30
26
4.49.4: The Trails Builder Entries Durable Homes; Electrical Site Plan
Sepia Print on Vellum
1995 October 20
26
4.49.5: The Trails Open Space- Phase Two; Grade Plan
Print on Vellum
1995 November 17
26
4.49.6: The Trails Open Space- Phase Two; Grade Plan
Print on Vellum
1994 November 17
26
4.49.7: The Trails Builder Entries Beazer Homes; Irrigation Details
Sepia Print on Mylar
1995 October 30
26
4.49.8: Sequoia Durable Homes Parcel E-2; Concept Plan
Pen on Vellum
1994 November 11
26
4.49.9: Crestdale Lane Planting Plan
Pen on Vellum
1996 April 30
26
4.49.10: Willow Bend Builder Entry
Pen on Trace
1994 August 4
26
4.49.11: Sierra Ridge Builder Entry Parcel D-2
Pen on Trace
1994 July 27
26
4.49.12: Sierra Ridge Builder Entry Parcel D-2; Option B
Pen on Trace
1995 July 27
26
4.49.13: Sierra Ridge Builder Entry Parcel D-2; Option A
Pen on Trace
1996 July 27
26
4.49.14: The Trails Streetscape; Landscape Upgrade Concept
Sepia Print on Vellum
1995 March 8
26
4.49.15: The Trails Streetscape; Landscape Upgrade Concept
Sepia Print on Vellum
1995 March 8
Summerlin Village 1 North Contract Documents
tube
26
4.50.1: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Cover Page
Print on Vellum
1997 April 3
26
4.50.2: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Layout Plan L1
Print on Vellum
1997 April 3
26
4.50.3: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Construction Details L2
Print on Vellum
1997 April 3
26
4.50.4: The Hills at Summerlin Streetscape Lot 32 to Hillpointe Road Wall Redesign Planting Plan L3
Print on Vellum
1997 April 3
26
4.50.5: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Cover Page
Print on Vellum
1991 November 25
26
4.50.6: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting and Layout Plan L-1
Print on Vellum
1991 November 25
26
4.50.7: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting and Layout Plan L-2
Print on Vellum
1991 November 25
26
4.50.8: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Planting Layout Plan and Details L-3
Print on Vellum
1991 November 25
26
4.50.9: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-1
Print on Mylar
1991 November 25
26
4.50.10: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-2
Print on Mylar
1991 November 25
26
4.50.11: The Hills at Summerlin Streetscape - Streetscape for Parcels B, I, J Pinewood and Glenside Drive - Irrigation Plan I-3
Print on Mylar
1991 November 25
Summerlin Open Space
tube
27
4.51.1: Village 1, 2 and 3 Parks and Open Space Connections
Print on Mylar
undated
27
4.51.2: Village 1, 2 and 3 Parks and Open Space Connections
Print on Sepia
undated
27
4.51.3: Monument and Entry Features
Print on Mylar
undated
27
4.51.4: The Hills Design Concept Plan
Print on Mylar
undated
27
4.51.5: Community Wide Streetscape Arterials and Parkway
Print on Mylar
undated
27
4.51.6: The Hills Streetscape and Open Space
Print on Mylar
undated
Summerlin Streetscapes
tube
27
4.52.1: Parks Open Space and School Facilities Plan
Marker on Bond
1990 August 8
27
4.52.2: 1990 Draft Plan Village Delineation and community Structure Diagram
Marker on Bond
undated
Summerlin Drainage Plan
tube
27
4.53.1: Summerlin Proposed Drainage Plan
Marker on Bond
undated
27
4.53.2: Summerlin Proposed Drainage Plan; Option B Elevations
Marker on Bond
undated
27
4.53.3: Summerlin Activity Spines
Print on Bond
1990 October 17
The Trails Streetscape Anasazi Drive
tube
27
4.54.1: The Trails Streetscape Anasazi Drive Cover Page
Print on Bond
1996 April 5
27
4.54.2: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout Enlarged Plan L-2.1
Print on Bond
1996 April 5
27
4.54.3: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.2
Print on Bond
1996 April 5
27
4.54.4: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.3
Print on Bond
1996 April 5
27
4.54.5: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.4
Print on Bond
1996 April 5
27
4.54.6: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.5
Print on Bond
1996 April 5
27
4.54.7: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.6
Print on Bond
1996 April 5
27
4.54.8: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.7
Print on Bond
1996 April 5
27
4.54.9: The Trails Streetscape Anasazi Drive Planting and Sidewalk Details L-2.8
Print on Mylar
1996 April 5
27
4.54.10: The Trails Streetscape Anasazi Drive Landscape and Sidewalk Layout L-2.9
Print on Vellum
1996 April 5
27
4.54.11: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.1
Print on Vellum
1996 April 5
27
4.54.12: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.2
Print on Vellum
1996 April 5
27
4.54.13: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.3
Print on Vellum
1996 April 5
27
4.54.14: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.4
Print on Vellum
1996 April 5
27
4.54.15: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.5
Print on Vellum
1996 April 5
27
4.54.16: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.6
Print on Vellum
1996 April 5
27
4.54.17: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.7
Print on Vellum
1996 April 5
27
4.54.18: The Trails Streetscape Anasazi Drive Irrigation Details I-3.8
Print on Vellum
1996 April 5
27
4.54.19: The Trails Streetscape Anasazi Drive Irrigation Notes and Schedule I-3.9
Print on Vellum
1996 April 5
27
4.54.20: The Trails Streetscape Anasazi Drive Irrigation Plan I-3.10
Print on Vellum
1996 April 5
27
4.54.21: The Trails Streetscape Anasazi Drive Electrical Site Plan E-4.1
Print on Vellum
1996 April 5
Illustrative Site Plan The Trails Park at Summerlin
tube
27
4.55.1: Illustrative Site Plan The Trails Park at Summerlin
Print on Bond
undated
Summerlin Unit Phase 1 and 2 Trails and Streetscape
tube
28
4.56.1: The Trails Streetscape- Phase 2 Parcel G-1 Cover Page
Print on Vellum
1991 February 15
28
4.56.2: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.1
Print on Vellum
1991 February 15
28
4.56.3: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.2
Print on Vellum
1991 February 15
28
4.56.4: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.3
Print on Vellum
1991 February 15
28
4.56.5: The Trails Streetscape- Phase 2 Parcel G-1 Landscape and Sidewalk Layout L-2.4
Print on Vellum
1991 February 15
28
4.56.6: The Trails Streetscape- Phase 2 Parcel G-1 Typical Grading Sections 2.5
Print on Vellum
1991 February 15
28
4.56.7: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.1
Print on Vellum
1991 February 15
28
4.56.8: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.2
Print on Vellum
1991 February 15
28
4.56.9: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.3
Print on Vellum
1991 February 15
28
4.56.10: The Trails Streetscape- Phase 2 Parcel G-1 Irrigation I-3.4
Print on Vellum
1991 February 15
28
4.56.11: The Trails Streetscape- Parcel K-2 Cover Page
Print on Vellum
1995 July 21
28
4.56.12: The Trails Streetscape- Parcel K-2 Landscape and Monument Layout L-2.1
Print on Vellum
1995 July 21
28
4.56.13: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
1995 July 21
28
4.56.14: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
1995 July 21
28
4.56.15: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
1995 July 21
28
4.56.16: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
1995 July 21
28
4.56.17: The Trails Streetscape- Parcel K-2 Sidewalk and Landscape Layout L-2.6
Print on Vellum
1995 July 21
28
4.56.18: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.7
Print on Vellum
1995 July 21
28
4.56.19: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk Layout L-2.8
Print on Vellum
1995 July 21
28
4.56.20: The Trails Streetscape- Parcel K-2 Landscape and Sidewalk L-2.9
Print on Vellum
1995 July 21
28
4.56.21: The Trails Streetscape- Parcel K-2 Planting and Sidewalk Details L-2.10
Print on Mylar
1995 July 21
28
4.56.22: The Trails Streetscape- Parcel K-2 Typical Grading Sections L-2.11
Print on Mylar
1995 July 21
28
4.56.23: The Trails Streetscape- Parcel K-2 Irrigation L-3.1
Print on Vellum
1995 July 21
28
4.56.24: The Trails Streetscape- Parcel K-2 Irrigation L-3.2
Print on Vellum
1995 July 21
28
4.56.25: The Trails Streetscape- Parcel K-2 Irrigation L-3.3
Print on Vellum
1995 July 21
28
4.56.26: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.4
Print on Vellum
1995 July 21
28
4.56.27: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.5
Print on Vellum
1995 July 21
28
4.56.28: The Trails Streetscape- Parcel K-2 Irrigation Plan L-3.6
Print on Vellum
1995 July 21
28
4.56.29: The Trails Streetscape- Parcel K-2 Irrigation L-3.7
Print on Vellum
1995 July 21
28
4.56.30: The Trails Streetscape- Parcel K-2 Irrigation L-3.8
Print on Vellum
1995 July 21
28
4.56.31: The Trails Streetscape- Parcel K-2 Irrigation L-3.9
Print on Vellum
1995 July 21
28
4.56.32: The Trails Streetscape- Parcel K-2 Irrigation Details L-3.10
Print on Vellum
1995 July 21
28
4.56.33: The Trails Streetscape- Parcel K-2 Irrigation Notes and Schedule L-3.11
Print on Vellum
1995 July 21
28
4.56.34: The Trails Streetscape- Parcel K-2 Electrical Streetscape Lighting Plan E-4.1
Print on Vellum
1995 July 21
28
4.56.35: The Trails Streetscape- Phase 1 and 2 Parcel K-2
Print on Vellum
1995 April 7
28
4.56.36: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Monument Layout L-2.1
Print on Vellum
1995 April 7
28
4.56.37: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
1995 April 7
28
4.56.38: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
1995 April 7
28
4.56.39: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
1995 April 7
28
4.56.40: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
1995 April 7
28
4.56.41: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout tL-2.6
Print on Vellum
1995 April 7
28
4.56.42: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.7
Print on Vellum
1995 April 7
28
4.56.43: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.8
Print on Vellum
1995 April 7
28
4.56.44: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Landscape and Sidewalk Layout L-2.9
Print on Vellum
1995 April 7
28
4.56.45: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Planting and Sidewalk Details L-2.10
Print on Vellum
1995 April 7
28
4.56.46: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Typical Grading Sections L-2.11
Print on Vellum
1995 April 7
28
4.56.47: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Monument Details L-2.12
Print on Vellum
1995 April 7
28
4.56.48: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.2
Print on Sepia Mylar
1995 April 5
28
4.56.49: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.3
Print on Sepia Mylar
1995 April 5
28
4.56.50: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.4
Print on Mylar
1995 April 5
28
4.56.51: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.5
Print on Mylar
1995 April 5
28
4.56.52: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.6
Print on Mylar
1995 April 5
28
4.56.53: The Trails Streetscape- Phase 1 and 2 Parcel K-2 Irrigation L-3.8
Print on Mylar
1995 April 5
28
4.56.54: The Trails Streetscape- Parcel M-2 Cover Page
Print on Vellum
1995 October 9
28
4.56.55: The Trails Streetscape- Parcel M-2 Landscape and Monument Layout L-2.1
Print on Vellum
1995 October 9
28
4.56.56: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
1995 October 9
28
4.56.57: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.3
Print on Vellum
1995 October 9
28
4.56.58: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.4
Print on Vellum
1995 October 9
28
4.56.59: The Trails Streetscape- Parcel M-2 Landscape and Sidewalk Layout L-2.5
Print on Vellum
1995 October 9
28
4.56.60: The Trails Streetscape- Parcel M-2 Typical Grading Sections L-2.6
Print on Vellum
1995 October 9
28
4.56.61: The Trails Streetscape- Parcel M-2 Entry Monument Details L-2.7
Print on Mylar
1995 October 9
28
4.56.62: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.1
Print on Sepia Mylar
1995 October 9
28
4.56.63: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.2
Print on Sepia Mylar
1995 October 9
28
4.56.64: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.3
Print on Sepia Mylar
1995 October 9
28
4.56.65: The Trails Streetscape- Parcel M-2 Irrigation Plan I-3.4
Print on Sepia Mylar
1995 October 9
28
4.56.66: The Trails Streetscape- Parcel M-2 Irrigation Details, Notes and Schedule I-3.5
Print on Sepia Mylar
1995 October 9
28
4.56.67: The Trails Streetscape- Parcel M-2 Electrical Streetscape Lighting Plan E-4.1
Print on Sepia Mylar
1995 October 9
Neighborhood Plan Village 1 and 7
tube
29
4.57.1: Neighborhood Plan Village 1 and 7
Marker and Pen on Trace
undated
The Hills at Summerlin Streetscape
tube
29
4.58.1: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Cover Page
Print on Vellum
1991 February 15
29
4.58.2: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Planting and Layout 1.1
Print on Vellum
1991 February 15
29
4.58.3: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Planting and Layout 1.2
Print on Vellum
1991 February 15
29
4.58.4: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Plan 2.1
Print on Vellum
1991 February 15
29
4.58.5: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Plan 2.2
Print on Vellum
1991 February 15
29
4.58.6: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Details 2.3
Print on Vellum
1991 February 15
29
4.58.7: The Hills at Summerlin Streetscape- Streetscape Adjacent to Parcels D, DD, G and G Irrigation Details 2.4
Print on Vellum
1991 February 15
Summerlin Draft Master Plan
tube
29
4.59.1: Summerlin Draft Master Plan Alternative B
Marker on Bond
1990 June 6
29
4.59.2 A: Summerlin Draft Master Plan Road Hierarchy
Trace Overlay
undated
29
4.59.2 B: Summerlin Draft Master Plan Road Hierarchy
Trace Overlay
undated
29
4.59.3: Summerlin Preliminary Draft
Sepia Print on Vellum
1990 July 30
29
4.59.4: Summerlin Land Use Concept
Sepia Print on Vellum
undated
Summerlin Pueblo
tube
29
4.60.1: The Pueblo at Summerlin Village Two Streetscape
Sepia Print on Vellum
undated
The Hills at Summerlin
tube
30
4.61.1: The Hills at Summerlin - The Hills Park Stage - Cover Page
Print on Vellum
1992 August 12
30
4.61.2: The Hills at Summerlin - The Hills Park Stage - L-1.1
Print on Mylar
1992 August 12
30
4.61.3: The Hills at Summerlin - The Hills Park Stage - L-1.2
Print on Mylar
1992 August 12
30
4.61.4: The Hills at Summerlin - The Hills Park Stage - L-2.1
Print on Mylar
1992 August 12
30
4.61.5: The Hills at Summerlin - The Hills Park Stage - L-2.2
Print on Mylar
1992 August 12
30
4.61.6: The Hills at Summerlin - The Hills Park Stage - L-2.3
Print on Mylar
1992 August 12
30
4.61.7: The Hills at Summerlin - The Hills Park Stage - L-2.4
Print on Mylar
1992 August 12
30
4.61.8: The Hills at Summerlin - The Hills Park Stage - L-2.5
Print on Mylar
1992 August 12
30
4.61.9: The Hills at Summerlin - The Hills Park Stage - L-2.6
Print on Mylar
1992 August 12
30
4.61.10: The Hills at Summerlin - The Hills Park Stage - L-3.1
Print on Mylar
1992 August 12
30
4.61.11: The Hills at Summerlin - The Hills Park Stage - L-3.2
Print on Mylar
1992 August 12
30
4.61.12: The Hills at Summerlin - The Hills Park Stage - L-4.1
Print on Sepia Vellum
1992 August 12
30
4.61.13: The Hills at Summerlin - The Hills Park Stage - L-4.2
Print on Sepia Vellum
1992 August 12
30
4.61.14: The Hills at Summerlin - The Hills Park Stage - S1.0
Print on Vellum
1992 August 12
30
4.61.15: The Hills at Summerlin - The Hills Park Stage - S1.1
Print on Vellum
1992 August 12
30
4.61.16: The Hills at Summerlin - The Hills Park Stage - S2.1
Print on Vellum
1992 August 12
30
4.61.17: The Hills at Summerlin - The Hills Park Stage - S2.2
Print on Vellum
1992 August 12
30
4.61.18: The Hills at Summerlin - The Hills Park Stage - S2.3
Print on Vellum
1992 August 12
30
4.61.19: The Hills at Summerlin - The Hills Park Stage - S2.4
Print on Vellum
1992 August 12
30
4.61.20: The Hills at Summerlin - The Hills Park Stage - E1
Print on Vellum
1992 August 12
30
4.61.21: The Hills at Summerlin - The Hills Park Stage - E2
Print on Sepia Vellum
1992 August 12
The Trails Builder Walls Sierra Ridge
tube
30
4.62.1: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Cover Page
Print on Vellum
1995 December 4
30
4.62.2: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Layout and Grading Plans L-1.1
Print on Mylar
1995 December 4
30
4.62.3: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Layout and Grading L-1.2
Print on Mylar
1995 December 4
30
4.62.4: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Wall and Site Grading L-3.2
Print on Mylar
1995 December 4
30
4.62.5: The Trails Builder Walls Sierra Ridge II (Parcel C-2) Wall and Site Details L-3.3
Print on Mylar
1995 December 4
Summerlin Phase 1 Entry Features and Signs for Unit 2
tube
31
4.63.1: The Trails Streetscape Unit Two Phase One- Cover Page
Print on Vellum
1994 November 14
31
4.63.2: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.1
Print on Vellum
1994 November 14
31
4.63.3: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.2
Print on Vellum
1994 November 14
31
4.63.4: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.3
Print on Vellum
1994 November 14
31
4.63.5: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.4
Print on Vellum
1994 November 14
31
4.63.6: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.5
Print on Vellum
1994 November 14
31
4.63.7: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.6
Print on Vellum
1994 November 14
31
4.63.8: The Trails Streetscape Unit Two Phase One- Landscape and Sidewalk Layout L-2.7
Print on Vellum
1994 November 14
31
4.63.9: The Trails Streetscape Unit Two Phase One- Planting and Sidewalk Details L-2.8
Print on Vellum
1994 November 14
31
4.63.10: The Trails Streetscape Unit Two Phase One- Sidewalk Horizontal Control Data L-2.9
Print on Vellum
1994 November 14
31
4.63.11: The Trails Streetscape Unit 3 Phase One- Cover Page
Print on Vellum
1994 December
31
4.63.12: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.1
Print on Vellum
1994 December
31
4.63.13: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.2
Print on Vellum
1994 December
31
4.63.14: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.3
Print on Vellum
1994 December
31
4.63.15: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.4
Print on Vellum
1994 December
31
4.63.16: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.5
Print on Vellum
1994 December
31
4.63.17: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.6
Print on Vellum
1994 December
31
4.63.18: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.7
Print on Vellum
1994 December
31
4.63.19: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.8
Print on Vellum
1994 December
31
4.63.20: The Trails Streetscape Unit 3 Phase One- Landscape and Sidewalk Layout L-2.9
Print on Vellum
1994 December
31
4.63.21: The Trails Streetscape Unit 3 Phase One- Entry Feature Planting and Sidewalk Details L-2.10
Print on Vellum
1994 December
31
4.63.22: The Trails Streetscape Unit 3 Phase One- Pillars
Print on Vellum
1994 December
31
4.63.23: Highline at the Trails- Cover Page
Print on Vellum
1994 November 23
31
4.63.24: Highline at the Trails- Wall Layout and Grading
Print on Vellum
1994 November 23
31
4.63.25: Highline at the Trails- Layout and Grading Plan L-1.2
Print on Vellum
1994 November 23
31
4.63.26: Highline at the Trails- Wall Layout and Grading Plan L-1.4
Print on Vellum
1994 November 23
31
4.63.27: Highline at the Trails- Wall Layout and Grading L-1.3
Print on Vellum
1994 November 23
31
4.63.28: Highline at the Trails- Wall and Site Details L-1.5
Print on Vellum
1994 November 23
31
4.63.29: Highline at the Trails- Wall and Site Details L-1.6
Print on Vellum
1994 November 23
31
4.63.30: The Trails Streetscape Phase One Entry Features and Signs- Cover Page
Print on Mylar
1994 March 21
31
4.63.31: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.1
Print on Mylar
1994 March 21
31
4.63.32: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading
Print on Mylar
1994 March 21
31
4.63.33: The Trails Streetscape Phase One Entry Features and Signs- Hillpointe Road
Print on Mylar
1994 March 21
31
4.63.34: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.3
Print on Mylar
1994 March 21
31
4.63.35: The Trails Streetscape Phase One Entry Features and Signs- Village Center Circle
Print on Mylar
1994 March 21
31
4.63.36: The Trails Streetscape Phase One Entry Features and Signs- 2.4
Print on Mylar
1994 March 21
31
4.63.37: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.4
Print on Mylar
1994 March 21
31
4.63.38: The Trails Streetscape Phase One Entry Features and Signs- Base II 2.5
Print on Mylar
1994 March 21
31
4.63.39: The Trails Streetscape Phase One Entry Features and Signs- Entry Feature Layout and Grading 1.5
Print on Mylar
1994 March 21
31
4.63.40: The Trails Streetscape Phase One Entry Features and Signs- Entry Monument Details 1.6
Print on Mylar
1994 March 21
31
4.63.41: The Trails Streetscape Phase One Entry Features and Signs- Wall Details 1.7
Print on Mylar
1994 March 21
31
4.63.42: The Trails Streetscape Phase One Entry Features and Signs- Sign Details 1.8
Print on Mylar
1994 March 21
31
4.63.43: The Trails Streetscape Phase One Entry Features and Signs- Wall and Entry Monument Details L-2.9
Print on Mylar
1994 March 21
Summerlin Village 7
tube
32
4.64.1: Village 7
Print on Vellum
1990 June 11
32
4.64.2: Village 7
Trace Overlay
undated
32
4.64.3: Village 7 alternative 3
Print on Vellum
1990 March 21
32
4.64.4: Village 7 Alternative 4
Print on Vellum
1990 March 21
32
4.64.5: Village 7 Alternative 5
Print on Vellum
1990 March 21
Summerlin Trails Builder Walls
tube
32
4.65.1: Trails at Summerlin Design Criteria Primary Village Entry
Sepia Print on Vellum
1992 July 1
32
4.65.2: Trails at Summerlin Design Criteria Secondary Village Entry
Sepia Print on Vellum
1992 July 1
32
4.65.3: Trails at Summerlin Hillpointe Road
Blueprint on Bond
1993 March 29
32
4.65.4: Trails at Summerlin Trails Center Drive
Blueprint on Bond
1993 March 29
32
4.65.5: Trails at Summerlin Design Criteria Open Space Plan
Sepia Print on Bond
1992 July 1
32
4.65.6: Trails at Summerlin Design Criteria Underpass Concept Studies
Sepia Print on Vellum
1992 July 1
32
4.65.7: Trails at Summerlin Design Criteria Underpass Final Alternatives
Sepia Print on Vellum
1992 July 1
32
4.65.8: Trails at Summerlin Design Criteria Preliminary Site Plan
Print on Vellum
1992 July 1
32
4.65.9: Trails at Summerlin Design Criteria Village Landscape Concept Diagram
Print on Vellum
undated
32
4.65.10: Trails at Summerlin Design Criteria Entry Concept Study
Sepia Print on Vellum
1992 July 1
32
4.65.11: Trails at Summerlin Design Criteria Parcel Entry- Traditional
Sepia Print on Vellum
1992 July 1
32
4.65.12: Trails at Summerlin Design Criteria Parcel Entry- Hacienda
Sepia Print on Vellum
1992 July 1
32
4.65.13: Trails at Summerlin Design Criteria Parcel entry- Contemporary Southwest
Sepia Print on Vellum
1992 July 1
32
4.65.14: Trails at Summerlin Design Criteria Road Sections
Print on Vellum
1992 July 1
32
4.65.15: Trails at Summerlin Design Criteria Wall Concept
Sepia on Vellum
1992 July 1
32
4.65.16: Trails at Summerlin Design Criteria Village Wall Elevations
Sepia on Vellum
1992 July 1
32
4.65.17: Trails at Summerlin Design Criteria Village Wall Elevation
Sepia on Vellum
1992 July 1
32
4.65.18: Trails at Summerlin Design Criteria Road Sections
Sepia on Vellum
1992 July 1
32
4.65.19: Trails at Summerlin Design Criteria Village Parks and Open Space Diagram
Sepia on Vellum
1992 July 1
32
4.65.20: Trails at Summerlin Design Criteria Park Program Analysis
Blueprint on Bond
1992 July 1
32
4.65.21: Trails at Summerlin Design Criteria Park Alternatives
Print on Bond
1992 July 1
32
4.65.22: Trails at Summerlin Design Criteria Park Alternatives
Print on Bond
1992 July 1
32
4.65.23: Trails at Summerlin Design Criteria Retail Center Criteria
Print on Bond
1992 July 1
Summerlin Phase 1
tube
33
4.66.1: Village Seven Context Plan Color
Blueprint on Mylar
undated
33
4.66.2: Village Seven Context Plan Black and White
Print in Mylar
undated
33
4.66.3: Village Seven Context Plan
Print on Bond
1988 October 12
33
4.66.4: Village Seven Topography Map
Print on Mylar
undated
33
4.66.5: Village Seven Concept Plan
Print on Bond
1988 October 12
33
4.66.6: Village Seven Concept Plan
Print on Bond
1988 October 12
33
4.66.7: Summerlin Phase 1
Print on Bond
undated
33
4.66.8: Summerlin Phase 1
Print on Mylar
undated
33
4.66.9: Sun City Summerlin Del Webb
Print on Bond
undated
33
4.66.10: Desert Shores Concept Plan
Print on Bond
undated
33
4.66.11: Concept Diagram
Marker on Trace
undated
33
4.66.12: Environmental Analysis
Marker on Trace
1988 September 1
33
4.66.13: Drainage Ways & Boundaries
Marker on Trace
1988 September 1
33
4.66.14: Utilities
Marker on Trace
1988 September 1
33
4.66.15: Measurements
Marker on Trace
undated
33
4.66.16: Study Area Analysis
Marker on Trace
undated
33
4.66.17: Summerlin Alternative 'B' Land Use Concept
Print on Bond
1990 July 2
33
4.66.18: Summerlin Phase 1
Marker on Bond
undated
33
4.66.19: Summerlin Phase 1
Marker on Bond
undated
33
4.66.20: Phase One Utilities
Tape on Bond
1988 September 29
Summerlin Hills Park Children's Fountain and Adult Pool
tube
34
4.67.1: Bath House HVAC Plan, M-1,
Print on Vellum
1989 December 13
34
4.67.2: Public Restrooms-Pluming, P-1
Print on Vellum
1989 December 13
34
4.67.3: Bath House HVAC Plan, P-2
Print on Vellum
1989 December 13
34
4.67.4: The Hills Park Main Pool Project Info SP-1
Print on Vellum
undated
34
4.67.5: The Hills Park Mechanical Room, SP-2
Print on Vellum
undated
34
4.67.6: The Hills Park Plumbing and Water, SP-3
Print on Vellum
undated
34
4.67.7: The Hills Park Deck and Safety Equipment
Print on Vellum
undated
34
4.67.8: Summerlin The Hills Park Title Page
Print on Mylar
undated
34
4.67.9: Summerlin The Hills Park Site Plan, CS1.1
Print on Mylar
1989 September 29
34
4.67.10: Summerlin The Hills Park Site Landscape Plan, CS1.2
Print on Mylar
1989 September 29
34
4.67.11: Summerlin The Hills Park Ramada, CS2.3
Print on Vellum
1989 September 20
34
4.67.12: Summerlin The Hills Park Portal, CS2.5
Print on Vellum
1989 September 20
34
4.67.13: Summerlin The Hills Park Pavilion, CS2.1
Print on Vellum
1989 September 20
34
4.67.14: Summerlin The Hills Park Pavilion, CS2.2
Print on Vellum
1989 September 20
34
4.67.15: Summerlin The Hills Park Toilet Building, CS2.4
Print on Vellum
1989 September 20
34
4.67.16: Summerlin The Hills Park Children's Fountain Layout, L-3.8
Print on Vellum
1989 December 22
34
4.67.17: Summerlin The Hills Park Site Plan
Print on Vellum
1989 December 12
34
4.67.18: Summerlin The Hills Park Plaza Fountain Layout, L-3.7
Print on Mylar
1989 December 22
34
4.67.19: Summerlin The Hills Park Sunken Garden Layout, L-3.5
Print on Mylar
1989 December 22
34
4.67.20: Summerlin The Hills Park Site Plan
Print on Mylar
undated
34
4.67.21: Summerlin The Hills Park Site Grading Plan, L-2.1
Print on Mylar
undated
34
4.67.22: Typographical Map
Print on Mylar
undated
Summerlin Village 1 Walls
tube
35
4.68.1: Village One Streetscape Schematic Design Package; 22 Pages
Blueprint and Pen on Bond
1989 March 17
35
4.68.2: Summerlin Street C: Tree and Light Layout
Print on Bond
1989 May 22
35
4.68.3: Summerlin Street A: Tree and Light Layout
Print on Bond
1989 May 22
35
4.68.4: Summerlin Street B: Tree and Light Layout
Print on Bond
1989 May 22
35
4.68.5: Summerlin Village One Streetscape Wall Types
Print on Vellum
undated
35
4.68.6: Summerlin Village One Streetscape Wall Types
Print on Vellum
undated
35
4.68.7: Summerlin Village One Streetscape Wall Type B (pre-drawing)
Variety on Bond
undated
35
4.68.8: Summerlin Village One Streetscape Wall Type A
Print on Bond
undated
35
4.68.9: Summerlin Village One Streetscape Wall Type B
Print on Bond
undated
35
4.68.10: Summerlin Concept Plan Village One North; 4 pages
Print on Vellum
1989 June 22
35
4.68.11: Summerlin Wall Type Matrix
Print on Bond
undated
35
4.68.12: Summerlin Ground Plane Plan
Print on Bond
undated
35
4.68.13: Summerlin Village One Streetscape Planting Plant, 8 pages
Blue Print on Bond
1989 July 5
35
4.68.14: Summerlin Village One Streetscape Slopes Greater Than 3.3%
Print and Marker on Bond
1989 June 8
35
4.68.15: Summerlin Village One Streetscape View Wall Locations
Print and Marker on Bond
1986 June 8
35
4.68.16: Pillar Sketches
Pencil on Trace
undated
35
4.68.17 A: Alternate A: Steep Slope Pilaster Spacing greater than 3.3%
Marker on Trace
1989 June 8
35
4.68.17 B: Alternate A: Steep Slope Pilaster Spacing greater than 3.3%
Marker on Trace
1989 June 8
35
4.68.18: Wall Step Detail "B"
Marker on Trace
1989 June 8
35
4.68.19: Village One North Streetscape Wall Colors
Print on Bond
1989 July 21
35
4.68.20: View Wall Exhibits
Print on Bond
1989 June 6
35
4.68.21: Custom Precast Concrete Coping
Print on Bond
1989 June 6
35
4.68.22: Fence Drawing
Pencil on Graph
undated
35
4.68.23: Fence Drawing
Pencil on Graph
undated
35
4.68.24: Summerlin Hills Village Drive Alt. A
Pencil on Graph
undated
35
4.68.25: Summerlin Town Center Alt. A
Pencil on Graph
undated
35
4.68.26: Summerlin Rampart/L. Mead
Pencil on Graph
undated
35
4.68.27: Summerlin Crosswalk and Wheelchair Ramp and Village Arterial Connector 5 pages
Print on Bond
undated
35
4.68.28: Streetscape Detail
Print on Vellum
undated
Summerlin Village 7 Planning
tube
36
4.69.1: Alternative 5 Village Seven
Print on Bond
1990 March 21
36
4.69.2: Shared Clubhouse Alternative A Village Seven Summerlin
Print on Vellum
1990 July 2
36
4.69.3: Village Seven Site Conditions Summary Plan
Print on Bond
1990 January 25
36
4.69.4: Village Seven Context Plan Summerlin
Print on Bond
1990 January 30
36
4.69.5: Design Analysis Village Seven Summerlin
Print on Bond
1990 January 30
36
4.69.6: Concept Diagram; Village Seven Summerlin
Print on Bond
1990 January 30
36
4.69.7: Concepts Village Seven
Print on Bond
undated
36
4.69.8: Alternative A Village Seven
Print on Bond
1990 January 30
36
4.69.9: Alternative B Village Seven
Print on Bond
1990 January 30
36
4.69.10: Alternative C Village Seven
Print on Bond
1990 January 30
36
4.69.11: Alternative D Village Seven
Print on Bond
1990 January 30
36
4.69.12: Alternative E Village Seven
Print on Bond
1990 January 30
36
4.69.13: Alternative 1 Village Seven
Print on Bond
1990 January 30
36
4.69.14: Alternative 2 Village Seven
Print on Bond
1990 January 30
36
4.69.15: Concept Diagram
Print on Bond
1990 February 16
36
4.69.16: Alternative 3 Village Seven
Print on Bond
1990 January 30
36
4.69.17: Alternative 4 Village Seven
Print on Bond
1990 January 30
Summerlin Village 2 Park
tube
37
4.70.1: Street Perspective Detail
Print on Vellum
undated
37
4.70.2: Street Perspective Detail Round-A-Bout
Print on Vellum
undated
37
4.70.3: Street Perspective Detail Entry
Print on Vellum
undated
37
4.70.4: Street Perspective Detail Entry 2
Print on Vellum
undated
37
4.70.5: Summerlin Village 1 Parcel Entry 1
Print on Vellum
undated
37
4.70.6: Village One Streetscape Town Center Entry
Print on Vellum
undated
37
4.70.7: Village One Streetscape Primary Entry
Print on Vellum
undated
37
4.70.8: Village One Streetscape Primary Entry 2
Print on Vellum
undated
37
4.70.9: Village One Streetscape Secondary Entry
Print on Vellum
undated
37
4.70.10: The Hills Open Space System
Print on Vellum
1991 February 1
37
4.70.11: The Pueblo Open Space System
Print on Vellum
1991 February 1
37
4.70.12: Open Space Plan Identifying Neighborhood Parks
Print on Vellum
undated
37
4.70.13: Typographical Map
Print on Clear Mylar
undated
37
4.70.14: Phase One Village Center Summerlin
Print on Vellum
undated
37
4.70.15: Street Concept Overlay
Print on Vellum
undated
37
4.70.16: Summerlin Village 1
Print on Vellum
undated
37
4.70.17: Typographical Map
Print on Vellum Graph
undated
Summerlin The Trails Planning Documents
tube
38
4.71.1: The Trails Park Concept Plan
Blueprint on bond
1992 December 17
38
4.71.2: The Trails at Summerlin Image Concepts; 25 pages
Blueprint on bond
1992 July 1
The Hills at Summerlin Village Design
tube
38
4.72.1: The Hills at Summerlin Village Design Concept
Print on Bond
1989 October 6
Summerlin Trails Builder Walls
tube
39
4.73.1: The Trails Streetscape-Phase One, 1.8
Print on Vellum
undated
39
4.73.2: The Trails Streetscape-Phase One, 1.7
Print on Vellum
undated
39
4.73.3: The Trails Streetscape-Phase One, 1.6
Print on Vellum
undated
39
4.73.4: The Trails Streetscape-Phase One, 1.5
Print on Vellum
undated
39
4.73.5: The Trails Streetscape-Phase One, 1.4
Print on Vellum
undated
39
4.73.6: The Trails Streetscape-Phase One, 1.3
Print on Vellum
undated
39
4.73.7: The Trails Streetscape-Phase One, 1.2
Print on Vellum
undated
39
4.73.8: The Trails Streetscape-Phase One, 1.1
Print on Vellum
undated
39
4.73.9: The Trails Streetscape Summerlin Title and Key
Print on Vellum
undated
39
4.73.10: The Trails Streetscape-Phase One, 2.18
Print on Vellum
undated
39
4.73.11: The Trails Streetscape-Phase One, 2.17
Print on Vellum
undated
39
4.73.12: The Trails Streetscape-Phase One, 2.16 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.13: The Trails Streetscape-Phase One, 2.15 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.14: The Trails Streetscape-Phase One, 2.14 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.15: The Trails Streetscape-Phase One, 2.13a Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.16: The Trails Streetscape-Phase One, 2.13 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.17: The Trails Streetscape-Phase One, 2.12
Print on Vellum
undated
39
4.73.18: The Trails Streetscape-Phase One, 2.9 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.19: The Trails Streetscape-Phase One, 2.8 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.20: The Trails Streetscape-Phase One, 2.7 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.21: The Trails Streetscape-Phase One, 2.6 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.22: The Trails Streetscape-Phase One, 2.5 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.23: The Trails Streetscape-Phase One, 2.4 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.24: The Trails Streetscape-Phase One, 2.3 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.25: The Trails Streetscape-Phase One, 2.2 Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.26: The Trails Open Space-Phase One Title
Print on Vellum
1994 May 2
39
4.73.27: The Trails Open Space-Phase One, Grading Plan, L-1.1, 1'=20"
Print on Vellum
1994 May 2
39
4.73.28: The Trails Open Space-Phase One, Grading Plan, L-1.2, 1'=20"
Print on Vellum
1994 May 2
39
4.73.29: The Trails Open Space-Phase One, Grading Plan, L-1.3, 1'=20"
Print on Vellum
1994 May 2
39
4.73.30: The Trails Open Space-Phase One, Grading Plan, L-1.4, 1'=20"
Print on Vellum
1994 May 2
39
4.73.31: The Trails Open Space-Phase One, Layout Plan, L-2.1, 1'=20"
Print on Vellum
1994 May 2
39
4.73.32: The Trails Open Space-Phase One, Layout Plan, L-2.2, 1'=20"
Print on Vellum
1994 May 2
39
4.73.33: The Trails Open Space-Phase One, Layout Plan, L-2.3, 1'=20"
Print on Vellum
1994 May 2
39
4.73.34: The Trails Open Space-Phase One, Layout Plan, L-2.4, 1'=20"
Print on Vellum
1994 May 2
39
4.73.35: The Trails Open Space-Phase One, Site Details, L-2.6, 1'=20"
Print on Vellum
1994 May 2
39
4.73.36: The Trails Open Space-Phase One, Landscape Plan, L-3.1, 1'=20"
Print on Vellum
1994 May 2
39
4.73.37: The Trails Open Space-Phase One, Landscape Plan, L-3.2, 1'=20"
Print on Vellum
1994 May 2
39
4.73.38: The Trails Open Space-Phase One, Landscape Plan, L-3.3, 1'=20"
Print on Vellum
1994 May 2
39
4.73.39: The Trails Open Space-Phase One, Landscape Plan, L-3.4, 1'=20"
Print on Vellum
1995 May 2
39
4.73.40: The Trails Open Space-Phase One, L-3.5, 1'=20"
Print on Vellum
1996 May 2
39
4.73.41: The Trails Streetscape-Phase One, 2.1 Landscape and Sidewalk Layout
Print on Vellum
1994 April 25
39
4.73.42: The Trails Streetscape-Phase One Title
Print on Vellum
1994 May 2
39
4.73.43: The Trails at Summerlin Colored Street Plan
Marker on Bond
undated
39
4.73.44: The Trails Streetscape Parcel H-2/C-3 Title
Print on Vellum
undated
39
4.73.45: The Trails Streetscape Parcel H-2/C-3, L-2.1, Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.46: The Trails Streetscape Parcel H-2/C-3, L-2.2, Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.47: The Trails Streetscape Parcel H-2/C-3, L-2.3, Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.48: The Trails Streetscape Parcel H-2/C-3, L-2.3, Landscape and Sidewalk Layout
Print on Vellum
undated
39
4.73.49: The Trails Streetscape Parcel H-2/C-3, L-2.1, Landscape and Sidewalk Layout without Plantings
Print on Vellum
undated
39
4.73.50: The Trails Streetscape Parcel H-2/C-3, L-2.2, Landscape and Sidewalk Layout without Plantings
Print on Vellum
undated
39
7.73.51: The Trails Streetscape Parcel H-2/C-3, L-2.4, Landscape and Sidewalk Details
Print on Vellum
undated
39
4.73.52: The Trails Streetscape Parcel H-2/C-3, L-2.5, Typical Grading Sections
Print on Vellum
undated
39
4.73.53: The Trails Streetscape Parcel H-2/C-3, L-3.1, Irrigation Plan
Print on Vellum
undated
39
4.73.54: The Trails Streetscape Parcel H-2/C-3, L-3.2, Irrigation Plan
Print on Vellum
undated
39
4.73.55: The Trails Streetscape Parcel H-2/C-3, L-3.3, Irrigation Plan
Print on Vellum
undated
39
4.73.56: The Trails Streetscape Parcel H-2/C-3, L-3.4, Irrigation Details
Print on Vellum
undated
39
4.73.57: The Trails as Summerlin Spring Gate Lane
Marker and Photos on Bond
1933 March 29
39
4.73.58: The Trails as Summerlin Spring Lake Mead Boulevard
Marker and Photos on Bond
1993 March 29
Summerlin Village 2
tube
40
4.74.1 A: Site Summary Map Village 2
Print on Bond
1989 January 9
40
4.74.1 B: Site Summary Map Village 2
Print on Bond
1989 January 9
40
4.74.2: Summerlin Village Two Open Space Concept
Marker on Trace
1988 November 29
40
4.74.3: Site Drainage
Marker on Trace
undated
40
4.74.4: Typographical Map
Print on Bond
undated
40
4.74.5: Typographical Map
Print on Vellum
undated
40
4.74.6: Typographical Map (Large Scale)
Print on Vellum
undated
40
4.74.7: Parcel Concept Map
Marker on Trace
undated
40
4.74.8: Parcel Concept Map
Marker on Trace
1989 January 12
40
4.74.9: Concept Drawing
Marker on Trace
undated
40
4.74.10: Parcel Concept Map
Marker on Trace
undated
40
4.74.11: Summerlin Village Two Use and Circulation Concept Plan
Marker on Trace
1988 November 29
40
4.74.12: Parcel Concept Map
Marker on Trace
undated
40
4.74.13: Acreage Count Parcel Concept Map
Marker on Trace
undated
40
4.74.14: Alternate A: "The Tied Together Neighborhood"
Marker on Trace
1988 November 16
40
4.74.15: Alternate B: "Separate Neighborhood"
Marker on Trace
1988 November 16
40
4.74.16: Drainage #1 Section A-A Summerlin Village 2
Marker on Trace
undated
40
4.74.17: Drainage #1 Section C-C Summerlin Village 2
Marker on Trace
undated
40
4.74.18: Site Summary Map Village 2 Typographical Map and Slopes
Print on Vellum
1989 January 9
40
4.74.19: Schematic Parcel Plan Village 2 Village Center
Print on Bond
1990 May 2
40
4.74.20: Village 2 Illustrative Plan Summerlin
Print on Bond
1990 December
40
4.74.21: Line Schematic Drawing
Print on Bond
undated
40
4.74.22: The Pueblo Walkway/Trail System
Print on Bond
undated
Summerlin Community Entry Design Drawings
tube
41
4.75.1: Entry Sketch
Marker on Trace
undated
41
4.75.2: Community Entry Detailed Layout
Pencil on Trace
1992 March 16
41
4.75.3: Summerlin Community Entry
Print on Bond
1991 June 11
41
4.75.4: Community Entry, L-3.2
Print on Vellum
1991 October 18
41
4.75.5: Community Entry, L-3.3
Print on Vellum
1991 October 18
41
4.75.6: Cross Section Summerlin Community Entry
Marker on Trace
undated
41
4.75.7: North Entry Planting Plan
Print on Vellum
undated
41
4.75.8: North Entry Layout and Grading
Print on Vellum
undated
41
4.75.9: Community Entry Planting and Site Details, L-3.1
Print on Vellum
1991 October 18
41
4.75.10: Community Entry South Entry Planting Plan, L-2.1
Print on Vellum
1991 October 18
41
4.75.11: Community Entry South Entry Layout and Grading, L-1.1
Print on Vellum
1991 October 18
41
4.75.12: Community Entry South Irrigation Plan, I-1
Print on Vellum
1991 October 18
41
4.75.13: Community Entry North Irrigation Plan, I-2
Print on Vellum
1991 October 18
41
4.75.14: Community Entry Irrigation Details, I-3
Print on Vellum
1991 October 18
41
4.75.15: Community Entry South Irrigation Schedule, I-4
Print on Vellum
1991 October 18
41
4.75.16: Summerlin Community Entry South Lighting Plan, E-1
Print on Vellum
1991 October 18
41
4.75.17: Summerlin Community Entry Electric Schedules and Details, E-3
Print on Vellum
1991 October 18
41
4.75.18: Summerlin Community Entry Electrical Details, E-4
Print on Vellum
1991 October 18
41
4.75.19: Irrigation Details, I-3
Print on Vellum
undated
41
4.75.20: Irrigation Schedule, I-4
Print on Vellum
undated
41
4.75.21: Plan View Sketch Entry
Marker on Trace
undated
41
4.75.22: Summerlin Parkway/Rampart Blvd Entry Statement- Phase 2, L-3
Blueprint on Bond
1990 January 23
41
4.75.23: Summerlin Community Entry Lake Mead and Buffalo Option B
Print on Bond
undated
41
4.75.24: Summerlin Community Entry Lake Mead and Buffalo Option A
Print on Bond
undated
41
4.75.25: Summerlin Community Entry Electrical Schedules and Details, E-1
Print on Vellum
1991 August 7
41
4.75.26: Summerlin Community Entry North Lighting Plan, E-2
Print on Vellum
1991 August 7
41
4.75.27: Summerlin Community Entry South Lighting Plan, E-3
Print on Vellum
1991 August 7
41
4.75.28: Summerlin Community Entry Electrical Details, E-4
Print on Vellum
1991 August 7
41
4.75.29: Entry Perspective Drawing
Marker on Trace
undated
41
4.75.30: Entry Sign Details, L-3.2
Print on Mylar
undated
41
4.75.31: Summerlin Community Entry Pyramid and Wall Detail, L-3.1
Print on Mylar
undated
41
4.75.32: The Pueblo at Summerlin Irrigation Schedule
Print on Mylar
undated
41
4.75.33: Community Entry Lake Mead and Buffalo Drive
Print on Mylar
undated
41
4.75.34: Community Entry Lake Mead and Buffalo Drive Irrigation
Print on Mylar
undated
41
4.75.35 A: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
7.75.35 B: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 C: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 D: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 E: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 F: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 G: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.35 H: Summerlin Community Entry at Lake Mead and Buffalo Drive Package
Print on Mylar
1990 March 2
41
4.75.36: Summerlin Community Entry General Details, L-3.2
Print on Mylar
undated
41
4.75.37: Oasis Landscape Entry The Pueblo at Summerlin
Print on Vellum
undated
41
4.75.38: Desert Landscape Entry The Pueblo at Summerlin
Print on Vellum
undated
41
4.75.39: Entry Section Elevation
Marker on Trace
undated
41
4.75.40: Entry Statement Elevation Option B
Print on Vellum
undated
41
4.75.41: Entry Statement Elevation Option A
Print on Vellum
undated
41
4.75.42: Construction Detail of Intersection
Print on Vellum
undated
Summerlin Village 1 North Parcel Criteria
tube
42
4.76.1: The Hills at Summerlin Parcel NFA Design and Engineering Criteria
Print on Photo paper
undated
42
4.76.2: Summerlin Density and Rating
Print on Mylar
1989 March 14
42
4.76.3: The Hills at Summerlin Parcel Program Summary
Print on Mylar
undated
42
4.76.4: The Hills at Summerlin Village Design Concept
Print on Mylar
1989 September 1
42
4.76.5: The Hills at Summerlin Parcel A Planning Criteria
Print on Mylar
1989 September 1
42
4.76.6: The Hills at Summerlin Parcel B Planning Criteria
Print on Mylar
1989 September 1
42
4.76.7: The Hills at Summerlin Parcel C Planning Criteria
Print on Mylar
1989 September 1
42
4.76.8: The Hills at Summerlin Parcel D Planning Criteria
Print on Mylar
1989 September 1
42
4.76.9: The Hills at Summerlin Parcel DD Planning Criteria
Print on Mylar
1989 September 1
42
4.76.10: The Hills at Summerlin Parcel E Planning Criteria
Print on Mylar
1989 September 1
42
4.76.11: The Hills at Summerlin Parcel F Planning Criteria
Print on Mylar
1989 September 1
42
4.76.12: The Hills at Summerlin Parcel G Planning Criteria
Print on Mylar
1989 September 1
42
4.76.13: The Hills at Summerlin Parcel H Planning Criteria
Print on Mylar
1989 September 1
42
4.76.14: The Hills at Summerlin Parcel I Planning Criteria
Print on Mylar
1989 September 1
42
4.76.15: The Hills at Summerlin Parcel J Planning Criteria
Print on Mylar
1989 September 1
42
4.76.16: The Hills at Summerlin Parcel K Planning Criteria
Print on Mylar
1989 September 1
42
4.76.17: The Hills at Summerlin Parcel KK Planning Criteria
Print on Mylar
1989 September 1
42
4.76.18: The Hills at Summerlin Neighborhood Focus (NFC) Parcel Planning Criteria
Print on Mylar
1989 September 1
42
4.76.19: The Hills at Summerlin- The Hills Park and School Complex- 1st Phase Improvement
Print on Mylar
1989 September 1
42
4.76.20: The Hills at Summerlin- The Hills Park and School Complex- Planning Criteria
Print on Mylar
1989 September 1
42
4.76.21: The Hills at Summerlin- Parcel Entry and Model Home Complex
Print on Mylar
undated
42
4.76.22: Summerlin Village One Pods Preliminary Design Package
Print on Various
undated
42
4.76.23: The Hills at Summerlin Parcel A-KK
Print on Mylar
1989 September 1
42
4.76.24: The Hills at Summerlin- Parcel K, Alternate A and B
Marker on Trace
1989 October 27
42
4.76.25: The Hills at Summerlin- Parcel I, Alternate A and B
Marker on Trace
1989 October 27
Summerlin Streetscapes The Trails Streetscape Super Ceded Drawings
tube
43
4.77.1: The Trails Streetscape Title
Print on Bond
undated
43
4.77.2: The Trails Streetscape Landscape and Sidewalk Layout, L-2.1
Print on Bond
1955 November 29
43
4.77.3: The Trails Streetscape Landscape and Sidewalk Layout, L-2.2
Print on Bond
1955 November 29
43
4.77.4: The Trails Streetscape Landscape and Sidewalk Layout, L-2.3
Print on Bond
1955 November 29
43
4.77.5: The Trails Streetscape Landscape and Sidewalk Layout, L-2.4
Print on Bond
1955 November 29
43
4.77.6: The Trails Streetscape Landscape and Sidewalk Layout, L-2.5
Print on Bond
1955 November 29
43
4.77.7: The Trails Streetscape Landscape and Sidewalk Layout, L-2.6
Print on Bond
1955 November 29
43
4.77.8: The Trails Streetscape, L-2.7
Print on Mylar
1995 October 23
43
4.77.9: The Trails Streetscape, L-2.8
Print on Mylar
1995 October 23
43
4.77.10: The Trails Streetscape Irrigation Plan, I-3.1
Print on Vellum
1995 October 23
43
4.77.11: The Trails Streetscape Irrigation Plan, I-3.2
Print on Vellum
1995 October 23
43
4.77.12: The Trails Streetscape Irrigation Plan, I-3.3
Print on Vellum
1995 October 23
43
4.77.13: The Trails Streetscape Irrigation Plan, I-3.4
Print on Vellum
1995 October 23
43
4.77.14: The Trails Streetscape Irrigation Plan, I-3.5
Print on Vellum
1995 October 23
43
4.77.15: The Trails Streetscape Irrigation Plan, I-3.6
Print on Vellum
1995 October 23
43
4.77.16: The Trails Streetscape Irrigation Plan, I-3.7
Print on Vellum
1995 October 23
43
4.77.17: The Trails Streetscape Irrigation Plan, I-3.8
Print on Vellum
1995 October 23
Summerlin Village 2 Park
tube
43
4.78.1: Overlook of Summerlin
Print on Mylar
undated
The Trails Illustrative Plan
tube
43
4.79.1: The Trails Park Illustrative Site Plan
Colored Pencil on Mylar
undated
43
4.79.2: The Trails Open Space Phase I Illustrative Site Plan
Colored Pencil on Mylar
undated
43
4.79.3: The Trails Open Space Phase II and III Illustrative Site Plan
Colored Pencil on Mylar
undated
The Trails Phase 2
tube
44
4.80.1: Proposed Future Design Grade
Print and Pencil on Bond
undated
44
4.80.2: The Trails Streetscape Phase 2 Overlay 2.1 (3 pgs)
Print on Variety
1995 June 8
44
4.80.3: The Trails Streetscape Phase 2 Overlays 2.2 (3 pgs)
Print on Mylar
1995 February-June
44
4.80.4: The Trails Streetscape Phase 2 Overlay 2.3 (3 pgs)
Print on Variety
1995 June 8
44
4.80.5: Phase 2 Overlay 2.4
Print on Mylar
1995 June 7
44
4.80.6: The Trails Streetscape Phase 2 Overlay 2.4 ( 4 pgs)
Print on Mylar
1995 February-June
44
4.80.7: The Trails Streetscape Phase 2 Overlay 2.5 (3 pgs)
Print on Mylar
1995 June 8
44
4.80.8: Phase 2 Overlay 2.5
Print on Mylar
1995 June 7
44
4.80.9: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.1
Print on Vellum
1995 September 1
44
4.80.10: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.2
Print on Vellum
1995 September 1
44
4.80.11: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.3
Print on Vellum
1995 September 1
44
4.80.12: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.4
Print on Vellum
1995 September 1
44
4.80.13: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.5
Print on Vellum
1995 September 1
44
4.80.14: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Irrigation I-3.6
Print on Vellum
1995 September 1
44
4.80.15: The Trails Streetscape Parcel D-1/E-1/J-1/A-1
Print on Bond
undated
44
4.80.16: Parcel E-1/D-1/A-1/J-1 Landscape and Sidewalk Layout
Print on Mylar
undated
44
4.80.17: Parcel E-1/D-1/A-1/J-1 Landscape and Sidewalk Layout
Print on Mylar
1995 September 1
44
4.80.18: Parcel E-1/D-1/A-1/J-1
Print on Mylar
undated
44
4.80.19: Parcel E-1/D-1/A-1/J-1
Print on Mylar
1995 September 1
44
4.80.20: Parcel E-1/ D-1/A-1/J-1 Landscape and Sidewalk Layout L-2.5
Print on Mylar
1995 September 1
44
4.80.21: The Trails Streetscape Parcel E-1/J-1 Planting and Sidewalk Details L-2.5
Print on Mylar
undated
44
4.80.22: The Trails Streetscape Parcel E-1/D-1/A-1/J-1 Typical Grading
Print on Mylar
1995 September 1
44
4.80.23: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 Cover Page
Print on Mylar
undated
44
4.80.24: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2 Landscape and Sidewalk Layout L-2.1
Sepia Print on Vellum
1995 June 8
44
4.80.25: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2 Landscape and Sidewalk Layout L-2.2
Sepia Print on Vellum
1995 June 8
44
4.80.26: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.3
Sepia Print on Vellum
1995 June 8
44
4.80.27: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 L-2.4
Print on Mylar
undated
44
4.80.28: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.4
Sepia Print on Vellum & Colored Pencil
1995 June 8
44
4.80.29: The Trails Streetscape Parcel I-1/H-1/A-2 Landscape and Sidewalk Layout L-2.5
Sepia Print on Vellum & Colored Pencil
1995 June 8
44
4.80.30: The Trails Streetscape Parcel I-1/H-1/A-2 Planting and Sidewalk Details L-2.6
Sepia Print on Vellum & Colored Pencil
1995 June 8
44
4.80.31: The Trails Streetscape Phase 2 Parcel I-1/H-1/A-2 L-2.7
Print on Mylar
1995 February 16
44
4.80.32: The Trails Streetscape Parcels I-1/ H-1/A-2 L-2.7
Print on Mylar
1995 February 16
44
4.80.33: The Trails Streetscape Phase 2 Parcel H-1/I-1/A-2
Sepia Print on Vellum
1995 June 8
44
4.80.34: The Trails Streetscape Parcel I-1/H-1/A-2 Typical Grading Section L-2.7
Sepia Print on Vellum & Colored Pencil
1995 June 8
44
4.80.35: The Trails Streetscape Parcel I-1/H-1/A-2 Irrigation I-3.1
Print on Bond
1995 June 8
44
4.80.36: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.2
Print on Bond
1995 February 15
44
4.80.37: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.3
Print on Bond
1995 February 15
44
4.80.38: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.4
Print on Bond
1995 February 15
44
4.80.39: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation I-3.5
Print on Bond
1995 February 15
44
4.80.40: The Trails Streetscape Phase II Parcel H-1/I-1/A-2 Irrigation Details Notes & Schedules I-3.6
Print on Bond
1995 February 15
44
4.80.41: The Trails Streetscape Parcel G-1/H-1/B-1
Print on Mylar
undated
44
4.80.42: The Trails Streetscape Parcel I-1/D-2/D-1
Print on Mylar
undated
44
4.80.43: The Trails Streetscape Parcel H-1/X/I-1/W
Print on Mylar
undated
44
4.80.44: The Trails Streetscape Spring Gate Lane
Print on Mylar
undated
44
4.80.45: The Trails Streetscape Parcel E-1/J-1 2.13a
Print on Mylar
undated
44
4.80.46: Planting Plan Landscape and Sidewalk Layout
Print on Mylar
undated
44
4.80.47: Planting Plan Landscape and Sidewalk Layout
Print on Mylar
undated
44
4.80.48: Planting Plan
Print on Mylar
undated
44
4.80.49: Landscape and Sidewalk Layout and Planting Plan
Print on Mylar
undated
The Trails Open Space
tube
45
4.81.1: The Trails Open Space Phase II and III Illustrative Site Plan
Print on Mylar
undated
45
4.81.2: The Trails at Summerlin Park and Open Space Plan
Marker on Trace
undated
45
4.81.3: The Trails Open Space at Summerlin Illustrative Site Plan
Colored Print on Bond
undated
45
4.81.4: The Trails Open Space Phase I Illustrative Site Plan
Print on Mylar
undated
The Hills Park
tube
46
4.82.1: The Hills Park Contract Document Issued for Construction Cover Page
Print on Mylar
1991 February 4
46
4.82.2: The Hills Park Site Utilities Overall Plan C-1
Print on Bond
1990 October 1
46
4.82.3: The Hills Park Site Utilities Core Area C-2
Print on Bond
1990 October 1
46
4.82.4: The Hills Park Storm Sewer Plan and Profile C-3
Print on Bond
1990 October 1
46
4.82.5: The Hills Park Site Grading Plan L-2.1
Print on Mylar
1990 October 1
46
4.82.6: The Hills Park Core Area Grading Plan L-2.2
Print on Mylar
1990 October 1
46
4.82.7: The Hills Park Site Layout Plan L-3.1
Print on Mylar
1990 October 1
46
4.82.8: The Hills Park Core Area Layout Plan L-3.2
Print on Mylar
1990 October 1
46
4.82.9: The Hills Park Core Area Layout Plan L-3.2
Print & Marker on Bond
1990 October 1
46
4.82.10: The Hills Park Plaza/Entry Court Layouts L-3.3
Sepia on Mylar
1990 October 1
46
4.82.11: The Hills Park Playground Layout and Details L-3.6
Sepia on Mylar
1990 October 1
46
4.82.12: The Hills Park General Site Details L-4.3
Sepia on Mylar
1990 October 1
46
4.82.13: The Hills Park Details-Sports Courts L-4.2
Print on Mylar
1990 October 1
46
4.82.14: The Hills Park General Site Details L-4.1
Sepia on Mylar
1990 October 1
46
4.82.15: The Hills Park Site Planting Plan L-5.1
Sepia on Mylar
1990 October 1
46
4.82.16: The Hills Park Core Area Planting Layout Plan L-5.2
Sepia on Mylar
1990 October 1
46
4.82.17: The Hills Park Plaza/Entry Courts Planting L-5.3
Sepia on Mylar
1990 October 1
46
4.82.18: The Hills Park Planting Details L-5.5
Sepia on Mylar
1990 October 1
46
4.82.19: The Hills Park Site Irrigation Plan I-1
Print on Bond
1990 October 1
46
4.82.20: The Hills Park Core Area Irrigation plan I-2
Print on Bond
1990 October 1
46
4.82.21: Plaza/Entry Courts Irrigation Plan I-3
Print on Bond
1990 October 1
46
4.82.22: The Hills Park Site Irrigation Plan I-1
Sepia on Mylar
1990 October 1
46
4.82.23: The Hills Park Core Area Irrigation Plan I-2
Sepia on Mylar
1990 October 1
46
4.82.24: Plaza/Entry Courts Irrigation Plans I-3
Sepia on Mylar
1990 October 1
46
4.82.25: The Hills Park Irrigation details I-4
Sepia on Mylar
1990 October 1
46
4.82.26: The Hills Park Irrigation Details I-5
Sepia on Mylar
1990 October 1
46
4.82.27: The Hills Park Fountain Mechanical Details F-1
Sepia on Mylar
1990 October 1
46
4.82.28: The Hills Park Pavilion Floor Plan Elevation A1
Sepia on Mylar
1990 October 1
46
4.82.29: The Hills Park Pavilion Sections A2
Print on Mylar and Colored Pencil
1990 October 1
46
4.82.30: The Hills Park Pavilion Framing Plans and Details A3
Print on Mylar and Colored Pencil
1990 October 1
46
4.82.31: The Hills Park Ramada Layout and Details A4
Print on Mylar
1990 October 1
46
4.82.32: The Hills Park Ramada Elevations Details A5
Print on Mylar
1990 October 1
46
4.82.33: The Hills Park Public Toilets Plans Elevation Details A7
Print on Mylar
1990 October 1
46
4.82.34: The Hills Park Sections and Details A10
Print on Mylar
1990 October 1
46
4.82.35: The Hills Park A11
Print on Mylar
1990 October 1
46
4.82.36: The Hills Park Pavilion Foundation Plan S-1
Print on Bond
1990 October 1
46
4.82.37: The Hills Park Pavilion Roof Framing Plan S-2
Print on Bond
1990 October 1
46
4.82.38: The Hills Park Ramada and Public Toilets Foundations and Roof Framing Plans S-3
Print on Bond
1990 October 1
46
4.82.39: The Hills Park Typical Structural Details S-7
Print on Bond
1990 October 1
46
4.82.40: The Hills Park Site Electrical Plan E1-E3
Blueprint
1990 October 1
46
4.82.41: The Hills Park Electrical Details E-4
Print on Bond
1990 October 1
46
4.82.42: The Hills Park Core Area Electrical Plan E-2
Print & Marker on Bond
1990 October 1
46
4.82.43: The Hills Park Public Toilets Plumbing Floor Plan P-1
Print on Bond
1990 October 1
Summerlin
tube
47
4.83.1: The Trails Streetscape Phase I Entry Features & Design (9 pgs)
Blueprint
1994 March 21
47
4.83.2: The Trails Builder Entries - Lewis Homes (Willow Bend) (8 pgs)
Blueprint
1994 November 29
47
4.83.3: The Trails Builder Entries Pulte Homes (9 pgs)
Blueprint
1995 April 24
47
4.83.4: The Trails Streetscape landscape, Irrigation & Electrical (18 pgs)
Blueprint
1995 August 4
47
4.83.5: The Trails Streetscape Landscape & Irrigation (7 pgs)
Blueprint
1996 August 1
47
4.83.6: The Trails Builder Walls Durable Homes (7 pgs)
Blueprint
1995 January 13
47
4.83.7: The Trails Builder Walls Indian Hills (4 pgs)
Blueprint
1996 January 27
Summerlin Trails Pools and Bathhouse
tube
48
4.84.1: The Trails Park at Summerlin Pool and Bathhouse Cover Sheet
Print on Mylar
1991 February 14
48
4.84.2: The Trails Park at Summerlin Pool and Bathhouse General Notes, Drawing Index C-1
Print on Mylar
1991 February 14
48
4.84.3: The Trails Park at Summerlin Pool and Bathhouse Horizontal Control Plan C-2
Print on Mylar
1991 February 14
48
4.84.4: The Trails Park at Summerlin Pool and Bathhouse Site Utility Plan Notes and Quantity C-3
Print on Mylar
1991 February 14
48
4.84.5: The Trails Park at Summerlin Pool and Bathhouse Site Utility Plan C-4
Print on Mylar
1991 February 14
48
4.84.6: The Trails Park at Summerlin Pool and Bathhouse Grading Plan C-5
Print on Mylar
1991 February 14
48
4.84.7: The Trails Park at Summerlin Pool and Bathhouse Misc. Sections and Details C-6
Print on Mylar
1991 February 14
48
4.84.8: The Trails Park at Summerlin Pool and Bathhouse Planting Plan L-1
Print on Vellum
1991 February 14
48
4.84.9: The Trails Park at Summerlin Pool and Bathhouse Planting Plan L-2
Print on Mylar
1991 February 14
48
4.84.10: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Mylar
1991 February 14
48
4.84.11: The Trails Park at Summerlin Pool and Bathhouse Irrigation Plan L-4
Print on Mylar
1991 February 14
48
4.84.12: The Trails Park at Summerlin Pool and Bathhouse Irrigation Details L-5
Print on Mylar
1991 February 14
48
4.84.13: The Trails Park at Summerlin Pool and Bathhouse General Structural Notes S101
Print on Mylar
1991 February 14
48
4.84.14: The Trails Park at Summerlin Pool and Bathhouse Foundation Plan and Details S201
Print on Mylar
1991 February 14
48
4.84.15: The Trails Park at Summerlin Pool and Bathhouse High and Low Floor Framing Plan Details S301
Print on Mylar
1991 February 14
48
4.84.16: The Trails Park at Summerlin Pool and Bathhouse Building Walls Sections and Details S401
Print on Mylar
1991 February 14
48
4.84.17: The Trails Park at Summerlin Pool and Bathhouse Details S501
Print on Mylar
1991 February 14
48
4.84.18: The Trails Park at Summerlin Pool and Bathhouse Details S601
Print on Mylar
1991 February 14
48
4.84.19: The Trails Park at Summerlin Pool and Bathhouse Details S602
Print on Mylar
1991 February 14
48
4.84.20: The Trails Park at Summerlin Pool and Bathhouse Floor Plan and Schedules A100
Print on Mylar
1991 February 14
48
4.84.21: The Trails Park at Summerlin Pool and Bathhouse Roof Plan and Details A101
Print on Mylar
1991 February 14
48
4.84.22: The Trails Park at Summerlin Pool and Bathhouse Exterior Elevation and Building Sections A200
Print on Vellum
1991 February 14
48
4.84.23: The Trails Park at Summerlin Pool and Bathhouse Wall Section and Details A300
Print on Vellum
1991 February 14
48
4.84.24: The Trails Park at Summerlin Pool and Bathhouse Interior Elevations and Casework A400
Print on Vellum
1991 February 14
48
4.84.25: The Trails Park at Summerlin Pool and Bathhouse Details A500
Print on Vellum
1991 February 14
48
4.84.26: The Trails Park at Summerlin Pool and Bathhouse Plumbing Legend and Schedules P100
Print on Mylar
1991 February 14
48
4.84.27: The Trails Park at Summerlin Pool and Bathhouse Plumbing Floor Plan and Details P200
Print on Mylar
1991 February 14
48
4.84.28: The Trails Park at Summerlin Pool and Bathhouse Plumbing Riser Diagram P300
Print on Mylar
1991 February 14
48
4.84.29: The Trails Park at Summerlin Pool and Bathhouse Electrical Site Plan E100
Print on Mylar
1991 February 14
48
4.84.30: The Trails Park at Summerlin Pool and Bathhouse Electrical Lighting and Power Plan E200
Print on Mylar
1991 February 14
48
4.84.31: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Print on Vellum
1994 January 31
48
4.84.32: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Print on Vellum
1994 January 31
48
4.84.33: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Vellum
1994 January 31
48
4.84.34: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Print on Vellum
1994 January 31
48
4.84.35: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Print on Vellum
1994 January 31
48
4.84.36: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Print on Vellum
1994 January 31
48
4.84.37: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Print on Vellum
1994 January 31
48
4.84.38: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Sepia on Vellum
1994 January 31
48
4.84.39: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Sepia on Vellum
1994 January 31
48
4.84.40: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Sepia on Vellum
1994 January 31
48
4.84.41: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Sepia on Vellum
1994 January 31
48
4.84.42: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Sepia on Vellum
1994 January 31
48
4.84.43: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Sepia on Vellum
1994 January 31
48
4.84.44: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Sepia on Vellum
1994 January 31
48
4.84.45: The Trails Park at Summerlin Pool and Bathhouse Floor Plan and Schedules A100
Print on Mylar
1994 January 31
48
4.84.46: The Trails Park at Summerlin Pool and Bathhouse Exterior Elevation and Building Sections A200
Print on Mylar
1994 January 31
48
4.84.47: The Trails Park at Summerlin Pool and Bathhouse Wall Section and Details A300
Print on Mylar
1994 January 31
48
4.84.48: The Trails Park at Summerlin Pool and Bathhouse Interior Elevations and Casework A400
Print on Mylar
1994 January 31
48
4.84.49: The Trails Park at Summerlin Pool and Bathhouse Details A500
Print on Mylar
1994 January 31
48
4.84.50: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Vellum
1994 January 31
48
4.84.51: The Trails Park at Summerlin Pool and Bathhouse Pool Site Plan SP-1
Print on Mylar
1994 January 31
48
4.84.52: The Trails Park at Summerlin Pool and Bathhouse Pool Sections SP-2
Print on Mylar
1994 January 31
48
4.84.53: The Trails Park at Summerlin Pool and Bathhouse Pool and Tot Pool Plumbing SP-3
Print on Mylar
1994 January 31
48
4.84.54: The Trails Park at Summerlin Pool and Bathhouse Structural Details SP-4
Print on Mylar
1994 January 31
48
4.84.55: The Trails Park at Summerlin Pool and Bathhouse Details SP-5
Print on Mylar
1994 January 31
48
4.84.56: The Trails Park at Summerlin Pool and Bathhouse Tile Details SP-6
Print on Mylar
1994 January 31
48
4.84.57: The Trails Park at Summerlin Pool and Bathhouse Pool Electric Plan SP-7
Print on Mylar
1994 January 31
48
4.84.58: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Mylar
1994 January 31
48
4.84.59: The Trails Park at Summerlin Pool and Bathhouse SP-1-SP-7 (7 pgs)
Blueprint
1994 January 31
48
4.84.60: The Trails Park at Summerlin Pool and Bathhouse Landscape Details L-3
Print on Vellum
1994 March 7
The Trails Image Concept
tube
49
4.85.1: The Trails Image Concept (25 pgs)
Blueprint on Bond
1992 July 1
49
4.85.2: The Trails Streetscape Phase 1 Entry Features and Signs (16 pgs)
Blueprint on Bond
1994 March 21
Summerlin Village 1 North Streetscapes Parcels; A, E, H, and K
tube
50
4.86.1: The Hills at Summerlin Streetscape Village I North Interior Streets CD's- Parcels- A, E, H and K
Print on Variety
1992 June 29
The Trails at Summerlin Streetscape Mock-Up
tube
51
4.87.1: The Trails: Hillpointe Road
Print on Vellum
undated
51
4.87.2: The Trails at Summerlin
Print on Vellum
undated
51
4.87.3: The Trails Four Trails Drive
Sepia on Mylar
1993 March 29
51
4.87.4: The Trails Spring Gate Lane
Print on Mylar
1993 March 29
51
4.87.5: The Trails Trails Center Drive
Print On Mylar
undated
51
4.87.6: Summerlin Walkway
Pen on Trace
undated
51
4.87.7: The Trails at Summerlin Streetscape Mock-Up
Print on Vellum
undated
51
4.87.8: Village 7 Units 2 and 3 CL & Street Control as Proposed
Print and Marker on Bond
undated
51
4.87.9 A: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 B: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 C: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 D: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 E: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 F: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.9 G: The Trails at Summerlin Streetscape Mock-Up
Print on Mylar and Bond
1993 April 22
51
4.87.10: The Trails at Summerlin- Trails Drive
Blueprint and Pictures
1993 March 29
51
4.87.11: The Trails Lake Mead Boulevard
Print on Mylar
1993 March 29
51
4.87.12: The Trails at Summerlin Walls
Pen on Trace
undated
51
4.87.13: The trails Village Wall Along Summerlin Parkway Pilasters at Property Line
Pen on Vellum
1994 February 4
51
4.87.14: The Trails Village Wall Along Summerlin Parkway Pilasters Intervals
Pen on Vellum
1994 February 4
51
4.87.15: The Trails at Summerlin- Village Wall Along Summerlin Parkway
Pen on Trace
1994 February 4
51
4.87.16: The Trails at Summerlin- Village Wall Along Summerlin Parkway
Pen on Bond
1994 February 4
51
4.87.17: The Trails at Summerlin: Tree Size
Pen on Vellum
undated
51
4.87.18: The Trails at Summerlin: Tree Size
Pencil on Mylar
undated
51
4.87.19: Village Center Landscape Development Master Plan
Blueprint
undated
51
4.87.20: Tree Types Overlay
Marker on Trace
undated
51
4.87.21: The Trails Village Context
Print and Marker on Mylar
undated
51
4.87.22: The Trails Village Context
Print and Colored Pencil on Bond
undated
51
4.87.23 A: Ground Plane and Entry Hierarchy
Marker on Trace
undated
51
4.87.23 B: The Trails Village Context
Marker and Sepia Print on Mylar
undated
51
4.87.24: The Trails Village Context
Print on Bond
undated
51
4.87.25: The Trails at Summerlin- Village Context
Print and Marker on Vellum
undated
51
4.87.26: The Trails at Summerlin- Village Context
Print on Vellum
undated
51
4.87.27: Summerlin Village 7 Primary Village Entry
Blueprint
1992 April 29
51
4.87.28: Summerlin Village 7 Secondary Village Entry
Blueprint
1992 April 29
51
4.87.29 A: PRL Precast
Trace and Bond
undated
51
4.87.29 B: PRL Precast
Trace and Bond
undated
51
4.87.29 C: PRL Precast
Trace and Bond
undated
51
4.87.30: The Trails Comparative Exhibit Streetscape-Contextual Comparison
Print on Bond
1993 March 3
51
4.87.31: The Trails Comparative Exhibit Wall Design- Cost vs. Image
Print, Pen and Pictures on Bond
1993 March 3
51
4.87.32: The Trails Comparative Exhibit- Cost Summary
Print and Pen on Bond
1993 March 3
51
4.87.33: The Trails Comparative Exhibit Streetscape-Size Decision Matrix
Print, Pen and Pictures on Bond
1993 March 3
51
4.87.34: The Trails Design Criteria: Park Alternatives
Print on Vellum
1992 July 1
51
4.87.35: The Trails Preliminary Site Plan
Marker and Pen on Blueprint
1992 July 1
51
4.87.36: The Trails Design Criteria: Preliminary Site Plan
Sepia on Mylar
1992 July 1
51
4.87.37: The Trails at Summerlin Design Criteria: Road Sections
Marker and Pen on Trace
1992 July 1
51
4.87.38: The Trails at Summerlin Design Criteria: Road Sections
Pen on Vellum
1992 July 1
51
4.87.39: The Trails Entry Drawing
Pencil on Bond
undated
51
4.87.40: The Trails at Summerlin
Pencil on Trace
undated
51
4.87.41: The Trails at Summerlin
Print on Vellum
undated
51
4.87.42: Trails Study Summerlin
Blueprint
undated
The Hills Streetscape Hillpointe Road and Village Entries
tube
52
4.88.1: The Hills Streetscape: Hillpointe Road & Village Entries (46 pgs)
Blueprint
1989 November 22
The Hills Park Contact Documents
tube
53
4.89.1: The Hills Park Contract Documents Issued for Construction (40 pgs)
Blueprint
1991 February 4
The Hills at Summerlin Streetscape: Hillpointe Road
tube
54
4.90.1: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Cover Sheet
Print on Vellum
1992 January 15
54
4.90.2: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-1
Print on Vellum
1992 January 15
54
4.90.3: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-2
Print on Vellum
1992 January 15
54
4.90.4: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-3
Print on Vellum
1992 January 15
54
4.90.5: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-4
Print on Vellum
1992 January 15
54
4.90.6: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-5
Print on Vellum
1992 January 15
54
4.90.7: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Plan C-6
Print on Vellum
1992 January 15
54
4.90.8: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-7
Print on Vellum
1992 January 15
54
4.90.9: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-8
Print on Vellum
1992 January 15
54
4.90.10: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Detail C-9
Print on Vellum
1992 January 15
54
4.90.11: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Detail C-10
Print on Vellum
1992 January 15
54
4.90.12: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-11
Print on Vellum
1992 January 15
54
4.90.13: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Layout Details C-12
Print on Vellum
1992 January 15
54
4.90.14: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-1
Print on Vellum
1992 January 15
54
4.90.15: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-2
Print on Vellum
1992 January 15
54
4.90.16: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-3
Print on Vellum
1992 January 15
54
4.90.17: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-4
Print on Vellum
1992 January 15
54
4.90.18: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-5
Print on Vellum
1992 January 15
54
4.90.19: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-6
Print on Vellum
1992 January 15
54
4.90.20: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Plan L-7
Print on Vellum
1992 January 15
54
4.90.21: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Planting Details L-8
Print on Vellum
1992 January 15
54
4.90.22: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-1
Print on Mylar
1992 January 15
54
4.90.23: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-2
Print on Mylar
1992 January 15
54
4.90.24: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-3
Print on Mylar
1992 January 15
54
4.90.25: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-4
Print on Mylar
1992 January 15
54
4.90.26: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-5
Print on Mylar
1992 January 15
54
4.90.27: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-6
Print on Mylar
1992 January 15
54
4.90.28: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Irrigation I-7
Print on Mylar
1992 January 15
54
4.90.29: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Schedules and Details E-1
Sepia on Mylar
1992 January 15
54
4.90.30: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Lighting Plan E-2
Sepia on Mylar
1992 January 15
54
4.90.31: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Sign Lighting Plan E-3
Sepia on Mylar
1992 January 15
54
4.90.32: The Hills at Summerlin Streetscape: Hillpointe Road, Street Z, Y, X, V and Patriot- Electrical Lighting Plan E-4
Sepia on Mylar
1992 January 15
The Hills at Summerlin Hillshire Drive
tube
54
4.91.1: The Hills at Summerlin Hillshire Drive Streetscape
Print on Vellum
1992 July 16
54
4.91.2: The Hills at Summerlin Hillshire Drive Streetscape Layout Plan C-1
Print on Vellum
1992 July 16
54
4.91.3: The Hills at Summerlin Hillshire Drive Streetscape Layout Plan C-2
Print on Vellum
1992 July 16
54
4.91.4: The Hills at Summerlin Hillshire Drive Streetscape Construction Details C-3
Print on Vellum
1992 July 16
54
4.91.5: The Hills at Summerlin Hillshire Drive Streetscape Construction Details C-4
Print on Vellum
1992 July 16
54
4.91.6: The Hills at Summerlin Hillshire Drive Streetscape Planting Plan L-1
Print on Vellum
1992 July 16
54
4.91.7: The Hills at Summerlin Hillshire Drive Streetscape Planting Plan L-2
Print on Vellum
1992 July 16
54
4.91.8: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-1
Sepia on Vellum
1992 July 16
54
4.91.9: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-2
Sepia on Vellum
1992 July 16
54
4.91.10: The Hills at Summerlin Hillshire Drive Streetscape Irrigation Plan I-3
Sepia on Vellum
1992 July 16
Summerlin The Trails Pools and Bathhouse
tube
55
4.92.1: The Trails Park Pool and Bathhouse
Print on Vellum
1994 March
55
4.92.2: The Trails Park Pool and Bathhouse General Notes Drawing Index Quantities C-1
Print on Vellum
1994 March
55
4.92.3: The Trails Park Pool and Bathhouse Horizontal Control Plan C-2
Print on Vellum
1994 March
55
4.92.4: The Trails Park Pool and Bathhouse Site Utility Plan Notes and Quantities C-3
Print on Vellum
1994 March
55
4.92.5: The Trails Park Pool and Bathhouse Site Utility Plan C-4
Print on Vellum
1994 March
55
4.92.6: The Trails Park Pool and Bathhouse Grading Plan C-5
Print on Vellum
1994 March
55
4.92.7: The Trails Park Pool and Bathhouse Misc. Sections and Details C-6
Print on Vellum
1994 March
55
4.92.8: The Trails Park Pool and Bathhouse Park Site Plan L-1
Print on Vellum
1994 March
55
4.92.9: The Trails Park Pool and Bathhouse Planting Plan L-2
Print on Vellum
1994 March
55
4.92.10: The Trails Park Pool and Bathhouse Planting Plan L-3
Print on Vellum
1994 March
55
4.92.11: The Trails Park Pool and Bathhouse Planting Plan L-4
Print on Vellum
1994 March
55
4.92.12: The Trails Park Pool and Bathhouse Enlarged Layout Plan L-5
Print on Vellum
1994 March
55
4.92.13: The Trails Park Pool and Bathhouse Enlarged Layout Plan L-6
Print on Vellum
1994 March
55
4.92.14: The Trails Park Pool and Bathhouse Landscape Details L-7
Print on Vellum
1994 March
55
4.92.15: The Trails Park Pool and Bathhouse Irrigation Plan L-9
Print on Vellum
1994 March
55
4.92.16: The Trails Park Pool and Bathhouse Details L-13
Print on Vellum
1994 March
55
4.92.17: The Trails Park Pool and Bathhouse Details L-14
Print on Vellum
1994 March
55
4.92.18: The Trails Park Pool and Bathhouse Details, Notes and Schedule L-15
Print on Vellum
1994 March
55
4.92.19: The Trails Park Pool and Bathhouse General Structural Notes S101
Print on Vellum
1994 March
55
4.92.20: The Trails Park Pool and Bathhouse Foundation Plan S201
Print on Vellum
1994 March
55
4.92.21: The Trails Park Pool and Bathhouse Foundation Plan and Details S202
Print on Vellum
1994 March
55
4.92.22: The Trails Park Pool and Bathhouse Roof Forming Plan community Center S301
Print on Vellum
1994 March
55
4.92.23: The Trails Park Pool and Bathhouse Roof Framing Plan and Details S302
Print on Vellum
1994 March
55
4.92.24: The Trails Park Pool and Bathhouse Building, Wall Sections and Details S401
Print on Vellum
1994 March
55
4.92.25: The Trails Park Pool and Bathhouse Wall Sections S402
Print on Vellum
1994 March
55
4.92.26: The Trails Park Pool and Bathhouse Details S501
Print on Vellum
1994 March
55
4.92.27: The Trails Park Pool and Bathhouse Details S502
Print on Vellum
1994 March
55
4.92.28: The Trails Park Pool and Bathhouse Details S601
Print on Vellum
1994 March
55
4.92.29: The Trails Park Pool and Bathhouse Details S602
Print on Vellum
1994 March
55
4.92.30: The Trails Park Pool and Bathhouse Floor Plan A100
Print on Vellum
1994 March
55
4.92.31: The Trails Park Pool and Bathhouse Roof Plan A101
Print on Vellum
1994 March
55
4.92.32: The Trails Park Pool and Bathhouse Exterior Elevations A200
Print on Vellum
1994 March
55
4.92.33: The Trails Park Pool and Bathhouse Building Sections and Details A300
Print on Vellum
1994 March
55
4.92.34: The Trails Park Pool and Bathhouse Wall Sections A301
Print on Vellum
1994 March
55
4.92.35: The Trails Park Pool and Bathhouse Reflected Ceiling plan A400
Print on Vellum
1994 March
55
4.92.36: The Trails Park Pool and Bathhouse Enlarged Plans, Interior, elevations, finished Sched A500
Print on Vellum
1994 March
55
4.92.37: The Trails Park Pool and Bathhouse Door Sched, Door types, Window types A600
Print on Vellum
1994 March
55
4.92.38: The Trails Park Pool and Bathhouse Floor Plans A100C
Print on Vellum
1994 March
55
4.92.39: The Trails Park Pool and Bathhouse Roof Plan A101C
Print on Vellum
1994 March
55
4.92.40: The Trails Park Pool and Bathhouse Ext. Elevations and Building Sections A200C
Print on Vellum
1994 March
55
4.92.41: The Trails Park Pool and Bathhouse Legend, Schedule M100
Print on Vellum
1994 March
55
4.92.42: The Trails Park Pool and Bathhouse Mechanical floor Plan M200
Print on Vellum
1994 March
55
4.92.43: The Trails Park Pool and Bathhouse Legend, Schedules P100
Print on Vellum
1994 March
55
4.92.44: The Trails Park Pool and Bathhouse Plumbing Floor Plan P200
Print on Vellum
1994 March
55
4.92.45: The Trails Park Pool and Bathhouse Mechanical Plan P100C
Print on Vellum
1994 March
55
4.92.46: The Trails Park Pool and Bathhouse Electrical Site Plan E100
Print on Vellum
1994 March
55
4.92.47: The Trails Park Pool and Bathhouse Electrical Lighting and Power Plan E200
Print on Vellum
1994 March
55
4.92.48: The Trails Park Pool and Bathhouse Electrical Lighting and Power Plan E300
Print on Vellum
1994 March
55
4.92.49: The Trails Park Pool and Bathhouse Electrical Panel board Schedules E400
Print on Vellum
1994 March
55
4.92.50: The Trails Park Planting Plan L-7
Sepia on Mylar
1994 November 9
55
4.92.51: The Trails Park Site Plan L-1
Sepia on Mylar
1994 November 9
55
4.92.52: The Trails Park Planting Plan L-2
Trace and Blueprint
1994 November 9
55
4.92.53: The Trails Park Perspective
Pen on Bond
1994 November 9
55
4.92.54: The Trails Park Sections
Pen on Bond
1994 November 9
55
4.92.55: The Trails Park Plan View
Blueprint
1994 November 9
55
4.92.56: The Trails Park Parking Summary
Print on Vellum
1994 March 15
55
4.92.57: The Trails Ball field Plan Phase I Cover Sheet
Print on Bond
1993 August
55
4.92.58: The Trails Ball field Plan Phase I Ball field Layout
Print on Vellum
1993 August
55
4.92.59: The Trails Ball field Plan Phase I Ball field Grading Plan 1
Blueprint
1993 August
55
4.92.60: The Trails Ball field Plan Phase I Ball field Grading Plan 2
Print on Mylar
1993 August
Summerlin Trails Builder Walls
tube
56
4.93.1: The Trails Builder Walls Canyon Oaks (Parcel J-2) 4 pgs
Blueprint
1995 November 12
56
4.93.2: The Trails Builder Walls Sierra Ridge II (Parcel C-2) 5 pgs
Blueprint
1995 December 3
56
4.93.3: The Trails Builder wall Indian Hills (Parcel B-3) 65 pgs
Blueprint
1996 January 17
56
4.93.4: The Trails Builder Walls Cantabria (Parcel A-3) 11 pgs
Blueprint
1996 August 1
56
4.93.5: The Trails Builder Walls Indian Hills (Parcel B-3 Units 2 and 4) 6 pgs
Blueprint
1996 August 1
56
4.93.6: The Trails Builder Walls Indian Hills (Parcel B-3 Unit 3) 4 pgs
Blueprint
1997 February 6
Summerlin Community Center and Golf Course
tube
57
4.94.1: Summerlin Design
Marker on Trace
undated
57
4.94.2: Summerlin Cross Section
Marker on Trace
undated
57
4.94.3: PGA Players Club
Marker on Trace
undated
57
4.94.4: Summerlin Cross Section
Marker on Trace
undated
57
4.94.5: Community Building Layout
Print on Vellum
undated
57
4.94.6: Summerlin Village Layout
Blueprint
undated
57
4.94.7: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.1
Print on Vellum
1995 August 4
57
4.94.8: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.2
Print on Vellum
1995 August 4
57
4.94.9: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.3
Print on Vellum
1995 August 4
57
4.94.10: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.4
Print on Vellum
1995 August 4
57
4.94.11: The Trails Streetscape- Parcel N-2 Irrigation Plan I-3.5
Print on Vellum
1995 August 4
57
4.94.12: The Trails Streetscape- Parcel N-2 Irrigation Details I-3.6
Print on Vellum
1995 August 4
57
4.94.13: The Trails Streetscape- Parcel N-2 Irrigation Notes and Schedules I-3.7
Print on Vellum
1995 August 4
57
4.94.14: Golf Course Drawing
Pencil on Mylar
undated
57
4.94.15: Golf Course Drawing
Pencil on Mylar
undated
57
4.94.16: Golf Course Drawing
Pencil on Mylar
undated
Summerlin Illustrative Plan
tube
58
4.95.1: Large Summerlin Illustrative Plan
Print on Bond
undated
58
4.95.2: Colored Cut Out Illustrative Plan
Print/Marker on Bond
undated
Community Entry Lake Mead Boulevard and Buffalo Drive
tube
58
4.96.1: Community Entry Lake Mead Boulevard and Buffalo Drive Northern Entry Planting Plan L-2.2
Print on Vellum
1991 October 18
58
4.96.2: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Vellum
1991 October 18
58
4.96.3: Community Entry Lake Mead Boulevard and Buffalo Drive Northern Entry Layout L-1.2
Print on Vellum
1991 October 18
58
4.96.4: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-1
Print on Vellum
1992 March 12
58
4.96.5: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-2
Print on Vellum
1992 March 12
58
4.96.6: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Vellum
1991 October 18
58
4.96.7: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Vellum
1991 October 18
58
4.96.8: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Vellum
1991 October 18
58
4.96.9: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Mylar
undated
58
4.96.10: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Planting Plan 2.1
Print on Vellum
undated
58
4.96.11: Summerlin Drawing
Pen on Trace
undated
58
4.96.12: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Vellum
1991 October 18
58
4.96.13: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Vellum
1991 October 18
58
4.96.14: South Entry Layout and Grading L-1.1
Print on Vellum
undated
58
4.96.15: The Pueblo at Summerlin Irrigation Details I-3
Print on Mylar
1992 March 12
58
4.96.16: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading 1.2
Print on Vellum
undated
58
4.96.17: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading 1.1
Print on Vellum
undated
58
4.96.18: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
1991 October 18
58
4.96.19: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Mylar
1991 October 18
Summerlin Village 1 North Contract Documents
tube
59
4.97.1: Community Entry Lake Mead Boulevard and Buffalo Drive Cover Page
Print on Mylar
1991 October 18
59
4.97.2: Community Entry Lake Mead Boulevard and Buffalo Drive South Entry Layout and Grading L-1.1
Print on Mylar
1991 October 18
59
4.97.3: Community Entry Lake Mead Boulevard and Buffalo Drive South entry Planting Plan L-2.1
Print on Mylar
1991 October 18
59
4.97.4: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
1991 October 18
59
4.97.5: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Mylar
1991 October 18
59
4.97.6: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Mylar
1991 October 18
59
4.97.7: Community Entry Lake Mead Boulevard and Buffalo Drive Irrigation Plan I-1
Print on Mylar
1991 October 18
59
4.97.8: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Schedules and Details E-1
Print on Mylar
1991 October 18
59
4.97.9: Community Entry Lake Mead Boulevard and Buffalo Drive South Lighting Plan E-3
Print on Mylar
1991 October 18
59
4.97.10: Community Entry Lake Mead Boulevard and Buffalo Drive Cover Page
Print on Mylar
1991 October 18
59
4.97.11: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Layout and Grading L-1.2
Print on Mylar
1991 October 18
59
4.97.12: Community Entry Lake Mead Boulevard and Buffalo Drive North Entry Planting Plan L-2.2
Print on Mylar
1991 October 18
59
4.97.13: Community Entry Lake Mead Boulevard and Buffalo Drive Planting and Site Details L-3.1
Print on Mylar
1991 October 18
59
4.97.14: Community Entry Lake Mead Boulevard and Buffalo Drive Entry Sign Details L-3.2
Print on Vellum
1991 October 18
59
4.97.15: Community Entry Lake Mead Boulevard and Buffalo Drive Sign and Site Details L-3.3
Print on Mylar
1991 October 18
59
4.97.16: Community Entry Lake Mead Boulevard and Buffalo Drive I-2
Print on Mylar
1991 October 18
59
4.97.17: Community Entry Lake Mead Boulevard and Buffalo Drive I-3
Print on Mylar
1991 October 18
59
4.97.18: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Schedules and Details E-1
Print on Mylar
1991 October 18
59
4.97.19: Community Entry Lake Mead Boulevard and Buffalo Drive North Lighting Plan E-2
Print on Mylar
1991 October 18
59
4.97.20: Community Entry Lake Mead Boulevard and Buffalo Drive Electrical Details E-4
Print on Mylar
1991 October 18
Summerlin Village 1 South
tube
60
4.98.1: Village One South Entry Location Plan
Print on Mylar
1989 October 12
60
4.98.2: The Hills at Summerlin Village Design Concept
Print on Bond
1989 October 6
60
4.98.3: Village One South Topography Map
Print on Mylar
undated
60
4.98.4: Parcel Change Resulting from Village Center Redesign Overlay
Colored Pencil on Trace
1990 July 18
60
4.98.5: The Hills Village Design Concept
Print on Mylar
1990 October 6
60
4.98.6: Village One South- Entry Location Plan
Print on Mylar
1989 October 12
60
4.98.7: Village One South
Print on Mylar
undated
The Trails Design Plans
tube
60
4.99.1: The Trails Street view
Colored Pencil on Trace
undated
60
4.99.2: The Trails Builder Walls Canyon Oaks (Parcel J-2)
Print on Vellum
1995 December 12
60
4.99.3: The Trails Builder Walls Canyon Oaks (Parcel J-2) Layout and Grading L-1.1
Print on Mylar
1995 December 12
60
4.99.4: The Trails Builder Walls Canyon Oaks (Parcel J-2) Wall and Site Details L-3.2
Print on Vellum
1995 December 12
60
4.99.5: The Trails Builder Walls Canyon Oaks (Parcel J-2) Wall and Site Details L-3.3
Print on Vellum
1995 December 12
60
4.99.6: Summerlin Village 7 Design Criteria Village entries
Marker on Trace
1992 May 27
60
4.99.7: The Trails at Summerlin Design Criteria Wall Concept
Colored Pencil on Trace
1992 July 1
60
4.99.8: The Trails at Summerlin Design Criteria
Marker on Trace
1992 July 1
60
4.99.9: The Trails at Summerlin Design Criteria
Marker on Trace
1992 July 1
60
4.99.10: The Trails at Summerlin Design Criteria
Marker on Trace
1992 July 1
60
4.99.11: The Trails at Summerlin Design Criteria
Marker on Trace
1992 July 1
60
4.99.12: The Trails at Summerlin Design Criteria
Marker on Trace
1992 July 1
60
4.99.13: The Trails at Summerlin Design Criteria
Colored Pencil on Trace
1992 July 1
60
4.99.14: The Trails at Summerlin Tree Type and Size
Blueprint on Bond
undated
60
4.99.15: The Trails at Summerlin Tree Types
Marker on Bond
undated
60
4.99.16: Study Area Boundary
Marker on Trace
undated
60
4.99.17: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Cover Page
Print on Vellum
1995 January 13
60
4.99.18: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading L-1.1
Print on Vellum
1995 January 13
60
4.99.19: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading L-1.2
Print on Vellum
1995 January 13
60
4.99.20: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.3
Print on Vellum
1995 January 13
60
4.99.21: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.4
Print on Vellum
1995 January 13
60
4.99.22: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-2.1
Print on Vellum
1995 January 13
60
4.99.23: The Trails Builder Walls Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-2.2
Print on Vellum
1995 January 13
60
4.99.24: The Trails at Summerlin Comparative Exhibit Streetscape: Exploded Cost and Components
Print and Pen on Bond
1993 March 3
60
4.99.25: The Trails at Summerlin Comparative Exhibit Sidewalk Design: Sidewalk Layout Plan
Print and Marker on Bond
1993 March 3
60
4.99.26: The Trails at Summerlin Comparative Exhibit Wall Design: Village Wall Layout Plan
Print and Marker on Bond
1993 March 3
Summerlin Trails Open Space Parcel Connection
tube
61
4.100.1: The Trails Open Space- Parcel Connection Cover Page
Print on Vellum
1996 April 18
61
4.100.2: The Trails Open Space- Parcel Connection Grading Plan L-1.1
Print on Mylar
1996 April 18
61
4.100.3: The Trails Open Space- Parcel Connection Grading Plan L-1.2
Print on Mylar
1996 April 18
61
4.100.4: The Trails Open Space- Parcel Connection Grading Plan L-1.3
Print on Mylar
1996 April 18
61
4.100.5: The Trails Open Space- Parcel Connection Grading Plan L-1.4
Print on Mylar
1996 April 18
61
4.100.6: The Trails Open Space- Parcel Connection Grading Plan L-1.1 A
Print on Mylar
1996 April 18
61
4.100.7: The Trails Open Space- Parcel Connection Grading Plan L-1.2 A
Print on Mylar
1996 April 18
61
4.100.8: The Trails Open Space- Parcel Connection Layout and Grading L-1.3 A
Print on Mylar
1996 April 18
61
4.100.9: The Trails Open Space- Parcel Connection Grading Plan L-1.5 A
Print on Mylar
1996 April 18
61
4.100.10: The Trails Open Space- Parcel Connection Grading Plan L-1.6 A
Print on Mylar
1996 April 18
Summerlin the Trails
tube
61
4.101.1: The Trails Streetscape- Parcel B-3 Units 2 & 4 Cover Page
Print on Vellum
1996 August 1
61
4.101.2: The Trails Streetscape- Parcel B-3 Units 2 & 4 Landscape and Sidewalk
Print on Vellum
1996 August 1
61
4.101.3: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
1996 August 1
61
4.101.4: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Mylar
1996 August 1
61
4.101.5: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
1996 August 1
61
4.101.6: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
1996 August 1
61
4.101.7: The Trails Streetscape- Parcel B-3 Units 2 & 4
Print on Vellum
1996 August 1
Summerlin Village 7
tube
61
4.102.1: The Trails of Summerlin Layout
Marker, Pen on Mylar
undated
Village 1 North
tube
62
4.103.1: Village 1 North Rough Grading (7 pgs)
Blueprint
1989 April 28
62
4.103.2: Village 1 North Improvements (8 pgs)
Blueprint
1990 June 18
62
4.103.3: Village 1 North Improvements Water and Sewer (6 pgs)
Blueprint
1990 May 16
62
4.103.4: Village 1 North Improvements (4 pgs)
Blueprint
1990 June 20
62
4.103.5: Village 1 North- Village Walls and Village Entries Phase 2 (7 pgs)
Blueprint
1990 January 16
62
4.103.6: Village 1 North- Village Walls Phase 1 Town Center Drive (7 pgs)
Blueprint
1989 November 16
Summerlin Construction Document
tube
63
4.104.1: The Hills Park Contract Documents Issued for Construction (40 pgs)
Blueprint
1991 February 4
Summerlin Village 1 South Parcel Criteria
tube
64
4.105.1: The Hills at Summerlin Parcel 2
Print on Mylar
1990 March 11
64
4.105.2: Planning Criteria
Print on Mylar
undated
64
4.105.3: The Hills at Summerlin Parcel 3
Print on Mylar
1990 March 11
64
4.105.4: Planning Criteria
Print on Mylar
undated
64
4.105.5: Lotting Plan
Print on Mylar
undated
64
4.105.6: The Hills at Summerlin Parcel 4
Print on Mylar
undated
64
4.105.7: Planning Criteria
Print on Mylar
undated
64
4.105.8: Lotting Plan
Print on Mylar
undated
64
4.105.9: The Hills at Summerlin Parcel 6
Print on Mylar
1990 May 11
64
4.105.10: Planning Criteria
Print on Mylar
undated
64
4.105.11: Lotting Plan
Print on Mylar
undated
64
4.105.12: the Hills at Summerlin Parcel 8
Print on Mylar
1990 May 11
64
4.105.13: Planning Criteria
Print on Mylar
undated
64
4.105.14: Lotting Plan
Print on Mylar
undated
64
4.105.15: The Hills at Summerlin Parcel 9
Print on Mylar
1990 May 11
64
4.105.16: Planning Criteria
Print on Mylar
undated
64
4.105.17: Lotting Plan
Print on Mylar
undated
64
4.105.18: The Hills at Summerlin Parcel 11
Print on Mylar
1990 May 11
64
4.105.19: Planning Criteria
Print on Mylar
undated
64
4.105.20: Lotting Plan
Print on Mylar
undated
64
4.105.21: The Hills at Summerlin Parcel 12
Print on Mylar
1990 May 11
64
4.105.22: Planning Criteria
Print on Mylar
undated
64
4.105.23: Lotting Plan
Print on Mylar
undated
64
4.105.24: The Hills at Summerlin Parcel 13
Print on Mylar
1990 May 11
64
4.105.25: Planning Criteria
Print on Mylar
undated
64
4.105.26: Lotting Plan
Print on Mylar
undated
64
4.105.27: The Hills at Summerlin Parcel 17
Print on Mylar
1990 May 11
64
4.105.28: Planning Criteria
Print on Mylar
undated
64
4.105.29: Lotting Plan
Print on Mylar
undated
64
4.105.30: The Hills at Summerlin Parcel 19
Print on Mylar
1990 April 10
64
4.105.31: Planning Criteria
Print on Mylar
undated
64
4.105.32: Lotting Plan
Print on Mylar
undated
64
4.105.33: The Hills at Summerlin Parcel 5
Print on Mylar
1990 May 11
64
4.105.34: Planning Criteria
Print on Mylar
undated
64
4.105.35: Lotting Plan
Print on Mylar
undated
64
4.105.36: Planning Criteria
Print on Mylar
undated
64
4.105.37: The Hills at Summerlin Parcel 7
Print on Mylar
1990 May 11
64
4.105.38: The Hills at Summerlin Parcel 5- Planning Criteria
Print on Mylar
1989 October 6
64
4.105.39: The Hills at Summerlin Parcel 14
Print on Mylar
1990 May 11
64
4.105.40: Planning Criteria
Print on Mylar
undated
64
4.105.41: Lotting Plan
Print on Mylar
undated
64
4.105.42: Lotting Plan
Print on Mylar
undated
Summerlin Hillpointe and Village Streetscape Contract Documents
tube
65
4.106.1: The Hills Streetscape Hillpointe and Village Entries Cover Page
Print on Vellum
1989 November 22
65
4.106.2: Site Layout and Grading Plan 1.1
Print on Mylar
undated
65
4.106.3: Site Layout and Grading Plan 1.2
Print on Mylar
undated
65
4.106.4: Site Layout and Grading Plan 1.3
Print on Mylar
undated
65
4.106.5: Site Layout and Grading Plan 1.4
Print on Mylar
undated
65
4.106.6: Site Layout and Grading Plan 1.6
Print on Mylar
undated
65
4.106.7: Site Layout and Grading Plan 1.7
Print on Mylar
undated
65
4.106.8: Site Layout and Grading Plan 1.8
Print on Mylar
undated
65
4.106.9: Site Planting Plan 2.1
Print on Mylar
undated
65
4.106.10: Site Planting Plan 2.2
Print on Mylar
undated
65
4.106.11: Site Planting Plan 2.3
Print on Mylar
undated
65
4.106.12: Site Planting Plan 2.4
Print on Mylar
undated
65
4.106.13: Site Planting Plan 2.6
Print on Mylar
undated
65
4.106.14: Site Planting Plan 2.7
Print on Mylar
undated
65
4.106.15: Site Planting Plan 2.8
Print on Mylar
undated
65
4.106.16: Hillpointe Road and Village Entries The Hills Site Location Plan- Site Planting Plan 2.9
Print on Vellum
1989 November 22
65
4.106.17: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.10
Print on Vellum
1989 November 22
65
4.106.18: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.11
Print on Vellum
1989 November 22
65
4.106.19: The Hills Streetscape Hillpointe and Village Entries Site Planting Plan 2.12
Print on Vellum
1989 November 22
65
4.106.20: Hillpointe Road and Village Entries Site Irrigation Plan 3.1
Print on Vellum
1989 November 22
65
4.106.21: Hillpointe Road and Village Entries Site Irrigation Plan 3.2
Print on Vellum
1989 November 22
65
4.106.22: Hillpointe Road and Village Entries Site Irrigation Plan 3.3
Print on Vellum
1989 November 22
65
4.106.23: Hillpointe Road and Village Entries Site Irrigation Plan 3.4
Print on Vellum
1989 November 22
65
4.106.24: Hillpointe Road and Village Entries Site Irrigation Plan 3.5
Print on Vellum
1989 November 22
65
4.106.25: Hillpointe Road and Village Entries Site Irrigation Plan 3.6
Print on Vellum
1989 November 22
65
4.106.26: Hillpointe Road and Village Entries Site Irrigation Plan 3.7
Print on Vellum
1989 November 22
65
4.106.27: Hillpointe Road and Village Entries Site Irrigation Plan 3.8
Print on Vellum
1989 November 22
65
4.106.28: Hillpointe Road and Village Entries Site Irrigation Plan 3.9
Print on Vellum
1989 November 22
65
4.106.29: Hillpointe Road and Village Entries Site Irrigation Plan 3.10
Print on Vellum
1989 November 22
65
4.106.30: Hillpointe Road and Village Entries Site Irrigation Plan 3.11
Print on Vellum
1989 November 22
65
4.106.31: Hillpointe Road and Village Entries Site Irrigation Details 3.13
Print on Vellum
1989 November 22
65
4.106.32: Hillpointe Road and Village Entries Site Irrigation Details 3.14
Print on Vellum
1989 November 22
65
4.106.33: Hillpointe Road and Village Entries Site Irrigation Details 3.15
Print on Vellum
1989 November 22
65
4.106.34: The Hills Streetscape Hillpointe and Village Entries Site Electrical Details 4.1
Print on Mylar
1989 November 20
65
4.106.35: The Hills Streetscape Hillpointe and Village Entries Site Electrical Details 4.2
Print on Mylar
1989 November 20
65
4.106.36: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.3
Print on Mylar
1989 November 20
65
4.106.37: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.4
Print on Mylar
1989 November 20
65
4.106.38: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.5
Print on Mylar
1989 November 20
65
4.106.39: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.6
Print on Mylar
1989 November 20
65
4.106.40: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.7
Print on Mylar
1989 November 20
65
4.106.41: The Hills Streetscape Hillpointe and Village Entries Site Electrical Plan 4.8
Print on Mylar
1989 November 20
65
4.106.42: 5.2
Print on Mylar
undated
65
4.106.43: Site Details 5.2
Print on Mylar
undated
65
4.106.44: Hillpointe Road and Village Entries The Hills Summerlin Seating Area Details
Print on Vellum
1990 May 23
65
4.106.45: Village One North Streetscape
Print on Mylar
undated
Summerlin Parcel A-3
tube
66
4.107.1: The Trails Streetscape Parcel A-3 Cover Page
Print on Bond
1996 January 2
66
4.107.2: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.1
Print on Bond
1996 January 2
66
4.107.3: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.2
Print on Bond
1996 January 2
66
4.107.4: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.3
Print on Bond
1996 January 2
66
4.107.5: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.4
Print on Bond
1996 January 2
66
4.107.6: The Trails Streetscape Parcel A-3 Cover Page
Print on Bond
1995 February 23
66
4.107.7: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.1
Print on Bond
1996 February 23
66
4.107.8: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.2
Print on Bond
1996 February 23
66
4.107.9: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.3
Print on Bond
1996 February 23
66
4.107.10: The Trails Streetscape Parcel A-3 Landscape and Sidewalk Layout L-2.4
Print on Bond
1996 April 5
66
4.107.11: The Trails Streetscape Parcel A-3 Planting and Sidewalk Details L-2.5
Print on Mylar
1996 February 23
66
4.107.12: The Trails Streetscape Parcel A-3 Typical Grading Section L-2.6
Print on Mylar
1996 February 23
66
4.107.13: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.1
Print on Bond
1996 February 23
66
4.107.14: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.2
Print on Bond
1996 February 23
66
4.107.15: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.3
Print on Bond
1996 February 23
66
4.107.16: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.4
Print on Bond
1996 February 23
66
4.107.17: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.5
Print on Bond
1996 February 23
66
4.107.18: The Trails Streetscape Parcel A-3 Irrigation Plan I-3.6
Print on Bond
1996 February 23
Summerlin Unit 1 Phase 2 Streetscapes
tube
67
4.108.1: The Trails Streetscape Parcel B-2 Cover Page
Print on Bond
1995 February 23
67
4.108.2: The Trails Streetscape Parcel B-2 Landscape and Sidewalk Layout L-2.1
Print on Bond
1995 February 23
67
4.108.3: The Trails Streetscape Parcel B-2 Landscape and Sidewalk Layout L-2.2
Print on Bond
1995 February 23
67
4.108.4: The Trails Streetscape Parcel B-2 Planting and Sidewalk Details L-2.3
Print on Mylar
1995 February 23
67
4.108.5: The Trails Streetscape Parcel B-2 Typical Grading Sections L-2.4
Print on Mylar
1995 February 23
67
4.108.6: The Trails Streetscape Parcel B-2 Irrigation Plan I-3.1
Print on Bond
1995 February 23
67
4.108.7: The Trails Streetscape Parcel B-2 Irrigation Plan I-3.2
Print on Bond
1995 February 23
67
4.108.8: The Trails Streetscape Parcel B-2 Irrigation Details I-3.3
Print on Bond
1995 February 23
67
4.108.9: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Cover Page
Print on Vellum
1995 February 23
67
4.108.10: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Plan I-3.1
Print on Vellum
1995 February 23
67
4.108.11: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Plan I-3.2
Print on Vellum
1995 February 23
67
4.108.12: The Trails Streetscape- Phase Two- Parcel B-2 Irrigation Details Notes and Schedules I-3.3
Print on Vellum
1995 February 23
67
4.108.13: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Landscape and Sidewalk Layout L-2.1
Print on Vellum
1995 February 23
67
4.108.14: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Landscape and Sidewalk Layout L-2.2
Print on Vellum
1995 February 23
67
4.108.15: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Sidewalk Horizontal Control Data L-2.3
Print on Vellum
1995 February 23
67
4.108.16: The Trails Streetscape- Phase 1 and 2 Parcel B-2 Typical Grading Section L-2.5
Print on Mylar
1995 February 23
67
4.108.17: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Cover Page
Print on Mylar
1995 February 23
67
4.108.18: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Plan I-3.1
Print on Mylar
1995 January 20
67
4.108.19: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Wall Details 1.2
Print on Mylar
1995 January 20
67
4.108.20: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Sign Details 1.3
Print on Mylar
1995 January 20
67
4.108.21 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
1995 February 15
67
4.108.21 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
1995 February 15
67
4.108.21 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.1
Print on Variety
1995 February 15
67
4.108.22 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
1995 February 15
67
4.108.22 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
1995 February 15
67
4.108.22 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.2
Print on Variety
1995 February 15
67
4.108.23 A: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
1995 February 15
67
4.108.23 B: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
1995 February 15
67
4.108.23 C: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
1995 February 15
67
4.108.23 D: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Landscape and Sidewalk Layout 2.3
Print on Variety
1995 February 15
67
4.108.24: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Planting and Sidewalk Details 2.4
Print on Mylar
1995 February 15
67
4.108.25: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Typical Grading Sections 2.5
Print on Mylar
1995 February 15
67
4.108.26: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.1
Print on Vellum
1995 January 20
67
4.108.27: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.2
Print on Vellum
1995 January 20
67
4.108.28: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation I-3.3
Print on Vellum
1995 January 20
67
4.108.29: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Details I-3.4
Print on Vellum
1995 January 20
67
4.108.30: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Irrigation Details Schedule and Notes I-3.5
Print on Vellum
1995 January 20
67
4.108.31: The Trails Streetscape- Unit One Phase 2- Parcels B-1/C-1 Lighting 4.1
Print on Vellum
1995 January 20
67
4.108.32: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Cover Page
Print on Vellum
1995 February 16
67
4.108.33: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.1
Print on Vellum
1995 February 16
67
4.108.34: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.2
Print on Vellum
1995 February 16
67
4.108.35: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.3
Print on Vellum
1995 February 16
67
4.108.36: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.4
Print on Vellum
1995 February 16
67
4.108.37: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Planting and Sidewalk Details 2.5
Print on Vellum
1995 February 16
67
4.108.38: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Typical Grading Section 2.6
Print on Vellum
1995 February 16
67
4.108.39: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.3
Print on Vellum
1995 June 1
67
4.108.40: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.4
Print on Vellum
1995 June 1
67
4.108.41: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Irrigation Plan I-3.5
Print on Vellum
1995 June 1
67
4.108.42: The Trails Streetscape- Phase 2- Parcel D-2/E-2 Landscape and Sidewalk Layout 2.1 Overlay
Print on Mylar
1995 February 16
67
4.108.43: Phase 2 Overlay 2.1
Print on Mylar
undated
67
4.108.44: The Trails Streetscape Phase 2 Base 2.1
Print on Mylar
undated
67
4.108.45: Phase 2 Overlay 2.2
Print on Mylar
undated
67
4.108.46: Phase 2 Overlay 2.2
Print on Mylar
undated
67
4.108.47: Phase 2 Overlay 2.3 a
Print on Mylar
undated
67
4.108.48: Phase 2 Overlay 2.3 a
Print on Mylar
undated
67
4.108.49: Phase 2 Base 2.3
Print on Mylar
undated
67
4.108.50: Phase 2 Overlay 2.4 a
Print on Mylar
undated
67
4.108.51: Phase 2 Overlay 2.4
Print on Mylar
undated
67
4.108.52: Phase 2 Base
Print on Mylar
1995 February 3
67
4.108.53: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.1
Print on Vellum
1995 January 24
67
4.108.54: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.2
Print on Vellum
1995 January 24
67
4.108.55: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation I-3.3
Print on Vellum
1995 January 24
67
4.108.56: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation Plan I-3.4
Print on Vellum
1995 January 14
67
4.108.57: The Trails Streetscape- Unit One, Phase II Parcel E-1/D-2 Irrigation Details Notes and Schedules I-3.5
Print on Vellum
1995 January 24
67
4.108.58: Phase 2 Overlay 2.3
Print on Mylar
1995 April 26
67
4.108.59: The Trails Streetscape- Phase 2 Parcel D-2/E-2 2.1
Print on Mylar
1995 February 16
67
4.108.60: The Trails Streetscape- Phase 1 and 2 Parcel D-2/E-2 Cover Page
Print on Vellum
1995 February 16
67
4.108.61: Phase 2 Overlay 2.4
Print on Mylar
1995 April 26
Summerlin The Trails Builder Entries
tube
68
4.109.1: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Cover Page
Print on Bond
1995 October 10
68
4.109.2: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall Layout and Grading Plan L-1.1
Print on Bond
undated
68
4.109.3: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Landscape Plan 2.1
Print on Bond
1995 October 9
68
4.109.4: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall and Site Details L-3.3
Print on Bond
1995 October 9
68
4.109.5: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Wall and Site Details L-3.2
Print on Bond
1995 October 9
68
4.109.6: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Landscape Details L-3.1
Print on Bond
1995 October 9
68
4.109.7: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Plan I-4.1
Print on Vellum
1995 October 9
68
4.109.8: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Details I-4.2
Print on Vellum
1995 October 9
68
4.109.9: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Irrigation Details Note Schedule I-4.3
Print on Vellum
1995 October 9
68
4.109.10: The Trails Builder Entries- Parcel M-2 Sunset Crest (Coleman Homes) Electrical Site Plan E-5.1
Print on Vellum
1995 February 10
68
4.109.11: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Cover Page
Print on Vellum
1995 February 10
68
4.109.12: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall Layout and Grading L-1.1
Print on Mylar
1995 February 10
68
4.109.13: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall Layout and Grading Plan L-1.2
Print on Mylar
1995 February 10
68
4.109.14: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Plan L-2.1
Print on Vellum
1995 February 10
68
4.109.15: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Plan L-2.2
Print on Vellum
1995 February 10
68
4.109.16: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Landscape Details L-3.1
Print on Vellum
1995 February 10
68
4.109.17: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Wall and Site Details L-3.2
Print on Vellum
1995 February 10
68
4.109.18: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Plan I-4.1
Print on Vellum
1995 January 21
68
4.109.19: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Plan I-4.2
Print on Vellum
1995 January 25
68
4.109.20: The Trails Builder Entries Woodside Homes (Highline, Parcel G-1) Irrigation Details Notes and Schedule I-4.3
Print on Vellum
1995 January 21
68
4.109.21: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Cover Page
Print on Vellum
1995 February 10
68
4.109.22: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall Layout and Grading Plan L-1.1
Print on Vellum
1995 February 10
68
4.109.23: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Plan Grading Plan L-2.1
Print on Vellum
1995 February 10
68
4.109.24: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Plan L-2.1
Print on Vellum
1995 January 6
68
4.109.25: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Landscape Details L-3.1
Print on Vellum
1995 February 10
68
4.109.26: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall and Site Details L-3.2
Print on Vellum
1995 February 10
68
4.109.27: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Irrigation Details Notes and Schedule L-3.2
Print on Vellum
1995 January 13
68
4.109.28: The Trails Builder Entries Beazer Homes (La Paz, Parcel I-1) Wall and Site Details L-3.3
Print on Vellum
1995 February 10
68
4.109.29: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Cover Page
Print on Bond
1995 January 20
68
4.109.30: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.1
Print on Bond
1995 January 13
68
4.109.31: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall Layout and Grading Plan L-1.2
Print on Bond
1995 January 13
68
4.109.32: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Plan and Grading L-2.1
Print on Bond
1995 January 13
68
4.109.33: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Plan L-2.2
Print on Bond
1995 January 13
68
4.109.34: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Landscape Details L-3.1
Print on Bond
1995 January 13
68
4.109.35: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-3.2
Print on Bond
1995 January 13
68
4.109.36: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Wall and Site Details L-3.3
Print on Vellum
1995 January 13
68
4.109.37: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Irrigation Plan I-4.1
Print on Vellum
1995 January 13
68
4.109.38: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) I-4.2
Print on Vellum
1995 January 13
68
4.109.39: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Irrigation Details Notes and Schedule I-4.3
Print on Vellum
1995 January 13
68
4.109.40: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Electrical Site Plan E-5.1
Print on Vellum
1995 January 11
68
4.109.41: The Trails Builder Entries Durable Homes (Sequoia, Parcel E-2) Electrical Site Plan E-5.2
Print on Vellum
1995 January 11
68
4.109.42: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Cover Page
Print on Vellum
1994 November 15
68
4.109.43: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Layout and Grading Plan L-1.1
Print on Vellum
1994 November 15
68
4.109.44: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Layout and Grading L-1.2
Print on Vellum
1994 November 16
68
4.109.45: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Details L-1.3
Print on Vellum
1994 November 15
68
4.109.46: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Wall Details L-1.4
Print on Vellum
1994 November 15
68
4.109.47: The Trails Streetscape- Builder Entry
Print on Vellum
1994 September 6
68
4.109.48: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Cover Page
Print on Bond
1995 January 13
68
4.109.49: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall Layout and Grading Plan L-1.2
Print on Bond
undated
68
4.109.50: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Landscape Plan L-2.2
Print on Bond
1995 January 13
68
4.109.51: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Landscape Details L-3.1
Print on Bond
1995 January 9
68
4.109.52: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall and Site Details L-3.2
Print on Mylar
undated
68
4.109.53: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Wall and Site Details L-3.3
Print on Mylar
undated
68
4.109.54: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Plan I-3.1
Print on Vellum
1995 January 9
68
4.109.55: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Plan I-3.2
Print on Vellum
1995 January 9
68
4.109.56: The Trails Builder Entries Coleman Homes (Sierra Ridge, Parcel D-2) Irrigation Details Notes and Schedule I-3.3
Print on Vellum
1995 January 9
68
4.109.57: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Cover Page
Print on Bond
1994 November 29
68
4.109.58: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Landscape and Sidewalk Layout L-2.1
Print on Bond
1994 November 29
68
4.109.59: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Landscape and Sidewalk Layout L-2.2
Print on Vellum
1994 November 29
68
4.109.60: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Planting and Sidewalk Details L-2.3
Print on Vellum
1994 November 29
68
4.109.61: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation Plan I-3.1
Print on Vellum
1994 December 18
68
4.109.62: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation plan I-3.2
Print on Vellum
1994 December 18
68
4.109.63: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) Irrigation Details, Notes and Schedule I-3.3
Print on Vellum
1994 December 18
68
4.109.64: The Trails Builder Entries Lewis Homes (Willow Bend, Parcel B-1) E-1
Print on Vellum
1994 November 29
68
4.109.65: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Cover Page
Print on Vellum
1995 April 24
68
4.109.66: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall Layout and Grading Plan L-1.1
Print on Vellum
1995 April 24
68
4.109.67: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Landscape Plan L-2.1
Print on Vellum
1995 April 24
68
4.109.68: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Landscape Details L-3.1
Print on Vellum
1995 April 24
68
4.109.69: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall and Site Details L-3.2
Print on Vellum
1995 April 24
68
4.109.70: The Trails Builder Entries Pulte Homes (Highpointe, Parcel N-2) Wall and site details L-3.3
Print on Vellum
1995 April 24
68
4.109.71: The Trails Builder Entries- Pulte Homes (Highpoint Parcel N-2) Irrigation Plan I-3.1
Print on Bond
1995 April 24
68
4.109.72: The Trails Builder Entries- Pulte Homes (Highpoint, Parcel N-2) Irrigation Details Notes and Schedule I-3.2
Print on Bond
1995 April 24
68
4.109.73: The Trails Builder Entries- Pulte Homes (Highpoint, Parcel N-2) Electrical Site Plan E-5.1
Print on Vellum
1995 April 24
Summerlin Trails Open Space Phase 1 and 2
tube
69
4.110.1: The Trails Open Space- Phase Two- Cover Page
Print on Vellum
1995 January 9
69
4.110.2: The Trails Open Space- Phase Two- Grading Plan L-1.1
Print on Vellum
1994 November 17
69
4.110.3: The Trails Open Space- Phase Two- Grading Plan L-1.2
Print on Vellum
1994 November 17
69
4.110.4: The Trails Open Space- Phase Two- Grading Plan L-1.5
Print on Vellum
1994 November 17
69
4.110.5: The Trails Open Space- Phase Two- Grading Plan L-1.6
Print on Vellum
1994 November 17
69
4.110.6: The Trails Open Space- Phase Two- Grading Plan L-1.7
Print on Vellum
1994 November 17
69
4.110.7: The Trails Open Space- Phase Two- Layout Plan L-2.1
Print on Vellum
1994 November 17
69
4.110.8: The Trails Open Space- Phase Two- Layout Plan L-2.2
Print on Vellum
1994 November 17
69
4.110.9: The Trails Open Space- Phase Two- Layout Plan L-2.3
Print on Vellum
1994 November 17
69
4.110.10: The Trails Open Space- Phase Two- Layout Plan L-2.4
Print on Vellum
1994 November 17
69
4.110.11: The Trails Open Space- Phase Two- Layout Plan L-2.5
Print on Vellum
1994 November 17
69
4.110.12: The Trails Open Space- Phase Two- Layout Plan L-2.6
Print on Vellum
1994 November 17
69
4.110.13: The Trails Open Space- Phase Two- Layout Plan L-2.7
Print on Vellum
1994 November 17
69
4.110.14: The Trails Open Space- Phase Two- Site Details L-2.8
Print on Vellum
1994 November 17
69
4.110.15: The Trails Open Space- Phase Two- Site Details L-2.9
Print on Vellum
1994 November 17
69
4.110.16: The Trails Open Space- Phase Two- Landscape Plan L-3.1
Print on Vellum
1994 November 17
69
4.110.17: The Trails Open Space- Phase Two- Landscape Plan L-3.2
Print on Vellum
1994 November 17
69
4.110.18: The Trails Open Space- Phase Two- Landscape Plan L-3.3
Print on Vellum
1994 November 17
69
4.110.19: The Trails Open Space- Phase Two- Landscape Plan L-3.4
Print on Vellum
1994 November 17
69
4.110.20: The Trails Open Space- Phase Two- Landscape Plan L-3.5
Print on Vellum
1994 November 17
69
4.110.21: The Trails Open Space- Phase Two- Landscape Plan L-3.6
Print on Vellum
1994 November 17
69
4.110.22: The Trails Open Space- Phase Two- Landscape Plan L-3.7
Print on Vellum
1994 November 17
69
4.110.23: The Trails Open Space- Phase Two- Plant Schedule and Details L-3.8
Print on Vellum
1994 November 17
69
4.110.24: The Trails Open Space- Phase Two- Irrigation Plan I-4.1
Print on Vellum
1994 October 19
69
4.110.25: The Trails Open Space- Phase Two- Irrigation Plan I-4.2
Print on Vellum
1994 October 19
69
4.110.26: The Trails Open Space- Phase Two- Irrigation Plan I-4.3
Print on Vellum
1994 October 19
69
4.110.27: The Trails Open Space- Phase Two- Irrigation Plan I-4.4
Print on Vellum
1994 October 19
69
4.110.28: The Trails Open Space- Phase Two- Irrigation Plan I-4.5
Print on Vellum
1994 October 19
69
4.110.29: The Trails Open Space- Phase Two- Irrigation Plan I-4.6
Print on Vellum
1994 October 19
69
4.110.30: The Trails Open Space- Phase Two- Irrigation Plan I-4.7
Print on Vellum
1994 October 19
69
4.110.31: The Trails Open Space- Phase Two- Irrigation Details I-4.8
Print on Vellum
1994 October 19
69
4.110.32: The Trails Open Space- Phase Two- Irrigation Details I-4.9
Print on Vellum
1994 October 19
69
4.110.33: The Trails Open Space- Phase Two- Irrigation Plan I-4.10
Print on Vellum
1994 October 19
69
4.110.34: The Trails Open Space- Phase Two- Electrical Site Plan E-5.1
Print on Vellum
1994 October 18
69
4.110.35: The Trails Open Space- Phase Two- Electrical Site Plan E-5.2
Print on Vellum
1994 October 18
69
4.110.36: The Trails Open Space- Phase Two- Electrical Site Plan E-5.3
Print on Vellum
1994 October 18
69
4.110.37: The Trails Open Space- Phase Two- Electrical Schedule and Details E-5.4
Print on Vellum
1994 October 18
69
4.110.38: The Trails Open Space- Phase One- Cover Page
Print on Vellum
1994 June 6
69
4.110.39: The Trails Open Space- Phase One- Grading Plan L-1.1
Print on Vellum
1994 May 2
69
4.110.40: The Trails Open Space- Phase One- Grading Plan L-1.2
Print on Vellum
1994 May 2
69
4.110.41: The Trails Open Space- Phase One- Grading Plan L-1.3
Print on Vellum
1994 May 2
69
4.110.42: The Trails Open Space- Phase One- Grading Plan L-1.4
Print on Vellum
1994 May 2
69
4.110.43: The Trails Open Space- Phase One- Layout Plan L-2.1
Print on Vellum
1994 May 2
69
4.110.44: The Trails Open Space- Phase One- Layout Plan L-2.2
Print on Vellum
1994 May 2
69
4.110.45: The Trails Open Space- Phase One- Layout Plan L-2.3
Print on Vellum
1994 May 2
69
4.110.46: The Trails Open Space- Phase One- Layout Plan L-2.4
Print on Vellum
1994 May 2
69
4.110.47: The Trails Open Space- Phase One- Site Details L-2.5
Print on Vellum
1994 May 2
69
4.110.48: The Trails Open Space- Phase One- L-2.6
Print on Vellum
1994 May 2
69
4.110.49: The Trails Open Space- Phase One- Landscape Plan L-3.1
Print on Vellum
1994 May 2
69
4.110.50: The Trails Open Space- Phase One- Landscape Plan L-3.2
Print on Vellum
1994 June 7
69
4.110.51: The Trails Open Space- Phase One- Landscape Plan L-3.3
Print on Vellum
1994 May 2
69
4.110.52: The Trails Open Space- Phase One- Landscape Plan L-3.4
Print on Vellum
1994 June 7
69
4.110.53: The Trails Open Space- Phase One- Plant Schedule and Details L-3.5
Print on Vellum
1994 May 2
69
4.110.54: The Trails Open Space- Phase One- Irrigation Plan I-4.1
Print on Vellum
1994 March 24
69
4.110.55: The Trails Open Space- Phase One- Irrigation Plan I-4.2
Print on Vellum
1994 March 24
69
4.110.56: The Trails Open Space- Phase One- Irrigation Plan I-4.3
Print on Vellum
1994 March 24
69
4.110.57: The Trails Open Space- Phase One- Irrigation Plan I-4.4
Print on Vellum
1994 March 24
69
4.110.58: The Trails Open Space- Phase One- Irrigation Details I-4.5
Print on Vellum
1994 March 24
69
4.110.59: The Trails Open Space- Phase One- Irrigation Details I-4.6
Print on Vellum
1994 March 24
69
4.110.60: The Trails Open Space- Phase One- Irrigation Schedule I-4.7
Print on Vellum
1994 March 24
69
4.110.61: The Trails Open Space- Phase One- Electrical Site Plan E5.01
Print on Vellum
1994 May 2
69
4.110.62: The Trails Open Space- Phase One- Electrical Schedule and Details E5.02
Print on Vellum
1994 May 2
69
4.110.63: The Trails at Summerlin- Pedestrian Underpass Details
Marker on Vellum
1993 February 6
69
4.110.64: The Trails at Summerlin- Park and Open Space Plan
Blueprint
undated
Summerlin Standard Sheets
tube
70
4.111.1: The Trails Streetscape- Cover Page
Print on Mylar
1994 March 21
70
4.111.2: The Trails Streetscape- Typical Grading Sections
Print on Mylar
undated
70
4.111.3: The Trails Streetscape- Planting and Sidewalk Details
Print on Mylar
undated
70
4.111.4: The Trails Streetscape- Typical Grading Sections
Print on Mylar
undated
70
4.111.5: The Trails Streetscape- Parcel K-2 Wall and Entry Monument Details l-2.12
Print on Mylar
1994 April 7
71
Transportation Master Plans
Physical location: CCA 8 Column 3, Row 2
72
Site Analysis
Physical location: CCA 8 Column 3, Row 2
73
Hills S Parcel Diagrams
Physical location: CCA 8 Column 3, Row 2
74
Hills Entries
Physical location: CCA 8 Column 3, Row 2
75
Hills Wall Mock-Up
Physical location: CCA 8 Column 3, Row 2

V:  V: The Domain, 2006-2007Return to Top

1 box, 10 folders and 12 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2006-2007
Box Folder
1 1
Project Description
2007
1 2
Proposals/Contracts
2006-2007
1 3
Proposals/Contracts
2007-2008
1 4
Plant Lists
undated
1 5
Meeting Agendas and Minutes
2006
1 6
Correspondence
2007
1 7
Correspondence
2008
1 8
Cost Estimates
2007
1 9
Design Sketches
2007
1 10
Design Guidelines
2007
Tubes
12 tubes
tube
1
Phase 1 & 2
Physical location: CCA 6 Column 1, Row 1
undated
2
Parkway Streetscape Design
Physical location: CCA 6 Column 1, Row 2
undated
3
Office Building
Physical location: CCA 8 Column 4, Row 3
undated
4
Central Park
Physical location: CCA 8 Column 4, Row 3
undated
5
Central Park
Physical location: CCA 8 Column 4, Row 3
undated
6
Phase II
Physical location: CCA 8 Column 4, Row 3
undated
7
Phase II
Physical location: CCA 8 Column 5, Row 1
undated
8
Phase II
Physical location: CCA 8 Column 5, Row 1
undated
9
Phase II
Physical location: Barn Box 9
undated
10
Phase II
Physical location: Barn Box 9
undated
11
Phase II
Physical location: Barn Box 14
undated
12
Phase II
Physical location: Barn Box 14
undated

VI:  VI: Grand Traverse, 1996-1998Return to Top

1 box, 12 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-1998
Box Folder
1 1
Lot 19 Proposals/Contracts
1996
1 2
Lot 18 Meeting Minutes
1996
1 3
Resort Proposals/Contracts
1998
1 4
Resort Programming
1998
1 5
Resort Charrette
1998
1 6
Lot 12 Correspondence
1998
1 7
Resort Report
1997
1 8
Resort Report
1997
1 9
Resort Report
1997
1 10
Resort Report
1997
1 11
Resort Report
1997
1 12
Resort Report
1997
TUBES
4 tubes
tube
1
Sketches
Physical loation: Barn Box 3
undated
2
Real Estate
Physical loation: Barn Box 3
undated
3
Resort
Physical loation: Barn Box 4
undated
4
DMC
Physical loation: CCA 8 Column 5, Row 3
undated

VII:  VII: Kierland, 1996-2008Return to Top

1 box, 9 folders and 17 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-2008
Box Folder
1 1
Propsals/Contracts
1997-1998
1 2
Additional Services Proposals/Contracts
2005-2008
1 3
Meeting Minutes
2005
1 4
Spa Entry Drive
2006
1 5
Plant List
undated
1 6
Correspondenc
1997-1998
1 7
Marketing/Presentations
1996-1998
1 8
Design Handbook
1998
1 9
Kierland Commons Residential Lofts Construction
2007
TUBES
17 tubes
tube
1
Sketches
Physical location: CCA 6 Column 1, Row 2
undated
2
Landscape Construction Documents
Physical location: CCA 6 Column 2, Row 7
2001 May 5; undated
3
Conceptual Base
Physical location: CCA 6 Column 2, Row 7
undated
4
Schematics
Physical location: CCA 6 Column 2, Row 8
undated
5
Documents
Physical location: CCA 6 Column 1, Row 9
undated
6
Design Development Documents, Landscape Construction Documents
Physical location: Barn Box 5
undated
7
Construction Documents
Physical location: CCA 8 Column 4, Row 1
undated
8
Site Plan
Physical location: CCA 6 Column 1, Row 4
undated
9
Commons
Physical location: CCA 8 Column 5, Row 1
undated
10
Landscape Plan
Physical location: CCA 8 Column 5, Row 1
undated
11
Construction Documents Structure Details
Physical location: CCA 8 Column 5, Row 2
undated
12
Clubhouse
Physical location: Barn box 6
undated
13
Commons
Physical location: Barn Box 6
undated
14
Commons
Physical location: Barn Box 10
undated
15
Westin Resorts
Physical location: Barn Box 11
undated
16
Tower Lofts
Physical location: Barn Box 11
undated
17
Westin Resorts
Physical location: Barn Box 11
undated

VIII:  VIII: Kennecott, 1995-1997Return to Top

1 box, 10 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-2008
Box Folder
1 1
Proposals/Contracts
1995-1996
1 2
Correspondence
1995
1 3
Correspondence
1995-1996
1 4
Design Basis Memorandum
undated
1 5
Work Program
1995
1 6
Cost Estimates
1996
1 7
Specifications
1995
1 8
Phase 2 Proposals/Contracts
1996
1 9
Phase 2 Correspondence
1996-1997
1 10
Phase 2 Field Reports
1995-1996
TUBES
tube
1
Complete Drawings
Physical location: Barn Box 6
undated
2
Issues for Owners Approval
Physical location: Barn Box 6
undated
3
Working, Drawings, Site
Physical location: Barn Box 6
undated
4
Parcels for Construction
Physical location: Barn Box 6
undated
5
Northern Trail System
Physical location: Barn Box 6
undated

IX:  IX: Verde River Greenway, 1990-1993Return to Top

2 boxes, 16 folders and 3 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-1993
Box Folder
1 1
Proposals/Contracts
1991-1993
1 2
Correspondence
1990-1993
1 3
Correspondence w/Client
1991-1993
1 4
Correspondence w/Other Agencies
1991-1993
1 5
Meeting Minutes/Notes to File
1991-1993
1 6
Work Program
1991-1993
1 7
Conversation Record
1991-1992
1 8
Cultural
1991
1 9
Land Use
1991
1 10
Programming
1990
1 11
Work Schedule
1991
1 12
Inventory Analysis
1991
1 13
Appendices
undated
2 1
Planning Process Report
undated
2 2
Management Plan Report
undated
2 3
Draft Report for Phase 1
1992 March 24
TUBES
3 tubes
tube
1
Preliminary Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
2
Soils
Physical location: CCA 8 Column 4, Row 3
undated
3
Master Plan/Design Concept
Physical location: CCA 8 Column 4, Row 3
undated

X:  X: Biltmore Estate (North Carolina), 1997-2003Return to Top

3 boxes, 29 folders and 5 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2003
Box Folder
1 1
Master Plan Proposals/Contracts
2003
1 2
Master Plan Correspondence Consultant
2003
1 3
Master Plan Correspondence
1998-2000
1 4
Master Plan Transmittals
2001
1 5
Master Plan Conceptural Design
2002
1 6
Field Report
1999
1 7
Progress Report
1999
1 8
Progress Report
1999
1 9
Progress Report
2000
1 10
Meeting Minutes
1998-1999
1 11
Engineering
1999
1 12
Programming
1998-1999
1 13
Change Orders
1999-2000
1 14
Master Plan Historic/Cultural
2002-2003
1 15
Master Plan Transportation
2002
1 16
Pay Requests
2000
2 1
Correspondence
1997-1998
2 2
Correspondence
1999
2 3
Correspondence
2000
2 4
Correspondence
2001
2 5
Design Sketches/Product Information
1998
2 6
Design Sketches/Product Information
1999
2 7
Design Sketches/Product Information
2000
2 8
Design Sketches/Product Information
2001
3 1
Cost Estimate
1999
3 2
Cost Estimates
1998
3 3
Cost Estimates
1999
3 4
Construction Bids/Proposals/Addendum
1999-2000
3 5
Construction Bids/Proposals/Addendum
1999-2000
TUBES
5 tubes
tube
1
Master Plan
Physical location: CCA 6 Column 1, Row 9
undated
2
Winery Village
Physical location: CCA 8 Column 6, Row 2
undated
3
Master Plan
Physical location: CCA 6 Column 1, Row 9
undated
4
Trail System
Physical location: CCA 8 Column 6, Row 3
undated
5
City Resubmittal
Physical location: Barn Box 8
undated

XI:  XI: Basalt River Corridor, 1997-2005Return to Top

2 boxes, 20 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2005
Box Folder
1 1
Proposals/Contracts
2003-2004
1 2
Correspondence
1996-2004
1 3
Meeting Minutes/Notes to File
1997-2005
1 4
Work Schedule
2003
1 5
Topography
2002
1 6
Fiscal Impact Analysis
2001-2003
1 7
Housing and Development Documents
2003
1 8
Housing Fees and Permits
2003
1 9
Parks & Recreation
undated
1 10
Transportation
2003
1 11
Design Sketches
2003
1 12
Survey and Base Map Information
2003
1 13
Master Plan Development
2003
1 14
Financial
[has oversized]
2003-2005
2 1
Community Area Plan
2003
2 2
Master Plan Report
2002
2 3
Master Plan Report
2002
2 3
Master Plan Documents
2003-2005
2 4
Social Capital Measurements
2003-2004
2 5
Public participation
2003
2 6
Schematic Design
2003

XII:  XII: Crested Butte, 1985-1998Return to Top

2 boxes, 35 folders and 10 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1985-1998
Box Folder
1 1
Design & Submission Marketing/Presentations
1994
1 2
Programming
1993-1995
1 3
South Village
1985
1 4
North Village Subdivision Proposals/Contracts
1995-1997
1 5
North Village Subdivision Correspondence
1995
1 6
North Village Subdivision Correspondence
1995-1996
1 7
Meeting Minutes/Notes to File
1992-1995
1 8
Sketches
undated
1 9
Design Sketches
1998
1 10
Design Guidelines
1985-1992
1 11
Illustrative Plan
1996
1 12
Crested Mountain Village Program Summaries
1996
1 13
Crested Mountain Village Graphics
undated
1 14
Parcel Proforma
1993
1 15
North Village Subdivision Works Program
undated
1 16
Work Program
1993-1998
2 1
Site Plans
1998
2 2
North Village Proposals/Contracts
1992
2 3
Planning Work Session Proposals/Contract
1992
2 4
Transmittals
1994-1995
2 5
Planning Work Session Correspondence
1992-1993
2 6
North Village Correspondence
1994-1995
2 7
Subdivision I Correspondence
1986-1992
2 8
North Village Meeting Minutes/Notes to File
1994-1995
2 9
Planning Work Session Meeting Mintues/Notes to File
1993
2 10
North Village 1 Meetingt Minutes/Notes to File
1984-1993
2 11
North Village Subdivision Meeting Minutes/Notes to File
1992
2 12
Meeting Minutes/Notes to File
1994-1995
2 13
Meeting Minutes/Notes to File
1997-1998
2 14
Meeting Minutes/Notes to File
1998
2 15
Miscellaneous Meeting Minutes/Notes to Fiel
1995
2 16
Crested Mountain Living Correspondence
1996-1997
2 17
Correspondence
1996-1997
2 18
Correspondence
1998
2 19
Reserve Correspondence
1998
TUBES
10 tubes
tube
1
Geological Review
Physical location: CCA 6 Column 2, Row 4
undated
2
North Village Mylar's
Physical location: CCA 6 Column 2, Row 4
undated
3
The Reserve
Physical location: CCA 6 Column 2, Row 4
undated
4
The Reserve
Physical location: CCA 6 Column 2, Row 4
undated
5
Village Planning Studies
Physical location: CCA 6 Column 2, Row 5
undated
6
Parcel Studies Reserve Studios
Physical location: CCA 6 Column 2, Row 5
undated
7
North Village Study Originals
CCA 6 Column 2, Row 8
1993; undated
8
Gold Link Subdivision Entry Design
Physical location: CCA 6 Column 1, Row 9
undated
9
Housing Site Plans
Physical location: Barn Box 11
undated
10
Hotel
Physical location: Barn Box 11
undated

XIII:  XIII: Quernecia, 1998-2006Return to Top

2 boxes, 17 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1998-2006
Box Folder
1 1
Proposals/Contracts
1999-2006
1 2
Meeting Minutes
1999-2000
1 3
Notes to File
1999
1 4
Design Sketches
1998-1999
1 5
Design Sketches
1999
1 6
Design Sketches
1999-2000
1 7
Field Report
1999-2001
1 8
Field Report
2006
1 9
Correspondence
1999-2002
1 10
Billing/Invoices
2002
1 11
Plant Lists
1999-2000
2 1
Work Program
1998
2 2
Golf Course Meeting Notes
1999-2000
2 3
Golf Course Notes to File
1999
2 4
Golf Course Cost Estimate
1999-2000
2 5
Golf Course Correspondence
1999-2000
2 6
Golf Course Guiding Principles
1999-2000

XIV:  XIV: Amaranth/Montage, 2006-2007Return to Top

2 boxes, 18 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2006-2007
Box Folder
1 1
Proposals/Contracts
2006-2007
1 2
Montage Invoices
2007-2008
1 3
Montage Meeting Minutes
2006-2007
1 4
Montage Design Sketches
2006
1 5
Design Standards Propsals/Contracts
2006-2007
1 6
Correspondence
2006
1 7
Preliminary Drainage Report
2007
1 8
Urban Design & Landscape Architecture Report
2007
1 9
690 Urban Design & Open Space Report
2007
1 10
690 Urban Design & Open Space Report
2007
2 1
Final Development Plan
2006 July
2 2
Amaranth Area 1 Final Planned Area Devlopment
2007 February
2 2
Amaranth Preliminary Planned Area Development
2007 April 26
2 4
Amaranth Area 2 GIS Tasks
2007 July 12
2 5
Amaranth Area 1 Site Improvement Program
2007 October 18
2 6
Amaranth PAD Comparison Report
2007 March 28
2 7
Amaranth Area 1 Design Standards
2007 September 1
2 8
Amaranth Area 1 Landscape Cost Analysis
2007
TUBES
4 tubes
tube
1
Soccer Park
Physical location: CCA 8 Column 6, Row 3
undated
2
Holdings
Physical location: CCA 8 Column 5, Row 3
undated
3
Parks
Physical location: CCA 6 Column 1, Row 3
undated
4
Village Center
Physical location: CCA 6 Column 1, Row 3
undated

XV:  XV: La Posada, 1996-2000Return to Top

2 boxes, 34 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-2000
Box Folder
1 1
Change Orders
1997-1999
1 2
Contract Administration
1999-2000
1 3
Correspondence Master Plan
1997-1999
1 4
Correspondence Agency- Master Plan
1997-1998
1 5
Correspondence Owner Master Plan
1997-2000
1 6
Correspondence Owner- Metro
2000
1 7
Cost Estimates
1997-1998
1 8
Design Sketches
1998
1 9
Facsimiles
1997
1 10
Field Reports
1998
1 11
Maintenance Guidelines
2000
1 12
Marketing Presentations
1998
1 13
Master Plan Addendums
1998
1 14
Master Plan DD's
1998
1 15
Master Plan
1999
1 16
Maps
undated
1 17
Master Plan Renovations
1998
1 18
Meeting Notes- Base Renovation
1996-1998
1 19
Meeting Minutes- CD Phase
1998
1 20
Meeting Notes/Minutes
1997-1999
2 1
Notes
undated
2 2
Notes
1997-1998
2 3
Notes to File- Master Plan
1997-1998
2 4
Physical- Geology
1998
2 5
Plant Proposals
1997-2000
2 6
Programming- Architectural
1997
2 7
Programming
1997-1998
2 8
Proposal/Contracts- Base Renovation
1997
2 9
Proposal/Contracts- Master Plan
1997-1999
2 10
Proposal/Contract/Owner- Metro
2000
2 11
Proposal of Additional Landscape Architectural
2000
2 12
Site Observation
1998-2000
2 13
Specifications- La Posada
1998
2 14
Specifications
1998

XVI:  XVI: KUSA, 1989-1991Return to Top

2 boxes, 24 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1989-1991
Box Folder
1 1
Site Plan Proposals/Contracts
1990
1 2
Site Plan Correspondence
1990
1 3
Site Plan Correspondence
1991
1 4
Site Plan Correspondence
1992
1 5
Site Plan Meeting Minutes/Notes to File
1990-1991
1 6
Site Plan Work Program
1990
1 7
Site Plan Engineering
1990-1991
1 8
Site Plan Programming
1989
1 9
Site Plan Cost Estimates
1990-1991
1 10
Site Plan Design Sketches/Product Information
1990-1991
1 11
Site Plan Design Sketches/Product Information
1991-1992
2 1
Site Plan Specifications
1990-1991
2 2
Rezoning Meeting Minutes/Notes to File
1989
2 3
Rezoning Correspondence
1989-1990
2 4
Rezoning Programming
1989
2 5
Rezoning Design Sketches/Product Information
1989
2 6
Rezoning Engineering
1989
2 7
Rezoning Cost Estimates
1989-1990
2 8
Rezoning Construction Bids/Proposals
1989
2 9
Work Program
1989
2 10
Construction Bids/Proposals
1991
2 11
Submittals/Shop Drawings
1991
2 12
P.U.D.
1989
2 13
Proposal Graphics
1990
TUBES
4 tubes
tube
1
Broadcast Facility Design Development
Physical location: Barn Box 5
undated
2
Planting Plan
Barn Box 5
undated
3
Site Analysis
Barn Box 5
undated
4
Landscape Plans
CCA 8 Column 5, Row 1
undated

XVII:  XVII: Idarado, 1999-2001Return to Top

2 boxes, 18 folders, 12 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1999-2001
Box Folder
1 1
Proposals/Contracts
1999
1 2
Correspondence
1999
1 3
Correspondence
2000
1 4
Correspondence
2001
1 5
Meeting Minutes/Notes to File
1999-2001
1 6
Work Program
2001
1 7
Cost Estimate
1999
1 8
Documentation
1999
1 9
Bridal Veil Development
2000
1 10
Idarado Property
1999
1 11
Property Proposal/Contract
1999
1 12
Legacy Project Engineering
2000-2001
1 13
Legacy Project Engineering
2000-2001
1 14
Design Sketches
2000-2001
2 1
Physical
2000-2001
2 2
Field Reports
2000
2 3
Programming
2000-2001
2 4
Programming
2000-2001
TUBES
12 tubes
tube
1
Bridal veil, liberty ball, drainage, grading, roads, Damp;D mill, eco center
Physical location: CCA 8 Column 5, Row 3
undated
2
Illustrative Site Plans
Physical location: CCA 8 Column 4, Row 2
undated
3
Legacy Project
Physical location: CCA 8 Column 4, Row 2
undated
4
Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
5
Conceptual Design, Colored Pencil Illustrative, Site Analysis
Physical location: Barn Box 9
undated
6
Bridal Veil Development
Physical location: Barn Box 9
undated
7
Design Development
Physical location: Barn Box 9
undated
8
Legacy Project
Physical location: Barn Box 9
undated
9
Legacy Project
Physical location: Barn Box 9
undated
10
Legacy Project
Physical location: Barn Box 9
undated
11
Legacy Project
Physical location: Barn Box 9
undated
12
Early studies, sections, illustrative plan (pencil)
Physical location:Barn Box 10
undated

XVIII:  XVIII: Banff, 1992-1995Return to Top

2 boxes, 23 folders and 9 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1992-1995
Box Folder
1 1
Banff Redevelopment
1992
1 2
Biological (Vegetation and Wildlife)
1994
1 3
Clippings/Related Articles
1992
1 4
Comp. Studies
1992
1 5
Construction Drawings
1994-1995
1 6
Correspondence for Downtown Enhancement
1992-1994
1 7
Cost Estimates
1993
1 8
Downtown Enhancement Design Sketches/Signage
1992
1 9
Downtown Enhancement Design Sketches/Signage
1992
1 10
Downtown Enhancement Conceptual Plan
1992
1 11
Downtown Enhancement Plan
undated
1 12
Engineering (Civil/Traffic)
1992
2 1
Presentation Text
undated
2 2
Meeting Minutes/Notes to File
1992
2 3
Meeting Minutes/Notes to File
1992
2 4
Meeting Minutes
1992-1994
2 5
Downtown Enhancement Plan Story Board
undated
2 6
Physical (Geology/Soils/Draining)
undated
2 7
Proposals/Contracts for Downtown Enhancement
1992-1994
2 8
Programming (Architectural)
1992
2 9
Transmittals
1993
2 10
Visual
1992
2 11
Work Program
1993-1994
TUBES
9 tubes
tube
1
Downtown Enhancement
Physical location: CCA 8 Column 6, Row 2
undated
2
Downtown Enhancement Plan
Physical location: CCA 8 Column 5, Row 1
undated
3
Originals
Physical location: CCA 8 Column 5, Row 1
undated
4
Downtown Enhancement
Physical location: CCA 8 Column 5, Row 1
undated
5
Originals
Physical location: CCA 8 Column 5, Row 1
undated
6
Site Location and Demo Plan
Physical location: CCA 8 Column 5, Row 1
undated
7
Site Grading
Physical location: CCA 8 Column 5, Row 1
undated
8
Plant List
Physical location: CCA 8 Column 5, Row 1
undated
9
Enhancement Blacklines
Physical location: Barn Box 14
undated

XIX:  XIX: Landwell, 2003-2007Return to Top

2 boxes, 19 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2003-2007
Box Folder
1 1
Visitor's Center Proposals/Contracts
2005
1 2
Visitor's Center Meeting Agendas & Minutes
2005
1 3
Urban Core Proposals/Contracts
2005
1 4
Urban Core Meeting Agendas & Minutes
2005
1 5
Urban Core Transportation
2005
1 6
Urban Core Design Guidelines
2005
1 7
Urban Core Design Guidelines
2005
1 8
Urban Core Design Guidelines
2005
1 9
East Property Proposals/Contracts
2005
1 10
East Property Correspondence
2004-2006
1 11
East Property Invoices
2004-2005
1 12
East Property Invoices
2005-2007
1 13
East Property Meeting Minutes
2004-2007
2 1
East Property Schedule
2004
2 2
East Property Plant Lists
2003-2004
2 3
East Property Parks and Recreation
2004
2 4
East Property Analysis Maps
undated
2 5
East Property Urban Core Block Studies
2005
2 6
East Property Urban Design Standards
2003
TUBES
6 tubes
tube
1
Illustrative Master Plan, Renderings, Zone Plans, Intersection Diagrams, Regional Context
Physical location: CCA 8 Column 6, Row 1
undated
2
Context, diagrams, site analysis
Physical location: CCA 8 Column 6, Row 1
undated
3
East Property
Physical location: CCA 8 Column 4, Row 1
undated
4
East Property
Physical location: CCA 8 Column 4, Row 1
undated
5
East Property
Physical location: Barn Box 11
undated
6
East Property
Physical location: Barn Box 15
undated

XX:  XX: Amoco Refinery Reuse Plan, 1996-2004Return to Top

2 boxes, 22 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-2004
Box Folder
1 1
Articles
2005
1 2
Construction
2001
1 3
Correspondence
2001-2004
1 4
Correspondence
2001-2003
1 5
Cost Estimates
1999
1 6
Cost Estimates
2002
1 7
Master Plan
1999-2002
1 8
Master Plan
2003-2004
1 9
Meeting Minutes
2000-2002
1 10
Meeting Minutes
2001-2003
1 11
Meeting Minutes
2001-2004
1 12
Meeting Record
2001-2003
2 1
Physical
undated
2 2
Plant List
2001-2003
2 3
Programming
1998-1999
2 4
Proposal/Contracts
1998-2002
2 5
Proposal/Contracts
2001-2002
2 6
Schedule
2001-2002
2 7
Signage
2001-2004
2 8
Water
1998-1999
2 9
Work Program
1996-2000
2 10
Work Program
2001-2002
TUBES
4 tubes
tube
1
Illustrative, re-use plan
Physical location: CCA 8 Column 6, Row 2
undated
2
Platt River Commons
Physical location: CCA 8 Column 3, Row 3
undated
3
CD Set
Physical location: Barn Box 8
undated
4
Mylar Site Drawings
Physical location: Barn Box 13
undated

XXI:  XXI: City of Mesa, 1993-2001Return to Top

2 boxes, 26 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-2001
Box Folder
1 1
Comprehensive Plan Proposals/Contracts
1994
1 2
Comprehensive Plan Correspondence
1993-1994
1 3
Comprehensive Plan Meeting Minutes
1994
1 4
Comprehensive Plan Notes to File
1994
1 5
Comprehensive Plan Focus Group Meeting
1994
1 6
Comprehensive Guide Summary of Tour
1994
1 7
Comprehensive Guide Plan
1994
1 8
General Plan Proposals/Contracts
1995
1 9
General Plan Correspondence
1995
1 10
General Plan Meeting Minutes
1995
1 11
General Plan Goals/Objectives
1995
1 12
General Plan Existing Conditions
1995
1 13
General Plan Land Use Alternatives
1995
1 14
General Plan Public Workshops
1995
1 15
General Plan Draft Plan
1995
2 1
1 General Plan Implementation
1996
2 2
General Plan Final Plan
1996
2 3
Comprehensive Guide
1994
2 4
Comprehensive Guide
1994
2 5
Megacorp Correspondence
1994-2001
2 6
Megacorp Proposals/Contracts
1994
2 7
Megacorp Meeting Minutes
1994
2 8
Megacorp Working Papers
1994
2 9
Megacorp Main Street Drawings
1994
2 10
Megacorp Notes To File
1994
2 11
Megacorp Action Plan Draft
1994

XXII:  XXII: Mesa Performing Arts Center, 1998-2005Return to Top

2 boxes, 20 folders and 1 tube
Container(s) Description Dates
MANUSCRIPT MATERIALS
1998-2005
Box Folder
1 1
Proposals/Contracts
1998-1999
1 2
Cost Estimates
2000
1 3
Cost Estimates
2000
1 4
Cost Estimates
2001
1 5
Environmental
2002
1 6
Correspondence
1999-2000
1 7
Correspondence
2001
1 8
Correspondence
2002-2004
1 9
Notes to File
2000
1 10
Notes to File
2001-2003
2 1
Meeting Minutes
2000
2 2
Meeting Minutes
2000
2 3
Meeting Minutes
2001
2 4
Meeting Minutes
2001
2 5
Meeting Minutes
2002-2003
2 6
Submittals/Shop Drawings
2002-2005
2 7
Change Orders
2002-2004
2 8
Construction Observation
2003-2004
2 9
Sketches
2000
2 10
Schematic Design
2000
TUBES
1 tube
tube
1
Schematic Design
Physical location: CCA 8 Column 6, Row 2
undated

XXIII:  XXIII: Santa Fe Railyard, 1999-2005Return to Top

2 boxes, 24folders and 30 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1999-2005
Box Folder
1 1
Agency Communication
2002
1 2
Articles
2000-2002
1 3
Brief History of the Planning of the Railyard
2001
1 4
Civil/Traffic
2001-2002
1 5
Correspondence
2001
1 6
Correspondence Agency
2002
1 7
Design Sketches
2001
1 8
Design Sketches/Product Info
2001
1 9
Fiscal Statement
2001-2002
1 10
Facsimiles
2000-2001
1 11
Finances
1999-2001
1 12
General Meeting Minutes
2001
1 13
Historic Architecture
2001-2002
1 14
Land Use
2001-2002
1 15
Marketing/Presentation
2001
1 16
Master Plan
2001-2002
1 17
Meeting Record
2000-2001
2 1
News Clippings
2000
2 2
Programming
2001
2 3
Programming
undated
2 4
Proposals/Contracts
2000-2001
2 5
Proposals/Contracts
2001-2002
2 6
Proposals/Contracts
2002-2005
2 7
Public Participation
2001
TUBES
30 tubes
tube
1
Base plans, process drawings, red lines, infrastructure, 3D Perspectives, Main Railyard
Physical location: CCA 8 Column 4, Row 2
undated
2
Master Plan Utilities
Physical location: CCA 8 Column 4, Row 3
undated
3
Community Days
Physical location: CCA 8 Column 4, Row 3
undated
4
"What Would 'Good' Look Like?"
Physical location: CCA 8 Column 4, Row 3
undated
5
Haison Group
Physical location: CCA 8 Column 4, Row 3
undated
6
Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
7
Master Plan Land Use
Physical location: CCA 8 Column 4, Row 3
undated
8
Parcelization Options
Physical location: CCA 8 Column 4, Row 3
undated
9
Master Plan Design Team
Physical location: CCA 8 Column 4, Row 3
undated
10
Master Plan Series Base Maps
Physical location: CCA 8 Column 4, Row 3
undated
11
City of Santa Fe
Physical location: CCA 8 Column 4, Row 3
undated
12
Liaison Group
Physical location:CCA 8 Column 4, Row 3
undated
13
Parcel Info
Physical location: CCA 8 Column 4, Row 3
undated
14
Transportation/Regionals
Physical location: CCA 8 Column 4, Row 3
undated
15
Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
16
Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
17
Master Plan Inventory Utilities
Physical location: CCA 8 Column 5, Row 1
undated
18
Master Plan- Historic Districts
Physical location: CCA 8 Column 5, Row 1
undated
19
Master Plan Parking Circulation
Physical location: CCA 8 Column 5, Row 1
undated
20
Master Plan Land Use and Zoning
Physical location: CCA 8 Column 5, Row 1
undated
21
Master Plan Architecture History Buildings
Physical location: CCA 8 Column 5, Row 1
undated
22
Master Plan Base Maps
Physical location: CCA 8 Column 5, Row 1
undated
23
Master Plan
Physical location: CCA 8 Column 5, Row 1
undated
24
Master Plan Site Plan
Physical location: CCA 8 Column 5, Row 1
undated
25
Master Plan Aerials Photos
Physical location: CCA 8 Column 5, Row 1
undated
26
Tenant Parking Plans Proposed Development
Physical location: CCA 8 Column 5, Row 1
undated
27
Master Plan
Physical location: Barn Box 10
undated
28
Submittals
Physical location: Barn Box 11
undated
29
Schematic Sketches
Physical location: Barn Box 14
undated
30
Master Plan
Physical location: Barn Box 16
undated

XXIV:  XXIV: Crown Residence, 1998-2005Return to Top

2 boxes, 25 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1998-2005
Box Folder
1 1
Change Orders
2004
1 2
Conference Call Notes
2003
1 3
Construction Bids/Proposals
2003
1 4
Correspondence
1998-2000
1 5
Correspondence
2002-2003
1 6
Correspondence
2002-2004
1 7
Detail Design Studies
2003
1 8
Design Review
undated
1 9
Drainage
2003
1 10
Engineering
1998-1999
1 11
Field Reports
1998-1999
1 12
Field Report Instructions
2003-2005
1 13
Five Tree Regulations
2002
1 14
Materials Research
2003
1 15
Meeting Minutes
1998
1 16
Meeting Minutes
1998-2000
1 17
Meeting Minutes
2002-2005
2 1
Planting Plan
1998
2 2
Proposals/Contracts
1998-1999
2 3
Proposals/Contracts
2002-2003
2 4
Schematic Design
1998-1999
2 5
Sketches/Image Graphic
undated
2 6
Specifications
2003
2 7
Images
[photocopies]
2003
2 8
Image Book
2003
TUBES
6 tubes
tube
1
Schematic Design Drawings, Water Feature Details
Physical location: CCA 8 Column 5, Row 3
undated
2
Design Development
Physical location: CCA 8 Column 4, Row 2
undated
3
Base Maps, Original Sketches, Illustrative
Physical location: CCA 8 Column 4, Row 3
undated
4
Design Development, Original Sketches, Plans, Details, Grading
Physical location: CCA 8 Column 4, Row 3
undated
5
Watercolor and Trace
Physical location: Barn Box 10
undated
6
Construction Document
Physical location: Barn Box 11
undated

XXV:  XXV: Santa Teresa, 1989-2000Return to Top

2 boxes, 25 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1989-2000
Box Folder
1 1
Santa Teresa Clippings
1995-1996
1 2
Santa Teresa Charette Clippings
1999
1 3
Santa Teresa Coversation Records
1995-1996
1 4
Santa Teresa Correspondence Owner
1995-1997
1 5
Santa Teresa Suncor Correspondence Owner
1999
1 6
Santa Teresa Correspondence
1996-1999
1 7
Santa Teresa Correspondence Agency
1995-1996
1 8
Santa Teresa Cultural Resources
1995-1996
1 9
Santa Teresa Design
1989-1997
1 10
Santa Teresa Development
1995-1996
1 11
Santa Teresa Development
1999-2000
1 12
Santa Tersa Development Data
1996-1997
1 13
Santa Teresa Development Program
1995-1996
1 14
Santa Teresa Facsimiles
undated
1 15
Santa Teresa Market Data
1996
1 16
Santa Teresa Master Plan
1990
1 17
Santa Teresa Meeting Minutes
1999
1 18
Santa Teresa Meeting Notes
1995-1996
1 19
Santa Teresa Meeting Minutes
1995-1996
1 20
Santa Teresa Progress
1996
2 1
Santa Teresa Project Update
1995
2 2
Santa Teresa Proposals
1995-1997
2 3
Santa Teresa Proposals/Contracts Owner & Landscape Architects
1996
2 4
Santa Teresa Suncor Proposal/Contracts
1999-2000
2 5
Santa Teresa Proposal
undated
2 6
Santa Teresa Resource Inventory and Assessment Report
1996
2 7
Santa Teresa Survey/Base Map
1995
2 8
Santa Teresa Water-Sewer
1995-1996
2 9
Santa Teresa Suncor Work Program
1996-1999
TUBES
2 tubes
tube
1
Map Studies
Physical location: CCA 8 Column 5, Row 2
undated
2
Border Crossing, Road Sections, Master Plan, Conceptual, Draft Master Plan, Soils, Notes
Physical location: CCA 8 Column 5, Row 2
undated

XXVI:  XXVI: Commons Due Diligence, 1992-2006Return to Top

2 boxes, 19 folders and 36 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1992-2006
Box Folder
1 1
Proposals/Contracts
1998-2000
1 2
Correspondence
1998-1999
1 3
Correspondence
1999-2000
1 4
Meeting Minutes
1998
1 5
Meeting Minutes
1999
1 6
Report
1999
1 7
Design Sketches
undated
1 8
Infrastructure
1999
1 9
Programming
1998-1999
1 10
Programming
1999
1 11
Parcel Land Use Plan
1999 April 20
2 1
Design Review Board
2005-2006
2 2
PUD Application
1992
2 3
PUD Application
1992
2 4
PUD Application
1997
2 5
Fire Access
1997
2 6
Zoning
1996
2 7
Neighborhood Briefing
1997
2 8
Parking Commons
1996
TUBES
tube
1
Misc. Maps/Drawings
Physical location:CCA 6 Column 2, Row 1
undated
2
Final Plan Black and White
Physical location:CCA 6 Column 2, Row 4
undated
3
PUD Studies
Physical location:CCA 6 Column 2, Row 3
undated
4
Parking Studies
Physical location:CCA 6 Column 2, Row 4
undated
5
Neighborhood Sections
Physical location:CCA 6 Column 2, Row 4
undated
6
Early Illustrative
Physical location:CCA 6 Column 2, Row 4
undated
7
River Front Park
Physical location: CCA 6 Column 2, Row 4
1999; undated
8
Zone
Physical location: CCA 6 Column 2, Row 4
undated
9
Presentation on Water
Physical location: CCA 6 Column 2, Row 7
undated
10
Black and White Presentation Sketch
Physical location: CCA 6 Column 1, Row 9
undated
11
Layout Drawings
Physical location: CCA 6 Column 2, Row 8
undated
12
Design Standards
Physical location: CCA 6 Column 2, Row 8
undated
13
Design Standards
Physical location: CCA 8 Column 6, Row 1
undated
14
Site Testing
Physical location: CCA 8 Column 6, Row 3
undated
15
Parking Studies
Physical location: CCA 8 Column 6, Row 1
undated
16
Presentation Drawings
Physical location: CCA 6 Column 1, Row 9
undated
17
PUD Studies
Physical location: CCA 8 Column 6, Row 1
undated
18
Schematic
Physical location: CCA 8 Column 6, Row 1
undated
19
Diagrams
Physical location: CCA 8 Column 6, Row 3
undated
20
Elevation
Physical location: CCA 8 Column 6, Row 1
undated
21
Site Design Details
Physical location: Barn Box 3
undated
22
Construction Documents
Physical location: Barn Box 3
undated
23
Schematic Design
Physical location: Barn Box 3
undated
24
Schematic Design Set
Physical location: Barn Box 3
undated
25
Schematic and Conceptual Design
Physical location: Barn Box 3
undated
26
Phase 1 and 2
Physical location: Barn Box 5
undated
27
Monograph
Physical location: CCA 8 Column 4, Row 2
undated
28
Bicycle Mapping
Physical location: CCA 8 Column 5, Row 2
undated
29
Site Test
Physical location: CCA 8 Column 5, Row 2
undated
30
Water Feature Site Plan
Physical location: Barn Box 8
undated
31
Construction Documents
Physical location: Barn Box 8
undated
32
Water Feature Submittals Plan
Physical location: Barn Box 8
undated
33
Design Development
Physical location: Barn Box 8
undated
34
Grading and Drawing Progress Set
Physical location: Barn Box 8
undated
35
Streets Studies
Physical location: Barn Box 13
undated
36
Project Presentations Sheets
Physical location: Barn Box 16
undated

XXVII:  XXVII: IMBT/Pine Hall, 2003-2006Return to Top

2 boxes, 11 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
2003-2006
Box Folder
1 1
Proposals/Contracts
2003-2005
1 2
General Master Plan
2006
1 3
Meeting Minutes/Notes to File
2003
1 4
Meeting Minutes/Notes to File
2004
1 5
Meeting Minutes/Notes to File
2004
1 6
Meeting Minutes/Notes to File
2005-2006
1 7
Work Program
2004-2006
1 8
Utilities
2005-2006
1 9
Correspondence
2003-2006
2 1
Pine Hall Design Standards
2004-2006
2 2
Economic Model
2003-2004

XXVIII:  XXVIII: Wildcat Ranch, 1988-1997Return to Top

2 boxes, 12 folders and 9 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1988-1997
Box Folder
1 1
Clippings
1995-1997
1 2
Construction
1991
1 3
Detailed Submission
1990
1 4
Engineering
1991
1 5
General Submission
1993
1 6
Information Packet
1993
1 7
P.U.D
1990
1 8
Physical
1989-1994
1 9
Residential Growth Management
1993
2 1
Planning
1989-1994
2 2
Purchasers Packet
undated
2 3
Wildlife Study
1988
TUBES
9 tubes
tube
1
Douglas Ranch
Physical location: CCA 8 Column 6, Row 3
undated
2
335, miscellaneous
Physical location: CCA 6 Column 2, Row 3
1989; 1989
3
Boatdock CD's
Physical location: CCA 6 Column 2, Row 3
undated
4
Prop. Studies
Physical location: CCA 6 Column 2, Row 3
undated
5
Douglas Ranch
Physical location: Barn Box 1
undated
6
Douglas Ranch
Physical location: Barn Box 1
undated
7
Plat Mylar's
Physical location: Barn Box 13
undated
8
Planning Studies
Physical location: Barn Box 13
1986; undated
9
Monograph
Physical location: Barn Box 16
undated

XXIX:  XXIX: Freed Development, 2006-2008Return to Top

2 boxes, 18 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
2006-2008
Box Folder
1 1
Proposals/Contracts
2006-2007
1 2
Correspondence
2006-2007
1 3
Correspondence
2007
1 4
Correspondence
2007
1 5
Correspondence
2007
1 6
Correspondence
2007
1 7
Correspondence
2007
1 8
Correspondence
2007
1 9
Correspondence
2007
1 10
Correspondence
2007
2 1
Correspondence
2007
2 2
Correspondence
2007
2 3
Correspondence
2007
2 4
Correspondence
2007-2008
2 5
Meeting Records/Notes to File
2006-2007
2 6
Invoices
2006-2007
2 7
Invoices
2007
2 8
Invoices
2007-2008

XXX:  XXX: McDowell Mountain Ranch, 1993-1995Return to Top

2 boxes, 22 folders and 12 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-1995
Box Folder
1 1
Proposals/Contracts
1993-1995
1 2
Correspondence/Owner
1993-1995
1 3
Correspondence/Agency
1994-1995
1 4
Correspondence with Consultant
1994
1 5
Meeting Minutes/Notes to File
1994-1995
1 6
Design Sketches
1994
1 7
McDowell Mountain Trails Proposals/Contracts
1994
1 8
McDowell Mountain Trails Cost Estimates
1994
1 9
McDowell Mountain Trails Design Sketches/Product Information
1994
1 10
McDowell Mountain Trails Project Manual
1994
1 11
McDowell Mountain Trails Transmittals
1994-1995
1 12
McDowell Mountain Trails Construction Documents
1994-1995
1 13
McDowell Mountain Ranch Electrical
1994-1995
1 14
McDowell Mountain Parks Correspondence
1994
2 1
McDowell Mountain Parks Meeting Mintues/Notes to File
1994
2 2
McDowell Mountain Parks Meeting Mintues/Notes to File
1994-1995
2 3
McDowell Mountain Parks Vegetation
1994
2 4
McDowell Mountain Parks Engineering
1994
2 5
McDowell Mountain Parks Info/Community Center Correspondence/Owner
1994
2 6
McDowelll Mountain Parks Info/Community Center Design Sketches
1994
2 7
McDowelll Mountain Parks Info/Community Center Design Sketches
1994-1995
2 8
McDowell Mountain Parks Specifications
1994 September 6
TUBES
12 tubes
tube
1
Schematic Analysis Plan
Physical location: CCA 6 Column 2, Row 6
undated
2
Design Development and Graphics
Physical location: CCA 6 Column 2, Row 6
undated
3
100% Review Set
Physical location: CCA 6 Column 2, Row 6
undated
4
Construction Set
Physical location: CCA 6 Column 2, Row 6
undated
5
MTG Park
Physical location: CCA 8 Column 5, Row 1
undated
6
Issue for Bid
Physical location: CCA 8 Column 5, Row 3
undated
7
Community Park and Info Center
Physical location: CCA 8 Column 5, Row 3
undated
8
Issue for Bid
Physical location: Barn Box 6
1994 December; undated
9
Community Park Info Center
Physical location: Barn Box 6
undated
10
Originals
Physical location: Barn Box 6
undated
11
Community Park and Info Center
Physical location: Barn Box 6
undated
12
Illustrative
Physical location: Barn Box 14
undated

XXXI:  XXXI: East Village, 1990-1996Return to Top

2 boxes, 22 folders and 17 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-1996
Box Folder
1 1
Proposals/Contracts
1990
1 2
Proposals/Contracts
1991
1 3
Proposals/Contracts
1991
1 4
Proposals/Contracts
1992
1 5
Proposals/Contracts
1993-1994
1 6
Correspondence
1990-1991
1 7
Correspondence
1994
1 8
Correspondence
1994-1996
2 1
Hydrology
1990-1991
2 2
Hydrology
1992-1993
2 3
Hydrology
1994
2 4
Wetlands
1993-1996
2 5
Wildlife
1993-1994
2 6
Geology/Soils
1990-1991
TUBES
17 tubes
tube
1
Progress Slicks
Physical location: CCA 8 Column 6, Row 2
undated
2
Base area parking, concept
Physical location: CCA 8 Column 6, Row 2
undated
3
Road Profiles
Physical location: CCA 8 Column 6, Row 2
undated
4
Court at alpine springs, two creeks, layout & grading
Physical location: CCA 8 Column 6, Row 2
undated
5
Road cross sections, two creeks studies
Physical location: CCA 8 Column 6, Row 2
undated
6
Conceptual, Wall and Bridge details
Physical location: CCA 8 Column 6, Row 2
undated
7
Early Mylar's on Trace
Physical location: CCA 6 Column 2, Row 7
undated
8
Wall Sections
Physical location: CCA 6 Column 2, Row 7
undated
9
200 Scale
Physical location: CCA 6 Column 2, Row 7
undated
10
Design Development
Physical location: CCA 6 Column 2, Row 7
undated
11
Conceptual Submissions
Physical location: CCA 6 Column 2, Row 1
undated
12
Walls, Bridges, Roads Submission Slicks
Physical location: CCA 6 Column 2, Row 6
1994 January 28; undated
13
Site Analysis
Physical location: CCA 6 Column 2, Row 7
undated
14
Preliminary Studies
Physical location: CCA 6 Column 2, Row 6
undated
15
Bridge Studies
Physical location:Barn Box 2
undated
16
Sails and Wetlands
Physical location: CCA 8 Column 4, Row 2
undated
17
Lift Profiles
Physical location: CCA 8 Column 4, Row 2
undated

XXXII:  XXXII: Goldberg Residence, 1988-1996Return to Top

2 boxes, 20 folders and 7 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1988-1996
Box Folder
1 1
Goldberg Residence Project Memorandum
1998
1 2
Goldberg Residence Propsals/Contracts
1992-1993
1 3
Goldberg Residence Correspondence
1992-1993
1 4
Goldberg Residence Correspondence
1994-1996
1 5
Goldberg Residence Meeting Minutes/Notes
1992-1995
1 6
Goldberg Residence Work Program
1988-1992
1 7
Goldberg Residence Work Program
1993
1 8
Goldberg Residence Work Program
1994-1996
1 9
Goldberg Residence Physical
1988-1993
1 10
Goldberg Residence Engineering
1989-1995
2 1
Goldberg Residence Programming
1993
2 2
Goldberg Residence Cost Estimates
1992-1995
2 3
Goldberg Residence Design Sketches/Product Information
1992-1996
2 4
Goldberg Residence Specifications
1993
2 5
Goldberg Residence Field Reports
1993-1995
2 6
Goldberg Residence Change Orders
1992-1994
2 7
Goldberg Residence Change Orders
1995
2 8
Goldberg Residence Change Orders
1995-1996
2 9
Goldberg Residence Submittals/Shop Drawings
1992-1996
2 10
Goldberg Residence Construction Documents
1993 July 14
TUBES
7 tubes
tube
1
Illustrative Drawings
Physical location: CCA 8 Column 6, Row 1
undated
2
Preliminary Studies
Physical location: Barn Box 3
undated
3
Mylar's
Physical location: Barn Box 3
undated
4
Overlays
Physical location: Barn Box 3
undated
5
Work
Physical location: Barn Box 3
1998; undated
6
Design Development
Physical location: CCA 8 Column 4, Row 2
undated
7
Specification Plan
Physical location: CCA 8 Column 4, Row 1
undated

XXXIII:  XXXIII: Central Platte Valley, 1987-2001Return to Top

2 boxes, 20 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1987-2001
Box Folder
1 1
Air Quality
1994
1 2
Articles
2001
1 3
Biological
1992
1 4
Clippings
1987-1995
1 5
Correspondence
1991-1994
1 6
Design Sketches/Product Info
undated
1 7
Engineering
1994
1 8
Master Plan Examples of Phase 1, 2 and 3 Deliverables
undated
1 9
Meeting Minutes/Notes to File
1994
1 10
Meeting Minutes/Notes to File
2000
1 11
Outdoor Resource Master Plan
1997
1 12
Outdoor Resource Master Plan
1997
1 13
Programming
1994
2 1
Proposal/Contracts
2000
2 2
Trillium Central Platte Valley Plan
1994
2 3
Trillium Site
1994
2 4
Trillium Site
1994

XXXIV:  XXXIV: Korean War Veterans Park (Albuquerque, NM), 1997-2000Return to Top

2 boxes, 27 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2000
Box Folder
1 1
Proposals/Contracts
1997-1998
1 2
Correspondence
1997-1998
1 3
Meeting Minutes
1997-1998
1 4
Billings/Invoices
1997-1998
1 5
Schematic Design Proposals/Contracts
1997-1998
1 6
Schematic Design Correspondence
1998
1 7
Schematic Design Notes to File
undated
1 8
Schematic Design Work Program
1998
1 9
Schematic Design Billing/Invoices
1997-1998
1 10
Schematic Design Cost Estimates
1998
1 11
Phase 2 Project Manual
1999 June 30
1 12
Phase 2 Proposals/Contracts
1998-2000
1 13
Phase 2 Correspondence
1998-1999
1 14
Phase 2 Correspondence
1999-2000
1 15
Phase 2 Meeting Minutes
1999-2000
1 16
Phase 2 Construction Bids/Proposals/Addendum
2000
1 17
Phase 2 Field Reports
2000
1 18
Phase 2 Billing/Invoices
2000
2 1
Phase 2 Notes to File
1998-1999
2 2
Phase 2 Work Program
1998
2 3
Phase 2 Engineering
1997
2 4
Phase 2 Cost Estimates
1998-1999
2 5
Phase 2 Design Sketches
1999
2 6
Phase 2 Construction Bids/Proposals/Addendum
1999
2 7
Phase 2 Field Reports
2000
2 8
Phase 2 Submittals/Shop Drawings
1999-2000
2 9
Phase 2 Construction Communications
1999-2000

XXXV:  XXXV: University of Arizona Highland Community, 1990-2004Return to Top

2 boxes, 33 folders and 3 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-2004
Box Folder
1 1
Proposals/Contracts
2000-2001
1 2
Owner Contracts
2000-2002
1 3
Correspondence
2000-2001
1 4
Correspondence
2002-2004
1 5
Change Orders
2002
1 6
Design Development
2001-2003
1 7
Construction Documents
2001-2002
1 8
Land Use
2002
1 9
Meeting Minutes
2000-2001
1 10
Meeting Minutes
2002-2004
1 11
Construction Observations
2001-2003
1 12
Paving Patterns Products
undated
1 13
Engineering
1990
2 1
Construction Bids/Proposals
2001
2 2
Additional Services Proposals/Contracts
2003
2 3
Open Space Proposals/Contracts
2001-2004
2 4
Open Space Design Development
2001-2003
2 5
Open Space Meeting Minutes
2002-2004
2 6
Open Space Schedule
2002-2003
2 7
Open Space Shematic Design
2003
2 8
Open Space Correspondence
2003-2004
2 9
Open Space Land Use
2002-2003
2 10
Open Space Infrastructure
2002-2004
2 11
Open Space Field Notes
2004
2 12
Quad North Proposals/Contracts
2001-2002
2 13
Quad North Meeting Minutes
2002-2003
2 14
Quad North Correspondence
2002
2 15
Quad North Notes to File
2002
2 16
Quad North Water
2002
2 17
Quad North Schematic Design
2002-2003
2 18
Quad North Land Use
2002
2 19
Quad North Site Observation
2002-2004
2 20
Concept Design
2000 November 15
TUBES
3 tubes
tube
1
Landscape Construction Record Set
Physical location: CCA 8 Column 5, Row 2
2005 March 24; undated
2
Design Development
Physical location: Barn Box 10
undated
3
Construction Documents
Physical location: Barn Box 12
undated

XXXVI:  XXXVI: Trillium, 2000-2004Return to Top

2 boxes, 29 folders and 9 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2000-2004
Box Folder
1 1
Surface Parking Proposals/Contracts
2003
1 2
Surface Parking Meeting Minutes
2003
1 3
Surface Parking Specifications
2003
1 4
Surface Parking Infrastructure
2003
1 5
Surface Parking Change Orders
2003
1 6
Parking Proposals/Contracts
2000-2001
1 7
Parking Correspondence
2000-2002
1 8
Parking Meeting Minutes
2001-2002
1 9
Parking Design Development
2000-2002
1 10
Parking Development Review Responses
untitled
1 11
Parking Proposals/Contracts
2004
1 12
Parking Notes to File
2003
1 13
Parking Correspondence
2003-2004
1 14
Parking Meeting Minutes
2003-2004
1 15
Community Master Plan
2003 October 1
1 16
Design Development
2004
1 17
Environmental
undated
1 18
Transportation
2004
2 1
Proposals/Contracts
2003
2 2
Drawings
2003
2 3
Drawings
2003-2004
2 4
Drawings
2004
2 5
Drawings
2004
2 6
Meeting Notes
2003
2 7
Master Plan Alternative
2003 December 23
2 8
Parks Planning
2004 January 20
2 9
Correspondence
2003-2004
2 10
Conceptual Plan
2004
2 11
Notes to File
2004
TUBES
9 tubes
tube
1
Surface Parking
Physical location: CCA 8 Column 6, Row 1
undated
2
Slope Analysis
Physical location: CCA 8 Column 6, Row 2
undated
3
Final GIS Presentation Maps
Physical location: CCA 8 Column 6, Row 2
undated
4
Planning Base Map
Physical location: CCA 8 Column 6, Row 2
undated
5
Village Neighborhood Plan
Physical location: CCA 8 Column 6, Row 2
undated
6
Surface Parking
Physical location: CCA 8 Column 5, Row 3
undated
7
Lotting Plans Redlines
Physical location: Barn Box 1
undated
8
Site Testing
Physical location: CCA 8 Column 4, Row 1
undated
9
City Side
Physical location:Barn Box 16
undated

XXXVII:  XXXVII: Blackcomb, 1978-1986Return to Top

2 boxes, 12 folders and 13 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1978-1986
Box Folder
1 1
Plan Review
1986 September
1 2
Development Proposal
1978
1 3
Proposal Appendix
1978
1 4
Proposal Map Appendix
undated
1 5
Proposal Map Appendix
undated
1 6
Development Plan
1981
2 1
Development Plan Phase 1
1986 December
2 2
Architectural Program
1979
2 3
Director's Report
1982
2 4
Planning and Design Report
1982
2 5
Mountain Development Maps
undated
2 6
Mountain Development Maps
undated
TUBES
13 tubes
tube
1
Master Plans
Physical location: CCA 8 Column 5, Row 1
undated
2
1986 Negatives
Physical location: CCA 8 Column 5, Row 1
undated
3
Technical Concept Plan
Physical location: CCA 8 Column 5, Row 1
undated
4
Development Suitability
Physical location: CCA 8 Column 5, Row 1
undated
5
Originals
Physical location: CCA 6 Column 1, Row 5
undated
6
Phase 2 Phase III
Physical location: Barn Box 8
undated
7
Sky Plan
Physical location: Barn Box 8
undated
8
Parcel Testing
Physical location: Barn Box 8
undated
9
Phase III
Physical location: Barn Box 8
undated
10
Originals
Physical location: Barn Box 8
undated
11
Originals
Physical location: Barn Box 8
undated
12
Illustrative Mylar
Physical location: Barn Box 8
undated
13
Miscellaneous Prints
Physical location: Barn Box 8
undated

XXXVIII:  XXXVIII: Wickenburg, 1997-2002Return to Top

2 boxes, 16 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2002
Box Folder
1 1
Propsals/Contracts
1997-1999
1 2
Propsals/Contracts
1999
1 3
Propsals/Contracts
2000-2001
1 4
Propsals/Contracts
2001-2002
1 5
Correspondence
2000-2002
1 6
Meeting Minutes
2000-2001
1 7
Work Program
2000-2001
1 8
Notes to File
2000-2002
1 9
Notes to File
2000-2002
1 10
Land Use
2000
1 11
Memorandums
1999-2002
1 12
Zoning
2001-2002
1 13
Design Sketches
undated
2 1
Plan Report
2001 September
2 2
Plan Report
2002 June
2 3
Plan Report
2002 June

XXXIX:  XXXIX: Cherokee Gates Redevelopment, 1991-2006Return to Top

2 boxes, 25 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1991-2006
Box Folder
1 1
Appendix
undated
1 2
Clippings
2001-2006
1 3
Correspondence
2001-2002
1 4
Correspondence
2001-2005
1 5
Design Guidelines
2002
1 6
Flyover Modifications
2002
1 7
Informational Packet
2002
1 8
Light Rail
2002
1 9
Meeting Record
2001-2002
1 10
Schedule
2001
1 11
Urban Standards
2005
1 12
Design Development
2001
1 13
Redevelopment Story
2002
1 14
Rezoning
undated
1 15
Villa Park Neighborhood Plan
1991
1 16
Athmar Park Neighborhood Permineter Plan
undated
1 17
Transportation
undated
2 1
Development Agreement
undated
2 2
Meeting Minutes
2001
2 3
Correspondence
2001
2 4
Affordable Housing
2002
2 5
Finances
2002
2 6
Engineering Qualifications
undated
2 7
South Broadway Improvement Plan
2002
2 8
Land Ownership
2002
TUBES
2 tubes
tube
1
Cherokee Denver
Physical location: CCA 8 Column 3, Row 1
undated
2
Illustrative
Physical location: CCA 6 Column 1, Row 2
undated

XL:  XL: Arbolera, 1997-2002Return to Top

2 boxes, 19 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2002
Box Folder
1 1
Arbolera de Villa
undated
1 2
Arbolera Master Development Plan
1998
1 3
Arbolera Place Design Submission
2001
1 4
Clippings
1999-2001
1 5
City Plans
1997
1 6
Construction
2000-2002
1 7
Correspondence
1998-2001
1 8
Design
1998
1 9
Master Development Plan
1998
1 10
Meeting Notes/Notes to File
1998-2001
1 11
Owner/Landscape Architect for Sawmill
1998-2000
1 12
Programming
undated
1 13
Proposal/Contract
2000
2 1
Redevelopment Plan for Sawmill
1997
2 2
Sawmill Advisory Council
1997
2 3
Sawmill Development
1997
2 4
Sawmill Real Estate
1997
2 5
Meeting Minutes
1997-1998
2 6
Sawmill Redevelopment Project
1997

XLI:  XLI: Copper Mountain, 1985-1997Return to Top

2 boxes, 29 folders and 16 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1985-1997
Box Folder
1 1
Proposal
1985-1986
1 2
Correspondence
1997
1 3
Master Plan Proposals/Contracts
1990-1991
1 4
Master Plan Correspondence
1990-1992
1 5
Master Plan Meeting Minutes
1990-1991
1 6
Master Plan Addendum Proposals/Contracts
1990-1991
1 7
Master Plan Addendum Correspondence
1990-1991
1 8
Master Plan Addendum Correspondence
1991
1 9
Master Plan Addendum Correspondence
1992
1 10
Master Plan Addendum Meeting Minutes/Notes to File
1991
1 11
Master Plan Addendum Meeting Agendas
1991
1 12
Master Plan Addendum Meeting Summaries
1991-1992
1 13
Master Plan Addendum Notes To File
1991
1 14
Master Plan Addendum Work Program
1990-1992
1 15
Master Plan Addendum Physical
1991
1 16
Master Plan Addendum Programming
1991
2 1
Entry Proposals/Contracts
1993-1996
2 2
Entry Correspondence
1992-1993
2 3
Entry Programming
undated
2 4
Entry Cost Estimates
1993
2 5
Meeting Summaries
1990-1991
2 6
Correspondence
1989-1992
2 7
Meeting Agendas
1991-1992
2 8
Soils/Geology
1991
2 9
Hydrology
1991
2 10
Village Core Proposals/Contracts
1996
2 11
Village Core Urban Design Study
1997
2 12
Village Core Programming
1996-1997
2 13
Maps
1991
TUBES
16 tubes
tube
1
Central Day Lodge
Physical location: CCA 6 Column 1, Row 7
2
Urban Design and Misc. Drawings
Physical location: CCA 6 Column 1, Row 7
undated
3
Presentation Drawings
Physical location: CCA 6 Column 1, Row 7
undated
4
Negative Aerial Photo Mylar's
Physical location: CCA 6 Column 1, Row 7
undated
5
West Parcel Studies
Physical location: CCA 6 Column 2, Row 3
undated
6
Illustrations
Physical location: CCA 6 Column 1, Row 9
undated
7
Design Studies
Physical location: CCA 6 Column 1, Row 9
undated
8
Master Plans
Physical location: CCA 6 Column 1, Row 8
undated
9
Trade Parcel
Physical location: CCA 8 Column 6, Row 1
undated
10
Entry
Physical location: CCA 8 Column 6, Row 1
undated
11
Preliminary Analysis
Physical location: CCA 6 Column 2, Row 1
undated
12
East Trade Parcel
Physical location: CCA 6 Column 2, Row 1
undated
13
Mylar Negatives
Physical location: CCA 8 Column 6, Row 1
undated
14
Trade Parcel
Physical location: CCA 8 Column 6, Row 1
undated
15
Parcel Studies
Physical location: CCA 8 Column 6, Row 1
undated
16
Urban Design Studies
Physical location: CCA 6 Column 1, Row 5
undated

XLII:  XLII: Scottsdale/Goldwater Art Wall, 1993-2000Return to Top

2 boxes, 20 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-2000
Box Folder
1 1
Proposals/Contracts Owner
1997-1999
1 2
Proposals/Contracts Consultants
1997-1998
1 3
Correspondence Owner
1997-1998
1 4
Correspondence Owner
1998-1999
1 5
Correspondence Consultant
1997-1998
1 6
Correspondence Consultant
1998-1999
1 7
Meeting Minutes
1997-2000
1 8
Notes to File
1997
1 9
Engineering
1998
1 10
Cost Estimate
1997-1998
1 11
Design Sketches
undated
2 1
Specifications
1998
2 2
Field Reports
1998
2 3
Design Sketches/Product Info for Scottsdale Path
1994
2 4
Meeting Minutes for Multi-Use Path
1993-1994
2 5
Correspondence for Multi-Use Path
1994-1995
2 6
Proposals/Contracts for Multi-Use Path
1996
2 7
Specifications for Multi-Use Path
1995
2 8
Submittals/Shop Drawings for Scottsdale Path
1994
2 9
Cost Estimates for Multi-Use Path
1993-1994

XLIII:  XLIII: Tempe Performing Arts Center, 2001-2006Return to Top

2 boxes, 32 folders and 3 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2001-2006
Box Folder
1 1
Meeting Agenda & Minutes
2002
1 2
Meeting Agenda & Minutes
2002
1 3
Meeting Agenda & Minutes
2003
1 4
Schedules & Deliverables
2002
1 5
Topographical
2001
1 6
Design Sketches
2002
1 7
Design Sketches
2001-2006
1 8
Cost Estimates
2001-2002
1 9
Cost Estimates
2002-2004
1 10
Specifications
undated
1 11
Specifications
undated
1 12
Design Development
2002
1 13
Design Development
2002-2003
1 14
Correspondence
2001-2002
1 15
Correspondence
2002
1 16
Correspondence
2003
1 17
Correspondence
2003
1 18
Correspondence
2003-2006
1 19
Correspondence
2007
1 20
Correspondence
2007
1 21
Correspondence
2007
1 22
Correspondence
2007
1 23
Correspondence
2007
1 24
Correspondence
2007
1 25
Correspondence
2007
2 1
Project Planning Guide
2001 December
2 2
Schematic Design
2002
2 3
Schematic Design
2002
2 4
Design Development Cost Check
2002
2 5
Drawings
2003
2 6
Notes To File
2001
2 7
Design Study
2002-2003
TUBES
3 tubes
tube
1
Arts Center
Physical location: CCA 8 Column 3, Row 3
undated
2
Schematic Design
Physical location: CCA 8 Column 6, Row 2
undated
3
Design Drawings
Physical location: Barn Box 4
undated

XLIV:  XLIV: 16th Street Mall Extension, 1993-2007Return to Top

2 boxes, 46 folders and 10 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-2007
Box Folder
1 1
Administration
1999-2007
1 2
Proposals/Contracts
1997-1998
1 3
Proposals/Contracts
1999-2000
1 4
Proposals/Contracts
2001
1 5
Correspondence
1998-1999
1 6
Correspondence
2000
1 7
Correspondence
2001-2002
1 8
Engineering
1997-1999
1 9
Engineering
2000
1 10
Design Sketches
1998-2001
1 11
Submittals/Shop Drawings
2002
1 12
Urban Design Standards & Guidelines
1997
1 13
Park Tower Condeos Correspondence
2000
1 14
Park Tower Condos Design Development
2000
1 15
Promenade Lots Specifications
2000
1 16
Loop Road Proposals/Contracts
1999-2001
1 17
Commons Streetscape Correspondence
1999-2004
1 18
Meeting Minutes
1997-1999
1 19
Meeting Minutes
2000
1 20
Meeting Minutes
2001
1 21
Meeting Minutes
2001
1 22
Meeting Minutes
2001
1 23
Meeting Minutes
2002
1 24
Meeting Minutes
2002
1 25
Meeting Minutes
2002
1 26
Mall Extension
2000-2001
1 27
Mall Enhancement Workshop
1993
1 28
Mall Proposals/Contracts
1993
1 29
Mall Transmittals
1993
1 30
Mall Meeting Minutes
1993
1 31
Mall Work Program
1993
1 32
Mall Correspondence
1993
1 33
Mall Engineering
1993
1 34
Mall Visual
undated
1 35
Programming
1993
1 36
Cost Estimates
1992
2 1
Design Sketches
undated
2 2
Market Square Proposals/Contracts
1999-2001
2 3
Market Square Correspondence
2000-2001
2 4
Market Square Correspondence
2001
2 5
Market Square Meeting Minutes
2000
2 6
Market Square Physical
2000
2 7
Market Square Physical
2000
2 8
Market Square Shop Drawings/Submittals
2000
2 9
Market Square Design Development
2000
2 10
Market Square Restaruant Corral Railings
2000
TUBES
10 tubes
tube
1
Mall Extension
Physical location:CCA 8 Column 6, Row 1
undated
2
Mall Pedestrian Ridge
Physical location:CCA 8 Column 6, Row 1
undated
3
Commons streetscape, schematic CDs
Physical location:CCA 8 Column 6, Row 1
undated
4
Market Square
Physical location:CCA 8 Column 6, Row 2
undated
5
Market Square
Physical location:CCA 8 Column 6, Row 2
undated
6
Market Square construction documents
Physical location:CCA 8 Column 6, Row 2
undated
7
Shop drawings and grading plans, Denver office, 2475
Physical location: CCA 8 Column 6, Row 2
2000/2001
8
Mall
Physical location: CCA 8 Column 6, Row 2
undated
9
Site Details, Sketches, Trace
Physical location: CCA 8 Column 6, Row 2
undated
10
Mall
Physical location: Barn Box 15
undated

XLV:  XLV: Lionshead, 1988-2001Return to Top

1 box, 41 folders and 8 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1988-2001
Box Folder
1 1
Proposals/Contracts
1996
1 2
Correspondence
1996
1 3
Programming
1995-1996
1 4
Programmimg
1996
1 5
Design Sketches/Product Information
1996
1 6
Work Program
1993
1 7
Work Program
1993
1 8
Work Program
1994-1996
1 9
Phase 2 Correspondence
1993
1 10
Phase 2 Meeting Minutes/Notes
1988-1993
1 11
Phase 2 Engineering
1988-1994
1 12
Phase 2 Design Sketches/Product Information
1992-1995
1 13
Redevelopment Correspondence
1997-1998
1 14
Redevelopment Proposals/Contracts
1996-1998
1 15
Redevelopment Meeting Minutes
1997-1998
1 16
Redeveloment Engineering
1997
1 17
Redevelopment Programming
1997
1 18
Redevelopment Construction Contracts
1997
1 19
Redevelopment Marketing/Presentations
1997
1 20
Redevelopment Notes to File
1996
1 21
Redevelopment Proposals/Contracts
1997
1 22
Redevelopment Plan
1993
1 23
Redevelopment Plan
1996
1 24
Redevelopment Project Update
1994
1 25
Redevelopment Preliminary Booklet
1996
1 26
East West Lionshead Proposals/Contracts
2001
1 27
East West Lionshead Correspondence
2001
1 28
East West Lionshead Work Program
1996
1 29
Concept Studies Proposals/Contracts
2000
1 30
Concept Studies Correspondence
2000
1 31
Concept Studies Meeting Minutes/Notes to File
2000
1 32
Concept Studies Programming
2000
1 33
Concept Studies Design Sketches/Product Information
2000
1 34
Concept Studies Master Plan
1999
1 35
Lions Square Lodge Proposals/Contracts
2001
1 36
Lions Square Lodge Correspondence
2001
1 37
Lions Square Lodge Design Sketches
2001
1 38
Lions Square Lodge Proposals/Contracts
1999-2000
1 39
Lions Square Lodge Correspondence
1998-2000
1 40
Lions Square Lodge Meeting Minutes/Notes to File
undated
1 41
Lions Square Lodge Cost Estimates
1999
TUBES
8 tubes
tube
1
Master Plan
Physical location: CCA 6 Column 1, Row 3
undated
2
Master Plan
Physical location: CCA 6 Column 1, Row 3
undated
3
Monograph
Physical location: CCA 8 Column 5, Row 1
undated
4
Lions Square Lodge
Physical location: CCA 8 Column 4, Row 2
undated
5
Elevations
Physical location: CCA 8 Column 5, Row 2
undated
6
West Lot Proposal
Physical location: CCA 8 Column 5, Row 2
undated
7
Service Yard and Interchange
Physical location: Barn Box 6
undated
8
Redevelopment Study
Physical location: Barn Box 7
undated

XLVI:  XLVI: Maroon Creek, 1988-1998Return to Top

2 boxes, 53 folders and 14 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1988-1998
Box Folder
1 1
Landscape Specifications
1993-1994
1 2
Maroon Creek Club Design Sketches/Product Info
1993-1997
1 3
Maroon Creek Club Progress Report #24
1995 June 7
1 4
Maroon Creek Construction and Design Issues
1994
1 5
Maroon Creek Correspondences
1993-1994
1 6
Maroon Creek Environment
1996
1 7
Maroon Creek Golf Correspondence
1993-1995
1 8
Maroon Creek Golf Cost Estimates
1994-1995
1 9
Maroon Creek Management
1996-1997
1 10
Maroon Creek Management
1996-1997
1 11
Maroon Creek Management Architectural
1994-1995
1 12
Maroon Creek Management Budgets
1993-1996
1 13
Maroon Creek Management Change Orders
1993-1995
1 14
Maroon Creek Management Civil
1988-1996
1 15
Maroon Creek Management Design Sketches/Product Info
1993-1995
1 16
Maroon Creek Management Design Sketches/Product Info
1996-1997
1 17
Maroon Creek Management Field Reports
1993-1997
1 18
Maroon Creek Management Golf
1986-1990
1 19
Maroon Creek Management Golf
1993
1 20
Maroon Creek Management Golf
1994
1 21
Maroon Creek Management Golf
1994-1997
1 22
Maroon Creek Management Lot 17
1996 August 26
1 23
Maroon Creek Management Meeting Minutes/Notes
1994
1 24
Maroon Creek Management Meeting Minutes/Notes
1995-1996
1 25
Maroon Creek Management Owner Decisions
1991-1998
1 26
Maroon Creek Management Political Approvals
1991-1996
1 27
Maroon Creek Management Soils
1988-1991
1 28
Maroon Creek Management Soils
1993
1 29
Maroon Creek Management Soils
1994-1995
1 30
Maroon Creek Management Submittals/Shop Drawings
1994
1 31
Maroon Creek Management Water
1988-1994
1 32
Maroon Creek Political Correspondence
1994-1995
1 33
Maroon Creek Club Design Guidelines
1995 March 31
1 34
Maroon Creek Club Residential Master Landscape and Grading Plan
1995 September 15
1 35
Maroon Creek Management Meeting Minutes/Notes
1990-1991
1 36
Maroon Creek Golf Proposals/Contracts
1993-1994
1 37
Maroon Creek Golf Meeting Minutes/Notes
1994-1995
1 38
Maroon Creek Golf Work Program
1993
1 39
Maroon Creek Golf Physical
undated
1 40
Maroon Creek Golf Engineering
1985
1 41
Maroon Creek Golf Field Reports
1995
1 42
Maroon Creek Golf Change Orders
1995
2 1
Maroon Creek Documents Part 1
undated
2 2
Maroon Creek Documents Part 2
undated
2 3
Maroon Creek Documents Part 3
undated
2 4
Maroon Creek Club Proposals/Contracts
1993
2 5
Maroon Creek Golf Design Sketches/Product Info
1994
2 6
Maroon Creek Club
1996
2 7
Maroon Creek Political Graphics/Sketches
1994
2 8
Maroon Creek Political Biological
undated
2 9
Maroon Creek Political Programming
1994
2 10
Maroon Creek Review Proposal/Contracts
1993
2 11
Maroon Creek Management Proposals/Contracts
1993-1997
TUBES
14 tubes
tube
1
Bridge
Physical location: CCA 6 Column 2, Row 5
undated
2
3 tubes a. aspen, b. PUT amendments, c. detailed plans, master plan, aspen
Physical location: CCA 6 Column 2, Row 5
2001
3
Detailed Plans Master Plan
Physical location: CCA 6 Column 2, Row 5
undated
4
PUT Amendments
Physical location: CCA 6 Column 2, Row 5
undated
5
Site Plans
Physical location: CCA 6 Column 2, Row 6
undated
6
Schematic Design
Physical location: CCA 6 Column 2, Row 5
undated
7
Final Plats
Physical location: Barn Box 1
undated
8
Tiehack
Physical location: Barn Box 12
undated
9
Club
Physical location: Barn Box 12
undated
10
Pfister
Physical location: Barn Box 12
undated
11
Club Irrigation
Physical location: Barn Box 12
undated
12
Irrigation
Physical location: Barn Box 12
undated
13
Original Planned Drawings
Physical location: Barn Box 12
undated
14
Golf Course
Physical location: Barn Box 12
undated

XLVII:  XLVII: Homestead, 1996-2006Return to Top

1 box, 31 folders and 3 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1996-2006
Box Folder
1 1
Proposals/Contracts
2003-2005
1 2
Base Map
2006
1 3
Meeting Notes
2005-2006
1 4
Easements
2004
1 5
Work Program
2004-2006
1 6
Cost Estimate
2004
1 7
Water
1996-2004
1 8
Plant Lists
2004-2005
1 9
Trail Maps
undated
1 10
Market Analysis
2003 June
1 11
Land Use
2002-2004
1 12
Construction Documents
2004
1 13
Phase 2 Proposals/Contracts
2005
1 14
Phase 2 Correspondence
2005-2006
1 15
Phase 2 Meeting Notes/Agendas
2005-2006
1 16
Phase 2 Cost Estimates
2006
1 17
Phase 2 Marketing
undated
1 18
Phase 2 Grading Plans
2005-2006
1 19
Phase 2 Grading Plans
2006-2007
1 20
Dairy Proposals/Contracts
2004-2006
1 21
Dairy Design Book
undated
1 22
Phase 3 Charette
2006
1 23
Correspondence
2001-2003
1 24
Parcels
2004
1 25
Phase 1 "What If?"
undated
1 26
Livery Stables Schematic Design Charrette
2006 February
1 27
Precedent Research
undated
1 28
Precedent Research
undated
1 29
Precedent Research
undated
1 30
Precedent Research
undated
1 31
Precedent Research
undated
TUBES
3 tubes
tube
1
Preserve
Physical location: CCA 6 Column 1, Row 9
undated
2
Phase 1
Physical location: CCA 6 Column 1, Row 9
undated
3
Phase 2
Physical location: Barn Box 11
undated

XLVIII:  XLVIII: The Meadows Castle Rock, Colorado, 1984-2007Return to Top

3 boxes, 192 folders and 67 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1984-2007
Box Folder
1 1
Boulevard Proposals/Contracts
1986
1 2
Boulevard General Correspondence
1986-1988
1 3
Boulevard Correspondence
1986-1987
1 4
Boulevard Meeting Notes/Agendas
1986-1987
1 5
Boulevard Vegetation
1986
1 6
Boulevard Design Sketches/Details
1986
1 7
Boulevard Structural Engineering
1986
1 8
Boulevard Cost Estimates
1986
1 9
Boulevard Civil/Traffic Engineering
1986
1 10
Boulevard Utility Engineering
1986-1987
1 11
Boulevard Construction Contracts
1986-1987
1 12
Boulevard Submittals/Shop Drawings
1986
1 13
Boulevard Specifications
1986
1 14
Phase 1 Work Program
1985
1 15
Phase 1 Specifications
1985
1 16
Phase 1 Soil Reports
1985
1 17
Phase 1 Marketing
1985
1 18
Phase 1 Irrigation Proposal
1985
1 19
Phase 1 Final Checklist
1986
1 20
Phase 1 Cost Estimates
1985-1986
1 21
Phase 1 Active Plants
1985
1 22
Phase 1 Schedule
1985
1 23
Phase 1 Recreational Program
1986
1 24
Phase 1 PUD Program
1984
1 25
Phase 1 Program Summary
1985-1986
1 26
Phase 1 Project Report
1985 June 17
1 27
Phase 1 Transmittals
1985
1 28
Phase 1 Site Report
1985
1 29
Vision Proposals/Contracts
1998
1 30
Vision Correspondence
1997-1998
1 31
Vision Meeting Minutes/Notes to File
1998-1999
1 32
Vision Biological
1998
1 33
Vision Engineering
1998
1 34
Vision Programming
1997-1998
1 35
Vision Cost Estimates
1998-1999
1 36
Vision Design Sketches/Product Information
1998
1 37
Park Proposals/Contracts
1999-2001
1 38
Park Meeting Notes
1999-2001
1 39
Park Correspondence/Transmittals
2000-2003
1 40
Park Schedule
1999-2000
1 41
Park City/County Plan
1996
1 42
Park Program
1998-1999
1 43
Park Construction Bids/Proposals/Specs
1999-2003
1 44
Park Schematic Design
undated
1 45
Park Programming
1999
1 46
Park Cost Estimates
1998-2003
1 47
Park Construction Documents
2000-2001
1 48
Park Conceptual Design
1999
1 49
Park Value Engineering
2003
1 50
Parkway Proposals/Contracts
1985-1986
1 51
Parkway General Correspondence
1986-1987
1 52
Parkway Correspondence
1985-1986
1 53
Parkway Meeting Notes
1986
1 54
Parkway Work Program
1985-1986
1 55
Parkway Cost Estimates
1985
1 56
Parkway Design Sketches/Details
1986
1 57
Parkway PUD Submittals
1986
1 58
Parkway Segment 1 Utility Engineering
1986
1 59
Parkway Segment 1 Proposal/Contracts
1986
1 60
Parkway Segment 1 Legal Description
undated
1 61
Parkway Segment 2 General Correspondence
1986-1987
1 62
Parkway Segment 2 Work Program/Schedules
1986
1 63
Parkway Segment 2 Meeting Notes
1986
1 64
Parkway Segment 2 Structural Engineering
1986
1 65
Parkway Segment 2 Utility Engineering
1986
1 66
Parkway Segment 2 Cost Estimates
1986
1 67
Parkway Segment 2 Design Sketches/Details
1986
1 68
Parkway Segment 2 Specifications
undated
1 69
Annexation Proposals/Contracts
1988
1 70
Annexation Meeting Notes
1986
1 71
Annexation Water Studies
1984
1 72
Annexation Submittal Checklists
undated
1 73
Annexation Research
undated
1 74
Annexation Program Summary
undated
1 75
Annexation Design Guidelines
undated
1 76
Town Center Neighborhood Parks Meeting Minutes
2006
1 77
Town Center Neighborhood Parks Plants
2006
1 78
Town Center Neighborhood Parks Schedule
undated
1 79
Town Center Neighborhood Parks Images
undated
1 80
Town Center Neighborhood Parks Correspondence
2006-2007
2 1
Correspondence
1993
2 2
Programming
1992-1993
2 3
PUD Submittals
1986
2 4
Cost Estimate
1985-1987
2 5
Engineering
1987
2 6
Design Sketches/Product Information
1987-1988
2 7
Land Use Program
1986
2 8
General Correspondence
1986
2 9
Work Programs/Schedules
1985-1986
2 10
Work Programs/Schedules
1993
2 11
Zoning Ordinance
1986
2 12
Meeting Notes
1986-1987
2 13
PUD Ordinance
undated
2 14
Parkway
1987-1988
2 15
Parkway Construction Bids/Proposals
1987
2 16
Parkway Change Orders
1987
2 17
Parkway Submittals Shop Drawings
1987
2 18
Parkway Construction Contracts
1987
2 19
Parkway Consultant Proposals
1985-1986
2 20
Court Proposals/Contracts
1996-1997
2 21
Planning Commission and Town Board
1984
2 22
Visual Simulation
undated
2 23
Program
1986
2 24
Site Visit
1984-1985
2 25
Monument Soils and Geology
2002
2 26
Monument Proposals/Contracts
2001-2002
2 27
Monument Correspondence
1999-2003
2 28
Monument Meeting Notes
2001-2002
2 29
Monument Billing
2002
2 30
Monument Conceptual
1991-2002
2 31
Monument Design Development
2002
2 32
Monument Schedules
2002
2 33
Monument Site Analysis
undated
2 34
Monument Cost Estimates
2001-2003
2 35
Monument Construction Documents
2001
2 36
Monument Schematic
undated
2 37
Monument Specifications
2002-2003
2 38
Development Guidelines Subdivision Regulation
1986
2 39
Development Guidelines Land Use
undated
2 40
Infrastructure Correspondence
1985
2 41
Infrastructure Cost Estimate
1985
2 42
The Meadows Report
undated
2 43
South Meadows Notes/Meetings/Agendas
1985
2 44
South Meadows Correspondence
1985
2 45
South Meadows P.U.D. Submittal
1985
2 46
South Meadows P.U.D. Ordinance
1984
2 47
South Meadows Approval Meeting
1985
2 48
South Meadows Planning & Design Services
1985
2 49
South Meadows Land Use Application
1985
2 50
The Meadows Project Manual
1987 October
2 51
Riparian Corridor- Boulders
2006
2 52
Meadows Boulevard Proposals
2004-2007
2 53
Riparian Corridor- Meeting Minutes
2006
2 54
Meadows Town Center Illustrative Views
2002
3 1
North Meadows Butterfield Crossing Drive Correspondence
1987-1989
3 2
North Meadows Butterfield Crossing Drive Cost Estimates
1987
3 3
North Meadows Butterfield Crossing Drive Construction Bids/Proposals
1987
3 4
North Meadows Butterfield Crossing Drive Construction Contracts
1987
3 5
North Meadows Butterfield Crossing Drive Field Reports
1988
3 6
North Meadows Butterfield Crossing Drive Change Orders
1987-1988
3 7
North Meadows Butterfield Crossing Drive Specifications
1987
3 8
Meadows Office/Industrial Correspondence
1985-1986
3 9
Meadows Office/Industrial Work Program/Schedules
1985
3 10
Meadows Entry Features Proposals/Contracts
1986
3 11
Meadows Entry Features Consultant Proposals
1986
3 12
Meadows Entry Features General Correspondence
1986-1987
3 13
Meadows Entry Features Meeting Notes
1986
3 14
Meadows Entry Features Structural Engineering
1986
3 15
Meadows Entry Features Cost Estimates
1986
3 16
Meadows Entry Features Design Sketches/Details
1986
3 17
Meadows Entry Features Construction Bids/Proposals
1986
3 18
Meadows Entry Features Change Orders/Field Orders
1987
3 19
Meadows Entry Features Submittals
1986
3 20
Meadows Entry Features Specifications
1986
3 21
Meadows Neighborhood C & D Proposal
1986-1987
3 22
Meadows Neighborhood C & D Meeting Notes
1986
3 23
Meadows Neighborhood C & D Civil/Traffic Engineering
1986
3 24
Meadows Neighborhood C & D Hydrology/Drainage
1986
3 25
Meadows Neighborhood C & D Utility Engineering
1986
3 26
Meadows Neighborhood C & D Land and Program
1986
3 27
Meadows Neighborhood C & D Plat Submittals
1987
3 28
Meadows Planting Plans
1985-1986
3 29
Coachline Road Park Meeting Notes
1986
3 30
Coachline Road Park Consultant Proposal
1986
3 31
Coachline Road Park Hydrology/Drainage
1986
3 32
Coachline Road Park Elements
undated
3 33
Castle Highlands PUD Site Plans
1984
3 34
Meadows Proposal
1984
3 35
Meadows MP Referrals & Correspondence
1984-1986
3 36
Meadows Schedules
1984-1985
3 37
Meadows Updated Subdivision Plan
1993
3 38
The Meadows Architectural Guidelines
1987 December 1
3 39
The Meadows Sign Guidelines
1988 January 8
3 40
The Meadows Development Guidelines
1986 October
3 41
Amendments to the Preliminary P.U.D. Site Plan
1986 May
3 42
Amendments to the Preliminary P.U.D. Site Plan
1986 September
3 43
Preliminary P.D. Site Plan
1986 September
3 44
The Meadows Planning Documents
undated
3 45
The Meadows Planning Documents
undated
3 46
The Meadows Phase One Development
1986 July
3 47
The Meadows Phase One Development (copy 2)
1986 July
3 48
Meadows Miscellaneous Artwork/Graphics
1985
3 49
Town Center Meeting Minutes
2003
3 50
Town Center Proposals/Contracts
2006-2007
3 51
Town Center Neighborhood Parks Construction Observations
2006
3 52
Town Center Neighborhood Parks Construction Documents
2006
3 53
Town Center Neighborhood Parks Bidding
2006
3 54
Town Center Neighborhood Parks Cost Estimates
2006
3 55
Development Guidelines
1986
3 56
Residential Development Guidelines
1987
3 57
Meadows Parkway Phase 1 Landscape Development
undated
3 58
Program Quantities
1984
TUBES
67 tubes
1984-2007
tube
1
Meadows Town Center Riparian Corridor
Physical location: CCA 8 Column 3, Row 3
undated
2
Meadows Town Center
Physical location: CCA 8 Column 3, Row 3
undated
3
Meadows Town Center
Physical location: CCA 8 Column 3, Row 3
undated
4
Meadows Town Center
Physical location: CCA 8 Column 3, Row 3
undated
5
Meadows Town Center
Physical location: CCA 8 Column 3, Row 3
undated
6
Meadows Town Center Riparian Corridor
Physical location: CCA 8 Column 3, Row 3
undated
7
South Meadows
Physical location: CCA 8 Column 3, Row 3
undated
8
Signage Master Plan
Physical location: CCA 8 Column 6, Row 2
undated
9
Site Analysis
Physical location: CCA 8 Column 6, Row 2
undated
10
Open space; neighborhood parks
Physical location: CCA 6 Column 1, Row 2
undated
11
Landscape Improvement
Physical location: CCA 6 Column 1, Row 1
undated
12
Institute architecture
Physical location: CCA 6 Column 1, Row 2
undated
13
Harris Grove Amenity
Physical location: CCA 8 Column 5, Row 3
undated
14
Record Prints North Meadows Butterfield Crossing Signage
Physical location: CCA 6 Column 1, Row 8
undated
15
PUD Graphics
Physical location: CCA 6 Column 1, Row 8
undated
16
Meadows Parkway Segment One
Physical location: CCA 6 Column 1, Row 8
undated
17
Design Guidelines
Physical location: CCA 6 Column 1, Row 8
undated
18
Construction Documents
Physical location: CCA 6 Column 1, Row 8
undated
19
Early Concept Studies
Physical location: CCA 6 Column 1, Row 8
undated
20
Record Prints Meadows Blvd Underpass Entry Walls
Physical location: CCA 6 Column 1, Row 8
undated
21
Neigh. "C" Final Lot Test and Marketing Plans on Mylar
Physical location: CCA 6 Column 1, Row 8
undated
22
Base Map Negatives
Physical location: CCA 6 Column 1, Row 8
undated
23
Parkway Pre-Entry Bridges
Physical location: CCA 6 Column 1, Row 8
undated
24
Prelim. Plat & Final P.D. Site Plans
Physical location: CCA 6 Column 1, Row 8
undated
25
PD Site Plan Amendment Number 7
Physical location: CCA 6 Column 1, Row 9
undated
26
Office and Industry
Physical location: Barn Box 4
undated
27
Landscape Maintenance
Physical location: Barn Box 4
1987; undated
28
Boulevard Planting and Access Study
Physical location: Barn Box 4
undated
29
Butterfield Crossing Park
Physical location: Barn Box 4
undated
30
Parkway Segment II
Physical location: Barn Box 4
undated
31
Parkway
Physical location: Barn Box 4
undated
32
Neighborhood Amendment
Physical location: Barn Box 4
undated
33
Contract Documents
Physical location: Barn Box 4
undated
34
Mylar Prints
Physical location: Barn Box 4
undated
35
Site Analysis Mylar's
Physical location: Barn Box 4
undated
36
Open Space
Physical location: Barn Box 4
undated
37
Mylar Topo's and Slope
Physical location: Barn Box 4
undated
38
Record Prints
Physical location: Barn Box 4
undated
39
Site Planned Development
Physical location: Barn Box 5
undated
40
Color Graphics
Physical location: CCA 8 Column 4, Row 2
undated
41
Castle Rock
Physical location: CCA 8 Column 4, Row 2
undated
42
Illustrative Site Plan
Physical location: CCA 8 Column 4, Row 3
undated
43
Final Lot Test and Marketing Plans
Physical location: CCA 8 Column 5, Row 3
undated
44
Marketing Original Graphics
Physical location: CCA 8 Column 5, Row 3
undated
45
Meadows Boulevard
Physical location: CCA 8 Column 5, Row 3
undated
46
Visual Simulation Line Drawing, Study Sketches, Original Mylar's
Physical location: CCA 8 Column 5, Row 3
undated
47
Parkway Segment 1 & 2
Physical location: CCA 8 Column 5, Row 3
undated
48
Current Graphics
Physical location: CCA 8 Column 5, Row 3
undated
49
PUD Plan
Physical location: CCA 8 Column 5, Row 1
undated
50
Promotional Graphics
Physical location: CCA 8 Column 5, Row 1
undated
51
Contract Documents
Physical location: CCA 8 Column 5, Row 1
undated
52
Design Files
Physical location: CCA 8 Column 5, Row 3
undated
53
Contract Documents
Physical location: CCA 8 Column 5, Row 1
undated
54
Superseded Alignments
Physical location: CCA 8 Column 5, Row 1
undated
55
Original Mylar's Illustrations
Physical location: CCA 8 Column 5, Row 1
undated
56
Neighborhood C&D Preliminary Lot Test
Physical location: CCA 8 Column 5, Row 3
undated
57
Contract Documents
Physical location: CCA 8 Column 5, Row 3
undated
58
Meadows Underpass
Physical location: CCA 8 Column 5, Row 3
undated
59
Analysis-Consultant Data
Physical location: CCA 8 Column 5, Row 3
undated
60
Contract Documents
Physical location: CCA 8 Column 5, Row 3
undated
61
Site Design Studies
Physical location: CCA 8 Column 5, Row 1
undated
62
Parkway Topo Originals
Physical location: CCA 8 Column 5, Row 1
undated
63
Castleton Center Parkway
Physical location: CCA 8 Column 5, Row 3
undated
64
Landscape Improvements
Physical location: Barn Box 11
undated
63
Landscape Improvements
Physical location: Barn Box 11
undated
64
Ranch
Physical location: Barn Box 12
undated
65
Ranch
Physical location: Barn Box 12
undated
66
Pipeline Facilities
Physical location: Barn Box 12
undated
67
Preliminary
Physical location: Barn Box 16
undated

XLIX:  XLIX:Owl Creek, 1973-2004Return to Top

3 boxes, 102 folders and 18 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1973-2004
Box Folder
1 1
Proposals/Contracts
1990
1 2
Correspondence
2003-2004
1 3
Meeting Mintues/Notes
2004
1 4
Work Program
1990
1 5
Engineering
1990
1 6
Programming
1990
1 7
Design Criteria
1990
1 8
Design Sketches/Product Information
1990
1 9
P.U.D.
1990
1 10
Water Rights
2003
1 11
Contracts for Golf Course
1991
1 12
Land Use
2004
1 13
Habitat (Wildlife)
2004
1 14
Visual Analysis
2004
1 15
Marketing Materials
2003
1 16
Appraisals
2004
1 17
Analysis Maps and Diagrams
2000
1 18
Development Programs
1998
1 19
Master Plan Alternatives
2004
1 20
Master Plan Documents
2000
1 21
Other Town Codes
2004
1 22
Golf Course Addition
1991
1 23
Legal Documents
2004
1 24
Special Review Process/Town Approval of Documents
2004
1 25
Correspondence with Design Team
2004
1 26
Open File (Misc)
1994
1 27
Open File (Misc)
2003
1 28
Open File (Misc)
2002-2003
1 29
Open File (Misc)
2003-2004
1 30
Owl Creek 1976 Submission
1976
1 31
Owl Creek Ranch
1984
1 32
Owl Creek Homes East Village PUD
1996
2 1
Introduction
undated
2 2
Development Programs
undated
2 3
Enviornmental Studies
undated
2 4
Master Plan
undated
2 5
Development Impacts
undated
2 6
Owl Creek Workbook
undated
2 7
Meteorology
1974
2 8
Hydrology
1974
2 9
Visual Analysis
undated
2 10
Geology
undated
2 11
Surface Hydrology
1974
2 12
Utilites
1974
2 13
Cultural Facilities
1974
2 14
Sewer and Water
1974
2 15
Recreation
1974
2 16
Housing
1973
2 17
Wildlife
1974
2 18
Soils
1974
2 19
Base Material
undated
2 20
Design Meeting Notes
1974
2 21
Proposals
1974
2 22
Transportation
1975
2 23
Correspondence
1975
2 24
Bibliography
1973
2 25
Regulations
undated
2 26
Growth-Income
undated
2 27
Skiing
undated
2 28
Budget/Cost Schedule
1975
2 29
Program Calculations
1974
2 30
Appendices G through P
undated
3 1
Appendices R through V
undated
3 2
Architectural and Site Development
1985
3 3
Owl Creek Townhomes Notes
1999
3 4
Snowmass Entry
2000
3 5
Owl Creek Townhomes Descriptions
1999
3 6
Owl Creek Burnt Mountain
1999
3 7
East Village Land Use
1994
3 8
Owl Creek Townhouse Sketches
1999
3 9
Final Submission Doc Info
1996
3 10
Signage Studies
1997-1999
3 11
Final Resolution
1999
3 12
EV Townhomes
1994
3 13
Townhomes II Work Program
1996
3 14
Townhome II Meeting Mintues/Notes to File
1995-1996
3 15
Townhomes II Correspondence
1996
3 16
Townhomes II Proposals/Contracts
1995
3 17
Townhomes Phase III Base Mapping
1996
3 18
Townhomes Phase III Meeting Minutes/Notes to File
1996
3 19
Townhomes Phase III Proposals/Contracts
1996
3 20
Owl Creek Townhomes Notes
1994
3 21
Town Submission Meeting
1996
3 22
Graphics
undated
3 23
Simulation Site Studies #10
undated
3 24
Simulation Site Studies #9
undated
3 25
Simulation Site Studies #8
undated
3 26
Simulation Site Studies #7
undated
3 27
Simulation Site Studies #6
undated
3 28
Simulation Site Studies #5
undated
3 29
Simulation Site Studies #4
undated
3 30
Simulation Site Studies #3
undated
3 31
Simulation Site Studies #2
undated
3 32
Simulation Site Studies #1
undated
3 33
Owl Creek Appendix One
undated
3 34
Marx Residence PUD
1990
3 35
Architectural Review Process
1984
3 36
Owl Creek Submission
1976-1978
3 37
Submission Appendix
1978
3 38
Drawings for Owl Creek Townhomes
1995
3 39
Owl Creek Details
1994
3 40
Owl Creek Townhomes Landscape
undated
TUBES
18 tubes
tube
1
Townhomes
Physical location: CCA 8 Column 6, Row 1
1973-2004; undated
2
Owl Creek Townhomes
Physical location: CCA 8 Column 6, Row 1
undated
3
Grading Plan, Enlargements, Layout, Planting Schedule
Physical location: CCA 8 Column 6, Row 1
undated
4
Owl Creek Townhomes
Physical location: CCA 8 Column 6, Row 1
undated
5
Phase 4
Physical location: CCA 8 Column 6, Row 1
undated
6
Townhomes
Physical location: CCA 8 Column 4, Row 1
undated
7
Townhomes Phase 4
Physical location: CCA 8 Column 4, Row 1
undated
8
Grand Bay Owl Creek Studies
Physical location: CCA 8 Column 4, Row 2
undated
9
Project 94 Mylar's
Physical location: CCA 8 Column 5, Row 1
undated
10
Townhomes
Physical location: CCA 8 Column 5, Row 1
undated
11
Homes
Physical location: CCA 8 Column 5, Row 1
undated
12
Townhomes
Physical location: CCA 8 Column 5, Row 1
undated
13
Homes-Mylar's
Physical location: CCA 8 Column 5, Row 1
undated
14
Phase III Part 2
Physical location: CCA 8 Column 5, Row 1
undated
15
Homes
Physical location: CCA 8 Column 5, Row 1
undated
16
Conceptual Submission
Physical location: CCA 8 Column 5, Row 1
undated
17
Townhomes
Physical location: CCA 8 Column 5, Row 1
undated
18
Homes I Grading Study Concept Submittals
Physical location: Barn Box 15
undated

L:  L: Nevada Department of Transportation (NDOT), 2002-2006Return to Top

2 boxes, 40 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2002-2006
Box Folder
1 1
Proposals/Contracts
2003
1 2
Proposals/Contracts
2003 April 17
1 3
Meeting Minutes/Notes to File
2003-2004
1 4
Meeting Minutes/Notes to File
2004
1 5
Meeting Minutes/Notes to File
2004
1 6
Meeting Minutes/Notes to File
2004
1 7
Meeting Minutes/Notes to File
2005
1 8
Meeting Minutes/Notes to File
2005-2006
1 9
Scope of Work
2003
1 10
Scope of Work
2004
1 11
Scope of Work
2004
1 12
Correspondence
2003
1 13
Correspondence
2004
1 14
Correspondence
2004
1 15
Correspondence
2004
1 16
Correspondence
2005-2006
1 17
Design Sketches
2004
1 18
Design Sketches
2004
1 19
Cost Estimates
2004
1 20
Cost Estimates
2004-2006
1 21
Design Guidelines
2004
1 22
Design Guidelines
2004
1 23
Design Guidelines
2004
1 24
Invoices
2004-2006
1 25
Master Plan Draft
2003
1 26
Project Schedule
2004
1 27
Project Schedule
2004
1 28
Plant Lists
undated
1 29
Landscape presentation
undated
1 30
Analysis Maps & Diagrams
2004
1 31
Design Development
2004
1 32
Design Development
2004
2 1
Landscape and Aesthetics Corridor Plans
2004 February
2 2
Landscape and Aesthetics Corridor Plans
2004 February
2 3
Landscape and Aesthetics Corridor Plans
2004 February
2 4
Landscape and Aesthetics Corridor Plans Draft
undated
2 5
Landscape and Aesthetics Corridor Plan Draft
2004 April
2 6
Fee Schedule
2004-2005
2 7
Development Plan
2002 November
2 8
Design Sketches
2005-2006
TUBES
2 tubes
tube
1
NDOT
Physical location: CCA 8 Column 6, Row 1
2002-2006
2
Phase II Charrette, Southern
CCA 8 Column 4, Row 1

LI:  LI: Arizona Canal at Scottsdale, 1997-2003Return to Top

2 boxes, 46 folders and 17 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2003
Box Folder
1 1
Proposals/Contracts
2002
1 2
Proposals/Contracts
2003
1 3
Design Concept Report
1997 March
1 4
Community Workshop Report
2002 May
1 5
Focus Group Reports
2002
1 6
Transportation Enhancement Report
2004 November 5
1 7
Change Orders
2001
1 8
Design Sketches
2002-2003
1 9
Design Sketches
2002-2003
1 10
Design Sketches
2002-2003
1 11
Design Sketches
2002-2003
1 12
Design Sketches
2002-2003
1 13
Design Sketches
2002-2003
1 14
Design Sketches
2002-2003
1 15
Design Sketches
2002-2003
1 16
Design Sketches
2002-2003
1 17
Project Description
2002
1 18
Design Phase Notebook
2003
1 19
Meeting Minutes/Notes to File
2002
1 20
Meeting Minutes/Notes to File
2002
1 21
Meeting Minutes/Notes to File
2003
1 22
Meeting Minutes/Notes to File
2003
1 23
Correspondence/Transmittals
2002-2003
1 24
Design Criteria
undated
2 1
Images
2002
2 2
Land Use Drawings
2002
2 3
Development Plan
2002
2 4
Canal Bank Improvement
2004
2 5
Contract
2002-2003
2 6
Contract
2002
2 7
Canal Park Drawings
undated
2 8
Compendium
2002-2003
2 9
Water Wall Design
2003
2 10
Drawings
2003
2 11
Sketches
2003
2 12
Roundabout Meeting
2003
2 13
Meeting Minutes for Planting
2003
2 14
Kurt Culbertson Drawings
2002
2 15
Roundabout Drawings
2003
2 16
Waterside Scottsdale
1993
2 17
Drainage Reports
2002
2 18
Arizona Canal Workbook
2003
2 19
Arizona Canal Workbook
2003
2 20
Meeting Notes
2003
2 21
Design Sketches
2002
2 22
Project Manual
2003
TUBES
17 tubes
tube
1
Design Principles, section iteration, Mylar grading
Physical location: CCA 8 Column 3, Row 3
undated
2
Development Plans Studies, Site Plan, Bridge Plaza Sections
Physical location: CCA 6 Column 2, Row 3
undated
3
Conceptual street design, Marshall way sheet set
Physical location: CCA 6 Column 2, Row 7
undated
4
Development Plans, Summer Plans/Sections
Physical location: CCA 8 Column 4, Row 1
undated
5
Early Development Plans
Physical location: CCA 8 Column 4, Row 1
undated
6
Public Workshop Input
Physical location: CCA 8 Column 4, Row 1
undated
7
Phase I
Physical location: CCA 8 Column 4, Row 1
undated
8
Construction Documents
Physical location: CCA 8 Column 5, Row 2
undated
9
Phase I Redline CD's
Physical location: CCA 8 Column 5, Row 2
undated
10
Original Set Bid Packages
Physical location: Barn Box 8
undated
11
Bridge Options
Physical location: Barn Box 8
undated
12
Design Decision
Physical location: Barn Box 8
undated
13
Site Design
Physical location: Barn Box 8
undated
14
LOT layout
Physical location: Barn Box 8
undated
15
Grading Options
Physical location: Barn Box 10
undated
16
Shop Drawings
Physical location: Barn Box 10
undated
17
Beam Concept
Physical location: Barn Box 15
undated

LII:  LII: Hurst Ranch, 2003-2008Return to Top

1 box, 35 folders and 8 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2003-2008
Box Folder
1 1
Proposals/Contracts
2004
1 2
Proposals/Contracts
2004
1 3
Proposals/Contracts
2005-2007
1 4
Correspondence
2003-2004
1 5
Correspondence
2004
1 6
Correspondence
2005
1 7
Correspondence
2005
1 8
Correspondence
2006
1 9
Correspondence
2007
1 10
Invoices
2004-2005
1 11
Invoices
2005
1 12
Invoices
2005
1 13
Invoices
2006
1 14
Invoices
2007
1 15
Invoices
2007-2008
1 16
Meeting Minutes/Notes to File
2003-2004
1 17
Meeting Minutes/Notes to File
2004-2005
1 18
Meeting Minutes/Notes to File
2005
1 19
Meeting Minutes/Notes to File
2006
1 20
Meeting Minutes/Notes to File
2006
1 21
Meeting Minutes/Notes to File
2007
1 22
Schedule
2004
1 23
Survey
2004-2005
1 24
Water Rights
2004-2006
1 25
Soils and Geology
2005
1 26
Habitat
2004-2005
1 27
ater Tank
2004-2005
1 28
Sketches/Graphics
2004
1 29
Sketches/Graphics
2004-2005
1 30
Project Manual
2005 March 15
1 31
Schematic Design
2006
1 32
Construction Documents
2004
1 33
Construction Documents
2005
1 34
Construction Documents
2005
1 35
Construction Documents
2006-2007
TUBES
8 tubes
tube
1
Hurst Ranch
Physical location: CCA 8 Column 6, Row 1
2003-2008
2
Hurst Ranch
Physical location: CCA 8 Column 6, Row 1
2003-2008
3
Ranch
Physical location: CCA 6 Column 1, Row 3
undated
4
Schematic Design
Physical location: CCA 6 Column 1, Row 3
undated
5
Original studies, florella, Solomon
Physical location: CCA 6 Column 1, Row 3
undated
6
Schematic Design/Design Development
Physical location: CCA 8 Column 5, Row 3
undated
7
Water Tank
Physical location: CCA 8 Column 4, Row 1
undated
8
Illustrative Renderings, Sections, Schematics
Physical location: CCA 8 Column 4, Row 1
undated

LIII:  LIII: Resnick Property, 1993-2004Return to Top

2 boxes, 38 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-2004
Box Folder
1 1
Proposals/Contracts
1993-1994
1 2
Proposals/Contracts
1994-1995
1 3
Proposals/Contracts
1994-1996
1 4
Correspondence
1993-1994
1 5
Correspondence
1995-1996
1 6
Meeting Minutes/Notes to File
1994-1995
1 7
Meeting Minutes/Notes to File
1995
1 8
Meeting Minutes/Notes to File
1995-1996
1 9
Work Program
1994-1995
1 10
Physical
1993-1994
1 11
Physical
1994-1995
1 12
Biological
1993-1995
1 13
Biological
1995
1 14
Biological
1995
1 15
Engineering
1993-1994
1 16
Engineering
1994-1996
1 17
Design Sketches
2004
1 18
Programming
1994
1 19
Cost Estimate
1993-1994
1 20
Cost Estimate
1994-1995
1 21
Design Sketches
1994
1 22
Design Sketches
1995-1996
1 23
Site Plan
1994
1 24
Imagery Notebook
1993
1 25
Imagery Notebook
1993
1 26
Construction Bids/Proposals
1994-1995
1 27
Construction Bids/Proposals
1995
1 28
Construction Bids/Proposals
1995
1 29
Construction Bids/Proposals
1995-1996
1 30
Construction Contracts
1995-1996
1 31
Pay Requests
1995-1997
1 32
Documentation/Specs
1994
2 1
Field Reports
1994-1995
2 2
Field Reports
1996
2 3
Change Orders
1994
2 4
Change Orders
1995
2 5
Change Orders
1996
2 6
Submittals/Shop Drawings
1995-1996
TUBES
2 tubes
tube
1
Design Studies 3
Physical location: CCA 8 Column 6, Row 1
1993-2004
2
Design Studies
Physical location: CCA 8 Column 5, Row 3
1993-2004

LIV:  LIV: Rocky Mountain Arsenal National Wildlife Refuge, 1991-2002Return to Top

1 box, 42 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1991-2002
Box Folder
1 1
Comprehensive Management Plan
1996
1 2
Comprehensive Management Plan Draft
1995
1 3
Organizational Charts
undated
1 4
Proposals/Contracts
1995-2002
1 5
Correspondence
1995-1999
1 6
Meeting Minutes
1999-2002
1 7
Project Work Plan
1991-1995
1 8
Project Work Plan
1991-1995
1 9
Vision Workshop
1994
1 10
Public Involvement Program
1994
1 11
Design Project Graphics, Mapping Format & Standards
1994
1 12
Conduct Focus Groups
1994-1995
1 13
Issues & Concerncs
1994
1 14
Goals & Objectives Statement
1994
1 15
Meeting Transcript
1994 September 14
1 16
Conduct Scoping Meeting
1994
1 17
Scoping Report
1994
1 18
Identify Biological Communities Needs/Uses
1994
1 19
Identify Existing & Potential Public Uses
1994
1 20
User Needs
1994
1 21
Environmental Education Needs/Programs
1994
1 22
Preliminary Program
1994-1995
1 23
Newsletter
1994-1995
1 24
Evaluation Criteria
1994
1 25
Alternatives
1994-1995
1 26
Public Review of Alternative Plans
1995
1 27
Public Use & Interpretive Plan
1995
1 28
Public Use & Interpretive Plan Draft
1995
1 29
Public Use Plan Draft
1996
1 30
Preliminary Environmental Impact Study (EIS) Draft
1995
1 31
Refuge Program Master Copy
1996
1 32
Preliminary Illustrative Plan
1995
1 33
Statement of Goals & Objectives
1995-1996
1 34
Draft Master Plan
1995-1996
1 35
Preliminary Design Concepts
1994-1996
1 36
Schematic Plans
1995
1 37
Urban Design Forum
1991-1994
1 38
Billing
1994-1996
1 39
Revegetation
1994
1 40
Stapelton
1994-1996
1 41
West Zone
1994
1 42
Master Plan and EIS Documents
undated
TUBES
2 tubes
tube
1
Site Survey
Physical location: CCA 6 Column 1, Row 1
undated
2
Site Survey
Physical location: CCA 6 Column 1, Row 1
undated

LV:  LV: The Gant, 2003-2007Return to Top

1 box, 24 folders and 3 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
2003-2007
Box Folder
1 1
Proposals/Contracts
2003-2004
1 2
Proposals/Contracts
2004-2006
1 3
Correspondence
2003-2007
1 4
Invoices
2003-2004
1 5
Invoices
2004
1 6
Invoices
2005
1 7
Invoices
2006
1 8
Invoices
2007-2009
1 9
Meeting Minutes/Notes to File
2003-2004
1 10
Schedule
2003-2004
1 11
Schedule
2004
1 12
Soils & Geology
2004
1 13
Sketches/ Images
2002-2003
1 14
Sketches/ Images
[photocopies]
2003-2004
1 15
Entry Sign Specifications
2009 August 18
1 16
Fire Place Design
undated
1 17
Design Review
2004
1 18
Design Development
2004
1 19
Design Development
2004
1 20
Specifications Manual
2004
1 21
Specifications Manual
2005
1 22
Cost Estimate
2003-2004
1 23
Work Program
2003
1 24
Project Summary
2004
TUBES
3 tubes
tube
1
Water Features
Physical location: CCA 8 Column 3, Row 1
undated
2
Enhancement Phase V- Lower Pool
Physical location: CCA 8 Column 4, Row 1
undated
3
Phase 1
Physical location: Barn Box 11
undated

LVI:  LVI: Teton Village, 1990-2002Return to Top

2 boxes, 89 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-2002
Box Folder
1 1
Teton Village Master Plan
1990 December
1 2
Master Plan Proposals/Contracts
1996-1997
1 3
Master Plan Correspondence
1996-1997
1 4
Master Plan Meeting Minutes
1996-1997
1 5
Master Plan Work Program
1997
1 6
Master Plan Visual Design Guidelines
undated
1 7
Master Plan Engineering
undated
1 8
Master Plan Programming
1996
1 9
Master Plan Economic/Fiscal Data
1996
1 10
Teton Club Proposals/Contracts
1997-1999
1 11
Teton Club Correspondence
1998-2000
1 12
Teton Club Meeting Minutes
1999
1 13
Teton Club Legal Description
1999-2002
1 14
Teton Club Festival Hall
1999
1 15
Teton Club Design Sketches
1999
1 16
Teton Club Signage
1999
1 17
Teton Club Field Reports
2000
1 18
Teton Club Change Orders
1999-2000
1 19
Teton Club Addendums
1999
1 20
Teton Club Geological Soils
1997-1999
1 21
Teton Club Hydrology
1999
1 22
Teton Club Engineering
1999
1 23
Teton Club Spa
1999
1 24
Teton Club Programming
1998
1 25
Teton Club Cost Estimates
1999-2000
1 26
Teton Club Stone
1999
1 27
Teton Club Sketch Plan
1998
1 28
Teton Club Sketch Plan
1998
1 29
Teton Club Sketch Plan
1999-2000
1 30
Teton Club Final Plan
1999
1 31
Teton Club Marketing
1999
1 32
Teton Club Meeting Minutes
1998
1 33
Teton Village Approvals Correspondence
1997
1 34
Teton Village Approvals Meeting Notes
1997
1 35
Teton Village Approvals Meeting Notes
1998
1 36
Teton Village Approvals Meeting Notes
1998
1 37
Teton Village Primary Pumphouse Correspondence
1998
1 38
Teton Village Pumphouse Plan Submission
1998
2 1
Teton Village Master Plan Proposals/Contracts
1996-1997
2 2
Teton Village Master Plan Correspondence
1996
2 3
Teton Village Master Plan Correspondence
1997
2 4
Teton Village Master Plan Meeting Minutes
1997
2 5
Teton Village Master Plan Work Program
1996-1997
2 6
Teton Village Master Plan Legal
1996-1998
2 7
Teton Village Master Plan Physical
1997-1998
2 8
Teton Village Master Plan Wetlands
1997
2 9
Teton Village Master Plan Parking
1993-1995
2 10
Teton Village Master Plan Parking
1996-1997
2 11
Teton Village Master Plan Programming
1997
2 12
Teton Village Master Plan Fiscal Impact Analysis
1997
2 13
Teton Village Master Plan Capital Improvements
1997-1998
2 14
Teton Village Master Plan Employee Housing
1997
2 15
Teton Village Master Plan Transportation
1997-1998
2 16
Teton Village Master Plan Tram Area
1995
2 17
Teton Village Master Plan Charette Manual
1990
2 18
Teton Village Proposals/Contracts
1990
2 19
Teton Village Master Plan Correspondence
1993
2 20
Teton Village Master Plan Meeting Minutes
1993
2 21
Teton Village Master Plan Weekly Meeting Packets
1993
2 22
Teton Village Joint Proposal/Contracts
1990
2 23
Teton Village Joint Planning Work Program
1990
2 24
Teton Village Programming Correspondence
1990
2 25
Teton Pines Proposals/Contracts
1994
2 26
Teton Village Skier Plaza Correspondence
1993
2 27
Teton Village Planning Proposals/Contracts
1992
2 28
Teton Village Land Use Planning
1988
2 29
Teton Village Joint Planning Programming
undated
2 30
Teton Village Skier Plaza Proposals/Contracts
1993
2 31
Teton Village Joint Planning Master Plans CCRS
1990
2 32
Teton Village Joint Planning Correspondence
1992-1993
2 33
Teton Village Joint Planning Meeting Minutes/Notes
1992
2 34
Teton Village Visual Analysis/Text
1990
2 35
Teton Village Marketing/Presentations
undated
2 36
Teton Village Design Sketches/Product Info
1994
2 37
Teton Village Master Plan Charette Documentation
1990
2 38
Grand Teton Music Festival Sketches
1998
2 39
Teton village Master Plan with SRA
1995
2 40
Land Use Illustrations
undated
2 41
Skier Plaza Conceptual Plan
1993
2 42
Land Trade
1990
2 43
Village Density Studies
undated
2 44
Teton Village Charette
2001
2 45
Master Plan Village Illustrative Plan
1997
2 46
Village Master Plan Drawings
1997
2 47
Master Plan Village Expansion
1998-1999
2 48
Village Master Plan PUD
1997
2 49
Master Plan Village Signage
1997
2 50
Village Master Plan Resort Association
1997
2 51
Charette Manual
1990
TUBES
4 tubes
tube
1
Teton Pines
Physical location: CCA 8 Column 6, Row 1
undated
2
Village Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
3
Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
4
Visual Simulation
Physical location: Barn Box 9
undated

LVII:  LVII: Muar District (Malyasia), 1995-1998Return to Top

1 box, 35 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
[Photos removed]
1995-1998
Box Folder
1 1
Briefing Package
1997
1 2
Design Sketches
1997
1 3
Proposals/Contracts
1996-1997
1 4
Proposals/Contracts
1997-1998
1 5
Meeting Minutes
1997
1 6
Work Program
1996-1997
1 7
Work Program
1997
1 8
Invoices
1995-1998
1 9
Notes to File
1996
1 10
Notes to File
1997
1 11
Notes to File
1997-1998
1 12
Development Plan
1997
1 13
Watershed
1996-1997
1 14
Physical
1997
1 15
Design Guidelines
undated
1 16
Mapping
1997
1 17
Correspondence
1995-1996
1 18
Correspondence
1996
1 19
Correspondence
1996
1 20
Correspondence
1997
1 21
Correspondence
1997
1 22
Correspondence
1997
1 23
Correspondence
1997
1 24
Correspondence
1997
1 25
Correspondence
1997
1 26
Correspondence
1997
1 27
Correspondence
1997
1 28
Correspondence
1998
1 29
Correspondence
1998
1 30
Budget
1995-1997
1 31
Internal Correspondence
1996
1 32
Presentation
1997
1 33
River Basin Study
1996-1997
1 34
Inception Report
1997 July
1 35
Soil and Plants
1997

LVIII:  LVIII: Muju Resort (South Korea), 1995-1997Return to Top

2 boxes, 61 folders and 23 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
[Some pages in Korean]
1995-1997
Box Folder
1 1
Correspondence
1995
1 2
Correspondence
1996 January
1 3
Correspondence
1996 February
1 4
Correspondence
1996 March
1 5
Correspondence
1996 March
1 6
Correspondence
1996 April
1 7
Correspondence
1996 May
1 8
Correspondence
1996 June
1 9
Correspondence
1996 July
1 10
Correspondence
1996 August
1 11
Correspondence
1996 September
1 12
Correspondence
1996 September
1 13
Correspondence
1996 October-November
1 14
Correspondence
1997
1 15
Meeting Minutes
1995
1 16
Meeting Minutes
1996
1 17
Billings/Invoices
1996
1 18
Chapter Notes
1995-1996
1 19
Concept Book
1996
1 20
Notes to File
1996
1 21
Design Sketches/Product Information
1995
1 22
Design Sketches/Product Information
1995
1 23
Design Sketches/Product Information
1996
1 24
Design Sketches/Product Information
1996
1 25
Design Sketches/Product Information
1996
1 26
Design Sketches/Product Information
1996
1 27
Design Sketches/Product Information
1996
2 1
Plant Lists
1995-1996
2 2
Illustrative Sketches
1996
2 3
Design Concept
1996
2 4
Physical
1994
2 5
Biological
1995
2 6
Engineering
1994-1995
2 7
Transportation
undated
2 8
Peak Two
1994
2 9
Meeting Notes
1995
2 10
Meeting Notes
1996
2 11
Mini Golf Proposals/Contracts
1996
2 12
Mini Golf Correspondence
1996
2 13
Architectural Correspondence
1995
2 14
Architectural Correspondence
1995
2 15
Architectural Correspondence
1995
2 16
Architectural Correspondence
1995
2 17
Architectural Meeting Minutes/Notes to File
1995
2 18
Architectural Programming
1995
2 19
Architectural Design Sketches/Product Info
1995
2 20
Kid's Land Correspondence
1996
2 21
Kid's Land Design Sketches
1996
2 22
Kid's Land Finish Schedule
1997
2 23
Zoo Consultant Contract
1995-1996
2 24
Structural Contract
1995-1996
2 25
Water Feature Contract
1995-1996
2 26
Illustrator Contract
1995-1996
2 27
Details
1995-1996
2 28
Plants Information
1995-1996
2 29
Project Plants
1996
2 30
SBW Memos
1995
2 31
SBW Memos
1996
2 32
SBW Memos
1996
2 33
SBW Memos
1996
2 34
Image Book
1997
TUBES
23 tubes
tube
1
Base Material
Physical location: CCA 8 Column 6, Row 3
undated
2
Cultural Art Center
Physical location: CCA 6 Column 1, Row 8
undated
3
Snowmaking Lake Flat File
Physical location: CCA 6 Column 1, Row 8
1996 August; undated
4
Main street Base 1 Do Sets
Physical location: CCA 6 Column 1, Row 8
undated
5
Cultural Art Center, Design Development, Original Sketches, Schematic
Physical location: CCA 6 Column 2, Row 3
undated
6
Layout and Materials Plan
Physical location: Barn Box 4
1996; undated
7
Roadway Landscape
Physical Location: Barn Box 4
undated
8
Construction Documents
Physical Location: CCA 8 Column 4, Row 3
undated
9
Main Street Construction Documents
Physical Location: CCA 8 Column 4, Row 3
undated
10
Circulation/ Land Use
Physical Location: CCA 8 Column 5, Row 1
undated
11
Mother Load
Physical Location: CCA 8 Column 5, Row 2
undated
12
Mother Load
Physical Location: CCA 8 Column 5, Row 2
undated
13
Yorth Hotel
Physical Location: Barn Box 12
undated
14
Recent Retail Mall
Physical Location: Barn Box 12
undated
15
Renderings
Physical Location: Barn Box 12
undated
16
Kids Land
Physical Location: Barn box 12
undated
17
Base Info Main Street
Physical Location: Barn Box 12
undated
18
Parking Lots and Arrival Facilities
Physical Location: Barn Box 12
undated
19
Retail Malls
Physical Location: Barn Box 12
undated
20
Hotel B
Physical Location: Barn Box 12
undated
21
Ski House 1 Hotel B
Physical Location: Barn Box 12
undated
22
Roadway Landscape
Physical Location: Barn Box 12
undated
23
Conceptual Drawings
Physical Location: Barn Box 15
undated

LIX:  LIX: North Lake Tahoe, 1995-2006Return to Top

1 box, 28 folders and 8 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1995-2006
Box Folder
1 1
Proposals/Contracts
2003
1 2
Meeting Notes
2003-2004
1 3
Committee Meeting Notes
2003
1 4
Committee Meeting Notes
2003-2004
1 5
Situation Analysis
2003
1 6
Workshops
2004
1 7
Correspondence
2004
1 8
Potential Projects
2004
1 9
Economic Report
2001-2003
1 10
Master Plan
2004
1 11
Master Plan
2004
1 12
Redevelopment Agency
2003-2004
1 13
Redevelopment Agency
2004
1 14
Tourism Redevelopment Proposals/Contracts
2004-2005
1 15
Tourism Redevelopment Meeting Notes
2005
1 16
Tourism Redevelopment Schneider Property Design Review
2005
1 17
Tourism Redevelopment Memo and Maps
2005
1 18
Tourism Redevelopment Site Visit
2004-2005
1 19
Tourism Redevelopment Conceptual Plan Draft
2005 August 31
1 20
Tourism Redevelopment Conceptual Plan
2005 December 15
1 21
Tourism Redevelopment Master Plan
1995 April
1 22
Redevlopment Conceptual Design
2006
1 23
Sands Programming
undated
1 24
Sands Correspondence
2001
1 25
Marina Correspondence
2000-2002
1 26
Marina Meeting Minutes
2000-2001
1 27
Tahoe City Marina Expansion Master Plan
2005
1 28
Tahoe Beach Club- Estate House
undated
TUBES
8 tubes
undated
tube
1
Shoreline
Physical location: CCA 8 Column 6, Row 1
undated
2
final approvals package
Physical location: CCA 8 Column 6, Row 1
undated
3
Project Level Approval Set
Physical location: CCA 8 Column 6, Row 1
undated
4
Mechanical drawings, park avenue soil maps, rendered, schematic set
Physical Location: CCA 8 Column 6, Row 2
2002-2003
5
Lake Tahoe Inn
Physical location: Barn Box 7
undated
6
Final Approval Package
Physical location: Barn Box 9
undated
7
Shoreline
Physical location: Barn Box 10
undated
8
Redevelopment
Physical location: Barn Box 12
undated

LX:  LX: Keystone, 1989-1998Return to Top

1 box, 45 folders and 9 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1989-1998
Box Folder
1 1
Amenity Building- Ski Tip II undated
undated
1 2
Construction Contracts- Ski Tip
1995
1 3
Correspondence
1992-1993
1 4
Correspondence
1996-1998
1 5
Correspondence- Ski Tip
1993-1994
1 6
Correspondence- Snake River Basin
1993-1994
1 7
Correspondence- Tender Foot
1994-1995
1 8
Correspondence- Tender Foot
1995
1 9
Cost Estimates Urban Design
1992
1 10
Design Sketches/Product Info- Ski Tip
1994
1 11
Existing Planned Unit Developments
undated
1 12
Keystone Stuff
1994
1 13
Master Plan
1990-1991
1 14
Master Development Plan Update
1996
1 15
Meeting Notes
1991 December
1 16
Meeting Minutes- Parcel Site Tests
1993
1 17
Meeting Minutes- Snake River Basin
1993
1 18
Meeting Minutes/Notes to File- Urban Design
1993
1 19
Mountain Master Plan Amendment
1989
1 20
Original Layout Concept and Graphics
1994
1 21
Planned Unit Development Technical Appendix Part 1
undated
1 22
Planned Unit Development Technical Appendix Part 2
undated
1 23
Programming- Sketch Plans
1993
1 24
Proposals/Contracts- Tender Foot
1994
1 25
PUD- Community Standards
undated
1 26
Planned Unit Development Density Summary
1994
1 27
Planting Plan- Ski Tip II
undated
1 28
Programming- Snake River Basin
1992-1994
1 29
Proposals/Contracts- Ski Tip
1994
1 30
Proposals/Contracts- Ski Tip
1995
1 31
Proposals/Contracts- Snake River Basin
1993
1 32
Proposals/Contracts- Tenderfoot
1995
1 33
PUD- Neighborhood Standards
undated
1 34
Revised Planting Plan- Ski Tip II
undated
1 35
River Run Village Skier Bridges and Ski Lift Submittals
1997
1 36
Skiing
1994
1 37
Snake River Master Plan
1993
1 38
Summit County Keystone Base I
1990
1 39
Tender Foot Fire Station
1995
1 40
Physical- Tender Foot
1994
1 41
Trade Parcel Rezoning Request Appendices
1993
1 42
Trade Parcel Rezoning Request
1993
1 43
Wetlands- Aquatic and Wetlands Consult
undated
1 44
Wildlife
1994
1 45
Work Program- Snake River Basin
1994
TUBES
9 tubes
tube
1
Wintergreen Resort
Physical location: CCA 8 Column 6, Row 3
undated
2
Wintergreen Resort
Physical location: CCA 8 Column 6, Row 3
undated
3
Blackrock Village
Physical location: CCA 6 Column 1, Row 1
undated
4
4-Lane
Physical location: CCA 6 Column 2, Row 3
undated
5
Tenderfoot BMR Housing
CCA 6 Column 2, Row 3
1996 August; undated
6
Blackrock Village Center Improvements
Physical location: CCA 6 Column 2, Row 5
undated
7
Wintergreen Resort
Physical location: CCA 8 Column 4, Row 1
undated
8
Housing
Physical location: Barn Box 6
undated
9
Employee Housing
Physical location: Barn Box 6
undated

LXI:  LXI: Flathead County, 1993-1995Return to Top

1 box, 37 folders and 11 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-1995
Box Folder
1 1
Articles
1994-1995
1 2
Articles
undated
1 3
Citizen Comments
1994
1 4
Clippings
1993-1995
1 5
Commercial Industrial
1993
1 6
Commissioner Sign Off
1993
1 7
Correspondence
1993
1 8
Demographic
1992
1 9
Ecosystem Management
1993-1994
1 10
Clippings
1993-1994
1 11
Fire Safety
1993-1994
1 12
Forestry
1993
1 13
Fundraising
1993
1 14
Goals
1993
1 15
Growth Projection
1993
1 16
Handouts
undated
1 17
Historical Info
1993
1 18
Land Use Implementation
1993-1994
1 19
Master Plan Survey
1993
1 20
Master Plan Update
1993
1 21
Master Plan Update Implementation Document
1994
1 22
Master Plan Update Land Use Refinement Process
1994
1 23
Master Plan Update Map Atlas
1994
1 24
Master Plan Update Policy Document
1994
1 25
Master plan Update Resource Document
1994
1 26
Master Plan Updates
1993
1 27
Meeting Notes
undated
1 28
Miscellaneous
1993-1994
1 29
Montana Magazine
1993
1 30
Northern Rockies Ecosystem
1993-1994
1 31
Notes to File
1993
1 32
Parks
1993
1 33
Planning Coalition
1993
1 34
Revisions to Master Plan
1993
1 35
Subdivision Regulations
1994
1 36
Summary of First Public Meeting
undated
1 37
Work Program
1993
TUBES
11 tubes
undated
tube
1
Monographs
Physical location: CCA 8 Column 5, Row 3
undated
2
Existing Land-use, zoning
Physical location: CCA 6 Column 2, Row 2
undated
3
Master Plan
Physical location: CCA 6 Column 2, Row 2
undated
4
Master Plan
Physical location: CCA 6 Column 2, Row 2
undated
5
Master Plan
Physical location: CCA 6 Column 2, Row 2
undated
6
Site Analysis Maps
Physical location: CCA 6 Column 2, Row 2
undated
7
master Plan Update
Physical location: CCA 6 Column 2, Row 9
undated
8
Monographs
Physical location: Barn Box 10
undated
9
Monographs
Physical location: Barn Box 10
undated
10
Monographs
Physical location: Barn Box 14
undated
11
Monographs
Physical location: Barn Box 14
undated

LXII:  LXII: Canyon Village (Yellowstone), 1982-1997Return to Top

1 box, 45 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1982-1997
Box Folder
1 1
Canyon Village
1987
1 2
Canyon Village Biological
undated
1 3
Canyon Village Complex- Phase I Project Summary
1988
1 4
Canyon Village Lagoons Correspondence
1989
1 5
Canyon Village Correspondence
1987-1988
1 6
Canyon Village Correspondence
1996-1997
1 7
Canyon Village Cost Estimates
1989-1990
1 8
Canyon Village Design Sketches/Product Info.
1983
1 9
Canyon Village Details
undated
1 10
Canyon Village Economic Analysis
1982-1986
1 11
Canyon Village Details
1989
1 12
Canyon village Engineering-Civil
1988-1989
1 13
Canyon Village Engineering-Legal Description
undated
1 14
Canyon Village Engineering- Mechanical
undated
1 15
Canyon Village Engineering- Utility
1987-1988
1 16
Canyon Village Graphics
undated
1 17
Canyon Village Lagoons (NPS)
1989
1 18
Canyon Village Lagoons Proposal/Contracts
1989
1 19
Canyon Village Lagoons Visual
1989
1 20
Canyon Village Marketing/Video/Visual
1987-1988
1 21
Canyon Village Master Plan
1987
1 22
Canyon Village Meeting Minutes/Notes to File
1987-1989
1 23
Canyon Village Meeting Minutes/Notes to File
1987
1 24
Canyon Village Lagoons Meeting Minutes/Notes to File
1989
1 25
Canyon Village Phase I
1987
1 26
Canyon Village Phase II Construction Bids/Proposals
1997
1 27
Canyon Village Physical
undated
1 28
Canyon Village Physical
1987
1 29
Canyon Village Physical- Geology/Soils
1987
1 30
Canyon Village Programming-Architectural
undated
1 31
Canyon Village Programming-Architectural
1987
1 32
Canyon Village Proposals/Contracts
1996
1 33
Canyon Village Proposals/Contracts
undated
1 34
Canyon Village Proposals/Contracts
undated
1 35
Canyon Village Proposals/Contracts
1987
1 36
Canyon Village Redevelopment Phase 1
1987
1 37
Canyon village Specs
undated
1 38
Canyon Village Transmittals
1987-1990
1 39
Canyon Video III
1988
1 40
Canyon Village Work Program
1987
1 41
Canyon Village Lagoons Work Program
1989
1 42
Grant Village Video
1988
1 43
Lodging Redevelopment Phase One
1987
1 44
Lodging Redevelopment Phase One
1987
1 45
Lodging Redevelopment
1987
TUBES
6 tubes
undated
tube
1
Existing Circulation Diagram
Physical location: CCA 6 Column 2, Row 4
undated
2
Illustrative Plan
Physical location: CCA 6 Column 2, Row 8
undated
3
Presentation Drawing Base Info
Physical location: CCA 8 Column 4, Row 1
undated
4
graphics
Physical location: CCA 8 Column 4, Row 1
undated
5
Phasing Plan
Physical location: CCA 8 Column 4, Row 1
undated
6
Site Analysis
Physical location: CCA 8 Column 4, Row 3
undated

LXIII:  LXIII: RidgeGate, 1993-1995Return to Top

2 boxes, 80 folders and 7 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-1995
Box Folder
1 1
RidgeGate Parks Proposals/Contracts
2004-2005
1 2
RidgeGate Parks Meeting Records
2004-2005
1 3
RidgeGate Parks Correspondence
2003-2006
1 4
RidgeGate Parks Project Schedules
2004-2005
1 5
RidgeGate Target Proposals/Contracts
2003-2005
1 6
RidgeGate Target Meeting Minutes
2003
1 7
RidgeGate Target Correspondence
2003-2005
1 8
RidgeGate Retail Meeting Minutes
2002-2003
1 9
RidgeGate Retail Proposals/Contracts
2002-2003
1 10
RidgeGate Retail Correspondence
2002-2003
1 11
RidgeGate Retail Preliminary Plans
2002
1 12
RidgeGate Retail Design Sketches
2002
1 13
RidgeGate General Services Proposals/Contracts
2005
1 14
RidgeGate General Services Meeting Minutes/Notes To File
2005-2006
1 15
RidgeGate General Services Correspondence
2005
1 16
RidgeGate General Services Pedestrian Underpass
2007
1 17
RidgeGate General Services Diagram
2004-2005
1 18
RidgeGate Interchange Proposals/Contracts
2006
1 19
RidgeGate Illustrative
2003
1 20
Ridgegate Graphics
2000-2004
1 21
Sculpture
2004-2006
1 22
Correspondence for Light Rail
2002
1 23
Proposals/Contracts for Retail Streets
2003-2004
1 24
Correspondence for Retail Streets
2003
1 25
Correspondence for Tree Procurement
2001-2002
1 26
Proposals/Contracts for Tree Procurement
2001-2002
1 27
Meeting Notes for Tree Procurement
2002
1 28
Plant List
undated
1 29
Correspondence for RidgeGate Streets
2001-2003
1 30
Proposals/Contracts for RidgeGate Streets
2001-2003
1 31
Construction Documents
2003
1 32
Infrastructure for Irrigation
2001
1 33
Meeting Notes for Landscape and Irrigation
2001-2003
1 34
Meeting Notes for Irrigation
2001
1 35
Irrigation Master Plan
2003
1 36
Phase I/Residential
2002
1 37
Design Standards and Guidelines
2001
1 38
Meeting Minutes for Sub Plan
2001
1 39
Proposals/Contracts for Sub Plan
2002
1 40
Sub Area Plan
2003
1 41
Meeting Notes Parks and Open Space
2002
1 42
Hydrology for Parks/Open Space
2001
1 43
Proposals/Contracts for Parks and Open Space
2001-2002
1 44
Parks and Open Space Master Plan Task 1 and 2
2002
1 45
Parks and Open Space Master Plan Draft 2
2003
1 46
Parks/Open Space Master Plan
2001-2003
1 47
Design Sketches for the Interchange
undated
1 48
Meeting Notes for Lincoln Commons
2004
1 49
Circle Streetscapes Plans
2001
1 50
Design Notes for Circle Streetscapes
2004
1 51
Proposals/Contracts for Circle Streetscapes
2003-2004
1 52
Environmental for District Coordination
2002-2003
1 53
Pond 302
2001-2002
1 54
Schematic Design District Coordination
2002
1 55
Design Sketches for Pedestrian Tunnel Specs.
undated
1 56
Meeting Minutes for District Coordination
2001-2004
1 57
Design Sketches for District Coordination
2003
1 58
Meeting Minutes for Landscape Maintenance
2003
1 59
Proposals/Contracts for District Coordination
2001-2003
1 60
Correspondence for District Coordination
2002-2003
1 61
Sign Permit Phase 1
2002
1 62
Cost Estimates for Phase 1
2002
1 63
Engineering for Phase 1
2002
1 64
Soil for Phase 1 Streets
2001-2002
1 65
Land Use for Phase 1 Streets
2001
1 66
Estimates for Phase 1 Streets
2001
1 67
Plants for Phase 1 Streets
2001-2002
1 68
Meeting Minutes for Phase 1 Streets
2001-2002
1 69
Correspondence for Phase 1 Streets
2001-2002
1 70
Proposals/Contracts for Phase 1 Streets
2001-2003
1 71
Land Use for Rampart Range
2002
1 72
Illustrative Concept Plan for Rampart Range
2003
1 73
Office District Sub Area Plan
2001
1 74
Retail Planning for Rampart Range
2001
2 1
Meeting Notes for Rampart Range
1999-2004
2 2
Correspondence
1999-2005
2 3
Rampart Range Proposals/Contracts
1999
2 4
Phase II Streets Proposals/Contracts
2007
2 5
Meeting Minutes
2000-2001
2 6
Weekly Reports
2004
TUBES
7 tubes
undated
tube
1
Phase 1 Streetscape
Physical location: CCA 8 Column 6, Row 1
1993-1995; undated
2
LMIS study; engineering sections, plans, station design, grading study
Physical location: CCA 6 Column 1, Row 2
undated
3
Streetscapes
Physical location: CCA 8 Column 5, Row 3
undated
4
Phase 1 Streetscape
Physical location: CCA 8 Column 5, Row 3
undated
5
Circle
Physical location: CCA 8 Column 4, Row 1
undated
6
Pastel schematic sections, signage, precedents, project image
Physical location: Barn Box 10
undated
7
Streetscapes
Physical location: Barn Box 10
undated

LXIV:  LXIV: Grand Targhee, 1995-2010Return to Top

2 boxes, 61 folders and 1 tube
Container(s) Description Dates
MANUSCRIPT MATERIALS
1995-2010
Box Folder
1 1
Correspondence
1999-2003
1 2
Meeting Minutes
1998
1 3
Forest Service Land Exchange
1998-1999
1 4
Programming
2001
1 5
Programming
2001
1 6
Squirrel Meadows
1998
1 7
Squirrel Meadows
1998
1 8
Socio-Economic Analysis
1996-1998
1 9
Squirrel Meadows Environmental Impact Statement
1999 June
1 10
Proposals/Contracts
2004-2008
1 11
Invoices
2003-2004
1 12
Invoices
2005
1 13
Invoices
2006
1 14
Invoices
2007-2008
1 15
Invoices
2009-2010
1 16
Hydrology
2006
1 17
Habitat
2005-2006
1 18
Correspondence
2003-2004
1 19
Correspondence
2005
1 20
Correspondence
2005
1 21
Correspondence
2005
1 22
Correspondence
2005
1 23
Correspondence
2005
1 24
Correspondence
2006
2 1
Correspondence
2007
2 2
Correspondence
2007-2008
2 3
Meeting Minutes
2001-2004
2 4
Meeting Minutes
2005
2 5
Meeting Minutes
2006
2 6
Meeting Minutes
2007
2 7
"Progress Toward a Vision for Colorado's Future" by Kurt Culbertson
undated
2 8
Presentations
2005-2007
2 9
Environmental Impact
2003-2005
2 10
Market Research
1999-2006
2 11
Financial Proforma
2004-2005
2 12
Sewer
2007
2 13
Ground water
2004-2006
2 14
Affordable Housing
2004-2006
2 15
Transportation
2006
2 16
Prior Studies
1995-1999
2 17
Development Program
2003-2004
2 18
Detail Design Study
2004
2 19
Sketches/Image Graphics
2007
2 20
Cost Estimates
2004
2 21
Specific/Development Plan
2003-2006
2 22
Design Guidelines
2004
2 23
Special Review Processes
2004-2005
2 24
Programming
2006
2 25
Schematic Design
2004-2005
2 26
Master Plan Alternatives
1996
2 27
Master Plan Alternatives
2004
2 28
Master Plan Alternatives
2004
2 29
Master Plan Alternatives
2004
2 30
Master Plan Alternatives
2004
2 31
Master Plan Alternatives
2005
2 32
Master Plan Alternatives
2007
2 33
Water Rights
2004-2008
2 34
Contractual Agreements
2004
2 35
Vegetation
2004-2005
2 36
Market
1998-2001
2 37
Master Plan
2001
TUBES
1 tube
undated
tube
1
Grand Targhee
Physical location: CCA 8 Column 6, Row 1
1995-2010; undated

LXV:  LXV: Big Mountain, 1990-2004Return to Top

2 boxes, 71 folders and 15 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-2004
Box Folder
1 1
Big Mountain Proposals/Contracts
2000-2004
1 2
Big Mountain Correspondence
2000
1 3
Big Mountain Correspondence
2001 January-May
1 4
Big Mountain Correspondence
2001 April - 2002
1 5
Big Mountain Meeting Minutes
2000 May-September
1 6
Big Mountain Meeting Minutes
2000 October-December
1 7
Big Mountain Meeting Minutes
2002
1 8
Big Mountain Schedule
2000-2001
1 9
Big Mountain Land Use
2000
1 10
Big Mountain Soils and Geology
1992-2000
1 11
Big Mountain Hydrology
2003
1 12
Big Mountain Hydrology
undated
1 13
Big Mountain Vegetation
undated
1 14
Big Mountain Market Research
2000
1 15
Big Mountain Financial Proformas
2000
1 16
Big Mountain Sewer
2000
1 17
Big Mountain Fire Protection
2001
1 18
Big Mountain Prior Studies
1999-2001
1 19
Big Mountain Developable Land Summary
2000
1 20
Big Mountain Development Program
2000
1 21
Big Mountain Development Program
2001-2003
1 22
Big Mountain Master Plan Document
2000-2001
1 23
Big Mountain master Plan Document
undated
1 24
Big Mountain Detail Design Studies
2001
1 25
Big Mountain Land Use Approvals
2000-2001
1 26
Big Mountain Guidelines for Sustainability
undated
1 27
Big Mountain Cad Files
2000
1 28
Big Mountain Program
2000
1 29
Big Mountain Design Development
2000
1 30
Big Mountain Precedents
1998
1 31
Big Mountain Ski Facilities
2000
1 32
Big Mountain Wildlife
1997
1 33
Big Mountain Wildlife
1996
1 34
Big Mountain Wildlife
1997
1 35
Big Mountain People Movers Report
2000
2 1
Big Mountain Architectural Sketches
2000
2 2
Big Mountain Architectural Sketches
2001
2 3
Big Mountain Architectural Sketches
undated
2 4
Big Mountain Transportation
1991
2 5
Big Mountain Transportation
2000
2 6
Big Mountain Transportation
2000-2001
2 7
Big Mountain Phase One
2000-2001
2 8
Big Mountain Design Guidelines
1996-2001
2 9
Big Mountain Phase Two
2001
2 10
Big Mountain Conference Center
2000
2 11
Big Mountain Retail Studies
2000
2 12
Big Mountain Conference Center Proposals/Contracts
1996
2 13
Big Mountain Conference Center Correspondence
1997
2 14
Big Mountain Conference Center Meeting Minutes/Notes to File
1996-1997
2 15
Big Mountain Conference Center Work Program
1996-1997
2 16
Big Mountain Phase 1 Design Proposals/Contracts
1991
2 17
Big Mountain Proposals/Contracts
1990-1991
2 18
Big Mountain Proposals/Contracts
1996-1997
2 19
Big Mountain Correspondence
1991-1992
2 20
Big Mountain Correspondence
1996-1997
2 21
Big Mountain Meeting Minutes/Notes to File
1991
2 22
Big Mountain Meeting Minutes/Notes to File
1996-1997
2 23
Big Mountain Work Program
1991-1996
2 24
Big Mountain Engineering
1991-1997
2 25
Big Mountain Programming
1991-1996
2 26
Big Mountain Design Sketches/Product Info
1991
2 27
Big Mountain Design Sketches/Product Info
1993
2 28
Big Mountain Market/Presentation
1991
2 29
Big Mountain Physical
1993
2 30
Big Mountain Visual
1991
2 31
Big Mountain Resort Executive Summary Report
2001
2 32
Big Mountain Resort Master Plan Report
2001
2 33
Big Mountain Resort Master Plan Addendum
2001
2 34
Big Mountain Ski and Summer Resort Master Plan Draft
2001
2 35
Hellroaring: Fifty Years on The Big Mountain
1996
2 36
Big Mountain Zoning Regulations Report
1993-2000
TUBES
15 tubes
undated
tube
1
Architectural Drawings
Physical location: CCA 8 Column 6, Row 2
undated
2
Grading Plans Master Plan Sketches
Physical location: CCA 8 Column 6, Row 1
undated
3
Glacier Village
Physical location: CCA 8 Column 5, Row 3
undated
4
Glacier Village
Physical location: CCA 8 Column 5, Row 1
undated
5
Tenderfoot Ridge
Physical location: CCA 8 Column 5, Row 3
undated
6
Tenderfoot Ridge, Mooserun
Physical location: CCA 8 Column 5, Row 3
undated
7
Glacier Village
Physical location: Barn Box 6
undated
8
Tenderfoot
Physical location: Barn Box 6
undated
9
Tenderfoot
Physical location: Barn Box 6
undated
10
Master Plan 2000
Physical location: Barn Box 6
undated
11
Glacier Village
Physical location: Barn Box 6
undated
12
Glacier Village, Parcel Plan, Sketch Plan, Ski Linkages, Water Plan, Concept Plans
Physical location: Barn Box 6
undated
13
Adjacent Lands
Physical location: Barn Box 6
undated
14
Glacier Village, Parcel Plan, Sketch Plan, Ski Linkages, Water Plan, Concept Plans
Physical location: Barn Box 6
undated
15
Master Plan
Physical location: Barn Box 6
undated

LXVI:  LXVI: Walnut Creek, 1993-1995Return to Top

1 box, 19 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1993-1995
Box Folder
1 1
Walnut Creek Title 1 Proposals/Contracts
1993
1 2
Walnut Creek Title 1 Correspondence
1993 May-June
1 3
Walnut Creek Title 1 Correspondence
1993 July-August
1 4
Walnut Creek Title 1 Correspondence
1993 September-October
1 5
Walnut Creek Title 1 Meeting Minutes/Notes to File
1993
1 6
Walnut Creek Title 1 Project Memorandum
1993
1 7
Walnut Creek Title 1 Engineering
1993 January 11
1 8
Walnut Creek Title 1 Engineering
1993 April-July
1 9
Walnut Creek Title 1 Engineering
1993 August
1 10
Walnut Creek Title 1 Engineering
1993 September
1 11
Walnut Creek Title 1 Design Sketches/Product Information
1993
1 12
Walnut Creek Title 1 Physical
1993
1 13
Walnut Creek Title 1 Biological
1991-1993
1 14
Walnut Creek Title 1 Programming
1993
1 15
Walnut Creek Title 1 Cost Estimates
1993
1 16
Walnut Creek Regulations
1993
1 17
Walnut Creek Exhibits
1993
1 18
Walnut Creek Sign Plan
1994 February
1 19
Walnut Creek Specifications
1995 April 20
TUBES
6 tubes
tube
1
Schematic
Physical location: CCA 8 Column 4, Row 3
undated
2
Master Sheet Set
Physical location: CCA 8 Column 5, Row 2
undated
3
Miscellaneous Analysis Art
Physical location: Barn Box 13
undated
4
Demo
Physical location: Barn Box 13
undated
5
Site Analysis Planning
Physical location: Barn Box 13
undated
6
Road Design
Physical location: Barn Box 13
undated

LXVII:  LXVII: Braun Ranch, 1987-2001Return to Top

1 box, 26 folders and 1 tube
Container(s) Description Dates
MANUSCRIPT MATERIALS
1987-2001
Box Folder
1 1
Braun Ranch Proposals/Contracts
1998-2001
1 2
Braun Ranch Correspondence/Transmittals
1998
1 3
Braun Ranch Correspondence/Transmittals
1999-2000
1 4
Braun Ranch Schedule
1998-2001
1 5
Braun Ranch Meeting Minutes/Notes
1998
1 6
Braun Ranch Meeting Minutes/Notes
1999
1 7
Braun Ranch Land Use/Vicinity Map
1998-2000
1 8
Braun Ranch Water
1998-2000
1 9
Braun Ranch Master Plan
1999
1 10
Braun Ranch Environment
1998-2000
1 11
Braun Ranch Visual Analysis
1999 July 14
1 12
Braun Ranch Engineering
1998-1999
1 13
Braun Ranch Engineering
1999-2000
1 14
Braun Ranch Programming
1996-1999
1 15
Braun Ranch Design Sketches
1991-1999
1 16
Braun Ranch Entitlement
2000
1 17
Braun Ranch Graphics
1999
1 18
Braun Ranch Legal
1987-1998
1 19
Braun Ranch Legal
1999
1 20
Braun Ranch Legal
2000
1 21
Braun Ranch Specifications/Submissions
1995-998
1 22
Braun Ranch Specifications/Submissions
1999-2000
1 23
Braun Ranch Specifications/Submissions
2001
1 24
Braun Ranch Land Use Application
1998 Octobter 20
1 25
Braun Ranch Protective Development Options
1995 November
1 26
Braun Ranch Executive Summary & Photo Documentation
1999 July 14
TUBES
1 tube
tube
1
Property 1392 Base Mapping
Physical location: CCA 8 Column 5, Row 1
undated

LXVIII:  LXVIII: Veteran's Cemetery of Western Colorado, 1999-2002Return to Top

1 box, 25 folders
Container(s) Description Dates
MANUSCRIPT MATERIALS
1999-2002
Box Folder
1 1
Proposals/Contracts
1999-2001
1 2
Correspondence
1999-2000
1 3
Correspondence
2001
1 4
Correspondence
2001
1 5
Correspondence
2001
1 6
Correspondence
2002
1 7
Meeting Minutes/Notes to File
1999-2000
1 8
Meeting Minutes/Notes to File
2001-2002
1 9
Work Program
2001
1 10
Physical
2000-2001
1 11
Engineering
1999-2001
1 12
Programming
1999-2000
1 13
Cost Estimates
1999-2001
1 14
Design Sketches/Product Information
1999-2001
1 15
Architecture
2000
1 16
Specifications
2000
1 17
Product Master Plan
2000
1 18
Construction Documents
2001
1 19
Construction Documents
2001
1 20
Construction Documents
2001
1 21
Architect's Supplemental Instructions
2001
1 22
Construction Meeting Minutes
2001
1 23
Construction Meeting Minutes
2001
1 24
Construction Meeting Minutes
2002
1 25
Construction Change Orders
2001-2002

LXIX:  LXIX: Primland Resort, 1999-2006Return to Top

1 box, 28 folders and 8 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1999-2006
Box Folder
1 1
Primland Proposals/Contracts
2001-2003
1 2
Primland Proposals/Contracts
2004-2005
1 3
Primland Correspondence
2001-2005
1 4
Primland Environmental
2003-2004
1 5
Primland Cost Estimate
2004
1 6
Primland Notes to File
undated
1 7
Primland Field Notes and Reports
undated
1 8
Primland Construction Documents
2001-2002
1 9
Primland Construction Documents
2003
1 10
Primland Construction Documents
2005
1 11
Primland Transportation
2003
1 12
Primland Infrastructure
2003
1 13
Primland Utilities
2004
1 14
Primland Golf Course
2003
1 15
Primland Golf Course Feasibility Analysis
1999 November 1
1 16
Primland Golf Course Character Image Portfolio
undated
1 17
Primland Schematic Design
2003
1 18
Primland Design Development
2001
1 19
Primland Sketches/Image Graphics
undated
1 20
Primland Meeting Notes
2001-2006
1 21
Primland Project Schedule
2003-2004
1 22
Primland Conceptual Design
2004
1 23
Primland Visual
2003-2004
1 24
Primland Legal
2001
1 25
Primland Legal
2001
1 26
Primland Financial Analysis
2002-2003
1 27
Primland Lodge & Grounds Character Image Portfolio
undated
1 28
Primland Lodge Proposals/Contracts
2005
TUBES
8 tubes
tube
1
Developmental
Physical location: CCA 8 Column 3, Row 1
undated
2
Lodge Concept and Site Plan
Physical location: Barn Box 4
undated
3
Site Plans
Physical location: Barn Box 4
undated
4
Imagery
Physical location: Barn Box 4
undated
5
Site Analysis; Plan; Landscape Concept 1
Physical location: Barn Box 4
undated
6
Lodge Concept and Site Plan
Physical location: Barn Box 4
undated
7
Alternate Plans Maintenance Facility
Physical location:Barn Box 11
undated
8
Alternative Plans Maintenance Facility Golf
Physical location: Barn Box 11
undated

LXX:  LXX: Avon, 1990-2007Return to Top

2 boxes, 63 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-2007
Box Folder
1 1
Avon Proposals/Contracts
1990-2005
1 2
Avon Meeting Minutes
2002-2005
1 3
Avon Meeting Minutes
2006
1 4
Avon Correspondence/Transmittals
2004-2005
1 5
Avon Market Research
2004
1 6
Avon Financial Proformas
2005
1 7
Avon Master Plan Prior Studies
2003-2005
1 8
Avon Analysis Maps and Diagrams
undated
1 9
Avon Master Plan Documents
2005-2006
1 10
Avon Source Data
2004
1 11
Avon Public Library
1994 April 29
1 12
Avon Town Center Transportation
1996 November 5
1 13
Avon Town Center Community/Area Plan
1996
1 14
Avon Town Center Design Program Summary
2003
1 15
Avon Town Center Correspondence/Transmittals
2006
1 16
Avon East Town Proposals/Contracts
2006
1 17
Avon East Town Meeting Minutes/Notes
2006-2007
1 18
Avon East Town Prior Studies
undated
1 19
Avon East Town Analysis Maps and Diagrams
undated
1 20
Avon East Town Master Plan Alternatives
2006
1 21
Avon East Town Specific/Development Plan
1999-2000
1 22
Avon East Town Public Participation
2007
1 23
Avon East Town Source Data
1998 October 13
1 24
Avon Tract C Proposals/Contracts
1997
1 25
Avon Tract C Meeting Minutes/Notes To File
1997
1 26
Avon Correspondence
undated
1 27
Avon Tract C Programming/Design Sketches
1996
1 28
Avon Lighting Plan Invoices
2007-2008
1 29
Avon Lighting Plan Street Lighting Master Plan
2008
1 30
Avon Town Center West Proposals/Contracts
2007
1 31
Avon Town Center West Snowmelt Invoices
2007-2008
1 32
Avon Town Center West Snow Removal/Cost Review
2007
1 33
Avon Town Center West Investment Meeting Minutes/Notes
2006-2007
1 34
Avon Town Center West Investment Financial Analysis
2006
1 35
Avon Town Center West Investment Analysis/History
2006
1 36
Avon Town Center West Investment Plan Sketches
undated
2 1
Avon Town Center West Investment Plan Subdivision
2004
2 2
Avon Town Center West Investment Urban Renewal
2006
2 3
Avon Town Center West Investment Proposals/Contracts
2006-2008
2 4
Avon Town Center West Investment Proposals/Contracts
undated
2 5
Avon Town Center West Investment Correspondence/Transmittals
2006
2 6
Avon Town Center West Investment Invoices
2006-2007
2 7
Village at Avon Proposals/Contracts
2002-2003
2 8
Village at Avon Correspondence Client Incoming
2002-2003
2 9
Village at Avon Correspondence Client Outgoing
2002-2003
2 10
Village at Avon Correspondence Consultants Incoming
2002-2003
2 11
Village at Avon Correspondence Consultants Outgoing
2002-2003 March
2 12
Village at Avon Correspondence Consultants Incoming
2003 April-November
2 13
Village at Avon Correspondence Town
2003
2 14
Village at Avon Meeting Minutes
2002-2003 March
2 15
Village at Avon Meeting Minutes
2003 April-October
2 16
Village at Avon Design Sketches
2002-2003
2 17
Village at Avon Schedules
2003
2 18
Village at Avon Bidding
2003
2 19
Village at Avon Construction Correspondence
2003
2 20
Village at Avon Construction Field Reports
2003
2 21
Village at Avon Lighting
2003
2 22
Village at Avon Gas, Electric Water Applications
2003
2 23
Village at Avon Tract E submittals
2003
2 24
Village at Avon Lot 2 Proposals/Contracts
2004
2 25
Village at Avon Lot 2 Invoices
2004-2006
2 26
Village at Avon Lot 2 Charging Station
2005
2 27
Village at Avon Lot 2 Master Plan
undated
TUBES
6 tubes
tube
1
Aspen Town Center East
Physical location: CCA 8 Column 6, Row 1
undated
2
Trail Recreation Master Plan
Physical location: CCA 8 Column 5, Row 2
undated
3
Center West
Physical location: Barn Box 10
undated
4
Town Center Transit
Physical location: Barn Box 11
undated
5
Town Center
Physical location: Barn Box 15
undated
6
Crewset
Physical location: Barn Box 15
undated

LXII:  LXXI: Northstar, 1995-2003Return to Top

1 box, 42 folders and 11 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1995-2003
Box Folder
1 1
Historical and Cultural Resources
1998-2000
1 2
Water Rights
1995-2000
1 3
Analysis
1999
1 4
Biological Resources Survey
2000-2001
1 5
Housing
2000
1 6
Housing
2001
1 7
Environmental Audit
1996-2001
1 8
Parks and Recreation
2000
1 9
Transportation
2000
1 10
Development Program
1999-2000
1 11
Correspondence
2000
1 12
Water Analysis
2001
1 13
Analysis Maps & Diagrams
2000-2003
1 14
Schematic Design
undated
1 15
Visual Study
2002
1 16
Overview of Planning & Environmental Issues
2000
1 17
Completion of the 1971 Master Plan Approval
undated
1 18
Articles
1968-1995
1 19
Master Plan EIR Info
2001
1 20
Proposals
2000
1 21
Zoning
1999-2000
1 22
Village 3 and 4 First Submittals
2005
1 23
Village Phase 3 Pools
2006
1 24
Phase II Design
2002
1 25
Village Construction Phase I
2000
1 26
Review of Northstar
2003-2004
1 27
Village Design Review
2003
1 28
Village Site Plan
2003
1 29
Village- Golf
2000
1 30
Village Enviornmental
2001
1 31
Village Comm Arts
undated
1 32
Village Parking
2001
1 33
Village Design
2002
1 34
The Village Working Model
2001
1 35
Heritage Plaza Correspondence
2004
1 36
Heritage Plaza Design
2004
1 37
Submittals
2005-2006
1 38
Northstar at Tahoe Due Diligence
2000
1 39
Northstar at Tahoe Due Diligence
2000
1 40
Northstar Nature Preserve
1989
1 41
Tahoe City Public Utility District
2005
1 42
Heritage Plaza Plans
2006
TUBES
11 tubes
tube
1
Recreation
Physical location: CCA 6 Column 1, Row 7
undated
2
Design Development
Physical location: CCA 8 Column 6, Row 2
undated
3
Heritage Plaza
Physical location: CCA 6 Column 1, Row 9
undated
4
Master Plan Drawings
Physical location: Barn Box 1
undated
5
Village Acetate
Physical location: Barn Box 2
undated
6
Village Originals Mylar's
Physical location: Barn Box 1
undated
7
Conceptual Master Plan
Physical location: Barn Box 2
undated
8
Original Rendered Site Plan and Sketches
Physical location: Barn Box 1
undated
9
Crested Butte
Physical location: Barn Box 14
undated
10
Crested Butte
Physical location: Barn Box 14
undated
11
Tahoe
Physical location: Barn Box 14
undated

LXXII:  LXXII: Deep Creek Mountain Resort, 1997-2007Return to Top

1 box, 42 folders and 10 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2007
Box Folder
1 1
Deep Creek Mountain Resort
2003
1 2
Deep Creek Mountain Resort Adventure Sports Center International
undated
1 3
Deep Creek Mountain Resort Strategic Plan for Tourism Case Studies
2001 February
1 4
Deep Creek Mountain Resort Residential and Retail Market Analysis
undated
1 5
Deep Creek Mountain Resort Strategic Plan for Tourism (Appendices)
undated
1 6
Deep Creek Mountain Resort Zoning
1997
1 7
Deep Creek Mountain Resort Metro Regional Information System Inc.
2002
1 8
Deep Creek Mountain Resort Source Data
2002
1 9
Deep Creek Mountain Resort Proposals/Contracts
2001-2002
1 10
Deep Creek Mountain Resort Meeting Minutes
2002
1 11
Deep Creek Mountain Resort Correspondence/Transmittals
2002
1 12
Deep Creek Lakeside Club Conceptual Design
undated
1 13
Deep Creek Lakeside Club Infrastructure
2004
1 14
Deep Creek Lakeside Club Environmental
undated
1 15
Deep Creek Lakeside Club Correspondence
2004
1 16
Deep Creek Lakeside Club Contracts
2004
1 17
Deep Creek Design Development
2004
1 18
Deep Creek Correspondence
2002-2005
1 19
Deep Creek Mountain Resort Preliminary Findings and Conclusions
2003-2005
1 20
Deep Creek Mountain Resort Land Use
2002
1 21
Deep Creek Mountain Resort Market Research
1997-2002
1 22
Deep Creek Mountain Resort Conceptual Development Plan
2002
1 23
Deep Creek Correspondence
2004-2005
1 24
Deep Creek Master Plan Meeting Minutes
2004
1 25
Deep Creek Correspondence
2002-2003
1 26
Deep Creek Mountain Resort Conceptual Signage Package
undated
1 27
Deep Creek Schematic Planting Design
2004 June 30
1 28
Deep Creek Field Report
2005
1 29
Deep Creek Golf Topography
undated
1 30
Deep Creek Master Plan
2004
1 31
Lodestone Golf Clubhouse
2007
1 32
Watershed Zoning Ordinance
1997-2002
1 33
Western Maryland Plan for Tourism
2001 February
1 34
Wisp Golf Course Remodel Meeting Minutes
2004
1 35
Wisp Golf Course Remodel
2003-2004
1 36
Wisp Golf Course Remodel
2005-2006
1 37
Wisp Phase 1 Proposal
2006
1 38
Wisp Master Planning
2006
1 39
Wisp Signage Program
2006
1 40
Wisp Resort Sign Program Design
2007
1 41
Wisp Golf Course Remodel Surveying
2007
1 42
Wisp Golf Course Remodel Project Management Plan
2005
TUBES
10 tubes
1997-2007
tube
1
Deep Creek Adventure Sports Center
Physical location: CCA 8 Column 3, Row 3
undated
2
Adventure Sports Fork Run Parcel
Physical location: CCA 8 Column 3, Row 3
undated
3
Detention Pond Survey, Master Plans
Physical location: CCA 8 Column 6, Row 1
undated
4
Master and Schematics
Physical location: CCA 8 Column 6, Row 1
undated
5
Lodestone
Physical location: CCA 8 Column 6, Row 3
undated
6
Village Phase 1 Site Design
Physical location: CCA 6 Column 1, Row 1
undated
7
Mountain Resort
Physical location: Barn Box 1
undated
8
Mountain Resort
Physical location: Barn Box 1
undated
9
Mountain Village
Physical location: Barn Box 4
undated
10
Lakeside Club
Physical location: Barn Box 11
undated

LXXIII:  LXXIII: Estrella, 1985-2008Return to Top

2 boxes, 98 folders and 70 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1985-2008
Box Folder
1 1
Maricopa Association of Governments Open Space Plans
1994-1996
1 2
Goodyear Open Space & Trails Proposals/Contracts
1996-1997
1 3
Goodyear Open Space & Trails Correspondence
1997
1 4
Estrella Phase 1 Roads Work Program
1987
1 5
Estrella Phase 1 Roads Meeting Notes
1987
1 6
Estrella Phase 1 Roads Correspondence
1987-1988
1 7
Estrella Phase 1 Roads Engineering
1986-1987
1 8
Estrella Phase 1 Roads Plan Materials List
1988
1 9
Estrella Phase 1 Roads Economic Analysis
undated
1 10
Estrella Phase 1 Report
1987
1 11
Estrella Phase 1 Report
1987
1 12
Estrella Design Guidelines
undated
1 13
Estrella Design Guidelines Meeting Minutes/Notes to File
1987-1988
1 14
Estrella Supplemental Design Guidelines for Parcel 58
1988
1 15
Estrella Design Guidelines for Residential Developments
1988
1 16
Non-Residential Guidelines Proposals/Contracts
2000-2003
1 17
Non-Residential Guidelines Report
2003 July
1 18
Non-Residential Guidelines Design Guidelines
2001
1 19
Non-Residential Guidelines Correspondence
2003-2008
1 20
Non-Residential Guidelines Conceptual Design
2003
1 21
Non-Residential Guidelines Meeting Minutes/Notes to File
2000-2001
1 22
Non-Residential Guidelines Sketches
undated
1 23
Non-Residential Guidelines Design Guidelines Examples
1998-2000
1 24
Non-Residential Guidelines Drafts
1998-2001
1 25
Streetscape
1996
1 26
Streetscape Proposal/Contracts
1996
1 27
Streetscape Correspondence
1996-1997
1 28
Sign Guidelines
1988
1 29
Sign Guidelines Proposals/Contracts
2002
1 30
Estrella Mountain Ranch
2001
1 31
Supplemental Design Guidelines for Estrella Mountain Estates
1988
1 32
Estrella Aerospace & Industrial Park Proposal/Contract
1995
1 33
Estrella Aerospace & Industrial Park Correspondence
1995
1 34
Estrella Aerospace & Industrial Park Meeting Minutes/Notes to File
1995-1998
1 35
Estrella Industrial Park Design Guidelines
1997
1 36
Estrella Industrial Park Streets Proposals/Contracts
1998-2000
1 37
Estrella Industrial Park Proposals/Contracts
undated
1 38
Estrella Industrial Park Correspondence
1996-1997
1 39
Estrella Industrial Park Thematic Image book
undated
1 40
Estrella Aerospace Cost Analysis
1988
1 41
Estrella Aerospace Proposals/Contracts
1998
1 42
Estrella Aerospace Design Guidelines
1997
1 43
Estrella Aerospace & Industrial Park CCRs
1996
1 44
Estrella Aerospace CCR
1996
2 1
Estrella Aerospace CCR
1997
2 2
Estrella Aerospace Additional Services Proposals/Contracts
2006-2007
2 3
Estrella Aerospace Center Thematic Image book
undated
2 4
Estrella Aerospace Proposals/Contracts
2000
2 5
Estrella Aerospace Streets Proposals/Contracts
1998
2 6
Estrella Aerospace Street Trace Overlays
1996
2 7
Estrella Parkway South Proposals/Contracts
1997
2 8
Estrella Parkway South Meeting Minutes
1997
2 9
Estrella Streetscape Phase 2 Proposals/Contracts
1997
2 10
Estrella Streetscape Phase 2 Correspondence
1997
2 11
Estrella Lakes & Open Spaces Schematic Design
1987
2 12
Estrella Commercial Park
2005-2007
2 13
Hidden Valley
1987
2 14
Estrella Lake Park North Technical Specifications
undated
2 15
Estrella Non-Residential Design Standards Draft
2007
2 16
Technical Specifications for Lake Park- North
1988
2 17
Technical Specifications
1988
2 18
Sign Guidelines
1988
2 19
Materials and Furnishings
1987
2 20
Phase One Roadway Landscape
1987
2 21
Phase One Sign Guidelines
1988
2 22
Phase One Landscape and Design Guidelines
undated
2 23
Design Guidelines for the Lake Village
2003
2 24
Meeting Notes for Mountain Village
1985-1986
2 25
Brochure Drawings
1988
2 26
Preliminary Planning Studies
1985
2 27
General Correspondence
1985
2 28
Work Programs/Schedules
1985
2 29
Clippings
1986-1988
2 30
Biological
1986
2 31
Land Use Program
1986
2 32
Master Plan Drawings
undated
2 33
Proposals
1985
2 34
Correspondence
1988
2 35
Work Programs/Schedules
1988
2 36
Cost Estimates
1988
2 37
Design Sketches/Product Info
1988
2 38
Construction Bids/Proposals
1988
2 39
Meeting Minutes/Notes to File
undated
2 40
Work Program
1987-1988
2 41
Transmittals
1987
2 42
Correspondence Signage - Entry Project
1987-1988
2 43
Cost Estimates
1993
2 44
Land Use- Phase II
1987-1988
2 45
General File
1987
2 46
Clippings
1993
2 47
Correspondence
1987-1989
2 48
Proposals/Contracts
1994
2 49
Signage
2005
2 50
Clippings
1987
2 51
Notes
undated
2 52
Preliminary PAD Submission
1986
2 53
Design Guidelines for Commerce Park
2007
2 54
Design Guidelines for Non- Residential Area at Lakeside Village
2003
TUBES
70 tubes
1985-2008
tube
1
Phase 2 Symposium Graphics & New Title Blocks
Physical location: CCA 8 Column 3, Row 3
undated
2
Signs
Physical location: CCA 8 Column 3, Row 3
undated
3
Phase Two, schematic planning studies
Physical location: CCA 8 Column 3, Row 3
undated
4
Phase two base Mylar's
Physical location: CCA 8 Column 3, Row 3
undated
5
Group properties
Physical location: CCA 8 Column 3, Row 3
undated
6
Estrella
Physical location: CCA 8 Column 3, Row 3
undated
7
Planting plan Mylar's, parcels
Physical location: CCA 8 Column 3, Row 3
undated
8
Phase One
Physical location: CCA 8 Column 3, Row 3
undated
9
Air photos
Physical location: CCA 8 Column 3, Row 3
undated
10
Park
Physical location: CCA 8 Column 3, Row 3
undated
11
Village center prints
Physical location: CCA 8 Column 6, Row 2
undated
12
Regional maps, studies
Physical location: CCA 8 Column 6, Row 2
undated
13
Print set
Physical location: CCA 8 Column 6, Row 2
undated
14
Phase Two base Mylar's, parcels, parcels sold, zoning
Physical location: CCA 8 Column 6, Row 2
undated
15
Signage, conceptual studies, logo designs, road sections, phase II, final grading
Physical location: CCA 8 Column 6, Row 2
undated
16
Lakes and open space, base Mylar's
Physical location: CCA 8 Column 6, Row 2
undated
17
Phase One
Physical location: CCA 8 Column 6, Row 2
undated
18
Roadway cross sections, good year aero space park
Physical location: CCA 8 Column 6, Row 2
undated
19
Brochure, original Mylar's, final submission
Physical location: CCA 8 Column 6, Row 2
undated
20
Record Prints; Lake Park Fountain; Spillway
Physical location: CCA 8 Column 6, Row 2
undated
21
Resort, roads, aspen
Physical location: CCA 8 Column 6, Row 2
undated
22
Paving Plan
Physical location: CCA 8 Column 6, Row 2
undated
23
Phase two, roadway sections Mylar's, original illustrative
Physical location: CCA 8 Column 6, Row 2
undated
24
Trails plans, master plan, Mylar, planning objectives
Physical location: CCA 8 Column 6, Row 2
undated
25
Signage
Physical location: CCA 8 Column 6, Row 2
undated
26
Flood Plain Data,200 Scale
Physical location: CCA 8 Column 6, Row 2
undated
27
Proposal plans
Physical location: CCA 8 Column 6, Row 2
undated
28
Record prints, north lake park, pricing
Physical location: CCA 8 Column 6, Row 2
undated
29
Phase two base data, w/blm, cut and fill
Physical location: CCA 8 Column 6, Row 2
undated
30
Grading/Paving Mylar's
Physical location: CCA 8 Column 6, Row 3
undated
31
Village Center, Fountain Construction Package, Details
Physical location: CCA 8 Column 6, Row 3
undated
32
Lakes
Physical location: CCA 8 Column 6, Row 3
undated
33
Spillway
Physical location: CCA 8 Column 6, Row 3
undated
34
Spillway background
Physical location: CCA 8 Column 6, Row 3
undated
35
Base maps
Physical location: CCA 8 Column 6, Row 3
undated
36
Lakes, open space
Physical location: CCA 8 Column 6, Row 3
undated
37
Lakes
Physical location: CCA 8 Column 6, Row 3
undated
38
Lakes
Physical location: CCA 8 Column 6, Row 3
undated
39
Lakes, cds
Physical location: CCA 8 Column 6, Row 3
1987; undated
40
Commercial parcel, resort
Physical location: CCA 8 Column 6, Row 3
undated
41
Lakes
Physical location: CCA 8 Column 6, Row 3
undated
42
Lakes, grading
Physical location: CCA 8 Column 6, Row 3
undated
43
Lakes
Physical location: CCA 8 Column 6, Row 3
undated
44
Presentation drawings
Physical location: CCA 8 Column 6, Row 3
undated
45
Aerospace, streetscape
Physical location: CCA 6 Column 1, Row 6
undated
46
Design process, trace, parkway south, aerospace
Physical location: CCA 6 Column 1, Row 6
undated
47
Mountain Estates
Physical location: CCA 6 Column 1, Row 6
undated
48
base Mylar's
Physical location: CCA 6 Column 2, Row 2
undated
49
Phase 1 Streets
Physical location: CCA 6 Column 2, Row 2
undated
50
Phase 1 Master Plan
Physical location: CCA 6 Column 2, Row 2
undated
51
Base Data
Physical location: CCA 6 Column 2, Row 1
undated
52
Master Plan 500 Scale
Physical location: CCA 6 Column 2, Row 1
undated
53
South Lake Park negatives
Physical location: CCA 6 Column 2, Row 2
undated
54
Master Plan Black and White Drawings
Physical location: CCA 6 Column 2, Row 2
undated
55
Phase One Mylar's
Physical location: CCA 6 Column 2, Row 1
undated
56
Mylar's A, Mylar's B
Physical location: Barn Box 3
undated
57
Lot Tests/Water Requirements
Physical location: Barn Box 2
undated
58
Elementary School/Park
Physical location: Barn Box 2
undated
59
Phase Two Base Mylar's
Physical location: Barn Box 2
undated
60
Phase One
Physical location: Barn Box 2
undated
61
Aerial Photos
Physical location: Barn Box 1
undated
62
North and South Lake Parks
Physical location: Barn Box 1
undated
63
Pre Phase One
Physical location: Barn Box 2
undated
64
Main Pavilion
Physical location: Barn Box 2
undated
65
Town Center Schematic Studies
Physical location: Barn Box 2
undated
66
Illustrative Plan
Physical location: Barn Box 2
undated
67
Master Plan
Physical location: Barn Box 3
undated
68
Construction Documents, Notes and Revisions
Physical location: CCA 8 Column 4, Row 1
undated
69
Master Plan
Physical location: CCA 8 Column 5, Row 1
undated
70
Final Print Set
Physical location: CCA 6 Column 1, Row 5
undated

LXXIV:  LXXIV: Maricopa Association of Governments, 1992-2002Return to Top

1 box, 24 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1992-2002
Box Folder
1 1
Proposals/Contracts
1992-1995
1 2
Correspondence
1993-1995
1 3
Meeting Minutes/Notes to File
1993
1 4
Meeting Minutes/Notes to File
1994-1995
1 5
Desert Spaces Final Report
1996
1 6
Programming
1993
1 7
Specifications
1993
1 8
Specifications
1994
1 9
Design Guidelines Working Paper
1993
1 10
Focus Group
1993-1994
1 11
Open Space Management Plan
1994
1 12
Open Space Management Plan
1994
1 13
Western Canal Enhancement Project
1996
1 14
Gilbert Gateway
1999
1 15
Comprehensive Guide Update
1994
1 16
Skate Park Feasibility Study
1998
1 17
Project Manual
1994
1 18
Executive Summary
undated
1 19
Open Space Plan
undated
1 20
Parks of the Canals Master Plan
2000
1 21
Northeast Quadrant Action Plan
1994
1 22
Site Inventory and Analysis
2002
1 23
Community Trail
1994
1 24
Rio Salado Design Concept Report
2001
TUBES
2 tubes
tube
1
Task 4 Inventory
Physical location: CCA 8 Column 4, Row 3
undated
2
Grading
Physical location: Box 11
undated

LXXV:  LXXV: Spring Valley, 1998-2001Return to Top

2 boxes, 38 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1998-2001
Box Folder
1 1
Spring Valley Ranch P.U.D. Preliminary Plan Application
2000-2001
1 2
Spring Valley Ranch P.U.D. Preliminary Plan Application
2000-2001
1 3
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 4
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 5
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 6
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 7
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 8
Spring Valley Ranch P.U.D. Appendix Items A-F
2000-2001
1 9
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 10
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 11
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 12
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 13
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 14
Spring Valley Ranch P.U.D. Appendix Items G-R
2000-2001
1 15
Spring Valley Ranch P.U.D. Appendix #2 Items J-R
2000-2001
1 16
Spring Valley Ranch P.U.D. Appendix #2 Items J-R
2000-2001
1 17
Spring Valley Ranch P.U.D. Appendix #2 Items J-R
2000-2001
1 18
Spring Valley Ranch P.U.D. Appendix #2 Items J-R
2000-2001
1 19
Spring Valley Ranch P.U.D. Appendix #2 Items J-R
2000-2001
1 20
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
1 21
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
1 22
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
2 1
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
2 2
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
2 3
Spring Valley Ranch P.U.D. Rezoning Binder
1998-1999
2 4
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 5
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 6
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 7
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 8
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 9
Spring Valley Ranch Appendix #1 Items A-I
2000-2001
2 10
Spring Valley Ranch Responses to Staff Report Book 2
1998-1999
2 11
Spring Valley Ranch Responses to Staff Report Book 2
1998-1999
2 12
Spring Valley Ranch Responses to Staff Report Book 2
1998-1999
2 13
Spring Valley Ranch P.U.D. Amendment Exhibits
2000-2001
2 14
Spring Valley Ranch P.U.D. Amendment Exhibits
2000-2001
2 15
Spring Valley Ranch P.U.D. Amendment Exhibits
2000-2001
2 16
Spring Valley Ranch P.U.D. Amendment Exhibits
2000-2001
TUBES
4 tubes
tube
1
Spring Valley
Physical location: CCA 8 Column 6, Row 1
1998-2001
2
Grading, Main Access Entrance Study, Village Center Site Plan, Cabin Sketch Plans, Conceptual Equestrian Plan
Physical location: CCA 8 Column 6, Row 1
undated
3
PUD, maps
Physical location: CCA 8 Column 6, Row 2
undated
4
Parking Design
Physical location: CCA 8 Column 5, Row 1
undated

LXXVI:  LXXVI: Pima Community College, 1998-2005Return to Top

2 boxes, 48 folders and 2 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1998-2005
Box Folder
1 1
Proposals/Contracts
1998-2005
1 2
Correspondence
1998-2000
1 3
Correspondence
2002-2004
1 4
Meeting Minutes/Notes to File
1999-2000
1 5
Programming
1999
1 6
Design Sketches/Product Information
1999
1 7
Design Sketches/Product Information
2000
1 8
Design Sketches/Product Information
2001
1 9
Design Sketches/Product Information
undated
1 10
Design Sketches/Product Information
undated
1 11
Budget Analysis
2000
1 12
Master File List/Project Number
1999
1 13
Proposals/Contracts
2002-2003
1 14
Owner Correspondence
1999-2002
1 15
Consultant Correspondence
1999-2001
1 16
Transmittals
2000-2002
1 17
Meeting Mintues
1999-2001
1 18
Meeting Mintues
2003
1 19
Notes to File
1999
1 20
Notes to File
2000
1 21
Notes to File
2000
1 22
Engineering
2000-2001
1 23
Cost Estimate
1999-2001
1 24
Submittals/Shop Drawings
2000
1 25
Project Request Form
2003
1 26
Soils and Geology
2003
1 27
Masonary Sitwalls at Amphitheater
2003
1 28
Request For Information
2003
1 29
Design Development
2004
1 30
Design Development
2004
1 31
Project Schedules
2003
1 32
Construction Observations
2003
1 33
Field Notes/Reports
2003
1 34
Environmental
2003
1 35
Master Plan Draft
undated
1 36
Bid Package
2002 January 7
1 37
Bid Package #2
2001 December 17
1 38
Plant Contract
1998
1 39
Specifications
2003
1 40
Project Description
2000
2 1
Schematic Design Narrative
2000 March 10
2 2
Design Development Narrative
2001 January 26
2 3
Design Development
2001
2 4
Design Development
2001
2 5
Design Development
2001
2 6
Design Development
2001
2 7
Project Folder
2001
2 8
Project Folder
2002
TUBES
2 tubes
tube
1
Master Site Plan
Physical location: CCA 6 Column 2, Row 3
undated
2
Baseline Park Canals
Physical location: CCA 6 Column 2, Row 3
undated

LXXVII:  LXXVII: Rancho Viejo, 1988-2006Return to Top

4 boxes, 278 folders and 41 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1988-2006
Box Folder
1 1
Biological RV Village II
1999 January 3
1 2
CCR's
1996 September 6
1 3
CCR's RV Turquoise Trail BP
1997 March 16
1 4
Clippings RV Village II
1999 July
1 5
Clippings Rancho Viejo
1999
1 6
Clippings RV Village I Final Plat
undated
1 7
Clippings Rancho Viejo Village Master Plan
1996-1998
1 8
College North Master Plan Report
1995 September
1 9
Commercial Market Analysis
2002 March 15
1 10
Construction Bids for Village 1
1998
1 11
Construction Bids/Proposals/Addendums
2000
1 12
Construction Bids RV Village I Tot Lot
1998
1 13
Construction Bids RV Village Unit I Plaza
1998
1 14
Correspondence
1996-1997
1 15
Correspondence- Agency Rancho Viejo Village Mplan
1996-1997
1 16
Correspondence- Consultant Rancho Viejo Village Master Plan
1997
1 17
Correspondence- General RV Village
1998 June 15
1 18
Correspondence- Owner RV Nike Propsal
1997
1 19
Correspondence- Owner RV Turquoise Trail BP
1997-1998
1 20
Correspondence- Owner Rancho Viejo Village Mplan
1996-1998
1 21
Correspondence- Owner Rancho Viejo Vison Plan
1996-2000
1 22
Correspondence- RV Village I Final Plat
1997-1998
1 23
Correspondence- RV Village I Landscape
1998-1999
1 24
Correspondence- RV Village I Model Homes
1999
1 25
Correspondence- RV Village Unit 1 Irrigation
1998
1 26
Correspondence- RV Village Plaza
1998-2000
1 27
Correspondence- RV Village Unit I Signage
1998
1 28
Correspondence- Agency RV College Heights
1997
1 29
Correspondence- Agency Rancho Viejo Master Plan
1995-2000
1 30
Correspondence- Consultant Rancho Viejo Master Plan
1996 July 1
1 31
Correspondence- Agencies RV Village II
1999
1 32
Correspondence- Consultant
2000 October 20
1 33
Correspondence- Consultant
2001
1 34
Correspondence Owner
2000 August 31
1 35
Correspondence Owner Rancho Viejo Master Plan
1991-2001
1 36
Correspondence Owner RV Village II
1999-2002
1 37
Cost Estimates Village One
1998
1 38
Cost Estimates Rancho Viejo Village II
undated
1 39
Cost Estimates RV Turquoise Trail
1997
1 40
Cost Estimates RV Village I Final Plat
1997-1998
1 41
Cost Estimates RV Village I Model Homes
1998
1 42
Cost Estimates RV Village I Signage
1998
1 43
Cost Estimates Rancho Viejo Village Master Plan
1996-1998
1 44
Cost Estimates RV Village Unit I Plaza
1998 July
1 45
Cost Estimates RV Village I Tot Lot
1998
1 46
Design Guidelines RV Nike Proposal
1997
1 47
Design Guidelines RV Turquoise Trail BP
1997 June 27
1 48
Design Guidelines RV Village General
1998 August 11
1 49
Design Guidelines RV Village I Unit 1 Landscape
1999
1 50
Design Sketches RV Turquoise Trail BP
1998
1 51
Design Sketches RV Village I final Plat
undated
1 52
Design Sketches RV Village I On-Lot From Yard
1998-1999
1 53
Design Sketches RV Village I Unit I Landscape
1998
1 54
Design Guidelines
1999 September
1 55
Design Sketches for Rancho Viejo
1996
1 56
Design Sketches/Product RV Village II
1998-2001
1 57
Design Sketches Rancho Viejo Village Master Plat
1996-1997
1 58
Design Sketches RV Village Unit I Signage
1998
1 59
Design Sketches/Product Info RV Village I Model Homes
1998
1 60
Design Sketches/Product Info RV Village I Plaza
1998
1 61
Engineering- Civil Traffic RV Village Master Plan
1996 July
1 62
Engineering- Civil/Traffic RV TTBP
1997
1 63
Engineering RV Village I Plaza
1998 August
1 64
Engineering -Utility RV Nike Proposal
1997
1 65
Engineering- Utility RV Turquoise Trail BP
1997
1 66
Engineering- Utility RV Village I Final Plat
1997
1 67
Facsimile
1999
1 68
Facsimiles Rancho Viejo
1996-2001
1 69
Field Reports
1999-2002
1 70
Facsimiles RV Village I Final Plan
1997
1 71
Framework Plan Rancho Viejo Village Center
2002 December
1 72
General CCR's
undated
1 73
General Correspondence- Consultant Rancho Viejo General
1996
1 74
General Proposal/Contracts Rancho Viejo General
1996-2001
1 75
General Rancho Viejo
1996-1999
1 76
General Work Program Rancho Viejo General
1996
1 77
Geplogy/Soils
1996-1997
1 78
Information Packet
undated
1 79
Permaculture Site Assessment for Contenta Village
undated
1 80
Urban Design Plan
2002
1 81
Unit 3 Preliminary Development
2002
1 82
Land Development
2001-2005
2 1
Land Use Rancho Viejo
1996-2000
2 2
La Entrada Phase 1 Preliminary and Final Development Plan Report
2006 June 9
2 3
Land Use Rancho Viejo Village Master Plan
1996-1997
2 4
Land Use Rancho Viejo Vision Plan
1996-2000
2 5
Marketing
undated
2 6
Marketing/Presentation
undated
2 7
Meeting Minutes
2000-2001
2 8
Meeting Notes Rancho Viejo Master Plan
1996-2001
2 9
Marketing/Presentation Rancho Viejo Village General
1996
2 10
Meeting Notes RV Village I Final Plat
1997
2 11
Meeting Notes Rancho Viejo Village Master Plan
1996-1998
2 12
Meeting Notes RV Village Plaza
1998 August 24
2 13
Memos
1996-1997
2 14
Meeting Notes Rancho Viejo Village II
1998 December 14
2 15
Notes to File
2000-2001
2 16
Notes to File Rancho Viejo Village Master Plan
1996-1997
2 17
Notes to File Rancho Viejo Vision Plan
1996 February
2 18
Programming for Rancho Viejo
1999-2001
2 19
Programming RV Village II
1998-1999
2 20
Proposals/Contracts
1998
2 21
Proposal/Contracts Consultant RV Village II
1999 February 4
2 22
Proposal/Contract RV Village II
1998-2002
2 23
Proposal/Contract
1998-2001
2 24
Proposal/Contract- Consultants
2000 June 19
2 25
Proposals/Contracts- Consultants for Rancho Viejo Signage
2001
2 26
Presentations RV Nike Proposal
1996-1997
2 27
Presentations RV Village I Final Plan
1997
2 28
Programming RV Village I Tot Lot
1998 August 20
2 29
Programming RV Village Unit I Plaza
1998 July 22
2 30
Proposal/Contract Model Homes Landscaping
1998
2 31
Proposal/Contract On-Lot Front Yard Schematics
1998
2 32
Proposal/Contract Plaza and Village Center
1998 May 11
2 33
Proposal/Contract RV Village I Final Plan
1996
2 34
Proposal/Contract RV Turquoise Trail BP
1997-1998
2 35
Proposal/Contract Signage
1998
2 36
Proposal/Contract Tot Lot
1998 May 11
2 37
Proposal/Contract Village Mainline Irrigation
1998
2 38
Proposal/Contracts Rancho Viejo Vision Plan
1996-1997
2 39
Project Info
1996-1997
2 40
Project Info
1996-1997
2 41
Project Info
1996-1997
2 42
Rancho Viejo Tract G Correspondence/Consultant
2000-2001
2 43
Rancho Viejo Tract G Correspondence/Owner
2000-2001
2 44
Rancho Viejo Tract G Design Sketches/Product Info
2000
2 45
Rancho Viejo Tract G General Administration Meeting Minutes
2000 January 20
2 46
Rancho Viejo Tract G Notes to File
2000 June 19
2 47
RV Village I Unit 2 Construction Bids/Proposals/Addendum
2000-2001
2 48
RV Village I Unit II Construction Communications
2001
2 49
RV Village I Unit 2 Correspondence/Owner
2000-2001
2 50
RV Village I Unit 2 Field Reports
2001
2 51
RV Village I Unit II Sketches/Product Information
2000-2001
2 52
RV Village I Unit 2 Notes to File
2000-2001
2 53
RV Village I Unit 2 Proposal/Contract Owner
2000-2001
2 54
RV Village II
undated
2 55
Rancho Viejo Village II
2000-2001
2 56
Rancho Viejo Village II
2001 May 29
2 57
Rancho Viejo Village II
2001 July 26
2 58
Rancho Viejo Village II Correspondence Consultant
2001
2 59
Rancho Viejo Village II Meeting Minutes
2001 February 1
2 60
RV Water Plan Correspondence Owner
undated
2 61
Rancho Viejo Windmill Ridge
2001 December 3
2 62
Rancho Viejo Windmill Ridge Model Complex
2001
2 63
Rancho Viejo Windmill Ridge Mode
2001 July 26
2 64
Rancho Viejo Windmill Ridge On Lot Lands
2001
2 65
Rancho Viejo Windmill Ridge Unit 1
2002 April 12
2 66
Rancho Viejo Windmill Ridge Unit 1
undated
2 67
Rancho Viejo Windmill Ridge Unit 1 Walls and Gates
2002
2 68
Rancho Viejo Windmill Ridge Unit II
2001 December 13
2 69
Rancho Viejo Reference/Research Materials
1996
2 70
Rancho Viejo Image Files
2000-2001
2 71
Rancho Viejo New Community #4
1999-2000
2 72
Rancho Viejo New Community #6
1999-2001
2 73
Rancho Viejo New Community #9
1998-2000
2 74
Rancho Viejo New Community #10
1999-2000
2 75
Rancho Viejo New Community #11 Clippings
2000-2001
2 76
Rancho Viejo New Community #13
2000
2 77
Rancho Viejo New Community #15 Engineering
1999
2 78
Rancho Viejo New Community #16 Programming
1998-2000
2 79
Rancho Viejo New Community #17 Product Information
1999
2 80
Rancho Viejo New Community #18
1996-2000
2 81
RV Partnership #3
2000-2002
2 82
RV Partnership #5
2002
2 83
RV Partnership #6
1990-2002
2 84
RV Partnership #7
2001-2002
2 85
RV Partnership #8
2002
2 86
RV Partnership #9
2002 January
2 87
Rancho Viejo Ranch Master Plan
2002 August
2 88
Rancho Viejo Surface Water Management Manual
2003 July
2 89
Rancho Viejo Owner/Landscape Architect
2002 January 18
2 90
Entry Signage
2000
2 91
Front Yard Landscape
1999
2 92
Proposals/Contracts
2001
2 93
Planning and Design for Village Center
2003
3 1
Rancho Viejo the Village at Rancho Viejo de Santa Fe
1997 March 10
3 2
Rancho Viejo Village West Summary Report
2005 Summer
3 3
Ranch Master Plan
2002 August
3 4
Rancho Viejo de Santa Fe Master Plan Report
1988 November
3 5
Rancho Viejo de Santa Fe Master Plan Report
1988 November
3 6
Rancho Viejo de Santa Fe Master Plan Report
1988 November
3 7
Rancho Viejo Reference/Research Materials
1996-1997
3 8
RV Contract Boiler Plate
undated
3 9
Rancho Viejo Design Sketches
2000-2001
3 10
RV College Heights Construction Bids/Proposals/Addendum
2001
3 11
RV College Heights Design Sketches/Product Info
2000
3 12
RV College Heights Engineering Structural
2001
3 13
Rancho Viejo Meeting Minutes
2001 August 21
3 14
Rancho Viejo Misc.
2001 August 22
3 15
Rancho Viejo Misc.
2001 July 30
3 16
Rancho Viejo Misc. Construction Bids/Proposals/Addendum
2000 March 14
3 17
Rancho Viejo Misc. Design Sketches/Product Info
2000-2001
3 18
Rancho Viejo Misc. Owner Landscape Architect
2001
3 19
Rancho Viejo Misc. Proposal/Contracts
2001
3 20
Rancho Viejo Misc. Notes to File
2001
3 21
Rancho Viejo Notes to File
2001 February 25
3 22
Rancho Viejo Physical/Geology/Soils
2001
3 23
Rancho Viejo Retail Correspondence/Agency
2000
3 24
Rancho Viejo Retail Correspondence/Consultant
2000-2001
3 25
Rancho Viejo Retail Correspondence/Owner
2000
3 26
Rancho Viejo Retail Facsimiles
2001
3 27
Rancho Viejo Signage Construction Communications
2000-2001
3 28
RV Signage Cost Estimates
2001
3 29
Rancho Viejo Signage Meeting Minutes
2001
3 30
Site Observation
2001
3 31
Submittals RV Unit II
2000 December 20
3 32
Submitted Version of the 1989 Master Plan Report
1989-1990
3 33
Specifications RV Village I Landscape
1998
3 34
Santa Fe Ordinances Correspondence
1996-1997
3 35
Technical Appendix I Community Charter for La Entrada at Rancho Viejo
2006 June 9
3 36
Transmittals Rancho Viejo
1999
3 37
Turquoise Trail Park Master Plan Report
1990 June
3 38
Village West Correspondence
2005
3 39
Village West Cost Estimates
2005
3 40
Village Center Proposal/Contract
2005
3 41
The Village at Rancho Viejo de Santa Fe Unit 1
1997 October 14
3 42
The Village at Rancho Viejo Unit 2
1998 September 3
3 43
Village West Master Plan Report
2005 December 8
3 44
Village West Master Plan Report Technical Appendix I
2005 December 8
3 45
Village West Master Plan Report Technical Appendix II
2005 December 8
3 46
Windmill Ridge Work Program
2001
3 47
RV Village West
2003
3 48
Windmill Ridge Unit 3
2001-2002
3 49
Proposals for Santa Fe Estates
2002
3 50
Meeting Record
2001
4 1
Village West Master Plan Report Technical Appendix III
2005 December 8
4 2
Village West Public Participation
2005
4 3
Village West Reports
2005
4 4
Village West Research
2005 July
4 5
The Village at Rancho Viejo de Santa Fe
1997 April 1
4 6
The Village at Rancho Viejo Drainage Report
1997 March 5
4 7
Village West Correspondence
2006
4 8
Village West Meeting Minutes
2005
4 9
Village West Schematic Design
undated
4 10
Vision Document for Rancho Viejo
1996 April 22
4 11
Visual Design RV Nike Proposal
1997
4 12
Village Center Preliminary and Final Development Plan Report
2004 June 4
4 13
Village West Master Plan Report
2005 December 8
4 14
Windmill Ridge Model Home Contract Administrator/Field Reports
2001
4 15
Windmill Ridge Construction Bids/Proposals/Addendum
2001
4 16
Windmill Ridge Brochure
2005 August
4 17
Windmill Ridge at Rancho Viejo Unit 2
2001 October 5
4 18
Windmill Ridge at Rancho Viejo Unit III Final Development Plan Report
2003 July 14
4 19
Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report
2002 July 8
4 20
Windmill Ridge Unit IV Cost Estimates
2005
4 21
Work Program Rancho Viejo Village I Final Plat
undated
4 22
Work Program Rancho Viejo Village Master Plan
1996-1998
4 23
Work Program Rancho Viejo Vision Plan
undated
4 24
Windmill Ridge at Rancho Viejo Unit 1 final Development Plan
1999 December 6
4 25
Correspondence
2003
4 26
Final Plat for Village 1
undated
4 27
Meeting Minutes
2000-2001
4 28
Cost Estimates for Turquoise Trail
1997
4 29
Signage- RV
undated
4 30
Turquoise Trail Signage
1997
4 31
Village Unit 1 Cost Estimates
1997
4 32
Adjacent Subdivisions Plans
undated
4 33
RV Nike Proposal and Updates
1997
4 34
Copies of RV Letters and Applications
1997
4 35
RV Plaza Cost
1997
4 36
RV Village Unit 1 Codes
undated
4 37
Preliminary Plat Report for Village Unit 1 and 2
undated
4 38
RV Overall Master Plat Meeting Minutes
1996-1997
4 39
RV Master Plan Context Maps
1996
4 40
Vision Plan Exhibit Originals
1996
4 41
Traffic Analysis
undated
4 42
RV Fire Protection Ordinances
1996
4 43
Budget and Plan
1996
4 44
RV Soils Info
undated
4 45
Fire and Rescue Impact Fees
1997
4 46
Meeting Notes
1996-1997
4 47
Windmill Ridge Master Plan Report Technical Appendix III
1995 September 22
4 48
Windmill Ridge Master Plan Report Technical Appendix IV
2002 March 21
4 49
Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report Appendix I
2002 July 8
4 50
Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report Appendix III
2002 July 8
4 51
Windmill Ridge at Rancho Viejo Unit III Preliminary Development Plan Report
2002 July 8
4 52
Windmill Ridge at Rancho Viejo Unit III Final Development Plan Report Appendix III
2003 July 14
4 53
Windmill Ridge Master Plan Report Technical Appendix II Traffic Impact Study
2002 March 21
TUBES
41 tubes
undated
tube
1
Windmill Ridge House Plans
Physical location: CCA 8 Column 6, Row 3
undated
2
Windmill Ridge Site Analysis
Physical location: CCA 6 Column 2, Row 1
undated
3
Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
4
Phase I/IV Product Types
Physical location: CCA 8 Column 4, Row 3
undated
5
Vision- Land Use, Master Plan
Physical location: CCA 8 Column 5, Row 1
undated
6
Presentation Graphics
Physical location: CCA 8 Column 5, Row 1
undated
7
Master Plan
Physical location: CCA 8 Column 5, Row 1
undated
8
Master Plan
Physical location: CCA 8 Column 5, Row 1
undated
9
Streetscape Studies
Physical location: CCA 8 Column 5, Row 1
undated
10
Land Analysis, Ranch Plan
Physical location: CCA 8 Column 5, Row 1
undated
11
Master Plan Original Mylar's land analysis bases
Physical location: CCA 8 Column 5, Row 1
undated
12
Village I Sketch Studies Land Plan
Physical location: CCA 8 Column 5, Row 1
undated
13
Design and Planning
Physical location: CCA 8 Column 5, Row 1
undated
14
Windmill Ridge Phase I Landscape Construction Documents
Physical location: CCA 8 Column 5, Row 1
undated
15
Phase II and on Original Construction Documents
Physical location: CCA 8 Column 5, Row 1
undated
16
Windmill Ridge Drainage Restoration Plans
Physical location: CCA 8 Column 5, Row 1
undated
17
Village 1
Physical location: CCA 8 Column 5, Row 2
undated
18
Village 1 Original Submittals
Physical location: CCA 8 Column 5, Row 2
undated
19
Village Center
Physical location: CCA 8 Column 5, Row 2
undated
20
Windmill Ridge Site Analysis Plan
Physical location: Barn Box 9
undated
21
Windmill
Physical location: Barn Box 11
undated
22
Windmill Phase 1
Physical location: Barn Box 11
undated
23
Unit 1
Physical location: Barn Box 13
undated
24
Master Plan
Physical location: Barn Box 13
undated
25
On Lot Renderings
Physical location: Barn Box 13
undated
26
Trees Hand Drawn
Physical location: Barn Box 13
undated
27
Windmill Ridge Model Complex
Physical location: Barn Box 13
undated
28
Village 1
Physical location: Barn Box 13
undated
29
Master Plans
Physical location: Barn Box 13
undated
30
Monument
Physical location: Barn Box 13
undated
31
Windmill Ridge Master Plan
Physical location: Barn Box 13
undated
32
Development Programs
Physical location: Barn Box 13
undated
33
Layout Plan for Village
Physical location: Barn Box 14
undated
34
Residential
Physical location: Barn Box 15
undated
35
Process Map, Site Analysis
Physical location: Barn Box 15
undated
36
Schematic Design
Physical location: Barn Box 15
undated
37
Windmill Ridge
Physical location: Barn Box 16
undated
38
Windmill Ridge IV
Physical location: Barn Box 16
undated
39
Signage Turquoise Trail
Physical location: Barn Box 16
undated
40
Unit II and III Master Plan
Physical location: Barn Box 14
undated
41
Unit II Master Plan
Physical location: Barn Box 14
undated

LXXVIII:  LXXVIII: Breckenridge, 1979-2006Return to Top

2 boxes, 86 folders and 27 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1979-2006
Box Folder
1 1
Articles
2001
1 2
Background Information for the Village
1999-2001
1 3
Biological- Vegetation
undated
1 4
Biological- Wildlife
1988
1 5
Biological for the Village
undated
1 6
Breckenridge
1991
1 7
Breckenridge
1995
1 8
Breckenridge Peak
1987
1 9
Breckenridge Properties Development Options
1995
1 10
Breck/Summit Data
1997-1998
1 11
Clippings for Main Street Revitalization
2003-2005
1 12
Comparable Resort Communities
1998
1 13
Contracts River walk Extension
2002
1 14
Correspondence Affordable Housing
2000
1 15
Correspondence Cucumber Creek
1995
1 16
Correspondence Planning
1995
1 17
Correspondence Planning
1997
1 18
Correspondence- Owner
1987-1989
1 19
Correspondence- Sawmill
1995
1 20
Correspondence- Highlands
1998
1 21
Correspondence- Main Street Revitalization
2004
1 22
Correspondence- Ranch
1992
1 23
Correspondence- River Walk Extension
undated
1 24
Correspondence- Village
1996
1 25
Correspondence- Village
2000-2001
1 26
Cost Village- Peak 8
1987-1989
1 27
Cost Estimates- Village
undated
1 28
Cucumber Creek Preliminary Program Plan
1995
1 29
Cucumber Creek Background
1996
1 30
Data Collection Report Main Street Project
2004
1 31
Design Development for Village
2000
1 32
Design- Peak 8
1987-1988
1 33
Design Sketches/Product Info
undated
1 34
Development Program- Retail II
2000
1 35
Engineering- Cucumber Creek
1995
1 36
Engineering- Village
1995
1 37
Engineering- Legal Description
1981-1986
1 38
Financial Proformas
2006
1 39
Gondola Breckenridge Planning
1992-1993
1 40
Gondola at Breckenridge
1996
1 41
Meeting Minutes River Walk Extension
2005
1 42
Highlands Breckenridge
1999-2000
1 43
Historical and Cultural Resources for Main Street
undated
1 44
Master Plans
1988
1 45
Meeting Minutes/Notes to File- Cucumber Creek
1995
1 46
Meeting Minutes/Notes to File- Breckenridge Planning
1997
1 47
Meeting Minutes/Notes- Retail
1997-1998
1 48
Meeting Minutes- Retail II
undated
1 49
Meeting Minutes/Notes to File- Highlands
1998
1 50
Meeting Notes/Minutes- The Lodge
1998
1 51
Meeting Minutes Main Street Revitalization
2002-2005
1 52
Meeting Minutes/Notes to File
1988
1 53
Meeting Minutes/Notes to File- Ranch
1992
1 54
Meeting Minutes/Notes to File- Village
undated
1 55
Notes for Village
2001
1 56
Physical- Retail
undated
1 57
Physical- Village
undated
1 58
Prior Studies
2005
1 59
Programming- Ranch
1992
1 60
Programming- Village
1996
1 61
Proposals/Contracts- Affordable Housing
2000
1 62
Highlands Programming
1999
1 63
Highlands Proposals/Contracts
1999
1 64
Highlands Correspondence
1999-2000
1 65
Highlands Notes
1999
2 1
Proposal/Contracts- Cucumber Creek
1994-1995
2 2
Proposal/Contracts- Peak 8
1987-1988
2 3
Proposal/Contracts- Sawmill Estate
1995
2 4
Proposal/Contracts- Ski
1991-1994
2 5
Proposal/Contracts- Retail
1997
2 6
Proposal/Contracts- Retail II
2000
2 7
Proposal/Contracts- Highlands
1998
2 8
Proposal/Contract- The Lodge
1998
2 9
Proposals/Contracts Main Street Revitalization
2005-2006
2 10
Proposal/Contracts for Planning Properties
1994
2 11
Proposal/Contracts- Ranch
1992
2 12
Proposal/Contracts- River walk Extensions
2006
2 13
Proposal/Contracts for Village 1
2000
2 14
Transmittals- Cucumber Creek
1994-1995
2 15
Transmittals- Village
1996-1997
2 16
Village At Breckenridge
1979-1996
2 17
Visual- Cucumber Creek
undated
2 18
Work Programs- Cucumber Creek
1995
2 19
Work Programs- Village
1996
2 20
Commercial Summary
1995
2 21
Mountain Valley Lodge
undated
TUBES
27 tubes
1979-2006
tube
1
Streetscape
Physical location: CCA 8 Column 6, Row 1
1979-2006; undated
2
GIS Analysis
Physical location: CCA 8 Column 6, Row 2
undated; undated
3
Main street
Physical location: CCA 6 Column 1, Row 3
undated
4
Conceptual Drawings
Physical location: CCA 6 Column 2, Row 8
undated
5
Geological
Physical location: CCA 6 Column 2, Row 8
undated
6
Peak 9
Physical location: CCA 6 Column 2, Row 8
undated
7
Village
Physical location: CCA 8 Column 4, Row 1
undated
8
Village
Physical location: CCA 8 Column 4, Row 1
undated
9
Village
Physical location: CCA 8 Column 4, Row 1
undated
10
Village
Physical location: CCA 8 Column 4, Row 1
undated
11
Schematic
Physical location: CCA 8 Column 4, Row 1
undated
12
Ski Area Peak 8
Physical location: CCA 8 Column 5, Row 1
undated
13
Cucumber Creek
Physical location: CCA 8 Column 4, Row 3
undated
14
Cucumber Creek
Physical location: CCA 8 Column 5, Row 3
undated
15
Planning
Physical location: CCA 8 Column 5, Row 3
undated
16
Villages
Physical location: Barn Box 6
undated
17
Villages
Physical location: Barn Box 6
undated
18
Villages
Physical location: Barn Box 6
undated
19
Village Riverwalk
Physical location: Barn Box 10
undated
20
Cucumber Creek
Physical location: Barn Box 12
undated
21
Peak 8
Physical location: Barn Box 12
undated
22
Cucumber Creek
Physical location: Barn box 12
undated
23
Cucumber Creek
Physical location: Barn Box 12
undated
24
GIS Analysis
Physical location: Barn Box 12
undated
25
Cucumber Creek
Physical location: Barn Box 13
undated
26
Cucumber Creek
Physical location: Barn Box 13
undated
27
Village Riverwalk
Physical location: Barn Box 15
undated

LXXIX:  LXXIX: Park Avenue, 1972-2002Return to Top

3 boxes, 107 folders and 38 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1972-2002
Box Folder
1 1
Annual Organizational Meeting - Richard Shaw
1978-1980
1 2
Cecil's Market Building Setbacks
2001
1 3
Cecil's Market Invoices
2001-2002
1 4
Cecil's Market and Hotels in Park Avenue
1995-2001
1 5
Design Management File - Richard Shaw
1972-1980
1 6
Development Process File - Richard Shaw
1975-1979
1 7
Office Organizational Meeting
1981 November 30
1 8
Park Avenue 17 Acre Architectural
1997-2000
1 9
Park Avenue 17 Acre Correspondence
1998-2000
1 10
Park Avenue 17 Acre Cost Estimates
1996-1998
1 11
Park Avenue 17 Acre Design Sketches
1998-2000
1 12
Park Avenue 17 Acre Engineering Gondola
1999-2000
1 13
Park Avenue 17 Acre Engineering, Civil
1996-2000
1 14
Park Avenue 17 Acre Engineering, Transportation
1994-1999
1 15
Park Avenue 17 Acre Land Coverage
1988-1996
1 16
Park Avenue 17 Acre Meeting Minutes/ Notes
1998-2000
1 17
Park Avenue 17 Acre Program Numbers
1999 December 13
1 18
Park Avenue 17 Acre Proposal/Contracts
1998
1 19
Park Avenue 17 Acre Proposed Amendment, Building Height
1994 March 14
1 20
Park Avenue Architecture
1996
1 21
Park Avenue Budget Summary
1993-1994
1 22
Park Avenue Correspondence
1994-1996
1 23
Park Avenue Density Calculations
1995-1996
1 24
Park Avenue Drainage Report
1993-1996
1 25
Park Avenue Executive Summary
1993-1994
1 26
Park Avenue Landscape Materials - Design Standards, Guidelines and Check List
1995
1 27
Park Avenue Parking Info
1996
1 28
Park Avenue Programming
1995-1996
1 29
Park Avenue Proposition
1992
1 30
Park Avenue Public Art
1995-1996
1 31
Park Avenue Redevelopment Civil Engineering
1996
1 32
Park Avenue Redevelopment Community Plans/Design Guide
undated
1 33
Park Avenue Redevelopment Contact List
undated
1 34
Park Avenue Redevelopment Contract Drafts
1992-1993
1 35
Park Avenue Redevelopment Correspondence Part 1
1992-1996
1 36
Park Avenue Redevelopment Correspondence Part 2
1992-1996
1 37
Park Avenue Redevelopment Correspondence
1993-1996
2 1
Park Avenue Redevelopment Cost Estimate
1991-1996
2 2
Park Avenue Redevelopment Design Sketches/Product Info
1994-1996
2 3
Park Avenue Redevelopment Engineering Gondola
1994-1999
2 4
Park Avenue Redevelopment Engineering Transportation
1989-1996
2 5
Park Avenue Redevelopment Environmental Analysis Req. B
1993-1996
2 6
Park Avenue Redevelopment Plan Executive Summary
1994 August 8
2 7
Park Avenue Redevelopment Existing Regulations/TRPA Code
1989-1993
2 8
Park Avenue Redevelopment Lighting Issues
1994-1996
2 9
Park Avenue Redevelopment Population Project
1995 May
2 10
Park Avenue Redevelopment Programming
1992-1997
2 11
Park Avenue Redevelopment Prop. Amend. Building Hgt.
1993
2 12
Park Avenue Redevelopment Proposal/Interview
undated
2 13
Park Avenue Redevelopment Proposed Amend. Excav
1993
2 14
Park Avenue Redevelopment Regulatory Issues
1993-1994
2 15
Park Avenue Redevelopment Subconsultants
1992-1996
2 16
Park Avenue Redevelopment Work Program
1994-1995
2 17
Park Avenue Simulations
1994-1995
2 18
Park Avenue Stateline Ski Area Summary of Impact
1989 May 2
2 19
Park Avenue Transit Approvals
2002
2 20
Parking Garage
2002 January 3
2 21
Project Cost File- Richard Shaw
1979-1980
2 22
Proposals- Richard Shaw
1979-1981
2 23
Proposals/Contracts
2001 May
2 24
Reading Material in Relation to Park Avenue
1992
2 25
Visual Simulations
1994-1995
2 26
Park Avenue Redevelopment Meeting Minutes/Notes to File
1992-1993
2 27
Park Avenue Redevelopment Meeting Minutes/Notes to File
1994-1995
2 28
Park Avenue Redevelopment Meeting Minutes/Notes to File
1996-1997
2 29
Park Avenue Team Memos
1994-1995
2 30
Park Avenue Redevelopment To Do Lists
1996
2 31
Park Avenue Redevelopment Physical
1992-1995
2 32
Park Avenue Redevelopment Solar Analysis
1992-1995
2 33
Park Avenue Redevelopment Visual Simulations
1995
2 34
Park Avenue Redevelopment Visual
1986-1991
2 35
Park Avenue Redevelopment Visual
1993-1994
3 1
Park Avenue Redevelopment Visual
1995-1997
3 2
Park Avenue Redevelopment Soils
1992-1993
3 3
Park Avenue Redevelopment Soils
1994-1996
3 4
Park Avenue Regional Plan Scenic Quality
1994-1995
3 5
Park Avenue Cost Estimates
1995-1996
3 6
Park Avenue Transportation
1994-1996
3 7
Park Avenue Architecture
1994-1996
3 8
Park Avenue Architecture
1996-1997
3 9
Park Avenue PUD's
1994
3 10
Park Avenue Drainage Plan
1994-1995
3 11
Park Avenue Signage
1995-1996
3 12
Park Avenue Utility
1996
3 13
Park Avenue Design Guidelines
1996
3 14
Park Avenue Earthwork Calculations
1995
3 15
Park Avenue Redevelopment Floor Area Calculations
1996
3 16
Park Avenue Redevelopment Schematic Alternative
1993
3 17
Park Avenue Redevelopment Executive Summary
1993
3 18
Park Avenue Redevelopment Executive Summary
1994-1996
3 19
Park Avenue Project Program
1979-1995
3 20
Manual of Professional Practice
1982-1996
3 21
Manual of Professional Practice
1982-1996
3 22
Manual of Professional Practice
1982-1996
3 23
Manual of Professional Practice
1982-1996
3 24
Plan Criteria
1993-1994
3 25
Executive Summary
1993
3 26
Executive Summary
1996
3 27
Proposed Amendment to Ch. 22
1994
3 28
Lake Tahoe Correspondence
1992
3 29
Park Ave Contracts
1994
3 30
Correspondence
1993-1994
3 31
Meeting Minutes
1992-1994
3 32
Park Ave Programming
1994
3 33
Park Ave Billing
1994
3 34
Park Ave Existing Regs/TRPA Code
1994
3 35
Misc.
1993-1994
TUBES
38 tubes
1972-2002
tube
1
Project Approved Package
Physical location: CCA 8 Column 6, Row 1
undated
2
GMP Sets
Physical location: CCA 8 Column 6, Row 1
undated
3
Original Sketches
Physical location: CCA 8 Column 6, Row 1
undated
4
Redevelopment Project 3
Physical location: CCA 8 Column 6, Row 1
undated
5
Prints/Mylar's
Physical location: CCA 8 Column 6, Row 1
undated
6
Trace Studies
Physical location: CCA 8 Column 6, Row 1
undated
7
Approval Set with Revised Sheets
Physical location: CCA 8 Column 6, Row 1
undated
8
Prints/Mylar's
Physical location: CCA 8 Column 6, Row 1
undated
9
Grading Plans, Groundwater
Physical location: CCA 8 Column 6, Row 1
undated
10
CD Set
Physical location: CCA 8 Column 6, Row 1
undated
11
Illustrative plan, park avenue development plan, construction document, half size
Physical location: CCA 8 Column 6, Row 1
undated
12
100% DD Set; Turning Radius Analysis; Approvals Set; Snowmelt Plan
Physical location: CCA 8 Column 6, Row 1
2002-2003; undated
13
Grading, Site Plan, Alternatives, Road Plans
Physical location: CCA 8 Column 6, Row 2
undated
14
Phase 1
Physical location: CCA 6 Column 1, Row 1
undated
15
Redevelopment Project 3
Physical location: CCA 8 Column 5, Row 3
undated
16
Proposed Land Coverage Plan
Physical location: CCA 6 Column 2, Row 3
undated
17
Original Approved Set
Physical location: Barn Box 5
undated
18
Ground Summit Arch
Physical location: CCA 8 Column 4, Row 2
undated
19
Process to Approval Set
Physical location: CCA 8 Column 4, Row 3
undated
20
Mylar's, Illustrative, Grading, Schedule
Physical location: CCA 8 Column 5, Row 2
undated
21
Streetscape
Physical location: CCA 8 Column 5, Row 2
undated
22
Prints/Mylar's
Physical location: CCA 8 Column 5, Row 2
undated
23
Site Info Mylar's
Physical location: CCA 8 Column 5, Row 2
undated
24
Approval Set
Physical location: Barn Box 9
undated
25
Construction Documents
Physical location: Barn Box 9
undated
26
Streetscape
Physical location: Barn Box 9
undated
27
Redevelopment Project 3
Physical location: Barn Box 10
undated
28
Construction Documents
Physical location: Barn Box 10
undated
29
Construction Documents
Physical location: Barn Box 10
undated
30
Trace Studies
Physical location: Barn Box 13
undated
31
Signage
Physical location: Barn Box 16
undated
32
Analysis and Visual Studies
Physical location: Barn Box 16
undated
33
Base Maps
Physical location: Barn Box 16
undated
34
Analysis Mylar's
Physical location: Barn Box 16
undated
35
Site Process
Physical location: Barn Box 16
undated
36
Environmental Assessment
Physical location: Barn Box 16
undated
37
Old Mylar's
Physical location: Barn Box 13
undated
38
Monograph
Physical location: Barn Box 14
undated

LXXX:  LXXX: Winter Park, 1989-2000Return to Top

2 boxes, 114 folders and 10 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1989-2000
Box Folder
1 1
Architectural and Development Standards
undated
1 2
Biological
1989
1 3
Biological
1992-1994
1 4
Biological FDP
1997
1 5
Clippings
1992
1 6
Clippings for the Town
1992
1 7
Clippings
1994
1 8
Clippings FDP
1998
1 9
Clippings
1990
1 10
Condominium and Retail Markets
1994
1 11
Conference Facility
1996
1 12
Contracts/Proposal Miscellaneous
1995
1 13
Correspondence
1989-1990
1 14
Correspondence
1996
1 15
Correspondence
1993
1 16
Correspondence
1993-1994
1 17
Correspondence
1997-1998
1 18
Correspondence FDP
1994-1998
1 19
Correspondence Miscellaneous
1995-1997
1 20
Correspondence
1992
1 21
Correspondence - City Land Site Planning
1996
1 22
Correspondence Site Plan
1998
1 23
Correspondence Circulation
1998-1999
1 24
Correspondence Park Buildings
1997-1999
1 25
Correspondence Parking Structure
1994-1995
1 26
Correspondence Village Subdivision
1997
1 27
Correspondence Urban Design
1997
1 28
Cost Estimates
1990
1 29
Cost Estimates
1991
1 30
Cost Estimates
1993-1994
1 31
Cost Estimates- Miscellaneous
1993-1995
1 32
Cost Estimates Town of Winter Park
1992-1993
1 33
Cost Estimates Landscape Architect
1998
1 34
Cost Estimates Hines Miscellaneous
1997
1 35
Design Guidelines
1994
1 36
Design Regulations and Guidelines
1997
1 37
Design Sketches Due Diligence
undated
1 38
Design Sketches Due Diligence
1994
1 39
Design Sketches Landscape Architect
1997-1999
1 40
Documentation/Design Guidelines
1990
1 41
Economic
1990
1 42
Economic Impact to Ski Operations
1994
1 43
Economic Model
1994
1 44
Engineering
1993-1994
1 45
Engineering Parking Study
1996
1 46
Engineering Village Subdivision
1997
1 47
Engineering/Civil
1989-1990
1 48
Executive Summary and Village Site Development Studies
1997
1 49
FDP Application
1997
1 50
Geology/Soils
1990
1 51
Illustrations
1998
1 52
Illustrative
1999
1 53
Marketing Studies
1993
1 54
Marketing/Presentations
1997
1 55
Market Study
1992
1 56
Master Plan
1999
1 57
Meeting Agendas, Notes, Minutes
1989-1990
1 58
Meeting Minutes/Notes to File
1991
1 59
Meeting Minutes/Notes to File
1993-1995
1 60
Meeting Minutes/Notes to File
1993
2 1
Meeting Minutes Ice Rink
1996
2 2
Meeting Minutes/Notes to File FDP
1994-1997
2 3
Meeting Minutes/Notes to File
1992
2 4
Meeting Minutes/Notes to File Landscape Architect
1997-1998
2 5
Meeting Minutes/Notes to File Mapping
1991
2 6
Meeting Minutes/Notes to File Parking Structure
1993-1994
2 7
Meeting Minutes/Notes to File Parking Study
1997-1998
2 8
Meeting Minutes/Notes Planning
1999
2 9
Meeting Minutes/Notes to File Urban Design
1997
2 10
Meeting Minutes/Notes to File- Village
1996
2 11
Meeting Minutes
1992
2 12
Physical
1990
2 13
Physical
1994
2 14
Physical
1992
2 15
Preliminary Development Plan Submission
1990
2 16
Programming
1991
2 17
Programming
1994
2 18
Programming Landscape Architecture
1997-1999
2 19
Programming FDP
1998
2 20
Programming Hines Miscellaneous
1997
2 21
Programming Rec. Association
1993-1994
2 22
Programming Rec. Association
1994
2 23
Programming Parking Study
1998
2 24
Programming Urban Design
1997
2 25
Programming/Land Use
1990
2 26
Programming/Recreational
1990
2 27
Proposal/Contracts
1989
2 28
Proposal/Contracts
1991
2 29
Proposal/Contracts
1992
2 30
Proposal/Contracts
1993-1994
2 31
Proposal/Contracts
1997
2 32
Proposal and Contracts FDP
1997-1998
2 33
Proposal/Contracts Mapping
1991
2 34
Proposal/Contracts Meeting
1992
2 35
Proposal/Contracts
1992
2 36
Proposal/Contracts Parking Study
1996
2 37
Proposal/Contracts Village Subdivision
1997
2 38
Proposal/Contracts Urban Design
1997
2 39
Proposal/Qualifications
1989
2 40
Proposal/Qualifications - Consultants
1989
2 41
Replacement Parking Plan for the Village
undated
2 42
Resort Operations Planning Study
1999
2 43
Streetscape Scenario Design
undated
2 44
Technical Appendix
1998
2 45
Village for Winter Park
1997
2 46
Winter Park Resort
1997-1998
2 47
Work Program Master Plan
1990
2 48
Zephyr Mountain Lodge Hydrology
2000
2 49
Correspondence
1988-1994
2 50
Master Plan
1992-1993
2 51
Regulations and Design Guidelines
undated
2 52
Notes to File
1991-1992
2 53
Sunrise Ski Report
1989
2 54
Proposals
1992-1995
TUBES
10 tubes
1997
tube
1
Various
Physical location: CCA 6 Column 2, Row 1
undated
2
Conceptual Master Plan
Physical location: CCA 6 Column 1, Row 2
undated
3
Marketing Presentation Materials
Physical location: CCA 6 Column 2, Row 3
undated
4
Illustrative Plan
Physical location:CCA 6 Column 2, Row 6
1997; undated
5
Interview
Physical location: Barn Box 5
undated
6
Mylar Base Grading
Physical location: Barn Box 5
undated
7
Village Structural
Physical location: CCA 6 Column 1, Row 5
undated
8
Park Zoning Maps
Physical location: CCA 8 Column 5, Row 2
undated
9
Renderings Original
Physical location: Barn Box 16
1997 June; undated
10
Conceptual Master Plan
Physical location: Barn Box 16
undated

LXXXI:  LXXXI: I-70/I-25 Interchange (Colorado), 1975-2006Return to Top

2 boxes, 72 folders and 12 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1975-2006
Box Folder
1 1
I-25 Phase 2 Correspondence
2006
1 2
I-25 Phase 2 Meeting Minutes/Notes to File
1996
1 3
I-25 Phase 2 Work Program
1996
1 4
I-25 Phase 2 Marketing/Presentations
1995-1999
1 5
I-25 Phase 2 Engineering
1995
1 6
I-25 Visual Analysis Proposals/Contracts
1995
1 7
I-25 Visual Analysis Meeting Notes
1998
1 8
I-25 Visual Analysis Billing/Invoices
1998
1 9
I-25 Incorporation/Annexation
1975-1997
1 10
I-25 Visual Analysis Work Program
1995
1 11
I-25 Visual Analysis Demographics
1994-1995
1 12
I-25 Visual Analysis Biological
1994-1995
1 13
I-25 Visual Analysis Engineering
1993-1994
1 14
I-25 Visual Analysis Marketing/Presentations
1993-1995
1 15
I-25 Broadway Streetscapes Proposals/Contracts
2004
1 16
I-25 Broadway Streetscapes Meeting Agendas & Minutes
2001-2003
1 17
I-25 Broadway Streetscapes Meeting Agendas & Minutes
2004-2006
1 18
I-25 Broadway Streetscapes Meeting Agendas & Minutes
2006
1 19
I-25 Broadway Streetscape Correspondence
2001-2003
1 20
I-25 Broadway Streetscape Correspondence
2003
1 21
I-25 Broadway Streetscape Correspondence
2004
1 22
I-25 Broadway Streetscape Correspondence
2004-2006
1 23
I-25 Broadway Streetscape Conceptual Design
undated
1 24
I-25 Broadway Streetscape Schematic Design
2003
1 25
I-25 Broadway Streetscape Survey
2003
1 26
I-25 Broadway Environmental Impact Statement (EIS)
2003 September
1 27
I-25 Broadway Environmental Impact Statement (EIS)
2003 September
1 28
I-25 Broadway Environmental Impact Statement (EIS)
2006
1 29
I-25 Broadway EIS Cost Estimates
2003
1 30
I-25 Broadway EIS Aesthetics and Urban Design Report Draft
2004 March 4
1 31
I-25 Broadway EIS Scope of Work
1998 November
1 32
I-25 Broadway EIS Correspondence
1998-2000
1 33
I-25 Broadway EIS Correspondence
2003
1 34
I-25 Broadway EIS Viaduct
2001-2004
1 35
I-25 Broadway EIS Meeting Minutes
1998-2000
1 36
I-25 Broadway EIS Meeting Minutes
2001-2002
1 37
I-25 Broadway EIS Meeting Minutes
2003-2004
1 38
I-25 Broadway EIS Design Sketches
1999-2000
1 39
I-25 Broadway EIS Viaduct Reconstruction
2001
1 40
I-25 Broadway EIS Summary of Public Meeting
2003 September 15
1 41
I-25 Broadway EIS Meeting Handouts
2004
1 42
I-25 Phase 2 Management & Facilities
1996
1 43
I-25 Corridor Preservation Model
1986
1 44
Mousetrap Proposals/Contracts
1989-1990
1 45
Mousetrap Meeting Minutes/Notes to File
1989-1990
1 46
Mousetrap Work Program
1990
1 47
Mousetrap Correspondence
1989-1990
1 48
I-70/I-225 Meeting Minutes/Notes to File
1988
1 49
I-70/I-225 Phase 2 Proposals/Contracts
1993-1997
1 50
I-70/I-225 Phase 2 Meeting Minutes/Notes to File
1994
1 51
I-70/I-225 Phase III Work Program
1993
2 1
I-70/I-225 Interchange Correspondence
1990-1995
2 2
I-70/I-225 Interchange Work Program
1987
2 3
I-70/I-225 Interchange Landscape Plan
1988
2 4
I-70/I-225 Design Guidelines Proposals/Contracts
1990-1991
2 5
I-70/I-225 Design Guidelines Correspondence
1990-1991
2 6
I-70/I-225 Design Guidelines Meeting Minutes/Notes to File
1990-1991
2 7
I-70/I-225 Design Guidelines Work Program
1989
2 8
I-70/I-225 Landscape Proposals/Contracts
1997
2 9
I-70/I-225 Landscape Correspondence
1997
2 10
I-70/I-225 Landscape Meeting Minutes/Notes to File
1997
2 11
E-470/I-70 Correspondence
2003-2004
2 12
E-470/I-70 Correspondence
undated
2 13
E-470/I-70 Market Research/Analysis
2002
2 14
E-470/I-70 Market Research/Analysis
2003
2 15
E-470/I-70 Education
2005
2 16
E-470/I-70 Meeting Minutes
2003-2004
2 17
E-470/I-70 Nolte Correspondence
2003-2004
2 18
E-470/I-70 FDP Submittal
2004
2 19
E-470/I-70 Design Guidelines
2004 March
2 20
E-470/I-70 Market Study
2003 November
2 21
E-470/I-70 COA Correspondence
2004-2005
TUBES
12 tubes
tube
1
EIS
Physical location: CCA 6 Column 1, Row 2
undated
2
Aerial Conservation Corridor
Physical location: Barn Box 1
undated
3
Conservation Corridor
Physical location: Barn Box 2
undated
4
Buckley
Physical location: CCA 8 Column 4, Row 2
undated
5
Topography
Physical location: CCA 6 Column 1, Row 4
undated
6
Interchange
Physical location: CCA 8 Column 4, Row 3
undated
7
Broadway
Physical location: CCA 8 Column 5, Row 1
undated
8
Sound wall Large Drawings
Physical location: Barn Box 10
undated
9
Broadway Viaduct Replacement
Physical location: Barn Box 11
undated
10
Seeding and Sleeving Plans
Physical location: Barn Box 14
undated
11
Sound Wall
Physical location: Barn Box 14
undated
12
Alameda
Physical location: Barn Box 14
undated

LXXXII:  LXXXII: Four Seasons, Jackson Hole, 1997-2003Return to Top

1 box, 34 folders and 13 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1997-2003
Box Folder
1 1
Proposals/Contracts
2000
1 2
Proposals/Contracts
2000
1 3
Proposals/Contracts
2001
1 4
Proposals/Contracts
2001
1 5
Proposals/Contracts
2002-2003
1 6
Correspondence
1997-1999
1 7
Correspondence
2000
1 8
Correspondence
2000
1 9
Correspondence
2000
1 10
Correspondence
2000
1 11
Correspondence
2000
1 12
Correspondence
2000
1 13
Correspondence
2000
1 14
Correspondence
2001
1 15
Correspondence
2001
1 16
Correspondence
2001
1 17
Correspondence
2001
1 18
Correspondence
2001
1 19
Correspondence
2001
1 20
Correspondence
2002
1 21
Correspondence
2002
1 22
Correspondence
2003
1 23
Design Sketches
2000-2001
1 24
Meeting Minutes/Notes to File
2000
1 25
Meeting Minutes/Notes to File
2000
1 26
Meeting Minutes/Notes to File
2001-2002
1 27
Work Program
2000
1 28
Design Guidelines
2001
1 29
Plant Material Imagery
2000
1 30
Sketch Plan Application
2000
1 31
Final Development Plan Supplement
2001
1 32
Final Development Plan Application
2001
1 33
Amendment Application
2001
1 34
Discovery Center Proposals/Contracts
2003
TUBES
13 tubes
tube
1
Four Seasons
Physical location: CCA 8 Column 6, Row 1
undated
2
Grading, Maintenance Facility, 40% Design Development, Construction Documents
Physical location: CCA 6 Column 2, Row 5
undated
3
Arcade Diagram
Physical location: CCA 6 Column 2, Row 5
undated
4
Resort Hotel
Physical location: CCA 6 Column 2, Row 5
undated
5
Master Plan Details
Physical location: CCA 6 Column 2, Row 5
undated
6
Large Scale Sketch Plans Submissions
Physical location: CCA 6 Column 2, Row 6
undated
7
Grading Plan
Physical location: CCA 6 Column 2, Row 5
undated
8
Sketch Plan
Physical location: CCA 6 Column 2, Row 9
2001; undated
9
Sketch Plans and Progress Prints
Physical location: CCA 6 Column 2, Row 8
undated
10
Renderings
Physical location: CCA 6 Column 2, Row 9
undated
11
GMP
Physical location: CCA 6 Column 2, Row 9
undated
12
Progress Prints
Physical location: CCA 6 Column 2, Row 8
undated
13
Build out Renderings
Physical location: CCA 6 Column 2, Row 9
undated

LXXXIII:  LXXXIII: Aspen (ADEPP), 1980-2001Return to Top

2 boxes, 67 folders and 28 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1980-2001
Box Folder
1 1
Highlands Proposals/Contracts
1992-1993
1 2
Highlands Correspondence
1991-1993
1 3
Highlands Correspondence
1994
1 4
Highlands Meeting Minutes
1993
1 5
Highlands Reports
1980
1 6
Highlands Physical
1993
1 7
Highland Engineering
1992-1995
1 8
Aspen Highland Programming
1995
1 9
Highlands Cost Estimates
1993
1 10
Highlands Design Sketches/Product Info.
1993-1994
1 11
Highlands AF-Ski Master Plan
1993
1 12
Highlands Employee Housing
undated
1 13
Highlands Environmental Assessment
1994
1 14
Highlands General Submission Report Volume 1
1993 June
1 15
Highlands General Sumbission Report Volume 2
1993 June
1 16
Highlands General Submission Report Appendix
1993 June
1 17
Highlands General Submission Report Appendix
1993 June
1 18
Aspen Club Proposals/Contracts
1996-1997
1 19
Aspen Club Correspondence
1996
1 20
Aspen Club Correspondence
1997
1 21
Aspen Club Meeting Minutes
1996-1997
1 22
Aspen Club Work Program
1997
1 23
Aspen Club Physical
1996-1997
1 24
Aspen Club Visual
1997
1 25
Aspen Club Engineering
1996-1997
1 26
Aspen Club Programming
1997
1 27
Aspen Club Cost Estimates
1996-1997
1 28
Aspen Club Design Sketches/Product Info
1996-1997
1 29
Aspen Club Construction Bids/Proposals
1997
1 30
Aspen Club Remodel Report
1997 May 20
1 31
Aspen Club Remodel Phase 1 Specifications
1997 May 5
1 32
Aspen Club Entry Improvements Plan
1994 June 29
1 33
Downtown Enhancement Proposals/Contracts
1996-1999
1 34
Downtown Enhancement Proposal
1996 October 23
1 35
Downtown Enhancement Correspondence/Transmittals
1997-1999
1 36
Downtown Enhancement Construction Documents
1999
1 37
Downtown Enhancement Meeting Minutes
1997
1 38
Mountain Ski Area Drawings
undated
1 39
Mountain Ski Area Master Plan
1985
2 1
Downtown Enhancement Submittals/Shop Drawings
1998-1999
2 2
Downtown Enhancement Engineering
1997
2 3
Downtown Enhancement User Survey
1997
2 4
Downtown Enhancement User Survey
1997
2 5
Downtown Enhancement Programming
1996
2 6
Downtown Enhancement Concept Plans
1997
2 7
Downtown Enhancement Cost Estimates
1997-1999
2 8
Downtown Enhancement Market Analysis
1995
2 9
Downtown Enhancement Meeting Notes
1999
2 10
Downtown Enhancement Public Process
1999
2 11
Downtown Enhancement Technical
1998-1999
2 12
Downtown Enhancement Slope of Work
1999
2 13
Downtown Enhancement Worksession
1997
2 14
Downtown Enhancement Worksession
1998-1999
2 15
Downtown Enhancement Background Information
1998
2 16
Downtown Enhancement Project Management
1998
2 17
Downtown Enhancement Design Phase
1998
2 18
Downtown Enhancement Phase Three Summary
1998
2 19
Downtown Enhancement Phase 3
1998-2001
2 20
Field Reports
1999-2000
2 21
Aspen Post Office
undated
2 22
Downtown Enhancement Mall
1998
2 23
Downtown Enhancement Inventory and Analysis/Working Paper
1997
2 24
CCASLA Award Submittal
1999
2 25
Aspen Institute
1978
2 26
Aspen Meadows- Proposals/Contracts
1992
2 27
Aspen Grove
1985
2 28
Aspen Inn Architectural Drawings
undated
TUBES
28 tubes
tube
1
Sketches Phase II and III
Physical location: CCA 6 Column 1, Row 7
undated
2
Pedestrian Malls
Physical location: CCA 6 Column 1, Row 7
undated
3
Site Furnishings
Physical location: CCA 6 Column 1, Row 7
undated
4
Phase II Plans
Physical location: CCA 6 Column 1, Row 7
undated
5
Maps Aerials Photos
Physical location: CCA 6 Column 1, Row 7
undated
6
Surveys, grading, utility plans
Physical location: CCA 6 Column 1, Row 7
undated
7
Handicap Parking Info
Physical location: CCA 6 Column 1, Row 7
undated
8
Circulation Diagram, Plan rendering, perspectives proposed streetscape
Physical location: CCA 6 Column 1, Row 7
undated
9
Phase III Plans Parking Special Events Schedule
Physical location: CCA 6 Column 1, Row 7
undated
10
Schematic
Physical location: CCA 6 Column 1, Row 7
undated
11
Aspen Mall Architectural Drawings
Physical location: CCA 6 Column 1, Row 7
undated
12
Phase II Rendered Plans and Originals
Physical location: CCA 6 Column 1, Row 7
undated
13
Aspen Club Topography
Physical location: CCA8 Column 6, Row 3
undated
14
Schematic/Site Analysis
Physical location: CCA 6 Column 1, Row 9
undated
15
Site Analysis
Physical location: CCA 8 Column 6, Row 1
undated
16
Master Plan
Physical location: CCA 8 Column 6, Row 1
undated
17
Phase 3
Physical location: CCA 8 Column 6, Row 1
undated
18
Commons Drawings
Physical location: Barn Box 1
undated
19
Aspen Highlands
Physical location: CCA 8 Column 4, Row 1
undated
20
Village
Physical location: CCA 8 Column 4, Row 2
undated
21
Highlands
Physical location: CCA 8 Column 4, Row 2
undated
22
Club Slicks and Mylar's
Physical location: CCA 8 Column 4, Row 2
undated
23
Highlands Detailed Plans
Physical location: CCA 8 Column 4, Row 2
undated
24
Highlands Mapping and Plans
Physical location: CCA 8 Column 4, Row 2
undated
25
Aspen Quickmart
Physical location: CCA 8 Column 4, Row 2
undated
26
Landscape Layout
Physical location: CCA 8 Column 5, Row 3
undated
27
Highlands
Physical location: CCA 8 Column 5, Row 2
undated
28
Land Use Summary
Physical location: Barn Box 6
undated

LXXXIV:  LXXXIV: Jackson Hole Ski Corporation, 1994-1998Return to Top

2 boxes, 82 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1994-1998
Box Folder
1 1
Kids Ranch Proposals/Contracts
1997
1 2
Kids Ranch Sketches
undated
1 3
Kids Ranch Sketches/Others
undated
1 4
Hay Meadow CUP Final Development Plan
2002
1 5
Hay Meadow CUP Proposals/Contracts
2002
1 6
Commons Area Proposals/Contracts
1997
1 7
Business Plan Program
1999
1 8
Business Plan Meeting Minutes
1999
1 9
Business Plan Design
undated
1 10
Business Plan Revenue Estimates
1997-1998
1 11
Business Plan Correspondence
1996-1998
1 12
JHMR Parking Correspondence
2001-2002
1 13
JHMR Bowman Road
2003
1 14
JHMR Proposal Review
2003
1 15
JHMR Seed Mix
1998
1 16
JHMR Parking Structures Cost Estimates
2001
1 17
Pumphouse- Minor Development Plan Submission
1998
1 18
JHMR Teton Village Map
undated
1 19
Pumphouse Transmittals
1998
1 20
Pumphouse Proposals/Contracts
1998
1 21
Bridger Area Design Development
undated
1 22
Mall Pond Correspondence
1997-1998
1 23
Mall Pond Proposals/Contracts
1997
1 24
Mall Pond Sketch Plan Submission
1998
1 25
Mall Pond Design Sketches
undated
1 26
Mall Pond Meeting Notes
1998
1 27
Maintenance Facility Submission Design Sketches
undated
1 28
Maintenance and Skier Plaza
1996-1997
1 29
JHMR Wall Finishes Approvals
2003
1 30
JHMR Site Detail
2001
1 31
JHMR Product Info
undated
1 32
JHMR Notes
2000-2001
1 33
JHMR Meeting Minutes
2001
1 34
JHMR Maintenance Facility Sketch Plan Application
2001
1 35
Correspondence
2000
1 36
Proposals/Contract
2000-2001
1 37
Rock Spring Hut
undated
1 38
Rock Spring Yurt Final Development Plan
2002
1 39
Village Height Proposal
2000
1 40
Newsletter Illustrative Plan
1998
1 41
Newsletter Correspondence
1998-2001
1 42
Land Exchange
1997-1998
1 43
Gondola Details
1997
1 44
Gondola Meeting Minutes
1997
1 45
Gondola Transmittals
1997
1 46
Gondola Correspondence
1997
1 47
Kids Ranch Final Development
1997-1998
1 48
Business Plan Market Report
1997
1 49
Ski Corporation Proposals/Contracts
1997
1 50
Ski Corporation Development Opportunities
1997
1 51
Parking Study Programming
1994
1 52
Michael Drive Design Sketches/Product Information
1997
1 53
Base Area Master Plan Proposals/Contracts
1994-1997
1 54
Base Area Master Plan Correspondence
1994-1996
1 55
Base Area Work Program
1994-1995
1 56
Base Area Meeting Minutes
1994-1995
1 57
Base Area Engineering
1996
1 58
Base Area Programming
1996-1997
1 59
Base Area Design Sketches/Product Information
1996
1 60
Base Area Plan Reductions
1995
1 61
Base Area Master Plan
1996 March 1
1 62
Ski Corporation Business Plan Proposals/Contracts
1997
1 63
Ski Corporation Business Plan Meeting Minutes/Notes
1997
1 64
Ski Corporation Business Plan Real Estate Data
1997
1 65
Ski Corporation Business Plan Cost Data
1997
1 66
Ski Corporation Business Plan Client Comments
1997
1 67
Ski Corporation Business Plan Proforma
1997
1 68
Gondola/Skier Services Final Development Plan
1996
2 1
Gondola/Skier Services Correspondence
1996
2 2
Gondola/Skier Meeting Notes
1996
2 3
Gondola/Skier Drawing/Sketches
undated
2 4
Cody House Proposals/Contracts
1997
2 5
Cody House Correspondence
1997
2 6
Cody House Correspondence
1998
2 7
Cody House Correspondence
1998
2 8
Cody House Meeting Minutes
1997-1998
2 9
Cody House Work Program
1998
2 10
Cody House Geological/Soils
1997
2 11
Cody House Sketches
1997
2 12
Cody House Details
1997
2 13
Cody House Final Plan/County
1998
2 14
Cody House Sketch Plan Submission
1998
TUBES
4 tubes
tube
1
Teton Club, conceptual
Physical location: CCA 8 Column 6, Row 1
undated
2
Teton Club
Physical location: CCA 6 Column 2, Row 9
undated
3
Cody House
Physical location: CCA 8 Column 4, Row 2
undated
4
Mall Pond
Physical location: CCA 8 Column 4, Row 2
undated

LXXXV:  LXXXV: Canyon Forest Village, 1992-2000Return to Top

1 box, 51 folders and 4 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1992-2000
Box Folder
1 1
Canyon Forest Village Proposals/Contracts
1992-1999
1 2
Canyon Forest Village Proposals/Contracts Sub-consultants
1994
1 3
Canyon Forest Village Correspondence
1992-1996
1 4
Canyon Forest Village Client Memos
1998
1 5
Canyon Forest Village Original Scoping Document
undated
1 6
Canyon Forest Village Transmittals
1992
1 7
Canyon Forest Village Meeting Minutes/Notes To File
1992-1993
1 8
Canyon Forest Village Schedule
1992
1 9
Canyon Forest Village Transportation
1996
1 10
Canyon Forest Village Site Information
1996-1998
1 11
Canyon Forest Village Physical
undated
1 12
Canyon Forest Village Biological
1992
1 13
Canyon Forest Village Programming
1992-1994
1 14
Canyon Forest Village Cost Estimate
1994
1 15
Canyon Forest Village Public Relations
1992
1 16
Canyon Forest Village Employee Housing
1994
1 17
Canyon Forest Village Alternatives
1998
1 18
Canyon Forest Village Bubble Diagrams
1994-1996
1 19
Canyon Forest Village Insight Center
1994
1 20
USGS Outparcel Information
1996
1 21
Canyon Forest Village Legal Description
1996
1 22
Canyon Forest Village Scoping Documents
1992
1 23
Canyon Forest Village Video Preparation
1992
1 24
Canyon Forest Village Marketing Plans/Brochures
1999
1 25
Canyon Forest Village Jeffrey Joyce Sketches
undated
1 26
Canyon Forest Village School Site
undated
1 27
Canyon Forest Village Guidelines for Sustainability
1999
1 28
Canyon Forest Village Proposal
1996 August
1 29
Canyon Forest Village Legal Documents
1999
1 30
Canyon Forest Village Legal
1999
1 31
Canyon Forest Village Legal
undated
1 32
Canyon Forest Village Interdisciplinary Team Directed Proposal
1996 September
1 33
Canyon Forest Village Design Standards
1998-1999
1 34
Canyon Forest Village Design Standards
1998-1999
1 35
Canyon Forest Village Design Standards
1998-1999
1 36
Canyon Forest Village Design Standards
1999
1 37
Correspondence
1999
1 38
Design Guidelines
1999
1 39
Standard and Guidelines
2000
1 40
Zoning
1998-1999
1 41
Education
1999-2000
1 42
Sketch for Parking
undated
1 43
Visual Analysis
1999
1 44
Hydrology
1999
1 45
Land Use
1999
1 46
Design
undated
1 47
Schedule
1999
1 48
Applicant's Narrative
1999
1 49
Proposed Zoning Regulation
1999
1 50
Design Sketches
1999
1 51
History
undated
TUBES
4 tubes
tube
1
Village Maps
Physical location: CCA 8 Column 4, Row 2
undated
2
Development Studies
Physical location: CCA 8 Column 4, Row 2
undated
3
Conceptual Master Plan Diagram
Physical location: CCA 8 Column 4, Row 1
undated
4
Village Studies
Physical location: Barn Box 16
undated

LXXXVI:  LXXXVI: Burlingame & Brush Creek, 1995-2010Return to Top

2 boxes, 64 folders and 6 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1995-2010
Box Folder
1 1
Meeting Notes/Minutes
1995-1996
1 2
Programming
1995
1 3
Cost Estimates
1995
1 4
Design Sketches/Product Info
undated
1 5
Memos
1995-1998
1 6
Memos
2006
1 7
Proposal/Contracts
2002
1 8
Proposal/Contracts
2002
1 9
Proposal/Contracts
2003
1 10
Proposal/Contracts
2003
1 11
Proposal/Contracts
2003
1 12
Meeting Minutes
2002-2010
1 13
Schedule
2003-2004
1 14
Title Policy
1997
1 15
Land Use
2003
1 16
Soil
2003 May 13
1 17
Environmental Audits
2003
1 18
Drainage
2003
1 19
Roads
undated
1 20
Design Sketches/Product Info
2006
1 21
City/County General Plan
2000-2003
1 22
Development Plan
2003
1 23
Development Plan
undated
1 24
Zoning
2003 June 2
1 25
Design Review
2003 June 12
1 26
Public Participation
2003
1 27
Special Review Processes
1997-2003
1 28
Construction Bids
2003
1 29
Field Reports
2004
1 30
Change Orders
2003-2006
1 31
Land Use Application Report
undated
1 32
Project Manual
2003 September 18
1 33
Project Manual
2003 September 18
1 34
Project Manual
2003 September 18
1 35
Project Manual
2003 September 18
1 36
Project Delivery Design Report
2010 March
1 37
Project Delivery Design Report
2010 March
1 38
Project Delivery Design Report
2010 March
1 39
Design Plans
2010 May 7
2 1
Project Report
2005-2010
2 2
Project Report
2005-2010
2 3
Project Report
2005-2010
2 4
Project Report
2005-2010
2 5
Sketches
2004 July 5
2 6
Financial
2004
2 7
Meeting Minutes
2004
2 8
Plant Lists
undated
2 9
Code Sections
2004 April
2 10
Conceptual Plans
undated
2 11
Conceptual Plan
undated
2 12
Water Connection
undated
2 13
Housing
2004 April 9
2 14
Housing
2004 April 9
2 15
Conceptual Design Plan
2004 October
2 16
Conceptual Design Plan
2004 October
2 17
Conceptual Design Plan
2004 October
2 18
Plaza/Conoco Review
2002-2003
2 19
Plaza/Conoco Zoning
2002
2 20
Plaza/Conoco Articles
2001-2002
2 21
Plaza/Conoco Meeting Minutes
2001-2002
2 22
Plaza/Conoco Development Program
2001
2 23
Plaza/Conoco Design Studies
2002
2 24
Plaza/Conoco Correspondence
2001-2003
2 25
Plaza/Conoco Proposals/Contracts
2001-2002
TUBES
6 tubes
1995-2004
tube
1
Preliminary Grading
Physical location: CCA 8 Column 6, Row 1
undated
2
Original Schematic
Physical location: CCA 8 Column 6, Row 1
2004; undated
3
"Early Master Plan Sketches; Aerial Photos; Slope Map; 3D Topo Map; Master Plan; Master Plan; Aspect Maps; Layout and Concept Grading; Final Plan, Grading and Illustrative; Planting Plan Sketches"
Physical location: CCA 8 Column 6, Row 1
undated
4
Old Pets./Sight Plan
Physical location: Barn Box 5
undated
5
Process Architecture
Physical location: Barn Box 5
undated
6
Preliminary Submissions
Physical location: CCA 8 Column 4, Row 3
undated

LXXXVII:  LXXXVII: Lowry, 1990-2008Return to Top

3 boxes, 112 folders and 56 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1990-2008
Box Folder
1 1
Lowry Range Market Research
2004 May-June
1 2
Lowry Range Contracts/Proposals
2004 February-August
1 3
Lowry Range Meeting Agendas & Minutes
2003-2004
1 4
Lowry Range Meeting Agendas & Minutes
2003-2004
1 5
Lowry Range Meeting Agendas & Minutes
2003-2004
1 6
Lowry Range Contact List
2004
1 7
Lowry Range Cost Estimates
2004 December
1 8
Lowry Range Transmittals
2004 June and December
1 9
Lowry Range Property Maps
2004
1 10
Lowry Range Onsite Analysis
2004 June 1-4
1 11
Lowry Range Community Facilities
2004 December 30
1 12
Lowry Range Infrastructure
2004 December 24
1 13
Lowry Range Transportation
2004 August-November
1 14
Lowry Range Correspondence
2004 July-August
1 15
Lowry Range Correspondence
2004 September-October
1 16
Lowry Range Correspondence
2004 December
1 17
Lowry Range Correspondence
2005 January-June
1 18
Lowry Range Water
2004 July-October
1 19
Lowry Range Water
2004 October
1 20
Lowry Range Water Report
2004 September 8
1 21
Lowry Range Energy
2004
1 22
Lowry Range Land Use
2004 August 10
1 23
Lowry Range Correspondence From Client
2004 August - 2005 February
1 24
Lowry Range Parks/Open Spaces
2004 October
1 25
Lowry Range Vision
2004 November
1 26
Lowry Range Proposals/Contracts
undated
1 27
Lowry Range Source Data
2001-2003
1 28
Lowry Range Source Data
2004-2006
1 29
Lowry Range Proposal to SLB
2006 November 8
1 30
Lowry Range Work Session
2004 August 19
1 31
Lowry Range Cost Estimates
2006 January 16
1 32
Lowry Range Biological Survey
2005
1 33
Lowry Range Mission & Absolutes
2003 August 1
1 34
Lowry Range Parks, Trails, & Open Space Summary
2005 January 10
1 35
Lowry Range Water Supply Report
2005 January
1 36
Lowry Range Vision Process
2002 August 28
1 37
Lowry Range Development Study
2003 August 1
1 38
Lowry Range Restoration Advisory Board
2004
1 39
Lowry Range Restoration Advisory Board
2004
1 40
Lowry Range Restoration Advisory Board Meeting Minutes
2003 November 19
1 41
Lowry Range Materials/Project Timelines
2004
1 42
Lowry Range Restoration Advisory Board Presentation
2004 May 19
1 43
Lowry Range Conservation Proposals
2006 April 20
1 44
Lowry Range Design Guidelines
2002 October
1 45
Lowry Range Design Guidelines
2002 October
1 46
Lowry Range Background Report
2005-2006
1 47
Lowry Range Background Report
2005-2006
1 48
Lowry Range East Linear Park
2006
2 1
Master Plan Review Proposal/Contracts
1998
2 2
Master Plan Review Correspondence
1998 August - 2001 December
2 3
Lowry Land Board Promo
1990
2 4
Lowry Land Board Promo
1990
2 5
Master Plan Review Meeting Minutes/Memos
1998 July-August
2 6
Master Plan Review Meeting Minutes/Memos
1999
2 7
Master Plan Review Programming
undated
2 8
Master Plan Review Design Sketches
1997-1998
2 9
Time and Materials (T&M) Correspondence
2002-2004
2 10
T&M Proposals/Contract
2002-2006
2 11
T&M Construction Bids/Proposals
2001-2003
2 12
T&M Due Diligence Reports
2002
2 13
T&M Meeting Minutes
2002-2004
2 14
T&M Financial Proformas
2000
2 15
T&M Market Research
2002 May 22
2 16
T&M Special Review Process
2002 August 2
2 17
T&M Vegetation
2002 October 29
2 18
T&M Program
2002 December
2 19
T&M Schematic Design
2003 May-December
2 20
T&M Design Sketches
2002 June-July
2 21
T&M Design Review
2003 May 30
2 22
T&M Submittals/Shop Drawings
2003 July 31
2 23
10th Anniversary Program
2004 September 11
2 24
Crescent Park Correspondence/Transmittals
2001 March-August
2 25
Crescent Park Correspondence/Transmittals
2001 September-October
2 26
Crescent Park Design Guidelines
2002 February
2 27
Crescent Park Meeting Minutes
2001 May-June
2 28
Crescent Park Development Plan
2000 April-November
2 29
Crescent Park Design Specifications
2003 March 17
2 30
Design Specifications for 11th & Quebec Street
2003 March 31
2 31
Traffic Impact Analysis Addendum
2000 January
2 32
Preliminary Geotechnical Investigation
2000 October 9
2 33
Sunset Village Park Project Manual
2003 August 1
2 34
Reading Garden Project Manual
2003 June 9
2 35
Lowry Golf Proposal/Contract
2004 July-August
2 36
Lowry Golf Community North Meeting Records
2004 May-July
2 37
Lowry Golf Community North Meeting Records
2004 July-December
2 38
Lowry Golf Community North Monuments
2004 April-July
2 39
Lowry Golf Community North Design Guidelines
2004 March 9
2 40
Lowry Golf Community Programming
undated
2 41
Lowry Golf Development Program
2003 April
2 42
Lowry Golf Transmittals
2003 July-August
2 43
Lowry East Contact/Proposals
2005-2008
2 44
Lowry East Meeting Minutes & Agendas
2003-2006
2 45
Lowry East Correspondence
2004-2006
2 46
Lowry East Correspondence
2004-2006
2 47
Lowry East Plant List
undated
2 48
Lowry East Schematic Design
2004 March 9
2 49
Lowry East Design Development
2005
2 50
Lowry East Design Guidelines
2002-2005 September
2 51
Lowry East Design Guidelines
2005 October
2 52
Lowry East Design Guidelines
undated
2 53
Lowry East Construction Documents
2004-2008
2 54
Lowry East Dog Park
2006 January 20
2 55
Lowry East Cost Estimates
2005 June 22
2 56
Lowry East Open Spaces
2005-2006
2 57
Lowry East Park Shelter
2006 July-August
3 1
Lowry Campus Redevelopment Proposal/Contract
undated
3 2
Lowry Campus Redevelopment Phase II Planning Report
2007 February 9
3 3
Lowry Campus Redevelopment Land Use Plan
2007 August
3 4
Lowry Campus Redevelopment Strategic Plan
2005 May
3 5
Lowry Campus Redevelopment Plan for Use Report
2008 April 22
3 6
Lowry Campus Redevelopment Concept Plan
2001 July 17
3 7
Lowry Buckley Annex Correspondence
2006 December - 2007 July
TUBES
56 tubes
tube
1
Lowry Range
Physical location: CCA 8 Column 3, Row 3
undated
2
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
3
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
4
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
5
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
6
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
7
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
8
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
9
Lowry East Schematic Design, shade structure details, CDs
Physical location: CCA 8 Column 3, Row 3
undated
10
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
11
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
12
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
13
Schematic Design Plans
Physical location: CCA 8 Column 3, Row 3
undated
14
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
15
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
16
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
17
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
18
Lowry East SD Monumentation
Physical location: CCA 8 Column 3, Row 3
undated
19
Lowry Range
Physical location: CCA 8 Column 3, Row 3
undated
20
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
21
Lowry T&M
Physical location: CCA 8 Column 3, Row 3
undated
22
Lowry Range
Physical location: CCA 8 Column 3, Row 3
undated
23
Illustrative Master Plans
Physical location: CCA 6 Column 1, Row 2
undated
24
T&M
Physical location: CCA 6 Column 1, Row 2
undated
25
T&;M
Physical location: CCA 6 Column 1, Row 2
undated
26
Buckley Annex
Physical location: CCA 6 Column 1, Row 1
undated
27
Lowry T&M
Physical location: CCA 8 Column 5, Row 3
undated
28
Crescent Park
Physical location: CCA 6 Column 2, Row 4
undated
29
Crescent Park
Physical location: CCA 6 Column 2, Row 4
undated
30
Crescent Park
Physical location: CCA 6 Column 2, Row 3
undated
31
Lowry T&M
Physical location: CCA 6 Column 1, Row 9
undated
32
Schematic Design, shade structure details
Physical location: CCA 8 Column 4, Row 1
undated
33
T&M Reading Garden
Physical location: CCA 8 Column 4, Row 1
undated
34
T&M
Physical location: CCA 8 Column 4, Row 1
undated
35
T&M
Physical location: Barn Box 7
undated
36
T&M
Physical location: Barn Box 7
undated
37
T&M
Physical location: Barn Box 7
undated
38
T&M
Physical location: Barn Box 7
undated
39
T&M
Physical location: Barn Box 7
undated
40
T&M
Physical location: Barn Box 7
undated
41
T&M
Physical location: Barn Box 7
undated
42
T&M
Physical location: Barn Box 7
undated
43
T&M
Physical location: Barn Box 7
undated
44
Northwest Neighbors
Physical location: Barn Box 7
undated
45
Employment Campus
Physical location: Barn Box 7
undated
46
Sites Development
Physical location: Barn Box 7
undated
47
Golf
Physical location: Barn Box 7
undated
48
Golf
Physical location: Barn Box 7
undated
49
Business Park
Physical location: Barn Box 7
undated
50
T&M
Physical location: Barn Box 7
undated
51
T&M
Physical location: Barn Box 9
undated
52
T&M
Physical location: Barn Box 9
undated
53
East
Physical location: Barn Box 9
undated
54
Range
Physical location: Barn Box 9
undated
55
Community North Redesign
Physical location: Barn Box 11
undated
56
Golf Community North Redesign
Physical location: Barn Box 15
undated

LXXXVIII:  LXXXVIII: Mariposa, 1995-2003Return to Top

3 boxes, 116 folders and 19 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1995-2003
Box Folder
1 1
Mariposa Image Notebook
1999 May 26
1 2
Mariposa Land Use Application
1999 June 1
1 3
Mariposa Master Plan
2001 November 26
1 4
Mariposa Streetscape and Mapping
2001
1 5
Mariposa Supporting Documents to the Master Plan Volume I Part 1
2001 July 6
1 6
Mariposa Supporting Documents to the Master Plan Volume I Part 2
2001 July 6
1 7
Reference Notebook
1999 May 26
1 8
Standards and Guidelines for Sustainability
1999 July 26
1 9
Supplemental Documents
2001 November 26
1 10
Supporting Documents to the Mariposa Master Plan Volume I
2001 November 26
1 11
Supporting Documents to the Mariposa Master Plan Volume II
2001 November 26
1 12
Supporting Documents to the Master Plan Volume I
2001 October 30
1 13
Mariposa Proposal/Contracts
2002
1 14
Mariposa Correspondence
1995-1996
1 15
Mariposa Correspondence
2001-2003
1 16
Mariposa Meeting Minutes
1995-2002
1 17
Mariposa Facsimiles
1995
1 18
Mariposa Facsimiles
2001-2003
1 19
Mariposa Programming
1995-2003
1 20
Mariposa Zoning
2001
1 21
Mariposa Zoning
2002
1 22
Mariposa Design Guidelines
2002
1 23
U.S. Department of Agriculture Soil Survey
1995
1 24
Mariposa Drainage Plan
1995
1 25
Mariposa Basin Correspondence- Conversation and Meeting Records
1994
1 26
Mariposa Basin Cost Estimates and Information
1994
1 27
Mariposa Basin Miscellaneous Notes and Sketches
1994
1 28
Mariposa Basin Trail Connection Proposals/Contracts
1998-2001
1 29
Mariposa Basin Trail Connection Correspondence
1998-1999
1 30
Mariposa Basin Trail Connection Meeting Minutes
1998-1999
1 31
Mariposa Basin Trail Connection Work Program
1998-1999
1 32
Mariposa Basin Trail Connection Notes to File
undated
1 33
Mariposa Basin Trail Connection Facsimiles
1998-2000
1 34
Mariposa Basin Trail Connection Hydrology/Drainage
1999
1 35
Mariposa Basin Trail Connection Cost Estimates
1999
1 36
Mariposa Basin Trail Connection Field Reports
1999-2000
1 37
Mariposa Basin Park Phase III Proposals/Contracts
1996-2000
1 38
Mariposa Basin Park Phase III Correspondence
1995-1999
1 39
Mariposa Basin Park Phase III Meeting Minutes
1995-2000
1 40
Mariposa Basin Park Phase III Notes to File
1995-2000
2 1
Mariposa Basin Park Phase III Facsimiles
1997-2002
2 2
Mariposa Basin Park Phase III Engineering
1998
2 3
Mariposa Basin Park Phase III Cost Estimates
1995-1998
2 4
Mariposa Basin Park Phase III Design Sketches
1996-1997
2 5
Mariposa Basin Park Design Guidelines
1990
2 6
Mariposa Basin Park Change Orders
1996
2 7
Mariposa Streetscape
2005-2006
2 8
Mariposa Basin Parking Lot Proposals/Contracts
1997-1998
2 9
Mariposa Basin Parking Lot Correspondence
1997-1998
2 10
Mariposa Basin Parking Lot Meeting Minutes
1997-1998
2 11
Mariposa Basin Parking Lot Facsimiles
1998
2 12
Mariposa Basin Parking Lot Cost Estimates
1997
2 13
Mariposa Basin Parking Lot Design Sketches
1998
2 14
Mariposa Basin Parking Lot Field Reports
1998
2 15
Mariposa Basin Parking Lot Construction Communications
1998
2 16
Mariposa Ranch Work in Progress Part 1
1995 November
2 17
Mariposa Ranch Work in Progress Part 2
1995 November
2 18
Mariposa Ranch Proposals/Contracts
1998-2001
2 19
Mariposa Ranch Correspondence
1995-1999
2 20
Mariposa Ranch Correspondence
1999
2 21
Mariposa Ranch Correspondence
2000
2 22
Mariposa Ranch Correspondence
2001-2002
2 23
Mariposa Ranch Notes to File
1998-2001
2 24
Mariposa Ranch Facsimiles
1998-1999
2 25
Mariposa Ranch Facsimiles
2000
2 26
Mariposa Ranch Facsimiles
2001
2 27
Mariposa Ranch Meeting Minutes
1998-1999
2 28
Mariposa Ranch Meeting Minutes
2000
2 29
Mariposa Ranch Meeting Minutes
2001
2 30
Mariposa Ranch Meeting Minutes
2001
2 31
Mariposa Ranch Meeting Minutes
2001
2 32
Mariposa Ranch Meeting Minutes
2001-2002
2 33
Mariposa Ranch Clippings
1999-2001
2 34
Mariposa Ranch Notes to File
2001
2 35
Mariposa Ranch Facsimiles
1998-1999
2 36
Mariposa Ranch Facsimiles
2000
2 37
Mariposa Ranch Facsimiles
2001
3 1
Mariposa Ranch Physical
1995-1998
3 2
Mariposa Ranch Visual
1995
3 3
Mariposa Ranch Engineering Property Analysis
undated
3 4
Mariposa Ranch Engineering
1989-1997
3 5
Mariposa Ranch Engineering
1998-2000
3 6
Mariposa Ranch Engineering
2001
3 7
Mariposa Ranch Programming
1999 March-June
3 8
Mariposa Ranch Programming
1999 July
3 9
Mariposa Ranch Programming
1999 October-November
3 10
Mariposa Ranch Programming
2000 January-April
3 11
Mariposa Ranch Programming
2000 May-October
3 12
Mariposa Ranch Programming
2000 November-December
3 13
Mariposa Ranch Programming
2001
3 14
Mariposa Ranch Cost Estimates
2000-2001
3 15
Mariposa Ranch Design Sketches
2001
3 16
Mariposa Ranch Fiscal Analysis
2000-2001
3 17
Mariposa Ranch Plan Alternatives
1995
3 18
Mariposa Ranch Design Guidelines
2000
3 19
Mariposa Ranch Design Guidelines
2001
3 20
Mariposa Ranch Covenance, Conditions & Restrictions
2001
3 21
Mariposa Ranch Master Plans
1999
3 22
Mariposa Ranch Master Plans
2001
3 23
Mariposa Ranch Master Plans
2002
3 24
Zoning Recommendations
2000
3 25
Job/Housing Balance
1999
3 26
Water
1999
3 27
Images Jeffery Joyce
2001
3 28
Images Steve Mullen
2001
3 29
Master Plan for Mariposa Ranch
2000-2001
3 30
Mariposa Ranch
2000
3 31
Public Facilities
1999-2000
3 32
Conservation/Development Model
undated
3 33
Transportation
1999-2000
3 34
Meeting Notes
1998
3 35
Articles
1999-2001
3 36
To Do Lists
1999
3 37
Meeting Minutes
1999-2001
3 38
Correspondence
1999-2000
3 39
Land Planning Services
1999
TUBES
19 tubes
2002
tube
1
Existing Conditions, Zoning, Site Analysis, Sections, Village Center
Physical location: CCA 6 Column 1, Row 9
undated
2
Master Plan
Physical location: CCA 8 Column 4, Row 1
undated
3
Concept Land use, Layout Plan Phase II
Physical location: CCA 8 Column 4, Row 1
undated
4
Concept Plan
Physical location: CCA 8 Column 4, Row 1
undated
5
Concept Design
Physical location: CCA 8 Column 4, Row 1
undated
6
Concept Design
Physical location: CCA 8 Column 4, Row 1
undated
7
Concept Design
Physical location: CCA 8 Column 4, Row 1
undated
8
Presentation Drawings
Physical location: CCA 8 Column 4, Row 2
2002; undated
9
Ranch
Physical location: CCA 8 Column 5, Row 1
undated
10
Most Recent Drawings
Physical location: CCA 8 Column 5, Row 1
undated
11
Ranch
Physical location: CCA 8 Column 5, Row 1
undated
12
Base Map
Physical location: CCA 8 Column 5, Row 1
undated
13
Little Lake Lodge Stagecoach
Physical location: CCA 8 Column 5, Row 2
undated
14
Lotting Plans
Physical location: CCA 8 Column 5, Row 2
undated
15
Topo/Aerial
Physical location: CCA 8 Column 5, Row 2
undated
16
Park Entry Design
Physical location: Barn Box 9
undated
17
Base Map
Physical location: Barn Box 11
undated
18
Miscellaneous Drawings
Physical location: Barn Box 13
undated
19
Academy
Physical location: Barn Box 13
undated

LXXXIX:  LXXXIX: Snowmass, 1968-2008Return to Top

7 boxes, 278 folders and 70 tubes
Container(s) Description Dates
MANUSCRIPT MATERIALS
1968-2008
Box Folder
1 1
Snowmass Center Proposals/Contracts
2000-2001
1 2
Snowmass Center Proposals/Contracts
2002
1 3
Snowmass Center Proposals/Contracts
2003-2006
1 4
Snowmass Center Correspondence
2000-2002
1 5
Snowmass Center Correspondence
2003-2005
1 6
Snowmass Center Meeting Minutes
2000-2002
1 7
Snowmass Center Meeting Minutes
2003
1 8
Snowmass Center Schedule
2002
1 9
Snowmass Center Title Policy
1968-1985
1 10
Snowmass Center Title Policy
1999-2003
1 11
Snowmass Center Surveys
1983-2002
1 12
Snowmass Center Water Rights
1983-2001
1 13
Snowmass Center Land Use
undated
1 14
Snowmass Center Topography
2002
1 15
Snowmass Center Soils & Geography
1997-2003
1 16
Snowmass Center Hydrology
2002
1 17
Snowmass Center Art Walk Master Plan
2002
1 18
Snowmass Center Habitat
2002
1 19
Snowmass Center Environmental
2002-2003
1 20
Snowmass Center Financial Performas
2002
1 21
Snowmass Center Appraisals
2002-2003
1 22
Snowmass Center Fiscal Impact Analysis
2002-2003
1 23
Snowmass Center Drainage
2002-2003
1 24
Snowmass Center Engineering
1994-1999
1 25
Snowmass Center Engineering
2000-2001
1 26
Snowmass Center Engineering
2002
1 27
Snowmass Center Engineering
2003-2005
1 28
Snowmass Center Health & Emergency Services
2001-2003
1 29
Snowmass Center Marketing
2000
1 30
Snowmass Center Marketing
2001
1 31
Snowmass Center Marketing
2002
1 32
Snowmass Center City/County General Plan
2002-2003
1 33
Snowmass Center Zoning
1999
1 34
Snowmass Center Zoning
2000
1 35
Snowmass Center Zoning
2002-2003
1 36
Snowmass Center Design Sketches
undated
1 37
Snowmass Center CCR's
2000-2002
2 1
Snowmass Center Public Hearing
2003
2 2
Snowmass Center Affordable Housing
2000-2002
2 3
Snowmass Center Schematic Design
2002
2 4
Snowmass Center Land Use Approvals
2000-2001
2 5
Snowmass Center Master Plans
2000-2002
2 6
Snowmass Center Housing Standards
undated
2 7
Snowmass Center Preliminary Plans
2000-2001
2 8
Snowmass Center Preliminary Plans
2002-2003
2 9
Snowmass Center Programming
2000-2003
2 10
Snowmass Center Specifications
2003
2 11
Snowmass Center Construction Contracts
undated
2 12
Snowmass Center Field Reports
1999-2003
2 13
Snowmass-Capitol Creek Meeting Minutes
2001
2 14
Snowmass-Capitol Creek Survey
1998
2 15
Snowmass-Capitol Creek Land Use
undated
2 16
Snowmass-Capitol Creek Historic & Cultural Resources
undated
2 17
Snowmass-Capitol Visual Analysis
2001
2 18
Snowmass-Capitol Environmental Permits
2001-2002
2 19
Snowmass-Capitol City/Council General Plan
2001
2 20
Snowmass-Capitol Zoning
2001
2 21
Snowmass-Capitol Public Participation
2001
2 22
Snowmass Parcels Proposals/Contracts
2001
2 23
Snowmass Parcels Survey
undated
2 24
Snowmass Parcels Transportation
undated
2 25
Snowmass Parcels Prior Studies
undated
2 26
Snowmass Parcels Analysis Maps & Diagrams
2001
2 27
Snowmass Roundabout Proposals/Contracts
2005-2006
2 28
Snowmass Roundabout Correspondence
2005-2006
2 29
Snowmass Roundabout Meeting Minutes
2005-2006
2 30
Snowmass Entranceway Proposals/Contracts
2005
2 31
Snowmass Entranceway Correspondence
2005
2 32
Snowmass Entranceway Meeting Minutes
2005
2 33
Snowmass Base Village Proposals/Contracts
2000
2 34
Snowmass Base Village Correspondence
1997-2000
2 35
Snowmass Base Village Meeting Minutes
2000
2 36
Snowmass Base Village Land Use
undated
2 37
Snowmass Base Village Soils & Geology
1983-1990
2 38
Snowmass Base Village Market Research
undated
2 39
Snowmass Base Village Transportation
1990-2001
2 40
Snowmass Base Village Prior Studies
2000
2 41
Snowmass Base Village Schematic Design
2000
2 42
Snowmass Base Village Development Program
2000-2001
2 43
Snowmass Base Village Detail Design Studies
1998
2 44
Snowmass Base Village Program
2000
2 45
Snowmass Base Village Schematic Design
2000
2 46
Snowmass Base Village Schematic Design
undated
2 47
Snowmass Base Village Marketing/Presentations
1998 April 27
2 48
Snowmass Base Village Planning Data
1980-1983
2 49
Snowmass Base Village Planning Data
1980-1983
2 50
Snowmass Base Village Memos, Reports & Notes
1982-1983
2 51
Snowmass Base Village Memos, Reports & Notes
1982-1983
3 1
Snowmass Base Village General Project Description
1982
3 2
Snowmass Base Village Planned Unit Development
1982 October 18
3 3
Snowmass Base Village Criteria Package
1982-1983
3 4
Snowmass Base Village Project Manual
1983
3 5
Snowmass Base Village Land Use Plan & Gross Parcel Plat
1983 December 12
3 6
Snowmass Base Village Stage One Technical Issues & Development Intent
1983 April 26
3 7
Snowmass Base Village P.U.D. Amendment Notes
1983
3 8
Snowmass Base Village P.U.D. Amendment Notes
1983
3 9
Snowmass Base Village P.U.D. Amendment Notes
1983
3 10
Snowmass Base Village Parcel B
1984 November 14
3 11
Snowmass Base Village Parcel B
1984 November 14
3 12
Snowmass Sanctuary Proposals/Contracts
2002-2003
3 13
Snowmass Sanctuary Housing
2001-2003
3 14
Snowmass Sanctuary Fractionals
2002-2003
3 15
Snowmass Sanctuary Economic Indicators
2001-2003
3 16
Snowmass Sanctuary Aspen Visitor Study
2000 December
3 17
Snowmass Sanctuary Sales Analysis
2003 May 21
3 18
Snowmass Stage 1 Submission
1984 July 2
3 19
Snowmass Building L Stage 1 Submission
1982 October 22
3 20
Snowmass Conference Center Submission
1982 October 29
3 21
Snowmass Village Intrawest Proposals/Contract
2003
3 22
Snowmass Village Intrawest Maps and Plans
undated
3 23
Snowmass Village Intrawest Building Storylines
2003
3 24
Snowmass Village Intrawest Situation Analysis
2001
3 25
Snowmass Village Intrawest Pricing Matrix
2003
3 26
Snowmass Village Intrawest Correspondence
2003
3 27
Snowmass Village Intrawest Market Investigation
2003
3 28
Snowmass Ski Area Expansion Proposals/Contracts
1991
3 29
Snowmass Ski Area Expansion Meeting Minutes/Notes
1991
3 30
Snowmass Ski Area Expansion Work Program
undated
3 31
Snowmass Ski Area Expansion SPA, PUD Plan
1991 April 22
3 32
Snowmass Ski Area Master Development Plan
1994 February
3 33
Snowmass Ski Area Final SPA Plan
1994
3 34
Snowmass Ski Area Final SPA Plan
1994
3 35
Snowmass Ski Area Final SPA Plan
1994
3 36
Snowmass Golf Feasibility Correspondence
1989 March 13
3 37
Snowmass Intercept Lot Proposals/Contracts
1991
3 38
Snowmass Intercept Lot Correspondence
1991
3 39
Snowmass Community Park Meeting Minutes/Notes to File
1991
3 40
Snowmass Community Park Programming (Land Use)
1991
3 41
Snowmass Community Park Cost Estimates
1991
3 42
Snowmass Master Plan Land Use Programming
1990-1991
3 43
Snowmass Master Plan Cost Estimates
1991
3 44
Snowmass Master Plan Employee Housing
1989-1991
3 45
Snowmass Master Plan Economic Projections
1990
3 46
Snowmass Master Plan Town Master Planning Doc.
1988-1992
3 47
Snowmass Ordinance Correspondence
1990-1991
3 48
Snowmass Ordinance Meeting Minutes/Notes to File
1991
3 49
Snowmass Ordinance Engineering (Traffic/Transportation)
1990-1991
4 1
Snowmass Parcel 'N' Final PUD and Plat Submission
1978 October 23
4 2
Snowmass Rodeo Parcel Proposals/Contracts
2001
4 3
Snowmass Club Pool/Spa Proposals/Contracts
2007-2008
4 4
Snowmass Club Pool/Spa Billing/Invoices
2007
4 5
Snowmass Club Proposals/Contracts
1990-1997
4 6
Snowmass Club Proposals/Contracts
1998-2000
4 7
Snowmass Club Correspondence
1992-1998
4 8
Snowmass Club Correspondence
1999
4 9
Snowmass Club Correspondence
2000-2002
4 10
Snowmass Club Meeting Minutes
1996-1998
4 11
Snowmass Club Meeting Minutes
1999
4 12
Snowmass Club Meeting Minutes
2000-2001
4 13
Snowmass Club Title Policy
1970-1981
4 14
Snowmass Club Title Policy
1998-1999
4 15
Snowmass Club Survey
1998-2000
4 16
Snowmass Club Due Diligence Report
2000
4 17
Snowmass Club Soils and Geology
1980-1999
4 18
Snowmass Club Appraisals
1999
4 19
Snowmass Club Fiscal Impact Analysis
1998-1999
4 20
Snowmass Club Drainage
2000
4 21
Snowmass Club Drainage
undated
4 22
Snowmass Club Fire Protection
undated
4 23
Snowmass Club Housing/Maintenance Facility
1998-2000
4 24
Snowmass Club Traffic/Parking
1998-2000
4 25
Snowmass Club Design Sketches
1997-1999
4 26
Snowmass Club P.U.D. Preliminary Plan
1999
4 27
Snowmass Club Joint Planning Process
1997
4 28
Snowmass Club Joint Planning Process
1998
4 29
Snowmass Club Joint Planning Process
1999
4 30
Snowmass Club Programming
1991-2000
4 31
Snowmass Club Planting Plan
2000-2001
4 32
Snowmass Club Cost Estimate
1997-1998
4 33
Snowmass Club Pool and Terrace
1997-2000
4 34
Snowmass Club Construction
1999-2000
4 35
Snowmass Club Specifications
1999-2000
5 1
Snowmass Club Firepit
2000
5 2
Snowmass Club Site Visits
2000-2001
5 3
Snowmass Club Phase 1 Gross Parcel Plat
1980 January 25
5 4
Snowmass Club Project Documents
undated
5 5
Snowmass Club 2 Correspondence
1998-2000
5 6
Snowmass Club 2 Correspondence
2001 January-February
5 7
Snowmass Club 2 Correspondence
2001 March-May
5 8
Snowmass Club 2 Correspondence
2001 June-August
5 9
Snowmass Club 2 Correspondence
2001 September-November
5 10
Snowmass Club 2 Correspondence
2001 December
5 11
Snowmass Club 2 Correspondence
2002 January
5 12
Snowmass Club 2 Correspondence
2002 February-March
5 13
Snowmass Club 2 Correspondence
2002 May-December
5 14
Snowmass Club 2 Correspondence
2003-2004
5 15
Snowmass Club 2 Meeting Minutes
2000
5 16
Snowmass Club 2 Meeting Minutes
2001 January-August
5 17
Snowmass Club 2 Meeting Minutes
2001 September-December
5 18
Snowmass Club 2 Meeting Minutes
2002-2003
5 19
Snowmass Club 2 Survey
1998-2001
5 20
Snowmass Club 2 Survey
2002-2003
5 21
Snowmass Club 2 Hydrology
2000-2003
5 22
Snowmass Club 2 Vegetation
2001-2002
5 23
Snowmass Club 2 Environmental Permits
2001
5 24
Snowmass Club 2 Electric
2000-2002
5 25
Snowmass Club 2 Water
2002
5 26
Snowmass Club 2 Fire Protection
2001-2002
5 27
Snowmass Club 2 Impact fees
2001-2002
5 28
Snowmass Club 2 Parks & Recreation
2001
5 29
Snowmass Club 2 Transportation
2000-2003
5 30
Snowmass Club 2 Analysis Maps & Diagrams
2001
5 31
Snowmass Club 2 Development Program
2002
5 32
Snowmass Club 2 Master Plan Document
2001
5 33
Snowmass Club 2 Detail Design Studies
2001
5 34
Snowmass Club 2 Sketches/Image Graphics
2001-2002
5 35
Snowmass Club 2 City/County General Plan
2001-2002
5 36
Snowmass Club 2 Community/Area plan
1998-1999
5 37
Snowmass Club 2 Community/Area plan
2000 June
5 38
Snowmass Club 2 Community/Area plan
2000 September
5 39
Snowmass Club 2 Community/Area plan
2000 October-December
5 40
Snowmass Club 2 Community/Area plan
2001
5 41
Snowmass Club 2 Community/Area plan
2002
6 1
Snowmass Club 2 Special Review Process
1997-1998
6 2
Snowmass Club 2 Special Review Process
2000-2002
6 3
Snowmass Club 2 Schematic Design
2000-2001
6 4
Snowmass Club 2 Design Development
2001
6 5
Snowmass Club 2 Construction Documents
2002-2003
6 6
Snowmass Club 2 Specifications
2002
6 7
Snowmass Club 2 Construction Bids
2001-2003
6 8
Snowmass Club 2 Construction Contracts
2002-2003
6 9
Snowmass Club 2 Pay Requests
2003 February 27
6 10
Snowmass Club 2 Field Reports
2000-2003
6 11
Snowmass Club 2 Change Orders
2003
6 12
Snowmass Club 2 Submittals/Shop Drawings
2002-2003
6 13
Snowmass Club Phase 2 Final Plat Submission
undated
6 14
Snowmass Club Phase 2 Exhibit Package
2001 August 29
6 15
Snowmass Club Phase 2 Exhibit Package
2001 August 29
6 16
Snowmass Club Phase 2 Exhibit Package
2001 August 29
6 17
Snowmass Club Preliminary P.U.D. and Plat Submission
1979 August 17
6 18
Snowmass Club Preliminary P.U.D. and Plat Submission
1979 August 17
6 19
Snowmass Club Final P.U.D. Submission
1980 January 25
6 20
Snowmass Village Entry Notes to File
1997-1998
6 21
Snowmass Village Entry Sketches
1999
6 22
Snowmass Village Entry Meeting Minutes
1998
6 23
Snowmass Village Entry Correspondence
1998
6 24
Snowmass Village Entry Correspondence
1999
6 25
Snowmass Village Entry Proposed Parcel Information
1999 May 16
6 26
Snowmass Village Entry Probable Costs
1999
6 27
Snowmass Village Entry Parcel Summaries
1998-1999
6 28
Snowmass Club Plat Submission
1981
6 29
Snowmass Club Planned Unit Submission
1992 January 23
6 30
Snowmass Club Phase 2 Specifications
1981 October
6 31
Snowmass Club Final Plat Submission
1982
6 32
Snowmass Comprehensive Plan Correspondence
1999
6 33
Snowmass Comprehensive Plan Invoice
undated
6 34
Snowmass Mountain SPA Proposal/Contract
2002
6 35
Snowmass Mountain SPA Correspondence
2002
6 36
Snowmass Rodeo Property
2000-2001
6 37
Snowmass Lawsuit
1996
6 38
Snowmass Nature Center
1998-1999
7 1
General Admin/Minutes
1993-1994
7 2
Preliminary PUD and Plat Submission
1980
7 3
Request for Nationwide Permit
1994
7 4
Building L Stage Two PUD
1983
7 5
Building L PUD
1984
7 6
Building L Memos, Reports, Notes
1982
7 7
Club Villas III Specifications
1984
7 8
East Village Draft Nationwide Permit Request
1992
7 9
Snowmass Club PUD Parcel 4
undated
7 10
Ski Area Final SPA Plan
undated
7 11
East Village PUD Development Plans Volume One
undated
7 12
East Village PUD Support Documents Volume Two
undated
7 13
East Village PUD
1991
7 14
Ski Area Specially Planned Area
1993
7 15
The Divide Lot Description Package
undated
7 16
Meeting Minutes
2001
7 17
Storied Place Construction Observation
2005
7 18
Meeting Minutes
1994
7 19
Snowmass Transit Aspen Colo.
1994
7 20
Aspen Skiing Contracts
2002
7 21
Horse Ranch Physical
1990
7 22
Horse Ranch Permanent Housing
1991-1994
7 23
Horse Ranch Signage
1991-1992
7 24
Park Hydro
1991
7 25
Horse Ranch Phase Two Design Development
1991
7 26
Notes
1990
7 27
Horse Ranch Engineering
1990
TUBES
70 tubes
1968-2005
tube
1
Conceptual plan
Physical location: CCA 8 Column 3, Row 3
undated
2
EIS Alternatives
Physical location: CCA 8 Column 3, Row 3
undated
3
Ski Area Burnt Mountain
Physical location: CCA 8 Column 3, Row 3
undated
4
The Divide caretaker unit, improvement plan, land use, character plan
Physical location: CCA 8 Column 3, Row 3
undated
5
The Divide grading, maintenance facility, section elevations, lot descriptions
Physical location: CCA 8 Column 3, Row 3
undated
6
The Divide Schematic Design, Parcel Plans, Sections, Floorplans, Water Storage Plans, Final Documents
Physical location: CCA 8 Column 3, Row 3
undated
7
Visual Simulation
Physical location: CCA 8 Column 6, Row 1
undated
8
Town of Snowmass Village
Physical location: CCA 8 Column 6, Row 1
undated
9
Town Center
Physical location: CCA 8 Column 6, Row 1
undated
10
Improvements
Physical location: CCA 8 Column 6, Row 1
undated
11
Base Village Parcel A Schematic
Physical location: CCA 8 Column 6, Row 1
undated
12
Base Maps, Site Grading, Existing conditions
Physical location: CCA 8 Column 6, Row 2
undated
13
Parcel A Schematics, Sections, Base Village Architecture schematic
Physical location: CCA 8 Column 6, Row 2
undated
14
Schematic design, image sheet
Physical location: CCA 8 Column 6, Row 2
undated
15
Maintenance Study
Physical location: CCA 8 Column 6, Row 2
undated
16
East Fork
Physical location: CCA 8 Column 6, Row 2
undated
17
Peter Alford snowmaking stuff
Physical location: CCA 8 Column 6, Row 2
undated
18
Parking
Physical location: CCA 8 Column 6, Row 2
undated
19
Maintenance Facility
Physical location: CCA 8 Column 6, Row 2
undated
20
Lotting summary, grading, irrigation schedule
Physical location: CCA 8 Column 6, Row 3
undated
21
The Divide topo and final site plan
Physical location: CCA 8 Column 6, Row 3
undated
22
The Divide concept plan
Physical location: CCA 8 Column 6, Row 3
undated
23
The Divide concept plan
Physical location: CCA 8 Column 6, Row 3
undated
24
Tennis Center
Physical location: CCA 8 Column 6, Row 3
undated
25
Zoning Master Plan
Physical location: CCA 6 Column 1, Row 3
undated
26
Misc. Village
Physical location: CCA 8 Column 5, Row 3
undated
27
Club Phase II
Physical location: CCA 8 Column 5, Row 3
undated
28
Rodeo
Physical location: CCA 8 Column 5, Row 3
undated
29
Improvements
Physical location: CCA 8 Column 5, Row 3
undated
30
Town Center
Physical location: CCA 8 Column 5, Row 3
undated
31
Base Area
Physical location: CCA 8 Column 5, Row 3
undated
32
Concept plans, grading, drainage
Physical location: CCA 8 Column 5, Row 3
undated
33
Rodeo Entry Master Plan
Physical location: CCA 8 Column 5, Row 3
undated
34
Conference Center
Physical location: CCA 8 Column 5, Row 3
undated
35
Parcel B
Physical location: CCA 8 Column 6, Row 3
undated
36
Ski Area Working Prints
Physical location: CCA 8 Column 6, Row 3
undated
37
The Draw
Physical location: CCA 6 Column 2, Row 4
undated
38
Sewer
Physical location: Barn Box 2
undated
39
Midstation
Physical location: Barn Box 2
undated
40
Club 2
Physical location: Barn Box 2
undated
41
Plan Base Negatives and 1990 Study
Physical location: Barn Box 1
undated
42
Lift Number 4
Physical location: Barn Box 1
undated
43
Summit Station Studies
Physical location: Barn Box 1
undated
44
The Draw Schematic Designs/Site Analysis
Physical location: Barn Box 1
undated
45
Interfaith Chapel
Physical location: Barn Box 2
undated
46
Graphics Mylar's and Films
Physical location: Barn Box 1
undated
47
Club 3
Physical location: Barn Box 2
undated
48
Maintenance Facility
Physical location: Barn Box 2
undated
49
Conference Center
Physical location: Barn Box 3
undated
50
Club Phase II Construction Documents
Physical location: Barn Box 3
undated
51
Master Plan
Physical location: Barn box 3
undated
52
Phase 2 Construction Document Set
Physical location: CCA 8 Column 4, Row 1
undated
53
The Divide
Physical location: CCA 8 Column 4, Row 1
undated
54
Horse Ranch Marketing Pricing
Physical location: CCA 8 Column 4, Row 2
undated
55
Clubhouse
Physical location: CCA 8 Column 4, Row 2
undated
56
Burnt Mountain
Physical location: CCA 8 Column 4, Row 1
undated
57
Horse Ranch Finished Documents
Physical location: CCA 8 Column 4, Row 2
undated
58
Horse Ranch
Physical location: CCA 8 Column 4, Row 2
undated
59
Area Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
60
Club Phase II Schematic Design
Physical location: CCA 8 Column 4, Row 2
undated
61
Phase II Schematic Design Illustrative
Physical location: CCA 8 Column 4, Row 2
undated
62
Preliminary Studies for Horse Ranch
Physical location: CCA 8 Column 4, Row 2
undated
63
Landscaping
Physical location: CCA 8 Column 4, Row 2
undated
64
Club and Lodge
Physical location: CCA 8 Column 4, Row 2
undated
65
Early Schematic Site Design
Physical location: CCA 8 Column 4, Row 2
undated
66
Horse Ranch
Physical location: CCA 8 Column 4, Row 3
undated
67
Horse Ranch
Physical location: CCA 8 Column 4, Row 2
undated
68
Horse Ranch Base Mylar's
Physical location: CCA 8 Column 4, Row 2
undated
69
Horse Ranch Bid Set
Physical location: CCA 8 Column 4, Row 3
undated
70
Horse Ranch Preliminary Concept Study
Physical location: CCA 8 Column 4, Row 3
undated

XC:  XC: SMALL PROJECTS, 1981-2010Return to Top

Container(s) Description Dates
Project 1: Allegheny World War II Memorial
2002-2005
MANUSCRIPT MATERIALS
2002-2005
Box Folder
1 1
Competition Submission
2002-2005
1 2
Competition Correspondence
2002-2003
1 3
Proposals/Contracts
2005
1 4
Correspondence
2005
1 5
Cost Estimates
2002-2005
Project 2: Mill Creek
1994
MANUSCRIPT MATERIALS
1994
Box Folder
1 6
Community Benefits
undated
1 7
Concept
undated
1 8
Village Center
1994
TUBES
3 tubes
tube
1
Regional Park Design, Final Engineering, Rendered Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
2
Early Master Plan Options
CCA 8 Column 4, Row 2
undated
3
Main Street
CCA 8 Column 5, Row 3
undated
Project 3: Veteran's Memorial (Asheville, NC)
2002-2005
MANUSCRIPT MATERIALS
2002-2005
Box Folder
1 9
Correspondence
2002-2005
1 10
Meeting Minutes
2004
1 11
Concept Estimate
2004 May 5
1 12
Design Sketches
2005
TUBES
tube
1
Veterans Memorial
Physical location: CCA 8 Column 3, Row 1
undated
2
Construction Documents Set
Physical location: Barn Box 1
undated
3
Cemetery Grand Junction
Physical location: Barn Box 1
undated
4
Cemetery
Physical location: Barn Box 1
undated
5
Cemetery
Physical location: Barn Box 1
undated
6
Cemetery
Physical location: Barn Box 1
undated
7
Cemetery
Physical location: Barn Box 1
undated
8
Cemetery
Physical location: Barn Box 1
undated
9
Cemetery
Physical location: Barn Box 2
undated
Project 4: Aspen Airport
1988-1998
MANUSCRIPT MATERIALS
1988-1998
Box Folder
1 13
Correspondence
1988-1998
1 14
Cost Estimates
1988
TUBES
tube
1
FAA Tower
Physical location: CCA 8 Column 6, Row 2
undated
2
FBO Proposal
Physical location: CCA 8 Column 6, Row 3
undated
Project 5: Colorado Rocky Mountain School
1992-1994
MANUSCRIPT MATERIALS
1992-1994
Box Folder
1 15
Master Plan
1993-1994
1 16
Retreat
1993
1 17
Correspondence
1990-1993
1 18
Design Sketches/ Product Info
1993
1 19
Meeting Minutes
1993
1 20
Programing
1992
TUBES
tube
1
Campus Inventory
Phyiscal location: CCA 8 Column 4, Row 3
undated
2
Topography
Phyiscal location: CCA 8 Column 5, Row 2
undated
Project 6: Four Seasons Resort at Troon (California)
1997-2002
MANUSCRIPT MATERIALS
1997-2002
Box Folder
1 21
Proposals/Contracts
2001-2002
1 22
Meeting Minutes
1997
Project 7: Ogden Downtown
2000-2002
MANUSCRIPT MATERIALS
2000-2002
Box Folder
1 23
Feasibility
2002
1 24
Summary of Market Investigation
2002
1 25
Correspondence
2002
1 26
Design Sketches
2002
1 27
Framework Study
2001
1 28
Notes to File
2000
Project 8: Gray Ranch
2005
MANUSCRIPT MATERIALS
2005
Box Folder
1 29
Proposals/Contracts
2005
1 30
Design Sketches
undated
1 31
Concept Design
2005 May 31
Project 9: Silver Triangle
2005
MANUSCRIPT MATERIALS
2005
Box Folder
1 32
Framework Plan Final Draft
2005 October
1 33
Framework Plan Final Draft
2005 August
Project 10: Cordillera
1999
MANUSCRIPT MATERIALS
1999
Box Folder
1 34
Proposals/Contracts
1999
1 35
Correspondence
1999
1 36
Meeting Minutes/Notes to File
1999
1 37
Construction Documents
undated
1 38
Design Sketches
1999
TUBES
tube
1
Eagle Chase
Physical location: CCA 8 Column 6, Row 2
undated
2
Blackhorse
Physical location: Barn Box 6
undated
Project 11: Salmon Run Institute
2000-2004
MANUSCRIPT MATERIALS
2000-2004
Box Folder
1 39
Proposals/Contracts
2003-2004
1 40
Correspondence
2004
1 41
Meeting Minutes/Notes to File
2003-2004
1 42
Cost Estimates
2004
TUBES
tube
1
Sketches, Concept Plan
Physical location: CCA 8 Column 6, Row 2
undated
Project 12: Cove Ranch
2004-2005
MANUSCRIPT MATERIALS
2004-2005
Box Folder
1 43
Proposals/Contracts
2004-2005
1 44
Meeting Minutes/Notes to File
2004
1 45
Correspondence
2004
Project 13: Equipetrol Norte (Bolivia)
1999-2000
MANUSCRIPT MATERIALS
1999-2000
Box Folder
1 46
Correspondence
1999
1 47
Notes to File
undated
1 48
Brochure
2000
Project 14: HILB Property
1995
MANUSCRIPT MATERIALS
1995
Box Folder
1 49
Meeting Notes/Notes to File
1995
TUBES
1995
tube
1
Parcel Plan Alternative One
Physical location: CCA 8 Column 4, Row 2
1995; undated
Project 15: Denver Union Terminal
1988-1999
MANUSCRIPT MATERIALS
1988-1999
Box Folder
1 50
Correspondence
1999
1 51
Proposal/Contracts
1999
1 52
Land Use
1988-1997
1 53
Meeting Minutes
1999
1 54
Memorandum
1991
1 55
Rail Related Track Records
undated
Project 16: World Trade Center
2003-2004
MANUSCRIPT MATERIALS
2003-2004
Box Folder
1 56
Construction Review
2004
1 57
Meeting Minutes
2003-2004
1 58
Plaza Renovation
2003-2004
1 59
Pricing
2003
Project 17: Smith Residence
2003
MANUSCRIPT MATERIALS
2003
Box Folder
1 60
Smith Residence Proposal/Contracts
2003
TUBES
tube
1
Smith Residence
Physical location: CCA 8 Column 6, Row 2
undated
Project 18: Casper
1999
MANUSCRIPT MATERIALS
1999
Box Folder
1 61
Correspondence
1999
1 62
Transmittals
1999
1 63
Design Sketches
undated
1 64
Programing
1999
Project 19: Incline Village (Nevada)
1999-2000
MANUSCRIPT MATERIALS
1999
Box Folder
1 65
Cost Estimates
1999
1 66
Cost Estimates
2000
1 67
Design Sketches
2000
1 68
Feasibility
1999
1 69
Recreation Facilities Master Plan
1999 May
1 70
Proposals/Contracts
1999
1 71
Correspondence
1999-2000
1 72
Meeting Minutes/Notes to File
1999
1 73
Assessment Report
1999
Project 20: Pole Residence
1999-2001
MANUSCRIPT MATERIALS
1999
Box Folder
1 74
Proposals/Contracts
1999-2001
1 75
Correspondence
1999-2001
1 76
Meeting Minutes/Notes to File
2000
Project 21: Hotel Jerome
1986
MANUSCRIPT MATERIALS
1999
Box Folder
1 77
Specification Report
1986 October 21
TUBES
tube
1
Design Development
Physical location: CCA 8 Column 4, Row 2
undated
2
Early Studies
Physical location: CCA 8 Column 4, Row 2
undated
3
C.D. Slicks
Physical location: CCA 8 Column 4, Row 2
undated
Project 22: Kyungsan
1997-1998
MANUSCRIPT MATERIALS
1999
Box Folder
1 78
Conceptual Master Plan
1998
1 79
Kyungsan Notes
1997-1998
TUBES
tube
1
Competition
Physical location: CCA 6 Column 1, Row 6
undated
Project 23: Edgemont Highlands
2004-2006
MANUSCRIPT MATERIALS
2004-2006
Box Folder
2 1
Proposals/Contracts
2005
2 2
Meeting Agendas & Minutes
2004
2 3
Correspondence
2004-2006
2 4
Market Analysis
2005 February 3
TUBES
tube
1
Conceptual Master Plan
Physical location: CCA 6 Column 1, Row 1
undated
Project 24: Buckeye
2004
MANUSCRIPT MATERIALS
2004
Box Folder
2 5
Proposals/Contracts
2004
2 6
Meeting Agendas & Minutes
2004
Project 25: Aspen Ritz Carlton
1988-1992
MANUSCRIPT MATERIALS
1988-1992
Box Folder
2 7
Field Reports
1990
2 8
Proposals/Contracts
1989-1991
2 9
Design Sketches
1988-1991
2 10
Meeting Minutes/Notes to File
1990-1991
2 11
Schedule
1989
2 12
Correspondence
1988-1989
2 13
Correspondence
1990
2 14
Correspondence
1990
2 15
Correspondence
1990
2 16
Correspondence
1990
2 17
Correspondence
1991
2 18
Correspondence
1991
2 19
Correspondence
1992
2 20
Correspondence
1992
2 21
Correspondence
1992
2 22
Schematic Design Details
undated
2 23
Schematic Design Specifications
undated
2 24
Schematic Design Details
undated
TUBES
tube
1
Construction Documents
Physical location: CCA 6 Column 1, Row 2
undated
2
Details, Planting Schedule, Schematic Sketches, Mylar, Originals
Physical location: CCA 6 Column 1, Row 3
undated
3
Original Mylar's
Physical location: CCA 8 Column 5, Row 3
undated
4
Site Plan
Physical location: CCA 6 Column 1, Row 4
undated
5
Phase 1
Physical location: CCA 8 Column 5, Row 1
1991-1992; undated
6
Details
Physical location: CCA 8 Column 5, Row 1
undated
7
Spa Grotto
Physical location: CCA 8 Column 5, Row 3
undated
8
Illustrative
Physical location: Barn Box 14
undated
9
Illustrative
Physical location: Barn Box 14
undated
10
Renderings Design Studies
Physical location: Barn Box 14
undated
11
Illustrative
Physical location: Barn Box 15
undated
12
Hotel
Physical location: Barn Box 15
undated
Project 26: Silver Bow Greenway (Montana)
1995
MANUSCRIPT MATERIALS
1995
Box Folder
2 25
Proposals/Contracts
1995
2 26
Meeting Minutes/Notes to File
1995
2 27
Work Program
1995
TUBES
tube
1
Miscellaneous
Physical location: CCA 8 Column 5, Row 2
undated
2
Greenway
Physical location: Barn Box 8
undated
3
Greenway
Physical location: Barn Box 8
undated
4
Greenway
Physical location: Barn Box 8
undated
5
Greenway Concept
Physical location: Barn Box 8
undated
6
Miscellaneous
Physical location: Barn Box 8
undated
Project 27: Shawnigan Lake School
1995-1996
MANUSCRIPT MATERIALS
1995-1996
Box Folder
2 28
Proposals/Contracts
1995-1996
2 29
Correspondence/Owner
1995-1996
2 30
Correspondence/Consultant
1995
2 31
Converstation Record
1996
2 32
Meeting Minutes
1995
2 33
Notes to File
1995
2 34
Design Guidelines
1995
2 35
Design Plans
1995
2 36
Design Plans
1995
2 37
Master Plan
1995 December 30
MANUSCRIPT MATERIALS
tube
1
Illustrative Master Plan
Physical location: CCA 6 Column 1, Row 6
undated
2
Concept Master Plan
Physical location: CCA 6 Column 1, Row 6
undated
Project 28: Boot Jack Ranch
1990-1996
MANUSCRIPT MATERIALS
1990-1996
Box Folder
2 38
Proposal/Contracts
1990-1991
2 39
Proposals/Contracts
1995-1996
2 40
Correspondence
1991-1996
2 41
Meeting Minutes
1990-1996
2 42
Work Program
undated
2 43
Programming
1995-1996
2 44
Engineering
1995
2 45
Cost Estimates
1995
2 46
Design Sketches
1990
2 47
Specs
1990
2 48
Engingeering Report
1996
Project 29: Las Campanas (Santa Fe)
1991-1995
MANUSCRIPT MATERIALS
1991-1995
Box Folder
2 49
Notes to File
1993-1994
2 50
Plant Lists
1995
2 51
Design Sketches
1993-1994
2 52
Landscape Guidelines
undated
2 53
Correspondence
1991-1993
2 54
Correspondence
1994
2 55
Correspondence
1994
2 56
Correspondence
1995
2 57
Proposal/Contracts
1993
2 58
Cost Estimates
1993
TUBES
tube
1
Commercial Center
Physical location: CCA 6 Column 1, Row 7
undated
2
Base Maps
Physical location: CCA 6 Column 1, Row 7
undated
3
Walter Residence
Physical location: CCA 6 Column 1, Row 9
undated
Project 30: White Pine Canyon (Park City)
2000
MANUSCRIPT MATERIALS
2000
Box Folder
2 59
Correspondence
2000
2 60
Vegetation
undated
2 61
Sketches
2000
2 62
Preliminary Sketch Plan
undated
TUBES
tube
1
Entry
Physical location: CCA 8 Column 6, Row 3
undated
2
Proposed Master Plan, Site Analysis, Mylar Sections, Study Diagrams, Sketches, Grading
Physical location: Barn Box 2
undated
3
Analysis and Base maps
Physical location: CCA 8 Column 5, Row 2
undated
4
Site Analysis, Grading, Sketches, Conceptual Design, Existing Conditions, Sections
Physical location: CCA 8 Column 5, Row 3
undated
Project 31: Fox Run
1985
MANUSCRIPT MATERIALS
1985
Box Folder
2 63
Stage Three Submission
1985 February 20
2 64
Stage Four Submission
1985 April 30
TUBES
tube
1
Construction Print Set
Physical location: CCA 6 Column 1, Row 2
undated
Project 32: Holeson Hill
1991
MANUSCRIPT MATERIALS
1991
Box Folder
2 65
Proposals/Contracts
1991
2 66
Notes to File
undated
2 67
Skteches
undated
Project 33: Buffington Harbor
1995
MANUSCRIPT MATERIALS
1995
Box Folder
2 68
Report
1995 November 30
TUBES
tube
1
Grading and Layout
Physical location: CCA 6 Column 1, Row 4
undated
2
CD Prints, Sketches
Physical location: CCA 8 Column 5, Row 1
undated
3
Design Development Prints
Physical location: CCA 8 Column 5, Row 1
undated
4
Joyce sketches, details, perspectives, diagrams
Physical location: CCA 8 Column 5, Row 1
undated
5
New Composites
Physical location: Barn Box 15
undated
Project 34: San Luis Valley
1996
MANUSCRIPT MATERIALS
1996
Box Folder
2 69
Proposals/Contracts
1996
Project 35: Porter Residence
1996-1998
MANUSCRIPT MATERIALS
1996-1998
Box Folder
3 1
Construction Proposals
1998
3 2
Correspondence - Consultant
1997
3 3
Correspondence - Owner
1997-1998
3 4
Correspondence
1994
3 5
Correspondence
1994
3 6
Correspondence
1994
3 7
Correspondence
1995
3 8
Correspondence
1995
3 9
Correspondence
1995
3 10
Correspondence
1995
3 11
Correspondence
1995
3 12
Design Sketches/Product Info
1997-1998
3 13
Meeting Notes
1998
3 14
Transmittals
1996
3 15
Construction Specifications
1994 March 18
3 16
Wetlands Maintenance
1995 January 28
Project 36: 7th & Main (Aspen)
1999-2001
MANUSCRIPT MATERIALS
1999-2001
Box Folder
3 17
Proposals/Contracts
1999
3 18
Design Sketches
1999-2000
3 19
Correspondence
1999-2001
3 20
Conceptual Application
1999-2001
TUBES
1999-2000
tube
1
Final Drawings
Physical location: CCA 8 Column 6, Row 1
1999-2000; undated
Project 37: Airport Boulevard (Denver)
1988-1990
MANUSCRIPT MATERIALS
1988-1990
Box Folder
3 21
Proposals/Contracts
1988-1990
3 22
Work Program
1990
3 23
Design Sketches
1999
3 24
Correspondence
1988
3 25
Cost Estimates
1988
3 26
Notes to File
undated
3 27
Qualifications Statement
1988 June 15
3 28
Character Study Text
1990
Project 38: Aurora City Center
1998
MANUSCRIPT MATERIALS
1998
Box Folder
3 29
Correspondence
1998
TUBES
tube
1
Illustrative Plan
Physical location: CCA 6 Column 1, Row 1
undated
Project 39: Adam's Ranch
1984
MANUSCRIPT MATERIALS
1984
Box Folder
3 30
Site Characteristics
1984
Project 40: Anderson Ranch
1982-1987
MANUSCRIPT MATERIALS
1982-1987
Box Folder
3 31
Proposal, Design Sketches
1982-1987
TUBES
tube
1
Land Use
CCA 8 Column 5, Row 3
undated
2
Arts Center Dorm Housing
CCA 8 Column 5, Row 2
undated
Project 41: Angel Fire (New Mexico)
1985-1996
MANUSCRIPT MATERIALS
1985-1996
Box Folder
3 32
Proposals/Contracts
1990-1996
3 33
Correspondence/Owner
1990
3 34
Correspondence/Consultant
1996
3 35
Correspondence
1985-1986
3 36
Correspondence
1986-1987
3 37
Converstation Record
1996
3 38
Transmittals
1996
3 39
Work Program
1990
3 40
Meeting Minutes/Notes to File
1990-1996
3 41
Cost Estimates
1990-1995
3 42
Design Sketches
1996
3 43
Programming
1990
3 44
Master Plan
1987
3 45
Plant Lists/Design Guidelines
1998
Project 42: Marolt Ranch
1989-1991
MANUSCRIPT MATERIALS
1989-1991
Box Folder
3 46
Correspondence
1989-1991
3 47
Meeting Minutes/Notes to File
1989-1990
3 48
Engineering
1989-1990
3 49
Proposals/Contracts
1989
3 50
Proposals/Contracts
1990
3 51
Design Sketches
1989-1990
3 52
Addendum
1989-1990
3 53
Planning and Design Study
1988 June
3 54
PUD Application
1989 December 29
TUBES
1989
tube
1
Student internship
Physical location: CCA 8 Column 6, Row 2
1989; undated
2
RTad studies, grading and drainage plan cds, site analysis, visual & design analysis
Physical location: Barn Box 12
undated
3
Mylar's
Physical location: Barn Box 12
undated
4
Details, development map, interview, graphics
Physical location: Barn Box 12
undated
Project 43: Sunday River
1998-1999
MANUSCRIPT MATERIALS
1998-1999
Box Folder
4 1
Development Plan
1999
4 2
Jordan Bowl
1998
4 3
Programming
1998-1999
4 4
Proposal/Contracts
1998-1999
4 5
Meeting Minutes/Notes to File
1998
4 6
Design Sketches
undated
TUBES
tube
1
Jordan Bowl
Physical location: CCA 8 Column 5, Row 2
undated
2
Jordan Bowl
Physical location: CCA 8 Column 5, Row 2
undated
3
Design Development Jordan Bowl
Physical location: CCA 8 Column 5, Row 2
undated
4
Village plan, schematic design, design development, original perspectives, prints, grading
Physical location: CCA 8 Column 5, Row 2
undated
5
Design Brief
Physical location: CCA 8 Column 5, Row 2
undated
Project 44: Kanozan (Japan)
1989
MANUSCRIPT MATERIALS
1989
Box Folder
4 7
Written Statement
1989 February 1
4 8
Biological/Plant List
undated
TUBES
tube
1
Mylar's
Physical location: CCA 8 Column 6, Row 3
undated
2
Presentation Prints
Physical location: CCA 8 Column 6, Row 3
undated
Project 45: 7th Street Esplanade (Glenwood Springs, CO)
1983-1984
MANUSCRIPT MATERIALS
1983-1984
Box Folder
4 9
Conceptual Design
1983
4 10
Correspondence
1983-1984
Project 46: Alemeda & Federal (Englewood, CO)
1992-1993
MANUSCRIPT MATERIALS
1992-1993
Box Folder
4 11
Proposals/Contracts
1993
4 12
Correspondence
1992
4 13
Meeting Minutes/Notes to File
undated
4 14
Cost Estimates
1992
TUBES
tube
1
Base Mylar's
Physical location: CCA 8 Column 6, Row 2
undated
Project 47: Wexner Residence
1984-1992
MANUSCRIPT MATERIALS
1984-1992
Box Folder
4 15
Correspondence
1984-1989
4 16
Correspondence
1990
4 17
Correspondence
1991-1992
4 18
Specification
1986 July 24
4 19
Specification
1991 May 8
4 20
Landscape Maintenance Manual
1989
TUBES
tube
1
CD Slicks
Physical location: Barn Box 13
undated
2
First Originals
Physical location: Barn Box 13
undated
3
Illustrative
Physical location: Barn Box 13
undated
4
Design Development Process Drawings
Physical location: Barn Box 13
undated
5
Design Studies and Prints
Physical location: Barn Box 16
undated
6
Planting and Revegetation
Physical location: Barn Box 16
undated
Project 48: Goodyear City Center
1999-2003
MANUSCRIPT MATERIALS
1999-2003
Box Folder
4 21
Proposal/Contracts
1999-2000
4 22
Proposal/Contracts
2001-2003
4 23
Invoices/Billings
2000
4 24
Invoices/Billings
2001-2002
4 25
Correspondence
2000
4 26
Notes to File
2000-2003
4 27
Design Sketches
2000-2003
4 28
Design Development
2003
4 29
Environmental
2000
4 30
Project Schedules
2000-2003
Project 49: Skyline Park (Denver)
1997-2000
MANUSCRIPT MATERIALS
1997-2000
Box Folder
4 31
Correspondence
1998-2000
4 32
Notes to File
2000
4 33
Master Plan
1997 September
TUBES
1997-2000
tube
1
Master Plan Project
Physical location: CCA 8 Column 6, Row 1
1997-2000
2
Submittals
Physical location: CCA 8 Column 4, Row 3
undated
3
Park
Physical location: CCA 8 Column 4, Row 3
undated
4
Park
Physical location: CCA 6 Column 1, Row 4
undated
5
Planting and Playground
Physical location: CCA 8 Column 5, Row 1
undated
6
Base Materials
Physical location: CCA 8 Column 5, Row 2
undated
7
Lawrence Halprin Original Prints
Physical location: CCA 8 Column 5, Row 2
undated
8
Presentation Exhibits
Physical location: CCA 8 Column 5, Row 2
undated
9
Design Sketches
Physical location: CCA 8 Column 5, Row 2
undated
10
Park
Physical location: Barn Box 15
undated
Project 50: Tessler Residence
2001-2003
MANUSCRIPT MATERIALS
2001-2003
Box Folder
4 34
Correspondence
2001-2003
TUBES
tube
1
Lot 16 Bar B Bar
Physical location: CCA 8 Column 6, Row 2
undated
Project 51: Starr Pass
2001-2003
MANUSCRIPT MATERIALS
2001-2003
Box Folder
4 35
Rezoning Application
1992 June 4
4 36
Rezoning Application
1992 June 4
4 37
Design Sketches
undated
Project 52: Getz Residence
1987
MANUSCRIPT MATERIALS
1987
Box Folder
4 38
Specifications
1987
TUBES
tube
1
Survey and Architectural Info
Physical location: Barn Box 2
undated
2
Preliminary Site Plan
Physical location: Barn Box 3
undated
Project 53: Little Nell Hotel
1983-1986
MANUSCRIPT MATERIALS
1983-1986
Box Folder
4 39
Growth Management Submission
1986 August
4 40
Report
1983-1986
4 41
Report
1983-1986
TUBES
tube
1
Courtyard Remodel
Physical location: CCA 8 Column 3, Row 1
undated
2
Trellis
Physical location: CCA 8 Column 5, Row 1
undated
3
Phase I Design Development/Study Diagram/Base Maps/Grading
Physical location: CCA 8 Column 5, Row 1
undated
4
Base Development
Physical location: CCA 8 Column 5, Row 1
undated
5
Construction Documents Originals
Physical location: Barn Box 7
undated
6
Construction Documents
Physical location: Barn Box 7
undated
7
Design Analysis Studies
Physical location: Barn Box 7
undated
8
Plan Illustrative
Physical location: Barn Box 7
undated
9
Schematic Design
Physical location: Barn Box 7
undated
10
Design Development
Physical location: Barn Box 7
undated
11
Monograph
Physical location: Barn Box 16
undated
12
Phase 1 Grading Plan
Physical location: Barn Box 16
undated
Project 54: Santa Fe Community College
1997-2001
MANUSCRIPT MATERIALS
1997-2001
Box Folder
4 42
Proposals/Contracts
1997-1999
4 43
Correspondence
1999-2001
4 44
Meeting Minutes
2001
TUBES
tube
1
Development Plan
Physical location: CCA 6 Column 2, Row 4
undated
Project 55: Bachelor Gulch
1996-1999
MANUSCRIPT MATERIALS
1997-2001
Box Folder
5 1
Proposals/Contracts
1999
5 2
Correspondence
1997-1999
5 3
Meeting Minutes/Notes to File
1997
5 4
Cost Estimates
1997
5 5
Biological
undated
5 6
Design Sketches/Product Information
1997-1999
5 7
Hotel/Spa Proposals/Contracts
1999
5 8
Hotel/Spa Correspondence
1999
5 9
Hotel/Spa Notes to File
1999
5 10
Hotel/Spa Design Sketches
1999
5 11
Project Manual
1996
TUBES
tube
1
Bachelor Gulch
Physical location: CCA 8 Column 6, Row 2
undated
2
Elevation of Entrance Road and Hotel
Physical location: CCA 8 Column 5, Row 2
undated
3
Lodge and Spa
Physical location: CCA 8 Column 5, Row 2
undated
4
Entrance Road and Hotel Elevation
Physical location: CCA 8 Column 5, Row 2
undated
Project 56: Wolf Creek Valley
1984
MANUSCRIPT MATERIALS
1984
Box Folder
5 12
Planning Criteria and Program
1983 August 9
5 13
PUD Submission
1984 May 29
5 14
PUD Submission
1984 May 29
TUBES
tube
1
Inventory Design
Physical location: CCA 8 Column 4, Row 1
undated
Project 57: Burnt Mountain
1981-1982
MANUSCRIPT MATERIALS
1984
Box Folder
5 15
Visual Analysis
1982 November
5 16
Consultant Reports
1981
5 17
Consultant Reports
1981
Project 58: Castle Rock
1982-2000
MANUSCRIPT MATERIALS
1982-2000
Box Folder
5 18
Land Use Master Plan
1982 July
5 19
Meeting Minutes/Notes to File
1999
5 20
Correspondence
1997-2000
5 21
Design Sketches
undated
5 22
Townhomes Master Plan
1999 August
TUBES
tube
1
Presentation Mylar's
Physical location: CCA 6 Column 1, Row 9
undated
2
The Village Preliminary Land Use Studies
Physical location: CCA 8 Column 4, Row 1
undated
3
The Village Land Use Plan
Physical location: CCA 8 Column 4, Row 2
undated
4
The Village Original Topography
Physical location: CCA 8 Column 4, Row 1
undated
5
The Villages
Physical location: CCA 8 Column 4, Row 3
undated
6
The Village Memmem Young
Physical location: CCA 8 Column 4, Row 2
undated
7
Master Plan Preliminary Studies
Physical location: CCA 8 Column 5, Row 2
undated
8
Final Master Plan Doc
Physical location: CCA 8 Column 5, Row 2
undated
9
Master Plan Preliminary Presentation
Physical location: CCA 8 Column 5, Row 2
undated
10
Master Plan Site Inventory Info
Physical location: CCA 8 Column 5, Row 2
undated
Project 59: Red Mesa
1987
MANUSCRIPT MATERIALS
1987
Box Folder
5 23
Visual Analysis
undated
5 24
Supporting Documentation/Site Analysis
1987
5 25
Supporting Documentation/Site Analysis
1987
5 26
Supporting Documentation/Site Analysis
1987
Project 60: Dead Horse
1987
MANUSCRIPT MATERIALS
1987
Box Folder
5 27
Visual Impact Study
1987 October
TUBES
tube
1
Snake River Ranch
Physical location: CCA 8 Column 5, Row 2
undated
2
Snake River Ranch
Physical location: Barn Box 9
undated
3
Mapping Analysis
Physical location: Barn Box 15
undated
Project 61: Grand Junction Parks
1993
MANUSCRIPT MATERIALS
1993
Box Folder
5 28
Proposals/Contracts
1991-1993
5 29
Correspondence
1991-1993
5 30
Summary Priority Recommendations
1992 September
5 31
Master Plan Volume 1
1993
5 32
Master Plan Volume 2
1993
5 33
Master Plan Volume 3
1993
5 34
Master Plan Appendix
1993
5 35
Open Space Master Plan Volume 1
1993
TUBES
tube
1
Open Space Master Plan
Physical location: CCA 6 Column 2, Row 6
undated
Project 62: Temixco
2008
MANUSCRIPT MATERIALS
2008
Box Folder
5 36
Proposals/Contracts
2008
TUBES
tube
1
Open Space
Physical location: CCA 6 Column 1, Row 1
undated
Project 63: Furnace Creek Ranch
1996-1997
MANUSCRIPT MATERIALS
1996-1997
Box Folder
5 37
Correspondence
1996-1997
Project 64: Gary Property
1991-1993
MANUSCRIPT MATERIALS
1991-1993
Box Folder
5 38
Proposals/Contracts
1991-1993
5 39
Correspondence
1991-1993
5 40
Meeting Minutes/Notes to File
1991
TUBES
tube
1
Water Service Areas
Phyiscial location: CCA 6 Column 2, Row 6
undated
2
Bond Utility Maps
Phyiscial location: CCA 6 Column 2, Row 6
undated
3
Master Plan Entry Design
Phyiscial location: CCA 6 Column 2, Row 7
undated
4
Firing Range
Phyiscial location: CCA 6 Column 2, Row 6
undated
5
Prints and Sketches
Phyiscial location: Barn Box 3
Project 65: CS Ranch
1996
MANUSCRIPT MATERIALS
1996
Box Folder
5 41
Design Sketches
1996
TUBES
tube
1
Proposals
Physical location: CCA 6 Column 1, Row 9
undated
2
Final Design
Physical location: CCA 8 Column 5, Row 1
undated
3
Angel Fire Concept Plan
Physical location: CCA 8 Column 5, Row 2
undated
4
Angel Fire Concept Plan
Physical location: CCA 8 Column 5, Row 2
undated
5
Angel Fire Concept Plan
Physical location: CCA 8 Column 5, Row 2
undated
6
Angel Fire
Physical location: CCA 8 Column 5, Row 2
undated
Project 66: Nuevo Centro Urbano Morelos
2009
MANUSCRIPT MATERIALS
2009
Box Folder
5 42
Analysis and Planning
2009
Project 67: Sierra Sunset
2009
MANUSCRIPT MATERIALS
2009
Box Folder
6 1
Visual Analysis
2002
6 2
Correspondence
2002-2004
6 3
Design Sketches
2002
Project 68: Seven Falls
2007
MANUSCRIPT MATERIALS
2007
Box Folder
6 4
Proposals/Contracts
2007
Project 69: Trout Creek
2006-2007
MANUSCRIPT MATERIALS
2006-2007
Box Folder
6 5
Proposals/Contracts
2006-2007
6 6
Correspondence
2006-2007
TUBES
2007
tube
1
Visual Sensitivity
Physical location: Barn Box 4
2007
Project 70: Boston Ranch
2004
MANUSCRIPT MATERIALS
2004
Box Folder
6 7
Cultural Resource Report
2004 January
6 8
Market Assessment
2004 November
6 9
Charette
2004
6 10
Study of Development
2004
TUBES
tube
1
Conceptual Designs
Physical location: CCA 6 Column 1, Row 7
undated
Project 71: Cornerstone Ranch
2003-2008
MANUSCRIPT MATERIALS
2003-2008
Box Folder
6 11
Proposals/Contracts
2003-2008
Project 72: St. Albans
1992-1993
MANUSCRIPT MATERIALS
1992-1993
Box Folder
6 12
Design Guidelines
1993 June
6 13
Documentation Graphics
1992
6 14
Design Sketches
1992
6 15
Proposals/Contracts
1992
6 16
Meeting Minutes/Notes to File
1992
6 17
Image Notebook
undated
6 18
Correspondence
1992
6 19
Correspondence
1992
6 20
Correspondence
1992
TUBES
tube
1
Master Plan
Physical location: CCA 8 Column 4, Row 3
undated
2
Regional
Physical location: CCA 8 Column 5, Row 2
undated
Project 73: Sunrise Resort
1990
MANUSCRIPT MATERIALS
1990
Box Folder
6 21
Master Plan
1990 December 21
Project 74: Ucross Ranch (Wyoming)
1994
MANUSCRIPT MATERIALS
1994
Box Folder
6 22
Master Plan
1994 June 14
Project 75: Urschel Property
1991-1992
MANUSCRIPT MATERIALS
1991-1992
Box Folder
6 23
General Submission for Rezoning
1992 June 1
6 24
Proposals/Contracts
1991
6 25
Correspondence
1991-1992
6 26
Physical
1992
6 27
Engineering
1992
Project 76: Lobo Ranch
2006
MANUSCRIPT MATERIALS
2006
Box Folder
6 28
Proposals/Contracts
2006
6 29
Executive Summary
undated
TUBES
tube
1
Entry Sequence
Physical location: CCA 6 Column 2, Row 5
undated
Project 77: Legacy
2000-2003
MANUSCRIPT MATERIALS
2000-2003
Box Folder
6 30
Proposals/Contracts
2000-2001
6 31
Correspondence
2001-2002
6 32
Meeting Minutes/Notes to File
2000-2003
6 33
Design Sketches
2001-2002
6 34
Operations & Maintenance Manual
2002 November 13
TUBES
Plaza
Physical location: CCA 8 Column 5, Row 3
undated
Project 78: Kapyung Four Seasons Resort (Korea)
2000-2003
MANUSCRIPT MATERIALS
2000-2003
Box Folder
6 35
Meeting Minutes/Notes to File
1997
6 36
General Administration
1997-1998
6 37
Proposals/Contracts
1996
TUBES
tube
1
Site Analysis
Physical location: CCA 8 Column 6, Row 1
undated
Project 79: Lake Arrowhead
1984-1985
MANUSCRIPT MATERIALS
1984-1985
Box Folder
6 38
Correspondence
1984-1985
Project 80: Johnson Residence (Wildcat)
1995-1997
MANUSCRIPT MATERIALS
1995-1997
Box Folder
6 39
Proposals/Contracts
1995
6 40
Correspondence
1996
6 41
Cost Estimates
1997
6 42
Construction Bids/Proposals
1995
TUBES
tube
1
The Landscape Base Drawings
Physical location: CCA 6 Column 2, Row 4
2
Phase I Slicks
Physical location: CCA 8 Column 4, Row 2
undated
3
Drawings
Physical location: CCA 8 Column 4, Row 3
undated
4
Schematic Landscape Design
Physical location: CCA 8 Column 4, Row 3
undated
5
Electrical CDs, Schematic Landscape Design, Original Pool-Patio-Lawn Section, Garden Expansion
Physical location: CCA 8 Column 5, Row 2
undated
6
Preliminary CD with Redline Notes
Physical location: CCA 8 Column 4, Row 3
undated
Project 81: Chang An Center
2003
MANUSCRIPT MATERIALS
2003
Box Folder
6 43
Proposals/Contracts
2003
TUBES
2003
tube
1
Chang An Center
Physical location: CCA 8 Column 6, Row 1
2003
Project 82: Lakeside (British Columbia)
2005
MANUSCRIPT MATERIALS
2005
Box Folder
6 44
Envisioning Session
2005
TUBES
tube
1
Deer Valley
Physical location: CCA 6 Column 1, Row 3
undated
2
Inn Signage/Visual Analysis
Physical location: CCA 8 Column 4, Row 1
undated
Project 83: Guapilo New Town
1995-2005
MANUSCRIPT MATERIALS
Some documents in Spanish
1995-2005
Box Folder
6 45
Proposals/Contracts
1996-2005
6 46
Conceptual Plan
2005
6 47
Design Sketches
2005
6 48
Programming
1995
6 49
Report
[In Spanish]
undated
TUBES
tube
1
Guapilo II (Campos Del Este) #3485, project and charrette archive drawings
Physical location: CCA 8 Column 6, Row 2
undated
2
Mylar's Base Drawings
Physical location: CCA 6 Column 2, Row 6
undated
3
Large Format negatives
Physical location: CCA 6 Column 2, Row 7
undated
Project 84: Goodman Residence
2007
MANUSCRIPT MATERIALS
2007
Box Folder
6 50
Proposals/Contracts
2007
TUBES
tube
1
Overflow approvals
Physical location: CCA 8 Column 6, Row 1
2007
2
Construction Set
Physical location: Barn Box 2
undated
3
Entry Court Garden
Physical location: Barn box 3
undated
4
Complete Set of Construction Drawings
Physical location: Barn Box 4
undated
5
Original Overlay
Physical location: Barn Box 4
undated
6
Planting Plan
Physical location: Barn Box 4
undated
Project 85: Glen Cove
1984-1997
MANUSCRIPT MATERIALS
1984-1997
Box Folder
6 51
Proposals/Contracts
1997
6 52
Correspondence
1996-1997
6 53
Meeting Minutes/Notes to File
1996-1997
6 54
Design Sketches
undated
6 55
Engineering
1984-1997
6 56
Visual
1993-1997
TUBES
tube
1
Existing Conditions
Physical location: CCA 8 Column 5, Row 2
undated
Project 86: Great Lakes Marina
1988-1990
MANUSCRIPT MATERIALS
1988-1990
Box Folder
6 57
Proposals/Contracts
1990
6 58
Incoming Transmittals
1988-1990
Project 87: Ice Rink-Savanah
1991-1993
MANUSCRIPT MATERIALS
1991-1993
Box Folder
6 59
Proposals/Contracts
1991-1992
6 60
Meeting Notes
1991-1993
6 61
Cost Estimates
1991
6 62
Physical
1993
6 63
Engineering
1993
6 64
Design Sketches
1993
Project 88: Chalalan
undated
MANUSCRIPT MATERIALS
Some documents in Spanish
undated
Box Folder
6 65
Illustrative
undated
TUBES
tube
1
Exhibits
Physical location: Barn Box 2
undated
Project 89: Cadence
2003-2005
MANUSCRIPT MATERIALS
Some documents in Spanish
2003-2005
Box Folder
6 66
Meeting Notes
2005
6 67
Correspondence
2005
6 68
Design Sketches
2003-2005
Project 90: Marriott Vail
1999
MANUSCRIPT MATERIALS
1999
Box Folder
7 1
Proposals/Contracts
1999
7 2
Correspondence
1999
7 3
Notes
1999
7 4
Sketches
1999
Project 91: Museum of Northern Arizona
1994
MANUSCRIPT MATERIALS
1994
Box Folder
7 5
Proposals/Contracts
1994
TUBES
tube
1
Schematic Design
Physical location: CCA 6 Column 2, Row 5
undated
Project 92: Powderhorn
1996
MANUSCRIPT MATERIALS
1996
Box Folder
7 6
Charette Notion
1996
Project 93: Red Brick Arts
MANUSCRIPT MATERIALS
1996-1997
Box Folder
7 7
Proposals/Contracts
1996-1997
7 8
Correspondence
1996
7 9
Meeting Minutes/Notes
1996
7 10
Design Sketches
1996
TUBES
tube
1
School
Physical location: Barn Box 2
undated
Project 94: Blue Mountain
1982-1984
MANUSCRIPT MATERIALS
1982-1984
Box Folder
7 11
Land Use Plan
1982-1984
7 12
Land Use Plan
1982-1984
7 13
Land Use Plan
1982-1984
TUBES
tube
1
Tennis Center
Physical location: Barn Box 12
undated
Project 95: Squaw Creek Resort
1985-2005
MANUSCRIPT MATERIALS
1985-2005
Box Folder
7 14
Design Guidelines
2002
7 15
Project Manual
2005
7 16
Proposals/Contracts
1997
7 17
Program Memo
1985
7 18
Design Concept
undated
TUBES
tube
1
Site Design
Physical location: CCA 8 Column 5, Row 3
undated
2
Design Reviews
Physical location: CCA 8 Column 5, Row 2
undated
3
Composite Design Workshop Construction Drawings and Water Featured Construction Documents
Physical location: CCA 8 Column 5, Row 2
undated
4
Schematic Design
Physical location: CCA 8 Column 5, Row 2
undated
5
Design Development Reproducible
Physical location: CCA 8 Column 5, Row 2
undated
6
Construction Documents
Physical location: Barn Box 9
undated
7
Retaining Wall with redlines, vellum CDs
Physical location: Barn Box 9
undated
Project 96: Three Sisters Resort
1986
MANUSCRIPT MATERIALS
1986
Box Folder
7 19
Notes to File
1986
Project 97: Chase Residence
1997
MANUSCRIPT MATERIALS
1997
Box Folder
7 20
Proposals/Contracts
1997
7 21
Correspondence
1997
7 22
Programming
undated
Project 98: Budagher Market & Festival Center
2000
MANUSCRIPT MATERIALS
2000
Box Folder
7 23
Correspondence
2000
7 24
Proposal/Contracts
2000
7 25
Design Sketches
2000
Project 99: Cherry Creek
1987-2010
MANUSCRIPT MATERIALS
1987-2010
Box Folder
7 26
Proposals/Contracts
1997
7 27
Field Reports
2010
7 28
Notes to File
1987-1998
7 29
Correspondence
1997-2010
TUBES
tube
1
Concept Plans
Physical location: CCA 6 Column 2, Row 4
undated
2
Concepts, Aerial Photos Misc.
Physical location: CCA 6 Column 2, Row 5
undated
3
Concepts, Phasing Plans
Physical location: CCA 6 Column 2, Row 4
undated
4
Grading Topography, Utility Plans and Concepts
Physical location: CCA 6 Column 2, Row 4
undated
5
Concepts Misc.
Physical location: CCA 6 Column 2, Row 4
undated
6
Negatives
Physical location: CCA 6 Column 2, Row 1
undated
Project 100: Whistler
2000
MANUSCRIPT MATERIALS
2000
Box Folder
7 30
Meeting Minutes/Notes to File
2000
Project 101: Booth Creek
2003
MANUSCRIPT MATERIALS
2003
Box Folder
7 31
Proposals/Contracts
2003
Project 102: Powell Butte
2002
MANUSCRIPT MATERIALS
2002
Box Folder
7 32
Proposals/Contracts
2002
7 33
Correspondence
2002
7 34
Notes to File
2002
Project 103: Blue Heron Bay
undated
MANUSCRIPT MATERIALS
2002-2003
Box Folder
7 35
Concept Plan
undated
7 36
Detail Design Studies
2002
7 37
Development Program
2002
7 38
Meeting Minutes
2002
7 39
Proposals/Contracts
2003
7 40
Vegetation
undated
TUBES
tube
1
"Site analysis; design analysis-trace; marina alternatives - trace; road grading; aerial phots; Barn renovation sketches; interview drawings (developable land summary, existing conditions, site analysis, elevation analysis, water view analysis); conceptual master plan illustrative; master development concept plan; club center design and alternatives; townhouse sections and elevations"
CCA 8 Column 3, Row 1
undated
Project 104: Strang Ranch
MANUSCRIPT MATERIALS
Box Folder
7 41
Correspondence
1984-1985
Project 105: Limestone Springs
MANUSCRIPT MATERIALS
Box Folder
7 42
Development Plan
undated
7 43
Master Plan Document
2001
7 44
Meeting Minutes/Notes to File
2002
7 45
Work Program
2002
Project 106: Republic Plaza
MANUSCRIPT MATERIALS
Box Folder
7 46
Correspondence
1997-1999
TUBES
tube
1
Landscape Plans and Details
Physical location: CCA 8 Column 5, Row 2
undated
Project 107: Springwoods
MANUSCRIPT MATERIALS
Box Folder
7 47
Conceptual Design
2009
Project 108: Design Workshop, Inc. Projects
MANUSCRIPT MATERIALS
Box Folder
7 48
Parks and Recreation Projects
undated
7 49
Miscellaneous Projects Binder
undated
Project 109: Denargo Market
MANUSCRIPT MATERIALS
Box Folder
7 50
Proposals/Contracts
2006
7 51
Budget/Financial
2007
7 52
Meeting Minutes/Notes to File
2006
7 53
Design
2006
7 54
Correspondence
2006
TUBES
tube
1
Redevelopment
Physical location: Barn Box 9
undated
Project 110: Bellingham Harbor
MANUSCRIPT MATERIALS
Box Folder
7 55
Proposals/Contracts
2005
7 56
Meeting Minutes/Notes to File
2005-2006
7 57
Correspondence
2005-2006
7 58
Master Plan Project Position Paper
2006
TUBES
tube
1
Bellingham Harbor
Physical location: CCA 8 Column 3, Row 3
undated
Project 111: Tanbara Woodland Resort
MANUSCRIPT MATERIALS
Box Folder
7 59
Master Plan Report
1991
Project 112: Aizu Resort
MANUSCRIPT MATERIALS
1991
Box Folder
7 60
Site Analysis
1991 March 11
TUBES
item
1
Site Analysis
Physical location: CCA 8 Column 5, Row 2
undated
Project 113: Old Town Plaza
MANUSCRIPT MATERIALS
2008-2010
Box Folder
7 61
Proposals/Contracts
2008
7 62
Proposals/Contracts
2009
7 63
Correspondence
2009-2010
7 64
Project Matrix
2009
7 65
Invoices
2009
Project 114: Fourth Ward Redevelopment (Houston)
MANUSCRIPT MATERIALS
2008-2010
Box Folder
7 66
Master Agreement
2009
7 67
Utility & Street Condition Assessment Study
2008 February 21
Project 115: Harvest Design
MANUSCRIPT MATERIALS
Box Folder
7 68
Proposals/Contracts
2005
7 69
Meeting Minutes/Notes to File
2005
7 70
Correspondence
2005
Project 116: Superstition Area Land Plan
MANUSCRIPT MATERIALS
Box Folder
7 71
Proposals/Contracts
2005
7 72
Proposals/Contracts/Owner
1998
7 73
Proposals/Contracts/Consultants
1998-1999
7 74
Correspondence
1999-2001
7 75
Meeting Minutes
1998
7 76
Notes to File
2001
7 77
Cost Estimates
1999
7 78
Work Program
2001
7 79
Report
2001
7 80
Report
2001
TUBES
tube
1
Topography
Physical location: CCA 6 Column 2, Row 3
undated
Project 117: Landow Residence
MANUSCRIPT MATERIALS
Box Folder
7 81
Proposals/Contracts
2003
7 82
Design Sketches
undated
TUBES
tube
1
Schematic Layout
Physical location: CCA 8 Column 4, Row 1
undated
Project 118: Buck Creek
MANUSCRIPT MATERIALS
Box Folder
8 1
Proposals/Contracts
1996-1997
8 2
Correspondence
1996-1998
8 3
Meeting Minutes/Notes to File
1997-1998
8 4
Finance
1997-1998
8 5
Physical
1996-1997
8 6
Programming
1996-1997
Project 119: Kemmerer Residence
MANUSCRIPT MATERIALS
Box Folder
8 7
Proposals/Contracts
1997
8 8
Correspondence
1997-1998
8 9
Correspondence/Consultant
1998
8 10
Correspondence/Owner
1997-1998
8 11
Meeting Minutes/Notes to File
1997-1998
8 12
Design Sketches
undated
8 13
Design Guidelines
1998
Project 120: Macmillan Residence (Jackson, WY)
MANUSCRIPT MATERIALS
Box Folder
8 14
Proposals/Contracts
1994-1996
8 15
Correspondence
1995
8 16
Meeting Minutes/Notes to File
1995-1996
8 17
Cost Estimates
1995-1996
8 18
Design Sketches
1995-1996
8 19
Construction Bids/Proposals/Addendum
1996
TUBES
tube
1
Irrigation and Stream Pumps
Physical location: CCA 6 Column 1, Row 8
undated
2
Planting Beds
Physical location: Barn Box 4
undated
3
Conceptual Plan
Physical location: CCA 8 Column 5, Row 1
undated
4
Conceptual Plan
Physical location: CCA 8 Column 5, Row 2
undated
5
Design
Physical location: Barn Box 6
undated
6
Concept diagrams, planting schedule ,illustrative site plan, trace sketches, sections
Physical location: Barn Box 7
undated
Project 121: Chandler Skate Park
MANUSCRIPT MATERIALS
Box Folder
8 20
Proposals/Contracts/Consultants
1998
8 21
Proposals/Contracts/Owner
1997-1998
8 22
Billing/Invoices
1998-1999
8 23
Design Sketches
1998
8 24
Feasibility Report
1998
Project 122: Pines Grading
MANUSCRIPT MATERIALS
Box Folder
8 25
Correspondence
1997
Project 123: Beaver Creek
MANUSCRIPT MATERIALS
Box Folder
8 26
Proposals/Contracts
1995
8 27
Notes to File
undated
8 28
Billing/Invoices
1995
8 29
Correspondence
1995
8 30
Design Regulations
1979
8 31
Elk Track Townhomes Proposals
2001
8 32
Elk Track Townhomes Design Review
2001-2002
8 33
Elk Track Townhomes Encroachment Approvals
2002
8 34
Elk Track Townhomes Cost Estimates
2002
TUBES
tube
1
Disney Vacation Club
Physical location: CCA 8 Column 4, Row 3
undated
Project 124: Gauer Estate
MANUSCRIPT MATERIALS
Box Folder
8 35
Correspondence
1991-1994
8 36
Legal
1994
8 37
Meeting Notes
1992
8 38
Programming
1992-1994
8 39
Proposal/Contracts
1992-1994
TUBES
tube
1
Vineyard
Physical location: CCA 8 Column 4, Row 3
undated
2
Alternates
Physical location: Barn Box 2
1993-1999; undated
3
Vineyard Original Mylar's
Physical location: Barn Box 2
undated
4
Base Mapping
Physical location: CCA 6 Column 1, Row 5
undated
5
Development Plan
Physical location: CCA 6 Column 1, Row 5
undated
Project 125: Sand Creek Parkway
MANUSCRIPT MATERIALS
Box Folder
8 40
Correspondence
2002-2004
8 41
Cost Estimates
2003
8 42
Design Development
undated
8 43
Lighting
2003
8 44
Master Plan
1994
8 45
Meeting Minutes
2002-2003
8 46
Meeting Minutes/Notes to File
undated
8 47
Proposal/Contracts
1993
8 48
Proposal/Contracts
2003
TUBES
tube
1
Blueprints
Physical location: CCA 8 Column 6, Row 2
undated
2
Parkway
Physical location: CCA 8 Column 5, Row 3
undated
3
Parkway
Physical location: CCA 8 Column 5, Row 3
undated
4
Blue Prints
Physical location: Barn Box 15
undated
5
Original Mylar's
Physical location: Barn Box 15
undated
Project 126: Bear Mountain
MANUSCRIPT MATERIALS
Box Folder
8 49
Articles
1989
8 50
Base Area Plan
1998
8 51
Biological
1988
8 52
Correspondence
1989
8 53
Correspondence
1992
8 54
Development Plan
1989
8 55
Economic Analysis
1992
8 56
Environmental Assessment
1989
8 57
Meeting Minutes/Notes to File
1989
8 58
Physical
1992
8 59
Programming
1989
8 60
Proposal/Contracts
1988
8 61
Proposal/Contracts
1989
8 62
Text Reference
1989
8 63
Work Program
1989
TUBES
tube
1
Conceptual Studies
Physical location: CCA 8 Column 6, Row 3
undated
2
Illustrative
Physical location: CCA 6 Column 1, Row 2
undated
3
Bear Mountain
Physical location: CCA 6 Column 1, Row 2
undated
4
Base
Physical location: Barn Box 8
undated
5
Mylar
Physical location: Barn Box 8
undated
Project 127: Fitzsimmons
MANUSCRIPT MATERIALS
2000-2006
Box Folder
8 64
Commons Development
2001
8 65
Correspondence
2001-2004
8 66
Correspondence
2004
8 67
General Development Plan
undated
8 68
Meeting Minutes
2001
8 69
Meeting Minutes
2006
8 70
Proposals/Contracts
2001-2002
8 71
Proposals/Contracts
2002
8 72
Research
2000-2001
8 73
Text
2000-2001
TUBES
tube
1
Parkway Parcel Study
Physical location: CCA 6 Column 1, Row 1
undated
Project 128: City North
MANUSCRIPT MATERIALS
2007-2010
Box Folder
8 74
Images
2007
8 75
Meeting Minutes
undated
8 76
Proposals/Contracts
2007-2010
Project 129: Chechessee Bluffs
MANUSCRIPT MATERIALS
1993-1994
Box Folder
9 1
Correspondence
1993-1994
9 2
Cost Estimates
1993
9 3
Design Sketches
undated
9 4
Engineering
1993
9 5
Marketing/Presentations
1993
9 6
Notes to File
undated
9 7
Programming
1993
9 8
Proposals/Contracts
1993-1994
9 9
Conceptual Master Plan
1994
Project 130: Bishop's Lodge
MANUSCRIPT MATERIALS
1996-1998
Box Folder
9 10
Carefree Resorts Study
1997
9 11
Construction Communications
1998
9 12
Correspondence
1998
9 13
Cost Estimates
1998
9 14
Cost Estimates- Charette
1998
9 15
Design Sketches
1998
9 16
Layout
1996
9 17
Meeting Minutes
1998
9 18
Marketing/Presentations
1997
9 19
Programming
1998
9 20
Proposal/Contract
1998
9 21
Work Program
1998
TUBES
Drawings
Physical location: Barn Box 13
undated
Project 131: Ambergris Cay (Turks and Caicos Islands)
MANUSCRIPT MATERIALS
2003-2006
Box Folder
9 22
Contracts
2003
9 23
Correspondence- Other
2004
9 24
Environmental
2005
9 25
Environmental Soils and Ground
undated
9 26
Environmental Vegetation
2005
9 27
Field Notes
2005
9 28
Historic/Cultural- Existing Buildings
2003
9 29
Meeting Record
2005-2006
9 30
Market Studies
2003
9 31
Pamphlets
undated
9 32
Plants
undated
9 33
Professional Services Agreement
2004
9 34
Research
undated
9 35
Signage
2005
9 36
Spa
2005
Project 132: Clark County Wetlands
MANUSCRIPT MATERIALS
1993-2000
Box Folder
9 37
Construction Documents
undated
9 38
Cost Estimates
1999
9 39
Marketing/Presentations
undated
9 40
Programming/Architectural
undated
9 41
Proposals/Contracts
1998
9 42
Proposals/Contracts- Agency
1993
9 43
Valley Crest- The Nature Center
2000
9 44
Work Program
1994
TUBES
tube
1
Review
Physical location: CCA 8 Column 5, Row 2
undated
2
Review
Physical location: CCA 8 Column 5, Row 2
undated
Project 133: Tamandua
MANUSCRIPT MATERIALS
[Some items in Spanish]
1991-1993
Box Folder
9 45
Correspondence
1991-1993
9 46
Meeting Minutes/Notes to File
1991-1992
9 47
Proposals/Contracts
1991-1992
9 48
Work Program
1991
Project 134: Chateau Roaring Fork
MANUSCRIPT MATERIALS
1995-1997
Box Folder
9 49
Design
1996
9 50
Design Sketches
1996
9 51
Engineering
1996
9 52
Meeting Notes
1996
9 53
Meeting Notes
1996-1997
9 54
Physical
1996
9 55
Proposal/Contracts
1996
9 56
Roaring Fork Club
1995-1997
9 57
Trail Plan
1996
9 58
Transmittal
1996
TUBES
tube
1
Illustrative Site Plans
Physical location: CCA 8 Column 5, Row 1
undated
2
Club-Admin/Clubhouse/Entry Drawings
Physical location: CCA 8 Column 6, Row 3
undated
3
Prelim Site/ Master Plans Including Golf Layout Roads
Physical location: CCA 8 Column 5, Row 1
undated
4
Condominiums
Physical location: CCA 8 Column 5, Row 2
undated
5
Signage
Physical location: Barn Box 11
undated
6
School
Physical location: Barn Box 14
undated
7
Grading/Drainage Drawings
Physical location: Barn Box 15
undated
Project 135: Geneva
MANUSCRIPT MATERIALS
1987-1994
Box Folder
9 59
Clippings/Research
1987-1989
9 60
Correspondence
1993
9 61
Design Sketches
undated
9 62
Engineering
1992
9 63
Meeting Minutes/Notes to File
undated
9 64
Meeting Minutes/Notes to File
undated
9 65
Proposals/Contracts
1989
9 66
Proposals/Contracts
1992-1993
9 67
Proposals/Contracts
1993
9 68
Work Program
1993-1994
Project 136: Christus St. Michael
MANUSCRIPT MATERIALS
2004-2006
Box Folder
9 69
Proposals/Contracts
2004-2005
9 70
Transportation Charette
2005-2006
9 71
Budget/Financials
2005-2006
9 72
Correspondence
2005-2006
9 73
Meeting Agendas & Minutes
2005
TUBES
tube
1
Hospital Master plans and Sketches
Barn Box 5
undated
Project 137: Johnson Residence (California)
MANUSCRIPT MATERIALS
1995-1996
Box Folder
9 74
Proposals/Contracts
1995-1996
9 75
Correspondence
1996
9 76
Engineering
1995
9 77
Cost Estimates
1995-1996
9 78
Design Sketches/Production Information
1996
9 79
Project Manual
1996 June 7
9 80
Specificaitons
1995
Project 138: Flatiron Marketplace
MANUSCRIPT MATERIALS
1999-2002
Box Folder
10 1
Correspondence
2000-2001
10 2
Correspondence
2001
10 3
Correspondence
2001-2002
10 4
Cost Estimates
1999
10 5
Design Sketches
undated
10 6
Landscape Specifications Manual
2000
10 7
Meeting Record
2002
10 8
Proposals/Contracts
2000-2001
TUBES
tube
1
Record Set
Physical location: CCA 6 Column 2, Row 9
undated
2
Bid Set Originals
Physical location: CCA 6 Column 2, Row 9
undated
3
Fashion Bid Set
Physical location: CCA 6 Column 2, Row 9
undated
4
Redlined as Built
Physical location: CCA 6 Column 2, Row 9
undated
5
Lifestyle Gardens
Physical location: CCA 6 Column 2, Row 9
undated
6
Irrigation
Physical location: CCA 6 Column 2, Row 7
undated
7
lifestyle Record
Physical location: CCA 6 Column 2, Row 8
undated
8
Original Drawings
Physical location: CCA 6 Column 2,, Row 9
undated
9
90% Submittals
Physical location: CCA 6 Column 2, Row 8
undated
10
VE Diagrams
Physical location: CCA 6 Column 2, Row 9
undated
11
Lifestyle Bid Set
Physical location: CCA 6 Column 2, Row 9
undated
12
90% Submittals
Physical location: CCA 6 Column 2, Row 8
undated
Project 139: Thoms Property
MANUSCRIPT MATERIALS
2005-2008
Box Folder
10 9
Proposals/Contracts
2008
10 10
Final Lot Portfolios
2006
10 11
Design Sketches
undated
10 12
Design Sketches
undated
10 13
Stormwater Symposium
2007 June 5
10 14
Meeting Minutes/Notes to File
2006-2007
10 15
Submittal Requirement
2006-2007
10 16
Images
[Photocopies]
undated
10 17
Correspondence
2005-2007
TUBES
tube
1
Various Project Documents
Physical location: Barn Box 2
2
Sketches
Physical location: Barn Box 2
undated
Project 140: Valle San Pedro
MANUSCRIPT MATERIALS
[Some materials in Spanish]
2004-2008
Box Folder
10 18
Proposals/Contracts
2004-2008
10 19
Plant List
2004
10 20
Presentation
[In Spanish]
2004 October
10 21
ERA Report
2004
10 22
Master Plan
[In Spanish]
2004
10 23
Symbols Manual
[In Spanish]
undated
TUBES
tube
1
Schematic and Illustrative Plans
Physical location: CCA 8 Column 3, Row 3
2004-2006; undated
2
Phase One Schematics
Physical location: CCA 6 Column 2, Row 7
undated
3
Residential
Physical location: CCA 6 Column 2, Row 7
2006; undated
4
Sketches
Physical location: CCA 6 Column 1, Row 9
undated
5
Zoning and Land Use
Physical location: Barn Box 3
undated
6
Design Development
Physical location: Barn Box 3
undated
7
Land Use
Physical location: Barn Box 3
undated
8
Work Session
Physical location: Barn Box 4
undated
9
Land Use
Physical location: Barn Box 5
undated
10
Land use Plans
Physical location: Barn Box 5
undated
11
Design Development Package
Physical location: Barn Box 5
undated
Project 141: Beckwith Interchange Property
MANUSCRIPT MATERIALS
2008
Box Folder
10 24
Submittal Package
2008
10 25
Proposals/Contracts
2008
10 26
Construction Costs
2008
10 27
Correspondence
2008
10 28
Master Declaration of Protective Covenants
undated
Project 142: Orchard at Picacho
undated
MANUSCRIPT MATERIALS
2006-2007
Box Folder
10 29
Proposals/Contracts
2006-2007
10 30
PAD Submittal Draft
2006
10 31
PAD Submittal
2006
10 32
PAD Submittal
2007
10 33
Notes to File
2007
TUBES
tube
1
Conceptual Land Use Plan
CCA 6 Column 2, Row 1
undated
2
Entry Plans
Barn Box 3
undated
3
Conceptual Land Use Plan
Barn Box 3
undated
Project 143: Barr Lake
undated
MANUSCRIPT MATERIALS
1993
Box Folder
10 34
Proposals/Contracts
1995
10 35
Meeting Minutes/Notes to File
1995
10 36
Biological
1995
10 37
Programming
1993
10 38
Marketing/Presentations
1995
10 39
Final Documents
1996
Project 144: Taos Ski Resort
undated
MANUSCRIPT MATERIALS
1997-2006
Box Folder
10 40
Correspondence
1999-2000
10 41
Design Sketches/Product Info
1999
10 42
Development Alternatives
2000
10 43
History of Taos
undated
10 44
Market Analysis
1999
10 45
Notes
1999
10 46
Notes
2000-2006
10 47
Proposal/Contracts
1997-2000
10 48
Proposal/Contracts
1999
10 49
Real Estate Market Analysis
1998
10 50
Taos Resort
1997-1999
Project 145: Sun Valley
undated
MANUSCRIPT MATERIALS
1991-1998
Box Folder
10 51
Proposals/Contracts
1991
10 52
Proposals/Contracts
1997
10 53
Correspondence
1997
10 54
Meeting Minutes
1997-1998
10 55
Physical
undated
10 56
Engineering
1997
10 57
Cost Estimates
1997
10 58
Design Sketches
1997
10 59
Imagery Book
1997
10 60
Master Plan Marketing/Presentations
1991
TUBES
tube
1
Master Plan
Physical location: CCA 8 Column 6, Row 1
2
Master Plan
Physical location: CCA 8 Column 6, Row 1
undated
3
Architectural Sheet Set, Lighting Plan, Conceptual Grading, Parking Lot Improvements (Half-size sheet set)
Physical location: CCA 8 Column 6, Row 1
undated
4
Master Plan
Physical location: CCA 6 Column 1, Row 1
undated
5
CDs, Details, Irrigation, Design Development on trace
Physical location: CCA 8 Column 4, Row 2
undated
6
Construction Documents
Physical location: CCA 8 Column 4, Row 2
undated
7
Construction Documents
Physical location: CCA 8 Column 4, Row 2
undated
8
Conceptual Alternatives, CD's, Details, Facilities, Original sketches, existing conditions
Physical location: CCA 8 Column 4, Row 2
undated
Project 146: Adam's Rib
undated
MANUSCRIPT MATERIALS
1989-1991
Box Folder
10 61
Proposals/Contracts
1989 March 6
10 62
Correspondence
1989-1991
10 63
Master Plans
1989-1990
10 64
Engineering
undated
10 65
Scope of Work
1992 July 1
10 66
Water Consumption Report
1992 June
10 67
Mountain Lift Numbers
1989 June 26
10 68
Phasing and Costs
undated
10 69
Programming
1989
10 70
Master Development Plan
1989 November 28
TUBES
tube
1
Phase 1
Physical location: CCA 8 Column 4, Row 1
undated
2
Phase 1 Site Condition Summary
Physical location: CCA 8 Column 4, Row 2
undated
Project 147: Douglas County
MANUSCRIPT MATERIALS
1987-2006
Box Folder
11 1
Correspondence
1991
11 2
Cost Estimates
1991
11 3
Design Guidelines
1991
11 4
Design Sketches/Product Info
1987
11 5
Impact Fees
2005
11 6
Master Plan
2005
11 7
Meeting Minutes
2006
11 8
Proposal/Contracts
1991
11 9
Proposal/Contracts
2006
11 10
Work Program
undated
Project 148: Delta County
undated
MANUSCRIPT MATERIALS
1996-1997
Box Folder
11 11
Construction Bids
undated
11 12
Construction Contracts
1997
11 13
Correspondence
1996-1997
11 14
Design Guidelines
undated
11 15
Design Sketches/Product Info
undated
11 16
Examples
1996
11 17
Meeting Minutes/Notes
1997
11 18
Product Info
1997
11 19
Proposals/Contracts
1997
11 20
Worksession Number 1
1997
11 21
Worksession Number 2
1997
11 22
Work Program
undated
TUBES
tube
1
Agricultural Construction Plans
Physical location: Barn Box 1
undated
2
Agricultural Construction Plans
Physical location: Barn Box 2
undated
Project 149: Frisco
undated
MANUSCRIPT MATERIALS
1989-1996
Box Folder
11 23
Correspondence
1995-1996
11 24
Engineering
undated
11 25
Final PUD Submission
1996
11 26
Fisco Triangle PUD
undated
11 27
Meeting Minutes/Notes to File
1996
11 28
Physical
1995
11 29
Preliminary Plan and PUD Submission
undated
11 30
Proposal/Contracts
1995
11 31
Promo Frisco Lakefront Development
1989
TUBES
tube
1
Trails, wetlands, trade parcel,1757,aspen office
Physical location: CCA 8 Column 6, Row 3
undated
2
Frisco the Reserve
CCA 8 Column 6, Row 3
undated
3
Final Plat Drawings
CCA 8 Column 5, Row 3
undated
4
Buildable Area Analysis, PUD Setback Analysis,3/1996 Site Plan, Civil CDs, Final PLATT
CCA 8 Column 5, Row 2
undated
5
Slope Analysis
CCA 8 Column 5, Row 2
undated
6
Road Studies/Architectural
Barn Box 10
undated
7
Environmental Analysis
Barn Box 10
undated
8
Preliminary Site Plan
Barn Box 10
undated
9
Preliminary Plat Drawings
Barn Box 10
undated
10
North Village
Barn Box 10
undated
11
Planting Illustrative Drawings
Barn Box 10
undated
12
Trails, Wetland Trails Parcel
Barn Box 10
undated
Project 150: Marriott Canyons (Park City)
MANUSCRIPT MATERIALS
Box Folder
11 32
Correspondence
1999
11 33
Work Program/Schedules
1999
11 34
Meeting Minutes/Notes
1999 February-May
11 35
Meeting Minutes/Notes
1999 June-August
11 36
Proposals/Contracts
1999
11 37
Physical
1999
11 38
Engineering
1999
11 39
Cost Estimates
1999
Project 151: Coleman Residence
MANUSCRIPT MATERIALS
1998-2001
Box Folder
11 40
Proposals/Contracts
1998-2000
11 41
Correspondence
1998-1999
11 42
Correspondence
2000
11 43
Meeting Minutes
1999-2000
11 44
Programming/Architecture
2000
11 45
Design Details
undated
11 46
Field Reports
2000-2001
Project 152: South Farm (Utah)
MANUSCRIPT MATERIALS
Box Folder
11 47
Proposals/Contracts
1997
11 48
Correspondence
1997
11 49
Meeting Minutes
1997
11 50
Work Program
1997
11 51
Commercial Retail Data
1997
11 52
Amenity Trends
1997
11 53
Market Report
1997
TUBES
tube
1
Lotting Schemes, Conceptual Zoning, Map Studies
Physical location: CCA 8 Column 6, Row 2
undated
2
Base Maps
Barn Box 7
undated
3
Schematic Conceptual Design
Barn Box 7
undated
Project 153: Loveland
MANUSCRIPT MATERIALS
1992-1995
Box Folder
11 54
Correspondence
1995
11 55
Marketing/Presentation
1995
11 56
Meeting Minutes/Notes to File
1994-1995
11 57
Natural Areas
1993
11 58
Proposals/Contracts
1992-1996
11 59
Proposals/Contracts
1993-1995
11 60
Supporting Graphics
1995
TUBES
tube
1
Miscellaneous Maps and Photos
Physical location: Barn Box 7
undated
Project 154: Berger Residence
MANUSCRIPT MATERIALS
1991-2006
Box Folder
12 1
Contract/Proposals
2003
12 2
Gate Contract/Proposals
2006
12 3
Correspondence
1993
12 4
Design
undated
12 5
Meeting Minutes / Notes to File
1994
12 6
Proposal/Contracts
1993
12 7
Regulations
2006
12 8
Schematic Design
undated
12 9
Stone Dimension Drawings
undated
12 10
Stone Documentation and Drawings
2003
TUBES
1991-2006
tube
1
Bleeker SF
Physical location: CCA 8 Column 6, Row 1
1991-2006
Project 155: Little America
MANUSCRIPT MATERIALS
1997
Box Folder
12 11
Biological
undated
12 12
Correspondence
1997
12 13
Cost Estimates
1997
12 14
Engineering
undated
12 15
Marketing/Presentation
undated
12 16
Meeting Minutes/Notes
1997
12 17
Programming
1997
12 18
Proposal/Contract
1997
Project 156: Sunflower
MANUSCRIPT MATERIALS
2007
Box Folder
12 19
Sunflower Redevelopment
2007
12 20
Sunflower Redevelopment
undated
TUBES
tube
1
Schematic Designs
Physical location: CCA 6 Column 1, Row 2
undated
2
Surrounding Area
Physical location: CCA 6 Column 1, Row 3
undated
Project 157: Nassau/Bethel Estate
MANUSCRIPT MATERIALS
1999-2007
Box Folder
12 21
Correspondence
2004-2005
12 22
Key Issues
2004
12 23
The Living Waterfront
2008
12 24
Maps
undated
12 25
Market Booklet
undated
12 26
Ownership Issues/Leases
1999
12 27
Proposals/Contracts
2004-2007
12 28
References
undated
12 29
Sanitized Report for John Alfred Dock
2004
12 30
Scheduling
2004
12 31
Sketches
undated
Project 158: Dorros Residence
MANUSCRIPT MATERIALS
2000-2003
Box Folder
12 32
Design Sketches/Product Info
2000-2002
12 33
Environmental Audits/Hazardous Materials
2001-2002
12 34
Proposals/Contracts
2000-2001
12 35
Vegetation
2001-2003
TUBES
tube
1
Construction Documents
Physical location: CCA 6 Column 2, Row 9
undated
2
Conceptual Landscape Plan
Physical location: Barn Box 1
undated
3
Schematic Landscape Plan
Physical location: Barn Box 1
undated
Project 159: Patience Residence
MANUSCRIPT MATERIALS
2002-2005
Box Folder
12 36
Patience Residence Construction
2003-2005
12 37
Patience Residence Correspondence
2002-2005
12 38
Patience Residence Cost Estimates
2002
12 39
Patience Residence Design Info
2002-2003
12 40
Patience Residence Field Reports
2004-2005
12 41
Patience Residence Proposals/Contracts
2002-2003
12 42
Patience Residence Survey
2002-2003
TUBES
tube
1
Schematic Design
Physical location: CCA 8 Column 5, Row 1
undated
2
Native Plants
Physical location: CCA 8 Column 5, Row 2
undated
Project 160: Bow Canmore
MANUSCRIPT MATERIALS
1990-1998
Box Folder
12 43
Bow Canmore
1990
12 44
Canmore Urban Design
1998
12 45
Landscape Reference
1990
12 46
Proposal/Contract
1990
12 47
Visual Impact Assessment Design Manual
1991
12 48
Visual Impact Assessment Executive Summary
1991
12 49
Visual Impact Assessment Report
1991
12 50
Visual Impact Assessment Summary of Findings
undated
12 51
Visual Impact Assessment Part One- Process Documentation
1990
12 52
Visual Impact Assessment Part Three- Design Manual
1990
TUBES
tube
1
Monographs
Physical location: Barn Box 14
undated
Project 161: Luther Residence
MANUSCRIPT MATERIALS
2000-2001
Box Folder
12 53
Luther Residence Correspondence
2000-2001
12 54
Luther Residence Proposals/Contracts
2000-2001
12 55
Luther Residence Correspondence
2001
TUBES
tube
1
Construction Documents
Physical location: CCA 6 Column 2, Row 8
undated
2
Courtyard Perspectives
Physical location: CCA 8 Column 4, Row 1
undated
Project 162: Union Park Design
MANUSCRIPT MATERIALS
2004
Box Folder
12 56
Clippings
2004
12 57
Contracts/Proposals
2004
12 58
Correspondence
2004
12 59
LEED Book
undated
12 60
Meeting Minutes
2004
12 61
Sustainability
2004
TUBES
tube
1
Design Guidelines, schematic
Physical location: CCA 8 Column 6, Row 3
undated
2
Schematic Design
Physical location: CCA 8 Column 6, Row 3
undated
Project 163: Artist Point Overlook (Yellowstone)
MANUSCRIPT MATERIALS
2000-2003
Box Folder
12 62
Correspondence
2000-2003
12 63
Design/Sketches
2000
12 64
Design Standards
undated
12 65
Meeting Minutes
2000-2003
12 66
Proposal/Contracts
2001-2002
12 67
Road and Bridge Standards
undated
TUBES
tube
1
Schematic Design
Physical location: CCA 6 Column 2, Row 8
undated
2
Conditions
Physical location: CCA 6 Column 2, Row 8
undated
Project 164: Jacobs Residence
MANUSCRIPT MATERIALS
1997-2006
Box Folder
13 1
Budget/Finances
2005-2006
13 2
Construction Bids
1999
13 3
Correspondence
1989-1992
13 4
Correspondence
1999
13 5
Correspondence-Consultant
1999
13 6
Correspondence-Owner
1999
13 7
Design and Construction Standards
2000
13 8
Design Sketches/Product Info
1999
13 9
Fishing Cabin
1998-1999
13 10
Meeting Minutes
2005
13 11
Notes
2008
13 12
Notes to File
1999
13 13
Plants
1997
13 14
Programming-Land Use
1998
13 15
Proposal/Contracts
2005-2006
TUBES
tube
1
Drawings
Physical location: CCA 6 Column 1, Row 2
undated
2
Drawings
Physical location: CCA 6 Column 1, Row 3
undated
3
Drawings
Physical location: CCA 6 Column 1, Row 2
undated
Project 165: Buttermilk (Aspen)
MANUSCRIPT MATERIALS
1993-2003
Box Folder
13 16
Master Plan Study
undated
13 17
Proposals/Contracts
2003
13 18
Correspondence
2003
13 19
Grading
2002
13 20
Correspondence
1994-1995
13 21
Meeting Minutes/Notes
1995
13 22
Engineering
1993
13 23
Programming
undated
13 24
Cost Estimates
1995
13 25
MDP
1995
TUBES
tube
1
Master Plan Studies
Physical location: CCA 8 Column 6, Row 1
undated
2
Obsolete Drawings
Physical location: CCA 8 Column 6, Row 1
undated
3
Conceptual Plans
Physical location: CCA 8 Column 6, Row 1
undated
4
Base
Physical location: CCA 8 Column 5, Row 3
undated
5
Prints
Physical location: Barn Box 5
undated
6
Base Village
Physical location: Barn Box 15
undated
Project 166: Heard Museum Amphitheater
MANUSCRIPT MATERIALS
1997-1999
Box Folder
13 26
Proposals/Contracts Consultants
1998
13 27
Proposals/Contracts Owner
1998
13 28
Correspondence/Owner
1998
13 29
Correspondence/Consultant
1998-1999
13 30
Conversataion Record
1998
13 31
Meeting Minutes
1997-1998
13 32
Notes to File
1998
13 33
Facsimiles
1998
13 34
Cost Estimates
1998
13 35
Design Sketches
1998-1999
13 36
Field Reports
1999
TUBES
tube
1
Site Details
Physical location: CCA 8 Column 4, Row 2
undated
Project 167: Design Week: MSU
MANUSCRIPT MATERIALS
2005-2006
Box Folder
13 37
Correspondence
2005-2006
13 38
Bumwad
2006
13 39
Schedules
2006
Project 168: Albuquerque Botanical Garden
MANUSCRIPT MATERIALS
1992
Box Folder
13 40
Master Plan
1992
13 41
Master Plan
1992
13 42
Master Plan
1992
13 43
Master Plan
1992
13 44
Master Plan
1992
Project 169: Snowbasin (Utah)
MANUSCRIPT MATERIALS
1997
Box Folder
13 45
Proposals/Contracts
1997
13 46
Correspondence
1997
13 47
Work Program
1997
13 48
Meeting Minutes
1997
13 49
Programming
1997
Project 170: South Y (City of South Lake Tahoe)
MANUSCRIPT MATERIALS
1993-1996
Box Folder
13 50
Proposals/Contracts
1993-1994
13 51
Correspondence/Owner
1994-1996
13 52
Correspondence/Consultant
1995-1996
13 53
Meeting Minutes
1994-1996
13 54
Work Program
1994
13 55
Design Sketches
1994-1996
13 56
Programming
1994-1996
13 57
Cost Estimates
1994
13 58
Engineering
1994
13 59
Marketing
1994
13 60
Visual
undated
TUBES
tube
1
Blueprints of Construction Documents
Physical location: CCA 8 Column 6, Row 1
undated
2
CD Mylar's
Physical location: CCA 6 Column 1, Row 4
undated
3
Bus Transfer Facility
Physical location: CCA 8 Column 5, Row 1
undated
4
Record Set
Physical location: CCA 8 Column 5, Row 2
undated
5
Irrigation Plans, Approval Set
Physical location: CCA 8 Column 5, Row 2
undated
6
Final Infrastructure Package
Physical location: CCA 8 Column 5, Row 2
undated
Project 171: Grand Calumet (Indiana)
MANUSCRIPT MATERIALS
1997
Box Folder
14 1
Client Correspondence
1997
14 2
Team Correspondence
1997
14 3
Project Information
1997
14 4
Proposals/Contract
1997
14 5
Internal Correspondence
1997
14 6
Inteview for Planning Project
1997
14 7
Invoices
1997
14 8
Correspondence
1997
14 9
Correspondence
1997
TUBES
tube
1
Vision
Physical location: CCA 6 Column 1, Row 6
undated
Project 172: Sand Point/Sand Harbor Nevada State Park
MANUSCRIPT MATERIALS
1998-2005
Box Folder
14 10
Project Description/Proposals/Contracts
2004-2005
14 11
Correspondence
1998
14 12
Correspondence
1999
14 13
Correspondence
2005
14 14
Meeting Minutes
1998
14 15
Architecture
1999
14 16
Fire Marshal
1999
14 17
Public Works
1999
14 18
Cost Estimates
1999
Project 173: Gardening on El Paso
MANUSCRIPT MATERIALS
1997-1998
Box Folder
14 19
Proposals/Contracts
1997-1998
14 20
Proposals/Contracts
1999
14 21
Correspondence
1997-1998
14 22
Correspondence
1997
14 23
Correspondence
1998
14 24
Meeting Minutes
1997-1998
14 25
Work Program
1997
14 26
Cost Estimates
1997
14 27
Cost Estimates
1997
14 28
Submittals/Shop Drawings
1998
14 29
Physical
undated
14 30
Change Orders
1998
14 31
Design Sketches
1998
TUBES
tube
1
Present Drawings
Physical location: Barn Box 2
undated
2
Miscellaneous Drawings
Physical location: Barn Box 2
undated
Project 174: High Prairie Farms
MANUSCRIPT MATERIALS
1996-2003
Box Folder
14 32
Proposals/Contracts
1996
14 33
Correspondence
1996-1997
14 34
Meeting Minutes/Notes to File
1996-1997
14 35
Programming
1996-1997
14 36
Residential Data
1996
14 37
Development Proformas
1997
14 38
Master Plan Adjustment Meeting Minutes
2003
14 39
Master Plan Adjustment Survey
2003
14 40
Master Plan Equestrian Park Analysis
1997
14 41
Master Plan Prior Studies
undated
14 42
Master Plan Detail Design Studies
2003
14 43
Master Plan Sketches/Image Graphics
2003
14 44
Master Plan Proposal
2003
14 45
Horse Park Work Program
1991-1999
TUBES
tube
1
Renderings
Physical location: CCA 8 Column 6, Row 1
undated
2
Engineering and Site Regional Maps
Physical location: CCA 8 Column 4, Row 1
undated
Project 175: Hirsch/Snowmass
MANUSCRIPT MATERIALS
2002-2004
Box Folder
14 46
Proposals/Contracts
2003
14 47
Correspondence/Transmittals
2002-2004
14 48
Meeting Minutes
2002-2003
14 49
Vegetatation
2002 May
14 50
Sketches/Image Graphics
2003
14 51
Source Data
2002
14 52
Specifications
2003
14 53
Construction Bids/Proposals
2002-2003
14 54
Change Orders
2003
14 55
Water
2003
TUBES
tube
1
Landscape design and all plats
Physical location: CCA 8 Column 6, Row 3
undated
2
Architects set sketch; schematic design original; schematic design copies Mylar; schematic design planting; schematic design grading
Physical location: CCA 8 Column 6, Row 3
undated
3
Landscape design and plats
Physical location: Barn Box 1
undated
Project 176: Lake Catamount
MANUSCRIPT MATERIALS
1989-1995
Box Folder
15 1
Clippings
1993
15 2
Correspondence
1989-1990
15 3
Correspondence
1993-1994
15 4
Correspondence
1994
15 5
Design Sketches
1994
15 6
Drawings
1995
15 7
Issues Summary
1994
15 8
Issues Summary
1994
15 9
Land Use
undated
15 10
Meeting Minutes/Notes
1993-1994
15 11
Plan and Program
1995
15 12
Proposal/Contracts
1994
15 13
Work Program
1993-1994
15 14
Work Program
1994-1995
Project 177: Snowshoe
MANUSCRIPT MATERIALS
1995-1998
Box Folder
15 15
Proposals/Contracts
1995-1997
15 16
Correspondence
1996
15 17
Correspondence
1996-1998
15 18
Meeting Minutes/Notes to File
1995-1996
15 19
Plant List
1996
15 20
Wok Program
1996
15 21
Design Sketches
1996
15 22
Resort Meeting Minutes
1996
15 23
Resort Master Plan
1996
15 24
Resort Programming
1996
15 25
Resort Programming
1996
15 26
Resort Cost Estimates
1997
15 27
Resort Master Plan
1997
TUBES
tube
1
Ridge Development Concept
Physical location: CCA 8 Column 6, Row 2
undated
2
Resort
Physical location: CCA 8 Column 5, Row 2
undated
3
Resort
Physical location: Barn Box 7
undated
4
Design Concept on Trace
Physical location: Barn Box 7
undated
5
Monograph
Physical location: Barn Box 14
undated
Project 178: Centennial Airport
MANUSCRIPT MATERIALS
1998
Box Folder
15 28
Proposals/Contracts
1998
15 29
Correspondence
1998
15 30
Land Use Study
1998
15 31
Land Use Study Draft
1998
15 32
Meeting Minutes/Notes
1998
15 33
Work Program
1999
15 34
Background Information
1998
Project 179: Pfister Ranch
MANUSCRIPT MATERIALS
1988-1991
Box Folder
15 35
Permit Application
undated
15 36
Growth Management Application
1991 June
15 37
Growth Management Application
1991 September
15 38
Golf Development Submission
1988 July 1
15 39
Study of Project Comparables
1988 September 19
15 40
Growth Management Application
1990 June 1
15 41
Detailed Submission
1990 September
15 42
GMP & Amended General Submission
1989 June 1
Project 180: Pflugerville
MANUSCRIPT MATERIALS
2006-2010
Box Folder
16 1
Proposals/Contracts
2009
16 2
Meeting Minutes/Notes To File
2008-2009
16 3
Meeting Minutes/Notes To File
2009
16 4
Meeting Minutes/Notes To File
2009
16 5
Billing/Invoices
2009
16 6
Sub-consultant Contracts
2009
16 7
Public Input
2009
16 8
Zoning
2006
16 9
Zoning
2006
16 10
Correspondence
2009-2010
16 11
Maps
2009
16 12
Parks, Recreation & Open Spacer Public Review Draft
2010 August
16 13
Comprehensive Plan Draft
2010 July
16 14
Comprehensive Plan Draft
2009
16 15
Citizen Advisory Committee Draft
2009 November
TUBES
tube
1
Comprehensive Plan
Physical location: CCA 8 Column 6, Row 3
undated
Project 181: Dittman Residence
MANUSCRIPT MATERIALS
1995-2002; 1995
Box Folder
16 16
Consultants
1998
16 17
Correspondence
1995-2000
16 18
Correspondence
1995-2002
16 19
Cost Estimates
undated
16 20
Design
1996
16 21
Design Team/Coordination
1998
16 22
Field Reports
1998
16 23
Geology
undated
16 24
Graphics
undated
16 25
Master Plan
undated
16 26
Meeting Notes
1995-1996
16 27
Owner
1998
16 28
Physical
1995-2000
16 29
Planting Plan
1996
16 30
Planting Plan
1998-2000
16 31
Proposal/Contracts
1995-1998
16 32
Sketches
1998
16 33
Specialties
2000
16 34
Specifications
undated
16 35
Subdivision
1996
16 36
Water
1996
16 37
Wildlife/Vegetation
1996
TUBES
tube
1
Blue Prints
Physical location: CCA 8 Column 6, Row 1
undated
2
Master Plan
Physical location: CCA 6 Column 2, Row 9
undated
Project 182: Stolper Residence
MANUSCRIPT MATERIALS
2005-2009
Box Folder
16 38
Proposals/Contracts
2005-2009
16 39
Correspondence
2005-2006
16 40
Correspondence
2006-2007
16 41
Invoices
2005-2007
16 42
Meeting Minutes
2006
16 43
Visual Analysis
[photocopies]
undated
16 44
Schematic Design
2006
16 45
Design Sketches
2006
16 46
Design Development
2006-2007
16 47
Planting Specifications
2006-2007
16 48
Construction Bids/Proposals
2006
16 49
Construction Bids/Proposals
2007
16 50
Construction Bids/Proposals
2008-2009
16 51
Field Reports
2008
Project 183: The Rocks at Reata Pass
MANUSCRIPT MATERIALS
1997-2003
Box Folder
16 52
Construction Documents
2002
16 53
Construction Correspondence
2002
16 54
Correspondence Client
2001-2002
16 55
Correspondence Owner
2002-2003
16 56
Electrical/Mechanical
1997
16 57
Landscape Specifications
2002
16 58
Work Plan
2002
TUBES
tube
1
Commerce/Gantzel Residence
Physical location: CCA 6 Column 2, Row 4
undated
2
Design Development Concepts
Physical location: CCA 6 Column 2, Row 4
undated
3
Grading Plans, Design Development
Physical location: CCA 8 Column 4, Row 1
undated
4
Final Drawings Originals
Physical location: CCA 8 Column 4, Row 1
undated
5
Submittals Vellum Originals
Physical location: CCA 8 Column 4, Row 1
undated
6
Pre-Bid Construction Document
Physical location: CCA 8 Column 4, Row 1
undated
7
1st Submittals
Physical location: CCA 8 Column 4, Row 1
undated
8
2nd Submittal on Vellum
Physical location: CCA 8 Column 4, Row 1
undated
9
First Submittals Constitution Documents
Physical location: CCA 6 Column 1, Row 4
undated
10
Grading Plans, Design Development
Physical location: CCA 6 Column 1, Row 5
undated
Project 184: Institute of American Indian Arts (IAIA)
MANUSCRIPT MATERIALS
1992-2000
Box Folder
17 1
Proposals/Contracts
1996-2000
17 2
Work Program
1997-1999
17 3
Engineering Design Standards
1997-1999
17 4
Programming
1997-1999
17 5
Cost Estimates
1997-1998
17 6
Design Sketches
1992-1999
17 7
Communications
1999
17 8
Documentation Master Plans
1993
17 9
Documentation Master Plans
1993
17 10
Meeting Notes
1999
17 11
Correspondence
1998-1999
17 12
Proposal for Landscape Design
1996
Project 185: Biltmore Fashion Park, AZ
MANUSCRIPT MATERIALS
2005-2006
Box Folder
17 13
Proposals/Contracts
2005
17 14
Meeting Agendas/Records
2005
17 15
Tenant Criteria Manual
2006
17 16
Correspondence
2005
17 17
Cost Estimates
2005
17 18
Meeting Notes
2005
17 19
Work Plans
2005
17 20
Plant Lists
2005
17 21
Schematic Designs
2005
17 22
Concept Plans
2005
TUBES
tube
1
Design Development Drawings & Sketches
Physical location: CCA 8 Column 3, Row 3
undated
2
Schematic Designs
Physical location: CCA 8 Column 3, Row 3
undated
3
City Resubmittals
Physical location: Barn Box 3
undated
4
City Comments
Physical location: Barn Box 3
undated
5
Schematic Design
Physical location: Barn Box 3
undated
6
Design Development Set
Physical location: Barn Box 5
undated
7
Site Notes
Physical location: Barn Box 5
undated
Project 186: Lair of the Golden Bear
MANUSCRIPT MATERIALS
1998-2005
Box Folder
17 23
Meeting Minutes
2002-2005
17 24
Permit
1998
17 25
Opportunities and Constraints Report
2002 December
17 26
Environmental Assessment
undated
17 27
Project Description
2005 April 15
17 28
Master Plan Appendix
2003
17 29
Master Plan
2003
Project 187: Great Valley Corp Center
MANUSCRIPT MATERIALS
2005-2007
Box Folder
17 30
Proposals/Contracts
2005-2007
17 31
Meeting Minutes/Notes to File
2006
17 32
Correspondence
2005-2006
17 33
Site Testing
2006
17 34
Maps
2006
17 35
Maps
2007
17 36
Maps
2007
17 37
Master Plan
2007 February
17 38
Master Plan
2007 February
TUBES
tube
1
Containing most project presentation boards, sketches and construction documents
Physical location: CCA 6 Column 1, Row 1
undated
2
Containing most project presentation boards, sketches and construction documents
Physical location: CCA 6 Column 1, Row 1
undated
3
Containing most project presentation boards, sketches and construction documents
Physical location: CCA 6 Column 1, Row 1
undated
4
Ranch Hotel
Physical location: Barn Box 9
undated
Project 188: Early Winters
MANUSCRIPT MATERIALS
1988-1992; 1988
Box Folder
18 1
Clippings
1991-1992
18 2
Master Plan Cost Estimates
1990
18 3
Master Plan Design Sketches/Product Info
1990
18 4
Master Plan Economics Analysis
1988-1989
18 5
Master Plan EIS
1990
18 6
Miscellaneous Engineering
undated
18 7
Village Plan Marketing/Presentations
1990
18 8
Miscellaneous Meeting Minutes/Notes to File
1990
18 9
Village Plan Meeting Minutes/Notes to File
1989
18 10
Master Plan PDR
1989-1990
18 11
Master Plan Programming
1989-1990
18 12
Village Plan Programming
1990
18 13
Miscellaneous Proposal/Contracts
1990
18 14
Master Plan Submittal Requirements
1989-1990
18 15
Village Plan Work Programs
1990
18 16
Miscellaneous Work Program
1990
TUBES
tube
1
Land Ownership Mylar's, Land Study Analysis
Physical location: CCA 8 Column 6, Row 2
2
Schematic, soils, geology, wildlife, visual analysis
Physical location: CCA 8 Column 6, Row 2
undated
3
IDP/EIS, Original Mylar
Physical location: CCA 8 Column 6, Row 2
undated
4
GIS Map Analysis
Physical location: CCA 8 Column 6, Row 3
undated
5
Village Originals Mylar
Physical location: CCA 8 Column 2, Row 2
undated
6
Preliminary Master Plan, Topography, Presentation Drawings
Physical location: CCA 8 Column 2, Row 2
undated
7
Property Ownership
Physical location: CCA 6 Column 2, Row 2
undated
8
Village Center
Physical location: CCA 6 Column 2, Row 2
undated
9
EIS Original
Physical location: CCA 6 Column 2, Row 2
undated
10
PDR Final Graphics
Physical location: CCA 6 Column 2, Row 2
undated
11
Flood Plain Map
Physical location: CCA 6 Column 2, Row 2
undated
12
Sketches, Preliminary Analysis, Trace Diagramming
Physical location: Barn Box 2
undated
13
Village Studies, Base Info, Alternatives A&B, Sections
Physical location: Barn Box 2
undated
14
Originals
Physical location: CCA 8 Column 5, Row 2
undated
15
Framework Development Plan
Physical location: CCA 8 Column 5, Row 2
undated
16
Master Plan First Phase
Physical location: CCA 8 Column 5, Row 2
undated
17
Monographs
Physical location: Barn Box 14
undated
Project 189: Los Padillas Elementary School
MANUSCRIPT MATERIALS
1992-1994
Box Folder
18 17
Proposals/Contracts
1992
18 18
Proposals/Contracts
1993
18 19
Correspondence
1992
18 20
Correspondence
1993
18 21
Correspondence
1993
18 22
Correspondence
1994
18 23
Change Orders
1993
18 24
Notes to File
1992
18 25
Design Sketches
undated
Project 190: Sundance (Utah)
MANUSCRIPT MATERIALS
1994-1996
Box Folder
18 26
Proposals/Contracts
1995
18 27
Correspondence/Owner
1995-1996
18 28
Correspondence/Consultant
1996
18 29
Conversation Record
1996
18 30
Meeting Minutes
1995-1996
18 31
Notes to File
1996
18 32
Facsimiles
1995-1996
18 33
Facsimiles
1996
18 34
Design Sketches/Product Information
1994-1995
18 35
Vegetation
undated
18 36
Cost Estimates
1995-1996
18 37
Field Reports
1996
18 38
Change Orders
undated
18 39
Master Plans
1996
TUBES
tube
1
Master Plan
Physical location: Barn Box 8
undated
Project 191: Vail
MANUSCRIPT MATERIALS
1980-2001
Box Folder
18 40
Arrowhead Correspondence
1993-1994
18 41
Programming
1980-1994
18 42
Programming
1994
18 43
Lodge at Vail Proposals/Contracts
1996-1997
18 44
Lodge at Vail Correspondence
1997-1998
18 45
Lot P3 Proposals/Contracts
1995-1996
18 46
Lot P3 Meeting Minutes/Notes to File
1995
18 47
Lot P3 Design Sketches/Product Information
1995
18 48
Open Lands Proposals/Contracts
1993
18 49
Open Lands Correspondence
1993
18 50
Open Lands Meeting Minutes/Notes to File
1993
18 51
Open Lands Work Program
1993
18 52
Proposal/Contract for Community Facilities
1999
18 53
Cost Estimates for the Ski Club
1999
18 54
Design Sketches/Product Info for Ski Club
2000
18 55
Meeting Minutes for Ski Club
1999-2000
18 56
Clippings for Ski Club
undated
18 57
Proposal/Contract for Ski Club
2000
18 58
Correspondence for Ski Club
1999-2000
18 59
Transmittals for Ski Club
1999-2001
18 60
Programming for Common Ground
1998
18 61
Proposals/Contracts for Common Ground
1998
18 62
Proposals/Contracts for Common Ground
1998
18 63
Meeting Minutes/Notes for Common Ground
1998
18 64
Clippings for Common Ground
1998
18 65
Finance for Common Ground
1998
18 66
Proposal/Contracts
2000
TUBES
tube
1
Lodge
Physical location: CCA 8 Column 6, Row 3
undated
2
Westin Resort
Physical location: CCA 6 Column 1, Row 2
undated
3
Resort Renovation Design Development
Physical location: CCA 8 Column 5, Row 3
undated
4
Site Plan
Physical location: CCA 8 Column 5, Row 3
undated
5
Retail
Physical location: CCA 8 Column 4, Row 2
undated
6
Lodge
Physical location: CCA 8 Column 5, Row 3
undated
7
Cascade
Physical location: CCA 8 Column 4, Row 3
undated
8
Western Vail/Cascade
Physical location: CCA 8 Column 5, Row 2
undated
9
Lodge at Vail Resorts
Physical location: CCA 8 Column 4, Row 3
undated
10
Westin Design Development Prints
Physical location: CCA 8 Column 5, Row 3
undated
11
Old Vail Valley Dr. Engineer Drawings
Physical location: CCA 8 Column 5, Row 2
undated
12
Lodge
Physical location: CCA 8 Column 5, Row 2
undated
13
Cascade Lodge
Physical location: Barn Box 6
undated
Project 192: Gary Redevelopment
MANUSCRIPT MATERIALS
1995-1999
Box Folder
19 1
City of Gary Downtown Redevelopment Plan Appendix
1998
19 2
Plan Correspondence Consultant
undated
19 3
Correspondence Owner
1996-1997
19 4
Development Plan
1995-1996
19 5
Development Plan Proposal/Contract Consultant
1997-1998
19 6
Proposal/Contract Owner
1997-1999
19 7
Work Program
1996-1997
19 8
Development Planning
1997
19 9
Concept Master Plan
1997
TUBES
tube
1
Aerial Photograph
Physical location: CCA 6 Column 2, Row 6
undated
2
Trace and Vellum Renderings
Physical location: CCA 8 Column 4, Row 2
undated
Project 193: Great Western Park
MANUSCRIPT MATERIALS
1998-2004
Box Folder
19 10
Proposals/Contracts
1999-2000
19 11
Correspondence
1999-2000
19 12
Correspondence
2000
19 13
Correspondence
2000-2001
19 14
Meeting Minutes/Notes
1998-2000
19 15
Schematic Design
2000
19 16
Detail Design Studies
2001
19 17
Firing Range Correspondence
2000-2004
19 18
Firing Range Utilities
2001
19 19
Firing Range Schematic Design
2004
19 20
Firing Range Design Development
2003
Project 194: Agua Claras Mine Project
1980-1993
MANUSCRIPT MATERIALS
1980-1993
Box Folder
19 21
Proposals/Contracts
1990-1991
19 22
Correspondence
1990-1991
19 23
Meeting Minutes/Notes to File
1990-1991
19 24
Phase 1 Summary Report
1991 January 18
19 25
Video Story Board
1992
19 26
Correspondence
1991-1992
19 27
Case Study
1992-1993
19 28
Phase 2 Proposals/Contracts
1991
19 29
Phase 2 Correspondence
1991
19 30
Phase 2 Meeting Minutes/Notes to File
1991
19 31
Phase 2 Work Program
1990-1992
19 32
Engineering
1991
19 33
Office Parcel Correspondence
1991
19 34
Programming
1980
19 35
Phase 3 Proposals/Contracts
1991
19 36
Phase 3 Correspondence
1991
TUBES
tube
1
Phase I and II
Physical location: CCA 8 Column 4, Row 2
Project 195: Perisher Valley
1995-1996
MANUSCRIPT MATERIALS
1995-1996
Box Folder
19 37
Base Area Plan
undated
19 38
Correspondence
1996
19 39
Correspondence Ski
1996
19 40
Design Sketches/Product Info
undated
19 41
Meeting Minutes/Notes
1996
19 42
Project Reference
1991
19 43
Project Reference
1991
19 44
Physical
undated
19 45
Proposals
1995
19 46
Ski Area Plans
undated
19 47
Traffic Study
1996
19 48
Mountain Master Plan
1995
TUBES
tube
1
Resort
Physical location: CCA 6 Column 2, Row 5
undated
2
Resort
Physical location: CCA 6 Column 2, Row 9
undated
3
Trails
Physical location: CCA 8 Column 4, Row 2
undated
Project 196: Cove Springs Refinement
2003-2006
MANUSCRIPT MATERIALS
2003-2006
Box Folder
19 49
Proposals/Contracts
2004-2006
19 50
Meeting Minutes
2004
19 51
Meeting Minutes
2005
19 52
Correspondence
2004-2005
19 53
Cost Estimates
2004
19 54
Environmental
2005
19 55
Illustrative Maps
2003
19 56
Infrastructure
2004
19 57
Conceptual Design
2004
Project 197: Lake Las Vegas Wash
1993-1998
MANUSCRIPT MATERIALS
1993-1998
Box Folder
20 1
Articles
1997
20 2
Biological
1998
20 3
Correspondence - Consultant
1998
20 4
Correspondence
1997-1998
20 5
Correspondence
1997
20 6
Correspondence - Conversation Records
1998
20 7
Correspondence - Owner
1997
20 8
Correspondence - Owner
1998
20 9
Cost Estimates
1997
20 10
Cost Estimates
1997
20 11
Design Sketches
1997
20 12
Design Sketches/Product Info
1998
20 13
Design Sketches/Product Info
undated
20 14
Master Plans
undated
20 15
Meeting Minutes/Notes
1997-1998
20 16
Meeting Minutes/Notes
1998
20 17
Meeting Minutes
undated
20 18
Programming
1997
20 19
Proposal/Contracts
1997-1998
20 20
Proposal/Contracts
1993
20 21
Proposal/Contracts
1998
20 22
Proposal/Contracts - Owner/Landscape
1997
20 23
Proposal/Contracts - Owner/Landscape - Hyatt
1997
20 24
Water Features
1997-1998
20 25
Work Program
1998
TUBES
1997
tube
1
Presentation Interview
Physical location: Barn Box 5
undated
2
Master Plan
Physical location: Barn Box 5
undated
3
Hyatt Lake Las Vegas
Physical location: CCA 8 Column 4, Row 2
undated
4
Mylar's
Physical location: CCA 6 Column 1, Row 5
undated
5
Illustrative Renderings and Sketches
Physical location: CCA 8 Column 4, Row 3
undated
6
Hyatt Regency Trace Sketches
Physical location: CCA 8 Column 4, Row 3
1997; undated
7
Conceptual Illustrative Site Plan
Physical location: Barn Box 6
undated
8
Planting
Physical location: Barn Box 14
undated
Project 198: JY Ranch
2002
MANUSCRIPT MATERIALS
2002
Box Folder
20 26
Correspondence
2002
20 27
County Documents
2002
20 28
Design Development
2002
20 29
Design Development
2002
20 30
Meeting Minutes
2002
20 31
Market Research
2002
TUBES
tube
1
Trail Map
Physical location: CCA 8 Column 4, Row 1
undated
Project 199: Hunt/Garza
1997-2007
MANUSCRIPT MATERIALS
1997-2007
Box Folder
20 32
Clippings
1998
20 33
Correspondence-Garza
1997-1998
20 34
Correspondence-Hunt Affordable
1998
20 35
Correspondence-Market Study
1998
20 36
Cost Estimates
1998
20 37
Design Sketches
undated
20 38
Master Plan
2006-2007
20 39
Meeting Minutes/Notes to File
1998
20 40
Meeting Minutes/Notes to File-Market Study
1998
20 41
Notes
1998
20 42
Programming-Garza Properties
1998
20 43
Programming-Hunt Affordable
1998
20 44
Proposals/Contracts
1997-1998
20 45
Proposals/Contracts-Market Study
1998
20 46
Proposal of Service
1997
20 47
Vision Plan
1998
TUBES
tube
1
Vision
Physical location: CCA 8 Column 4, Row 2
undated
2
Hunt Affordable
Physical location: CCA 8 Column 4, Row 2
undated
3
Hunt Affordable Conceptual Sections
Physical location: CCA 8 Column 4, Row 2
undated
4
Hunt Affordable
Physical location: CCA 8 Column 4, Row 2
undated
Project 200: Green Valley Ranch
1997-2005
MANUSCRIPT MATERIALS
1997-2005
Box Folder
20 48
Proposals/Contracts
2002
20 49
Correspondence/Transmittals
2002-2003
20 50
Meeting Minutes/Notes To File
2002
20 51
Meeting Minutes/Notes To File
2002
20 52
Meeting Minutes/Notes To File
2002
20 53
Meeting Minutes/Notes To File
2002
20 54
Enginineering
2002
20 55
Cost Estimates
2002-2003
20 56
Design Review
2001
20 57
City Requirements
1997-2003
20 58
Proposals/Contracts
2004
20 59
Conceptual Design
2005
20 60
Zoning Requirements
undated
20 61
Image Booklet
2002 May 1
TUBES
tube
1
Bumwad plan sketches
Physical location: CCA 6 Column 1, Row 1
undated
2
Golf Resort
Physical location: CCA 6 Column 2, Row 1
undated
3
Shops
Physical location: CCA 8 Column 5, Row 3
undated
4
Shops
Physical location: CCA 8 Column 5, Row 3
undated
5
Shops at Green Valley Ranch
Physical location: CCA 6 Column 1, Row 8
undated
6
Shops at Green Valley Ranch
Physical location: CCA 6 Column 1, Row 8
undated
Project 201: Glacier Club/Tamarron
2001-2006
MANUSCRIPT MATERIALS
2001-2006
Box Folder
21 1
Proposals
2006
21 2
Schematic Design
2006
21 3
Field Notes
2004
21 4
Construction Documents
2003 August 5
21 5
Design Sketches
undated
21 6
Pool
2003-2004
21 7
Firepit
2004-2006
21 8
Meeting Records
2001
21 9
Correspondence
2001-2002
21 10
Land Use
2001-2002
21 11
Site Map
2001
21 12
Grading Plan
2002
21 13
Construction Summary
2002-2003
21 14
Tamarron Proposals
2000-2004
TUBES
item
1
Conceptual Master Development Plan
Physical location: CCA 6 Column 1, Row 1
undated
2
Hand Drawn Conceptual Plans
Physical location: CCA 8 Column 5, Row 3
undated
3
Signage
Physical location: Barn Box 9
undated
4
Golf
Physical location: Barn Box 10
undated
5
Golf
Physical location: Barn Box 15
undated
6
Mix Studies
Physical location: Barn Box 16
undated
Project 202: Callaway Gardens
1999-2006
MANUSCRIPT MATERIALS
1999-2006
Box Folder
21 15
Project Information
2003
21 16
Contracts/Proposals
2005
21 17
Environmental
1999-2004
21 18
Environmental
2005
21 19
Federal Grants
2005
21 20
Historic/Cultural
undated
21 21
Infrastructure
2005
21 22
Marketing
2005
21 23
Meeting Agendas/Notes
2006
21 24
Summary
2000-2005
Project 203: Cuchara
1998
MANUSCRIPT MATERIALS
1998
Box Folder
21 25
Correspondence
1998
21 26
Correspondence-Develop Plan
1998
21 27
Documentation
undated
21 28
Images
undated
21 29
Meeting Minutes/Notes
1998
21 30
Programming
1998
21 31
Proposals/Contracts
1998
21 32
PUD
1998
Project 204: Mesdag Residence
1997-2000
MANUSCRIPT MATERIALS
1997-2000
Box Folder
21 33
Residence Building Permits
undated
21 34
Residence Cost Estimates
1997-1999
21 35
Residence Correspondence
1997-1999
21 36
Residence Field Reports
1998-2000
21 37
Residence Gate
1998-2000
21 38
Residence Grading Plan
1999
21 39
Residence Lighting
1998
21 40
Residence Legal Document
1998-1999
21 41
Residence Proposals/Contracts
1997-2000
21 42
Residence Site Visits
1998-1999
21 43
Residence Soil Earth Moving Permit
1998
21 44
Residence Subdivision
1997
21 45
Residence Visual Analysis
1999
21 46
Residence Water Rights
1998-1999
TUBES
tube
1
Mesdag Residence
Physical location: CCA 8 Column 6, Row 1
undated
2
Illustrations
Physical location: CCA 6 Column 2, Row 6
undated
3
Analysis
Physical location: CCA 6 Column 2, Row 6
undated
4
Layout and Materials Details
Physical location: Barn Box 15
undated
Project 205: Stoneridge
1989-1998
MANUSCRIPT MATERIALS
1989-1998
Box Folder
21 47
Clippings
1998
21 48
Correspondence Agency
1998
21 49
Correspondence Consultant
1998
21 50
Correspondence Owner
1998
21 51
Engineering Civil/Traffic
undated
21 52
Engineering Legal Description
1998
21 53
Engineering Utility
1989-1998
21 54
Facsimiles
1998
21 55
Marketing/Presentation
1998
21 56
Meeting Minutes
1998
21 57
Notes to File
1998
21 58
Programming Land Use
1998
21 59
Proposal/Contracts
1998
21 60
PUD
undated
21 61
Work Program
undated
TUBES
tube
1
Master Plan
Physical location: CCA 6 Column 1, Row 4
undated
Project 206: Landau Residence
1992-1996
MANUSCRIPT MATERIALS
1992-1996
Box Folder
22 1
Proposals/Contracts
1993-1996
22 2
Billings/Invoices
1993-1994
22 3
Site Visit Reports
1994
22 4
Notes and Sketches
1993-1996
22 5
Correspondence
1992-1993
22 6
Correspondence
1994
22 7
Correspondence
1994
22 8
Correspondence
1994
22 9
Correspondence
1994
22 10
Correspondence
1995
22 11
Correspondence
1995
22 12
Correspondence
1996
TUBES
tube
1
Saddle Back Ranch
Physical location: CCA 6 Column 1, Row 2
undated
2
Irrigation
Physical location: CCA 8 Column 5, Row 1
undated
Project 207: Base Village
1994-1995
MANUSCRIPT MATERIALS
1994-1995
Box Folder
22 13
Biological
1994-1995
22 14
Correspondence
1995
22 15
Design Sketches
undated
22 16
Employee Housing
undated
22 17
Engineering
1995
22 18
Meeting Minutes/Notes
1995
22 19
Programming
1995
22 20
Proposal/Contract
1995
22 21
Transmittal
1995
22 22
Work Program
1995
TUBES
tube
1
Parcel A Sketches, parking plan w/ notes
Physial location: CCA 8 Column 6, Row 2
undated
2
Base Village
Physial location: CCA 8 Column 6, Row 2
undated
3
Overlay Originals
Physial location: CCA 8 Column 6, Row 2
undated
Project 208: Delgany Street in Central Platte Valley
1999-2006
MANUSCRIPT MATERIALS
1999-2006
Box Folder
22 23
Comments
2001-2002
22 24
Construction Documents
2000-2004
22 25
Contracts
1999-2000
22 26
Correspondence
2002-2003
22 27
Cost Estimates
2000
22 28
Design Development
2003
22 29
Maps
2002-2003
22 30
Meeting Minutes
1999-2002
22 31
Meeting Minutes
2002-2003
22 32
Meeting Minutes
2004
22 33
Notes
1999
22 34
Proposal/Contracts
2004
22 35
Proposal/Contracts
2004-2006
22 36
Schematic Design
2004-2006
22 37
Site Plan
2004
Project 209: Golden Peak Redevelopment
1993-1996
MANUSCRIPT MATERIALS
1993-1996
Box Folder
22 38
Proposals/Contracts
1994-1995
22 39
Correspondence
1992-1996
22 40
Meeting/Minutes Notes
1995
22 41
Meeting/Minutes Notes
1995-1996
22 42
Meeting/Minutes Notes
1995-1996
22 43
Meeting/Minutes Notes
1996
22 44
Meeting/Minutes Notes
1996
22 45
Meeting/Minutes Notes
1996
22 46
Meeting/Minutes Notes
1996
22 47
Meeting/Minutes Notes
1996
22 48
Biological
1996
22 49
Engineering
1995
22 50
Design Sketches
1994-1995
22 51
Zoning
1993-1994
22 52
Work Program
1995
22 53
Cost Estimate
1995
TUBES
tube
1
Final CD originals, Illustrative copies
Physical location: CCA 8 Column 6, Row 3
undated
2
Pre-SD originals, old vail valley drive studies, early concept and context studies
Physical location: CCA 8 Column 6, Row 3
undated
3
Pre-DD process originals, approval process originals
Physical location: CCA 8 Column 6, Row 3
undated
4
Illustrative Plans
Physical location: CCA 8 Column 6, Row 3
undated
Project 210: Lauder Residence
1990-2001
MANUSCRIPT MATERIALS
1990-2001
Box Folder
23 1
Proposals/Contracts
1990-2000
23 2
Correspondence
1990-1994
23 3
Correspondence
1998-2000
23 4
Meeting Minutes
2000-2001
23 5
Survey
1995-2000
23 6
Physical Geotech
2000
23 7
Construction Details
2000
23 8
Cost Estimates
2001
23 9
Construction Documents
2000
TUBES
tube
1
Lots 1-7 Trees
Physical location: CCA 8 Column 6, Row 1
undated
2
Spa Details and Deck
Physical location: CCA 8 Column 5, Row 3
undated
3
Tennis House
Physical location: Barn Box 1
undated
Project 211: Gunnison Parks
1992-1997
MANUSCRIPT MATERIALS
1992-1997
Box Folder
23 10
Master Plan Proposals/Contracts
1996-1997
23 11
Master Plan Correspondence
1996-1997
23 12
Master Plan Meeting Minutes/Notes to File
1996
23 13
Master Plan Interview Information
1996
23 14
Master Plan Engineering
1994
23 15
Master Plan Engineering
1996
23 16
Master Plan Programming
1990-1995
23 17
Master Plan Programming
1996
23 18
Agricultural Lease Agreement
1992
23 19
Master Plan Design Sketches/Product Information
1992-1993
23 20
Master Plan Design Sketches/Product Information
1996
23 21
Master Plan Marketing/Presentations
1996
TUBES
tube
1
Final Drawings
Physical location: Barn Box 1
undated
2
Master Plan
Physical location: CCA 8 Column 4, Row 2
undated
Project 212: Woodrun V
1978-1983
MANUSCRIPT MATERIALS
1978-1983
Box Folder
23 22
Final P.U.D. and Plat Submission
1978
23 23
Final Plat Submission
1982
23 24
Feasibility Cost Analysis
1980
23 25
Architectural Program
1979
23 26
Architectural Program
1979
23 27
Parcel 9 Final Plat Submission
1982
23 28
Parcel 10 Final Plat Submission
1983
23 29
Parcel 12 Final Plat Submission
1981
23 30
Investor's Package
1982
23 31
Townhouses Schematic Design
undated
TUBES
tube
1
Signage
Physical location: CCA 8 Column 4, Row 1
undated
Project 213: Adventure Sports Center
2002-2006
MANUSCRIPT MATERIALS
2002-2006
Box Folder
24 1
Proposals/Contracts
2003-2006
24 2
Precident Study
2003
24 3
Meeting Minutes
2002-2006
24 4
Correspondence
2002-2003
24 5
Correspondence
2003
24 6
Correspondence
2004-2005
24 7
Cost Estimates
2004-2006
24 8
Conceptual Design
2004
24 9
Schematic Design
2003
24 10
Design Development
2004
24 11
Specifications
2004-2005
24 12
Construction Bids
2003
24 13
Construction Contracts
2006
24 14
Change Orders
2004-2006
Project 214: Cave Creek
1992-1997
MANUSCRIPT MATERIALS
1992-1997
Box Folder
24 15
Proposals
1995
24 16
Proposals
1996-1997
24 17
Correspondence
1995-1997
24 18
Correspondence
1997
24 19
Correspondence
1997
24 20
Meeting Minutes
1995-1997
24 21
Notes to File
1996-1997
24 22
Programming
1996
24 23
Cost Estimates
1996-1997
24 24
Construction Bids/Proposals
1992-1996
TUBES
tube
1
Granding and Planting Plans
Physical location: CCA 8 Column 5, Row 1
undated
Project 215: Camp Hillard
1995-2003
MANUSCRIPT MATERIALS
1995-2003
Box Folder
24 25
Design Deveopment Proposals/Contracts
1995-1996
24 26
Design Development Correspondence
1995-1996
24 27
Design Development Transmittals
1995-1996
24 28
Design Development Physical
1995-1996
24 29
Design Development Programming
1995-1996
24 30
Design Development Design Sketches/Product Infromation
1995-1996
24 31
Design Development Marketing/Presentations
undated
24 32
Master Plan Revisions Proposals/Contracts
1997
24 33
Master Plan Revisions Correspondence
1997-1998
24 34
Master Plan Revisions Design Sketches/Production Information
1997
24 35
Mini Golf & Creative Play Proposals/Contracts
1996
24 36
Mini Golf & Creative Play Correspondence
1996-1997
24 37
Mini Golf & Creative Play Programming
1996
24 38
Mini Golf & Creative Play Design Sketches/Product Information
1996-1997
24 39
Proposals/Contracts
2001-2002
24 40
Meeting Minutes
2001
24 41
Notes to File
2001
24 42
Cost Estimates
2002
24 43
Design Sketches
2001
24 44
Memos/Emails
2001-2002
24 45
Memos to Client
2001-2002
24 46
Presentataion Drawings
2001
24 47
Construction Documents
2002
24 48
Design Development
2003
24 49
Request for Information
2003
24 50
Equipment
2003
TUBES
tube
1
Creative Play Development
Physical location: CCA 6 Column 2, Row 3
undated
2
Creative Play Development
Physical location: CCA 6 Column 2, Row 4
undated
3
Mini Golf
Physical location: CCA 6 Column 1, Row 9
undated
4
Creative Play Development
Physical location: CCA 8 Column 4, Row 3
undated
5
Preliminary Programming, Bunkhouse plans and details, bubble diagram
Physical location: CCA 8 Column 4, Row 3
undated
6
The Hamptons
Physical location: CCA 8 Column 5, Row 2
undated
7
Lower Field Redevelopment
Physical location: Barn Box 10
undated
Project 216: Snake River
1989-1995
MANUSCRIPT MATERIALS
1989-1995
Box Folder
25 1
Trade-Site Correspondence
1989-1990
25 2
Trade Site Meeting Minutes/Notes to File
undated
25 3
Trade Site Proposal/Contract
1989-1990
25 4
Proposal/Contracts
1989
25 5
Conceptual Site Planning
1995
25 6
Correspondence
1995
25 7
Master Plan
undated
Project 217: Pike's Peak
1987-1999
MANUSCRIPT MATERIALS
1987-1999
Box Folder
25 8
Proposal/Contracts
1997-1999
25 9
Correspondence
1997-1999
25 10
Project Information
1991
25 11
Work Program
1987-1999
25 12
Meeting Minutes
1998 June
25 13
Public Meeting Notes
1998-1999
25 14
Public Meeting Notes
1998
25 15
Public Meeting Notes
1998
25 16
Appendices
undated
25 17
Multi-Use Plan
1998
25 18
Multi-Use Report
1999 September
25 19
Multi-Use Report
1999 September
Project 218: Bonderman Residence
1992-2000
MANUSCRIPT MATERIALS
1992-2000
Box Folder
25 20
Proposal/Contracts
1993-1995
25 21
Proposal/Contracts
1996-2000
25 22
Correspondence
1993-1995
25 23
Correspondence
1996-1998
25 24
Correspondence
1999-2000
25 25
Transmittals
1992-1995
25 26
Transmittals
1996-1999
25 27
Water Resources
2000
25 28
Notes to File
1995
25 29
Cost Estimates
1994-1996
25 30
Change Orders
1994-1997
25 31
Meeting Minutes
1994-1995
25 32
Meeting Minutes
1995-2000
25 33
Design Sketches
undated
25 34
Imagery Notebook
1994
25 35
Landscape Specs
1996 January 3
TUBES
tube
1
Site Planning Plan
Physical location: CCA 8 Column 5, Row 1
undated
Project 219: Arroyo Del Oso
1995-1997
MANUSCRIPT MATERIALS
1995-1997
Box Folder
26 1
Billing/Invoices
1996
26 2
Change Orders
1996
26 3
Clippings
1996
26 4
Conceptual Plan
1997
26 5
Construction Contract
1996
26 6
Conversation Record
1996
26 7
Correspondence-Consultant
1997
26 8
Correspondence-Owner
1996
26 9
Correspondence
1994-1996
26 10
Cost Estimates
1996
26 11
Design Sketches/Product Info
1996
26 12
Facsimiles
1996
26 13
Facsimiles
1996-1997
26 14
Meeting Minutes
1995-1996
26 15
Meeting Minutes
1998
26 16
Proposal/Contracts
1996
26 17
Proposal/Contracts
1998
26 18
Recreational
undated
26 19
Transmittals
1996
26 20
Memos
1997
26 21
Work Program
1998
TUBES
tube
1
Park Phase 1 Improvements
Physical location: CCA 8 Column 4, Row 3
undated
Project 220: Job's Peak
1995-1997
MANUSCRIPT MATERIALS
1995-1997
Box Folder
26 22
Five Creek
undated
26 23
Conversation Record
1996
26 24
Correspondence Owner
1995-1997
26 25
Proposal/Contracts
1996
26 26
Design Sketches/Product Info
undated
26 27
Legal Description
undated
26 28
Geology/Soils
1995
26 29
Land Use
undated
26 30
Marketing/Presentations
1995
26 31
Meeting Minutes/Notes to File
1995
26 32
Proposal/Contracts
1995-1996
26 33
Market Assessment for Five Creek
1995 September
26 34
Architectural and Landscape Coucil Rules and Regulations
2005
26 35
Declartation of Covenants, Conditions and Restrictions
undated
26 36
Design Guidelines
1996
Project 221: Silvertip Resorts
1993-2000
MANUSCRIPT MATERIALS
1993-2000
Box Folder
26 37
Proposals/Contracts
1998-2000
26 38
Meeting Minutes
1993
26 39
Meeting Minutes
1994-1998
26 40
Engineering
1993-1995
26 41
Land Analysis
1996
26 42
Design Sketches
1991-1998
26 43
Programming
1998
26 44
Marketing/Presentations
1998-1999
26 45
Village Design Manual
1999
TUBES
tube
1
Silvertip
Physical location: CCA 8 Column 6, Row 1
undated
2
Silvertip
Physical location: CCA 8 Column 6, Row 1
undated
3
Site Plan
Physical location: CCA 8 Column 6, Row 1
undated
4
Schematic Design Plan
Physical location: CCA 6 Column 2, Row 3
undated
5
Data Inventory Bases
Physical location: Barn Box 15
undated
Project 222: Oxbow
1997-2001
MANUSCRIPT MATERIALS
1997-2001
Box Folder
26 46
Charrette Summary
2001
26 47
Plaza Report
1997
26 48
Plaza Report
1997
26 49
Plaza Documents
1997-2001
Project 223: Yampa Valley
1992
MANUSCRIPT MATERIALS
1992
Box Folder
26 50
Master Plan
1992
Project 224: Jemez Springs Park
1999-2000
MANUSCRIPT MATERIALS
1999-2000
Box Folder
26 51
Design Sketches
1999-2000
26 52
Irrigation
2000
26 53
Meeting Notes
1999
Project 225: Rio Grande State Park
1997
MANUSCRIPT MATERIALS
1997
Box Folder
26 54
Correspondence
1997
Project 226: Running Y
1996-2005
MANUSCRIPT MATERIALS
1996-2005
Box Folder
27 1
Meeting Minutes for Pine Valley
2004-2005
27 2
Ranch Contracts
2004-2005
27 3
Ranch Hydrology
1995-2001
27 4
Ranch Land Use
2004
27 5
Ranch Resort Analysis Map and Diagram
undated
27 6
Ranch Resort Caledonia Marsh Restoration
1999 October 8
27 7
Ranch Resort Master Plan Documents
2004 May 12
27 8
Resort-Habitat
1996-2004
27 9
Visual Analysis
undated
Project 227: Furry Creek
1996-1997
MANUSCRIPT MATERIALS
1996-1997
Box Folder
27 10
Biological
undated
27 11
Correspondence
1996-1997
27 12
Correspondence-Furry Creek
1996-1997
27 13
Design
1995
27 14
Design Sketches
1997
27 15
Development
1997
27 16
Marketing/Proposals
1997
27 17
Meeting Minutes/Notes
1997
27 18
Programming
1997
27 19
Phone Conversation
1996-1997
27 20
Proposals/Contracts
1996
27 21
Proposals/Contracts
1997
27 22
Transmittals
1997
27 23
Visual
1996
27 24
Work Program
1996
27 25
Project Summary
1997
TUBES
tube
1
Renderings
Physical location: CCA 6 Column 2, Row 8
undated
Project 228: Mesa Del Sol
1995-1999
MANUSCRIPT MATERIALS
1996-1997
Box Folder
27 26
EPC Submittal Package Regional Recreation Complex
1996 July
27 27
Construction Cost Estimates
1996-1999
27 28
Conversation Records
1996
27 29
Hydrology/Drainage
undated
27 30
Master Plan
1996
27 31
Phase 1 Notes
1996-1999
27 32
Recreation Complex- Clippings
1996
27 33
Recreation Complex Correspondence Agency
1996
27 34
Recreation Complex Correspondence Owner
1996
27 35
Recreation Complex Cost Estimates
1996
27 36
Recreation Complex Master File List
1996
27 37
Recreation Complex Meeting Minutes
1996
27 38
Recreation Complex Notes to File
1996
27 39
Recreation Complex Owner/Landscape Architect
1996
27 40
Recreation Complex Utility
1995
27 41
Soils and Geography
1999
27 42
Notes to File
1998
27 43
Notes to File
1998
27 44
Feasibility Study
1997
27 45
Feasibility Study
1997
Project 229: Eastern Hills
2000-20005
MANUSCRIPT MATERIALS
2000-20005
Box Folder
28 1
Survey Map
2001
28 2
Market Analysis
2000
28 3
Vision Plan
2001
28 4
Design Standards
2001
28 5
Design Standards
2002
28 6
Design Standards
2002
28 7
Design Standards
2002
28 8
Design Standards
undated
28 9
Design Standards
undated
28 10
Land Use & Density Plan
2002
28 11
Zoning
2001-2003
28 12
Meeting Minutes/Notes to File
2001-2002
28 13
Meeting Minutes/Notes to File
2002
28 14
Meeting Minutes/Notes to File
2003-2005
28 15
Plotting Plans
2003
28 16
Cost Estimate
2001-2003
28 17
Correspondence
2001-2003
28 18
Correspondence
2003
28 19
Design Sketches
2003
28 20
Park Plaza as Interpretive Art
2004
TUBES
tube
1
Neighborhood Park Three
Physical location: CCA 8 Column 6, Row 2
undated
2
FDP
Physical location: CCA 8 Column 6, Row 2
undated
3
Framework Development Plan
Physical location: CCA 8 Column 6, Row 2
undated
4
Draining Corridor
Physical location: CCA 6 Column 1, Row 3
undated
5
Land Use
Physical location: CCA 8 Column 4, Row 1
undated
6
Community Planning
Physical location: CCA 8 Column 5, Row 2
undated
7
Community Planning
Physical location: CCA 8 Column 5, Row 2
undated
8
Community Center
Physical location: Barn Box 11
undated
9
Park 3
Physical location: Barn Box 11
undated
10
Park 3
Physical location: Barn Box 11
undated
11
Monographs
Physical location: Barn Box 16
undated
Project 230: Edith Wharton Restoration
2000
MANUSCRIPT MATERIALS
2000
Box Folder
28 21
Planning Workshop
2000
28 22
Planning Workshop
2000
Project 231: Canyons Lower Village (Park City, Utah)
1999-2001
MANUSCRIPT MATERIALS
1999-2001
Box Folder
28 23
Proposals/Contracts
2001
28 24
Correspondence
2001
28 25
Meeting Minutes
2000
28 26
Subconsultant Agreement
2001
28 27
Land Use
1999
28 28
Transportation
2001
28 29
Prior Studies
undated
28 30
Developable Land Summary
2001
28 31
Analysis Maps and Diagrams
2001
28 32
Development Program
2001
28 33
Specific Development Plan
1999
28 34
Submittals/Shop Drawings
2000
TUBES
tube
1
Canyons Streetscape
Physical location: CCA 8 Column 3, Row 1
undated
2
Canyons North Sketch Plan No. 1 Canyons North PD Canyons North Master PD
Physical location: CCA 6 Column 1, Row 1
undated
3
Village Master Plan
Physical location: CCA 6 Column 2, Row 3
undated
4
Village Master Plan
Physical location: Barn Box 2
undated
5
Foothills Park
Physical location: Barn Box 4
undated
Project 232: Crayson Residence
1992-1993
MANUSCRIPT MATERIALS
1992-1993
Box Folder
28 35
Correspondence
1992-1993
Project 233: Heavenly
8 tubes
TUBES
2005-2006
tube
1
Heavenly Ranch
Physical location: CCA 8 Column 3, Row 3
2005-2006
2
Streetscapes
Physical location: CCA 6 Column 1, Row 6
undated
3
Stagecoach
Physical location: CCA 8 Column 4, Row 2
undated
4
Stagecoach
Physical location: CCA 8 Column 4, Row 2
undated
5
Master Plan
Physical location: CCA 8 Column 4, Row 1
undated
6
Stagecoach
Physical location: CCA 8 Column 4, Row 1
undated
7
Grand Summit Resort Hotel Architect's Construction Documents
Physical location: CCA 8 Column 4, Row 3
undated
8
Architects CD's
Physical location: CCA 8 Column 5, Row 2
undated
Project 234: Gilbert South Recharge
1 tube
TUBES
2005
tube
1
Process and Base
Physical location: CCA 8 Column 3, Row 3
2005
Project 235: Santa Ana
1 tube
TUBES
1997
tube
1
Recreation Area
Physical location: CCA 8 Column 3, Row 3
1997
Project 236: Tuckasegee
1 tube
TUBES
2006
tube
1
River Rock Erosion Control
Physical location: CCA 8 Column 3, Row 3
2006
Project 237: Promontory (Park City)
9 tubes
TUBES
tube
1
Master Plan
Physical location: CCA 8 Column 6, Row 1
undated
2
Clubhouse planting plans
Physical location: CCA 6 Column 1, Row 8
undated
3
Golf Course Construction Plan
Physical location: CCA 6 Column 2, Row 5
undated
4
Master Plan
Physical location: CCA 6 Column 2, Row 5
undated
5
Standard Details
Physical location: Barn Box 4
undated
6
Clubhouse Complex
Physical location: Barn Box 4
undated
7
Drawings
Physical location: CCA 8 Column 4, Row 2
undated
8
Grading Package
Physical location: CCA 8 Column 4, Row 2
undated
9
Site Inventory
Physical location: CCA 8 Column 4, Row 2
undated
Project 238: Rio Salado
13 tubes
TUBES
undated
tube
1
North Bank Sketches
Physical location: CCA 8 Column 6, Row 1
undated
2
Crossing
Physical location: CCA 6 Column 1, Row 6
undated
3
Crossing
Physical location: CCA 6 Column 1, Row 6
undated
4
100% Submittals
Physical location: CCA 6 Column 2, Row 8
undated
5
Crossing Trace
Physical location: CCA 6 Column 1, Row 4
undated
6
Crossing
Physical location: CCA 6 Column 1, Row 4
undated
7
Project Drawings
Physical location: CCA 8 Column 5, Row 2
undated
8
Landscape Plans
Physical location: Barn Box 9
undated
9
Crossing
Physical location: Barn Box 14
undated
10
Base CASS
Physical location: Barn Box 14
undated
11
Conceptual Development
Physical location: Barn Box 15
undated
12
Crossing
Physical location: Barn Box 15
undated
13
South Bank Trail Proposal
Physical location: Barn Box 15
undated
Project 239: McCabe (Capitol Valley Ranch)
5 tubes
TUBES
tube
1
McCabe Ranch
Physical location: CCA 8 Column 6, Row 1
undated
2
CD's Tract B
Physical location: CCA 8 Column 6, Row 1
undated
3
Light Residence
Physical location: Barn Box 5
undated
4
Light Residence
Physical location: CCA 8 Column 5, Row 1
undated
5
Light Residence
Physical location: CCA 8 Column 5, Row 1
undated
Project 240: Donovan Park
5 tubes
TUBES
tube
1
Construction Package 1 of 2
Physical location: CCA 8 Column 6, Row 1
undated
2
Construction Package 2 of 2
Physical location: CCA 8 Column 6, Row 1
undated
3
Donovan Park
Physical location: CCA 8 Column 6, Row 1
undated
4
Facilities
Physical location: CCA 8 Column 6, Row 3
undated
5
Donovan Park
Physical location: CCA 8 Column 6, Row 3
undated
Project 241: Manchester Road
1 tube
TUBES
tube
1
Manchester Road
Physical location: CCA 8 Column 3, Row 1
undated
Project 242: Utah Museum Natural History
2 tubes
TUBES
tube
1
Construction Documents
Physical location: CCA 8 Column 5, Row 3
undated
2
Schematic Design
Physical location: CCA 8 Column 5, Row 3
undated
Project 243: UMORE Park
3 tubes
TUBES
tube
1
Site Design
Physical location: CCA 8 Column 6, Row 1
undated
2
Context Map, Sketching and Renderings
Physical location: CCA 8 Column 6, Row 1
undated
3
Schematic Drawings
Physical location: CCA 6 Column 1, Row 3
undated
Project 244: Isla Palenque
1 tube
TUBES
tube
1
Sketches and Renderings
Physical location: CCA 8 Column 6, Row 1
undated
Project 245: Goldwater Tributary Wall
3 tubes
TUBES
tube
1
Topo, grading & drainage cds, conceptual details, trace
Physical location: CCA 6 Column 1 Row 6
undated
2
Wall
Physical location: CCA 6 Column 1, Row 4
1999; undated
3
Wall
Physical location: CCA 6 Column 1, Row 4
undated
Project 246: Hotel Park City
2 tubes
TUBES
tube
1
Schematic Design Site package, golf course sketches, conceptual landscape plan sketch, utility plan, stair and ramp plans from D&H Stell
Physical location: CCA 8 Column 3, Row 1
undated
2
The Cottages
Physical location: CCA 8 Column 5, Row 1
undated
Project 247: Blum Residence
4 tubes
TUBES
tube
1
Mylar's
Physical location: CCA 8 Column 6, Row 2
undated
2
Mylar's
Physical location: CCA 8 Column 6, Row 2
undated
3
Planting Plans, Aerial Photos
Physical location: CCA 8 Column 5, Row 1
undated
4
Arch Blueprints
Physical location: CCA 8 Column 5, Row 1
undated
Project 248: Ridgemoor
3 tubes
TUBES
tube
1
Ridgemoor
Physical location: CCA 8 Column 6, Row 2
undated
2
Lot Plans
Physical location: CCA 8 Column 4, Row 3
undated
3
Base Sheets Analysis
Physical location: Barn Box 14
undated
Project 249: Pioneer Park
2 tubes
TUBES
tube
1
Master Plan Drawings
Physical location: CCA 8 Column 6, Row 3
undated
2
Construction Documents
Physical location: CCA 8 Column 6, Row 3
undated
Project 250: Coe Ranch (Santa Clara County, California)
3 tubes
TUBES
1992
tube
1
Topography
Physical location: CCA 6 Column 1, Row 7
undated
2
Land Overlays
Physical location: CCA 6 Column 1, Row 7
undated
3
Drawings
Physical location: CCA 8 Column 5, Row 1
undated
Project 251: Minturn Railyard
3 tubes
TUBES
tube
1
Civic Center Railyard
Physical location: CCA 6 Column 1, Row 3
undated
2
Civic Center Railyard
Physical location: CCA 6 Column 1, Row 3
undated
3
Civic Center Railyard
Physical location: CCA 6 Column 1, Row 3
undated
Project 252: Habuka
1 tube
TUBES
tube
1
Habuka
Physical location: CCA 6 Column 1, Row 3
undated
Project 253: Lincoln Street (Washington)
1 tube
TUBES
tube
1
Parking Lot
Physical location: CCA 6 Column 1, Row 3
undated
Project 254: City North
1 tube
TUBES
tube
1
Sketches
Physical location: CCA 6 Column 1, Row 3
undated
Project 255: Summit/Kendall Yards (Washington)
3 tubes
TUBES
tube
1
Retail plans
Physical location: CCA 6 Column 1, Row 1
undated
2
Site Illustrations
Physical location: CCA 6 Column 1, Row 1
undated
3
Concept Plan, Sections (originals - Gene Dyer),illustrative
Physical location: CCA 6 Column 1, Row 1
undated
Project 256: Eaton Headquarters
1 tube
TUBES
tube
1
Construction Documents
Physical location: CCA 6 Column 1, Row 2
undated
Project 257: Zheng Bei
2 tubes
TUBES
tube
1
Golf Course Conceptual Master Plan and Sketches
Physical location: CCA 6 Column 1, Row 1
undated
2
Sketches
Physical location: CCA 8 Column 5, Row 2
undated
Project 258: James Island
1 tube
TUBES
tube
1
Sight Plans
Physical location: CCA 6 Column 1, Row 3
2005 December 1; undated
Project 259: Lewisville
1 tube
TUBES
tube
1
Old Town Plaza Master Plan
Physical location: CCA 8 Column 6, Row 3
undated
Project 260: Querencia
3 tubes
TUBES
tube
1
Design Development Set
Physical location: CCA 6 Column 2, Row 3
undated
2
Los Cabos
Physical location: CCA 6 Column 1, Row 4
undated
3
Preliminary Drawings
Physical location: CCA 6 Column 1, Row 4
undated
Project 261: Norefjell
1 tube
TUBES
tube
1
Design Analysis
Physical location: CCA 6 Column 2, Row 6
undated
Project 262: Butterfield Park
2 tubes
TUBES
tube
1
Phase 1 Plan
Physical location: CCA 6 Column 1, Row 9
undated
2
Analysis Studies
Physical location: Barn Box 9
undated
Project 263: Dakota Springs
1 tube
TUBES
tube
1
Mylar's Architect Plans Original Art
Physical location: Barn Box 2
undated
Project 264: Redstone Parkside
1 tube
TUBES
tube
1
New Park
Physical location: CCA 8 Column 5, Row 1
undated
Project 265: Rio Grande Botanical Garden
1 tube
TUBES
tube
1
trace rendering, planting plan
Physical location: Barn Box 4
undated
Project 266: Cornerstone Park (Nevada)
1 tube
2000
TUBES
tube
1
Concept Plan
Physical location: Barn Box 5
2000; undated
Project 267: Aspen Mountain
5 tubes
TUBES
tube
1
Master Plan
Physical location: Barn Box 5
undated
2
Subdivisions
Physical location: CCA 8 Column 4, Row 1
undated
3
Master Plan
Physical location: CCA 8 Column 4, Row 1
undated
4
Master Plan
Physical location: Barn Box 11
undated
5
Master Plan
Physical location: Barn Box 15
undated
Project 268: La Farge
5 tubes
TUBES
tube
1
Revegetation Plans
Physical location: Barn Box 5
undated
2
Existing Conditions
Physical location: Barn Box 5
undated
3
Site Planning
Physical location: CCA 8 Column 4, Row 1
undated
4
Exshaw Quarry
Physical location: CCA 8 Column 4, Row 3
undated
5
Revegetation Plans
Physical location: CCA 8 Column 4, Row 3
undated
Project 269: Casteel Creek Ranch
3 tubes
TUBES
tube
1
Site Details
Physical location: CCA 8 Column 4, Row 1
2001; undated
2
Site Details
Physical location: CCA 8 Column 4, Row 1
undated
3
Levine
Physical location: CCA 8 Column 5, Row 3
undated
Project 270: Andorra
2 tubes
TUBES
tube
1
Gondola Base Area Program
Physical location: CCA 8 Column 4, Row 1
undated
2
Community Department
Physical location: CCA 8 Column 5, Row 2
undated
Project 271: Agate Fossil Beds National Monuments
3 tubes
TUBES
tube
1
Design Considerations
Physical location: CCA 8 Column 4, Row 2
undated
Project 272: Sioux City
6 tubes
TUBES
tube
1
Design Standards
Physical location: CCA 8 Column 4, Row 2
undated
2
Urban Design Guidelines
Physical location: CCA 8 Column 4, Row 2
undated
3
Design Guidelines
Physical location: CCA 8 Column 4, Row 2
undated
4
Design Guidelines
Physical location: CCA 8 Column 4, Row 2
undated
5
Design Standards
Physical location: CCA 8 Column 4, Row 2
undated
6
North Side Vision
Physical location: Barn Box 14
undated
Project 273: David A. Duffield Trust
1 tube
TUBES
tube
1
Drawings
Physical location: CCA 8 Column 4, Row 2
undated
Project 274: Howelsen Hill
3 tubes
TUBES
tube
1
Olympic Grove
Physical location: CCA 8 Column 4, Row 2
undated
2
Mylar's
Physical location: CCA 8 Column 4, Row 2
undated
3
Schematic
Physical location: CCA 8 Column 4, Row 2
undated
Project 275: Wimberley Blue Hole
1 tube
TUBES
tube
1
Regional Park Development
Physical location: CCA 8 Column 4, Row 2
undated
Project 276: Hemmeter
1 tube
TUBES
tube
1
Design Info
Physical location: CCA 8 Column 4, Row 1
undated
Project 277: Williams Village
2 tubes
TUBES
tube
1
Design Development
Physical location: CCA 8 Column 4, Row 3
undated
2
Plans and Diagrams
Physical location: CCA 8 Column 6, Row 2
undated
Project 278: Marx Residence
3 tubes
TUBES
tube
1
Drawings
Physical location: CCA 8 Column 5, Row 1
undated
2
Illustrative
Physical location: Barn Box 6
undated
3
Originals
Physical location: Barn Box 6
undated

XCI:  XCI: DaybreakReturn to Top

21 tubes
Container(s) Description Dates
TUBES
tube
1
Sunrise Mountain Park, Conceptual
Physical location: CCA 8 Column 6, Row 3
undated
2
Westside MvC, 50% schematic design
Physical location: CCA 8 Column 6, Row 3
undated
3
Village Center 1, Charrette, Schematic, Commercial, Corporate center, Parking
Physical location: CCA 8 Column 6, Row 3
undated
4
Entry
Physical location: CCA 8 Column 6, Row 3
undated
5
Phase 2 and 3
Physical location: CCA 8 Column 6, Row 3
undated
6
Oquirrh Lake Phase II-II
Physical location: CCA 8 Column 6, Row 3
undated
7
Oquirrh Lake Phase I
Physical location: CCA 8 Column 6, Row 3
undated
8
Oquirrh Lake Process Drawings
Physical location: CCA 8 Column 6, Row 3
undated
9
Oquirrh Lake Process Drawings
Physical location: CCA 8 Column 6, Row 3
undated
10
Village Center One
Physical location: CCA 8 Column 5, Row 1
undated
11
Oquirrh Lake Phase I
Physical location: CCA 8 Column 5, Row 3
undated
12
Daybreak Village II/III Open Space Master Plan
Physical location: CCA 8 Column 5, Row 3
undated
13
Daybreak Phase II Roundabout
Physical location: CCA 8 Column 5, Row 1
undated
14
Water Circulation
Physical location: CCA 8 Column 5, Row 3
undated
15
Sunrise
Physical location: CCA 6 Column 2, Row 5
undated
16
Circle West
Physical location: Barn Box 11
undated
17
Circle West
Physical location: Barn Box 11
undated
18
Phase I Schematic Design
Physical location: Barn Box 16
undated
19
Design Development Sets
Physical location: Barn Box 16
undated
20
Phase 1 Schematic Design Set
Physical location: Barn Box 16
undated
21
11400 South
Physical location: Barn Box 16
undated

Names and SubjectsReturn to Top