<?xml version="1.0" encoding="utf-8"?>

<!DOCTYPE ead PUBLIC "+//ISBN 1-931666-00-8//DTD ead.dtd (Encoded Archival Description (EAD) Version 2002)//EN" "ead.dtd">
<!--Template updated 2011-05-11 by J. Allison-Bunnell in accordance with changes that resulted in Best Practices version 3.5-->
<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
<!--                              EADHEADER BEGINS HERE                           -->
<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
<!--Remember to name and save documents using the OCLC code + local filename. Documents that are revised/updated after initial submission much be submitted with precisely the same filename.-->

<ead> 
<!--The following section is header information that describes the finding aid-->
  <eadheader langencoding="iso639-2b" scriptencoding="iso15924" relatedencoding="dc" repositoryencoding="iso15511" countryencoding="iso3166-1" dateencoding="iso8601" id="a0"> 
  	<eadid countrycode="us" encodinganalog="identifier" mainagencycode="waps" identifier="80444/xv77175" url="http://archiveswest.orbiscascade.org/ark:/80444/xv77175">NTE2ua273.xml</eadid> 
	 <filedesc> 
		<titlestmt> 
			<titleproper encodinganalog="title">Guide to the Washington State University Capital Planning Building Files
			 <date encodinganalog="date" calendar="gregorian" era="ce" normal="1957/1998">1957-1998</date></titleproper>
		  
			<titleproper type="filing" altrender="nodisplay">Washington State University Capital Planning Building Files</titleproper>
		  
			<author encodinganalog="creator">Finding aid prepared by Mark O'English</author>
		</titlestmt> 
		<publicationstmt> 
		  
			<publisher encodinganalog="publisher">Washington State University Libraries Manuscripts, Archives, and Special Collections
			</publisher>
		  
			<date calendar="gregorian" encodinganalog="date" normal="2016">© 2016</date> 
		 
		</publicationstmt> 
	 </filedesc> 
	 <profiledesc> 
		<creation>Finding aid encoded by Suzanne James-Bacon.
			<date normal="2016" era="ce" calendar="gregorian">2016</date></creation>
		
		<langusage>Finding aid written in English.
		  <language langcode="eng" encodinganalog="language" scriptcode="latn">English</language>.</langusage> <descrules>Finding aid based
		on DACS 2nd Edition ( 
		<title render="italic">Describing Archives: A Content
		  Standard</title>).</descrules> 
	 </profiledesc> 
  </eadheader> 
	
	<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
	<!--                         COLLECTION-LEVEL DESCRIPTION BEGINS HERE             -->
	<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
	
  <archdesc level="collection" type="inventory" relatedencoding="marc21"> 
	 <did id="a1"> 
		<repository> 
			<corpname encodinganalog="852$a">Washington State University Libraries, Manuscripts, Archives and Special Collections</corpname>
		  
		   </repository> 
		<unitid encodinganalog="099" countrycode="us" repositorycode="waps" type="collection">Archives 273</unitid>
		
	 	<origination> 
	 		<corpname encodinganalog="110" role="creator">Washington State University. Department of Facilities Development</corpname> </origination>
	 	<unittitle encodinganalog="245$a">Washington State University Facilities Development Building Files</unittitle>
		
		<unitdate type="inclusive" encodinganalog="245$f" era="ce" calendar="gregorian" datechar="" certainty="" normal="1957/1998">1957-1998</unitdate>
		
	 	<physdesc> <extent encodinganalog="300$a">31.5 Linear feet of shelf space</extent>
		  <extent encodinganalog="300$a">32 Boxes</extent>
		</physdesc>
			<abstract encodinganalog="5203_">The collection consists of reports, plans, designs, and
				schematics relating to a large number of WSU Buildings; though a few earlier
				materials are included, the majority of the materials dates from the late 1980s to
				early 1990s.</abstract> 
		<langmaterial>Collection materials are in<language encodinganalog="546" langcode="eng">English</language></langmaterial>
	 </did>
  	
		<bioghist encodinganalog="5451_" id="a2">
			<!--Enter ENCODINGANALOG value of 5450_ for biog. or 5451_ for historical note, or use <head> element-->
			<p>A University Architect served as the construction officer at Washington State
				University from 1911 forward. The modern form of the office dates from 1947 when it
				became a full-time, staffed administrative department. In 1967 the University
				Architect office was renamed as Facilities Planning, and then to Facilities
				Development in 1993. In 2001 it was renamed as Capital Planning. While Capital
				Planning is responsible for major planning and development, smaller projects are
				conducted by Facilities Operations. Facilities Operations descended from the
				Physical Plant in 1998, which in turn descended from Building and Grounds in 1967.
				While each line of programs has existed separately, some migration in function has
				occurred over the years. The primary difference between Capital Planning and
				Facilities Operations is the cost of the project in question - initially items
				costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP.
				By 2009, this break point is between $1,500,000 and $2,000,000. </p>
			<p>Many terms historically used to describe individuals and communities with
				disabilities are offensive and were used to dismiss, discount and dehumanize these
				individuals and communities. Terms often focused on a perceived impairment and not
				the person. MASC recognizes the harm caused by these terms. We retain the language
				in this finding aid to document history and preserve context.</p>
		</bioghist> 
	 <scopecontent encodinganalog="5202_" id="a3"> 
			<p>The collection consists of reports, plans, designs, and schematics relating to a
				large number of WSU Buildings; though a few earlier materials are included, the
				majority of the materials dates from the late 1980s to early 1990s.</p> 
	 </scopecontent> 
	 <arrangement encodinganalog="351" id="a4"> 
			<p>The collection is maintained in the order in which it was received in the Archives
				from Capital Planning, and loosely consists of two series in a close-to-alphabetical
				order.</p> 
	 </arrangement> 
  	<accessrestrict encodinganalog="506" id="a14"> 
			<p>The majority of this collection is open and available for research use. A few files
				are marked as confidential or classified (these are primarily identified as Attorney
				General files or Issues and Claims files; please contact Capital Planning if you
				wish access to these) and access to those may be restricted. These files are labeled
				in this page as RESTRICTED, each box containing restricted material is so labeled,
				and individual restricted folders are stickered as such.</p>
  	</accessrestrict> 
  	<userestrict encodinganalog="540" id="a15"> 
  		<p>Copyright restrictions may apply.</p>
  	</userestrict> 
	 <prefercite encodinganalog="524" id="a18"> 
	 	<p>[Item Description] </p>
	 	<p>Washington State University Capital Planning Building Files, 1957-1998 (UA 273) </p>
	 	<p>Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.</p> 
	 </prefercite>  
	 <acqinfo encodinganalog="541" id="a19"> 
	 	<p>These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on February 10, 2004 (UA 2004-01).</p>
	 </acqinfo> 
  	<processinfo encodinganalog="583" id="a20"> 
  		<p>This collection was processed by Tim Mace and University Archivist Mark O'English in early 2009. </p>
  		<p>In 2022, in response to evolving standards regarding the language used to describe individuals and communities with disabilities, Gayle O’Hara added a Historical Note to this finding aid.</p>
  	</processinfo> 
  	<relatedmaterial encodinganalog="5441_" id="a6"> 
  		<p>The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our <extref href="https://libraries.wsu.edu/masc/finders/UAlist.htm">Accessions List</extref>, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.</p>
  	</relatedmaterial> 
 
  	<!-- ooooooooooooooooooo     ACCESS POINTS     oooooooooooooooooooo -->
  	
	 <controlaccess id="a12"> 
		<p>This collection is indexed under the following headings in the online
		  catalog. Researchers desiring materials about related topics, persons, or
		  places should search the catalog using these headings.</p> 
	 	<controlaccess> 
	 		<corpname role="subject" encodinganalog="610" rules="rda">Washington State University. Capital Planning -- Records and correspondence</corpname>
	 		<corpname role="subject" encodinganalog="610" rules="rda">Washington State University. Department of Facilities Development -- Records and correspondence</corpname>
	 		<corpname role="subject" encodinganalog="610" rules="rda">Washington State University. Department of Facilities Planning -- Records and correspondence</corpname>
	 		<corpname role="subject" encodinganalog="610" rules="rda">Washington State University. University Architect -- Records and correspondence</corpname>
	 		<corpname role="subject" encodinganalog="610" rules="rda">State College of Washington. University Architect -- Records and correspondence</corpname>
	 		<corpname role="subject" encodinganalog="610" rules="rda">Washington State University -- Buildings -- History -- Archives</corpname>
	 		<corpname role="creator" encodinganalog="710" rules="rda">&gt;Washington State University. Capital Planning</corpname>
	 		<corpname role="creator" encodinganalog="710" rules="rda">Washington State University. Capital Planning and Development</corpname>
	 		<corpname role="creator" encodinganalog="710" rules="rda">Washington State University. Department of Facilities Development</corpname>
	 		<corpname role="creator" encodinganalog="710" rules="rda">Washington State University. Department of Facilities Planning</corpname>
	 	</controlaccess> 
	 	<controlaccess> 
	 		<subject encodinganalog="650" source="lcsh">College buildings -- Washington (State)</subject>
	 	</controlaccess> 
	 	<controlaccess> 
	 		<subject source="archiveswest" altrender="nodisplay" encodinganalog="690">Architecture</subject> 
	 		<subject source="archiveswest" altrender="nodisplay" encodinganalog="690">Colleges and Universities</subject>
	 		<subject source="archiveswest" altrender="nodisplay" encodinganalog="690">Washington (State)</subject>
	 	</controlaccess>
	 </controlaccess> 
  	<!--A finding aid without a series or container list may end here.-->
  	
  	<!-- ooooooooooooooooooooooooo BEGIN CONTAINER LIST (Optional) oooooooooooooooo -->
   	<!--Be sure to choose the appropriate TYPE attribute for this collection-->
	 <dsc type="combined" id="a23"> 
	 	<!--At each <c0x> level, be certain that you have chosen the appropriate LEVEL attribute!-->
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">College of Agriculture. Controlled Environment Laboratories and Growth Chambers. 1/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">Agriculture Sciences Building - Program Statement. Clark and Hulbert Halls. 11/1965.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">Agriculture Sciences Building - Clark Hall Preliminary Design. 7/1968. / Lloyd J. Lovegren and Associates Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">Agriculture Sciences Building - Preliminary Design. 11/1969. / Lloyd J. Lovegren and Associates Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">Animal Disease Biotechnology Facility Value Engineering Design Development.12/1992. / KIM and Associates, Ltd.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">Animal Disease Biotechnology (ADBF) Facility Site Selection Study. 6/1991. / Burke Lee Architects, Planners and Landscape Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Design Development. 12/1992. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Schematic Design Brochure. 6/1992. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Program Statement. 1/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF Partial Specifications (Third Submittal). 12/1992. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Construction Document Phase/Structural Calculation. Vol. I Final Submittal. 2/1994. / Structural Design Northwest, Inc. ; Garrick A. Dung - Professional Engineer</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Construction Document Phase/Structural Calculation. Vol. II - Final Submittal. 2/1994. / Structural Design Northwest, Inc. ; Garrick A. Dung - Professional Engineer</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Construction Document Phase/Structural Calculation. Vol. III - Final Submittal. 2/1994. / Structural Design Northwest. Inc. ; Garrick A. Dung - Professional Engineer</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Architectural Specifications - Volume I of 2. 2/1992. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">1</container>
				<unittitle encodinganalog="title">ADBF - Mechanical and Electrical Specification - Volume II of II. 3/1994. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Alumni Center - Schematic Design Brochure. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Alumni Center - Interior Design. 4/1988. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Alumni Center - Furnishings Presentations. 7/1988. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Alumni Center - Specifications. 12/1987. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Athletic Facilities Study - ALSC Architects. 6/1996. / ALSC Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Animal Sciences Laboratory Building (ASLB) - Schematic Design Submittal. / MBT Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB Building - Schematic Design Submittal. / MBT Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Project Manual, Vol. I. Sec 0 - 14. 9/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Project Manual, Vol. II. Sec 15 - 16. 9/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Design Development Value Engineering. 11/1994. / Ehninger Fetzer Tholen</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - ***Revised*** Construction Documents Estimate. 8/1995. / Ackroyd Cost Control Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Energy Conservation Report/Life Cycle Cost Analysis. 2/1995. / Affiliated Engineers NW, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Schematic Design Estimate (Final). 4/1994. / Ackroyd Cost Control Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Addendum NO. 1. 9/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Addendum NO. 2. 9/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Addendum NO. 4. 10/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">ASLB - Addendum NO. 5. 10/1995. / MBT Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Completion Of Laboratory - Central Animal Laboratory Facility. 5/1975. / Barnard and Holloway, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Veterinary Animal Holding and Quarantine Facilities Isolation Building Specification. 11/1979. / Architects: Barnard and Holloway ; Mechanical: Rice and LunhElectrical: Stingle - Atwood</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Completion of Large Animal Isolation Facility - Specifications. 3/1982. / Barnard and Holloway</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">The Architecture Interior Design Landscape Architecture Facility @ WSU Design Report. 5/1981. / Architects: Adkison Leigh Sims Cuppage</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Design Associates: Simmer Gunsul Frasca Partnership. / Landscape Architects: Jongejan Gerard McNeal</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">A Study of Alternative Sites - Architecture, Interior Design, Landscape Architecture Facility. 3/1980. / Architects: Adkison Leigh Sims Cuppage ; Design Associates: Simmer Gunsul Frasca PartnershipLandscape Architects: Jongejan Gerard McNeal</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">2</container>
				<unittitle encodinganalog="title">Avery Hall - English Building Phase 1. 11/1970. / Architects: Fred Bassetti and Company ; Mechanical Engineers: Valentine, Fisher and TomlinsonElectrical Engineers: Beverly A. Travis and Associates ; Landscape Architects: Richard Haag Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Multi Purpose Coliseum (Beasley) Program and Site Analysis. 12/1968. / John Graham and Company - Architects/Planners/Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Multi Purpose Coliseum Schematic Design. 4/1969. / John Graham and Company - Architects/Planners/Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Multi Purpose Coliseum - Preliminary Design. 10/1969. / John Graham and Company - Architects/Planners/Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 1 Report. 5/1988. / Peden Petersen Lee, R. S. Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 2 Calculations. 5/1988. / Peden Petersen Lee, R.S. Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Biosciences Building Phase II - Program. 11/1973.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Biosciences Building Phase II - Preliminary Design (Kolb and Stansfield). 7/1974.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Biosciences Building Phase II - Specifications (Kolb and Stansfield). 3/1975.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Biological Sciences Building (Eastlick) - Preliminary Presentation. 11/1959. / Decker and Christenson AIA Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Addition - Predesign Study. 10/1992. / Sasaki Associates, Inc. ; Stewart Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Addition - Schematic Design. 11/1994. / Architect: Sasaki Associates ; Associated Architect: Stewart AssociatesStructural and Civil Engineers: Summit Technology ; Mechanical Engineers: Notkin Engineering ; Electrical Engineers: Elcon Associates ;</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Addition - 100% Design Development Submittal 1 of 2. 5/1995. / Architect: Sasaki Associates. Inc. ; Mechanical Engineer: Notkin Engineering. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Addition - 100% Design Development Submittal 2 of 2. 5/1995. / Architect: Sasaki Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Addn. - Structural Calculations 1 of 2. 2/1996. / Prepared by Summit Technology</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Add. - Structural Calculations 2 of 2. 2/1996. / Prepared by Summit Technology</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Add. - Construction Bid Documents 1 of 2. 2/1996. / Sasaki Architects, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Add. - 100% Design Mechanical Calculations. 5/1996. / Architect: Sasaki Associates, Inc. ; Mechanical Engineer: Notkin Engineering In.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Renovation - Schematic Design Value Engineering. 6/1996. / EFT Architects/Planners/Project Managers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Renovation - Schematic Design. 6/1996. / Sasaki Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bohler Gym Add. - Load Calculations. 5/1996. / Elcon Associates. inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Boiler No. 8 - Proposal for Engineering Services. 11/1975. / Bovay Engineers, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">3</container>
				<unittitle encodinganalog="title">Bryan Hall Remodel - Schematic Design Brochure. 7/1972. / James and Hicks, Architects ; Rice and Luhn, Mechanical EngineersJoseph Dyole and Assoc. Electrical Engineers ; Atwood - Hinzman, Structural Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child and Family Studies Center - Building Program. 10/1967.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Center - Bldg Assessments Report (Rogers Orton Dining Hall). 12/1991. / The Tsang Partnership, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Center Building Program. 6/1991. / The Tsang Partnership, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Facility - Design Development Phase. 7/1992. / The Tsang Partnership. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Center - Schematic Design Phase Report. 1/1992. / The Tsang Partnership, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Facility - Schematic Design. 4/1992. / The Tsang Partnership. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Facility - Design Development Phase. 7/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Facility Project Manual. 2/1993. / Architect: The Tsang Partnership, Inc. ; Structural Engineer: Chulker, Putnam Collins and Scott, Inc.Mechanical Engineer: Thomas J. Gerard and Assoc. ; Electrical Engineers. Doyle Engineering, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Child Care Center Playground. Report of Subsurface Exploration and Geotechnical Studies. 4/1994. / Gifford Consultants. inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Project Manual General Volume I of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S. ; Landscape Architect: Hellstorm AssociatesElectrical Engineers: Doyle Engineering Inc. ; Vibration Consultants: Applied Dynamics Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Project Manual. Mechanical Specifications Volume II of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Project Manual. Electrical Specification Volume III of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Index/ Sec. 16000 - 16851.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Section 15010 - General Provisions.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Engineering Calculations. / Brooks Hensley Creager Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Schematic Design Documents. 11/1984. / Brooks Hensley Creager Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Schematic Design Documents. 9/1986. / Brooks Hensley Creager Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Pedestrian Corridor Design Development of College Avenue From Library Road to Stadium Way. / Brooks Hensley Creager Architects P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">4</container>
				<unittitle encodinganalog="title">Chemistry Building - Site Study Selection. 3/1984. / Burke/Lee A joint venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Specifications for a Crew Shellhouse. 2/8/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Fulmer Hall: Chemical Waste Collection Site Facility. 6/24/1994.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Schematic Design Brochure: Chemical Waste Collection Sites - Vet Complex. 9/3/1996.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Schematic Design Brochure: Chemical Waste Collection Sites - Eastlick Hall, Wegner Hall, Engineering Complex and Silver Recovery Units. 11/18/1994.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Creamery Annex: Schematic Design Brochure. 11/10/1998.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Chemical Sciences Bld: Site Selection Study. 11/1980.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Chemistry Building: Program Statement. 3/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Chemistry Building #3 Section 15010 - General Provisions.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Site Study: Cancer Research and Training Center. 11/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Building Program, Preliminary Draft: Cancer Research and Training Center. 11/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Proposal: Carpenter Hall Renewal. 5/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Carpenter Hall Schematic Design. 4/24/1987.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Carpenter Hall Design Development. 10/16/1987.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Carpenter Hall Renewal Addendums. .</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Centeral Chilled Water System. 1973 - 1974.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Centeral Water Chilling and Dist. A Feasibility Study. 1973 - 1974.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Centeral Campus Storm Sewer and Circulation Improvements Study. 4/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Cleveland Hall. 10/1961.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Cleveland Hall, Addition to.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Department of Anthropology.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">College Hall Renovation: Design Development. 1/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">College Hall.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Project Manual: College Hall Renovation. 8/12/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Comp. Sci. Bld. Martin Academic/Stadium. 7/1971.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 10/22/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Schematic Design: Martin Stadium Academic Center Phase II Computer Science Building. 3/15/1975.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 5/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Open Plan Feasibility Study: Computer Sciences/Mathmatics Building. 4/1980.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">5</container>
				<unittitle encodinganalog="title">Cancer Research: Preliminary Concepts (along side of box). 12/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Campus Downtown Pedestrian Corridor.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">West Entrance Pedestrian Way - Specifications. 7/1986. / Burke/Lee A Joint Venture Architects/Landscape Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Compton Union (Wilson) - Expansion Program Statement.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Compton Union Building - Technical Report. Graphical Results from a Telephone Survey of WSU Student. Faculty, and Staff on the Compton Union Building (CUB) and Campus Recreation Facilities. 9/1996.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">SESRC (Social and Economic Sciences Research Center) Report # 96 - 22 (CUB6 # 1265).</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Comparative Behavior Laboratory - Schematic Design Brochure Addition to. 1/1966. / Victor Louis Wulff Architect. AIA and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Colorado Street preliminary Design - Technical Memorandum. 10/1994. / CH2M Hill Engineers Planners Economists Scientists</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Commons Remodeling Program for Ground Floor. Listings of Projected Uses and Requirements. 5/1971.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Master Plan. 11/1988. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Schematic Design Submittal. 1/1989. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facilities - Proposed Phase 1 Additions. Subsurface Exploration and Geotechnical Engineering Report. 1/1989. / RittenHouse-Zeman and Associates/Geotechnical and Hydrogeological Experts</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Buckley Cost Estimate. 2/1989. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Volume 1 - Specifications. 11/1989. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Volume 2 - Architectural Details. 11/1989. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Project Manual Volume 1 Specifications. 4/1990. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Cost Estimate and Area Comparison Charts. Schematic Design Phase. 4/1992. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Schematic Design Submittal The BJSS Group Architecture and Planners AIA. 4/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Design Development Submittal (Buckley WA): Design Description, Cost Estimate, Area Comparison, Proposed Time Schedule. 9/1992. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Outline Specifications (Buckley WA). 9/1992. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 4/1993. / The BJSS Group Architecture and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Project Manual Volume 2 Details and Schedule. 4/1993. / The BJSS Group Architects and Planners, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 10/1993. / The BJSS Group Architects and Planners, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Project Manual Volume 2 Details and Schedule. 10/1993. / The BJSS Group Architects and Planners, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II - Structural Calculations. 1/1993. / AKB Consulting Engineers/BJSS</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">6</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Western Washington Research and Extension Center (Puyallup) Veterinary Research - Diagnostic Center. 8/1987. / Gross, Thurman and DeMers, Joe, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Building. 11/1982 - Revised 12/1983. / The Callison Partnership, Ltd.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. Site Selection Study. 8/1982. / Burke/Lee A Joint Venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. Design Development. 7/1983.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. - Building Program (Original). 12/1983.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. - (Revised). 12/1983.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. - Specifications Cummings Schiatter Associates. 4/1984. / Loschky Marquardt and Nesholm</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Engineering Teaching Research Laboratory Building (ETRL). Project Manual Volume 1. 3/1996. / Callison Architecture. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building - Project Manual Volume 2. 3/1996. / Callison Architecture, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL - Project Manual Volume I - (Placed On Top in Box). 5/1995. / Callison Architecture, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building - Electrical Panel Schedule. 5/1995. / Callison Architecture, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building Schematic Design Submittal - Scheme T. / Callison Architecture, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building - Design Development outline Specifications. 7/1994. / Callison Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building - Addendum #1 and Addendum #2. 3/1996. / Callison Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">ETRL Building - Project Manual - Volume I Bid Set. 3/1996. / Callison Architecture, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">7</container>
				<unittitle encodinganalog="title">Electrical/Mechanical Engineering Bldg. - Addendums No. 2 and 3. 1984. / The Callison Partnership, Ltd. - Predesign Consultant</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Engineering Teaching Research Laboratory Building. Energy Conservation Report - Life Cycle Cost Analysis. 7/1994. / Riley Engineering, Inc. ; The Callison Partnership Ltd.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">English Building - Phase 1 - Avery Hall. / Architects: Fred Bassetti and Company ; Mechanical Engineers: Valentine, Fisher and TomlinsonElectrical Engineers: Beverly A. Travis and Associates ; Landscape Architects: Richard Haag Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Experimental Animal Laboratory - Program. 6/1975.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Experimental Animal Laboratory - Waste Treatment Facilities - Engineering Report. / Parametrix, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Experimental Animal Laboratory - Design Development. 10/1975. / Architects: Kirk, Wallace, McKinley, AIA and Associates;Structural Engineers: Skilling, Helle, Christiansen, RobertsonMechanical and Electrical: Valentine, Fisher and Tomlinson ; Electrical: Sparli</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Experimental Animal Laboratory - Draft Impact Statement. 12/1976. / Parametrix, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Facility Condition Survey - McAllister/ Kruegel Resident Halls CO 11063. / SCM Consultants , Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Facility Condition Survey - Administration Annex CO 10153. 7/1990. / SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Facility Condition Survey - Van Doren Hall CO 10153. 7/1990. / SCM Consultants. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Facility Condition Survey - Chemical Engineering Building CO 10153. 7/1990. / SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Facility Condition Survey - Commons Building CO 10153. 7/1990. / SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Family Student Housing Environmental Checklist. 5/1994. / Burke/Lee Architects/Landscape Architects/Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall Remodeling - Phase II. 5/1980.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall/Annex Renewal - Value Engineering Study. 8/1993. / Meng Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall and Annex - Fume Hood Survey - Draft. 11/1993. / Mclellen and Copenhagan ; Mahium and Nordfors, McKinley, Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall/Annex Renewal - Schematic Design Submittal. / McKinley Gordon PSC, Architect - McKinley Gordon PSC ; Ratti Swenson Perbix, Inc. - Structural Engineer.H.K. Kim Engineers, Inc. - MBE Structural Engineer. ; Riley Engineering - Mechanical and Electr</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall Remodeling - Building Program Statement - Phase II.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall - Fulmer Hall Annex Renewal - Construction Documents. Project Manual Volume 1. Specification 0 - 4. 4/1995. / Mahlum and Nordfors McKinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall Remodeling - Building Program Statement. Phases II and III. 8/1979.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall Phases I and II Completion - Specifications. 12/1983. / Waldron Pomeroy Smith Foote and Akira Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall Remodeling - Program Statement. 11/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fulmer Hall/Fulmer Annex - Program Statement. 5/1993.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Building Program - Building Program - Design Disciplines Building Phase II (worn brown unbound notebook). / Prepared as a collaborative effort by the Departments of Architecture, Fine Arts, Interior Design and Landscape Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Center Mechanical Systems Renovations - Specifications. / Halvorson, Beach and Bower Inc. ; Waldron Pomeroy Smith Foote and Akira ArchitectsRobert Fossatti Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Center - Mechanical Systems Renovations. 95% Construction Document Submittal. 3/1988. / Halvorson, Beach and Bower, Inc. ; Waldron Pomeroy Smith Foote and Akira ArchitectsRobert Fossatti Associates Sparling and Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Plaza - Project Manual. 5/1995. / Architect: ALSC Architects ; Structural Consultant: Structural Design NWLandscape Consultant: T.C. Sherry and Associates, P.S. ; Electrical Engineer: DEI Electrical Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts - Building Program. Life Safety Requirements - Mechanical Systems Renovation. 10/1987.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts - Design Disciplines Building. 6/1967. / Naramore, Bain, Brady and Johanson</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Building - Mechanical Systems Renovations. Schematic Design Phase Submittal. 11/1987. / Halvorson, Beach and Bower, Inc. ; Waldron, Pomeroy, Smith, Foote and Akira, ArchitectsRobert Fossatti Associates ; Sparling and Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">8</container>
				<unittitle encodinganalog="title">Fine Arts Building Plaza - Schematic Design Analysis. 1/1995. / ALSC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food and Nutrition Facility - Site Selection Study. 9/1983. / Burke/Lee A Joint Venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food Proc. and Pilot Plant - Proposed Building Plan. 6/1983.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility - Building Program. 9/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food and Human Nutrition Facility - Schematic Design Phase. 5/1986. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility - Phase II Schematic Design Presentation. Area Comparison Table and Cost Estimate. 10/1988. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility. Phase II - 95% Construction Document Submittal/Program updates. 11/1989. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility Phase II - Design Development Presentation. 4/1989. / Northwest Architectural Company ; Structural Design Northwest. Inc. and Peden, Petersen and Lee. P.S.Thomas J. Gerard and Associates, Inc. ; Wanless-Cook Associates ; Milten</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility Phase II - Plan Holders List, Addendum #3 and Bid Tabulation Form. 3/1990. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility Phase II - Project manual. Volume I of II Architectural/Structural. 2/1990. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility Phase II - Project Manual. Volume II of II Mechanical/Electrical. 2/1990. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Human Nutrition Facility - Specifications. 6/1989. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food and Nutrition Facility (New Science Facility) - Proposal for Architectural Services - Support Document. / Hummel Jones Miller Hunsucker, P.A. Arthru Erickson Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Service Building Addition - Building Program. 4/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Service (Housing and Food Service Facility) - Design Development. 11/1985. / Miller/Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Service Equipment Specifications. 8/1985. / Walker McGough Foltz Lyeria, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food - Service Building Addition - Specifications. 9/1986. / Miller/Hull</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food Services Building Addition - Specifications Landscape Work. 4/1988. / Miller/Hull</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food Services Building Addition - Specifications Landscape Bid. 1989. / Miller/Hull</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">9</container>
				<unittitle encodinganalog="title">Food Service (Housing) Facility - Schematics. 6/1985. / Miller/Hull</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Feed Preparation Mixing and Storage Facility - Site Study. 12/1985. / Burke/Lee A Joint Venture. Architects, Landscape Architects, Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Feed Preparation, Mixing and Storage Facility - Building Program. 7/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Feed Preparation Mixing and Storage Facility - Design Development. 7/1986. / ARC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Feed Preparation Mixing and Storage Facility - Schematic Design. / ARC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Feed Preparation Mixing and Storage Facility - Project Manual. 5/1987. / ARC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Fieldhouse - Concept Study. 7/1997. / ALSC Architects, P.S. ; Riley Engineering - Mechanical and Electrical EngineersStructural Design Northwest - Structural Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">New Administration Building - Program Statement. 12/1964.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
					<unittitle encodinganalog="title">New Administration Building - Schematic Design Brochure. 12/1964. / Worthington. Skilling, Helle and Jackson - Structural Engineers ; James B. Notkin. and Associates - Mechanical Engineers ; Thomas E. Sparling and Associates - Electrical Engineers ; Richard Haag and Associates - Landscape Architects ; Robin M. Towne and Associates - Acoustical Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements Contract 1 - Headhouse and Site Improvements, Puyallup Research and Extension Center. 3/1996. / Stafford Harris, Inc. ; Bouillon Christofferson and Schairer. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements Contract 2 - Greenhouses, Puyallup Research and Extension Center. 3/1996. / Stafford Harris , Inc. ; Bouillon Christofferson and Schairer, inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements Contract 3 - New Campus Electrical Upgrade, Puyallup Research and Extension Center - Specifications. 4/1995. / Stafford Harris. Inc. ; Bouillon Christofferson and Schairer, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse - Headhouse Facilities Building Program, Puyallup Research and Extension Center. 9/1994.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements Puyallup - Schematic Design CO 11611. 12/1994. / Stafford Harris, Inc. ; Sub-Consultants: Bouillon Christofferson and Schairer. Inc.; AKB Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements - Design Development/Puyallup WWREC. 2/1995. / Stafford Harris, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Greenhouse Replacements - Schematic Design Submittal WWREC. / Stafford Harris, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Golf Storage Building - Specifications. 2/1984. / Cambell Engineers, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Goldsworthy Hall Renovation - Building Program. 8/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Gannon/Golds - Mens Residence Halls - Design and Cost Submittal. 6/1959. / Lea, Pearson and Richards Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Glenn Terrell Friendship Mall - Project Manual. 5/1993. / Architect: ALSC Architects, P.S. ; Landscape Consultant: Thorson PartnershipElectrical Engineer: Doyle Engineering</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">General Services Complex - Schematic Design Brochure. 1967. / Architect: Victor Louis Wulff, Architect. AIA and Associates ; Consultants: T. R. Hance - Structural EngineersRice and Luhn - Mechanical Engineers ; Wanless - Cook - Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">General Services Complex Phase II - Program Statement. 10/1975. / Victor Louis Wulff Architect, A.LA. Associates ; Atwood - Hinzman, Structural</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Graduate Student Residence Hall - Specifications. Drawings and Cost Estimate. 7/1969. / Walker/McGough/Foltz, Architects ; Lyerla/Peden, Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Hazardous Waste Facilities - Schematic Design Brochure. 6/1996. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Hazardous Materials Survey - Mechanical Engineering Laboratory. 8/1994. / AGRA Earth and Environmental</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Hazardous Waste Facilities - Predesign Study. 6/1994. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">10</container>
				<unittitle encodinganalog="title">Hazardous Material Survey - Fulmer Hall/Fulmer Annex Renovation. 7/1994. / RZA AGRA, Inc. Engineering Environmental Services</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Report Summary Volume I The Pence Associates, Inc. / Campanella Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Guide - Memorandum, Mobility Related Improvements. 8/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Persons Transition Plan for Facilities Access, Draft Number Four - University of Washington Main Campus, Pack Forest, Friday Harbor Laboratories, Richland Graduate Center. 9/1978.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Part A. Schematic Design and Design Improvement. 11/1980. / The Pence Associates, Inc. ; Campanella Murakami Brummitt, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Schematic Design. Part B The Pence Associates, Inc. 11/1980. / Campanella Murakami Brummitt. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Schematic Design and Development. Supplement - Part A. 11/1980. / The Pence Associates, Inc. ; Campanella Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility - Building/Site Survey (Stapled). 8/1/1998. / Campanella Murakami Brummitt Inc. ; The Pence Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Outline Specifications, Phase 1/Part B - 2 (Physical Plant). 6/1981.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Survey of Physical Barriers Which Affect the Handicapped. 12/1977.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Construction Specifications. Phase 1. Part C - Building Retrofit / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Construction Documents. Phase 1, Part - Elevator Controls. 3/1981. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Specs. Phase 1, Part C-1 - Building Retrofit - Nez Perce Village Unit F-Apt. 17. 9/1982. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Phase I, Parts B and C Design Development. 3/1981. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Construction Specifications. Phase I, part B - I Site Improvements. 10/1981. / The Pence Associates. Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Structural Calculations. / Atwood Hinzman Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Report Summary Volume 1. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Remodeling for the Handicapped - Specifications. 11/1974. / Douglas C. Durkoop</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Remodeling for the Handicapped - Kamiak Apartments. 10/1979.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Handicapped Accessibility Improvements - Schematic Design Part C. / The Pence Associates, Inc. ; Campanella Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">WSU Map - Campus and Vicinity Wheelchair Routes and Building Access. 1978. / The Pence Associates. Inc. ; Campanella Murakami Brummitt Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Heald Hall Fifth Floor Addition - Schematic Design Brochure. 1966. / Decker, Kolb and Stansfield Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Heald Hall Renewal - Predesign Study. 9/1992. / The Miller Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Hollingbery Annex - Handball/Racquet Phases I and II. Building Program. 3/1979.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Hollingbery Field House Annex - Handball/Racquet - Design Development. 6/1979. / Architects: Adkison, Leigh. Sims, Cuppage ; Structural Engineers: Atwood/HinzmanMechanical and Electrical: Riley Engineering</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Renewal - Project Scope Development. 1/1994. / ALSC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Addition - Shelving and Compact Storage Systems. Project Manual. 6/1993. / ALSC Architects. P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library - Specifications for Fire Pump Installation - Bid Set Drawings and Specifications/ Fire Protection and Suppression Design Alternatives. 12/1993. / Creighton Brook Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Addition - Project Manual - General Construction. Volume 1 of 2. 8/1991. / ALSC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Addition - Project Manual - Mechanical and Electrical. Volume 2 of 2. 8/1991. / ALSC Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Addition Specifications. 5/1990. / ALSC Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">11</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development Appendix ALSC Architects. 2/1990. / Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development. 1/1990. / Architects. ALSC Architects, Zimmer Gunsul Frasca ; Structural Engineer. Structural Design NorthwestMechanical Engineer: Riley Engineering ; Electrical Engineer: Doyle Engineering ; Civil Engineer:</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development Specification. 1/1990. / ALSC Architects, P.S. ; Zimmer Gunsul Grasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition - Preliminary Design. 11/1989. / Architects: ALSC Architects. Zimmer Gunsul Frasca ; Structural Engineer: Structural Design NorthwestMechanical Engineer: Riley Engineering ; Electrical Engineer: Doyle Engineering ; Civil Engineer:</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition and Renewal. Site Design and Building Massing Studies. 5/1989. / ALSC Architects, Zimmer Gunsul Frasca Partnership ; Structural: Suden Golden and GuestMechanical: Riley Engineering ; Electrical: Wanless Cook ; Civil: Wyatt Jaykim ; Libr</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition - Preliminary Site Studies and Cost Estimates. 3/1989. / Architects: ALSC Architects ; Design Architects: Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition - Schematic Design Architects: ALSC Architects. 7/1989. / Design Architects: Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Addition and Renewal - Architect Selection Interview. 9/1988. / Architects: ALSC Architects ; Design Architects: Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library Renovation - Partial Schematic Design for Full Renovation and Design Development for Phase One. 9/1980. / Joyce/Nordfors and Associates, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Renovation - Program. 3/1980.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Holland Library for State College of Washington. 1947. / Schematic Design Brochure</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">HVAC Design Analysis (Incinerator). 10/1997. / Prepared By Bovay Northwest, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Building - Specifications - Volume 1. 8/1998.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Building - Specifications - Volume 2. 8/1998.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Project - Civil Design Analysis. 10/1997. / Prepared By Bovay Northwest, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Study - Incinerator Report. 8/1991. / Wieland, Lindgren and Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Study - Reasonable Available Control Technology. 11/1994. / Bovay Northwest ; EnviromechDames and Moore</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Site Selection Study for Pathological Waste incinerator. 2/1995. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Opinion of Probable Costs for Pathological and Solid Waste Incinerators. 3/1995. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Environmental Impact Statement for Replacement Medical Waste. Incinerator, Volume 1 of II. (Needs to Be Pulled and Tossed. A Complete Set Volume I and II are in Box # 29.). 10/1996. / WSU</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Geotechnical Report on Storage Building Gifford Consultants, Inc. 11/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Environmental Health and Safety Plan Review Record. Notice of Construction. 1/1998. / Envirotech Drawings</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Notice of Construction Application Declaring Intent to Construct, Install, or Establish A New Air Contaminant Source or Replacement or Substantial Alteration of Emission Control Technology on an Existing Stationary Source. Attachment: Proces</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator. / Envirotech Drawings</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - New incinerator Building - Utility Study. 2/1997. / Bovay Northwest A Dames and Moore Subsidiary</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Schematic Design Brochure. 3/1997. / Bovay Northwest, Inc. ; EnviroMech</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Design Development Submittal. 7/1997. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Conceptual Design Analysis for Medical Waste Incinerator. 1/1997. / Bovay Northwest ; EnviroMech</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator Project - Design Development: Outline Specifications Submittal. 7/1997. / Bovay Northwest A Dames and Moore Subsidiary</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">12</container>
				<unittitle encodinganalog="title">Incinerator - Bidders Equipment List, Technical Data and Guarantees. 1/1998. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Incinerator Upgrades - Trade Specifications. 9/1995. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Intercollegiate Center For Nursing Education - Project Manual (Yakima). 1/1995. / Architect: Integrus Architecture, P.S. ; Structural Engineer: Structural Design Northwest. Inc.Mechanical and Electrical Engineers: MW Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Intercollegiate Center for Nursing Education - Project Manual (Yakima). 11/1994. / Architect: Integrus Architecture. P.S. ; Structural Engineer: Structural Design Northwest, Inc.Mechanical and Electrical Engineers: MW Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Intercollegiate Center for Nursing Education (Spokane) - Design Development / Walker McGough Foltz Lyerla. 10/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Intercollegiate Center for Nursing Education - Joint EWSC - WSU Building Program. 3/1976.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Intercollegiate Center for Nursing Education (Yakima) - Design Development. 8/1994. / Architect: Integrus Architecture, P.S. ; Structural Engineer: Structural Design Northwest, Inc.Mechanical and Electrical Engineers: MW Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Johnson Hall Specifications for Remodel Rooms 101, 122, 184, 190, 387, 396 and 39. By the Board of Regents Of WSU. 6/1994.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Johnson Hall Addition - Schematic Design Brochure. 10/1978. / Architect: Gayne L Jones and Associates ; Structural: Charles E. KitchinMechanical: Valentine. Fisher, and Tomlinson ; Electrical: Beverly A. Travis</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Kimbrough Hall - Specifications for General Contract - Books 1,2, and 3. 2/1964. / Ralph E. Decker, AIA Architects ; Administrative Architect: Gary L. Shavey. AIAUniversity Architect: Philip E. Keene, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">13</container>
				<unittitle encodinganalog="title">Kimbrough Hall Addition - Predesign Study - Books 1,2, and 3. 6/1992. / Predesign Consultants: Thompson Vaivoda and Associates, Architects AIA ; In Association With Heylman Martin and Associates, Architects, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall - Asbestos Abatement Submittals by Tektoniks Corp. 6/1997. / Tektonics Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Music Building - Pictures and Design Plans. 3/1966. / Ralph E. Decker AIA Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall - Preliminary Presentation. 1/1963. / Ralph E. Decker AIA Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Music Building - A Program for an Addition to. 5/1970.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall Addition and Renewal - Bid Set Volume One. 3/1998. / Architect: Thompson Vaivoda and Assoc. Archs ; Structural: kpff Consulting EngineersCivil: Rosewater Engineering ; Mechanical and Electrical Glumac ; Landscape: Murase and Associates ; Acoustica</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall Addition and Renewal - Bid Set Volume Two. 3/1998. / Architect: Thompson Vaivoda and Assoc. Arch's ; Structural: kpff Consulting EngineersCivil: Rosewater Engineering ; Mechanical and Electrical: Glumac ; Landscape: Murase and Associates ; Acoustic</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall Addition and Renewal - Addendum Two . 4/1998. / Prepared by Thompson Vaivoda and Associates, Architects AIA.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall Addition and Renewal - Design Development Set Project Manual. 5/1996. / Thompson Vaivoda and Associates Architects, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall Renovation - Hazardous Materials Abatement Project.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Abatement Specifications and Contract Documents. 5/1997. / Prepared By: Edward S. DeLorme While Employed By: SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall - Asbestos Abatement Project - Final Report. 12/1997. / Prepared by Richard A. Johnson, CIH SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Kimbrough Hall - Addition and Renewal - Schematic Design. 1/1996. / Architect: Thompson Vaivoda and Associates Architects AIA ; Associated Architect: Heylman Martin and AssociatesStructural: kpff Consulting Engineers ; Mechanical and Electrical: Glumac Internatio</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Launch Boathouse and Dock - Building Program 84 - 85. / McKinley Nance Director of Facilities Planning</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Laboratory Animal Resources Facility - Building Program. 8/1970. / Mr. Owen Bradvold - Office of Facilities Planning Liaison and Advisory Architect</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Additions - Second Floor. 10/1969. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall - South Addition. 4/1970. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall - Completion of South and Anatomy Refrigeration Room. 11/1971. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling - Building Program 1 of 2. 4/1978.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling - Building Program 2 of 2. 4/1978.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling - Schematic Design Brochure. 10/1978. / Culler Gale Martell and Ericson. Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling - General Specifications. 9/1979. / Culler Gale Martell Ericson P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Phase 11 - Building Program. 6/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling Phase 11 - Schematic Design Brochure. 2/1983. / Culler Gale Marteil and Ericson, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling/Renovation Program. 11/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Remodeling/Renewal Program Phase II. 4/1986.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Renewal - Schematic Phase. 3/1987. / De Neff Deeble Barton Associates ; Peter A. SudenTres West Engineers, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">McCoy Hall Renewal - Project Manual. 12/1987. / De Neff Deeble Barton Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Martin Stadium and Academic Center North Stands Replacement - Schematic Design Brochure/Some Pictures. / Naramore Bain Brady and Johanson Architects Engineers Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Martin Stadium - Fire Lane Route Study. 7/1997. / PPL Coffman Project# 95027-03</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">14</container>
				<unittitle encodinganalog="title">Martin Stadium - Schematic Design Brochure, Academic Athletic Complex (Lengthwise along box). 3/1972. / Naramore Bain Brady and Johanson Architects Engineers Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Murrow Hall Renovation/Addition - Predesign Study. 6/1998. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Morrill Hall Remodeling - Design Development. 9/1979. / Ralph D. Anderson and Partners ; Booth and Koch Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Morrill Hall Remodeling - Construction Details, As Built. 12/1981. / Ralph D. Anderson and Partners/Booth and Koch Architects and Environmental Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Murrow Remodeling - Schematic Design Brochure. 1971. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Murrow - Schematic Design Brochure. 7/1969. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook ; Structural: Peter Suden</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Murrow - Department of Communications Student Publications Radio - Television Services - Building Program Statement.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Memorial Hospital Study - Schematic Design Brochure. 1/1976. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook ; Structural: Peter Suden</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Meats Laboratory - Schematic Design Brochure. 9/1964. / Barnard and Holloway Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Meats Laboratory - Schematic Design Brochure Phase II. / Barnard and Holloway Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Married Student Apartments - Kamiak 100 Unit. 1964. / McClure and Adkison Architects AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Neill Hall Renewal - Specifications. 2/1988. / Anderson Koch and Duane</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Neill Hall Renewal - Final Cost Estimate. 3/1989. / Duarte Bryant Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Neill Hall Renewal - Schematic Phase. 1988. / Anderson Koch and Duarte ; United Pacific EngineersLee Engineering ; Travis Fitzmaurice and Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Neill Hall Renewal - Building Program. 5/1987.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">North-South Ski Lodge - Design Development Phase I. 2/1976. / Architects: Adkison Leigh Sims Cuppage ; Structural: L.C. CampbellMechanical and Electrical: Riley Engineering</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Nuclear Reactor Building. Addition to. 3/1967. / Miller and Fiedler - Architects AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Orton Hall - Schematic Design Brochure. 6/1962. / Philip E. Keene - University Architect ; Lea, Pearson and Richards - Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Rogers Hall - Mens Residence Tower. 5/1961. / Philip E. Keene - University Architect ; Lea, Pearson, and Richards - Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Rogers/Orton Site Plan for Residence Halls. 6/1962. / Resume of Richard Haag Associates ; Landscape Architects - Planning Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Owen Science Library - Foundation Investigation. 6/1974. / For Harris, Reed and Litzenberger Architects, AIA ; By: Shannon and Wilson, Inc. - Geotechnical Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Owen Science Library Design Development. 1979. / Harris, Reed and Litzenberger, AIA, Architects ; Abam Engineers, Inc., Structural EngineersValentine, Fisher and Tomlinson, Mechanical and Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Expansion - Revised. Description of Project; Building Committee; Statement of Problem; Statement of Goals; Planning Criteria; General Considerations; Space Requirements; Specific Requirements. 12/1995.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Addition - Design Development. 4/1988. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Addition - Specifications (construction set). 12/1988. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Addition Building Program. 8/1987.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Facility - Specifications. 6/1985. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Facility - Design Development. 3/1985. / Adkison Leigh Sims Cuppage - Architects ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Olympic Weight Room Building Addition - Building Program, Hollingbery Field House. 12/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">P.E Building - Program for the Proposed Gymnasium. 11/1965.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">P.E. Building - Schematic Design Brochure. 11/1966. / Paddock and Hollingbery AIA Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Parking Facility - Design Criteria and Outline Specification. 1500 Car Parking Facility Preliminary Design. 8/1970. / John Graham and Company Architects - Planners - Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Presidents Residence. Additions and Remodeling to. 1967. / Trogdon-Smith, AIA Architects ; Philip E Deene, AIA, Director of Facilities PlanningMechanical and Electrical: Rice. Strecker, and Cook ; Structural: Lyerla and Peden ; Landscape Architect: L Keith Hells</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Physical Science Building - Schematic Design Brochure. 2/1970. / Naramore Bain Brady and Johanson ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrical ; Paul</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Physical Science Building Phase II - Schematic Design Brochure. 7/1970. / Naramore Bain Brady and Johanson ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrica</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Physical Science Building Elevator Data. 5/1970. / Prepared By Charles W Larch and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Physical Science Building - Preliminary Design. 11/1968. / Naramore Bain Brady and Johanson Architects ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrical ;</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Publications Building - Schematic Design Brochure. 1967. / Architects: Evanoff and Kabush, AIA ; Structural Engineers: Lyerla and PedenMechanical and Electrical: James S. Latenser</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Puyallup - Controlled Environment - Lab and Greenhouse. 1970. / Research and Extension Center ; Carlson and James ArchitectAndrew T. Bingham - Structural ; Stingle-Atwood and Associates - Mechanical and Electrical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Puyallup - Office and Lab Facilities. Research and Extension Center. 5/1966. / Naramore Bain Brady and Johanson - Architects ; Bouillon, Christofferson and Schairer - Mechanical and ElectricalWorthington Skilling Helle and Jackson - Structural</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Prosser - Rogers Hamilton Laboratory Building. Institute of Agriculture Sciences Irrigation Experiment Station. 9/1961. / Philip E. Deene, AIA ; Cowan and Paddock, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Regents Dining Hall Remodeling - Schematic Design Brochure. 2/1979. / Tan Brookie Kundig Architects ; Structural: L. C. CampbellMechanical: Gerard and Associates ; Electrical: Wanless - Cook Associates ; Good Service Consultants: George E. Bundy and Associate</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Research and Technology Park - Project Manual - Building One. Phase 3 Tenant Improvements. 11/1985. / Taber Chaitin Associates - Architecture, Landscape Architecture, Planning, Interior Design ; Charlie Capital Group - Developer</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Research and Technology Park - Project Manual Phase 2 - Site and Weatherskin. 7/1985. / Taber Chaitin Associates - Architecture. Landscape Architecture, Planning, Interior Design ; Charlie Capital Group - Developer</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Research and Technology Park - Building One Phase 2. Replaces Addendum No. 1 ENTIRELY. / Taber Chaitin Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Research and Technology Park - Building One Phase 3 - Addendum #6. 2/1986. / Taber Chaitin Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">15</container>
				<unittitle encodinganalog="title">Rogers/Orton Din. Hall - Schematic Design Brochure. / Kenneth W. Brooks, AIA Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda Dining Hall (RDH) - Renovation Proposal; Packet of Pictures. / John Graham and Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda Dining Hall - Selective Demolition and Asbestos removal. 5/1985. / Walker McGough Goltz Lyerla P.S. - Architect and Engineers ; Centrac Associates, Inc. - Asbestos Removal Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H. Design Development - Outline Specifications. Construction Cost Estimate. 5/1985. / Walker McGough, Foltz Lyerla, P.S. - Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Design Development. 6/1985. / Walker McGough Foltz Lyerla, P.S. - Architects and Structural Engineers ; Mechanical and Electrical: Riley EngineeringAsbestos Removal and Lighting Consultants: Centrac Associates ; Design Collaborative - Interior Des</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Remodel Engineers Calculations. 9/1985. / Architects and Engineers: Walker McGough Foltz Lyerla P.S. ; Mechanical and Electrical: Riley Engineering, Inc.Lighting Engineer. Centrac Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Renovation - Building Program. 1/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Life Cycle Cost Analysis. 4/1985. / Prepared by Riley Engineering, Inc. and Walker McGough Foltz Lyerla</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Project Manual. 9/1985. / Walker, McGough Foltz Lyerla, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H - Project Manual. Selective Demolition and Asbestos Abatement. 5/1985. / Walker McGough Foltz Lyerla, P.S. - Architects and Engineers. ; Centrac Associates - Asbestos Abatement ConsultantRiley Engineering - Mechanical/Electrical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Rotunda D.H. Remodel - Schematic Design Brochure. 4/1985. / Walker McGough Goltz Lyerla. P.S. - Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall - Renovation - Project Manual. 10/1985. / Warren Cummings Heylmnan and Partners - Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation - Life Cycle Cost Analysis. 5/1984. / Warren Cummings Heylman and Partners/Architects Stingle - Atwood and Associates/Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation- Design Development. 4/1984. / Warren Cummings Heylman and Partners/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation- Hall Residents Proposal. 8/1983. / Warren Cummings Heylman and Partners/Architects 3/</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Remodel Building Program. 8/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation Design Development. 3/1984. / Warren Cummings Heylman and Partners/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation - Schematic Design Submittal. Design Analysis Tabulations; Construction Cost Estimate; Outline Specifications. 12/1982. / Warren Cummings Heylman and Partners/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Renovation - Project Manual Draft Copy. 9/1985. / Warren Cummings Heylman and Partners/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Stimson Hall Landscaping - Project Manual. 2/1987. / Warren Cummings Heylman and Partners/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodel Phase 2. Volume 2 Sec 15/16. 1/1988. / Architect and Planners: Decker/Fukui Davison ; Structural Engineers: Engineers Northwest, Inc.Mechanical Engineers: Halvorson, Beach and Bower. Inc. ; Electrical Engineers. Sparling and Associates, Inc</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodel Phase 1 - Project Manual, Volume 1. 6/1983. / Architect and Planners: Decker/Fukui Davison ; Structural Engineers: Engineers Northwest, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling Phase 1 - Project Manual, Volume 2. / Architect and Planners: Decker/Fukui Davison</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Building Program. 10/1977.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Building Program Phase 1. 5/1982. / Architect and Planners: Decker/Fukui Davison</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Phase 1 Schematic Design Brochure. 11/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Building Program Phase 2. 5/1982.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Building Program Phase 2. 12/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">16</container>
				<unittitle encodinganalog="title">Science Hall Remodeling - Schematic Design Phase 2.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Safety Building - Schematic Design Submittal (Placed alongside of box due to length). / Doudna Williams Phipps Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Services Addition - Energy Conservation Report, Life Cycle Cost Analysis. 11/1993. / Riley Engineering, Inc. ; Mahlum and Nordfors. McKinley, Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Services Addition - Value Engineering Study Mahlum and Nordfors, McKinley, Gordon. 10/1993.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Services Addition - Scheme E McKinley Gordon. 10/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Services Addition - Schematic Design Submittal McKinley Gordon Architect. 11/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Health Service Remodeling and Addition Schematic Design Brochure. / De Neff Deeble Barton Associates - Architects and Planners ; Rice and Luhn - Mechanical EngineersWanless-Cook Associates - Electrical Engineers ; Peter A. Suden - Structural Engineers ;</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Students Bookstore - Schematic Design Submittal. / Architect: Trogdon - Smith AIA ; Bookstore Planning: Henry Berry Associates, Inc.Structural Engineers Lyerla and Peden ; Mechanical Engineers: Rice and Strecker ; Electrical Engineers: Joseph M. Doyle and Asso</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Bookstore - Addition to. 9/1978. / TSG Architects ; Structural: Peter A. SudenMechanical: Rice and Luhn ; Electrical: Wanless-Cook</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Residential Community (Steptoe). Schematic Design Brochure 200 Apartments. 4/1969. / Architect. Durham Anderson Freed AIA ; Landscape Architect: Richard Carothers AssociatesStructural: Harold K. Roe, CE, SE ; Mechanical: Benjamin S. Notkin and Assoc</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Recreation Center - Project Update. 4/1998. / Architect: Yost Grube Hall Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Recreation Center - Schematic Design. 4/1998. / Architect: Yost Grube Hall Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Student Health - Student Health Service Clinic Building Preliminary Brochure (Placed alongside of box due to length). 1963. / Prepared by McClure and Adkison Architect AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Streit - Perham Remodel - Project Manual. 12/1985. / Clayton R. Joyce Architects ; Interior Design: Design CollaborativeStructural: H.K. Kim Engineers, Inc. ; Mechanical: D. W Thompson Consultant, Ltd. ; Electrical Engineers: Louis C. Warner and Co.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Streit - Perham Remodel - Design Development. 4/1985. / Clayton R. Joyce Architects ; Interior Design: Design CollaborativeStructural: H.K. Kim Engineers, Inc. ; Mechanical: D. W. Thompson Consultant, Ltd. ; Electrical Engineers: Louis C. Warner and Co.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Streit - Perham Remodel - Specifications - Asbestos Abatement and Demolition. 7/1985. / Clayton and Joyce Architects ; Centrac Associates - Asbestos Abatement Consultant</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">South Fairway Intramural Field - Schematic Design Report. 2/1992. / Richard Carothers Associates - Landscape Architects. Planners, Civil Engineers, and Surveyors ; Subconsultants: Tam, Boyle Heyamoto - ArchitectsRiley Engineers - Mechanical/Electrical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">South Fairway Intramural Field - Construction Document Submittal. 5/1993. / Richard Carothers Associates - Landscape Architects, Planners, Civil Engineers, and Surveyors ; Subconsultants: Tan, Boyle Heyamoto - ArchitectsRiley Engineers - Mechanical/Electric</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Swine Center - Design Development Phase II. Livestock Teaching and Research Facilities. 1975. / Architects: ORB Architects Planners Engineers ; EISI Engineered Industrial Systems. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Swine Center - Design Development Phase II. Livestock Teaching and Research Facilities (Booklet is titled the same as above, contains different supplemental material). 1975. / Architects: ORB Architects Planners Engineers ; EISI Engineered Industrial System</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Sloan - Technology Building - Engineering Addition Preliminary Design. 5/1959. / Culler Gale Martell Norrie Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Stephenson Residence Center - Preliminary Design Submittal - Third Tower. 1967. / Architects: Walker and McGough, AIA ; Mechanical Engineers Lyle Marque and AssociatesElectrical Engineers: Joseph M. Doyle ; Landscape Architect Keith L. Hellstrom</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Smith Agricultural Engineering Building - Alterations and Additions. 1966. / Architects: Evanoff and Kabush, AIA ; Structural: Lyerla and PedenMechanical and Electrical: James S Latenser</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane Intercollegiate Research and Technology Institute (SIRTI) Design Development. 7/1990. / WMFL, P.S. Architect and Engineers in Association with Arthur Erickson Architects ; Structural: WMFL, P.S. Architects, and EngineersElectrical: Riley Engineering ; L</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">SIRTI Geotechnical Information - Stone Column/Vibro - Replacement Foundation Improvement Work, SIRTI Site, Spokane WA. / Gifford Consultants, Inc. - Geotechnical Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">SIRTI - Project Manual. 4/1991. / WMFL Architects and Engineers ; MW Consulting Engineers: MechanicalRiley Engineering: Electrical ; SKU: Civil Engineering/ Landscape Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">SIRTI - Building Program. 4/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane Riverpoint - Health Sciences Building - Schematic Design. / Architect: Integrus Architecture ; Structural: Integrus ArchitectureMechanical/Electrical: MW Consulting Engineers ; Cost Estimating: Roen Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane Riverpoint - Health Sciences Building - Predesign Study at the Riverpoint Higher Education Park For The Joint Center for Higher Education Integrus Architecture, P.S. 7/1996.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane Riverpoint - State Archives Facility Eastern Washington Region and Cooperative Academic Library Services (CALS) - Riverpoint Higher Education Park Management. 10/1998. / Prepared for: the Office of the Secretary of State Archives and Records Division,</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane - Joint Center for Higher Education. 6/1993. / Trent and Riverside Avenue Properties ; Architectural and Structural: Integrus ArchitectureMechanical and Electrical: MW Consulting Engineers ; Property Management: R.W. Robideaux and Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">17</container>
				<unittitle encodinganalog="title">Spokane University District Development - Preplanning and Schematic Design. 9/1988. / W.M.F.L., P.S. Associate Architects: Arthur Erickson Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Building Program DCVRs To be Kept With as Built Drawings. 1963. / C. D. Contractors, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Specifications Volume I of II. 4/1989. / The Henry Klein Partnership ; Mechanical: Notkin Engineer, Inc.Electrical: Sparling and Associates ; Structural: ABKJ ; Landscape Consultant: Jongejan/Gerrard/McNeal Kitchen Consultant: Forma ; C</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Specification Volume II of II, Mechanical and Electrical With Addendums Attached. 4/1989. / The Henry Klein Partnership ; Mechanical: Notkin Engineer, Inc.Electrical: Sparling and Associates ; Structural: ABKJ ; Landscape Consultant. Jong</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Specifications (three binders). 12/1993. / The Henry Klein Partnership, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Building Program. 6/1992. / Architect: Cardwell/Thomas and Associates/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Thompson Hall - Feasibility Study, Foley Institute for Public Policy and Public Service. 1/1995. / Architect. Cardwell/Thomas and Associates/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Schematic Design. 6/1994. / Architect: Cardwell/Thomas and Associates/Architects ; Structural: Ratti, Swenson, PerbixMechanical: Path Engineers, Inc. ; Electrical: Elcon Associates, Inc. ; Cost Control: Ackroyd. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
					<unittitle encodinganalog="title">Thompson Hall Renewal - Design Development Supplemental Information. Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. / Ackroyd, Inc. Cardwell/Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Thompson Hall Remodel Project. Results of Subsurface Explorations and Floor Slab Moisture Survey. 6/1995. / Gifford Consultants, Inc. - Geotechnical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Thompson Hall Remodeling - Former Administration Building Remodeling De Neff Deeble and Barton Architects. 1975. / Rice, Strecker and Cook Professional Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">18</container>
				<unittitle encodinganalog="title">Supplemental Appendix to the Energy Conservation Report and Life Cycle Cost Analysis. 12/1992. / Mechanical: Path Engineers. Inc. ; Electrical Engineer: Elcon Associates, Inc.Architect: Cardwell/ Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Schematic Design Brochure. 1963. / Architect: John W. Maloney, AIA ; University Architect: Philip E. Keene, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Building Program Statement. 12/1983.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Site Selection Study. 2/1984. / Burke/Lee A Joint Venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Addition to - Schematic Design. 11/1987. / Burke/Lee A Joint Venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renovation - Remodeling Program. 5/1990. / The Henry Klein Partnership ; Structural: KPFFMechanical: Nolkin Engineering ; Electrical: Sparling and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Preplanning Documents - Outline Specifications, Cost Estimate and Drawings. 7/1990. / The Henry Klein Partnership, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Schematic Design. 4/1992. / Architects: The Henry Klein Partnership, ; Structural: Andersen Bjornstad, Kane, JacobsHalvorson, Beach and Bower Sparling and Associates, Inc. ; Acoustical: Michael R. Yantis Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Design Development Submittal. 7/1992. / Henry Klein Partnership, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Schematic Design Submittal. 7/1992. / Andersen Bjornstad Kane Jacobs, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Renovation Feasibility Study. 5/1992. / Morrison Knudsen Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Todd Hall Renovation - Health and Safety Plan, Demolition of Lead Paint Containing Material. 3/1994. / RZA AGRA, Inc. - Earth and Environmental Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Troy Hall Remodeling - Schematic Design Brochure. 1971. / Duglas C. Durkoop, Architect ; Rice and Luhn, Mechanical EngineersJoseph M. Doyle and Associates, Electrical Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities University Center - Building Addition. 2/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities University Center - Master Planning Report. 6/1988. / Architect: The McKinley Architects, PSC ; Associate Architect: Dillman - Luvaas Architects, P.S.Civil and Structural Engineers: KPFF: Consulting ; Civil Engineering Consultant to KPFF: Lin and A</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities University Center - Schematic Design. / Architect: The McKinley Architects, PSC ; Associate Architect: Dillman - Luvaas Architects, P.S.Civil and Structural Engineers: KPFF Consulting Engineers ; Civil Engineering Consultant to KPFF: Lin and Associ</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities University Center Addition Addendum No. 1. 2/1990. / The McKinley Architects PSC</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities Campus - Consolidated Information Center (C.I.C.). 12/1993. / Integrus Architecture, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities C.I.C. - Schematic Design. 10/1994. / Integrus Architecture, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities Campus - Science and Education Center - Predesign Report. 6/1998. / SRG Partnership, PC</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">19</container>
				<unittitle encodinganalog="title">Tri-Cities C.I.C - Predesign Study. 5/1994. / Prime Architect and Structural Engineers Integrus Architecture P.S. ; Mechanical and Communications Electronics Consultants: MW Consulting EngineersElectrical Consultants: Elcon Associates, Inc. ; Cost Estimating</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 1 - 14. 6/1995. / Cardwell/Thomas and Associates ; Structural: Senson Say FagetMechanical: Path Engineers ; Electrical: Elcon Associates ; Estimate: Ackroyd and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 15 - 16. 6/1995. / Cardwell/Thomas and Associates ; Structural: Senson Say FagetMechanical: Path Engineers ; Electrical: Elcon Associates ; Estimate: Ackroyd and Associate</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Bid Package No. 2. Specification for Appendix A - Hazardous Materials Abatement Project. 3/1998. / Prepared by Ed Delorme, OHST AHERA Project Designer # 940511-05 while employed by: SCM Consultants. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renovation - Abatement Specifications and Contract Documents. 6/1995. / Prepared by: Edward S. DeLorme, OHST AHERA Project Designer #940511-05 while employed by: SCM Consultants, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Division 15 Mechanical. 4/1998.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Bid Package II - Project Manual. Volume I Divisions 0-8 Project No. 94-1-024.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Bid Package I: Demolition - Project Manual. 6/1997. / Cardwell/Thomas and Associates/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Bid Package II Project Manual. Volume I Divisions 1-7 Project No. 94-1-024. 3/1998. / Cardwell/Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">20</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Bid Package II Project Manual. Volume II Divisions 8-16. 3/1998. / Cardwell Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Valley Road Multi - Use Recreation Fields - Phase 2 Developments. 3/1998. / RCA/Huitt - Zollars, Inc., Prime Consultants ; Tan-Heyamoto, ArchitectRiley Engineering, Mechanical-Electrical Engineers ; Gifford Consultants, Geotechnical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Van Doren Hall - Facility Condition Survey. 7/1990. / SCM Consultants, Inc. Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Visitor Center Site Study - Comprehensive Physical Planning Process. 11/1988. / Burke/Lee A Joint Venture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">New Veterinary Teaching Hospital - Design Development. 3/1990. / De Neff Deeble Barton Associates - Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">New Veterinary Teaching Hospital - Schematic Design. 3/1990. / De Neff Deeble Barton Associates - Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Research - Diagnostic Center - Schematic Design Material, Western WA Research and Extension Center. 12/1988. / Gtde Weisenbach ; Foil Wyatt Mckewen</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital Interim Report. 2/1988. / De Neff Deeble Barton Associates - Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. / Burke/Lee A Joint Venture, Campus Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Science Building - Design Development, Multipurpose Animal Holding Facility. 9/1981. / Naramore Bain Brady and Johanson</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Science Building - Site Evaluation and Recommendation, Multipurpose Animal Holding Facility. 9/1980. / The NBBJ Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Animal Holding Facilities - Schematic Design Brochure. 6/1978. / Barnard and Holloway, Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Veterinary Science Building (Bustad) - Design Development. 1/1975. / Architects: Maloney, Herrington. Freesz and Lund ; Structural: Skilling, Helle, Christiansen and RobertsonMechanical and Electrical: Valentine, Fisher and Tomlinson</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Engineering/Life Science Building - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Grasca Partnership ; Electrical: PAE Consulting Engineers, IncLandscape Architect: Zimmer Gunsul Frasca Partnership ; Civil Engineer: Kato and Warren, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver Campus Circulation - Preliminary Design. 6/1998. / Architect: Zimmer Gunsul Frasca Partnership Electrical : PAE Consulting ,Inc. ; Landscape: Zimmer Gunsul FrascaCivil: Kato and Warren, Inc. ; Soils Engineer. Geotechnical Resources ; Planning and En</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver Physical Plant Maintenance Shops - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Frasca ; Structural Engineer: Kramer GehlenMechanical: PAE Consulting Engineers, Inc. ; Electrical: PAE Consulting Engineers, Inc. ; Landscape Architect: Zim</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Multimedia Classroom Building - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Frasca Partnership, ; Electrical: PAE Consulting Engineers, Inc.Landscape Architect: Zimmer Gunsul Frasca Partnership ; Civil Engineer: Kato and Warren, Inc. ;</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Phase 1 Campus Development - Schematic Design. Classroom Building Library Building; Student Services and Classroom Building 6504 or 6526; Physical Plant Building 1. 10/1993. / Architect: Zimmer Gunsul Frasca ; Structural: Kramer GehlenMechanical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Phase II Campus Development Schematic Design. Early Childhood/Education Facility. 12/1995. / Architect: Zimmer Gunsul Frasca, Partnership ; Structural Engineer: Keramer Gehlen and AssociatesMechanical: PAE Consulting Engineers ; Electrical Engin</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Phase II Campus Development - Preliminary Design. Campus Infrastructure Work. 3/1996. / Architect: Zimmer Gunsul Frasca Partnership ; Structural: Kramer Gehlen and AssociatesCivil: Kato and Warren Inc., ; Mechanical: PAE Consulting Engineers ; Ele</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Cascades Volcano Observatory - United States Geological Survey. Conceptual Panning Submittal. 6/1996. / By: General Services Administration, United States Geological Survey United States Department of the Interior ; Washington State University</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Phase II Academic Buildings - Predesign Study. Engineering Life Sciences Building; Multimedia/Electronic Communications Building. 5/1996. / Prepared By Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver Campus Master Plan. 9/1992. / Prepared by: Zimmer Gunsul Frasca ; Moyer/ReedParametrix, inc. ; The JD White Company ; The Basmaciyan Group ; PAE Engineering ; Geotechnical Resources Incorporated</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver Campus Master Plan Appendix: Wetlands, Wildfire and Fisheries Report; Geotechnical Investigation; Master Plan Utility Report; Master Plan Electrical Report; Master Plan Mechanical Report; Transportation; Technical Report. / Zimmer Gunsul Frasca</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - A special Report to the Presidents and Regents from the ADVISORY COUNCIL VANCOUVER - Vancouver Long Range Planning Report. 3/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver and Clark College Bauer Hall - Second Phase Building Program - State Project # 88-030. 6/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">21</container>
				<unittitle encodinganalog="title">Vancouver - Clark College Bauer Hall Phase II - State Project # 88-030. Project Manual for Construction Documents. 3/1989. / Gary Rogowski - Architect AIA ; Structural: Kramer/Gehlen Associates Inc.Mechanical: Paraclete, PS ; Electrical: Dean J. Alhay and A</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Draft Supplemental Environmental Impact Statement. 12/1992. / The JD White Company, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Summary Master Plan. 7/1992. / Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - An Addition for The Southwest Washington Joint Center for Education and WSU At the Evergreen State College Building in Vancouver 1986 - 1987. / Andy Bremmeyer with Advisors ; Don Heil, Robert Patton, and Dave ScottDr. George Condon, Director of WS</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Campus Infrastructure Preliminary Design Specifications. 2/1996. / Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Campus Infrastructure Work - Phase II Development Construction Documents, WSU Review, Not for Construction. 5/1996. / Zimmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Mechanical and Electrical Calculation for the Phase II Campus Infrastructure Project and The Early Childhood/Education Facility Project. 8/1996. / PAE Consulting Engineers. Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Phase II Development Campus Infrastructure Work Construction Document Set. 1/1997. / Zimmmer Gunsul Frasca Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Vancouver - Early Childhood Education Facility. 7/1996. / Zimmer Gunsul Frasca Partnership ; Kramer Gehlen Associates Consulting Engineers/Structural/Civil</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Water System Plan Update. 12/1994. / Thomas, Dean and Hoskins, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Water Research Center - Schematic Design Brochure. / Carlson and James Architects ; Stingle and Atwood and AssociatesLyerla and Peden</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Waste Management Program Evaluation. Technical and Economic Feasibility Report - Appendix Section. 5/1990. / Doucet and Mainka, P.C.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Specification (TRA Architecture Engineering Planning Interiors). General Work Project Manual Volume 1 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Specifications. Mechanical and Electrical Project Manual Volume 2 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Schedules - Project Manual Volume 3 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Library Addition - Schematic Design Brochure. / J. Kimball Barnard, AIA ; Bovay Engineers, Inc., Structural Mechanical and Electrical</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Design Development Remodeling/Addition. 9/1978.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Design Development Renovation/Addition. 10/1978. / TRA Architecture Engineering Planning Interiors</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wegner Hall - Remodeling and Addition Building Program. 9/1977.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wenatchee - Tree Fruit Research Center - Office and Laboratory Building. 1966. / Fraley and Leighton Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wenatchee - Tree Fruit Research Center - USDA Addition. 1977. / Fraley and Leighton Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wilson Hall Remodeling - Schematic Design Brochure. 1971. / Architects: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless-Cook</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wilson Compton Union Building Addition. 1966. / Architects: Maloney, Herrington, Greesz and Lund ; Structural: Worthington, Skilling, Helle and JacksonMechanical and Electrical: Valentine, Fisher, and Tomlinson ; Food Service Consultants: John R. Carlson Associat</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Wilmer Davis Hall - Food Services Facility - Design Development Documents. Proposed Alterations and Additions. 6/1970. / Architects: James and Hicks ; Mechanical: Rice and LuhnElectrical: Wanless and Cook ; Structural: Paul Panagakis ; Food Service Consultants: J</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">22</container>
				<unittitle encodinganalog="title">Womens Residence Hall - Schematic Design Brochure (Streit Perham). 1959. / Walker McGough and Trogdon Architects AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Daggy Phase I Humanities Building. 4/1970. / Architects: Fred Bassetti and Company ; Mechanical: Valentine, Fisher and TomlinsonElectrical: Beverly A. Travis and Associates ; Theatrical Consultants: George C. Izenour and Associates ; Acoustical Consultants. Robin</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Daggy Phase I Humanities/Speech Building - Building Program.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Dana Hall Remodeling. 6/1973. / Architect: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless-Cook</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Athletic Facilities Study - Analysis of Existing Facilities! Improvements and Additions: 812S Martin Stadium; 0009 Hollingbery Field House; 372 Bailey Field; 171 Mooberry Track; 319C Stadium Way Tennis Courts; 013 Lower Soccer Fields; 365E WSU Golf Course ;</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">AMID/Landscape Architecture Building Predesign Study. 5/1998. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Consolidated Information Center (C.I.C.) - Project Manual Volume 1. 9/1995. / Integrus Architecture. P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Consolidated Information Center (C.I.C.) - Project Manual Volume 2. 9/1995. / Integrus Architecture, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Campus infrastructure and Road improvements - Phase I. Schematic Design Brochure. 1/1998. / KPFF Consulting Engineers, Prime Civil Engineer ; Wood/Harbinger, Mechanical/ElectricalC3 Management Group, Cost Estimator ; White Shield, Surveyor/Geologist</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Carpenter Hall Renewal Building Program. 7/1987, 1/1988.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Chemical Storage Building Environmental Health Services Facility. 5/1994. / Bovay Northwest, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Cleveland Hall Renovation - Value Engineering Study. 6/1927. / Roen Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">23</container>
				<unittitle encodinganalog="title">Elevator Planning - Independent Counsel for Elevators in New Construction or Modernization "old". / Charles W. Lerch and Associates - Elevator Consulting and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Hazardous Waste Facility - Dangerous Waste Permit WADO 0414853301. Chemical Storage Facility, Incinerator Basement, Hazardous Waste Treatment and Waste Water Discharge Facility. 9/1989. / Bovay Northwest Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Hazardous, Pathological, and Radiological Waste Handling Facilities. Building Program - Physical Plant Draft,. 11/1991. / Parametrix, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Hydrogeologic Investigation of the Proposed Coal Ash Disposal Facility. Physical Plant, Parametrix, Final Report. 12/1991. / Parametrix, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Intercollegiate Center for Nursing Education - Joint Eastern Washington State College. Capital Budget Requests. 1977-1979. / Walker McGough Foltz Lyerla</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Records, Maintenance Materials Storage and Recycling - Project Manual. Phase I, Re - Bid Specifications, Archos Corporation. 10/1994. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Records Maintenance, Material, Storage - Schematic Design, Inactive Records, Maintenance Materials Storage and Recycle Building: Phase I. 12/1992. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Records, Maintenance Materials Storage, and Recycling Building - Phase I Building Program. 8/1991.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Storm and Sanitary Sewer System Study - Physical Plant (Where is it located?). 8/1990. / CH2M Hill Engineers Planners Economists Scientists</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Student Services Addition - Project Manual Volume I Divisions 0 - 7 (Lighty Student Services). 9/1993. / Mahlum and Nordfors McKinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Student Services Addition - Project Manual Volume II Divisions 8 - 16 (Lighty Student Services). 9/1993. / Mahlum and Nordfors McKinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">24</container>
				<unittitle encodinganalog="title">Stadium Way Programming Analysis - Draft Report. / KPFF Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Addition - Predesign Study. 10/1992. / Sasaki Associates, Inc. ; Stewart Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Renovation - Predesign Study. 6/1994. / Sasaki Associates, Inc. ; Stewart Associates - Predesign Consultant</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Renovation - Capital Project Review Submittal. Allotment Request for Construction. 6/1994. / Prepared BY: WSU Department of Facilities Development</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Animal Science Building - Predesign Study. 7/1992. / MBT Associates - Predesign Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Engineering/Life Sciences Building. Multimedia/Electronic Communications Building. Phase II Academic Buildings - Predesign Study - Vancouver. 5/1996. / Zimmer Gunsul Frasca</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Chemical Storage Building. Environmental Health Services Facility - Predesign Study. 5/1994. / Bovay Northwest - Predesign Consultant</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">25</container>
				<unittitle encodinganalog="title">Phase II Science Hall Remodeling - Building Program (Murrow East). 12/1985.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Building Program (Bldg. Communication, Value Engineering Report, Physical Plant, Schedule and Equipment) +Slides and Pictures. 1991. / De Neff Deeble Barton Associates Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">WSU Tri-Cities Early Building Specifications. 1964 -1981.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">TriCities University Center Addition - Project Manual. 2/1990. / McKinley Architects - Volume 1 Divisions 0 - 7</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">TriCities University Center Addition - Project Manual. / McKinley Architects - Volume 2 Divisions 8 - 16</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">TriCities University Center Addition - Addendum No. 3. 3/1990. / McKinley Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">26</container>
				<unittitle encodinganalog="title">TriCities University Center Addition - Project Manual As Built. / McKinley Architects - Volume 1 Divisions 0 - 14</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Animal Disease Biotechnology Facility - Project Data Base - Second Submittal. 11/1993. / Northwest Architectural Company ; Wyatt - Jaykim Engineers - SurveyorsGifford Consulting Northwest - Geotechnical Consultants to Wyatt - Jaykim ; C3 Management Group,</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Responses to Review Comments - (These annotated comments accompany the Bid Set, responding to review comments from earlier submittals.). 7/1994. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Area Comparison/Cost estimate/Mechanical Calculations/Fire Protection Calculations/Electrical Calculations - Final Review Submittal. 2/1994. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Schematic Design Slides - BD. Of Regents Presentation.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Energy Conservation Report and Life Cycle Cost Analysis. 3/1993. / Northwest Architectural Company - Architects/Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Fixed Equipment - Third Submittal. 12/1993. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - A landmark facility dedicated to serving the state of Washington. the Western Region. and the Nation. College of Veterinary; Medicine Facility Program Goals/Financial Summary of ADBF; Grants, Licenses and Selected Refereed Publications in 93 and 94. 2/</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF Slide - College of Veterinary Medicine.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF NAC Aerial Drawing of CVM (photo and slide). 7/1994.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - College of Veterinary Medicine - Design Development Manual Volume II. Structural/Mechanical/Electrical Calculations. 11/1992. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF College of Veterinary Medicine - Design Development Manual - Volume I. Project Description/Cost Estimate/Equipment Schedule/Code Analysis. 11/1992. / Northwest Architectural Company ; Structural Design NorthwestGerard and Associates - Mechanical ; Crei</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Cost Estimate - Third Submittal - Cost Estimate. 12/1993. / Northwest Architectural Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Krieger Steel Products - Brochure Material. 12/1990.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">ADBF - Water Saver Faucet Co. - Brochure Material: Laboratory and Hospital Faucet Fixtures; Emergency Eye Wash and Shower Equipment. 7/1990.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Animal Sciences Laboratory - Construction Documents Estimate Prepared For MBT. 5/1995. / Ackroyd - Cost Control Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Animal Sciences Laboratory - Won - Door Corporation (fire guard) Brochure Material. 8/1991.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Animal Sciences Laboratory Building - Value Engineering Services. 8/1994. / EFT - Architects/Planners/Project Managers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Animal Sciences Laboratory Building - Value Engineering Study Proposal. 8/1994. / Meng Associates, Analysis Group - Architecture Planning/Value Engineering/Construction Research</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Asbestos Removal Plans - Alpha Engineering Group, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Beasley Performing Arts Coliseum - Asbestos Removal and Abatement Specifications. 4/1992. / By the Board of Regents - Physical Plant Department</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Beasley Performing Arts Coliseum - Asbestos Survey Report for the Department of Physical Plant. / Alpha Engineering Group, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Addition - Summary of Field and Laboratory Test Results File: WASUMI - M9601 A/ Contract 12254. 8/1997. / Strata Geotechnical Engineering and Materials Testing</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Gym Addition/Renewal - Statement of Qualifications. 10/1991. / Sasaki Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Gym Addition - Revised OFM Predesign Submittal. / Prepared for Sasaki Associates, Inc. By C3 Management Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Addition - 50% Design Development Value Engineering! Workbook and Preliminary Idea Listing Test and Screen Alternatives - Optimize Total Costs and Total Performance. / Ehninger Fetzer Tholen - Architects/Planners/Project Managers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Remodel - OFM Predesign Submittal. 5/1994. / C3 Management Group, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Bohler Gymnasium Addition - Life Cycle Cost Analysis (Report Some Plans Included). 2/1995. / Notkin Engineering, inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Chemistry Building Cost Estimate Analysis. 3/1986. / Brooks Hensley Creager Architects,</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Chemistry Building - Program Statement. 3/1984.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Chemistry Building - Design Development. Pedestrian Corridor Development of College Avenue From Library Road to Stadium Way. / Brooks Hensley Creager Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Child Care Playground - Project Manual. 4/1994. / Architect: The Tsang Partnership. inc. ; Landscape Architect: Douglas H. Tuma, ASLA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Child Care Center - Building Program. 6/1991.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">27</container>
				<unittitle encodinganalog="title">Child Care Facility Playground - Specifications. 4/1994. / Architect: The Tsang Partnership, Inc. ; Landscape Architect: Douglas H. Tuma, ASIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Request for Proposal, Strategic Partner in Communications - WSU Systems and Computing. 4/1991.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">University Center/Classroom Auditoria Building - Predesign Study. 5/1992. / Predesign Consultant: The Callison Partnership. Ltd.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">University Center - Site Considerations. 5/1992. / Burke/Lee A Joint Venture, Architects, Planners and Landscape Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Communication Infrastructure Renewal Project - Submitted July 1, 1993 to the CIR Review Team for Approval of the Format, Approval Requested Zone 2 - Sloan MCF - Communications Closet Drawings. 7/1993. / JWP information Systems Network Integration Services</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Composting Facility - Preliminary Design Report Draft - Project #0901-001.01. 3/1994. / Prepared for WSU by EMCON Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Cost Estimate and Area Comparison Charts - Schematic Design Phase. 4/1992. / The BJSS Group - Architects and Planners AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Construction Documents - Cost Estimate. 2/1993. / The BJSS Group - Architects and Planners, AIA</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Addendum No. 2. 6/1993. / The BJSS Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Dairy Forage Facility - Phase II Addendum No. 3. / The BJSS Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Kruegel Hall McAllister Hall Neill Hall - Photo Album. 4/1957.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Mechanical Engineering Laboratory - Hazardous Materials Survey AGRA E and Es Job No. 12-1195-00. 8/1994. / AGRA Earth and Environmental</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">ETRL - Preliminary Environmental Assessment. 5/1994. / Prepared by Hart Crowser for The Callison Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">ETRL - Pre-Design Building Program Draft - College of Engineering and Architecture. 7/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">ETRL - Value Engineering Study. 5/1994. / Meng Analysis Group - Value Engineering/Construction Research</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">ETRL - Value Engineering Study - (different from above). 5/1994. / Meng Associates - Analysis Group/Architecture/Planning/Value Engineering/Construction Research</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">McAllister/Kruegel Residence Halls Consultant Agreement No. 11063. 2/1993. / SCM Consultants, Inc. Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">McAllister/Kruegel Residence Halls Consultant Agreement No. 11063 - Part C Structural Analysis. 2/1993. / SCM Consultants Inc. Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Hall/Fulmer Annex Renewal - Budget Estimate. 6/1993. / Mahlum and Nordfor McKinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Hall - Mckinley Gordon Architects Statement of Qualifications. 3/1993.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Hall/Fulmer Annex - Operations and Maintenance Plan for Asbestos. 3/1994. / RZA AGRA, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Hall/Fulmer Annex Renovation Project - Consultant Roster Registration Environmental Consulting Services and Proposal for the Renovation Project. 11/1993. / Hart Crowser - Earth and Environmental Technologies</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Hall/Fulmer Annex Renewal - Lab Layout Drawings for user Group Meetings. 11/1993. / Mahlum and Nordfors McKinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Fulmer Annex Renewal - Energy Conservation Report. 4/1994. / Prepared by Riley Engineering, Inc. Mahlum and Nordfors Mckinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Glenn Terrell Friendship Mall and Extended Areas - Technical Report. 5/1987. / By Landscape Architecture Students in Landscape Architecture 361 ; Department of Horticulture and Landscape Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Glenn Terrell Friendship Mall - Schematic Design Brochure. / Design Team Catherin Howett/George Trakas ; A Partnership Project of WSU and the WSU Arts Commission</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Greenhouse Replacements - Design Development/Puyallup WWREC with Slides Included. 2/1995. / Stafford Harris, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Hazardous Waste Sites Phase II - Preliminary Construction Budget Estimate. 1/1994. / Bovay Northwest Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Chemical Waste Collection Sites - Schematic Design Brochure.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Eastlick Hall/Wegner Hall/Engineering Complex/Silver Recovery Units. 11/1994. / Bovay Northwest Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">28</container>
				<unittitle encodinganalog="title">Chemical Storage Building/Environmental Health Services Facility - Predesign Study (DRAFT). 4/1994. / Bovey Northwest, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Hill Residence Halls - Condition Survey/Review - Stevens and McCroskey Halls. Duarte Bryant Architecture - Statement of Qualifications. 3/1995.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Stevens Hall Dormitory - Exterior Renovation - Design Submittal. Lateral Study/Outline Specifications/Cost Estimate. 12/1992. / Duarte Bryant Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Stevens Hall Dormitory - Exterior Restoration - Building Survey. 8/1992. / Duarte Bryant Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Heald Hall - Rebar Study (Reinforcing Investigation). 7/1993. / Miller Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Heald Hall - Expanded Options Study. 8/1995. / The Miller/Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Heald Hall Renewal - Predesign Phase Proposal. 3/1992. / The Miller/Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Heald Hall Renewal - Options Phase Document. 6/1992. / The Miller/Hull Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development. / ALSC Architects/ Zimmer Gunsul Frasca Partnership - Design Architect ; Structural: Structural Design NorthwestMechanical: Riley Engineering ; Electrical: Doyle Engineering ; Civil: Wyatt - Jaykim</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Libraries - A Guide to Spacesaver High - Density Compact Storage Systems for the Library Environment The Space Saver Group.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Holland Library Renewal - Project Scope Development. 1/1994. / ALSC Architects, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development Cost Estimate. 2/1990. / ALSC Architects/Zimmer Gunsul Frasca Partnership - Design Architect</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Holland Library Addition - Holland Library Addition - Package No. 2. 8/1993. / Mortenson - The Construction Organization</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Holland Library Addition - Design Development/Cost Estimate. 1/1989. / C3Management Group, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Library - An Assessment of Current and Projected Library Space Needs @ WSU. 3/1988. / P. Genie Trapp - Office of Institutional Research</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">ICNE - Yakima Permanent Facility - Proposed Site Study. Location: Between Glenn, Palmer and Prior Halls and the Brown Dental Clinic. 2/1994. / Integrus Architecture, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">ICNE Yakima Site Studies Log Project No. 93091. 1993. / SCM Consultant, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Wheat Research Center - New Plant Growth. / Tan Boyle Heyamota Architects ; Architects Design Group, Design ConsultantsPeden Petersen Lee, Structural Consultants ; MW Consulting Engineers, Mechanical and Electrical Consultants ; Ricard Carothers Associates,</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Plant Growth Wheat Research Center - Schematic Design (Layouts).</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">New Plant Growth - Wheat Research Center - Schematic Design Submittal. 11/1994. / Tan Boyle Heyamota/Architects Design Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">New plant Growth Facility - Submittal of Qualifications. 5/1994. / Tan Boyle Heyamoto Architects/Architect Design Group</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Inactive Records, Maintenance Materials Storage, and Recycle Building: Phase 1 - Schematic Design. 12/1992. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Records, Maintenance Materials Storage, and Recycling Building - Construction Document Submittal. 9/1993. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Records, Maintenance Material Storage, and Recycling building - Phase I - First Design Submittal. 4/1992. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Records, Maintenance Material Storage, and Recycling Building - Phase I - Revised Schematic Design Submittal. 10/1992.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Records Storage and Recycle Building - Schematic Design Cost Estimate. 11/1992. / Archos Corporation/C3 Management Group, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Records, Maintenance Materials Storage, and Recycling Building Phase I - Supplementary Building Program. 3/1992. / Archos Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">University Facilities Planning and Student Housing Research - Qualifications Submittal Document. 1/1995. / MGT of America, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">The University of Connecticut Residential Life Facilities Study - Summary Report. 1/1991. / Division of Student Affairs and Services ; Dober, Lidsky, Craig and Associates, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Proposed Undergraduate Housing Facility Program - Babson College. Babson College 1991 New Housing Study Committee. 3/1991. / Dober, Lidsky, Craig and Associates, Inc., Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Student Housing Proposal/Statement of Qualifications. 1/1995. / IBI Group - Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Graduate Student Housing - Massachusetts Institute of Technology/ 143 Albany Street. 5/1988. / Facility Program Dober and Associates, Incorporated Planning Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Plant Growth Wheat Research Facility - Summary of Field and laboratory Test Results. 8/1997. / File: WASUNI - M9602A Contract: 12380 ; Strata Geotechnical Engineering and Materials Testing</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume I of II WSU. 10/1996.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume II of II WSU. 10/1996.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">29</container>
				<unittitle encodinganalog="title">Incinerator - Design Development Submittal for Incinerator Project. Civil Design Analysis/Preliminary Structural Calculations/Mechanical/Electrical. 7/1997. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Incinerator - Design Development Submittal for Incinerator Project. 7/1997. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Incinerator - New Incineration Facility/Wastewater Pre-Treatment Study. 2/1997. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Incinerator - Engineering Report Chapter 6 Site Selection. 7/1993. / Bovay Northwest</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Waste Management Evaluations - Proposal for Consulting Services. 2/1990. / Doucet and Mainka, P.C.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Incinerator - Multicare Medical Center Incineration Project. Final Environmental Impact Statement. Pursuant to the State Environmental Policy Act of 1984 Chapter 43.2 (RCW 2/1990).</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Waste Management Program Evaluation - Technical and Economic Feasibility Report. 2/1990. / Doucet and Mainka, P.C.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Final Waste Management Program Evaluation - Report (DM347). 5/1990. / Doucet and Mainka, P.C.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Yakama Village - One - Year Warranty Inspection Final Report Checklist. 1/1997. / Design West</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Student Services Addition - Mechanical Fixture Information Booklet. 9/1993. / Mahlum and Nordfors Mckinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Student Services Addition - Design Development Phase - Schematic Design Review Comments. 3/1993. / McKinley Gordon - A Professional Service Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">French Administration Building Addition - Proposal to provide Value Engineering Services. 6/1993. / Presented to: Mahlum and Nordfors Mckinley Gordon ; Submitted by: KJM and Associates, LTD</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Student Services Addition Design Development Estimate - Draft. 10/1993. / Turner Construction Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Student Services Addition - Electrical Fixture Information Booklet. 9/1993. / Mahlum and Nordfors Mckinley Gordon</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Design Development Supplemental Information: Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. / Cardwell/Thomas and Associates/Arc</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Schematic Design. 6/1994. / Cardwell/Thomas and Associates/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Selected Product Information. Division 8 Doors and Windows/Division 9 Finishes/Division 10 Specialties. 3/1995. / Cardwell/Thomas and Associates/Architects</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Addenda 1 - 6 Bid Package II. 5/1998. / Cardwell/Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall - Hazardous Material Survey - Addendum No. 1. 10/1997. / SCM Consultants Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal - Value Engineering Study. 10/1994. / Olympic Associates Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Hazardous Materials Survey Project 3710.010. 2/1995. / SCM Consultants, Inc. - Architects and Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Thompson Hall Renewal Project - Value Engineering Services. 7/1994. / Cardwell/Thomas and Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall - Health and Safety Observations. 9/1994. / AGRA Earth and Environment, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Copy Finish Hardware Schedule for your review and comment. 3/1994. / The Henry Klein Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Value Engineering Study. 10/1992. / The Henry Klein Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renovation - Schematic Drawings. 7/1990. / The Henry Klein Partnership ; Structural: ABJKMechanical: Halvorson, Beach and Bower ; Electrical: Sparling and Assoc., Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renovation - Room Capacity Chart along with drawings. 10/1991. / The Henry Klein Partnership</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renovation - Health and Safety Plan - Demolition of Lead Paint Containing Material R14. 3/1994. / AGRA - Engineering and Environmental Services</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Renewal - Allotment Request for Construction - Renovation - renovation will bring fire, safety, and handicapped compliance up to date. 12/1993.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Construction Cost Estimate. 1/1989. / Olympic Associates Company</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Foundation Investigation. 7/1984. / c/o Henry Klein Partnership ; Shannon and Wilson, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Fire Alarm and Clock Control System. 12/1989. / Simplex</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">30</container>
				<unittitle encodinganalog="title">Todd Hall Addition - C.D. Contractors, Inc. Certified Payroll Reports beginning with period ending 6/23/1989 to date. 11/1989. / C and D General Contractors.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Todd Hall Addition - Equipment Brochures Job # 3147. 12/1988. / FORMA - Interior Design Planning and Purchasing</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center (C.I.C.) - Design Development Outline Specifications. 12/1994. / Integrus Architecture</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center - Drainage Report (Tri-Cities). 12/1994. / Rose Water Engineering, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center - Energy Conservation Report (Tri-Cities). 1/1995. / MW Consulting Engineers</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center - Value Engineering Study - Tri-Cities Branch. 11/1994. / Roen Associates</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Hazardous Communication - Hazardous Chemical Program Manual. 7/1989. / Contractors Northwest; Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center - Design Development Cost Estimate (Tri-Cities). 1/1995.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center Preliminary Program Information. 12/1993. / Integrus Architecture, P.S.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Tri-Cities WSU - Campus Expansion Traffic Impact Study - Level of Service Reports - Existing Condition Year Traffix System Version 6.7. 1994. / Licensed To INCA Engineers, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Tri-Cities Campus Expansion - Traffic Impact Study. 8/1994. / Prepared by INCA Engineers, Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Consolidated Information Center - Phase I Geotechnical Studies. 12/1994. / Shannon and Wilson, Inc. - Geotechnical and Environmental Consultants</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Center for Northwest Anthropology - A Cultural Resources Survey of the WSU Tri-Cities Branch Campus Properties Contributions in Cultural Resource Management No. 49. 2/1995.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Phase 11 Building Construction - Quality Control Program. / Morgen and Oswood Construction Co., Inc.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Site Preparation Phase I - Information for Preparation of Bids on Excavation and Fill.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Phase II: Building Construction Contract No. 11470. Environmental and Pollution Prevention Plan. / Morgen and Oswood Construction Co., Inc,</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Project Information and Procedures. Owners Project # 11470. / Morgen and Oswood Project Number 9304</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Value Engineering and Constructability Study. 5/1992. / Morrison Knudsen Corporation</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Project Manual for Phase I: Site Grading/ Job Number 5-88-328A. 6/1991. / De Neff Deeble Barton Associates Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Clinic Building - Environmental Analysis. Volume Five of Six Oregon State University Environmental Quality Study (Item 10.10). Submitted to Grants and Contracts Management Branch - Public Health Service. / Submitted by Mr. Mil</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Environmental Quality Study for (Exhibit D). Veterinary Research Laboratory Addition, Moscow Idaho. Caldwell Veterinary Medical Center, Caldwell, Idaho. Caldwell Veterinary Medical Center Isolation Building. Caldwell, Idaho. Volume Six of Six - University</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">College of Veterinary Medicine Capital Budget Request - Construction of New Veterinary Teaching Hospital. 1989 -1999.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">McCoy /Bustad Complex - Veterinary Teaching Hospital - Site Study. 4/1988. / De Neff Deeble Barton Associates - Architects and Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">New Veterinary Teaching Hospital - College of Veterinary Medicine - Schematic Design. / De Neff Deeble Barton Associates - Architects and Planners ; Thomas J. Gerard and Associates, Inc. - MechanicalSuden, Golden and Guest, Inc. - Structural ; Foil - Wyatt - Mc</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. / Burke/Lee A Joint Venture - Campus Planners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital - Interview. 10/1987. / Project Design Team: De Neff Deeble Barton Associates Architects and Planners ; Foil - Wyatt - McKewen - Veterinary Planning ConsultantSuden, Golden and Guest, Inc. - Structural Engineers ; Thorson Partners</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">31</container>
				<unittitle encodinganalog="title">Veterinary Hospital - Benefit and Life Cycle Cost Analysis Summary.</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">32</container>
				<unittitle encodinganalog="title">Veterinary Teaching Hospital Complex - Review Copy of Program. 7/1988. / De Neff Deeble Barton Associates - Architects and Planners ; Program Consultant: Foil - Wyatt - Mckewen</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">32</container>
				<unittitle encodinganalog="title">New Veterinary Teaching Hospital - College of Veterinary Medicine. 12/1990. / De Neff Deeble Barton Associates Program consultant - Foil - Wyatt - Mckewen</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">32</container>
				<unittitle encodinganalog="title">New Veterinary Teaching Hospital Complex Program (Needs Not Meet In New Construction). 12/1990. / De Neff Deeble Barton Associates Foil - Wyatt - Mckewen</unittitle>
			</did>
		</c01>
	 	<c01 level="file">
			<did>
				<container type="box">32</container>
				<unittitle encodinganalog="title">Health Professions Educational Facilities Construction Grant - Volume One of Six. 7/1977. / Submitted by: Washington State University, Oregon State University, University of Idaho,</unittitle>
			</did>
		</c01>		
	 </dsc> 
  </archdesc> </ead>

