<?xml version="1.0" encoding="utf-8"?>

<!DOCTYPE ead PUBLIC "+//ISBN 1-931666-00-8//DTD ead.dtd (Encoded Archival Description (EAD) Version 2002)//EN" "ead.dtd">
<!--Template updated 2011-05-11 by J. Allison-Bunnell in accordance with changes that resulted in Best Practices version 3.5-->
<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
<!--                              EADHEADER BEGINS HERE                           -->
<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
<!--Remember to name and save documents using the OCLC code + local filename. Documents that are revised/updated after initial submission much be submitted with precisely the same filename.-->

<ead> 
	<!--The following section is header information that describes the finding aid-->
	<eadheader langencoding="iso639-2b" scriptencoding="iso15924" relatedencoding="dc" repositoryencoding="iso15511" countryencoding="iso3166-1" dateencoding="iso8601" id="a0"> 
		<eadid countrycode="us" encodinganalog="identifier" mainagencycode="waps" identifier="80444/xv770118" url="https://archiveswest.orbiscascade.org/ark:80444/xv770118">NTE2ua1985_21.xml</eadid> 
		<filedesc> 
			<titlestmt> 
				<titleproper encodinganalog="title">Preliminary Guide to the Washington State University Applied Energy Studies WPPSS Nuclear Plant Study
					<date encodinganalog="date" calendar="gregorian" era="ce" certainty="approximate" normal="1978/1982">circa 1978-1982</date></titleproper> 		   		  
				<titleproper type="filing" altrender="nodisplay">Washington State University Applied Energy Studies WPPSS Nuclear Plant Study</titleproper>
				
				<author encodinganalog="creator">Finding aid prepared by Mark O'English</author>
			</titlestmt> 
			<publicationstmt> 
				
				<publisher encodinganalog="publisher">Washington State University Libraries Manuscripts, Archives, and Special Collections
				</publisher>
				
				<date calendar="gregorian" encodinganalog="date" normal="2022">© 2022</date> 
				
			</publicationstmt> 
		</filedesc> 
		<profiledesc> 
			<creation>Finding aid encoded by Suzanne James-Bacon.
				<date normal="2021" era="ce" calendar="gregorian">2022</date></creation>
			
			<langusage>Finding aid written in English.
				<language langcode="eng" encodinganalog="language" scriptcode="latn">English</language>.</langusage> <descrules>Finding aid based
						on DACS 2nd Edition ( 
						<title render="italic">Describing Archives: A Content
							Standard</title>).</descrules> 
		</profiledesc> 
	</eadheader> 
	
	<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
	<!--                         COLLECTION-LEVEL DESCRIPTION BEGINS HERE             -->
	<!-- oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo -->
	
	<archdesc level="collection" type="inventory" relatedencoding="marc21"> 
		<did id="a1"> 
			<repository> 
				<corpname encodinganalog="852$a">Washington State University Libraries, Manuscripts, Archives and Special Collections</corpname>
				
			</repository> 
			<unitid encodinganalog="099" countrycode="us" repositorycode="waps" type="collection">UA1985-21</unitid>
			
			<origination> 
				<corpname encodinganalog="110" role="creator" rules="rda">Washington State University. Applied Energy Studies</corpname> </origination> 
			<unittitle encodinganalog="245$a"> Preliminary Guide to the Washington State University Applied Energy Studies WPPSS Nuclear Plant Study</unittitle>
			
			<unitdate type="inclusive" encodinganalog="245$f" era="ce" calendar="gregorian" datechar="" certainty="approximate" normal="1978/1982">circa 1978-1982</unitdate>
			
			<physdesc> <extent encodinganalog="300$a">25.5 Linear feet of shelf space</extent>
				<extent encodinganalog="300$a">30 Boxes + 5 Map Tubes</extent>
			</physdesc>
			<abstract encodinganalog="5203_">Documents from the Applied Energy Study regarding the Nuclear Plant Study from 1978-1982.</abstract> 
			<physloc>(MASC STAFF USE) 2-38-07-1</physloc> 
			<langmaterial>Collection materials are in <language encodinganalog="546" langcode="eng">English</language></langmaterial>
		</did>
		
		<bioghist encodinganalog="5451_" id="a2"><!--Enter ENCODINGANALOG value of 5450_ for biog. or 5451_ for historical note, or use <head> element-->		
			<p>The Office of Applied Energy Studies was responsible for the independent review of the Washington Public Power Supply System (WPPSS) in 1981. They reviewed the cost and schedule of the project, which was inevitably scrapped due to budget problems. The WWPPSS was a public project in Washington State that intended to guarantee power to Washington residents as the population continued to grow. </p>		
		</bioghist> 
		<scopecontent encodinganalog="5202_" id="a3"> 
			<p>This collection includes plans and documents regarding the Nuclear Plant Study from 1978-1982.  </p>
		</scopecontent> 
		<arrangement encodinganalog="351" id="a4"> 
			<p>This is an unprocessed collection. Any arrangement reflects either a pre-existing order from the records' creators or previous custodians, or preliminary sorting performed by staff. </p><p>All boxes contain mostly budget and cost reports related to WPPSS. Also includes progress reports, project bids and contracts, as well as the official recommendation by the committee in Box 31. Material is mostly labeled into bound collections or labeled subject files but some boxes contain loose files. </p>
		</arrangement> 
		<accessrestrict encodinganalog="506" id="a14"> 
			<p>This collection is open and available for research use.</p>
		</accessrestrict> 
		<userestrict encodinganalog="540" id="a15"> 
			<p>Copyright restrictions apply.</p>
		</userestrict> 
		<prefercite encodinganalog="524" id="a18"> 
			<p>[Item description] </p>
			<p> Preliminary Guide to the Washington State University Applied Energy Studies WPPSS Nuclear Plant Study, circa 1978-1982 (UA1985-21) </p>
			<p>Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.</p> 
		</prefercite> 
		<acqinfo encodinganalog="541" id="a19"> 
			<p>This material was transferred to WSU Libraries' MASC by George W. Hinman of Applied Energy Studies on June 12, 1985 and retained as UA1985-21.</p>
		</acqinfo> 
		<processinfo encodinganalog="583" id="a20"> 
			<p>(MASC STAFF USE) The donating office provided a rough inventory by box, so restructuring by series or reboxing in acid-free containers during accessioning (in a pre-digital era) was deemed counter-productive. </p>
		</processinfo> 
		
		
		<!-- ooooooooooooooooooo     ACCESS POINTS     oooooooooooooooooooo -->
		
		<controlaccess id="a12"> 
			<p>This collection is indexed under the following headings in the online
				catalog. Researchers desiring materials about related topics, persons, or
				places should search the catalog using these headings.</p> 
			<controlaccess> 
				<corpname role="subject" encodinganalog="610" rules="rda">Washington State University. Applied Energy Studies -- Records and correspondence</corpname>
			</controlaccess> 
			<controlaccess> 
				<subject source="archiveswest" altrender="nodisplay" encodinganalog="690">Washington (State)</subject> 
				<subject source="archiveswest" altrender="nodisplay" encodinganalog="690">Colleges and Universities</subject>		  
			</controlaccess> 
		</controlaccess> 
		<!--A finding aid without a series or container list may end here.-->
		
		<!-- ooooooooooooooooooooooooo BEGIN CONTAINER LIST (Optional) oooooooooooooooo -->
		<!--Be sure to choose the appropriate TYPE attribute for this collection-->
		<dsc type="combined" id="a23">
			<!--At each <c0x> level, be certain that you have chosen the appropriate LEVEL attribute!-->
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">NW Regional Forecast of Power Loads and
						Resources 7181-6192</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">EBASCO FY82 Baseline Budget 6
						Volumes</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">WPPS Cost Per KWe Compared to Midland Cost Per
						KWe</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">NP 1 and 4 United Engineers Progress Report,
						May 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">NP 1 and 4 United Engineers Progress Report,
						April 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">Managing Director's Reports, Mar. 81 to
						Current</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">Annual Report, 1980</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">WNP-1/4 Program Review with WPPSS Manager
						Director, 01/16/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">WNP-1/4 Program Review with WPPSS Manager
						Director, 03/19/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">Library Index</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">1</container>
					<unittitle encodinganalog="title">"Level 1 Reports Mar. 79 to Feb.
						81"</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WNP-1/4 Director's Monthly Progress Report,
						05/14/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WNP-1/4 Program Review with WPPSS Manager
						Director, 04/16/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WNP-1/4 Program Director's Progress Report,
						06/18/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Independent Review of WPPSS 4 and 5 - Study
						Plan</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Cost Overruns and Schedule Delays, Vol.
						II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Official Statement, 3/6/81 (Bond)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">FY82 Budget Agenda, Nos. 3 and 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">FY82 Budget Schedule, Nos. 3 and 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Review of 4 and 5 (Study Plan)
						(Requests)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Nuclear Fuel Planning Process</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">FY82 Budget and Schedule Nos. 3 and 5 (4 Je
						81)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WNP 315 Ebasco Engineering</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Report, Phase 1 Study 1 and 4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Alternative Evaluation WNP, 4/5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Overview of FY82 Schedule and Budget WNP
						1/4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">NRC Influence of Cost and Schedule</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Causes of Cost Overruns and Schedule Delays,
						Vol. I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WNP-1/4 FY82 Budget Review</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Construction Budget Plant #1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">1981 Ten-Year Fuel Management,
						6/1/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">Board of Directors Res. #890, adopted
						2/23/77</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">2</container>
					<unittitle encodinganalog="title">WPPSS Cost Per KWe Compared to Midland Cost
						Per KWe</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">3 FY82 Baseline Budget, Vol. 1 of
						6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">Washington Public Power Supply
						System</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">FY82 Budget and Schedule
						Presentation</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">Chart of Accounts, June 1978</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">WNP-1/4 FY82 Budget Review, Attachment
						2</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">3</container>
					<unittitle encodinganalog="title">FY82 Baseline Budget, Vol. 2 of 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">4 Contract 2, Unit 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Contract 62A</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Contract 2, Unit 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Contract 62C</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Contract 62B</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Monthly Financial Report, Feb.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Monthly Financial Report, March
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Monthly Financial Report, April
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">4</container>
					<unittitle encodinganalog="title">Monthly Financial Report, May 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">5</container>
					<unittitle encodinganalog="title">5 Cost and Comparison to Estimate
						Reports</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">5</container>
					<unittitle encodinganalog="title">FY82 Baseline Budget, Vol. 5 of 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">5</container>
					<unittitle encodinganalog="title">FY82 Baseline Budget, Vol. 4 of 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">5</container>
					<unittitle encodinganalog="title">FY82 Baseline Budget, Vol. 3 of 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">5</container>
					<unittitle encodinganalog="title">FY82 Baseline Budget, Vol. 6 of 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">6 PCS Unit 4, 30 June 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Cost and comparison WNP#4 P8 580-1164 pkg. 2
						of 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Contract 4, Part II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Construction Budget Nuclear Project No.
						3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Construction Budget Nuclear Project No.
						1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Cost and Comparison WNP#4 P8.1165-1772 pkg. 3
						of 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">NP4 Vol. I PCS, 30 June 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">6</container>
					<unittitle encodinganalog="title">Contract 4, Part I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">7</container>
					<unittitle encodinganalog="title">Miscellaneous</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">8</container>
					<unittitle encodinganalog="title">Commit Ledger, Unit 4, Book 1,
						2/27/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">8</container>
					<unittitle encodinganalog="title">Commitment Ledger, Unit 4, Part 3,
						2/27/81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP#4 Contract 123 - Bid documents and specs,
						Vol. I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">Panel Member Reports</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP#4 Accrued Liabilities, 28 Feb.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WPPSS-WNP#4, Reconciliation
						Worksheets</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP 4 Owners Const. Cost PCS - Cost and
						Comparison, 28 Feb. 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP 4 Reconciliation of General Ledger with
						Budget</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">Cash Reports WNP 4 and 5, 28 Feb.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">Cost Reports WNP#4, 30 June 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP 4 Pay requested big 6</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP#4 Contract - 4 Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WPPSS-VE and C Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP#4 Bid Documents and Specs Cont.
						#4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">9</container>
					<unittitle encodinganalog="title">WNP#4 Contract 123 - Bid Documents and Specs,
						Vol. II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">10 Users Guide Construction Control Schedule
						WPPSS Nuclear Project</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">Bechtel Power Corporation</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">WPPSS-VE and C Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">NP4 "To Go" Cost Review Reports</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">Participants Committee</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">WNP#4 Pay Request Documents</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">PHS Work Papers NP4 Cost to Date</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">Reconciliation of Construction
						Contracts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">Big 6 Contractors, Plant 4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">WNP#4 Contract 123 - Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">WNP#4 Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">10</container>
					<unittitle encodinganalog="title">List of Contracts - WNP4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">11</container>
					<unittitle encodinganalog="title">11 Cost and Comparison WNP-1 P8.1-650 pkg. 1
						of 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">11</container>
					<unittitle encodinganalog="title">W-4 Contract No. 9774-254 Bid Proposal Vol.
						I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">11</container>
					<unittitle encodinganalog="title">Cost and Comparison WNP-1 P8.1378-2029 pkg. 3
						of 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">11</container>
					<unittitle encodinganalog="title">N.P.4 CM and A&amp;E Budget Backup</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">11</container>
					<unittitle encodinganalog="title">N. P. 4 Bechtel 82 Budget</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">12 WNP#4 Contract 223 - Bid Documents and
						Specs</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 137 - Bid Documents, Vol
						II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 137 - Bid Documents and Specs,
						Vol. I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 137 - Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 211 - Front End
						System</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 216 - Front End
						System</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 223 - Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 - Bid Proposal, Vol.
						I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">12</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 - Front End
						System</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">13</container>
					<unittitle encodinganalog="title">13 WNP#5 Pay Request Documents</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">13</container>
					<unittitle encodinganalog="title">WNP#1/4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">13</container>
					<unittitle encodinganalog="title">WNP#3/5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">13</container>
					<unittitle encodinganalog="title">General #55</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">13</container>
					<unittitle encodinganalog="title">Cost and Comparison WNP-1 P8.651-1377 pkg. 2
						of 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 Contract 211 Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 PCS Review - Man-Hours in 1982
						Budget</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#5 Owners Const. Cost PCS - Cost and
						Comparison, 28 Feb. 81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">NP4 To Go Cost Review Staff Comment
						TT</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">Nuclear Fuel Plant 4 Contracts and Actual
						Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 - Nuclear Fuel Reconciliation of
						CTC</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 Contract 216 Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 Contract 218 Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 Front End
						System</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">WNP Prepurchases and Const. Contracts
						Equitable Cost Sharing</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">Telephone/Mail Directory</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">Washington State Law - 60.28.010 -
						Retention</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">14</container>
					<unittitle encodinganalog="title">Panel Agenda - Information and
						Responsibilities</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 Bid Proposal, Vol.
						II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 Bid Proposal, Vol.
						I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 Bid Documents, Vol.
						I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 Bid Documents, Vol.
						II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 253 Bid Documents, Vol.
						III</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">15</container>
					<unittitle encodinganalog="title">WNP#4 Contract 257 Bid Proposal</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">16</container>
					<unittitle encodinganalog="title">Conformed Contract 263, Part I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">16</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 Bid Documents and Specs,
						Vol. I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">16</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 Bid Documents, Vol.
						II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">16</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 Bid Documents and Specs,
						Vol. III</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">16</container>
					<unittitle encodinganalog="title">WNP#4 Contract 254 Bid Documents and Specs,
						Vol. II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">17</container>
					<unittitle encodinganalog="title">Part 4 225 Conformed Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">17</container>
					<unittitle encodinganalog="title">Part 2 225 Conformed Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">17</container>
					<unittitle encodinganalog="title">Part 1 225 Conformed Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">17</container>
					<unittitle encodinganalog="title">Part 3 225 Conformed Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">17</container>
					<unittitle encodinganalog="title">Conformed Contract 263, Part II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">No. 214</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">Conformed Contract 232, Part 2</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">Conformed Contract 214</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">Conformed Contract 226</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">Conformed Contract 232, Part 1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">No. 219</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">18</container>
					<unittitle encodinganalog="title">Conformed Contract 231</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">Conformed Contract 2361238, Part 1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">Conformed Contract 224, Part III</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">Conformed Contract 2361238, Part 2</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">No. 231</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">Bid Pricing Schedule</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">19</container>
					<unittitle encodinganalog="title">Conformed Contract 219</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">20</container>
					<unittitle encodinganalog="title">24 610 July 1981 - 1982 Owners
						Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">20</container>
					<unittitle encodinganalog="title">Conformed Contract 224, Part V</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">20</container>
					<unittitle encodinganalog="title">WNP 4/5 Fuel Contracts Summary</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">20</container>
					<unittitle encodinganalog="title">Conformed Contract 224, Part I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">20</container>
					<unittitle encodinganalog="title">Conformed Contract 224, Part IV</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Chart of Accounts, Tom Henderson</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Nuclear Project Nos. 3 and 5 Progress
						Report</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Nuclear Project Nos. 3 and 5 Progress
						Report</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Contingency</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WNP#5 Owners Const. Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Construction Contracts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">No. 225 Cable Tray Takeoff</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Ebasco A&amp;E Budget</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Construction Management NP5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WNP#5 Nuclear Fuel</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WPPSS Budget Preparation FY82 Criteria, Phases
						I and II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WNP#5 Cost and Comparison to Estimates Report,
						period ending 31 Mar. 81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">No. 265 J. A. Jons. Conc. R8</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">NP5 - Concrete to Date</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WNP#5 A&amp;G Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WNP#5 Staff Report</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">WPPSS Deferral Plans</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">21</container>
					<unittitle encodinganalog="title">Panel Request Reading File, Vol. I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Contract No. 3240-226 Erection of Piping
						Systems and Installation of Mechanical Equipment for Turbine Building and
						Yard and Performance of Related Work</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Total Site Manpower</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">WNP#5 Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Deferral Scenario</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Contract C-0800 Between WPPSS and Ebasco
						Service Incorporated Aug. 21, 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Revised Ebasco (Incentive)
						Contract</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">WNP#5 Reconciliation of General Ledger with
						Budget</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">22 Sept. 81 Meeting Quamme-Langston
						PHS</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">No. 231 - Paint - McMullun</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">NP5 To Go Contract 232 WAC Wallace Superior -
						EAB-TGB</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Contract 225-Fishbach and Moore-Power Cable
						Conduit and Cable Tray Penetrations</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Contract 224 MK E51 Lord Elect.
						Mech.</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Misc. info</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">NP5 Contract 251-226 Piping and Mechanical -
						Peter Kiewit</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">NP5 Contract 263-1229 RAB/FHB Concrete
						Morrison-Knudson</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Contract 2261251 Hangers</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">FY82 Project Schedule Baseline</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Four-week Composite Schedule Week Beginning
						Sept. 21</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Construction Budgets 1982 Estimate at
						Completion</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">Misc. info NP 4/5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">T Topping - copies of memos, etc.</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">22</container>
					<unittitle encodinganalog="title">WNP#5 Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Conformed Contracts 265, Part II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Construction Budget Nuclear Project No.
						5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Construction Budget Nuclear Project No.
						3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Construction Budget Nuclear Project No.
						1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Construction Budgets</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Conformed Contract 265, Part I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Proposal and Pricing Summary with other
						Required Documents, Sept. 1979</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Successful Bid Proposal Contract 225, Part
						2</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Successful Bid Proposal Contract 225, Part
						1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Successful Bid Proposal Contract 225, Part
						3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">23</container>
					<unittitle encodinganalog="title">Successful Bid Proposal Contract 225, Part
						4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">24</container>
					<unittitle encodinganalog="title">24 Miscellaneous</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">25</container>
					<unittitle encodinganalog="title">Heavy Rigging and Performance of Related
						Work</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">25</container>
					<unittitle encodinganalog="title">Daily Log Book, Vol. I of 2
						volumes</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">25</container>
					<unittitle encodinganalog="title">Daily Log Book, Vol. II of 2
						volumes</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">25</container>
					<unittitle encodinganalog="title">WNP-1/4 Contract 259 Major Rigging</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">25</container>
					<unittitle encodinganalog="title">226/251 FY82 LG Bore Welds and
						Values</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">Vol. I, Bidding Documents</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">Vol. II, Appendices</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">WNP#5 Contract 221 Heavy Rigging-Lampson
						Crane</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">No. 232</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">No. 232</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">No. 234</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">26</container>
					<unittitle encodinganalog="title">No. 236</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">Organization Charts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">Reading File, Vol. 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#3 Cost and Comparison to Estimate Report,
						period ending 31 Mar. 81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#5 Contract Escapation Clauses</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#5 Nuclear Fuel</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">Estimate To Go Owners Construction Cost - WNP
						4 and 5 (6 Vol.)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">Reading File, Vol. 1</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">Reading File, Vol. 2</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#5 Reconciliation of Equip/Nat'l
						Contracts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#5 List of Contractors</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">27</container>
					<unittitle encodinganalog="title">WNP#5 Reconciliation of Construction
						Contracts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part V</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part II</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part VI</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part IV</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part 3</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part VII</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Estimate To Go A and G - WNP 4 and 5 (8
						Vol.)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Electric Users Cost Group</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">28</container>
					<unittitle encodinganalog="title">Weekly Report - Working Papers Week of July
						18, 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Termination Study WNP#5 May 1981 prepared by
						R.D. Keck</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Deferral scenarios, 30 Oct. 1981, original
						drafts</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Deferral Scenarios, 30 Oct. 1981,
						DWS</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP 4 Two-year Suspension Ca3L Flaw</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WSU/Hinman NP 4/5 Deferral study DWS Working
						Papers 14 Oct. 81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP5 Deferral 5/5 Study 2-yr., 12 Oct.
						81</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP5 Termination Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Cash Flow Deferral Scenarios
						Explanation</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WSU/WPPSS Agenda for Panel Session, 7-10 July
						91 (81?)</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">To Go NP5 WSU/Hinman</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WSU/WPPSS Staff Study Detail NP4 Actual Costs,
						29 July 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WNP#5 Contract 62A, B and C Ebasco Estimate
						Workpapers</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WNP#5 Contract #2 Ebasco Estimate
						Workpapers</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WNP#5 Contract #4 Ebasco Estimate
						Workpapers</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP5 2/2 Suspension Cash Flow</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP5 Deferral 5/5 Termination, 14 Oct.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Ten-year WNP 4 and 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP4 Deferral-SIS Study 2-yr., 12 Oct.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">NP4 Deferral-SIS Termination, 13 Oct.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Deferrals-Master Copy-incl. worksheets on cash
						flows</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">WNP Termination - "Read" WSU/WPPSS</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Documents shipped Richland to Seattle, 7 Oct.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">29</container>
					<unittitle encodinganalog="title">Conformed Contract 251, Part I</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WSU, Final Report of Panel</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Staff/DWS NP4 "To Go" Cost Review Report, 10
						Sept. 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WSU/WPPSS 4 and 5 Budgets 1982 DWS</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WSU/WPPSS Deferral Scenarios Reference
						Documents, Aug. 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WSU/WPPSS 4 and 5 Study Documents to Read
						Before Filing</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WSU/WPPSS Contracts Modules 1A, 1B, II, IV, V,
						Aug. 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Staff Report NP4 To Go Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Staff Report NP4 To Go Cost</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Governor's Panel Report NP4 NP5, Sept.
						1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Report To Go NP4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Price Adjustment (Escalation) WNP#4 Babcock
						and Wilcox Contract 4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WNP#4 Contract 137 Bechtel
						Estimate</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WNP#4 Contract 123 Bechtel
						Estimate</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Concrete CTC NP4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Hangers NP4 and Report</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">NP4 CTC Electrical-cable trays</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">Large Pipe - CTC NP4</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">NP4 CTC Misc. info</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">1982 Project Construction Budget Preparation
						Criteria, Phase I, 20 Sept. 1981</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">30</container>
					<unittitle encodinganalog="title">WNP#5 Contract #2 NSSS - Combustion
						Engineering, inc.</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Applied Energy Studies 1 of 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Applied Energy Studies 2 of 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Applied Energy Studies 3 of 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Applied Energy Studies 4 of 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Applied Energy Studies 5 of 5</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">Deferral - PHS Copies</unittitle>
				</did>
			</c01>
			<c01 level="file">
				<did>
					<container type="box">Map Tubes</container>
					<unittitle encodinganalog="title">WSU/Hinman Task 2 Report, 30 Sept.
						1981</unittitle>
				</did>
			</c01>

		</dsc> 
	</archdesc> </ead>

