<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE ead PUBLIC "+//ISBN 1-931666-00-8//DTD ead.dtd (Encoded Archival Description (EAD) Version 2002)//EN" "ead.dtd">
<ead>
  <eadheader countryencoding="iso3166-1" dateencoding="iso8601" langencoding="iso639-2b" repositoryencoding="iso15511" relatedencoding="dc" scriptencoding="iso15924">
    <eadid countrycode="US" url="http://archiveswest.orbiscascade.org/ark:/80444/xv00177" identifier="80444/xv00177" mainagencycode="wasmar" encodinganalog="identifier">WaSMAR8101_10.xml</eadid>
    <filedesc>
      <titlestmt>
        <titleproper encodinganalog="title">Guide to the Seattle Department of Transportation Capital Projects and Roadway Structures Digital Photograph Collection 2000-2004<date normal="2000/2022" type="bulk"/></titleproper>
        <titleproper type="filing" altrender="nodisplay">SDOT Capital Projects and Roadway Structures</titleproper>
        <author encodinganalog="creator">Finding aid prepared by Julie B. Viggiano</author>
      </titlestmt>
      <publicationstmt>
        <publisher encodinganalog="publisher">Seattle Municipal Archives</publisher>
        <date encodinganalog="date" calendar="gregorian" era="ce" normal="2010">© 2010</date>
        <address>
          <addressline>PO Box 94728</addressline>
          <addressline>600 Fourth Avenue, Floor 3</addressline>
          <addressline>Seattle 98124-4728</addressline>
          <addressline>archives@seattle.gov</addressline>
          <addressline>http://www.seattle.gov/cityarchives</addressline>
        </address>
      </publicationstmt>
    </filedesc>
    <profiledesc>
      <creation>This finding aid was produced using ArchivesSpace on <date>2023-08-10</date>.</creation>
      <langusage>Finding aid written in <language langcode="eng" encodinganalog="language" scriptcode="latn">English</language>.</langusage>
      <descrules>Finding aid based on DACS (Describing Archives: A Content Standard), 2nd Edition.</descrules>
    </profiledesc>
  </eadheader>
  <archdesc level="series" relatedencoding="marc21" type="inventory">
    <did>
      <repository>
        <corpname encodinganalog="852$a">Seattle Municipal Archives</corpname>
      </repository>
      <unittitle encodinganalog="245$a">Department of Transportation Capital Projects and Roadway Structures Digital Photographs</unittitle>
      <origination>
        <corpname source="lcnaf" encodinganalog="110">Seattle (Wash.). Dept. of Transportation</corpname>
      </origination>
      <unitid countrycode="US" repositorycode="wasmar" encodinganalog="099">8101-10</unitid>
      <physdesc>
        <extent encodinganalog="300$a">898 digital image files</extent>
      </physdesc>
      <unitdate normal="2000/2022" type="bulk" encodinganalog="245$g">2000-2022</unitdate>
      <abstract encodinganalog="5203_">Digital photographs documenting the construction of the West Galer Flyover Project in Interbay.</abstract>
      <langmaterial><language langcode="eng" scriptcode="Latn" encodinganalog="546">English</language>
.    </langmaterial>
    </did>
    <bioghist encodinganalog="5451_">
      <p>The Seattle Department of Transportation (SDOT) was formed by combining transportation planning from the former Strategic Planning Office (SPO) with the former Seattle Transportation Department (SeaTran) to bring a more comprehensive approach to transportation service delivery. A major element of SDOT's creation was the establishment of the Policy, Planning, and Major Project's division, which is charged with transportation system planning and providing increased control and influence over major projects under construction in Seattle.</p>
      <p>SDOT is currently organized into eight divisions. The Director's Office, Human Resources, and Communications constitute the Executive management division. The Capital Projects and Roadway Structures division includes the Transportation Capital Improvement Program and operation and maintenance of the city's bridges and other structures. Street Use &amp; Urban Forestry provides permitting for all work including planting, pruning, and removal of trees. Responsibility for long-range transportation planning, and developing transportation policy for the city of Seattle falls to the Policy &amp; Planning division. Initiation of large projects and program development is lead by the Major Projects division. Financial oversight of the department, information systems and administrative support is directed by the Resource Management division. The Street Maintenance division has responsibility for street resurfacing, cleaning and general maintenance and Traffic Management is responsible for operation of the city's street system, and neighborhood and operational programs.</p>
      <p>This department has had a long evolution beginning with the Department of Streets and Sewers which was responsible for planning, construction, repair, and cleaning of the City's streets, sidewalks, and sewers. City Council appointed Seattle's first Street Commissioner in 1875. The position came under the jurisdiction of the Board of Public Works in 1890. The position of Superintendent of Streets, Sewers and Parks was established in 1896; authority over parks was removed in 1904. In 1936 the Engineering Department assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department and the Department became the Maintenance Division of the Engineering Department.</p>
      <p>An ordinance creating a Department of Transportation was passed in July 1971. The legislation provided for the appointment of the Director of Transportation, specified the duties of the Transit Advisory Board, provided for the Seattle Transit Commission, and transferred all remaining operational aspects to the newly organized department. The Seattle Transportation Department was created in 1997 when the traffic and transportation functions of the Engineering Department were consolidated. By June 2002, SDOT and SPO consolidated to form a newly organized department which absorbed responsibilities for maintenance and operation of streets, bridges, retaining walls and seawalls, and traffic control systems in the City. An ordinance passed in 2004 changed the department's name to Seattle Department of Transportation (SDOT). </p>
    </bioghist>
    <odd encodinganalog="500">
      <p>
        <extref href="http://archives.seattle.gov/digital-collections/index.php/Search/objects/search/ca_collections.idno%3A8101-10">8101-10 in the Photograph Index</extref>
      </p>
    </odd>
    <scopecontent encodinganalog="5202_">
      <p>Images include the construction of the West Galer Flyover Project in Interbay and detail construction of the overpass from early in the project. Also included are images documenting DOT projects on the Mercer Corridor, NE 45th Viaduct, and the Lake City Way multi-modal project. FEMA repairs and road improvements are featured, as well as images from projects in the bridge rehabilitation and replacement program, including the Jose Rizal bridge painting. Also included are images of the Duwamish bike trail. 
Recently added project photographs include Fairview Ave N Replacement Bridge reopening, public stairway upgrades, and Aurora Ave N sidewalk upgrades and tree preservation.</p>
    </scopecontent>
    <accessrestrict encodinganalog="506">
      <p>Records are open to the public.</p>
    </accessrestrict>
    <prefercite encodinganalog="524">
      <p>[Item number.] Seattle Department of Transportation Capital Projects and Roadway Structures Digital Photograph Collection, Record Series 8101-10.Seattle Municipal Archives.</p>
    </prefercite>
    <acqinfo encodinganalog="541">
      <p>Photographs acquired through the Seattle Municipal Archives Digital Image Management Program.</p>
    </acqinfo>
    <accruals encodinganalog="584">
      <p>This series may grow due to continued accessioning through the Digital Image Management Program. This finding aid will be updated to reflect additional accessions.</p>
    </accruals>
    <controlaccess>
      <controlaccess>
        <corpname source="lcnaf" encodinganalog="610">Seattle (Wash.). Dept. of Transportation</corpname>
      </controlaccess>
      <controlaccess>
        <geogname source="nwda" encodinganalog="651">Seattle</geogname>
        <geogname source="local" encodinganalog="651">Interbay</geogname>
        <geogname source="lcsh" encodinganalog="651">Seattle (Wash.)</geogname>
      </controlaccess>
      <controlaccess>
        <subject source="lcsh" encodinganalog="650">Road construction--Washington (State)--Seattle</subject>
        <subject source="lcsh" encodinganalog="650">Bridges--Design and construction--Washington (State)--Seattle</subject>
        <subject source="lcsh" encodinganalog="650">Transportation--Washington (State)--Seattle</subject>
        <subject source="lcsh" encodinganalog="650">Construction equipment--Washington (State)--Seattle--Photographs</subject>
        <subject source="lcsh" encodinganalog="650">Construction--Washington (State)--Seattle</subject>
        <subject source="lcsh" encodinganalog="650">Viaducts--Design and construction--Washington (State)--Seattle--Photographs</subject>
        <subject source="nwda" encodinganalog="650">Photographs</subject>
      </controlaccess>
    </controlaccess>
  </archdesc>
</ead>

