Facilities Services Records, 1888-2003

Overview of the Collection

Creator
Oregon State University. Facilities Services.
Title
Facilities Services Records
Dates
1888-2003 (inclusive)
1930-1990 (bulk)
Quantity
324 cubic feet, including 8650 sheets and 271 photographs, (131 boxes, including 13 oversize boxes, and 172 map folders)
Collection Number
RG 193
Summary
The Facilities Services Records document the physical campus of Oregon State University in Corvallis as well as OSU facilities throughout the state of Oregon beginning with construction of the first building on the current campus in 1888. The records consist predominantly of architectural drawings and files for the design, construction, and modification to structures.
Repository
Oregon State University Libraries, Special Collections and Archives Research Center
Special Collections and Archives Research Center
121 The Valley Library
Oregon State University
Corvallis OR
97331-4501
Telephone: 5417372075
Fax: 5417378674
scarc@oregonstate.edu
Access Restrictions

Collection is open for research.

Languages
English

Historical NoteReturn to Top

Facilities Services at Oregon State University is reponsible for planning, construction, operation, and maintenance of campus facilities and providing a safe environment for faculty, staff, students, and visitors.

Until the early 1990s, Facilities Services was known as the Physical Plant. Until the 1940s, it was common for the head of the physical plant to also be a faculty member in the School of Engineering.

Gordon V. Skelton, a Professor of Highway Engineering, was Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection from 1932 until 1940. From the early 1900s until 1932, he functioned in this role as Chair of the Department of Civil Engineering.

Mark Clyde Phillips, an Associate Professor of Mechanical Engineering, served as Superintendent of Heating from 1910 to 1933 and 1940-1947; he was Superintendent of the Physical Plant from 1933 to 1940. Louis N. Traver served as General Superintendent of the Physical Plant from 1940 to 1947, when Richard A. Adams was appointed to the post. Adams held the position until his retirement at the end of 1971. Subsequent Directors were Everett H. Lillig (1971-1981) and Howard A. Wells, Jr. (1981-1988); and Kathleen Mulligan (1988-1999).

Prior to 1932, there were individual superintendents for heating, buildings, campus and greenhouses, light and power, and plumbing and no general superintendent or head of the Physical Plant.

Content DescriptionReturn to Top

The Facilities Services Records provide in-depth documentation of the physical campus of Oregon State University in Corvallis and OSU facilities throughout the state of Oregon. The records include architectural drawings and plans for structures used in teaching, research, and administration; athletic events; and student housing and dining.

Documentation of the design and construction of major buildings, major renovations, and minor remodeling projects are available in several series and include building specifications, contracts, project manuals, and agreements with architects and engineers. Information about major campus systems, such as electrical, plumbing, fire protection, and heating, are also included. For new construction and major renovations, records of proposals for the Percent for Art public art program are available.

The records include documentation of campus planning; capital expenditures and funding; policies and procedures; land acquisition and ownership; space use; and planning, transportation projects, and other development for the City of Corvallis.

In addition to architectural drawings and plans for individual structures and campus-wide systems, the records include book plans; campus, farm, and property maps; and aerial photographs. The records include plans by numerous architects and designers including John V. Bennes; the Olmsted Brothers; Charles H. Burgraff; Lee Thomas; Burns, Bear, McNeil, Schneider, Bloodworth, and Hawes; Hewlett and Jamison; and Jeppsen and Miller.

The bulk of the records pertain to facilities on the OSU campus in Corvallis. However, materials pertaining to facilities at other locations are also available, including Camp Adair and Adair Village; United States Department of Agriculture buildings at the H.J. Andrews Experimental Forest; and research vessels, docks, and buildings at the the Hatfield Marine Science Center in Newport.

The Gordon V. Skelton correspondence in Series X includes materials pertaining to Skelton's role as chair of the Civil Engineering Department, including curriculum, graduate programs, and interactions with the Dean of Engineering and other campus administrators.

Use of the CollectionReturn to Top

Preferred Citation

Facilities Services Records (RG 193), Oregon State University Archives, Corvallis, Oregon.

Administrative InformationReturn to Top

Arrangement

The records consist of 22 series: I. Architectural Drawings and Plans, 1901-1999; II. Building Project Files, 1938-2002; III. Building Specifications and Reports, 1909-2003; IV. Capital Construction Project files, 1962-1997; V. Facilities Planning and Use Committee Records, 1981-1985; VI. General Construction Files, 1989-1997; VII. Minor Building Modifications Files, 1985-1993; VIII. General Subject Numbered Files, 1968-1991; IX. Committee Records, 1966-2003; X. Correspondence, 1888-2003; XI. Land Ownership and Property, 1940-1951; XII. Policies and Procedures, 1986-1994; XIII. Publications, 1989-2001; XIV. Space Use, 1960-1969; XV. Staff Meeting Minutes, 1992-2001; XVI. Time Records, 1913-1939; XVII. Renderings (Drawings) of Campus Buildlings, 1949-1975; XVIII. Book Plans, 1960-1993; XIX. Lighting (Interior) Study, circa early-mid 1980s; XX. Campus, Farm, and Property Maps, 1899-1900; XXI. Aerial Photographs, 1952-1979; and XXII. Photographs, 1963.

Acquisition Information

Transferred from Facilities Services (and the Physical Plant) in numerous accessions from the 1970s through 2007.

Future Additions

Additions to the collection are expected.

Related Materials

The Memorabilia Collection includes brochures and general information about Facilities Services, information about individual structures, and materials pertaining to campus planning. More detailed information about the construction of some major buildings is available in the records of the corresponding office or department; for example, information about construction and remodeling of the Valley Library (and its predecessors, the Kerr Library and Kidder Hall) are available in the Library Records (RG 009).

Capital Construction Funding Records for 1952-1989 as well as other materials pertaining to buildings and facilities are part of the Business Affairs Records (RG 017).

Additional correspondence of Gordon V. Skelton is available in the Civil Engineering Department Records (RG 030).

Detailed Description of the CollectionReturn to Top

Series I:  Architectural Drawings and Plans, 1901-1999,   (bulk 1928-1991) Return to Top

196 cubic feet (7418 sheets), (151 map folders and 5 oversize boxes)

Series I consists of architectural drawings and plans for construction of or major modifications to most structures on the Corvallis campus and for many at other OSU locations throughout the state. They include facilities used for teaching, research, administration, athletic events, and student housing and dining. This series also include plans for buildings constructed by the United States Department of Agriculture (USDA); projects pertaining to campus-wide systems or multiple buildings; structures at Camp Adair and Adair Village; research vessels; and buildings for which plans were prepared but were not constructed. The lists of building plans typically use the current name of OSU buildings.

Container(s) Description Dates
Individual Structures
140 cubic feet (5531 sheets) (109 map folders and 5 oversize boxes)
These plans are for construction of or major modifications to more than a hundred individual structures on the Corvallis campus and at other OSU locations in Oregon. They include facilities used for teaching, research, administration, and athletic events. A plan-level list with building name, plan title, date, architect, and number of sheets is available online.
1901-1999
Student Housing
25 cubic feet (1103 sheets) (18 map folders and 2 oversize boxes)
The Student Housing plans are for student housing and dining structures. They include plans for Arnold Dining Hall and Bloss and Finley Residence Halls; Buxton, Cauthorn, Hawley, and Poling Halls; Azalea House; College Inn; Heckart and Reed Lodges; the Housing Service Building; Married Student Housing; Sackett, Snell, and Weatherford Halls; and the West Hall Dormitory and Cafeteria. Plans for several structures that were not built are also included. A plan-level list with building name, plan title, date, architect, and number of sheets is available online.
1928-1996
USDA Buildings
2 cubic feet (273 sheets) (1 oversize box and 3 map folders)
The USDA Buildings plans are for structures on the Oregon State University Corvallis campus or other properties that were constructed by the United States Department of Agriculture (USDA) for its research units. They include plans for the Forestry Sciences Laboratory, the National Forage Seed Production Research Center, and the Ornamental Plans Research Facility on the Corvallis campus as well as plans for the administrative site at the H.J. Andrews Experimental Forest near Blue River, Oregon, in the central Cascade Range. A list of the USDA Buildings plans is available online.
1967-1984
Campus Wide
25 cubic feet (344 sheets) (2 oversize boxes and 13 map folders)
Plans that document projects that pertain to campus-wide systems or multiple buildings are included in this subseries. These include plans for electrical systems, fire alarm systems, handicapped accessibility and safety deficiency corrections, parking lots, roofs, sidewalks and streets, subsurface investiagions, underground fuel tank removal, utility tunnels, and water systems. A list of the Campus Wide plans is available online. Plans pertaining to the utility tunnels are described by plan title; all other plans are described at the folder-level with the range of dates of the contents of each folder.
1948-1993
Camp Adair (Adair Village)
1 cubic foot (75 sheets) (1 oversize box and 4 map folders)
The Camp Adair (Adair Village) plans consist of plans for structures used by Oregon State College from the end of World War II (1946) through the late 1970s as well as maps of the camp and village.
1946-1979
*
Adair Air Force Station
35 sheets
1958-1969
Box
107
Adair Village Boundary Survey
2 sheets
1949
*
Library Storage
3 sheets
1973-1979
Box
107
Library Storage
4 sheets
undated
*
Maps of Lands and Rights of Way
10 sheets
1946-1949
*
Veterans Housing Project for Corvallis, Oregon
15 sheets
1946
*
Veterans Temporary Housing
6 sheets
1946
Research Vessels
2 cubic feet (35 sheets) (2 map folders)
These plans are for oceanographic research vessels built or modified by Oregon State University.
1959-1963
Not Built
1 cubic foot (57 sheets) (2 oversize boxes and 2 map folders)
These plans are for buildings and structures that were not constructed. They include a proposed agricultural engineering bulding (1953), an agricultural sciences and continuing education complex (1969), a biological science building (1930), family living center (1962), Oceanography III building (1975), Navy ROTC building (1945), and a research laboratory building (1945). In some cases, they represent proposed buildings for which approval or funding was not received. Plans for student housing structures that were not built are in the Student Housing subseries. A list of these Not Built plans is available online; the list provides building name, plan title, date, architect, and number of sheets.
1930-1975

Series II:  Building Project Files, 1938-2002,   (bulk 1974-1998) Return to Top

84.3 cubic feet including 138 photographs, (87 boxes and 1 map folder)

The building project files document the construction, renovation, and maintenance of various OSU buildings and include building specifications, contracts, correspondence, project manuals, progress reports, contract insurance reports, agreements with architects and engineers, contract proposals, and statements of qualifications. Structural repair and maintenance projects are also described in this series and cover insulation installation, re-roofing, and HVAC system management. Architectural drawings and plans have been separated to Series I. Records documenting the selection and installation of artwork funded by the Percent for Art public art program are also included in this series. The series includes photographs (indicated below). This series includes records pertaining to capital construction projects.

Container(s) Description Dates
Box
1
Parker Stadium Additions
1966-1969
1
Mechanical Engineering Building
1966-1968
1
Earth Sciences Addition
1964-1977
1
Oceanography Building-First Addition
1968
1
Kidder Hall
1964
1
Oceanography Building-First Addition
1968
1
Kerr Library-First Addition
1964-1973
2
Kerr Library-First Addition
1969-1973
2
Horse Center/Arena
1966-1975
2
Animal Isolation Facility
1968-1978
2
Dixon Recreation Center
1971-1976
2
Covell Hall-KOAC
1976-1978
2
Bicycle Rack Covers
1976
2
Energy Conservation-Instrumentation and Monitoring at OSU
1977
2
Oceanography Building-First Addition
1968
2
Parker Stadium Covering
1976
2-3
Animal Care Facilities
1973-1976
3
Dearborn Hall Remodel
1974-1975
3
McAlexander Fieldhouse-Technical Information
1969-1970
3
Coliseum Substation and Weatherford Switching Station
1970-1971
3
Cordley Hall Ventilation Improvements
1978-1979
3
Electrical Distribution System
1972-1977
3
Dixon Recreation Center
1978-1979
3
Spring Sports Complex
1972-1977
3
Snell Hall
1976
Map Case
*
Memorial Union East Directory, undated
Box
3
Student Union Facilities
1976-1978
4
Student Union Facilities (includes Memorial Union remodel)
1976-1981
4
Gilbert Hall Addition
1978-1981
5
Gilbert Hall Addition and Renovation
Includes photographs in Budget Summary and Construction Summary folders.
1978-1981
5
Safety Deficiencies Phases I-III (and corrections)
Agriculture Hall, Batcheller Hall, Bexell Hall, Cordley Hall, Covell Hall, Dearborn Hall, Dryden Hall, Farm Crops Building, Forest Research Lab, Gilbert Hall, Gill Coliseum, Kidder Hall, Langton Hall, Oceanography Building, Rogers Hall, Shepard Hall, Vocational Shops, Weniger Hall, Wiegand Hall, Wilkinson Hall, and Women’s Building
1975-1980
Map Case
*
Phase I, Fee Analysis (1 sheet)
undated
Box
6
Safety Deficiencies Phases I-II
Nash Hall, and Dryden Hall
1978-1979
6
Physical Plant Warehouse Building #2
1979
6
Plageman Infirmary
1978
6
Forest Research Lab
1979
6
Re-Roofing Projects
Agriculture Utilities, Gill Coliseum, Merryfield Annex, McAlexander Field House, Langton Hall, Pharmacy Building, Plageman Infirmary, Covell Hall, Weniger Hall, Withycombe Hall, and Orchard Street Nursery
1979-1980
6
Gill Coliseum
1980
6
Tennis Court Resurfacing
1976-1978
6
Tennis Court Resurfacing
1976-1978
6
Residence Halls Covered Walkway Painting
Callahan Hall, McNary Hall, West Hall, Buxton Hall, and Poling Hall
1976-1978
6
Sidewalk Repairs and Wheelchair Ramps
1979-1980
6
Street Lighting Improvements
1979-1980
6
Street Overlays
1979-1980
6
Veterinary Barn
1979
6
Vocational Shops Storage Building
1980
6
Exterior Painting
Waldo Hall and Agricultural Utility Building
1979
6
Weniger Hall
1980
6
West Greenhouse
1980
6
Kitchen Modifications
West Hall and Weatherford Hall
1980
6
Weatherford Hall
1981
6
Re-Roofing Projects
Withycombe Hall and Merryfield Hall
1978
6
Withycombe Hall
1975-1979
6
Women’s Softball Field
1979
6
Veterinary Hospital
1980-1982
7
Veterinary Medicine Teaching Hospital (Magruder Hall)
Includes photographs in Roof-VMTH folder
1979-1983
8
Veterinary Medicine Teaching Hospital
1979-1980
8
Crop Science Building
1980
8
Memorial Union
1979
8
Education Hall
1976-1978
8
Roofing Projects
Withycombe Hall, Social Science Building, Heating Plant, and Merryfield Hall
1978
8
Adair Village Library Storage
1978-1980
8
Exterior Painting
Apperson Hall, Batcheller Hall, Covell Hall, Dearborn Hall, Women’s Building, Moreland Hall, and Langton Hall
1977-1979
8
Ionization Detectors
Avery Lodge and Dixon Lodge
1979
8
Bexell Halll
1979
8
Cordley Hall
1979
8
Dawes House
1977-1978
8
East Greenhouse
1979
9
Exterior Painting
Education Hall, Kerr Library Walkway, Nash Hall, Peavy Hall, and Pharmacy Building
1980
9
Gill Coliseum WIA Remodel
1980
9
Housing Warehouse Lot Expansion
1979
9
Marine Science Center
1979
9
Infirmary New Hot Water Piping
1980
9
Milam Hall Sanitary Sewer Repair
1979
9
Oceanography Addition
1979-1980
9
Parker Stadium Structural Steel & Handrails Painting
1995-1996
9
Maintenance
Administration Building, Apperson Hall, Bexell Hall, Buxton Hall, Campus, Cauthorn Hall, Ch2M Building, Coed Cottage, Computer Science, Cordley Hall, Covell Hall, Crop Science, Dairy Center, Dearborn Hall, Dryden Hall, East Greenhouse, Education Hall, Elementary Education room 220C, Fairbanks, Freight Office, Gilbert Hall, Gill Coliseum, Gilmore Hall, Heating Plant, Industrial Building, Information Booth, Kidder Hall, Lab Animal Resource Center, Langton Hall, Library, Magruder Hall, McAlexander Fieldhouse, Memorial Union, Merryfield Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Naval Armory, Ocean II, OSU Credit Union, Outdoor Directory Near Bookstore, Park Terrace, PE Laundry, Peavy Hall, Pharmacy Building, Plageman Hall, President’s Residence, Radiation Center, Snell Hall, Steam Tunnel, Stewart Center, Student Health, Tunnel Mall in Jefferson, Vocational Shops, Waldo Hall, Weniger Hall, West Greenhouse, Wilkinson Hall, Wilson Hall, Withycombe Hall, and Women’s Building
1984-1985
9
Weniger Hall
1984-1985
9
Langton Hall
1985
9
Marine Science Center
1976-1977
9
Marine Science Center Library
1974-1980
9
Marine Science Center East Parking Lot
1977
9
Cultural and Conference Center
1979-1982
9
Veterinary Hospital
1979-1980
10
Gilbert Hall Addition and Renovation
1979-1983
10
Gill Coliseum
1984
10
Small Contract Bids
Administration Services Building, Ag Chem Department, Animal Science Shed, Arnold Way Sidewalk, Dryden Hall, Student Health Services, Weniger Hall, Women’s Building, and Wyckoff Memorial Volleyball Court
1972-1973
10
Campus Outdoor Lighting
1971-1980
10
National Forage Seed Research Center
1981-1985
10
Stadium Avenue Revisions Phase I
1981-1982
10
Parking Improvements
1980-1981
10
Newport Marine Science Center Paving Project
1980
10
Oceanography Annex Remodeling
1981
10
Parker Stadium TV Crew Shelter
1979-1980
10
Parker Stadium Football Facilities
1979-1980
10
Martel House
1977-1980
10
Parker Stadium Improvements
1967-1969
10
Tennis Courts
1976
10
Utility Tunnel and Heating Plant Insulation
1982
10
Veterinary Diagnostic Laboratory
1981
10
Water Study
1969-1979
10
Weatherford Hall Modernization
1981
10
Weniger Hall Air Conditioning
1981-1982
10
West Greenhouse and Motor Pool Annex Re-Roofing
1981
10
Withycombe Hall Solar and Atmospheric Radiation Laboratory
1980-1981
10
Women’s Building Remodel
1981
10
Withycombe Hall
1975
10
Spring Sports Complex
1972-1976
10
Marine Science Center Dormitory Addition
1974-1975
10
Kidder Hall Study
1979
10
Administration Building Mechanical System Study
1981
10
Cordley Hall Refrigeration System Revisions
1976-1977
10
Primary Power Distribution System Short Circuit Study
1974
10
Electrical Distribution Facilities Study
1971
11
Electrical Engineer’s Services: CH2M Hill
1971-1976
11
Electrical Distribution System: Engineering Payments, Engineering and Design Associates
, 1974-1980
11
Construction Reports
1981
11
Motor Pool Re-roofing
contract payment request
1981
11
Motor Pool Annex Re-roof: Jack Largent Company
1981
11
Gill Coliseum: New Maple Floor-Correspondence
1972-1973
11
Wiegand Hall: Re-roofing
1975-1978
11
Agriculture Hall: Re-roofing
1981
11
Gilbert Hall Addition
1977-1981
11
Memorial Union Phase III
1978-1982
11
Fire Alarm Study: Prepared for OSU Physical Plant Dept
1971
11
Campus Fire Alarm System: OSU
1974
11
Marine Science Center Aquaculture Lab
1977-1982
12
Marine Science Center Aquaculture Lab
1978-1981
12
Marine Science Center Research Support Facility
1979-1982
12
Administrative Services Building Room B 210-E Contract
1980
12
Administrative Services A/B HVAC Study-Keith Kruchek
1981
12
Andrews Experimental Forest
1980-1981
12
Campus Outdoor Lighting System Improvements
1975-1976
12
Cauthorn Hall Lounge Remodel Contract
1979
12
Cordley Hall Ammonia Replacement Program
1979
12
Cordley Hall Alterations: Siemens Electron Microscope
1980
12
Cordley Hall Third Floor Cold Storage Renovation
1981
12
Quad Floor Lounge Partitions Housing: Architect
1978-1979
12
Data Services Center: Administrative Building Air Conditioning
1980
12
Data Services Center: Heat Balancing-Keith Kruchek
1979-1980
12
Dearborn Hall Remodel Rooms 202 Through 206 and 301 Contracts
1981-1982
12
Dryden Hall Remodel Rooms 204 and 205 Contract
1979-1980
12
Earth Sciences (Wilkinson Hall) Roof
1973-1977
13
Education Hall Stair Covering
1981
13
Parking Lots
Finley Hall and McAlexander Fieldhouse
1978
13
Precast Concrete Joint Re-caulking
Finley Hall and Bloss Hall
1975
13
Gill Coliseum Football Locker Room Remodel
1980
13
Primary Electrical Distribution System
Oceanography Building, Bioscience Building, Heating Plant, Forestry Building, Administration Building, Bloss Hall, Arnold Hall, Library, Chemistry Building, Agricultural Sciences Building, Married Student Housing, Intramural Recreation, Student Health Services Addition, Weatherford Hall, Art Center, Batcheller Hall, Covell Hall, Physical Plant, and Civil Engineering Building
1969-1975
13
Forest Research Laboratory
1980-1981
13
Gilbert Hall Piping Modifications
1980-1981
13
Gill Coliseum Remodel
1979-1980
13
Handrail Modifications
Education Hall, Extension Hall, Gilmore Hall, Graf Hall, Merryfield Hall. Pharmacy Hall, and Social Science Building
1981-1982
13
Gill Coliseum Maple Flooring
1971-1972
13
Heating Plant Boiler Re-Tubing
1981
13
Heating Plant Replace Breeching
1981
13
Industrial Building Printing Plant Remodel
1980
13
Kerr Library Lighting Study
1981
13
Kidder Hall Heating and Cooling System Analysis
11979-1980
13
Langton Hall Swimming Pool Drainage Modifications
1982
13
Marine Science Center Fire Detection System
1982
13
Marine Science Center Freeze Protection Building
1980-1981
13
Marine Science Center Paving Project
1980
13
McAlexander Fieldhouse Remodel
1980
13
Magnetic Water Conditioners
McNary Hall, Wilson Hall, and Callahan Hall
1980
13
Martel House Remodel
1980
13
McNary Hall Cafeteria Chiller Replacement
1980-1981
13
McNary Dining Hall Heating and Air Conditioning System Study
1979-1981
13
Median Improvements on 26th Street (between Western Avenue and Washington Way)
1981
13
Milne Computer Center Halon Fire Suppression System
1981
13
Moreland Hall Handrail Modifications
1981
13
Motor Pool Re-Roofing
1981
13
Construction Progress Report
Memorial Union Remodel, Handicapped Accessibility, Washington Way Tennis Court Renovation, Gilbert Hall Renovation, Crop Science Building, Newport Research Support Facility, and Veterinary Medical Teaching Hospital
1982-1983
13
Re-Roofing Projects
Heating Plant, Agriculture Hall, Extension Hall, and Women’s Study Center
1982
13
Madison Avenue Landscaping (between 9th and 11th Streets)
1983
13
Marine Science Center Covered Walkway
11980-1984
13
Weniger Hall HVAC Systems
1975-1980
13
Wilkinson Hall Addition
1979
13
Wall Partitions
Cauthorn Hall and Hawley Hall
1979
13
Parking Lot (26th and Parker Stadium)
1985
13
Spring Sports Complex
1980-1981
13
Waldo Hall Remodel
1979
13
Extension Annex Addition and Alterations
1982
13
Extension Hall Parking Lot Overlay
1982
13
Extension Hall Parking Lot Overlay
1982
13
Farm Crops Building Access Flooring
1982
13
Heating Plant Oxygen Analyzers
1983
13
Arnold Dining Hall Folding Partition
1982
13
26th Street Island Improvement
1982-1983
14
Dorm Services Building Addition
1982
14
Gilbert Hall Addition and Renovation
1979-1982
14
Heating Plant Oxygen Analyzers
1983
14
Marine Science Center Backflow Prevention
1982
14
Newport Research Support Facility
1981-1982
14
Memorial Union Re-Roofing
1982
14
Oceanography Biological Curation Building
1982
14
Steam Condensate Return Pipe Insulation
1982-1983
14
Weatherford Hall Bathroom Modernization
1982
14
Gilbert Hall Replacement Windows
1983
14
Gilbert Renovation
1980-1982
14
Gilbert Hall Addition and Renovation
1977-1982
14
Gilbert Hall Remodel
1980-1983
14
Washington Way Tennis Court Renovation
1976-1984
14
Memorial Union Remodel Phase IV
1981-1984
15
Memorial Union Remodel Phase IV
1982-1983
15
Specifications - Removal of Architectural Barriers to the Handicapped in various buildings at OSU
1981
15
OSU Foundation Cultural and Conference Center (Changes in the Contract Documents)
1980
15
Intramural/Recreation Building (Dixon Recreation Center Maintenance)
1973-75
15
Gilbert Hall Remodel
1979-1983
15
Arnold Dining Hall Folding Partition
1982
15
Oceanography Biological Curation Building
1982
15
Bio-Mass Gasification Project
1979-80
15
Construction Insurance
1976-78
15
Cordley Hall Piping Modifications
1983
15
Dorm Services Building Addition
1982-1983
15
Extension Annex Addition and Alterations
1982-1983
15
Dryden Hall Fire Restoration
1983
15
Farm Crops Building Access Flooring
1982
16
Precast Joint Caulking
Finley Hall and Bloss Hall
1983
16
Proposed “Great Hall”
1976
16
Insulation of Attics
Benton Hall, Bexell Hall, Covell Hall, Moreland Hall, Study Center, Waldo Hall, Sheppard Hall, Physical Plant, Milam Hall, Apperson Hall, and Extension Hall
1983
16
Magruder Hall Computer Room Installation
1983
16
Marine Science Center Backflow Prevention
1982
16
Marine Science Center Weather Station
1983
16
Mechanical Room Steam Pipe Insulation
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Cordley Addition, Covell Hall, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building Manhole, Vocational Shops, Kerr Hall, Kidder Hall, Laboratory Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Laboratory, Shepard Hall, Plageman Infirmary, Waldo Hall, Wiegand Hall, Wythecombe Hall Boiler Room, Women’s Building, and Women’s Study Center
1983
16
Major Construction Miscellaneous Correspondence
1971-1973
16
Minor Construction Miscellaneous Correspondence
1971-1980
16
Performing Arts Center
1976
16
Re-Roofing Projects
Oceanography Building, Clark Meat Lab, McAlexander Fieldhouse, Langton Hall, Pharmacy Building, Erma Plageman Infirmary, Covell Hall, Weniger Hall, and Orchard Street Nursery
1983
16
Marine Science Center Parking Lot
1983
16
Extension Hall Parking Lot Overlay
1982
16
Weniger Hall Exterior Door Modification
1983
16
Steam Condensate Return Pipe Insulation (Utility Tunnel)
1983
16
McNary Hall Exterior Finish Replacement
1983
16
Heating Plant Emergency Generator Modifications
1983
16
Crop Science Building Fire Protection
1980-1985
16
Crop Science Building
1978-1983
17
Crop Science Building
1978-1984
17
Crop Science Building Fire and Life Safety Review
1969-1980
17
Oceanography Curation Building Preparation Room
1983-1984
17
Wave Tank Facility Covering Building
1982-1983
17
Re-Roofing Projects
Oceanography Building and Clark Meat Lab
1983-1984
17
Administrative Services Building Data Services Air Conditioning Revision
1983
17
Mechanical Room Steam Pipe Insulation
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Covell Hall, Cordley Addition, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building North Manhole, Vocational Shops North and South Manhole, Kerr Library, Kidder Hall, Lab Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Lab, Shepard Hall, Plageman Infirmary North and South Manhole, Waldo Hall, Wiegand Hall, Withycombe Hall Boiler Room, Women’s Building, and Women’s Study Center
1982
17
Cordley Hall Piping Modifications
1983
17
Dearborn Hall Access Flooring
1983
17
East Greenhouse Heating Modifications
1983
17
Precast Slab Joint Caulking
Finley Hall and Bloss Hall
1983
17
Insulating Attics
Apperson Hall, Batcheller Hall, Benton Hall, Bexell Hall, Covell Hall, Dryden Hall, Extension Hall, Fairbanks Hall, Langton Hall, McAlexander Fieldhouse, Milam Hall, Moreland Hall, Physical Plant Office, Shepard Hall, Waldo Hall, Wiegand Hall, and Women’s Study Center
1983
18
Attic Insulation
University Steam Plant Complex, McAlexander Fieldhouse, Batcheller Hall, Milam Hall, Langton Hall, Wiegand Hall, Covell Hall, Apperson Hall, Extension Hall, Waldo Hall, Moreland Hall, Bexell Hall, Fairbanks Hall, Shepard Hall, Benton Hall, Dryden Hall, Women’s Study Center, and Physical Plant Office
1981-1983
18
Diving Board Handrails
Langton Hall and Women’s Building
1982-1984
18
Magruder Hall Computer Installation
1983
18
Marine Science Center Parking Lot
1983
18
Marine Science Center Weather Station
1983
18
Marine Science Center Dock Renovations
1983-1984
18
McNary Hall Exterior Finish Replacement
1983-1984
18
Milne Computer Center Air Conditioning Modifications
1983-1984
18
Milne Computer Center Room 210 Remodel
1983-1984
18
Oceanography Biological Curation Building Preparation Room
1983-1984
18
Orchard Avenue Parking Lot
1983
18
Weatherford Hall Hot Water Tank Replacement
1983
18
Weniger Hall Water Purification System
1983-1984
18
Test-holes and Proposed Water-well
1974
18
Dearborn Hall Room 312 Remodel Phases I-II
1984-1986
18
Gill Coliseum Project I
1984-1987
19
Gill Coliseum Projects I-IV
1984-1985
19
Gill Coliseum Portable Stage
1985
19
Attic Insulation
Kidder Hall, Gilmore Hall, and Women’s Building
1984
19
Madison Avenue Reconstruction (S.W. Sixth Street to S.W. Eleventh Street)
1981
19
Marine Science Center Covered Walkway
1984
19
Steam and Condensate Pipe Insulation
Boiler Plant, Gilbert Hall, Gill Coliseum, Plumbing Shop, Carpenter Shop, Carpenters
1984
19
Carpenters
Lunch Room, and Strand Agriculture Hall
1984-1987
19
McNary Hall Exterior Finish Replacement Phase II
1984
19
Re-Roofing
McAlexander Fieldhouse, Nash Hall, Memorial Union Building, Women’s Building, and Navy ROTC Building
1984-1985
19
Nash Hall Fire Restoration
1983-84
19
Pharmacy Building Heat Recovery System
1984
19
East Greenhouse Water Line Replacement
1984
19
Parker Stadium Artificial Turf Replacement
1984
19
Women’s Building and Langton Hall Remodel
1984-85
19
Snell Hall Renovation
1983
19
Weniger Hall Remodel
1984-85
19
West Range Greenhouse Plumbing and Electrical Modifications
1984
19
Weniger Hall Remodel
1984-85
19
Veterinary Research Laboratory Remodel
1984
20
Snell Hall Remodel
1984-85
20
Weniger Hall Remodel
1984
20
Gill Coliseum Refinish Maple Floor
1985
20
Waldo Hall Remodel
1985
20
Dixon Recreation Center Re-roof
1985
20
Re-roofing
College Inn, Food Service Warehouse, and Sackett Hall
1984
20
Gill Coliseum Refinish Maple Floor
1985
20
Utility Data for Langton Hall and Women’s Building
1984
20
Oceanography II Remodel
1985
20
Sanitary Sewer Project
1983
20
Waterline Replacement
Milam Hall, Nash Hall, and Withycombe Hall
1984-85
20
Women’s Building Remodel
1984-85
20
Veterinary Medicine Animal Isolation Laboratory Septic Tank Drain Field
1984
20
Kidder Hall Re-roofing
1985-86
20
Lab Animal Resources Exterior Wall Insulation
1983-86
20
Off Duty Service Requests
1984-87
21
Police and Security Department/Traffic Office Report of Activities
1983-1986
21
Energy Conservation Measures
Langton Hall and Women’s Building
1984-1986
21
Re-Roofing
Nash Hall and Navy ROTC Building
1984-1987
21
Oceanography Building Remodel I-II
1984-1986
21
Snell Hall Third Floor Remodel
1985-1986
21
Parking Lot Improvements and Repair
1985-1986
21
Rogers Hall Insulate Heating and Chilled Water Piping
1986
21
Weniger Hall Re-Roofing
1987
21
Weniger Hall Acid Resistant Drain Piping
1984-1986
21
OSU Horse Center Farrier School Manchester Arena
1984-1986
22
Kidder Hall Re-roofing
11985-1987
22
Langton Hall Roofing
1986-1987
22
Gilbert Hall Renovation
1980-1986
22
Crew Building
1986
22
Benton Hall Re-roofing and Exterior Repairs
1986
22
Batcheller Hall Electrical and Computer Alterations
1986
22
Heating Plant Economizer Installation
1986-1987
22
Snell Hall Third Floor Remodel
1985-1986
22
Women’s Building Re-roof
1986
22
Snell Hall Re-roof
1986-1987
22
National Forage Seed Production Research Center
1983-1986
22
Water Line Replacement
Milam Hall, Withycombe Hall, Nash Hall, and Rogers Hall
1984
22
OSU Golf Course
1978-1980
23
Poling and Hawley Halls Lounge Remodel
1985-1986
23
625 SW 16th Project
1986-1987
23
West Greenhouse Parking Lot Improvements
1987
23
Parking Lot Repairs
1986-1987
23
Snell Hall Re-roofing Project
1986
23
Soderstrom Architects and Roofing Consultants Correspondence
Involves majority of campus buildings
1983-1986
23
Floor Refinishing
Langton Hall and Women’s Building
1986-1988
23
Re-roofing Project
Callahan Hall, McNary Cafeteria, and West International House
1987
23
Electrical and Computer Engineering Building Alterations for Handicapped
1986
23
Physical Plant Department Handicapped Access
1986-1987
23
Graf Hall Alterations
1986
23
ECE Building and Graf Hall Related Alternations
1986
23
Apperson Hall and Merryfield Hall Alterations
1986
23
ECE Building, Apperson, and Merryfield Hall Alterations
1986-1987
24
Kidder Hall Re-roofing
1986-1987
24
Memorial Union Storm Sewer
1987
24
Oceanography Building (Room 424) Remodel
1986-1988
24
Parking Lot Improvements
1987-1988
24
Pole Building West of Magruder Hall
1986-1987
24
Women’s Building Re-roofing
1986-1987
24
Weniger Hall Re-roofing
1987-1988
24
Electrical and Mechanical Consulting Services
1982-1987
24
Asbestos Removal
Callahan Hall, McNary Cafeteria, and West International House
1986-1987
24
Weatherford Hall Renovation
1987
24
Restoration, Re-roofing, and Repairs
Batcheller Hall and Benton Hall
1986-1988
24
Roof Repairs
Peavy Hall and Langton Hall
1987
24
Clark Meat Lab Sanitary Sewer
1986-1988
24
Cordley Hall Re-roofing
1987
25
Dixon Recreation Center Re-roofing
1988-1989
25
Dixon Recreation Center Weight Room Floor Addition
1987-1988
25
Physical Plant Communications Conduit Installation
1988
25
Computer Science Building Alterations
1986-1987
25
Physical Plant Shops Alterations
1986-1987
25
Computer Science Building Artwork Installation
1987-1988
25
Hatfield Marine Science Center Seawater System Investigation and Repair
1982-1988
25
Hatfield Marine Science Center Proposed Laboratory and Library Addition
1986-1988
25
Hinsdale Wave Research Lab
1986-1988
25
Horse Barn and Manchester Arena Re-roofing
1987-1988
25
Langton Hall Re-roofing
1987-1988
26
Langton Hall Pool Roof Restoration
includes photographs
1987-1988
26
McNary Hall Dining Modifications
1988
26
Memorial Union Ventilation System Improvements
1987-1988
26
Milam Hall Re-roofing
1987-1988
26
Irrigation System for 26th and Orchard Street Parking Lot
1986-1987
26
Peavy Hall (Room 254) Modifications
1987-1988
26
Target Range Re-roofing
1987
26
Radiation Center and Campus Lights Energy Conservation Project
1988
26
Sanitary Sewer Replacement
Shepard Hall to Education Hall
1988
26
625 S.W. 16th Street Revised Project
1987-1988
26
Sackett Hall Re-roofing
1987-1988
27
Plageman Infirmary Re-roofing
1987
27
Peavy Room 254 Modifications
1987
27
Women’s Building Remodeling
1987-1988
27
Shepard Hall to Benton Hall Sewer Line replacement (Devco Engineering)
1985-1988
27
Butke-Transportation, Parking Study Payments
1982-1988
27
CH2M - Miscellaneous Correspondence
1986-1987
27
Sewer Line Replacement(Paul and Green Associates)
1986
27
Jeppsen, Miller, & Tobias (Architects)
1979-1988
27
Kidder Hall Remodeling
1987
27
Cordley Hall Re-roofing
1987
27
Target Range Re-roofing
1987
27
Langton Hall Re-roofing
1987
27
Memorial Union Building Ventilation System Alterations
1987
27
The Residence Hall Quad Re-roofing Project
1988
27
HMSC Seawater System Repair
1987
27
Irrigation Systems Installation - Phase III
1985-1986
27
Langton Hall and Women’s Building Refinish Floors
1987
27
Dixon Recreation Center Re-roofing Project
1987-1988
27
Public and Central Facilities Wing Re-roofing
1988
28
Warehouse No. 55 Re-roofing
1988
28
Langton Hall Roof Reconstruction
1986-1987
28
Snell Forum Re-roofing
1988
28
Women’s Building Shower Rooms Renovation
1987
28
The Horse Barn & Manchester Arena Re-roofing Project
1986
28
Gilmore Hall Re-roofing
1985
28
Batcheller Hall Cornice Restoration
1986
28
Women’s Building Re-roofing
1984
28
Gill Coliseum Exterior Restoration
1988
28
Withycombe Hall Notice of Plans Review
1984
28
Milam Hall Notice of Plans Review
1984
28
Rogers Hall Notice of Plans Review
1984
28
Nash Hall Notice of Plans Review
1984
28
Parking Lot Improvements
1987
28
Milam Hall Re-roofing
1987
28
Parking Lot Landscaping
1986
28
Pole Building West of Magruder Hall
1987
28
Sackett Hall Re-roofing
1987
28
625 SW 16th Street Revised Project
1987
28
Target Range Re-roofing
1987
28
Kidder Hall Re-roofing
1985
28
Soderstrom Architects Payments and Supplements (Various Projects)
1983-1990
28
Soderstrom Architects Parking Garage Correspondence
1988
28
Stastny Architects Handicapped Accessibility Phase III Correspondence
1987-1990
28
Stastny Architects Handicapped Accessibility Phase III Contract
1978-1990
28
Waldo Hall Elevator Handicapped Accessibility Contract and Correspondence
1990-1991
29
Stastny Architects Handicapped Accessibility Phase III
1987-1990
29
Aero Engineering Lab Re-roofing
1989-1990
29
Ocean Shop Roof Extension
1990-1991
29
Re-roofing
Finley Hall and Bloss Hall
1989-1990
29
Burt Hall Re-roofing
1990-1991
29
Gilbert Hall Basement Heating and Condensate System Modifications
1988-1991
29
Gill Coliseum Main Roof Re-roofing
1990-1991
29
Handicapped Accessibility Phase III (Toilet Room Accessibility Projects)
1989-1991
29
Marine Science Center Public and Central Facilities Wing Re-roofing
1988
29
General Consultants Correspondence (Various Projects)
1985-1988
29
Hatfield Marine Science Center OSU Research Vessel Dock Repair
1989
29
Memorial Union Craft Center Kiln
1989-1990
29
Heating Plant Cogeneration
1986-1989
29
Cordley Hall Chillers (Replacement Study),
1987-1988
29
Carson, Bekooy, Gulick & Associates, Inc. Correspondence (Various Projects)
1986- 1988
29
Administrative Services Building Expansion
1986-1989
29
OSU Fish Disease Research Lab Proposal
1987
29
Gilbert Hall Remodel
11988-1989
30
Bookstore Remodel
1989
30
Devco Engineering Correspondence (Various Projects)
1987-1988
30
O.H. Hinsdale Wave Research Laboratory and Addition
1986-1990
30
Electrical and Computer Engineering Building
1985-1989
30
Parker Stadium End Zone Improvements
1989
30
Re-roofing Projects
Graf Hall, Memorial Union Building, McAlexander Fieldhouse, and President Byrne’s Residence
1983-1989
30
Soderstrom Correspondence (Various Projects)
1986-1990
30
Soderstrom Payments and Supplements (Various Projects)
1983-1989
31
Electrical and Computer Engineering Building (Covell Hall)
1985-1989
31
Electrical and Computer Engineering Building Structural Steel Reports
1987
31
Electrical and Computer Engineering Building Westcold Duroscrew Machine Repair
1988-1989
31
Covell Hall Alterations Project II
1986-1988
31
Administration Building Expansion
1988-1990
31
Administration Building Halon Fire Suppression System
1989
32
Administration Building Telecommunications Equipment Housing
1988-1989
32
Apperson Hall Re-roofing
1988
32
Benton Hall Acoustical Remodel
1988-1989
32
Covell Hall Fire Escape
1988-1989
32
Dixon Recreation Center Re-roofing
1989
32
Wiegand Hall Fume Hood Installation
1988-1989
32
East Greenhouse Revisions
1989
32
Fish Disease Research Laboratory (Phases I-II)
1988-1989
33
Forest Research Laboratory Structural Rehabilitation Phase II
1988-1989
33
Hatfield Marine Science Center Roofs
1987-1989
33
Gill Coliseum Exterior Renovation
1988-1989
33
Graf Hall Alterations
1988-1989
33
Handicapped Accessibility Phase III
1987-1990
33
Heating Plant Cogeneration
1988-1989
33
Memorial Union Bookstore Remodel
1989
34
Parking Lots and Streets Maintenance and Repair
1989
34
President’s Residence Re-roofing
1989
34
Residence Hall Quad Re-roofing
1988
34
Shepard Hall Re-roofing
1989
34
Snell Forum Re-roofing
1988-1989
34
Underground Fuel Tanks Removal
1988-1989
34
Warehouse No. 55 Re-roofing
1988-1989
34
Campus Way 11th to 14th Streets Widening Project
1989-1990
34
Computer Science Building Upper Roof Re-roofing
1989
34
Food Services Warehouse Freezer
1988-1990
34
Forest Research Laboratory Electrical Service Improvements
1987-1990
34
Gill Coliseum Flat Roofs Re-roofing
1989
35
Gilbert Hall Remodel
1989
35
Handicapped Accessibility Phase III Contracts A-C
1988
35
Hinsdale Wave Research Lab, North/South Extension
1988-1990
35
Marine Science Center Oceanography and Fisheries Wings Re-roofing
1989-1990
35
Langton Hall Golf Shed Re-roofing
1989
35
Seed Laboratory
1989-1990
35
Wiegand Hall Growth Chamber Installation
1988-1990
35
Wiegand Hall Re-roofing Contract
1989
36
Wiegand Hall Re-roofing
1989-1990
36
Withycombe Hall Room 303 Fume Hood
1988-1990
36
Parker Stadium Improvements Phases I-III
1987-1990
36
Parker Stadium End Zone Building
1989-1990
36
Heating Plant
1938-1942
36
Campus Maintenance-General
Plageman, Home Economics, Kidder Library; includes photographs
1939-1948
36
Kerr Library Expansion Project
2 folders
1994-1996
37
644 SW 17th Street Structure Removal
7200
1992
37
708 SW 16th Structure Removal
7200
1992
Arnold Hall Cafeteria Reroof
1990-1992
Box
37
General
7200
1990-1992
37
Signed Contract
1991
37
Project Manual
1991
Box
37
Callahan Hall Water Piping Replacement (signed contract)
17030
1991-1992
37
Campus Fire Alarm Central Reporting System (signed contract)
17030
1990-1992
37
Child Care Center Art Work
17030
1991-1992
Dixon Aquatics Center
1992
Box
37
DDC System (project manual)
17030
1991
37
DDC Contract Correspondence
7200
1991-1992
Box
37
Dryden Hall Reroofing (signed contract)
7200
1991-1992
37
Kidder/Milne Waterline Replacement (signed contract)
17030
1991-1992
37
Peavy Arboretum Machine Shed Expansion (signed contract)
17030, 7200
1991-1992
37
Peavy Arboretum Forest Club Cabin Addition (signed contract)
17030
1990-1992
37
Above Ground Fuel Oil Storage Tanks Phase II
1992
Foundation-Bids
7200
1993
Foundation (signed contract)
7200
1993
37
Fuel Storage Tanks Phase II
7200
1993-1995
38
Fuel Storage Tanks Phase I
7201
1992-1995
38
Gilmore Hall Parking Improvements
7201
1993-1995
38
Gilmore Lot
7201
1994-1995
38
HMSC Pedestrian Walkway
7201
1993-1994
38
Intramural Field Irrigation
7201
1993-1995
38
McNary Hall Parking Improvements
7201
1994
38
Milam/Strand Sanitary/Storm Sewer Replacement
7201
1993-1994
38
MU Piping Replacement Phase II
7201
1992
38
Orchard Street Structure Removal “A”
7201
1992-1994
38
Parker Stadium Grandstand Seating Assembly
7201
1994
38
Parker Stadium Bleacher Replacement
7201
1994-1995
39
McAlexander Fieldhouse Area B Reroof
7200
1992-1993
39
Milam Auditorium Seating Replacement
7200
1992-1993
Mitchell Gym
1992-1993
Box
39
General Project Correspondence (Pre-Advertisement)
5000
1992
39
Budget
5000
1992
39
Cost Estimates (Designer Planner)
5000
1992
39
Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory)
5000
1992-1993
39
A/E Selection
5000
1991
39
Percent For Art Correspondence
5000
1992-1993
39
OSBHE Correspondence
5000
1992
39
Schedules (Project Time)
5000
1991-1992
39
Program(Architect Responsibility)
5000
1991
39
Schematic Design
5000
1992
39
Design Development
5000
1992
39
Design Review (In-House),
5000
1992
39
Contract Documents
5000
1992
39
Energy Analysis
5000
1992
39
Bid Preparation
5000
1992
39
Addenda
5000
1992
39
Correspondence, Contractor Const. Schedule, Sub List, Surety Letters
5000
1992-1993
39
Construction Meeting Notes
5000
1992
39
Special Testing (Concrete, etc)
5000
1992
39
Project Close-out (Punch List, Acceptance recom., Board accept.)
5000
1992-1994
39
DDC System (project manual)
17030
1991
39
A/E Agreement/Supplements
5000
1992
39
A/E Payments
5000
1993
39
A/E Contract Correspondence
5000
1992-1993
39
Contract Change Orders
5000
1992-1993
39
Contractor Payments
5000
1992-1993
Box
39
Mitchell Hall Renovation
5000
1992
39
Rosenfeldt Reroof (Horse Barns)
7200
1992
39
Rosenfeldt Lab and Feed Barn Bldg. Reroofing- signed contract
17030
1991
39
Sackett Condensate Repair
7200
1992
39
Sackett Hall Condensate Return Line Repair Rebid- signed contract
17030
1992
40
Memorial Union Piping Replacement-signed contract
7200
1992
40
Memorial Union Waterline Replacement
7200
1992-1993
40
Orchard Street Structure Removal “B”- signed contract
7200
1992
40
PTW Parking Improvements-signed contract
7200
1992
40
Sanitary/Storm Sewer Rehabilitation-signed contract
1992
40
Sewer Rehabilitation
7200
1992-1994
40
Strand Ag Hall Rooms 136/138 A/C Modifications-signed contract
7200
1992-1993
40
Street and Parking Lot Patching-signed contracts
7200, 7201
1992-1993
Wilkinson Hall Reroof
1989-1993
Box
40
Signed Contract
1989
40
Project Manual
1989
40
General
7200
1989-1993
Box
40
Women’s Bldg 22/24 Remodel (Blood Lab)
7200
1993-1994
40
University Theatre HVAC Rebid
7200
1992-1993
40
Streets and Parking Lots
7200
1992
Water Research Lab Reroof
1991-1993
Box
40
Signed Contract
1991
40
Project Manual
1991
40
General
7200
1989-1993
Box
41
Weniger Hall Reroof
1992
Signed Contract
17030
1991
Project-Manual
17030
1991
General
1991-1992
Women’s Building Pool Reroofing
1991-1992
Box
41
Signed contract
7200
1992
41
General
7200
1991-1992
Box
41
Women’s Building Window Replacement-signed contract
7200
1991-1992
Ag Science II
1990-1992
Box
41
Payments
7200
1990-1992
41
Planning Minutes
7200
1988
41
Planning Correspondence Jan-June
7200
1987-1989
41
Meeting Notes (Weekly Status)
7200
1990-1992
Box
42
Clark Lab and Peavy Repairs
7200
1992
42
Forest Research Scanning Lab
7200
1992-1993
42
Industrial Building Demolition
7200
1992-1993
42
Industrial Building Reroofing-signed contract
7200
1992-1993
42
Kerr Library Room 134 HVAC-signed contract
7200
1992
42
Lower Campus Irrigation-signed contract
7200
1992-1993
University Theatre
1990-1993
Box
42
Change Orders
7200
1991
42
Contract Correspondence
7200
1991-1993
42
Payments
17030
1991-1992
41
Signed Contract
1991
41
General
1990
Box
42
Women’s Building Remodel for Conference Room-signed contract
17030
1990-1991
42
Parker Stadium Signage
17030
1991
42
Tennis Court Renovations
1992-1992
Box
42
Signed Contract
17030
1991-1992
42
General
17030, 7200
1991-1992
43
OSU Street and Parking Lot Asphalt Concrete Patching and Paving-signed contract
1991
43
Parking Lots and Streets
17030
1991-1992
43
Ocean Administration Building Reroofing-signed contract
17030
1990
43
Campus Lighting
17030
1990-1992
43
Hartman Company Supplemental Payments
8000
1990-1993
43
Hyde & Associates
8000
1990-1995
43
Hyde & Assoc. Heat Plant Fuel Tanks
8000
1993-1994
43
Interface Engineering Supplement/Payment
8000
1992-1994
43
ISES/Facilities Condition Audit
8000
1991
McBride Ralston
1991-1993
Box
43
Correspondence
8000
1991-1992
43
New Agreement Payments
8000
1990-1993
43
New Agreement Supplemental Payments
8000
1992-1993
43
1993 Agree. Suppl/Pay
8000
1993
Box
43
Settecase Smith Doss/Admin Services Lobby
8000
1993
43
Administrative Services Bldg Remodel
8001
1992-1993
OSU Environmental Computing Center
1992-1994
Box
44
A/E Payments
5000
1992
44
Contract Change Orders
5000
1992-1994
44
Contractor Payments
5000
1992-1994
44
Project Manual Specifications
5000
1992
Box
44
Langton Hall Room 200-Signed Contract
17030
1989-1990
44
Langton Hall Reroof Areas C, D, & E Signed Contract
17030
1990-1991
44
Magruder Reroof
17030
1990-1991
44
Moreland Hall Reroof
17030
1989-1990
44
Street and Parking Lot Patching
17030
1990-1991
44
Weniger Hall Room 151 Lighting Improvements
17030
1990
44
West Hall Cafeteria Reroofing
17030
1990-1991
44
Wiegand Hall Reroofing Areas B and C
17030
1990-1991
45
Withycombe-Wiegand Sanitary Sewer Rehabilitation
17030
1990
OSU Environmental Computing Center
1991-1993
Box
45
Budget
5000
1991-1993
45
General Project Correspondence (Pre-Advertisement)
5000
1991-1992
45
Cost Estimates (Designer, Planner)
5000
1991-1992
45
Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory)
5000
1991-1993
45
Studies/Special Reports (Traffic, Soils, Asbestos)
5000
1991-1992
45
A/E Selection
5000
1991
45
% for Art/Correspondence
5000
1993
45
Schedules (Project Time)
5000
1991-1992
45
OSBHE Correspondence
5000
1991
45
OSBHE Correspondence
5000
1991
45
Program (Architect Responsibility)
5000
1989-1991
45
Schematic Design
5000
1991
45
Design Development
5000
1991-1992
45
Design Review (In-House)
5000
1991-1992
45
Contract Documents
5000
1992
45
Plan Review (In-House)
5000
1992
45
Equipment
5000
1992-1994
45
Bid Preparation
5000
1992
45
Addenda
5000
1992
45
Construction Correspondence
5000
1993-1994
45
Special Testing (Concrete, etc)
5000
1992-1993
45
Construction Meeting Notes
5000
1992
45
Correspondence, Contractor, Const. Schedule, Sub List, Surety Letters
5000
1992
45
Project Close-out (Punch List, Acceptance Recom., Board Accept.)
5000
1993-1994
45
Structural Calculations KPFF Project No.91421
5000
1992
45
A/E Contract Correspondence
5000
1991-1993
OSU Environmental Computing Center:
1991-1994
Box
46
A & E Payments
5000
1993-1994
46
Contract/Artist–Kim Hoffman
5000
1993
46
Contract/Artist–Leo Osborne
5000
1993
46
A/E Payments
5000
1991
46
Contract/Artist–Frank Boyden
5000
1993
Box
46
Environmental and Engineering Services, Inc. Agreement, Supplement/Payment
5000
1996
46
Endex Engineering, Inc., Agreement, Supplement/Payment
8000
1996
gLAs Architectural Group
1994-1996
Box
46
Agreement, Supplement/Payment
8000
1996
46
1994 Agreement, Supplements for 1996
8000
1994-1996
46
Correspondence
2 folders
8000
1996-1997
46
Withycombe Correspondence
8000
1993-1996
46
Withycombe Supplements/Payments
8000
1993-1996
Box
46
ISES Corporation Facilities Condition Audits
8000
1992-1996
46
Lisa Bailey Architect Agreement, Supplement/Payment
8000
1995
46
Marinello Engineering Agreement, Supplement/Payment
8000
1996
McBride Architects
1994-1996
Box
46
PC Agreement, Supplement/Payments
8000
1994-1995
46
Correspondence
8000
1994-1996
46
Various (Exterior Envelope Study of the Administration Building, Radiation Lab Reroofing Project and Roof Analysis Report)
8000
1994-1995
46
Agreement, Supplement/Payment
8000
1996
Box
47
McBride Architects Agreement, Supplement/Payments
8000
1990-1996
47
MFIA Inc. Agreement, Supplement/Payment
8000
1996
47
RSS Architecture Agreement, Supplement/Payments
8000
1994-1996
47
Professional and Personal Services Contracts
8100
1992-1994
47
The Balzhiser Group Agreement/Contract/Supplements
8000
1987-1992
Parker Stadium Improvements
1988-1993
Box
47
Correspondence
7200
1991-1993
47
Misc.
folder 1
1991
47
Geotechnical Report-Proposed West Grandstand Stadium Cover and New Locker Room Facility
1988-1992
47
Change Orders
7200
1991-1992
47
Weekly Meeting Notes
7200
1991
47
Correspondence
7200
1991-1993
47
Payments
7200
1992-1993
Parker Stadium Improvements
1991
Box
48
Payments
2 folders
1991
48
Construction Contract Set, Project Manual Volume I
1991
48
General
1991
Box
48
Forest Research Laboratory
1988-1992
Box
48
Remodel
1991-1992
48
Proposal
1991
48
Reroofing Project
1988-1989
48
Restroom Remodel
1991
48
Scanning Lab Renovation
1991-1992
48
Scanning Lab Renovation Budgets
1991-1992
48
Family Studies Center-Conversion of Kent House, etc. into Parking Lots
1989-1992
48
Forestry Research Lab Specifications
1994
Box
48
HVAC Modifications
2 copies
undated
48
Locker Room Remodel
2 copies
undated
48
Process Control Lab Remodel
2 copies
1994
48
Benton Acoustics, Feasibility Study
1993
48
Carkin Arbuckle Costic Architects
1993-1994
Box
48
Benton Hall Renovation Correspondence
8000
1993-1994
48
Correspondence
8000
1993-1994
48
Supplement/Payments
8000
1993-1994
Carlson/Veit Architects
1993-1995
Box
48
Women’s Building Rooms 6/7 Remodel (Research Lab) Correspondence and Supplement/Payments
8000
1993-1995
Box
48
Carson Bekooy Gulick 1992 Agreement, 1994 Correspondence
8000
1994
48
Cooling Feasibility Study, Weatherford Hall Dining Facility
8000
1994
48
Carson Bekooy Gulick 1992 Agreement, 1992-1993 Correspondence
8000
1992-1993
48
Carson Bekooy Gulick 1992 Agreement, 1994 Supplement/Payments
8000
1994
49
Carson Bekooy Gulick 1992 Agreement, Supplement/Payments
8000
1992-1994
49
Carson Suppl #6 Dryden Piping
8000
1989-1993
CH2M Hill
1993-1994
Box
49
HMSC Soil Testing
8000
1994
49
Steam Line Correspondence and Supplements/Payments
8000
1994
Box
49
Condensate System Consultant Selection
8000
1993-1994
49
Consultants reference (David Evans and Associates, Inc., John Graham Associates,
1986-1987
Box
49
Interface Engineering, Inc., PAE Consulting Engineers Inc., Schuchart & Associates, SERA Architects, Van Gulik & Associates , Inc.)
1986-1987
49
Consulting Services, General
8000
1990-1991
DEVCO Engineering, Inc
1993-1994
Box
49
New Agreement, Supplement/Payments
8000
1994
49
New Agreement, Correspondence
8000
1993
Box
49
Dearborn Motor Test, Consultant Selection
8000
1994
49
DEVCO Engineering, Inc., Supplement/Payments
8000
1993
49
Foundation Engineering, Inc., Property Administration Building Special Testing
8000
1994-1995
49
McBride Ralston Correspondence
8000
1993
49
UST Environmental Services
8000
1993-1994
Dixon Aquatic Facility
1990-1992
Box
49
Expansion Contract Correspondence
7200
1991
49
Contract Correspondence
7200
1990
49
Planning Correspondence
7200
1990
49
Expansion Payments
7200
1991
49
DDC Control System
1992
Dixon Aquatics Facility
1990-1993
Box
50
Expansion Payments
7200
1991-1993
50
Expansion Project Manual, Specifications, Vol. 1 of 2
1990
50
Expansion Project Manual, Details, Vol. 2 of 2
1990
Box
50
East Greenhouse Flat Roof Replacement
7200
1992
Family Study Center
1990-1993
Box
50
Artwork
7200
1990-1991
50
Payments
1991
50
Change Orders
7200
1991-1992
50
Concrete/Steel Tests
7200
1990-1991
50
Contract Correspondence
7200
1991-1993
50
Project Manual/Signed Contract
1990
Settecase Smith Doss
1987-1994
Box
50
Parker Stadium End Zone Payments
8000
1989-1990
50
Parker Stadium II Agreement/Supplements
8000
1990-1991
50
Parker Stadium II Payments
8000
1990-1993
50
Theatre Relocation Correspondence
8000
1990-1994
50
Theatre Relocation Payments
8000
1991-1993
50
Theatre HVAC Correspondence
8000
1992-1993
50
Theatre HVAC Agreement/Payment
8000
1990-1993
50
Parker End Zone Correspondence
8000
1987-1993
50
Parker Stadium II
8000
1990-1992
Box
51
TBG Dixon Rec Aquatics Payments
8000
1989-1991
Cordley Hall Reroofing Project
1991-1993
Box
51
Signed Contract
17030
1991
51
General
7200
1991-1993
Cordley Hall Waterline Replacement
1989-1991
Box
51
Signed Contract
1992
51
General
7200
1991-1993
51
Bids
7200
1991
Box
51
Cordley Seawater/Planning Correspondence
7200
1993
Dixon Aquatics Facility
1991-1993
Box
51
Artwork
7200
1991-1992
51
Change Orders
7200
1991-1993
51
Contract Correspondence
7200
1992-1993
Box
51
Dixon Recreation Center Corrosion Study
7200
1993
52
Dixon Recreation Center Contract Correspondence
7200
1991-1992
Family Study Center
1989-1993
Box
52
Meeting Notes
7200
1991
52
Payments
7200
1990-1993
52
Planning Correspondence Yearly
7200
1989-1990
52
Bid/Contract Correspondence
17030
1990-1992
Box
52
FRL Locker Room Remodel- bids
7200
1993
52
Oregon State University FRL Locker Room Remodel- signed contract
7200
1993
52
Forest Research Lab Locker Room Remodel
7200
1993
52
FRC HVAC bid documents
7200
1993
52
Oregon State University FRL HVAC Modifications - signed contract
7200
1993
52
Forest Research Lab HVAC Modifications
7200
1993
52
Forest Research Lab Remodels- Plan Stage
7200
1991-1992
52
Gleeson Hall Reroofing-signed contract
1991
53
Gleeson Hall Reroof
7200
1991
53
Heating Plant Reroofing-signed contract
1992
53
Heat Plant Reroof
7200
1992-1993
53
Langton Stair Replacement-Bids
1993
53
Langton Hall Exterior Stair Replacement-signed contract
7200
1993
53
McAlexander Fieldhouse Painting & Roof Recoating-signed contract
7200
1992-1993
53
McAlexander Fieldhouse Painting & Roof Recoating-signed contract
7200
1992-1993
53
Administrative Services Lobby Renovation-signed contract
7200
1993
53
Administrative Services Lobby Construction Correspondence
7201
1993-1994
53
Ag Science II Contract Correspondence 1990
7200
1991
53
Ag Science II DDC System Contract Correspondence 1991
7201
1991
53
Administrative Services Lobby Payment/Change Order
7201
1993-1994
53
Administrative Services Lobby Planning Correspondence
7201
1993-1994
Ag Science II DDC System
1990-1992
Box
53
General
17030
1990-1993
53
Contract Correspondence, 1990
7201
1992-1994
53
Payments
7201
1991-1992
Box
54
Ag Science II DDC System Payments 1991
7201
1991-1992
54
Batcheller Hall and Covell Hall Reroofing-signed contract
7200, 7201
1993
54
Burt Hall Piping Replacement-signed contract,
7200, 7201
1993-1995
54
Coleman Field Parking Improvements-signed contract
7200
1994
54
Coleman Field Parking Lot
7201
1994
54
Ag Experiment Station, Consultant Services (Food Tox Lab)
8000
1992
54
Ag Experiment Station, Consultant Services
8000
1990-1991
54
Master Plan Consultant-A Project Team Proposal
1989
54
Master Plan Consultant-OSU Long Range Campus Master Plan Update
1989
54
Ag Science II/RMC Consulting (Bob Cash)
8000
1989-1990
54
Ann Storrs
8000
1991-1992
54
Architectural Consultant Selection
8000
1990
54
Balzheiser and Hubbard Fire Alarm Systems
8000
1990
54
Carson Suppl #2 Food Service Warehouse Freezer
8000
1990
54
Carson Suppl #4 Weniger Growth Chambers, Room 635
8000
1988-1990
54
Carson Suppl #4 Weniger Growth Chambers, Room 635
8000
1988-1990
54
Corrosion Study of Transmission Pipes
1986
54
Carson Suppl #30 FRL
8000
1986-1990
54
Carson New Agreement/Payments
17020
1989-1990
54
Subsurface Investigation-Proposed Bio. Science Bldg./Revised Compilation of Existing Soils Data and Summary of Subsurface Conditions
1990
CH2M
1986-1991
Box
54
Correspondence 1990
8000
1990
54
New Agreements Payments
8000
1989-1991
54
Suppl #2/16 Gilbert Condensate
8000
1986-1990
Box
54
Ed Carpenter, Artist
8000
1989-1991
54
Fire Alarm System Consultant Selection
8000
1989-1990
54
Geotechnical Study-Child Care Center
1990
54
Geotechnical Study-Family Study Center
1989
54
Geotechnical Investigation-Kerr Library Additions
7201
1991
54
Fujitani Hilts & Assoc. Family Studies Center
8000
1989-1992
54
James Graham 1990
8000
1988-1990
55
K & D Engineering, Inc. Correspondence and Supplement/Payment
8000
1992
55
Kerr Library Expansion Consultant Selection
8000
1990
55
Mackensie Engineering (Formerly M/Saito)
8000
1990
55
Statement of Qualifications presented to OSU for Consulting Services for Roof Management Program
1990
55
Marie Baxter/Todd Bartman, Artists
8000
1992
55
McBride Ralston Payments/Supplements 1990
8000
1990
55
Peavy Addn/Frl Consultant Selection
8000
1990
55
Peterson Agreement/Supplement 1989
8000
1989
55
Pittsburgh Testing Lab (Steel)
8000
1990-1992
55
Roberta Kaserman, Artist
8000
1991-1992
55
SRG Peavy Addition Correspondence
8000
1990
55
Tyler, Douglas/ECE Artwork (included photos)
8000
1992
55
AG Experiment Station, Consultant SVCS
8000
1992
55
Albert Duble, Acoustics Consultant
8000
1992
Carson
1986-1989
Box
55
Correspondence 1990
8000
1989
55
Supplement 14/31
17020
1988-1989
55
Supplement #23/26/27/28 AT&T
8000
1986-1989
CH2M
1986-1989
Box
55
Correspondence 1989
8000
1989
55
Agreement/Supplement
8000
1986-1988
55
Supp #18 Cordley Chillers
17020
1986-1989
55
Suppl #19/29 FRL
8000
1988-1989
Box
55
Child Care Center Architect Selection
8000
1989
55
Child Care Center Architect Selection
8000
1989
55
Chris Billings & Associates
8000
1989
55
Child Care Architectural Site
8000
1989
55
Civil Engineering Consultant Selection
8000
1989
55
Piper Jaffray Incorporated-Annual Report
1990
55
Kerr Library Addition
8000
1989
55
Statement of Qualifications for Engineering Consulting Services for the OSU Physical Plant
17020
1989
55
Hill International, Inc.
1989
55
Roofing Replacement Consulting Services (Charles L. Youngman, Inc.)
1989
55
Consulting Services, General
8000
1989
55
Prospectus for Energy Design Consultant (North American Energy Services)
8000
1990
55
Engineering Report for OSU Langton Hall Swimming Pool Balcony
1989
55
DEVCO Correspondence Jan.-Jul
8000
1989
56
DEVCO Correspondence Aug.-Dec
8000
1989
56
LH Morrish Electric Inc.
8000
1988
56
Physical Plant Memorandum-Selection of Electrical Consultant
1988
56
Electrical Consultant Selection
8000
1986-1989
56
Endex Engineering, Inc. Misc.
8000
1988-1989
56
Family Studies Center Architect Selection
8000
1988-1989
56
Foundation Engineering
8000
1988-1989
56
Gazley, Plowman, Atkinson-Correspondence
17020
1987-1989
56
Gordon & Associates, Inc.
8000
1988-1989
56
Kerr Expansion Contract Correspondence
7200
1991
56
Administrative Services Lobby Consultant Selection
8000
1993
56
Benton Acoustics Consultant Selection
8000
1993
56
Resilience Tests Conducted on Artificial Playing Surface at Parker Stadium
1990
56
Braun Intertec (Formerly NW Testing Labs)
8000
1986-1992
56
Carson Correspondence
8000
1990
56
Carson Engineers Agreement
8000
1986-1989
56
CH2M Agreement 1989
8000
1989-1991
DEVCO
1989-1990
Box
56
Correspondence
8000
1990
56
Payments
8000
1989
56
Supplemental Payment
8000
1989-1990
Box
57
DEVCO Supplemental Payment July-Dec
8000
1991
57
GBD/Family Studies Center Correspondence Yearly
8000
1990-1992
57
Geotechnical Study-Family Study Center
8000
1989
57
GBD Family Study Center Correspondence Jan.-June
8000
1990
McBride Ralston
1990-1992
Box
57
New Agreement Payments
8000
1990-1991
57
New Agreement Supplemental Payments
8000
1991
50
Payments/Supplements
8000
1991-1992
Box
57
Michael & Lakeman Child Care Center Correspondence 1990
8000
1989-1990
57
Professional Services Contracts
8100
1986-1991
57
Robin Rickabaugh, Artist (Principia Graphica)
8000
1988-1992
Settecase Smith Doss/Ag Science II
1987-1993
Box
57
Agreement/Supplement
8000
1987-1991
57
Correspondence
8000
1991-1994
57
Payments
8000
1991-1993
TBG Dixon Rec Aquatics
1988-1993
Box
57
Correspondence
8000, 17020
1988-1993
57
Payments
8000
1992-1993
Box
58
Burt Hall Reroof-signed contract
7200
1992-1993
58
Clark Lab Wall Repair and Reroof-signed contract
7200
1993
58
Cordley Hall Chiller Replacement-signed contract
17030
1991
58
Crop Science Parking Lot and Moreland Hall Parking Lot Improvements Project-signed contract
17030
1990-1991
58
Moreland Hall Parking Lot Improvements-signed contract,
8000
1990
Forest Research Lab Reroof and Glulam Replacement Project
1990
Box
58
Signed Contract
1990
58
General
17030
1990-1991
Box
58
Gilbert Hall Remodel-signed contract
8000
1989
58
Gleeson Hall Entrance Reconstruction-Signed Contract
17030
1991
Graf Hall Reroofing
1990-1991
Box
58
Project Manual
17030
1990
58
Signed Contract
17030
1990
58
General
17030
1990-1991
Box
58
Handicapped Access Phase III “G” Waldo Elevator Payments/Change Ord
17030
1990-1991
58
Prevailing Wage Rates for Public Works Contracts in Oregon
17030
1990
59
Handicapped Accessibility Phase III Contract G-signed contract
17030
1990
59
Handicapped Access Phase III Waldo Elevator Correspondence
17030
1990-1991
59
Housing Service Building Loading Dock Reroof-signed contract
17030
1991
59
Housing Service Building Loading Dock Roof
17030
1991-1992
59
Strand Ag 111,113 and 113A
1992
59
Strand Ag.-Admissions
17030
1991
59
Strand Ag. Allocation-Journalism/Photography, Communication Arts
1991
59
Strand Ag. Allocation-Water Resources
17030
1992
59
Strand Ag. Solutions
1991-1992
59
Cordley Back-Up
1989-1991
59
Cordley Hall Solution
17030
1991-1992
59
Weniger Hall Solution
1991-1992
59
Weniger
1990-1991
59
Ag. Science Aftermath
1990-1992
59
Withycombe Exit
1990-1991
59
Withycombe
1991
59
Academic Affairs Space Search
1990
59
Langton Women’s Lockers
1991
59
Philosophy Dept. Computer Sci. Bldg
1992
59
Driver Training Trailer
1992
59
University Computing Steering Committee
1992
59
Parking Structure
not dated
59
Snell #25/29
1991
59
Langton Rm. 125 Women’s Gym
1991
59
Gilmore
1992
59
Gilmore Annex
17030
1992
59
Gilmore Hits L & M
1992
59
Education Hall
17030
1991
Asia University Relocation to Education Hall, 4th Floor
17030
1991
Box
59
ELI/Snell Hall
1991
59
Ballard Hall
1991
59
Ballard Extension Hall-“College of Agriculture Spacial Analysis”
1988-1989
59
Oceanography-Ballard Hall, Snell, Strand Ag
1988
59
Cordley
17030
1984-1988
59
Waldo Hall
1990
59
Computer Science Building
1990-1992
59
Oceanography
1990-1991
59
Computer Science
1990
59
Women’s Center/Benton Annex
1988-1991
59
Moreland Hall
1990
59
Social Science
1990
59
Family Study Center
1990
59
Development Office-Snell Hall
1990-1991
59
Public Safety
1991
59
7831 (Repairs-Cordley, Education Hall, Pharmacy)
1988-1990
59
State of Oregon Auditors
1990-1992
60
Dryden Hall
1991
60
Funding CH2M Hill Building
1991
GBD Family Study Center
1989-1992
Box
60
Correspondence
8000
1989-1992
60
College of Home Economics
8000
1989-1992
60
Agreement/Supplements
8000
1989-1990
60
Proposal for OSU-Forest Research Laboratory
17030
1991
Box
60
Proposed Architectural/Engineering Services Forest Research Laboratory Renovation
1991
60
FRL Renovation/AE Selection
8000
1991
60
Howard & Kathleen Meehan Ag Science II Artwork
1992-1993
60
Howard & Kathleen Meehan, Dixon Artwork
8000
1991-1993
60
Johanson Fine Arts
8000
1991-1992
60
McBride Ralston Correspondence
8000
1990
Michael & Lakeman Child Care Center
1990-1991
Box
60
Agreement
8000
1991
60
Correspondence
8000
1991
60
Supplements/Payments
8000
1990-1991
Peterson Kolberg/Forest Research Lab Renovation
1991-1994
Box
60
Agreement/Supplement
8000
1991-1992
60
Correspondence
8000
1991-1994
60
Payments
8000
1991-1993
Settecase Smith Doss Ag Science II
1987-1991
Box
60
Correspondence
8000
1991-1993
60
Payments
8000
1988-1990
60
Programming
8000
1987
60
Arch Contract/Supplements
8000
1991
Box
60
Settecase Smith Doss/ECE Roof
8000
1993
60
Withycombe Lab Planning Correspondence
7201
1992-1993
60
Withycombe Toilet Remodel
7201
1993-1994
60
Withycombe Hall Laboratory Remodel-signed contract
7200
1993
61
Withycombe Lab Remodel
7201
1993-1994
61
Withycombe Toilet Remodel Bids
1993
61
Carlson/Veit Women’s Bldg 22/24 Correspondence
1993-1994
61
Carlson/Veit Women’s B. 22/24 Supplement/Payments
8000
1993
61
MU Kitchen Exhaust Hood Analysis
8000
1992
61
Pharmacy-Fume Hoods Study and Preliminary Cost Estimate
17020
1992
61
Moreland-Heating Venting Report/Remedies
8000
1992
61
Carson Correspondence 1992
8000
1992-1997
61
Carson Supplemental Payments
8000
1989-1992
61
Cordley Piping Consultant Selection
8000
1992
DEVCO
1992-1993
Box
61
Correspondence
8000
1992
61
New Agreement Correspondence July-Dec.
8000
1992
61
New Agreement Supplement/Payments
8000
1992-1993
61
1989 Agreement Supplement Payments
8000
1992-1993
Box
61
DEVCO/Industrial Bldg. Correspondence
8000
1992-1993
61
DEVCO/Industrial Bldg. Agreement/Payments
8000
1992-1993
61
Balzhiser & Hubbard 96 Agreement Supp/Pay 96
8000
1996
61
Balzhiser & Hubbard 94 Agreement Supp/Pay 95/96
8000
1995-1996
Benchmark Arch
1995-1996
Box
61
Correspondence through
8000
6/30/96
61
1996 Agreement Supplement/Payment
8000
1996
61
Supplements/Payments
8000
1995-1996
Box
62
Braun Intertec 1994 Agr. Suppl/Pmt
8000
1996, through 9/30/96
62
Braun Intertec 1994 Agr. Suppl/Pmt 1996
8000
10/1/96 - 12/31 96
62
Braun Intertec
8000
1993-1995
62
Carson Correspondence
8000
1996
62
College Inn Mechanical Systems Upgrade
1995
62
Bexell Accessibility Study
1995
62
Carson 94 Agreement Supplement/Payment
8000
1995
62
Carson Bekooy Gulick 1994 Agreement Supplement/Payment 1994
8000
1996
62
Carson Supplement/Payments for 1993
8000
1993
62
CH2M Hill Condensate System Supplement/Payments for 1994
8000
1994
62
CH2M Hill Condensate System Supplement/Payments for 1994
8000
1994
62
Cordley Renovation
8000
1995
62
Century West Construction
8000
1995
62
Consulting Services
8000
General 1992-1995
62
Engineer Consultants
8000
1992
Carson
1990-1992
Box
61
Correspondence
8000
1991
61
New Agreement/Payments
8000
1991-1992
61
Supplement, #1 Pharmacy Piping
8000
1989-1991
61
Supplement, #5 Cordley Chiller
8000
1990-1992
61
Supplemental Payments
8000
1991
Box
62
CH2M Correspondence Yearly
8000
1990-1991
62
Energy Consultant Selection, General Consultant Services
8000
1990
63
Consultants for Energy Management System Improvements
1990
63
DEVCO Correspondence
8000
1990-1992
63
DEVCO 1989 Agreement, Payments
8000
1989-1991
63
Methods and Forms Documentation for OSSHE and OSU Facility Condition Analysis
1990
63
Proposal for Facilities Engineering Services for a Seismic Assessment of the OSU/FCA Buildings
1990
63
ISES/Facilities Condition Audit
8000
1989-1990
63
James Stephenson, Gladys Valley Artwork
8000, includes photos
1993-1995
63
Jerry Meyer, Theater Artwork
8000, includes photos
1993-1994
63
Mike’s Heating and A/C
8000
1991-1993
63
Campus Development Plan, 1989 Update
1989
63
Long Range Campus Development Plan Consultant Selection
8000
1989-1990
63
Submittals for OSU Long Range Campus Master Plan Update
1989
63
Long Range Campus Plan Proposal
1989
Agricultural Sciences II
1990-1993
Box
63
Project Manual Volume 1, Signed Contract
8000
1990
63
Lighting Problem Review Documents
7200
1991-1992
63
Observation Reports
7200
1991
63
Payments
7200
1991-1993
Agricultural Sciences II
1987-1992
Box
64
DDC System, Signed Contract
7200
1990
64
Artwork
7200
1988-1992
64
Change Orders
7200
Jan.-April, 1990-1992
64
Contract Correspondence, 1990
7200
1992-1994
64
Building Consultants
8000
1987
Map Case
*
Schematic Design Phase Approval(with signatures)
undated
Box
65
Grant Application
7200
1989-1992
65
Change Orders
7200
1990-1992
65
Concrete/Steel Tests
7200
1991-1992
65
Proposal for the Construction
1988
65
Concrete/Steel Tests
7200
1990-1991
65
Contract Correspondence
7200
1990-1992
Parker Stadium Storage Bay Enclosure
1993-1994
Box
65
Signed Contract
7200
1993
65
Bid
1993
65
General
7201
1993-1994
Box
65
Radial Brick Chimney Removal, Signed Contract
7200, 7201
1994-1995
65
Rogers Hall Reroof, Signed Contract
7200. 7201
1994-1995
65
Sackett/Nash Parking Improvements, Signed Contract
7200
1994
66
Strand Ag. Room 106 Remodel
7201
1993
66
Strand Hall Rooms 107/109 Renovations, Signed Contract
7200
1993
66
Strand Ag. Rooms 107/109 Remodel
7201
1993-1994
66
1994 Street and Parking Lot Pavement Patching, Signed Contract
7200
1994
66
1994 Street and Lot Patching
7201
1994-1995
66
Weatherford Dining Cooling Improvements, Bid and Signed Contract,
7200
1994
66
Weatherford Dining A/C
7201
1994
66
Bid for Weniger Hall 118-122 A/C
7200
1993
66
Sackett/Nash Parking Improvements Project
7201
1993-1995
66
Weniger Hall 118-122 A/C, Signed Contract
7201
1993-1994
66
Weniger Operation and Maintenance Manuals, 118-122 A/C
7201
1994
66
Base Bids - Service Master
4 folders
11200
1992
67
Base Bids - Service Master
7 folders
11200
1991-1993
67
Gill Coliseum Elevation Repairs, Signed Contract
7200
1996-1997
Horse Barn Addition
1994-1996
Box
67
Bids
7200
1995
67
General
7200
1995-1996
67
Signed Contract
7200
1994-1995
Box
67
Housing Buildings Stair Tower Repairs, Signed Contract
7200
1996
67
Housing Stair Cracks
7200
1995-1996
Langton Hall Masonry Restoration
1993-1996
Box
67
General
7200
1993-1996
67
Signed Contract
7200
1993
Box
67
Langton Hall Room 300 Painting, Signed Contract
7200
1996
67
Langton Gym Painting
7200
1996-1997
Milam Hall Third Floor Remodeling
1995-1996
Box
67
Bids
7200
1995
67
Project Manual
7200
1995
Box
68
Milam 3rd floor Remodel (pulled drawing)
7200
1995-1996
68
Nash Cornice Repairs
7200
1996
68
Oregon State University Oceanography Administrative Building
7200
1994
68
Oregon State University Ocean Administration Building Repipe
7200
1996
68
Oceanography Warehouse Building Reroof
1995-1997
Star Café (Memorial Union)
1994-1995
Box
68
General
7200
1994-1995
68
Correspondence
7200
1995
68
Payments/Change Orders
7200
1995
Box
68
Strand Hall Reroofing/Cornice Restoration,
7200, 7201
1993-1997
68
Strand Hall Reroofing and Cornice Repair-signed contract
7200
1994
68
Strand Roof Clarification Requests & Change Order Quotes
7201
1994
68
Strand Remodels, Planning Correspondence
7201
11993
68
Valley Football Center Water Heater Replacement-signed contract
7200
1995
69
Valley Football Center Water Heater Replacement
7200
1995
69
Veterinary Research Lab Reroof-signed contract
7200
1994
69
Veterinary Research Lab Reroof and Animal Resource Center Repair
7200
1994
69
Withycombe Hall Laboratory Remodel
7200
1993
69
Withycombe Toilet Room Remodel-signed contract
7200
1993
69
Women’s Building 6/7 Remodel (Research Lab) includes signed contract
7201
1993-1994
69
Gordon & Associates Supplements Seed Lab
8000
1989-1990
69
HMSC Library Consultant
8000
1989
69
James Graham Architects
8000
1978-1989
69
Larry Kirkland Architects
8000
1987-1988
69
Mechanical Consultant Selection
8000, 17020
1988-1989
69
Northwest Engineering
8000
1989
69
Paraclete Engineering Agreement
8000
1989
69
Parker Stadium Architect Selection
8000
1989
69
Parking Structure Consultant Selection
8000
1987-1988
69
Peterson Engineering. Correspondence
8000
1989
69
Sahara Corvallis Partnership (CH2M Hill Bldg)
8000
1990
69
Sera Architects
8000
1988
9
Settecase/Smith/Doss Ag. Science II Correspondence
17020
1987-1988
TBG/Fish Disease Lab
1987-1989
Box
69
Payments
8000
1989
69
Correspondence
8000
1987-1989
Benton Hall Room 303
1991
Box
69
Renovation-signed contract
8000
1991
69
Remodel
17030
1991
Child Care Center
1988-1992
Box
69
Change Orders
17030
1991
69
Concrete/Steel Tests
17030
1991
70
Payments
17030
1991-1992
70
Contract
17030
1991-1992
70
Planning Correspondence
17030
1988-1990
70
Signed contract
17030
1990
70
Planning
1990
70
Contract Correspondence
17030
1990-1991
Box
71
Electrical and Computer Engineering Building (ECE) Roof Modifications
1993-1995
71
ECE Building Roof Modifications
Signed Contract
1992
71
Above Ground Fuel Tanks Phase II-Piping
1993
71
Fuel Tank Piping
1993
71
Project Proposal: Above Ground Fuel Storage Tank, Phase III
1995
72
Fuel Storage Tanks Phase III (Piping)
1993-1995
72
Fuel Tanks (Planning Correspondence)
1993
72
Gill Coliseum Parking Lot Repair
Signed Contract
1995
72
Gill Coliseum Parking Lot
1995-1996
72
Gill Coliseum & Heating Plant Parking Lot Repair
Signed Contract
1995
72
Heat Plant Parking Lot
1995
72
Kerr Library Roof Repair
1995
72
Kerr Library Roof Repair
Signed Contract
1995
72
Animal Resource Center Capital Repair
Project Manual
1994
72
Animal Resource Center Reroof
7200
1994-1996
72
Rogers/Snell Hall Elevator Up-Grade
Signed Contract and Correspondence
1994
72
Sackett Hall Water Heater Installation
Signed Contract and Correspondence
1994
72
Shop Buildings Reroof
Signed Contract and Correspondence
1995-1996
72
Street and Parking Lot Pavement Patching
7200
1995-1996
72
Benton Slope Irrigation
Signed Contract and Correspondence
1995-1996
72
Boiler Chimney Stack InstallationBoiler Chimney Stack Installation
Signed Contract and Correspondence
1994-1995
73
Condensate Return System
1994
73
Cordley Hall Piping Replacement
1994-1995
73
Dixon Recreation Center Reroof
Signed Contract and Correspondence
1993-1995
73
Dryden Hall Piping Replacement
Signed Contract and Correspondence
1993-1994
73
Horn Barn/Riding Arena Reroof Project
2000-2001
73
Hyslop Farm Hoods
2001
73
Kerr Admin. Lobby
2001
74
Kidder Hall Reroof,
Project Manual and Correspondence
1999-2000
74
Langton Hall HVAC—Rebid
Signed Contract and Correspondence
1998-2000
74
McNary Dining Hall Phase III (Cont.
Project Manual and Correspondence
2000-2001
74
Owen Hall Data Cabling
2000
74
Peavy Hall Telecommunications Wiring Systems and Rebid
2000-2001
74
Reser ADA Phase II Upgrade
2001-2002
74
Pharmacy Bldg Third Floor Classroom Remodel Project
Signed Contract
1999
74
Sackett Hall Reroof & Waterproofing Project
Signed Contract and Project Manual
1999
74
Snell Hall 5th Floor Remodel
Signed Contract and Correspondence
2000-2001
74
Social Science Building Access, Walk & Related Site Improvements
2000
75
Laboratory Strong Floor-Hinsdale Wave Lab
Signed Contract and Correspondence
2001-2002
75
Wiegand Entrance Canopy Repair
Signed Contract and Project Manual
1999-2000
75
Weniger Hall 3rd Floor Remodel
Signed Contract and Correspondence
2000-2001
75
Women’s Bldg Basement Remodel Project
Signed Contract and Correspondence
1999-2000
75
Women’s Bldg Lighting Upgrade
Signed Contract and Correspondence
2000-2001
75
Crop & Soil Sciences Bldg Lab Remodel Rooms 242, 246;
Signed Contract and Project Manual
1999-2000
75
Cordley Hall 4th Floor Remodel
Signed Contract and Correspondence
2000-2001
75
Cordley Hall 5th Floor Remodel
Signed Contract, Project Manual, Correspondence, and Submittals
1999-2000
76
Gill Coliseum Room 132 Remodel
Signed Contract and Correspondence
2000-2001
76
Graf Hall Piping Replacement
Signed Contract and Correspondence
2000-2002
76
House Sites Restoration
Signed Contract and Correspondence
1999-2000
76
Pharmacy 3rd Floor Classroom
1999
124
Contract Insurance Reports (7100 series)
1987-1994
Advertised Construction (7200 series)
1993-2002
Box
124
Administrative Services Lobby ADA Renovation
124
Batcheller Hall Cornice Repair
124
Book Storage Shelving Construction
124-125
Dearborn Motor Pool Test Facility
125
Finley Hall Piping Rehabilitation
2001-2002
125
West Hall Remodel
1996-1998
125
LaSells Stewart Center Reroof
1997
125
Sackett Hall Fire Alarm System
1997
125
Sackett Hall Reroof
1997
125
15th and Washington Parking Lot
1997
125
26th Street Reconstruction
1997-1998
126
Administration Building Roof Repair
1996-1997
126
Peavy Hall Field Irrigation
1996-1997
126
President's Residence
1996-1997
126
Radiation Center Parking Reconstruction
1995-1996
126
Street and Parking Lot Pavement Patching
1996
126
Women's Field Irrigation
1994-1996
126
Withycombe Hall Reroof
1995-1998
126
Strand Hall Classroom Retrofit
1993
126
Langton Hall HVAC Upgrade
1996
126
Education Hall Exterior Restoration Phase I and II
1994-1995
127
Fairbanks Hall Exterior Restoration
1993-1996
127
Fish Hawk Creek Bridges
1996-1997
127
McAlexander Fieldhouse - New Ventilation System for ROTC Target Range
undated
127
Forestry Research Lab Chemical Storage
1995-1998
127
Forest Research Office Addition
1995-1996
127
East Greenhouse Parking Lot Upgrade
1996
127
Dixon Recreation Center Renovation - Package 1
128
Forest Ecosystem Research Lab (FERL) Biological Waste Tanks
128
Forest Research Lab Reroof
128
Gilmore Hall Fire Escape Replacement
128
Hatfield Marine Science Center Exhibit Lighting
128
Magruder Hall I.V. Support
128
McNary Hall Remodel Phase
128
Rowing Tank
128
Weniger Hall 5th Floor Air Conditioning
128
Education Hall Entry Canopy
128
Graf Hall Room 101 Remodel
128
Snell Hall Roof Repair
128
Withycombe Hall Sitework - Parking Lot
Architects and Engineers (8000 series)
1994-1996
Box
129
Walker and Macy - Long Range Plan
129
Strand Classroom Remodel Architect Selection
129
Devco: Structural Evaluation of Exterior Wall Cracks - Callahan, Wilson, McNary Halls
129
Devco: 1992 Agreement Supplement/Payment
1995
129
Devco: 1994 Agreement Supplement/Payment
1994-1996
129
Devco: 1996 Agreement Supplement/Payment
1996
129
Devco: Correspondence
1995
129
Devco: New Agreement Correspondence
1994
129
Brown and Caldwell: Proposal for Engineering Design Services for Memorial Union Sanitary Sewer Repair
Contract Proposals and Statements of Qualifications
1993-1995
Box
130
Forest Ecosystem Research Laboratory
1994
130
University Housing and Dining Renovation
1995
130
Women's Crew Team Locker Room and Boat House Facility
1994
130
Memorial Union West Wing and Commons Renovation
1993
Closed Project Files
Documentation with contracts and project acceptance forms.
1993-1995
Box
131
Women's Building ADA Upgrade
131
Radiation Center Parking Reconstruction
131
Agricultural Sciences II DDC System
131
McAlexander Fieldhouse Painting and Roof Recoating
131
Environmental Computing Center
131
Dryden Hall Pipe Replacement
131
Burt Hall Pipe Replacement I and II
131
Batcheller and Covell Halls Reroof
131
Langton Hall Masonry Restoration
131
Milam and Strand Halls Storms Sewer
131
Administrative Services Lobby Revisions
131
Strand Hall Rooms 107 and 109
131
Cordley Hall Pipe Replacement
131
Women's Building Room 6/7 Remodel
131
Strand Hall Reroof and Cornice Repair
131
Campus Condensate Return System Replacement Phase I
131
Sacket and Nash Parking Improvements
131
Coleman Field Parking Improvement
131
Parker Stadium Grandstand Seating
131
Lab Animal Resource Repairs
131
Property Administration Building
131
Radial Brick Chimney Removal
131
Boiler Stack Installation
131
Star Cafe Remodel
131
Langton Hall ADA Upgrade
131
Fish Disease Lab Office Upgrade
131
Office Lab at SOES
131
Dry Cow Barn - Dairy Center

Series III:  Building Specifications and Reports, 1909-2003Return to Top

12 cubic feet, including 8 photographs, (15 boxes and 1 map folder)

Series III consists of building specifications for construction and renovation of various OSU buildings and structures and reports regarding campus planning, proposed structures, campus traffic flow, building accessibility for the disabled, and planning reports by the City of Corvallis. Building specifications for the construction of numerous campus buildings in the 1950s through 1970s are included, such as the residence halls, Cordley Hall, Dixon Recreation Center, Kerr Library, Nash Hall, Peavy Hall, the Radiation Center, Rogers Hall, Snell Hall, the Veterinary Medicine teaching hospital, Weniger Hall, and Wilkinson Hall. The series also includes specifications for several structures completed in the 1920s and 1940s, such the Dairy, Horse, and Sheep Barns; Covell Hall, Gill Coliseum, and Sackett Hall. This series includes the 1909 campus plan by the Olmsted Brothers landscape architects.

Container(s) Description Dates
Individual Campus Buildings
1952-1987
Administration Building (Kerr)
1967-1971
Box
77
Schematic Design Study
Hewlett and Jamison, architectural firm
undated
77
Cost Study for Proposed Administration Building
Oregon State Board of Higher Education
1967
77
Sanitary Sewer Extensions
Oregon State Board of Higher Education
1970
77
Agreements and Receipts for Administration Building Furnishings/Hardware
1971
Box
77
H. J. Andrews Experimental Forest Administrative Site
OSU Planning and Institutional Research
1980
Apperson Hall
1963-1986
Box
77
Feasibility Study for Apperson Hall
Bear, McNeil, Schneider, Bloodworth, & Hawes; Architects
1963
77
Apperson Hall & Merryfield Hall Alterations
Jeppsen, Miller, & Tobias, Architects
1986
Arnold Hall
1968-1970
Box
77
Arnold Hall Cafeteria - Specifications
Bear, McNeil, Bloodworth, & Hawes, Architects
1970
77
Arnold Hall - Cafeteria
Bear, McNeil, Bloodworth, & Hawes, Architects
1968
Box
77
Avery and Dixon Houses - Specifications
Architects Hamlin & Martin
1965
77
Azalea House - Specifications
Gathercoal & Jeppsen Architects
1952-1953
Batcheller Hall
1986-1987
Box
77
Alterations: Project Manual
1986
77
Cornice Restoration and Benton Hall Re-roofing and Exterior Repairs
Soderstrom Architects
1987
Box
77
Benton Hall Feasibility Study
Bear, McNeil, Schneider, Bloodworth & Hawes Architects
1964
77
Bexell Hall Heating Control Study
1974
Bloss Residence Hall
1968-1971
Box
77
Unit No. 3 Complex A- The Presidents’ Complex
Bear, McNeil, Bloodworth, & Hawes, Architects
1968
77
Specifications
Bear, McNeil, Bloodworth, & Hawes, Architects
1970
77
Specifications for Interior Furnishings and Installation
Bear, McNeil, Bloodworth, Hawes & Peterson, Architects
1971
Box
77
Buxton Hall Dormitory Unit #4 - General Specifications and those for Built-In Furniture and Interior Furnishings
3 reports - Burns, Bear, McNeil, & Schneider, Architects
1961
77
Cauthorn Hall Lounge Alterations- Specifications
Bear, McNeil, Schneider, Bloodworth, & Hawes, Architects
1966
77
Clark (Meats) Laboratory - Specifications
Jeppsen & Miller, Architects
1966
77
Computer Science Building Alterations
Jeppsen, Miller & Tobias, Architects
1986
Cordley Hall
1956-1965
Box
77
First Addition to Cordley Hall-Specifications
2 reports-Bear, McNeil, Schneider, Bloodworth and Hawes, Architects
1965
77
Agricultural & Biological Science Building (Cordley)- Specifications
Burns, Bear, McNeil & Schneider Architects
1956
Box
78
Cordley Hall First Addition, Application for Grant Higher Education Facilities Act of 1963
Oregon State System of Higher Education
1967
78
First Addition and Second Addition to Cordley Hall
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects, 1 photo of First and Second Addition
1962
78
Exhaust and Cross Contamination Study: Cordley Hall Unit I, Gilbert Hall, and Weniger Hall
(Morrison, Funatake & Associates, Inc.) (7 photos of pipes and wires
1973
Crew (rowing) Facility
1964-1986
Box
78
Specifications
Oregon State System of Higher Education
1964
78
Crew Shell/Shelter Shop
1986
Box
78
Crop Science Building
Martin, Schultz & Geyer, Architects
1979
78
Dairy Center - Specifications
Zaik and Miller, Architects
1968
Dearborn Hall
1974-1986
Box
78
Dearborn Hall Alterations
Jeppsen, Miller & Tobias, Architects
1986
78
Dearborn Hall Renovation
Farnham and Oliver Architects
1974
Dixon Recreation Center
1970-1973
Box
78
Building Program
Planning and Institutional Research
1970-1973
78
Preliminary Specifications
Balzhiser, Longwood, Smith, Paul, and Anderson, Architects
1972
78
Intramural/Recreation Building Specifications
, Longwood, Smith, Paul and Anderson, Architects and Planners
1973
Box
78
Dormitory Services Building-Specifications
Burns, Bear, McNeil, & Schneider, Architects
1960
78
Education Hall Exterior Wall Waterproofing
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1964
Electrical and Computer Engineering Building
1985-1986
Box
78
Project Manual Volumes I-II
Settecase, Smith, and Doss, Architects
1986
78
Electrical and Computer Engineering Building Solar Energy Analysis of Central Atrium with Glazed Roof
Gregory Acker, Architect
1986
78
Electrical and Computer Engineering Building Program
Office of Planning and Institutional Research
1985
Box
78
Environmental Fluid Dynamics Laboratory Building Specifications
State Board of Higher Education
1972
78
Fairbanks Hall Feasibility Study
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1963
Family Study Center (Bates Hall)
1962-1990
Box
78
Design Program and Description
Jeppsen and Miller, Architects
1962
78
Building Program
Prepared for the College of Home Economics by Ray Glass
1988
78
Design Development Proposal
2 folders
GBD Architects
1989
78
Project Manual for Family Study Center
GBD Architects
1990
Box
78
Farm Crops Building Feasibility Study
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1964
Finley Residence Hall
1965-1966
Box
78
Residence Hall Proposal and Design
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1965
78
Residence Hall Specifications
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1966
Box
79
Food Toxicology and Nutrition Lab - Specifications for Concrete and Plumbing Work for Trout Hepatoma Laboratory
(P. Daniel Read, Architect
1963
Gilbert Hall
1974-1980
Box
78
Gilbert Hall Addition
Zimmer, Gunsul, Frasca Partnership, Architects
1978-1980
78
Gilbert Hall Renovation
Zimmer, Gunsul, Frasca Partnership, Architects
1980
78
Feasibility Study
Planning and Institutional Research
1974
78
Building Specifications
Planning and Institutional Research
1974
Gill Coliseum
1966-1984
Box
79
Gill Coliseum Additions and Alterations- Project Manual
Settecase, Smith, Doss Architecture
1984
78
Review of Existing Structure
CH2M
1984
78
Residence Hall Specifications
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1966
Box
79
Graf Hall Alterations
Jeppsen, Miller, & Tobias, Architects
1986
Greenhouse and Service Buildings
1964
Box
78
Specifications: Greenhouse and Service Buildings: West Range Second Unit to 1964 Additions
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1964
78
Specifications: Greenhouses & Service Buildings: West Range 1964 Additions
Bear, McNeil, Scheider, Bloodworth & Hawes Architects
1964
Hatfield Marine Science Center
1962-1980
Box
79
Presentation of a Site Development Plan for the Yaquina Marine Sciences Laboratory South Beach Site Oregon State University
Cornell, Howland, Hayes & Merryfield
1962
79
State of Oregon Board of Higher Education Contract Documents for the Construction of a Dock and Approach at the Oregon State University Yaquina Bay Marine Sciences Laboratory
Cornell, Howland, Hayes & Merryfield
1963
79
Oregon State University Yaquina Bay Marine Science Laboratory Newport: Preliminary Scheme Prepared for Presentation to the State Board of Higher Education
Cornell, Howland, Hayes, & Merryfield
1965
79
Building Program Marine Science Center Improvements
OSU Planning & Institutional Research
1968
79
Specifications Underground Cable System at Marine Science Center Oregon State University
Office of University Engineer Physical Plant Department
1968
79
Project Program Aquaculture Research Facility
OSU Planning and Institutional Research
1977
79
Newport Research Support Facility National Marine Fisheries Service Northwest & Alaska Fisheries Center: Newport: Construction Documents Phase
Hewlett, Jamison, Atkinson & Luey
1980
79
General Documents and Specifications for Marine Science Center Housing
Hewlett, Jamison & Atkinson, Architects
1972
79
Specifications for Marine Science Laboratory and Service Building
Hewlett & Jamison, Architects
1963
79
Specifications for Meeting/Dining Building, Marine Science Center
Hewlett, Jamison, Atkinson & Luey, Architects
1976
79
Specifications for Marine Science Laboratory and Service Building
Hewlett & Jamison, Architects
1963
79
National Marine Fisheries Service Northwest and Alaska Fisheries Center, Newport Research Support Facility
Hewlett, Jamison, Atkinson & Luey, Architects
1980
Hawley Hall
Burns, Bear, McNeil & Schneider, Architects
1958-1959
Box
80
Specifications for Men’s Dormitory, Unit “3,”
Burns, Bear, McNeil & Schneider, Architects
1958
80
Specifications for the Interior Furnishings Women’s Residence Hall and Dining Hall/Men’s Dormitory, Unit “3,”
Burns, Bear, McNeil & Schneider, Architects
1959
80
Specifications for Built-in-Furniture Men’s Dormitory, Unit “3,”
Burns, Bear, McNeil & Schneider, Architects
1958
Box
80
Heating Plant - Specifications for Central Heating Plant Addition
Burns, Bear, McNeil & Schneider, Architects
1959
Hinsdale Wave Research Laboratory
1972-1987
Box
80
Contract Documents for the Construction of the Oregon State University Environmental Fluid Dynamics Laboratory Concrete Wave Tank
Cornell, Howland, Hayes & Merryfield
1972
80
Project Manual for the O. H. Hinsdale Wave Research Laboratory, West Wing
Settecase Smith Doss Architecture
1987
Box
80
Horse Center - Project Manuals for Proposed Horse Center for Oregon State University
2 reports-Morin, Longwood, Edlund, Architects
1971
80
Kidder Hall - Specifications for 1964 Former Library Building Remodel: Sets 1 and 2
2 reports-Hewlett & Jamison, Architects
1964
Lab Animal Resource Center
1959
Box
80
Specifications for Animal Care Facility
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
1973
80
Animal Care Facilities Specifications Architectural, Structural, Mechanical, Electrical Detail Drawings and Schedules
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
1974
Box
80
Langton Hall - Proposal for Program Analysis and Feasibility for the Addition of a Competition Swimming Pool Facility to Langton Hall
Atelier/Northwest, Architects
1975
LaSells Stewart Center
1979-1980
Box
80
Oregon State University Foundation Cultural and Conference Center
Skidmore, Owings & Merrill, Architects
1980
80
Specifications for Cultural Center, Oregon State University Foundation, Volumes I-II
3 reports-Skidmore, Owings & Merrill, Architects
1965-1970
Library Buildings
1965-1970
Box
80
Specifications for Oregon State University Library, First Addition
Hamlin, Martin& Schultz, Architects
1970
80
New Library Building for Oregon State College
Hamlin & Martin, Architects
1965
Memorial Union
1959-1981
Box
80
Specifications for Memorial Union Remodel, Phase III
Jeppsen, Miller & Tobias, Architects
1980
80
Specifications for General Work: Additions to Memorial Union Building,
Church, Newberry, Roehr and Schuette, Architects
1959
80
Specifications for Mechanical Work: Additions to Memorial Union Building
Church, Newberry, Roehr and Schuette, Architects
1959
80
Specifications for Electrical Work: Additions to Memorial Union Building
Church, Newberry, Roehr and Schuette, Architects
1959
81
Specifications for Food Service Equipment: Additions to Memorial Union Building
Church, Newberry, Roehr and Schuette, Architects
1959
*
Traffic Flow Pattern (for food service)
1 map folder
undated
81
Specifications for Acoustical Ceiling Commons Room, Memorial Union Building
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1965
81
Specifications for Memorial Union Remodel Phase IV
Jeppsen, Miller & Tobias, Architects
1981
81
Specifications for Student Union Facilities, Phase II: Memorial Union Alterations and Additions
Jeppsen, Miller & Tobias, Architects
1978
81
Student Union Facilities: Alterations and Additions
2 folders
Jeppsen, Miller and Tobias, Architects
1976
Box
81
Merryfield Hall and Annex - Feasibility Study for Production Technology
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1964
81
Mitchell Playhouse - Feasibility Study for Mitchell Playhouse
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1963
Nash Hall
1966-1968
Box
81
Specifications for Bioscience Building for Oregon State University
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1968
81
Bio Science Building Specifications
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1966
National Forage Seed Production Research Center
1984-1985
Box
81
Mechanical and Electrical Bid Invitation for National Forage Seed Production Research Center, Oregon State University Campus
Moreland, Unruh and Smith, Architects
1985
81
USDA National Forage Seed Production Research Center Conceptual Design
Moreland, Unruh and Smith, Architects
1984
81
USDA National Forage Seed Production Research Center Detailed Facilities Program,
Moreland, Unruh and Smith, Architects
1984
81
USDA National Forage Seed Production Research Center Calculations
Moreland, Unruh and Smith, Architects
1984
81
USDA National Forage Seed Production Research Center 35% Design Submittal
Moreland, Unruh and Smith, Architects
1984
Oceanography Building
1962-1985
Box
81
General Specifications
Jeppsen & Miller, Architects
1962
81
Mechanical Systems Testing and Adjusting Data for Oceanography II Building
Jeppsen, Miller and Tobias, Architects
1985
81
Electrical Specifications for Oceanography Building at Oregon State University,
Jeppsen and Miller, Architects
1962
81
Fixed Equipment Contract - Specifications for Oceanography Building at Oregon State University
Jeppsen and Miller, Architects
1962
81
Mechanical Specifications for Oceanography Building at Oregon State University
Jeppsen and Miller, Architects
1962
Orchard Court Apartments
1960-1963
Box
81
General Contract - Specifications for 1963 Addition to Married Student Housing Project
Jeppsen and Miller, Architects
1963
81
Specifications and Contract Documents: General, Mechanical, and Electrical Work for Married Student Housing Project
Jeppsen and Miller, Architects
1960
Box
81
Orchard Court Community Center - Building Program for Orchard Court Community Center
OSU Planning and Institutional Research
1972
82
Ornamental Plants Research Facility - Construction Bids
Administrative Services Division Procurement and Personal Property Management Branch-Contracting Unit
1972
82
Oxford House - Specifications for the Alterations to Oxford House
Dukehart & Kinne, Architects
1966
Parker Stadium
1966-1971
Box
82
Stadium Improvements: Parker Stadium, Oregon State University and Autzen Stadium, University of Oregon
Moffatt, Nichol & Bonney, Inc., Consulting Engineers
1969
82
Parker Stadium Addition
(Donald J. Zarosinski, Consulting Engineer
1967
82
End Zone Corner Seats, Parker Stadium
Donald J. Zarosinski, Consulting Engineer
1966
82
General Documents and Specifications for OSU Stadium Concessions and Ticket Booth,
Hewlett & Jamison, Architects
1966
82
Oregon State University Parker Stadium Parking
Cornell, Howland, Hayes & Merryfield
1971
Peavy Hall
1968-1976
Box
82
Forestry Sciences Laboratory Service Building
U.S. Department of Agriculture - Forest Service
1974
82
Specifications for Forestry Building, Oregon State University
Hamlin, Martin & Schultz, Architects
1969
82
Forestry Sciences Laboratory North Wing
U.S. Department of Agriculture – Forest Service
1970
82
Forestry Sciences Laboratory East Wing
U.S. Department of Agriculture – Forest Service
1972
82
Forestry Sciences Laboratory West Wing
U.S. Department of Agriculture – Forest Service
1975
82
Forest Science Wing Addition - Forest Research Laboratory Oregon State University
Payne & Settecase, Architects
1967
82
Building Specifications for Oregon State University Forestry Building
Hamlin, Martin & Schultz, Architects
1968
82
Solicitation Forms for Forestry Sciences Laboratory North Wing
Pacific Northwest Forest and Range Experiment Station
1970
82
Irrigation System and Landscaping - Forestry Sciences Laboratory
U.S. Department of Agriculture - Forest Service
1976
82
Solicitation Forms for Forestry Sciences Laboratory East Wing
U.S. Department of Agriculture - Forest Service
1974
82
Solicitation Forms for Forestry Sciences Laboratory West Wing
(U.S. Department of Agriculture - Forest Service
1975
82
Solicitation Forms for Forestry Sciences Laboratory Service Building,
Pacific Northwest Forest and Range Experiment Station
1970
82
Solicitation Forms for Forestry Sciences Laboratory
U.S. Department of Agriculture - Forest Service
1976
Pharmacy Building
1960-1964
Box
82
Specifications, Alteration and Addition to Pharmacy Building
Herman Brookman, Architect
1964
82
Alteration and Addition to Pharmacy Building
Herman Brookman, Architect
1960-1962
Physical Plant
1968-1986
Box
82
Physical Plant Shops Alterations Project Manual
Jeppsen, Miller & Tobias, Architects
1986
82
A Resume of the Physical Plant Operation at Oregon State University
1968
Plageman Hall
1960
Box
82
General Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building
Chris Jeppsen, Architect
1960
82
Electrical Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building
undated
Poling and Cauthorn Residence Halls
1956
Box
83
Specifications for Men’s Dormitory Units A & B and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1956
83
Specifications for Kitchen Equipment in Men’s Dormitory A & B and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1956
83
Specifications for Interior Furnishing for Men’s Dormitory Units A & B and Cafeteria,
Burns, Bear, McNeil & Schneider, Architects
1956
83
Electrical Specifications for Men’s Dormitory Units A & B and Cafeteria
cBurns, Bear, McNeil & Schneider, Architects
1956
83
General Specifications for Men’s Dormitory Units A & B and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1956
Radiation Center Building
1962-1986
Box
83
Specifications for Nuclear Reactor Addition to the Radiation Center
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1965
83
Oregon State University TRIGA Reactor Annual Report
1982
83
Oregon State University TRIGA Reactor Annual Report
1984
83
Oregon State University TRIGA Reactor Annual Report
1986
83
Design of Radiation Center Building
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1962
83
Modification of Agreement between General Dynamics Corporation and State Board of Higher Education
Oregon State Board of Higher Education
1965
83
Contract with General Atomic for Purchase of TRIGA Mark II Nuclear Reactor, Oregon State University
Oregon State Board of Higher Education
1965
83
TRIGA Mark II Reactor General Specifications and Description
1964
Residence Hall Quadrangle
1965-1972
Box
83
Feasibility Study of Lounge and Office Arrangements in Residence Hall Quadrangle
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1965
83
Program for Feasibility Study - Quad Residence Halls
1972
Rogers Hall
1959-1966
Box
83
General Specifications for Mechanical Engineering Building
Wilmsen, Endicott & Unthank, Architects
1966
83
Analysis of Design for the Mechanical Engineering Building
Wilmsen, Endicott & Unthank, Architects
1959
Snell Residence Hall
1958-1984
Box
83
Specifications for Kitchen Equipment in Women’s Residence Hall and Dining Hall
Burns, Bear, McNeil & Schneider, Architects
1958
83
Specifications for Built-in-Furniture for Women’s Residence Hall and Dining Hall
Burns, Bear, McNeil & Schneider, Architects
1958
83
Oregon State University Foundation Furniture Specification and Bidding Instructions: Departmental Space Requirements Study, Need Assessment, and Design Development Report
Jeppsen, Miller & Tobias, Architects
1984
83
Specifications for Women’s Residence Hall and Dining Hall
Burns, Bear, McNeil & Schneider, Architects
1958
Spring Sports Complex
1971-1973
Box
83
Contract Documents for the Construction for Oregon State University Spring Sports Complex
Cornell, Howland, Hayes & Merryfield
1973
83
Oregon State University Spring Sports Complex
(Oregon State Board of HigherEducation
1972
83
Program for Conceptual Study of Spring Sports Complex at Oregon State University
Office of Planning and Institutional Research
1971
Box
83
Squaw Creek Fish Culture Facilities - Building Specifications
Planning and Institutional Research
1971
83
Feasibility Study for Agricultural Hall, Strand Hall
Bear, McNeil, Schneider, Bloodworth and Hawes Architects
1963
83
Student Cooperative Housing, Master Site Study
Hamlin and Martin Architects
1964
Veterinary Medical Teaching Hospital
1977-1979
Box
83
Veterinary Medical Teaching Hospital
Payne, Settecase, Smith and Partners Architects
1978
83
Proposed Veterinary Medical Teaching Hospital-Clinic
Office of Planning and Institutional Research
1977
83
Electrical Construction Specifications for the Veterinary Medical Teaching Hospital
Payne, Settecase, Smith & Doss, Architects
1979
83
Mechanical Construction Specifications for the Veterinary Medical Teaching Hospital
Payne, Settecase, Smith & Doss, Architects
1979
83
General Construction Specifications for the Veterinary Medical Teaching Hospital
Payne, Settecase, Smith & Doss, Architects
1979
Veterinary Medical Isolation Laboratory
1968-1973
Box
84
Building Program for Veterinary Isolation Facility
Office of Planning and Institutional Research
1968
84
Proposed Changes to Animal Disease Research Isolation Facility Contract
Neil Farnham, Architect
1973
84
Addendum No. 1 - Animal Disease Research Isolation Facility
Neil Farnham, Architect
1973
84
Specifications for Oregon State University Animal Disease Research Isolation Facility
Neil Farnham, Architect
1973
Box
84
Waldo Hall - Feasibility Study for Waldo Hall
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1963
Water Research Demonstration Laboratory - State of Oregon Board of Higher Education
1965
Box
84
Contract Documents for the construction of a Water Research Demonstration Laboratory
Cornell, Howland, Hayes & Merryfield, Architects
1965
Weatherford Hall
1965-1972
Box
84
Remodeling Program for West Wing of Weatherford Hall
Office of Planning and Institutional Research
1972
84
Rehabilitation Study of Weatherford Hall
Blair & Zaik, Architects
1965
Weniger Hall
1958-1980
Box
84
Mechanical Systems Testing and Adjusting Data for Weniger Hall North and Weniger Hall South
Burns, Bear, McNeil & Schneider, Architects
1978
84
Mechanical System Investigation of Weniger Hall
Morrison, Funatake, Inouye, Andrews, Inc. Consulting Engineers
1980
84
General Specifications for Addition to Physics Chemistry Building
Burns, Bear, McNeil & Schneider, Architects
1960
84
Specifications for 1965 Alterations to Physics Chemistry Building for Meteorology and Bio-Physics
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
1965
84
General Specifications for Physics Chemistry Building
Burns, Bear, McNeil & Schneider, Architects
1958
West Hall
1959-1960
Box
84
Specifications for Kitchen Equipment in Dormitory Unit #5 and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1959
84
Specifications for the Interior Furnishings in Dormitory Unit #5 and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1960
84
General Specifications for Dormitory Unit #5 and Cafeteria
Burns, Bear, McNeil & Schneider, Architects
1959
84
Dormitory Unit “5" and Cafeteria for Oregon State College
Burns, Bear, McNeil & Schneider, Architects
1959
Box
84
Wiegand Hall - Mechanical Systems Testing and Adjusting Data for Wiegand Hall
Morrison, Funatake & Assoc., Engineers
1977
Wilkinson Hall
1970-1973
Box
84
Earth Sciences Addition
Jeppsen, Miller and Tobias, Architects
1971
84
Mechanical Systems Testing and Adjusting Data for Earth Sciences Addition
Jeppsen, Miller and Tobias, Architects
1973
84
Proposal for a Graduate Science Facilities Grant for the Earth Sciences Building
Office of Planning and Institutional Research
1970
Box
84
Withycombe Hall - Withycombe Hall Valve Chart
undated
Multiple Building Projects, Campus Plans, and non-OSU Structures
1909-1992
Box
84
Adult Student Housing (ASH) Project
2 reports-HUD funded 170-unit housing project built on Witham Hill Drive in NW Corvallis, but not managed by OSU
1972
84
Agricultural Science Complex
Hamlin, Martin & Schultz, Architects
1969
84
Agricultural Science I - Building Program for Agricultural Science at Oregon State University
Office of Planning and Institutional Research
1968
84
A Brief Historical Resume of OSU’s Long Range Physical Development Plans
circa 1985
84
Campus Landscape Maintenance Planning Report
Department of Architecture and Landscape Architecture
1980
84
Campus Outdoor Lighting Plan for Oregon State University
Donald Hearing and Stanley Reed, Engineering & Design Associates
1971
84
Campus Outdoor Lighting Plan for Oregon State University
Ray Loofburrow and Stanley Reed, Engineering & Design Associates
1979
84
Capital Construction Priorities
Oregon State Board of Higher Education
1968
84
Carpets in Residence Hall Corridors - Contract Document
Office of University Engineer
1969
85
Community Center Conceptual Study Program
1971
85
Condensate Return Lines Corrosion Study
1984
85
Creating the Future: A Plan for Beginning the 90's
1990
Electrical Distribution System and Facilities Reports
1971-1979
Box
85
Long Range Study of Primary Electrical Distribution Facilities for Oregon State University
Stanley Reed and Michael Unger, Engineering & Design Associates
1971
85
Proposed Additions Electrical Distribution System 1973-75 Biennium
1987
85
Proposed Additions Electrical Distribution System 1973-75 Biennium
1980
85
Review of Electrical Distribution System Capacity and Loads for Oregon State University
Stanley Reed and Michael Unger, Engineering & Design Associates
1979
Box
85
Fire Alarm Study
Morrison, Funatake & Associates, Inc., Consulting Engineers
1971
Handicapped accessibility studies
1975-1986
Box
85
Specifications for the Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University
Stastny & Graham, Architects
1981
85
Handicapped Accessibility Phase II and Electrical and Computer Engineering Building Project No. 2: Related Alterations Handicapped Accessibility
Stastny Architects
1986
85
Removal of Architectural Barriers work Location Reference
Office of Planning and Institutional Research
1980
85
Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University: Report of Facility Survey and Recommendations for Facility Improvements to Improve Program Accessibility
2 reports- Atelier/Northwest, Architects)
1975-1976
Box
85
Kansas State University’s Six University Study
Office of Budgets
1985
85
Oregon State University Academic Planning and University Policies
1962
85
Oregon State University Administrative Cost/Structure Assessment-Final Report
1992
85
Oregon State University/Heritage Annexation
Paul Green & Associates, Inc., Engineers & Land Surveyors
1982
85
Oregon State University Long Range Development Plan
1964
85
Oregon State University Physical Development Plan
1987
85
Oregon State University Space Utilization Studies
3 folders
OSSHE
1972-1985
85
Physical Facilities Inventory-Revisions to Section E
1991
85
Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939- 40 to 1942-43
1939
Physical Plant Studies
1986-1989
Box
85
Marking Stairs for Visually Impaired
1989
85
Impact of Resource Allocation Policies on Universities Chemistry Research Laboratories
University of Michigan and Cornell University
1986
Box
85
Planning and Procedures Handbook for Campus and Building Development
1970
86
Program for Feasibility Study of University Union Facilities
Office of Planning and Institutional Research
1972
Re-roofing Investigations and Repair Proposals
1983
Box
86
Re-roofing Investigation for Nash Hall, Navy R.O.T.C. Building, and Women’s Building
Martin, Soderstrom & Matteson, Architects
1983
86
Re-roofing Investigation for Memorial Union Building and McAlexander Fieldhouse
Martin, Soderstrom & Matteson, Architects
1983
86
Waterproofing Proposals for Women’s Building and Gill Coliseum,
1983
86
3-M Roofing Specifications for Oceanography Building
1983
86
3-M Roofing Specifications for Armory Roof
1983
Box
86
Report on Oregon Agricultural College
Olmsted Brothers- Landscape Architects
1909
86
Sewer Utility Study Part A Program Development
1979
86
Steel Waterline Replacement
1982-1987
86
Subsurface Soils Data
Shannon & Wilson, Inc., Soil Mechanics and Foundation Engineers
1967
86
Tour of Facilities-School of Agriculture (Phases I and II)
Facilities Planning and Use Committee
1980
86
Traffic Study - Corvallis Area Transportation Study, Transportation Plan 1985 Interim Report
Technical Advisory Committee, U.S. Department of Transportation Bureau of Public Roads, and Department of Housing and Urban Development
1969
86
Transition Plan
Office of Planning and Institutional Research
1978
86
Transportation, Circulation and Parking-OSU
Carl H. Buttke, Inc.-Consulting Transportation Engineer
1983
86
Utilities Survey (2 reports)
phrase
1959
86
Utility Tunnel Extension
W. Bruce Morrison and Associates, Inc., Consulting Engineers
1969
Corvallis Development Projects and Planning Reports and Studies
1967-1988
Box
86
Community Center Plan, Corvallis Oregon
1967
86
Sewer Investigation, Public Works Department
1975
86
The Corvallis Bypass - Draft Environmental Impact Statement, United States Department of Transportation
1978
86
Adopted Comprehensive Plan, City of Corvallis
1978
86
Circle Boulevard - Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation
1978
86
Circle Boulevard - Public Corridor - Design Hearing Transcript, City of Corvallis
1979
86
Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation
1979
86
Public Corridor Design Hearing Transcripts (Walnut Boulevard), City of Corvallis
1979
86
Land Development Code - Draft for Planning Commission Review, City of Corvallis
1980
86
The Potential for a Research - Technology Park in Corvallis: A Preliminary Analysis, Oregon District 4 Council of Governments
phrase
1981
86
Contract Documents for the Construction and Improvement of: Madison Avenue Reconstruction - S.W. Sixth St. to S.W. Eleventh St., City of Corvallis
1981
86
A Research Technology Park in the Corvallis Area an Examination of Feasibility and Options, Oregon District 4 Council of Governments
1982
86
McKee High Technology Park - Application and Annexation Comprehensive Plan Amendment and Development District Change, Paul and Green Associates, Inc.
1982
86
Sunset Research Park - A Research Technology Park, City of Corvallis
1983
86
North University Area Plan, City of Corvallis
1983
87
Corvallis Transportation Plan, City of Corvallis
phrase
1983
87
Capital Investment Plan, City of Corvallis: 1988-1993
2 reports- one is proposed
1988
87
Downtown Streetscape Plan: Drafts
2 reports-City of Corvallis
1988
Box
88
Plans of Formal Gardens
pre-1940
Building Specifications
1924-1954
Box
89
Dairy Barn
1929
89
Hand Ball Courts Building
1929
89
Greenhouses
1927
89
Horse Barn
1924
89
Pharmacy
1924
89
Physics Building
Covell Hall
1927
89
Sheep Barn
1929
89
Women’s Gymnasium Building
Women’s Building
1925
88
Chemical Engineering [Gleeson Hall]
1954
88
Experiment Station - Pendleton Field Station, ca
1929
88
Pavilion
Gill Coliseum
1948
88
Home Economics Building
1951
80
Home Management House
1948
88
Navy ROTC Building
not built
1945
88
Oceanography Building
Burt Hall
undated
Building Specifications and Bids
1946-1963
Box
90
Animal Industries Building (Withycombe Hall)
2 folders
1950
90
Dormitories
1961-1963
90
Engineering Wing
14 folders
1947
90
Food Technology Building (Wiegand Hall)
1950
90
Home Management House
1948
90
Industrial Building
1946
90
Paving Specifications
1948
90
Pavilion (Gill Coliseum)
1948
90
Poultry Brooder House
1953
90
Women’s Dormitory (Sackett Hall)
1946-1947
Box
Proposed Structures
1930-1935
Box
91
Chemistry Building Costs
1930-1935
91
Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939/40 – 1942/43
The report includes information about all campus structures including original costs and restoration value as well as some plans and drawings.
1939
91
Memorial Union Long Range Development Planning
1970
91
OSU Physical Development Plan
1976
91
OSU Roof Management Plan – Interim Report
1988
91
Mitchell Playhouse Facilities Evaluation
1989
91
Facility Condition Analysis for the Administrative Services Building
1995
91
Orchard Street Structure (Richter House) Removal
1992
91
Demolition of Building at 2827 Orchard and Restoration of Site
1992
91
Facilities Services Annual Report for 1997-1998
1998
91
Campus Development Plan (Draft) for 2000-2010
2000
91
Campus Master Plan
2003
91
The 1965-1971 Capital Construction Program of the Dept. of Higher Education (OSSHE)
1966
91
Building Program Proposed by the State Board of Higher Education
1961
*
Comparative Residence and Dining Hall Information on Construction Methods, Materials, Functional Requirements, Appointments and Areas from questionnaires dated 1959
1 map folder
1961

Series IV:  Capital Construction Project Files, 1962-1997Return to Top

8.5 cubic feet including 6 photographs, (11 boxes)

Series IV documents building construction projects budgeted for $100,000 or more. The Capital Construction Project Files contain bid documentation, correspondence, memoranda, photographs, as well as meeting minutes from the Oregon State System of Higher Education (OSSHE) Building Committee. The bulk of the records in this series pertain to the construction of Burt, Nash, and Peavy Halls and the Bloss and Arnold residence halls. This series includes the 5000 files for several projects in the mid-1990s: dock construction at the Hatfield Marine Science Center; renovations at McNary and Milam Halls; construction of the Property Administration Building; reconstruction of the Industrial Building (Cascade Hall) after the 1992 fire; renovations at Withycombe Hall for the University Theater; and ADA upgrades at Langton Hall and the Women's Building. Additional materials pertaining to these and other capital construction projects are available in Series II, III, and VI.

Container(s) Description Dates
Box
87
Bloss-Arnold Combined
1971
87
Central Heating Plant Boiler
1971
87
Peavy Hall
1971
87
Orchard Court Community Center
1972
87
Wave Tank
1972-1973
87
Kerr Library First Addition
1970-1972
87
Horse Center
1971-1972
87
Earth Science Building
1971-1974
87
Hatfield Marine Science Center Housing
1972-1975
87
East Area Residence Halls-Phase I and II
1969
87
Milne Computer Center
1968-1969
87
Milne Computer Center
1968-1969
87
Oceanography Addition
1965-1967
87
Nuclear Reactor Addition to Radiation Center
1972-1975
87
Rogers Hall
1965-1968
87
Cordley Hall First Addition
1965-1967
87
Finley Hall
Includes photographs.
1965-1967
87
Utility Tunnel Extension
1964-1970
87
USDA Forestry Science Lab Services Wing
1966-1970
87
Administrative Services Building
1969-1971
87
Crop Science Building
1980
87
Cultural and Conference Center-LaSells
1979-1980
87
Gilbert Hall Addition
1978-1980
87
Pharmacy Building Addition
1964-1966
87
Hatfield Marine Science Center Oyster Hatchery Addition
1965-1968
87
Kidder Hall Alterations
1964-1965
87
Avery and Dixon Lodges
1965-1966
87
Conversion of Research Vessel Yaquina
1963-1964
87
Radiation Center
1962-1964
87
Dormitories Number 7 and 8
1963-1964
87
Kerr Library Building Construction
1962-1964
87
McNary Dormitory and Cafeteria
1962-1964
87
Biosciences Building
1968-1970
87
Hatfield Marine Science Center-Meeting/Dining Building
1975-1976
87
Electrical Distribution Facilities
1970-1974
87
Memorial Way Pedestrian Mall
1973-1974
87
Dearborn Hall Remodel
1974-1975
87
Animal Disease Research Isolation Facility
1973-1975
87
Recreation Center (Dixon),
1973-1976
87
Animal Care Facility
1974-1977
87
Spring Sports Complex
1972-1973
87
Married Students Housing Addition
1963
87
Conversions of Solariums to Student Rooms
1963
87
Dairy Center
1968
87
Newport Research Support Facility
1980
87
Andrews Experimental Forest Facility Improvements
1980
87
Golf Course Proposal
1973-1979
87
Crop Science Building
1976-1981
87
Aquaculture Research Facility
1977-1979
87
Memorial Union Phase II Improvements
1976-1978
87
Yaquina Bay Dorm Facilities
1968
87
Forest Research Lab Wing Addition
1968
87
Medical Science Building Cafeteria
1968
87
Pharmacy Greenhouses
1964-1965
87
Memorial Remodel Phase IV
1981-1983
87
Washington Way Tennis Courts Renovation
1981
87
Veteran Medicine Hospital
1979-1980
87
Memorial Union Phase III
1980
87
Parking Improvements
1980-1981
87
Parker Stadium Turf Replacement
2 folders
1984
92
Oceanography Building (Burt Hall)
13 folders
1965-1974
92
Bioscience Building (Nash Hall)
24 folders
1966-1972
89
Bioscience Building (Nash Hall
1966-1972
93
Bioscience Building (Nash Hall)
2 folders
1968-1972
93
Forestry Building (Peavy Hall)
22 folders
1966-1972
93
Bloss Hall
15 folders
1969-1972
89
Bloss Hall
1969-1972
94
Arnold Hall
21 folders
1964-1972
119-120
Hatfield Marine Science Center (HMSC) Dock Construction
1995-1997
120-122
Industrial Building Reconstruction
1993-1996
122
McNary Hall Renovations
1995-1997
122
Milam Hall Renovation
1997-1998
122-123
Property Administration Building
1994-1995
123
Withycombe Laboratory Theater
1991-1997
123-124
Langton Hall and Women's Building ADA Upgrade
1993-1996

Series V:  Facilities Planning and Use Committee Records, 1981-1985Return to Top

1.25 cubic feet, (2 boxes)

Series V documents the activities of the Facilities Planning and Use Committee and the coordination of campus and facilities planning, room use, and renovation and building construction projects. The records include correspondence, meeting minutes, memoranda, project proposals, and reports. See also Series IX, Committee Records.

Container(s) Description Dates
Box
95
20 folders
1981-1984
96
6 folders
1985

Series VI:  General Construction Files, 1989-1997Return to Top

0.8 cubic foot, (2 boxes, including 1 oversize box)

Series VI documents the design and construction of Bates Hall and the Forest Ecosystem Research Laboratory and consists of budgets, correspondence, memoranda, notes, and reports.

Container(s) Description Dates
Box
96
Family Studies Center (Bates Hall)
2 folders
1989-1990
96
Forest Ecosystem Research Laboratory
10 folders
1996-1997
113
Forest Ecosystem Research Laboratory Project Schedule
apx 20x24 in.
2 sheets
1996

Series VII:  Minor Building Modification Files, 1985-1993Return to Top

3.5 cubic feet including 108 photographs, (4 boxes and 1 map folder)

The Minor Building Modification Files document building repair and maintenance projects from the mid-1980s through early 1990s and are arranged alphabetically by building name. Several of the files include photographs.

Container(s) Description Dates
Box
97
Administration Building
1991-1992
97
Apperson Hall
1991-1992
97
Ballard Extension
1991-1992
97
Benton Hall
1991-1993
97
Bexell Hall
1992
97
Burt Hall
4 folders
1991-1993
97
Campus General
2 folders
1989-1993
97
Cordley Hall
2 folders
1991-1993
97
Crop Science Building
1992-1993
97
Dearborn Hall
1992-1993
97
Dryden Hall
1990-1992
97
Education Hall
1991-1992
97
Fairplay Office/Laboratory
1992
97
Family Study Center
1991-1993
97
Forest Research Lab
1992
97
Gilbert Hall
1991-1992
98
Gill Coliseum
1991-1992
98
Gleeson Hall
includes 6 photographs
1991
98
Graf Hall
1991-1993
98
Green Houses
1992-1993
98
Ground Water Research Lab
1991
98
Hazardous Waste Facility
1991
98
Heating Plant
includes 4 photographs
1990-1992
98
Hinsdale Wave Tank
1990
98
Hispanic Cultural Center
1991
98
Hovland Hall
1992
98
Hyslop Farm Buildings
1992
98
Industrial Building
1992
98
Kerr Library
1991-1993
98
Kidder Hall
1992-1993
98
Langton Hall
1991-1993
98
LaSells Stewart Center
1991-1993
98
Magruder Hall
2 folders
1985-1993
98
McAlexander Fieldhouse
1985
98
Memorial Union
1985-1992
98
Merryfield Hall
1985-1992
98
Milam Hall
1985-1992
98
Milne Computer Center
1985
98
Mitchell Playhouse
1985
98
Moreland Hall
1985-1992
98
Motor Pool
includes 1 photograph
1985
98
Nash Hall
2 folders
1985-1992
98
Naval Armory
1985
98
Oak Creek Lab
1985
98
Oceanography Administration Building
1985
98
Oceanography Warehouse
1991-1993
98
Off-Campus Housing
1992
98
Orchard Street Nursery
includes 2 photographs
1985
98
Parker Stadium
2 folders
includes 3 photographs
1985-1993
98
Parking Lots
includes 3 photographs
1985-1993
98
Peavy Arboretum
1990-1991
99
Peavy Hall
5 folders
includes 64 photographs
1985-1993
99
Pharmacy Hall
2 folders
includes 9 photographs
1985-1993
99
Physical Plant
includes 3 photographs
1985
99
Plageman Infirmary
includes 5 photographs
1985-1993
99
Poultry House
1992
99
Public Safety Building
1985
99
Rabbit Buildings
1985
99
Radiation Center
includes 9 photographs
1985
99
Rogers Hall
1985
99
Seed Lab
includes 2 photographs
1985-1992
99
Shepard Hall
1985-1992
99
Snell Hall
includes 3 photographs
1985-1993
99
Social Science
includes 3 photographs
1985
99
Strand Agriculture Hall
2 folders
includes 1 photograph
1985-1992
Map Case
*
College of Agricultural Sciences Proposed Office Arrangement
1 sheet
1991
Box
99
Surplus Property Building
includes 3 photographs
1991
99
Vet Diag Lab
includes 3 photographs
1985
99
Vet. Med. Animal Isolation Lab
1985
99
Veterinary Research Lab
1985
99
Vocational Shops
1985
99
Waldo Hall
1985-1992
100
Weniger Hall
3 folders
1985-1993
100
Wiegand Hall
1985-1993
100
Wilkinson Hall
1985-1992
100
Withycombe Hall
2 folders
includes 2 photographs
1985-1993
100
Women’s Building
1985-1992

Series VIII:  General Subject Numbered Files, 1968-1991Return to Top

4.6 cubic feet, (5 boxes)

The General Subject Numbered files document building maintenance and renovation projects and various aspects of the daily management of campus structures including energy consumption and conservation, sewage services, custodial services, water supply, and HVAC system maintenance. The records include contracts, correspondence, and reports. Some of the files are arranged by architect or contractor and others by building. The bulk of the records are for the 1980s.

Container(s) Description Dates
Box
100
G. Acker-Architect
17020
1985-1986
100
Brown & Caldwell
17020
1981-1986
100
Butke-Transportation, Parking Study Agreement
17020
1981-1987
100
CH2M-Heating Plant Economizer
17020
1986
100
James Carpenter
17020
1986
Carson (Carson, Bekooy, Gulick, and Associates Consulting) Supplements
1986-1988
Box
100
Campus Water System (#1)
17020
1986-1987
100
BalEx, Heating Plant, Misc. (#2)
17020
1986-1988
100
Cordley 3097 (#3)
17020
1987
100
Conmar (#4)
17020
1987
100
Rogers Hall Air Balancing (#5)
17020
1987
100
Waldo (#6)
17020
1987
100
Weniger Lighting (#7)
17020
1987
100
Ocean I Rm. 426 Cooling (#9)
17020
1987-1988
100
Burt Rm. 424A Cooling (#10)
17020
1987
100
Langton Hall Shower Exhaust (#11),
17020
1987
100
Nash Hall Rm. 14 Humidity/Temp. Control (12/16)
17020
1988
100
Moreland Hall Fume Hood (#13)
17020
1988
100
Burt 178 Cooling (#15)
17020
1988
100
Cordley Mients Facility (#18)
17020
1988
100
Weniger 5th Floor Cooling (#21)
17020
1988
100
Misc (#24)
17020
1988
100
Food Service Warehouse Freezer (#27)
17020
1989
100
Fume Hood Investigation
17020
1987
100
Snell Water Piping
17020
1987
100
Water Piping Replacement
17020
1984-1985
100
Weniger Vacuum Pump
17020
1987
100
Energy Consultant Selection
2 folders
17020
1983-1988
101
Soderstrom Architects Payments/Supplements
17020
1987-1988
101
Soderstrom Architects Correspondence
17020
1987
101
Stastny Architects Handicapped Access. Payments
17020
1985-1988
CH2M-Supplements
1986-1988
Box
101
LaSells Stewart Center HVAC (#4)
17020
1986-1987
101
HMSC Seawater Chiller (#5)
17020
1987-1988
101
Kidder HVAC Modifications (#8)
17020
1987
101
Langton Pool Roof (#11, #13)
17020
1987-1988
101
Poling Hall (#12)
17020
1987
101
Burt 383 AC Improvements (#14)
17020
1988
101
Food Toxicology Chiller (#15)
17020
1988
101
Underground Fuel Tanks
17020
1988
101
Devco Engineering Payments
17020
1988-1989
101
General Parking Lot-Consultants
17020
1988
101
Geotechnical Resources
17020
1980-1984
101
Interior Designers, General
17020
1987
101
Jeppsen, Miller & Tobias-Covell Fire Escape
17020
1988-1989
101
Jeppsen, Miller & Tobias-Electrical and Computer Engineering/Related Alt.Payments
2 folders
17020
1989
101
Parking Garage Study
17020
1989
101
TBG/Womens Building Biomech Lab
17020
1987-1988
101
Contracts, Award Fee
17024
1987
101
Sasaki Associates-Consultants, general
17027
1989
101
Alterations to Apperson and Merryfield Hall
17027
1986
101
Crew Facilities-Samard
17030
1986
101
Crew Facilities-Mcallister
17030
1986-1987
101
Memorial Union Building Dome Reroofing
17030
1986
101
Building Manager Memo
17030
1984-1987
101
Crop Science
17030
1985
101
Gilmore Hall Reroof
17030
1985-1987
101
Architectural services-Gill Coliseum, Project 1
17030
1984-1986
102
Heating Plant Cogeneration Equipment Purchase CH2M-Hill Northwest
17030
1989
102
Irrig. Systems Installation-Phase III
17030
1986-1987
102
McNary & Wilson Halls Roof Replacement
17030
1986-1987
102
Memorial Union Dome Reroof
17030
1986-1987
102
Computer Science Building Alterations
17030
1984-1985
102
Wiegand Hall Fume Hood Installation
17030
1987
102
Administration Steam Line Cross-Over
17035
1984
102
Ballard Extension Hall - Room 118
17035
1985-1986
102
Benton Hall Sewer
17035
1984-1985
102
Black Cultural Center
17035
1987
102
Campus Waterline Replacement
17035
1985-1987
102
Cordley Remodel Room 1060
17035
1984-1985
102
Education Hall Recoat Exterior Wall
17035
1984
102
EE Tech Ballasts Social Science
17035
1980-1981
102
Farm Crops Remodel
17035
1983
102
Farrier School
17035
1985
102
Furnaces-Campus Maint. Agreement
17020
1985
102
Gill Coliseum Lighting
17035
1979-1980
102
Heating Plant Cogeneration-Bid Opening
17035
1989
102
Heating Plant Emergency Generator Auto Start-up
17035
1983-1984
102
Heating Plant Tank Liner
17035
1983
102
Housing Emergency Sanitary Sewer Hook-up at Housing Warehouse
17035
1983
102
Langton Kalwall
17035
1985
102
Lasells Stewart Center Air Conditioning
17035
1984-1985
102
Library Timers For Stacks
17035
1981-1982
102
McAlexander Fieldhouse Recaulk
17035
1978-1979
102
Memorial Union Mech. Room Asbestos Removal
17035
1985
102
Memorial Union Rotunda Painting
17035
1985
102
Milam Hall Automatic Door
17035
1983
102
Ocean Administration Remodel
17035
1984-1985
102
Oxford House Storm Drain
17035
1986
102
Parker Stadium - Paint Press Box
17035
1985
102
Reroof Apiary Building 176
17035
1985-1986
102
Roof Entomology Research Farm
17035
1986
102
Roofing-Poultry C, Printing, Storage
17035
1983
102
Sewerline Proj.-Phase VII Root Control
17035
1987
102
Sidewalk Project
17035, 2 folders
1986-1987
102
30th & Oak Creek Drainage Ditch
17035
1986
102
30th Street Mall Sculpture
17035
1982-1983
102
Vet Dairy Barn Walk-in Cooler
17035
1985
102
Waldo Hall Room 242
17035
1985
102
Weniger Hall–Reglaze Greenhouse
17035
1984
102
West Greenhouse Growth Chambers
17035
1983
102
Wilkinson Raised Floor
17035
1984
103
Wilkinson Transformer Retro-File
17035
1986
103
Womens Building Pipe Insulation
17035
1986
103
Womens Building Window Replacement
17035
1986
103
Women’s Softball Field Fence
17035
1983-1984
103
Ag. Utilities & Seed Lab Asbestos Removal
17037
1989
103
Bookstore Remodel
17037
1989
103
Kerr Library Computer Center
17037
1988
103
Langton/Women’s Building O & M
17037
1985
103
Langton/Womens Building Refinish Floors
17037
1986
103
Refinish Floors for Langton and Women’s Building
17037
1986
103
Misc. Sewer Projects
17037
1986
103
Nash Hall - Backdraft Dampers for Fume Hoods
17037
1981-1983
103
Parker Stadium Lights Computerized Operation
17037
1984
103
Poultry Re-roofing
17037
1978
103
Senior Class Project - Walk in Kerr - Kidder Quad
17037
1985
103
Plan Reviews, Approval
17039
1985
103
Minority Businesses
17060
1987-1988
103
Marriott Contract Info
18040
1988-1989
103
Contract Info - ABM
18040
1986
103
Contract Bidding Info
18040
1988-89
103
Service Contract Servicemaster
18040
1986
103
SMI Contract Information
18040
1987-1988
103
Contract Change Orders - Marriott
18041
1990
103
Contract Change Orders ABM
18041
1983-1987
103
Contract Change Orders Servicemaster
18041
1987
103
Custodial Services Corres. Marriott
2 folders
18042
1989-1990
103
Payment Back-up Info - Marriott
18043
1989-1990
103
Custodial Services - Corres. Marriott
18042
1988-1989
103
Custodial Services Correspondence - ABM
18042
1986
103
Custodial Services Correspondence - Servicemaster
2 folders
18042
1986-1987
103
Custodial Services - Correspondence
3 folders
18042
1983-1985
103
ABM
18043
1985-1986
103
Payment Back-up Information ABM
18043
1983-1984
103
Payment Back-up Info Servicemaster
18043
1986
103
Department of Energy
19010
1981-1986
103
Energy Articles
19020
1986
103
Energy General Information
19025
1988
103
Energy - Misc./General
19025
1983-1987
103
Heating Degree-Day Histories
19025
1972-1986
103
Nacubo Awards Program
19040
1986
103
Energy Audits
19050
1979-1985
103
Energy Control Progress Reports
19050
1979
103
Governor’s Task Force on Energy Management
19050
1977-1984
103
State Energy Mgmt. Annual Report
19050
1985-1987
103
Technical Ast. Reports Ocean I, II
19050
1981-1983
104
BPA - General
20010
1983-1985
104
BPA/PP&L Lighting Contract
20010
1983
104
BPA Solicitation
20010
1981-1983
104
Energy Conservation, General
2 folders
20020
1983; 1988
104
Energy Conservation Measures
20020
1975-1987
104
Cycle 4
20030
1983-1986
104
Public Energy Pkg - Application Burt VAV
20035
1989
104
PP&L/Brown & Caldwell
20035
1986
104
Bookplan Updates
21045
1987
104
Electricity Consumption
29030
1971-1990
104
Misc. Electricity Correspondence
29030
1988
104
Electricity Consumption
29030
1988
104
Misc. Gas Correspondence
2 folders
29040
1970-1988
104
Energy Conservation Projects
20040
1988
104
Gas Consumption
29040
1968-1983
104
Malheur Experiment Station
9035
1990-1991
104
Tennis Court Renovations
29040
1988-1991
104
Monthly Cost for Steam
2 folders
29090
1977-1988
104
Water Meter Exemption Readings
29110
1988
104
Monthly Reports
31040
1982-1984
104
Dorms and Cafeterias - Hartman Payments
31040
1981-1983
104
Contract-Honeywell for orig. EMS
31040
1981-1984
104
Wide Carriage Printer
19050
1978
104
EMS Correspondence
31065
1986
104
Fixed Equipment Review
32017
1987
104
Mobile Equipment
32050
1986
104
Pumps/Air Compressors
32080
1984
104
Refrigeration
32090
1985
104
Backflow Preventors
33010
1985-1986
104
Irrigation
33010
1986
104
Monthly Maintenance Letters
33015
1989
104
Summer
33017
1981
104
Public Improvement Projects
33035
1988
104
Preventative Maintenance General Information
33040
1985-1990
104
Backflow Preventor Listing
35020
1985-1988
104
Backflow Prevention Testing
35020
1984-1987
104
Backflow Preventors
35020
1974-1980

Series IX:  Committee Records, 1966-2003Return to Top

0.6 cubic foot, (2 boxes)

Series IX consists predominantly of materials pertaining to the University Safety Committee, the Oregon State Board of Higher Education Building Committee, and the Campus Planning Committee as well as committee records pertaining to the campus master plan and re-engineering. The records include meeting minutes, reports, correspondence, and related documentation. See also Series V, Facilities Planning and Use Committee Records.

Container(s) Description Dates
Box
91
Facilities Planning Committee – Proposal for Humanities and Social Science and Fine Art Complex
1966
91
University Safety Committee
3 folders
1970-1989
91
Building Committee (Oregon State Board of Higher Education)
9 folders
1955-1968
131
Campus Planning Committee
2001-2003
131
Master Plan
2002
131
Re-Engineeering
2001-2003

Series X:  Correspondence, 1888-2003Return to Top

2 cubic feet, (5 boxes)

The correspondence documents various policies, procedures, and activities of Facilities Services. The series consists primarily of the Gordon Skelton correspondence for 1908-1938 and correspondence from the 1960s pertaining to campus planning, policies, and procedures.

Container(s) Description Dates
Box
91
Water Tower
1888-1889
91
Capital Repairs and Rehabilitation
1951
91
Annual Summaries of Occupational Injuries and Illnesses for 1997 thru 1999
1998-2000
91
OSU Building Addresses
2003
91
Separate Bids Chicago Plan (Reference from University of Illinois)
1964
91
Procedure Directions for Contract Matters
1965-1969
91
Procedure Directions for Contract Matters Where Grant Funds Involved
1968
91
Manual of Instructions Grant Applications Title II
1967-1968
91
Labor Unions
1961-1962
91
Cost Comparisons: Physical Plant and Contractor’s Costs
1965
91
Associated General Contractors Meeting
1966
91
Equal Employment Opportunity Compliance Reports
1963-1965
91
U.S. Office of Education Grant Funds Contract Procedures
1965-1969
91
Legislative Actions in 1971 Affecting Public Contracting
1971
91
Facility Projection Reports
1970
91
Dormitory Construction Costs Comparative Analysis from 1957 thru 1966
1966
91
Capital Outlay
3 folders
1962-1969
Gordon V. Skelton
The Skelton correspondence consists of materials documenting Skelton's oversight of campus buildings, especially fire protection; roads; and walkways in his role as the campus Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection. Of special note is correspondence with architect John Bennes. The correspondence also includes materials pertaining to his role as chair of the Civil Engineering Department.
1908-1938
Box
105
Fire Protection
13 folders
1908-1935
105
Accident Commission
1919-1927
105
Board of Education and General Administration
1933-1935
105
Business Office
2 folders
1920-1933
105
Chamber of Commerce
1915-1916
105
College Buildings and Property (and letters to Mr. Bennes relating to same),
1911-1927
105
Dean Covell’s Office
1909-1927
105
Dean’s Office
1933-1934
105
Dietzgen and Co.
1916-1926
105
General Highway and Civil Engineering
1908-1919
105
Graduate Committee
1933-1935
105
Highway Department
1926-1933
105
Highway Research Board
1921-1934
105
Highway Research
1934-1935
105
Library
1928-1934
105
Memorial Union
1931-1934
105
Peavy – Dolan Controversy
1913-1917
105
Portland (Ore.) Bridge Reports by J.P. Newell
1923
105
Registrar’s Office
1929-1935
105
Roads,
1916-1925
105
Surveys and Lands
1909-1915
105
University of Oregon
1933-1935
105
Walks and Improvements Constructed
1910-1912
105
Miscellaneous
2 folders
1909-1921
94
General
3 folders
1908-1938
Box
88
Project Details Forms – Capital Construction
2 folders
1961-1969
88
Priority List Capital Construction Proposed
2 folders
1961-1966
88
Building Program Directives
1967-1969
88
Senate Bills 142 and 143
1965
88
Senate Bill 428
1967
88
Long Range Planning
3 folders
1940-1970
88
Early Planning of Buildings
2 folders
1940-1964
88
Value of Land and Buildings
1959-1967
88
Construction Survey Forms Questionnaire
1959-1961
88
Air Conditioning Policy
1962-1967
88
Major Rehabilitation Program
1960
88
Removal of Obsolete or Temporary Space
1960
88
Building Codes
1938-1941
131
Facilities Services 2002-2003 Budget
2002
131
Move of Transportation Services and Parking to Adams Hall
2003

Series XI:  Land Ownership and Property, 1940-1951Return to Top

0.1 cubic foot, (1 box)
Container(s) Description Dates
Box
88
Land Records
Copies of land records (from County Assessor?) for Oregon State College property acquired between 1940 and 1951 and a compilation of information about earlier land acquisitions.
1940-1951

Series XII:  Policies and Procedures, 1986-1994Return to Top

0.01 cubic foot, (1 box)

The Policies and Procedures include a small number of documents pertaining to environmental health and safey and disaster planning.

Container(s) Description Dates
Box
88
Environmental Health and Safety Hazard Communication Program – Supervisor Outline
1986
88
Safety Training
1994
88
CFC Phase-Out
circa 1994
88
Disaster Management Plan
1990
88
Fire Marshall Policy on Electrical Appliances
1992

Series XIII:  Publications, 1989-2001Return to Top

0.1 cubic foot, (1 box)

The Publications consist of newsletters, guides, and handbooks. The newsletters include both internal newsletters for Facilities Services staff and external newsletters for the OSU campus community. The newsletters include staff and department news items as well as information about new building construction and remodeling projects.

Container(s) Description Dates
Box
88
Newsletter
3 folders
Facilities Bulletin; Facilities Services Bulletin; Facilities Link; and Our News
1989-2001
88
Physical Plant Service Guide for 1989/90
1989
88
Working Safely with Hazardous Substances – A Handbook for Employees
circa 1989-1992

Series XIV:  Space Use, 1960-1969Return to Top

0.6 cubic foot, (2 boxes, including 1 oversize box)

Series XIV consists of materials pertaining to space use on the Oregon State University campus in the 1960s and includes data on square footage of usable space and use as well as reports and correspondence.

Container(s) Description Dates
Box
88
Space Utilization Report
1966
88
Comparison of Classroom and Laboratory Occupancy – Fall Terms 1965 and 1966
1967
88
Institutional Analysis (Space)
1967
88
Utilization of Classrooms and Laboratories for Fall Term 1967
1968
88
Analysis of Non-Residential Space by Principal Use
1968
88
Space Standards
1968
88
Square Feet of Buildings and Assigned Areas
1968-1969
109
Use-Function Tabulation Sheets
apx 23x31 in.
Unbound set of about 115 ledger sheets documenting the use and function of campus building space broken down by room. In addition to recording room function (e.g. office, classroom, laboratory, or conference room) and use (e.g. graduate/undergraduate instruction, public service, or staff accommodation), the ledger entries give net usable space, room capacity, and department jurisdiction. An alphabetical index in included as well as a three-page summary of department space use for 1964.
1960-1964

Series XV:  Staff Meeting Minutes, 1992-2001Return to Top

Container(s): Box 71

0.8 cubic foot, (1 box)

The Staff Meeting Minutes include reports of weekly department heads meetings and less-frequent all staff meetings. They provide detailed information and updates on major consruction projects as well as minor modifications that are underway and on the general administration and functioning of Facilities Services.

Series XVI:  Time Records, 1913-1939Return to Top

0.3 cubic foot, (1 box)

The time books are for laborers who worked on walkways, roads, sewers, ditches, and other projects on campus. Much of the work was supervised by Gordon V. Skelton, Professor of Highway Engineering and Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection.

Container(s) Description Dates
Time Books
1913-1939
Box
88
1913-1919
88
1923-1929
88
1933-1939
Box
88
Time Certificates
1936-1937

Series XVII:  Renderings (Drawings) of Campus Buildings, 1949-1975Return to Top

2 cubic feet, (1 oversize box and 7 map folders)

These architectural renderings depict the settings of proposed campus buildings; they were typically prepared during the design process for a structure. Some of the renderings are in color.

Container(s) Description Dates
Box
*
976-76-19a: Agriculture Science I
undated
Cordley Hall
1954
Box
110
P199:03: Agricultural and Biological Science Building
undated
110
P199:04: Agricultural and Biological Science Building
undated
*
987-76-11a: First Addition and Second Addition to Cordley Hall
undated
*
987-76-04: Agricultural and Biological Science Building
1954
Great Hall
1975
Box
*
*
1975
Box
110
Kerr Administration Building, Administration Building
1968
*
987-76-05: Magruder Hall
undated
*
987-76-10: Marine Science Center (Hatfield), Lab and Library Additions
undated
110
P199:09: Milam Hall, Addition to Home Economics Building
1950
*
987-76-16: Milne Computer Center
undated
*
987-76-07: Nash Hall
undated
110
987-76-07: Oregon State Stadium (Reser Stadium)
1952
Sackett Hall
undated
Box
110
110
Box
*
987-76-18: Student Housing - Arnold Hall Cafeteria
undated
Student Housing - Bloss Hall
undated
Box
*
*
987-43-13: Preliminary Study of Residence Hall Unit "1" of Complex "A", South Residence Hall Group
Box
*
P199:11: Student Housing - West Hall, Dormitory Unit 5 and Cafeteria
1959
110
P199:02: Weatherford Hall, Men's Dormitory and Cafeteria Building
1955
Weniger Hall
1955-1957
Box
110
P199:07: Physics Chemistry Building
1955
110
P199:08: Physics Chemistry Building
undated
*
987-76-17: Physics Chemistry Building
1957
Box
110
P199:01: Wiegand Hall, Food Technology Building
1949
Wilkinson Hall
undated
Box
110
Earth Sciences Addition
*
987-76-02: Earth Sciences Addition (color)
*
987-76-06: Earth Sciences Addition (line drawing)
Box
110
P199:10: Withycombe Hall, Animal Industries
undated

Series XVIII:  Book Plans, 1960-1993Return to Top

1.5 cubic feet, (3 oversize boxes)

Book plans are floor plans for campus buildings and structures that provide information on general layout, square footage, and room use for classrooms, research and teaching laboratories, offices, and storage areas.

Container(s) Description Dates
Box
109
450 plans in 6 folders
1960-1993
114-115
550 plans in 2 volumes
circa 1970-1989

Series XIX:  Lighting (Interior) Study, circa early-mid 1980sReturn to Top

1 cubic foot, including 230 sheets, (2 oversize boxes)

Floor plans of most campus buildings annotated with the locations of fluorescent and incandescent fixtures, the number of watts or tubes, and which fixtures have been partially or completely disconnected.

Container(s) Description Dates
Box
113
All buildings (except Merryfield Annex and Hall and Weniger and Withycombe Halls)
2 folders
109
Merryfield Annex and Hall; Weniger and Withycombe Halls

Series XX:  Campus, Farm, and Property Maps, 1899-1990Return to Top

2 cubic feet, (1 oversize box, 1 roll storage box, and 5 map folders)

The Campus, Farm and Property Maps include maps of existing structures, plans for campus development, campus boundaries, property ownership, and maps of Corvallis, Oregon. The maps are listed in chronological order.

Container(s) Description Dates
*
Map of the College Farm and Campus
Scale 1"=132'; incomplete draft.
1899
*
Map of the College Farm and Campus
Scale 1"=132'; colored.
circa 1908
*
General Plan Grounds and Buildings Oregon Agricultural College
3 sheets
Scale 1"=100'. After a report by Olmsted Brothers; Arthur L. Peck; photocopies.
1910
*
General Plan Grounds and Buildings Oregon Agricultural College
2 sheets
Scale 1"=100'. Known as Olmsted Plan; includes detailed explanatory note from G.V. Skelton.
1910
Campus and Farm Maps
10 sheets
Prepared by Gordon V. Skelton at scale of 1"=50'; show topography, building locations, streets and walks, property lines and ownership, sewer and other utility lines, drain tiles, and trees and shrubbery.
1914-1921
Campus Maps
Box
*
1-A: Lower Campus
1914 and March 1920
*
2-A: Library Quadrangle
July 1914 and March 1921
*
2 1/2-A: Buildings on Monroe Avenue including the Mechanic Arts Building (now Merryfield Hall) and the Engineering Laboratory (now Graf Hall)
Dec. 1920
*
3-A: South of Jefferson including the Armory (now McAlexander Fieldhouse), Bell Field, and Waldo Hall
July 1914 and March 1920
*
4-A: Memorial Union Quadrangle west to Dairy Barns (Agricultural Utilities Building)
July 1914 and March 1921
*
5-A: North of Campus Way
July 1914 and March 1921
Farm Maps
July 1914
Box
*
6-B: Poultry Buildings and Poling Hall
*
7-B: Includes Women's Dormitory (now Ballard Extension Hall) and Cauthorn (now Fairbanks) Hall and west to barns
*
8: North of railroad tracks
*
9: Includes Hog Barn and Artillery Barn
*
Road and Walk Improvements at OAC Barns
Scale 1"=50'.
1918
*
Campus and Farm
Scale 1"=200'.
1921
*
Campus Plan
Scale 1"=100'. Showing the A.D. Taylor Plan, dated March 1926, of future development superimposed upon present plan of campus.
1928
Box
116
Armory Heat Plant
Scale 1"=20'. Prepared by G.V. Skelton; shows tunnels and existing utilities from railroad to playhouse; 15.5 x 80 inches.
1931
*
South Farm
Scale 1"=100'.
1933
*
Campus Plan
circa 1940
*
Madison Street Entrance
Scale 1"=10'.
1941
*
General Study of Campus and Adjacent Area by A.D. Taylor
Scale 1"=200'. Proposed schedule for construction of buildings.
1944
*
Oregon State College Map of Corvallis and Surrounding Territory by A.D. Taylor
Scale 1"=500'.
1945
*
Land Acquisition Map Showing Recommended Order of Purchase
4 sheets
Scale 1"=400'; includes land valuations.
1947
*
Preliminary Study of Collegiate Athletics Area
Scale 1"=100'.
1947
Box
109
Campus Boundary and Property Owned
9 sheets
Scale 1"=300'. Includes maps for 1949, 1950, 1953, 1955, 1957 (2 sheets), and 1961 (2 sheets).
1949-1961
*
Corvallis, Oregon
Scale 1"=400'; includes one duplicate.
1950
Box
109
Study for the Development of Lower Campus at Oregon State College
Scale 1"=50'. Includes proposed future living units for OSC students and faculty between Monroe and Jefferson and 9th and 11th Streets.
1952
*
Property Map - Benton Linn, and Polk Counties
Scale 1"=40 chains.
1953
*
Relocation of Philomath Road
3 sheets
Shows property ownership along south margin of campus.
1959
*
Campus Boundary and Property Owned
3 sheets
Scale 1"=300'. Includes maps for 1963, 1966, and 1968.
1963-1968
Box
109
Long Range Development Plan
Scale 1"=400'; photographic print.
1964
109
South Residence Hall Group
2 sheets
Scale 1"=120'; photographic prints.
1964
109
Campus Property Owned - West Campus Area
Scale 1"=300'; from 35th to 43rd Streets and Harrison Blvd. to Washington Way.
1968
*
Long Range Development Plan
Scale 1"=200'.
1964
*
Property Map - Benton, Linn, and Polk Counties
Scale 1"=40 chains.
1969
*
Campus Map
Original drawing, ink on mylar.
circa 1975
*
Physical Development Plan
Scale 0.75"=200'; includes two duplicates.
1976
Box
109
City of Corvallis Future Land Use Map
Scale 0.75"=1600'.
1978
*
Existing Campus Plan
Scale 1"=200'.
1989
*
Campus Map
Scale 1"=200'.
circa 1990
*
West Campus
2 sheets
Scale 1"=100'; from 35th Street to west and Washington Way to Jackson Street; shows elevation contours, roads, and structures.
undated

Series XXI:  Aerial Photographs, 1952-1979Return to Top

2 cubic feet, including 8 photographs, (2 roll storage containers, 5 map folders, and one wall-mounted item)

Series XXI consist of aerial photographs of the OSU campus and vicinity and Corvallis, Oregon. They are listed below in chronological order.

Container(s) Description Dates
*
987-76-31: Oblique aerial view of Oregon State College campus
21x32 inches
Photograph by Western Ways.
August 6, 1952
*
987-76-32: Lower campus and Corvallis residential area
45x45 inches
From about 9th to 17th Streets and Jefferson south to A street. Photograph by Western Ways.
circa 1955
*
987-76-29: OSU campus and Corvallis
3 prints; 34x36 inches and 25x29 inches (2 prints)
Scale 1 in. = 200 feet. Covers 11th-35th Streets (E-to-W) and Western to Tyler Avenues (S-to-N). Photograph by Western Ways. Three prints mounted on wood laminate.
May 13, 1963
*
987-76-30: OSU campus
20x33 inches
Tinted oblique aerial photograph of OSU campus; mounted on wood laminate. Photograph by Photo-Art Commercial Studios.
1968
Box
117
987-76-34: OSU campus and vicinity
41 inches wide; unknown length
Photograph by H.G. Chickering.
1972
*
P199:13; 987-76-34: Corvallis and OSU campus
43x96 inches
View extends from Willamette River on east to 53rd Street on west and from approximately Buchanan Avenue on the north to Hwy. 20 on the south.
1975
Box
118
987-76-35: OSU campus and vicinity
55 inches wide; unknown length
Scale 1 in = 200 feet; color print.
1979
*
987-76-33: Farm area
45x52 inches
Photograph by Western Ways.
undated

Series XXII:  Photographs, 1963Return to Top

Container(s): *

0.2 cubic feet, including 3 photographs, (1 map folder)

Series XXII consists of photographs of 3-dimensional architectural models of the Yaquina Bay Marine Sciences Laboratories and the Marine Science Center.

Names and SubjectsReturn to Top

Subject Terms

  • Architects--Oregon.
  • Campus planning--Oregon--Corvallis.
  • College buildings--Oregon.
  • College facilities--Oregon--Planning.
  • Engineering--Study and teaching (Higher)--Oregon--Corvallis.
  • Oceanographic research ships--Oregon.
  • Public art--Oregon--Corvallis.
  • Student housing--Oregon--Corvallis.

Corporate Names

  • H.J. Andrews Experimental Forest (Or.)
  • Hatfield Marine Science Center.
  • Oregon Agricultural College--Buildings.
  • Oregon State Agricultural College--Buildings.
  • Oregon State College--Buildings.
  • Oregon State University--Buildings.

Geographical Names

  • Adair Village (Or.)
  • Camp Adair (Or.)

Form or Genre Terms

  • Aerial photographs.
  • Architectural drawings (visual works)
  • Floor plans.
  • Maps.
  • Photographic prints.
  • Renderings (drawings)

Other Creators

  • Personal Names
    • Bennes, John V. (creator)
    Corporate Names
    • Olmsted Brothers. (creator)
    • Oregon Agricultural College. Physical Plant. (creator)
    • Oregon State College. Physical Plant. (creator)
    • Oregon State University. Physical Plant. (creator)